{"meta":{"query_hash":"5b8113af66a9","filters":{"venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition"},"cohort_total":10,"direct_labels_cover":0,"predictions_cover":10,"exported":10,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/5b8113af66a9","api":"https://metacan.xera.ac/api/v1/cohort?venue=SPE%2FICoTA+Coiled+Tubing+Conference+and+Exhibition"},"results":[{"id":"W1971164986","doi":"10.2118/94163-ms","title":"Large Diameter Coiled Tubing Becomes Available Safely Offshore Through a Newly Developed Spoolable Connector: Case Histories and Field Implementation","year":2005,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Offshore Engineering and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Submarine pipeline; North sea; Coiled tubing; Welding; Butt welding; Cable gland; Marine engineering; Computer science; Engineering; Mechanical engineering; Geology; Geotechnical engineering","score_opus":0.021030367368835224,"score_gpt":0.24371588835400212,"score_spread":0.2226855209851669,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971164986","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9791512,0.0020845446,0.014361594,0.0006909985,0.00044320154,0.00029204556,0.000057802125,0.00090228755,0.0020163076],"genre_scores_gemma":[0.99165565,0.0010639251,0.0066620386,0.00009679061,0.000132965,0.000054690856,0.000078040444,0.00004593983,0.00020997459],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984879,0.00002701746,0.0004024421,0.00040477107,0.00015802297,0.00051982765],"domain_scores_gemma":[0.9992861,0.00021190803,0.00006656363,0.00025189857,0.00009463181,0.00008890907],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019908894,0.00035181915,0.00038291575,0.00016624446,0.0002869623,0.00023663777,0.0000978242,0.00020516982,0.0004753],"category_scores_gemma":[0.00010667376,0.000367955,0.000047766283,0.00019984173,0.00007003824,0.00086768484,0.00008467338,0.00030654753,0.000032969263],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000517817,0.00051713194,0.066269115,0.0048121344,0.0015495385,0.0017977111,0.08013244,0.0038996115,0.13882317,0.0786858,0.09413613,0.52885944],"study_design_scores_gemma":[0.013050715,0.0016113492,0.0038228093,0.0022928473,0.0008204135,0.002893086,0.045531724,0.13898157,0.49579725,0.0073425607,0.2809543,0.0069013997],"about_ca_topic_score_codex":0.00019597744,"about_ca_topic_score_gemma":0.0014457196,"teacher_disagreement_score":0.521958,"about_ca_system_score_codex":0.00013701219,"about_ca_system_score_gemma":0.000046078145,"threshold_uncertainty_score":0.9998772},"labels":[],"label_agreement":null},{"id":"W1980188112","doi":"10.2118/89660-ms","title":"High Rate Stimulation Using 2 7/8\" Coiled Tubing Zonal Isolation Straddle Packer","year":2004,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ConocoPhillips (Canada)","funders":"","keywords":"Straddle; Coiled tubing; Petroleum engineering; Well stimulation; Geology; Stimulation; Isolation (microbiology); Operator (biology); Engineering; Marine engineering; Neuroscience; Reservoir engineering; Chemistry; Petroleum; Paleontology; Business; Biology; Bioinformatics","score_opus":0.017584298031385302,"score_gpt":0.21167564659269122,"score_spread":0.19409134856130592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980188112","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76715595,0.00013047233,0.2311304,0.000051625262,0.00050881197,0.00013813088,0.000015413802,0.0004193274,0.0004498339],"genre_scores_gemma":[0.99539346,0.00017170876,0.0037936426,0.00002941305,0.0003110129,0.000010741599,0.00019352986,0.00006284911,0.000033671018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985176,0.00003370853,0.00042028175,0.0003639881,0.00022549058,0.00043897016],"domain_scores_gemma":[0.99941254,0.00006047275,0.00007622328,0.0002033479,0.00010959227,0.0001378189],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023726464,0.00033823066,0.00031665992,0.00020172706,0.00021975492,0.00025034853,0.00008106093,0.00018766303,0.00009234288],"category_scores_gemma":[0.000031324988,0.00038068535,0.00006872753,0.00025303682,0.000050180424,0.00070399913,0.000027725744,0.00029316006,0.0000334732],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019749234,0.000019928277,0.00027813573,0.000106627725,0.00003572916,0.00000875204,0.00044817978,0.85929483,0.13263574,0.003018367,0.000015762304,0.00411817],"study_design_scores_gemma":[0.0016407672,0.00007413057,0.003189996,0.00076982647,0.00007326093,0.000026763755,0.00017491904,0.967657,0.02106649,0.0046268413,0.0000852589,0.00061470707],"about_ca_topic_score_codex":0.00013004847,"about_ca_topic_score_gemma":0.000028780432,"teacher_disagreement_score":0.22823745,"about_ca_system_score_codex":0.00018065442,"about_ca_system_score_gemma":0.000052866835,"threshold_uncertainty_score":0.9998645},"labels":[],"label_agreement":null},{"id":"W1984003475","doi":"10.2118/81708-ms","title":"Re-Completion