{"meta":{"query_hash":"53f36e675aec","filters":{"venue":"The Electricity Journal"},"cohort_total":27,"direct_labels_cover":0,"predictions_cover":27,"exported":27,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/53f36e675aec","api":"https://metacan.xera.ac/api/v1/cohort?venue=The+Electricity+Journal"},"results":[{"id":"W1966350762","doi":"10.1016/j.tej.2014.04.010","title":"Notes from a Small Market: The Energy-only Market in Alberta","year":2014,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Market power; Variety (cybernetics); Investment (military); Factor market; Market microstructure; Industrial organization; Nonmarket forces; Market analysis; Economics; Business; Market share analysis; Market rate; Market economy; Order (exchange); Marketing; Finance; Computer science; Politics; Monopoly; Political science","score_opus":0.00459220662865685,"score_gpt":0.16813772956155898,"score_spread":0.16354552293290214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966350762","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2469497,0.012161361,0.0021923375,0.1964377,0.0018889194,0.000049838207,0.0021351194,0.000108511704,0.53807646],"genre_scores_gemma":[0.85009956,0.005381432,0.0004021194,0.006459098,0.00057829695,0.000009000636,0.0004253717,0.000052809202,0.13659224],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9996873,0.000022937282,0.0000065480067,0.000041333402,0.00012131207,0.0001205348],"domain_scores_gemma":[0.99914217,0.00026515446,0.000066059976,0.000027321326,0.0002464768,0.00025284887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004433089,0.00027709734,0.00041974173,0.00049759774,0.003332593,0.0050965413,0.0009273779,0.0017374461,0.015339198],"category_scores_gemma":[0.001539441,0.00015183193,0.00028164042,0.0012875202,0.002439204,0.0023946227,0.0009589873,0.0029561778,0.0005287187],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041292416,0.0001351245,0.009514053,0.0001600567,0.000052199375,0.0020506317,0.0032775751,0.005971245,0.0008092338,0.56384504,0.37476844,0.03900354],"study_design_scores_gemma":[0.0001579621,0.00009955346,0.042662453,0.0002609663,0.00009235613,0.00035934272,0.025477665,0.009542393,0.0013349813,0.19755875,0.7222467,0.00020683448],"about_ca_topic_score_codex":0.8609018,"about_ca_topic_score_gemma":0.93685174,"teacher_disagreement_score":0.13909823,"about_ca_system_score_codex":0.0124013685,"about_ca_system_score_gemma":0.011883877,"threshold_uncertainty_score":0.27983475},"labels":[],"label_agreement":null},{"id":"W1977381041","doi":"10.1016/j.tej.2012.03.003","title":"Assessing the Economic Value of Transmission in Alberta's Restructured Electricity Market","year":2012,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Economic shortage; Electricity; Clearing; Transmission (telecommunications); Electricity retailing; Business; Economics; Natural resource economics; Environmental economics; Industrial organization; Engineering; Finance; Telecommunications","score_opus":0.00649132535944546,"score_gpt":0.23130224588412063,"score_spread":0.22481092052467516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977381041","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9930837,0.00008088763,0.0003577587,0.00022490011,0.000008465693,0.000015376947,0.00022518211,0.000014187132,0.0059894887],"genre_scores_gemma":[0.99826235,0.000056600533,0.00021544928,0.000015690728,0.0000049794435,0.0000025557408,0.00020342786,0.000004181292,0.0012347688],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99955016,0.00011938486,0.000016749074,0.00003825611,0.00015456592,0.000120811936],"domain_scores_gemma":[0.9980665,0.00091309374,0.00023610545,0.00008182293,0.00045310394,0.00024953668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001067285,0.0004017318,0.0003337659,0.001036687,0.00093821523,0.0030760362,0.0013702961,0.0011468028,0.0024426267],"category_scores_gemma":[0.0038641673,0.00029563,0.00042138709,0.0015060897,0.0011815593,0.0015343861,0.0006919516,0.0012971424,0.00010701056],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001720439,0.000545897,0.11686537,0.000069383364,0.00020261643,0.0022400876,0.00025360507,0.83607525,0.0024871,0.020281123,0.002888927,0.01637016],"study_design_scores_gemma":[0.00020915015,0.00042709784,0.1294096,0.00003376526,0.00018224801,0.00015314802,0.0024665224,0.8550173,0.001973485,0.006420612,0.003597984,0.00010901723],"about_ca_topic_score_codex":0.70894015,"about_ca_topic_score_gemma":0.83043027,"teacher_disagreement_score":0.29105985,"about_ca_system_score_codex":0.013397451,"about_ca_system_score_gemma":0.0052015455,"threshold_uncertainty_score":0.5855479},"labels":[],"label_agreement":null},{"id":"W2030608828","doi":"10.1016/j.tej.2011.09.009","title":"Ontario Feed-in-Tariffs: System Planning Implications and Impacts on Social Welfare","year":2011,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":31,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Welfare; Economics; Social Welfare; Economic surplus; Public economics; Microeconomics; Market economy; Political science","score_opus":0.054299120316087204,"score_gpt":0.29131148939922563,"score_spread":0.23701236908313844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030608828","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5001495,0.0016954604,0.009532536,0.039056927,0.00020263925,0.0006391215,0.010275601,0.00037335022,0.4380749],"genre_scores_gemma":[0.94743764,0.00084645103,0.003925527,0.0006083093,0.00002050623,0.00007650896,0.0007342258,0.000051861647,0.04629899],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99808925,0.0004436588,0.000040000028,0.00010015712,0.000685695,0.0006412419],"domain_scores_gemma":[0.9974132,0.00062937406,0.000121855766,0.00007557052,0.0013645006,0.00039547557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017195916,0.00032572635,0.00043831964,0.0011367974,0.0030304273,0.0044827526,0.0010260717,0.0011416102,0.012220835],"category_scores_gemma":[0.00554938,0.0003549681,0.0008023535,0.0023692844,0.0010751714,0.0011219505,0.000839926,0.00087850646,0.00031135528],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014174667,0.00052363484,0.15159915,0.0009465869,0.00054817856,0.0008787186,0.0049366774,0.10956892,0.0034440584,0.44988704,0.13227527,0.14397426],"study_design_scores_gemma":[0.0007687894,0.00054506934,0.3964005,0.000523285,0.00091334234,0.0002167238,0.017139146,0.1641574,0.0041861464,0.10430298,0.31050462,0.0003419487],"about_ca_topic_score_codex":0.98831683,"about_ca_topic_score_gemma":0.9964616,"teacher_disagreement_score":0.9064291,"about_ca_system_score_codex":0.093570895,"about_ca_system_score_gemma":0.11981061,"threshold_uncertainty_score":0.6789075},"labels":[],"label_agreement":null},{"id":"W2039417394","doi":"10.1016/j.tej.2007.02.005","title":"How Effective Are M&amp;As in Distribution? Evaluating the Government's Policy of Using Mergers and Amalgamations to Drive Efficiencies into Ontario's LDCs","year":2007,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Restructuring; Incentive; Scope (computer science); Government (linguistics); Distribution (mathematics); Industrial organization; Welfare; Economics; Business; Public economics; Microeconomics; Finance; Market economy; Computer