{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":186,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":186,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"14e540d231dd","filters":{"topic":"Assembly Line Balancing Optimization"}},"results":[{"id":"W2164474269","doi":"10.1002/nav.10043","title":"The stochastic U‐line balancing problem","year":2002,"lang":"en","type":"article","venue":"Naval Research Logistics (NRL)","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Line (geometry); Computer science; Task (project management); Visibility; Production line; Function (biology); Path (computing); Mathematical optimization; Shortest path problem; Production (economics); Algorithm; Mathematics; Theoretical computer science; Graph; Computer network","retraction":null,"screen_n_in":null,"score":{"opus":0.0782222590228775,"gpt":0.3220612259787486,"spread":0.2438389669558712,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001535859,0.0001891399,0.0001877474,0.0001502564,0.0005153357,0.0002001959,0.000482112,0.000136837,0.0000718863],"category_scores_gemma":[0.003129397,0.0001479234,0.00004744108,0.0006404473,0.0002070941,0.00009315777,0.0001454063,0.0008913728,0.0005092315],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003030059,"about_ca_system_score_gemma":0.00004363533,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002842804,"about_ca_topic_score_gemma":0.00006951387,"domain_scores_codex":[0.9974005,0.0001238153,0.0003575766,0.0002608982,0.0009383386,0.0009189242],"domain_scores_gemma":[0.9974956,0.001355356,0.00003547779,0.0005001884,0.0004385672,0.0001748477],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001355194,0.00004134235,0.00008154009,0.00008150301,0.00003534364,0.00002355719,0.0002055351,0.9581745,0.001290108,0.005628964,0.02324086,0.01118315],"study_design_scores_gemma":[0.0002595352,0.0001001017,0.000120762,0.00005079731,0.000008467323,0.000009068135,0.00006569637,0.9911817,0.0002674714,0.002106886,0.005652109,0.0001774058],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.004058742,0.002636945,0.9386669,0.001113061,0.0008119844,0.001057862,0.00003371957,0.0009456068,0.05067515],"genre_scores_gemma":[0.9924729,0.0003773669,0.004544747,0.00001699655,0.0004753146,0.00006396544,0.00001521987,0.00007483589,0.001958651],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9884142,"threshold_uncertainty_score":0.654531,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2797299896","doi":"10.1016/j.cie.2018.04.014","title":"Simultaneous balancing, sequencing, and workstation planning for a mixed model manual assembly line using hybrid genetic algorithm","year":2018,"lang":"en","type":"article","venue":"Computers & Industrial Engineering","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Guelph","funders":"","keywords":"Workstation; Genetic algorithm; Computer science; Simplex algorithm; Algorithm; Linear programming; Simulated annealing; Integer programming; Mathematical optimization; Binary number; Mathematics; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.02743422696939048,"gpt":0.2518191364576782,"spread":0.2243849094882877,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002165914,0.0003786597,0.0003772535,0.0002639029,0.0001411015,0.0001389435,0.0001674893,0.0002193427,0.000001156889],"category_scores_gemma":[0.000174281,0.0004641326,0.00006160801,0.0002431877,0.00002907425,0.0002354798,0.00006732496,0.0003020553,0.000001624312],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003532633,"about_ca_system_score_gemma":0.00007760309,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001080468,"about_ca_topic_score_gemma":0.000001085444,"domain_scores_codex":[0.9983544,0.00001685382,0.0004993756,0.0003851719,0.0001972052,0.0005469448],"domain_scores_gemma":[0.9991351,0.0002564214,0.00009783256,0.0002125079,0.0001326161,0.0001655538],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001326102,0.000005358996,0.00001957187,0.00004436117,0.00005515608,0.00001564234,0.0002577305,0.9736689,0.005368349,0.000008752397,0.0002576224,0.02028527],"study_design_scores_gemma":[0.0009446827,0.000113171,0.00001345123,0.0002747841,0.00006076862,0.00006108944,0.00003073359,0.9920528,0.005761821,0.00001693763,0.0001996652,0.0004701245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2946243,0.0001086891,0.7030916,0.000006358364,0.001286066,0.0003568928,0.00002389302,0.0004958021,0.000006456062],"genre_scores_gemma":[0.6114776,0.000005375373,0.386782,0.0000174012,0.001543883,0.00001608546,0.0000482452,0.0001011538,0.000008318229],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.3168533,"threshold_uncertainty_score":0.999781,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2039722815","doi":"10.1007/s10696-011-9074-7","title":"Design of single assembly line for the delayed differentiation of product variants","year":2010,"lang":"en","type":"article","venue":"Flexible Services and Manufacturing Journal","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Windsor","funders":"","keywords":"Computer science; Product differentiation; Product (mathematics); Product type; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01410525347070693,"gpt":0.2229566510949721,"spread":0.2088513976242652,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000288155,0.0001099421,0.0001598173,0.00007813537,0.00009943786,0.00005083779,0.0001294643,0.00005222348,0.00001179032],"category_scores_gemma":[0.00001184168,0.00007877985,0.00003564377,0.00004570139,0.00001193669,0.0001916953,0.00002184796,0.000154263,3.429735e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000007421974,"about_ca_system_score_gemma":0.00001292595,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001380044,"about_ca_topic_score_gemma":0.0000232524,"domain_scores_codex":[0.9993417,0.0000141136,0.0002922739,0.00008738694,0.0001197473,0.0001448398],"domain_scores_gemma":[0.999441,0.00010671,0.0001819971,0.0001397528,0.00009298157,0.00003760858],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00006793931,0.00003784797,0.0001077417,0.0003593748,0.0001133545,2.919178e-7,0.0003788096,0.6497241,0.3423077,0.00003063497,0.00003582025,0.006836406],"study_design_scores_gemma":[0.0004250339,0.00009329766,0.007541008,0.00005970775,0.00007520086,0.00002388534,0.00004901274,0.4033963,0.5878811,0.0002316508,0.0001313119,0.00009245472],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5602322,0.0002094922,0.4388001,0.00005027458,0.0004703444,0.0001804126,0.000004697448,0.00002960281,0.00002283601],"genre_scores_gemma":[0.9793653,0.0001339532,0.02017589,0.000009595503,0.0002551252,0.000004898384,0.000006585465,0.00002218309,0.0000264736],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4191331,"threshold_uncertainty_score":0.3212549,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2050013525","doi":"10.1016/j.asoc.2006.06.002","title":"Buffer allocation and performance modeling in asynchronous assembly system operations: An artificial neural network metamodeling approach","year":2006,"lang":"en","type":"article","venue":"Applied Soft Computing","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Metamodeling; Computer science; Artificial neural network; Asynchronous communication; Context (archaeology); Domain (mathematical analysis); Artificial intelligence; Systems engineering; Distributed computing; Engineering; Software engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01347537931249474,"gpt":0.2003372814042379,"spread":0.1868619020917432,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005597018,0.000235656,0.0002815909,0.0001137012,0.0002890183,0.0001590175,0.0001166949,0.0001202423,3.116865e-7],"category_scores_gemma":[0.000005675495,0.0002712307,0.00002145977,0.0003027491,0.00001219966,0.0003557005,0.00004768678,0.0002333619,0.000003114304],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001530827,"about_ca_system_score_gemma":0.00002181009,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00009156213,"about_ca_topic_score_gemma":0.00005604493,"domain_scores_codex":[0.9984433,0.00003546282,0.0005639653,0.0003525849,0.0001679794,0.0004367144],"domain_scores_gemma":[0.9996188,0.00003752359,0.0000457614,0.0001964879,0.00005423519,0.00004718006],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000006215963,0.00001552835,0.0003063682,0.0001052878,0.000007307562,4.615989e-7,0.0002343238,0.9881595,0.00131944,0.002290618,0.000001533963,0.007553407],"study_design_scores_gemma":[0.0002066296,0.00001138471,0.0003906505,0.00004909057,0.00001750819,0.000008554468,0.0002448344,0.9986308,0.0001340992,0.0000315284,5.322794e-7,0.0002743798],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4942102,0.0001040208,0.5047265,0.000002864345,0.0000752132,0.0002030231,2.675426e-7,0.0003353009,0.0003426545],"genre_scores_gemma":[0.8963177,0.000003232639,0.1028941,0.00001216815,0.000591634,0.00002994838,0.00009165606,0.00005871117,9.135616e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4021075,"threshold_uncertainty_score":0.999974,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4251718306","doi":"10.1080/07408170108936831","title":"One-piece flow manufacturing on U-shaped production lines: a tutorial","year":2001,"lang":"en","type":"article","venue":"IIE Transactions","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"","keywords":"Flow (mathematics); Flow line; Production (economics); Production line; Manufacturing engineering; Material flow; Industrial engineering; Computer science; Engineering drawing; Product (mathematics); Engineering; Mechanical engineering; Mathematics; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.01410454936694193,"gpt":0.216559058497562,"spread":0.20245450913062,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006915283,0.0001731578,0.0001527477,0.0001513301,0.0001590894,0.0000387107,0.00008167995,0.0001101773,0.0001613469],"category_scores_gemma":[0.00001652845,0.0002045539,0.0000715865,0.0002176343,0.00001407143,0.0002713069,0.000001530858,0.0002522256,0.0001421405],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001425076,"about_ca_system_score_gemma":0.00001793158,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000151228,"about_ca_topic_score_gemma":0.00009227484,"domain_scores_codex":[0.9990925,0.00001671023,0.0002283729,0.0002342004,0.0001813208,0.0002469177],"domain_scores_gemma":[0.9995819,0.00003175281,0.00002429769,0.0002521112,0.00004001486,0.00006997384],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004461273,0.00007280469,0.000009952917,0.00002676121,0.00004158074,0.000002396554,0.0002045976,0.9806303,0.00643631,0.000005783318,0.0001541144,0.01237074],"study_design_scores_gemma":[0.001284703,0.0001268971,0.002542622,0.0001632443,0.0001614307,0.00004688685,0.00008756021,0.8741096,0.09552594,0.000124178,0.02504858,0.0007783559],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1679972,0.00002978391,0.8229786,0.0005350408,0.004486744,0.0003654241,0.00001147483,0.001635457,0.001960295],"genre_scores_gemma":[0.9913538,0.0001342201,0.006285354,0.00002811365,0.001444581,0.00005809955,0.00002550997,0.00006494991,0.0006054104],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8233566,"threshold_uncertainty_score":0.8341466,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2887366348","doi":"10.1080/00207543.2018.1476786","title":"A realistic multi-manned five-sided mixed-model assembly line balancing and scheduling problem with moving workers and limited workspace","year":2018,"lang":"en","type":"article","venue":"International Journal of Production Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Windsor","funders":"Kharazmi University; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Automotive industry; Workspace; Mathematical optimization; Assembly line; Scheduling (production processes); Benders' decomposition; Linear programming; Integer programming; Computer science; Job shop scheduling; Line (geometry); Industrial engineering; Engineering; Mathematics; Mechanical engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.03837285834049546,"gpt":0.3357371352307845,"spread":0.297364276890289,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00161831,0.000150823,0.0001968083,0.0006429583,0.0001526971,0.0002051575,0.0001965294,0.0000829598,0.000003750645],"category_scores_gemma":[0.001437849,0.0001337592,0.00002483122,0.0004006575,0.0001419883,0.0005536538,0.00008617116,0.0005642996,0.000002285624],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002316701,"about_ca_system_score_gemma":0.0001255669,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003288582,"about_ca_topic_score_gemma":0.0001254687,"domain_scores_codex":[0.9981921,0.00009306634,0.0004149979,0.0002548754,0.0007654799,0.0002795276],"domain_scores_gemma":[0.9970121,0.0001753647,0.0001691863,0.0001346194,0.002378282,0.0001303926],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003334154,0.00005355894,0.004648503,0.00006243679,0.0002007558,0.00002708714,0.001266357,0.970549,0.0168001,0.00009414496,0.0006720902,0.005292541],"study_design_scores_gemma":[0.0008643424,0.0001832254,0.003742056,0.0009631698,0.0000219294,0.0002770252,0.000853194,0.9882424,0.004482497,0.0001554363,0.00005443227,0.000160225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7113568,0.0002703366,0.2855569,0.002008142,0.0004356505,0.0002026526,0.000002211506,0.00006527892,0.0001020607],"genre_scores_gemma":[0.8194886,0.0001943189,0.1792313,0.00001171895,0.0007758519,0.000006765386,0.000005339932,0.00003712184,0.0002490096],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1081318,"threshold_uncertainty_score":0.5454543,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4381838392","doi":"10.1080/0951192x.2023.2204467","title":"Review of task allocation for human-robot collaboration in assembly","year":2023,"lang":"en","type":"article","venue":"International Journal of Computer Integrated Manufacturing","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Canadian Institute for Advanced Research","keywords":"Task (project management); Flexibility (engineering); Robot; Computer science; Process (computing); Modalities; Human–computer interaction; Knowledge management; Management science; Risk analysis (engineering); Artificial intelligence; Process management; Systems engineering; Engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.01365002574034324,"gpt":0.2998665328611028,"spread":0.2862165071207595,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004765184,0.0001330039,0.0002806668,0.0005929035,0.00001707655,0.00004345646,0.0003249099,0.00006296547,0.000009744234],"category_scores_gemma":[0.00007388056,0.0001281363,0.0000906477,0.0002801116,0.00001021386,0.0003496467,0.00002643811,0.0001588123,0.000004096211],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002209269,"about_ca_system_score_gemma":0.00005922752,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009160194,"about_ca_topic_score_gemma":0.0000151283,"domain_scores_codex":[0.9986046,0.00003305597,0.0008404228,0.0000989777,0.0002953872,0.0001275534],"domain_scores_gemma":[0.9986928,0.0001112273,0.0003295456,0.00009310543,0.0007402789,0.00003304662],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003198393,0.00004032694,0.0001152566,0.0009914957,0.0001674942,0.00001815298,0.000225387,0.9590507,0.01580081,0.0002133436,0.009243778,0.01410123],"study_design_scores_gemma":[0.002426282,0.0002781494,0.006720644,0.02330242,0.00007017959,0.0000905007,0.0001504345,0.6941336,0.2568897,0.001089002,0.01435725,0.0004918021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.265855,0.001653205,0.7276865,0.0007722561,0.003183818,0.0004805491,0.00002855898,0.0001680441,0.0001720765],"genre_scores_gemma":[0.9799518,0.002072717,0.01711718,0.0001738663,0.0004252624,0.00001470296,0.0001902012,0.00003557045,0.00001868939],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7140968,"threshold_uncertainty_score":0.5225247,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2606713714","doi":"10.1016/j.cie.2017.04.019","title":"Improving