{"meta":{"query_hash":"9462ac53adae","filters":{"venue":"Report"},"cohort_total":230,"direct_labels_cover":0,"predictions_cover":230,"exported":230,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/9462ac53adae","api":"https://metacan.xera.ac/api/v1/cohort?venue=Report"},"results":[{"id":"W1965191467","doi":"10.2749/222137809796078694","title":"Structural connections for massive timber plate elements in hybrid structures","year":2009,"lang":"en","type":"article","venue":"Report","topic":"Civil and Structural Engineering Research","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of British Columbia; Natural Resources Canada; New Brunswick Innovation Foundation","keywords":"Structural engineering; Composite number; Engineering; Action (physics); Computer science; Geology; Materials science; Composite material; Physics","score_opus":0.014477905621619064,"score_gpt":0.2759629511099631,"score_spread":0.26148504548834406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965191467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963936,0.00010091868,0.0011412083,0.00005502923,0.0004253283,0.0002627138,0.000024090858,0.0001767832,0.0014202889],"genre_scores_gemma":[0.99812794,0.000013129757,0.0013232204,0.000010199106,0.000115375224,0.000019170075,0.0000638064,0.000017538578,0.00030961854],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990073,0.000003980076,0.00029032718,0.00017016436,0.0001528754,0.000375372],"domain_scores_gemma":[0.9996571,0.00002762512,0.000026257476,0.0001722984,0.0000352929,0.00008141532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000069459325,0.00013708616,0.0001624927,0.00011565304,0.000046238685,0.000030535914,0.00007388674,0.0000442491,0.000114374685],"category_scores_gemma":[0.00006489107,0.00012474631,0.00005979708,0.00010005093,0.000011421289,0.00009061828,0.000010148939,0.00015781612,0.0000036262422],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053053107,0.0000120947225,0.024411473,0.00019268664,0.0001496758,0.0010456103,0.00022970037,0.9211076,0.014417796,0.0028024495,0.0051508155,0.030427072],"study_design_scores_gemma":[0.0012562348,0.00011840198,0.556439,0.000040768846,0.00002082767,0.0010318437,0.000030045792,0.40644646,0.010454285,0.0133907115,0.010132525,0.0006389187],"about_ca_topic_score_codex":0.000015264393,"about_ca_topic_score_gemma":0.000018887724,"teacher_disagreement_score":0.5320275,"about_ca_system_score_codex":0.000111184556,"about_ca_system_score_gemma":0.000016509031,"threshold_uncertainty_score":0.50870067},"labels":[],"label_agreement":null},{"id":"W1966198258","doi":"10.2749/222137807796120355","title":"Structural steel maintenance and rehabilitation methods of current Canadian infrastructure","year":2007,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Preventive maintenance; Scope (computer science); Bridge (graph theory); Engineering; Rehabilitation; Planned maintenance; Public infrastructure; Proactive maintenance; Maintenance engineering; Bridge maintenance; Transport engineering; Business; Forensic engineering; Computer science; Operations management; Reliability engineering; Political science","score_opus":0.012123403156728116,"score_gpt":0.30469696494476545,"score_spread":0.29257356178803734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966198258","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.990253,0.00027784923,0.0067995805,0.000028894825,0.00056771294,0.00011890717,0.0000061038804,0.00004392524,0.001904053],"genre_scores_gemma":[0.9865782,0.000008052491,0.013347336,0.000006625001,0.000023048644,0.0000015066998,0.000005314041,0.000007356271,0.000022549371],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9993376,0.000016568529,0.0002939119,0.00012109892,0.0000798365,0.00015095227],"domain_scores_gemma":[0.9994388,0.00010199505,0.00004372411,0.00019962358,0.000079738915,0.00013612492],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058713724,0.00007553461,0.00012656862,0.00007262142,0.00002287346,0.000005955907,0.000036324265,0.00004792504,0.000039978782],"category_scores_gemma":[0.00040940024,0.00006776178,0.000032796463,0.000106208834,0.000051148047,0.000049709583,0.000011135912,0.00010649377,3.329696e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020208168,0.0000025526947,0.37797728,0.00045189346,0.000015300677,0.000057504032,0.0016871549,0.0008165224,0.028949067,0.0018242436,0.0021388761,0.5860594],"study_design_scores_gemma":[0.00010302136,0.000016604967,0.9685972,0.000026465843,0.0000067641686,0.00013355378,0.00015190804,0.0032335995,0.0014985186,0.0009164478,0.025203947,0.0001120179],"about_ca_topic_score_codex":0.0011666805,"about_ca_topic_score_gemma":0.0063273706,"teacher_disagreement_score":0.59061986,"about_ca_system_score_codex":0.00011024769,"about_ca_system_score_gemma":0.00005655021,"threshold_uncertainty_score":0.35308215},"labels":[],"label_agreement":null},{"id":"W1967052792","doi":"10.2749/222137807796120076","title":"Punching Shear Retrofit of Reinforced Concrete Flat Slabs Subjected to Static and reversed Cyclic Loads","year":2007,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Structural engineering; Slab; Punching; Retrofitting; Ductility (Earth science); Shear (geology); Reinforcement; Dissipation; Materials science; Reinforced concrete; Geotechnical engineering; Geology; Engineering; Composite material; Creep","score_opus":0.009271365858256584,"score_gpt":0.24084269023295138,"score_spread":0.2315713243746948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967052792","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99133277,0.00004961932,0.0032980673,0.000018593817,0.00033748895,0.0003567018,0.000005374739,0.00031896014,0.0042824466],"genre_scores_gemma":[0.99197173,0.000010323915,0.0069622933,0.000040645344,0.000052267653,0.0000051988172,0.000023916533,0.0000501806,0.00088345463],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9981319,0.0000106447105,0.0007873414,0.000255344,0.00038128294,0.00043352885],"domain_scores_gemma":[0.99889666,0.00010244572,0.00015388952,0.00049762375,0.000106934465,0.00024246592],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004489704,0.00024481374,0.00041418007,0.0002112598,0.000046085384,0.000027620643,0.00012708211,0.0001412427,0.000064735395],"category_scores_gemma":[0.00028923387,0.00024770678,0.00008129701,0.00036272345,0.00005260407,0.0001865389,0.000054098702,0.0002361327,0.000013586804],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038255956,9.222021e-9,0.0032343152,0.00009034368,0.00004646619,0.0004963519,0.00038039192,0.00027865567,0.99389917,0.000103659826,0.00011759998,0.0013147607],"study_design_scores_gemma":[0.0006006033,0.00011852485,0.019938417,0.00012575129,0.00007851739,0.0009005574,0.00015722476,0.0023953419,0.97372675,0.000013930202,0.0014694658,0.00047491203],"about_ca_topic_score_codex":0.00015257989,"about_ca_topic_score_gemma":0.000002212013,"teacher_disagreement_score":0.020172436,"about_ca_system_score_codex":0.00012878254,"about_ca_system_score_gemma":0.00003456153,"threshold_uncertainty_score":0.9999975},"labels":[],"label_agreement":null},{"id":"W1979405370","doi":"10.2749/222137807796157904","title":"A risk-based approach to corrosion protection and maintenance of steel bridges","year":2007,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Prioritization; Probabilistic logic; Coating; Corrosion; Reliability engineering; Computer science; Bridge maintenance; Optimal maintenance; Operations research; Risk analysis (engineering); Engineering; Structural engineering; Business; Materials science","score_opus":0.014869798811352928,"score_gpt":0.22357299876131181,"score_spread":0.2087031999499589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979405370","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63657814,0.000023846522,0.36117533,0.0000086686,0.000076826036,0.00023368196,0.0000022519662,0.00008600863,0.0018152648],"genre_scores_gemma":[0.99770993,0.0000043570644,0.0021200725,0.0000110446845,0.000017782038,0.000014288447,0.0000025478662,0.0000099289955,0.00011003531],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99935967,0.000009389388,0.00024329177,0.00015395021,0.00011750996,0.0001161915],"domain_scores_gemma":[0.999572,0.000021730108,0.000058351732,0.0002152399,0.00006039962,0.000072325034],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005996755,0.0000715908,0.000119092365,0.000050463022,0.000024790492,0.0000063745665,0.000029537354,0.00004606021,0.0000036895146],"category_scores_gemma":[0.00020010993,0.000064783395,0.00003096852,0.00012269024,0.000020207042,0.000027076201,0.000013853791,0.000082864426,0.000001555261],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002852706,0.00010815284,0.14015107,0.00069791195,0.00000871853,0.00007735862,0.0005022455,0.017513204,0.7704787,0.0001136666,0.00094234856,0.06912132],"study_design_scores_gemma":[0.00051410735,0.00012382834,0.6993653,0.000091054135,0.000019517522,0.0002608779,0.00016009345,0.10747006,0.18428981,0.00002942582,0.007386054,0.0002898362],"about_ca_topic_score_codex":0.00007043106,"about_ca_topic_score_gemma":0.000018672246,"teacher_disagreement_score":0.5861889,"about_ca_system_score_codex":0.00004315728,"about_ca_system_score_gemma":0.000012678794,"threshold_uncertainty_score":0.26417902},"labels":[],"label_agreement":null},{"id":"W2065199071","doi":"10.2749/222137807796119663","title":"Design of the Golden Ears Bridge","year":2007,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Span (engineering); Deck; Structural engineering; Pier; Beam bridge; Engineering; Key (lock); Computer science","score_opus":0.017113550410063495,"score_gpt":0.23164837045399986,"score_spread":0.21453482004393637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2065199071","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22849105,0.00005499508,0.7683072,0.00001412336,0.00024264245,0.000044129876,3.81273e-7,0.0001111347,0.0027343286],"genre_scores_gemma":[0.9985264,0.0000034341217,0.0010400498,0.0000057726807,0.000027111359,6.128989e-7,8.799886e-7,0.000007775759,0.000387983],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99962413,0.0000030670658,0.0001601986,0.00004456836,0.000095605734,0.000072408104],"domain_scores_gemma":[0.99975014,0.000016608195,0.000024638863,0.00017147136,0.000017159382,0.000019980354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015501298,0.000042648877,0.00006466566,0.000028293714,0.000011476193,0.0000036863503,0.00005406799,0.000024231025,0.000023261546],"category_scores_gemma":[0.000023490587,0.000030726635,0.00004304438,0.00016196647,0.000011255693,0.000020979678,0.0000063323664,0.000043927677,0.0000033734918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014710351,0.0000022153847,0.0023807005,0.000019130512,0.00007201781,0.000046385212,0.000106859676,0.95062304,0.038700014,0.000121155026,0.001164708,0.006762332],"study_design_scores_gemma":[0.00014816623,0.000010559422,0.538775,0.000026916041,0.00006332516,0.00047101354,0.000036941707,0.20764244,0.24762775,0.00010438665,0.0048563457,0.0002371379],"about_ca_topic_score_codex":0.000015680602,"about_ca_topic_score_gemma":0.0000017154671,"teacher_disagreement_score":0.7700353,"about_ca_system_score_codex":0.000017448572,"about_ca_system_score_gemma":0.0000062000768,"threshold_uncertainty_score":0.12529957},"labels":[],"label_agreement":null},{"id":"W2079081985","doi":"10.2749/222137809796067524","title":"ACMC – Performance Based Code for Design, Construction and Maintenance","year":2009,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canadian Celiac Association","keywords":"Serviceability (structure); Computer science; Code (set theory); Programming language; Engineering; Civil engineering","score_opus":0.011096911504471832,"score_gpt":0.21945238604168213,"score_spread":0.2083554745372103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079081985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28713274,0.00007555315,0.70946866,0.000078433106,0.00078916823,0.0002752115,0.000004101563,0.0002447738,0.0019313825],"genre_scores_gemma":[0.91127646,0.00002805556,0.08836436,0.000044992812,0.00015903925,0.000016224936,0.000004460896,0.000011922349,0.000094479896],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994563,0.000002694432,0.00016122093,0.00012271306,0.00006359423,0.00019347903],"domain_scores_gemma":[0.9997088,0.000016066084,0.000036202815,0.00013523917,0.00006687466,0.000036829006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013707302,0.00009438877,0.00010767059,0.0000341755,0.00005627897,0.00001731111,0.000035700265,0.00004877494,0.000002630811],"category_scores_gemma":[0.000043715998,0.00008622877,0.000021113645,0.000059671693,0.000022486547,0.0000906213,0.0000030188005,0.00006509233,8.446911e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022735125,0.000025631276,0.025532624,0.0005299514,0.000086211716,0.0003733495,0.0002908278,0.1617104,0.1420146,0.001765158,0.014711828,0.6527321],"study_design_scores_gemma":[0.0021472115,0.0004546524,0.09258121,0.0004204856,0.00008020384,0.003866596,0.000120568664,0.38283917,0.36486164,0.0029937762,0.14853169,0.0011027931],"about_ca_topic_score_codex":5.19052e-7,"about_ca_topic_score_gemma":3.872902e-7,"teacher_disagreement_score":0.65162927,"about_ca_system_score_codex":0.000041677325,"about_ca_system_score_gemma":0.000022731232,"threshold_uncertainty_score":0.35163072},"labels":[],"label_agreement":null},{"id":"W2315952674","doi":"10.2749/222137900796313960","title":"Rehabilitation of the Cummings Bridge, Ottawa, Canada","year":2000,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Rehabilitation; Computer science; Medicine; Physical therapy","score_opus":0.0028304174981494206,"score_gpt":0.18182249390302274,"score_spread":0.17899207640487333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315952674","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905665,0.00003579834,0.0008149691,0.0001728257,0.00017189475,0.000037506223,0.0000024206488,0.00005676584,0.008141351],"genre_scores_gemma":[0.9983179,0.0000022029658,0.00022754548,0.000013126572,0.000019130313,0.0000020446132,0.0000036226133,0.0000063537304,0.0014080729],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995785,0.0000041440762,0.00018339285,0.000052876756,0.00012346637,0.000057645164],"domain_scores_gemma":[0.9997406,0.000020295774,0.000020439069,0.00017825757,0.000021433518,0.000018947852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004627405,0.000044645505,0.00006910121,0.000013703565,0.000017060811,0.0000033108574,0.000046013047,0.000016364189,0.00020805566],"category_scores_gemma":[0.000041149826,0.00003360846,0.000040652023,0.00015097077,0.000011619902,0.000027059428,0.000002241287,0.000039388357,0.0000015418259],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.838772e-7,0.0000028766397,0.009432772,0.000060821505,0.000058984406,0.000013600378,0.00015432715,0.93907344,0.0019117313,0.00013731299,0.022722669,0.026430495],"study_design_scores_gemma":[0.00010997012,0.000008749875,0.7351515,0.00003024875,0.000039681127,0.0001220923,0.00004281069,0.09322307,0.011418225,0.00007995396,0.15957886,0.00019483021],"about_ca_topic_score_codex":0.07404159,"about_ca_topic_score_gemma":0.038853236,"teacher_disagreement_score":0.84585035,"about_ca_system_score_codex":0.000049050315,"about_ca_system_score_gemma":0.000034711094,"threshold_uncertainty_score":0.9786852},"labels":[],"label_agreement":null},{"id":"W2318005565","doi":"10.2749/222137810796062860","title":"Montreal – Aquatic Complex for 2005 FINA World Championships","year":2010,"lang":"en","type":"article","venue":"Report","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Human settlement; Consolidation (business); Civil engineering; Environmental science; Engineering; Geotechnical engineering; Business","score_opus":0.01467095034598287,"score_gpt":0.24586456498468695,"score_spread":0.23119361463870408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2318005565","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8233131,0.00006078686,0.042135604,0.00075623876,0.0016080794,0.00086092093,0.000014730651,0.000679365,0.13057119],"genre_scores_gemma":[0.9914204,0.0000013776558,0.0040002856,0.000038174567,0.00027173097,0.00004658304,0.000048957936,0.00002343806,0.0041490914],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99917537,0.0000063995935,0.0002751352,0.00015837619,0.000103042694,0.00028166958],"domain_scores_gemma":[0.9993636,0.00008956514,0.000037650178,0.0003831907,0.000038193248,0.000087827015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025116693,0.00011927741,0.00016342575,0.00006233218,0.00007780858,0.000029788705,0.00008345666,0.000065502696,0.0002498304],"category_scores_gemma":[0.0001502201,0.000111543355,0.00007901628,0.000091367954,0.00003546674,0.00008549378,0.000013110672,0.00020151166,0.000008530794],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008818605,0.00029351303,0.13612734,0.00113036,0.00042595618,0.0008024487,0.0015075313,0.0058300328,0.032233924,0.022335399,0.72175497,0.07747034],"study_design_scores_gemma":[0.00036773918,0.000023748873,0.1723339,0.0000056774347,0.000031923984,0.0003015267,0.000087724606,0.031085385,0.0006110974,0.0626308,0.7321636,0.0003568316],"about_ca_topic_score_codex":0.00008163634,"about_ca_topic_score_gemma":0.0029562472,"teacher_disagreement_score":0.16810727,"about_ca_system_score_codex":0.000057384925,"about_ca_system_score_gemma":0.000050640218,"threshold_uncertainty_score":0.4548606},"labels":[],"label_agreement":null},{"id":"W2318454144","doi":"10.2749/222137814814068346","title":"The construction engineering of the digital design of free forms.","year":2014,"lang":"en","type":"article","venue":"Report","topic":"Architecture and Art History Studies","field":"Arts and Humanities","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Constructive; Foundation (evidence); Architecture; Quarter (Canadian coin); Computer science; Architectural engineering; Engineering; Set (abstract data type); Construction engineering; Programming language; Process (computing); Geography","score_opus":0.01340265971932354,"score_gpt":0.16754599507433485,"score_spread":0.15414333535501132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2318454144","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37424892,0.00068975025,0.019972695,0.0009546835,0.0030544982,0.00054619124,0.000023731556,0.00011211165,0.6003974],"genre_scores_gemma":[0.9981263,0.0000023898576,0.000075642434,0.0000058925243,0.00009864625,0.00000254572,3.250663e-7,0.0000036224517,0.001684637],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999671,0.0000051222473,0.00014767394,0.00004060019,0.000084389736,0.00005126096],"domain_scores_gemma":[0.99959695,0.00006810722,0.000111130284,0.00018378088,0.000034027984,0.0000059708973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010027292,0.00003834266,0.000067761706,0.000010139979,0.0001819714,0.000009805529,0.00007486047,0.0000069152197,0.000007911411],"category_scores_gemma":[0.00013089659,0.000018232562,0.000046197907,0.000008683995,0.00022773999,0.000032065564,0.00003709398,0.000032247015,6.4858887e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035919285,0.000047620026,0.00567327,0.00012127873,0.00030921062,0.000008912299,0.036770243,0.0014525629,0.0013043979,0.88772553,0.014957466,0.051593594],"study_design_scores_gemma":[0.000064598134,0.00003769405,0.00076014246,0.000020389876,0.000016230046,0.000049533057,0.0005654309,0.00011434235,0.000933326,0.005334368,0.99204934,0.000054603825],"about_ca_topic_score_codex":0.0000064321575,"about_ca_topic_score_gemma":0.000019418236,"teacher_disagreement_score":0.97709185,"about_ca_system_score_codex":0.000004743768,"about_ca_system_score_gemma":0.000010063855,"threshold_uncertainty_score":0.13995953},"labels":[],"label_agreement":null},{"id":"W2319004439","doi":"10.2749/222137813808626966","title":"Innovative erection methods for long span roofs: two outstanding examples","year":2013,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Span (engineering); Roof; Schedule; Engineering; Feature (linguistics); Civil engineering; Structural engineering; Computer science","score_opus":0.030631614643108793,"score_gpt":0.34610878102331755,"score_spread":0.31547716638020873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2319004439","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057275828,0.000059591064,0.94012487,0.00002634191,0.0004109348,0.00014875091,9.949129e-7,0.00036247162,0.0015902361],"genre_scores_gemma":[0.91466016,0.000004705232,0.08465319,0.000009317667,0.00011798269,0.000068046465,0.00003197986,0.000024635852,0.0004299949],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993691,0.000010984316,0.00027044961,0.00013582747,0.00006644823,0.0001472062],"domain_scores_gemma":[0.99956006,0.00006648065,0.000050585644,0.00014977201,0.00013198194,0.00004112843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020785857,0.00010956884,0.00016006146,0.00012455528,0.00004732305,0.000048873924,0.000039669474,0.00004148172,0.00010896134],"category_scores_gemma":[0.00013284302,0.00009994256,0.00005944408,0.00036951347,0.000010142553,0.0001702741,0.000007795023,0.000073556126,0.0000073705414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004026421,0.0000075984503,0.0076592173,0.00014216031,0.00049802434,0.000014648476,0.00053266337,0.6243963,0.072296396,0.001356956,0.0018836425,0.29120836],"study_design_scores_gemma":[0.0002732947,0.000020749872,0.035213143,0.00002885329,0.000047300102,0.00016280707,0.00028916128,0.8717632,0.08354283,0.0011158728,0.007163871,0.00037888234],"about_ca_topic_score_codex":0.000089911446,"about_ca_topic_score_gemma":0.000009509112,"teacher_disagreement_score":0.8573843,"about_ca_system_score_codex":0.000082972365,"about_ca_system_score_gemma":0.00000871469,"threshold_uncertainty_score":0.40755394},"labels":[],"label_agreement":null},{"id":"W2319022796","doi":"10.2749/222137814814070019","title":"Sustainability of Infrastructures vs. Climate Changes","year":2014,"lang":"en","type":"article","venue":"Report","topic":"Civil and Structural Engineering Research","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Snow; Storm; Flooding (psychology); Extreme weather; Winter storm; Sustainability; Environmental science; Rain and snow mixed; Climate change; Global warming; Meteorology; Climatology; Environmental resource management; Geography; Geology; Ecology; Oceanography","score_opus":0.004072574044033068,"score_gpt":0.2312734679873122,"score_spread":0.2272008939432791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2319022796","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9899359,0.00008391597,0.0017175588,0.0001022525,0.00025343208,0.00010128625,0.0000050273934,0.00023602312,0.0075646066],"genre_scores_gemma":[0.99958223,0.00002381352,0.0002158832,0.0000030777678,0.00007442018,0.0000062651425,0.000007171443,0.0000140372895,0.000073082745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99932945,0.000007712319,0.00016987354,0.000103140104,0.00016304858,0.000226769],"domain_scores_gemma":[0.9995351,0.00003181983,0.000023012368,0.00027048576,0.00008524138,0.000054336953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002293806,0.00008618731,0.00016052555,0.000060453833,0.000018895958,0.000008923633,0.00008161697,0.000048137324,0.00005252964],"category_scores_gemma":[0.0002223068,0.000073261814,0.000036443267,0.00010561781,0.000033184988,0.00003094587,0.000034886787,0.00010101101,0.0000013591629],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000086071355,0.000041477706,0.18259898,0.010408796,0.00025904216,0.00048111813,0.0012754288,0.40022737,0.06145275,0.01436712,0.0075584813,0.32124335],"study_design_scores_gemma":[0.00029691373,0.00012797644,0.84402674,0.00004693148,0.000019034302,0.0004191137,0.000056933866,0.057623964,0.03482761,0.0064832866,0.055634186,0.0004373034],"about_ca_topic_score_codex":0.000027475775,"about_ca_topic_score_gemma":0.000015707952,"teacher_disagreement_score":0.6614278,"about_ca_system_score_codex":0.000043961245,"about_ca_system_score_gemma":0.000012171517,"threshold_uncertainty_score":0.298753},"labels":[],"label_agreement":null},{"id":"W2326905881","doi":"10.2749/222137815818358466","title":"Challenges in the Evaluation of Existing Concrete Structures: Margaret Avenue Bridge","year":2015,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Regional Municipality of Waterloo","funders":"","keywords":"Demolition; Bridge (graph theory); Joint (building); Forensic engineering; Engineering; Closure (psychology); Slab; Span (engineering); Civil engineering; Structural engineering; Political science; Law","score_opus":0.2592390341010645,"score_gpt":0.35760525646381075,"score_spread":0.09836622236274623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326905881","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97042644,0.0024006113,0.0018656853,0.00012241796,0.00029098106,0.00013855076,0.0000034944992,0.00008497277,0.024666863],"genre_scores_gemma":[0.99971217,0.000031017207,0.00015593825,0.0000043737723,0.000059498932,0.000005162254,0.00001658044,0.000008127155,0.000007152388],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925125,0.000039472434,0.00021550928,0.00008153031,0.00033674372,0.000075495765],"domain_scores_gemma":[0.9996071,0.000027265054,0.00004765404,0.00020394429,0.00009127948,0.000022792727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094089593,0.00006397227,0.00010821049,0.000055788223,0.000008764761,0.000008249659,0.00006692365,0.000035582765,0.000009133899],"category_scores_gemma":[0.0002736723,0.000049645936,0.00002955193,0.00012399699,0.000012220393,0.00004254808,0.000005801825,0.0000728605,0.0000012512485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055507276,0.000002180235,0.0016622695,0.00013238072,0.000120901066,0.00010110814,0.008065946,0.894556,0.001644368,0.003332237,0.0010075067,0.08936955],"study_design_scores_gemma":[0.0006820326,0.000028625265,0.2111339,0.00006528603,0.00014267532,0.0006026651,0.002453999,0.77395576,0.0030505713,0.0026685155,0.0049137194,0.0003022281],"about_ca_topic_score_codex":0.00003034794,"about_ca_topic_score_gemma":0.00002054944,"teacher_disagreement_score":0.20947163,"about_ca_system_score_codex":0.00004644302,"about_ca_system_score_gemma":0.000025325558,"threshold_uncertainty_score":0.20245026},"labels":[],"label_agreement":null},{"id":"W2326946398","doi":"10.2749/222137900796313889","title":"Dynamic Testing of the Sherbrooke Pedestrian Bridge","year":2000,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Université de Sherbrooke","keywords":"Bridge (graph theory); Pedestrian; Engineering; History; Computer science; Library science; Civil engineering","score_opus":0.011685324556531056,"score_gpt":0.2183396263036142,"score_spread":0.20665430174708313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326946398","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9816485,0.00008026946,0.0031107175,0.000021383848,0.000117542026,0.00003711294,0.0000013845383,0.00017302118,0.014810053],"genre_scores_gemma":[0.99811536,0.000007792918,0.000655121,0.0000050570015,0.00001727969,0.0000016169895,0.0000026190294,0.0000111275185,0.0011840026],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995696,0.0000036370257,0.00019106698,0.00006488034,0.000092317714,0.00007848206],"domain_scores_gemma":[0.99971366,0.000013888233,0.000021993346,0.00021363272,0.000014714708,0.00002208669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000046295998,0.000060115122,0.000085854175,0.000020762143,0.000023036126,0.00000775286,0.00006619175,0.000025397394,0.00015447843],"category_scores_gemma":[0.000036402686,0.000044879413,0.00005778321,0.00022984065,0.000013744632,0.000030032095,0.000004741282,0.00006134362,0.0000072565654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.569377e-7,0.0000026410974,0.004873068,0.00005228265,0.000043443957,0.000022409306,0.00005299347,0.9218785,0.0071396655,0.000011480966,0.00015745446,0.06576538],"study_design_scores_gemma":[0.00008636776,0.000005516304,0.2613839,0.00003902454,0.000034969715,0.00031784686,0.00000851408,0.7274236,0.0052125137,0.000048667745,0.00530916,0.00012989627],"about_ca_topic_score_codex":0.00004709006,"about_ca_topic_score_gemma":0.000012393845,"teacher_disagreement_score":0.25651082,"about_ca_system_score_codex":0.000023596145,"about_ca_system_score_gemma":0.000009587611,"threshold_uncertainty_score":0.18301293},"labels":[],"label_agreement":null},{"id":"W2327239125","doi":"10.2749/222137815818356945","title":"Durability Features of the Vimy Memorial Bridge","year":2015,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Durability; Span (engineering); Engineering; Default gateway; Overhead (engineering); Arch bridge; Civil engineering; Forensic engineering; Arch; Computer science; Electrical engineering; Computer network; Database","score_opus":0.017362473652768686,"score_gpt":0.23748827660844538,"score_spread":0.22012580295567669,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2327239125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.982171,0.000098791206,0.0050762086,0.00011217956,0.0018992196,0.00006741187,0.0000035264952,0.00018595267,0.010385709],"genre_scores_gemma":[0.9994368,0.0000012246286,0.00014556515,0.000004926341,0.00013642645,0.0000016551304,0.0000032990454,0.0000064354763,0.00026368405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99955714,0.0000073858237,0.00016085892,0.00006301046,0.00015058726,0.000061008508],"domain_scores_gemma":[0.999616,0.000009116844,0.000028800858,0.00026157536,0.000046172612,0.00003828355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011813122,0.000054732147,0.000097739,0.000017196578,0.000011329953,0.000006541623,0.00006773926,0.00003169014,0.000014688315],"category_scores_gemma":[0.00013804491,0.000036002046,0.00007053664,0.00013735119,0.00001995451,0.000032121265,0.000012742685,0.00006331625,0.0000020128011],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019652922,0.000021612464,0.021139132,0.00015115262,0.00035774393,0.00006759552,0.000935323,0.88815475,0.022161547,0.0011786962,0.053254094,0.0125587275],"study_design_scores_gemma":[0.0004289283,0.000016721695,0.8326457,0.000019160789,0.000095910545,0.00051115133,0.0000853602,0.03054869,0.11693942,0.0007094245,0.017699514,0.00030003168],"about_ca_topic_score_codex":0.00006495081,"about_ca_topic_score_gemma":0.000010163936,"teacher_disagreement_score":0.85760605,"about_ca_system_score_codex":0.000031326268,"about_ca_system_score_gemma":0.000020042095,"threshold_uncertainty_score":0.14681208},"labels":[],"label_agreement":null},{"id":"W2329112848","doi":"10.2749/222137813806548578","title":"Brunette River Bridge: New Upgrade, New Constraints","year":2013,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Span (engineering); Civil engineering; Upgrade; Pipeline (software); Deck; Girder; Corrosion; Forensic engineering; Prestressed concrete; Engineering; Environmental science; Structural engineering; Computer science; Materials science","score_opus":0.011182818795024942,"score_gpt":0.21355399998993188,"score_spread":0.20237118119490694,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2329112848","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31846383,0.00044024736,0.63604605,0.0009610661,0.0013020806,0.00027691046,0.000003108126,0.001794032,0.04071269],"genre_scores_gemma":[0.9819722,0.00001800119,0.0035527179,0.00007491714,0.00026531503,0.000002723854,0.000019814197,0.000024141737,0.014070173],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9993164,0.0000030300748,0.00023722519,0.0001355138,0.00013545305,0.00017238736],"domain_scores_gemma":[0.99950397,0.0000103216635,0.000030045167,0.00022898751,0.00002388198,0.00020279038],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000028139444,0.00012283438,0.00014676,0.00006458107,0.000019740804,0.000042304673,0.00006934271,0.00005803334,0.0016700448],"category_scores_gemma":[0.000027678952,0.00011734073,0.000079636186,0.00017003852,0.000028924233,0.00013494639,0.000009721902,0.00010026897,0.0003807784],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.904735e-7,0.000004969191,0.0034576487,0.000035807414,0.00036117615,0.00025940666,0.00032652947,0.1130494,0.009698622,0.0007264574,0.6286467,0.24343233],"study_design_scores_gemma":[0.00097124884,0.000026274143,0.52332795,0.00006238904,0.000171723,0.0024971045,0.000054046148,0.21648338,0.01243411,0.0021281904,0.2405412,0.0013024],"about_ca_topic_score_codex":0.00072188023,"about_ca_topic_score_gemma":0.0000061938067,"teacher_disagreement_score":0.66350836,"about_ca_system_score_codex":0.000032484437,"about_ca_system_score_gemma":0.00004284267,"threshold_uncertainty_score":0.99924254},"labels":[],"label_agreement":null},{"id":"W2329406074","doi":"10.2749/222137813806735525","title":"Assessment of End Zone Cracking in Precast Prestressed NU Girders in Bridges","year":2013,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Serviceability (structure); Girder; Precast concrete; Structural engineering; Cracking; Prestressed concrete; Engineering; Shear (geology); Durability; Bearing capacity; Geotechnical engineering; Materials science; Composite material","score_opus":0.012569179623620015,"score_gpt":0.2576053536264073,"score_spread":0.2450361740027873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2329406074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9921852,0.000066319844,0.00074306066,0.0000497436,0.00009911319,0.00023784071,0.0000010541524,0.00005647404,0.006561207],"genre_scores_gemma":[0.9994156,0.00001959215,0.00039785303,0.0000061357246,0.000011631448,0.00003669286,0.0000053745885,0.0000113237265,0.000095839976],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99913245,0.000019862402,0.0004140125,0.00014828696,0.0001412754,0.00014412048],"domain_scores_gemma":[0.99954903,0.00005715259,0.000055444896,0.00026669516,0.000033058197,0.000038596518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022262124,0.000082061815,0.00017928079,0.00007947839,0.0000063553393,0.000016195054,0.000059942628,0.000048966554,0.00025202212],"category_scores_gemma":[0.0000815735,0.00008381366,0.00003216267,0.00012764255,0.000020066347,0.000106796535,0.000025991249,0.00011970785,0.0000035643639],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018925164,0.000038797014,0.92667943,0.00014475505,0.000004671411,0.00010863054,0.00018672642,0.011783009,0.053625558,0.000020867901,0.00022154982,0.0071840985],"study_design_scores_gemma":[0.00018167053,0.000008826112,0.9526541,0.00006879748,0.00000194923,0.000019297397,0.0000782976,0.042231355,0.004236123,0.000017787997,0.00041629202,0.00008550473],"about_ca_topic_score_codex":0.0010364306,"about_ca_topic_score_gemma":0.00035831777,"teacher_disagreement_score":0.049389433,"about_ca_system_score_codex":0.000082935054,"about_ca_system_score_gemma":0.000041251333,"threshold_uncertainty_score":0.3417822},"labels":[],"label_agreement":null},{"id":"W2329737160","doi":"10.2749/222137815818358862","title":"Accelerated Bridge Construction using Ceramic Concrete Slabs","year":2015,"lang":"en","type":"article","venue":"Report","topic":"Magnesium Oxide Properties and Applications","field":"Materials Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Read Jones Christoffersen (Canada); University of British Columbia; University of Alberta","funders":"","keywords":"Precast concrete; Materials science; Slab; Fabrication; Cracking; Ceramic; Composite material; Bending; Cement; Portland cement; Structural engineering; Compressive strength; Stiffness; Tension (geology); Ultimate tensile strength; Engineering","score_opus":0.123650999834269,"score_gpt":0.3145629223416612,"score_spread":0.19091192250739222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2329737160","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99138016,0.000056274363,0.0018055384,0.00017310643,0.00039711574,0.00015516163,0.000005830254,0.00012456637,0.0059022256],"genre_scores_gemma":[0.99430645,0.0000023520822,0.0047742967,0.000063176456,0.00013190883,0.000013862251,0.000012379305,0.000011103439,0.00068446336],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991247,0.000023950968,0.00028588128,0.00023109753,0.0001734552,0.00016088913],"domain_scores_gemma":[0.9992374,0.0000066915823,0.00016242515,0.00028590273,0.00021051343,0.000097072276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030790968,0.000080966136,0.00012059974,0.000023952154,0.000094079725,0.00008896868,0.00008930987,0.00004487068,0.00030025997],"category_scores_gemma":[0.00006570272,0.000070664166,0.000023629429,0.00012033679,0.00008461227,0.00015623661,0.000049380073,0.000046333167,0.00014879412],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000086221025,0.0000018271262,0.0011737003,0.0000072211974,0.0000020109699,0.000042808184,0.000059905982,0.000039791164,0.997335,0.00040025424,0.00062311656,0.00030574633],"study_design_scores_gemma":[0.00054380775,0.000054170392,0.0024491716,0.000020132908,0.00004844004,0.0055692904,0.00026933025,0.006175707,0.9387024,0.00081338815,0.04493273,0.00042144288],"about_ca_topic_score_codex":0.00077576254,"about_ca_topic_score_gemma":0.000003017428,"teacher_disagreement_score":0.05863261,"about_ca_system_score_codex":0.00006357467,"about_ca_system_score_gemma":0.00019131669,"threshold_uncertainty_score":0.3287636},"labels":[],"label_agreement":null},{"id":"W2330374193","doi":"10.2749/222137815818357377","title":"Preliminary Design of the New Bridge for the St Lawrence River","year":2015,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Arup Group (Canada)","funders":"","keywords":"Bridge (graph theory); Shore; Pier; Civil engineering; Span (engineering); Engineering; Girder; General partnership; Liberian dollar; Architectural engineering; Construction engineering; Transport engineering; Geology; Business","score_opus":0.04641690864675744,"score_gpt":0.2538976879141871,"score_spread":0.20748077926742967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330374193","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006375785,0.00026705163,0.9924452,0.000161717,0.00031930098,0.00013418164,0.000002729112,0.00006789342,0.00022615836],"genre_scores_gemma":[0.9966819,0.0000072867006,0.0022892943,0.000011883329,0.00006355971,0.00000730357,0.0000022458191,0.000008650869,0.0009278252],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996465,0.0000050676754,0.00012765774,0.000054551547,0.00010266815,0.00006359028],"domain_scores_gemma":[0.99961907,0.000051716655,0.000032102074,0.00022793078,0.000037599097,0.000031572403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012061525,0.00005093355,0.00006747133,0.000011970802,0.000020581272,0.0000067930832,0.00009965805,0.000021854454,0.000007145424],"category_scores_gemma":[0.000090726455,0.000028543293,0.000051993953,0.000101679114,0.00002113595,0.00003331185,0.000012167128,0.000038770246,0.0000013642742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003906834,0.0000011221292,0.00013285896,0.0000086378595,0.00004326801,0.000002395995,0.0001855706,0.9711229,0.00037256881,0.00009680449,0.024869516,0.003160415],"study_design_scores_gemma":[0.00016664504,0.000028919485,0.023506332,0.00001555574,0.00009489341,0.00010984434,0.000042703974,0.9493897,0.008656593,0.00036214697,0.017521597,0.00010504214],"about_ca_topic_score_codex":0.00004713249,"about_ca_topic_score_gemma":0.0000013694712,"teacher_disagreement_score":0.99030614,"about_ca_system_score_codex":0.000016605909,"about_ca_system_score_gemma":0.000036449386,"threshold_uncertainty_score":0.11639617},"labels":[],"label_agreement":null},{"id":"W2331181690","doi":"10.2749/222137810796024015","title":"Exploring Issues of Aesthetics in a Railway Environment: the Infrastructure of Stratford City, London","year":2010,"lang":"en","type":"article","venue":"Report","topic":"Urban Design and Spatial Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Redevelopment; Quarter (Canadian coin); Transport engineering; Quality (philosophy); Architectural engineering; Engineering; Civil engineering; Business; Geography; Archaeology","score_opus":0.02751165332804386,"score_gpt":0.21288207322313163,"score_spread":0.18537041989508776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2331181690","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99794525,0.00010393353,0.00070285075,0.000027492395,0.000064106935,0.00005925882,0.000001465647,0.000016153866,0.0010794925],"genre_scores_gemma":[0.9990939,0.00018821658,0.0005500351,0.0000017153967,0.000029732033,0.0000059928143,0.0000026302157,0.000010155493,0.00011762372],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99935555,0.0000065931517,0.0003104805,0.00007708403,0.00015935051,0.00009095692],"domain_scores_gemma":[0.9995946,0.0000131424695,0.00007229558,0.0002873207,0.000011375365,0.00002123953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016049099,0.00007637836,0.00016788718,0.00005938944,0.000010152093,0.000005061165,0.00009997267,0.000044003475,0.00010813759],"category_scores_gemma":[0.000017721368,0.000056029316,0.00005819461,0.00010963242,0.00004545766,0.00006127707,0.000020503674,0.00016521101,0.0000012232684],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018977522,0.000108827815,0.40357783,0.00018368197,0.00021786313,0.00028343487,0.0038179853,0.070299804,0.47074932,0.0012360683,0.00045198546,0.049054198],"study_design_scores_gemma":[0.00063264143,0.00014600823,0.40277594,0.00009734078,0.00018994238,0.00026760827,0.0005099042,0.030062927,0.5193076,0.004674059,0.040701404,0.0006346029],"about_ca_topic_score_codex":0.00012534129,"about_ca_topic_score_gemma":0.00008433538,"teacher_disagreement_score":0.04855828,"about_ca_system_score_codex":0.000009220144,"about_ca_system_score_gemma":0.00000788504,"threshold_uncertainty_score":0.22848092},"labels":[],"label_agreement":null},{"id":"W2334436015","doi":"10.2749/222137814814067851","title":"Burgoyne Bridge Designed to Respect History of Site and to Create a New Landmark","year":2014,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Demolition; Landmark; Context (archaeology); Arch; Civil engineering; Process (computing); Span (engineering); Engineering; Arch bridge; Stakeholder; Architectural engineering; Construction engineering; Computer science; Archaeology; Geography; Political science","score_opus":0.011671051102469838,"score_gpt":0.215494662721761,"score_spread":0.20382361161929116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2334436015","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71348333,0.0001601612,0.28087088,0.000088224886,0.0001900683,0.0000729867,0.0000012629773,0.00018051731,0.004952576],"genre_scores_gemma":[0.99168414,0.0000055218734,0.003396111,0.000042434443,0.0000689368,0.0000026095954,0.0000040114414,0.000014689126,0.004781563],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99951756,0.000007933311,0.00018077313,0.00011516537,0.00008756318,0.000091000366],"domain_scores_gemma":[0.9995931,0.000025249352,0.000021356222,0.00019379132,0.00002193787,0.0001446134],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013356555,0.00007717752,0.00016326836,0.00011072282,0.0000084292205,0.0000062905638,0.000033068747,0.000026359503,0.000044660617],"category_scores_gemma":[0.00012602935,0.000074583884,0.00003331649,0.00011806101,0.000005275007,0.000026789408,0.000011002437,0.000037835074,0.000010958669],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007704529,0.000010363568,0.011724265,0.00020837762,0.0002857532,0.00017413948,0.0028260886,0.3870593,0.40458167,0.00037558537,0.14182502,0.0508524],"study_design_scores_gemma":[0.0006392264,0.00020807164,0.40276736,0.00012232087,0.00015956794,0.00035220134,0.000018657214,0.0753267,0.030858027,0.00007693251,0.48868108,0.000789851],"about_ca_topic_score_codex":0.0002438953,"about_ca_topic_score_gemma":0.000026117037,"teacher_disagreement_score":0.3910431,"about_ca_system_score_codex":0.00008088229,"about_ca_system_score_gemma":0.000017383258,"threshold_uncertainty_score":0.30414426},"labels":[],"label_agreement":null},{"id":"W2334731754","doi":"10.2749/222137815818359221","title":"Numerical Investigation of an RC Column Retrofitted with Steel Brace","year":2015,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Structural engineering; Brace; OpenSees; Retrofitting; Ductility (Earth science); Column (typography); Materials science; Shear (geology); Shear wall; Finite element method; Engineering; Composite material; Creep; Connection (principal bundle)","score_opus":0.02130883235502424,"score_gpt":0.23708138383874114,"score_spread":0.2157725514837169,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2334731754","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99702567,0.000015758143,0.0006607518,0.000014692206,0.00012931711,0.00011361076,0.0000013603707,0.00022494038,0.0018139238],"genre_scores_gemma":[0.9928056,3.6378918e-7,0.006851121,0.000009573319,0.000038615843,0.000006444774,0.000032341482,0.000023067765,0.00023287909],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992193,0.000009788002,0.00024157697,0.00011858788,0.00028721834,0.00012355758],"domain_scores_gemma":[0.9993243,0.000009015656,0.000088293324,0.00030022225,0.00011930064,0.0001588378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009936416,0.00009517458,0.00015768617,0.0000376797,0.000014206226,0.00001698476,0.000074220145,0.00006252288,0.000012756312],"category_scores_gemma":[0.00004676762,0.00008647382,0.00002039969,0.00018059992,0.000051496412,0.00019738116,0.0000087886365,0.00009785386,0.000004852312],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015669224,0.0000024958163,0.5588943,0.00019179075,0.00019988514,0.0024053943,0.0022463268,0.066713236,0.35766563,0.0003457199,0.0028355643,0.008343027],"study_design_scores_gemma":[0.0012119478,0.0006265703,0.3766492,0.00008140592,0.00011207346,0.0037283762,0.00025939778,0.05211551,0.5623079,0.00014879211,0.0020586487,0.00070016406],"about_ca_topic_score_codex":0.00012166834,"about_ca_topic_score_gemma":0.0000021855992,"teacher_disagreement_score":0.2046423,"about_ca_system_score_codex":0.00007004369,"about_ca_system_score_gemma":0.000097097654,"threshold_uncertainty_score":0.35263},"labels":[],"label_agreement":null},{"id":"W2335086523","doi":"10.2749/222137814814067329","title":"Built-up Wrought-Iron Compression Member with Missing Stitch Rivets","year":2014,"lang":"en","type":"article","venue":"Report","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Rivet; Chord (peer-to-peer); Structural engineering; Pedestrian; Bridge (graph theory); Truss; Engineering; Arch; Truss bridge; Forensic engineering; Computer science; Civil engineering; Database","score_opus":0.01265383735710723,"score_gpt":0.24097381878776247,"score_spread":0.22831998143065524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335086523","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97445756,0.00008726576,0.005425237,0.000050877115,0.00032638447,0.00005982401,6.419987e-7,0.00040628054,0.019185908],"genre_scores_gemma":[0.9948352,0.000004185898,0.0035829789,0.000013231781,0.00015490202,0.0000037341356,0.00001508584,0.0000393155,0.0013513821],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99899006,0.000015459642,0.00024916758,0.00024225644,0.00027796088,0.00022510676],"domain_scores_gemma":[0.9992398,0.000034476125,0.00007537553,0.0005063378,0.000048337595,0.000095689975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012930165,0.00016583606,0.00023368321,0.00006114527,0.00007813523,0.000045803015,0.00010669798,0.00007186705,0.00010230436],"category_scores_gemma":[0.000053931977,0.00012890741,0.0000567985,0.00015215833,0.0000276159,0.00009932494,0.00003462681,0.00015861841,0.000032981297],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040176863,0.000025983805,0.11547848,0.00036523148,0.0004185991,0.0007935582,0.00059634075,0.113378026,0.72541445,0.000119657896,0.0063936994,0.036975823],"study_design_scores_gemma":[0.00097040925,0.00007271251,0.21967661,0.00050578173,0.00042544896,0.002574329,0.00005903484,0.14934015,0.5629614,0.00052408315,0.061606605,0.0012834232],"about_ca_topic_score_codex":0.0001986339,"about_ca_topic_score_gemma":0.000022378104,"teacher_disagreement_score":0.16245301,"about_ca_system_score_codex":0.00005742722,"about_ca_system_score_gemma":0.0000110689525,"threshold_uncertainty_score":0.52566916},"labels":[],"label_agreement":null},{"id":"W2335275161","doi":"10.2749/222137813808626759","title":"Dynamic Train-Bridge Interaction in Monorail Sao Paulo Metro Line 2","year":2013,"lang":"en","type":"article","venue":"Report","topic":"Railway Engineering and Dynamics","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bogie; Monorail; Bridge (graph theory); Track (disk drive); Structural engineering; Engineering; Line (geometry); Frame (networking); Vibration; Computer science; Mechanical engineering; Acoustics; Physics","score_opus":0.00945045663269553,"score_gpt":0.23214434193207434,"score_spread":0.2226938852993788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335275161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9702172,0.00011424699,0.0243251,0.00005536276,0.000700496,0.00015054,0.0000038407134,0.0004379162,0.00399528],"genre_scores_gemma":[0.997437,0.000036030437,0.0016178704,0.000010923617,0.000050778563,0.000045921508,0.0000537686,0.000046008307,0.00070168334],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910057,0.000006708792,0.0003690922,0.00017034929,0.000114802715,0.00023845409],"domain_scores_gemma":[0.9995595,0.000026980533,0.000037210488,0.00027652588,0.000029500432,0.00007028567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014078217,0.00015163478,0.00018803323,0.00017100414,0.000013671166,0.00003612764,0.000072678915,0.00008431784,0.000057764537],"category_scores_gemma":[0.00005570859,0.00015796185,0.000058606653,0.0002068879,0.0000075274643,0.00018972029,0.00001268132,0.00023811458,0.00010746668],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003820637,0.000055655833,0.0053680297,0.00011087524,0.00006460412,0.00048795348,0.00027086,0.95256776,0.010138451,0.00002763065,0.0011514183,0.029752955],"study_design_scores_gemma":[0.00014350949,0.000018207753,0.07372358,0.000030283743,0.0000068539694,0.00021149359,0.000054932767,0.9235574,0.0002446146,0.00009877853,0.0017064989,0.00020382622],"about_ca_topic_score_codex":0.00017535924,"about_ca_topic_score_gemma":0.0001633951,"teacher_disagreement_score":0.068355545,"about_ca_system_score_codex":0.000193027,"about_ca_system_score_gemma":0.000012237652,"threshold_uncertainty_score":0.6441497},"labels":[],"label_agreement":null},{"id":"W2465713267","doi":"10.2749/222137816819258573","title":"Galvanic Corrosion Protection for Bridge Structures","year":2016,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cathodic protection; Galvanic anode; Galvanic cell; Corrosion; Galvanic corrosion; Anode; Reinforced concrete; Bridge (graph theory); Bridge deck; Overlay; Engineering; Materials science; Environmental science; Deck; Forensic engineering; Metallurgy; Structural engineering; Computer science; Chemistry; Electrode","score_opus":0.028094323712991344,"score_gpt":0.24914907318136167,"score_spread":0.22105474946837034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2465713267","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.725422,0.000039369446,0.27185762,0.00010866986,0.00093350257,0.00045770511,0.000008708916,0.000426545,0.0007458158],"genre_scores_gemma":[0.9991095,0.000007349054,0.00019742326,0.00001088153,0.00010040593,0.000057832673,0.0000036885435,0.000015749356,0.00049713405],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99946845,0.000005671663,0.00017979495,0.00014499703,0.000083623585,0.00011745686],"domain_scores_gemma":[0.9996174,0.000024984563,0.000031602838,0.00023403,0.00004737633,0.000044581797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013015077,0.00007351749,0.00008827353,0.000023249648,0.000035241974,0.00000998612,0.000037769623,0.000053361993,0.00009934],"category_scores_gemma":[0.000169796,0.000049430073,0.000060659087,0.000041356383,0.000012557625,0.00005999551,0.00001075449,0.000035366975,0.000013214512],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022718434,0.0000031353952,0.0017915238,0.000057818528,0.0000026118103,0.000012042006,0.000020267627,0.000028382245,0.92968374,0.000117554795,0.003316585,0.06494361],"study_design_scores_gemma":[0.0011542141,0.00015512398,0.17693643,0.00010275077,0.000031087842,0.0008676864,0.000011129795,0.005339383,0.5633616,0.004663638,0.2467921,0.0005848704],"about_ca_topic_score_codex":0.000005877149,"about_ca_topic_score_gemma":0.000007640523,"teacher_disagreement_score":0.36632216,"about_ca_system_score_codex":0.00006378499,"about_ca_system_score_gemma":0.000014735096,"threshold_uncertainty_score":0.20156999},"labels":[],"label_agreement":null},{"id":"W2561100343","doi":"10.2749/vancouver.2017.1312","title":"Seismic Performance of Perforated Steel Plate Shear Walls Designed According to Canadian Seismic Provisions","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Steel plate shear wall; Shear wall; Structural engineering; Infill; Stiffness; Dissipation; Finite element method; Seismic analysis; Shear (geology); Ductility (Earth science); Reinforced concrete; Materials science; Geotechnical engineering; Geology; Engineering; Composite material; Physics","score_opus":0.016772476513060065,"score_gpt":0.2416548716508584,"score_spread":0.2248823951377983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2561100343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99305975,0.000033287855,0.0012710075,0.00020958652,0.0002774907,0.00022522497,0.000013905673,0.00011366975,0.004796089],"genre_scores_gemma":[0.99782574,0.0000731592,0.0004673492,0.00011941931,0.0000864541,0.000023133138,0.000026256153,0.00004498902,0.0013335176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998491,0.000008245634,0.00049239845,0.00027307903,0.0002315414,0.00050376955],"domain_scores_gemma":[0.9984589,0.000012584678,0.0001526212,0.0009321183,0.00013329089,0.00031044777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036799052,0.00021760252,0.0003710023,0.0003277695,0.0004363619,0.00009147734,0.0004054375,0.000112210684,0.000046534307],"category_scores_gemma":[0.00007425817,0.00021299128,0.000101294354,0.00022974188,0.000037995494,0.00045690913,0.000054525273,0.00018562007,0.00011828126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022062466,0.000020206651,0.1167709,0.00018905962,0.00023897982,0.0003078688,0.00044772218,0.84192514,0.019046197,0.0000041992002,0.0025136645,0.01851401],"study_design_scores_gemma":[0.00019603885,0.000058422134,0.033279557,0.00014833387,0.000055924116,0.0001479618,0.00013495731,0.943956,0.014387638,0.0000050245494,0.0072952313,0.00033487062],"about_ca_topic_score_codex":0.015816571,"about_ca_topic_score_gemma":0.0013883465,"teacher_disagreement_score":0.10203091,"about_ca_system_score_codex":0.00021948446,"about_ca_system_score_gemma":0.000328182,"threshold_uncertainty_score":0.9907372},"labels":[],"label_agreement":null},{"id":"W2767992473","doi":"10.2749/222137815815775989","title":"Controlling Wind Response with Innovative Damper Technology","year":2015,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tower; Damper; Aerodynamics; Wind tunnel; Engineering; Structural engineering; Tuned mass damper; Wind engineering; Architectural engineering; Aerospace engineering","score_opus":0.011069025535113882,"score_gpt":0.2295723283008827,"score_spread":0.21850330276576882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2767992473","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89362323,0.00008199422,0.10357816,0.00018892302,0.00010738072,0.000052485437,9.889633e-7,0.0005234117,0.0018434431],"genre_scores_gemma":[0.9972736,0.0000010418477,0.0022913099,0.000014269087,0.000030042956,0.0000046596897,0.00000582625,0.000016713011,0.00036250142],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994966,0.000006934116,0.00016750117,0.000102528415,0.00011315386,0.00011328419],"domain_scores_gemma":[0.99955976,0.000017273442,0.000029917406,0.00018693497,0.00015899495,0.00004714723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001818711,0.000087820845,0.00014114573,0.00018783002,0.000016621269,0.0000128768215,0.00004447792,0.000058626614,0.000012696708],"category_scores_gemma":[0.00014275577,0.000069143636,0.0000147223645,0.00072651164,0.000029161998,0.00006278464,0.0000069434896,0.00010345245,0.000011060318],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023943918,0.000005683542,0.005611837,0.000010342075,0.0002987985,0.0007793481,0.00032563592,0.9640242,0.024548266,0.0006564909,0.0008237314,0.0026762367],"study_design_scores_gemma":[0.0055491757,0.00057452027,0.046041243,0.00015528855,0.00022365346,0.007909958,0.0039127064,0.63505685,0.13076271,0.0010801159,0.16661282,0.002120946],"about_ca_topic_score_codex":0.0000038046505,"about_ca_topic_score_gemma":0.0000014714599,"teacher_disagreement_score":0.32896733,"about_ca_system_score_codex":0.00005646863,"about_ca_system_score_gemma":0.000041493342,"threshold_uncertainty_score":0.28195956},"labels":[],"label_agreement":null},{"id":"W2772150635","doi":"10.2749/222137817822208870","title":"Fatigue Damage Identification in Precast Truss Girders Using Relative Wavelet Entropy","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Precast concrete; Girder; Structural engineering; Truss; Fibre-reinforced plastic; Wavelet; Prestressed concrete; Truss bridge; Materials science; Computer science; Engineering; Artificial intelligence","score_opus":0.06871274980092612,"score_gpt":0.3618936181407813,"score_spread":0.2931808683398552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772150635","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99354434,0.000027496899,0.0036597971,0.000041962572,0.000780686,0.0002591601,0.000002453581,0.00028408936,0.001400002],"genre_scores_gemma":[0.99173075,0.000020178846,0.007950267,0.0000018742473,0.00011794091,0.000019173798,0.000008034403,0.000027685652,0.00012409044],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999054,0.000017442197,0.00038721212,0.00018762756,0.00015097372,0.00020275469],"domain_scores_gemma":[0.99904966,0.000019633573,0.00020295466,0.0006402184,0.00003981409,0.00004769259],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026137521,0.000111783,0.00014549933,0.00008887087,0.00013914917,0.000064107786,0.00016780928,0.00009389344,0.000008196493],"category_scores_gemma":[0.00020948335,0.00011915906,0.000030206114,0.000057864407,0.000038981878,0.00040796996,0.000036312686,0.00019268795,0.0000034700442],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005475099,0.000061108636,0.77976835,0.0009841705,0.0001708391,0.0029451174,0.00458107,0.009266002,0.10637151,0.0044678194,0.0011790235,0.090150245],"study_design_scores_gemma":[0.00013224747,0.000008627793,0.9373754,0.00013009757,0.00000911407,0.000111790774,0.000025432832,0.027752656,0.032014657,0.0017026729,0.00054897275,0.00018832467],"about_ca_topic_score_codex":0.00032088955,"about_ca_topic_score_gemma":0.000018350822,"teacher_disagreement_score":0.15760706,"about_ca_system_score_codex":0.00029177545,"about_ca_system_score_gemma":0.000026558797,"threshold_uncertainty_score":0.48591655},"labels":[],"label_agreement":null},{"id":"W2772283535","doi":"10.2749/222137813806478954","title":"Using Instrumented Quarter-Cars for ‘Drive By’ Bridge Inspection","year":2013,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Science Foundation Ireland","keywords":"Bridge (graph theory); Accelerometer; Structural health monitoring; Structural engineering; Engineering; Computer science","score_opus":0.034933390386526195,"score_gpt":0.3148590248338332,"score_spread":0.279925634447307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772283535","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98478186,0.00003328752,0.012004682,0.000035223562,0.0009510525,0.00051044475,0.0000048255415,0.0012830754,0.00039552563],"genre_scores_gemma":[0.9882286,0.000008691021,0.011403835,0.000010109599,0.00016870289,0.00010353072,0.000017739301,0.0000308835,0.00002788779],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9992686,0.000005262625,0.00027557532,0.00014277967,0.00009950543,0.00020826951],"domain_scores_gemma":[0.99960375,0.000013156334,0.00006222165,0.0001947335,0.00006526161,0.00006085893],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000061542705,0.00010532169,0.00012152782,0.000055061868,0.00006371181,0.000024685107,0.000051735577,0.00007593747,0.000007896018],"category_scores_gemma":[0.00001527956,0.00010987003,0.00003885894,0.00008522357,0.000013226435,0.00017326859,0.0000099718645,0.000086464766,0.000005448486],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029235685,0.00007293456,0.11985505,0.0009964737,0.00031852297,0.0001284184,0.0013722203,0.0012421159,0.3100858,0.00032478827,0.26698032,0.2985941],"study_design_scores_gemma":[0.0010206816,0.00035275958,0.4884235,0.0003162799,0.00007000438,0.0031686125,0.0002253931,0.15294904,0.31855953,0.0041153217,0.029545577,0.0012533105],"about_ca_topic_score_codex":0.0005824031,"about_ca_topic_score_gemma":0.0000028242746,"teacher_disagreement_score":0.36856845,"about_ca_system_score_codex":0.00026183107,"about_ca_system_score_gemma":0.000014418947,"threshold_uncertainty_score":0.44803697},"labels":[],"label_agreement":null},{"id":"W2772379793","doi":"10.2749/222137817822208681","title":"Soil Structure Interaction and Performance Based Design for the Port Mann Cable Stayed Bridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Soil Stabilization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Port (circuit theory); Metre; Span (engineering); Deck; Seismic analysis; Engineering; Structural engineering; Geotechnical engineering; Civil engineering; Geology; Electrical