Techniques on Shallow Gas Wells Using Coiled Tubing Conveyed Fracturing","year":2003,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Casing; Wellbore; Petroleum engineering; Completion (oil and gas wells); Geology; Coiled tubing; Hydraulic fracturing; Drilling; Natural gas field; Well stimulation; Petroleum; Reservoir engineering; Engineering; Natural gas; Paleontology; Mechanical engineering","score_opus":0.021329471763913813,"score_gpt":0.22307421463569518,"score_spread":0.20174474287178137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984003475","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.911697,0.00030269125,0.06970429,0.000072781746,0.00065201847,0.0003982252,0.000012230308,0.0012089302,0.015951864],"genre_scores_gemma":[0.9961477,0.00056094327,0.002759283,0.000100469755,0.00020319216,0.000026122481,0.000053993503,0.00009501366,0.000053270665],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99797386,0.000077824654,0.00048671005,0.00050245394,0.00030834967,0.00065083004],"domain_scores_gemma":[0.9991457,0.00013287901,0.0000927157,0.0003418269,0.000098863464,0.00018799976],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00044790862,0.00046661362,0.00046972994,0.0003010291,0.0002574577,0.00027255525,0.00012837807,0.00025090523,0.00018631516],"category_scores_gemma":[0.000081248836,0.0005150715,0.00010066034,0.00023935022,0.00006595777,0.00039879396,0.000028436158,0.0005069692,0.00004538024],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014189829,0.00020559265,0.0032153013,0.0014023994,0.0003020938,0.0001426786,0.0032450699,0.24176246,0.6970835,0.0129996985,0.0006946705,0.03880467],"study_design_scores_gemma":[0.001308411,0.00020900815,0.0006230893,0.0030041998,0.0001078797,0.00006550544,0.0006633559,0.58522874,0.39976,0.0026422944,0.004898357,0.0014891404],"about_ca_topic_score_codex":0.000062208324,"about_ca_topic_score_gemma":0.000021772023,"teacher_disagreement_score":0.34346628,"about_ca_system_score_codex":0.00018358417,"about_ca_system_score_gemma":0.000037270005,"threshold_uncertainty_score":0.9997301},"labels":[],"label_agreement":null},{"id":"W2002006735","doi":"10.2118/94155-ms","title":"Online Detection of Coiled Tubing Anomalies on a Small Scale for Safe CT Operations","year":2005,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Non-Destructive Testing Techniques","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corrosion; Guard (computer science); Magnetic flux leakage; Pipeline (software); Geology; Circumference; Scale (ratio); Computer science; Materials science; Engineering; Physics; Magnet; Composite material; Electrical engineering; Mechanical engineering; Geometry; Mathematics","score_opus":0.025752879697208884,"score_gpt":0.24555383896364588,"score_spread":0.219800959266437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2002006735","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95251757,0.00008779487,0.04425966,0.000114577386,0.000120795325,0.0004758938,0.00007837934,0.0005113181,0.0018340035],"genre_scores_gemma":[0.92254823,0.00012800352,0.07687554,0.00003732243,0.00016479655,0.000085473956,0.00009784216,0.000041138534,0.000021628515],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988499,0.000037997394,0.00039782387,0.000307132,0.00013077367,0.00027635504],"domain_scores_gemma":[0.9992953,0.00014018647,0.00006857034,0.00022894138,0.00019574058,0.000071265065],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018671721,0.000250625,0.0003089392,0.00021432016,0.00017772136,0.000089861016,0.000105133724,0.000091365604,0.000028010318],"category_scores_gemma":[0.00010867236,0.0002710957,0.00007052556,0.00017072033,0.00009336917,0.00030345307,0.000031631098,0.00020009838,0.0000057824536],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007416852,0.00014118248,0.00082865945,0.0002539952,0.00004071155,0.0000022551776,0.00057894376,0.0017961148,0.9364352,0.0057627494,0.000041237116,0.054044735],"study_design_scores_gemma":[0.001976264,0.00084740337,0.007960077,0.0015846499,0.00012840496,0.000074402866,0.0005319199,0.16519246,0.8023683,0.018132348,0.00029073123,0.00091307843],"about_ca_topic_score_codex":0.000082297265,"about_ca_topic_score_gemma":0.0008364537,"teacher_disagreement_score":0.16339634,"about_ca_system_score_codex":0.00010378004,"about_ca_system_score_gemma":0.000036119167,"threshold_uncertainty_score":0.99997413},"labels":[],"label_agreement":null},{"id":"W2022334076","doi":"10.2118/94179-ms","title":"Case