{"meta":{"query_hash":"9abd40a0cd12","filters":{"venue":"Reliable and sustainable electric power and energy systems management"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/9abd40a0cd12","api":"https://metacan.xera.ac/api/v1/cohort?venue=Reliable+and+sustainable+electric+power+and+energy+systems+management"},"results":[{"id":"W2571709326","doi":"10.1007/978-981-10-2230-2_6","title":"Sustainable Energy Optimization in a Smart Microgrid","year":2017,"lang":"en","type":"book-chapter","venue":"Reliable and sustainable electric power and energy systems management","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Microgrid; Renewable energy; Reliability engineering; Energy storage; Reliability (semiconductor); Automotive engineering; Engineering; Distributed generation; Photovoltaic system; Power (physics); Electrical engineering","score_opus":0.0022638980171425242,"score_gpt":0.15586088308216517,"score_spread":0.15359698506502265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2571709326","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012491416,0.078968294,0.32189107,0.006874254,0.0029103856,0.00004763977,0.00016387181,0.00054086075,0.5761122],"genre_scores_gemma":[0.3419278,0.11441636,0.094314404,0.0016144958,0.002629609,0.00014468298,0.00033484027,0.0005780336,0.4440398],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99990165,0.000021870941,0.000003652353,0.000014359108,0.000050265066,0.000008119414],"domain_scores_gemma":[0.99995124,0.000022325505,0.00000391581,0.000008263233,0.00000970757,0.000004547386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001630716,0.0007053636,0.00041259965,0.00030406725,0.00020590157,0.0010116247,0.00038892793,0.0005331003,0.0044371444],"category_scores_gemma":[0.00024397051,0.00025195433,0.000345243,0.0007579402,0.00063930993,0.0013195619,0.0006627991,0.0011852758,0.0012354037],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028431372,0.000058638925,0.00013545506,0.0004189782,0.00004791934,0.00009737759,0.000115497685,0.13820189,0.002528236,0.55105835,0.06332434,0.24398492],"study_design_scores_gemma":[0.0000076098127,0.00003377705,0.00023194677,0.00020683552,0.00001535094,0.000104964194,0.00007628147,0.06939227,0.0014422217,0.61265093,0.3158188,0.000019007039],"about_ca_topic_score_codex":0.0005566348,"about_ca_topic_score_gemma":0.00092777645,"teacher_disagreement_score":0.0044371444,"about_ca_system_score_codex":0.00052501954,"about_ca_system_score_gemma":0.00046938437,"threshold_uncertainty_score":0.014843762},"labels":[],"label_agreement":null},{"id":"W2576778469","doi":"10.1007/978-981-10-2230-2","title":"Sustainable Power Systems","year":2017,"lang":"en","type":"book","venue":"Reliable and sustainable electric power and energy systems management","topic":"Renewable energy and sustainable power systems","field":"Energy","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Power (physics); Physics","score_opus":0.004458877907415172,"score_gpt":0.19525754621756483,"score_spread":0.19079866831014966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2576778469","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00037686861,0.0066439193,0.0132986335,0.0019632808,0.0021636905,0.00004334768,0.0002190746,0.00042389857,0.9748674],"genre_scores_gemma":[0.0067899125,0.007893305,0.0043786615,0.0009303621,0.0006506692,0.00006206973,0.00035307326,0.00021396288,0.978728],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994708,0.000058164816,0.0000127343565,0.000068607034,0.00035352827,0.000036175094],"domain_scores_gemma":[0.99986243,0.000021554359,0.0000070819447,0.000034798366,0.000059854206,0.000014299974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031521925,0.0011504869,0.0005635491,0.0010645549,0.00091379794,0.0028150226,0.0008023026,0.0013199213,0.09496152],"category_scores_gemma":[0.0006675237,0.00035866653,0.00037450134,0.0012640083,0.0007915847,0.0027715203,0.0023237893,0.0017888084,0.058658987],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010576639,0.00003595383,0.000085642474,0.00022990174,0.000012085687,0.00008871188,0.00013241904,0.0013933552,0.00094008155,0.21602957,0.47595954,0.30508214],"study_design_scores_gemma":[0.0000015670978,0.0000051600155,0.000050784645,0.000057441488,0.0000016255938,0.000047707304,0.000028475162,0.00031093645,0.00016955941,0.033650164,0.96567386,0.000002709575],"about_ca_topic_score_codex":0.0013129876,"about_ca_topic_score_gemma":0.0036437477,"teacher_disagreement_score":0.09496152,"about_ca_system_score_codex":0.0011386566,"about_ca_system_score_gemma":0.0013603016,"threshold_uncertainty_score":0.31767797},"labels":[],"label_agreement":null},{"id":"W2577567932","doi":"10.1007/978-981-10-2230-2_1","title":"Reliability Assessment of Power Grid Supporting Sustainable Transportation","year":2017,"lang":"en","type":"book-chapter","venue":"Reliable and sustainable electric power and energy systems management","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Grid; Automotive engineering; Power grid; Electric power system; Engineering; Penetration (warfare); Power (physics); Computer science; Operations research","score_opus":0.002528347094859158,"score_gpt":0.19399773627262634,"score_spread":0.19146938917776718,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2577567932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16818017,0.011232291,0.6710042,0.001283485,0.00040389498,0.00015991495,0.0005607868,0.0015094561,0.14566576],"genre_scores_gemma":[0.96399975,0.0027978094,0.019142853,0.000045935383,0.00013476756,0.0000437452,0.00031156593,0.00014210108,0.013381461],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999703,0.00009416171,0.0000071332893,0.000028002818,0.00014611267,0.000021522126],"domain_scores_gemma":[0.9996301,0.00017034092,0.000024657962,0.00003641869,0.00012793242,0.000010533489],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044113793,0.0005241063,0.00034416938,0.00072078785,0.00019088377,0.0007848439,0.00056983484,0.00039891238,0.0025076126],"category_scores_gemma":[0.0014416476,0.000248099,0.0003215607,0.00059365865,0.0003380637,0.00075064617,0.00031954827,0.00045612908,0.0005889337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012272599,0.00003212736,0.0013906723,0.00024141822,0.00006103671,0.00018732049,0.00011808827,0.77842045,0.00729665,0.047664203,0.00918702,0.15527828],"study_design_scores_gemma":[0.000008597546,0.00011648528,0.0015553136,0.00007769552,0.000031375544,0.00014455423,0.0000952681,0.9149831,0.0034483674,0.06607683,0.01344444,0.000017955057],"about_ca_topic_score_codex":0.0019273738,"about_ca_topic_score_gemma":0.0014771101,"teacher_disagreement_score":0.0025076126,"about_ca_system_score_codex":0.00065435475,"about_ca_system_score_gemma":0.00037964052,"threshold_uncertainty_score":0.008388877},"labels":[],"label_agreement":null}]}