science","score_opus":0.025889686582754118,"score_gpt":0.3485487290078418,"score_spread":0.3226590424250877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039417394","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7673209,0.0012911083,0.000792994,0.03732487,0.000131841,0.0004280102,0.0011969913,0.000047899426,0.19146544],"genre_scores_gemma":[0.9935334,0.00034163502,0.00033988702,0.00081144087,0.00003124479,0.00003509567,0.00006663819,0.0000056073654,0.004835158],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98324376,0.007600077,0.00047907262,0.00059165613,0.004647715,0.003437732],"domain_scores_gemma":[0.9367711,0.026386177,0.0077068657,0.0011905152,0.0198661,0.008079245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014225977,0.00046517936,0.0005394596,0.0012097498,0.004046125,0.011250384,0.0016532692,0.0032100591,0.005606627],"category_scores_gemma":[0.06319618,0.00035486982,0.00036576344,0.0021714412,0.004235097,0.005296084,0.0014045688,0.002279954,0.000460393],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0071399026,0.0038572354,0.45770353,0.0016641229,0.00073431304,0.0007289989,0.010168879,0.053099178,0.0033258076,0.20288774,0.06528829,0.19340205],"study_design_scores_gemma":[0.0015705478,0.0036356451,0.70006233,0.0010187409,0.0014060335,0.00014316395,0.048643086,0.04485508,0.006139023,0.023057204,0.16920553,0.0002636334],"about_ca_topic_score_codex":0.87037325,"about_ca_topic_score_gemma":0.9391395,"teacher_disagreement_score":0.89727443,"about_ca_system_score_codex":0.10272557,"about_ca_system_score_gemma":0.079493135,"threshold_uncertainty_score":0.7453297},"labels":[],"label_agreement":null},{"id":"W2079541384","doi":"10.1016/j.tej.2013.12.009","title":"Are Residential Customers Price-Responsive to an Inclining Block Rate? Evidence from British Columbia","year":2014,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Energy Efficiency and Management","field":"Energy","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Block (permutation group theory); Agricultural economics; Price elasticity of demand; Business; Economics; Microeconomics; Mathematics","score_opus":0.017457470181161838,"score_gpt":0.2581131267570665,"score_spread":0.24065565657590465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079541384","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9797234,0.0015656417,0.000065490894,0.0028469118,0.000032706575,0.000027200975,0.0012483504,0.000007937957,0.014482402],"genre_scores_gemma":[0.9936127,0.0010203569,0.000043613363,0.0007584499,0.000017094737,0.000013030302,0.00072324363,0.00000783817,0.0038037424],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9975368,0.0006679975,0.00011924362,0.00025929682,0.0006829184,0.0007336735],"domain_scores_gemma":[0.97255087,0.010738003,0.005546503,0.0012697572,0.007231651,0.002663163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017993709,0.0002585728,0.0005733742,0.0012302903,0.0022489072,0.0028699562,0.00219693,0.0014772754,0.008428521],"category_scores_gemma":[0.013859791,0.0005268734,0.00057447096,0.003868867,0.0016991994,0.00094804575,0.00096166215,0.0023818735,0.00107707],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013016772,0.00042228753,0.97546047,0.00012832349,0.0002804728,0.0007153461,0.0018626949,0.0003644921,0.00022587938,0.0009344257,0.007954128,0.010349692],"study_design_scores_gemma":[0.00007631576,0.000061659855,0.9902534,0.00012329331,0.00020509327,0.000070311326,0.005460609,0.0003870743,0.00008637874,0.00015332545,0.0030878098,0.000034660723],"about_ca_topic_score_codex":0.9653661,"about_ca_topic_score_gemma":0.9815056,"teacher_disagreement_score":0.034633875,"about_ca_system_score_codex":0.012266856,"about_ca_system_score_gemma":0.009223944,"threshold_uncertainty_score":0.08900273},"labels":[],"label_agreement":null},{"id":"W2079593790","doi":"10.1016/j.tej.2007.10.005","title":"Export Demand Response in the Ontario Electricity Market","year":2007,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Mains electricity; Economics; Supply and demand; Mean reversion; Industrial organization; Business; Electricity retailing; Demand shock; Electricity price; Electricity demand; Monetary economics; Market economy; International economics; Commerce; Microeconomics; Electricity generation; Financial economics; Power (physics); Engineering","score_opus":0.007685336472541902,"score_gpt":0.21026686772912245,"score_spread":0.20258153125658054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079593790","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9790791,0.00010879583,0.00022293266,0.0017014157,0.000013451255,0.0000120713175,0.0008770404,0.000021959542,0.017963259],"genre_scores_gemma":[0.992683,0.000069933536,0.000064244676,0.00006545564,0.000007404893,0.0000027283957,0.00037749077,0.000010160874,0.006719509],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99973243,0.00004441538,0.000009545167,0.000029677369,0.00008157499,0.000102349586],"domain_scores_gemma":[0.99874794,0.000398971,0.00017690763,0.00004547213,0.00043479903,0.00019582562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005066784,0.00015932064,0.00041796832,0.00035773715,0.0010435127,0.0017922806,0.00051421963,0.000716737,0.00693833],"category_scores_gemma":[0.0033936002,0.0002003643,0.00028760248,0.00070920185,0.0006485701,0.00077862747,0.0004340126,0.0006347637,0.0004320996],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0053616134,0.0004920414,0.6712079,0.00030009638,0.00022846945,0.0028921883,0.0076840715,0.12443545,0.010454917,0.060704418,0.08280135,0.033437505],"study_design_scores_gemma":[0.00024986174,0.00015874168,0.7856973,0.000028460894,0.0000765025,0.00017676264,0.014075648,0.16558586,0.0014582919,0.006990805,0.025402453,0.00009927313],"about_ca_topic_score_codex":0.8798871,"about_ca_topic_score_gemma":0.9460423,"teacher_disagreement_score":0.120112896,"about_ca_system_score_codex":0.013308507,"about_ca_system_score_gemma":0.004106414,"threshold_uncertainty_score":0.24164051},"labels":[],"label_agreement":null},{"id":"W2086789394","doi":"10.1016/j.tej.2013.03.003","title":"British Columbia Electricity Supply Gap Strategy: A Redefinition of Self-Sufficiency","year":2013,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Mandate; Electricity; Economic shortage; Revenue; Mains electricity; Business; Liquefied natural gas; Natural resource economics; Electricity retailing; Self-sufficiency; Economics; Natural gas; Electricity market; Finance; Power (physics); Waste management; Engineering; Government (linguistics)","score_opus":0.016357294977839117,"score_gpt":0.2451533510476377,"score_spread":0.22879605606979858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2086789394","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11940372,0.005573563,0.02532358,0.19813506,0.0008063131,0.00027957855,0.0005434859,0.00039043112,0.6495443],"genre_scores_gemma":[0.94615376,0.0014925406,0.005768636,0.015856754,0.00020524731,0.00014993091,0.00014841808,0.000102304475,0.030122321],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9946819,0.0012005059,0.00020966817,0.00037116345,0.00230779,0.0012289898],"domain_scores_gemma":[0.9896422,0.003061933,0.0005602967,0.0006590944,0.0045690225,0.0015074941],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01075964,0.0005736743,0.00072002923,0.003573892,0.0034925104,0.009854992,0.0022419293,0.0041092853,0.0063733743],"category_scores_gemma":[0.020704642,0.00031696318,0.0005154322,0.0023163038,0.0059735845,0.0037897183,0.006163787,0.0043344335,0.00045422977],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004071802,0.000057263514,0.003358276,0.00015344794,0.000030552543,0.00013728082,0.0015910713,0.0015388415,0.00042581526,0.9112264,0.03261943,0.048820898],"study_design_scores_gemma":[0.000089289235,0.00014668345,0.014547983,0.0019003289,0.000117573596,0.00035039152,0.007270564,0.010215921,0.0019995528,0.52419955,0.4390435,0.000118666394],"about_ca_topic_score_codex":0.18544495,"about_ca_topic_score_gemma":0.3365137,"teacher_disagreement_score":0.81455505,"about_ca_system_score_codex":0.02140078,"about_ca_system_score_gemma":0.0715571,"threshold_uncertainty_score":0.36873108},"labels":[],"label_agreement":null},{"id":"W2553061511","doi":"10.1016/j.tej.2016.10.012","title":"KWh