configuration of complex production lines via simulation-based optimization","year":2017,"lang":"en","type":"article","venue":"Computers & Industrial Engineering","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Simulated annealing; Production line; Mathematical optimization; Ant colony optimization algorithms; Computer science; Automotive industry; Production (economics); Computation; Simulation-based optimization; Industrial engineering; Operations research; Engineering; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0311103759646734,"gpt":0.2369655150424987,"spread":0.2058551390778253,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000173958,0.0002144715,0.0002670518,0.0001884548,0.0001624612,0.0001151081,0.0002315494,0.0001735264,0.00001000537],"category_scores_gemma":[0.0005122252,0.0002573885,0.00006024816,0.0001401184,0.00003537969,0.0004557132,0.00003139786,0.0001783672,0.000002131846],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001048764,"about_ca_system_score_gemma":0.00003593217,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002256533,"about_ca_topic_score_gemma":0.000001365431,"domain_scores_codex":[0.9989349,0.00001478316,0.0004446429,0.0002150342,0.0001878813,0.0002027434],"domain_scores_gemma":[0.9989812,0.0001107054,0.0002396217,0.0004339696,0.0001743719,0.00006008554],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001065913,0.00001130653,0.0001607417,0.00006521369,0.00002216152,6.140284e-7,0.00003113566,0.9725199,0.01579767,0.00001625233,0.00004418347,0.01132019],"study_design_scores_gemma":[0.0006453295,0.00002801485,0.0004336424,0.0001067921,0.00002473462,7.433275e-7,0.000003204366,0.978702,0.0197112,0.000001238375,0.0001167675,0.0002263228],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01835164,0.00001457297,0.9783417,0.00006015924,0.00237303,0.0003622338,0.000004421137,0.0004512117,0.00004101651],"genre_scores_gemma":[0.9574156,0.000001913254,0.04146339,0.00000496411,0.0009433944,0.00001093032,0.0001001425,0.00005354859,0.0000061226],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.939064,"threshold_uncertainty_score":0.9999878,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2045604025","doi":"10.1016/j.ijpe.2008.11.015","title":"A continuous model for supply planning of assembly systems with stochastic component procurement times","year":2009,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Transport Canada; Concordia University","funders":"","keywords":"Component (thermodynamics); Procurement; Computer science; Key (lock); Product (mathematics); Mathematical optimization; Function (biology); Set (abstract data type); Supply chain; Operations research; Business; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01235981996958254,"gpt":0.2325674301587949,"spread":0.2202076101892124,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002314499,0.0001014424,0.0002177988,0.0001815555,0.00001797572,0.00003715839,0.0001454499,0.00003197523,0.000001077212],"category_scores_gemma":[0.00004256016,0.00009626367,0.00004774408,0.00002844684,0.00001076334,0.0002974856,0.0000054649,0.00007749323,4.795208e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002070575,"about_ca_system_score_gemma":0.00006424268,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000109087,"about_ca_topic_score_gemma":8.422165e-7,"domain_scores_codex":[0.9991565,0.000006403403,0.0005180247,0.00009406411,0.0001315948,0.00009335708],"domain_scores_gemma":[0.9989028,0.00002079596,0.000416775,0.00007169993,0.000554617,0.00003331596],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001550551,0.00004853446,0.0001209258,0.00001860877,0.0001490829,6.965064e-7,0.0002434268,0.9955693,0.002187428,0.0004633845,0.0004946412,0.0005489321],"study_design_scores_gemma":[0.0006099371,0.0001658319,0.0002679395,0.0001687017,0.00003300419,0.000122191,0.00009531352,0.9955552,0.00261645,0.0001747327,0.00009370549,0.00009705064],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3559573,0.0001295911,0.642184,0.000364394,0.001035582,0.0002360287,0.00001181601,0.00002428243,0.0000570084],"genre_scores_gemma":[0.9854888,0.00002025524,0.01391938,0.00001184584,0.0004677812,0.000006540596,0.00001356038,0.00001750316,0.00005431427],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6295315,"threshold_uncertainty_score":0.3925518,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2139191215","doi":"10.2308/bria.2009.21.2.57","title":"The Influence of Incentive Structure on Group Performance in Assembly Lines and Teams","year":2009,"lang":"en","type":"article","venue":"Behavioral Research in Accounting","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"York University; Wilfrid Laurier University","funders":"","keywords":"Incentive; Task (project management); Group (periodic table); Business; Group structure; Microeconomics; Industrial organization; Psychology; Economics; Management","retraction":null,"screen_n_in":null,"score":{"opus":0.02742407342356136,"gpt":0.347548115556791,"spread":0.3201240421332296,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008641192,0.0001072199,0.0001339007,0.0002655955,0.00009790388,0.00007549756,0.0002100548,0.00008587037,9.000663e-7],"category_scores_gemma":[0.0001481227,0.00008721839,0.00001127707,0.0007073889,0.00006178191,0.0003934524,0.00005363925,0.0005657438,0.000001147638],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001467518,"about_ca_system_score_gemma":0.00002637235,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000119739,"about_ca_topic_score_gemma":0.0002994734,"domain_scores_codex":[0.9987156,0.00005195309,0.0002808702,0.0001611518,0.0004033426,0.0003870454],"domain_scores_gemma":[0.9994907,0.0001527342,0.00004011542,0.0001686551,0.0001199651,0.0000278453],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00004850396,0.0000586665,0.7248063,0.00006233638,0.000001718446,0.000007686134,0.0004410016,0.1724708,0.04351385,0.0002184475,0.00001400025,0.05835662],"study_design_scores_gemma":[0.000237354,0.00008978105,0.9444929,0.000284529,0.000001245338,9.70671e-7,0.0001776397,0.05171948,0.002790953,0.00007312845,0.00003911115,0.00009295437],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9993843,0.0001030612,0.00001035693,0.00004398983,0.00003479681,0.0002413171,0.000002125081,0.00002993576,0.0001501142],"genre_scores_gemma":[0.9993885,0.0001678424,0.0003684957,0.00000584106,0.00003524043,0.00001067984,0.000003584203,0.00001393153,0.000005840131],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2196865,"threshold_uncertainty_score":0.3556662,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4388440503","doi":"10.1016/j.cie.2023.109737","title":"Human-robot collaboration in assembly line balancing problems: Review and research gaps","year":2023,"lang":"en","type":"article","venue":"Computers & Industrial Engineering","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Assembly line; Robot; Engineering; Line (geometry); Computer science; Manufacturing engineering; Human–robot interaction; Systems engineering; Mechanical