{"meta":{"query_hash":"c18bf13e8be7","filters":{"venue":"SPE Economics & Management"},"cohort_total":12,"direct_labels_cover":0,"predictions_cover":12,"exported":12,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/c18bf13e8be7","api":"https://metacan.xera.ac/api/v1/cohort?venue=SPE+Economics+%26+Management"},"results":[{"id":"W2003356598","doi":"10.2118/141104-pa","title":"The Potential Pitfalls of Using North American Tight and Shale Gas Development Techniques in the North African and Middle Eastern Environments","year":2012,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Hydraulic Fracturing and Reservoir Analysis","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Middle East; Shale gas; Oil shale; Unconventional oil; Tight gas; Natural gas; Tight oil; Business; Petroleum engineering; Geology; Natural resource economics; Economy; Hydraulic fracturing; Geography; Economics; Engineering; Paleontology; Archaeology","score_opus":0.00852859800580466,"score_gpt":0.17990128073782677,"score_spread":0.1713726827320221,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003356598","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9976309,0.0002452149,0.0008970705,0.00006317778,0.000037355643,0.00016417445,0.0000020433474,0.000011759527,0.0009483265],"genre_scores_gemma":[0.99659383,0.0013835642,0.00184956,0.000022286371,0.000039283943,0.00001461535,0.0000040580007,0.0000139767035,0.00007882928],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993312,0.000021096175,0.00022557809,0.000122014484,0.00006549361,0.00023461613],"domain_scores_gemma":[0.9996716,0.00001520486,0.0000664752,0.00019894708,0.0000019608187,0.00004585139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019632443,0.00011953685,0.00014260132,0.00007795658,0.00008116797,0.000040296072,0.00016087934,0.000013573582,0.0000030158149],"category_scores_gemma":[9.2820324e-7,0.00008416064,0.00002602612,0.00006819009,0.00008122263,0.00007336733,0.00012217916,0.000071856884,0.000003236854],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028748284,0.00018031265,0.58635366,0.00023032475,0.0009221575,0.000012745356,0.0055532213,0.1330447,0.000036762718,0.00008578023,0.00007238812,0.2734792],"study_design_scores_gemma":[0.00021460943,0.000019010089,0.93423545,0.000024789508,0.00010267576,0.0000043000273,0.001493274,0.031560343,0.00036722605,0.00004126161,0.031628184,0.000308896],"about_ca_topic_score_codex":0.00010705592,"about_ca_topic_score_gemma":0.00077411503,"teacher_disagreement_score":0.34788176,"about_ca_system_score_codex":0.00006764904,"about_ca_system_score_gemma":0.0000027126837,"threshold_uncertainty_score":0.3431971},"labels":[],"label_agreement":null},{"id":"W2057904907","doi":"10.2118/134602-pa","title":"Using the SPE/WPC/AAPG/SPEE/SEG PRMS To Evaluate Unconventional Resources","year":2012,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Hydrocarbon exploration and reservoir analysis","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Unconventional oil; Tight gas; Petroleum; Petroleum engineering; Tight oil; Computer science; Oil shale; Formation evaluation; Operations research; Geology; Engineering; Hydraulic fracturing; Paleontology","score_opus":0.03472686030648385,"score_gpt":0.2612898192672997,"score_spread":0.22656295896081585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057904907","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9006827,0.00031112143,0.014559409,0.0017721207,0.0014071155,0.0005310185,0.000009203827,0.00016366293,0.08056368],"genre_scores_gemma":[0.99277645,0.00025724238,0.0034734253,0.00034531613,0.00059774495,0.000034055232,0.00001693672,0.000045060708,0.0024537537],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989747,0.00003508803,0.00031387393,0.00018619339,0.0001370935,0.00035304317],"domain_scores_gemma":[0.9993886,0.000015395406,0.000050382172,0.0003906114,0.000016856655,0.00013819664],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00056549703,0