History: Efficient Coiled-Tubing Sand Cleanout in a High-Angle Well Using a Complete Integrated Cleaning System","year":2005,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ConocoPhillips (Canada)","funders":"","keywords":"Wellbore; Coiled tubing; Petroleum engineering; Directional drilling; Drilling; Oil well; Oil production; Engineering; Geology; Geotechnical engineering; Mechanical engineering","score_opus":0.022653977965862993,"score_gpt":0.19569832489298808,"score_spread":0.1730443469271251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022334076","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.955782,0.0007025677,0.039325334,0.000022358174,0.0006558182,0.00028475322,0.000021493515,0.00067535054,0.002530322],"genre_scores_gemma":[0.99772316,0.00006628803,0.0017502689,0.000027169996,0.00023068824,0.000018282575,0.000055730852,0.000086852735,0.000041530588],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99793047,0.00007374802,0.000616705,0.00049892097,0.00023666437,0.00064350327],"domain_scores_gemma":[0.99923486,0.00008928441,0.000101356265,0.00029053932,0.000096473304,0.000187462],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037979946,0.0004432439,0.00055931776,0.00042467067,0.00017536187,0.00018754415,0.00012414265,0.0001956944,0.00007784869],"category_scores_gemma":[0.000026231095,0.0004894095,0.00008317134,0.00031717902,0.000073519914,0.00028772897,0.00005458107,0.0005053412,0.000054936085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048380036,0.000058321537,0.00027592888,0.0005869592,0.000058116733,0.000710936,0.0033544183,0.9416253,0.04390844,0.0020499262,0.00013589072,0.007187366],"study_design_scores_gemma":[0.001240084,0.000045506124,0.000053215303,0.0018096603,0.00005896975,0.0007576154,0.0016724474,0.9905338,0.0021059487,0.000013746579,0.0011392598,0.00056969904],"about_ca_topic_score_codex":0.0006620344,"about_ca_topic_score_gemma":0.00018611248,"teacher_disagreement_score":0.04890853,"about_ca_system_score_codex":0.0011109652,"about_ca_system_score_gemma":0.00006390738,"threshold_uncertainty_score":0.99975574},"labels":[],"label_agreement":null},{"id":"W2022907733","doi":"10.2118/74820-ms","title":"Horizontal Well Cleaning and Evaluation Using Concentric Coiled Tubing: A 3 Well Case Study from Australia","year":2002,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Coiled tubing; Concentric; Completion (oil and gas wells); Petroleum engineering; Directional drilling; Drawdown (hydrology); Wellbore; Drilling; Geology; Oil well; Oil field; Drilling fluid; Geotechnical engineering; Environmental geology; Well drilling; Engineering; Mechanical engineering; Aquifer; Metamorphic petrology","score_opus":0.05948866892249436,"score_gpt":0.26131910454147506,"score_spread":0.2018304356189807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022907733","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9928706,0.00072406884,0.0039442894,0.000015642125,0.00057741615,0.000552664,0.000016815131,0.0003134203,0.0009850555],"genre_scores_gemma":[0.99886894,0.00025833913,0.00042284487,0.000010513957,0.000271783,0.00002281671,0.000043154178,0.00005720549,0.000044412074],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808234,0.00009955328,0.00046234648,0.00053074077,0.00035187358,0.00047311655],"domain_scores_gemma":[0.99923587,0.00010633246,0.000085346284,0.00025305746,0.00011585739,0.00020354775],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034912056,0.0004012376,0.00041097566,0.00016840252,0.0002672312,0.00034138747,0.00008568431,0.00016971586,0.00044999368],"category_scores_gemma":[0.00003194377,0.00044910976,0.000056182653,0.00026523243,0.00006231939,0.0004886802,0.00005210403,0.00037333436,0.00005649859],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025777085,0.0012766141,0.08541922,0.0013513367,0.0016252091,0.006624553,0.06221573,0.43173206,0.2175021,0.00093740434,0.0015524254,0.18950556],"study_design_scores_gemma":[0.0021115355,0.00016059517,0.00081515417,0.000343434,0.00027066786,0.0003872242,0.004250128,0.98884577,0.0019808137,0.00011290518,0.00015032305,0.00057146477],"about_ca_topic_score_codex":0.0010053042,"about_ca_topic_score_gemma":0.00017338237,"teacher_disagreement_score":0.5571137,"about_ca_system_score_codex":0.0001537634,"about_ca_system_score_gemma":0.00001633606,"threshold_uncertainty_score":0.9997961},"labels":[],"label_agreement":null},{"id":"W2065129484","doi":"10.2118/74840-ms","title":"Shallow