engineering","score_opus":0.02400825400553667,"score_gpt":0.24247031091871568,"score_spread":0.21846205691317902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772379793","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44795936,0.00004929276,0.5507796,0.00007829711,0.00041989333,0.00023736252,0.0000047489193,0.0001736628,0.0002977828],"genre_scores_gemma":[0.99915344,0.000023929533,0.0005412025,0.0000067300402,0.000059349644,0.000027515736,0.000012857074,0.000018833183,0.00015615781],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955815,0.000002867752,0.00013835203,0.0001061095,0.000077491226,0.00011701362],"domain_scores_gemma":[0.9994903,0.000041312764,0.000051761315,0.00034795082,0.000039242685,0.000029440584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019702822,0.000081868886,0.00008496281,0.00001757747,0.00019346178,0.000067907116,0.00007685478,0.000056951634,0.00000776479],"category_scores_gemma":[0.00011845227,0.00006307995,0.000023406246,0.000019821298,0.00001832787,0.00012300938,0.000011503967,0.000093110844,5.9617133e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008037327,0.0000023064845,0.0008377742,0.000065751185,0.000011434821,0.000005398637,0.000016713258,0.99334353,0.00045772977,0.00000492151,0.00035111603,0.0048952657],"study_design_scores_gemma":[0.000116023715,0.000021813148,0.0601953,0.00001699986,0.000015710995,0.000059496124,0.0000048622283,0.9333976,0.0024670507,0.000021429018,0.0036019888,0.000081751554],"about_ca_topic_score_codex":0.00004288369,"about_ca_topic_score_gemma":0.000010494085,"teacher_disagreement_score":0.5511941,"about_ca_system_score_codex":0.000029138651,"about_ca_system_score_gemma":0.000015670428,"threshold_uncertainty_score":0.25723255},"labels":[],"label_agreement":null},{"id":"W2772610077","doi":"10.2749/222137817822208636","title":"Integrating Aesthetic Design and Structural Engineering on a Signature Bridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Signature (topology); Downtown; Mandate; Architectural engineering; Key (lock); Engineering; Structural system; Construction engineering; Computer science; Civil engineering; Computer security; Political science; Geography","score_opus":0.013874747648467084,"score_gpt":0.24186263304661007,"score_spread":0.227987885398143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772610077","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70607054,0.00029932565,0.29106832,0.00011490718,0.00056561636,0.00014783282,0.000002200895,0.00061047194,0.0011207879],"genre_scores_gemma":[0.9941581,0.000013670082,0.0056253416,0.0000098038545,0.00006446683,0.000006253738,0.0000050169215,0.000028318858,0.000089032575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937963,0.00000515816,0.0001763435,0.00016263247,0.00011881671,0.00015740596],"domain_scores_gemma":[0.99946713,0.00002039637,0.000051757885,0.00036436657,0.000021984331,0.00007436262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000098076176,0.00016197473,0.00016326537,0.000071505805,0.00013545349,0.00014623905,0.000108723354,0.00007274078,0.000013469189],"category_scores_gemma":[0.00010209102,0.00013961662,0.000048767073,0.000042523854,0.000021575086,0.00012732916,0.000017606804,0.00020769917,0.0000033952617],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041753906,0.0000014315658,0.00041656347,0.00004326781,0.00006502553,0.000325743,0.00015107534,0.94612426,0.0077458126,0.0007001359,0.00027373366,0.044148806],"study_design_scores_gemma":[0.00011351129,0.0000186043,0.021039668,0.000049923165,0.00002051015,0.00067236676,0.0000076514025,0.972944,0.004285814,0.00007319175,0.000549912,0.00022483703],"about_ca_topic_score_codex":0.000016966194,"about_ca_topic_score_gemma":0.0000014493453,"teacher_disagreement_score":0.28808755,"about_ca_system_score_codex":0.000030708623,"about_ca_system_score_gemma":0.0000070338588,"threshold_uncertainty_score":0.56934005},"labels":[],"label_agreement":null},{"id":"W2773389852","doi":"10.2749/222137817822208780","title":"Eglinton Crosstown and Evergreen Line LRTs - Structural Design on Mass Transit Projects","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Transit (satellite); Rapid transit; Rail transit; Transport engineering; Transit system; Line (geometry); Light rail; Light rail transit; Urban transit; Engineering; Civil engineering; Computer science; Public transport","score_opus":0.021685590324231296,"score_gpt":0.26145994536848427,"score_spread":0.23977435504425298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773389852","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96749145,0.00007215846,0.02123066,0.00019765917,0.00045486164,0.00039276012,0.000003733452,0.00020352703,0.00995317],"genre_scores_gemma":[0.99690384,0.000012793694,0.0020947687,0.000020159727,0.00016590313,0.000009764328,0.00000643631,0.000025700961,0.0007606287],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990186,0.000016048325,0.00025499382,0.0002708159,0.0001778225,0.00026170874],"domain_scores_gemma":[0.9990992,0.00002798585,0.00007380437,0.00064508413,0.00006461612,0.000089340414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022632403,0.00018842134,0.00021525155,0.000039213053,0.00028377704,0.00017161209,0.00013665044,0.00012218642,0.000039343064],"category_scores_gemma":[0.00010950527,0.0001590227,0.000050715636,0.000028773213,0.000094500894,0.00027339158,0.00002006364,0.00019354095,0.0000019788604],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015724708,0.00024338598,0.36716586,0.00401479,0.0018047459,0.02288068,0.013039977,0.17456184,0.085787386,0.0042631184,0.02030996,0.30435577],"study_design_scores_gemma":[0.0029035746,0.0008727671,0.7739277,0.00014678322,0.00017825344,0.0026291434,0.00031710055,0.072950795,0.057474058,0.06206557,0.02453638,0.0019978827],"about_ca_topic_score_codex":0.00008286061,"about_ca_topic_score_gemma":0.000022555914,"teacher_disagreement_score":0.40676183,"about_ca_system_score_codex":0.00010696129,"about_ca_system_score_gemma":0.000066342946,"threshold_uncertainty_score":0.64847577},"labels":[],"label_agreement":null},{"id":"W2773464983","doi":"10.2749/222137817822208933","title":"Radial Floating Ice Deflector: An Innovative Approach","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Arctic and Antarctic ice dynamics","field":"Earth and Planetary Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Manitoba Hydro; SNC-Lavalin (Canada)","funders":"","keywords":"Constructability; Conceptual design; Marine engineering; Process (computing); Engineering; Computer science; Aerospace engineering; Mechanical engineering; Systems engineering","score_opus":0.033150493889557556,"score_gpt":0.2736667225734286,"score_spread":0.24051622868387107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773464983","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8305954,0.000009031184,0.0020618055,0.0000719034,0.0003606241,0.00008510957,0.000007364835,0.00003820035,0.16677058],"genre_scores_gemma":[0.9872245,0.000004095118,0.011444059,0.00010001903,0.00037423876,3.9343416e-7,0.00016802536,0.0000036545605,0.00068102323],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99906045,0.000026027525,0.0002117061,0.0002561481,0.00021307688,0.00023257142],"domain_scores_gemma":[0.99906915,0.000031105214,0.000268649,0.00045960603,0.00007918267,0.00009231361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046924347,0.00009922032,0.00013174636,0.000028732997,0.00071490783,0.00013216409,0.00025714003,0.000055451048,0.0002446412],"category_scores_gemma":[0.00027069435,0.000082518534,0.000029023215,0.00007124869,0.00012232708,0.0004558929,0.00001804049,0.00015076285,0.000044104105],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000125820725,0.000015664094,0.9670127,0.00000983113,0.00001633164,0.00021798223,0.0005347043,0.00016957989,0.000027479471,0.00023067399,0.00006714428,0.031685308],"study_design_scores_gemma":[0.00013224133,0.000057406734,0.97427434,0.000006857486,0.000009144492,0.0006706645,0.00032387226,0.020966977,0.00002496627,0.0002911925,0.0030736346,0.00016873295],"about_ca_topic_score_codex":0.0046085953,"about_ca_topic_score_gemma":0.00040371114,"teacher_disagreement_score":0.16608956,"about_ca_system_score_codex":0.0000053250606,"about_ca_system_score_gemma":0.00012300906,"threshold_uncertainty_score":0.6966848},"labels":[],"label_agreement":null},{"id":"W2774248921","doi":"10.2749/222137810796063328","title":"Maximizing Waters of the Niagara River for Power Generation: Challenges Constructing the Niagara Tunnel Intake Approach","year":2010,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Electricity generation; Hydrology (agriculture); Power station; Environmental science; Water resource management; Engineering; Power (physics); Geotechnical engineering; Electrical engineering","score_opus":0.019849895022539078,"score_gpt":0.20934123068930227,"score_spread":0.18949133566676318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2774248921","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9516317,0.0003772992,0.035434417,0.0005290385,0.0026457103,0.0005015427,0.0000071764694,0.00031178963,0.008561321],"genre_scores_gemma":[0.9912504,0.00001691721,0.008360995,0.000015950478,0.0002090689,0.000032625663,0.000004654282,0.000030021278,0.00007936593],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991108,0.000010189866,0.00031877207,0.00018042502,0.0001716947,0.00020808977],"domain_scores_gemma":[0.99928176,0.000052425516,0.00007819259,0.00049282453,0.000058319125,0.000036457583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030383322,0.00015317684,0.00017676063,0.000028740385,0.00012023461,0.000026011989,0.00021439698,0.00013564172,0.00000608856],"category_scores_gemma":[0.00011684966,0.00009083511,0.0001264971,0.00006775236,0.00012556552,0.000053611293,0.00004063563,0.0003395469,5.230955e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019206125,0.00006712432,0.0007305663,0.0006050413,0.00065909,0.000043137043,0.004791467,0.5780877,0.32773897,0.06476396,0.0028096025,0.019684158],"study_design_scores_gemma":[0.004036443,0.0002704047,0.05480304,0.0003450107,0.0007362622,0.017045764,0.0051557203,0.29685318,0.26735923,0.021697775,0.3273435,0.004353686],"about_ca_topic_score_codex":0.000004758623,"about_ca_topic_score_gemma":0.0000045269776,"teacher_disagreement_score":0.32453388,"about_ca_system_score_codex":0.000016002014,"about_ca_system_score_gemma":0.000017640268,"threshold_uncertainty_score":0.37041482},"labels":[],"label_agreement":null},{"id":"W2775021374","doi":"10.2749/222137817822208717","title":"Soil-Structure-Pipe Interaction Analysis and Inelastic Design of the Port Mann Water Supply Tunnel Shaft and Pipe – Case Study","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Geotechnical engineering; Structural engineering; Port (circuit theory); Engineering; Mechanical engineering","score_opus":0.01124725755667736,"score_gpt":0.2372435724375838,"score_spread":0.22599631488090643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775021374","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9799819,0.000032464282,0.01939257,0.000033879896,0.00025430467,0.00016929739,0.0000038366543,0.00006621898,0.000065510874],"genre_scores_gemma":[0.9995808,0.000007528026,0.00023336231,0.0000037242348,0.000038323913,0.0000069593393,0.0000037465438,0.000018088655,0.00010745147],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.999159,0.000017120201,0.00031048362,0.00020999745,0.00014376923,0.00015966465],"domain_scores_gemma":[0.99918854,0.00003447982,0.00008598309,0.0005817387,0.000036570622,0.00007268633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017802097,0.0001635311,0.0002703235,0.00010124929,0.00016713898,0.000083675994,0.000110456844,0.00007911341,0.000015158834],"category_scores_gemma":[0.000116964904,0.000101938625,0.0000605216,0.00006924779,0.000056441077,0.00011572722,0.00009068832,0.00019627888,2.408024e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004054896,0.00007509269,0.18082687,0.00025325592,0.0023475525,0.0077670356,0.0016482708,0.734973,0.06860251,0.000017920007,0.00012460515,0.0033233108],"study_design_scores_gemma":[0.00062484475,0.00013282418,0.83817595,0.00004250894,0.0017409803,0.024512013,0.00054463506,0.11135994,0.021533867,0.00061461213,0.00019582183,0.00052201044],"about_ca_topic_score_codex":0.00051577884,"about_ca_topic_score_gemma":0.00021347818,"teacher_disagreement_score":0.65734905,"about_ca_system_score_codex":0.000018945826,"about_ca_system_score_gemma":0.000009368517,"threshold_uncertainty_score":0.41569367},"labels":[],"label_agreement":null},{"id":"W2775289781","doi":"10.2749/222137810796063733","title":"Autoroute A-25 Project – Main Bridge Innovations","year":2010,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Ministère des Transports","keywords":"Bridge (graph theory); Christian ministry; General partnership; Kilometer; Principal (computer security); Transport engineering; Public transport; Ministry of Transport; Engineering; Business; Telecommunications; Finance; Computer science; Political science; Computer security","score_opus":0.013359602598197655,"score_gpt":0.25724276643580674,"score_spread":0.24388316383760908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775289781","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85592216,0.000015804912,0.11399049,0.00013264215,0.0014752898,0.00012503113,0.000011694395,0.0013568556,0.026970053],"genre_scores_gemma":[0.9952388,0.0000020771017,0.0028975229,0.00001855396,0.00013893418,0.000011823805,0.0000489149,0.00001799294,0.0016254156],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994724,0.000002235491,0.00020803833,0.00010095585,0.000100970065,0.00011544156],"domain_scores_gemma":[0.99965507,0.000008539894,0.000024955563,0.00024484043,0.00003683846,0.000029773993],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009254387,0.00008279955,0.00009264172,0.00011389227,0.00003330838,0.000028449493,0.000055352244,0.000054255695,0.000091658054],"category_scores_gemma":[0.000056111472,0.00007896914,0.000043436023,0.0003003921,0.000013670996,0.00008005723,0.000008194326,0.00016571984,0.000020575608],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004456382,0.000047017536,0.018711913,0.00023073998,0.0008065014,0.0011663537,0.0010611841,0.11577879,0.6383448,0.036715265,0.10586109,0.081271864],"study_design_scores_gemma":[0.0002560868,0.0000123270065,0.27420303,0.000013561972,0.000061632694,0.0018004624,0.000034781344,0.33231062,0.013881415,0.00023160975,0.37656635,0.0006281358],"about_ca_topic_score_codex":0.00005901105,"about_ca_topic_score_gemma":0.00004157858,"teacher_disagreement_score":0.6244634,"about_ca_system_score_codex":0.000025455454,"about_ca_system_score_gemma":0.000033287073,"threshold_uncertainty_score":0.3220268},"labels":[],"label_agreement":null},{"id":"W2775387030","doi":"10.2749/222137817822208744","title":"Structural Engineering Global Interoperability: Codes and Standards","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interoperability; Unification; Presentation (obstetrics); China; Code (set theory); Political science; Computer science; Engineering; Law; Programming language; World Wide Web","score_opus":0.0784635127671304,"score_gpt":0.4145313447925455,"score_spread":0.3360678320254151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775387030","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97837037,0.000030514737,0.0008387032,0.0003047653,0.00081111846,0.000068607944,0.00001400098,0.00003161467,0.019530294],"genre_scores_gemma":[0.998567,0.000006651108,0.00048279914,0.00001349478,0.00006592671,0.0000018738392,6.717455e-7,0.0000022063389,0.0008593769],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984561,0.000011577815,0.00031125624,0.00026915615,0.0008390229,0.0001128923],"domain_scores_gemma":[0.99875903,0.00002996334,0.00018480046,0.0006791609,0.00029743384,0.000049626444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021240416,0.00007467735,0.00014083847,0.00004039311,0.0002819791,0.00073738204,0.00028945797,0.000024517449,0.00020699936],"category_scores_gemma":[0.0027848566,0.0000528926,0.000035911053,0.00006414098,0.00011097467,0.00048489528,0.00026615744,0.00005298197,0.0000074957975],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011233117,0.0000013015741,0.8463181,0.0000054678685,0.000011598308,0.000057360714,0.0000555104,0.000015230893,0.000024117266,0.0013728482,0.0008320096,0.15129521],"study_design_scores_gemma":[0.00017322254,0.000021094169,0.8660998,0.000012052148,0.0000072092716,0.00057505956,0.00010433706,0.0060277972,0.00008494044,0.0030113156,0.123758614,0.00012456586],"about_ca_topic_score_codex":0.00008344403,"about_ca_topic_score_gemma":0.000097248885,"teacher_disagreement_score":0.15117066,"about_ca_system_score_codex":0.000058195197,"about_ca_system_score_gemma":0.000060693666,"threshold_uncertainty_score":0.7110592},"labels":[],"label_agreement":null},{"id":"W2918280921","doi":"10.2749/vancouver.2017.0699","title":"Prediction of Post-Earthquake Damage of Reinforced Concrete Highway Bridges","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Geological Survey of Canada; Natural Resources Canada; École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Fragility; Bridge (graph theory); Spectral acceleration; Structural engineering; Probabilistic logic; Acceleration; Reinforced concrete; Incremental Dynamic Analysis; Displacement (psychology); Vulnerability (computing); Measure (data warehouse); Computer science; Engineering; Seismic analysis; Peak ground acceleration; Physics; Data mining","score_opus":0.015831189097373997,"score_gpt":0.22729357295531671,"score_spread":0.21146238385794272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2918280921","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99017274,0.000027983686,0.0003206237,0.000021261903,0.00013287422,0.000037494625,0.000021921303,0.000057316898,0.0092078075],"genre_scores_gemma":[0.99865746,0.00006905651,0.000063872256,0.000006132607,0.000059799782,0.000001980251,0.000038922244,0.000008300595,0.0010944806],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9994099,0.0000024369785,0.00030206444,0.00007094534,0.00013006879,0.00008455975],"domain_scores_gemma":[0.9992106,0.0000068018253,0.00018013321,0.0004944138,0.000082181316,0.000025878493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014695263,0.000060511644,0.00017370823,0.000050601648,0.000041543593,0.000009995996,0.000097703974,0.00004315067,0.00003227934],"category_scores_gemma":[0.000059716338,0.000057277277,0.000074885495,0.000030733332,0.000044184962,0.00017910324,0.0000185313,0.000048151895,0.000005033588],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002794785,0.0000035128232,0.10677071,0.0004823036,0.0005199299,0.00024564046,0.0005168129,0.028340202,0.8528812,0.00019213563,0.0026654606,0.0073541286],"study_design_scores_gemma":[0.00028292465,0.00005262934,0.5546203,0.00009001157,0.000086282984,0.00007811812,0.00007054975,0.15857536,0.28188118,0.00000403261,0.0041420795,0.000116525625],"about_ca_topic_score_codex":0.00016405873,"about_ca_topic_score_gemma":0.0000023604243,"teacher_disagreement_score":0.57100004,"about_ca_system_score_codex":0.000009175862,"about_ca_system_score_gemma":0.00001730411,"threshold_uncertainty_score":0.23356996},"labels":[],"label_agreement":null},{"id":"W2920042566","doi":"10.2749/vancouver.2017.2083","title":"The New Champlain Bridge: Technical Challenges in Design of the Approach Viaducts","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Bridge (graph theory); Schedule; Computer science; Construction engineering; Quality (philosophy); Civil engineering; Transport engineering; Architectural engineering; Engineering","score_opus":0.06201397706165166,"score_gpt":0.2640902998887844,"score_spread":0.20207632282713275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2920042566","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053883307,0.007403363,0.8720663,0.0064926473,0.0017867141,0.0010578323,0.0000031837303,0.00067311025,0.056633532],"genre_scores_gemma":[0.9984118,0.00029942967,0.0010170592,0.0000020256448,0.00005248238,0.0000070255746,6.337156e-7,0.000010461077,0.00019910808],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99945587,0.000012804257,0.00019913017,0.00009617775,0.00012868189,0.00010733399],"domain_scores_gemma":[0.99918205,0.00003284863,0.00006837741,0.00067483453,0.000014917059,0.000026999302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029443615,0.00007284056,0.00011605761,0.000023256147,0.00009587966,0.000026073174,0.00026337506,0.00004906106,0.0000028103443],"category_scores_gemma":[0.00021372954,0.00004238236,0.000050625713,0.000061173974,0.00004745633,0.000043768963,0.000033372144,0.00011726943,9.372791e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010092827,0.00001910015,0.0010849113,0.00010051332,0.00015587332,0.000051946376,0.00037345098,0.8494111,0.012141398,0.0059629045,0.0031037773,0.12758498],"study_design_scores_gemma":[0.00037178549,0.000018224178,0.6612597,0.000073642776,0.00004574012,0.00068094983,0.00010429843,0.3132573,0.014442741,0.0011382846,0.008240629,0.00036664566],"about_ca_topic_score_codex":0.000040110375,"about_ca_topic_score_gemma":0.0000199559,"teacher_disagreement_score":0.94452846,"about_ca_system_score_codex":0.00002387368,"about_ca_system_score_gemma":0.000022728645,"threshold_uncertainty_score":0.17283024},"labels":[],"label_agreement":null},{"id":"W2921213258","doi":"10.2749/vancouver.2017.1981","title":"Vibration Testing of Scaled Cable-Stayed Bridges","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Government of New Brunswick; Transport Canada; University of New Brunswick","funders":"","keywords":"Modal; Vibration; Accelerometer; Bridge (graph theory); Similitude; Structural engineering; Dynamic testing; Operational Modal Analysis; Modal analysis; Scale model; Modal testing; Engineering; Scale (ratio); Finite element method; Computer science; Acoustics; Aerospace engineering; Physics","score_opus":0.04839355755334295,"score_gpt":0.32139440463488683,"score_spread":0.2730008470815439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921213258","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98803145,0.000026657674,0.0038440626,0.000027549137,0.00044187866,0.00011427156,0.0000015867778,0.0005041004,0.0070084725],"genre_scores_gemma":[0.981054,0.0000058118167,0.018666945,0.0000018044237,0.00016519244,0.000008251835,0.0000019986367,0.000015616864,0.000080368955],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99942946,0.0000040493537,0.00024916368,0.00008869157,0.00011171018,0.00011693374],"domain_scores_gemma":[0.99926853,0.000029040651,0.00014795331,0.00045102666,0.00006886476,0.000034556404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014583471,0.000065108354,0.000118477226,0.000027876353,0.000096035044,0.000023425127,0.00010934449,0.000048905382,0.0000044287017],"category_scores_gemma":[0.00040426807,0.00006525498,0.000019096708,0.000027618913,0.00002281371,0.00013103899,0.000026187729,0.00006700567,0.0000012911909],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017120903,0.000016735812,0.6404073,0.0011859392,0.000055738696,0.0006045191,0.000244034,0.015444837,0.116613075,0.0001236845,0.0031261873,0.22216082],"study_design_scores_gemma":[0.000055649754,0.000016282518,0.7952194,0.000089748515,0.0000054938587,0.00014716618,0.0000038683033,0.023966013,0.17976567,0.0002579246,0.00038507543,0.00008771344],"about_ca_topic_score_codex":0.0004535562,"about_ca_topic_score_gemma":0.0000064176033,"teacher_disagreement_score":0.22207311,"about_ca_system_score_codex":0.0000477229,"about_ca_system_score_gemma":0.000021126298,"threshold_uncertainty_score":0.26610208},"labels":[],"label_agreement":null},{"id":"W2921814326","doi":"10.2749/vancouver.2017.1934","title":"Robustness of Multi-Storey Timber Buildings","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Response to Dynamic Loads","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia; University of British Columbia","funders":"","keywords":"Robustness (evolution); Structural engineering; Limit state design; Bending moment; Residual; Structural load; Engineering; Computer science","score_opus":0.021127375122370062,"score_gpt":0.28033757242431295,"score_spread":0.2592101973019429,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921814326","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9843234,0.00004401525,0.008821381,0.000017321485,0.0006917247,0.00006844802,0.0000022162772,0.00012072539,0.005910762],"genre_scores_gemma":[0.98796064,0.0000061579367,0.008920734,0.0000017807226,0.00006333288,0.000004321363,0.0000024101166,0.00002516502,0.0030154434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993567,0.0000043171044,0.00022498946,0.00012275779,0.00014514603,0.00014608956],"domain_scores_gemma":[0.9990864,0.000018802317,0.0001177362,0.0006756936,0.00005210009,0.00004927813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013649242,0.00009810281,0.00016296544,0.000037385118,0.000054950408,0.000023454317,0.00021062413,0.00006766957,0.00007908875],"category_scores_gemma":[0.0003168891,0.00008975795,0.00005817476,0.000024978368,0.000057298985,0.00011389795,0.000049152826,0.00008342024,0.000007852219],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007971895,0.000046030073,0.106985755,0.00043167404,0.0003903121,0.002825686,0.0004014204,0.6689094,0.17314674,0.00040285516,0.005129254,0.04125116],"study_design_scores_gemma":[0.0006311265,0.000015580623,0.4407461,0.00007743644,0.00004013386,0.0015819935,0.000013967842,0.5195782,0.026082397,0.00003489732,0.010779189,0.00041893186],"about_ca_topic_score_codex":0.000056063982,"about_ca_topic_score_gemma":0.000011046607,"teacher_disagreement_score":0.33376035,"about_ca_system_score_codex":0.00005113211,"about_ca_system_score_gemma":0.00002258425,"threshold_uncertainty_score":0.3660223},"labels":[],"label_agreement":null},{"id":"W2922224474","doi":"10.2749/vancouver.2017.2075","title":"Design of the Cable-Stayed Bridge Signature Span of the New Champlain Bridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pylon; Span (engineering); Bridge (graph theory); Structural engineering; Deck; Engineering; Pier; Tower; Beam bridge","score_opus":0.023552915026722503,"score_gpt":0.24057677128265792,"score_spread":0.21702385625593543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922224474","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19566178,0.00030855444,0.79819167,0.0006797497,0.0014504404,0.000407483,0.0000199468,0.00016350638,0.003116875],"genre_scores_gemma":[0.9982269,0.000009867078,0.000344569,0.000010505956,0.000066338056,0.0000017014512,0.000002234645,0.000015844304,0.0013220798],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99932593,0.000014590226,0.0002540861,0.00009827185,0.00019475522,0.000112384514],"domain_scores_gemma":[0.9988311,0.000023033965,0.00018651332,0.0008816295,0.000041487638,0.000036265603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014838291,0.000101576865,0.00017909349,0.00002466524,0.00009279777,0.000020488433,0.0003310654,0.000067965615,0.000037635145],"category_scores_gemma":[0.00015933969,0.00006140902,0.00012745445,0.00010788357,0.00004490997,0.00005683042,0.00004400752,0.000136797,9.791868e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002997794,0.0000028163743,0.0017946463,0.00003707257,0.00010853039,0.000008838629,0.00015954894,0.96933234,0.021973692,0.00006749537,0.005009508,0.0015025041],"study_design_scores_gemma":[0.00026892265,0.00001087339,0.52010405,0.00009169602,0.00010586469,0.00014249363,0.000014150195,0.2993092,0.17617807,0.0001585727,0.003401957,0.00021415329],"about_ca_topic_score_codex":0.00045902576,"about_ca_topic_score_gemma":0.000026117114,"teacher_disagreement_score":0.8025651,"about_ca_system_score_codex":0.000023567616,"about_ca_system_score_gemma":0.00005012652,"threshold_uncertainty_score":0.25041872},"labels":[],"label_agreement":null},{"id":"W2922896994","doi":"10.2749/vancouver.2017.2755","title":"Bridge scour monitoring: challenges and opportunities","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of British Columbia","funders":"","keywords":"Bridge scour; Bridge (graph theory); Flooding (psychology); Engineering; Environmental science; Civil engineering; Forensic engineering; Marine engineering; Pier","score_opus":0.21114356748880292,"score_gpt":0.36318670898488054,"score_spread":0.15204314149607762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922896994","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9747275,0.0049966914,0.000015977477,0.00038869868,0.0014398134,0.00009535128,0.0000012971162,0.0007832357,0.017551398],"genre_scores_gemma":[0.98400044,0.014207226,0.00083798944,0.000002599153,0.00063000526,0.000019282685,7.3768496e-7,0.00002783806,0.00027390377],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99935573,0.000005030144,0.00017937334,0.00014091,0.00012867301,0.00019028591],"domain_scores_gemma":[0.9991928,0.000014788456,0.00007357599,0.00058021786,0.000035546364,0.00010310969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017380294,0.0001141679,0.00014479019,0.00003993848,0.00016225221,0.000058294256,0.0001415071,0.000072251554,0.0000027798862],"category_scores_gemma":[0.000052292013,0.000114641436,0.000020642301,0.000004954051,0.00005163117,0.00019292199,0.00006307948,0.00011564646,0.0000018776801],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037225313,0.0000048403786,0.024668451,0.0004667878,0.000040032337,0.001760691,0.0004805607,0.000004153163,0.00041745647,0.0013257003,0.0010061499,0.96982145],"study_design_scores_gemma":[0.000050897706,0.000016277972,0.9756093,0.00010875312,0.0000065047343,0.00068200286,0.000040836265,0.000045351546,0.004323277,0.0009898411,0.01796922,0.00015771147],"about_ca_topic_score_codex":0.00006189398,"about_ca_topic_score_gemma":0.0000016942914,"teacher_disagreement_score":0.96966374,"about_ca_system_score_codex":0.00003981455,"about_ca_system_score_gemma":0.000016285388,"threshold_uncertainty_score":0.46749422},"labels":[],"label_agreement":null},{"id":"W2923030451","doi":"10.2749/vancouver.2017.2322","title":"Case Study: University of British Columbia’s 18-storey TallWood House at Brock Commons","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Architectural engineering; Residence; Columbia university; Civil engineering; Sociology; Media studies","score_opus":0.018851927247455418,"score_gpt":0.21872858853468152,"score_spread":0.19987666128722612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2923030451","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969202,0.000019722844,0.00081702427,0.0000025301679,0.00012836551,0.00007080961,0.000015672213,0.00023518456,0.0017904876],"genre_scores_gemma":[0.9940039,0.000007812616,0.00013446028,9.521547e-7,0.00001875133,4.5953715e-7,0.000004620839,0.000018973096,0.0058100782],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99952495,0.000006897106,0.00014413317,0.000119004966,0.00010821537,0.00009679266],"domain_scores_gemma":[0.99932885,0.000008210756,0.00007778314,0.0004840472,0.000034022265,0.0000670954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000043367825,0.000055434506,0.00016827951,0.000019837182,0.00017908428,0.00006131637,0.000114428636,0.000042047897,0.00013145863],"category_scores_gemma":[0.0000210327,0.00009787956,0.0000711106,0.00004263378,0.000035004494,0.000091435446,0.000060555692,0.0000700228,0.000005116089],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007227857,0.0001275709,0.710824,0.00014229912,0.0010489781,0.12409772,0.0006948253,0.067098044,0.0023242212,0.000002208841,0.08403963,0.009593261],"study_design_scores_gemma":[0.001699889,0.000113940616,0.8911666,0.00006019822,0.00049824227,0.048989166,0.0039876313,0.03583555,0.0002641423,0.000009532998,0.016543306,0.00083178846],"about_ca_topic_score_codex":0.05439505,"about_ca_topic_score_gemma":0.19722815,"teacher_disagreement_score":0.1803426,"about_ca_system_score_codex":0.000058943475,"about_ca_system_score_gemma":0.000011737458,"threshold_uncertainty_score":0.9519018},"labels":[],"label_agreement":null},{"id":"W2923678557","doi":"10.2749/vancouver.2017.2599","title":"Columbia River Skywalk – Turning a Need into a Landmark","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Landmark; Pedestrian; Span (engineering); Pipeline transport; Pipeline (software); Civil engineering; Constructability; Engineering; Architectural engineering; Work (physics); Transport engineering; Construction engineering; Computer science; Structural engineering; Artificial intelligence; Mechanical engineering","score_opus":0.006749926675576191,"score_gpt":0.22645354539066034,"score_spread":0.21970361871508415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2923678557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9645469,0.000065568565,0.018787555,0.00006423811,0.00051138183,0.000052210293,0.0000011139371,0.00042172856,0.015549306],"genre_scores_gemma":[0.9958399,0.000009077617,0.0016556598,0.000009614018,0.00010661422,0.000005922738,0.000010374638,0.000017689687,0.0023451634],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994865,0.0000034817183,0.00016326226,0.000112812086,0.0001121214,0.0001218333],"domain_scores_gemma":[0.9994187,0.000009306958,0.00005540474,0.00042419325,0.000028313698,0.00006410161],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008555524,0.00007894316,0.00013820751,0.000036207624,0.000165475,0.00016013431,0.00011512305,0.00005027986,0.00012452978],"category_scores_gemma":[0.0001050382,0.000088481625,0.00006863974,0.000047384532,0.000028695342,0.00012632301,0.000023610879,0.00009376116,0.000025760992],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018813034,0.00003089144,0.3707848,0.00046431934,0.00167653,0.004284494,0.0038965945,0.3280305,0.057679925,0.00040706364,0.05138544,0.18134065],"study_design_scores_gemma":[0.00053384836,0.000017727927,0.5232434,0.000068570866,0.000114811875,0.0005543679,0.00010973811,0.395455,0.0029778695,0.0005496094,0.07573844,0.0006365701],"about_ca_topic_score_codex":0.0010454075,"about_ca_topic_score_gemma":0.00023612934,"teacher_disagreement_score":0.18070407,"about_ca_system_score_codex":0.000037109712,"about_ca_system_score_gemma":0.000009422106,"threshold_uncertainty_score":0.36081758},"labels":[],"label_agreement":null},{"id":"W2923765451","doi":"10.2749/vancouver.2017.2466","title":"Concepts for Durable Post-Tensioned Bridges over Highways in Ontario, Canada","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Pier; Structural engineering; Bridge (graph theory); Engineering; Slab; Span (engineering); Girder; Prestressed concrete; Christian ministry; Civil engineering; Forensic engineering","score_opus":0.011550244880282398,"score_gpt":0.23521741600652774,"score_spread":0.22366717112624535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2923765451","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995656,0.000027708697,0.0017719937,0.00013244072,0.00064740086,0.00008555498,0.000008043743,0.00010844086,0.0015623992],"genre_scores_gemma":[0.99780107,0.000002448001,0.00027128067,0.00003324837,0.000034086752,0.000010594179,0.000042459473,0.000013692766,0.0017911209],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994319,0.0000016985625,0.00019370198,0.00012017439,0.00010403589,0.00014848338],"domain_scores_gemma":[0.99952,0.000017295637,0.000048609323,0.00031247467,0.000050496805,0.000051101197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000054861648,0.00008888271,0.00015783888,0.000031459553,0.000083167586,0.000039494076,0.00008016479,0.000038635957,0.000084053005],"category_scores_gemma":[0.00008915397,0.00008558567,0.00004345044,0.00002156272,0.000010807073,0.0000973296,0.000010671767,0.000072784394,0.0000010975812],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003637026,0.000015875587,0.17121711,0.00016856423,0.00035790208,0.0019021058,0.0004237488,0.7084404,0.03697104,0.0008434416,0.07636073,0.0032626907],"study_design_scores_gemma":[0.00031736502,0.000007321435,0.88299567,0.000021164988,0.000017942079,0.00007569785,0.00003304962,0.08686784,0.0062249545,0.000015659738,0.023219293,0.00020405017],"about_ca_topic_score_codex":0.9471617,"about_ca_topic_score_gemma":0.9876504,"teacher_disagreement_score":0.7117786,"about_ca_system_score_codex":0.00026685573,"about_ca_system_score_gemma":0.0001657144,"threshold_uncertainty_score":0.34900823},"labels":[],"label_agreement":null},{"id":"W2924173233","doi":"10.2749/vancouver.2017.0042","title":"Innovative Expansion Joint Replacement for Burlington Bay Skyway","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Expansion joint; Joint (building); Modular design; Bridge (graph theory); Engineering; Seal (emblem); Service (business); Retrofitting; Transport engineering; Structural engineering; Computer science; Business","score_opus":0.026063113032493444,"score_gpt":0.276215193570086,"score_spread":0.2501520805375926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924173233","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4726761,0.000043151696,0.51891726,0.0001754134,0.0009302565,0.00021146181,0.000004965863,0.0003507342,0.0066906814],"genre_scores_gemma":[0.9949637,0.0000071724116,0.003554238,0.0000137107445,0.00012188222,0.00003165556,0.000029633115,0.000020299303,0.0012577113],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932885,0.0000022374138,0.00027390593,0.0001508758,0.00011499853,0.000129118],"domain_scores_gemma":[0.99925363,0.00000988823,0.00009891375,0.00048749422,0.000110941066,0.000039157232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017987876,0.00010282425,0.00015322957,0.00006237582,0.00014173484,0.000055263037,0.00007396507,0.00004671336,0.000041121002],"category_scores_gemma":[0.0001778824,0.00009221864,0.00006086325,0.000061005478,0.000015880156,0.00007363797,0.000018747038,0.00006334368,0.0000059259146],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005649482,0.000036134155,0.007390674,0.00047511864,0.00093113433,0.00020589205,0.0009554447,0.69844157,0.18073939,0.0044500204,0.016975394,0.089342766],"study_design_scores_gemma":[0.0006750885,0.000074581854,0.035284966,0.000086968495,0.000056725967,0.00011214888,0.0001286185,0.6797628,0.23854834,0.00035858093,0.044374805,0.00053641625],"about_ca_topic_score_codex":0.000015912548,"about_ca_topic_score_gemma":0.000004123234,"teacher_disagreement_score":0.5222876,"about_ca_system_score_codex":0.000057062094,"about_ca_system_score_gemma":0.00001418031,"threshold_uncertainty_score":0.37605667},"labels":[],"label_agreement":null},{"id":"W2924288374","doi":"10.2749/vancouver.2017.0896","title":"Assessing the Impact of Improper Placement on Reinforced Concrete Beam Behaviour","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Digital image correlation; Beam (structure); Stiffness; Structural engineering; Boom; Cracking; Reinforced concrete; Reinforcement; Materials science; Engineering; Composite material","score_opus":0.018648013366060822,"score_gpt":0.321307141484746,"score_spread":0.3026591281186852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924288374","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9786667,0.000010457797,0.00026355602,0.000007427518,0.0005849164,0.00011475101,0.0000015295434,0.000044243243,0.020306373],"genre_scores_gemma":[0.99922717,0.0000047000094,0.00010002782,0.0000037862903,0.00019914392,0.000007813963,0.0000032781315,0.00001893792,0.000435169],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99934876,0.0000036220738,0.00022626831,0.0000912191,0.00014850845,0.00018163538],"domain_scores_gemma":[0.999118,0.0000108485265,0.00015905246,0.0006252206,0.00005410083,0.0000328203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022793892,0.000109526874,0.00013686239,0.000021287524,0.00015788991,0.00010384454,0.00015349107,0.000047152793,0.000020078189],"category_scores_gemma":[0.00007127364,0.00006386076,0.00009487869,0.000015752037,0.00003769536,0.00016742591,0.00003548007,0.0001455493,0.000003052933],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004270681,0.0000036026597,0.1896424,0.00008812357,0.00042294565,0.00082122214,0.0009021949,0.18028475,0.6170937,0.00014421836,0.0042301593,0.0063239764],"study_design_scores_gemma":[0.00045172276,0.00014934933,0.6470045,0.00020383729,0.00005119603,0.00031239373,0.00022012889,0.007172404,0.34363407,0.000013162319,0.0004806739,0.00030659468],"about_ca_topic_score_codex":0.0001838116,"about_ca_topic_score_gemma":3.8084667e-7,"teacher_disagreement_score":0.4573621,"about_ca_system_score_codex":0.000092261085,"about_ca_system_score_gemma":0.000039770268,"threshold_uncertainty_score":0.26041663},"labels":[],"label_agreement":null},{"id":"W2924350993","doi":"10.2749/vancouver.2017.3159","title":"A Case Study on Evaluating the Performance Criteria of the 2014 Canadian Highway Bridge Design Code","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Bridge (graph theory); Hazard; Structural engineering; Seismic hazard; Civil engineering; Span (engineering); Engineering; Environmental science; Computer science; Transport engineering","score_opus":0.06846070482543354,"score_gpt":0.31554542080046194,"score_spread":0.2470847159750284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924350993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99719554,0.000019725872,0.0007049544,0.0000870258,0.00055548025,0.0002771227,0.000003915286,0.000063700376,0.0010925517],"genre_scores_gemma":[0.9996322,0.0000019141773,0.000106237356,0.000011664633,0.000060708117,0.00001974431,4.3240362e-7,0.000018164552,0.00014893316],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9992658,0.000029711506,0.00021570349,0.0001212176,0.00018398218,0.00018358011],"domain_scores_gemma":[0.9987696,0.00005045438,0.00007381654,0.0010105626,0.000037833688,0.000057758953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006518885,0.00010941974,0.00012286211,0.000025966772,0.00040308447,0.00006209344,0.00028974775,0.00004624238,0.000009761938],"category_scores_gemma":[0.00021235978,0.00006465599,0.000042564454,0.000034408335,0.00003810173,0.000042808537,0.000030968728,0.00019676558,0.0000025217937],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010985945,0.000035936762,0.009627821,0.00009151744,0.00016356396,0.0035875624,0.001233061,0.9706965,0.004976617,0.00009636267,0.0041609784,0.005319068],"study_design_scores_gemma":[0.00035411946,0.00030624383,0.64447874,0.000083170904,0.00008516352,0.010367986,0.00015606961,0.3398714,0.0026135931,0.00007595486,0.0012838049,0.00032373462],"about_ca_topic_score_codex":0.01652608,"about_ca_topic_score_gemma":0.00481068,"teacher_disagreement_score":0.6348509,"about_ca_system_score_codex":0.000057509023,"about_ca_system_score_gemma":0.000071942595,"threshold_uncertainty_score":0.99002296},"labels":[],"label_agreement":null},{"id":"W2924390273","doi":"10.2749/vancouver.2017.2163","title":"Calgary Airport Trail Tunnel Temperature Monitoring","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Smart Materials for Construction","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Runway; Range (aeronautics); Bridge (graph theory); Air temperature; Engineering; Channel (broadcasting); Environmental science; Civil engineering; Transport engineering; Telecommunications; Marine engineering; Meteorology; Geography; Aerospace engineering; Cartography","score_opus":0.015066452293750556,"score_gpt":0.2487094021754197,"score_spread":0.23364294988166914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924390273","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9765309,0.000005957339,0.000007046901,0.00009999365,0.0023023838,0.00009458303,9.794239e-7,0.000066477776,0.020891668],"genre_scores_gemma":[0.9968633,0.0000050378753,0.0008444398,0.00001109734,0.00035020593,0.000012196119,0.0000039573997,0.000013750047,0.0018959937],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990749,0.0000090883395,0.00020612912,0.00027760296,0.0002546094,0.0001777015],"domain_scores_gemma":[0.998999,0.0000037565026,0.00020264492,0.0007093641,0.0000066851444,0.00007855056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024368202,0.000100530575,0.00011390038,0.000011340386,0.00041511917,0.00011094418,0.00020135494,0.00008310299,0.0004480582],"category_scores_gemma":[0.00008666171,0.000092085626,0.000049615235,0.000022363069,0.00014016728,0.00035256418,0.0001468146,0.00008697554,0.00028606798],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035101928,0.000008520731,0.85822123,0.000002496727,0.000004847594,0.00055051944,0.000027544516,0.000005613614,0.1390751,0.000005919362,0.0006626342,0.0014320326],"study_design_scores_gemma":[0.000081609185,0.000008168617,0.95476824,0.000010003281,0.000008232316,0.001472258,0.000012701536,0.000004218753,0.034622345,0.00011659248,0.00878481,0.00011081948],"about_ca_topic_score_codex":0.00089833123,"about_ca_topic_score_gemma":0.000054003605,"teacher_disagreement_score":0.10445276,"about_ca_system_score_codex":0.00008807868,"about_ca_system_score_gemma":0.000015151112,"threshold_uncertainty_score":0.49059233},"labels":[],"label_agreement":null},{"id":"W2924404061","doi":"10.2749/vancouver.2017.1422","title":"Sir Ambrose Shea Lift Bridge – Newfoundland and Labrador, Canada","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Truss; Lift (data mining); Span (engineering); Bridge (graph theory); Truss bridge; Tower; Structural engineering; Beam bridge; Engineering; Architecture; Geology; Geography; Computer science; Archaeology","score_opus":0.009411766615420768,"score_gpt":0.2208855893983357,"score_spread":0.21147382278291493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924404061","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9890106,0.00018081132,0.0030893544,0.00017469437,0.00054229284,0.00004098413,0.000006892165,0.00014641359,0.0068079564],"genre_scores_gemma":[0.99840456,0.000031109274,0.00014688371,0.000025506899,0.000096565585,0.0000020776572,0.000011611683,0.000014196056,0.0012674885],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995133,0.000002119122,0.00014128821,0.00011273038,0.00011011241,0.0001203923],"domain_scores_gemma":[0.9994883,0.000009483747,0.00003745744,0.0003518698,0.000019343574,0.00009357826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004428937,0.00009079635,0.00012601679,0.000023080962,0.00011829832,0.00009450678,0.000071741044,0.00003193598,0.000027937418],"category_scores_gemma":[0.000051982643,0.00008568821,0.000023261568,0.000028050046,0.000019652836,0.00009914207,0.000018145758,0.00006885441,0.0000020902944],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002307181,0.000024308945,0.47205386,0.00073712657,0.0014666906,0.008037654,0.000653202,0.19559821,0.018674381,0.0020830764,0.08854002,0.21210839],"study_design_scores_gemma":[0.00013537679,0.0000039504466,0.9047896,0.000011153954,0.000024198665,0.00035389286,0.000008569584,0.047069293,0.00043686395,0.000019869967,0.046957355,0.00018985049],"about_ca_topic_score_codex":0.37486464,"about_ca_topic_score_gemma":0.41128933,"teacher_disagreement_score":0.43273577,"about_ca_system_score_codex":0.00006357278,"about_ca_system_score_gemma":0.000046660345,"threshold_uncertainty_score":0.6292982},"labels":[],"label_agreement":null},{"id":"W2924542448","doi":"10.2749/vancouver.2017.0880","title":"Life-cycle cost analysis of concrete structures reinforced with stainless steel reinforcing bars","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rebar; Durability; Spall; Service life; Corrosion; Materials science; Reinforced concrete; Chloride; Structural engineering; Composite material; Concrete cover; Metallurgy; Engineering","score_opus":0.013970473711661584,"score_gpt":0.25048533943969487,"score_spread":0.2365148657280333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924542448","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9801806,0.00003348049,0.005311858,0.000024661333,0.00014337648,0.0002203355,0.000017785464,0.00013629516,0.013931562],"genre_scores_gemma":[0.99900633,0.000013782199,0.00044339878,0.000022369144,0.00002675861,0.000010538075,0.000032594457,0.000020832676,0.00042338762],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987103,0.000012078315,0.00052126567,0.00022310155,0.00030659244,0.00022665865],"domain_scores_gemma":[0.9978684,0.00005696075,0.00032263633,0.0013693785,0.00016868675,0.00021390083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031613765,0.00017075412,0.00049486174,0.00013551996,0.00015451787,0.000084064,0.000241994,0.000086815795,0.00018163772],"category_scores_gemma":[0.0005877765,0.00014370363,0.00015666492,0.00019190516,0.00011886715,0.00020020422,0.00006872527,0.00014001604,0.0000017755958],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028852365,0.0000020142882,0.13470575,0.0004699053,0.0022691346,0.0006868835,0.0010804627,0.8226034,0.027686257,0.0028222408,0.0006235357,0.0067618974],"study_design_scores_gemma":[0.0012361164,0.000107834385,0.36547396,0.000098125805,0.0013193968,0.00010273309,0.0005695039,0.5989103,0.027571706,0.00004208444,0.003764065,0.00080423267],"about_ca_topic_score_codex":0.00023082984,"about_ca_topic_score_gemma":0.000043445434,"teacher_disagreement_score":0.2307682,"about_ca_system_score_codex":0.0000573245,"about_ca_system_score_gemma":0.000114271614,"threshold_uncertainty_score":0.5860064},"labels":[],"label_agreement":null},{"id":"W2924760203","doi":"10.2749/stockholm.2016.1608","title":"Macdonald Bridge Suspended Spans Deck Replacement: Construction Engineering Challenges and Solutions","year":2016,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Deck; Engineering; Structural engineering; Wind tunnel; Suspension (topology); Aerodynamics; Nova scotia; Forensic engineering; Span (engineering); Civil engineering; Marine engineering; Aerospace engineering; Geology","score_opus":0.023623357991654683,"score_gpt":0.21473966691853316,"score_spread":0.19111630892687848,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924760203","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56113136,0.004780359,0.42090574,0.0014560453,0.0014672556,0.00027588656,0.000022475926,0.002375951,0.0075849625],"genre_scores_gemma":[0.9968798,0.0013189688,0.0014850746,0.000004374618,0.000091942486,0.000011580928,0.0000075481726,0.000023789044,0.0001769142],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99921155,0.000005589739,0.0002494628,0.0001961579,0.00012869177,0.00020856941],"domain_scores_gemma":[0.99958134,0.000034378412,0.0000344152,0.00022646136,0.000031835843,0.000091545444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011050005,0.00013878332,0.00015358922,0.00011552789,0.00004193382,0.000016288928,0.00004072516,0.00006214965,0.000094730334],"category_scores_gemma":[0.000054116106,0.000114042174,0.000051365445,0.00008550283,0.000029743813,0.00013839992,0.000019002564,0.00006442591,0.0000107578935],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057576082,0.00005223899,0.009140721,0.00090529636,0.00261179,0.0009277345,0.0011136674,0.09524678,0.22187166,0.14124192,0.004206585,0.522624],"study_design_scores_gemma":[0.003145391,0.00015558164,0.5411563,0.0006180433,0.00052464596,0.015053125,0.00040980885,0.27675274,0.042097658,0.00267022,0.11444603,0.0029704352],"about_ca_topic_score_codex":0.0000075251555,"about_ca_topic_score_gemma":0.000010738404,"teacher_disagreement_score":0.53201556,"about_ca_system_score_codex":0.00007022529,"about_ca_system_score_gemma":0.000009326598,"threshold_uncertainty_score":0.4650505},"labels":[],"label_agreement":null},{"id":"W2924927391","doi":"10.2749/vancouver.2017.1437","title":"A Baseline Study of a Major Viaduct in Toronto, Canada, for Strategic Planning for the Superstructure","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Substructure; Superstructure; Transport engineering; Section (typography); Life expectancy; Engineering; Rehabilitation; Civil engineering; Business; Medicine; Structural engineering; Physical therapy; Environmental health","score_opus":0.021305712494973657,"score_gpt":0.28933339486625104,"score_spread":0.2680276823712774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924927391","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957956,0.00024339258,0.0013375005,0.000026101607,0.0011777008,0.00071857276,0.000020065636,0.000017279732,0.0006638016],"genre_scores_gemma":[0.9990513,0.0000024339943,0.0004609138,0.0000051896013,0.0003388813,0.000047483445,0.0000055704804,0.000019450808,0.00006879395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99930805,0.0000037809518,0.00025824897,0.00012426017,0.00010597916,0.00019969945],"domain_scores_gemma":[0.9993724,0.00005599799,0.0000868999,0.00039823996,0.00006247502,0.000023982466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024963185,0.00010486615,0.00017582643,0.000012540228,0.00012829449,0.000025167605,0.00017411988,0.000037017922,0.000006316033],"category_scores_gemma":[0.00010038342,0.00007440999,0.00003460822,0.000014133242,0.000011122578,0.00007109479,0.000015815622,0.000070726404,1.4531749e-8],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009827352,0.00026278655,0.38926092,0.0027369594,0.0022847028,0.0032969634,0.02659495,0.47133166,0.05495237,0.002425877,0.017539453,0.028330607],"study_design_scores_gemma":[0.010540525,0.00090854976,0.6313558,0.00059320976,0.00055336236,0.00080061826,0.1555406,0.15256377,0.025564773,0.0017372754,0.018016849,0.0018246308],"about_ca_topic_score_codex":0.24166463,"about_ca_topic_score_gemma":0.64624023,"teacher_disagreement_score":0.40457562,"about_ca_system_score_codex":0.00018545805,"about_ca_system_score_gemma":0.00011395565,"threshold_uncertainty_score":0.7633852},"labels":[],"label_agreement":null},{"id":"W2924928156","doi":"10.2749/vancouver.2017.2512","title":"Condition Assessment and Renewal Options Analysis for the Queensborough Bridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Christian ministry; Limiting; Bridge (graph theory); Transport engineering; Engineering; Computer science; Risk analysis (engineering); Operations research; Business","score_opus":0.029107928480215747,"score_gpt":0.3345184719031611,"score_spread":0.3054105434229453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924928156","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13947718,0.00011837293,0.8577646,0.0004311577,0.00022818692,0.00011225589,0.000023001849,0.00013229846,0.0017129256],"genre_scores_gemma":[0.99776286,0.00006948707,0.0017333312,0.0000073780875,0.000068801724,0.000030261788,0.000066760236,0.0000075591515,0.00025354835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996074,0.0000032442708,0.00014024001,0.00009653126,0.000076789984,0.00007582542],"domain_scores_gemma":[0.9994756,0.000035291934,0.00005428532,0.00036956283,0.00003563271,0.00002964738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012769799,0.000063861415,0.000111465306,0.000047538553,0.00026277473,0.000103208724,0.0000613954,0.000028114893,0.00001897913],"category_scores_gemma":[0.000031547086,0.000048071048,0.00009425719,0.00006405475,0.000027893317,0.00008648715,0.000010560859,0.000042381493,5.8123703e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002679833,0.000007070808,0.039559975,0.000042590444,0.003326246,0.00003323886,0.000095363015,0.93571895,0.0020875582,0.007038494,0.0020428966,0.01004493],"study_design_scores_gemma":[0.00006829129,0.000003634785,0.625981,0.000002119948,0.00045568094,0.000023760384,0.000012147569,0.37143713,0.00021330608,0.00022416329,0.0015108441,0.000067938614],"about_ca_topic_score_codex":0.00012542284,"about_ca_topic_score_gemma":0.00006532611,"teacher_disagreement_score":0.85828567,"about_ca_system_score_codex":0.00002822143,"about_ca_system_score_gemma":0.000008480499,"threshold_uncertainty_score":0.20210773},"labels":[],"label_agreement":null},{"id":"W2929475283","doi":"10.2749/vancouver.2017.0912","title":"Concrete Structure Assessment using ACI 562: History and Possible Next Steps","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Reliability (semiconductor); Strength reduction; Structural engineering; Reduction (mathematics); Reliability engineering; Reinforcement; Bending; Structural reliability; Computer science; Sensitivity (control systems); Strength of materials; Building code; Engineering; Finite element method; Mathematics; Probabilistic logic","score_opus":0.04224208481335904,"score_gpt":0.2871439453013444,"score_spread":0.24490186048798537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2929475283","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98647827,0.0004875204,0.00040650976,0.000027725466,0.0010228762,0.00011488493,0.0000054313477,0.00012363352,0.011333167],"genre_scores_gemma":[0.9977666,0.000025236643,0.0015307692,0.000024337643,0.00008161218,0.0000021742255,0.000005251272,0.000018944895,0.00054503663],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9992419,0.000011888271,0.00022718789,0.00021107857,0.00014920304,0.00015876221],"domain_scores_gemma":[0.99901295,0.000016305363,0.000106086925,0.0007102341,0.00004632032,0.00010808077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017276639,0.00012540034,0.00018991795,0.000027321776,0.00014685305,0.00009481483,0.00010648332,0.00008578757,0.00026510496],"category_scores_gemma":[0.00007437489,0.000120881974,0.000042948213,0.0000138019595,0.0000766998,0.00024157598,0.000076926975,0.00016189892,0.0000016944854],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012759677,0.0000023510495,0.1342533,0.00024061496,0.000046944326,0.0008327975,0.00034757037,0.00016586394,0.8522311,0.000228511,0.0032742054,0.008364027],"study_design_scores_gemma":[0.0011920173,0.00006470356,0.70300984,0.00015216366,0.00013378933,0.0024518124,0.0002039004,0.080090225,0.010637598,0.00033218187,0.20060627,0.001125477],"about_ca_topic_score_codex":0.00008459407,"about_ca_topic_score_gemma":0.00001497122,"teacher_disagreement_score":0.84159344,"about_ca_system_score_codex":0.00028451026,"about_ca_system_score_gemma":0.00010188543,"threshold_uncertainty_score":0.4929424},"labels":[],"label_agreement":null},{"id":"W2933480251","doi":"10.2749/vancouver.2017.2301","title":"Bending, vibration and long-term performance of timber-concrete-composites floors","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia; University of British Columbia","funders":"","keywords":"Serviceability (structure); Stiffness; Structural engineering; Vibration; Bending stiffness; Cross laminated timber; Bending; Materials science; Shear (geology); Composite material; Engineering","score_opus":0.013147501107086427,"score_gpt":0.2248318454238396,"score_spread":0.21168434431675318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2933480251","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99167717,0.00031044192,0.000024547782,0.000013105618,0.00011926565,0.0000587015,9.2524704e-7,0.000049302515,0.0077465563],"genre_scores_gemma":[0.9990316,0.00013133933,0.00024700828,0.0000012256736,0.000041036652,0.0000043431173,0.000011317249,0.000009563759,0.00052254443],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999673,0.000002021227,0.00012517002,0.00006974419,0.000059674272,0.00007038896],"domain_scores_gemma":[0.9996925,0.000004759203,0.000059787144,0.0002083311,0.000013538909,0.000021069094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000046804536,0.000065851666,0.000094551215,0.000021509697,0.00008752749,0.00003937835,0.00004591843,0.000029114073,0.000019355717],"category_scores_gemma":[0.000007189006,0.000055122095,0.000018551518,0.0000091811235,0.000030091081,0.00022241651,0.000017942071,0.0000295005,0.000005506008],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006029036,0.0000021156523,0.9747403,0.00009023412,0.000046366138,0.0000457998,0.00012349225,0.00011463486,0.022134012,0.000008966536,0.00004126097,0.0026467443],"study_design_scores_gemma":[0.00011839135,0.0000512518,0.69764835,0.000053725784,0.000024630808,0.0001110071,0.0000022494073,0.0033060072,0.29850683,0.0000037316595,0.00009318428,0.00008062858],"about_ca_topic_score_codex":0.00001009897,"about_ca_topic_score_gemma":0.000004423541,"teacher_disagreement_score":0.27709198,"about_ca_system_score_codex":0.000008466258,"about_ca_system_score_gemma":0.0000047451595,"threshold_uncertainty_score":0.22478138},"labels":[],"label_agreement":null},{"id":"W2933527870","doi":"10.2749/vancouver.2017.2392","title":"Low Level Road Bridges: A Sustainable Project","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Sustainability; Bridge (graph theory); Transport engineering; Civil engineering; Engineering","score_opus":0.026124956155490948,"score_gpt":0.27380000866303605,"score_spread":0.2476750525075451,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2933527870","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7960186,0.0001400951,0.13915129,0.00016402174,0.00070046366,0.0002778428,0.0000073131278,0.0011123625,0.062427983],"genre_scores_gemma":[0.98737943,0.000012494701,0.00040541898,0.0000058784567,0.00009805564,0.000012333028,0.000011027412,0.000019174806,0.012056164],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940646,0.0000026199957,0.00016227666,0.00012315794,0.00011554527,0.0001899647],"domain_scores_gemma":[0.9993337,0.0000038732214,0.000048448393,0.00052016374,0.0000529226,0.00004092007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009823645,0.00009673857,0.00012983452,0.00006442752,0.00014358781,0.00012942337,0.00012830057,0.000044284567,0.000033211534],"category_scores_gemma":[0.0001263851,0.000089883695,0.00006802197,0.000054433876,0.00001996265,0.0001908955,0.000024970454,0.00007445267,0.000016411666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021392581,0.000065534456,0.014421603,0.0016670757,0.0012226712,0.011843397,0.0013903364,0.64941865,0.0135113485,0.0044950885,0.058394678,0.24354821],"study_design_scores_gemma":[0.0005813859,0.00003260691,0.2348441,0.00007884973,0.00010482301,0.001307505,0.00075389526,0.64543414,0.038178373,0.00021818507,0.07750039,0.00096574734],"about_ca_topic_score_codex":0.00056503096,"about_ca_topic_score_gemma":0.000013530752,"teacher_disagreement_score":0.24258246,"about_ca_system_score_codex":0.0000618849,"about_ca_system_score_gemma":0.000032781754,"threshold_uncertainty_score":0.36653507},"labels":[],"label_agreement":null},{"id":"W2933825197","doi":"10.2749/vancouver.2017.0002","title":"Developments in the wind engineering of tall buildings","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Wind and Air Flow Studies","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Serviceability (structure); Wind engineering; Engineering design process; Engineering; Architectural engineering; Tuned mass damper; Civil engineering; Structural engineering; Mechanical