.00017097857,0.00017211506,0.00017718256,0.00011801405,0.00011736416,0.00027531045,0.000038126072,0.0007178109],"category_scores_gemma":[0.00000476643,0.00014292292,0.00013786506,0.00018627936,0.000025562198,0.00020791983,0.00014399848,0.00009414602,0.00079854764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075237062,0.000029588833,0.0006237635,0.000031138967,0.00046229412,0.0000024746084,0.00062973856,0.9877559,0.00006702148,0.00492921,0.001880917,0.0035804221],"study_design_scores_gemma":[0.0004546152,0.000013608536,0.0033375425,0.000021066126,0.000251576,0.000004623739,0.0012557154,0.59013116,0.00041836163,0.0029945066,0.40065223,0.00046499574],"about_ca_topic_score_codex":0.000020670597,"about_ca_topic_score_gemma":0.000060562765,"teacher_disagreement_score":0.39877132,"about_ca_system_score_codex":0.00021613258,"about_ca_system_score_gemma":0.000006140281,"threshold_uncertainty_score":0.99997944},"labels":[],"label_agreement":null},{"id":"W2068042538","doi":"10.2118/168426-pa","title":"Progressive Land Reclamation as the Design-and-Operational Basis for the Kearl Oil-Sands Mine","year":2015,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Rangeland and Wildlife Management","field":"Environmental Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Imperial Oil (Canada)","funders":"","keywords":"Land reclamation; Oil sands; Overburden; Context (archaeology); Resource (disambiguation); Surface mining; Mining engineering; Environmental science; Environmental planning; Environmental resource management; Geology; Geography; Asphalt; Archaeology; Coal mining","score_opus":0.022365378617196778,"score_gpt":0.23052534646991965,"score_spread":0.20815996785272287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2068042538","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6522585,0.0009418829,0.02728887,0.14153405,0.001490324,0.004997158,0.000033142693,0.0001116762,0.1713444],"genre_scores_gemma":[0.9030344,0.0017675124,0.029576011,0.007944985,0.0008377388,0.0018423704,0.000074010284,0.00006423427,0.054858774],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99933136,0.000032564087,0.00015450279,0.00022310272,0.00009865889,0.00015981308],"domain_scores_gemma":[0.9995707,0.000084731364,0.00007154036,0.00021694985,0.0000063689304,0.000049656945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007109209,0.000106095285,0.00007999762,0.000019023359,0.00021822739,0.00015832215,0.00022085056,0.0000208952,0.00025453087],"category_scores_gemma":[0.000014454066,0.00006222559,0.000034533117,0.00004627655,0.00007944308,0.00013435358,0.00020459396,0.00003722137,0.00021964932],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035688994,0.00020064285,0.020508219,0.000058194786,0.0005411026,0.000011268106,0.0022317136,0.17314827,0.000007621584,0.032264736,0.2712864,0.4993849],"study_design_scores_gemma":[0.0014191429,0.00014748775,0.024987191,0.000017020142,0.00015092734,0.00000621919,0.0007291818,0.09156798,0.00004524438,0.011130884,0.8695131,0.00028561876],"about_ca_topic_score_codex":0.00006184181,"about_ca_topic_score_gemma":0.000040718514,"teacher_disagreement_score":0.59822667,"about_ca_system_score_codex":0.00010167709,"about_ca_system_score_gemma":0.0000060520365,"threshold_uncertainty_score":0.28232208},"labels":[],"label_agreement":null},{"id":"W2076741437","doi":"10.2118/124203-pa","title":"Simulations of Field-Development Planning Help Improve Economics of Heavy-Oil Project","year":2010,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Trajectory; Injector; Software; Field (mathematics); Shell (structure); Net present value; Computer science; Plan (archaeology); Operations research; Engineering; Simulation; Mechanical engineering; Geology; Production (economics); Mathematics; Operating