{"meta":{"query_hash":"a247e229a9cd","filters":{"venue":"SPE Offshore Europe Conference and Exhibition"},"cohort_total":7,"direct_labels_cover":0,"predictions_cover":7,"exported":7,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/a247e229a9cd","api":"https://metacan.xera.ac/api/v1/cohort?venue=SPE+Offshore+Europe+Conference+and+Exhibition"},"results":[{"id":"W1457736559","doi":"10.2118/175426-ms","title":"Preparation for Cost Effective Decommissioning and Abandonment of Subsea Pipelines","year":2015,"lang":"en","type":"article","venue":"SPE Offshore Europe Conference and Exhibition","topic":"Marine and Offshore Engineering Studies","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Intecsea (Canada)","funders":"","keywords":"Nuclear decommissioning; Subsea; Pipeline transport; Abandonment (legal); Engineering; Risk analysis (engineering); Environmental science; Business; Marine engineering; Waste management; Environmental engineering","score_opus":0.023121916115229787,"score_gpt":0.26271340009839494,"score_spread":0.23959148398316515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1457736559","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9071774,0.0014926201,0.08120801,0.00013736553,0.00031585537,0.0011707903,0.00002577635,0.0001595437,0.008312645],"genre_scores_gemma":[0.99811727,0.0005467668,0.0010176937,0.000008233881,0.00008911798,0.000070941016,0.00003590141,0.000015801375,0.00009825281],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950755,0.000013669081,0.00015466892,0.00013353956,0.00007522346,0.000115355004],"domain_scores_gemma":[0.99965096,0.000050159557,0.00002704802,0.000074250136,0.00012849408,0.000069110385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014074417,0.000122007805,0.00016888513,0.00005084509,0.000035779816,0.000026144491,0.000029311135,0.00003431119,0.0000043688706],"category_scores_gemma":[0.00007284432,0.00010910967,0.000017760667,0.000059184276,0.00003460857,0.0001057084,0.000030806765,0.00005158091,0.0000015160136],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001279096,0.00022857107,0.05190684,0.0032638854,0.00049296254,0.000022441134,0.017620014,0.02428185,0.050316818,0.024031788,0.042651687,0.7839041],"study_design_scores_gemma":[0.007709143,0.0025985837,0.11339159,0.0014750846,0.00039932248,0.00006419787,0.0016901322,0.5255512,0.16586609,0.0045897057,0.17467149,0.0019934357],"about_ca_topic_score_codex":0.000007026928,"about_ca_topic_score_gemma":0.000020961648,"teacher_disagreement_score":0.7819106,"about_ca_system_score_codex":0.0000124734015,"about_ca_system_score_gemma":0.000009465319,"threshold_uncertainty_score":0.44493634},"labels":[],"label_agreement":null},{"id":"W2175436889","doi":"10.2118/175441-ms","title":"Detailed Approach for the Assessment of Accumulated Wellhead Fatigue","year":2015,"lang":"en","type":"article","venue":"SPE Offshore Europe Conference and Exhibition","topic":"Offshore Engineering and Technologies","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Apache (Canada)","funders":"","keywords":"Subsea; Wellhead; Workover; Reliability engineering; Computer science; Engineering; Marine engineering; Environmental science; Petroleum engineering","score_opus":0.07206925549749503,"score_gpt":0.2794205492184225,"score_spread":0.20735129372092748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2175436889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20542456,0.00069221255,0.7784011,0.00025495604,0.0002991187,0.000558313,0.00002914406,0.0006099182,0.013730715],"genre_scores_gemma":[0.9917121,0.0002576513,0.007809118,0.0000067297938,0.000048014794,0.000032538694,0.000052271076,0.00002325822,0.00005832561],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939245,0.000013424622,0.00017594968,0.00014154485,0.00011461175,0.00016203563],"domain_scores_gemma":[0.9995371,0.00004842642,0.000030153888,0.00020393837,0.00013424165,0.00004615793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001799798,0.00013849378,0.00016670315,0.00006232256,0.000037176258,0.000038786384,0.0001316735,0.000071458504