engineering","score_opus":0.01250018582280578,"score_gpt":0.23356831751468493,"score_spread":0.22106813169187914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2933825197","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9641091,0.000006669998,0.000010692287,0.00012682777,0.000051879168,0.000039011502,1.7197493e-7,0.0000033204947,0.035652325],"genre_scores_gemma":[0.99896437,0.0000036004828,0.00057768496,0.000017656113,0.000013064703,0.0000018515681,2.3885133e-7,0.0000022020577,0.0004193578],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995917,0.0000020758264,0.00010747168,0.00008163864,0.00013372513,0.00008340709],"domain_scores_gemma":[0.9997306,0.000007345569,0.000069447146,0.00018130767,0.0000015828163,0.00000972633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022838774,0.000038205246,0.000056517485,0.00000641341,0.000072241884,0.000011063997,0.00016861575,0.000012100321,0.000021729782],"category_scores_gemma":[0.00007747373,0.000025392485,0.000014922736,0.000022530858,0.000041058676,0.0000685931,0.00012397575,0.000033842764,0.000012927594],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.980198e-7,0.000016018446,0.9920522,0.0000035786675,0.0000043021387,0.00015210107,0.00052405207,0.0001795621,0.004921334,0.000029785939,0.00036677753,0.0017497194],"study_design_scores_gemma":[0.000041285934,0.0000032728985,0.96960473,0.00001093766,0.0000012809028,0.00003251692,0.000026477872,0.000011916484,0.0013857401,0.000016989328,0.02882934,0.00003549016],"about_ca_topic_score_codex":0.00015515744,"about_ca_topic_score_gemma":0.00001656499,"teacher_disagreement_score":0.03523297,"about_ca_system_score_codex":0.000016791892,"about_ca_system_score_gemma":0.0000033194033,"threshold_uncertainty_score":0.10354754},"labels":[],"label_agreement":null},{"id":"W2935723670","doi":"10.2749/vancouver.2017.2906","title":"New Dynamic Center Piece for Montréal Delivers on All Challenges","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pylon; Carriageway; Structural engineering; Engineering; Precast concrete; Deck; Span (engineering); Girder; Bridge (graph theory); Civil engineering","score_opus":0.05138831036873591,"score_gpt":0.34730964240111334,"score_spread":0.2959213320323774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2935723670","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12243592,0.0016203992,0.00028006642,0.25735313,0.0021593277,0.00089868996,0.00019388337,0.00010686601,0.6149517],"genre_scores_gemma":[0.89901763,0.0012530205,0.00017366798,0.0009938907,0.0004665614,0.0000054725024,0.000003428302,0.000009880599,0.09807643],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993463,0.000008533558,0.000090837035,0.0001643181,0.00016553108,0.00022443698],"domain_scores_gemma":[0.9993228,0.000026411939,0.00016305108,0.00030787307,0.000026504134,0.00015339386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001922118,0.00005454251,0.00007947194,0.000014066853,0.00038643458,0.000054138356,0.00019149233,0.000054434764,0.000026664173],"category_scores_gemma":[0.00033433363,0.000055801644,0.00006450606,0.00000853235,0.00005433479,0.000107070795,0.00001532467,0.000041756895,0.000025579433],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000080965125,0.000067883106,0.002433569,0.000025058069,0.00009483224,0.0008481175,0.009769954,0.000013227974,0.000030487316,0.14067192,0.648158,0.19780596],"study_design_scores_gemma":[0.0001677476,0.000019904455,0.019762047,0.000014039362,0.000005436198,0.000009887249,0.0000994198,0.000011462342,0.0000068239306,0.0012931976,0.9785383,0.00007176929],"about_ca_topic_score_codex":0.24656866,"about_ca_topic_score_gemma":0.4993023,"teacher_disagreement_score":0.7765817,"about_ca_system_score_codex":0.00013344493,"about_ca_system_score_gemma":0.00020772305,"threshold_uncertainty_score":0.7584485},"labels":[],"label_agreement":null},{"id":"W2936273289","doi":"10.2749/vancouver.2017.1478","title":"Distributed Sensing to Assess the Impact of Support Conditions on Slab Behaviour","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Advanced Fiber Optic Sensors","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Slab; Structural engineering; Deflection (physics); Stiffness; Materials science; Work (physics); Flexural strength; Bending; Engineering; Mechanical engineering; Physics","score_opus":0.041835389079938605,"score_gpt":0.352700449666023,"score_spread":0.3108650605860844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936273289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98750484,0.0000016128911,0.0045986003,0.00007888754,0.00024175161,0.0001648894,0.00013395779,0.0001006892,0.007174782],"genre_scores_gemma":[0.9990046,0.0000011732392,0.00060244877,0.0000060921448,0.00004865943,0.000003342357,0.00007098817,0.00002705125,0.00023566335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9992705,0.000007029875,0.000248166,0.00012859167,0.00015629551,0.00018939906],"domain_scores_gemma":[0.9987422,0.000052600833,0.00012594185,0.00091795006,0.00008239717,0.00007889012],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013413496,0.00011556573,0.00016772152,0.00003372615,0.00014058182,0.000036588033,0.00013104742,0.000047449274,0.000042412674],"category_scores_gemma":[0.00027512384,0.0000867561,0.00009654444,0.000052691557,0.000045286466,0.000080283964,0.000030268919,0.00012610175,0.000024599207],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038096347,0.00014892752,0.1954856,0.000046754678,0.0005963653,0.006447651,0.00073593884,0.63241106,0.1296759,0.00055838097,0.030681368,0.0031739543],"study_design_scores_gemma":[0.0001679504,0.00007821977,0.96633947,0.00004337763,0.000046769903,0.0010804596,0.00007677217,0.0023000678,0.02875806,0.00013618924,0.0007482675,0.00022438835],"about_ca_topic_score_codex":0.0000747431,"about_ca_topic_score_gemma":0.0000074927193,"teacher_disagreement_score":0.7708539,"about_ca_system_score_codex":0.0001082983,"about_ca_system_score_gemma":0.00003601403,"threshold_uncertainty_score":0.35378113},"labels":[],"label_agreement":null},{"id":"W2936451852","doi":"10.2749/vancouver.2017.0487","title":"Northeast Anthony Henday Drive / Yellowhead Trail System Interchange","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Pipeline transport; Pier; Yard; Coal mining; Coal; Bridge (graph theory); Oil refinery","score_opus":0.011118525042109239,"score_gpt":0.2353373815186196,"score_spread":0.22421885647651035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936451852","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8684354,0.00008483054,0.008369198,0.00010366782,0.0015954635,0.00022743754,0.000009788055,0.00045216797,0.12072205],"genre_scores_gemma":[0.9982518,0.000006296576,0.00024367282,0.000009250806,0.00029467087,0.000017297087,0.00001083651,0.000030443718,0.0011357508],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99897814,0.00001531061,0.0003170154,0.00023494977,0.00016703646,0.00028756293],"domain_scores_gemma":[0.99872285,0.000014092643,0.00009432867,0.0009834698,0.00007865662,0.00010659815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002397154,0.00016740394,0.0002468598,0.00004357848,0.00022710024,0.00011325127,0.00023680614,0.00010271548,0.000057416306],"category_scores_gemma":[0.000067333975,0.00015064671,0.000107295615,0.000032539043,0.000091729424,0.00025967485,0.00005629526,0.0001731765,0.000025108322],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010771358,0.0002260454,0.72978073,0.00575701,0.001214262,0.024979154,0.019703327,0.001725367,0.0077654254,0.007875659,0.029163504,0.1717018],"study_design_scores_gemma":[0.00091918744,0.00014606102,0.6835727,0.00032503,0.00013602995,0.006053491,0.0045560165,0.011611389,0.0031676881,0.0023700513,0.2857423,0.0014000533],"about_ca_topic_score_codex":0.00018037761,"about_ca_topic_score_gemma":0.00016177507,"teacher_disagreement_score":0.2565788,"about_ca_system_score_codex":0.00023750821,"about_ca_system_score_gemma":0.000042747724,"threshold_uncertainty_score":0.61431944},"labels":[],"label_agreement":null},{"id":"W2937202072","doi":"10.2749/vancouver.2017.2285","title":"The dynamic evaluation of composite materials footbridges","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Structural dynamics; Natural frequency; Vibration; Structural engineering; Modal; Modal analysis; Dynamic load testing; Acceleration; Pedestrian; Dynamic testing; Dynamic loading; Traffic volume; Computer science; Engineering; Civil engineering; Finite element method; Transport engineering; Physics; Acoustics; Materials science","score_opus":0.018720771288928014,"score_gpt":0.2952220273309415,"score_spread":0.2765012560420135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937202072","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99322087,0.0001259006,0.0038700684,0.000055884182,0.0004496404,0.000053306227,0.0000024505287,0.000054529406,0.0021673436],"genre_scores_gemma":[0.99971306,0.000026223412,0.00009802818,7.386132e-7,0.000021859289,0.0000056491945,0.000010147281,0.0000067643946,0.00011751081],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954104,0.000008659705,0.00017192685,0.000048988448,0.00017372356,0.00005566564],"domain_scores_gemma":[0.99945813,0.000011047428,0.00008208541,0.00036302934,0.00007253935,0.000013142016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037458003,0.000045594385,0.00007986633,0.0000167631,0.00011024414,0.00005466658,0.00008972985,0.000019139059,0.00002058241],"category_scores_gemma":[0.000074381445,0.000032414144,0.000029279225,0.000017277152,0.000024619194,0.000050083952,0.000010582953,0.00002079945,0.000003130379],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000492283,0.000005343361,0.0010757955,0.0000585148,0.00032994236,0.000014353697,0.0000789377,0.35159442,0.5645323,0.0004484693,0.0003701659,0.08148687],"study_design_scores_gemma":[0.0001375616,0.00000595817,0.25463057,0.000018275789,0.00011431318,0.00006430947,0.00001808565,0.52384543,0.22011985,0.00025749116,0.00068431534,0.00010383195],"about_ca_topic_score_codex":0.000023929211,"about_ca_topic_score_gemma":0.0000101748265,"teacher_disagreement_score":0.34441242,"about_ca_system_score_codex":0.000024511883,"about_ca_system_score_gemma":0.000008101549,"threshold_uncertainty_score":0.13218103},"labels":[],"label_agreement":null},{"id":"W2937339575","doi":"10.2749/vancouver.2017.2098","title":"Innovative Means and Methods for the New Champlain Bridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Offshore Engineering and Technologies","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Precast concrete; Engineering; Span (engineering); Schedule; Civil engineering; Computer science; Operating system","score_opus":0.03482739520630403,"score_gpt":0.340771444580852,"score_spread":0.305944049374548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937339575","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009167766,0.0006710567,0.98466784,0.00075935037,0.0009638785,0.00016900092,0.0000025258441,0.00050246407,0.003096101],"genre_scores_gemma":[0.9079677,0.00012023228,0.09066179,0.000008604231,0.00028288175,0.00003716191,0.000002503486,0.000026932777,0.0008921966],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965334,0.000002001808,0.00010539607,0.000090316425,0.000033996927,0.00011493167],"domain_scores_gemma":[0.99939597,0.000095937074,0.000035273002,0.00042778635,0.000026755433,0.000018253808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033041343,0.00007510984,0.00009882145,0.000026243182,0.000121005076,0.000051089344,0.0001316935,0.000050365208,0.0000015405516],"category_scores_gemma":[0.00062176184,0.000053733733,0.00001944004,0.000040305855,0.000038904785,0.00005084481,0.00004065457,0.000090388414,6.967286e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027539893,0.000003607081,0.0013110073,0.00005325524,0.0001749732,0.00003167154,0.0002593226,0.0010055952,0.0031555959,0.008378408,0.02663089,0.9589929],"study_design_scores_gemma":[0.0002085932,0.000026852686,0.04742825,0.000025580917,0.000022768176,0.00027013823,0.00004745932,0.027375862,0.02199468,0.0037624193,0.89860225,0.00023517391],"about_ca_topic_score_codex":0.000024721387,"about_ca_topic_score_gemma":0.0000046594027,"teacher_disagreement_score":0.95875776,"about_ca_system_score_codex":0.000011268507,"about_ca_system_score_gemma":0.0000108426975,"threshold_uncertainty_score":0.2191198},"labels":[],"label_agreement":null},{"id":"W2938664617","doi":"10.2749/vancouver.2017.2642","title":"Creative Construction Method for an Attractive Tied Arch","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Arch; Girder; Truss; Structural engineering; Bridge (graph theory); Engineering; Span (engineering); Arch bridge; Beam bridge","score_opus":0.041425427942878595,"score_gpt":0.36080247035243523,"score_spread":0.31937704240955667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938664617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05411306,0.000009467859,0.9335342,0.000026051037,0.00033576787,0.00010394986,0.0000073052224,0.00018505439,0.011685111],"genre_scores_gemma":[0.88880503,0.0000037840455,0.110532634,0.000003840414,0.00012531911,0.000025471525,0.000031347507,0.000016220278,0.00045634853],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999545,0.0000070617475,0.00014522475,0.00013173648,0.000073499956,0.00009752013],"domain_scores_gemma":[0.9994762,0.000026592632,0.000071021954,0.0003070658,0.00006779763,0.000051314255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013178129,0.000081541366,0.0001350337,0.000046523703,0.00016625614,0.00005226498,0.000068319205,0.000048710608,0.000027049262],"category_scores_gemma":[0.00010846405,0.000077522476,0.00006174719,0.00002691685,0.000027177979,0.00020820572,0.0000062273853,0.00006530879,0.0000020536534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007528322,0.000030608942,0.0050831414,0.00017577466,0.0015014118,0.00011147628,0.0014823087,0.34528404,0.12137725,0.009346077,0.0012300743,0.51430255],"study_design_scores_gemma":[0.00038571015,0.000056936475,0.04270599,0.000016035587,0.00014220749,0.0004742837,0.00042784945,0.8246028,0.12339123,0.0012755976,0.0061692414,0.00035213205],"about_ca_topic_score_codex":0.0001231436,"about_ca_topic_score_gemma":0.00001600576,"teacher_disagreement_score":0.83469194,"about_ca_system_score_codex":0.000037888272,"about_ca_system_score_gemma":0.000012421624,"threshold_uncertainty_score":0.31612748},"labels":[],"label_agreement":null},{"id":"W2938959648","doi":"10.2749/vancouver.2017.3183","title":"Application of Performance Based Design to Highway and Transit Structures","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Bridge (graph theory); Computer science; Parametric statistics; Conceptual design; Displacement (psychology); Design methods; Simple (philosophy); Transit (satellite); Limiting; Structural engineering; Engineering; Transport engineering; Public transport; Mechanical engineering; Mathematics","score_opus":0.012441411863854222,"score_gpt":0.22961446962235915,"score_spread":0.21717305775850493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938959648","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19260888,0.0000147884675,0.8069023,0.00002932856,0.000038647948,0.00005288309,8.82745e-7,0.000057709032,0.00029460178],"genre_scores_gemma":[0.99194324,0.0000037352802,0.007992457,0.000005008902,0.00001677282,0.000006470542,0.0000031057655,0.0000070472893,0.000022171977],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999697,0.0000017959356,0.00011310557,0.000072473136,0.00006457494,0.00005104895],"domain_scores_gemma":[0.9996626,0.0000061386995,0.000030602077,0.00024635033,0.000020101226,0.000034253902],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000544413,0.000052194937,0.00008510764,0.000038617327,0.00004388964,0.000015727988,0.000053623513,0.00002435609,0.000007764069],"category_scores_gemma":[0.000013045635,0.000047226124,0.000016719025,0.00003120398,0.000012766184,0.000050387145,0.0000034439786,0.000026047328,8.8007005e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037069963,8.867656e-7,0.0017176279,0.000048765105,0.000020540643,0.0000031253605,0.00003800268,0.91148144,0.03965205,0.00009329076,0.000039018214,0.04690155],"study_design_scores_gemma":[0.00006487908,0.000009287577,0.12525459,0.000006080704,0.00001460875,0.000014203688,0.0000026351884,0.7099454,0.16385606,0.000018860217,0.00074156,0.000071873765],"about_ca_topic_score_codex":0.000013100914,"about_ca_topic_score_gemma":0.0000015049776,"teacher_disagreement_score":0.79933435,"about_ca_system_score_codex":0.000008020612,"about_ca_system_score_gemma":0.0000050068647,"threshold_uncertainty_score":0.19258253},"labels":[],"label_agreement":null},{"id":"W2938976718","doi":"10.2749/vancouver.2017.2771","title":"Special Accommodation for Structural Steel Coating of Burlington Bay Skyway","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Bridge (graph theory); Closure (psychology); Engineering; Overhead (engineering); Accommodation; Structural engineering; Arch; Wind engineering; Forensic engineering; Computer science; Electrical engineering; Medicine","score_opus":0.01533684699454975,"score_gpt":0.2749565417275304,"score_spread":0.2596196947329807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938976718","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97148144,0.000011868395,0.005520997,0.000012325583,0.0046371133,0.00018155485,0.000007525493,0.00006188371,0.018085316],"genre_scores_gemma":[0.99002534,0.0000031734048,0.0048741987,0.0000019308152,0.004881096,0.00000819748,0.000016398613,0.000019464429,0.00017020408],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9993537,0.0000022625725,0.0002712828,0.00010472589,0.000108621396,0.0001594036],"domain_scores_gemma":[0.99934214,0.000017436165,0.00019222136,0.0003369062,0.00008678257,0.000024506931],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014460551,0.000090041074,0.00015281413,0.000029145001,0.00015446609,0.000043981974,0.00012959943,0.00005713976,0.000012724923],"category_scores_gemma":[0.00017407328,0.00008400927,0.000059174006,0.0000148572735,0.000023258763,0.00017868016,0.000028202357,0.00007534389,7.88942e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009995047,0.000016021588,0.29640564,0.0010326739,0.00030547858,0.00020347319,0.0020967647,0.07099115,0.32935813,0.005879142,0.008768988,0.28484255],"study_design_scores_gemma":[0.0012926682,0.00008378375,0.50094616,0.00028235852,0.00008771848,0.00027188406,0.00031885976,0.03805794,0.3878477,0.0033149049,0.06677081,0.0007251972],"about_ca_topic_score_codex":0.00001521673,"about_ca_topic_score_gemma":0.000015412266,"teacher_disagreement_score":0.28411737,"about_ca_system_score_codex":0.00004110313,"about_ca_system_score_gemma":0.000017192175,"threshold_uncertainty_score":0.34257984},"labels":[],"label_agreement":null},{"id":"W2940001422","doi":"10.2749/vancouver.2017.3060","title":"Sustainable Serviceability of Structural Concrete","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Serviceability (structure); Structural engineering; Cracking; Prestressed concrete; Deflection (physics); Creep; Grid; Cartesian coordinate system; Compatibility (geochemistry); Reinforced concrete; Engineering; Geotechnical engineering; Materials science; Mathematics; Physics; Geometry; Composite material","score_opus":0.011103219822617588,"score_gpt":0.2546809629335347,"score_spread":0.24357774311091712,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940001422","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97503936,0.00005319373,0.00006323265,0.000044654036,0.0002535351,0.00012182201,0.0000033066356,0.000108365486,0.024312528],"genre_scores_gemma":[0.99895173,0.0000022830116,0.0001393131,0.0000058147366,0.000029882298,0.000003869236,0.0000039120105,0.000009057882,0.00085414166],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993022,0.0000088159195,0.0002674112,0.00013683498,0.00011992437,0.00016479591],"domain_scores_gemma":[0.99861145,0.00002192045,0.00009774154,0.0010547353,0.000151019,0.00006315589],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029372048,0.000081725106,0.00017753388,0.00001504579,0.0001102577,0.000034232256,0.00018021713,0.00005170654,0.00019572275],"category_scores_gemma":[0.00031857053,0.00007536719,0.00006572024,0.000025882808,0.00007151407,0.00015773028,0.00008598945,0.00007818635,0.000004090098],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046672663,0.0000021661526,0.92418027,0.0015981311,0.000050261937,0.00083138584,0.0006769451,0.00027574567,0.06503663,0.0030621057,0.00086756016,0.0033721458],"study_design_scores_gemma":[0.0004503098,0.000033370216,0.9139749,0.000024206736,0.000028049668,0.00024090751,0.00038409646,0.013321647,0.057283502,0.0020659945,0.01185159,0.00034145176],"about_ca_topic_score_codex":0.00028814154,"about_ca_topic_score_gemma":0.000017235838,"teacher_disagreement_score":0.023912365,"about_ca_system_score_codex":0.000045637782,"about_ca_system_score_gemma":0.00003634481,"threshold_uncertainty_score":0.3073385},"labels":[],"label_agreement":null},{"id":"W2941382995","doi":"10.2749/vancouver.2017.1734","title":"Opening effect on punching shear strength of RC slabs","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Queen's University","funders":"","keywords":"Slab; Structural engineering; Punching; Shear (geology); Finite element method; Reinforced concrete; Materials science; Shear strength (soil); Geotechnical engineering; Geology; Composite material; Engineering","score_opus":0.01337343778137509,"score_gpt":0.2695664292780703,"score_spread":0.2561929914966952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2941382995","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9624179,0.000023476974,0.00008628782,0.000006957036,0.00053802296,0.00012697515,0.0000018655661,0.000134175,0.036664348],"genre_scores_gemma":[0.99871683,0.0000022505264,0.00078410475,0.0000025077616,0.0000749596,0.0000060044017,0.0000054279303,0.000027536184,0.0003803936],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991894,0.0000071503164,0.00025522584,0.00014531624,0.00022200639,0.00018092294],"domain_scores_gemma":[0.9989703,0.00004516948,0.00014040055,0.0007630397,0.000023161658,0.000057894653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019579375,0.00014068864,0.0002381787,0.00004594446,0.0001023237,0.00006118817,0.00023638937,0.00006553721,0.00004452797],"category_scores_gemma":[0.0002321093,0.00012264593,0.00008497187,0.000023836401,0.00002880783,0.00017282605,0.000055759316,0.00017650057,0.00001613425],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058366342,8.2413237e-7,0.072675675,0.00035285656,0.00024731783,0.0031954471,0.00034443688,0.008794469,0.6089266,0.0006967504,0.0004006733,0.3043066],"study_design_scores_gemma":[0.00043398974,0.00017386916,0.05968355,0.00020553265,0.000054432196,0.00039788085,0.000010091179,0.0032759423,0.9331805,0.000019690204,0.0022539273,0.00031057396],"about_ca_topic_score_codex":0.00008303064,"about_ca_topic_score_gemma":6.065188e-7,"teacher_disagreement_score":0.32425392,"about_ca_system_score_codex":0.000042861302,"about_ca_system_score_gemma":0.000013073421,"threshold_uncertainty_score":0.50013554},"labels":[],"label_agreement":null},{"id":"W2941543166","doi":"10.2749/vancouver.2017.1042","title":"Engineering the Oculus – World Trade Center PATH Transportation Hub","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Buckland & Taylor (Canada)","funders":"","keywords":"Arch; Shoring; Schedule; Computer science; Downtown; Engineering; Structural engineering; Geography; Operating system","score_opus":0.008289055457501771,"score_gpt":0.21530314982027401,"score_spread":0.20701409436277224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2941543166","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7302145,0.00040770962,0.2379535,0.0021415164,0.0041368864,0.00044679467,0.000044134533,0.0021132028,0.022541776],"genre_scores_gemma":[0.9989263,0.00001545956,0.0003512625,0.000015740105,0.00012960513,0.000010400487,0.000031348598,0.000023324807,0.0004965881],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99938256,0.0000025978936,0.00021540458,0.000115058676,0.00013770886,0.00014664688],"domain_scores_gemma":[0.99942666,0.000010841982,0.0000507239,0.00045225015,0.000010102144,0.000049415412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000084098225,0.00011512713,0.00011745109,0.000049682458,0.00012370161,0.000086664106,0.00014885233,0.000032279815,0.0000584508],"category_scores_gemma":[0.000020684309,0.000087152825,0.000098453274,0.000071765106,0.000016385095,0.00014113207,0.0000036733438,0.00012205419,0.000008817098],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004343188,0.000013121618,0.012346077,0.000118760196,0.00035344003,0.0005107907,0.0005727306,0.9533311,0.008079437,0.0016541618,0.0047123726,0.01830368],"study_design_scores_gemma":[0.0002943916,0.000005847379,0.48596892,0.000049268976,0.000087372326,0.00013920334,0.0000396208,0.41202885,0.0068663717,0.000037050722,0.09409589,0.00038723557],"about_ca_topic_score_codex":0.00002361934,"about_ca_topic_score_gemma":0.00004845304,"teacher_disagreement_score":0.54130226,"about_ca_system_score_codex":0.000028694074,"about_ca_system_score_gemma":0.000005396007,"threshold_uncertainty_score":0.3553989},"labels":[],"label_agreement":null},{"id":"W2943075607","doi":"10.2749/vancouver.2017.1521","title":"The Existing Champlain Bridge – Assessment Using Refined Analyses","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; McGill University","funders":"","keywords":"Girder; Structural engineering; Finite element method; Bridge (graph theory); Engineering; Corrosion; Linear elasticity; Materials science; Composite material","score_opus":0.15584284546943472,"score_gpt":0.4212043432392835,"score_spread":0.2653614977698488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2943075607","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63774496,0.00024899424,0.3269208,0.00028046544,0.0012225232,0.0001101174,0.0000043669666,0.0005825801,0.032885168],"genre_scores_gemma":[0.99685127,0.000016877497,0.0025283387,0.0000054375187,0.00013292307,0.0000035833975,0.000012648075,0.000016363349,0.00043255213],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993234,0.000007903793,0.000242922,0.000114856564,0.00015474268,0.0001561458],"domain_scores_gemma":[0.9991907,0.000032495172,0.0001093991,0.00058335875,0.000039096478,0.000044977645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024375558,0.00009886276,0.0001304966,0.00003558713,0.000591734,0.00022018855,0.0001475023,0.00003112824,0.000011742684],"category_scores_gemma":[0.0001490643,0.00007183019,0.00007854838,0.00005948169,0.0000317675,0.00009878613,0.000028782611,0.000095099815,0.0000017512102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004170175,0.00000797692,0.008905019,0.00007453905,0.0008459108,0.0006929531,0.000101746526,0.8392835,0.0857646,0.0022377088,0.0013235698,0.06075828],"study_design_scores_gemma":[0.0000813294,0.00000349754,0.12913199,0.000018846185,0.000054993376,0.00021775464,0.000028234843,0.8581328,0.0022186176,0.000075049655,0.009864957,0.00017195364],"about_ca_topic_score_codex":0.00014042946,"about_ca_topic_score_gemma":0.000026574904,"teacher_disagreement_score":0.3591063,"about_ca_system_score_codex":0.00007111339,"about_ca_system_score_gemma":0.000018848894,"threshold_uncertainty_score":0.45511997},"labels":[],"label_agreement":null},{"id":"W2943204623","doi":"10.2749/vancouver.2017.1453","title":"Construction of the Terwillegar Park Stressed-Ribbon Footbridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Bridge (graph theory); Engineering; Structural engineering; Ribbon; Stiffness; Deck; Civil engineering; Mathematics; Geometry","score_opus":0.006721239638614779,"score_gpt":0.2105763368934581,"score_spread":0.2038550972548433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2943204623","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9805111,0.00004938862,0.008987595,0.00008479412,0.0008429159,0.000048810984,0.000004972495,0.00010266903,0.009367753],"genre_scores_gemma":[0.99929917,0.000012180223,0.00037545763,0.0000022324048,0.000057482142,0.000002248863,0.0000030674364,0.000008569105,0.0002396045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.999574,0.0000036783204,0.00017463288,0.0000712471,0.00010573005,0.00007068248],"domain_scores_gemma":[0.9993413,0.0000059848117,0.00009457638,0.0005073825,0.000028290096,0.000022438064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000048172886,0.00006362046,0.00010084329,0.000022885652,0.00009007826,0.000025649022,0.00012002083,0.00003511921,0.000026795647],"category_scores_gemma":[0.000056206594,0.0000458634,0.00007429217,0.00003975391,0.00005465316,0.00006954623,0.000019062201,0.000060969873,0.0000018392109],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011520506,0.000022909602,0.32617626,0.00040971872,0.00086917786,0.00015362469,0.00032695997,0.45151418,0.05475067,0.0074815173,0.0053009163,0.15298255],"study_design_scores_gemma":[0.0003158114,0.000013233524,0.67656523,0.0000886703,0.00011900464,0.00055916887,0.00012234972,0.113209955,0.18373895,0.00026201844,0.024676178,0.0003294224],"about_ca_topic_score_codex":0.000061019917,"about_ca_topic_score_gemma":0.000011259873,"teacher_disagreement_score":0.35038897,"about_ca_system_score_codex":0.000015512325,"about_ca_system_score_gemma":0.000008835008,"threshold_uncertainty_score":0.18702552},"labels":[],"label_agreement":null},{"id":"W2943385173","doi":"10.2749/vancouver.2017.2059","title":"The New Champlain Bridge Corridor Project – Needs, Owner","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Infrastructure Canada; Innovation, Science and Economic Development Canada","funders":"","keywords":"Bridge (graph theory); Schedule; Government (linguistics); Engineering; Transport engineering; Civil engineering; Telecommunications; Computer science","score_opus":0.021986830263252193,"score_gpt":0.2679834162293029,"score_spread":0.2459965859660507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2943385173","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3860846,0.0015421429,0.4215235,0.006714345,0.012941306,0.0012411597,0.000026976515,0.0042814454,0.16564451],"genre_scores_gemma":[0.98000205,0.00005142823,0.00020726564,0.0000138230835,0.00030600053,0.0000072483276,0.000009928872,0.000020659663,0.019381614],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994409,0.000003725645,0.00017915307,0.00008892662,0.00012783716,0.00015946494],"domain_scores_gemma":[0.9992224,0.000017748882,0.00006278124,0.00061878096,0.000022075501,0.000056234392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012251116,0.000099087236,0.00010799879,0.000044822355,0.00027281503,0.00017876261,0.00018000137,0.000039011462,0.000025731404],"category_scores_gemma":[0.00012877767,0.00005593479,0.00007358083,0.00007176502,0.000026414762,0.00009354695,0.000022289556,0.00009394729,0.000025881038],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016391836,0.000009212388,0.0062760566,0.00007622103,0.0007125776,0.00062146474,0.0009353942,0.0745242,0.004724648,0.0023417652,0.49249777,0.4172643],"study_design_scores_gemma":[0.00018926119,0.000009618282,0.051154926,0.000016277201,0.000038989838,0.0005264925,0.000059607533,0.09598853,0.0028314984,0.000105829655,0.84879726,0.00028168276],"about_ca_topic_score_codex":0.00030119048,"about_ca_topic_score_gemma":0.00004767069,"teacher_disagreement_score":0.5939174,"about_ca_system_score_codex":0.00002697321,"about_ca_system_score_gemma":0.000034505654,"threshold_uncertainty_score":0.22809546},"labels":[],"label_agreement":null},{"id":"W2944792611","doi":"10.2749/vancouver.2017.1537","title":"The Existing Champlain Bridge - Strengthening Measures","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Champlain Regional College; Stantec (Canada)","funders":"","keywords":"Girder; Precast concrete; Bridge (graph theory); Structural engineering; Deck; Engineering; Infill; Enhanced Data Rates for GSM Evolution; Civil engineering; Telecommunications","score_opus":0.04478668550715433,"score_gpt":0.28431861405839504,"score_spread":0.2395319285512407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2944792611","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69349015,0.00088583503,0.19811633,0.00050097494,0.0024101061,0.00015705195,0.0000054513566,0.0014701473,0.10296397],"genre_scores_gemma":[0.99877125,0.000026389998,0.00028585535,0.0000030479243,0.00015386828,0.0000047728468,0.0000036340398,0.0000149263815,0.00073626],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999447,0.000004807981,0.00018088924,0.00008852302,0.00013752194,0.00014125752],"domain_scores_gemma":[0.9993592,0.000034630742,0.00006528647,0.0004732707,0.000027600894,0.000040014755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023680466,0.00008016616,0.000086174936,0.000019914523,0.00054716616,0.00018908875,0.00015525808,0.000027299131,0.0000091473175],"category_scores_gemma":[0.00033088593,0.00005812646,0.000055031425,0.000028440085,0.000031042768,0.000078338206,0.00001948986,0.0000928615,0.0000074427285],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053178583,0.000004455343,0.009694522,0.000053771964,0.0005200377,0.00055085693,0.00055375975,0.2504443,0.008003181,0.0044870568,0.0039932714,0.72168946],"study_design_scores_gemma":[0.00025794184,0.000010556318,0.22444545,0.0000662689,0.0000684498,0.00076246384,0.00015425487,0.5741053,0.011131858,0.0005226321,0.18787819,0.00059659954],"about_ca_topic_score_codex":0.000065968714,"about_ca_topic_score_gemma":0.000034796885,"teacher_disagreement_score":0.7210929,"about_ca_system_score_codex":0.000023144725,"about_ca_system_score_gemma":0.0000070614255,"threshold_uncertainty_score":0.42084152},"labels":[],"label_agreement":null},{"id":"W2944843998","doi":"10.2749/vancouver.2017.1513","title":"The Existing Champlain Bridge – Instrumentation, Monitoring and Load Tests","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"GlobVision (Canada); Champlain Regional College","funders":"","keywords":"Girder; Bridge (graph theory); Instrumentation (computer programming); Span (engineering); Structural engineering; Load testing; Engineering; Flexural strength; Structural health monitoring; Geotechnical engineering; Forensic engineering; Computer science","score_opus":0.030736958708897654,"score_gpt":0.29801175341624464,"score_spread":0.267274794707347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2944843998","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9902468,0.00019651426,0.0038891337,0.00010376286,0.0007138493,0.000043023778,6.1538555e-7,0.0001728241,0.004633521],"genre_scores_gemma":[0.99898297,0.000064025844,0.00038918186,0.0000013973183,0.00013581479,0.0000054248558,0.0000016719091,0.00000998132,0.000409519],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9995587,0.0000027145923,0.00014501996,0.00008305788,0.00011028586,0.00010024603],"domain_scores_gemma":[0.9995883,0.000025466848,0.000054020795,0.0002632172,0.00003120218,0.000037752565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014084573,0.00006652684,0.00006518238,0.000014865411,0.00041701354,0.00018769561,0.00007066906,0.000021301184,0.0000023568948],"category_scores_gemma":[0.00018684291,0.000052433505,0.0000198857,0.000026725442,0.000028914072,0.00011573341,0.000019484565,0.000059131457,0.0000026068915],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053588988,0.0000048497013,0.32847777,0.00011964009,0.00034162,0.00033376945,0.0009694421,0.03101896,0.017754622,0.0012874271,0.0008908524,0.6187957],"study_design_scores_gemma":[0.00011640902,0.0000040505606,0.95977205,0.000027053575,0.000015861911,0.00027061068,0.00007104161,0.028111013,0.005086921,0.000125285,0.006254979,0.00014473214],"about_ca_topic_score_codex":0.000086076856,"about_ca_topic_score_gemma":0.000014264984,"teacher_disagreement_score":0.63129425,"about_ca_system_score_codex":0.000039448456,"about_ca_system_score_gemma":0.000008704791,"threshold_uncertainty_score":0.32073733},"labels":[],"label_agreement":null},{"id":"W2945247437","doi":"10.2749/vancouver.2017.1505","title":"The Existing Champlain Bridge - Overview of Issues – The Owner’s Perspective","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Girder; Bridge (graph theory); Forensic engineering; Corrosion; Engineering; Truss; Civil engineering; Reinforced concrete; Structural engineering; Materials science","score_opus":0.12085447752563463,"score_gpt":0.3748722572023852,"score_spread":0.25401777967675054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945247437","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8010218,0.009621662,0.00046015665,0.005997023,0.0016110927,0.0005289188,0.000013329015,0.0002833115,0.18046267],"genre_scores_gemma":[0.99745643,0.00037640645,0.000027246097,0.000012119816,0.000102268976,0.000008770482,7.6232874e-7,0.000009685123,0.002006338],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99938977,0.000021037036,0.00021295734,0.000112552014,0.00014434938,0.000119327335],"domain_scores_gemma":[0.9986732,0.000111935326,0.00012606973,0.0009658538,0.000096505406,0.000026458207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007302899,0.00007483539,0.00012313407,0.0000069576763,0.00038081338,0.00006443726,0.0002376007,0.000026630505,0.000030754847],"category_scores_gemma":[0.0011187069,0.00003529084,0.00007866059,0.000026888565,0.00011530801,0.00005196076,0.00007808841,0.00010294474,0.0000070933934],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015531848,0.00013708607,0.19244514,0.0013489425,0.0006902913,0.0017116838,0.034703415,0.0008490972,0.054764725,0.21444346,0.06951293,0.4292379],"study_design_scores_gemma":[0.00022031208,0.000029490935,0.6076803,0.00014214509,0.000037747544,0.0004232584,0.0015733939,0.004099166,0.0073820255,0.0054530934,0.37264594,0.00031308856],"about_ca_topic_score_codex":0.0005077834,"about_ca_topic_score_gemma":0.00015996337,"teacher_disagreement_score":0.42892483,"about_ca_system_score_codex":0.00004242236,"about_ca_system_score_gemma":0.00002110862,"threshold_uncertainty_score":0.29289472},"labels":[],"label_agreement":null},{"id":"W2945334468","doi":"10.2749/vancouver.2017.2536","title":"Fort Nelson River Bridge Superstructure Replacement &amp; Substructure Strengthening","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Constructability; Civil engineering; Upgrade; Engineering; Construction engineering; Infill; Transport engineering; Computer science; Systems engineering","score_opus":0.026689204415996405,"score_gpt":0.26858120448415973,"score_spread":0.24189200006816333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945334468","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9881866,0.000074821386,0.0016632954,0.000077176366,0.0011933869,0.00016821922,0.000012043223,0.00029298165,0.0083315],"genre_scores_gemma":[0.99781215,0.00001896695,0.00096428196,0.000023509525,0.00018940744,0.000008169025,0.000046170182,0.000031728476,0.000905598],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987891,0.000009926796,0.0003439072,0.0003282604,0.00025629488,0.0002725526],"domain_scores_gemma":[0.9981671,0.000017714874,0.00011269743,0.0015076251,0.00006104298,0.00013384396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021529666,0.00020175545,0.00023092038,0.00003424044,0.000270099,0.0001137634,0.00024453644,0.00013261633,0.00039227624],"category_scores_gemma":[0.00021703928,0.00018437924,0.00012260459,0.000034022047,0.00007562811,0.00018448384,0.00009172787,0.00024707924,0.00002203911],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000114758615,0.000018035058,0.8472909,0.000306213,0.00015691451,0.0009960346,0.003252888,0.0016729963,0.05596578,0.00047310352,0.025742494,0.0640099],"study_design_scores_gemma":[0.00058233034,0.000021646469,0.82607055,0.000048022455,0.00004773229,0.00096400885,0.000052011637,0.0019678215,0.009588723,0.00060306326,0.15950304,0.00055107527],"about_ca_topic_score_codex":0.00009595183,"about_ca_topic_score_gemma":0.00013573324,"teacher_disagreement_score":0.13376054,"about_ca_system_score_codex":0.00010431661,"about_ca_system_score_gemma":0.000029829382,"threshold_uncertainty_score":0.7518768},"labels":[],"label_agreement":null},{"id":"W2945398817","doi":"10.2749/vancouver.2017.2090","title":"Highway Approaches of the New Champlain Bridge Corridor","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Bridge (graph theory); Transport engineering; Civil engineering; Engineering","score_opus":0.04396076753257528,"score_gpt":0.23304963281908372,"score_spread":0.18908886528650845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945398817","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78698194,0.00025849987,0.1590007,0.00086618005,0.0024655592,0.00022208774,0.000011446662,0.0004903769,0.049703192],"genre_scores_gemma":[0.9974042,0.0000040625537,0.00030387685,0.000004199661,0.00009472486,0.0000016755556,0.0000036907334,0.000010454721,0.002173072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995882,0.0000028295974,0.00015497484,0.00007464952,0.000102716855,0.00007661242],"domain_scores_gemma":[0.99930036,0.000006613073,0.00007548291,0.0005666044,0.000014658244,0.00003627892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006471761,0.000065917004,0.00010986874,0.000019374404,0.00006786211,0.000025185565,0.00016468887,0.000032191117,0.000029532406],"category_scores_gemma":[0.00008108235,0.000046025456,0.00006972347,0.00005033069,0.000027071506,0.000053100026,0.000023993212,0.000059164864,0.000003943551],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011121242,0.000026932108,0.034083232,0.00035584223,0.00094575755,0.00017126855,0.0011781416,0.6811134,0.029544996,0.009219145,0.067812346,0.17553781],"study_design_scores_gemma":[0.00024248956,0.0000073977258,0.6997928,0.00003982237,0.000068174646,0.000293038,0.000034917994,0.20449156,0.07129558,0.00020292753,0.023255361,0.00027590524],"about_ca_topic_score_codex":0.00013538757,"about_ca_topic_score_gemma":0.00001874455,"teacher_disagreement_score":0.6657096,"about_ca_system_score_codex":0.000014305187,"about_ca_system_score_gemma":0.000018443247,"threshold_uncertainty_score":0.18768635},"labels":[],"label_agreement":null},{"id":"W2945839091","doi":"10.2749/vancouver.2017.2241","title":"Former Dominion Archives Building Seismic Upgrade Case Study","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Masonry and Concrete Structural Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Nordion (Canada)","funders":"","keywords":"Masonry; Dominion; Arch; Engineering; Masonry veneer; Structural engineering; Geotechnical engineering; Basement; Section (typography); Geology; Civil engineering; Computer science; Archaeology","score_opus":0.016031953011497315,"score_gpt":0.27079204783224886,"score_spread":0.25476009482075157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945839091","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9907363,0.000035896235,0.00083048845,0.000032457483,0.00023857795,0.00010410276,0.0000011971151,0.00009873273,0.007922228],"genre_scores_gemma":[0.9987135,0.000010479849,0.00039433825,0.000005086084,0.00015176096,0.000010034531,0.00000230362,0.0000128552,0.0006996331],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993674,0.000009647937,0.0002114599,0.0001620337,0.000094681236,0.00015478312],"domain_scores_gemma":[0.99930644,0.000017247961,0.000082946775,0.000526271,0.000008145264,0.000058962672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009753562,0.00011026447,0.00016441128,0.000043710377,0.00028617666,0.00008084829,0.00012322445,0.000025807132,0.00003790503],"category_scores_gemma":[0.000033019525,0.000092065544,0.00008904195,0.00002847817,0.00002480291,0.00014824118,0.000045965815,0.00010100947,0.0000041165176],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049480892,0.00006397131,0.2488639,0.0002761195,0.0022958654,0.30896437,0.0070783067,0.033863243,0.025788886,0.00034114294,0.001095869,0.37131882],"study_design_scores_gemma":[0.0022611427,0.00025998926,0.13008842,0.0001187833,0.0010830694,0.16920765,0.0057134503,0.623105,0.013297227,0.001964401,0.050747827,0.0021530618],"about_ca_topic_score_codex":0.00023631308,"about_ca_topic_score_gemma":0.000027542677,"teacher_disagreement_score":0.58924174,"about_ca_system_score_codex":0.00001051299,"about_ca_system_score_gemma":0.0000065260906,"threshold_uncertainty_score":0.3754324},"labels":[],"label_agreement":null},{"id":"W2946474474","doi":"10.2749/vancouver.2017.1847","title":"Member Stiffness for Frame Analysis of GFRP Reinforced Concrete Structures","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Structural engineering; Stiffness; Ampere; Materials science; Engineering; Electrical engineering; Current (fluid)","score_opus":0.025840731755812647,"score_gpt":0.29798524692840644,"score_spread":0.2721445151725938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2946474474","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9918011,0.0000373736,0.0029637655,0.000012167189,0.0005539819,0.0002833144,0.00005409457,0.0001660852,0.0041281194],"genre_scores_gemma":[0.99620456,0.0000070772594,0.0025425386,0.000008753327,0.00007623173,0.000028931481,0.00010097499,0.000035791032,0.0009951504],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99865,0.00000437309,0.0005570363,0.00022803765,0.00028158168,0.00027897742],"domain_scores_gemma":[0.9979967,0.00006523171,0.00038599808,0.0012636809,0.00018832885,0.00010006349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001344626,0.00021556666,0.0005805216,0.00017439721,0.00013041138,0.00008256666,0.00038524502,0.00016718448,0.00018274729],"category_scores_gemma":[0.00030456664,0.0001990738,0.00036422824,0.00013224443,0.00010601052,0.00022304898,0.00005745881,0.00012207683,0.000001903092],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021229715,2.1228097e-7,0.022060648,0.0006267407,0.010606589,0.0006396807,0.0008037903,0.1708552,0.76163334,0.0130700655,0.0015807437,0.017910706],"study_design_scores_gemma":[0.0014155649,0.00006708953,0.2793007,0.000058032576,0.0051987297,0.00025053075,0.00008973512,0.22094326,0.4838784,0.00032628595,0.007237208,0.0012344841],"about_ca_topic_score_codex":0.00014297655,"about_ca_topic_score_gemma":0.0000031633795,"teacher_disagreement_score":0.27775493,"about_ca_system_score_codex":0.00004617959,"about_ca_system_score_gemma":0.0000329935,"threshold_uncertainty_score":0.8117994},"labels":[],"label_agreement":null},{"id":"W2947361593","doi":"10.2749/vancouver.2017.1529","title":"The Existing Champlain Bridge - Assessment of Structural Deficiencies","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Champlain Regional College; Stantec (Canada)","funders":"","keywords":"Girder; Bridge (graph theory); Precast concrete; Engineering; Rehabilitation; Plan (archaeology); Forensic engineering; Structural engineering; Civil engineering; Computer science; Construction engineering; Geology","score_opus":0.054595104217671525,"score_gpt":0.3434889638047809,"score_spread":0.28889385958710934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947361593","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.969941,0.000064979955,0.00080307934,0.000046636113,0.00044677424,0.00006271843,0.00000250056,0.000055744913,0.028576536],"genre_scores_gemma":[0.9995519,0.0000062970876,0.00024080207,0.000002240974,0.000029484716,0.0000034238833,0.0000015024707,0.0000053648005,0.00015900626],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99943215,0.0000073870206,0.00021736244,0.00008466384,0.00014422782,0.00011419067],"domain_scores_gemma":[0.9991746,0.00006039012,0.00010695898,0.00058573025,0.00004507122,0.000027258693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004311742,0.000056717297,0.00009198467,0.000008182061,0.00033150223,0.00006145546,0.00015703484,0.000020190753,0.000013637455],"category_scores_gemma":[0.0003554068,0.00003883662,0.00004349551,0.000016920478,0.00008221359,0.000051821207,0.00005746929,0.000069104855,8.102364e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006107443,0.000006289659,0.87215763,0.00015670642,0.000028179162,0.00019505194,0.0004705025,0.0011255632,0.06130259,0.0082912175,0.00069101725,0.055569112],"study_design_scores_gemma":[0.000045603254,0.000005999186,0.97604674,0.000009363293,0.000003258107,0.00010360154,0.000039723192,0.019089753,0.0016124685,0.00015886938,0.002823817,0.000060782353],"about_ca_topic_score_codex":0.00006891553,"about_ca_topic_score_gemma":0.00004293622,"teacher_disagreement_score":0.1038891,"about_ca_system_score_codex":0.00003204201,"about_ca_system_score_gemma":0.000029788278,"threshold_uncertainty_score":0.25496808},"labels":[],"label_agreement":null},{"id":"W2948535170","doi":"10.2749/vancouver.2017.2763","title":"The 102nd Avenue Bridge over Groat Road – Design Concept and Challenges","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Aecom (Canada)","funders":"","keywords":"Abutment; Span (engineering); Bridge (graph theory); Structural engineering; Engineering; Medicine","score_opus":0.04587216262251069,"score_gpt":0.2583326864664263,"score_spread":0.21246052384391562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2948535170","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7750592,0.0524763,0.13581108,0.003441984,0.004052122,0.0006447694,0.00001686392,0.0013559995,0.027141647],"genre_scores_gemma":[0.9978052,0.0015348507,0.00013200719,0.000004783921,0.00010826393,0.000003565753,0.0000017095655,0.000012660457,0.00039699],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9995898,0.0000069855378,0.00011461066,0.00009873346,0.00008518597,0.00010470549],"domain_scores_gemma":[0.9995024,0.00002520804,0.00004450165,0.00037175723,0.000014894861,0.000041216088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000121154924,0.00007805952,0.00009396636,0.000014062121,0.00019796606,0.000098895245,0.0000882493,0.000036212397,0.000009629365],"category_scores_gemma":[0.00007389283,0.000057633835,0.0000327576,0.0000139705835,0.000051617597,0.000086199674,0.000017912836,0.000062447485,0.00000416515],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008736218,0.0000065917984,0.0010888127,0.0000872457,0.00056340446,0.0005435267,0.0016320706,0.035767823,0.00291177,0.0026878575,0.0065050186,0.9481971],"study_design_scores_gemma":[0.00026444864,0.000017808019,0.8000585,0.000028424492,0.000058010533,0.0004188218,0.00006530581,0.1363796,0.0034892564,0.00034663317,0.05854633,0.00032688605],"about_ca_topic_score_codex":0.00003044038,"about_ca_topic_score_gemma":0.000008520488,"teacher_disagreement_score":0.94787025,"about_ca_system_score_codex":0.000013827937,"about_ca_system_score_gemma":0.0000055702135,"threshold_uncertainty_score":0.23502396},"labels":[],"label_agreement":null},{"id":"W2950975443","doi":"10.2749/vancouver.2017.1545","title":"The Existing Champlain Bridge – Developing a Customized Inspection and Assessment Methodology","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Champlain Regional College","funders":"","keywords":"Bridge (graph theory); Grading (engineering); Rating system; Computer science; Reliability engineering; Component (thermodynamics); Engineering; Civil engineering","score_opus":0.1794443538313672,"score_gpt":0.39866513490739586,"score_spread":0.21922078107602866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950975443","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88228434,0.00014987042,0.0946205,0.00058695,0.0010410058,0.00017308827,7.0278156e-7,0.00029991838,0.020843614],"genre_scores_gemma":[0.9882702,0.000096498916,0.011387323,0.000013523351,0.00006879757,0.000019277772,0.0000015899034,0.000009532752,0.00013323098],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99936414,0.000056902023,0.00022586725,0.00014394234,0.00007814717,0.00013097859],"domain_scores_gemma":[0.9991753,0.00025560043,0.0001011241,0.00039187053,0.00004014942,0.000035930436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017255918,0.00007396064,0.00014699236,0.00001695484,0.0006332987,0.00010614596,0.00007801079,0.000043239852,0.0000039977645],"category_scores_gemma":[0.0011770725,0.000056378736,0.00002837568,0.000020886228,0.000060822775,0.00006443111,0.00007283347,0.00013221512,0.0000016397928],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009596588,0.000012272334,0.17360221,0.00025628982,0.00013867686,0.0007341556,0.0011993237,0.00012757638,0.05228496,0.023354858,0.0018292632,0.7463645],"study_design_scores_gemma":[0.00051474076,0.00001093875,0.90878785,0.000035024597,0.000015282318,0.0010180579,0.00010254437,0.018254763,0.0020014,0.0014661315,0.06757187,0.0002213978],"about_ca_topic_score_codex":0.00010529432,"about_ca_topic_score_gemma":0.00012859989,"teacher_disagreement_score":0.74614304,"about_ca_system_score_codex":0.00008596264,"about_ca_system_score_gemma":0.000043569566,"threshold_uncertainty_score":0.48708856},"labels":[],"label_agreement":null},{"id":"W3016203736","doi":"10.2749/newyork.2019.2738","title":"Strategy to Assess the Aerodynamic Performance of the Golden Gate Bridge during the Planned Seismic and Wind Retrofit Program","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Fluid Dynamics and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Aeroelasticity; Aerodynamics; Structural engineering; Bridge (graph theory); Deck; Flutter; Span (engineering); Vibration; Engineering; Transient (computer programming); Sensitivity (control systems); Wind engineering; Computer science; Aerospace engineering; Acoustics","score_opus":0.010123986009848386,"score_gpt":0.22965621913253711,"score_spread":0.21953223312268874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016203736","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9978863,0.000032607688,0.00006880841,0.00015814712,0.00011712207,0.00037810535,0.000004708672,0.000048998376,0.0013051777],"genre_scores_gemma":[0.99845576,0.00002822445,0.000021519065,0.000024263698,0.00002540437,0.00001209455,0.0000056591034,0.000016450309,0.0014106312],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9992607,0.000019579868,0.00025436375,0.00013561132,0.00018220178,0.0001475481],"domain_scores_gemma":[0.99935657,0.000019014671,0.000073681855,0.00048694812,0.000035726523,0.000028062932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027428323,0.0000995948,0.00013026792,0.0000281928,0.00008258804,0.000062949686,0.00018264317,0.00003659117,0.00001213864],"category_scores_gemma":[0.000011073718,0.000051929022,0.000057060508,0.00022735944,0.000027332477,0.000070811584,0.00005637438,0.00013660017,0.0000075987105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001655987,0.000014149133,0.2598848,0.00014005607,0.00015218713,0.000011023361,0.00019573607,0.725176,0.012880775,0.00011714873,0.00010977558,0.0013018334],"study_design_scores_gemma":[0.000049225397,0.000024492592,0.51761025,0.000015894046,0.000015779315,0.000054056643,0.00002798408,0.48160675,0.00038504624,0.0000028339082,0.00015566425,0.000051996445],"about_ca_topic_score_codex":0.00003956685,"about_ca_topic_score_gemma":0.000060270348,"teacher_disagreement_score":0.25772548,"about_ca_system_score_codex":0.000030789,"about_ca_system_score_gemma":0.000022255243,"threshold_uncertainty_score":0.2117604},"labels":[],"label_agreement":null},{"id":"W3032755278","doi":"10.2749/vancouver.2017.1074","title":"Analysis of Confederation Bridge Pier Behaviour Following Blizzard Using Pier Tiltmeter Monitoring System","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Health PEI; Dalhousie University","funders":"","keywords":"Pier; Tiltmeter; Traverse; Bridge (graph theory); Geodesy; Geology; Compass; Engineering; Structural engineering; Geotechnical engineering; Cartography; Geography; Physics","score_opus":0.06938714407891647,"score_gpt":0.3657082535383542,"score_spread":0.2963211094594377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3032755278","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934268,0.000055795743,0.0029787777,0.000003581303,0.0020786552,0.00018215121,0.000004841035,0.00039233625,0.00087709085],"genre_scores_gemma":[0.99483466,0.0000046489913,0.0047602854,7.666042e-7,0.00029401993,0.000016580569,0.000008187102,0.00004028812,0.000040534673],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99856055,0.000017047214,0.0006079648,0.00023481486,0.0003264723,0.00025314433],"domain_scores_gemma":[0.99860704,0.00002097983,0.00031397564,0.00086292287,0.000113466536,0.00008163893],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003723596,0.00017332475,0.00045585993,0.00026219344,0.0002739361,0.00012588802,0.00018111635,0.0001337373,0.000004789385],"category_scores_gemma":[0.00006492716,0.00018044318,0.00024433696,0.00010851781,0.000019620651,0.00029847719,0.000053938988,0.00013746646,9.888931e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031980755,0.0000044701183,0.9855638,0.00013920642,0.0005554099,0.0003288177,0.00010545513,0.001475975,0.009564309,0.000020266545,0.000014304743,0.0022247878],"study_design_scores_gemma":[0.000091717455,0.000010824796,0.91989744,0.00020979797,0.00084498175,0.00009149777,0.000032676922,0.02902348,0.04955712,0.0000048525735,0.000033685574,0.00020195465],"about_ca_topic_score_codex":0.00069290044,"about_ca_topic_score_gemma":0.000007233825,"teacher_disagreement_score":0.065666385,"about_ca_system_score_codex":0.00031466063,"about_ca_system_score_gemma":0.00003142383,"threshold_uncertainty_score":0.7358259},"labels":[],"label_agreement":null},{"id":"W3035115398","doi":"10.2749/vancouver.2017.1429","title":"Conceptual Design, Detailed Design, and Construction of the Terwillegar Park Stressed Ribbon Footbridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Precast concrete; Context (archaeology); Civil engineering; Schedule; Prestressed concrete; Bridge (graph theory); Engineering; Span (engineering); Conceptual design; Ribbon; Architectural engineering; Computer science; Geography; Archaeology; Mechanical engineering","score_opus":0.021153304392577937,"score_gpt":0.22416525155679243,"score_spread":0.2030119471642145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035115398","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5689597,0.000104324434,0.43006343,0.00003527691,0.00029727662,0.00013009466,0.0000024087674,0.000081182785,0.00032630877],"genre_scores_gemma":[0.99252063,0.00002511666,0.007311275,0.000003020247,0.000035175468,0.0000069360453,0.000002161208,0.000012373656,0.00008332356],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994113,0.000022515333,0.00023223128,0.00011503877,0.000119064774,0.00009986447],"domain_scores_gemma":[0.99934965,0.000037014695,0.00013087987,0.0003992325,0.000043513126,0.00003967837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013126207,0.00010219557,0.00016371351,0.00003038837,0.00012968256,0.000039965667,0.000108411405,0.00005600674,0.000019498033],"category_scores_gemma":[0.00011841499,0.00007518678,0.000053543055,0.00004587203,0.00017013,0.0000972174,0.000022403194,0.000075831966,8.5321864e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049724043,0.000018565155,0.07127112,0.00015097063,0.0008708929,0.00013740479,0.00071565487,0.77978915,0.10700001,0.0030626273,0.0014140209,0.03551987],"study_design_scores_gemma":[0.0008227417,0.000051614104,0.16900568,0.00009461739,0.00022630123,0.00059509685,0.0003131653,0.4188954,0.4070268,0.00030958522,0.002205599,0.00045342775],"about_ca_topic_score_codex":0.000023829156,"about_ca_topic_score_gemma":0.0000037280674,"teacher_disagreement_score":0.42356092,"about_ca_system_score_codex":0.00001778667,"about_ca_system_score_gemma":0.000018314433,"threshold_uncertainty_score":0.30660278},"labels":[],"label_agreement":null},{"id":"W3040149319","doi":"10.2749/vancouver.2017.0183","title":"Structural Monitoring of a Closure Strip in the Staged Construction of a Slab-on-Girder Bridge on Highway 401","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Girder; Christian ministry; Structural engineering; Bridge (graph theory); Closure (psychology); Settlement (finance); Engineering; Slab; Joint (building); Prestressed concrete; Civil engineering; Forensic engineering; Computer science; Law","score_opus":0.0227730954978904,"score_gpt":0.2732991881993581,"score_spread":0.2505260927014677,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3040149319","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99490196,0.000030471727,0.000048213053,0.000022010803,0.0019200728,0.00016201679,0.000010601814,0.0000378412,0.00286681],"genre_scores_gemma":[0.99915457,0.000013241294,0.0003850815,0.0000024202304,0.0003858983,0.0000083770765,0.0000031597162,0.000019039288,0.000028185483],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99892324,0.00001957355,0.00040031577,0.00015504933,0.0002964671,0.00020537923],"domain_scores_gemma":[0.99894065,0.00004004033,0.0002579754,0.0006662564,0.000071295646,0.000023782748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000263035,0.00014956253,0.0002408312,0.00008572015,0.00009204775,0.000029805286,0.00022450449,0.00008823942,0.00000467265],"category_scores_gemma":[0.00013790285,0.00010972393,0.00007341695,0.0000694509,0.00007928095,0.00010965118,0.000022263379,0.0002908469,8.041427e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008859741,0.000020522195,0.94356614,0.00023192329,0.00011169277,0.00047701385,0.0016147286,0.009535665,0.026929105,0.0015913454,0.00019066333,0.015642578],"study_design_scores_gemma":[0.00040719518,0.000062041996,0.92448485,0.00020810062,0.0000147985065,0.0001488384,0.0003046812,0.00014013759,0.07353789,0.00032032013,0.00023849697,0.0001326252],"about_ca_topic_score_codex":0.000118789154,"about_ca_topic_score_gemma":0.000007152285,"teacher_disagreement_score":0.04660879,"about_ca_system_score_codex":0.00005728614,"about_ca_system_score_gemma":0.000027624521,"threshold_uncertainty_score":0.4474412},"labels":[],"label_agreement":null},{"id":"W3084988918","doi":"10.2749/newyork.2019.2644","title":"Super-long span bridge aerodynamics: on-going results of the TG3.1 benchmark test – Step 1.2","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Fluid Dynamics and Vibration Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Aeroelasticity; Aerodynamics; Benchmark (surveying); Bridge (graph theory); Wind tunnel; Structural engineering; Span (engineering); Stability (learning theory); Computer science; Turbulence; Engineering; Aerospace engineering; Physics; Geology; Meteorology; Medicine; Machine learning","score_opus":0.005271766053570629,"score_gpt":0.20084192687472308,"score_spread":0.19557016082115244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084988918","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9658656,0.00002752494,0.0012499687,0.00010769772,0.00039424907,0.00015149442,0.000028499107,0.00007938612,0.032095563],"genre_scores_gemma":[0.99699795,0.000024929881,0.00020241353,0.000021755928,0.000046769703,0.0000030636152,0.00004886974,0.00002666549,0.0026275741],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988441,0.000014071965,0.0004914704,0.00020904346,0.00027650438,0.00016482249],"domain_scores_gemma":[0.99894536,0.00010792867,0.00010386612,0.0007351735,0.000062870764,0.000044835102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003068799,0.00012895826,0.00020584762,0.00007506277,0.00003850847,0.00002892821,0.00016139746,0.000065348344,0.000048457186],"category_scores_gemma":[0.00018579909,0.00010158212,0.00015056839,0.00027848146,0.00001967882,0.0000692406,0.000040049526,0.00014115137,0.000050546038],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028924387,0.000109794964,0.6940182,0.00015384694,0.00023796754,0.00011803478,0.0002611183,0.27859694,0.020795764,0.0005273663,0.003062042,0.0020900052],"study_design_scores_gemma":[0.0002627173,0.000035723246,0.42947045,0.00008390997,0.000031119947,0.00004821401,0.000021013075,0.567014,0.0016621427,0.000010675793,0.0011928544,0.00016719793],"about_ca_topic_score_codex":0.00010911502,"about_ca_topic_score_gemma":0.00022197525,"teacher_disagreement_score":0.28841704,"about_ca_system_score_codex":0.0000641639,"about_ca_system_score_gemma":0.00003491197,"threshold_uncertainty_score":0.41423985},"labels":[],"label_agreement":null},{"id":"W3085056862","doi":"10.2749/nantes.2018.s34-71","title":"Super-Long