system; Physics","score_opus":0.016797448066215366,"score_gpt":0.26268340900636955,"score_spread":0.2458859609401542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076741437","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9702908,0.000033261913,0.014653015,0.000028082683,0.00084061053,0.00016348714,0.000015747826,0.00007371952,0.01390131],"genre_scores_gemma":[0.88066053,0.00007456663,0.11866574,0.0000108621525,0.00007810298,0.000014862239,0.000018229268,0.000032946693,0.0004441583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909544,0.0000074830004,0.0005065161,0.00016863954,0.00003795805,0.00018396556],"domain_scores_gemma":[0.99940944,0.00009089794,0.00009134323,0.00034417023,0.000022868822,0.00004130766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024253638,0.00014884555,0.00024226918,0.00021737124,0.000028844062,0.00002219631,0.00018996604,0.000075009135,0.000047303005],"category_scores_gemma":[0.000014531875,0.00017622646,0.00006399869,0.00006853062,0.0000151981685,0.00010614536,0.00007098684,0.0001376171,0.0000056915665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000102952035,0.000016891856,0.0004023865,0.0002068609,0.000112343114,3.9404904e-7,0.00021071389,0.973359,0.00057471776,0.001885271,0.000069348825,0.02315178],"study_design_scores_gemma":[0.00059794437,0.00002505815,0.0012409128,0.000031588454,0.000022349048,4.877655e-7,0.000096787975,0.9342126,0.029189408,0.00076744857,0.03353813,0.0002772554],"about_ca_topic_score_codex":0.000010691714,"about_ca_topic_score_gemma":0.000016665454,"teacher_disagreement_score":0.10401273,"about_ca_system_score_codex":0.00005253124,"about_ca_system_score_gemma":0.000023124301,"threshold_uncertainty_score":0.7186306},"labels":[],"label_agreement":null},{"id":"W2147831934","doi":"10.2118/154056-pa","title":"Unconventional-Natural-Gas Business: TSR Benchmark and Recommendations for Prudent Management of Shareholder Value","year":2011,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Global Energy and Sustainability Research","field":"Energy","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Shareholder value; Shareholder; Earnings; Natural gas; Unconventional oil; Business; Profit (economics); Discounted cash flow; Finance; Economics; Economic Value Added; Fossil fuel; Cash flow; Monetary economics; Corporate governance; Microeconomics","score_opus":0.029809456966545127,"score_gpt":0.26770674128135646,"score_spread":0.23789728431481133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147831934","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4613907,0.001122559,0.0024439509,0.012035771,0.0026806274,0.004457626,0.00018105238,0.00017249415,0.5155152],"genre_scores_gemma":[0.94622695,0.0025146948,0.031246005,0.00030497063,0.00009181598,0.00048705295,0.00039820763,0.000048563434,0.018681718],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985864,0.00003828808,0.0004550237,0.0004560784,0.00010365209,0.00036051212],"domain_scores_gemma":[0.9991688,0.000035880457,0.00013238183,0.0004400136,0.00013808178,0.00008480487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042342272,0.00018950069,0.00022815354,0.0001721131,0.00013268874,0.000049205923,0.00032533397,0.000056105717,0.00089194695],"category_scores_gemma":[0.000010789593,0.00020084846,0.000113258735,0.00017174009,0.00007534082,0.00021275286,0.00042217915,0.000072402465,0.000023863846],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010130003,0.00020879654,0.00026761147,0.0005215904,0.00049022073,0.000005693149,0.00011035457,0.0013000045,0.0000011530869,0.9124033,0.0020418607,0.08254811],"study_design_scores_gemma":[0.0022170658,0.00008920296,0.046080597,0.00012987768,0.00020142089,0.0000032019645,0.0024982903,0.0023521564,0.00016249057,0.5789214,0.36687303,0.00047130507],"about_ca_topic_score_codex":0.00054503966,"about_ca_topic_score_gemma":0.0002543616,"teacher_disagreement_score":0.49683347,"about_ca_system_score_codex":0.00021465436,"about_ca_system_score_gemma":0.00002027689,"threshold_uncertainty_score":0.97661936},"labels":[],"label_agreement":null},{"id":"W2277001310","doi":"10.2118/169859-pa","title":"Integrated Economic Model