effects of residential optional dynamic pricing: Winter evidence from British Columbia, Canada","year":2016,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Housing Market and Economics","field":"Economics, Econometrics and Finance","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Education University of Hong Kong","keywords":"Environmental science; Economics","score_opus":0.008945166370225435,"score_gpt":0.18265789525173565,"score_spread":0.1737127288815102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2553061511","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9857819,0.0008223058,0.00014550581,0.0014810436,0.0000205025,0.000014992699,0.0025216453,0.000019624016,0.009192545],"genre_scores_gemma":[0.9934149,0.00046415857,0.00006451511,0.000096760305,0.0000084278045,0.000003883023,0.0013481288,0.000015281012,0.0045839627],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989655,0.00012517745,0.00004305097,0.000111683505,0.00035140343,0.00040310668],"domain_scores_gemma":[0.9931665,0.0014069754,0.00077329687,0.00039035216,0.0032797628,0.0009830322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010142868,0.00026129693,0.00065759727,0.00087595836,0.00227688,0.002462249,0.0015856103,0.0006701368,0.0052891006],"category_scores_gemma":[0.0058862143,0.0002945488,0.00040358136,0.0036241862,0.0014624178,0.00074834883,0.0007210177,0.0012839901,0.0004793169],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015839243,0.00055193465,0.9077624,0.00013438777,0.0003579022,0.0007917843,0.0032545829,0.00711442,0.0011723489,0.0053093666,0.032925583,0.03904131],"study_design_scores_gemma":[0.0000517385,0.000036132213,0.98635453,0.000054076936,0.00011223226,0.00003869938,0.0041418676,0.0027098644,0.00019410072,0.00050903176,0.005755121,0.000042664546],"about_ca_topic_score_codex":0.99523324,"about_ca_topic_score_gemma":0.99802256,"teacher_disagreement_score":0.02542479,"about_ca_system_score_codex":0.02542479,"about_ca_system_score_gemma":0.01531624,"threshold_uncertainty_score":0.18447065},"labels":[],"label_agreement":null},{"id":"W2603591328","doi":"10.1016/j.tej.2017.03.002","title":"Ontario electricity: When prophecy failed but rent collection succeeded","year":2017,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic rent; Electricity; Restructuring; Electricity market; Economics; Electricity retailing; Market economy; Business; Natural resource economics; Engineering; Finance","score_opus":0.02824680165880255,"score_gpt":0.27953011414932605,"score_spread":0.2512833124905235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2603591328","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24107873,0.0019226517,0.000871809,0.29474568,0.001197195,0.00008615087,0.00083697174,0.000115322415,0.4591455],"genre_scores_gemma":[0.8670995,0.00062483276,0.0003431466,0.009885667,0.00014243345,0.000026377633,0.00013648778,0.00009210405,0.12164943],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99516404,0.0004482893,0.00007812352,0.00022598721,0.0016584396,0.0024249987],"domain_scores_gemma":[0.99595356,0.0005512638,0.00020717937,0.00014793765,0.0016886804,0.0014514251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023896578,0.00020208338,0.00032652853,0.0007109074,0.02020192,0.010145513,0.0012140521,0.0054576593,0.012923885],"category_scores_gemma":[0.008555989,0.00037701687,0.00044683152,0.0013425158,0.0075868606,0.0029955378,0.0026161068,0.005293864,0.0005937474],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026741409,0.0000644105,0.027899124,0.00012970036,0.00007656534,0.002090778,0.025722602,0.0012466421,0.0011078696,0.52439195,0.3914392,0.025563741],"study_design_scores_gemma":[0.00005600294,0.00003899797,0.05933839,0.00013697887,0.00004547903,0.00017866776,0.03848869,0.0010451403,0.0006575447,0.030171102,0.8697083,0.00013482383],"about_ca_topic_score_codex":0.98232657,"about_ca_topic_score_gemma":0.99483705,"teacher_disagreement_score":0.8667356,"about_ca_system_score_codex":0.13326445,"about_ca_system_score_gemma":0.17612952,"threshold_uncertainty_score":0.96690583},"labels":[],"label_agreement":null},{"id":"W2606814356","doi":"10.1016/j.tej.2017.01.011","title":"Modeling the value of integrated U.S. and Canadian power sector expansion","year":2017,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Electricity; Environmental economics; Electric power system; Flexibility (engineering); Variable renewable energy; Electric power transmission; Grid; Transmission system; Business; Software deployment; Transmission (telecommunications); Industrial organization; Economics; Natural resource economics; Telecommunications; Power (physics); Engineering; Electrical engineering","score_opus":0.008719455630106055,"score_gpt":0.1977402026130146,"score_spread":0.18902074698290852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2606814356","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8607484,0.0015628133,0.009686942,0.006623723,0.00020302057,0.00008693112,0.0051376214,0.00017563885,0.11577475],"genre_scores_gemma":[0.99044013,0.00036823985,0.0012227851,0.00009538148,0.00001338445,0.000015445685,0.0004377592,0.000027594058,0.0073793717],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947566,0.000117823496,0.000013250922,0.000070796945,0.000093771945,0.00022878309],"domain_scores_gemma":[0.99887913,0.00038499103,0.000080262325,0.000043533913,0.00041813703,0.00019388349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001006895,0.0006780645,0.00055810745,0.0007408797,0.0012107124,0.0030435347,0.0018261881,0.0017001639,0.006404992],"category_scores_gemma":[0.004002359,0.00054882886,0.0007714909,0.0015064247,0.0008850115,0.0015938925,0.0008643068,0.0018423551,0.000261517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008505667,0.000033906625,0.0032505535,0.0000243813,0.000035482804,0.000070834874,0.00003779878,0.9734765,0.00017629666,0.017644005,0.002184906,0.0029802143],"study_design_scores_gemma":[0.000037128575,0.000032938988,0.0033152027,0.000022593533,0.000060375278,0.000017219576,0.00027610606,0.98547214,0.00022958449,0.0070249336,0.0034846673,0.000027076841],"about_ca_topic_score_codex":0.9100493,"about_ca_topic_score_gemma":0.9246013,"teacher_disagreement_score":0.08995068,"about_ca_system_score_codex":0.026454015,"about_ca_system_score_gemma":0.019092282,"threshold_uncertainty_score":0.19193822},"labels":[],"label_agreement":null},{"id":"W2612902751","doi":"10.1016/j.tej.2017.03.011","title":"An integrated reconfigurable control and self-organizing communication framework for community resilience microgrids","year":2017,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Resilience (materials science); Control (management); Electricity; Microgrid; Computer science; Mains electricity; Risk analysis (engineering); Distributed computing; Computer security; Telecommunications; Business; Engineering; Electrical