Span Bridge Aerodynamics: First Results of the Numerical Benchmark Tests from Task Group 10","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Fluid Dynamics and Vibration Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Aeroelasticity; Aerodynamics; Benchmark (surveying); Bridge (graph theory); Flutter; Computer science; Stability (learning theory); Span (engineering); Task (project management); Engineering; Structural engineering; Systems engineering; Machine learning; Aerospace engineering","score_opus":0.007310559163576392,"score_gpt":0.21404943759810208,"score_spread":0.20673887843452568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3085056862","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9724322,0.00004933784,0.018084507,0.00020972811,0.0004875563,0.000115016264,0.00010079007,0.00011175255,0.00840913],"genre_scores_gemma":[0.99843067,0.000016355145,0.0005639202,0.000025741654,0.00020260441,0.000004701642,0.00023026977,0.000024907971,0.000500859],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987594,0.00001836074,0.0005402844,0.00024648386,0.0002608441,0.00017461297],"domain_scores_gemma":[0.9989606,0.00006987388,0.000105086736,0.00070555985,0.00009099389,0.00006788312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019935849,0.00013823179,0.00021821272,0.000048725204,0.00008356474,0.00003197915,0.00019658051,0.00008310164,0.00019231507],"category_scores_gemma":[0.00021206442,0.00010971211,0.0001464283,0.00033269092,0.00007040953,0.00008190949,0.00006436637,0.00010763943,0.000037970894],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027145765,0.00061082025,0.7790319,0.00019551486,0.0018355245,0.0007285629,0.0026030946,0.086691685,0.037298698,0.0011154526,0.08231257,0.0073047727],"study_design_scores_gemma":[0.00017338044,0.000027314703,0.51050293,0.000024979046,0.00004434457,0.000027177803,0.000007158889,0.48326132,0.00029159564,0.000041008476,0.005460685,0.00013810654],"about_ca_topic_score_codex":0.0012524319,"about_ca_topic_score_gemma":0.0032662393,"teacher_disagreement_score":0.39656964,"about_ca_system_score_codex":0.000059953076,"about_ca_system_score_gemma":0.000023331186,"threshold_uncertainty_score":0.447393},"labels":[],"label_agreement":null},{"id":"W3126559213","doi":"10.2749/vancouver.2017.2723","title":"Effectiveness of UHPFRC cover for the seismic strengthening of deficient bridge piers","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Spall; Pier; Structural engineering; Concrete cover; Reinforcement; Finite element method; Bridge (graph theory); Engineering; Reinforced concrete; Bending; Bar (unit); Geotechnical engineering; Materials science; Geology","score_opus":0.018870089756735462,"score_gpt":0.2712936307795901,"score_spread":0.25242354102285464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126559213","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9833422,0.00008746105,0.014866652,0.0000037282987,0.0004330921,0.00029647184,0.000015602682,0.00003389432,0.0009208983],"genre_scores_gemma":[0.99963397,0.0000065917584,0.00023813422,9.593952e-7,0.00001733658,0.000020210678,0.0000052908044,0.000017813678,0.000059688522],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993724,0.0000063706552,0.00024284322,0.00009783316,0.00014828236,0.00013223612],"domain_scores_gemma":[0.99893737,0.00019917588,0.0001983856,0.00056621537,0.000075717886,0.000023159879],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030109243,0.00009264483,0.00019006892,0.000025127483,0.00007767838,0.000015504414,0.00020852116,0.000043553697,0.0000059914687],"category_scores_gemma":[0.00019789558,0.00006929695,0.00011675873,0.000025573943,0.00007705205,0.00006826591,0.000035852914,0.000062615465,8.944099e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017225955,0.000002645211,0.04140911,0.0016667702,0.0005569714,0.00011613435,0.0006214839,0.43930048,0.46956787,0.0009696464,0.00026703253,0.045349583],"study_design_scores_gemma":[0.0004938593,0.00005006077,0.30220369,0.00014903577,0.00013338147,0.00014053588,0.000027864604,0.042691085,0.6531498,0.000048397014,0.00074606284,0.00016626786],"about_ca_topic_score_codex":0.00009999429,"about_ca_topic_score_gemma":2.2169172e-7,"teacher_disagreement_score":0.3966094,"about_ca_system_score_codex":0.00003757585,"about_ca_system_score_gemma":0.00002564534,"threshold_uncertainty_score":0.28258476},"labels":[],"label_agreement":null},{"id":"W3126580686","doi":"10.2749/vancouver.2017.3191","title":"Evergreen Line Performance Based Design – An Owner’s and Designer’s Perspective","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada); Klohn Crippen Berger (Canada)","funders":"","keywords":"Christian ministry; Engineering design process; Engineering; Seismic analysis; Design–build; Deflection (physics); Situated; Design process; Civil engineering; Construction engineering; Architectural engineering; Computer science; Mechanical engineering; Operations management; Work in process","score_opus":0.03687485153992958,"score_gpt":0.2726859419745033,"score_spread":0.2358110904345737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126580686","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31122476,0.00010234765,0.68488884,0.00015201718,0.00020808751,0.00011736071,0.0000020994175,0.00042200147,0.0028824795],"genre_scores_gemma":[0.99070406,0.0000230725,0.008553401,0.000011014887,0.000082766746,0.000007461331,0.000005496661,0.00002005838,0.000592682],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994507,0.00000892548,0.00014054193,0.00016411912,0.00010905045,0.00012665849],"domain_scores_gemma":[0.9993533,0.000014127303,0.00005083853,0.00043092048,0.00006272277,0.00008811765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015882278,0.000116775984,0.00013571842,0.000060350296,0.00016360146,0.00007943263,0.00010160675,0.00005029215,0.00003742227],"category_scores_gemma":[0.00006996981,0.00008933587,0.000031604493,0.00004032396,0.000036730424,0.000267411,0.000011089111,0.00008126357,0.0000046932505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015426642,0.000009658311,0.004340504,0.000043002805,0.00010879215,0.00016676853,0.00022202641,0.9668386,0.00619758,0.00012792672,0.00022605622,0.021703675],"study_design_scores_gemma":[0.000146037,0.00003954252,0.038032565,0.00001141158,0.0000309177,0.000089458175,0.00003886422,0.950374,0.0108175725,0.000056558038,0.00019413499,0.00016890319],"about_ca_topic_score_codex":0.00006512625,"about_ca_topic_score_gemma":0.000009969167,"teacher_disagreement_score":0.6794793,"about_ca_system_score_codex":0.00005688599,"about_ca_system_score_gemma":0.000025258043,"threshold_uncertainty_score":0.3643011},"labels":[],"label_agreement":null},{"id":"W3126629979","doi":"10.2749/vancouver.2017.3167","title":"Canadian Code Framework for Performance Based Seismic Design of Bridges","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Seismic analysis; Return period; Seismic hazard; Bridge (graph theory); Code (set theory); Building code; Incremental Dynamic Analysis; Computer science; Earthquake simulation; Seismic retrofit; Engineering; Structural engineering; Civil engineering; Reinforced concrete; Geography","score_opus":0.02706062367596456,"score_gpt":0.25815979214860946,"score_spread":0.2310991684726449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126629979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63861734,0.00006400559,0.35986602,0.00019100354,0.00019929503,0.00012566407,0.000029409928,0.00005388995,0.0008533952],"genre_scores_gemma":[0.99346447,0.000050099214,0.006072726,0.000079502985,0.00007471436,0.000022858323,0.000019234723,0.000015009026,0.00020140817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938685,0.0000025056738,0.00020249654,0.00010806235,0.000087482986,0.00021262084],"domain_scores_gemma":[0.9992214,0.000026455724,0.00009123855,0.0005291343,0.000049700255,0.00008207506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022135185,0.00008765932,0.00016942898,0.000082599225,0.0001565408,0.000027446333,0.00018384932,0.00007181289,0.000020901918],"category_scores_gemma":[0.0000802729,0.00008787138,0.00006543462,0.000038570823,0.00002473967,0.00011234042,0.000005893596,0.0000704629,0.000009747796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009370598,0.000008917006,0.063167416,0.00020779372,0.00010699438,0.00006953454,0.00006264465,0.9206631,0.0007048742,0.000027823055,0.0044118194,0.010559721],"study_design_scores_gemma":[0.00009233615,0.00001618812,0.015418071,0.00006836605,0.00003640455,0.000020946967,0.000009299762,0.9630219,0.012133539,0.000067505,0.0089890165,0.00012646626],"about_ca_topic_score_codex":0.0044699837,"about_ca_topic_score_gemma":0.0007440418,"teacher_disagreement_score":0.35484713,"about_ca_system_score_codex":0.00007516849,"about_ca_system_score_gemma":0.00015897588,"threshold_uncertainty_score":0.6757308},"labels":[],"label_agreement":null},{"id":"W3127109965","doi":"10.2749/vancouver.2017.0562","title":"Hagwilget Bridge, Canada:","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Transportation Safety and Impact Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Stiffening; Truss; Truss bridge; Engineering; Transport engineering; Civil engineering; Computer science; Medicine","score_opus":0.013459014893485546,"score_gpt":0.2337596906944863,"score_spread":0.22030067580100074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127109965","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8841755,0.00014734038,0.0054260097,0.0006342771,0.00080056203,0.000057544865,0.000024793584,0.00019405501,0.10853995],"genre_scores_gemma":[0.99828905,0.000022238952,0.00006604891,0.000025457162,0.000060707975,0.0000016711531,0.000021382357,0.000009115794,0.0015043273],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999564,0.0000012130862,0.00014812709,0.00006261433,0.00012232167,0.000101717895],"domain_scores_gemma":[0.9994835,0.0000039378588,0.0000458295,0.00038301715,0.000022857614,0.000060854076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000053210453,0.000053654225,0.00009169219,0.000014045705,0.00010429517,0.000026829215,0.0000879294,0.000021195798,0.000098261095],"category_scores_gemma":[0.000025712154,0.000053855387,0.000036542446,0.000021390933,0.000010539933,0.00010816321,0.0000028759257,0.000046996687,0.0000103896855],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007965454,0.000023699156,0.7997788,0.00010028673,0.0006613021,0.007231449,0.00025301607,0.025302358,0.0018062344,0.00055975927,0.14127016,0.023004958],"study_design_scores_gemma":[0.00004405736,9.727435e-7,0.90804505,0.0000035697637,0.000017951043,0.00004947898,0.0000034970121,0.00048336797,0.00067781884,0.000018779137,0.090585575,0.000069863214],"about_ca_topic_score_codex":0.2181498,"about_ca_topic_score_gemma":0.5469107,"teacher_disagreement_score":0.3287609,"about_ca_system_score_codex":0.00003569557,"about_ca_system_score_gemma":0.000095758944,"threshold_uncertainty_score":0.7870566},"labels":[],"label_agreement":null},{"id":"W3127189074","doi":"10.2749/vancouver.2017.1469","title":"Distributed Deflection Measurement of Reinforced Concrete Elements Using Fibre Optic Sensors","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Advanced Fiber Optic Sensors","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Deflection (physics); Structural engineering; Stiffness; Reinforced concrete; Bending; Displacement (psychology); Transducer; Environmental science; Engineering; Optics; Physics; Electrical engineering","score_opus":0.04090725311705421,"score_gpt":0.28297426063211156,"score_spread":0.24206700751505736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127189074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9747917,0.000030181765,0.021887144,0.000008738504,0.0004178624,0.00020390586,0.000008089103,0.00013878316,0.0025135668],"genre_scores_gemma":[0.989157,0.000007219603,0.010617218,0.0000014585221,0.000049337217,0.0000043960554,0.000014987167,0.000032166216,0.00011617383],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987071,0.000008113866,0.00050505495,0.00016461876,0.00038484004,0.00023026965],"domain_scores_gemma":[0.9987324,0.0000111111685,0.00032623654,0.00067137706,0.00019172636,0.00006715256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026518805,0.00014489701,0.00022627732,0.000044287804,0.00012889516,0.000027400733,0.00010731905,0.00007230873,0.000016520462],"category_scores_gemma":[0.00035122808,0.00015739557,0.00006896799,0.00005576564,0.000044854347,0.00017400336,0.00003266885,0.00009616533,0.000005333659],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027194767,0.0000020590035,0.003245845,0.0001664372,0.00028214685,0.00058121583,0.00009111122,0.38953844,0.60534567,0.00008603954,0.00017034177,0.00046350024],"study_design_scores_gemma":[0.0009338992,0.00006474627,0.006048305,0.0002678548,0.00015933624,0.0013662466,0.00008876354,0.51130176,0.4767846,0.000041245934,0.002390863,0.0005523682],"about_ca_topic_score_codex":0.000042136162,"about_ca_topic_score_gemma":0.0000019271638,"teacher_disagreement_score":0.1285611,"about_ca_system_score_codex":0.00026008746,"about_ca_system_score_gemma":0.00003231541,"threshold_uncertainty_score":0.6418405},"labels":[],"label_agreement":null},{"id":"W3127238879","doi":"10.2749/vancouver.2017.0715","title":"Structural Evaluation and Load Rating of Lorne Bridge: A Historic Open-Spandrel Arch Bridge-Case Study","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Structural engineering; Bridge (graph theory); Arch; Span (engineering); Engineering; Finite element method; Deck; Beam bridge; Arch bridge; Abutment; Civil engineering","score_opus":0.08054270798000938,"score_gpt":0.3555555425531108,"score_spread":0.2750128345731014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127238879","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9959109,0.00020533288,0.0022913923,0.000012927553,0.00032560373,0.0003188038,0.0000023101927,0.000060607174,0.0008721255],"genre_scores_gemma":[0.9994068,0.0000066357406,0.0003281584,0.0000017439631,0.00007297111,0.000017703382,0.000007701486,0.000018221985,0.00014004829],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99892926,0.000022008733,0.00038836017,0.00021360909,0.00032483495,0.00012194246],"domain_scores_gemma":[0.99900335,0.000021478378,0.00018478792,0.0005460888,0.0001812326,0.00006308853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005787363,0.00013084861,0.00025783037,0.00006626065,0.00018779124,0.00012475964,0.00015417267,0.00003854344,0.00002900662],"category_scores_gemma":[0.00028630803,0.00012454987,0.000041117524,0.000080631326,0.000032519816,0.00026858764,0.00008464562,0.00010656927,9.455659e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056316814,0.00008536129,0.29494095,0.00045398407,0.0013376849,0.0073394333,0.009199769,0.29120192,0.013447998,0.00012515068,0.0011660424,0.3806454],"study_design_scores_gemma":[0.0008155706,0.00004862283,0.52310634,0.000021502428,0.00017147778,0.0038598333,0.00021932213,0.47087306,0.0005633942,0.000026982378,0.000076751065,0.00021712566],"about_ca_topic_score_codex":0.0028709865,"about_ca_topic_score_gemma":0.00030171385,"teacher_disagreement_score":0.38042825,"about_ca_system_score_codex":0.00013847172,"about_ca_system_score_gemma":0.000055154636,"threshold_uncertainty_score":0.50789964},"labels":[],"label_agreement":null},{"id":"W3127399490","doi":"10.2749/vancouver.2017.0746","title":"Preserving a Well-loved Heritage Structure","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Rehabilitation; Tourism; Work (physics); Plan (archaeology); Gateway (web page); Club; Key (lock); Asset (computer security); Skyline; Business; Computer science; Architectural engineering; Engineering; Political science; Geography; Computer security; Civil engineering; Psychology; World Wide Web; Medicine","score_opus":0.008358958933973665,"score_gpt":0.23125847436923092,"score_spread":0.22289951543525724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127399490","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9169953,0.00017536571,0.019139905,0.00014394759,0.0009772328,0.000096323674,0.0000074225677,0.0007437957,0.061720718],"genre_scores_gemma":[0.99656236,0.000009457312,0.0010212206,0.000008562401,0.00013237538,0.0000024240578,0.000012094739,0.000022061044,0.0022294433],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945265,0.000002870362,0.00016519894,0.00012436746,0.0001183911,0.00013649363],"domain_scores_gemma":[0.9991844,0.000005933849,0.000051853815,0.00067398214,0.00002350627,0.000060299782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000043443433,0.00010443088,0.00013092971,0.000034581837,0.00012309023,0.00012124233,0.00018866581,0.000059266622,0.00042468417],"category_scores_gemma":[0.00006340294,0.00009635351,0.00006173039,0.00003651096,0.000017747458,0.00017345065,0.00003453382,0.00010375456,0.0000150275255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001039206,0.000011668341,0.029079698,0.0004386913,0.0008755394,0.0021418638,0.0005519384,0.7428001,0.17985082,0.0009897256,0.018621128,0.024628414],"study_design_scores_gemma":[0.00039211783,0.000012279967,0.1888341,0.000055402492,0.00008765362,0.0006939412,0.00009903781,0.68843,0.042087894,0.0005457534,0.07804981,0.00071202085],"about_ca_topic_score_codex":0.000049030386,"about_ca_topic_score_gemma":0.000031885753,"teacher_disagreement_score":0.1597544,"about_ca_system_score_codex":0.000025323092,"about_ca_system_score_gemma":0.000007083934,"threshold_uncertainty_score":0.46499938},"labels":[],"label_agreement":null},{"id":"W3127407745","doi":"10.2749/vancouver.2017.2584","title":"Fatigue Performance of a Precast Hybrid FRP-Reinforced Bridge Truss Girder System","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Girder; Truss; Precast concrete; Structural engineering; Fibre-reinforced plastic; Stiffness; Diagonal; Materials science; Truss bridge; Composite material; Engineering; Mathematics","score_opus":0.02658025462715889,"score_gpt":0.25493366881818924,"score_spread":0.22835341419103036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127407745","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9765014,0.000036233647,0.00087733625,0.0000055680225,0.0007781814,0.0002593493,0.000012020948,0.0003260164,0.021203877],"genre_scores_gemma":[0.99817336,0.000011099241,0.00045860623,0.0000022470695,0.000101508915,0.000024950628,0.000018559453,0.000042833613,0.0011668359],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986296,0.0000047803733,0.0005611089,0.00019335008,0.00031542883,0.00029568418],"domain_scores_gemma":[0.99826086,0.000013126432,0.0003342858,0.0011906478,0.000100228586,0.00010086029],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013909442,0.00021670012,0.00035455267,0.00006508791,0.00013693646,0.00006552037,0.0003844476,0.0000773087,0.00003737188],"category_scores_gemma":[0.00005742386,0.00020559605,0.00012217382,0.00003877551,0.00007264862,0.00038479804,0.000073274,0.00015622166,0.000024527608],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034598584,0.000004446954,0.21915655,0.010966466,0.0015778003,0.008545616,0.0019586305,0.22943862,0.37847197,0.0027239595,0.0047696442,0.14204031],"study_design_scores_gemma":[0.0007355578,0.00008788883,0.21342337,0.00045811635,0.00010484605,0.004786809,0.000029971647,0.16587076,0.6123219,0.000001395678,0.0015215254,0.00065782876],"about_ca_topic_score_codex":0.00013698483,"about_ca_topic_score_gemma":5.0801833e-7,"teacher_disagreement_score":0.23384997,"about_ca_system_score_codex":0.00009536886,"about_ca_system_score_gemma":0.000042769676,"threshold_uncertainty_score":0.8383963},"labels":[],"label_agreement":null},{"id":"W3127604003","doi":"10.2749/vancouver.2017.2623","title":"Upgrading the Yellowhead Highway in Jasper National Park","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Asphalt Pavement Performance Evaluation","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Girder; Bridge (graph theory); Prestressed concrete; Engineering; Civil engineering; Jurisdiction; State highway; Forensic engineering; Transport engineering; Political science","score_opus":0.03790904497963296,"score_gpt":0.3078071899704961,"score_spread":0.2698981449908632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127604003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.884603,0.00005352449,0.00036959295,0.0003206546,0.0005680393,0.00014188446,7.492416e-7,0.00007449909,0.11386806],"genre_scores_gemma":[0.99840474,0.000016305887,0.00016158068,0.000022438893,0.00019316038,0.000027937462,0.000010211993,0.000011060599,0.0011525338],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99927884,0.000006060539,0.00020287868,0.00009071217,0.00029833353,0.00012318317],"domain_scores_gemma":[0.99957573,0.000011210242,0.000067481145,0.0002931007,0.00003530969,0.000017188257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075390976,0.000062551444,0.000063398715,0.0000360414,0.0001359121,0.000050205796,0.00013467151,0.000031461324,0.00007155625],"category_scores_gemma":[0.000113520604,0.000049114067,0.00002290853,0.00003471763,0.000024206518,0.0002588531,0.000020731062,0.00009342612,0.00007535709],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000899928,0.000076617056,0.7639977,0.00012037311,0.00014904735,0.00041243524,0.0018200594,0.12600331,0.01866351,0.004822367,0.060613852,0.02331177],"study_design_scores_gemma":[0.00025271814,0.000006463457,0.79710597,0.00003220863,0.0000076486385,0.000064984786,0.000030589796,0.15271388,0.00375195,0.0007613471,0.04511406,0.00015816954],"about_ca_topic_score_codex":0.000015839274,"about_ca_topic_score_gemma":0.000037649217,"teacher_disagreement_score":0.11380177,"about_ca_system_score_codex":0.00011650139,"about_ca_system_score_gemma":0.00003105268,"threshold_uncertainty_score":0.20028135},"labels":[],"label_agreement":null},{"id":"W3127652124","doi":"10.2749/vancouver.2017.2141","title":"Seismic collapse safety of RC circular bridge pier retrofitted with fibre reinforced polymer","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Pier; Fibre-reinforced plastic; Retrofitting; Structural engineering; Bridge (graph theory); Seismic retrofit; Reinforced concrete; Engineering; Seismic analysis; Ductility (Earth science); Materials science; Composite material","score_opus":0.01183500545858341,"score_gpt":0.23148868419110313,"score_spread":0.21965367873251973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127652124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98663247,0.00008315607,0.0019384454,0.000044455035,0.00031487332,0.00026972953,0.000017899656,0.00023000025,0.010468993],"genre_scores_gemma":[0.9944596,0.000015769368,0.00031380777,0.00001680113,0.00007062798,0.000010112899,0.0000435151,0.00006028597,0.005009442],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99851865,0.000006788875,0.00051079824,0.00024140472,0.00039408184,0.00032827616],"domain_scores_gemma":[0.99790436,0.000015605365,0.00033337946,0.0014909188,0.00012610297,0.00012964512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011978177,0.00024861924,0.00039957897,0.000075034084,0.00014721655,0.000053551055,0.00032578953,0.00014971444,0.00010769678],"category_scores_gemma":[0.000069537455,0.00022293959,0.00012488024,0.00010032921,0.00012737245,0.0002801652,0.000063868625,0.000191351,0.00001503011],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046598024,0.0000016697647,0.11935319,0.0006672672,0.0011853598,0.00842686,0.00060928083,0.035980947,0.8202577,0.0007697848,0.0028740163,0.009407923],"study_design_scores_gemma":[0.0014902801,0.00011368403,0.3730401,0.00020821512,0.00020393629,0.004566928,0.000029280474,0.017162308,0.5992143,0.0000069079656,0.003177688,0.00078632665],"about_ca_topic_score_codex":0.00025849027,"about_ca_topic_score_gemma":0.0000011164825,"teacher_disagreement_score":0.25368693,"about_ca_system_score_codex":0.0001026028,"about_ca_system_score_gemma":0.00009275553,"threshold_uncertainty_score":0.9091213},"labels":[],"label_agreement":null},{"id":"W3127673446","doi":"10.2749/vancouver.2017.1973","title":"Ambient Vibration Testing of the Hawkshaw Bridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Government of New Brunswick; Transport Canada; University of New Brunswick","funders":"","keywords":"Bridge (graph theory); Vibration; Structural engineering; Girder; Span (engineering); Modal; Modal analysis; Acceleration; Finite element method; Engineering; Ambient vibration; Operational Modal Analysis; Computer science; Acoustics; Materials science; Physics","score_opus":0.05883514255090104,"score_gpt":0.3216086324209804,"score_spread":0.26277348987007937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127673446","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9938549,0.0000139135245,0.00024925463,0.00005920901,0.0008014103,0.0001091531,0.0000012206117,0.0002132431,0.0046977284],"genre_scores_gemma":[0.99661285,0.0000020754353,0.0031797048,0.0000042501238,0.00013154894,0.0000066623543,6.1196647e-7,0.00001021443,0.000052057836],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99954754,0.0000040412756,0.00018510461,0.00006509355,0.00011222501,0.00008600785],"domain_scores_gemma":[0.99923104,0.000014823572,0.00013310245,0.0005604202,0.000041581017,0.000019053621],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011784447,0.000047787013,0.000066860266,0.000011432521,0.000121453835,0.00001865596,0.00015075924,0.000031218515,0.0000018909838],"category_scores_gemma":[0.0002877228,0.00003598825,0.00002265756,0.000027887427,0.000024099745,0.000072722934,0.00004624718,0.00007006097,9.290781e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026352723,0.000007867021,0.82358503,0.00032879313,0.000020085885,0.000086342945,0.00018641296,0.0005452184,0.080729604,0.0003510537,0.0028594984,0.09129744],"study_design_scores_gemma":[0.00001673796,0.000004913438,0.88348025,0.000051495113,0.0000025453674,0.00008648955,9.225084e-7,0.0011059827,0.11431234,0.00025401215,0.0006488102,0.000035472414],"about_ca_topic_score_codex":0.00023533344,"about_ca_topic_score_gemma":0.000005441438,"teacher_disagreement_score":0.09126197,"about_ca_system_score_codex":0.000039127808,"about_ca_system_score_gemma":0.000017465665,"threshold_uncertainty_score":0.14675583},"labels":[],"label_agreement":null},{"id":"W3127696277","doi":"10.2749/vancouver.2017.0110","title":"A New Pulse-Based E-R-µ Method for Predicting the Peak Seismic Response of Highly Nonlinear Bridge Structures","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; University of Toronto; Ministry of Transportation of Ontario","funders":"","keywords":"Nonlinear system; Linearization; Acceleration; Control theory (sociology); Response analysis; Displacement (psychology); Deflection (physics); Range (aeronautics); Computer science; Algorithm; Applied mathematics; Structural engineering; Mathematics; Engineering; Physics","score_opus":0.01998780767759638,"score_gpt":0.30007676963274016,"score_spread":0.28008896195514377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127696277","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8063203,0.00009168754,0.19217974,0.0005473677,0.00022452477,0.00015461563,0.000027012655,0.00009059456,0.00036412114],"genre_scores_gemma":[0.9788244,0.0000074679306,0.02004304,0.00007927685,0.00030946126,0.0000114390095,0.000017877948,0.000025519968,0.0006815267],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991297,0.000020439165,0.00033854548,0.00015406794,0.00017073446,0.0001865288],"domain_scores_gemma":[0.9987543,0.00014470637,0.00021140702,0.00077847263,0.00006054524,0.00005054256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088783837,0.00011840871,0.00022230142,0.00006435025,0.00019364637,0.00004902995,0.00028463994,0.00006025321,0.000013496725],"category_scores_gemma":[0.00038750103,0.000085947904,0.0001677797,0.0000669953,0.000027058333,0.0000990005,0.00002699734,0.00010552259,0.0000014112219],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010309997,0.000046832793,0.030370168,0.000636538,0.0012620479,0.0003260202,0.0014295238,0.6503877,0.15309861,0.000062497995,0.025166383,0.1361827],"study_design_scores_gemma":[0.00036857187,0.000031435586,0.057138257,0.000036715945,0.00013518578,0.00008326047,0.000031372867,0.86827993,0.051908623,0.00008852127,0.02176882,0.00012932828],"about_ca_topic_score_codex":0.00036339255,"about_ca_topic_score_gemma":0.000013097797,"teacher_disagreement_score":0.21789223,"about_ca_system_score_codex":0.000027204278,"about_ca_system_score_gemma":0.00013991822,"threshold_uncertainty_score":0.35048538},"labels":[],"label_agreement":null},{"id":"W3127722289","doi":"10.2749/vancouver.2017.3175","title":"Opportunities in the Performance Based Seismic Design of Bridges in British Columbia","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Seismic analysis; Clearance; Conceptual design; Engineering; Earthquake engineering; Function (biology); Service (business); Seismic retrofit; Construction engineering; Design–build; Computer science; Transport engineering; Civil engineering; Structural engineering; Reinforced concrete; Business; Mechanical engineering","score_opus":0.042462362090518874,"score_gpt":0.23369975612825186,"score_spread":0.191237394037733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127722289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99772185,0.00008841046,0.0006250683,0.000053417538,0.000056456018,0.00007856427,0.0000026799949,0.000021270127,0.0013523119],"genre_scores_gemma":[0.9990119,0.0003925825,0.000076884295,0.00006681705,0.000025052566,0.000021033,0.000007642073,0.000009343183,0.00038877848],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932075,0.0000143211655,0.00028674665,0.000089136236,0.0001411574,0.00014786616],"domain_scores_gemma":[0.99945575,0.000021704896,0.00008609907,0.00040039368,0.000020269548,0.000015763686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059031486,0.000053329328,0.00016646646,0.000048944563,0.00006914228,0.000112243855,0.00022989609,0.000037692567,0.000025036172],"category_scores_gemma":[0.00003066905,0.000067994,0.00003631433,0.00006391107,0.000051710056,0.00019843814,0.00001250439,0.00009766512,0.0000017432714],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017624117,0.000028771667,0.7661126,0.0001086245,0.000015722972,0.0010812284,0.00015220394,0.21290977,0.0001591695,3.655303e-7,0.002028392,0.017401353],"study_design_scores_gemma":[0.00013194821,0.000009511094,0.4901566,0.000108417415,0.000007865284,0.00012011168,0.00017403456,0.50802374,0.0002456282,0.000005962269,0.0009387608,0.00007741947],"about_ca_topic_score_codex":0.009281517,"about_ca_topic_score_gemma":0.004003736,"teacher_disagreement_score":0.29511398,"about_ca_system_score_codex":0.000026956064,"about_ca_system_score_gemma":0.0000537854,"threshold_uncertainty_score":0.99731576},"labels":[],"label_agreement":null},{"id":"W3127818125","doi":"10.2749/vancouver.2017.0437","title":"Performance Analysis of Recycled and Natural Aggregate Concrete Column with Varying Design Parameters","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Aggregate (composite); Structural engineering; Ductility (Earth science); Column (typography); Cracking; Flexural strength; Reinforcement; Materials science; Yield (engineering); Finite element method; Factorial experiment; Composite material; Engineering; Mathematics; Creep; Statistics","score_opus":0.01669659894804517,"score_gpt":0.22745384252347642,"score_spread":0.21075724357543124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127818125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9953363,0.00039629283,0.0014392961,0.000016677248,0.0001597096,0.00016702253,0.000003109009,0.000115095165,0.0023664804],"genre_scores_gemma":[0.9932068,0.0006257486,0.0059054997,0.0000072430203,0.000018247778,0.000020474004,0.00001067909,0.000032104646,0.0001732138],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998774,0.000019143203,0.000401311,0.00027716963,0.00024297506,0.00028543873],"domain_scores_gemma":[0.9985293,0.00007003664,0.00039915272,0.0008190197,0.00009079473,0.00009165975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029910725,0.00020701821,0.00050926965,0.00018120532,0.00020017165,0.000096535216,0.00023305556,0.000073700656,0.000009153322],"category_scores_gemma":[0.000070902446,0.00018116858,0.00007871784,0.00024111535,0.000197373,0.0004760501,0.000050381343,0.00016061646,0.0000015864794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051262486,0.000006449813,0.73953533,0.0005852777,0.008128407,0.0018899464,0.00084759016,0.10209553,0.06126404,0.00001837239,0.00015620729,0.0849602],"study_design_scores_gemma":[0.00044705623,0.00006964329,0.09842103,0.00017871386,0.00067707687,0.00037507503,0.000009043197,0.85212964,0.047215197,0.000004235949,0.00013077269,0.00034254577],"about_ca_topic_score_codex":0.000088838664,"about_ca_topic_score_gemma":0.000008334828,"teacher_disagreement_score":0.7500341,"about_ca_system_score_codex":0.000046425044,"about_ca_system_score_gemma":0.00003116607,"threshold_uncertainty_score":0.738784},"labels":[],"label_agreement":null},{"id":"W3127977481","doi":"10.2749/vancouver.2017.0430","title":"Seismic Performance of Cross Laminated Timber (CLT) Platform Building by Incremental Dynamic Analysis","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Tree Root and Stability Studies","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"FPInnovations; University of Northern British Columbia; University of British Columbia","funders":"","keywords":"OpenSees; Cross laminated timber; Orthotropic material; Structural engineering; Finite element method; Shear wall; Seismic analysis; Geology; Incremental Dynamic Analysis; Seismic loading; Engineering; Geotechnical engineering","score_opus":0.012060520080482457,"score_gpt":0.2817481490681762,"score_spread":0.2696876289876937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127977481","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99578696,0.00011847008,0.0007843078,0.000010087033,0.000121939,0.00007005111,0.000020090214,0.0000892709,0.0029988028],"genre_scores_gemma":[0.9990599,0.000022669723,0.00015449959,8.6567036e-7,0.000011222198,0.0000068279064,0.000031309322,0.000014044561,0.0006986671],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99912137,0.000002560065,0.00034286853,0.00016440325,0.00017555838,0.00019324293],"domain_scores_gemma":[0.9992655,0.000013393098,0.00013872382,0.0004948959,0.000054531345,0.000032973607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021846639,0.00012480577,0.00028087606,0.000066316024,0.00019910454,0.000043458236,0.0001520956,0.000054947912,0.00002787761],"category_scores_gemma":[0.000038961312,0.000119038494,0.00011041514,0.00010577496,0.00009253201,0.00024716914,0.00007880927,0.00008933636,0.0000045717834],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006453773,0.000014986298,0.98215765,0.00007517621,0.0005000101,0.000019443332,0.00009430079,0.012523533,0.0037684152,0.0000012956162,0.00010280712,0.000735931],"study_design_scores_gemma":[0.00013323447,0.000014121259,0.77675444,0.000012597322,0.00011977813,0.000017339076,0.000022094227,0.21319357,0.009196293,0.0000051116713,0.000406552,0.00012489854],"about_ca_topic_score_codex":0.00018011933,"about_ca_topic_score_gemma":0.0007838016,"teacher_disagreement_score":0.20540324,"about_ca_system_score_codex":0.00009998959,"about_ca_system_score_gemma":0.000008866879,"threshold_uncertainty_score":0.48542488},"labels":[],"label_agreement":null},{"id":"W3128149417","doi":"10.2749/vancouver.2017.2423","title":"Adding value through innovation in structural design: 2 – Innovative design of timber structures","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Theme (computing); Sustainability; Presentation (obstetrics); Value (mathematics); Architectural engineering; Engineering; Construction engineering; Engineering ethics; Computer science","score_opus":0.04413963010316834,"score_gpt":0.3059150129620991,"score_spread":0.26177538285893076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128149417","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24042769,0.00003515135,0.7563703,0.000024180972,0.000355973,0.00016773844,0.000003640524,0.0001178514,0.002497476],"genre_scores_gemma":[0.9440662,0.000005573697,0.055753857,0.000010286396,0.00005356091,0.000008213039,0.0000214663,0.00002246241,0.000058382106],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988596,0.000020909072,0.0005901201,0.000170195,0.00019251418,0.0001667026],"domain_scores_gemma":[0.9990984,0.000043047457,0.00026251035,0.00040633185,0.00017278771,0.000016900014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002514449,0.00016266013,0.00026311126,0.00020500286,0.000082242266,0.000049889895,0.00016023788,0.00009378763,0.000048574573],"category_scores_gemma":[0.00034718905,0.0001492066,0.000030994506,0.0005652252,0.000054496686,0.00037004586,0.000026121916,0.0001558826,0.0000014496904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006930722,0.0000012185518,0.000973095,0.000024940615,0.000068440495,0.00003877015,0.00026180252,0.976964,0.0123306895,0.0074430173,0.0001335388,0.001753553],"study_design_scores_gemma":[0.000510024,0.00003379701,0.10839644,0.000079057354,0.0000330489,0.00016975569,0.00011647062,0.7436039,0.13864954,0.007631479,0.00029520455,0.0004813179],"about_ca_topic_score_codex":0.000083823405,"about_ca_topic_score_gemma":0.0000023087744,"teacher_disagreement_score":0.7036385,"about_ca_system_score_codex":0.00007629954,"about_ca_system_score_gemma":0.00003869481,"threshold_uncertainty_score":0.60844684},"labels":[],"label_agreement":null},{"id":"W3128159852","doi":"10.2749/vancouver.2017.2051","title":"Fretting Fatigue Analysis of Bridge Stay Cables at Saddle Supports using Multiaxial Stress-Based Approaches","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Mechanical stress and fatigue analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Pylon; Saddle; Fretting; Structural engineering; Bridge (graph theory); Deck; Stress (linguistics); Finite element method; Computer science; Engineering","score_opus":0.12836782859929088,"score_gpt":0.30743978036282316,"score_spread":0.17907195176353227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128159852","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94799346,0.000109043904,0.05025837,0.000010650183,0.000096070515,0.00009550183,0.00011691798,0.0000684217,0.0012515931],"genre_scores_gemma":[0.99700207,0.000009798637,0.0025887303,0.0000027965752,0.000060158392,0.0000072422677,0.00021527562,0.000027049178,0.00008687074],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983751,0.000021706008,0.0006306504,0.0003241677,0.00035853664,0.00028980692],"domain_scores_gemma":[0.99827904,0.000058232694,0.00046094772,0.0010122771,0.000067943794,0.000121574216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032582288,0.00018463797,0.0005877477,0.00017727194,0.0002549552,0.0000677695,0.0002297126,0.00011451677,0.00024270138],"category_scores_gemma":[0.00021100718,0.00018084356,0.00038136268,0.00022051379,0.000058074795,0.00012007893,0.00008519803,0.00010076871,0.0000010934034],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007816609,0.0000612019,0.5000381,0.00015008896,0.0021743441,0.0003580807,0.00008908472,0.48574543,0.0055134213,0.00002687825,0.000038000984,0.005797595],"study_design_scores_gemma":[0.00014837638,0.000008172156,0.08344861,0.000045981942,0.0014175338,0.0000052888995,0.00002532409,0.8742446,0.04033414,0.00000990504,0.000079833495,0.00023225699],"about_ca_topic_score_codex":0.0022230768,"about_ca_topic_score_gemma":0.00087556784,"teacher_disagreement_score":0.41658944,"about_ca_system_score_codex":0.0000781463,"about_ca_system_score_gemma":0.000027866463,"threshold_uncertainty_score":0.73745865},"labels":[],"label_agreement":null},{"id":"W3128367850","doi":"10.2749/vancouver.2017.1644","title":"Northeast Anthony Henday Drive / Yellowhead Trail Interchange Flyover Ramp Bridges","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Girder; Bridge (graph theory); Span (engineering); Structural engineering; RADIUS; Engineering; Computer science","score_opus":0.015321196295987476,"score_gpt":0.24006705840867737,"score_spread":0.2247458621126899,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128367850","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9303617,0.00033272814,0.03857122,0.00035500215,0.0023616443,0.00020632213,0.000025767044,0.0011844768,0.026601143],"genre_scores_gemma":[0.9973815,0.00004893037,0.00045102104,0.000016427883,0.0003031596,0.000012410491,0.0000151184995,0.000046900688,0.0017245314],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989682,0.000006581487,0.0002683064,0.0002441255,0.00019505291,0.00031775856],"domain_scores_gemma":[0.998933,0.000020913752,0.00006615881,0.00081866723,0.000034109966,0.00012711929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013643366,0.00020708135,0.00025074513,0.00005362872,0.00015693149,0.0001190992,0.00028036404,0.00013955572,0.000055623786],"category_scores_gemma":[0.00012403415,0.00019206989,0.00012520707,0.000033370714,0.00007957087,0.00015134213,0.000059814505,0.0002803959,0.000030836018],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014597712,0.00043238135,0.051368788,0.002137954,0.0021933536,0.022120025,0.005492895,0.28807917,0.11600659,0.0073288223,0.063436024,0.441258],"study_design_scores_gemma":[0.0009568704,0.000119177545,0.59836125,0.0003046089,0.00010488425,0.0038663854,0.00014736046,0.049044482,0.0086121615,0.0014807468,0.33538088,0.0016212045],"about_ca_topic_score_codex":0.00014237253,"about_ca_topic_score_gemma":0.000094684765,"teacher_disagreement_score":0.5469925,"about_ca_system_score_codex":0.00005570899,"about_ca_system_score_gemma":0.000016135567,"threshold_uncertainty_score":0.7832383},"labels":[],"label_agreement":null},{"id":"W3128435854","doi":"10.2749/vancouver.2017.000496","title":"Rehabilitation and Superstructure Replacement of the Miles Canyon Timber Suspension Bridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Bridge (graph theory); Canyon; Suspension (topology); Tourism; Rehabilitation; Tower; Lease; Forensic engineering; Work (physics); Engineering; Archaeology; Civil engineering; Geography; Business; Cartography; Finance","score_opus":0.01194630291702541,"score_gpt":0.22359409195705637,"score_spread":0.21164778904003095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128435854","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99545527,0.00020338595,0.000002062419,0.0003143903,0.00019537046,0.00011016984,0.0000017592969,0.000019166557,0.0036984175],"genre_scores_gemma":[0.9992153,0.000021073998,0.00017545729,0.0000032133216,0.000021728714,0.0000036171562,0.0000029632379,0.0000068480276,0.00054976484],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996806,0.000006447533,0.000109434,0.00007270711,0.0000785159,0.00005230476],"domain_scores_gemma":[0.9995437,0.00001335173,0.00004297164,0.00036489626,0.000022111448,0.000012951145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007512241,0.000052512867,0.00007081119,0.000008930518,0.0000874668,0.000016369944,0.000039586772,0.00002677894,0.0000141157425],"category_scores_gemma":[0.000070429516,0.000032068507,0.000024459603,0.0000094354355,0.000045759836,0.000058311445,0.000025303487,0.000030235544,8.3899806e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029978397,0.000012918442,0.9672155,0.00017515446,0.00008418148,0.000032592376,0.0018419102,0.00037637036,0.020449765,0.00015354589,0.007546773,0.0020813325],"study_design_scores_gemma":[0.00015381568,0.000038040635,0.96939945,0.00004844933,0.000023828026,0.00007473881,0.00004990112,0.0002497613,0.025642153,0.00016670939,0.0040934836,0.00005969421],"about_ca_topic_score_codex":0.00022205738,"about_ca_topic_score_gemma":0.00012257899,"teacher_disagreement_score":0.0051923892,"about_ca_system_score_codex":0.000019383211,"about_ca_system_score_gemma":0.000007795339,"threshold_uncertainty_score":0.13077158},"labels":[],"label_agreement":null},{"id":"W3128486534","doi":"10.2749/vancouver.2017.1082","title":"Finite element investigation of the compressive membrane action effect on concrete slabs","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Queen's University","funders":"","keywords":"Slab; Finite element method; Structural engineering; Punching; Shear (geology); Materials science; Engineering; Composite material","score_opus":0.023462291391663368,"score_gpt":0.26926850201866204,"score_spread":0.24580621062699867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128486534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99519646,0.000009165524,0.000062576204,0.000036318335,0.000801943,0.00028056305,0.0000045539628,0.00007454208,0.0035338716],"genre_scores_gemma":[0.9995869,0.0000048463226,0.000077271114,0.000011045688,0.000060577106,0.000018488457,0.000011541267,0.000015194609,0.00021415552],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992586,0.000018939067,0.00024177067,0.00011469443,0.00025021768,0.0001158186],"domain_scores_gemma":[0.99886495,0.0000640589,0.0002837954,0.000704626,0.00004382459,0.00003876115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012592618,0.00011905489,0.00015915513,0.000026036367,0.00012238386,0.000031284046,0.00019242687,0.000061455,0.000025913187],"category_scores_gemma":[0.00015768567,0.000085136446,0.0000782408,0.000029734674,0.000073357594,0.000118577525,0.000039473754,0.00014070538,0.0000072917146],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001964737,4.3045045e-8,0.017753216,0.000100374484,0.00006223423,0.000049542297,0.00008575903,0.0061416538,0.9727885,0.00008655032,0.00015367882,0.002758767],"study_design_scores_gemma":[0.00023798831,0.00006042696,0.05717624,0.00007803427,0.000038822986,0.000043492397,0.0000039088277,0.0040269564,0.9378227,0.000015297037,0.00040509432,0.00009105584],"about_ca_topic_score_codex":0.000043790824,"about_ca_topic_score_gemma":0.0000012049302,"teacher_disagreement_score":0.039423022,"about_ca_system_score_codex":0.000055822147,"about_ca_system_score_gemma":0.000016163687,"threshold_uncertainty_score":0.34717634},"labels":[],"label_agreement":null},{"id":"W3128557522","doi":"10.2749/vancouver.2017.0421","title":"Rosedale Overhead: Functional Upgrades, Structural Rehabilitation and Seismic Retrofit","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Klohn Crippen Berger (Canada); Hatch (Canada); WSP (Canada)","funders":"","keywords":"Girder; Structural engineering; Deck; Bridge (graph theory); Span (engineering); Engineering; Overhead (engineering); Electrical engineering","score_opus":0.007974263711487017,"score_gpt":0.22077618004800986,"score_spread":0.21280191633652284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128557522","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9892119,0.00016737495,0.0064268955,0.00027165888,0.0007501789,0.0000773926,0.0000046687956,0.00032994951,0.0027599346],"genre_scores_gemma":[0.9976338,0.000009064372,0.0014922265,0.000008648553,0.0001324143,0.0000061167866,0.000014754559,0.000018329489,0.00068463205],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99934924,0.0000039882725,0.00018278258,0.00016780646,0.00014628151,0.00014990794],"domain_scores_gemma":[0.9994292,0.000036159763,0.000046722547,0.00039885592,0.000024503428,0.00006454798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009782974,0.00011355154,0.00012647915,0.00003594484,0.00018014672,0.000091341826,0.000070265305,0.00009557137,0.000021110485],"category_scores_gemma":[0.00022517629,0.00010720692,0.000043291948,0.000023122902,0.00006032173,0.00016145573,0.00002552499,0.00016375807,0.0000024001574],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000646369,0.000023837523,0.11178115,0.00087895454,0.00035460378,0.0005744256,0.00035827895,0.77060467,0.03176595,0.02577904,0.02494264,0.032871794],"study_design_scores_gemma":[0.00021740244,0.000033768833,0.91563976,0.000019351924,0.000013618547,0.00063682586,0.0000130737135,0.06377867,0.00024217667,0.008997099,0.010201565,0.00020667378],"about_ca_topic_score_codex":0.000051675193,"about_ca_topic_score_gemma":0.000005927429,"teacher_disagreement_score":0.80385864,"about_ca_system_score_codex":0.000046842168,"about_ca_system_score_gemma":0.000011196216,"threshold_uncertainty_score":0.43717712},"labels":[],"label_agreement":null},{"id":"W3128751340","doi":"10.2749/vancouver.2017.2234","title":"Seismic Retrofit of the McIlraith Bridge","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Structural engineering; Substructure; Span (engineering); Bridge (graph theory); Seismic retrofit; Girder; Seismic analysis; Durability; Engineering; Geology; Computer science; Reinforced concrete","score_opus":0.016141717888331162,"score_gpt":0.24013961441836135,"score_spread":0.2239978965300302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128751340","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97766477,0.000043369644,0.00036329668,0.0001310046,0.00021672974,0.000023559554,0.0000018352089,0.000034771154,0.02152069],"genre_scores_gemma":[0.99771017,0.00003019287,0.000021534597,0.000028793513,0.000078562676,0.000001702167,0.0000014835705,0.000007922465,0.0021196585],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995801,0.0000018528015,0.00015065845,0.000064452885,0.00011409077,0.00008888546],"domain_scores_gemma":[0.9991695,0.000002769545,0.00008951016,0.0007013093,0.000019897803,0.000016962988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010177656,0.000050906634,0.00010267688,0.000016758695,0.00008773606,0.00001472569,0.00020329261,0.000027010678,0.000018488881],"category_scores_gemma":[0.00003193361,0.00003513756,0.000081688064,0.00003763267,0.0000318794,0.00007738994,0.000034324858,0.00006407119,0.00001352072],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002438707,0.00001312041,0.94506633,0.0000970756,0.00022048349,0.00011190247,0.00017804196,0.017473048,0.008243988,0.000037736452,0.017386978,0.011168873],"study_design_scores_gemma":[0.00006809501,0.0000031330505,0.9154248,0.00002833326,0.00003429656,0.00012355702,0.000007837755,0.049080215,0.013683508,0.000054530083,0.021414334,0.00007733177],"about_ca_topic_score_codex":0.000105035986,"about_ca_topic_score_gemma":0.0000051723973,"teacher_disagreement_score":0.031607166,"about_ca_system_score_codex":0.000015337286,"about_ca_system_score_gemma":0.000015169074,"threshold_uncertainty_score":0.14328681},"labels":[],"label_agreement":null},{"id":"W3128897474","doi":"10.2749/vancouver.2017.0683","title":"Performance Based Seismic Design of Shape Memory Alloy Reinforced Concrete Bridge Pier","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"SMA*; Pier; Structural engineering; Shape-memory alloy; Residual; Bridge (graph theory); Seismic analysis; Computer science; Engineering","score_opus":0.029002400037860372,"score_gpt":0.24774198026995803,"score_spread":0.21873958023209766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128897474","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9898466,0.000029762286,0.0023708497,0.000016633201,0.000501807,0.00032157343,0.000005376287,0.00026508057,0.0066423146],"genre_scores_gemma":[0.9957552,0.000022415741,0.002672006,0.000032801374,0.000074091244,0.000022562446,0.000018630828,0.000053121836,0.0013491892],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985458,0.000010205863,0.0005400233,0.00022278895,0.00034238072,0.00033876902],"domain_scores_gemma":[0.9981732,0.000041052244,0.0003235313,0.0012294777,0.00011507679,0.000117706535],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028556856,0.00024710648,0.000360527,0.000078195204,0.0001406421,0.000052821146,0.0004472112,0.00014008328,0.00017331542],"category_scores_gemma":[0.00013014437,0.00024699027,0.00012354567,0.000050772378,0.00012960169,0.00037982984,0.00005728158,0.00019419416,0.0000336478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085708234,1.322342e-7,0.005296033,0.00030390752,0.00012693487,0.00091700215,0.0001317583,0.45413923,0.52707213,0.000019508689,0.0010912962,0.010816341],"study_design_scores_gemma":[0.00042595636,0.000047469406,0.024914594,0.00006527546,0.00004452039,0.00029345675,0.0000034623542,0.7807873,0.19266681,5.602076e-7,0.00046955026,0.00028103974],"about_ca_topic_score_codex":0.000056547375,"about_ca_topic_score_gemma":8.11021e-8,"teacher_disagreement_score":0.33440533,"about_ca_system_score_codex":0.000071225004,"about_ca_system_score_gemma":0.00010376503,"threshold_uncertainty_score":0.9999982},"labels":[],"label_agreement":null},{"id":"W3128928752","doi":"10.2749/vancouver.2017.1445","title":"Veterans Home Bridge Rehabilitation","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Bridge (graph theory); Truck; Rehabilitation; Engineering; Deck; Forensic engineering; Truss bridge; Listing (finance); Driver rehabilitation; Truss; Bridge deck; Transport engineering; Arch; Civil engineering; Structural engineering; Business; Medicine; Automotive engineering; Physical therapy","score_opus":0.011736440894228551,"score_gpt":0.254667306120064,"score_spread":0.24293086522583546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128928752","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9462128,0.000032281074,0.04574757,0.00015791792,0.00053474243,0.000038508304,0.0000020281836,0.00032326285,0.0069508427],"genre_scores_gemma":[0.9986205,0.000005871096,0.0009780554,0.0000043915497,0.00006985425,0.000004494613,0.000009436263,0.000011152081,0.0002962367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996293,0.0000024324197,0.00013356125,0.00008102758,0.00007844457,0.00007521519],"domain_scores_gemma":[0.9995038,0.000012651103,0.000029603176,0.00039857943,0.000021649761,0.000033739947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000068438734,0.000057328984,0.00008253001,0.00003566144,0.00007575887,0.000055026303,0.000069974296,0.000028045848,0.00004092566],"category_scores_gemma":[0.00007999882,0.000055836488,0.00005471648,0.00002622605,0.00001861574,0.00013217395,0.0000066883176,0.000045190918,0.00002337288],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001555775,0.000029166717,0.09686684,0.0004880076,0.00061363855,0.0010089861,0.0020755194,0.5509839,0.048740983,0.0030717477,0.016469434,0.2796362],"study_design_scores_gemma":[0.00011068265,0.000011276137,0.9160747,0.00001239908,0.000017105807,0.0001105543,0.0000126516225,0.074056484,0.0010237618,0.00017783087,0.008245308,0.00014722957],"about_ca_topic_score_codex":0.00004539766,"about_ca_topic_score_gemma":0.0000068833497,"teacher_disagreement_score":0.81920785,"about_ca_system_score_codex":0.000024093717,"about_ca_system_score_gemma":0.000004071462,"threshold_uncertainty_score":0.22769459},"labels":[],"label_agreement":null},{"id":"W3128980219","doi":"10.2749/vancouver.2017.3150","title":"Innovative Design and Construction of Special Guideway Structures for Vancouver’s New Evergreen Line SkyTrain Extension","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Precast concrete; Scope (computer science); Transport engineering; Engineering; Civil engineering; Line (geometry); Railway line; Light rail; Rail transit; Telecommunications; Architectural engineering; Computer science; Public transport; Mathematics; Geometry","score_opus":0.024773168780260174,"score_gpt":0.2617466319524261,"score_spread":0.23697346317216592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128980219","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08064483,0.000057516856,0.9176843,0.000052089887,0.0006406372,0.0001758988,0.0000060701223,0.00010291616,0.00063574524],"genre_scores_gemma":[0.8803084,0.000019393236,0.118735366,0.000003417032,0.0005519659,0.0000039072315,0.000005332629,0.000017660981,0.0003545507],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993713,0.0000035279793,0.00028699945,0.00013794671,0.00009708626,0.00010317174],"domain_scores_gemma":[0.9993946,0.00003001777,0.0001275722,0.0002806177,0.00012235381,0.000044858458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018751856,0.00009835826,0.00021411406,0.00006212778,0.000059836762,0.000016804614,0.000069594375,0.00007917954,0.000013346585],"category_scores_gemma":[0.00043202212,0.00008998409,0.000043461707,0.00006746339,0.000045837834,0.00007045507,0.000020624722,0.00007153855,2.4090826e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065256376,0.000018501149,0.00048569913,0.00022986348,0.00041987366,0.00012349749,0.00015126615,0.65238136,0.06857234,0.0036538437,0.034474183,0.23942433],"study_design_scores_gemma":[0.0030619646,0.00046002882,0.038495295,0.00037547905,0.0004606466,0.0007495288,0.00017560915,0.57928896,0.23826428,0.07825471,0.058899086,0.0015144442],"about_ca_topic_score_codex":0.000047296748,"about_ca_topic_score_gemma":0.000013098147,"teacher_disagreement_score":0.7996636,"about_ca_system_score_codex":0.000018084975,"about_ca_system_score_gemma":0.000032964836,"threshold_uncertainty_score":0.36694446},"labels":[],"label_agreement":null},{"id":"W3129031137","doi":"10.2749/vancouver.2017.0631","title":"Complexity Meets Craft:","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Interoperability; Process (computing); Computer science; Craft; Software engineering; Engineering; Software; Set (abstract data type); Systems engineering; World Wide Web; Operating system; Programming language","score_opus":0.037553257559005744,"score_gpt":0.2659036138233821,"score_spread":0.2283503562643764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129031137","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43725628,0.00014368123,0.042005684,0.0007394062,0.0014087926,0.0001684356,0.000003903777,0.0008801086,0.5173937],"genre_scores_gemma":[0.99648905,0.000011728566,0.0019872226,0.0000061667715,0.000052097443,0.0000032339638,0.000005967895,0.000009648348,0.0014348752],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996965,0.0000010310663,0.00009047745,0.000070290334,0.000066028726,0.000075676806],"domain_scores_gemma":[0.99958754,0.0000019531058,0.000040105235,0.0003270084,0.000015610427,0.000027758157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005871087,0.000046673256,0.00006126428,0.000011128301,0.00011898904,0.00006214104,0.000085700005,0.000025475962,0.00009209672],"category_scores_gemma":[0.000027338718,0.000044636316,0.00001748251,0.00000601564,0.000017914075,0.00009127435,0.000019673396,0.000036802197,0.000018141029],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019880894,0.00017500436,0.15578274,0.0018627123,0.00041150575,0.0047808895,0.0011101877,0.6341476,0.0030282473,0.009917863,0.055809982,0.13295339],"study_design_scores_gemma":[0.0003111012,0.000012565391,0.5127637,0.00005199149,0.000023454859,0.00027907657,0.0000063152343,0.11356336,0.03429448,0.0032719835,0.33495116,0.00047083822],"about_ca_topic_score_codex":0.000027834873,"about_ca_topic_score_gemma":0.000013034157,"teacher_disagreement_score":0.5592328,"about_ca_system_score_codex":0.000010753486,"about_ca_system_score_gemma":0.000004811087,"threshold_uncertainty_score":0.1820216},"labels":[],"label_agreement":null},{"id":"W3129036666","doi":"10.2749/vancouver.2017.3084","title":"Geometric effects on Ultrasonic Pulse Velocity Method for Structural Assessment – Experimental Study on Mortar Specimens","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Geophysical Methods and Applications","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Ultrasonic sensor; Mortar; Acoustics; Transducer; Materials science; Ultrasonic testing; Laser Doppler vibrometer; Nondestructive testing; Structural engineering; Engineering; Composite material; Optics; Laser; Physics; Laser beams","score_opus":0.03387214685049599,"score_gpt":0.39982199353786374,"score_spread":0.36594984668736774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129036666","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9791019,0.000012701203,0.015733775,0.000031730637,0.00045778422,0.0011070156,0.0000124629705,0.00010617512,0.0034364338],"genre_scores_gemma":[0.9515555,0.0000010406046,0.04762621,0.0000124287735,0.00025379536,0.00041011692,0.0000104577275,0.00003061125,0.000099846075],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9989192,0.000032300664,0.00023139312,0.00033450284,0.00024476243,0.00023786153],"domain_scores_gemma":[0.998656,0.0002914775,0.00011443195,0.00081448106,0.00002955054,0.00009406274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034305544,0.00018721282,0.0002742738,0.00006569533,0.00028889606,0.000078294914,0.00019043974,0.000045902347,0.000015775511],"category_scores_gemma":[0.0001565473,0.00016217997,0.00011233257,0.000091524584,0.000013968034,0.00005771245,0.00003096442,0.00016825924,0.000010944953],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010533859,0.004038638,0.030284474,0.00033332244,0.0015134631,0.00081407453,0.00063079153,0.007090693,0.6580926,0.010575204,0.0018630299,0.28465834],"study_design_scores_gemma":[0.00058368634,0.0006435634,0.8670302,0.000013029412,0.00005047348,0.000016383228,0.000054851364,0.0034084737,0.1267644,0.00060546276,0.00058214855,0.00024734007],"about_ca_topic_score_codex":0.0000403822,"about_ca_topic_score_gemma":0.0000015042688,"teacher_disagreement_score":0.83674574,"about_ca_system_score_codex":0.0001374987,"about_ca_system_score_gemma":0.000014537384,"threshold_uncertainty_score":0.6613507},"labels":[],"label_agreement":null},{"id":"W3129089658","doi":"10.2749/vancouver.2017.2483","title":"The 5% Solution","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Climate Change and Sustainable Development","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nordion (Canada)","funders":"","keywords":"Carbon footprint; Tonne; Reduction (mathematics); Production (economics); Footprint; Metre; Structural integrity; Field (mathematics); Civil engineering; Environmental science; Engineering; Computer science; Waste management; Greenhouse gas; Structural