engineering; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0561535644670217,"gpt":0.3186866503302946,"spread":0.2625330858632729,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001340506,0.0002293845,0.0004002376,0.0006509671,0.00008624954,0.000113941,0.0001864524,0.0002082936,0.000005199561],"category_scores_gemma":[0.0002987448,0.0002718934,0.00002900638,0.002767057,0.00001680637,0.0002952451,0.0001179965,0.0006771349,0.0000193862],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002591648,"about_ca_system_score_gemma":0.00004894936,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001894306,"about_ca_topic_score_gemma":0.00001201411,"domain_scores_codex":[0.9982947,0.00006855968,0.0005116574,0.0003095661,0.0002975531,0.0005179973],"domain_scores_gemma":[0.9993179,0.0001737282,0.00004093854,0.000245007,0.0001126176,0.0001098446],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000001130532,0.000006967483,0.0001344272,0.0006759731,0.00001739575,0.00001479237,0.0001428086,0.9868033,0.006173164,0.00008916241,0.004701375,0.001239485],"study_design_scores_gemma":[0.0008235784,0.00006130036,0.0009408479,0.002984714,0.00002039613,0.000008060915,0.00003588164,0.9906,0.0007831976,0.00001349107,0.003375452,0.0003531051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8344923,0.02968756,0.1068961,0.003755753,0.006979471,0.007785589,0.00004776576,0.009322696,0.001032734],"genre_scores_gemma":[0.9929777,0.001897953,0.003461477,0.00005676473,0.001056672,0.0001689632,0.0001496792,0.0001577369,0.00007307821],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1584854,"threshold_uncertainty_score":0.9999733,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2066268728","doi":"10.1016/j.ejor.2008.03.033","title":"Ant colony optimization with a specialized pheromone trail for the car-sequencing problem","year":2008,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Ant colony optimization algorithms; Metaheuristic; Computer science; Benchmark (surveying); Artificial intelligence; Mathematical optimization; Ant colony; Pheromone; Mathematics; Ecology; Biology; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.07406110709103525,"gpt":0.299402702420774,"spread":0.2253415953297388,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002408049,0.0001111005,0.0001589502,0.000144689,0.0004603764,0.0001082269,0.0002659377,0.00002086065,0.00005946212],"category_scores_gemma":[0.0003220915,0.0000735499,0.00004920568,0.0003513452,0.00009828569,0.0003072924,0.00002129822,0.0003430882,0.000008645088],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002258394,"about_ca_system_score_gemma":0.0003776736,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004091656,"about_ca_topic_score_gemma":0.000007212619,"domain_scores_codex":[0.9981923,0.000297412,0.000420838,0.0001103751,0.0007336838,0.0002454142],"domain_scores_gemma":[0.9980848,0.0003482437,0.00008125018,0.0001250321,0.001275291,0.00008532795],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001331237,0.00001861787,0.00005537459,0.00001439465,0.00005639562,0.00006640449,0.0008769206,0.9887217,0.004927591,0.0001904092,0.004594027,0.0003449983],"study_design_scores_gemma":[0.00224893,0.0008108463,0.00139698,0.0001435266,0.00002660482,0.0006975551,0.0003765075,0.984238,0.003010729,0.00001497159,0.006827103,0.0002082366],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06188151,0.000454315,0.9286619,0.000992012,0.0001780136,0.0007584671,0.00001097299,0.00004659304,0.007016182],"genre_scores_gemma":[0.8347336,0.0003410464,0.1632966,0.00003647604,0.001002297,0.00001627161,0.00001668507,0.00007677838,0.0004802788],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7728521,"threshold_uncertainty_score":0.3540889,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1978791206","doi":"10.1115/1.2034513","title":"Concurrent Optimization of Product Module Selection and Assembly Line Configuration: A Multi-Objective Approach","year":2005,"lang":"en","type":"article","venue":"Journal of Manufacturing Science and Engineering","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Modular design; Modularity (biology); Computer science; Product (mathematics); Selection (genetic algorithm); Mathematical optimization; Genetic algorithm; Product design; Set (abstract data type); Manufacturing cost; Product line; Manufacturing engineering; Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.009855098509389823,"gpt":0.2206753698177919,"spread":0.2108202713084021,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005070118,0.0001229262,0.0001907813,0.0003091561,0.00006611831,0.00005887698,0.00008376853,0.00003566669,0.000001337213],"category_scores_gemma":[0.0001191124,0.0001143786,0.00002086177,0.0002218621,0.00003876317,0.0008391702,0.00001802501,0.000160203,1.512859e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001091703,"about_ca_system_score_gemma":0.00004297438,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002070478,"about_ca_topic_score_gemma":8.3214e-7,"domain_scores_codex":[0.9991089,0.000007162634,0.0003249165,0.0001319516,0.0002683509,0.0001587256],"domain_scores_gemma":[0.999477,0.00002269771,0.0001279969,0.00005982498,0.0002349504,0.00007749163],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00000244891,0.00001610715,0.00004730264,0.00007672521,0.0000130738,2.778154e-7,0.000286869,0.9695482,0.02360297,0.00001162052,0.000004716129,0.006389678],"study_design_scores_gemma":[0.0002541323,0.00004008417,0.002982103,0.00004738769,0.00001375107,0.00006139381,0.00003954192,0.7661351,0.2303001,4.895952e-7,0.00003848532,0.00008738666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4511694,0.0002621037,0.5482406,0.00002521366,0.0001402593,0.00008359639,5.51967e-7,0.00003516834,0.0000430892],"genre_scores_gemma":[0.9238757,0.0001403629,0.07579888,0.00000334894,0.0001605015,0.000002003055,8.123084e-7,0.00001311168,0.00000527337],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4727063,"threshold_uncertainty_score":0.4664226,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2038275092","doi":"10.1108/20441241111143812","title":"Applying just‐in‐time principles in the delivery and management of airport terminal buildings","year":2011,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Context (archaeology); Productivity; Quality (philosophy); Business; Work (physics); Marketing; Operations management; International airport; Transport engineering; Engineering; Process management; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.02607255167923948,"gpt":0.2192267643145724,"spread":0.1931542126353329,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004242406,0.000183601,0.0001761123,0.000193457,0.00003370112,0.00002439535,0.0001954369,0.00004155361,0.00001093344],"category_scores_gemma":[9.307465e-7,0.0001583911,0.00002264608,0.0001265842,0.0000390204,0.0001150867,0.0002276671,0.00008500178,0.00000367401],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005257902,"about_ca_system_score_gemma":0.000001893914,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003362633,"about_ca_topic_score_gemma":0.000006051073,"domain_scores_codex":[0.9989452,0.00002612111,0.0003175705,0.0002526083,0.0002295069,0.0002289415],"domain_scores_gemma":[0.9996648,0.00001346547,0.00006263393,0.0002364888,0.00000202514,0.00002062449],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002370002,0.001355817,0.6488776,0.008417537,0.000828367,0.001358423,0.008981542,0.06350307,0.001391397,0.009703891,0.001585945,0.2537594],"study_design_scores_gemma":[0.001656193,0.0001464448,0.93966,0.0005026864,0.000213632,0.00002344427,0.002459474,0.04207117,0.0004639403,0.0001639544,0.01201747,0.0006216115],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9841236,0.0002580064,0.002670032,0.00001988952,0.00002852662,0.001865779,0.000003413011,0.00004652468,0.01098425],"genre_scores_gemma":[0.9758081,0.003151698,0.02025095,0.00002981255,0.00001211323,0.0005029741,0.0000132711,0.0000256983,0.0002053557],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2907824,"threshold_uncertainty_score":0.6459,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2003612330","doi":"10.1080/00207543.2011.631599","title":"Two-sided