engineering","score_opus":0.009136105385163686,"score_gpt":0.23715473382326813,"score_spread":0.22801862843810444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612902751","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09556563,0.00024623662,0.8899291,0.00027369685,0.0001319987,0.00008848791,0.00007436471,0.002446433,0.011243959],"genre_scores_gemma":[0.95979846,0.00006048911,0.037758272,0.00004677014,0.000027612652,0.00006147737,0.00004507476,0.000044831857,0.0021569857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998167,0.000032258333,0.000007961883,0.000048898662,0.00004439156,0.000049850973],"domain_scores_gemma":[0.99986064,0.000026957421,0.000017916442,0.000035831432,0.000031866704,0.00002680719],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024184723,0.0003950917,0.00044739558,0.00025863768,0.00046199083,0.0006642428,0.0013674684,0.00041564295,0.002222046],"category_scores_gemma":[0.00037000896,0.00014800209,0.00033816652,0.00020457419,0.00042269178,0.0006481721,0.0010661163,0.0005110304,0.00033194508],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018561454,0.00014005629,0.0004879274,0.00006107122,0.000058445876,0.0002112767,0.00012067068,0.86811477,0.025460325,0.024631662,0.0022807007,0.0782475],"study_design_scores_gemma":[0.000012834675,0.000058078193,0.00010747962,0.0000033512108,0.000010714297,0.000029855177,0.000021911635,0.99226344,0.002216388,0.0039604525,0.0013069962,0.000008456966],"about_ca_topic_score_codex":0.0022957525,"about_ca_topic_score_gemma":0.0033161729,"teacher_disagreement_score":0.0022957525,"about_ca_system_score_codex":0.00036629208,"about_ca_system_score_gemma":0.00053215347,"threshold_uncertainty_score":0.0074334145},"labels":[],"label_agreement":null},{"id":"W2790046275","doi":"10.1016/j.tej.2018.01.007","title":"A framework for assessing economic and environmental benefits from transmission line rehabilitation investments","year":2018,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Rehabilitation; Business; Line (geometry); Electric power transmission; Transmission (telecommunications); Environmental economics; Natural resource economics; Industrial organization; Economics; Environmental planning; Risk analysis (engineering); Engineering; Environmental science; Telecommunications; Electrical engineering; Medicine","score_opus":0.0077723794714398995,"score_gpt":0.23425706224316684,"score_spread":0.22648468277172693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2790046275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.075424165,0.0015340802,0.79459983,0.0043704733,0.00018720086,0.0007350146,0.0014919952,0.0004007471,0.12125643],"genre_scores_gemma":[0.8087804,0.001417202,0.17387392,0.00023799,0.00013094225,0.0008002882,0.0004622065,0.00009837172,0.0141986925],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965689,0.0015454682,0.00017045159,0.0003683528,0.00081966876,0.0005270222],"domain_scores_gemma":[0.997274,0.0013649804,0.0004057262,0.00015773873,0.00055497675,0.00024256147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005722395,0.0020808873,0.0014320585,0.005995804,0.0011445011,0.009445761,0.0032210953,0.0037569215,0.008324772],"category_scores_gemma":[0.00724794,0.0007157271,0.0016729987,0.0041739293,0.0037185433,0.0066149035,0.0030850617,0.0031146782,0.0006368109],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039382463,0.00023769923,0.0018591767,0.00015497727,0.00012961129,0.0002187976,0.00017992995,0.23893411,0.0008287251,0.736951,0.0022334761,0.018232992],"study_design_scores_gemma":[0.00005287513,0.0002476914,0.0024509316,0.00022495334,0.00015214428,0.0001411147,0.0008447356,0.31841233,0.0008084481,0.6633015,0.01325618,0.00010704442],"about_ca_topic_score_codex":0.013419724,"about_ca_topic_score_gemma":0.017535308,"teacher_disagreement_score":0.013419724,"about_ca_system_score_codex":0.00574966,"about_ca_system_score_gemma":0.004911165,"threshold_uncertainty_score":0.041716874},"labels":[],"label_agreement":null},{"id":"W2904333925","doi":"10.1016/j.tej.2018.11.005","title":"Including electricity imports in California’s cap-and-trade program: A case study of a border carbon adjustment in practice","year":2018,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Energy, Environment, and Transportation Policies","field":"Energy","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia; Pacific Institute for Climate Solutions; Department of Water Resources","keywords":"Opposition (politics); Electricity; Obligation; Emissions trading; Economics; Politics; International economics; International trade; Business; Political science; Engineering; Greenhouse gas; Law","score_opus":0.019193257220685614,"score_gpt":0.3124294453023512,"score_spread":0.2932361880816656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2904333925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92016816,0.00014547839,0.0009646483,0.0024924665,0.000028170525,0.00011790112,0.00012393035,0.00006411151,0.07589511],"genre_scores_gemma":[0.99215186,0.000093391056,0.0009735377,0.00028223073,0.000013748983,0.000037719867,0.000084682135,0.000020357153,0.006342523],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9979741,0.0007172397,0.00007330573,0.00025701598,0.00035838375,0.00062004593],"domain_scores_gemma":[0.99419194,0.0030900375,0.00067233655,0.0005456977,0.0006518083,0.0008480995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021803176,0.000283345,0.00033939723,0.00074933574,0.0060140337,0.005474924,0.001366367,0.0036164154,0.0070304153],"category_scores_gemma":[0.008404532,0.00036832935,0.00042403166,0.0021999856,0.0022809196,0.0021089853,0.0019350447,0.0035321368,0.00027748596],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010781528,0.006357848,0.42918596,0.00046237576,0.00026164457,0.01803214,0.04387795,0.088707276,0.003278216,0.21664113,0.031548385,0.16056886],"study_design_scores_gemma":[0.0009935593,0.0027027852,0.394727,0.0007955788,0.00062296336,0.0026287085,0.1925707,0.10176746,0.004440144,0.038896255,0.25950167,0.00035312283],"about_ca_topic_score_codex":0.22052461,"about_ca_topic_score_gemma":0.35734317,"teacher_disagreement_score":0.22052461,"about_ca_system_score_codex":0.007141261,"about_ca_system_score_gemma":0.010845584,"threshold_uncertainty_score":0.43848205},"labels":[],"label_agreement":null},{"id":"W3087617280","doi":"10.1016/j.tej.2020.106848","title":"Rising market concentration in Texas’s retail electricity market","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Expansive; Competition (biology); Electricity retailing; Retail market; Electricity market; Market concentration; Market power; Electricity; Business; Market economy; Commerce; Market structure; Wholesale market; Industrial