engineering; Mathematics; Geology","score_opus":0.025912493055320816,"score_gpt":0.2766909450036007,"score_spread":0.25077845194827986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129089658","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6780266,0.000017604125,0.00009106928,0.003359457,0.00025626278,0.00008655056,1.682936e-7,0.00001642108,0.3181458],"genre_scores_gemma":[0.9742746,0.000042739,0.00006472466,0.000040428666,0.000026719188,0.000010341425,0.0000010658508,0.0000025109334,0.025536917],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999594,0.0000034418476,0.00007183299,0.00008408663,0.0001218876,0.00012474807],"domain_scores_gemma":[0.99952143,0.0000062582,0.000072956565,0.00037216741,0.0000038464354,0.000023330724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030959497,0.000028424303,0.000025612168,0.000001886583,0.0010038805,0.00007001704,0.00013510894,0.000012923513,0.0002509461],"category_scores_gemma":[0.000101294034,0.00001793045,0.000014745975,0.000009489367,0.00007737422,0.0000743979,0.00018740655,0.000023187324,0.00024877934],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010709595,0.000032663185,0.6865231,0.0000051181514,0.000011085218,0.0020059822,0.00054016727,0.000010319811,0.002075665,0.00031754212,0.10503337,0.20343427],"study_design_scores_gemma":[0.000028208513,0.0000028269042,0.5508688,0.0000010706481,0.0000011964211,0.00008610434,0.00007161615,0.000035266155,0.0003183487,0.00063115376,0.44792065,0.000034747096],"about_ca_topic_score_codex":0.00031327154,"about_ca_topic_score_gemma":0.00019956312,"teacher_disagreement_score":0.34288728,"about_ca_system_score_codex":0.00008593874,"about_ca_system_score_gemma":0.0000068472477,"threshold_uncertainty_score":0.77211386},"labels":[],"label_agreement":null},{"id":"W3129147422","doi":"10.2749/vancouver.2017.1344","title":"Column Removal Analysis of Bare Steel Gravity Frames Using Connection Behaviour from Physical Tests","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Response to Dynamic Loads","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Robustness (evolution); Structural engineering; Framing (construction); Progressive collapse; Column (typography); Connection (principal bundle); Shear (geology); Computer science; Engineering; Materials science; Reinforced concrete; Composite material; Chemistry","score_opus":0.020509729193910566,"score_gpt":0.30355195591208933,"score_spread":0.28304222671817875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129147422","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984472,0.000026315105,0.0005839979,0.0000062442937,0.0003118182,0.0000822075,0.000055274693,0.000100776175,0.00038616464],"genre_scores_gemma":[0.9985993,0.0000022768997,0.0011445931,0.0000016758418,0.00008970497,0.0000024518324,0.000044032313,0.000020535053,0.00009546682],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990539,0.000020111333,0.00028085837,0.00022372516,0.00026819622,0.00015321243],"domain_scores_gemma":[0.99882394,0.000079281795,0.00015375947,0.00079044566,0.00008989799,0.00006269565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000115121846,0.00013327655,0.00039332564,0.000108430075,0.00011016484,0.00004129133,0.00015587747,0.00009636224,0.000044142023],"category_scores_gemma":[0.00041681842,0.00013615565,0.00019796981,0.00015962565,0.000063067484,0.00014482129,0.0000507257,0.00013812994,0.0000021739722],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036280064,0.000033288285,0.6799447,0.000022602042,0.0012522159,0.0012193341,0.00031485394,0.027343215,0.2860228,0.000028077384,0.00004338031,0.0037392231],"study_design_scores_gemma":[0.0000969546,0.000008321879,0.7935191,0.000014353726,0.00069070735,0.00009155137,0.000031143652,0.19949515,0.005778179,0.000117371674,0.00003228988,0.00012490398],"about_ca_topic_score_codex":0.0024466298,"about_ca_topic_score_gemma":0.00039385472,"teacher_disagreement_score":0.28024462,"about_ca_system_score_codex":0.00013272591,"about_ca_system_score_gemma":0.000035626705,"threshold_uncertainty_score":0.5552266},"labels":[],"label_agreement":null},{"id":"W3129181292","doi":"10.2749/vancouver.2017.0951","title":"Replacement of the Macdonald Bridge Suspended Spans: Fabrication and Field Construction Works","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Span (engineering); Deck; Nova scotia; Downtown; Superstructure; Engineering; Structural engineering; Transport engineering; History; Archaeology","score_opus":0.012180445551129923,"score_gpt":0.24129739912773326,"score_spread":0.22911695357660333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129181292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9253865,0.00013716795,0.0651765,0.0006134972,0.0007658047,0.0001243474,0.0000017766749,0.00009701493,0.007697407],"genre_scores_gemma":[0.99928653,0.000045655743,0.0004587547,0.000009741818,0.000037528152,0.0000029881835,0.000002908541,0.000004768454,0.00015111984],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99962395,0.0000036714684,0.00015734659,0.00007690308,0.00008699421,0.000051154402],"domain_scores_gemma":[0.99948,0.00001193145,0.00009092792,0.0003689536,0.000029886382,0.00001831343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006424136,0.000050396982,0.00007721158,0.000020414685,0.000070775306,0.0000315982,0.0000627341,0.000033977598,0.000044472163],"category_scores_gemma":[0.00009702408,0.000039240695,0.00003421926,0.000033515294,0.000029899038,0.00007295049,0.000018793917,0.000057945723,5.6097423e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006040283,0.00002499589,0.446808,0.00044152673,0.0009463732,0.0000486799,0.0006491728,0.080631554,0.039737437,0.009669259,0.010649194,0.4103334],"study_design_scores_gemma":[0.0003364666,0.000019026436,0.791764,0.000109435736,0.00010194273,0.0003032335,0.00008922622,0.09819993,0.10481375,0.0006252323,0.0034098912,0.00022784129],"about_ca_topic_score_codex":0.000067214794,"about_ca_topic_score_gemma":0.00001132222,"teacher_disagreement_score":0.41010556,"about_ca_system_score_codex":0.000015563463,"about_ca_system_score_gemma":0.000005914686,"threshold_uncertainty_score":0.1600189},"labels":[],"label_agreement":null},{"id":"W3129744073","doi":"10.2749/copenhagen.2018.337","title":"Confederation Bridge Pot Bearing Monitoring and Assessment","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Fire effects on concrete materials","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Dalhousie University","funders":"","keywords":"Bearing (navigation); Bridge (graph theory); Displacement (psychology); Environmental science; Forensic engineering; Pier; Engineering; Geotechnical engineering; Geology; Structural engineering; Geography; Cartography","score_opus":0.02060400340544688,"score_gpt":0.29030151784898117,"score_spread":0.2696975144435343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129744073","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97569114,0.000022573126,0.0016537237,0.000022684133,0.001231833,0.00010492258,6.7941954e-7,0.00025227122,0.021020196],"genre_scores_gemma":[0.99727577,0.000006194108,0.0019380181,0.0000042741776,0.0006524098,0.000011174729,0.0000036417198,0.000021012063,0.000087495035],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99947447,0.000010696873,0.00017279157,0.00012136467,0.000100990095,0.000119664655],"domain_scores_gemma":[0.99973005,0.000019325633,0.000029398972,0.00014592908,0.000036098467,0.000039212166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025846317,0.000078467776,0.000108156564,0.00002548048,0.000058799305,0.00011258825,0.000025701856,0.00003993243,0.000022196684],"category_scores_gemma":[0.000031704745,0.00008344486,0.000011721814,0.000013128972,0.000017682902,0.00010482104,0.000023357652,0.00005058818,0.000013071063],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025264178,0.0000028436052,0.027314557,0.00009505371,0.00004458573,0.00026238296,0.00009734975,0.00005204542,0.9642831,0.00046076803,0.00033646953,0.00704829],"study_design_scores_gemma":[0.0002016358,0.000063193664,0.35737854,0.00007903197,0.00001829967,0.0005833989,0.000010935517,0.0076443986,0.6238936,0.000038773233,0.009840558,0.00024758806],"about_ca_topic_score_codex":0.000044767567,"about_ca_topic_score_gemma":0.0000015130823,"teacher_disagreement_score":0.3403895,"about_ca_system_score_codex":0.00004586487,"about_ca_system_score_gemma":0.000014365238,"threshold_uncertainty_score":0.34027824},"labels":[],"label_agreement":null},{"id":"W3130020411","doi":"10.2749/wroclaw.2020.0844","title":"Comparative Study of International Major Codes for the Seismic Design of Buildings","year":2020,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Turkish; Eurocode; Bulgarian; Seismic analysis; Computer science; Engineering; Architectural engineering; Civil engineering; Structural engineering; Linguistics","score_opus":0.04586570929754926,"score_gpt":0.29135025406272513,"score_spread":0.24548454476517587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130020411","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8060405,0.00006628549,0.19342765,0.00008436924,0.000049818304,0.00015703241,0.000004277626,0.000018841813,0.00015118743],"genre_scores_gemma":[0.99919516,0.000016690568,0.000655494,0.000028731536,0.000042485502,0.000018541066,0.0000037987106,0.0000047832623,0.000034342458],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995552,0.000004155827,0.00022572177,0.00006301906,0.000105669635,0.00004624629],"domain_scores_gemma":[0.9997153,0.00005643038,0.000075934084,0.000080848666,0.000058959016,0.000012508156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011666986,0.000046686433,0.00015294111,0.000023371525,0.000015305763,0.0000039995443,0.00010293278,0.00001108472,0.000011589681],"category_scores_gemma":[0.00001855197,0.000033520457,0.000041376454,0.0000915318,0.0000132477735,0.00003926292,0.0000123319805,0.0000322496,9.109186e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029728615,0.000050943607,0.0065747886,0.00003302057,0.0007924316,0.000008324819,0.0050324756,0.9728207,0.011319934,0.000010663081,0.00280969,0.0005172917],"study_design_scores_gemma":[0.000247636,0.00007656954,0.0015428554,0.000007819171,0.00010027434,0.0000075601015,0.0029157123,0.9720902,0.021088578,0.000013100986,0.0018613391,0.000048386984],"about_ca_topic_score_codex":0.000024864843,"about_ca_topic_score_gemma":9.741749e-7,"teacher_disagreement_score":0.1931546,"about_ca_system_score_codex":0.000008387646,"about_ca_system_score_gemma":0.000010046258,"threshold_uncertainty_score":0.13669246},"labels":[],"label_agreement":null},{"id":"W3130252956","doi":"10.2749/kualalumpur.2018.0151","title":"Economy and Elegance in Bridge Design: The Beauty of Practical Objects that Do Their Job Well","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Elegance; Bridge (graph theory); Aesthetics; Key (lock); Function (biology); Impression; Virtue; Computer science; Quality (philosophy); Beauty; Architectural engineering; Human–computer interaction; Engineering; Art; Political science; Epistemology; Law; World Wide Web; Philosophy; Computer security","score_opus":0.028758798799142695,"score_gpt":0.2579027010198261,"score_spread":0.2291439022206834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130252956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.857427,0.0003315448,0.12708867,0.00030502904,0.0002676175,0.00016052116,0.0000012222273,0.0001162765,0.014302127],"genre_scores_gemma":[0.9989444,0.00003128406,0.00083923567,0.00002100227,0.000072495495,0.0000043866376,9.809369e-7,0.000009138479,0.000077077486],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957186,0.000012699125,0.00016540194,0.00009802404,0.000049556005,0.000102436024],"domain_scores_gemma":[0.99965817,0.000068309935,0.000038994312,0.0001848817,0.000020605094,0.0000290364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021019924,0.00007335047,0.00012124126,0.00005041515,0.000017860955,0.000019475556,0.000039942737,0.000035685243,0.000030152813],"category_scores_gemma":[0.000044748293,0.00005083046,0.00002652652,0.000132855,0.000049523158,0.00009608708,0.000011112681,0.00008158674,0.000003832305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018001688,0.00012707966,0.31833166,0.0009804086,0.0021012288,0.0012261751,0.019881256,0.5191559,0.048682977,0.009260371,0.023778185,0.05629474],"study_design_scores_gemma":[0.00041714415,0.000071821414,0.36948746,0.00006964196,0.000062284926,0.0012937264,0.0004958947,0.45151764,0.15334393,0.00080909854,0.021968529,0.00046285332],"about_ca_topic_score_codex":0.000022114638,"about_ca_topic_score_gemma":0.000015498656,"teacher_disagreement_score":0.14151742,"about_ca_system_score_codex":0.000019788808,"about_ca_system_score_gemma":0.00001839642,"threshold_uncertainty_score":0.20728059},"labels":[],"label_agreement":null},{"id":"W3130281131","doi":"10.2749/nantes.2018.s32-1","title":"Hybrid CLT-Based Modular Construction Systems for Prefabricated Buildings","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Modular design; Modular construction; Prefabrication; Architectural engineering; Engineering; Focus (optics); Construction engineering; Civil engineering; Structural engineering; Computer science","score_opus":0.015539816794678763,"score_gpt":0.2152254128357299,"score_spread":0.19968559604105116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130281131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9547292,0.0005784692,0.039258838,0.000031058076,0.0010816858,0.0004120811,0.000009542895,0.00061546994,0.003283671],"genre_scores_gemma":[0.9970399,0.0000064596707,0.002193911,0.0000047333388,0.0002218446,0.000079095735,0.00003769574,0.000025702519,0.00039061872],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994566,0.0000049075716,0.00019136947,0.00012938732,0.00008037959,0.00013737382],"domain_scores_gemma":[0.9996437,0.000010414161,0.00004361363,0.00018540592,0.000083164065,0.000033720138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008754561,0.00009358348,0.00012004671,0.000042639043,0.00005732467,0.000031230797,0.000038418813,0.000034138524,0.000009751217],"category_scores_gemma":[0.000018653367,0.000080473714,0.000042902157,0.000048297632,0.00003625664,0.0000633098,0.0000044013627,0.000027446096,0.000019270316],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00070271885,0.00048640982,0.12625416,0.004683543,0.004216735,0.0017444027,0.0010060269,0.13272813,0.4662843,0.0052942554,0.19140574,0.06519357],"study_design_scores_gemma":[0.0009999886,0.00030400016,0.001079736,0.00012816516,0.00015781721,0.0011391371,0.000032607735,0.29992107,0.4602143,0.0002935342,0.23523998,0.00048966374],"about_ca_topic_score_codex":0.0000483982,"about_ca_topic_score_gemma":6.431067e-7,"teacher_disagreement_score":0.16719294,"about_ca_system_score_codex":0.000050965176,"about_ca_system_score_gemma":0.000018317782,"threshold_uncertainty_score":0.32816228},"labels":[],"label_agreement":null},{"id":"W3130336953","doi":"10.2749/kualalumpur.2018.0701","title":"Integration of SHM at an early stage in the design and construction of long-span bridges","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Process (computing); Construction engineering; Span (engineering); Structural health monitoring; Stage (stratigraphy); Life span; Engineering; Work (physics); Systems engineering; Computer science; Reinforced concrete; Construction management; Civil engineering; Structural engineering; Mechanical engineering","score_opus":0.016414506740244812,"score_gpt":0.24754450906118375,"score_spread":0.23113000232093894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130336953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9496673,0.000014214698,0.049633067,0.000003184736,0.00015852675,0.000080815335,7.990357e-7,0.000014437951,0.00042767197],"genre_scores_gemma":[0.99635863,0.0000111675345,0.003517265,0.0000014841893,0.000070049464,0.0000025207062,0.0000020924467,0.000005459973,0.000031308122],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996207,0.000014541192,0.00016645333,0.00006193602,0.00007315355,0.00006324081],"domain_scores_gemma":[0.9997513,0.000012815487,0.00005527581,0.00012491457,0.00004572455,0.000009964638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021177767,0.00004666431,0.000076157565,0.000037322174,0.000015471784,0.000006111633,0.000031649623,0.000031376316,0.000004219442],"category_scores_gemma":[0.000021678332,0.000033887867,0.0000102062,0.000053335734,0.000065473316,0.000085573716,0.000006518888,0.000044007546,2.1511514e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006487983,0.000017372658,0.58950746,0.00012680652,0.00003632379,0.0001442301,0.0077550807,0.0046481285,0.35194826,0.0009885893,0.00008585397,0.044677045],"study_design_scores_gemma":[0.0000768208,0.00007852984,0.65489,0.000037593632,0.0000062105055,0.00018825044,0.00035791798,0.0028888707,0.34125346,0.000102936116,0.0000702965,0.00004910744],"about_ca_topic_score_codex":0.00012680926,"about_ca_topic_score_gemma":0.00007187983,"teacher_disagreement_score":0.06538257,"about_ca_system_score_codex":0.00002140549,"about_ca_system_score_gemma":0.000007805928,"threshold_uncertainty_score":0.13819072},"labels":[],"label_agreement":null},{"id":"W3130541870","doi":"10.2749/guimaraes.2019.0088","title":"A review on experimental flexural cracking in FRP reinforced concrete members","year":2019,"lang":"en","type":"review","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fibre-reinforced plastic; Cracking; Materials science; Rebar; Reinforced concrete; Flexural strength; Composite material; Structural engineering; Young's modulus; Engineering","score_opus":0.05459367802348195,"score_gpt":0.34445725704410435,"score_spread":0.2898635790206224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130541870","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00021290149,0.9821196,0.0000026872203,0.0000030684178,0.0013671106,0.0019498994,0.000012110129,0.00039995436,0.013932648],"genre_scores_gemma":[0.000085609616,0.99713737,0.00016426531,0.00009858306,0.00014707222,0.00027190114,0.0003439378,0.0001992992,0.0015519379],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963862,0.00005544676,0.0018166604,0.00061295787,0.00050917035,0.00061960734],"domain_scores_gemma":[0.99793166,0.00011426773,0.0005345698,0.0012186278,0.000039358303,0.0001615326],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000332646,0.00090746087,0.0029323774,0.00029043993,0.000032129272,0.000055448923,0.0003778452,0.00046899216,0.00046667914],"category_scores_gemma":[0.000118028634,0.0007986845,0.0008657141,0.00041974173,0.000042801697,0.00021286195,0.000103975755,0.00096377835,0.00035443547],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016492511,4.2891676e-7,0.0000045033617,0.2362116,0.0006451359,0.010519607,0.0001610571,0.0013284335,0.00021682787,0.00028275486,0.009103314,0.74150985],"study_design_scores_gemma":[0.00018121836,0.00004421121,5.1255e-7,0.09609593,0.0003629261,0.0029382554,0.000008081591,0.0002619166,0.0001809438,2.0746192e-7,0.89903456,0.0008912485],"about_ca_topic_score_codex":0.000040833675,"about_ca_topic_score_gemma":2.231099e-7,"teacher_disagreement_score":0.88993126,"about_ca_system_score_codex":0.00087366084,"about_ca_system_score_gemma":0.0001840836,"threshold_uncertainty_score":0.9994464},"labels":[],"label_agreement":null},{"id":"W3130730615","doi":"10.2749/kualalumpur.2018.0946","title":"Corrosion-resistant Reinforced Concrete Columns","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Materials science; Fibre-reinforced plastic; Corrosion; Dissipation; Ductility (Earth science); Composite material; Deflection (physics); Structural engineering; Stiffness; Reinforcement; Reinforced concrete column; Reinforced concrete; Column (typography); Engineering","score_opus":0.01194436069247161,"score_gpt":0.23852987884775176,"score_spread":0.22658551815528014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130730615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93900394,0.0000458171,0.0016153051,0.00001736451,0.0014722031,0.00023753902,0.0000084397325,0.0009444723,0.05665493],"genre_scores_gemma":[0.9920798,0.000008439349,0.0014745756,0.000050373077,0.00027769635,0.000018072391,0.000029399698,0.000047464884,0.0060141725],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99868745,0.0000062265017,0.00043973693,0.0002100815,0.00030100564,0.00035552686],"domain_scores_gemma":[0.999016,0.000027277581,0.00008524064,0.0005731606,0.00014158287,0.00015672432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000116889096,0.00019495699,0.00023029868,0.00006343755,0.00009939466,0.000050372775,0.00017586505,0.00012083117,0.00055991334],"category_scores_gemma":[0.00008447722,0.00019321108,0.00009394129,0.00018249034,0.00012687748,0.00014735931,0.000044788787,0.00014566832,0.00025941659],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029044675,2.452802e-8,0.00041521664,0.00002573747,0.000024093162,0.0008024622,0.00012577379,0.00019883795,0.9890208,0.0006738188,0.007702534,0.0009816221],"study_design_scores_gemma":[0.00071175065,0.0002493096,0.0037869061,0.00008982276,0.00008808584,0.0022932875,0.00008046697,0.02561333,0.8421468,0.00003965421,0.12396352,0.00093706703],"about_ca_topic_score_codex":0.0000557389,"about_ca_topic_score_gemma":0.0000021821024,"teacher_disagreement_score":0.14687404,"about_ca_system_score_codex":0.00010927036,"about_ca_system_score_gemma":0.0000487265,"threshold_uncertainty_score":0.78789186},"labels":[],"label_agreement":null},{"id":"W3131869168","doi":"10.2749/nantes.2018.s32-9","title":"Feasibility Study of Mass-Timber Cores for the UBC Brock Commons Tallwood Building","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Tree Root and Stability Studies","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Cross laminated timber; Engineering; Architectural engineering; Work (physics); Structural engineering; Civil engineering; Wind engineering; Mechanical engineering","score_opus":0.047327717613211494,"score_gpt":0.30948145564730456,"score_spread":0.2621537380340931,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3131869168","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99197173,0.00014931487,0.004303197,0.000033683293,0.000370375,0.00066756224,0.000009467086,0.00011855632,0.002376087],"genre_scores_gemma":[0.9991781,0.0000014882942,0.00044845132,0.0000021260926,0.00011650962,0.00005855231,0.0000014324226,0.000016349068,0.0001769994],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99913573,0.000013478708,0.00035326762,0.00016807335,0.00015799367,0.00017144467],"domain_scores_gemma":[0.9990693,0.00021228155,0.00006222156,0.0005245704,0.000104432205,0.000027240503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024617734,0.0001112215,0.00022178599,0.000020367028,0.00013861053,0.000012612681,0.00012267046,0.00003385748,0.000013417919],"category_scores_gemma":[0.00017079312,0.00007809198,0.0000822286,0.00009785273,0.00008009383,0.00004059365,0.000052550706,0.000069899535,0.000001466293],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022194145,0.00015543075,0.9923701,0.000056896166,0.00021266298,0.0000070704755,0.000755842,0.00072211475,0.0013543243,0.000035955476,0.0038468565,0.00046054556],"study_design_scores_gemma":[0.0005195688,0.0002788165,0.9876671,0.000011901433,0.00011817726,0.000022830563,0.0015141426,0.0016420161,0.0017032878,0.0005794038,0.005776212,0.00016654257],"about_ca_topic_score_codex":0.000075896205,"about_ca_topic_score_gemma":0.009397487,"teacher_disagreement_score":0.009321591,"about_ca_system_score_codex":0.000037653626,"about_ca_system_score_gemma":0.000011644603,"threshold_uncertainty_score":0.52440184},"labels":[],"label_agreement":null},{"id":"W3132390046","doi":"10.2749/nantes.2018.s21-95","title":"Prolife: Strengthening a Steel Railway Bridge with Deck Sections","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Railway Engineering and Dynamics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Deck; Girder; Truss; Bridge deck; Engineering; Structural engineering; Forensic engineering; Civil engineering","score_opus":0.009104830749561903,"score_gpt":0.21604611346262242,"score_spread":0.20694128271306053,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3132390046","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9010791,0.000037352078,0.07227359,0.000012739567,0.00042204614,0.000106510706,0.0000072129587,0.0010257409,0.025035692],"genre_scores_gemma":[0.99392104,0.0000030964425,0.0041307523,0.0000052568107,0.00040957384,0.000023987144,0.00002259726,0.0000574718,0.001426227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921954,0.0000038950675,0.00021431138,0.00016853867,0.00015136627,0.0002423565],"domain_scores_gemma":[0.9995004,0.000015135423,0.000033305118,0.00031340102,0.000065768996,0.00007199934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000100874604,0.00014320007,0.00013163895,0.00007522287,0.000069681824,0.000035324683,0.000063750376,0.000060428087,0.000011831624],"category_scores_gemma":[0.00002212633,0.00012962228,0.000035656525,0.00021079998,0.00003483931,0.00008259598,0.00001193939,0.00013571605,0.000027756098],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040399027,0.00013105605,0.085180014,0.00032298703,0.0005623911,0.001839697,0.0012350684,0.8705111,0.010814125,0.0011292165,0.02198872,0.0062451963],"study_design_scores_gemma":[0.0008657366,0.00030447077,0.26177984,0.00019860658,0.00010973974,0.006767431,0.000066489556,0.5893628,0.005908588,0.00010282257,0.13335231,0.001181175],"about_ca_topic_score_codex":0.000031032214,"about_ca_topic_score_gemma":0.000089071065,"teacher_disagreement_score":0.28114834,"about_ca_system_score_codex":0.000054895023,"about_ca_system_score_gemma":0.00003267713,"threshold_uncertainty_score":0.5285843},"labels":[],"label_agreement":null},{"id":"W3132587595","doi":"10.2749/guimaraes.2019.1808","title":"Value of Information-Based Inspection Planning using a Population Approach","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Probabilistic logic; Computer science; Population; Sizing; Value of information; Matching (statistics); Reliability engineering; Data mining; Engineering; Artificial intelligence; Statistics; Mathematics","score_opus":0.0066588440143426735,"score_gpt":0.22225432017234723,"score_spread":0.21559547615800456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3132587595","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8912841,0.000008420044,0.100940995,5.2870456e-7,0.00053316524,0.00008843232,5.7467355e-7,0.000119216,0.007024551],"genre_scores_gemma":[0.98977715,2.0162258e-7,0.010104102,0.0000038043133,0.00006708298,0.0000020298646,0.00003252002,0.000007675613,0.0000054535153],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995321,0.0000028956492,0.00022424737,0.00004606876,0.00011194119,0.000082757695],"domain_scores_gemma":[0.99975497,0.000004813372,0.00008123678,0.00011549872,0.000030528958,0.00001295886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009007763,0.000055597593,0.000086899716,0.00009042012,0.000019946092,0.000009784083,0.0000242542,0.00004344312,0.0000028539328],"category_scores_gemma":[0.000013505127,0.000054978627,0.000026785714,0.00009930851,0.0000036876795,0.0002318259,0.000004488652,0.000061243634,0.0000015699707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022530626,0.0000013955724,0.13002785,0.00008550551,0.0000067925434,0.000001748869,0.000120377976,0.8667476,0.002562965,0.00013218037,0.000009869541,0.00030145166],"study_design_scores_gemma":[0.00013815355,0.000008182813,0.14227045,0.00006725743,0.000008618708,0.00006954955,0.00011365759,0.8506699,0.006209255,0.000055048095,0.0002935745,0.00009634085],"about_ca_topic_score_codex":0.00007833661,"about_ca_topic_score_gemma":1.1203817e-7,"teacher_disagreement_score":0.09849302,"about_ca_system_score_codex":0.00007895425,"about_ca_system_score_gemma":0.000015275027,"threshold_uncertainty_score":0.22419633},"labels":[],"label_agreement":null},{"id":"W3133473858","doi":"10.2749/copenhagen.2018.409","title":"Monitoring of the Great Belt Bridge hanger vibrations and expansion joint movements using Digital Image Correlation","year":2018,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Bridge (graph theory); Digital image correlation; Vibration; Computer science; Structural health monitoring; Photogrammetry; Computer vision; Engineering; Structural engineering; Artificial intelligence; Acoustics","score_opus":0.04244299726483097,"score_gpt":0.3024504470067223,"score_spread":0.2600074497418913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133473858","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99407434,0.00004118533,0.00424604,0.000008539226,0.000948387,0.00016993069,0.000003947481,0.00015153596,0.00035607704],"genre_scores_gemma":[0.9954109,0.000010062168,0.0042255884,0.0000019775098,0.00027965434,0.0000053379717,0.0000027629903,0.000017981853,0.00004574482],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993641,0.0000059131526,0.0002606868,0.0001042591,0.00015325865,0.00011180283],"domain_scores_gemma":[0.99956805,0.000010535261,0.000086505075,0.00022617547,0.00007622497,0.00003250023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000684575,0.000080931015,0.00009050834,0.000041224695,0.00009755411,0.000028480845,0.000040715535,0.00004699569,0.0000030567694],"category_scores_gemma":[0.000044530807,0.00006593839,0.000024937799,0.00009893907,0.000046478825,0.00027462203,0.00005101186,0.00007009529,6.8835743e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066335756,0.000011228955,0.68267053,0.00016779776,0.000035345576,0.000026627844,0.0009529421,0.00025466617,0.27061796,0.000016747319,0.0002115777,0.045027908],"study_design_scores_gemma":[0.000048897247,0.000015735413,0.8141188,0.00015678444,0.0000073849174,0.000093991,0.000014724242,0.005118038,0.18013929,0.00015822389,0.00005595747,0.00007217246],"about_ca_topic_score_codex":0.00008303161,"about_ca_topic_score_gemma":0.0000011057284,"teacher_disagreement_score":0.13144824,"about_ca_system_score_codex":0.00008659241,"about_ca_system_score_gemma":0.000014875762,"threshold_uncertainty_score":0.26888895},"labels":[],"label_agreement":null},{"id":"W3133650954","doi":"10.2749/newyork.2019.2314","title":"Tawatinâ Bridge - An Extradosed Rail and Pedestrian Bridge","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Pedestrian; Box girder; Landmark; Structural engineering; Beam bridge; Engineering; Span (engineering); Civil engineering; Girder; Computer science; Artificial intelligence","score_opus":0.014405633776752452,"score_gpt":0.235292328004147,"score_spread":0.22088669422739457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133650954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9883997,0.000089560584,0.0077553,0.000028595296,0.00023955079,0.00007411972,0.0000030632277,0.0003589926,0.0030511476],"genre_scores_gemma":[0.9987773,0.000020616279,0.0003891038,0.000015844551,0.00007941434,0.0000029919775,0.000044457032,0.000023945222,0.0006463536],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99936074,0.0000068458517,0.00021249615,0.00016839638,0.00011463933,0.00013685582],"domain_scores_gemma":[0.9995643,0.000012563781,0.000029456765,0.00027689012,0.000018061413,0.00009871065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009271018,0.00011265173,0.00015664179,0.00006305413,0.00002301951,0.000043731303,0.00004974122,0.000051844145,0.00013051523],"category_scores_gemma":[0.000018116438,0.00010992459,0.000042550757,0.00011967901,0.000011781163,0.00014955996,0.000008381698,0.000085897525,0.000029065479],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034780507,0.000068246714,0.25160643,0.0009195511,0.0010166599,0.0014248785,0.0019533453,0.3961563,0.15366554,0.0015650884,0.00639745,0.1851917],"study_design_scores_gemma":[0.00036487996,0.000029902054,0.73285234,0.000014700904,0.00003961569,0.00062256114,0.000025705234,0.2534743,0.0019342379,0.000033478213,0.010284492,0.00032380768],"about_ca_topic_score_codex":0.00008925161,"about_ca_topic_score_gemma":0.0000128203865,"teacher_disagreement_score":0.4812459,"about_ca_system_score_codex":0.000019949595,"about_ca_system_score_gemma":0.000011050086,"threshold_uncertainty_score":0.4482595},"labels":[],"label_agreement":null},{"id":"W3133666749","doi":"10.2749/newyork.2019.1647","title":"The Fort York Footbridges in Toronto. The first Duplex Stainless-Steel bridges in North America","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Downtown; Arch; Bridge (graph theory); Pedestrian; Engineering; Civil engineering; History; Archaeology","score_opus":0.006314800455293239,"score_gpt":0.2135923583571259,"score_spread":0.20727755790183267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133666749","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99285257,0.0010232982,0.000803128,0.00028491704,0.00034250264,0.00020481435,0.0000034862574,0.0001353337,0.004349933],"genre_scores_gemma":[0.9989957,0.00022998943,0.000035648067,0.000035611807,0.000054815144,0.000030884617,0.000017039483,0.000021836957,0.0005784264],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990467,0.000010689831,0.00035484377,0.0001609801,0.00018107405,0.00024573208],"domain_scores_gemma":[0.99937505,0.00008308725,0.000053407755,0.0004368771,0.000020062243,0.00003150847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015612798,0.00013726331,0.00018471073,0.000037171878,0.000055742574,0.000051630723,0.00018169293,0.000037868132,0.00004475327],"category_scores_gemma":[0.00003787888,0.00008611243,0.000074300944,0.000286341,0.000027547216,0.00008944635,0.000026144386,0.000140396,0.00001683333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005586009,0.0000057180728,0.1728319,0.000033630364,0.00005475252,0.00005215401,0.00045808547,0.8153327,0.00004768761,0.00016501616,0.0008058519,0.010206911],"study_design_scores_gemma":[0.00012168754,0.0000102580525,0.7472604,0.000013830391,0.000008061133,0.000032510354,0.0010521028,0.17833337,0.00007997174,0.0000041449907,0.072926074,0.00015759707],"about_ca_topic_score_codex":0.0022233084,"about_ca_topic_score_gemma":0.027279379,"teacher_disagreement_score":0.63699937,"about_ca_system_score_codex":0.00023467212,"about_ca_system_score_gemma":0.000019936262,"threshold_uncertainty_score":0.99047023},"labels":[],"label_agreement":null},{"id":"W3133763834","doi":"10.2749/newyork.2019.0333","title":"Lessons from the Cardington Fire Tests: Applications in the Performance-Based Fire Design","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Fire effects on concrete materials","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Fire safety; Fire performance; Fire protection engineering; Fire resistance; Fire protection; Engineering; Architectural engineering; Fire test; Key (lock); Construction engineering; Sustainability; Civil engineering; Computer science","score_opus":0.01737553191580961,"score_gpt":0.23929769951637464,"score_spread":0.22192216760056505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133763834","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99607074,0.00019885764,0.00068937603,0.00033823983,0.00025031218,0.0008818906,0.000013245795,0.00016033127,0.0013969991],"genre_scores_gemma":[0.9990575,0.000018226448,0.0002752675,0.000077393415,0.00012973818,0.00031648573,0.000047859874,0.000028194632,0.00004938312],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99917203,0.00006824379,0.0002349963,0.00017068947,0.00017904527,0.00017500413],"domain_scores_gemma":[0.99854106,0.0006209613,0.00005434748,0.00074467977,0.000019571342,0.000019382232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006624173,0.00012896827,0.00016728665,0.000014771932,0.000067420275,0.00006133145,0.00026719703,0.000067777626,0.00005089274],"category_scores_gemma":[0.000057022462,0.00007846654,0.00004782102,0.00016841652,0.00002061606,0.00006318414,0.000017754055,0.00013760431,0.00010483567],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005281624,0.00009876516,0.38365543,0.00071285403,0.0003308997,0.0003732907,0.003663873,0.36527023,0.16556641,0.00029391254,0.031139962,0.048841566],"study_design_scores_gemma":[0.00089859613,0.00011643556,0.420411,0.00040322958,0.00013448899,0.0001256924,0.0004146535,0.3779984,0.07865352,0.0001223396,0.11980684,0.00091480155],"about_ca_topic_score_codex":0.0001865357,"about_ca_topic_score_gemma":0.000006012202,"teacher_disagreement_score":0.08866688,"about_ca_system_score_codex":0.00006632021,"about_ca_system_score_gemma":0.00004655786,"threshold_uncertainty_score":0.31997725},"labels":[],"label_agreement":null},{"id":"W3133799004","doi":"10.2749/newyork.2019.2107","title":"The City of Calgary 12 Street Bridge Replacement and Monitoring","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Girder; Structural engineering; Deck; Bridge (graph theory); Span (engineering); Expansion joint; Engineering; Prestressed concrete; Box girder; Strain gauge; Geotechnical engineering","score_opus":0.011441969172193667,"score_gpt":0.22915097189050032,"score_spread":0.21770900271830665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133799004","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9941289,0.00019411033,0.0032049308,0.000008760245,0.00027515923,0.000045035184,4.876351e-7,0.0000625196,0.0020801015],"genre_scores_gemma":[0.9992454,0.00006240902,0.00019000708,0.0000010146973,0.000027663322,0.0000021267908,0.0000022322101,0.000006372261,0.0004627585],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99959505,0.000003125632,0.00016401018,0.00006990388,0.00009678622,0.00007111494],"domain_scores_gemma":[0.9997151,0.000021716753,0.000028859788,0.00019418355,0.000014982385,0.000025191857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009990351,0.000051940486,0.00008220911,0.000018702338,0.00002069422,0.000009972489,0.000031471354,0.00002013654,0.000011433661],"category_scores_gemma":[0.000015483512,0.000038453458,0.000026982038,0.00004712685,0.0000096771755,0.00003081474,0.000013102099,0.00004834306,0.00000113748],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008448513,0.0000038768458,0.93911976,0.00010837336,0.00024200426,0.000023246435,0.0001318697,0.028203258,0.011440143,0.00032036632,0.00022778165,0.020170892],"study_design_scores_gemma":[0.0001368608,0.000018795634,0.914736,0.000025386402,0.000025166162,0.000052239644,0.00006512688,0.05563769,0.025409535,0.000021685355,0.0037479608,0.0001235813],"about_ca_topic_score_codex":0.000071197624,"about_ca_topic_score_gemma":0.000005636531,"teacher_disagreement_score":0.027434433,"about_ca_system_score_codex":0.000017771015,"about_ca_system_score_gemma":0.0000047187746,"threshold_uncertainty_score":0.15680864},"labels":[],"label_agreement":null},{"id":"W3133856383","doi":"10.2749/newyork.2019.2664","title":"Flutter Analysis Using Quasi-Steady Time-Domain Flutter Derivatives","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Vibration and Dynamic Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke; Western University","funders":"","keywords":"Flutter; Acceleration; Time domain; Vibration; Deck; Nonlinear system; Structural engineering; Bridge (graph theory); Mechanics; Computer science; Engineering; Acoustics; Physics; Aerodynamics; Classical mechanics","score_opus":0.00841499114970419,"score_gpt":0.2320994967755188,"score_spread":0.2236845056258146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133856383","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6945423,0.000027759019,0.2945442,0.000042742136,0.000077790035,0.00007060961,0.0000028288762,0.00015151231,0.010540267],"genre_scores_gemma":[0.989826,0.0000025641496,0.0049969885,0.00011086393,0.00005777442,0.0000035659664,0.00007495067,0.00002824381,0.004899038],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989345,0.000028337807,0.00038191574,0.00023630758,0.00021855527,0.00020039266],"domain_scores_gemma":[0.99935156,0.000019868372,0.00008188155,0.0004411826,0.000042301683,0.00006321322],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00019608861,0.00015052523,0.00033450313,0.00027366827,0.00003873597,0.000044103854,0.000079947495,0.00007508236,0.002023979],"category_scores_gemma":[0.000012303704,0.00014249433,0.00023370657,0.0006755748,0.00001727506,0.00017689176,0.00002314655,0.00009026315,0.0005028987],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000069650555,0.00006320945,0.27481166,0.000056878267,0.004124618,0.00031593058,0.0010170917,0.6052308,0.11204746,0.00008697631,0.0017054353,0.0005329745],"study_design_scores_gemma":[0.00011641804,0.000006898181,0.011366348,0.000007757823,0.00035685362,0.000053762942,0.00012530384,0.9848232,0.00076180336,0.000048382044,0.0020845383,0.0002487083],"about_ca_topic_score_codex":0.0000198621,"about_ca_topic_score_gemma":0.000009262477,"teacher_disagreement_score":0.37959242,"about_ca_system_score_codex":0.00007619376,"about_ca_system_score_gemma":0.00001822068,"threshold_uncertainty_score":0.9988883},"labels":[],"label_agreement":null},{"id":"W3133903129","doi":"10.2749/newyork.2019.0921","title":"Kingston Third Crossing","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Bridge (graph theory); Alliance; Shore; Light rail; Stakeholder; Civil engineering; Engineering; Geography; Business; Transport engineering; Public transport; Archaeology; Political science","score_opus":0.004595537235915639,"score_gpt":0.21490161985582873,"score_spread":0.2103060826199131,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133903129","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89202124,0.000049699935,0.0014696437,0.0000070792394,0.002100652,0.000048616686,1.9610924e-7,0.00024488586,0.10405799],"genre_scores_gemma":[0.99673885,0.0000024433048,0.0010983313,0.00001574851,0.00025793858,0.0000020042726,0.0000018995705,0.000018048526,0.0018647437],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995185,0.0000013683884,0.00012865015,0.00009333194,0.00009164298,0.00016647679],"domain_scores_gemma":[0.9997364,0.0000049166156,0.000022920287,0.00019088827,0.000020338346,0.000024480896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007815468,0.00006909772,0.000086087864,0.000025824638,0.000035529614,0.000040934123,0.000039831142,0.000043154123,0.000034715475],"category_scores_gemma":[0.000010793819,0.00006322407,0.00003333034,0.000050449584,0.000011035395,0.00008415978,0.000012867433,0.00010029103,0.00008559077],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010747234,0.000011013348,0.41511005,0.0003394835,0.00011099037,0.0020699396,0.001705108,0.044021018,0.4897488,0.0020564627,0.010100876,0.034715507],"study_design_scores_gemma":[0.0003094118,0.000023510958,0.13893698,0.00017852659,0.00001602647,0.0018192466,0.00013348102,0.004490099,0.14451337,0.00058625574,0.7084536,0.00053949957],"about_ca_topic_score_codex":0.00000980124,"about_ca_topic_score_gemma":6.897465e-7,"teacher_disagreement_score":0.6983527,"about_ca_system_score_codex":0.000045735596,"about_ca_system_score_gemma":0.00001504766,"threshold_uncertainty_score":0.25782028},"labels":[],"label_agreement":null},{"id":"W3134036420","doi":"10.2749/newyork.2019.2720","title":"Burlington Bay Skyway Hanger Fail-Safe System","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Deck; Truss; Redundancy (engineering); Structural engineering; Span (engineering); Engineering; Bay; Christian ministry; Channel (broadcasting); Marine engineering; Telecommunications; Civil engineering; Reliability engineering","score_opus":0.0031566988579922713,"score_gpt":0.17583016780042524,"score_spread":0.17267346894243296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134036420","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83783287,0.00027296323,0.09139517,0.00004431274,0.0021193486,0.00017102562,0.0000034523334,0.0015717895,0.06658905],"genre_scores_gemma":[0.99512887,0.0000054848383,0.0004952768,0.000008075861,0.000116117844,0.0000061144106,0.000021222526,0.000027122918,0.0041917106],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929214,0.0000049554837,0.00024412597,0.00014756991,0.00015981267,0.00015140718],"domain_scores_gemma":[0.9995457,0.00001283955,0.000034069642,0.0003151873,0.000032129974,0.00006008791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000098834724,0.000115202085,0.00017984191,0.00008141606,0.000019953146,0.000028434655,0.000063062784,0.00006589649,0.00027198897],"category_scores_gemma":[0.000011055939,0.000103743594,0.00008585275,0.00016695136,0.000005591251,0.00007729893,0.0000100840925,0.00008784221,0.00039522414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027764015,0.0000033558083,0.0059445947,0.0004459246,0.00025565916,0.0002493759,0.00023349737,0.9675494,0.01828504,0.0011810384,0.001994739,0.0038546338],"study_design_scores_gemma":[0.0002312843,0.000015949245,0.0077315373,0.00009724202,0.00006639136,0.00056954386,0.00032337106,0.9081994,0.0153337745,0.00001031405,0.06694267,0.0004784742],"about_ca_topic_score_codex":0.000019443416,"about_ca_topic_score_gemma":0.0000025467034,"teacher_disagreement_score":0.15729599,"about_ca_system_score_codex":0.00008100126,"about_ca_system_score_gemma":0.0000084241265,"threshold_uncertainty_score":0.5079938},"labels":[],"label_agreement":null},{"id":"W3134107920","doi":"10.2749/newyork.2019.0799","title":"Investigation and Diagnosis of Fatigue Cracks of Rib-to-Deck Welded Joints in Orthotropic Decks by the Phased Array Ultrasonic Scanner","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Orthotropic material; Deck; Welding; Structural engineering; Bridge deck; Phased array; Ultrasonic sensor; Scanner; Materials science; Acoustics; Engineering; Composite material; Finite element method; Electrical engineering","score_opus":0.010607278880883704,"score_gpt":0.22855750615214832,"score_spread":0.21795022727126462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134107920","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99792814,0.00012824123,0.00065104844,0.000045529792,0.0003015951,0.00023478123,0.000004205335,0.000020185,0.0006862767],"genre_scores_gemma":[0.99946743,0.000036234385,0.0003467313,0.000017471833,0.000031317733,0.00002645223,0.0000067451842,0.000015517768,0.000052097308],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99920547,0.000014023226,0.0003589465,0.00013112238,0.00014165607,0.00014875691],"domain_scores_gemma":[0.9995271,0.0000461463,0.00010486141,0.00023158733,0.000049105645,0.000041196527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016676278,0.000100560144,0.00019692085,0.00006577892,0.000014063215,0.0000076271,0.00006711812,0.000059520375,0.000020140124],"category_scores_gemma":[0.00010491119,0.00007663943,0.000031138752,0.0001638502,0.00003296737,0.00007053975,0.000006611497,0.0001114377,0.0000016627403],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003383775,0.0000042943443,0.6558007,0.000063217754,0.000016503838,0.0000038309563,0.00044285445,0.0008060278,0.34201828,0.000011607159,0.0003444543,0.00048483798],"study_design_scores_gemma":[0.00023212843,0.000023378925,0.327356,0.00017116634,0.000010725883,0.000020872052,0.000096954565,0.000043596374,0.6712295,0.000097673576,0.00062813814,0.000089879126],"about_ca_topic_score_codex":0.0001295838,"about_ca_topic_score_gemma":0.00003737269,"teacher_disagreement_score":0.3292112,"about_ca_system_score_codex":0.000037343652,"about_ca_system_score_gemma":0.000024903069,"threshold_uncertainty_score":0.31252652},"labels":[],"label_agreement":null},{"id":"W3134182342","doi":"10.2749/newyork.2019.2586","title":"Design application and verification of equivalent static wind loads in bridge design","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Wind and Air Flow Studies","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Aerodynamics; Aeroelasticity; Wind engineering; Structural engineering; Bridge (graph theory); Pylon; Wind tunnel; Skew; Engineering; Computer science; Marine engineering; Aerospace engineering","score_opus":0.026821896420343508,"score_gpt":0.25363910378314236,"score_spread":0.22681720736279887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134182342","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.933638,0.00003625934,0.06475161,0.00008024721,0.000023244234,0.00040263028,4.822318e-7,0.000008184672,0.0010593709],"genre_scores_gemma":[0.99732745,0.000025129762,0.002338923,0.000015132781,0.0000055306987,0.00001288857,0.0000023232312,0.0000042873376,0.00026835685],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99936604,0.000027844291,0.00019436426,0.00018182972,0.00014184855,0.00008806113],"domain_scores_gemma":[0.9996734,0.000034803437,0.00010260405,0.00016450965,0.000004583863,0.000020044592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004088623,0.0000532136,0.00009502793,0.000016593132,0.000017145356,0.000004196115,0.00004272772,0.000020676081,0.000053296033],"category_scores_gemma":[0.000018071882,0.00004797739,0.000010146655,0.00008992562,0.0000468827,0.00007331014,0.000035318903,0.000028235358,0.000063246196],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033544555,0.00013661238,0.72850543,0.000044737408,0.000011558104,0.000022033526,0.00097338104,0.011862632,0.23679379,0.000045354995,0.00067335507,0.02089758],"study_design_scores_gemma":[0.00016687578,0.00006040587,0.9834785,0.000014204934,0.0000062718627,0.000019973053,0.000038654296,0.0035703925,0.011660748,0.00035690662,0.00054678076,0.00008028927],"about_ca_topic_score_codex":0.00010199426,"about_ca_topic_score_gemma":0.0000022783906,"teacher_disagreement_score":0.25497308,"about_ca_system_score_codex":0.000046142028,"about_ca_system_score_gemma":0.000008806262,"threshold_uncertainty_score":0.19564612},"labels":[],"label_agreement":null},{"id":"W3134316278","doi":"10.2749/newyork.2019.2638","title":"Objective-based equivalent static wind loads for long-span bridges","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Wind and Air Flow Studies","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Aeroelasticity; Structural engineering; Time domain; Modal; Deflection (physics); Wind engineering; Span (engineering); Frequency domain; Modal analysis; Design process; Computer science; Engineering; Aerodynamics; Finite element method; Aerospace engineering; Physics; Materials science","score_opus":0.01476061018055727,"score_gpt":0.2585043692172238,"score_spread":0.24374375903666654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134316278","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98560804,0.000028784112,0.0034476037,0.00047930557,0.00024013831,0.00045995458,0.000008009964,0.000041233914,0.009686937],"genre_scores_gemma":[0.98961693,0.00000281792,0.00037365564,0.0001755134,0.000057301273,0.000019765468,0.00001199679,0.000013701961,0.00972834],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989401,0.000012286231,0.00019835173,0.00032399024,0.00026485336,0.00026040224],"domain_scores_gemma":[0.9995132,0.00005775005,0.000099616096,0.00025998914,0.000010971694,0.000058453446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022695886,0.00011596358,0.00016250645,0.000016360304,0.00008502489,0.000017671739,0.00009141321,0.000029685176,0.0006770753],"category_scores_gemma":[0.000049027683,0.00009617712,0.00008658628,0.00007019818,0.00007470309,0.000084665684,0.00007296297,0.000047786194,0.00042172006],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001953129,0.00009650883,0.98572004,0.0000394085,0.000023339602,0.00009250966,0.00013220281,0.004498125,0.0020618932,0.000008121862,0.00434629,0.002962057],"study_design_scores_gemma":[0.00044390577,0.00017642176,0.96919405,0.00002831938,0.00002237035,0.000037093236,0.00008723817,0.0014154172,0.0060758237,0.00012471186,0.022184253,0.00021040383],"about_ca_topic_score_codex":0.00011023956,"about_ca_topic_score_gemma":0.00003453874,"teacher_disagreement_score":0.017837962,"about_ca_system_score_codex":0.00012225332,"about_ca_system_score_gemma":0.000024937886,"threshold_uncertainty_score":0.74134994},"labels":[],"label_agreement":null},{"id":"W3134338620","doi":"10.2749/newyork.2019.1398","title":"Prediction of Bearing Lifetime Demands by Considering the Bridge Design and Location Parameters","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Bearing (navigation); Bridge (graph theory); Span (engineering); Structural engineering; Engineering; Bearing capacity; Girder; Term (time); Computer science; Environmental science","score_opus":0.025583642427617095,"score_gpt":0.21431590592731659,"score_spread":0.1887322634996995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134338620","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.946304,0.00020146971,0.052675422,0.0000258984,0.00014165165,0.00019770628,0.0000013490111,0.000079294536,0.00037317703],"genre_scores_gemma":[0.99943644,0.000025540214,0.000449165,0.00000988694,0.0000073024025,0.0000068899594,0.000004649356,0.000007966894,0.00005216322],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995194,0.000016203636,0.00020635317,0.000101869846,0.000086259715,0.000069895825],"domain_scores_gemma":[0.9995939,0.000099657016,0.000042746924,0.0001993987,0.000037335598,0.000026918638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036116288,0.00005487335,0.00009135294,0.000016394784,0.00002039763,0.0000123984855,0.00002735915,0.00003424842,0.000011104186],"category_scores_gemma":[0.00009900893,0.00004492734,0.000016273583,0.00007115101,0.000024005956,0.00005791283,0.000015231997,0.00005900634,0.0000030350604],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036741458,0.000017040968,0.4799202,0.0004361729,0.000077205346,0.000016908318,0.0010374098,0.08501639,0.41808096,0.000050853756,0.004230922,0.01107918],"study_design_scores_gemma":[0.0004681247,0.00008751427,0.31976607,0.00012779633,0.000055979614,0.00042350346,0.0001105648,0.5554413,0.12046468,0.00010694213,0.0027141846,0.00023332829],"about_ca_topic_score_codex":0.000024927387,"about_ca_topic_score_gemma":6.4755494e-7,"teacher_disagreement_score":0.47042492,"about_ca_system_score_codex":0.000019353924,"about_ca_system_score_gemma":0.000014783728,"threshold_uncertainty_score":0.18320836},"labels":[],"label_agreement":null},{"id":"W3134344869","doi":"10.2749/newyork.2019.2329","title":"Design and Construction of the Samuel De Champlain Bridge, Montreal, Canada","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Infrastructure Canada; SNC-Lavalin (Canada)","funders":"","keywords":"Bridge (graph theory); Engineering; Schedule; Modular design; Service (business); Track (disk drive); Civil engineering; Telecommunications; Forensic engineering; Transport engineering; Computer science; Business","score_opus":0.00553722417072751,"score_gpt":0.17796762761628282,"score_spread":0.1724304034455553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134344869","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9346443,0.0000654054,0.064307116,0.000031151834,0.00018743811,0.000057951132,0.0000015778558,0.00003280596,0.00067229033],"genre_scores_gemma":[0.9986548,0.000012665178,0.001180554,0.000007861983,0.0000104845385,0.0000012953119,0.0000016032246,0.0000055350206,0.00012524192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970186,0.0000066451935,0.00010863579,0.000051298317,0.00007076435,0.00006080502],"domain_scores_gemma":[0.9998007,0.00001726132,0.000026962294,0.00011849825,0.000014436598,0.000022164731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000055616052,0.00004424364,0.00007462297,0.000015291556,0.000014603552,0.000004518582,0.000025678515,0.00001998025,0.00001658718],"category_scores_gemma":[0.0000136318595,0.000034033674,0.000016024575,0.000071186085,0.0000105716,0.00001935036,0.0000048161032,0.000037957772,2.5390352e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025963132,0.0000012616184,0.02188081,0.00007314721,0.000103989616,0.000018248562,0.000106258805,0.9572719,0.0108673945,0.00018899121,0.0012534453,0.008231991],"study_design_scores_gemma":[0.0001550894,0.000006346792,0.40231654,0.000024390032,0.00003350727,0.00092099665,0.00006926721,0.56840885,0.026413923,0.00013649072,0.0013706548,0.0001439375],"about_ca_topic_score_codex":0.08482938,"about_ca_topic_score_gemma":0.014613453,"teacher_disagreement_score":0.388863,"about_ca_system_score_codex":0.000042555606,"about_ca_system_score_gemma":0.000054307708,"threshold_uncertainty_score":0.9212648},"labels":[],"label_agreement":null},{"id":"W3134450156","doi":"10.2749/newyork.2019.2530","title":"Stadthöfe Hamburg – Innovative Structural Design between Water, Heritage and Modern Lifestyle","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Ecology, Conservation, and Geographical Studies","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Architectural engineering; Boundary (topology); Civil engineering; Scale (ratio); Space (punctuation); Task (project management); Engineering; Computer science; Geography; Archaeology; Cartography; Systems engineering; Mathematics","score_opus":0.015477329414536386,"score_gpt":0.23575727134903846,"score_spread":0.22027994193450207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134450156","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995354,0.00004860503,0.00034473045,0.00032454633,0.00008805484,0.00025264415,0.000002404286,0.000036821395,0.0035481853],"genre_scores_gemma":[0.99614066,0.000012409393,0.0009786843,0.00020462328,0.000030757303,0.000012242769,0.00001369999,0.000007716192,0.0025991928],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990423,0.000037937232,0.00023551717,0.00030139709,0.00016139243,0.00022149601],"domain_scores_gemma":[0.99960876,0.000055780878,0.00007439313,0.0001764518,0.000027235721,0.000057365196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031307922,0.00011289274,0.00017636239,0.000021522786,0.00013839285,0.000020222707,0.000075089614,0.00007149191,0.0003192642],"category_scores_gemma":[0.00004226863,0.00007997237,0.000021898451,0.00015942325,0.00018254762,0.00016426422,0.00017355909,0.0000988748,0.00006253176],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046197842,0.000007991937,0.99606913,0.000004889653,0.00002281391,0.000022442217,0.0002486238,0.000024319239,0.0012266263,0.000025862892,0.00023641303,0.0021062416],"study_design_scores_gemma":[0.00012903615,0.000066534914,0.98963445,0.0000037313487,0.000008029258,0.000030851686,0.000059820788,0.00009990097,0.0006189913,0.004642976,0.0045728697,0.00013283304],"about_ca_topic_score_codex":0.00038392787,"about_ca_topic_score_gemma":0.00008868298,"teacher_disagreement_score":0.0064347307,"about_ca_system_score_codex":0.000031152482,"about_ca_system_score_gemma":0.000013348764,"threshold_uncertainty_score":0.34957188},"labels":[],"label_agreement":null},{"id":"W3134557592","doi":"10.2749/newyork.2019.1088","title":"Study on Evaluation Procedures for Prestressed Concrete Bridges Damaged by Salt Attack with Severe Corrosion of PC Cables","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Structural engineering; Limit state design; Corrosion; Beam (structure); Engineering; Finite element method; Limit (mathematics); Prestressed concrete; Service life; Nonlinear system; Computer science; Reliability engineering; Mathematics; Materials science; Composite material; Physics","score_opus":0.027637598332550122,"score_gpt":0.28915337271417363,"score_spread":0.2615157743816235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134557592","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957855,0.000075424636,0.0002851808,0.000020822632,0.0001713898,0.002363231,0.000036130536,0.00012850901,0.0011338228],"genre_scores_gemma":[0.99907655,0.0000053125127,0.00006679166,0.000011173064,0.000019191293,0.00013839066,0.0001027253,0.00003060656,0.000549257],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987197,0.000044287288,0.0003537484,0.00030227806,0.00042744345,0.00015256752],"domain_scores_gemma":[0.9989269,0.00014034145,0.00014148977,0.000474238,0.00026239245,0.000054655968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005246887,0.00015887113,0.000272864,0.00003785683,0.000036560283,0.000020042065,0.000085800304,0.00006136258,0.000054966822],"category_scores_gemma":[0.00030532724,0.00012943978,0.000045553606,0.00009038599,0.000020912485,0.00008953849,0.000017807257,0.00008516048,0.00000486432],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007532064,0.00009686707,0.6041779,0.0010652615,0.000061280276,0.00002569302,0.001159173,0.025999162,0.34712613,0.000008813273,0.018661238,0.00086525705],"study_design_scores_gemma":[0.009529465,0.004038517,0.52431655,0.00085873867,0.00042403975,0.00021716332,0.0031773981,0.088520266,0.3643528,0.00002164283,0.0032970659,0.0012463607],"about_ca_topic_score_codex":0.000029598257,"about_ca_topic_score_gemma":0.000036123754,"teacher_disagreement_score":0.07986137,"about_ca_system_score_codex":0.0000672461,"about_ca_system_score_gemma":0.00012116867,"threshold_uncertainty_score":0.5278401},"labels":[],"label_agreement":null},{"id":"W3134700893","doi":"10.2749/newyork.2019.2573","title":"Equivalent static wind load procedure for skew winds on large bridges","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Wind and Air Flow Studies","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Bridge (graph theory); Wind engineering; Structural engineering; Skew; Terrain; Vibration; Wind speed; Engineering; Wind tunnel; Aeroelasticity; Computer science; Aerodynamics; Geology; Aerospace engineering; Acoustics","score_opus":0.013041011612771772,"score_gpt":0.2613224517550987,"score_spread":0.24828144014232695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134700893","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9708851,0.000033062995,0.00009585013,0.00080179167,0.0002060821,0.0004884068,0.00001549459,0.000039060324,0.027435172],"genre_scores_gemma":[0.9711696,0.000007324002,0.00016851265,0.00038871868,0.000084819076,0.000020538255,0.000009690362,0.000014474591,0.028136339],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987652,0.000007096018,0.00019828223,0.00034212065,0.00037970714,0.00030764547],"domain_scores_gemma":[0.9995574,0.00003080482,0.0000950432,0.00024679533,0.000011193193,0.00005876876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027826728,0.00012332918,0.00015970833,0.000011263336,0.00009687377,0.000016156493,0.00009460856,0.000036407226,0.0006670349],"category_scores_gemma":[0.00007577224,0.00009627631,0.00007313486,0.00006372678,0.000035590812,0.00008300933,0.0000951139,0.00006152159,0.00074574683],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007389023,0.00056793966,0.8663208,0.00024842776,0.00008177744,0.00025464216,0.0012105452,0.0008166164,0.0065733367,0.00034688035,0.11822341,0.0052817552],"study_design_scores_gemma":[0.0007591906,0.00039884675,0.58763546,0.0000849362,0.000029086017,0.00009932117,0.00022706116,0.00033783817,0.0027955896,0.0005089496,0.40677884,0.0003448611],"about_ca_topic_score_codex":0.00002082999,"about_ca_topic_score_gemma":0.000015565254,"teacher_disagreement_score":0.2885554,"about_ca_system_score_codex":0.00013697351,"about_ca_system_score_gemma":0.00003089059,"threshold_uncertainty_score":0.95853156},"labels":[],"label_agreement":null},{"id":"W3134718954","doi":"10.2749/newyork.2019.2444","title":"Bridge