U-type assembly line balancing problem","year":2011,"lang":"en","type":"article","venue":"International Journal of Production Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Assembly line; Type (biology); Integer programming; Line (geometry); Mathematical optimization; Computer science; Engineering; Mathematics; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.08698589668642406,"gpt":0.3661331800831972,"spread":0.2791472833967732,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001985863,0.000110938,0.0001585883,0.0006995123,0.00006172305,0.0000652858,0.0004483134,0.00005893903,0.0001452371],"category_scores_gemma":[0.001018949,0.0001042843,0.00005811296,0.0004761152,0.00004386356,0.0005679589,0.00006153757,0.0005865919,0.00006720035],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002880338,"about_ca_system_score_gemma":0.0001360365,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003050923,"about_ca_topic_score_gemma":0.00001709881,"domain_scores_codex":[0.997867,0.0001074652,0.0005379171,0.0001558432,0.001079601,0.0002521258],"domain_scores_gemma":[0.9959736,0.00007187101,0.0001401173,0.0001646346,0.00355556,0.00009419627],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0008543816,0.0006136115,0.01133772,0.000136463,0.001035705,0.000331215,0.00455231,0.481578,0.4197181,0.003678133,0.03912786,0.03703652],"study_design_scores_gemma":[0.003581615,0.00128057,0.01795316,0.001331147,0.00008158114,0.002561741,0.001649996,0.09725721,0.8470195,0.009610426,0.01668517,0.0009879071],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9223713,0.0006605495,0.03744555,0.002110061,0.01227684,0.0004911868,0.000004021196,0.0002817988,0.02435873],"genre_scores_gemma":[0.9699363,0.0002219875,0.02727079,0.00001420353,0.002053472,0.00000442119,0.000006098929,0.00003686996,0.0004558345],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4273014,"threshold_uncertainty_score":0.4252589,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1971414088","doi":"10.1108/17410381011077964","title":"A computer simulation approach to evaluating assembly line balancing with variable operation times","year":2010,"lang":"en","type":"article","venue":"Journal of Manufacturing Technology Management","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Maximization; Minification; Line (geometry); Assembly line; Computer science; Variable (mathematics); Simulation; Mathematical optimization; Engineering; Mathematics; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.00802099015545313,"gpt":0.2384375148387684,"spread":0.2304165246833153,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006157206,0.0001951944,0.0002623044,0.0006855677,0.00009216616,0.00007739182,0.0002851288,0.0001411426,0.00001250896],"category_scores_gemma":[0.00002773626,0.0001684665,0.00003154121,0.0002645991,0.00001496641,0.0002727183,0.00009735695,0.0004659331,0.000009601591],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001020539,"about_ca_system_score_gemma":0.00001510475,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001178571,"about_ca_topic_score_gemma":0.000002608765,"domain_scores_codex":[0.9987805,0.00001794449,0.0004559784,0.0001857164,0.0003107913,0.0002489999],"domain_scores_gemma":[0.999315,0.00003922009,0.0001768159,0.0002838055,0.0001271054,0.00005809023],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001912958,0.00003982667,0.0001082003,0.00007527569,0.000108384,0.000007376899,0.00005159671,0.9834399,0.002590936,0.000450213,0.0001408894,0.01296829],"study_design_scores_gemma":[0.0006369375,0.0002257827,0.001050891,0.00009843821,0.00008030771,0.00005514981,0.00005366547,0.9756247,0.0210435,0.0002026644,0.0007259629,0.0002020307],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.346362,0.000008467899,0.6516392,0.0001029603,0.0002631016,0.0002435209,3.546589e-7,0.0002212016,0.00115919],"genre_scores_gemma":[0.5645223,0.000002653841,0.4352458,0.00002807913,0.0001308971,0.000008164241,0.000002784378,0.00002562323,0.00003371293],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.2181604,"threshold_uncertainty_score":0.6869863,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W181187632","doi":"10.1139/tcsme-2010-0014","title":"A NEW ALGORITHM FOR U-SHAPED TWO-SIDED ASSEMBLY LINE BALANCING","year":2010,"lang":"en","type":"article","venue":"Transactions of the Canadian Society for Mechanical Engineering","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Algorithm; Assembly line; Line (geometry); Schedule; Computer science; Simple (philosophy); Product (mathematics); Flow (mathematics); Mathematical optimization; Mathematics; Engineering; Geometry","retraction":null,"screen_n_in":null,"score":{"opus":0.006922233843501754,"gpt":0.2113784755069822,"spread":0.2044562416634804,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002255055,0.0002116445,0.0002592213,0.00006693113,0.0001982938,0.00003344471,0.0002989741,0.0002335072,0.00002371193],"category_scores_gemma":[0.00008315528,0.0002130765,0.0005794022,0.0003075138,0.00001193617,0.0001258051,0.000004888057,0.000390991,9.886058e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002329255,"about_ca_system_score_gemma":0.0002773892,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002881742,"about_ca_topic_score_gemma":0.03317263,"domain_scores_codex":[0.9988986,0.000003291335,0.0003212899,0.0001866418,0.000138356,0.000451864],"domain_scores_gemma":[0.9990548,0.0001811255,0.0000415391,0.0003120422,0.0001019543,0.0003084968],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003044159,0.000009732085,8.04111e-7,0.0001134797,0.0002417142,1.46262e-7,0.0001464395,0.806125,0.1747648,0.001404097,0.0005828195,0.0166079],"study_design_scores_gemma":[0.0007292196,0.00002603088,0.000008417456,0.00004216218,0.0001262683,0.000005317113,0.00002169793,0.9544293,0.04256368,0.0001331451,0.001698705,0.0002160587],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.001868385,0.00003028696,0.9951781,0.0002895621,0.001526252,0.0006717052,0.0001667247,0.0002488459,0.00002012346],"genre_scores_gemma":[0.4355212,0.000005091264,0.5638021,0.00005488622,0.0002798729,0.00009651671,0.0000215494,0.00009650575,0.0001222483],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.4336528,"threshold_uncertainty_score":0.9844695,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3138932436","doi":"10.1287/ijoc.2020.1015","title":"Solving the Type-2 Assembly Line Balancing with Setups Using Logic-Based Benders Decomposition","year":2021,"lang":"en","type":"article","venue":"INFORMS journal on computing","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto; University of Windsor; University of Regina","funders":"","keywords":"Benders' decomposition; Integer programming; Preprocessor; Mathematical optimization; Task (project management); Integer (computer science); Computer science; Set (abstract data type); Decomposition; Algorithm; Sequence (biology); Upper and lower