organization; Economics; Marketing; Monopoly; Engineering","score_opus":0.010654029213831219,"score_gpt":0.1967203963961414,"score_spread":0.18606636718231018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3087617280","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9639564,0.00020713593,0.00028474323,0.0061620376,0.000049007052,0.0000075296657,0.0001826968,0.00003072146,0.029119745],"genre_scores_gemma":[0.99717355,0.00006423608,0.00005588815,0.00019731327,0.000069626665,0.0000017653359,0.000055431123,0.0000068550044,0.0023752816],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99975556,0.00003801199,0.000007736049,0.000047713376,0.00006280748,0.000088142995],"domain_scores_gemma":[0.9982821,0.0004420046,0.00043871233,0.000059946484,0.00039548124,0.0003817285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047648384,0.000115995295,0.00025185297,0.00086684205,0.0014438027,0.0041319565,0.0005905449,0.00097135303,0.010242031],"category_scores_gemma":[0.0022412594,0.0001716987,0.0002072004,0.0010592847,0.0011946838,0.002320644,0.0011120181,0.0012509753,0.0006217263],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017383728,0.0008660277,0.5403767,0.00013311436,0.00014938929,0.005497895,0.0059340503,0.026335912,0.0070535885,0.21970068,0.1172652,0.07494899],"study_design_scores_gemma":[0.0002370216,0.000534196,0.7670443,0.0001094398,0.00009904937,0.0009166966,0.02662836,0.08876114,0.0041473294,0.03158953,0.0798113,0.000121696816],"about_ca_topic_score_codex":0.024260212,"about_ca_topic_score_gemma":0.054764707,"teacher_disagreement_score":0.024260212,"about_ca_system_score_codex":0.0038758456,"about_ca_system_score_gemma":0.0011343571,"threshold_uncertainty_score":0.04823804},"labels":[],"label_agreement":null},{"id":"W3110236022","doi":"10.1016/j.tej.2020.106878","title":"High electrification futures: Impacts to the U.S. bulk power system","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Renewable Energy Laboratory; Pacific Northwest National Laboratory; Office of Energy Efficiency; U.S. Department of Energy; Office of Energy Efficiency and Renewable Energy; Environmental Defense Fund; Natural Resources Canada","keywords":"Electrification; Futures contract; Environmental economics; Natural resource economics; Electricity; Rural electrification; Business; Economics; Engineering; Electrical engineering; Finance","score_opus":0.006635990697534596,"score_gpt":0.1794587249971947,"score_spread":0.1728227342996601,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110236022","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79558796,0.00206814,0.0012039506,0.06562819,0.00087879517,0.000023428614,0.0054563577,0.00021058162,0.12894247],"genre_scores_gemma":[0.99004376,0.0010548868,0.00043703688,0.00104565,0.00008745924,0.000006223779,0.00078787556,0.000027756065,0.00650931],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975985,0.000077633806,0.000005736952,0.000016219366,0.000086132815,0.00005440557],"domain_scores_gemma":[0.99943525,0.00014423825,0.00005559151,0.00001884366,0.00021029435,0.00013567695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048095812,0.00027250437,0.000119878765,0.00032191587,0.0007397432,0.0018159162,0.0002902148,0.0010997374,0.00801246],"category_scores_gemma":[0.0014466061,0.000100109435,0.00023517148,0.00083185156,0.00036541754,0.001499712,0.00082720217,0.0009805692,0.0005039635],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018062595,0.00066717266,0.17830756,0.0003278985,0.00020731651,0.0039212722,0.0013290507,0.0924169,0.007840362,0.09336231,0.36803484,0.25177902],"study_design_scores_gemma":[0.0002642434,0.0010149056,0.3954626,0.00037028748,0.00027154182,0.0009986832,0.018981911,0.122598745,0.007820725,0.10857615,0.34346527,0.00017503215],"about_ca_topic_score_codex":0.0648636,"about_ca_topic_score_gemma":0.10988421,"teacher_disagreement_score":0.0648636,"about_ca_system_score_codex":0.0016703518,"about_ca_system_score_gemma":0.0015753148,"threshold_uncertainty_score":0.12897211},"labels":[],"label_agreement":null},{"id":"W3113787841","doi":"10.1016/j.tej.2020.106903","title":"Going viral: The impacts of covid19 on retail electricity","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Remuneration; Electricity; Business; Business model; Key (lock); Coronavirus disease 2019 (COVID-19); Mains electricity; Grid; Industrial organization; Environmental economics; Commerce; Economics; Marketing; Finance; Engineering; Computer science; Computer security; Medicine","score_opus":0.014930916475880917,"score_gpt":0.20505439925811406,"score_spread":0.19012348278223315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113787841","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.509977,0.0022886188,0.00061053096,0.06300874,0.0022009097,0.000066334374,0.0035800042,0.00028262573,0.41798517],"genre_scores_gemma":[0.9723536,0.000845984,0.00015642849,0.006458088,0.000578671,0.00001388125,0.00095906534,0.00013139339,0.018503021],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99802905,0.000515235,0.000045240926,0.00010871318,0.000709752,0.0005919961],"domain_scores_gemma":[0.99164295,0.0023615053,0.0010029315,0.00031957665,0.0025497058,0.0021233417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018819324,0.00022934964,0.00018294658,0.0009212805,0.0028514508,0.0076394146,0.00097475963,0.0022807915,0.034488115],"category_scores_gemma":[0.011034142,0.000167793,0.00039666935,0.001455119,0.0016524924,0.0039404253,0.0031063317,0.0033604235,0.0033973],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016048315,0.001306072,0.22155173,0.00037526013,0.00013947333,0.0025818015,0.0066421614,0.0038920627,0.0018613434,0.10751091,0.5351562,0.117378145],"study_design_scores_gemma":[0.0001764738,0.0007481901,0.31123486,0.00076820544,0.00015949114,0.00093756756,0.069041915,0.010970259,0.002621441,0.032173645,0.57088137,0.00028653388],"about_ca_topic_score_codex":0.051254783,"about_ca_topic_score_gemma":0.087839656,"teacher_disagreement_score":0.051254783,"about_ca_system_score_codex":0.0030416588,"about_ca_system_score_gemma":0.0025014265,"threshold_uncertainty_score":0.11537421},"labels":[],"label_agreement":null},{"id":"W3195749126","doi":"10.1016/j.tej.2021.107012","title":"Electricity as a service and local control: Responding to a post-Covid world","year":2021,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Housing, Finance, and Neoliberalism","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Coronavirus disease 2019 (COVID-19); Electricity; Service (business); Business; Focus (optics); Control (management); Mains electricity; Economics; Electricity market; Industrial organization; Public economics; Environmental economics; Market economy; Marketing; Engineering; Electrical engineering; Management","score_opus":0.017330169528796152,"score_gpt":0.23225588460316077,"score_spread":0.21492571507436461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195749126","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25897723,0.0029684673,0.0020321826,0.5857542,0.00075332524,0.000015746034,0.00009621481,0.00005141635,0.14935124],"genre_scores_gemma":[0.96294594,0.00077573286,0.00021044185,0.016612533,0.00034367532,0.000008769255,0.000021790558,0.000026386726,0.019054834],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99850875,0.00050246174,0.000028199489,0.00012160862,0.00032213563,0.00051680085],"domain_scores_gemma":[0.99733585,0.0008547546,0.00033490677,0.00013886625,0.00049909035,0.00083643297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021965757,0.00012974696,0.00020134138,0.0004269162,0.0028548287,0.006252825,0.00083051535,0.0036687371,0.013994727],"category_scores_gemma":[0.0051072706,0.00012427903,0.00017172376,0.0010810575,0.008511669,0.005307249,0.004459808,0.004629314,0.0004028908],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011662205,0.00010218276,0.009574935,0.0001157592,0.000019589083,0.00055934134,0.02602071,0.00093013403,0.00055520184,0.8231174,0.09991097,0.03897727],"study_design_scores_gemma":[0.000049006405,0.000086101,0.03259278,0.00017755249,0.000015970127,0.00023437018,0.09279777,0.0020329189,0.0005507004,0.13703933,0.7343584,0.00006503299],"about_ca_topic_score_codex":0.030486919,"about_ca_topic_score_gemma":0.08466138,"teacher_disagreement_score":0.030486919,"about_ca_system_score_codex":0.0069246623,"about_ca_system_score_gemma":0.0046903985,"threshold_uncertainty_score":0.060618937},"labels":[],"label_agreement":null},{"id":"W4210254026","doi":"10.1016/j.tej.2022.107080","title":"Does