Health Monitoring by Infrared Thermography","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Bridge (graph theory); Thermography; Nondestructive testing; Visual inspection; Computer science; Structural health monitoring; Standardization; Construction engineering; Engineering; Field (mathematics); Forensic engineering; Transport engineering; Structural engineering; Infrared; Artificial intelligence","score_opus":0.01590701134395804,"score_gpt":0.2925830756213216,"score_spread":0.2766760642773635,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134718954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9897961,0.0010854215,0.00013038871,0.000045026492,0.0019046683,0.00029754243,0.0000055215014,0.0017015632,0.0050337925],"genre_scores_gemma":[0.99746704,0.00020112339,0.0016309372,0.00001822179,0.00023205117,0.000024334306,0.000011602165,0.00004763522,0.0003670257],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99892056,0.00001248831,0.00034509884,0.00018696941,0.00020460233,0.0003302822],"domain_scores_gemma":[0.9993123,0.000020344813,0.00007669081,0.000444242,0.000027185097,0.000119272474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018517076,0.00013938661,0.00020203702,0.00007784675,0.00004043458,0.00001923059,0.00012156592,0.00007395884,0.000019278397],"category_scores_gemma":[0.000009669856,0.00014080555,0.000055706983,0.00018729898,0.000010152515,0.0000991112,0.000022770966,0.00019415646,0.000023236124],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008611286,0.00001646601,0.8173041,0.0006775398,0.00008169452,0.000111813526,0.00049515546,0.00012850075,0.012293265,0.000058809626,0.057255235,0.11156884],"study_design_scores_gemma":[0.00013749978,0.00006718577,0.916762,0.0001438683,0.0000033886658,0.00021127159,0.00001897641,0.00012136785,0.023234157,0.00036183468,0.05862901,0.00030945207],"about_ca_topic_score_codex":0.00014862747,"about_ca_topic_score_gemma":2.589942e-7,"teacher_disagreement_score":0.111259386,"about_ca_system_score_codex":0.00015064096,"about_ca_system_score_gemma":0.00003101013,"threshold_uncertainty_score":0.5741884},"labels":[],"label_agreement":null},{"id":"W3134729543","doi":"10.2749/newyork.2019.1802","title":"Notes of a Journeymen Architect","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Globalization; Appropriation; Bridge (graph theory); Flexibility (engineering); Globe; Engineering; Public relations; Political science; Management; Law; Economics; Psychology","score_opus":0.004489804633539483,"score_gpt":0.19873679930441068,"score_spread":0.1942469946708712,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134729543","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9632834,0.000057225276,0.02545518,0.000015054766,0.00014362733,0.000028706956,7.7406884e-7,0.00011667127,0.010899331],"genre_scores_gemma":[0.9985581,0.0000050324243,0.0009936193,0.000002634359,0.000018859528,8.6527285e-7,0.0000034759726,0.000007919701,0.0004094963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967283,0.00000194373,0.00014253927,0.00004840592,0.00007585984,0.00005841622],"domain_scores_gemma":[0.9997894,0.000015414986,0.000021631095,0.0001384033,0.000013391042,0.00002177213],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000044378256,0.000043486132,0.00009684385,0.000053475254,0.000003979403,0.0000039981132,0.000031146148,0.00001825988,0.00020875539],"category_scores_gemma":[0.000017928436,0.000038183305,0.00004858443,0.000096216194,0.000004844555,0.000022426304,0.0000045093616,0.000042105945,0.00003118429],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014257092,0.000002564239,0.009809615,0.0000771037,0.00011319429,0.000026944386,0.000089474765,0.90404344,0.07638382,0.0001758199,0.00016373741,0.009112878],"study_design_scores_gemma":[0.0003885522,0.00006884007,0.07970536,0.000075675365,0.000068528854,0.00076466775,0.00008135737,0.63166225,0.27703917,0.00028695274,0.009403794,0.00045484857],"about_ca_topic_score_codex":0.000013342738,"about_ca_topic_score_gemma":7.5555016e-7,"teacher_disagreement_score":0.2723812,"about_ca_system_score_codex":0.000009185441,"about_ca_system_score_gemma":0.000005213996,"threshold_uncertainty_score":0.22857252},"labels":[],"label_agreement":null},{"id":"W3134765676","doi":"10.2749/newyork.2019.2691","title":"TwentyTwo Bishopsgate, London","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Demolition; Skyline; Tower; Basement; Girder; Civil engineering; Engineering; Architectural engineering; Foundation (evidence); Geography; Archaeology","score_opus":0.003048264178966951,"score_gpt":0.1878740837260138,"score_spread":0.18482581954704685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134765676","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94249153,0.00014363414,0.015375973,0.00002818714,0.0008471498,0.00006362919,0.000001067681,0.0006630038,0.040385842],"genre_scores_gemma":[0.9956532,0.000014768866,0.00030095605,0.000013457399,0.000045412144,0.0000024441376,0.000017760538,0.000015844456,0.0039361413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995629,0.000002014615,0.00014445628,0.00009205195,0.00009634921,0.00010222251],"domain_scores_gemma":[0.9997153,0.000006175458,0.00001588495,0.00020686374,0.000016517311,0.000039242885],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000042330863,0.00007050368,0.00009910762,0.000055140004,0.000009455172,0.000015529129,0.000042101667,0.00003285598,0.00048252568],"category_scores_gemma":[0.000007086428,0.00006498948,0.00005289483,0.00015233956,0.000004445317,0.00006500118,0.0000066555035,0.000059113845,0.000253391],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020788425,0.0000052579285,0.017328165,0.000092250426,0.00017325729,0.00019623648,0.00006313678,0.92928374,0.03152929,0.00048142014,0.005865837,0.01497934],"study_design_scores_gemma":[0.0004182647,0.000024173092,0.04251378,0.000035125227,0.000055239627,0.00079257565,0.00006255652,0.6667976,0.041377567,0.000145559,0.24712053,0.00065706566],"about_ca_topic_score_codex":0.000009994559,"about_ca_topic_score_gemma":0.0000013432024,"teacher_disagreement_score":0.26248616,"about_ca_system_score_codex":0.000025566673,"about_ca_system_score_gemma":0.0000049770715,"threshold_uncertainty_score":0.52833176},"labels":[],"label_agreement":null},{"id":"W3134766868","doi":"10.2749/newyork.2019.2131","title":"Damage Assessment of a continuous Hollow Core Deck Bridge subjected to ASR","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Structural engineering; Deck; Retrofitting; Cracking; Finite element method; Bridge (graph theory); Bridge deck; Expansion joint; Nonlinear system; Sensitivity (control systems); Residual; Computer science; Materials science; Engineering; Composite material; Physics","score_opus":0.017709031163305532,"score_gpt":0.2840890312462755,"score_spread":0.26638000008296997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134766868","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.981081,0.0000143143225,0.0009788134,0.000022360207,0.0004508328,0.0003497137,0.000009865402,0.00019467912,0.016898436],"genre_scores_gemma":[0.99845433,0.0000029422972,0.000637774,0.000031352676,0.000020312129,0.000011165071,0.000019291512,0.000019505678,0.0008033102],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99906516,0.000011047585,0.00035981112,0.00019407184,0.00020877311,0.00016116524],"domain_scores_gemma":[0.9991225,0.000042971595,0.000059709906,0.0005704366,0.00010314534,0.00010125758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026087035,0.00010747926,0.00027439024,0.000051464784,0.000011610601,0.000012706853,0.00009283169,0.000055575947,0.0003124624],"category_scores_gemma":[0.00010312975,0.000105300074,0.00008131269,0.0001806004,0.000011382187,0.00004101885,0.000045614997,0.00010198646,0.000043609736],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008066991,0.00001625632,0.6093027,0.00007424043,0.000013800544,0.00015098012,0.000079992664,0.00018554287,0.38772082,0.000049965423,0.0017646371,0.0006330083],"study_design_scores_gemma":[0.00024196629,0.000055526172,0.9815168,0.00003227959,0.000010149517,0.00007652601,0.000023165545,0.0022168476,0.008950215,0.000008242787,0.0067275143,0.00014078543],"about_ca_topic_score_codex":0.000059028924,"about_ca_topic_score_gemma":0.000028271701,"teacher_disagreement_score":0.37877062,"about_ca_system_score_codex":0.00006497983,"about_ca_system_score_gemma":0.00006249958,"threshold_uncertainty_score":0.42940125},"labels":[],"label_agreement":null},{"id":"W3134881492","doi":"10.2749/newyork.2019.0417","title":"Weather Forecasting Technology Applied to Structures Improves Resiliency","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Smart Materials for Construction","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Storm; Extreme weather; Warning system; Weather forecasting; Meteorology; Computer science; Environmental science; Climate change; Geography","score_opus":0.006455047821722834,"score_gpt":0.21003170978459035,"score_spread":0.2035766619628675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134881492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9739964,0.000002440157,0.000121344216,0.00008211787,0.00050338253,0.00031944463,0.0000010840382,0.00010603026,0.024867743],"genre_scores_gemma":[0.99424285,2.3695283e-7,0.0048430488,0.000040817362,0.00004534627,0.000020715248,0.0000018543595,0.000014484302,0.00079066947],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99906737,0.0000049832456,0.00021381446,0.0003376586,0.00017043971,0.00020572629],"domain_scores_gemma":[0.99946,0.000006730177,0.00010546997,0.00038028436,0.000005079428,0.000042476382],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0001403404,0.00009398129,0.0001178411,0.000053756914,0.00004952894,0.000012494083,0.00012774451,0.00007873243,0.0010519163],"category_scores_gemma":[0.0000496078,0.00008235101,0.00002191724,0.00020071559,0.000058324327,0.00006512817,0.00018019901,0.00005478945,0.0008184853],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009797801,0.0000048055267,0.32089382,0.0000039862252,0.0000038994817,0.000018203062,0.00004626257,0.00010992715,0.6696935,0.0003240279,0.00027735438,0.008614371],"study_design_scores_gemma":[0.00032819455,0.00014408119,0.57181484,0.000014755338,0.000018636525,0.0025570476,0.00028546684,0.00009676013,0.3552729,0.01797973,0.050968375,0.0005191972],"about_ca_topic_score_codex":0.000093494724,"about_ca_topic_score_gemma":0.000027668322,"teacher_disagreement_score":0.31442064,"about_ca_system_score_codex":0.000076252785,"about_ca_system_score_gemma":0.00000879662,"threshold_uncertainty_score":0.99995947},"labels":[],"label_agreement":null},{"id":"W3134995536","doi":"10.2749/newyork.2019.0984","title":"Traffic loading – AASHTO, State Implementations and International Codes of Practice","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notional amount; Bridge (graph theory); Implementation; Computer science; Software; Process (computing); State (computer science); Engineering; Transport engineering; Civil engineering; Structural engineering; Software engineering; Operating system","score_opus":0.007237452041953069,"score_gpt":0.27830514037887116,"score_spread":0.2710676883369181,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134995536","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9879502,0.000041172974,0.0011025144,0.000030938376,0.0006958264,0.00006716475,0.0000054756647,0.00004202525,0.0100646885],"genre_scores_gemma":[0.99725884,0.000036565743,0.0023465827,0.000007858792,0.00004826885,0.0000028318545,0.000009519324,0.000008316627,0.00028124143],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99961483,0.0000030135202,0.00016559853,0.00006650103,0.00007607957,0.000073963085],"domain_scores_gemma":[0.9997715,0.000029416791,0.00005503138,0.000074203956,0.000053267664,0.000016602384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010847837,0.000045134766,0.00006515859,0.000038507384,0.000011603468,0.000012579893,0.000029449891,0.000012813893,0.000030458405],"category_scores_gemma":[0.000034042347,0.00004430258,0.000014104843,0.00003392157,0.000007617093,0.00015721565,0.000011956645,0.000047818605,0.000003262487],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066874396,0.000066780725,0.26378813,0.0005185356,0.0012683864,0.0006491429,0.010558307,0.2753396,0.3237138,0.0046679475,0.0047082966,0.114654206],"study_design_scores_gemma":[0.0038037559,0.00028561405,0.32360432,0.00058831857,0.00030964243,0.008136571,0.014571269,0.058441162,0.19414727,0.0023998846,0.3919304,0.0017817783],"about_ca_topic_score_codex":0.000011032787,"about_ca_topic_score_gemma":0.0000033978706,"teacher_disagreement_score":0.3872221,"about_ca_system_score_codex":0.000026541884,"about_ca_system_score_gemma":0.00001114266,"threshold_uncertainty_score":0.18066067},"labels":[],"label_agreement":null},{"id":"W3134995589","doi":"10.2749/newyork.2019.0182","title":"Robotics in Construction and the New Era of Efficient Concrete Bridges","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Bridge (graph theory); Robot; Structural system; Production (economics); Robotics; Mechanization; Computer science; Reinforced concrete; Structural approach; Construction engineering; Engineering; Artificial intelligence; Civil engineering; Structural engineering; Economics; Structural change; Microeconomics","score_opus":0.005220338056577337,"score_gpt":0.20502140901626278,"score_spread":0.19980107095968544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134995589","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934334,0.00008576358,0.002537985,0.00015171077,0.0007564475,0.0001378068,0.000001255462,0.000031502634,0.0028640851],"genre_scores_gemma":[0.9971699,0.000028300457,0.002653948,0.00001211385,0.000043819142,0.0000021131236,0.00000246038,0.0000058615988,0.00008146872],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994919,0.0000110474375,0.0002935459,0.000068465015,0.00007223567,0.000062863925],"domain_scores_gemma":[0.9997061,0.000032653898,0.00006465218,0.000149596,0.000037051952,0.000009981114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002223192,0.000050314884,0.00013460127,0.00003449474,0.000011519386,0.000013116747,0.000029670797,0.00003501413,0.00003139861],"category_scores_gemma":[0.000029466162,0.00003986433,0.000015785306,0.000107755295,0.0000761201,0.000026159705,0.000012042596,0.0000683038,0.0000042495562],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012583465,0.000002962448,0.06464308,0.00033929962,0.00018389677,0.00006399973,0.0008843266,0.34288353,0.17390582,0.37998328,0.00081645994,0.036167525],"study_design_scores_gemma":[0.01598667,0.00014733824,0.07166457,0.00090978865,0.00023290311,0.014471689,0.002625391,0.3402866,0.5147772,0.009073608,0.028008843,0.0018154089],"about_ca_topic_score_codex":0.000037939888,"about_ca_topic_score_gemma":7.1853384e-7,"teacher_disagreement_score":0.37090966,"about_ca_system_score_codex":0.000014227538,"about_ca_system_score_gemma":0.00003113529,"threshold_uncertainty_score":0.16256203},"labels":[],"label_agreement":null},{"id":"W3135119167","doi":"10.2749/newyork.2019.1641","title":"Two Outstanding Aluminum Pedestrian Bridges in a National Historic Site","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Serviceability (structure); Pedestrian; Chord (peer-to-peer); Context (archaeology); Truss; Structural engineering; Engineering; Pedestrian crossing; Civil engineering; Transport engineering; Forensic engineering; Computer science; Archaeology; Geography","score_opus":0.010908092119168955,"score_gpt":0.2388983700932593,"score_spread":0.22799027797409033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135119167","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9729351,0.00015422722,0.00694544,0.000042500422,0.00064954994,0.00006792915,0.0000030263873,0.0002303453,0.018971905],"genre_scores_gemma":[0.99774146,0.00000791806,0.0002957138,0.000008578939,0.00008155289,0.0000040572136,0.000028599425,0.000013513293,0.0018185903],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935585,0.000004163091,0.00021543246,0.00011977729,0.00019059957,0.00011418035],"domain_scores_gemma":[0.9997809,0.000017449305,0.00002837186,0.000110744695,0.000027475337,0.000035067344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001246223,0.00008127904,0.00012582033,0.00016740472,0.000011904207,0.000017007356,0.000038057235,0.000031242595,0.0001438344],"category_scores_gemma":[0.00003479251,0.00008428124,0.000050051247,0.00022708559,0.0000046999003,0.00009128754,0.0000067747833,0.0000827325,0.00004884354],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030547376,0.000004467794,0.10400839,0.00005328323,0.000051387888,0.00015711751,0.00025328985,0.8837539,0.009054802,0.0004942107,0.0011990982,0.000966985],"study_design_scores_gemma":[0.00074098015,0.000014059792,0.09413464,0.000048933685,0.00002401041,0.00042151182,0.00013156577,0.8762688,0.002332975,0.00013242196,0.025258753,0.000491333],"about_ca_topic_score_codex":0.00010329951,"about_ca_topic_score_gemma":0.000041382602,"teacher_disagreement_score":0.0248064,"about_ca_system_score_codex":0.00033281793,"about_ca_system_score_gemma":0.000023212517,"threshold_uncertainty_score":0.3436889},"labels":[],"label_agreement":null},{"id":"W3135129503","doi":"10.2749/newyork.2019.0357","title":"Full-Scale Performance Evaluation of Structure-Dynamic Vibration Absorber Systems","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Seismic and Structural Analysis of Tall Buildings","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Tuned mass damper; Structural engineering; Serviceability (structure); Slosh dynamics; Tower; Vibration; Damper; Engineering; Computer science; Acoustics; Physics","score_opus":0.006054477910722889,"score_gpt":0.21740126082683553,"score_spread":0.21134678291611264,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135129503","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9961661,0.00018969241,0.00045098522,0.000007986035,0.00051473925,0.00018151158,0.0000025454583,0.00006244527,0.0024240129],"genre_scores_gemma":[0.99945414,0.000011500076,0.00015891476,0.0000034499142,0.000034177596,0.0000043957184,0.0000473164,0.000012234822,0.0002738793],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901205,0.000010970547,0.0003223479,0.00013065212,0.0004228993,0.000101084835],"domain_scores_gemma":[0.99948066,0.000006917698,0.00011038229,0.00023906032,0.0001395324,0.000023446772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025481268,0.00009039572,0.00017275459,0.0000623199,0.000018198321,0.000014974211,0.00006779481,0.000060965573,0.00014715428],"category_scores_gemma":[0.000009430214,0.00007719819,0.00005145443,0.00010720391,0.00000982473,0.0001748356,0.00000958408,0.00006242762,0.000016786596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000040379036,0.0000016579743,0.007528864,0.00008146398,0.000054332948,0.0000010831943,0.000050811173,0.8478124,0.14211339,0.000011703992,0.000069645874,0.0022705744],"study_design_scores_gemma":[0.00011409575,0.000012350526,0.05554952,0.000023633573,0.00006123732,0.00011040088,0.000034127737,0.9401729,0.00361312,0.000034402823,0.00017757072,0.000096631215],"about_ca_topic_score_codex":0.000023354212,"about_ca_topic_score_gemma":0.0000050785293,"teacher_disagreement_score":0.13850027,"about_ca_system_score_codex":0.00008334755,"about_ca_system_score_gemma":0.000019366236,"threshold_uncertainty_score":0.31480506},"labels":[],"label_agreement":null},{"id":"W3135144609","doi":"10.2749/newyork.2019.0897","title":"Statistical Analysis of Bridge Management System Inspection Data","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McMaster University","funders":"","keywords":"Bridge (graph theory); Computer science; Christian ministry; Scheduling (production processes); Multivariate statistics; Statistical analysis; Transport engineering; Engineering; Statistics; Machine learning; Operations management; Mathematics","score_opus":0.012109698812633261,"score_gpt":0.25128051783806027,"score_spread":0.239170819025427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135144609","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71605587,0.000029724928,0.2401797,0.0000019813133,0.0013879596,0.00014456054,0.000049744856,0.00026685643,0.041883614],"genre_scores_gemma":[0.99770534,0.000006241937,0.0019835937,9.576871e-7,0.00005126983,0.0000018439086,0.00013745364,0.000007861535,0.00010546639],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99944174,0.0000033268948,0.00020898697,0.00012918124,0.00012776555,0.00008901592],"domain_scores_gemma":[0.99937475,0.000006567055,0.00003884234,0.0005420345,0.000020179292,0.000017643788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012834801,0.000050964754,0.00014964389,0.00010533491,0.000009268494,0.0000070303545,0.00008327036,0.000020551382,0.000015498113],"category_scores_gemma":[0.000004844162,0.000047694422,0.00002364818,0.00021354704,0.000005642316,0.000053572017,0.00004353794,0.00004017032,0.000010667781],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002179768,0.000031547166,0.7363948,0.0024302679,0.007838129,0.0021438035,0.00023565222,0.1984245,0.00328128,0.021052001,0.00995953,0.01818669],"study_design_scores_gemma":[0.000078019,0.000006718218,0.886657,0.00003911628,0.000553075,0.000082979925,0.000114560484,0.10771281,0.0003982579,0.000008944548,0.0042531556,0.00009536847],"about_ca_topic_score_codex":0.00004330548,"about_ca_topic_score_gemma":0.0000044823746,"teacher_disagreement_score":0.28164944,"about_ca_system_score_codex":0.00006279984,"about_ca_system_score_gemma":0.0000038504854,"threshold_uncertainty_score":0.19449222},"labels":[],"label_agreement":null},{"id":"W3135213525","doi":"10.2749/newyork.2019.0570","title":"Reliability of Structures that Pass Imperfect Proof Load Tests","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Probabilistic and Robust Engineering Design","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Reliability (semiconductor); Mathematics; Repeatability; Reliability engineering; Imperfect; Statistics; Control theory (sociology); Computer science; Engineering; Power (physics); Physics","score_opus":0.05076417664273099,"score_gpt":0.32725532394587137,"score_spread":0.2764911473031404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135213525","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97747284,0.00014929513,0.01177914,0.00006926199,0.0009971858,0.00042898726,0.0000043803707,0.00005721629,0.009041684],"genre_scores_gemma":[0.99384844,0.0000021214064,0.0024535554,0.000012134735,0.00003942387,0.000006383215,0.0000014877785,0.000009509311,0.0036269252],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99718964,0.000066832225,0.00065867923,0.00049625454,0.0013884314,0.00020015163],"domain_scores_gemma":[0.99701625,0.0007704135,0.00034074884,0.0013303306,0.00046224322,0.00008001571],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034830854,0.00013080704,0.00036732163,0.0000707389,0.000029710229,0.00003770178,0.0004045437,0.00010034351,0.00035600294],"category_scores_gemma":[0.008071453,0.00007968573,0.0001326211,0.0003193238,0.00008130503,0.00014470352,0.0000993348,0.00012425134,0.00006407258],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074392716,0.00014592447,0.9172745,0.00015762783,0.000045987057,0.00024477497,0.00039725966,0.03223537,0.01895942,0.0023948422,0.018177336,0.00989259],"study_design_scores_gemma":[0.00030903498,0.00017100002,0.91308343,0.000040418123,0.000023024513,0.00044212205,0.0000724319,0.0028698305,0.011846534,0.05318626,0.017646845,0.00030905328],"about_ca_topic_score_codex":0.000041402473,"about_ca_topic_score_gemma":0.000002951619,"teacher_disagreement_score":0.05079142,"about_ca_system_score_codex":0.00006801405,"about_ca_system_score_gemma":0.00030696436,"threshold_uncertainty_score":0.96628666},"labels":[],"label_agreement":null},{"id":"W3135242237","doi":"10.2749/newyork.2019.1598","title":"Analysis of a Modular Timber/Concrete Composite System for Short- Span Bridges","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Structural engineering; Modular design; Span (engineering); Composite number; Girder; Deck; Bridge (graph theory); Slab; Transverse plane; Engineering; Structural load; Computer science; Materials science; Composite material","score_opus":0.01272886186790954,"score_gpt":0.21364660156619017,"score_spread":0.20091773969828064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135242237","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9930452,0.0003938093,0.001047276,0.000006433468,0.00012230115,0.0002205345,0.000020091702,0.00013616998,0.00500816],"genre_scores_gemma":[0.9985987,0.000006318185,0.00038378776,0.0000014125187,0.000025246529,0.000019892876,0.00009406519,0.000018225463,0.00085233647],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940455,0.000005732293,0.0002492137,0.00012406224,0.000102822174,0.00011360354],"domain_scores_gemma":[0.99958634,0.000018234809,0.000039215585,0.0002843662,0.000043388703,0.000028430604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009674468,0.000094145675,0.00033187054,0.00009826443,0.000014513024,0.000012053704,0.00004911446,0.0000395881,0.000012399959],"category_scores_gemma":[0.0000028536592,0.00007946714,0.00018072249,0.00014242946,0.0000074521568,0.000046453846,0.00000989013,0.000023910849,0.000010707845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039742947,0.000009375771,0.6663758,0.0009532573,0.0085178735,0.0001544412,0.00031631012,0.24756725,0.07507679,0.00011667598,0.00020309449,0.000669354],"study_design_scores_gemma":[0.00034021665,0.000107058615,0.09836203,0.000118174896,0.0030140795,0.000108838656,0.000113691116,0.7691163,0.12501,0.0000031509724,0.0033623683,0.0003440899],"about_ca_topic_score_codex":0.000054271462,"about_ca_topic_score_gemma":0.0000051405727,"teacher_disagreement_score":0.5680138,"about_ca_system_score_codex":0.00004015638,"about_ca_system_score_gemma":0.0000067647857,"threshold_uncertainty_score":0.32405758},"labels":[],"label_agreement":null},{"id":"W3135322895","doi":"10.2749/newyork.2019.2726","title":"Designing buildings to deliver city densification over transport infrastructure","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Yard; Transport engineering; Presentation (obstetrics); Abu dhabi; Civil engineering; Engineering; Architectural engineering; Environmental planning; Geography; Archaeology; Metropolitan area","score_opus":0.00586381163556798,"score_gpt":0.21019384273633404,"score_spread":0.20433003110076606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135322895","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.717999,0.000015696876,0.28047833,0.000013217561,0.00020654009,0.00007968988,0.000001371267,0.00025267337,0.0009534809],"genre_scores_gemma":[0.99002874,0.000004711512,0.00942972,0.00004796107,0.000052564366,0.000005334098,0.000025052756,0.000024048864,0.000381898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99923754,0.0000034849384,0.00024224457,0.00018887306,0.00017598152,0.00015187192],"domain_scores_gemma":[0.9995665,0.000010235784,0.000031278352,0.00025344806,0.000050598414,0.000087948334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000837511,0.00012685989,0.0001541683,0.00011079491,0.000024769199,0.00001734724,0.00007194871,0.00007378005,0.00039212892],"category_scores_gemma":[0.0000149950465,0.00012487544,0.00006963439,0.00027872558,0.0000060437237,0.00011721472,0.0000062180525,0.00010735951,0.000042332667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035509504,0.0000016034134,0.038898952,0.00003179534,0.000066628825,0.000032198488,0.00021476277,0.79826593,0.15720275,0.00009857253,0.0008178987,0.0043653324],"study_design_scores_gemma":[0.00022377394,0.000018887073,0.8014717,0.00004003077,0.00007333117,0.00022294874,0.00007816064,0.0982907,0.07879894,0.00007677511,0.020165471,0.00053927215],"about_ca_topic_score_codex":0.000029156752,"about_ca_topic_score_gemma":0.0000033391052,"teacher_disagreement_score":0.76257277,"about_ca_system_score_codex":0.00007777095,"about_ca_system_score_gemma":0.000009067964,"threshold_uncertainty_score":0.5092273},"labels":[],"label_agreement":null},{"id":"W3135384754","doi":"10.2749/newyork.2019.1711","title":"Multi-story truss moment frames equipped with friction dampers and self-centering system for enhanced seismic performance","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Truss; Structural engineering; Damper; Moment (physics); Dissipation; Chord (peer-to-peer); Residual; Nonlinear system; Structural system; Engineering; Computer science; Physics","score_opus":0.006588513170881199,"score_gpt":0.2039317659964142,"score_spread":0.197343252825533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135384754","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9552329,0.00013719728,0.04322929,0.000009573009,0.0003054801,0.00026351266,0.0000023041,0.000328957,0.0004907789],"genre_scores_gemma":[0.99709076,0.00015238066,0.002096294,0.000016530434,0.00006144333,0.00007591522,0.000016036189,0.000031334366,0.0004592968],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918115,0.0000048333627,0.000222725,0.000226228,0.0001345609,0.00023048301],"domain_scores_gemma":[0.9995973,0.000009816448,0.00007652913,0.00023005994,0.000034153483,0.000052102794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001618375,0.00015360516,0.00022779324,0.00009392305,0.00008501183,0.000023579241,0.000054135464,0.00005801731,0.000005693444],"category_scores_gemma":[0.0000018086929,0.00013234149,0.0000482538,0.00009834142,0.0000092404625,0.00022006249,0.000014669853,0.000094949006,0.000011882932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016377617,0.0001741322,0.09491399,0.007606542,0.0017207037,0.00009116954,0.005774395,0.5232506,0.34261617,0.000013371613,0.0002653888,0.023409773],"study_design_scores_gemma":[0.00077515346,0.000094316405,0.0052193454,0.00022476118,0.00008342371,0.0001410146,0.0010502787,0.9558482,0.029754138,1.9293644e-7,0.0065456335,0.00026352308],"about_ca_topic_score_codex":0.000008911317,"about_ca_topic_score_gemma":8.9250176e-7,"teacher_disagreement_score":0.43259764,"about_ca_system_score_codex":0.00018122929,"about_ca_system_score_gemma":0.000019032927,"threshold_uncertainty_score":0.539673},"labels":[],"label_agreement":null},{"id":"W3135405896","doi":"10.2749/newyork.2019.2699","title":"London Expanding - Adding Value Through Fine Engineering","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Tower; Population; Principal (computer security); Value (mathematics); Engineering; Civil engineering; Architectural engineering; Computer science; Computer security; Sociology","score_opus":0.004348234916085143,"score_gpt":0.21231477892765296,"score_spread":0.20796654401156783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135405896","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9246622,0.00018850622,0.020282073,0.000025860352,0.0010991768,0.00020392812,0.000001451741,0.00056814123,0.052968718],"genre_scores_gemma":[0.9958241,0.000009905093,0.0032416417,0.000018841847,0.00017055147,0.000009393388,0.000015790945,0.000040308918,0.0006694743],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99898213,0.000006049592,0.00030743345,0.00021660731,0.0001723519,0.00031543622],"domain_scores_gemma":[0.9994472,0.00004698014,0.00003554929,0.00038733683,0.000032662498,0.00005027321],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016393707,0.00016674113,0.00021580399,0.000050663613,0.00003442009,0.000039495197,0.00008830078,0.000089851055,0.00023106918],"category_scores_gemma":[0.00006681205,0.00016459402,0.000081592036,0.00016441372,0.000009017827,0.00033015708,0.00003417629,0.00019567124,0.000033022923],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021029658,0.00004874838,0.10554266,0.0015645294,0.00036891404,0.0014584282,0.0019106024,0.76273227,0.08971175,0.024449788,0.0067515452,0.005439748],"study_design_scores_gemma":[0.0014815698,0.00017312252,0.057794582,0.0003187988,0.00010722402,0.0032474233,0.0006363476,0.115092926,0.06269661,0.009747295,0.7463889,0.0023151794],"about_ca_topic_score_codex":0.000023359818,"about_ca_topic_score_gemma":0.0000011589693,"teacher_disagreement_score":0.7396374,"about_ca_system_score_codex":0.0002152761,"about_ca_system_score_gemma":0.000026430045,"threshold_uncertainty_score":0.6711949},"labels":[],"label_agreement":null},{"id":"W3135508778","doi":"10.2749/newyork.2019.0608","title":"Reliability-Based Site-Specific Live Load Models for the Gordie Howe International Bridge","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ford Motor Company (Canada)","funders":"","keywords":"Bridge (graph theory); Windsor; Reliability (semiconductor); Structural load; Engineering; Span (engineering); Limit (mathematics); Computer science; Structural engineering; Environmental science; Mathematics","score_opus":0.01615372383825973,"score_gpt":0.23094079434684636,"score_spread":0.21478707050858664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135508778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22748698,0.00023564274,0.7657481,0.00027416233,0.0014383751,0.00029205665,0.000026081168,0.00034770695,0.004150915],"genre_scores_gemma":[0.9970682,0.000026749029,0.0016447859,0.000035688634,0.00012749822,0.000028433515,0.000059872895,0.000020479107,0.0009882582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929714,0.0000038423004,0.00021827401,0.00016712955,0.00019729107,0.00011631238],"domain_scores_gemma":[0.99935144,0.00010058027,0.000036760215,0.0003548971,0.00012382751,0.000032470594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017035913,0.000100421355,0.000118285934,0.000037731577,0.000029904564,0.000038641185,0.00011231734,0.00004443679,0.00019241155],"category_scores_gemma":[0.000030928186,0.00007588609,0.0001415868,0.00008289296,0.000013741441,0.00007830602,0.000010905392,0.00008603017,0.000059665403],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000058188916,0.0000029948417,0.00022212802,0.000017077109,0.00004362823,0.000004553955,0.000057665435,0.99464935,0.001132226,0.00019134469,0.0022651684,0.0014080468],"study_design_scores_gemma":[0.00015130958,0.000006852998,0.0023264221,0.000007503123,0.00001609878,0.000012191329,0.000017493952,0.9535029,0.0008077272,0.000121947414,0.04292398,0.0001055953],"about_ca_topic_score_codex":0.000029301544,"about_ca_topic_score_gemma":0.0000048704046,"teacher_disagreement_score":0.76958126,"about_ca_system_score_codex":0.00012314877,"about_ca_system_score_gemma":0.000023649909,"threshold_uncertainty_score":0.3094545},"labels":[],"label_agreement":null},{"id":"W3135700308","doi":"10.2749/newyork.2019.2337","title":"Design of Integral Abutment Bridges for a Lateral Slide Replacement","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical and construction materials studies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Abutment; Span (engineering); Bridge (graph theory); Girder; Structural engineering; Demolition; Caisson; Deck; Christian ministry; Pile; Overlay; Engineering; Slab; Formwork; Civil engineering; Computer science","score_opus":0.014657672811756423,"score_gpt":0.2238742948581212,"score_spread":0.20921662204636476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135700308","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95433897,0.00005792178,0.04347997,0.00005047765,0.00073110807,0.00043041658,0.0000050614385,0.00013441738,0.00077167613],"genre_scores_gemma":[0.9949472,0.000016423292,0.0042091203,0.000006361031,0.000028497865,0.000057585054,0.000004410764,0.0000080383425,0.0007223625],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995004,0.0000044233325,0.00024239128,0.00009030781,0.00006621903,0.00009624879],"domain_scores_gemma":[0.999763,0.000014652793,0.00004286344,0.00013119998,0.00003330089,0.000014975196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012744221,0.000064628504,0.00014749294,0.000018623743,0.000011101229,0.0000057573593,0.000030897143,0.00002478006,0.000056983365],"category_scores_gemma":[0.000010985327,0.00005273438,0.000038815244,0.000020594607,0.000010487887,0.000021537537,0.000015788992,0.000021526905,0.000010368618],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040986686,0.00013202478,0.038315386,0.0013348043,0.0008353232,0.00008300351,0.00048801932,0.14170198,0.793166,0.0024318341,0.0102533465,0.010848439],"study_design_scores_gemma":[0.0018027856,0.0008261073,0.018171815,0.00023728766,0.000114778704,0.00075450685,0.0002563049,0.019574745,0.9136064,0.0036435097,0.040315237,0.0006964981],"about_ca_topic_score_codex":0.000007871103,"about_ca_topic_score_gemma":4.5796196e-7,"teacher_disagreement_score":0.122127235,"about_ca_system_score_codex":0.000023814218,"about_ca_system_score_gemma":0.000007562369,"threshold_uncertainty_score":0.21504456},"labels":[],"label_agreement":null},{"id":"W3135708508","doi":"10.2749/newyork.2019.1238","title":"Learnings from the past to design metallic bridges spanning centuries into the future","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Allowance (engineering); Bridge (graph theory); Engineering; Life span; Service (business); Forensic engineering; Business; Operations management; Gerontology; Marketing","score_opus":0.010999676520019812,"score_gpt":0.21654428348482546,"score_spread":0.20554460696480564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135708508","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.990623,0.0009223952,0.004170145,0.002186669,0.00091267884,0.00028467964,0.0000011827636,0.00020514839,0.0006940928],"genre_scores_gemma":[0.99803954,0.00003604558,0.0005008519,0.00026803222,0.00036500773,0.000016548382,0.000007390421,0.0000211619,0.000745414],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99918795,0.00005018862,0.00020625826,0.0001979797,0.00019724811,0.00016040045],"domain_scores_gemma":[0.9991007,0.00019421204,0.000043791835,0.00056427444,0.000040996834,0.000056016142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044715768,0.00012350135,0.00014680183,0.000013841117,0.00010239185,0.00008006102,0.0001978742,0.000048381316,0.00022464123],"category_scores_gemma":[0.0001133681,0.00006884101,0.00007761822,0.00011945139,0.000023443385,0.000063682215,0.00007441019,0.00021578048,0.00017074506],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012278825,0.000025453188,0.6113043,0.000120741934,0.00029561872,0.00028014218,0.04283979,0.04366598,0.13036656,0.0006665741,0.07284836,0.097463705],"study_design_scores_gemma":[0.00010807511,0.000026921298,0.24910305,0.000033512497,0.00003917038,0.000051652696,0.0032000346,0.002396545,0.0051085753,0.00014707712,0.7395299,0.00025548734],"about_ca_topic_score_codex":0.00017072695,"about_ca_topic_score_gemma":0.00004319818,"teacher_disagreement_score":0.6666815,"about_ca_system_score_codex":0.000038992308,"about_ca_system_score_gemma":0.000020223959,"threshold_uncertainty_score":0.28072548},"labels":[],"label_agreement":null},{"id":"W3135748151","doi":"10.2749/newyork.2019.0585","title":"Wind Loading on Catenary Domes","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Wind and Air Flow Studies","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Catenary; Wind tunnel; Structural engineering; Dome (geology); RADIUS; Pressure coefficient; Geology; Geometry; Engineering; Geotechnical engineering; Mathematics; Aerospace engineering; Computer science","score_opus":0.009570311292486275,"score_gpt":0.22599232100275538,"score_spread":0.2164220097102691,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135748151","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75977606,0.0000123658265,0.0000013490436,0.00024867486,0.00017208295,0.00005223882,2.96341e-7,0.000021254866,0.23971571],"genre_scores_gemma":[0.97193986,0.000004650118,0.000047771744,0.00016280396,0.000049149214,0.0000012744648,0.0000014028304,0.00000534746,0.027787719],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99941224,0.0000049042005,0.000098189936,0.00018493996,0.00016715586,0.00013260104],"domain_scores_gemma":[0.99974227,0.00001346219,0.00003884865,0.00017252068,0.0000015896295,0.00003131466],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00010122027,0.000060747596,0.00007987425,0.000009643207,0.000053507905,0.0000073026904,0.00005446453,0.000019609677,0.0014127602],"category_scores_gemma":[0.000012894949,0.000045147342,0.00003281813,0.000056752888,0.00003178212,0.000060683906,0.00007545168,0.00004710397,0.0039557843],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045596785,0.00003668562,0.9722133,0.000004192608,0.00001080364,0.00045700077,0.00016839843,0.00029550208,0.010085219,0.000030170952,0.014078151,0.002615976],"study_design_scores_gemma":[0.00013816594,0.00007052012,0.80446583,0.000020138981,0.0000055818928,0.00020983115,0.00009983282,0.00003330344,0.0043626055,0.00020410157,0.19022189,0.0001681907],"about_ca_topic_score_codex":0.000055641158,"about_ca_topic_score_gemma":0.0000024903943,"teacher_disagreement_score":0.21216385,"about_ca_system_score_codex":0.000042666165,"about_ca_system_score_gemma":0.0000033324136,"threshold_uncertainty_score":0.9995001},"labels":[],"label_agreement":null},{"id":"W3135782847","doi":"10.2749/newyork.2019.2345","title":"Main span closure for the New Samuel de Champlain Bridge (NSCB) - An innovative alternative closure using a temporary king-post to accelerate construction","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pylon; Span (engineering); Bridge (graph theory); Closure (psychology); Deck; Schedule; Engineering; Constructability; Precast concrete; Structural engineering; Computer science","score_opus":0.02995594937963308,"score_gpt":0.28579279903603455,"score_spread":0.25583684965640147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135782847","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67979825,0.00002784495,0.3188437,0.0001730305,0.0004529581,0.00035216473,0.00003352985,0.00014888788,0.00016965566],"genre_scores_gemma":[0.9904672,0.000003899269,0.008672569,0.00014147793,0.00035876798,0.000017802211,0.00009749811,0.000049775732,0.00019100195],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888337,0.000022635795,0.00037702304,0.00027224945,0.00018068674,0.00026404273],"domain_scores_gemma":[0.99919826,0.000060544604,0.00012041522,0.0003364962,0.0001694653,0.00011480602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031502565,0.00021131245,0.00024710622,0.00016370902,0.00010499305,0.000096826574,0.00014027812,0.00009271083,0.000053637556],"category_scores_gemma":[0.000082655606,0.00017600723,0.00008817736,0.00059522217,0.000022174974,0.000254602,0.000023925977,0.00018684161,0.000005934098],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048739206,0.00000879065,0.026576823,0.00008076695,0.000517448,0.000060194805,0.0018578304,0.91204435,0.050023112,0.0010247681,0.0007767606,0.006980437],"study_design_scores_gemma":[0.0010710034,0.00018823148,0.106897354,0.00013592711,0.00013645552,0.0013282055,0.0012606492,0.8372519,0.03913065,0.000604459,0.0110502485,0.0009448947],"about_ca_topic_score_codex":0.0008114058,"about_ca_topic_score_gemma":0.00007616892,"teacher_disagreement_score":0.31066898,"about_ca_system_score_codex":0.00016362155,"about_ca_system_score_gemma":0.00013921694,"threshold_uncertainty_score":0.7177367},"labels":[],"label_agreement":null},{"id":"W3135855219","doi":"10.2749/newyork.2019.1635","title":"Design of a Remarkable Bascule Bridge Over an Historical Canal","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Bridge (graph theory); Engineering; Civil engineering; Landmark; Architectural engineering; Computer science","score_opus":0.014978484383793012,"score_gpt":0.21864598131410548,"score_spread":0.20366749693031247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135855219","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64037514,0.00013846511,0.3552496,0.000014446516,0.00050550554,0.00009444605,0.0000014065332,0.0002282748,0.0033926992],"genre_scores_gemma":[0.99624825,0.0000055270903,0.0021203079,0.0000052597106,0.000035805853,0.0000021338117,0.000008709063,0.000014616703,0.001559411],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994443,0.000008008295,0.00020426181,0.00010326971,0.00014203164,0.000098110395],"domain_scores_gemma":[0.99962664,0.000011795148,0.00003112749,0.00024755276,0.00002769793,0.000055164975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000113114984,0.00006982443,0.00015843989,0.00006149348,0.000008779721,0.00000602596,0.000048777827,0.0000397322,0.00032014446],"category_scores_gemma":[0.0000149126545,0.00006639732,0.000051531377,0.00014130551,0.0000039730035,0.00008014417,0.0000050291565,0.00005560884,0.0000089805835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041535686,0.000006791799,0.0035845106,0.00004419036,0.00008077653,0.000048447695,0.000055778273,0.96721196,0.024729239,0.000061775594,0.003227067,0.0009452949],"study_design_scores_gemma":[0.00015697209,0.000033481734,0.03989934,0.000011249163,0.000038941682,0.00014289272,0.000007176549,0.946794,0.0051313937,0.000023652501,0.0075685503,0.00019236315],"about_ca_topic_score_codex":0.00060568575,"about_ca_topic_score_gemma":0.000010815585,"teacher_disagreement_score":0.3558731,"about_ca_system_score_codex":0.00017187114,"about_ca_system_score_gemma":0.000023504248,"threshold_uncertainty_score":0.35053572},"labels":[],"label_agreement":null},{"id":"W3135881898","doi":"10.2749/newyork.2019.0460","title":"Finite element modeling of concrete beams reinforced with basalt FRP bars","year":2019,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Fibre-reinforced plastic; Materials science; Cracking; Parametric statistics; Finite element method; Tension (geology); Structural engineering; Corrosion; Calibration; Basalt fiber; Composite material; Compression (physics); Nonlinear system; Reinforced solid; Ductility (Earth science); Reinforced concrete; Fiber; Engineering; Mathematics","score_opus":0.010682615510159005,"score_gpt":0.21822583289813047,"score_spread":0.20754321738797146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135881898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9437625,0.000046368586,0.04281156,0.000007196869,0.00027691963,0.00038025435,0.00000637058,0.00025580375,0.012453028],"genre_scores_gemma":[0.9874721,0.000015785878,0.011246297,0.000019406332,0.000033753407,0.000015599062,0.000048847167,0.00005196974,0.0010962116],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985028,0.0000053926424,0.0005699031,0.00021325899,0.00040013762,0.00030854225],"domain_scores_gemma":[0.99903333,0.00003152372,0.00013551522,0.0005886477,0.00011508493,0.00009590248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001423143,0.00021570243,0.00033920372,0.00008432507,0.000020584663,0.000017016562,0.00015207106,0.00009039567,0.00022624165],"category_scores_gemma":[0.00002344968,0.00018876838,0.00009046243,0.0001418533,0.000023615621,0.00017745102,0.000036158264,0.00017514615,0.000033618333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014620411,4.2593125e-8,0.0006881926,0.00006271102,0.000057212404,0.000085054344,0.00008334509,0.9894776,0.009132448,0.00011365981,0.000019350186,0.00026579553],"study_design_scores_gemma":[0.00056736515,0.00011376641,0.00023688271,0.00010554268,0.000053094478,0.00022204973,0.000072881754,0.92459327,0.07296621,0.00000724269,0.00071736,0.00034431388],"about_ca_topic_score_codex":0.00006795421,"about_ca_topic_score_gemma":9.605908e-8,"teacher_disagreement_score":0.064884275,"about_ca_system_score_codex":0.00007269265,"about_ca_system_score_gemma":0.000056223987,"threshold_uncertainty_score":0.7697751},"labels":[],"label_agreement":null},{"id":"W3144125142","doi":"10.2749/christchurch.2021.0390","title":"Attachment of a crash-tested traffic barrier to a new bridge deck design in aluminium","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Transportation Safety and Impact Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Crashworthiness; Crash; Bridge deck; Bridge (graph theory); Deck; Structural engineering; Engineering; Cable gland; Aluminium; Automotive engineering; Computer science; Forensic engineering; Materials science; Finite element method; Composite material; Mechanical engineering","score_opus":0.029320321918280445,"score_gpt":0.28036195891498916,"score_spread":0.25104163699670873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3144125142","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90875065,0.00015317899,0.090372935,0.0001177494,0.000082213344,0.00011214922,0.0000050285125,0.00007288717,0.00033320967],"genre_scores_gemma":[0.99540913,0.00002665223,0.0040103085,0.000043053748,0.000024766283,0.000007698389,0.000028833188,0.000016954375,0.00043259264],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99900365,0.000016758397,0.0004865708,0.00014821622,0.00018345255,0.00016134635],"domain_scores_gemma":[0.9994818,0.000033960845,0.00004196012,0.00023916087,0.000052163545,0.00015097832],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001700202,0.00009878259,0.00023851015,0.000113069225,0.000009640843,0.000009016903,0.00004922373,0.00005115575,0.00021689851],"category_scores_gemma":[0.00005964326,0.00010929622,0.00009245847,0.000592274,0.0000060278576,0.00006747307,0.0000041263215,0.000066242574,0.000015166436],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002885664,0.000099361496,0.07887895,0.00008520724,0.00024870815,0.0021611985,0.0030036322,0.8663914,0.040326044,0.000015096789,0.0037555501,0.0050059836],"study_design_scores_gemma":[0.00039237764,0.000030791194,0.96269345,0.00006639563,0.00007857444,0.00012759333,0.00010550675,0.0030551876,0.027756507,0.000010389599,0.005478747,0.0002044634],"about_ca_topic_score_codex":0.000045699835,"about_ca_topic_score_gemma":0.00019713985,"teacher_disagreement_score":0.8838145,"about_ca_system_score_codex":0.000047534217,"about_ca_system_score_gemma":0.00017582557,"threshold_uncertainty_score":0.44569704},"labels":[],"label_agreement":null},{"id":"W3145481093","doi":"10.2749/christchurch.2021.0710","title":"Experimental fire performance of unloaded stay-cables for bridge infrastructure","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Fire effects on concrete materials","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Galvanization; Materials science; Thermal expansion; Thermocouple; Structural engineering; Bridge (graph theory); Spiral (railway); Thermal; Composite material; Engineering; Mechanical engineering","score_opus":0.009792285351037941,"score_gpt":0.23440727440337664,"score_spread":0.2246149890523387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145481093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99755025,0.0004547865,0.00016917431,0.0000075206112,0.00068539724,0.00017434797,0.00003107624,0.000116689625,0.00081077],"genre_scores_gemma":[0.997839,0.000013429668,0.0016998386,0.0000105601475,0.000112439644,0.000034562305,0.00006729031,0.00003065332,0.00019226511],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99928033,0.00000917606,0.00029072617,0.00014330317,0.00011871293,0.00015776383],"domain_scores_gemma":[0.9995504,0.000030765204,0.000061877385,0.00026286655,0.00005872723,0.00003538524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010324722,0.0001140505,0.00022986504,0.000018212646,0.000024253248,0.000017958335,0.000061668914,0.00006826886,0.000184159],"category_scores_gemma":[0.00005020586,0.000116996656,0.000055947337,0.00005880981,0.000019162906,0.000084901054,0.000028511024,0.000041949585,0.000004223001],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014813933,0.0000057613265,0.0014296877,0.00042026554,0.000051142946,0.000115026865,0.00011001711,0.0013533863,0.9920411,0.000017615603,0.0030430816,0.0013980727],"study_design_scores_gemma":[0.00021861643,0.000043346456,0.0076595666,0.000041963005,0.00001067604,0.00025949828,0.000020420406,0.006012493,0.9798112,0.000006290571,0.005792473,0.00012344608],"about_ca_topic_score_codex":0.000006107016,"about_ca_topic_score_gemma":3.3759565e-7,"teacher_disagreement_score":0.0122299185,"about_ca_system_score_codex":0.00004685839,"about_ca_system_score_gemma":0.000048614533,"threshold_uncertainty_score":0.4770985},"labels":[],"label_agreement":null},{"id":"W3146857840","doi":"10.2749/christchurch.2021.0725","title":"The York-Arup cable experiments: Implications for the fire design of cable-supported bridges","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Fire effects on concrete materials","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Bridge (graph theory); Fire resistance; Resilience (materials science); Structural engineering; Fire safety; Fire protection; Engineering; Firefighting; Civil engineering; Materials science","score_opus":0.04019170665323539,"score_gpt":0.2801361153903301,"score_spread":0.23994440873709472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3146857840","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37296823,0.023319893,0.57548076,0.0048570423,0.0065252623,0.0069838488,0.00032345086,0.001451509,0.008089988],"genre_scores_gemma":[0.99523205,0.00015694658,0.002021221,0.000036517362,0.00012947775,0.00061427744,0.000040911338,0.000048491813,0.0017200893],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990845,0.000038475882,0.00038661805,0.0001606125,0.00010829467,0.00022150797],"domain_scores_gemma":[0.99831915,0.0006738475,0.0001058726,0.0007334866,0.00013290612,0.000034745874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053432153,0.0001157412,0.00018376503,0.000010659565,0.0001737906,0.00006549712,0.0001711325,0.000054339598,0.00006905483],"category_scores_gemma":[0.00036687683,0.00007816262,0.00007076844,0.00011583524,0.000040597093,0.00004810696,0.000033439086,0.00004696689,0.0000054573024],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002069421,0.000021965034,0.0004470724,0.00014903623,0.00039850624,0.00006120506,0.00029301457,0.042073723,0.84786004,0.00040408218,0.10205679,0.006213894],"study_design_scores_gemma":[0.00028402064,0.000037989732,0.003556505,0.000045560977,0.00009858964,0.0003731098,0.0002008735,0.041527297,0.85105306,0.0001240211,0.10247661,0.00022233462],"about_ca_topic_score_codex":0.00012948483,"about_ca_topic_score_gemma":0.0000044444796,"teacher_disagreement_score":0.62226385,"about_ca_system_score_codex":0.000053813048,"about_ca_system_score_gemma":0.00012852521,"threshold_uncertainty_score":0.31873792},"labels":[],"label_agreement":null},{"id":"W3148451129","doi":"10.2749/christchurch.2021.0261","title":"Highway traffic loading - AS5100 and NZTA Bridge Manual compared to international codes","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notional amount; Bridge (graph theory); Eurocode; Transport engineering; Engineering; Process (computing); Computer science; Civil engineering; Structural engineering; Business","score_opus":0.014706048301616842,"score_gpt":0.25949527604793354,"score_spread":0.2447892277463167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148451129","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9692535,0.00010836403,0.026193487,0.0001956386,0.000547208,0.000030699623,0.000009512761,0.0003005959,0.0033609874],"genre_scores_gemma":[0.9975248,0.000014789172,0.0013768937,0.00003157069,0.00009780904,0.000003404442,0.000078544486,0.000012606601,0.0008596027],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994382,0.000004535121,0.00018844687,0.00014428601,0.00012620099,0.000098277174],"domain_scores_gemma":[0.9997121,0.000015780393,0.000016434597,0.00012313244,0.000054675147,0.00007788167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005213858,0.00008295377,0.00012919692,0.000069078334,0.000025779616,0.000056308745,0.000045321773,0.000028336191,0.00012222366],"category_scores_gemma":[0.0000405881,0.000087971246,0.00003326707,0.00016230582,0.000008193835,0.00006108999,0.000019947835,0.000060026763,0.000013469081],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045620454,0.000010270064,0.001972583,0.000047415026,0.00033850007,0.000929561,0.0004543817,0.94657665,0.02691724,0.00039476837,0.008210579,0.014143499],"study_design_scores_gemma":[0.00035901816,0.000010223743,0.11979361,0.00006057536,0.000066932946,0.0021834942,0.00020033393,0.7796143,0.0317263,0.000024961246,0.06545461,0.0005056047],"about_ca_topic_score_codex":0.000009666743,"about_ca_topic_score_gemma":0.000015857548,"teacher_disagreement_score":0.1669623,"about_ca_system_score_codex":0.00004216157,"about_ca_system_score_gemma":0.000011694017,"threshold_uncertainty_score":0.35873634},"labels":[],"label_agreement":null},{"id":"W3149248564","doi":"10.2749/christchurch.2021.0311","title":"Preventing the wind-induced vibration of arches during construction","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Fluid Dynamics and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Arch; Aeroelasticity; Structural engineering; Tuned mass damper; Aerodynamics; Vibration; Wind tunnel; Engineering; Deck; Damper; Flutter; Computer science; Physics; Aerospace engineering; Acoustics","score_opus":0.009930767003264437,"score_gpt":0.21643600611942598,"score_spread":0.20650523911616153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3149248564","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.987391,0.00003518204,0.009691569,0.000084808904,0.00012265213,0.000032417083,5.486189e-7,0.0000437549,0.0025980542],"genre_scores_gemma":[0.99868613,0.000014639209,0.001066109,0.000004542301,0.000042073952,0.0000017492771,0.000013166065,0.00000698328,0.00016460578],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995259,0.0000134269185,0.00023280438,0.000073025214,0.00009837722,0.0000564748],"domain_scores_gemma":[0.99970376,0.000012535128,0.000056281555,0.00016234494,0.00005202871,0.000013034306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011180394,0.000042209376,0.00007435091,0.000028553286,0.0000436007,0.000019085208,0.000025126552,0.000025175043,0.00003497653],"category_scores_gemma":[0.0000506009,0.00003634913,0.00005484382,0.00015943545,0.000009403901,0.00006775334,0.000012091012,0.000051540675,0.000001341788],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001080371,0.000010415128,0.009517238,0.000072161085,0.00012340336,0.000050644725,0.00020995198,0.047390077,0.9393546,0.0013578911,0.000017584178,0.0018949355],"study_design_scores_gemma":[0.00010547931,0.0000038543735,0.06674908,0.00003147776,0.00004952218,0.0004301778,0.00031289918,0.2817847,0.65001,0.00025955308,0.00015788076,0.00010538406],"about_ca_topic_score_codex":0.0000060191805,"about_ca_topic_score_gemma":0.000015020753,"teacher_disagreement_score":0.28934464,"about_ca_system_score_codex":0.000016416516,"about_ca_system_score_gemma":0.000024736617,"threshold_uncertainty_score":0.14822745},"labels":[],"label_agreement":null},{"id":"W3149685833","doi":"10.2749/christchurch.2021.0464","title":"Challenges of implementing bridge model updating in industry practice","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Bridge (graph theory); Computer science; Field (mathematics); Software engineering; Data science; Engineering management; Engineering","score_opus":0.0888051986664557,"score_gpt":0.3913664904604292,"score_spread":0.3025612917939735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3149685833","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96833664,0.0005401613,0.00025518818,0.00017907437,0.00013591428,0.00007456873,0.0000014965834,0.00022362269,0.030253308],"genre_scores_gemma":[0.97502327,0.00020916267,0.024623804,0.000010234281,0.000078934696,0.000011371008,0.0000037036657,0.000019654975,0.000019870284],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9990448,0.000017902315,0.00043708124,0.00014257885,0.00014797486,0.00020967655],"domain_scores_gemma":[0.999447,0.000061033592,0.000112272166,0.0002566842,0.00009056962,0.000032472584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004748354,0.000075530836,0.0001432186,0.00004869436,0.000016851158,0.0000061476276,0.00005439617,0.00011711774,0.0000050904227],"category_scores_gemma":[0.000358325,0.00008874484,0.00002103853,0.000121863355,0.0000056954714,0.00014648394,0.000060915812,0.00033988836,3.843154e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020212521,0.0001368187,0.18295069,0.004157206,0.00021483096,0.007296518,0.006461846,0.047273412,0.036040574,0.012564066,0.002203896,0.7006799],"study_design_scores_gemma":[0.000542891,0.00004278418,0.6194882,0.0011543162,0.00005370621,0.005366595,0.003331915,0.10475316,0.2542621,0.0036767258,0.006460045,0.0008676041],"about_ca_topic_score_codex":0.000101645564,"about_ca_topic_score_gemma":0.00002983906,"teacher_disagreement_score":0.69981235,"about_ca_system_score_codex":0.000084883184,"about_ca_system_score_gemma":0.00006804419,"threshold_uncertainty_score":0.36189097},"labels":[],"label_agreement":null},{"id":"W3201662376","doi":"10.2749/ghent.2021.0043","title":"Influence of climate change on thermal stresses in concrete box girders","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"York University","funders":"","keywords":"Deck; Girder; Structural engineering; Bridge (graph theory); Thermal; Climate change; Finite element method; Box girder; Environmental science; Engineering; Geology; Meteorology","score_opus":0.0175997300856744,"score_gpt":0.24866526116339033,"score_spread":0.23106553107771594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201662376","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9920528,0.00015874028,0.0000033540064,0.00004613393,0.00008842247,0.00007470898,0.0000071008744,0.00006814026,0.0075005977],"genre_scores_gemma":[0.9996411,0.00020859254,0.000033880577,0.000053922,0.000018289422,0.000012494055,0.000006180444,0.0000099044555,0.000015637352],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993442,0.00001645487,0.00025377172,0.00013337815,0.00011499806,0.00013717293],"domain_scores_gemma":[0.99955,0.000046841127,0.000038789334,0.00028060316,0.000048288362,0.000035520414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012730452,0.00007459009,0.000148805,0.000030099805,0.000009942695,0.000006053908,0.000043186043,0.00004450842,0.000077244644],"category_scores_gemma":[0.0001380999,0.000073920986,0.000037300953,0.00012661752,0.000022032802,0.00006117593,0.000027962738,0.00008787452,0.000007198454],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058556205,0.000019914438,0.5426653,0.00074421853,0.000022840497,0.0037394457,0.0013553965,0.027607007,0.40951607,0.00036337526,0.00010378793,0.013804077],"study_design_scores_gemma":[0.0003645682,0.000037293645,0.824652,0.0002695759,0.000009332873,0.00009504381,0.00017033852,0.002055317,0.16983847,0.000021512042,0.0022445866,0.00024191388],"about_ca_topic_score_codex":0.00003833543,"about_ca_topic_score_gemma":0.000029248353,"teacher_disagreement_score":0.2819867,"about_ca_system_score_codex":0.000023856403,"about_ca_system_score_gemma":0.000023055509,"threshold_uncertainty_score":0.301441},"labels":[],"label_agreement":null},{"id":"W3202121209","doi":"10.2749/ghent.2021.1205","title":"The