,0.0000059251906],"category_scores_gemma":[0.000042383766,0.00010047179,0.000031945892,0.0001515718,0.00006996197,0.00008680357,0.000033596672,0.0001343459,0.0000018283736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013662799,0.00032916557,0.01777411,0.0017039529,0.000696711,0.000014644705,0.0021779377,0.53483576,0.056724507,0.12956195,0.026847946,0.22919671],"study_design_scores_gemma":[0.0006602429,0.00018053749,0.007963022,0.00007021842,0.000060327257,0.0000068475674,0.0005483136,0.97205186,0.013587337,0.0008285827,0.0037736201,0.00026906974],"about_ca_topic_score_codex":0.0000026335529,"about_ca_topic_score_gemma":0.0000031824277,"teacher_disagreement_score":0.78628755,"about_ca_system_score_codex":0.00001591773,"about_ca_system_score_gemma":0.000024669005,"threshold_uncertainty_score":0.40971208},"labels":[],"label_agreement":null},{"id":"W2222392587","doi":"10.2118/175458-ms","title":"Mission Command Project Management","year":2015,"lang":"en","type":"article","venue":"SPE Offshore Europe Conference and Exhibition","topic":"Outsourcing and Supply Chain Management","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Apache (Canada)","funders":"","keywords":"Command and control; Project management; Delegation; Decentralization; Engineering; Management; Economics; Political science; Law; Telecommunications","score_opus":0.0530617090117156,"score_gpt":0.25049581679845173,"score_spread":0.19743410778673615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2222392587","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.116316505,0.00022829707,0.005869274,0.0064463834,0.00070709066,0.0009244188,0.000004233827,0.00044246292,0.86906135],"genre_scores_gemma":[0.99136835,0.00010771251,0.00036609438,0.0014307763,0.0006187691,0.000010828841,0.00012058064,0.000029334235,0.0059475508],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988352,0.000023093797,0.00021111022,0.0003617131,0.00029952073,0.0002693549],"domain_scores_gemma":[0.9994437,0.000007952816,0.00009712584,0.00023876542,0.0001791162,0.000033340355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039580473,0.00020370634,0.0001736299,0.0002494138,0.0001551195,0.000467239,0.00015436663,0.00004352732,0.000087025386],"category_scores_gemma":[0.000030667645,0.00017506747,0.000034510645,0.00032167078,0.00006209198,0.000548971,0.00028315384,0.00011208265,0.0004004267],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039184332,0.00038704317,0.023219796,0.0011534072,0.00011305661,0.00039484055,0.0011383356,0.00024961153,0.00038353092,0.20637481,0.6388652,0.12732857],"study_design_scores_gemma":[0.0012423957,0.000054087228,0.004055638,0.00024734996,0.000092899456,0.0000068083937,0.0022661667,0.00895843,0.00004797762,0.0053902795,0.97720224,0.00043570672],"about_ca_topic_score_codex":0.00013232873,"about_ca_topic_score_gemma":0.000025034891,"teacher_disagreement_score":0.87505186,"about_ca_system_score_codex":0.000018784083,"about_ca_system_score_gemma":0.000015728521,"threshold_uncertainty_score":0.7139044},"labels":[],"label_agreement":null},{"id":"W2231085720","doi":"10.2118/175450-ms","title":"Spectral Noise Logging Integrated with High-Precision Temperature Logging for a Multi-Well Leak Detection Survey in South Alberta","year":2015,"lang":"en","type":"article","venue":"SPE Offshore Europe Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Petro-Canada","funders":"","keywords":"Annulus (botany); Petroleum engineering; Casing; Coal; Coal mining; Natural gas; Environmental science; Aquifer; Logging; Geology; Mining engineering; Methane; Natural gas field; Engineering; Waste management; Geotechnical