dynamic pricing work in a winter-peaking climate? A case study of Hydro Quebec","year":2022,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Desjardins","funders":"","keywords":"Work (physics); Environmental science; Hydro power; Hydroelectricity; Climate change; Economics; Meteorology; Geography; Engineering; Water resource management; Oceanography; Geology; Electrical engineering","score_opus":0.005218323653306488,"score_gpt":0.21522961050368727,"score_spread":0.21001128685038079,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210254026","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98463744,0.00014982185,0.0008679343,0.0011865098,0.00002370967,0.000064179505,0.00036036392,0.00004838747,0.012661623],"genre_scores_gemma":[0.9953739,0.000086991095,0.00063134695,0.00006304304,0.0000059205913,0.000009377393,0.0001228075,0.000015052997,0.0036915387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994978,0.00017364448,0.000009963355,0.000049274913,0.000071232644,0.00019804061],"domain_scores_gemma":[0.99855524,0.00064871646,0.00008187909,0.00006619328,0.00038007708,0.00026791668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007985202,0.00040968443,0.00033977747,0.00039253393,0.0024397436,0.0020092041,0.0015244365,0.0015297477,0.0034444472],"category_scores_gemma":[0.0023390318,0.0002392437,0.00035564895,0.0011506666,0.001004771,0.0008212477,0.0005241083,0.0007798464,0.00025200692],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002143801,0.0030586561,0.17059529,0.00037079758,0.0004002329,0.022177871,0.004595067,0.6799342,0.0092141535,0.02148326,0.027521003,0.05850575],"study_design_scores_gemma":[0.000722948,0.0008433402,0.16965702,0.000113211536,0.00020477433,0.0009567084,0.026259659,0.7683463,0.002638441,0.00464183,0.025408715,0.00020707435],"about_ca_topic_score_codex":0.93127316,"about_ca_topic_score_gemma":0.95132285,"teacher_disagreement_score":0.06872684,"about_ca_system_score_codex":0.010922378,"about_ca_system_score_gemma":0.0066749356,"threshold_uncertainty_score":0.1382631},"labels":[],"label_agreement":null},{"id":"W4221006047","doi":"10.1016/j.tej.2022.107109","title":"Do gentailers charge higher residential electricity prices in the Texas retail electricity market?","year":2022,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Housing Market and Economics","field":"Economics, Econometrics and Finance","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Electricity; Electricity retailing; Competition (biology); Business; Electricity market; Electricity pricing; Market power; Retail market; Industrial organization; Commerce; Marketing; Microeconomics; Economics; Engineering; Electrical engineering","score_opus":0.02870049609125515,"score_gpt":0.2186858013558014,"score_spread":0.18998530526454624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221006047","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9925262,0.00012773002,0.000051223466,0.0023864792,0.000024164474,0.0000048797215,0.0001465931,0.000003427496,0.0047292756],"genre_scores_gemma":[0.99804366,0.00005947638,0.000013577745,0.0002565945,0.00003264633,0.0000011107188,0.00009398489,0.0000023661598,0.0014966484],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99969554,0.000075336495,0.000010079353,0.00004268748,0.000040859042,0.00013539995],"domain_scores_gemma":[0.9967847,0.0009350837,0.0014811846,0.00008590164,0.00023289506,0.0004802346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050510495,0.000086880245,0.0002465547,0.00031187697,0.00048934564,0.0019252524,0.0004816068,0.0012358286,0.015491505],"category_scores_gemma":[0.0032599804,0.00018392534,0.00027266002,0.00054403354,0.0006605236,0.0014357181,0.0003797129,0.0010964433,0.0013483963],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011314153,0.0006752134,0.9640589,0.000042951455,0.00009568967,0.0005464062,0.0015462716,0.00058783876,0.00048595126,0.009299138,0.009348198,0.0121820215],"study_design_scores_gemma":[0.00011861012,0.00013362504,0.9768102,0.000021266049,0.000060831895,0.0002217544,0.011997359,0.0032393998,0.0002953446,0.002715107,0.0043637664,0.0000227333],"about_ca_topic_score_codex":0.024267199,"about_ca_topic_score_gemma":0.048679825,"teacher_disagreement_score":0.024267199,"about_ca_system_score_codex":0.0007663008,"about_ca_system_score_gemma":0.00042849715,"threshold_uncertainty_score":0.05182427},"labels":[],"label_agreement":null},{"id":"W4223474842","doi":"10.1016/j.tej.2022.107111","title":"Impact of COVID-19 on Ontario’s electricity market: Load, generation, emissions","year":2022,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"COVID-19 impact on air quality","field":"Environmental Science","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Coronavirus disease 2019 (COVID-19); Electricity; Electricity generation; Electricity market; 2019-20 coronavirus outbreak; Severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2); Business; Economics; Environmental science; Natural resource economics; Engineering; Power (physics); Electrical engineering; Virology; Medicine; Physics","score_opus":0.03926787702152481,"score_gpt":0.3255572967687366,"score_spread":0.28628941974721184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4223474842","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29693964,0.0036600654,0.001165161,0.08609335,0.002327562,0.0005047079,0.08747852,0.0005511005,0.52127993],"genre_scores_gemma":[0.76345575,0.001721571,0.001143999,0.012930322,0.0005941465,0.00013736999,0.021031173,0.00029097276,0.19869469],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99331576,0.0002990918,0.00018304783,0.00020104027,0.0045145946,0.0014865167],"domain_scores_gemma":[0.98320574,0.0016857624,0.0010436442,0.00038379538,0.010146868,0.0035342276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029833,0.00038315606,0.0004424289,0.0014617556,0.003689216,0.0067446926,0.0014905176,0.0024618322,0.017457733],"category_scores_gemma":[0.0114126615,0.00055378856,0.0010247973,0.0021405902,0.0011913236,0.0012016515,0.0016829707,0.0022368173,0.0013079696],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013121483,0.00037810093,0.17657083,0.00047322304,0.00032312569,0.0013024176,0.0010467236,0.0080429735,0.0028007969,0.041009545,0.73681587,0.029924275],"study_design_scores_gemma":[0.00028988978,0.00019543048,0.42380264,0.00020177577,0.0001459435,0.00016994221,0.0018090582,0.0072715315,0.0019451953,0.0028266185,0.561185,0.00015690995],"about_ca_topic_score_codex":0.9853516,"about_ca_topic_score_gemma":0.99185735,"teacher_disagreement_score":0.06441548,"about_ca_system_score_codex":0.06441548,"about_ca_system_score_gemma":0.11109143,"threshold_uncertainty_score":0.4673692},"labels":[],"label_agreement":null},{"id":"W4248428443","doi":"10.1016/j.tej.2013.06.011","title":"Now Coal-Free, Is Ontario Ahead of Schedule, or Behind?","year":2013,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Coal; Schedule; Economics; Operations management; Engineering; Waste