for Evaluation and Optimization of Cyclic-Steam-Stimulation Projects","year":2016,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cenovus Energy (Canada)","funders":"Cenovus Energy; University of Pennsylvania","keywords":"Net present value; Steam injection; Schedule; Scheduling (production processes); Present value; Production (economics); Computer science; Oil field; Petroleum engineering; Engineering; Operations management; Economics","score_opus":0.030348838449507656,"score_gpt":0.27930137948292366,"score_spread":0.24895254103341602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2277001310","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31690836,0.00003218254,0.6814511,0.000031908283,0.00014551074,0.00051002024,0.00001497382,0.000056630866,0.00084931636],"genre_scores_gemma":[0.8020636,0.0003257993,0.19720517,0.0000041241556,0.000034253848,0.00008373908,0.000032688687,0.000030391657,0.00022024428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939823,0.000013772016,0.0002788162,0.00016258836,0.00003449148,0.000112116846],"domain_scores_gemma":[0.9996603,0.000052816973,0.000056157747,0.00016764451,0.00003355774,0.000029515488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042047747,0.00010748181,0.0001374108,0.00015103459,0.000019669882,0.00001828016,0.00006257292,0.00004706969,0.00002110976],"category_scores_gemma":[0.000017060753,0.00009864675,0.000032997046,0.000030211737,0.000012358224,0.00018849029,0.000018976016,0.000019845877,0.0000029865855],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014984968,0.0000041003027,0.000045320758,0.000061504674,0.00004595257,1.8307823e-8,0.000041509593,0.96612245,0.00009517219,0.0020576757,0.00005764084,0.031453684],"study_design_scores_gemma":[0.0012454453,0.000012862185,0.00025340548,0.000023133902,0.000034466975,1.267379e-7,0.00001455939,0.9949911,0.00038189843,0.0026629264,0.0002633495,0.00011668661],"about_ca_topic_score_codex":0.000002211763,"about_ca_topic_score_gemma":0.000003510436,"teacher_disagreement_score":0.48515522,"about_ca_system_score_codex":0.00020922106,"about_ca_system_score_gemma":0.000011873707,"threshold_uncertainty_score":0.40226978},"labels":[],"label_agreement":null},{"id":"W2283733733","doi":"10.2118/174784-pa","title":"Machine Learning as a Reliable Technology for Evaluating Time/Rate Performance of Unconventional Wells","year":2016,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Hydraulic Fracturing and Reservoir Analysis","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Apache (Canada)","funders":"","keywords":"Computer science; Markov chain Monte Carlo; Expression (computer science); Population; Econometrics; Production (economics); Probabilistic logic; Function (biology); Data mining; Artificial intelligence; Machine learning; Bayesian probability; Mathematics","score_opus":0.006531126770680511,"score_gpt":0.21503056139528812,"score_spread":0.2084994346246076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2283733733","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9723369,0.00025782594,0.0052790376,0.00085963024,0.00022737628,0.0003023679,0.000009874427,0.00017716536,0.02054985],"genre_scores_gemma":[0.9742238,0.0010052469,0.004368626,0.000021792974,0.00004616996,0.000046278394,0.000013184886,0.000032047083,0.020242868],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926233,0.000008483097,0.0002853727,0.00018270449,0.000046405767,0.00021470583],"domain_scores_gemma":[0.99961925,0.00003788945,0.00008307501,0.000204663,0.000025588404,0.000029537126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045246223,0.00011480014,0.00019083878,0.00021835678,0.00005928588,0.000012744962,0.00016902277,0.00005255314,0.00043270772],"category_scores_gemma":[0.000015982021,0.00009620379,0.00008669161,0.00008700875,0.000027807773,0.000081741564,0.0000712188,0.000066584915,0.00035292786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024107425,0.00001524306,0.0007347682,0.000192043