Gas Pilot for Coiled Tubing Drilling: A Case History","year":2002,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Coiled tubing; Drilling; CTD; Drill; Petroleum engineering; Plan (archaeology); Geology; Engineering; Mechanical engineering; Oceanography; Paleontology","score_opus":0.044253536071010645,"score_gpt":0.19983960248252336,"score_spread":0.1555860664115127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2065129484","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89857477,0.004369169,0.08134542,0.00019525425,0.0019541583,0.0006981629,0.000041249245,0.0015405758,0.011281223],"genre_scores_gemma":[0.9964028,0.001112297,0.0013195508,0.00006467807,0.00038360604,0.00009241217,0.000044152468,0.00009666368,0.0004838137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982985,0.000025506002,0.00043171103,0.0004574382,0.00018790372,0.00059892854],"domain_scores_gemma":[0.9991533,0.0001512633,0.0000650275,0.00029793804,0.00011348331,0.0002189882],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022711941,0.00039888592,0.00041359753,0.00021885705,0.00019982466,0.00013776221,0.00011931283,0.00015896035,0.00028218658],"category_scores_gemma":[0.00006401001,0.00045260435,0.000111439025,0.00013383322,0.00007186074,0.00036435723,0.000030953128,0.00031485414,0.00005589598],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003868319,0.00083515083,0.0014244553,0.006643363,0.0010304847,0.0029685162,0.023985235,0.3309304,0.29234603,0.021678831,0.03483174,0.28293896],"study_design_scores_gemma":[0.0013919703,0.0002180685,0.000026706046,0.0005337361,0.000085388965,0.0004578333,0.00025507627,0.9818665,0.0023104604,0.00047370087,0.011675247,0.0007053139],"about_ca_topic_score_codex":0.00006171303,"about_ca_topic_score_gemma":0.000069514856,"teacher_disagreement_score":0.65093607,"about_ca_system_score_codex":0.00024144472,"about_ca_system_score_gemma":0.000021674268,"threshold_uncertainty_score":0.9997926},"labels":[],"label_agreement":null},{"id":"W2075350984","doi":"10.2118/81730-ms","title":"New Life for Old Wells – A Case Study of the Effects of Re-Stimulating Gas Wells Using Fracturing Through Coiled Tubing and Snubbing Techniques","year":2003,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Hydraulic Fracturing and Reservoir Analysis","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Schlumberger (Canada)","funders":"","keywords":"Coiled tubing; Petroleum engineering; Geology","score_opus":0.018472374569016663,"score_gpt":0.2535104488507613,"score_spread":0.23503807428174464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075350984","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97299016,0.00049539516,0.025068145,0.000033303924,0.00016636903,0.0008152867,0.000003935188,0.000107346255,0.00032004638],"genre_scores_gemma":[0.99607575,0.00018180282,0.0035205137,0.000034284454,0.00008823366,0.00002170753,0.0000030940064,0.000048910424,0.00002568214],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9982329,0.00013625505,0.0006228393,0.0003877748,0.0002545801,0.0003656395],"domain_scores_gemma":[0.9986066,0.0005479323,0.00024333833,0.00036828336,0.00011329643,0.00012054454],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036818313,0.00033467688,0.00061402377,0.00016088382,0.0003171392,0.00010892909,0.000120249,0.00017026442,0.000020384494],"category_scores_gemma":[0.00035942942,0.00028029594,0.0001296429,0.00028803587,0.00007069068,0.0003346243,0.00007499565,0.00030261333,3.2364196e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020543172,0.00060348073,0.024267346,0.01000407,0.001655747,0.00034180356,0.06038649,0.3373671,0.53611475,0.0004671585,0.00024987827,0.028336762],"study_design_scores_gemma":[0.004006774,0.00066984637,0.0006263839,0.005589968,0.0010836229,0.00024643578,0.013610082,0.24827877,0.7233093,0.0014161268,0.00015224455,0.001010465],"about_ca_topic_score_codex":0.0019870142,"about_ca_topic_score_gemma":0.00014430807,"teacher_disagreement_score":0.18719453,"about_ca_system_score_codex":0.000050565133,"about_ca_system_score_gemma":0.000059973274,"threshold_uncertainty_score":0.9999649},"labels":[],"label_agreement":null},{"id":"W2085073224","doi":"10.2118/81718-ms","title":"Inflatable