management; Management","score_opus":0.022237108434277737,"score_gpt":0.2734723726245197,"score_spread":0.25123526419024195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248428443","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12532765,0.004266009,0.00071640953,0.5682846,0.0013284789,0.000058483714,0.0022003702,0.00005709376,0.29776087],"genre_scores_gemma":[0.7556156,0.0035232536,0.0008619563,0.047620837,0.00026040344,0.000027281889,0.0004211395,0.00006617349,0.19160333],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99687356,0.00025197226,0.00006137588,0.00019348793,0.000848078,0.001771551],"domain_scores_gemma":[0.9950899,0.00041194985,0.0002758518,0.00009867546,0.0021257652,0.0019979079],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019474465,0.00013291994,0.0002565523,0.0006526153,0.010657135,0.0057941014,0.0009987934,0.0032530387,0.017292371],"category_scores_gemma":[0.0059165913,0.00023723481,0.00029871333,0.0015484742,0.0041344925,0.003196669,0.0013475239,0.002503475,0.00080818834],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022260986,0.000073951756,0.059731983,0.00027216892,0.000090581314,0.00067186437,0.01317084,0.00064682605,0.0011474781,0.34811002,0.5192291,0.056632705],"study_design_scores_gemma":[0.000031377916,0.000026360585,0.062028095,0.00024212974,0.000051259864,0.00010490243,0.03209881,0.0004723478,0.00047805315,0.014790877,0.8895538,0.00012202701],"about_ca_topic_score_codex":0.99175584,"about_ca_topic_score_gemma":0.99750286,"teacher_disagreement_score":0.084080115,"about_ca_system_score_codex":0.084080115,"about_ca_system_score_gemma":0.23472501,"threshold_uncertainty_score":0.61004674},"labels":[],"label_agreement":null},{"id":"W4376105984","doi":"10.1016/j.tej.2023.107267","title":"Walk the line: The paradoxical complexities of US/Canada energy trade","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Global Energy Security and Policy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Electricity; Legislation; Renewable energy; International trade; Business; Politics; Energy policy; Emissions trading; Economy; Natural resource economics; Economics; Political science; Greenhouse gas; Engineering; Geography; Law","score_opus":0.018819108488028983,"score_gpt":0.2338932260981594,"score_spread":0.21507411761013043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376105984","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08104574,0.012026045,0.002996778,0.40257683,0.0010634622,0.00002451749,0.00055723643,0.000064407985,0.49964488],"genre_scores_gemma":[0.9681842,0.003329158,0.00070205785,0.014646537,0.00027865075,0.000012613327,0.00005811251,0.00006922216,0.012719599],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99728227,0.00065131695,0.000057617945,0.00030216345,0.0009687469,0.000737796],"domain_scores_gemma":[0.9915577,0.003394595,0.00042231413,0.0004472199,0.0031324264,0.0010457729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004637305,0.0002737368,0.00067952904,0.0020064455,0.01342242,0.019189361,0.0019435347,0.0063240775,0.012209139],"category_scores_gemma":[0.02049601,0.0002710608,0.00042667554,0.003986437,0.021902213,0.010979877,0.0032166983,0.006554294,0.00054415694],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036978905,0.0000091358115,0.0008426054,0.000029522389,0.000012066829,0.000108656786,0.0027670881,0.0008552752,0.000057741756,0.95916736,0.029690176,0.006423505],"study_design_scores_gemma":[0.000027715656,0.0000045441275,0.0027510729,0.00021959617,0.00002183131,0.00006704404,0.018107133,0.0021081353,0.0001211649,0.8296264,0.14687799,0.00006737716],"about_ca_topic_score_codex":0.8938837,"about_ca_topic_score_gemma":0.91916424,"teacher_disagreement_score":0.106116295,"about_ca_system_score_codex":0.05546827,"about_ca_system_score_gemma":0.04940278,"threshold_uncertainty_score":0.40245235},"labels":[],"label_agreement":null},{"id":"W4382929299","doi":"10.1016/j.tej.2023.107288","title":"Impact of multiyear rate plans on power distributor productivity: Evidence from Alberta","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Revenue; Economics; Incentive; Attrition; Empirical evidence; Industrial organization; Operations management; Natural resource economics; Microeconomics; Macroeconomics; Finance","score_opus":0.014617434082529647,"score_gpt":0.24963377420410104,"score_spread":0.2350163401215714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382929299","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9859363,0.0008244607,0.00036937094,0.0013058785,0.000031215037,0.000022387687,0.0007886943,0.000033462384,0.010688242],"genre_scores_gemma":[0.99467623,0.00065436534,0.0001340082,0.00011418186,0.00001405835,0.0000053700646,0.0004974457,0.0000051791076,0.00389911],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99719524,0.0005397504,0.00008731215,0.00019886893,0.0012528334,0.0007260552],"domain_scores_gemma":[0.9809832,0.0071985116,0.0042684055,0.00074416783,0.0041095857,0.0026961425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002369858,0.00024818582,0.00029144535,0.0010602317,0.0009546221,0.0027560492,0.0014946922,0.00081372744,0.0029859333],"category_scores_gemma":[0.013107915,0.00026550988,0.00042192606,0.0020248573,0.0009766909,0.00080935203,0.0008940792,0.0010058461,0.00033749084],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018269259,0.0008719243,0.9124223,0.000107174244,0.00036927132,0.000489846,0.00084436085,0.021615265,0.0008003326,0.0026477466,0.0058136242,0.05219133],"study_design_scores_gemma":[0.00013592657,0.00046537517,0.98205835,0.00006519763,0.00018917411,0.000064945685,0.004168411,0.0053534457,0.000517765,0.00054849876,0.0063980515,0.000034886965],"about_ca_topic_score_codex":0.82590014,"about_ca_topic_score_gemma":0.92107856,"teacher_disagreement_score":0.17409986,"about_ca_system_score_codex":0.018580107,"about_ca_system_score_gemma":0.017488996,"threshold_uncertainty_score":0.3502503},"labels":[],"label_agreement":null},{"id":"W4390296028","doi":"10.1016/j.tej.2023.107352","title":"Congestion unpriced: Inefficiency and gaming in Ontario’s two-schedule electricity market design","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Canada Energy Regulator","funders":"","keywords":"Inefficiency; Schedule; Electricity market; Electricity; Payment; Congestion management; Economics; Shadow price; Microeconomics; Business; Industrial organization; Electric power system; Finance; Power (physics); Engineering","score_opus":0.014560178166843896,"score_gpt":0.21082394423008566,"score_spread":0.19626376606324175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390296028","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95427406,0.00015786372,0.008406922,0.001445733,0.000033148783,0.000203526,0.00062917185,0.000056727888,0.034792952],"genre_scores_gemma":[0.99400336,0.000033694025,0.0013237264,0.00005246347,0.000005921332,0.000019018922,0.00010333257,0.00001253986,0.004446034],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99890184,0.00040200955,0.000029987603,0.00010391273,0.00020196523,0.0003602353],"domain_scores_gemma":[0.9968143,0.001925613,0.00019651781,0.00012924151,0.00058517506,0.0003491908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002226818,0.00034071947,0.0007732552,0.00067471084,0.0012357715,0.0029017448,0.0015505081,0.0012794837,0.005402051],"category_scores_gemma":[0.008971457,0.00048513245,0.00070342555,0.0007755148,0.0011062213,0.0013416244,0.0005254799,0.0011397125,0.00014753935],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012254185,0.0005344803,0.037657667,0.00013077265,0.00015660978,0.00074357155,0.0004933586,0.8178248,0.0015312058,0.10552909,0.010280456,0.02389259],"study_design_scores_gemma":[0.000276385,0.00027995196,0.021708405,0.000019451018,0.000090059126,0.00007021596,0.0006959718,0.9550628,0.00048544427,0.017001884,0.0042486712,0.000060836253],"about_ca_topic_score_codex":0.6812734,"about_ca_topic_score_gemma":0.8323847,"teacher_disagreement_score":0.3187266,"about_ca_system_score_codex":0.016169606,"about_ca_system_score_gemma":0.013058666,"threshold_uncertainty_score":0.6412073},"labels":[],"label_agreement":null},{"id":"W4404515272","doi":"10.1016/j.tej.2024.107447","title":"Is