bounds; Mathematics; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.01599873091923164,"gpt":0.2623558772787281,"spread":0.2463571463594965,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004683349,0.0002287614,0.0002297464,0.0001317362,0.0005256549,0.0003199355,0.0001660389,0.00008621111,0.00001372606],"category_scores_gemma":[0.0001015641,0.0001589267,0.00007498971,0.0004848377,0.00001890138,0.0003316524,0.0000372409,0.0006393013,0.000009289853],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003091424,"about_ca_system_score_gemma":0.0001846463,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000353584,"about_ca_topic_score_gemma":0.000008359639,"domain_scores_codex":[0.9985951,0.00003988317,0.0004613115,0.0001389701,0.000368748,0.0003959535],"domain_scores_gemma":[0.9989641,0.0002125842,0.0002113011,0.0001973823,0.0003172699,0.00009730318],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001745034,0.00001256981,0.0009999612,0.00002790487,0.00004963887,0.00006605639,0.0001639145,0.9926587,0.003192212,0.00006069195,0.00006313497,0.002687742],"study_design_scores_gemma":[0.0005213883,0.00009724762,0.00101755,0.0004659922,0.00003173987,0.0006366209,0.0002435124,0.9904511,0.006122408,0.00003143792,0.0001477245,0.0002333029],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4338269,0.00009705348,0.5643232,0.0001383479,0.0005348583,0.00006983518,7.835462e-7,0.0001567249,0.0008522773],"genre_scores_gemma":[0.9532384,0.00001209738,0.0456431,0.0005868817,0.0004486096,4.32222e-7,0.00001784323,0.00004715272,0.000005499527],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5194115,"threshold_uncertainty_score":0.6480842,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2286315129","doi":"10.1016/j.procir.2015.12.130","title":"Resource Efficient Configuration of an Aircraft Assembly Line","year":2016,"lang":"en","type":"article","venue":"Procedia CIRP","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Queen's University; Queen's University Belfast; Università degli Studi di Napoli Federico II","keywords":"Assembly line; Process (computing); Line (geometry); Engineering; Profitability index; Manufacturing engineering; Throughput; Resource (disambiguation); Computer science; Systems engineering; Engineering drawing; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.007205504766131933,"gpt":0.2148080185506236,"spread":0.2076025137844917,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001468533,0.000113259,0.0001409165,0.00008265873,0.00002526848,0.00001119892,0.0001092683,0.00007863304,0.00002016841],"category_scores_gemma":[0.0001615941,0.00009040963,0.00002607383,0.0001467024,0.00002511786,0.0001221911,0.00001189116,0.0000507292,0.00003515203],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000463686,"about_ca_system_score_gemma":0.00002750134,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001754201,"about_ca_topic_score_gemma":0.000003648935,"domain_scores_codex":[0.9992418,0.00001435491,0.0002475872,0.0001527025,0.0001736226,0.000169973],"domain_scores_gemma":[0.9995058,0.00005617405,0.00005940979,0.0002038015,0.000108801,0.00006605504],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00003364502,0.0001023994,0.0006816803,0.0002088971,0.00002793748,0.000002709489,0.000652111,0.49148,0.4767726,0.0008932926,0.001096987,0.0280477],"study_design_scores_gemma":[0.0007606533,0.0001292443,0.003079243,0.0001383193,0.00002328603,0.000006940288,0.0000487775,0.4785813,0.5146343,0.00005612414,0.002264605,0.0002772377],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5845992,0.00008486854,0.4103701,0.0001831806,0.0001833461,0.0002380625,0.0000113274,0.0005190826,0.003810801],"genre_scores_gemma":[0.9968577,0.00000954712,0.002755689,0.00001765107,0.0001718928,0.0000170289,0.00002032144,0.00003636628,0.0001138234],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4122585,"threshold_uncertainty_score":0.3686798,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2089761050","doi":"10.1007/s10696-007-9022-8","title":"Improvement of earliness and lateness by postponement on an automotive production line","year":2007,"lang":"en","type":"article","venue":"International Journal of Flexible Manufacturing Systems","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Postponement; Assembly line; Automotive industry; Stock (firearms); Production line; Engineering; Operations research; Computer science; Industrial engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.007378044757072411,"gpt":0.2486230474883406,"spread":0.2412450027312682,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008009294,0.0001377536,0.0002059697,0.0003011204,0.00002402317,0.00004698378,0.0001736571,0.00005642919,0.00000545672],"category_scores_gemma":[0.0000371009,0.0001236406,0.00003707639,0.00004878894,0.0000165063,0.000277677,0.00002193401,0.0001346749,9.440313e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002496428,"about_ca_system_score_gemma":0.00001968667,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005270748,"about_ca_topic_score_gemma":0.000003796791,"domain_scores_codex":[0.9984794,0.00001687324,0.0006399725,0.0001230029,0.0006035487,0.0001371753],"domain_scores_gemma":[0.9988669,0.00003643542,0.0003434172,0.0001054864,0.0005777173,0.00007002878],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0002670157,0.0001830011,0.0005668387,0.0001464698,0.0003461369,0.00002343355,0.0005509917,0.9247338,0.05842368,0.0001100565,0.000265933,0.01438262],"study_design_scores_gemma":[0.0008213009,0.000502447,0.007371379,0.0004703816,0.00002830688,0.0001086346,0.0004399665,0.01139183,0.9779047,0.00002935132,0.0007439214,0.000187828],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9420248,0.0002119264,0.05381771,0.00008343986,0.003449668,0.0001588087,0.00001575685,0.00005250962,0.0001853833],"genre_scores_gemma":[0.9987493,0.00004338995,0.0004357302,0.00001292342,0.0005919777,0.000002465046,0.00001298177,0.00002513844,0.0001261005],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.919481,"threshold_uncertainty_score":0.5041916,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4401624930","doi":"10.1016/j.jii.2024.100676","title":"Human-Robot Collaboration in Mixed-Flow Assembly Line Balancing under Uncertainty: An Efficient Discrete Bees Algorithm","year":2024,"lang":"en","type":"article","venue":"Journal of Industrial Information Integration","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec à Montréal","funders":"Key Research and Development Program of Heilongjiang","keywords":"Assembly line; Robot; Line (geometry); Flow (mathematics); Computer science; Flow line; Algorithm; Mathematical optimization; Engineering; Simulation; Artificial intelligence; Mathematics; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01768390940399167,"gpt":0.2862371201840418,"spread":0.2685532107800501,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001123025,0.0002259636,0.0003034487,0.0009044683,0.00008868172,0.0005866256,0.0001464192,0.0003001369,0.00003000945],"category_scores_gemma":[0.0002257939,0.0001981883,0.00008084315,0.0009949927,0.00001899524,0.003667839,0.00001401273,0.0006726566,0.00001462774],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008626446,"about_ca_system_score_gemma":0.0002506319,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003954818,"about_ca_topic_score_gemma":0.0001161725,"domain_scores_codex":[0.9976593,0.0000984432,0.001434347,0.0001017429,0.0004952454,0.0002108777],"domain_scores_gemma":[0.9988491,0.00007986514,0.0003355139,0.0001317798,0.0005074383,0.00009630741],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002054097,0.00001919859,0.0000141603,0.0000196845,0.00002787858,0.000003510087,0.001187469,0.9553073,0.001802131,0.0004730731,0.001044257,0.04008078],"study_design_scores_gemma":[0.0008162651,0.000234845,0.0001680507,0.0004984586,0.00003326292,0.00002698878,0.002385631,0.9917673,0.003229047,0.0001068315,0.000534162,0.0001991422],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1845637,0.000103333,0.8111631,0.0003592992,0.003034634,0.0003189532,0.00003453016,0.0001749678,0.0002474935],"genre_scores_gemma":[0.9880939,0.00002094878,0.01034724,0.00004777093,0.001049342,0.00001262085,0.0003869457,0.00002793491,0.00001333039],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8035302,"threshold_uncertainty_score":0.8081883,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2514821803","doi":"10.1016/j.autcon.2016.08.022","title":"A mixed-integer linear programming approach for temporary haul road