CT Conveyed Selective Well Testing System for Logging Openhole and Horizontal Wellbores: Development and Use","year":2003,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ConocoPhillips (Canada)","funders":"","keywords":"Inflatable; Logging; Petroleum engineering; Completion (oil and gas wells); Geology; Engineering; Mechanical engineering","score_opus":0.019567248023527245,"score_gpt":0.1993742902580684,"score_spread":0.17980704223454116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085073224","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9583816,0.00047028618,0.037475232,0.000006803338,0.00021297614,0.00038872517,0.0000114685145,0.0003232509,0.0027296538],"genre_scores_gemma":[0.9935433,0.0001031172,0.0061191875,0.000009072193,0.000044644905,0.00004882489,0.000029514425,0.0000421623,0.0000601452],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988773,0.000024199624,0.000282397,0.00033950343,0.00009914232,0.00037746225],"domain_scores_gemma":[0.9994322,0.00020437536,0.000047258993,0.00010523591,0.00008136619,0.00012955078],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027373925,0.00026252266,0.00028919338,0.00011415578,0.0002578816,0.0003087571,0.00004294269,0.0000708978,0.0000035617181],"category_scores_gemma":[0.00008331899,0.0002812997,0.000019073694,0.000121644654,0.000041132647,0.00043186685,0.000027812104,0.0001661977,0.0000047004764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038244098,0.00024209717,0.08886608,0.020180995,0.001457426,0.00030646942,0.019914806,0.12368134,0.49978286,0.06126963,0.0013740835,0.18254179],"study_design_scores_gemma":[0.0038124844,0.00025432964,0.0034479664,0.0035228312,0.00015108983,0.00036864655,0.003311932,0.7072947,0.2659396,0.000475436,0.009729444,0.0016915316],"about_ca_topic_score_codex":0.000056813587,"about_ca_topic_score_gemma":0.000024074126,"teacher_disagreement_score":0.5836134,"about_ca_system_score_codex":0.000083421946,"about_ca_system_score_gemma":0.00004622685,"threshold_uncertainty_score":0.99996394},"labels":[],"label_agreement":null},{"id":"W2094008859","doi":"10.2118/89324-ms","title":"Prediction of Critical Foam Velocity for Effective Cuttings Transport in Horizontal Wells","year":2004,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Drilling; Mechanics; Petroleum engineering; Flow (mathematics); Volumetric flow rate; Critical ionization velocity; Drilling fluid; Materials science; Geotechnical engineering; Geology; Physics","score_opus":0.011095618659470577,"score_gpt":0.21111749638362434,"score_spread":0.20002187772415375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094008859","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84058213,0.00010881498,0.15786172,0.00006513456,0.00025909793,0.00031028176,0.000044848086,0.000157897,0.0006101042],"genre_scores_gemma":[0.99850583,0.000091025606,0.001163581,0.0000083876985,0.00009548565,0.00005674239,0.000051081344,0.000024149496,0.0000036884135],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914056,0.000009673017,0.0002760398,0.00021127838,0.00011043919,0.00025199098],"domain_scores_gemma":[0.99967796,0.000085693115,0.000022354727,0.00008644526,0.00006282356,0.00006475477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017848823,0.00016269344,0.00024429456,0.00011878418,0.000047057743,0.000019680194,0.000046340454,0.0001262077,0.0000067629016],"category_scores_gemma":[0.00004195175,0.00018343587,0.000058128673,0.000122040576,0.00006128379,0.00022411681,0.000006249487,0.00017452019,0.0000022334655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049105607,0.0006791842,0.012342262,0.008047389,0.0002301657,0.000059369035,0.014865939,0.33242333,0.4818286,0.053165317,0.00012836742,0.09573903],"study_design_scores_gemma":[0.007624256,0.0012891346,0.05542603,0.004383426,0.00020213365,0.00005324377,0.0011110938,0.53468055,0.3676014,0.026056677,0.00040742784,0.001164608],"about_ca_topic_score_codex":0.00007970328,"about_ca_topic_score_gemma":0.00002763213,"teacher_disagreement_score":0.20225723,"about_ca_system_score_codex":0.00008022801,"about_ca_system_score_gemma":0.000022287095,"threshold_uncertainty_score":0.74802977},"labels":[],"label_agreement":null}]}