engineering; Groundwater","score_opus":0.030343125818713592,"score_gpt":0.22070141732080686,"score_spread":0.19035829150209327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2231085720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8607599,0.000118779324,0.13779612,0.000026827747,0.00033313304,0.00029424333,0.000023806506,0.00020304746,0.00044410588],"genre_scores_gemma":[0.9980577,0.00006541832,0.0013118847,0.000016155287,0.00009922277,0.000014827014,0.00019461168,0.00006160837,0.00017853723],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989478,0.000051043986,0.00023183491,0.000325169,0.00012066121,0.0003234657],"domain_scores_gemma":[0.9994905,0.000056209243,0.000035869463,0.00015435484,0.00013812706,0.00012492799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032744097,0.00026215607,0.0002515358,0.00019343784,0.000053041702,0.00012749573,0.00008115542,0.00011671923,0.0000071814543],"category_scores_gemma":[0.00009218799,0.00022656741,0.000025446285,0.00026354977,0.00003208717,0.00022993059,0.000019062389,0.0003100645,0.000018917595],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011306175,0.00014044277,0.017780077,0.00058116036,0.0001063466,0.00007786078,0.0065639634,0.851664,0.105269335,0.0003789724,0.0007256944,0.015581542],"study_design_scores_gemma":[0.0028698698,0.00036819262,0.017319813,0.00078953017,0.00003619263,0.000028522494,0.0006049993,0.9398587,0.036013514,0.00008952366,0.001216382,0.0008047966],"about_ca_topic_score_codex":0.00042793187,"about_ca_topic_score_gemma":0.005962818,"teacher_disagreement_score":0.1372978,"about_ca_system_score_codex":0.000064796004,"about_ca_system_score_gemma":0.00003310336,"threshold_uncertainty_score":0.9239151},"labels":[],"label_agreement":null},{"id":"W2969545554","doi":"10.2118/195729-ms","title":"Managing Process Safety in a Decommissioning Project","year":2019,"lang":"en","type":"article","venue":"SPE Offshore Europe Conference and Exhibition","topic":"Marine and Offshore Engineering Studies","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Nuclear decommissioning; Engineering; Process (computing); Hazardous waste; Risk analysis (engineering); Operations management; Business; Computer science; Waste management","score_opus":0.011710837225057506,"score_gpt":0.23108422077129195,"score_spread":0.21937338354623445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969545554","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7630891,0.00050423096,0.0032317827,0.00026679272,0.00032382255,0.00044519515,0.000005072347,0.00038857205,0.23174542],"genre_scores_gemma":[0.9981788,0.0010154131,0.00022538236,0.000025517505,0.00005503696,0.0000115932025,0.000020381904,0.000028831162,0.00043907796],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922895,0.000015254972,0.00019633214,0.00021530973,0.00010386216,0.00024025944],"domain_scores_gemma":[0.9997524,0.00002100494,0.000018282375,0.00012769365,0.00004278466,0.00003785024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011772356,0.00017176838,0.00019584374,0.00015614976,0.00003825682,0.000050507984,0.00007798782,0.000042769345,0.00007864349],"category_scores_gemma":[0.00001782567,0.0001614423,0.000020289233,0.0002580548,0.000017855406,0.00018447581,0.00004930616,0.00019433763,0.00004090773],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041300588,0.0002234204,0.26230678,0.0071356315,0.000283539,0.00038228478,0.017759852,0.09801956,0.016257698,0.02777013,0.008198241,0.56124985],"study_design_scores_gemma":[0.00357189,0.0004788363,0.18936615,0.003975022,0.00007706228,0.00010673063,0.004496044,0.69642735,0.006968195,0.004283143,0.08740237,0.00284723],"about_ca_topic_score_codex":0.000014669182,"about_ca_topic_score_gemma":0.00003856245,"teacher_disagreement_score":0.59840775,"about_ca_system_score_codex":0.000021569102,"about_ca_system_score_gemma":0.00001769666,"threshold_uncertainty_score":0.6583426},"labels":[],"label_agreement":null},{"id":"W2969857847","doi":"10.2118/195761-ms","title":"Integrating First Principles-Based Approaches into the Routine Design Practice for Offshore Consequence Analysis and Operational Troubleshooting Assessments","year":2019,"lang":"en","type":"article","venue":"SPE Offshore Europe Conference and Exhibition","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Workflow; Engineering design process; Computational fluid dynamics; Finite element method; Engineering; Systems engineering; Process (computing); Troubleshooting; Computer science; Mechanical