,0.00035234954,7.589326e-7,0.0000124897215,0.96156085,0.00072581857,0.00084552646,0.00041614939,0.035119902],"study_design_scores_gemma":[0.00080822443,0.00012246301,0.00026117451,0.0001069429,0.000089917216,9.586171e-7,0.00002080348,0.93031037,0.007991318,0.0053008553,0.054787356,0.00019963674],"about_ca_topic_score_codex":0.000009233641,"about_ca_topic_score_gemma":0.0000031725401,"teacher_disagreement_score":0.054371204,"about_ca_system_score_codex":0.00010080384,"about_ca_system_score_gemma":0.000008773446,"threshold_uncertainty_score":0.4737846},"labels":[],"label_agreement":null},{"id":"W2506481049","doi":"10.2118/183642-pa","title":"A Sensitivity Analysis of Cyclic Solvent Stimulation for Post-CHOPS EOR: Application on an Actual Field Case","year":2016,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Suncor Energy Incorporated","keywords":"Profitability index; Petroleum engineering; Enhanced oil recovery; Oil field; Production (economics); Net present value; Petroleum; Environmental science; Oil production; Present value; Dissolution; Engineering; Geology; Economics","score_opus":0.013777442190764879,"score_gpt":0.2733179140934446,"score_spread":0.2595404719026797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2506481049","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54474664,0.00000296082,0.45459363,0.00005800135,0.00006943545,0.00020261756,0.00002881797,0.000049106995,0.00024879817],"genre_scores_gemma":[0.98486847,0.000028849183,0.014856031,0.000028074994,0.000054410208,0.0000374826,0.000044893954,0.000019705421,0.00006206111],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934447,0.00002179508,0.00025818383,0.00019990857,0.00004189038,0.00013375773],"domain_scores_gemma":[0.99923265,0.00026039884,0.000056042696,0.0003718822,0.00002816053,0.000050875246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037125207,0.00011361025,0.00019335155,0.00028831404,0.00002861509,0.000017289642,0.00005787689,0.000050884068,0.000021705013],"category_scores_gemma":[0.000021111458,0.00010600334,0.00011511865,0.00010884851,0.0000067734836,0.00010966629,0.000018219538,0.000031156862,0.000006538879],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032739794,0.00002334158,0.00015999688,0.000032733646,0.00035398934,0.0000029250116,0.00005173497,0.9159454,0.0007988764,0.002375627,0.000020093123,0.08020253],"study_design_scores_gemma":[0.00042273343,0.000058331894,0.005296348,0.0000068126183,0.00020264566,0.0000010877759,0.00003097972,0.9905324,0.0019090254,0.00045511566,0.0009485865,0.00013591762],"about_ca_topic_score_codex":0.000025470437,"about_ca_topic_score_gemma":0.0001092042,"teacher_disagreement_score":0.44012186,"about_ca_system_score_codex":0.00010705825,"about_ca_system_score_gemma":0.0000025142867,"threshold_uncertainty_score":0.43226907},"labels":[],"label_agreement":null},{"id":"W2520222836","doi":"10.2118/184395-pa","title":"Oil- and Gas-Wellsite-Reclamation-Liability Estimation","year":2016,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Environmental Justice and Health Disparities","field":"Social Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"Canadian Association of Petroleum Producers","keywords":"Land reclamation; Liability; Environmental science; Business; Accounting; Geography; Archaeology","score_opus":0.013966397552847617,"score_gpt":0.26660723477071563,"score_spread":0.252640837217868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2520222836","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6737941,0.00016140881,0.0007999716,0.025529379,0.00042488615,0.00013836005,0.000011298292,0.000053727024,0.29908687],"genre_scores_gemma":[0.88452613,0.05995324,0.008717224,0.0015036204,0.00031980543,0.00007478459,0.000012869617,0.000020535612,0.04487179],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993563,0.000035017885,0.00016811189,0.00018563871,0.000060703464,0.00019420714],"domain_scores_gemma":[0.9996525,0.000068084664,0.00006145961,0.