design in rough-grading projects","year":2016,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Truck; Integer programming; Engineering; Linear programming; Grading (engineering); Transport engineering; Industrial engineering; Field (mathematics); Operations research; Computer science; Civil engineering; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.02736575111233167,"gpt":0.239384752012677,"spread":0.2120190009003453,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004860144,0.0001736982,0.0002043079,0.0004395377,0.00004679227,0.00003788556,0.0000798467,0.0001609027,0.000002890303],"category_scores_gemma":[0.0001962681,0.0001569121,0.00003931495,0.000520883,0.00003160454,0.0006872016,0.00001202358,0.0001003862,0.000004846866],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003180579,"about_ca_system_score_gemma":0.00005994501,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002734936,"about_ca_topic_score_gemma":0.00001149669,"domain_scores_codex":[0.9987772,0.00007524671,0.0004816038,0.0002637411,0.0001373319,0.0002648831],"domain_scores_gemma":[0.999526,0.0001147601,0.0001080431,0.0001544712,0.00006451426,0.00003226988],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005132693,0.00007188617,0.03342715,0.0003298511,0.00003068374,0.000002614891,0.0006728057,0.6685516,0.004366125,0.001325357,0.0002453381,0.2909253],"study_design_scores_gemma":[0.0009536836,0.00002763654,0.002590332,0.0001971675,0.000006755957,0.00002280273,0.0002118824,0.9917094,0.003778635,0.0002020206,0.00008801111,0.0002117253],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08778228,0.00003203634,0.9097213,0.00005051168,0.0003761401,0.001135774,0.000002966752,0.0006561031,0.0002429619],"genre_scores_gemma":[0.6422139,0.000006709425,0.357255,0.000003428061,0.00007778735,0.0003718504,0.00002749043,0.00003166097,0.00001218257],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5544317,"threshold_uncertainty_score":0.6398688,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4386773670","doi":"10.5267/j.ijiec.2023.7.001","title":"Assembly line balancing with cobots: An extensive review and critiques","year":2023,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Workstation; Assembly line; Robot; Computer science; Scheduling (production processes); Process management; Process (computing); Engineering; Operations management; Manufacturing engineering; Artificial intelligence; Operating system; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02333663294388385,"gpt":0.2844910595093534,"spread":0.2611544265654696,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002794164,0.0001465222,0.0002619708,0.0003683183,0.0000315885,0.00007938521,0.0001790896,0.00006778321,0.000006034549],"category_scores_gemma":[0.0003494926,0.0001387854,0.000038869,0.0003611599,0.00001404757,0.0004644029,0.00002441918,0.000295224,0.00000355938],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008995974,"about_ca_system_score_gemma":0.00006444761,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004831368,"about_ca_topic_score_gemma":0.000002408282,"domain_scores_codex":[0.9989795,0.0000220301,0.0004500812,0.00009956504,0.0003057095,0.000143131],"domain_scores_gemma":[0.9988031,0.0001747252,0.0001219758,0.00007514167,0.0007181337,0.0001069615],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000007547981,0.00001119335,0.0001472858,0.00004600473,0.0001363848,0.00005877114,0.0001055875,0.9953045,0.000713055,0.0001265047,0.001009322,0.002333856],"study_design_scores_gemma":[0.001079288,0.0002115221,0.001468594,0.00225584,0.0001365007,0.0005047001,0.000107186,0.9921192,0.0005547075,0.00004984936,0.001231633,0.0002810126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2054186,0.002521469,0.7846619,0.002893384,0.002961303,0.0004125081,0.00005384432,0.0009023605,0.0001746863],"genre_scores_gemma":[0.9830964,0.001732803,0.01376753,0.0001557407,0.00106069,0.000007904271,0.0001056834,0.00006172025,0.00001157187],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7776778,"threshold_uncertainty_score":0.5659505,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4285166142","doi":"10.5267/j.ijiec.2022.2.001","title":"Assembly line rebalancing and worker assignment considering ergonomic risks in an automotive parts manufacturing plant","year":2022,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Automotive industry; Constructive; Assembly line; Heuristic; Quality (philosophy); Benchmark (surveying); Manufacturing engineering; Engineering; Risk analysis (engineering); Work (physics); Computer science; Operations research; Industrial engineering; Process (computing); Business; Mechanical engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.03440726592990508,"gpt":0.2632480629523334,"spread":0.2288407970224283,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004509633,0.0001738854,0.0002531475,0.0005912926,0.00007186806,0.0001037342,0.000224353,0.00006508382,0.00001828545],"category_scores_gemma":[0.0001205527,0.0002062259,0.00005012558,0.0001345477,0.00001081403,0.0003692422,0.00009369487,0.000669986,7.386661e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006464595,"about_ca_system_score_gemma":0.00008389162,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002465152,"about_ca_topic_score_gemma":0.00001061311,"domain_scores_codex":[0.9985762,0.0000562256,0.0006664649,0.0001444207,0.0003580665,0.0001986065],"domain_scores_gemma":[0.9993199,0.0001985667,0.0001996032,0.00007941091,0.00010016,0.000102383],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002538345,0.00003675398,0.001917669,0.000003299118,0.00009759251,0.00009253538,0.0004462596,0.9941362,0.0008596819,0.00004185422,0.00005439839,0.00228836],"study_design_scores_gemma":[0.001420965,0.000102287,0.008908982,0.0001509163,0.00002124187,0.0002599868,0.0003039399,0.9866314,0.001595483,0.00003972464,0.0003500232,0.0002150715],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9052191,0.00008560642,0.09188359,0.0001627639,0.002358425,0.0001321658,0.00003335804,0.00009690382,0.00002811662],"genre_scores_gemma":[0.993924,0.00001774884,0.005432006,0.00002460009,0.000496153,0.00001222625,0.00005270637,0.00003832004,0.000002285454],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.08870488,"threshold_uncertainty_score":0.840965,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2081660128","doi":"10.1080/00207540701223394","title":"Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally","year":2007,"lang":"en","type":"article","venue":"International Journal of Production Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Schedule; Scheduling (production processes); Shortest path problem; Production schedule; Computer science; Production (economics); Path (computing); Longest path problem; Critical path method; Mathematics; Engineering; Computer network","retraction":null,"screen_n_in":null,"score":{"opus":0.1194106475040753,"gpt":0.3724037514728116,"spread":0.2529931039687363,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003006555,0.0001223859,0.0001880352,0.0004456382,0.0001175422,0.00005690374,0.0005045335,0.00008239332,0.000004782525],"category_scores_gemma":[0.002181942,0.00009825145,0.0001019379,0.0003033034,0.0001154545,0.0003757844,0.00005771592,0.0004643181,7.745565e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002963163,"about_ca_system_score_gemma":0.000253243,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007972657,"about_ca_topic_score_gemma":0.0001141184,"domain_scores_codex":[0.9977433,0.00005194108,0.0006164551,0.0001764087,0.00116409,0.0002478204],"domain_scores_gemma":[0.9953583,0.0001091201,0.0003351212,0.0002053048,0.00393601,0.00005613075],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0007032228,0.0003505648,0.01919249,0.0002756962,0.00043506,0.000005703541,0.001020268,0.7306219,0.2233275,0.002372078,0.005388237,0.01630728],"study_design_scores_gemma":[0.001065902,0.0001814897,0.05329582,0.0006523915,0.00005494022,0.000150841,0.001163363,0.09498293,0.8410753,0.001027714,0.006008129,0.0003411536],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8680674,0.0001426735,0.1190769,0.006823489,0.005301814,0.000411491,0.00005450841,0.00003267149,0.00008903957],"genre_scores_gemma":[0.9679975,0.0002252441,0.0291118,0.00001523451,0.002230424,0.00001043932,0.00001928087,0.0000329393,0.0003571173],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.635639,"threshold_uncertainty_score":0.4006578,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1965880809","doi":"10.1016/j.ejor.2005.06.053","title":"Modeling