it worthwhile to participate in transactive energy? A decision-making model for empowering residential customers","year":2024,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Hydro-Québec","keywords":"Transactive memory; Business; Group decision-making; Decision-making models; Environmental economics; Knowledge management; Marketing; Computer science; Psychology; Economics; Social psychology","score_opus":0.021610082086503876,"score_gpt":0.296763006032032,"score_spread":0.2751529239455281,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404515272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2483143,0.0005586556,0.67991245,0.008483644,0.0001431421,0.00036240811,0.00046403657,0.00021010931,0.0615513],"genre_scores_gemma":[0.9701376,0.0002392473,0.021302162,0.00018456188,0.00003691959,0.00016190938,0.000048986512,0.000016838407,0.007871832],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984648,0.00081881706,0.00003926721,0.00028592785,0.00014074004,0.0002505304],"domain_scores_gemma":[0.99710137,0.0018150036,0.0003801781,0.00010708684,0.00020238252,0.00039399875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023649638,0.00082341826,0.00069008424,0.00040164083,0.0007450919,0.0028450384,0.001717284,0.0023607204,0.0073401337],"category_scores_gemma":[0.004712752,0.0004758736,0.00071235636,0.00057620683,0.0016569337,0.002458633,0.0015180808,0.0023438816,0.00053198606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028670524,0.0002690031,0.0017245902,0.00009314946,0.00004524277,0.0005157821,0.00060393004,0.6889706,0.0016840834,0.2928771,0.001872125,0.011057632],"study_design_scores_gemma":[0.00003394776,0.00006488965,0.0001974552,0.000011425982,0.000014930143,0.000029801298,0.00016693347,0.9498314,0.00015570733,0.04850067,0.0009771199,0.000015610616],"about_ca_topic_score_codex":0.004100173,"about_ca_topic_score_gemma":0.0037514567,"teacher_disagreement_score":0.0073401337,"about_ca_system_score_codex":0.002155614,"about_ca_system_score_gemma":0.0018866335,"threshold_uncertainty_score":0.024555206},"labels":[],"label_agreement":null},{"id":"W4412651215","doi":"10.1016/j.tej.2025.107484","title":"Electricity market design with increasing renewable generation: Lessons from Alberta","year":2025,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"SGS (Canada); University of Calgary; University of Alberta","funders":"Social Sciences and Humanities Research Council; Social Sciences and Humanities Research Council of Canada; Canada First Research Excellence Fund; University of Alberta","keywords":"Renewable energy; Electricity market; Electricity generation; Electricity; Electricity retailing; Natural resource economics; Business; Environmental economics; Industrial organization; Economics; Engineering; Power (physics); Electrical engineering","score_opus":0.012836858397250968,"score_gpt":0.21637187137447442,"score_spread":0.20353501297722346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412651215","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.565027,0.0035208643,0.04313665,0.017567376,0.00023205945,0.00013816854,0.0008494909,0.00022088262,0.3693076],"genre_scores_gemma":[0.96745425,0.00134506,0.0070889452,0.00048783768,0.00004037536,0.000019360432,0.00020885054,0.000031499043,0.023323728],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9996469,0.00011130392,0.00000922825,0.000033206925,0.00011484573,0.000084497275],"domain_scores_gemma":[0.9993998,0.0002099096,0.00004526018,0.000043485587,0.0002246497,0.00007685467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076781644,0.00033677282,0.0004700475,0.000331606,0.0011869175,0.0029202397,0.001340501,0.0012773813,0.0049667796],"category_scores_gemma":[0.0018007881,0.00024746187,0.0005417601,0.0007510869,0.0016564274,0.0013970415,0.00083651306,0.0012731968,0.00025640387],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017506597,0.00013804447,0.005922714,0.00013824947,0.000063009385,0.0008391327,0.0003919357,0.41174406,0.0012212965,0.5462701,0.01084463,0.022251846],"study_design_scores_gemma":[0.00042135487,0.00016540269,0.010269631,0.0001078653,0.00012273258,0.00027412688,0.0024483884,0.545148,0.0013704057,0.3493146,0.09023044,0.00012699122],"about_ca_topic_score_codex":0.67264587,"about_ca_topic_score_gemma":0.7278771,"teacher_disagreement_score":0.32735413,"about_ca_system_score_codex":0.010216978,"about_ca_system_score_gemma":0.008952391,"threshold_uncertainty_score":0.658564},"labels":[],"label_agreement":null},{"id":"W4413293409","doi":"10.1016/j.tej.2025.107496","title":"Does energy policy scholarship consider energy resilience? A bibliometric analysis and agenda for reform","year":2025,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Global Energy Security and Policy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Scholarship; Resilience (materials science); Energy (signal processing); Political science; Energy policy; Environmental economics; Public economics; Economic system; Economics; Regional science; Public administration; Sociology; Economic growth; Renewable energy; Engineering; Physics; Electrical engineering","score_opus":0.016372723667266057,"score_gpt":0.3042743000794386,"score_spread":0.28790157641217257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413293409","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13257761,0.11989994,0.009806494,0.47770163,0.0025197903,0.00013935736,0.004446585,0.00023061396,0.25267798],"genre_scores_gemma":[0.9361827,0.04655135,0.002674073,0.00638078,0.0030487005,0.00012743924,0.0016238,0.000085209824,0.0033258137],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9758673,0.011296693,0.002067877,0.0012192234,0.00771011,0.0018387183],"domain_scores_gemma":[0.7536652,0.18539184,0.017122766,0.011855386,0.028273402,0.0036913233],"candidate_categories":["metaresearch","bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.02554819,0.0005817697,0.0020271547,0.077398665,0.004465013,0.02481993,0.0015493148,0.003171279,0.009959045],"category_scores_gemma":[0.1740698,0.0003684458,0.0006416157,0.20416673,0.009337046,0.03202044,0.0059003276,0.0022299911,0.0010450005],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000889137,0.00007867962,0.044406462,0.002339337,0.00031293413,0.00011681992,0.006746044,0.00127802,0.0001424795,0.77495885,0.040465843,0.12906556],"study_design_scores_gemma":[0.000039963357,0.0000656762,0.078534886,0.008657259,0.00036967237,0.00017188361,0.043117538,0.0041103098,0.00063686434,0.5110812,0.35310066,0.000114038216],"about_ca_topic_score_codex":0.012930876,"about_ca_topic_score_gemma":0.014804987,"teacher_disagreement_score":0.9744518,"about_ca_system_score_codex":0.010267294,"about_ca_system_score_gemma":0.017393919,"threshold_uncertainty_score":0.13511336},"labels":[],"label_agreement":null}]}