0001334883,0.0000050667863,0.00007937455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042639827,0.00006491391,0.00008114682,0.000035244797,0.00025100794,0.000055332363,0.00008646627,0.000035424233,0.00041277084],"category_scores_gemma":[0.0000162783,0.000058319085,0.000019774361,0.000022902377,0.00016527415,0.00029760483,0.0000601206,0.000024099736,0.00030925166],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008607013,0.000035653073,0.003100799,0.00018212524,0.000014637373,5.7686526e-7,0.0012353766,0.00008364396,0.0000029197827,0.34753156,0.00080036157,0.6470037],"study_design_scores_gemma":[0.0013944043,0.00005930958,0.1311367,0.00025779096,0.00013347129,5.910223e-7,0.012611534,0.0026552062,0.00005681403,0.16108842,0.6899558,0.00064997276],"about_ca_topic_score_codex":0.00020262736,"about_ca_topic_score_gemma":0.0009712611,"teacher_disagreement_score":0.6891554,"about_ca_system_score_codex":0.00025572392,"about_ca_system_score_gemma":0.000013000545,"threshold_uncertainty_score":0.4519551},"labels":[],"label_agreement":null},{"id":"W4234458458","doi":"10.2118/167375-pa","title":"Development and Implementation of the AVAILS+ Collaborative Forecasting Tool for Production Assurance in the Kuwait Oil Company, North Kuwait (KOC NK)","year":2014,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Computer science; Production (economics); Asset (computer security); Transparency (behavior); Process management; Operations research; Business","score_opus":0.018977760132439816,"score_gpt":0.24703234346853956,"score_spread":0.22805458333609974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234458458","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.984667,0.00004016723,0.013405015,0.00018824551,0.0003089369,0.00047900376,0.000006747749,0.000022333861,0.0008825356],"genre_scores_gemma":[0.93854165,0.00009730288,0.06097886,0.000022951435,0.00006848471,0.00014648183,0.000012766359,0.000017060896,0.000114445495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927354,0.000036819943,0.0003286905,0.00015320309,0.00006198418,0.00014575788],"domain_scores_gemma":[0.999599,0.00008918769,0.00007860614,0.00019080426,0.000029513038,0.000012886953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007338644,0.00010975656,0.00013347424,0.00006428706,0.00007207596,0.000044787314,0.0001412398,0.000019522482,0.0000033640158],"category_scores_gemma":[0.000023578965,0.00008796975,0.000023753833,0.00013963816,0.000017212245,0.00011212018,0.0000363537,0.00005726449,0.000001051069],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066551997,0.0000067559426,0.0035898315,0.00027477942,0.000044388544,6.803206e-8,0.0014049282,0.91293454,0.000018290415,0.0018575608,0.00021674634,0.07964548],"study_design_scores_gemma":[0.0014652839,0.000028673954,0.2029892,0.00008664581,0.00004059903,0.0000012370642,0.0023908708,0.69705844,0.0025668635,0.000759413,0.09225859,0.0003541905],"about_ca_topic_score_codex":0.0000054159386,"about_ca_topic_score_gemma":0.0004147219,"teacher_disagreement_score":0.21587609,"about_ca_system_score_codex":0.000084365274,"about_ca_system_score_gemma":0.000010890982,"threshold_uncertainty_score":0.35873023},"labels":[],"label_agreement":null},{"id":"W4240681973","doi":"10.2118/156676-pa","title":"Water Use in Canada's Oil-Sands Industry: The Facts","year":2013,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Petroleum Processing and Analysis","field":"Chemistry","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Imperial Oil (Canada)","funders":"","keywords":"Oil sands; Environmental science; Asphalt; Petroleum industry; Steam-assisted gravity drainage; Productivity; Unconventional oil; Groundwater; Hydrology (agriculture); Geology; Fossil fuel; Environmental engineering; Waste management; Geography; Archaeology; Engineering; Geotechnical