Samuel De Champlain Bridge – A holistic approach to sustainability and durability","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Infrastructure Canada","funders":"","keywords":"Durability; Sustainability; Bridge (graph theory); Engineering; General partnership; Civil engineering; Architectural engineering; Forensic engineering; Business; Computer science; Finance","score_opus":0.017167519728018568,"score_gpt":0.2615391011186032,"score_spread":0.24437158139058462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202121209","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7310439,0.00020522354,0.26621258,0.00034387322,0.000088537854,0.0001000173,0.000003113467,0.00017401173,0.0018287535],"genre_scores_gemma":[0.99864095,0.000014188045,0.0009722089,0.000021350801,0.000037763573,0.000021046768,0.000009449664,0.0000096640215,0.00027338794],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99935997,0.000021624282,0.00018218455,0.00016794202,0.000095007024,0.00017329186],"domain_scores_gemma":[0.99939615,0.00006449904,0.000013706231,0.00033422335,0.000091675895,0.00009976056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033256158,0.00008168275,0.00011425278,0.00001966275,0.000096631586,0.000057628444,0.000045043125,0.00003426073,0.00000473741],"category_scores_gemma":[0.0008048202,0.00006470794,0.00004377585,0.0002146075,0.000029538664,0.000030041761,0.000025357349,0.00008806138,8.651742e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019118834,0.00006179466,0.02913369,0.0010122594,0.00035878114,0.00057012786,0.0023417382,0.8870353,0.0037934545,0.010805858,0.002446261,0.062421605],"study_design_scores_gemma":[0.00012696105,0.000007967493,0.67807645,0.0000071128434,0.000042275737,0.0014508485,0.0006660521,0.30286938,0.0014545035,0.0022623015,0.012750449,0.00028574324],"about_ca_topic_score_codex":0.00007760485,"about_ca_topic_score_gemma":0.000019743597,"teacher_disagreement_score":0.6489427,"about_ca_system_score_codex":0.00014491014,"about_ca_system_score_gemma":0.000052585026,"threshold_uncertainty_score":0.26387134},"labels":[],"label_agreement":null},{"id":"W3202932828","doi":"10.2749/ghent.2021.1066","title":"A methodology for resiliency assessment of existing bridges – a study on a bridge from 1930","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Structural Response to Dynamic Loads","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Bridge (graph theory); Presentation (obstetrics); Work (physics); Hazard; Computer science; Engineering; Cantilever; Architectural engineering; Construction engineering; Structural engineering; Mechanical engineering; Medicine","score_opus":0.1668517345987707,"score_gpt":0.42790971351881657,"score_spread":0.2610579789200459,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202932828","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9684254,0.00008203258,0.027322883,0.000028239814,0.00047900053,0.00030376425,0.00002928016,0.000109819994,0.0032195803],"genre_scores_gemma":[0.9676846,0.0000034203422,0.03158224,0.000011102798,0.00008351107,0.00005441043,0.000028809945,0.000028687886,0.0005232081],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9986692,0.00013071587,0.0004761829,0.00030842045,0.0002232555,0.00019223095],"domain_scores_gemma":[0.9981491,0.0011065862,0.000112129994,0.00048173903,0.00010587516,0.000044591165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059332803,0.00013536273,0.00036339578,0.000063323554,0.000029160496,0.0000122262545,0.000096584256,0.000058381775,0.000032452102],"category_scores_gemma":[0.0017814946,0.0001325665,0.00009375447,0.00013283406,0.00001761984,0.00003113805,0.00004451061,0.00011884507,0.0000012998048],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003496561,0.0005381239,0.29088694,0.00043349265,0.0015925933,0.011753032,0.0042893547,0.02161782,0.6053167,0.0024480626,0.0014020841,0.05937215],"study_design_scores_gemma":[0.0005097787,0.00016195438,0.9748834,0.000038625072,0.00006540588,0.0002853219,0.0003149637,0.0103593245,0.012079089,0.0005413997,0.00059453864,0.0001662073],"about_ca_topic_score_codex":0.00019101558,"about_ca_topic_score_gemma":0.000058396727,"teacher_disagreement_score":0.68399644,"about_ca_system_score_codex":0.000119685465,"about_ca_system_score_gemma":0.00013339991,"threshold_uncertainty_score":0.5405905},"labels":[],"label_agreement":null},{"id":"W3203483722","doi":"10.2749/ghent.2021.1982","title":"Super-long span bridge aerodynamics benchmark: additional results for TG3.1 Step 1.2","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Fluid Dynamics and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Aeroelasticity; Benchmark (surveying); Aerodynamics; Bridge (graph theory); Stability (learning theory); Span (engineering); Computer science; Task (project management); Structural engineering; Wind tunnel; Engineering; Aerospace engineering; Machine learning; Systems engineering; Medicine; Geology","score_opus":0.012130478458119912,"score_gpt":0.23503378556934507,"score_spread":0.22290330711122516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3203483722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2964797,0.00032190292,0.63408464,0.0010711938,0.0017828307,0.0005178454,0.010696876,0.0007299722,0.05431502],"genre_scores_gemma":[0.9411067,0.000085611675,0.011269998,0.00010398982,0.00038118122,0.00006847351,0.04028156,0.000058134578,0.0066443835],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988539,0.000010520288,0.00045870445,0.00026602743,0.00020971561,0.00020113395],"domain_scores_gemma":[0.9992056,0.000100346544,0.00005149095,0.00035709108,0.00019891345,0.00008654017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019096212,0.0001272673,0.0001844348,0.00006555204,0.000077076205,0.00006543426,0.00006546335,0.00008057667,0.00076487183],"category_scores_gemma":[0.00025902645,0.0001438552,0.00017427742,0.00021697965,0.000014767503,0.00010715613,0.000023812125,0.000091559006,0.000018846245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008288543,0.00029209402,0.005421668,0.00025389934,0.0011598223,0.0031689918,0.00018117206,0.28142542,0.003551879,0.009287094,0.6861499,0.009025187],"study_design_scores_gemma":[0.00032550673,0.000014112249,0.028992733,0.000023042174,0.00004914328,0.000319209,0.000017184804,0.8943855,0.00023698545,0.00010044758,0.07530187,0.00023424569],"about_ca_topic_score_codex":0.00002181237,"about_ca_topic_score_gemma":0.000667977,"teacher_disagreement_score":0.644627,"about_ca_system_score_codex":0.00008255511,"about_ca_system_score_gemma":0.00008983531,"threshold_uncertainty_score":0.837481},"labels":[],"label_agreement":null},{"id":"W3203609971","doi":"10.2749/ghent.2021.1590","title":"Vibration serviceability performance of prefabricated cross-laminated timber steel rib composite floors","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Serviceability (structure); Cross laminated timber; Structural engineering; Vibration; Composite number; Engineering; Finite element method; Engineered wood; Composite construction; Modal; Materials science; Civil engineering; Composite material","score_opus":0.011582117701900917,"score_gpt":0.22460694540543533,"score_spread":0.2130248277035344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3203609971","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9909756,0.00023758004,0.000051835734,0.000018223891,0.00013379671,0.00009966058,0.0000048138477,0.0001678985,0.0083105685],"genre_scores_gemma":[0.997684,0.000024661646,0.00050569203,0.0000053853955,0.000016187718,0.000010432226,0.00013050098,0.000015326386,0.0016077842],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992987,0.000015766715,0.00030586016,0.00013977516,0.00012612923,0.000113755545],"domain_scores_gemma":[0.9994598,0.000011516114,0.000052878266,0.00028443,0.00016282672,0.000028543214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000894555,0.000099682744,0.00015205996,0.000021736676,0.000038794024,0.000023292925,0.000043704433,0.000056560042,0.00010138567],"category_scores_gemma":[0.000010213906,0.00008903535,0.000040855677,0.00018457747,0.000022817196,0.00017902644,0.000023427845,0.000060948867,0.000023529179],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040961404,0.00015066742,0.78912866,0.00060015864,0.00022520758,0.00019164883,0.0005152585,0.053155154,0.15468904,0.0000069394905,0.00011765932,0.001178632],"study_design_scores_gemma":[0.00016565195,0.000024112991,0.5268387,0.000026873704,0.000025714251,0.0000902377,0.000009479233,0.043672014,0.42860618,0.000005349758,0.0004428233,0.00009282689],"about_ca_topic_score_codex":0.000019789039,"about_ca_topic_score_gemma":0.000008304589,"teacher_disagreement_score":0.27391714,"about_ca_system_score_codex":0.000041268457,"about_ca_system_score_gemma":0.00002826199,"threshold_uncertainty_score":0.36307558},"labels":[],"label_agreement":null},{"id":"W3203691743","doi":"10.2749/ghent.2021.0241","title":"Hurricane risk assessment of offshore wind turbines under changing climate","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Tropical and Extratropical Cyclones Research","field":"Earth and Planetary Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Environmental science; Offshore wind power; Wind power; Submarine pipeline; Wind speed; Atlantic hurricane; Meteorology; Climate change; Hazard; Vulnerability (computing); Climatology; Estimation; Risk assessment; Tropical cyclone; Oceanography; Computer science; Engineering; Geography; Geology","score_opus":0.02060926714536575,"score_gpt":0.2933182516080282,"score_spread":0.27270898446266245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3203691743","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.985885,0.00034050812,0.00032570184,0.0003985693,0.00017248584,0.00006028675,0.00003945738,0.000021839058,0.01275612],"genre_scores_gemma":[0.99777246,0.00023352553,0.0013067003,0.000045733417,0.00013533376,4.4471795e-7,0.000120958015,0.00000279783,0.00038207808],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985444,0.000071878814,0.00029648095,0.0002530505,0.00043073803,0.0004034297],"domain_scores_gemma":[0.99933046,0.000087620436,0.000105419436,0.00023766122,0.00010524795,0.00013361147],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00023902541,0.00008762103,0.00020500753,0.000054091608,0.00012246902,0.00003318696,0.00009243328,0.000051261093,0.0025888227],"category_scores_gemma":[0.000082062325,0.00006427469,0.00008792892,0.00035957372,0.00006814009,0.0000783242,0.000037546837,0.0001766599,0.000031941825],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000060100856,0.0000245118,0.9898864,0.000029752422,0.00002141669,0.000676073,0.000012391275,0.0007184223,0.0001600722,0.00024140088,0.00004239954,0.008181155],"study_design_scores_gemma":[0.00009604177,0.00005186689,0.99475545,0.000013664037,0.000014768214,0.00022021047,0.00012459746,0.0016214893,0.00029643555,0.0005221034,0.002200306,0.00008306844],"about_ca_topic_score_codex":0.00089650013,"about_ca_topic_score_gemma":0.0010658056,"teacher_disagreement_score":0.0123740425,"about_ca_system_score_codex":0.000003947646,"about_ca_system_score_gemma":0.00011251791,"threshold_uncertainty_score":0.99832296},"labels":[],"label_agreement":null},{"id":"W3203779092","doi":"10.2749/ghent.2021.1623","title":"Dynamic behavior of aluminum deck-on-steel girder bridges under vehicular traffic loads considering the effect of road roughness","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Structural engineering; Bridge (graph theory); Deck; Girder; Surface finish; Vibration; Engineering; Bridge deck; Computer science; Mechanical engineering","score_opus":0.01390578487633934,"score_gpt":0.2938088737964389,"score_spread":0.2799030889200995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3203779092","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9975319,0.00081140705,0.00012639501,0.000042118172,0.0007432112,0.00034488013,0.0000049856267,0.000287509,0.0001075805],"genre_scores_gemma":[0.999264,0.00004608824,0.0004665116,0.0000065876234,0.00004582928,0.00006812463,0.000009336672,0.000050131872,0.000043380038],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9985555,0.00006782258,0.0005494844,0.0002290473,0.00032513466,0.00027305286],"domain_scores_gemma":[0.99886596,0.00018848875,0.00014316724,0.0006531885,0.00009661661,0.00005256807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036008394,0.00020384899,0.00040299702,0.000058522968,0.00005047577,0.000012288049,0.00013661369,0.00013397729,0.000012260495],"category_scores_gemma":[0.00010114421,0.00015962725,0.00013666,0.0001856531,0.000077208824,0.00005066897,0.00005155097,0.00023286908,0.0000015800455],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011997923,0.00016964618,0.1557288,0.005556162,0.00080875336,0.007442941,0.0010476883,0.32267612,0.2895832,0.00022338917,0.0008294122,0.2158139],"study_design_scores_gemma":[0.00027408067,0.00012597471,0.49977314,0.00031045696,0.000121216,0.001544371,0.000075413685,0.0043342696,0.49300766,0.00001896428,0.0001772002,0.00023722881],"about_ca_topic_score_codex":0.000056652374,"about_ca_topic_score_gemma":0.000015708842,"teacher_disagreement_score":0.34404436,"about_ca_system_score_codex":0.00013035136,"about_ca_system_score_gemma":0.00006282664,"threshold_uncertainty_score":0.650941},"labels":[],"label_agreement":null},{"id":"W3203821823","doi":"10.2749/ghent.2021.1528","title":"Numerical analysis of the fatigue behaviour of friction stir welded joints in aluminum bridge decks","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Advanced Welding Techniques Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centre Québécois de Recherche et de Développement de l'Aluminium; University of Waterloo; Université Laval","funders":"","keywords":"Friction stir welding; Welding; Lap joint; Butt joint; Materials science; Context (archaeology); Bridge (graph theory); Durability; Fatigue limit; Butt welding; Structural engineering; Joint (building); Fabrication; Rivet; Composite material; Engineering; Metallurgy; Geology","score_opus":0.02352009636169107,"score_gpt":0.2877205315559753,"score_spread":0.26420043519428427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3203821823","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88711715,0.00004694564,0.11203086,0.000024327475,0.00007111376,0.000056589844,0.000006120172,0.00006717137,0.0005797473],"genre_scores_gemma":[0.99543124,0.00002522059,0.004405641,0.0000038020585,0.000008616624,0.000009047547,0.00002212442,0.000013757151,0.000080567246],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99892074,0.000026885395,0.0005508412,0.00016197855,0.00022653963,0.00011301155],"domain_scores_gemma":[0.99916434,0.000023744093,0.00017135755,0.0005181378,0.00009683889,0.000025562924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017138974,0.00008793873,0.00036035615,0.00018715057,0.000014136206,0.0000037550174,0.00009609154,0.00006876085,0.000057549427],"category_scores_gemma":[0.00014211483,0.00007951732,0.0002589133,0.0016379292,0.000018775514,0.000045846446,0.00004028044,0.0001262584,3.9831292e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023202147,0.00007503635,0.7714915,0.000030070032,0.00053495436,0.00020433585,0.0001303537,0.20685652,0.019375853,0.000044131484,0.00027042002,0.0009845023],"study_design_scores_gemma":[0.00006842434,0.0000052815944,0.7565249,0.00003726099,0.0006783512,0.000043626977,0.000028733373,0.048234638,0.19406171,0.00011514636,0.00008906103,0.00011285702],"about_ca_topic_score_codex":0.0003730554,"about_ca_topic_score_gemma":0.0001204889,"teacher_disagreement_score":0.17468585,"about_ca_system_score_codex":0.00009013994,"about_ca_system_score_gemma":0.000025575839,"threshold_uncertainty_score":0.3242622},"labels":[],"label_agreement":null},{"id":"W3204067247","doi":"10.2749/ghent.2021.2044","title":"Numerical study of a blind bolted connection between an aluminum bridge deck and steel girders","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Mechanical stress and fatigue analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Fretting; Deck; Girder; Structural engineering; Finite element method; Bridge (graph theory); Engineering; Aluminium; Materials science; Composite material","score_opus":0.04458920501252139,"score_gpt":0.2904859406262851,"score_spread":0.24589673561376368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204067247","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958196,0.000074197604,0.0036570742,0.000011875632,0.000045178986,0.000078380894,0.0000027316437,0.000048803144,0.00026211413],"genre_scores_gemma":[0.9997632,0.0000130026265,0.000099842124,0.0000035610522,0.000046081503,0.0000059899266,0.000027518923,0.000011844218,0.000028997092],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99921364,0.000028295326,0.00031104064,0.00018703676,0.00015836931,0.000101616526],"domain_scores_gemma":[0.99954045,0.000028936822,0.000054791763,0.00022756767,0.00006067578,0.00008758269],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011804023,0.000077054676,0.00024624477,0.000033588818,0.000028633844,0.000015791753,0.000033500117,0.000049943126,0.000043215427],"category_scores_gemma":[0.000059522627,0.000076352786,0.000040087387,0.00018488354,0.000008257552,0.000051684947,0.000017138382,0.00007757779,0.0000010685183],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025667587,0.0006896762,0.9562367,0.00012952823,0.0013377917,0.0014058058,0.000907915,0.0033060468,0.014268598,0.00006814325,0.00022370806,0.021400413],"study_design_scores_gemma":[0.000861202,0.00023336621,0.9763744,0.000019051624,0.00031234208,0.00008915375,0.0006387305,0.01457831,0.006194288,0.00007231387,0.00040222786,0.00022464785],"about_ca_topic_score_codex":0.00026551078,"about_ca_topic_score_gemma":0.00005820929,"teacher_disagreement_score":0.021175765,"about_ca_system_score_codex":0.0000117452855,"about_ca_system_score_gemma":0.000011585961,"threshold_uncertainty_score":0.31135762},"labels":[],"label_agreement":null},{"id":"W3204112333","doi":"10.2749/ghent.2021.1415","title":"Investigation of hybrid multi-core buckling-restrained brace components","year":2021,"lang":"en","type":"article","venue":"Report","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Structural engineering; Brace; Buckling; Stiffness; Yield (engineering); Core (optical fiber); Strain hardening exponent; Induced seismicity; Compression (physics); Tension (geology); Computer science; Materials science; Engineering; Composite material","score_opus":0.04244565010513464,"score_gpt":0.24916477756519909,"score_spread":0.20671912746006443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204112333","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963577,0.000120170145,0.0028494722,0.00003649901,0.00011790123,0.000024097651,0.0000033323206,0.00007771326,0.00041311377],"genre_scores_gemma":[0.99779314,0.00004179439,0.0015721264,0.000035225312,0.000043359363,0.0000024094477,0.00014577486,0.000010935212,0.00035523518],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994087,0.000004152356,0.0002672972,0.00010271548,0.00012349735,0.000093626215],"domain_scores_gemma":[0.99962884,0.000008748217,0.000058162823,0.00020276051,0.00006146079,0.00004000569],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008700341,0.00006662025,0.000138635,0.00004236325,0.00001912739,0.0000065284303,0.000037693717,0.0000207621,0.000026206944],"category_scores_gemma":[0.000037065412,0.00007024146,0.00005875534,0.00014928897,0.000017916935,0.000069667796,0.0000126199475,0.00006403365,0.000010356054],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019762435,0.000021642427,0.124396466,0.00015439255,0.00017076734,0.0013205588,0.0002118882,0.03561122,0.83589613,0.000011755551,0.00088218367,0.0013210324],"study_design_scores_gemma":[0.00029751015,0.000005801708,0.08767005,0.00008547612,0.00005739956,0.0005665414,0.000064146705,0.4956986,0.4135268,0.000083285646,0.0017709447,0.00017343536],"about_ca_topic_score_codex":0.000025745245,"about_ca_topic_score_gemma":0.0000036357274,"teacher_disagreement_score":0.4600874,"about_ca_system_score_codex":0.000018773877,"about_ca_system_score_gemma":0.00003081712,"threshold_uncertainty_score":0.28643635},"labels":[],"label_agreement":null},{"id":"W4285195550","doi":"10.2749/prague.2022.1590","title":"Dynamic Analysis and Innovative Design of a Kilometer-Long Highway Bridge under Extreme Landslide Generated Wave Loading","year":2022,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Pier; Bridge (graph theory); Pile; Structural engineering; Displacement (psychology); Geotechnical engineering; Landslide; Engineering; Wave loading; Beam bridge; Geology; Marine engineering; Civil engineering; Span (engineering)","score_opus":0.0257206527751833,"score_gpt":0.2259311158967458,"score_spread":0.20021046312156252,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285195550","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46867892,0.0001642721,0.5307367,0.0000120507475,0.00008031547,0.00006344706,0.000008032707,0.0001575204,0.00009873342],"genre_scores_gemma":[0.9949897,0.000015358852,0.0046884436,0.000009429147,0.00001040001,0.000019697767,0.000059199057,0.000025324394,0.00018243666],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989997,0.00002868857,0.0003666553,0.00020893496,0.00020681485,0.00018916874],"domain_scores_gemma":[0.9995235,0.0000593293,0.000080781654,0.00023310138,0.000056130193,0.000047163052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027297082,0.00014694531,0.00030579284,0.00037750648,0.000069959264,0.000019698826,0.00006661048,0.000051146213,0.000049556224],"category_scores_gemma":[0.000037844573,0.00014743,0.00005982621,0.0015233097,0.000022151837,0.000045371446,0.000057205947,0.00021632377,2.947095e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056716644,0.000009190879,0.0006675469,0.00002928058,0.00058772677,0.00023371563,0.000060249193,0.94371337,0.054027244,0.00007253708,0.0000498832,0.0005436028],"study_design_scores_gemma":[0.00038751858,0.00007583315,0.14513007,0.000014753598,0.0003574984,0.00093396165,0.00006231033,0.84444755,0.0071427994,0.00056070613,0.00037527498,0.0005117098],"about_ca_topic_score_codex":0.00006073534,"about_ca_topic_score_gemma":0.000007089689,"teacher_disagreement_score":0.5263108,"about_ca_system_score_codex":0.00010775353,"about_ca_system_score_gemma":0.000022902159,"threshold_uncertainty_score":0.6012021},"labels":[],"label_agreement":null},{"id":"W4285260538","doi":"10.2749/prague.2022.1511","title":"Evaluation of Non-Prismatic Open Cross-Section Bridge Arch for the Toronto Port Lands Bridges","year":2022,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Arch; Structural engineering; Engineering; Bridge (graph theory); Section (typography); Girder; Curvature; Cross section (physics); Geology; Geometry; Computer science; Mathematics; Physics","score_opus":0.048733715424535494,"score_gpt":0.3542419484335277,"score_spread":0.3055082330089922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285260538","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8392415,0.00029956174,0.15440919,0.00003495514,0.00093952636,0.00069506245,0.000020544345,0.0000949024,0.004264782],"genre_scores_gemma":[0.9988642,0.0000072980324,0.0001686077,0.0000067406036,0.00009132933,0.00027312242,0.00007995618,0.000015922722,0.00049282843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990529,0.00001830942,0.00030008334,0.00011192833,0.0004266863,0.000090088026],"domain_scores_gemma":[0.99944603,0.00004368515,0.00008018988,0.00026435594,0.00014545838,0.000020276155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016146302,0.000070120106,0.00013045341,0.000027930708,0.00012483093,0.00003827716,0.00015857209,0.000020126861,0.00023907686],"category_scores_gemma":[0.00007477592,0.00005824706,0.000075404736,0.00010717454,0.000009482492,0.00011560383,0.00004787565,0.00005957415,4.4318801e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051102957,0.0000057201028,0.003140589,0.000029766381,0.00013196259,0.000001689946,0.00019279141,0.98581254,0.0012838505,0.000022204047,0.001035778,0.008337975],"study_design_scores_gemma":[0.00019541616,0.000018283288,0.2507048,0.0000027218518,0.000110277106,0.0000620703,0.00009679324,0.7455849,0.0010495217,0.000023506907,0.0020876755,0.000064043925],"about_ca_topic_score_codex":0.0010065432,"about_ca_topic_score_gemma":0.00022604958,"teacher_disagreement_score":0.2475642,"about_ca_system_score_codex":0.00023962917,"about_ca_system_score_gemma":0.00005377117,"threshold_uncertainty_score":0.2617724},"labels":[],"label_agreement":null},{"id":"W4285274628","doi":"10.2749/prague.2022.1410","title":"Numerical Investigation of Slab-Column Connections with Various Reinforcement Ratios","year":2022,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Punching; Structural engineering; Slab; Flexural strength; Deflection (physics); Reinforcement; Finite element method; Parametric statistics; Failure mode and effects analysis; Monotonic function; Materials science; Mathematics; Engineering; Composite material; Mathematical analysis; Physics","score_opus":0.011397470680138301,"score_gpt":0.21549835848494395,"score_spread":0.20410088780480565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285274628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9850821,0.00001812348,0.00924686,0.000039306924,0.00030042126,0.0003024162,0.0000039182933,0.00024394097,0.004762922],"genre_scores_gemma":[0.9979945,0.0000012391364,0.0012799781,0.00002121426,0.000021887548,0.00011184921,0.000056886474,0.000019392419,0.00049309945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99910665,0.000010753126,0.0003209577,0.00011716524,0.00031579228,0.00012867962],"domain_scores_gemma":[0.99951273,0.00001844699,0.0001069994,0.0002531631,0.00005266588,0.000055970148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008236704,0.00009521109,0.00014077644,0.000065883505,0.000097367076,0.000010368429,0.00007334948,0.000024055491,0.00031200334],"category_scores_gemma":[0.000017510209,0.00009681775,0.00003781725,0.00025952575,0.000029147059,0.000087268905,0.000025024694,0.00014918603,0.0000029237074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021026348,8.029911e-7,0.012682152,0.00004208348,0.00010445777,0.00031313888,0.0006326215,0.92559284,0.05775749,0.0010871853,0.000862609,0.00090359163],"study_design_scores_gemma":[0.0027501322,0.0018905924,0.05411132,0.000073035735,0.0004825922,0.015123877,0.001150749,0.25006324,0.6371035,0.0004308689,0.03495505,0.0018650107],"about_ca_topic_score_codex":0.00016579138,"about_ca_topic_score_gemma":0.0000014965307,"teacher_disagreement_score":0.6755296,"about_ca_system_score_codex":0.00015327774,"about_ca_system_score_gemma":0.000075534204,"threshold_uncertainty_score":0.3948113},"labels":[],"label_agreement":null},{"id":"W4285274638","doi":"10.2749/prague.2022.0431","title":"Subsurface defect detection in concretes by active infrared thermography","year":2022,"lang":"en","type":"article","venue":"Report","topic":"Thermography and Photoacoustic Techniques","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Engineering and Physical Sciences Research Council; Queen's University; Queen's University Belfast","keywords":"Thermography; Slab; Infrared; Thermal; Irradiance; Environmental science; Materials science; Thermal infrared; Void (composites); Remote sensing; Structural engineering; Optics; Geology; Composite material; Meteorology; Engineering","score_opus":0.003719909458512517,"score_gpt":0.1892536704854005,"score_spread":0.18553376102688798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285274638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98867524,0.00053580943,0.0018181194,0.000002618081,0.000177625,0.0002340522,0.00012003908,0.00067496084,0.0077615315],"genre_scores_gemma":[0.99960846,0.000026642172,0.000054937445,0.000013021521,0.000010644395,0.00017929795,0.000027811075,0.000027173497,0.0000520182],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992961,0.000044417673,0.00019281279,0.0001557032,0.00014397035,0.00016695034],"domain_scores_gemma":[0.9996631,0.000047737412,0.000047860623,0.00019811493,0.000012099272,0.000031059844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022514431,0.000111034686,0.00013165566,0.00014067648,0.000068561916,0.000009549412,0.00008413706,0.000049624497,0.0001237673],"category_scores_gemma":[0.000012800427,0.00012503147,0.00010847806,0.00049437024,0.000021861839,0.000059619982,0.00002306167,0.00026822244,3.012638e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007505138,0.000041310806,0.013591209,0.000041114334,0.0001794169,0.00038197514,0.0010802511,0.0031114796,0.961892,0.00002678892,0.0022347898,0.01734461],"study_design_scores_gemma":[0.00049322203,0.00022315164,0.03897315,0.000021170326,0.000053076725,0.000532964,0.00068392913,0.0027108348,0.9107867,0.00204045,0.042786103,0.0006952514],"about_ca_topic_score_codex":0.00010633264,"about_ca_topic_score_gemma":0.000010282738,"teacher_disagreement_score":0.0511053,"about_ca_system_score_codex":0.000065992856,"about_ca_system_score_gemma":0.000009686125,"threshold_uncertainty_score":0.5098635},"labels":[],"label_agreement":null},{"id":"W4285279453","doi":"10.2749/prague.2022.1919","title":"Seismic Detailing of Single Span Bridges to AASHTO Standards for the State of Nevada, USA.","year":2022,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Structural engineering; Dowel; Engineering; Span (engineering); State highway; Bridge (graph theory); Substructure; Structural load; Seismic analysis; Seismic zone; Geotechnical engineering; Civil engineering; Induced seismicity","score_opus":0.011739188313559867,"score_gpt":0.23420935702841433,"score_spread":0.22247016871485448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285279453","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7344682,0.00025596897,0.26437506,0.00008177789,0.00028682672,0.00018417818,0.00009125102,0.00007443863,0.0001822874],"genre_scores_gemma":[0.9986265,0.0000070639085,0.00090732257,0.0000109306275,0.000025157058,0.000029900191,0.0000046596747,0.000024008186,0.00036449695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990952,0.0000066351977,0.00032247478,0.000111263194,0.0003017477,0.00016266061],"domain_scores_gemma":[0.9994632,0.000093425544,0.000058815967,0.00027614445,0.000070876406,0.000037514936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038225186,0.00008992651,0.00018232169,0.000053234224,0.00005855868,0.000008352397,0.00013566579,0.000018577504,0.00001623598],"category_scores_gemma":[0.000122654,0.00007581783,0.000083810235,0.00014258556,0.0000169639,0.000020848895,0.000050980536,0.00010676165,1.5956839e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010315424,0.0000060988355,0.00008719362,0.000079666956,0.000037320377,0.000006861225,0.000079547324,0.98551285,0.011182496,0.000032403204,0.00039831316,0.0025669055],"study_design_scores_gemma":[0.0005115137,0.0005352914,0.014127895,0.00007731441,0.0001174731,0.00047034168,0.00029287013,0.57230157,0.1378249,0.0014328102,0.27177152,0.00053652015],"about_ca_topic_score_codex":0.00013362707,"about_ca_topic_score_gemma":0.000026951855,"teacher_disagreement_score":0.41321132,"about_ca_system_score_codex":0.00009309704,"about_ca_system_score_gemma":0.000049150352,"threshold_uncertainty_score":0.30917612},"labels":[],"label_agreement":null},{"id":"W4285286605","doi":"10.2749/prague.2022.1071","title":"Education City Stadium, Doha, Qatar","year":2022,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stadium; Championship; Club; Quarter (Canadian coin); Engineering; Political science; Architectural engineering; Law; History; Archaeology","score_opus":0.006035230010371261,"score_gpt":0.21240914688915447,"score_spread":0.2063739168787832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285286605","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.929682,0.00036516078,0.035081033,0.00015866938,0.001977645,0.00010250339,0.000010814896,0.00080412626,0.03181804],"genre_scores_gemma":[0.9967616,0.0000050696917,0.00047795806,0.000031369258,0.00007133286,0.000018687511,0.00008033538,0.000011444773,0.002542179],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995507,0.0000057685406,0.0001407231,0.000087907334,0.0001360385,0.00007886495],"domain_scores_gemma":[0.99973685,0.0000051940824,0.000020946836,0.00018234426,0.000016402142,0.0000382958],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000075833006,0.000056651097,0.00006940949,0.000066347355,0.000059390728,0.000011742016,0.000053273943,0.000012755151,0.0010114895],"category_scores_gemma":[0.000011770101,0.000061976956,0.00004181271,0.00019831277,0.000004787322,0.000048559377,0.000016470227,0.00009559082,0.000010026458],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019750983,0.000019132234,0.0028808413,0.000030345262,0.0000921778,0.00006738733,0.00020429924,0.9417765,0.0039134664,0.0007533593,0.027668826,0.022591675],"study_design_scores_gemma":[0.00016048322,0.000024839212,0.02934737,0.0000058668056,0.00006861035,0.0011360227,0.00060403236,0.20359586,0.006687346,0.0005042605,0.75734675,0.0005185819],"about_ca_topic_score_codex":0.000056356148,"about_ca_topic_score_gemma":0.0000027092974,"teacher_disagreement_score":0.73818064,"about_ca_system_score_codex":0.0001047194,"about_ca_system_score_gemma":0.000036727906,"threshold_uncertainty_score":0.9999017},"labels":[],"label_agreement":null},{"id":"W4285296303","doi":"10.2749/prague.2022.1337","title":"Toward Crack-based Assessment of Shear-distressed Reinforced Concrete Infrastructure","year":2022,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Prioritization; Reinforced concrete; Computer science; Risk analysis (engineering); Construction engineering; Engineering; Structural engineering; Business; Management science","score_opus":0.013112983264253907,"score_gpt":0.2570718063495269,"score_spread":0.243958823085273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285296303","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98478985,0.00004767592,0.003908387,0.00004675343,0.000849567,0.00037608383,0.00008229204,0.00045366696,0.0094457315],"genre_scores_gemma":[0.9938391,0.000003437634,0.005311057,0.00004540214,0.0000466915,0.00007499213,0.0002490599,0.000051032526,0.00037923412],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980056,0.000027373773,0.0006807583,0.00025062327,0.0007092739,0.0003263261],"domain_scores_gemma":[0.99886215,0.000051118353,0.00023575325,0.00063698244,0.00009418085,0.0001197907],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00018642888,0.00025084137,0.00039585502,0.00013013936,0.000097907876,0.000024213068,0.00030472197,0.000085012325,0.0015411577],"category_scores_gemma":[0.00004589495,0.00026523398,0.00018460695,0.00029923194,0.00006302332,0.000107066946,0.00011007114,0.00044832172,0.00000214721],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033490553,2.2895064e-7,0.00577807,0.00023898346,0.000121269855,0.0013285582,0.00016097409,0.76461357,0.22350775,0.000661368,0.0022272016,0.0013285358],"study_design_scores_gemma":[0.0028828122,0.00048119543,0.0644792,0.000080836915,0.0002615878,0.0025735968,0.00048832485,0.5535581,0.34233326,0.00007974456,0.03112509,0.0016562296],"about_ca_topic_score_codex":0.000045049666,"about_ca_topic_score_gemma":1.02092216e-7,"teacher_disagreement_score":0.21105543,"about_ca_system_score_codex":0.0003172526,"about_ca_system_score_gemma":0.00024522276,"threshold_uncertainty_score":0.99998},"labels":[],"label_agreement":null},{"id":"W4312561967","doi":"10.2749/nanjing.2022.0928","title":"Advancements in Timber Construction: A Review of Prefabricated Mass Timber Floor Assemblies","year":2022,"lang":"en","type":"review","venue":"Report","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Prefabrication; Architectural engineering; Engineering; Demolition; Leverage (statistics); Sustainability; Construction engineering; Cross laminated timber; Construction industry; Civil engineering; Computer science","score_opus":0.052138396405194305,"score_gpt":0.3072681329505613,"score_spread":0.255129736545367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312561967","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000069711386,0.9572561,0.000011778249,0.000007179761,0.00043651025,0.00073752337,0.000020514904,0.00010618724,0.04141727],"genre_scores_gemma":[0.000004891191,0.995393,0.00077435694,0.0000088099405,0.000039905655,0.0005259209,0.00043231048,0.000062038234,0.0027587917],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980995,0.000067955196,0.0010904094,0.00026614772,0.00028289153,0.00019306944],"domain_scores_gemma":[0.99910825,0.00003207845,0.00033227506,0.00045756722,0.000033646844,0.00003619192],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002451875,0.00032980458,0.0014379665,0.00015474649,0.000023431745,0.000009342674,0.00013127063,0.00009999569,0.0023471906],"category_scores_gemma":[0.000047013422,0.00026765972,0.00027285743,0.0005205207,0.000027961656,0.00009027145,0.00005055601,0.00024622618,0.000080109494],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027578747,0.000052854884,0.0001228269,0.24701948,0.0007489818,0.0007266769,0.000019535446,0.00011461913,6.544715e-7,0.000012740475,0.0050223935,0.74615645],"study_design_scores_gemma":[0.00007928703,0.000017430883,0.0000037412362,0.029293157,0.00045902777,0.00061287783,0.0000036885947,0.000008181899,0.0000051819256,0.000009719806,0.96927476,0.00023296896],"about_ca_topic_score_codex":0.0000079731535,"about_ca_topic_score_gemma":9.905958e-7,"teacher_disagreement_score":0.96425235,"about_ca_system_score_codex":0.00021606279,"about_ca_system_score_gemma":0.0001283106,"threshold_uncertainty_score":0.9999776},"labels":[],"label_agreement":null},{"id":"W4313168517","doi":"10.2749/nanjing.2022.0173","title":"Nonlinear Coupling in Cable-Supported Bridges for Non-Analogous Modes","year":2022,"lang":"en","type":"article","venue":"Report","topic":"Vibration and Dynamic Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Nonlinear system; Coupling (piping); Structural engineering; Modal; Vibration; Stiffness; Suspension (topology); Modal analysis; Displacement (psychology); Physics; Engineering; Acoustics; Mathematics; Materials science; Mechanical engineering","score_opus":0.01361968332377626,"score_gpt":0.24728953131819387,"score_spread":0.23366984799441762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313168517","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6038317,0.00007429777,0.39192185,0.000085478125,0.00020612546,0.0002546025,0.00004308533,0.00021557826,0.0033672878],"genre_scores_gemma":[0.99632055,0.000009543784,0.0021630023,0.00003433768,0.00004785239,0.00008030279,0.0002687732,0.000022905382,0.0010527442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992474,0.0000033504743,0.0003115402,0.00014688139,0.00013948393,0.00015139004],"domain_scores_gemma":[0.9996971,0.000021197484,0.000047556612,0.00017343523,0.000026322963,0.000034383487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025317256,0.000077796256,0.00016896112,0.00011885651,0.0000725528,0.000013699152,0.000063430634,0.000025745088,0.00013094052],"category_scores_gemma":[0.000028219927,0.00008860952,0.00007736711,0.0002064808,0.000006567299,0.00004870561,0.000022717177,0.00009605549,0.0000029845273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030799288,0.00001729061,0.0066521643,0.000015641965,0.000034254146,0.00017873297,0.000046660145,0.99157065,0.00062706077,0.000011502259,0.0007240668,0.00011892414],"study_design_scores_gemma":[0.00015556964,0.000011169069,0.00061006466,0.0000022883487,0.000023897075,0.00007673673,0.00020032455,0.9954736,0.00041881143,0.000033639608,0.0028902893,0.00010360966],"about_ca_topic_score_codex":0.00013227324,"about_ca_topic_score_gemma":0.000099582794,"teacher_disagreement_score":0.39248884,"about_ca_system_score_codex":0.00011139622,"about_ca_system_score_gemma":0.00004982057,"threshold_uncertainty_score":0.36133915},"labels":[],"label_agreement":null},{"id":"W4385418307","doi":"10.3384/report.diva-194234","title":"Towards a more circular biobased economy and nutrient use on Gotland: finding suitable locations for biogas plants","year":2023,"lang":"en","type":"report","venue":"Report","topic":"Phosphorus and nutrient management","field":"Environmental Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Engineering Link (Canada)","funders":"Energimyndigheten; Sveriges Lantbruksuniversitet; Linköpings Universitet","keywords":"Biogas; Digestate; Nutrient; Raw material; Environmental science; Biofuel; Bioenergy; Agriculture; Crop residue; Tonne; Manure; Agronomy; Anaerobic digestion; Environmental engineering; Waste management; Engineering; Biology; Ecology; Methane","score_opus":0.08852859640166387,"score_gpt":0.31735870726057175,"score_spread":0.22883011085890786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385418307","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78419954,0.0012006323,0.0051675886,0.0021803388,0.0058207717,0.011707023,0.002322114,0.0009215596,0.18648046],"genre_scores_gemma":[0.7661187,0.011001796,0.0018163761,0.00096233725,0.0010651817,0.0038521402,0.010382949,0.0005892992,0.2042112],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972578,0.000016358865,0.0006172406,0.0009572835,0.0006414953,0.0005098139],"domain_scores_gemma":[0.99843913,0.000096379335,0.00050207664,0.0007269288,0.000036078283,0.00019937562],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001080113,0.00035120896,0.0004530396,0.00018239298,0.00027055893,0.00014483949,0.00019976746,0.00022814091,0.00014365847],"category_scores_gemma":[0.00024226216,0.00033061352,0.00017914364,0.0002203015,0.00009832669,0.00016520816,0.00029740372,0.00018219031,0.00011523166],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011036392,0.0006496731,0.17664745,0.00061118806,0.00057154434,0.0029242462,0.00032116717,0.0007253487,0.00012312253,0.0005398316,0.8107364,0.006039615],"study_design_scores_gemma":[0.00036601705,0.000093297866,0.027200904,0.0001675964,0.00011246041,0.000151558,0.00006374287,0.00019381085,0.0005191662,0.00042090483,0.9703014,0.00040917206],"about_ca_topic_score_codex":0.0033906472,"about_ca_topic_score_gemma":0.00009716659,"teacher_disagreement_score":0.15956493,"about_ca_system_score_codex":0.00097166526,"about_ca_system_score_gemma":0.00020494482,"threshold_uncertainty_score":0.9999146},"labels":[],"label_agreement":null},{"id":"W4385631477","doi":"10.2749/istanbul.2023.0798","title":"Development of Indonesia’s Probabilistic based Bridge Loading Code","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Structural engineering; Probabilistic logic; Reliability (semiconductor); Structural load; Engineering; Limit state design; Code (set theory); Load testing; Computer science; Reliability engineering; Set (abstract data type)","score_opus":0.03568061971797049,"score_gpt":0.2656619394452026,"score_spread":0.22998131972723213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385631477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99609256,0.000008598464,0.001747605,0.000006904555,0.00023709086,0.00015606584,0.0000031279155,0.00055974,0.0011883038],"genre_scores_gemma":[0.9950348,7.824423e-7,0.0047339983,0.000003204556,0.000018890103,0.000025522084,0.000042671545,0.000026464728,0.00011365078],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990465,0.0000034051263,0.0003998172,0.00012860371,0.00022323643,0.00019840806],"domain_scores_gemma":[0.9995749,0.000026867889,0.000064182386,0.00023576422,0.0000428961,0.000055377048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015125106,0.000110009656,0.00016577466,0.000107165564,0.000026125328,0.000009040444,0.00009126585,0.000051382165,0.000023035946],"category_scores_gemma":[0.00005170104,0.00011125813,0.00004424049,0.00027275208,0.000018802992,0.000044968845,0.000023832059,0.00007367183,0.000035184243],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021453208,0.0000021986282,0.054394476,0.0012530602,0.00016662209,0.002935927,0.0012912512,0.082376495,0.81158775,0.0003219232,0.0015361756,0.044112675],"study_design_scores_gemma":[0.00040411594,0.000014701251,0.44096622,0.00014324323,0.000041081883,0.0003034093,0.000032944252,0.04078841,0.5115169,0.00002683825,0.005277966,0.00048418622],"about_ca_topic_score_codex":0.000005027462,"about_ca_topic_score_gemma":0.0000013529678,"teacher_disagreement_score":0.38657174,"about_ca_system_score_codex":0.00009123254,"about_ca_system_score_gemma":0.0001012692,"threshold_uncertainty_score":0.4536975},"labels":[],"label_agreement":null},{"id":"W4385631496","doi":"10.2749/istanbul.2023.0033","title":"Nonlinear Analysis of Cable-Supported Bridges Using an Open-source Finite Element Software","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Vibration and Dynamic Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Nonlinear system; Finite element method; Structural engineering; Modal analysis; Software; Coupling (piping); Vibration; Bridge (graph theory); Engineering; Computer science; Mechanical engineering; Physics; Acoustics","score_opus":0.03286374511091011,"score_gpt":0.2923528951072962,"score_spread":0.25948914999638606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385631496","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46836242,0.000009753603,0.5307756,0.000014496175,0.00005223768,0.00008183384,0.00004513021,0.00031081695,0.00034772922],"genre_scores_gemma":[0.985194,0.000019834182,0.01025128,0.000035657333,0.00004191502,0.0000076097685,0.0016102772,0.000040770803,0.0027986018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988361,0.000018337365,0.00052058854,0.00021045163,0.00023958196,0.00017496472],"domain_scores_gemma":[0.9992121,0.000029277133,0.00013447409,0.00045342947,0.00008952181,0.00008123876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035743488,0.00011186327,0.0003483857,0.000432008,0.00005462009,0.00004738114,0.00015961993,0.00005132484,0.00042288395],"category_scores_gemma":[0.000071841765,0.000116437834,0.00012004095,0.0018761347,0.000014803865,0.00016544916,0.00007328739,0.000057643032,0.000012032027],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015865012,0.000025379895,0.032782223,0.00001764082,0.0007881364,0.000106314226,0.00010188654,0.96464986,0.0006682776,0.0000020316859,0.00019017798,0.0006664595],"study_design_scores_gemma":[0.0000858051,0.000011802533,0.0076579964,0.0000068622694,0.0006479453,0.000009928089,0.00015275522,0.98783875,0.00066142436,0.0000037388184,0.00279432,0.00012864864],"about_ca_topic_score_codex":0.00050468475,"about_ca_topic_score_gemma":0.00029308838,"teacher_disagreement_score":0.5205243,"about_ca_system_score_codex":0.0000505562,"about_ca_system_score_gemma":0.00005601487,"threshold_uncertainty_score":0.47481972},"labels":[],"label_agreement":null},{"id":"W4385631509","doi":"10.2749/istanbul.2023.0744","title":"A Case Study on the Analysis and Rehabilitation of an Existing Through Arch Truss Bridge","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Truss; Structural engineering; Engineering; Arch; Bracing; Structural health monitoring; Deck; Forensic engineering; Civil engineering; Brace","score_opus":0.05670285227532336,"score_gpt":0.33170119913552765,"score_spread":0.2749983468602043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385631509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9953939,0.000004229612,0.004008138,0.000029933033,0.00003221044,0.00008980739,0.000002311965,0.00016193601,0.0002775629],"genre_scores_gemma":[0.99957746,0.0000013887193,0.0003326579,0.0000026658497,0.000017319098,0.000012743437,0.00000997177,0.000009167985,0.0000366217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993992,0.0000282703,0.00023845972,0.00012722716,0.00013300173,0.00007385258],"domain_scores_gemma":[0.9994425,0.00020047471,0.00003770382,0.0002677177,0.000029603185,0.000021966593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003359129,0.000067709094,0.00014485329,0.00015353288,0.000049125658,0.000014420969,0.000031032636,0.00001829888,0.0000068056647],"category_scores_gemma":[0.00016014714,0.000049611364,0.000058998463,0.001061472,0.000019604027,0.000054229196,0.000009265639,0.000058689024,9.3001563e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006855624,0.000043531665,0.06533142,0.00008598706,0.0014795293,0.0035821397,0.020580089,0.89530694,0.0015143103,0.00037741687,0.00009208368,0.011599709],"study_design_scores_gemma":[0.00010795865,0.00008732946,0.45500913,0.0000072659827,0.0003419041,0.00058616017,0.00847183,0.5346326,0.00052075536,0.000079875936,0.000032840693,0.0001223443],"about_ca_topic_score_codex":0.00059815834,"about_ca_topic_score_gemma":0.00010536793,"teacher_disagreement_score":0.3896777,"about_ca_system_score_codex":0.000013819965,"about_ca_system_score_gemma":0.0000038294406,"threshold_uncertainty_score":0.20230927},"labels":[],"label_agreement":null},{"id":"W4385641099","doi":"10.2749/istanbul.2023.0285","title":"New challenges in the IABSE TG3.1 benchmark on super long span bridge aerodynamics","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Wind and Air Flow Studies","field":"Environmental Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Aerodynamics; Benchmark (surveying); Bridge (graph theory); Thunderstorm; Computer science; Wind tunnel; Span (engineering); Wind speed; Computation; Aeroelasticity; Meteorology; Structural engineering; Simulation; Aerospace engineering; Engineering; Geology; Geography; Algorithm","score_opus":0.04506573247890022,"score_gpt":0.26532041243263454,"score_spread":0.22025467995373432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385641099","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.932062,0.000087205044,0.000009274323,0.00542966,0.00017694038,0.00012445915,0.0000013081373,0.00004615318,0.062063027],"genre_scores_gemma":[0.9959233,0.00044771784,0.000029183571,0.00015982284,0.00012876296,0.000010328119,0.0000103778375,0.000009441529,0.003281108],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99893266,0.000026456735,0.00017345295,0.00028491046,0.00033368685,0.0002488416],"domain_scores_gemma":[0.9995286,0.000055435245,0.000037613307,0.00033369768,0.0000021959559,0.000042448482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048923626,0.00010501361,0.0001123203,0.000026117823,0.00008905072,0.000016601378,0.00016848533,0.00003702239,0.00019554669],"category_scores_gemma":[0.000054959717,0.00007039318,0.00004982499,0.00023323498,0.000047988968,0.000069274916,0.00012936216,0.000116217205,0.00059328525],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010704291,0.00011365664,0.87263215,0.000015977532,0.000020472633,0.0038238985,0.0036464245,0.0016459756,0.00017100891,0.00026194638,0.050669115,0.0669887],"study_design_scores_gemma":[0.00007271634,0.000032945863,0.97515535,0.000014129907,0.0000037422622,0.00007334507,0.0002230098,0.000098483346,0.000017198456,0.00024476225,0.023968793,0.000095542455],"about_ca_topic_score_codex":0.0005414828,"about_ca_topic_score_gemma":0.0018135513,"teacher_disagreement_score":0.102523215,"about_ca_system_score_codex":0.000053064687,"about_ca_system_score_gemma":0.0000097823995,"threshold_uncertainty_score":0.76256794},"labels":[],"label_agreement":null},{"id":"W4385641109","doi":"10.2749/istanbul.2023.0245","title":"Gordie Howe International Bridge: Project Overview and Design Features","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Windsor; Span (engineering); Bridge (graph theory); Engineering; Tower; Deck; Redundancy (engineering); Aerodynamics; Civil engineering; Architectural engineering; Structural engineering; Geology; Aerospace engineering","score_opus":0.047242895087616844,"score_gpt":0.30160165861031735,"score_spread":0.2543587635227005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385641109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45460153,0.0072124177,0.48327515,0.0021287506,0.0065397588,0.0011028835,0.00005326228,0.010404207,0.03468206],"genre_scores_gemma":[0.9962035,0.00070660416,0.0011397307,0.000019611427,0.000112816706,0.00001468703,0.000051259685,0.000018900952,0.0017329097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995689,0.0000053256554,0.000119127995,0.0001039684,0.00011360581,0.00008908391],"domain_scores_gemma":[0.9998145,0.00001900001,0.000016636126,0.00010406998,0.00001961772,0.000026185164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010258612,0.00007381639,0.00008950615,0.00010973598,0.000020712068,0.000036002788,0.00004352781,0.000031651693,0.000025041769],"category_scores_gemma":[0.000044407338,0.00006669239,0.000035867863,0.00023841907,0.000008568319,0.00006436011,0.000015733633,0.000059022103,0.000012884911],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011845159,0.000009446705,0.0037336953,0.00032403955,0.0010190369,0.0016565267,0.0006626667,0.56912166,0.009314776,0.0012410079,0.24939114,0.16351418],"study_design_scores_gemma":[0.00030523384,0.000020631533,0.34359524,0.000069587244,0.00007888572,0.0013114169,0.000078452416,0.54938596,0.0045184577,0.00033019396,0.099787086,0.0005188742],"about_ca_topic_score_codex":0.00002313336,"about_ca_topic_score_gemma":0.00000235613,"teacher_disagreement_score":0.54160196,"about_ca_system_score_codex":0.000020721633,"about_ca_system_score_gemma":0.000009842126,"threshold_uncertainty_score":0.27196366},"labels":[],"label_agreement":null},{"id":"W4385641155","doi":"10.2749/istanbul.2023.1017","title":"The Role of Independent Engineer in the Design and Construction of Long Span Bridges in Canada","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Transport engineering; Certification; Engineering; Work (physics); Government (linguistics); General partnership; Public transport; Civil engineering; Construction engineering; Business; Finance; Management","score_opus":0.0061445192466040655,"score_gpt":0.1862933797615854,"score_spread":0.18014886051498133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385641155","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9933207,0.0001694279,0.006238875,0.000033365326,0.00007067186,0.000057535293,8.960814e-7,0.000015649568,0.00009284674],"genre_scores_gemma":[0.9997945,0.00006763274,0.00011133457,0.0000010172655,0.000006382029,0.000004478038,0.0000024298492,0.000004285697,0.000007979367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995486,0.000012631001,0.00020070568,0.00004676281,0.00012091853,0.00007038926],"domain_scores_gemma":[0.9997711,0.000079581325,0.00002821217,0.00009834441,0.000012263138,0.00001046995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022259183,0.000043458287,0.00008275596,0.00006180495,0.000009334374,0.0000048267534,0.00004233623,0.000016596172,0.00000204421],"category_scores_gemma":[0.00003375334,0.000029094223,0.0000125527295,0.00026116314,0.000012901833,0.000020770702,0.0000055914343,0.000060464405,1.0659708e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001110702,5.468608e-7,0.054992586,0.000013665318,0.000016165628,0.00003446828,0.00012828017,0.93609303,0.00056498,0.00012248171,0.000015803811,0.008016854],"study_design_scores_gemma":[0.000052497915,0.0000025139514,0.49832904,0.0000112671005,0.00000599328,0.00008899108,0.0010366172,0.4906425,0.009645781,0.000068306916,0.00007473979,0.00004175446],"about_ca_topic_score_codex":0.09492546,"about_ca_topic_score_gemma":0.11439092,"teacher_disagreement_score":0.44545054,"about_ca_system_score_codex":0.000043966822,"about_ca_system_score_gemma":0.00004844633,"threshold_uncertainty_score":0.9111015},"labels":[],"label_agreement":null},{"id":"W4385641168","doi":"10.2749/istanbul.2023.0936","title":"Sazlidere Bridge Wind Tunnel Testing Assisted Design","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Aerodynamics and Fluid Dynamics Research","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Aeroelasticity; Aerodynamics; Wind tunnel; Bridge (graph theory); Context (archaeology); Structural engineering; Wind speed; Engineering; Truck; Marine engineering; Aerospace engineering; Meteorology; Geology; Physics","score_opus":0.11132930234822969,"score_gpt":0.2999775932220789,"score_spread":0.1886482908738492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385641168","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9376522,0.000073197894,0.028248092,0.00008499409,0.00040386742,0.0003008161,0.000012470652,0.0016114374,0.031612962],"genre_scores_gemma":[0.9935733,0.000024076538,0.0031039366,0.000006762081,0.00008453568,0.000012555328,0.000055050707,0.00006515626,0.0030745973],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998777,0.000016703698,0.00029563258,0.00021824178,0.00029785844,0.0003945709],"domain_scores_gemma":[0.99929905,0.00012279024,0.000030161294,0.0003460075,0.00009237431,0.00010960364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006257309,0.00012810444,0.0001558389,0.00012960614,0.000087447326,0.00006256919,0.00013144738,0.00008314441,0.000027700213],"category_scores_gemma":[0.0003436653,0.00013375202,0.0000498489,0.00075499644,0.000027660204,0.00006867761,0.00006642219,0.00020447485,0.00027920082],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010942755,0.00005734837,0.027498499,0.00029056438,0.00025707955,0.02489817,0.000278192,0.5606028,0.31968454,0.00031917443,0.02432246,0.041780245],"study_design_scores_gemma":[0.000072666044,0.000010947397,0.38439026,0.000018942592,0.00000517109,0.00052937545,0.000007958259,0.6139302,0.000064329724,0.00015833783,0.0006716008,0.00014019955],"about_ca_topic_score_codex":0.000041267074,"about_ca_topic_score_gemma":0.000019677698,"teacher_disagreement_score":0.35689175,"about_ca_system_score_codex":0.000097300865,"about_ca_system_score_gemma":0.000067704204,"threshold_uncertainty_score":0.54542494},"labels":[],"label_agreement":null},{"id":"W4385641191","doi":"10.2749/istanbul.2023.0835","title":"Quantification of subsurface defects in reinforced concrete of bridges by unsupervised segmentation of IR images","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Thermography and Photoacoustic Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; National Science Foundation; Science Foundation Ireland; Queen's University Belfast; McKnight Foundation; Department for the Economy","keywords":"Cluster analysis; Corrosion; Context (archaeology); Bridge (graph theory); Structural engineering; Reinforced concrete; Segmentation; Structural health monitoring; Image segmentation; Computer science; Materials science; Artificial intelligence; Engineering; Geology; Composite material","score_opus":0.012533843577449308,"score_gpt":0.24552761703515663,"score_spread":0.23299377345770733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385641191","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934752,0.00010359889,0.005775199,0.0000032884207,0.000039256738,0.00017719572,0.000093830255,0.00014266415,0.00018979581],"genre_scores_gemma":[0.99941367,0.00014216073,0.00028095412,7.3902805e-7,0.0000022379725,0.000009869961,0.000109627916,0.0000113444485,0.000029401295],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999333,0.000014064066,0.00039191512,0.00007598493,0.000113256865,0.00007176994],"domain_scores_gemma":[0.99957675,0.00005593174,0.0001312712,0.00017333892,0.000049798207,0.000012922136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024089063,0.000060450453,0.00015965318,0.00011269275,0.000005035045,0.0000018428826,0.000048717717,0.000047971756,0.0000064126452],"category_scores_gemma":[0.000035545072,0.00006516216,0.00003841974,0.0003393042,0.000032024996,0.000050737108,0.0000061666337,0.00003691639,2.4371633e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000087551625,0.0000012470811,0.009782884,0.0002631597,0.000014446828,0.0000052800942,0.0001949919,0.0059268023,0.98337406,0.000035169414,0.00022075612,0.00017246498],"study_design_scores_gemma":[0.00010860563,0.000023930446,0.0351136,0.00006185775,0.000010983686,0.0000035732612,0.00014388749,0.0057325233,0.9587156,0.000019913927,0.000011682284,0.00005382619],"about_ca_topic_score_codex":0.00024226624,"about_ca_topic_score_gemma":0.0000022569416,"teacher_disagreement_score":0.025330713,"about_ca_system_score_codex":0.000012276869,"about_ca_system_score_gemma":0.000010714956,"threshold_uncertainty_score":0.2657236},"labels":[],"label_agreement":null},{"id":"W4385641291","doi":"10.2749/istanbul.2023.0409","title":"Main Cable Inspection and Strength Evaluation of Helicoidal Strand Main Cables Using a Modified NCHRP Evaluation Approach","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Engineering; Structural engineering; Forensic engineering","score_opus":0.08462882267294271,"score_gpt":0.3109627477922575,"score_spread":0.22633392511931483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385641291","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9898404,0.0001456893,0.0053710444,0.000007290288,0.00017626354,0.00052391505,0.000013963032,0.00019988274,0.0037215338],"genre_scores_gemma":[0.9992357,0.000025451794,0.0005048321,0.0000013217599,0.00004293087,0.00004035252,0.0000919146,0.000016843544,0.00004065656],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984735,0.00010931908,0.00038085968,0.00023749504,0.00064193207,0.00015684779],"domain_scores_gemma":[0.999391,0.000038049046,0.00008344237,0.00025092546,0.0001821806,0.00005435472],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033724518,0.00011265066,0.0001873055,0.0001399807,0.00007101513,0.000026051168,0.000033401167,0.00008628347,0.000049992344],"category_scores_gemma":[0.00029171395,0.00011700468,0.000040282917,0.00035236622,0.000029515017,0.00012760573,0.00001954523,0.00008383784,0.0000011738575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023216417,0.000026959251,0.003501862,0.00023627208,0.000031781343,0.000009572531,0.0007989869,0.8472693,0.13703686,0.00007572882,0.0001971476,0.0107923355],"study_design_scores_gemma":[0.00057643576,0.000013375572,0.013233985,0.000023922032,0.0000952149,0.00009042244,0.00045403937,0.98056,0.004484886,0.00033192607,0.000023260054,0.00011250336],"about_ca_topic_score_codex":0.00026785003,"about_ca_topic_score_gemma":0.00010018747,"teacher_disagreement_score":0.13329075,"about_ca_system_score_codex":0.00021335024,"about_ca_system_score_gemma":0.00015951965,"threshold_uncertainty_score":0.47713125},"labels":[],"label_agreement":null},{"id":"W4391598558","doi":"10.2749/newdelhi.2023.0631","title":"Bridges