engineering; Reliability engineering; Aerospace engineering; Structural engineering","score_opus":0.1713400846678681,"score_gpt":0.3623678721750452,"score_spread":0.19102778750717708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969857847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22524302,0.00018481174,0.7572449,0.012552341,0.000077605335,0.0007927029,0.000026102838,0.000032882323,0.003845667],"genre_scores_gemma":[0.95627856,0.00016626505,0.042432208,0.00041161568,0.00006356806,0.000041234365,0.00011135672,0.000013746767,0.0004814426],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967343,0.0006395144,0.0007386763,0.0008220771,0.0007947375,0.00027068937],"domain_scores_gemma":[0.99503666,0.0029714238,0.00046722303,0.00047695808,0.0009360537,0.000111665584],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0047938605,0.00025624456,0.00046213047,0.0002903567,0.0006733372,0.0010574984,0.0003885338,0.00008504608,0.00013595689],"category_scores_gemma":[0.0028017152,0.00016130171,0.00014412486,0.0012297195,0.00024084188,0.0007874073,0.00012882346,0.00023348766,0.00002697619],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024381778,0.00064334966,0.39509264,0.00018529015,0.0019527646,0.00005749866,0.012758434,0.11598097,0.0042949393,0.21124417,0.0010551806,0.2542966],"study_design_scores_gemma":[0.0006689701,0.00032446242,0.015168593,0.00007235316,0.0005633016,0.0000147714,0.0065929885,0.9681795,0.00083783147,0.0033780127,0.003879221,0.00031997001],"about_ca_topic_score_codex":0.00013210489,"about_ca_topic_score_gemma":0.0005965857,"teacher_disagreement_score":0.85219854,"about_ca_system_score_codex":0.000038973718,"about_ca_system_score_gemma":0.00024418384,"threshold_uncertainty_score":0.9999795},"labels":[],"label_agreement":null},{"id":"W2969869466","doi":"10.2118/195769-ms","title":"Major Accident Hazards – Own Your Barrier","year":2019,"lang":"en","type":"article","venue":"SPE Offshore Europe Conference and Exhibition","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Apache (Canada)","funders":"","keywords":"Hazard analysis; Workgroup; Identification (biology); Hazard; Risk analysis (engineering); Near miss; Engineering; Workforce; Hazardous waste; Occupational safety and health; Forensic engineering; Business; Computer security; Computer science; Waste management; Medicine; Political science","score_opus":0.05332885525482434,"score_gpt":0.32072172508490265,"score_spread":0.2673928698300783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969869466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9157969,0.00022713684,0.002409201,0.0037681456,0.00040725633,0.00019740553,0.00002301477,0.00004893967,0.077122025],"genre_scores_gemma":[0.97750044,0.0006798709,0.00023487935,0.00039771813,0.00014611462,0.0000037214677,0.000023265477,0.000014436433,0.020999536],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99733025,0.00020612273,0.0005218988,0.00067480694,0.00097334536,0.00029355095],"domain_scores_gemma":[0.9983029,0.00013091956,0.00018459908,0.0006350441,0.0005509764,0.00019557572],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0011527754,0.00020062656,0.0003641397,0.00024983846,0.00017524073,0.0005319284,0.0004208107,0.000090228066,0.0067218496],"category_scores_gemma":[0.00045124782,0.00014355373,0.00014025491,0.000602736,0.00009978392,0.00057779776,0.000185485,0.00018739885,0.005321734],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036906006,0.00015050372,0.23887062,0.000025763575,0.00013546279,0.00012765279,0.0037661798,0.00016109977,0.027062362,0.0312659,0.035333816,0.6627316],"study_design_scores_gemma":[0.0015645372,0.00046498756,0.6379087,0.00014555275,0.00016260233,0.00006568851,0.0037080287,0.00830647,0.0051649115,0.07555289,0.26589143,0.0010641705],"about_ca_topic_score_codex":0.000057138313,"about_ca_topic_score_gemma":0.00012051965,"teacher_disagreement_score":0.6616674,"about_ca_system_score_codex":0.000016497845,"about_ca_system_score_gemma":0.00010604974,"threshold_uncertainty_score":0.99545276},"labels":[],"label_agreement":null}]}