engineering","score_opus":0.010410211477227503,"score_gpt":0.18447752964491512,"score_spread":0.1740673181676876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240681973","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9055697,0.000020632226,0.0000014010101,0.002234385,0.000060344413,0.000007853744,0.000005530447,0.000013941666,0.09208624],"genre_scores_gemma":[0.9349029,0.00008668446,0.000045094126,0.0005572166,0.000050793624,0.000029848787,0.000022409715,0.0000146431685,0.06429043],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991088,0.000007392046,0.00023611651,0.0002467042,0.00006436141,0.00033662218],"domain_scores_gemma":[0.99947804,0.000016066704,0.000057681125,0.00037133522,0.000011196426,0.00006566929],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000084590465,0.00013802625,0.00015221046,0.000050950086,0.00007011671,0.00021041758,0.0003066261,0.00006271043,0.0018383854],"category_scores_gemma":[0.0000038239405,0.00009523361,0.00004102231,0.00004495622,0.00002060162,0.00015097235,0.00014675721,0.00023887631,0.00013909387],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039117745,0.00024008579,0.18293953,0.00051472377,0.0015363485,0.00013814462,0.00067678967,0.030894618,0.0031933472,0.0014247647,0.04246801,0.7359345],"study_design_scores_gemma":[0.00203719,0.000008388527,0.04958875,0.00015459664,0.00024622638,0.000005535929,0.004699466,0.023187168,0.016267767,0.0018491239,0.9005921,0.001363721],"about_ca_topic_score_codex":0.5551819,"about_ca_topic_score_gemma":0.5752919,"teacher_disagreement_score":0.8581241,"about_ca_system_score_codex":0.0004718404,"about_ca_system_score_gemma":0.00006527066,"threshold_uncertainty_score":0.99907404},"labels":[],"label_agreement":null},{"id":"W4252128798","doi":"10.2118/124490-pa","title":"Oil, Natural-Gas, and NGL Endowment in North, Central, and South America","year":2010,"lang":"en","type":"article","venue":"SPE Economics & Management","topic":"Global Energy and Sustainability Research","field":"Energy","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada; U.S. Geological Survey","keywords":"Endowment; Petroleum; Fossil fuel; Natural gas; Oil production; Petroleum industry; Oil and natural gas; Production (economics); Petroleum engineering; Natural resource economics; Geography; Economics; Geology; Engineering; Political science; Paleontology; Macroeconomics","score_opus":0.00457188751276221,"score_gpt":0.20530293542844263,"score_spread":0.20073104791568042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252128798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9494862,0.00015580811,0.0000026041837,0.0011941071,0.00026365288,0.00010823172,0.0000052319597,0.00002523154,0.048758924],"genre_scores_gemma":[0.9947465,0.0014352422,0.0005987404,0.00026284094,0.000063491636,0.00003057219,0.000017589235,0.00001452905,0.002830486],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987441,0.00003108382,0.00023422104,0.00042341644,0.00006984522,0.00049734244],"domain_scores_gemma":[0.9994421,0.000024955822,0.000046633577,0.00032459767,0.000017296261,0.00014439858],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014709518,0.00016358065,0.00019369333,0.00012144817,0.00008004362,0.00010412597,0.00017556948,0.00005254566,0.00009864659],"category_scores_gemma":[0.000019105544,0.00016607817,0.000034838096,0.00010445535,0.00012149599,0.000120261946,0.0003284806,0.0002503783,0.000023071078],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010311322,0.000115209754,0.018513795,0.00012954115,0.00010634908,0.000062219864,0.0006519793,0.0041657784,0.000017695842,0.36303982,0.00018095922,0.61291355],"study_design_scores_gemma":[0.0031912355,0.0001155706,0.24944735,0.000017504653,0.000047761405,0.00001241886,0.0034691752,0.014373835,0.00009389587,0.040166453,0.68817,0.0008947808],"about_ca_topic_score_codex":0.0017689506,"about_ca_topic_score_gemma":0.016200978,"teacher_disagreement_score":0.68798906,"about_ca_system_score_codex":0.00012307952,"about_ca_system_score_gemma":0.000018489029,"threshold_uncertainty_score":0.9040527},"labels":[],"label_agreement":null}]}