as Built Heritage: Preservation, Reimagination, Transformation","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Thriving; Placemaking; Vitality; Cultural heritage; Architecture; Industrial heritage; Bridge (graph theory); Architectural engineering; Cultural heritage management; Civil engineering; Environmental ethics; Engineering; Sociology; History; Urban design; Archaeology; Social science","score_opus":0.013973155538185275,"score_gpt":0.2587332978232398,"score_spread":0.2447601422850545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391598558","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73823196,0.00012687732,0.22398886,0.0028029268,0.00081126025,0.00023391447,0.000008781814,0.0048262784,0.028969165],"genre_scores_gemma":[0.99712884,0.00005941237,0.00019727873,0.00002155875,0.00006823923,0.000020211208,0.0002234253,0.000019569208,0.0022614754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932927,0.0000056759227,0.00025513058,0.000099133504,0.00019077255,0.000120020966],"domain_scores_gemma":[0.9996584,0.000013623323,0.000025171135,0.000178802,0.00008231027,0.000041665076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013413082,0.00008457602,0.00009089384,0.00013998614,0.000046245263,0.00004105113,0.000060683487,0.000040346375,0.00009549871],"category_scores_gemma":[0.00006950621,0.000087031396,0.00004735891,0.0005495115,0.000010326292,0.00041687008,0.0000051792476,0.00006615904,0.00014763357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019266056,0.0000037852722,0.0012884189,0.00012833906,0.000089430934,0.000091281545,0.0007214537,0.96067876,0.006358253,0.003502598,0.015575697,0.01156006],"study_design_scores_gemma":[0.00015428982,0.000008187914,0.060422182,0.000015440995,0.000026004596,0.00016693686,0.00023673009,0.86103255,0.012956825,0.0009275081,0.06381605,0.00023730219],"about_ca_topic_score_codex":0.00004702072,"about_ca_topic_score_gemma":0.000007790515,"teacher_disagreement_score":0.2588969,"about_ca_system_score_codex":0.00003803461,"about_ca_system_score_gemma":0.000013536469,"threshold_uncertainty_score":0.35490373},"labels":[],"label_agreement":null},{"id":"W4391598582","doi":"10.2749/newdelhi.2023.0464","title":"Case Study of Rochdale Canal Bridge Assessment using Non-Linear Finite Element analysis","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Structural engineering; Buckling; Finite element method; Bridge (graph theory); Skew; Engineering; Computer science","score_opus":0.04289702760216176,"score_gpt":0.33201849803023137,"score_spread":0.2891214704280696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391598582","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8590376,0.0000040303585,0.1405202,0.0000032295081,0.00010412026,0.00008754431,0.000006897328,0.00010082552,0.00013554015],"genre_scores_gemma":[0.99899215,0.0000030466672,0.0007528013,0.0000021960748,0.000042315638,0.0000089318655,0.000053039475,0.00001778437,0.0001277487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989108,0.000011899852,0.00048055316,0.00017250325,0.00026095114,0.00016330837],"domain_scores_gemma":[0.9994327,0.000031128893,0.000081099744,0.00032286174,0.00006346003,0.0000687931],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020511368,0.00012276643,0.0002987012,0.00044155444,0.000050249248,0.000013787017,0.000053559022,0.000030188501,0.00006667394],"category_scores_gemma":[0.0000167571,0.00012149085,0.0001347032,0.0017541827,0.000007066335,0.000049626327,0.000025818455,0.0000818762,0.0000027392389],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.8252735e-7,0.000014736294,0.022886911,0.000019475481,0.0011379113,0.003648572,0.000259574,0.97124106,0.0005714123,0.0000011379105,0.000034306657,0.00018444491],"study_design_scores_gemma":[0.00014194202,0.000021187,0.03829441,0.0000033081944,0.00070418697,0.0003704064,0.00087611086,0.95911556,0.00031508747,6.9085274e-7,0.00003706479,0.00012002847],"about_ca_topic_score_codex":0.007832079,"about_ca_topic_score_gemma":0.0014731291,"teacher_disagreement_score":0.13995452,"about_ca_system_score_codex":0.0000909874,"about_ca_system_score_gemma":0.000031766933,"threshold_uncertainty_score":0.9987748},"labels":[],"label_agreement":null},{"id":"W4391624339","doi":"10.2749/newdelhi.2023.0237","title":"Addressing Climate Resiliency in Long Span Bridges Through Early Stage Aerodynamic and Climate Consulting","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Bridge (graph theory); Aerodynamics; Climate change; Engineering; Microclimate; Span (engineering); Deck; Civil engineering; Environmental science; Computer science; Structural engineering; Geology; Geography","score_opus":0.039608537176594814,"score_gpt":0.3052326795288059,"score_spread":0.2656241423522111,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391624339","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9955316,0.00019703424,0.0001657376,0.000035935023,0.0002572982,0.00018021802,0.000019634288,0.0006411849,0.0029713647],"genre_scores_gemma":[0.99904215,0.0005940694,0.00015279655,0.0000103836655,0.000025102747,0.000011884783,0.000028181157,0.000032157397,0.000103273844],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985133,0.00003295195,0.00049702433,0.0003311294,0.00016847144,0.00045714047],"domain_scores_gemma":[0.9993781,0.00011058296,0.0000762141,0.0003374677,0.000031535492,0.000066085166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007200582,0.00015342877,0.00024063257,0.00008616792,0.00009971456,0.00007568868,0.00006713028,0.00007779506,0.000025594783],"category_scores_gemma":[0.00024540702,0.00015992402,0.000040795683,0.00032137535,0.000056989695,0.0002188285,0.00011784301,0.00019843363,0.000028311559],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001143766,0.000004952145,0.98586017,0.00036322835,0.0000038132118,0.0013765487,0.00065134227,0.0020383024,0.0069185295,0.00004684636,0.000030298123,0.0026945444],"study_design_scores_gemma":[0.00024200625,0.000010010007,0.96112,0.00018513596,0.000006083943,0.000112545116,0.00028143122,0.036940362,0.0006972178,0.000016486158,0.0001907777,0.00019792642],"about_ca_topic_score_codex":0.00020544931,"about_ca_topic_score_gemma":0.0005293705,"teacher_disagreement_score":0.034902062,"about_ca_system_score_codex":0.000065407155,"about_ca_system_score_gemma":0.000020483794,"threshold_uncertainty_score":0.6521512},"labels":[],"label_agreement":null},{"id":"W4391624364","doi":"10.2749/newdelhi.2023.0760","title":"488 University Avenue - Toronto: Redefining possible in the vertical expansion of buildings","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Vibration Control and Rheological Fluids","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Serviceability (structure); Tower; Wind tunnel; Structural engineering; Engineering; Civil engineering; Architectural engineering; Wind engineering; Wind force; Computer science; Marine engineering; Aerospace engineering; Meteorology","score_opus":0.014153390815365405,"score_gpt":0.22614838870007503,"score_spread":0.21199499788470963,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391624364","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98471475,0.000083641105,0.0011974117,0.00013742398,0.00012667068,0.000046836605,0.0000011277665,0.0001035173,0.013588608],"genre_scores_gemma":[0.9996252,0.000048416456,0.00010126071,0.000012205737,0.000022253953,8.2770237e-7,0.000004857488,0.0000034310876,0.00018156417],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99959254,0.000016437265,0.00012612669,0.000070061826,0.00010005075,0.00009479195],"domain_scores_gemma":[0.99979824,0.000051577754,0.000008988874,0.00011204871,0.000011787834,0.000017380995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024416618,0.000038932678,0.00008059572,0.000019052748,0.000026618609,0.0000047535373,0.000067857385,0.000046154135,0.00003074895],"category_scores_gemma":[0.00007410707,0.000028658216,0.00003069207,0.00015152033,0.000016254085,0.000062260704,0.000018899307,0.000057361936,0.000008155979],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018056446,0.00015925156,0.11807536,0.00026996314,0.00016203268,0.0102539,0.008295521,0.075103045,0.6365528,0.09413091,0.03064957,0.026167074],"study_design_scores_gemma":[0.0014662044,0.00022256588,0.7743508,0.0001864265,0.000053640553,0.0003846357,0.0026782618,0.16083424,0.01606724,0.001986354,0.04124991,0.00051973754],"about_ca_topic_score_codex":0.000087293825,"about_ca_topic_score_gemma":0.000029247409,"teacher_disagreement_score":0.65627545,"about_ca_system_score_codex":0.000028659575,"about_ca_system_score_gemma":0.000012770221,"threshold_uncertainty_score":0.116864815},"labels":[],"label_agreement":null},{"id":"W4391624430","doi":"10.2749/newdelhi.2023.0172","title":"Case study using Non-Linear Finite Element Analysis for Assessment of Slutchers Lane bridge","year":2023,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Finite element method; Structural engineering; Bridge (graph theory); Nonlinear system; Limit state design; Buckling; Sensitivity (control systems); Engineering; Beam (structure); Limit (mathematics); Computer science; Mathematics","score_opus":0.08026442346150689,"score_gpt":0.36646212995409333,"score_spread":0.28619770649258647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391624430","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62261426,0.000002532183,0.37704623,0.0000034460024,0.000075416836,0.00012514406,0.000009589529,0.00007418227,0.00004917782],"genre_scores_gemma":[0.99611986,0.000002492494,0.0035903652,0.0000021877077,0.000040161576,0.000021288744,0.000083753745,0.000018936667,0.00012097583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912816,0.0000077432005,0.0004079696,0.00015022843,0.00016439574,0.00014149347],"domain_scores_gemma":[0.99950457,0.000055961627,0.000073710005,0.00025971036,0.000059181966,0.000046885965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028421188,0.0001059363,0.00028014396,0.00031643707,0.000036175144,0.000010941633,0.00004288009,0.000029225625,0.000026695561],"category_scores_gemma":[0.000027255155,0.00010279379,0.00017038782,0.0010758983,0.000006270281,0.000037286805,0.000015121786,0.000051148843,0.0000011465808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.6549165e-7,0.000011258757,0.027508736,0.00003566367,0.0012080056,0.0008517515,0.00017892606,0.9693617,0.0005856816,0.0000018961125,0.000028915352,0.00022679217],"study_design_scores_gemma":[0.00016993345,0.000025405974,0.028462062,0.0000031695067,0.0006894741,0.00012684605,0.000546701,0.9694285,0.00037419418,0.0000012174738,0.00006364854,0.00010887408],"about_ca_topic_score_codex":0.00069733796,"about_ca_topic_score_gemma":0.000116034455,"teacher_disagreement_score":0.37350553,"about_ca_system_score_codex":0.00006180773,"about_ca_system_score_gemma":0.000020238578,"threshold_uncertainty_score":0.4191809},"labels":[],"label_agreement":null},{"id":"W4395450333","doi":"10.2749/manchester.2024.1415","title":"The impact on structural embodied carbon of using loads obtained from wind tunnel testing vs code-based loads","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Wind and Air Flow Studies","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Eurocode; Wind tunnel; Structural engineering; Wind engineering; Reduction (mathematics); Engineering; Marine engineering; Environmental science; Aerospace engineering; Mathematics","score_opus":0.025339992686267434,"score_gpt":0.2824090941086202,"score_spread":0.2570691014223528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395450333","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99184495,0.00012903714,0.000016497672,0.0001283601,0.0002699669,0.000117781725,0.000017758208,0.000055809658,0.007419848],"genre_scores_gemma":[0.9993669,0.0000013645761,0.00028472138,0.000022138422,0.00013688675,0.0000014713426,0.0000064541023,0.00001696239,0.00016311041],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99871284,0.000030492602,0.00032407272,0.00031555706,0.00035506435,0.00026194772],"domain_scores_gemma":[0.9992501,0.0002587915,0.0001274912,0.00029306338,0.000013101726,0.00005744979],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026839302,0.00017413388,0.00020192216,0.000022412178,0.00019698178,0.000051165393,0.00012735096,0.00004542496,0.0000701132],"category_scores_gemma":[0.00016917435,0.00010035235,0.00010449894,0.00022574699,0.00018177087,0.000056744288,0.00009091483,0.00013626108,0.000008697328],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085019026,0.00003217536,0.83745646,0.000021934717,0.00012240074,0.00079540466,0.00046003138,0.04935227,0.10508162,0.00001170004,0.00043888565,0.006142072],"study_design_scores_gemma":[0.0002630016,0.00016194127,0.8436088,0.00019353697,0.00007108406,0.00008117807,0.00013864294,0.14392196,0.010038775,0.0008531225,0.00036741362,0.00030053992],"about_ca_topic_score_codex":0.0036931757,"about_ca_topic_score_gemma":0.0000630132,"teacher_disagreement_score":0.09504285,"about_ca_system_score_codex":0.00020422104,"about_ca_system_score_gemma":0.000061207065,"threshold_uncertainty_score":0.55830014},"labels":[],"label_agreement":null},{"id":"W4395450572","doi":"10.2749/manchester.2024.0493","title":"A Case Study on the Structural Assessment of an Existing Through Arch Truss Bridge","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Truss; Structural engineering; Arch; Structural health monitoring; Truss bridge; Engineering; Beam bridge; Finite element method; Aeroelasticity; Expansion joint; Forensic engineering; Span (engineering); Civil engineering; Aerodynamics","score_opus":0.15272739185265188,"score_gpt":0.4600837277007757,"score_spread":0.30735633584812383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395450572","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957166,0.000040814874,0.00017818488,0.000022319555,0.00085993006,0.0004504292,0.0000050700837,0.00072942144,0.0019972555],"genre_scores_gemma":[0.9969002,0.0000019789222,0.002715761,0.0000050986237,0.000268695,0.000049986167,0.0000026973146,0.00003478838,0.000020809799],"study_design_codex":"case_report","study_design_gemma":"observational","domain_scores_codex":[0.9988874,0.000045287292,0.0003909062,0.00021254565,0.00027656532,0.00018730272],"domain_scores_gemma":[0.9992577,0.000139618,0.00004622299,0.00048525538,0.000032881184,0.000038319307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041108284,0.00013587733,0.00016390439,0.000046714442,0.000079180936,0.000038370443,0.000113399845,0.000039375056,0.000008519144],"category_scores_gemma":[0.000034721437,0.00009170922,0.00004202322,0.00017199399,0.000023566517,0.00009786141,0.000035710054,0.00031803772,5.451418e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003773808,0.00020518269,0.17897283,0.0033492567,0.00093382504,0.44617462,0.04349608,0.0058377837,0.006272126,0.017643236,0.0014062409,0.2956711],"study_design_scores_gemma":[0.00023038752,0.0009874377,0.823859,0.00043097735,0.00009959464,0.08637157,0.0036432818,0.06858616,0.010963929,0.0033677015,0.0008228546,0.0006371239],"about_ca_topic_score_codex":0.0010863477,"about_ca_topic_score_gemma":0.00002011667,"teacher_disagreement_score":0.64488614,"about_ca_system_score_codex":0.00015129772,"about_ca_system_score_gemma":0.000048695627,"threshold_uncertainty_score":0.37397933},"labels":[],"label_agreement":null},{"id":"W4406823746","doi":"10.2749/sanjose.2024.1326","title":"The Framework for a Comprehensive Bridge Management Platform Developed by Kinemetrics","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Bridge (graph theory); Computer science; Systems engineering; Software engineering; Engineering","score_opus":0.03709864353370402,"score_gpt":0.29351095832665647,"score_spread":0.25641231479295246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406823746","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0058899815,0.001926778,0.98864347,0.00013553513,0.00089437416,0.00015852328,0.000009176252,0.0006901204,0.0016520412],"genre_scores_gemma":[0.9804769,0.00047140982,0.017071022,0.00004286666,0.000114154194,0.000074048075,0.00007565433,0.000040686926,0.0016332215],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99938595,0.0000013937123,0.00021365061,0.00012157183,0.00012990221,0.00014752997],"domain_scores_gemma":[0.9996072,0.00013720937,0.00001533813,0.00017111911,0.00003336625,0.00003574766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007401523,0.00009763714,0.00009334475,0.000075402946,0.000069898786,0.000105085084,0.000074806885,0.000043508247,0.000009173929],"category_scores_gemma":[0.00003338868,0.000070793176,0.00007403969,0.0004527054,0.000010688253,0.00004397666,0.000014442239,0.0000924863,0.0000120927525],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010616589,0.00000765364,0.00006399281,0.0009488467,0.0022170777,0.00043229794,0.00026688282,0.10146572,0.00058990857,0.088416345,0.41469562,0.39088503],"study_design_scores_gemma":[0.000051647414,0.000005846094,0.0010942472,0.000034762485,0.000057618756,0.00008525168,0.00005045479,0.26009506,0.0007186294,0.0011996415,0.7364504,0.00015643318],"about_ca_topic_score_codex":0.0000036140175,"about_ca_topic_score_gemma":9.583575e-7,"teacher_disagreement_score":0.97458696,"about_ca_system_score_codex":0.00005881115,"about_ca_system_score_gemma":0.0000072375515,"threshold_uncertainty_score":0.2886862},"labels":[],"label_agreement":null},{"id":"W4406823769","doi":"10.2749/sanjose.2024.0209","title":"Review of the Asset Management, Inspection and Rehabilitation Work Required to Maintain Two Suspension Bridges, Angus L. Macdonald and A. Murray MacKay, in Halifax, Nova Scotia (Canada)","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nova scotia; Nova (rocket); Suspension (topology); Work (physics); Asset (computer security); Asset management; Engineering; Operations research; Business; History; Computer science; Aeronautics; Archaeology; Mechanical engineering; Finance; Computer security; Mathematics","score_opus":0.006205286231582339,"score_gpt":0.24442959537891087,"score_spread":0.23822430914732853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406823769","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9802624,0.009913458,0.00095133786,0.0019360913,0.0022733219,0.0008930554,0.00001028506,0.0001248586,0.0036352167],"genre_scores_gemma":[0.99786615,0.00071955007,0.0011167763,0.00011115572,0.00007647205,0.000008341703,0.000009056131,0.000018967783,0.00007352943],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99911445,0.00002433019,0.00033153483,0.00020625259,0.00017805942,0.00014534418],"domain_scores_gemma":[0.99963164,0.000037540194,0.000040786883,0.0002186546,0.000036195386,0.00003519458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045829537,0.0001081593,0.00016508275,0.0000829347,0.000023054614,0.000021285368,0.000046096622,0.000028180184,0.0000060021653],"category_scores_gemma":[0.00009841662,0.00008853424,0.000026398448,0.0003985302,0.000025282552,0.000074141535,0.00005192994,0.00011699875,6.6219627e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010083461,0.000039898598,0.4516826,0.049317718,0.00029277746,0.0037578247,0.0008044746,0.0067854016,0.014574476,0.009858762,0.35287097,0.10991425],"study_design_scores_gemma":[0.00032345156,0.000045426477,0.90449744,0.034491498,0.000096543146,0.0007385662,0.00034109567,0.00084338506,0.0018947851,0.0008011618,0.055511467,0.00041519845],"about_ca_topic_score_codex":0.009950023,"about_ca_topic_score_gemma":0.034578096,"teacher_disagreement_score":0.45281482,"about_ca_system_score_codex":0.00022180498,"about_ca_system_score_gemma":0.000031761687,"threshold_uncertainty_score":0.9966428},"labels":[],"label_agreement":null},{"id":"W4406823852","doi":"10.2749/sanjose.2024.1013","title":"Maintenance Plan and Durability Design for the New Samuel De Champlain Bridge","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Durability; Bridge (graph theory); Plan (archaeology); Engineering; Computer science; Construction engineering; Architectural engineering; History; Programming language; Archaeology","score_opus":0.030139659762420588,"score_gpt":0.255040192325939,"score_spread":0.2249005325635184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406823852","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014250989,0.00081178354,0.9837787,0.00047352025,0.00019787639,0.00010778291,0.0000044462686,0.00026276291,0.00011214916],"genre_scores_gemma":[0.9956751,0.00006279783,0.003518415,0.000019821253,0.00011042439,0.000016073167,0.0000052424093,0.000013751729,0.0005784126],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996058,0.000004351921,0.00012271474,0.00010569073,0.000048245238,0.00011323077],"domain_scores_gemma":[0.9996592,0.0001439584,0.000008238409,0.00013302246,0.000009483533,0.00004613632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023531987,0.00006734585,0.000074895645,0.000022464083,0.000035754903,0.000047288442,0.00003615546,0.000028104481,0.000013850044],"category_scores_gemma":[0.00008945132,0.00004613325,0.000042848704,0.000082232524,0.000013211127,0.000037664926,0.0000049562104,0.00006069921,0.000001671264],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001707806,0.0000033763617,0.00059976755,0.00043416128,0.00045286713,0.00028212438,0.0010714442,0.81588393,0.0071333144,0.0037803638,0.07327854,0.09706303],"study_design_scores_gemma":[0.000056895216,0.0000067596857,0.011125615,0.000019510757,0.000034219545,0.0006465813,0.00002124986,0.95830333,0.0015505471,0.00093451975,0.027206773,0.00009402286],"about_ca_topic_score_codex":0.000053281325,"about_ca_topic_score_gemma":0.000009305031,"teacher_disagreement_score":0.9814241,"about_ca_system_score_codex":0.000039084676,"about_ca_system_score_gemma":0.000026606549,"threshold_uncertainty_score":0.18812594},"labels":[],"label_agreement":null},{"id":"W4406823878","doi":"10.2749/sanjose.2024.1161","title":"A Reduced-order Modelling Approach for Vibration Mitigation Design of Long-span Suspension Bridges","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Vibration Control and Rheological Fluids","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Span (engineering); Suspension (topology); Vibration; Structural engineering; Computer science; Engineering; Mathematics; Acoustics; Physics","score_opus":0.03303279282623761,"score_gpt":0.2453296755304445,"score_spread":0.21229688270420688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406823878","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01844774,0.0005018738,0.9794814,0.00007923488,0.0002108717,0.00037493417,0.0000023454008,0.0002632155,0.00063836516],"genre_scores_gemma":[0.9456132,0.00004399762,0.05371738,0.000008018903,0.00014019448,0.000055054046,0.00011855731,0.000019927336,0.00028364197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992567,0.000015835303,0.00032109965,0.00017604743,0.00012050179,0.00010985808],"domain_scores_gemma":[0.99966985,0.00006157403,0.000027119388,0.00011668107,0.00009363828,0.00003115581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027774292,0.0000904285,0.00013823691,0.00006042575,0.000034057506,0.000035203506,0.000034991477,0.000091173664,0.000012110369],"category_scores_gemma":[0.000047540754,0.00007554586,0.00005840687,0.00013391278,0.000015611653,0.00016251371,0.0000062477025,0.00006064844,0.0000022707598],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008646915,0.000010074239,0.000018827832,0.00012030064,0.000024543746,0.0000134251095,0.00005057191,0.9307814,0.06633721,0.0008948441,0.0002905624,0.0014495979],"study_design_scores_gemma":[0.00008226121,0.000032800355,0.000113675516,0.000033154534,0.00002319651,0.000068032015,0.000009879986,0.9579215,0.041023966,0.00051927596,0.000084330626,0.00008792155],"about_ca_topic_score_codex":0.0000040723735,"about_ca_topic_score_gemma":3.4096226e-7,"teacher_disagreement_score":0.9271655,"about_ca_system_score_codex":0.000024383242,"about_ca_system_score_gemma":0.00003506175,"threshold_uncertainty_score":0.30806708},"labels":[],"label_agreement":null},{"id":"W4406823889","doi":"10.2749/sanjose.2024.0533","title":"Viaduct Solutions for Unstable Slopes in the Kicking Horse Canyon","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Canyon; Geology; Computer science; Marine engineering; Engineering; Geomorphology","score_opus":0.01677384368300667,"score_gpt":0.23913881843619175,"score_spread":0.2223649747531851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406823889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0721165,0.007226078,0.9059904,0.0016161769,0.0011626882,0.0004416525,0.000018778637,0.0018248665,0.009602851],"genre_scores_gemma":[0.99874336,0.00004457273,0.00053371314,0.000008781732,0.00009597975,0.000056819496,0.000011513479,0.00001664414,0.00048862636],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942,0.000004211148,0.0001716562,0.000110145134,0.00008364447,0.00021034144],"domain_scores_gemma":[0.99973416,0.000050493407,0.0000068159825,0.0001769605,0.000011313999,0.000020265172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042749316,0.000069209374,0.000091418515,0.000080883314,0.000039255578,0.00004450695,0.00007162123,0.00003922689,0.000008367997],"category_scores_gemma":[0.00006460462,0.00005171216,0.00007870956,0.0003394813,0.000007711377,0.000048568803,0.000010052302,0.00012730031,0.000007031324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.2748764e-7,0.0000080782365,0.000024565337,0.00012807635,0.000045181085,0.0003085888,0.00012585356,0.98630786,0.0018393944,0.0015225607,0.0038390884,0.0058504306],"study_design_scores_gemma":[0.00004016574,0.000008070917,0.0002394019,0.00009354351,0.00005460003,0.00025968975,0.0000867869,0.69034046,0.00032241244,0.0004873239,0.30792335,0.000144175],"about_ca_topic_score_codex":0.00011384686,"about_ca_topic_score_gemma":0.000039924565,"teacher_disagreement_score":0.92662686,"about_ca_system_score_codex":0.000042494226,"about_ca_system_score_gemma":0.00001876597,"threshold_uncertainty_score":0.21087606},"labels":[],"label_agreement":null},{"id":"W4406823954","doi":"10.2749/sanjose.2024.0995","title":"Rapid Bridge Replacement of the Highway 400 Overpass in Toronto, Canada","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Arup Group (Canada)","funders":"","keywords":"Bridge (graph theory); Transport engineering; Computer science; Engineering; Medicine","score_opus":0.0053939194027237845,"score_gpt":0.20257831549330355,"score_spread":0.19718439609057975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406823954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8918677,0.012080352,0.0027903817,0.0006622845,0.0072172284,0.0003790664,0.000024954681,0.0007412956,0.08423672],"genre_scores_gemma":[0.9993824,0.000047502035,0.000038829072,0.000013276903,0.00004494962,0.0000067326346,0.000002329982,0.000014565447,0.00044944382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931175,0.000005313484,0.0002496126,0.000113884926,0.0001847192,0.00013475302],"domain_scores_gemma":[0.999633,0.000024105086,0.000014843823,0.000291264,0.000008753816,0.000028026572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001102576,0.00008382284,0.00011136151,0.000013295693,0.000010386498,0.00001095357,0.00008540364,0.00004414145,0.00006642806],"category_scores_gemma":[0.000028408687,0.000061787854,0.000042579057,0.00009393738,0.000006813082,0.00003175992,0.000021813996,0.00012533374,3.1654255e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024174893,0.000046914905,0.0029592752,0.002150487,0.00052534963,0.002356572,0.00041249552,0.7029491,0.023309072,0.021218468,0.21545206,0.028595995],"study_design_scores_gemma":[0.00019500918,0.000026945887,0.16650468,0.00027748224,0.000026686188,0.0005316542,0.000036662088,0.04718579,0.008532368,0.00033221496,0.77598786,0.0003626748],"about_ca_topic_score_codex":0.29512566,"about_ca_topic_score_gemma":0.31513816,"teacher_disagreement_score":0.6557633,"about_ca_system_score_codex":0.0004894596,"about_ca_system_score_gemma":0.00012220054,"threshold_uncertainty_score":0.70956814},"labels":[],"label_agreement":null},{"id":"W4406823979","doi":"10.2749/sanjose.2024.0275","title":"Experimental Investigation of Water Loading for an Inclined Bridge due to Flood Overtopping","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Hydraulic flow and structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Flood myth; Bridge (graph theory); Geotechnical engineering; Environmental science; Geology; Civil engineering; Engineering; Geography","score_opus":0.023297532988223894,"score_gpt":0.2786961858177625,"score_spread":0.2553986528295386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406823979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9892453,0.00009914799,0.0090382425,0.000033516015,0.0005631103,0.00014944212,0.0000042415368,0.00017652434,0.00069047365],"genre_scores_gemma":[0.99836165,3.408111e-7,0.0012573655,0.00002808642,0.0002084113,0.000022345836,0.000045069257,0.000022568534,0.000054159787],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99943733,0.0000041219714,0.0002255094,0.00012993481,0.000083922816,0.00011920581],"domain_scores_gemma":[0.99978536,0.000009306873,0.000008541579,0.0001220797,0.000014551642,0.000060145823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009588951,0.00007458911,0.00011157077,0.00006232389,0.00002182103,0.000025355863,0.000038635113,0.00003998854,0.000014355585],"category_scores_gemma":[0.000013977751,0.00006167928,0.000040182564,0.000048275146,0.0000074717677,0.00008903837,0.000014488513,0.00003798332,0.000003425034],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028276502,0.0000018378722,0.000102072925,0.00011092341,0.000024885027,0.000078400524,0.0019211109,0.0028339433,0.9936,0.00010834112,0.00050458417,0.0007110447],"study_design_scores_gemma":[0.000061967025,0.00003805611,0.0014147753,0.000046810655,0.000008087091,0.00017061709,0.000025639427,0.02472123,0.9707318,0.00022529051,0.0024604185,0.000095288495],"about_ca_topic_score_codex":0.000030829295,"about_ca_topic_score_gemma":0.0000045204033,"teacher_disagreement_score":0.022868207,"about_ca_system_score_codex":0.000036386966,"about_ca_system_score_gemma":0.000013447823,"threshold_uncertainty_score":0.2515208},"labels":[],"label_agreement":null},{"id":"W4406823997","doi":"10.2749/sanjose.2024.0048","title":"Geneva St Ramp: Replacement of Steel Girder Bridge with Post-Tensioned Concrete Structure on Existing Foundations","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Bridge (graph theory); Girder; Structural engineering; Engineering; Forensic engineering","score_opus":0.018763381705344733,"score_gpt":0.2640103880266,"score_spread":0.24524700632125526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406823997","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95347,0.00021276578,0.04250432,0.0001501473,0.0005310532,0.00017263893,0.00006717332,0.0005893613,0.0023025407],"genre_scores_gemma":[0.99711376,0.000007772067,0.001976486,0.000028111026,0.00007941289,0.0000055031865,0.0002167079,0.00003558584,0.0005366363],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990805,0.000008074686,0.0003252755,0.00021244009,0.00024217543,0.00013158495],"domain_scores_gemma":[0.9994373,0.000042640735,0.000049482584,0.0003009353,0.00011618986,0.000053477917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008253731,0.00014684079,0.00018606147,0.00012727526,0.000045459994,0.000047293703,0.000046945857,0.000050846113,0.00019038381],"category_scores_gemma":[0.00005159939,0.00011695596,0.000063768566,0.00027746355,0.000023435507,0.00007421807,0.000010998848,0.00013058116,0.0000056712643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004422677,0.000003713562,0.0005518519,0.0004968075,0.0010008547,0.0004890074,0.00050072925,0.8491693,0.13724366,0.002516974,0.0027706444,0.00521224],"study_design_scores_gemma":[0.0007501093,0.0003620765,0.02580531,0.00064986286,0.00051926257,0.0018513129,0.00038049807,0.8636713,0.071377255,0.00009898161,0.03350257,0.001031483],"about_ca_topic_score_codex":0.00003705055,"about_ca_topic_score_gemma":0.000011159318,"teacher_disagreement_score":0.0658664,"about_ca_system_score_codex":0.0000663125,"about_ca_system_score_gemma":0.000043078275,"threshold_uncertainty_score":0.4769326},"labels":[],"label_agreement":null},{"id":"W4406824079","doi":"10.2749/sanjose.2024.0429","title":"Durability and sustainability in CSA S6:25 Canadian Highway Bridge Design Code – A unified service life design process to cover all structures and materials","year":2024,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Durability; Sustainability; Bridge (graph theory); Cover (algebra); Service life; Process (computing); Engineering; Construction engineering; Service (business); Code (set theory); Architectural engineering; Computer science; Civil engineering; Reliability engineering; Mechanical engineering; Business; Database; Set (abstract data type); Ecology","score_opus":0.02275945095292919,"score_gpt":0.2661472554340161,"score_spread":0.24338780448108688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406824079","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9285438,0.00019203799,0.0692732,0.00096198445,0.00017765447,0.0004991706,0.000035865585,0.00027471487,0.000041552867],"genre_scores_gemma":[0.99893075,0.000011467323,0.000766013,0.00013465271,0.000033303302,0.000036364232,0.00002083261,0.000026907717,0.000039691902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9988357,0.000052156844,0.00036357818,0.00035224395,0.00012353188,0.00027283147],"domain_scores_gemma":[0.999263,0.00007826378,0.000021013171,0.00023346297,0.00009950646,0.00030473748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005045528,0.00019159778,0.0002681152,0.00019862881,0.000036766585,0.00016038926,0.000068743444,0.000103839906,0.000047642872],"category_scores_gemma":[0.00027976438,0.00017825821,0.0000187277,0.000412706,0.000021714011,0.00018160148,0.000016897686,0.00010795449,0.0000021113665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044003435,0.0000060703414,0.0017586078,0.002207228,0.00019297953,0.0006491426,0.0019165878,0.984378,0.00627587,0.00054802536,0.0010570275,0.0009664893],"study_design_scores_gemma":[0.0005235723,0.0000754177,0.48779792,0.00015423517,0.00019876777,0.00069506955,0.00044788144,0.47245347,0.026160523,0.0045321877,0.0056251185,0.0013358583],"about_ca_topic_score_codex":0.015051899,"about_ca_topic_score_gemma":0.0053237467,"teacher_disagreement_score":0.5119245,"about_ca_system_score_codex":0.00027351582,"about_ca_system_score_gemma":0.00030851612,"threshold_uncertainty_score":0.99150693},"labels":[],"label_agreement":null},{"id":"W4411115063","doi":"10.2749/tokyo.2025.3141","title":"Cross-Laminated Timber Shear Walls Coupled with Steel Link Beams and Hold-Down Dampers: An Optimization Case Study","year":2025,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Structural engineering; Damper; Shear wall; Shear (geology); Link (geometry); Materials science; Computer science; Engineering; Composite material","score_opus":0.007731839037686092,"score_gpt":0.26193110146297516,"score_spread":0.25419926242528906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411115063","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8901736,0.0000423036,0.10874119,0.000015512771,0.00009075011,0.00018629587,0.0000017989648,0.00032035954,0.0004281712],"genre_scores_gemma":[0.9952215,0.000008244398,0.003519841,0.000010933996,0.000028614151,0.000011661325,0.000050904182,0.000023723946,0.0011245813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992131,0.000011389531,0.00027752327,0.00023713883,0.00012762233,0.00013325411],"domain_scores_gemma":[0.9994733,0.000017044955,0.000036639336,0.0003025807,0.00010020635,0.00007028373],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013881816,0.00015331124,0.00019485962,0.00012392986,0.00008224363,0.000121089965,0.00004236327,0.00006786125,0.00006724809],"category_scores_gemma":[0.000024683179,0.00013097342,0.00002465332,0.00035785022,0.000027863482,0.00019628166,0.000014800856,0.00011066118,0.0000011277945],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054594457,0.000016837155,0.0044687544,0.000026594405,0.00014692667,0.0016623837,0.00031152254,0.99243945,0.0001666689,0.00000521596,0.000011879931,0.0007383377],"study_design_scores_gemma":[0.00043763037,0.000058110734,0.010314163,0.0000163724,0.00010239821,0.0013701568,0.00074150047,0.9865503,0.00017787305,9.2919294e-7,0.00006650997,0.0001640925],"about_ca_topic_score_codex":0.00021779246,"about_ca_topic_score_gemma":0.000037282516,"teacher_disagreement_score":0.105221346,"about_ca_system_score_codex":0.00004689326,"about_ca_system_score_gemma":0.000021605929,"threshold_uncertainty_score":0.5340941},"labels":[],"label_agreement":null},{"id":"W4411115399","doi":"10.2749/tokyo.2025.0166","title":"Reusability of Structural Steel Beams after Cyclic Plastic Deformation and Strain Aging","year":2025,"lang":"en","type":"article","venue":"Report","topic":"Material Properties and Applications","field":"Materials Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reusability; Materials science; Strain (injury); Deformation (meteorology); Composite material; Structural engineering; Computer science; Engineering; Programming language","score_opus":0.009307213385022736,"score_gpt":0.2559216705855088,"score_spread":0.24661445720048605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411115399","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.998155,0.00002832351,0.0005562892,0.000109015265,0.00017419325,0.00013405042,0.000022594766,0.000023752977,0.0007967687],"genre_scores_gemma":[0.9990486,0.0000015133744,0.00071397313,0.000017433753,0.000020173822,0.000023274199,0.00000830842,0.0000025195714,0.0001641835],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9993631,0.000016304075,0.00030916007,0.0001401199,0.00008296953,0.000088308625],"domain_scores_gemma":[0.99960494,0.000022158232,0.0001013294,0.00021078337,0.000039622188,0.000021193851],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022497925,0.000055094035,0.000102830105,0.00002065309,0.00005522615,0.00003481688,0.000053256917,0.000026314374,0.00013724611],"category_scores_gemma":[0.00008494057,0.000041862175,0.000015729269,0.000050604976,0.00007167138,0.00011014834,0.00006302934,0.000024921559,0.0000034696839],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024367815,0.000010655987,0.012247807,0.00022536903,0.0000042252573,0.0000037360583,0.0001688955,0.00005144577,0.9847052,0.001002719,0.000023424529,0.0015321408],"study_design_scores_gemma":[0.00019361563,0.000028669121,0.7090316,0.000094103445,0.000029934557,0.00007703728,0.00016450409,0.0005980948,0.28353795,0.0048512574,0.0012440545,0.00014921854],"about_ca_topic_score_codex":0.0001229508,"about_ca_topic_score_gemma":0.000011785923,"teacher_disagreement_score":0.7011673,"about_ca_system_score_codex":0.00001902083,"about_ca_system_score_gemma":0.000029524545,"threshold_uncertainty_score":0.170709},"labels":[],"label_agreement":null},{"id":"W4411115628","doi":"10.2749/tokyo.2025.2009","title":"Post-disaster building indoor damage and survivor detection using autonomous path planning and deep learning with unmanned aerial vehicles","year":2025,"lang":"en","type":"article","venue":"Report","topic":"Robotics and Sensor-Based Localization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Motion planning; Computer science; Deep learning; Aeronautics; Path (computing); Real-time computing; Environmental science; Artificial intelligence; Remote sensing; Engineering; Geography; Robot; Computer network","score_opus":0.006584639845233135,"score_gpt":0.2214148194586188,"score_spread":0.21483017961338566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411115628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84706783,0.00013387427,0.15228724,0.000009042273,0.00014684659,0.00009358794,5.586639e-7,0.000121096484,0.00013991789],"genre_scores_gemma":[0.99757797,0.0000068552617,0.0022692184,0.000018350807,0.000053210944,0.0000026345645,0.000008441818,0.000025562833,0.000037766837],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934965,0.000023842847,0.00020548423,0.00018513096,0.000081151535,0.00015474582],"domain_scores_gemma":[0.99973106,0.000033159737,0.000056531593,0.00009193577,0.00004555361,0.00004177143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015337553,0.00012222164,0.00014812252,0.00011233929,0.0001479328,0.00009842753,0.000021078613,0.00007441017,0.00000130194],"category_scores_gemma":[0.00004266392,0.000118455944,0.0000137625775,0.00011945468,0.00002515012,0.000115159004,0.000022985752,0.00012662324,1.5570484e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050726547,0.000007208952,0.06842265,0.00013286638,0.000058582827,0.00024725578,0.0004786856,0.7867828,0.13857518,0.00005365209,0.0000010329998,0.005189357],"study_design_scores_gemma":[0.0003886557,0.000058124195,0.032091323,0.00013863387,0.000048847854,0.00016987686,0.00033704,0.95770556,0.008660687,0.000024265122,0.00018503224,0.00019195642],"about_ca_topic_score_codex":0.00008438624,"about_ca_topic_score_gemma":0.000028664932,"teacher_disagreement_score":0.17092276,"about_ca_system_score_codex":0.000046077763,"about_ca_system_score_gemma":0.000018337561,"threshold_uncertainty_score":0.48304933},"labels":[],"label_agreement":null},{"id":"W4411115657","doi":"10.2749/tokyo.2025.1530","title":"An Application of Machine Learning to the Detailed Design of Bridges","year":2025,"lang":"en","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science","score_opus":0.007892931533014557,"score_gpt":0.24328185232614064,"score_spread":0.23538892079312607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411115657","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0952976,0.00006670715,0.9042416,0.0000349583,0.000030434474,0.000063393265,6.0718924e-7,0.000066830326,0.00019786287],"genre_scores_gemma":[0.9977147,0.0000067611336,0.002122714,0.0000051032584,0.000009016571,0.000008845377,0.0000083540635,0.00000488494,0.000119599914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965775,0.00001003316,0.00017472456,0.00005714496,0.000059814414,0.000040508054],"domain_scores_gemma":[0.99972373,0.00002094743,0.00003133681,0.00017514838,0.0000348684,0.000013963351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013361973,0.00004089323,0.000089112495,0.00005991801,0.00001466788,0.0000037966433,0.000058695914,0.000017345232,0.000007480376],"category_scores_gemma":[0.0000407845,0.0000309229,0.000024836352,0.00022447051,0.000006037297,0.00001964699,0.00000513409,0.000039802482,0.0000011372944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013823624,0.0000014933487,0.002138465,0.000015482028,0.000025114958,4.925378e-7,0.00004289725,0.9422381,0.046352174,0.00009460231,0.000025241412,0.009064563],"study_design_scores_gemma":[0.00002531343,0.000007675776,0.018292965,0.0000057670727,0.000020621754,0.000004095204,0.000027136184,0.9253534,0.05544529,0.000012704978,0.0007743837,0.000030647712],"about_ca_topic_score_codex":0.000051489907,"about_ca_topic_score_gemma":0.000008202519,"teacher_disagreement_score":0.9024171,"about_ca_system_score_codex":0.00001088312,"about_ca_system_score_gemma":0.000006823678,"threshold_uncertainty_score":0.12609993},"labels":[],"label_agreement":null},{"id":"W4415292521","doi":"10.2749/ghent.2025.0409","title":"Rehabilitation of Structures in India and Lessons Learnt","year":2025,"lang":"","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Precast Prestressed Concrete Institute","funders":"","keywords":"Rehabilitation; Work (physics); Government (linguistics); Key (lock)","score_opus":0.005825801767464964,"score_gpt":0.2667894801598646,"score_spread":0.26096367839239965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415292521","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9786397,0.0015817279,0.014512575,0.00045830687,0.0004187408,0.0001521886,0.000005042094,0.00005297337,0.0041787247],"genre_scores_gemma":[0.99754786,0.00012240952,0.0019866955,0.000006415142,0.000014763788,0.000004966243,0.000009011402,0.000009952637,0.00029790582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99890184,0.00002428867,0.0006066254,0.00021313613,0.00012237519,0.00013171347],"domain_scores_gemma":[0.9994503,0.00012801697,0.00009060701,0.00024391331,0.00005107782,0.00003607424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021235395,0.00013735851,0.0003115978,0.00044617994,0.000023962293,0.000019380355,0.00004914539,0.00012532143,0.00004755222],"category_scores_gemma":[0.00040559153,0.00014464327,0.00006971302,0.00063588656,0.00006290397,0.00007727355,0.000026112059,0.00017687921,4.596811e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025891211,0.00002837074,0.102968104,0.0020054565,0.00043899735,0.0001044951,0.002386511,0.71047896,0.013139685,0.06341527,0.0002689584,0.10473928],"study_design_scores_gemma":[0.00023969267,0.000022066839,0.9328472,0.0001678908,0.000068922265,0.0000267599,0.0005167889,0.05919083,0.0033636566,0.0027295912,0.00067976664,0.00014684578],"about_ca_topic_score_codex":0.0001624371,"about_ca_topic_score_gemma":0.000020527428,"teacher_disagreement_score":0.8298791,"about_ca_system_score_codex":0.000075119984,"about_ca_system_score_gemma":0.000055723664,"threshold_uncertainty_score":0.58983815},"labels":[],"label_agreement":null},{"id":"W4415292529","doi":"10.2749/ghent.2025.2111","title":"IABSE TG3.1 final analysis: Comparison between full-scale measurements and numerical simulations of a long-span bridge during a non-synoptic event","year":2025,"lang":"en","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Bridge (graph theory); Storm; Thunderstorm; Aeroelasticity; Wind tunnel; Wind speed; Event (particle physics); Computer simulation","score_opus":0.05288417547493744,"score_gpt":0.359147355373171,"score_spread":0.30626317989823354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415292529","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9478979,0.00014494872,0.051300578,0.000023362974,0.00011601277,0.00022144677,0.000010287491,0.0001984638,0.00008700908],"genre_scores_gemma":[0.99679744,0.0000050136764,0.0030401114,0.0000015972801,0.00006527285,0.000013155532,0.0000333852,0.000014015238,0.000029994],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99854225,0.000021007036,0.0006836259,0.0002614144,0.00027600548,0.00021569895],"domain_scores_gemma":[0.9991141,0.00005183728,0.0001319042,0.0005376054,0.00008194094,0.000082603336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022490771,0.00014286276,0.00044214076,0.00024376142,0.000068981324,0.000015758202,0.00014594739,0.00007838473,0.000005029036],"category_scores_gemma":[0.00005342096,0.00015111815,0.00006888695,0.00058238994,0.000023986637,0.000074802585,0.00009634794,0.0001614779,6.3110457e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007898376,0.00001585605,0.95963466,0.00023647105,0.00034385576,0.000017046827,0.00007460732,0.036907278,0.00061784143,2.8793752e-7,0.000035116627,0.0021090512],"study_design_scores_gemma":[0.00013626357,0.000018749348,0.9158893,0.00010548475,0.00038258804,0.000014018047,0.0000054978723,0.07964626,0.0036616991,0.000015831009,0.000017782746,0.00010650453],"about_ca_topic_score_codex":0.00018191886,"about_ca_topic_score_gemma":0.00003898933,"teacher_disagreement_score":0.048899565,"about_ca_system_score_codex":0.00014866886,"about_ca_system_score_gemma":0.000040064275,"threshold_uncertainty_score":0.61624193},"labels":[],"label_agreement":null},{"id":"W4415292530","doi":"10.2749/ghent.2025.1523","title":"Feasibility Study on Structural Health Monitoring for Cantilevered Highway Sign","year":2025,"lang":"","type":"article","venue":"Report","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Cantilever; Structural health monitoring; Accelerometer; Vibration; Normal mode; Acceleration; Sign (mathematics)","score_opus":0.0716275976464113,"score_gpt":0.40885243436862145,"score_spread":0.33722483672221015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415292530","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9700314,0.0007524816,0.001149147,0.00041037158,0.01815552,0.0075397077,0.00007425,0.0014405927,0.0004465487],"genre_scores_gemma":[0.992752,0.000049364833,0.0047256625,0.000033856886,0.0012351996,0.00041817097,0.00001786717,0.000111274334,0.000656562],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99424124,0.00019378698,0.0022129437,0.00135243,0.0006807794,0.0013188506],"domain_scores_gemma":[0.9963438,0.000416237,0.0005650253,0.001942458,0.00035435215,0.00037811595],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0016504081,0.00077366934,0.0012310713,0.00039137618,0.00071620155,0.00013902274,0.0005213161,0.00033129592,0.000013833218],"category_scores_gemma":[0.0005992598,0.0008050776,0.00029584678,0.0006620977,0.000064110616,0.00019166632,0.00016425145,0.000839115,0.0000033937242],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006885417,0.00035290734,0.8463019,0.0046607926,0.00070009805,0.00044929955,0.0025243443,0.0015498726,0.0006539359,0.000617799,0.0040585995,0.13744192],"study_design_scores_gemma":[0.0011633922,0.0010909379,0.9838269,0.00087602524,0.00008605365,0.00006387674,0.00060346007,0.0008265851,0.008238097,0.0016600629,0.0009465979,0.0006180297],"about_ca_topic_score_codex":0.0018699812,"about_ca_topic_score_gemma":0.000036492827,"teacher_disagreement_score":0.13752498,"about_ca_system_score_codex":0.00395284,"about_ca_system_score_gemma":0.0010246239,"threshold_uncertainty_score":0.99987084},"labels":[],"label_agreement":null},{"id":"W4415292542","doi":"10.2749/ghent.2025.1927","title":"Review on experimental and numerical approaches to the combined effect of carbonation and chloride ingress in reinforced concrete","year":2025,"lang":"en","type":"article","venue":"Report","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Carbonation; Chloride; Durability; Corrosion; Reinforced concrete; Carbonatation","score_opus":0.023995472782675102,"score_gpt":0.2589092952842609,"score_spread":0.23491382250158577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415292542","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9941718,0.0025894234,0.000096714226,0.00023823684,0.00008884628,0.00046359052,5.427623e-7,0.000026929818,0.0023239304],"genre_scores_gemma":[0.99968386,0.000111568785,0.000010736784,0.0000888117,0.0000048274023,0.00005337043,0.0000031143134,0.0000038144149,0.000039925868],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99952173,0.000028625536,0.00021457682,0.00010886092,0.00006813683,0.00005804531],"domain_scores_gemma":[0.9996658,0.000116039606,0.000026329006,0.00015936777,0.0000073010006,0.000025192683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039144707,0.00007024706,0.00019226644,0.0000306931,0.00001350746,0.0000061439114,0.000030932493,0.000024242296,0.000002467081],"category_scores_gemma":[0.00021529259,0.000048770526,0.000019640122,0.000118396805,0.000019151006,0.00001880691,0.000032621814,0.00006290612,2.4939527e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0049201385,0.000043456814,0.25929695,0.040912382,0.00040720173,0.0004857682,0.008261047,0.008981543,0.5303908,0.01818482,0.008718777,0.11939712],"study_design_scores_gemma":[0.0022279317,0.00070525834,0.039372027,0.004343947,0.00007831864,0.000103571365,0.0001419502,0.1448703,0.80139285,0.000020584901,0.0062667322,0.00047655945],"about_ca_topic_score_codex":0.000023958453,"about_ca_topic_score_gemma":7.59646e-7,"teacher_disagreement_score":0.27100202,"about_ca_system_score_codex":0.00002995331,"about_ca_system_score_gemma":0.000007577981,"threshold_uncertainty_score":0.19888043},"labels":[],"label_agreement":null},{"id":"W4415292549","doi":"10.2749/ghent.2025.2326","title":"Serviceability Performance of Port Lands Bridges under Vehicle-Induced Vibrations","year":2025,"lang":"","type":"article","venue":"Report","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Serviceability (structure); Pedestrian; Deck; Vibration; Work (physics); Port (circuit theory)","score_opus":0.012121862251771672,"score_gpt":0.2546512090557651,"score_spread":0.24252934680399343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415292549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9653121,0.00019555917,0.026848018,0.00036559984,0.00079310196,0.00015619538,0.00001017884,0.00018717154,0.006132071],"genre_scores_gemma":[0.99814177,0.00007995012,0.00032717735,0.000042032636,0.00007343647,0.000011479345,0.00005770179,0.000023233048,0.0012432449],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99802715,0.000023317352,0.0010363259,0.00035841684,0.00028750085,0.00026730183],"domain_scores_gemma":[0.99863267,0.000058192087,0.00017867339,0.0007881985,0.0002494209,0.00009284998],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030010057,0.00027052438,0.00048262603,0.0002524265,0.00011253291,0.000042393036,0.00017183581,0.00019806926,0.00022459019],"category_scores_gemma":[0.000065811466,0.00028270634,0.00021467678,0.0009973133,0.00004239667,0.0002365769,0.000056512854,0.0002611978,0.0000098762985],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018473394,0.000057902344,0.101814836,0.0011634412,0.0007075348,0.000027225491,0.0001818966,0.8637159,0.02589926,0.0010372347,0.00011417407,0.0052621127],"study_design_scores_gemma":[0.00019110608,0.000027232858,0.42402953,0.00011263795,0.00019915962,0.000037780897,0.0001388714,0.5306483,0.04410272,0.00004381749,0.0002557808,0.00021307304],"about_ca_topic_score_codex":0.0002598832,"about_ca_topic_score_gemma":0.000039746315,"teacher_disagreement_score":0.33306763,"about_ca_system_score_codex":0.0001572646,"about_ca_system_score_gemma":0.00022027013,"threshold_uncertainty_score":0.9999625},"labels":[],"label_agreement":null},{"id":"W4415292568","doi":"10.2749/ghent.2025.1230","title":"Design and Optimization of Cast Steel Brackets to Connect Supplemental Viscous Damping and Special Moment Resisting Frames","year":2025,"lang":"","type":"article","venue":"Report","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Onex (Canada)","funders":"","keywords":"Bracket; Moment (physics); Connection (principal bundle); Context (archaeology); Finite element method; Damper","score_opus":0.014625016878367545,"score_gpt":0.2652009267483799,"score_spread":0.2505759098700124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415292568","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7757662,0.00060295325,0.22081763,0.0002330709,0.0005642384,0.0006517828,0.000021367003,0.000057637226,0.0012851323],"genre_scores_gemma":[0.9433751,0.000076641074,0.055974107,0.000016324011,0.00021019476,0.00001054698,0.000025040345,0.000028109296,0.00028393074],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978623,0.00006211205,0.00092327246,0.0005297779,0.0003002809,0.00032226424],"domain_scores_gemma":[0.99900585,0.00018929574,0.0002425476,0.000331604,0.00011222071,0.00011845606],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005530283,0.00027965652,0.0005254908,0.00033897924,0.00020034991,0.00014270865,0.00008610802,0.00011151176,0.00021389173],"category_scores_gemma":[0.00034709115,0.00032065745,0.00006270246,0.000448138,0.000061892446,0.00012982359,0.00019909641,0.00015738083,7.2273616e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007979012,0.000020122998,0.012369869,0.0005475383,0.00062932126,0.0003414165,0.0013007579,0.9365409,0.038873482,0.00020418262,0.00033309832,0.008759537],"study_design_scores_gemma":[0.0015199451,0.00029835087,0.049298827,0.001213362,0.0014190617,0.00078530074,0.0022425007,0.7432546,0.19781823,0.00021266485,0.00072630314,0.0012108578],"about_ca_topic_score_codex":0.0002168315,"about_ca_topic_score_gemma":0.000026387197,"teacher_disagreement_score":0.19328628,"about_ca_system_score_codex":0.00021724722,"about_ca_system_score_gemma":0.00007850683,"threshold_uncertainty_score":0.99992454},"labels":[],"label_agreement":null},{"id":"W4415292597","doi":"10.2749/ghent.2025.0905","title":"Passerelle Cents-Neudorf-Weimershof (CNW) – Wind-tunnel tests assisted design","year":2025,"lang":"","type":"article","venue":"Report","topic":"Civil and Structural Engineering Research","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Bridge (graph theory); Pylon; Span (engineering); Lift (data mining); Tower; Pedestrian","score_opus":0.029805684600750976,"score_gpt":0.2859749722105788,"score_spread":0.2561692876098278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415292597","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62549585,0.0168424,0.071619816,0.0024472657,0.020412475,0.0046321433,0.000090565,0.003199231,0.25526026],"genre_scores_gemma":[0.9765542,0.0003783541,0.0018814275,0.000030221529,0.00026406182,0.000035602727,0.0000402915,0.000111438705,0.02070439],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9955054,0.00010010416,0.0012627315,0.00092396996,0.00088598573,0.0013217961],"domain_scores_gemma":[0.9973899,0.00038430098,0.00015440269,0.0013246003,0.00032925434,0.0004175069],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008971891,0.0007089101,0.0008297391,0.00050679524,0.00028985544,0.00022572499,0.0005616645,0.000502431,0.00064377184],"category_scores_gemma":[0.0008175657,0.00073048007,0.00038195605,0.0015580966,0.00011101533,0.00022804433,0.00027016355,0.0010668506,0.00013889524],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003148045,0.00061066507,0.030811973,0.0047020707,0.0049672076,0.019095518,0.0005929807,0.48584482,0.2624153,0.0019767114,0.063210435,0.12545751],"study_design_scores_gemma":[0.0022319069,0.00024277618,0.7581548,0.0015855124,0.0006142787,0.0024080283,0.00018141342,0.11297691,0.022119662,0.0009517034,0.096153885,0.0023791022],"about_ca_topic_score_codex":0.00023530438,"about_ca_topic_score_gemma":0.000033644934,"teacher_disagreement_score":0.72734284,"about_ca_system_score_codex":0.0005722093,"about_ca_system_score_gemma":0.0005128612,"threshold_uncertainty_score":0.99951464},"labels":[],"label_agreement":null},{"id":"W4415292638","doi":"10.2749/ghent.2025.0911","title":"Ferreirinha Bridge – Aerodynamic Optimization and Verification","year":2025,"lang":"","type":"article","venue":"Report","topic":"Aerodynamics and Fluid Dynamics Research","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rowan Williams Davies & Irwin (Canada)","funders":"","keywords":"Bridge (graph theory); Aerodynamics; Span (engineering); Elevation (ballistics); Pedestrian; Process (computing)","score_opus":0.011341922699950609,"score_gpt":0.27832951749643686,"score_spread":0.26698759479648626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415292638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36188444,0.0022138904,0.60126394,0.0006128145,0.0013289833,0.0007445601,0.000031394287,0.00021219492,0.03170779],"genre_scores_gemma":[0.9848237,0.0039025662,0.003372365,0.000022554572,0.00006737029,0.00003841842,0.0002629083,0.000059919996,0.007450178],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99763054,0.000050876923,0.00080442405,0.00067685975,0.00034896113,0.0004883708],"domain_scores_gemma":[0.9985821,0.0000542485,0.00011996218,0.000841073,0.00024933837,0.00015322957],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006999691,0.00032420477,0.00036534437,0.0003567349,0.00022989327,0.0002444437,0.0002052313,0.0003075051,0.00006520511],"category_scores_gemma":[0.00017512737,0.00039397826,0.00009451628,0.0007293973,0.00015871234,0.00021749153,0.000186385,0.00042844773,0.000019864936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003109044,0.00012139802,0.0074667824,0.000724064,0.00032349772,0.000561839,0.00013192913,0.9419667,0.011210786,0.01757111,0.00056018843,0.019330598],"study_design_scores_gemma":[0.00027459013,0.00002033391,0.12338745,0.00010542732,0.000059274127,0.0001969814,0.00001778652,0.87430334,0.00003301966,0.00024653686,0.0010777911,0.00027747967],"about_ca_topic_score_codex":0.00015183406,"about_ca_topic_score_gemma":0.000092577735,"teacher_disagreement_score":0.6229393,"about_ca_system_score_codex":0.0004294966,"about_ca_system_score_gemma":0.00024637725,"threshold_uncertainty_score":0.9998512},"labels":[],"label_agreement":null},{"id":"W7092305781","doi":"10.2749/ghent.2025.0193","title":"Reliability-based Assessment of Existing Concrete Structures in ACI CODE-562-25","year":2025,"lang":"","type":"article","venue":"Report","topic":"Construction Engineering and Safety","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Building code; Reinforced concrete; Durability; Code (set theory)","score_opus":0.017309190935711673,"score_gpt":0.3076984055838727,"score_spread":0.29038921464816103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7092305781","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7785418,0.0005895588,0.15024011,0.00016573693,0.004035055,0.0006006664,0.00006772829,0.0003486521,0.06541072],"genre_scores_gemma":[0.9796429,0.000033582965,0.019665616,0.000014439598,0.0000637118,0.000021640595,0.000025738891,0.000033940374,0.0004984292],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969113,0.000074321295,0.0017069093,0.00053381035,0.0003618585,0.00041179126],"domain_scores_gemma":[0.99824065,0.00027778282,0.00027312778,0.0009023904,0.00021144155,0.000094614865],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010671994,0.0003558586,0.0007348567,0.00040174642,0.000067454384,0.000032869826,0.00018383467,0.000275204,0.00013188971],"category_scores_gemma":[0.00052093674,0.00041191344,0.00021394153,0.00076791836,0.00012897934,0.00008631367,0.00006983295,0.00065626437,9.434629e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002338149,0.000018310404,0.08470545,0.0023103,0.00016447951,0.00035230583,0.00011577552,0.88313216,0.013195639,0.009606646,0.00008206392,0.0062935147],"study_design_scores_gemma":[0.0013726087,0.000050147974,0.28970185,0.0010995964,0.0001359526,0.00015844943,0.00017836083,0.68184924,0.007826131,0.000753723,0.016252872,0.00062104996],"about_ca_topic_score_codex":0.0001572704,"about_ca_topic_score_gemma":0.000018060173,"teacher_disagreement_score":0.20499639,"about_ca_system_score_codex":0.00039577478,"about_ca_system_score_gemma":0.0007513607,"threshold_uncertainty_score":0.9998333},"labels":[],"label_agreement":null}]}