and analysis of a supply–assembly–store chain","year":2005,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"Chinese Academy of Sciences; Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China","keywords":"Supply chain; Markov chain; Computer science; Workstation; Set (abstract data type); Poisson distribution; Safety stock; Process (computing); Product (mathematics); Component (thermodynamics); Markov process; Conveyor system; Industrial engineering; Operations research; Mathematics; Engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.03919696098079783,"gpt":0.3152330231395685,"spread":0.2760360621587706,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002829186,0.00007800401,0.0002023011,0.0007675413,0.0000768176,0.00005947936,0.0001661921,0.00001905374,0.000054831],"category_scores_gemma":[0.0002742772,0.0000704402,0.00006621436,0.0006195123,0.00003131122,0.0002736952,0.00004079355,0.0002893962,0.000007390461],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007406065,"about_ca_system_score_gemma":0.00006176484,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002666595,"about_ca_topic_score_gemma":0.000008868965,"domain_scores_codex":[0.9984091,0.0002614108,0.0004737498,0.000088425,0.0006052699,0.0001620768],"domain_scores_gemma":[0.9989213,0.0001037817,0.00004303789,0.0001063015,0.0007261935,0.00009939519],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001556561,0.00001836735,0.0007991927,0.000009947849,0.0001919577,0.00001068843,0.0004570553,0.9874603,0.00814453,0.0003078866,0.0003491379,0.00223535],"study_design_scores_gemma":[0.0002477439,0.00006343902,0.005015532,0.00003456663,0.0000470751,0.00001532532,0.00008823772,0.9933721,0.0005968859,0.000004140049,0.0004531294,0.00006175436],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8888735,0.0007126237,0.1073833,0.000404053,0.00003860509,0.0000614835,0.000008155454,0.00001274854,0.002505464],"genre_scores_gemma":[0.9837847,0.0002548517,0.01556988,0.00001398292,0.0002497051,5.896765e-7,0.00001260256,0.000023895,0.00008973242],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.09491123,"threshold_uncertainty_score":0.2872468,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2012815519","doi":"10.1007/s00170-010-2614-6","title":"A computer simulation approach to evaluating bowl versus inverted bowl assembly line arrangement with variable operation times","year":2010,"lang":"en","type":"article","venue":"The International Journal of Advanced Manufacturing Technology","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Exponential function; Line (geometry); Exponential distribution; Variance (accounting); Distribution (mathematics); Basis (linear algebra); Normal distribution; Mathematics; Variable (mathematics); Statistics; Simulation; Algorithm; Engineering; Geometry; Mathematical analysis","retraction":null,"screen_n_in":null,"score":{"opus":0.01267451332524066,"gpt":0.2695939348826207,"spread":0.2569194215573801,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003627033,0.0001792192,0.0002000894,0.0003839891,0.00007905715,0.00007463045,0.0005930726,0.0001071672,0.00001737022],"category_scores_gemma":[0.0001229309,0.0001340089,0.00003490151,0.0001632139,0.00003053639,0.0003336146,0.00009715877,0.0004941289,0.000007841929],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001613505,"about_ca_system_score_gemma":0.00004370111,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003842932,"about_ca_topic_score_gemma":0.00001476816,"domain_scores_codex":[0.9987759,0.00001881452,0.0004126252,0.0001600052,0.0004423032,0.0001903502],"domain_scores_gemma":[0.9989875,0.0001247484,0.0002154415,0.0002320331,0.0003945744,0.00004573031],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002220925,0.00003503042,0.00001775668,0.000007098701,0.0001437481,0.000002723657,0.000099533,0.9384753,0.04602776,0.0004836158,0.0000692041,0.01441618],"study_design_scores_gemma":[0.001527842,0.0003020105,0.0001794572,0.00005471716,0.00003768222,0.0000552859,0.00006794483,0.8725184,0.1237565,0.0004659655,0.0008745358,0.0001597253],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4875149,0.00001275454,0.5104363,0.0004718643,0.0009415722,0.0001805704,0.000001638391,0.0001418056,0.0002986303],"genre_scores_gemma":[0.7144154,0.00000663507,0.2851492,0.0000620554,0.0002990138,0.00001244447,0.00001027259,0.00002736479,0.00001765143],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.2269005,"threshold_uncertainty_score":0.5464724,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1551220477","doi":"10.1007/978-3-540-71615-0_21","title":"Crossover Operators for the Car Sequencing Problem","year":2007,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Crossover; Computer science; Operator (biology); Benchmark (surveying); Scheduling (production processes); Job shop scheduling; Mathematical optimization; Assembly line; Genetic algorithm; Artificial intelligence; Mathematics; Machine learning; Engineering; Schedule","retraction":null,"screen_n_in":null,"score":{"opus":0.01749189456774317,"gpt":0.244169847977615,"spread":0.2266779534098719,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005720682,0.0003192214,0.0002553645,0.0002350008,0.0002143111,0.0002193331,0.0006771269,0.0002379673,0.000008193996],"category_scores_gemma":[0.00005342719,0.0002442643,0.00007138406,0.0002441948,0.0002106868,0.0001806181,0.0001249483,0.0004445507,0.00000777678],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005483797,"about_ca_system_score_gemma":0.0002102183,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001275537,"about_ca_topic_score_gemma":0.000111618,"domain_scores_codex":[0.9984275,0.000003830976,0.0003129602,0.0004560802,0.0003587111,0.0004409157],"domain_scores_gemma":[0.9988606,0.0003935583,0.00006714503,0.0004570145,0.0001639999,0.00005767485],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000001995235,9.925726e-7,0.00001376082,0.00004360012,0.000008334637,0.000003739911,0.0003352704,0.9582347,0.0001856171,0.00076905,0.00002882245,0.04037413],"study_design_scores_gemma":[0.0001487345,0.00002758543,0.00001546396,0.0001806317,0.00001181539,0.00001337795,2.815107e-7,0.9911839,0.002266909,0.003125282,0.002689864,0.0003361061],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.0001016487,0.0004593853,0.9950266,0.00006088888,0.001271212,0.0006306071,0.000007714142,0.0001862421,0.002255711],"genre_scores_gemma":[0.2236457,0.00007856768,0.7726257,0.0009819478,0.001881329,0.00004174637,0.00001944367,0.0002032896,0.0005223128],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.223544,"threshold_uncertainty_score":0.996081,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3046992156","doi":"10.1080/15623599.2020.1793075","title":"Integrated lean concepts and continuous/discrete-event simulation to examine productivity improvement in door assembly-line for residential buildings","year":2020,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Productivity; Modular design; Lean manufacturing; Reliability (semiconductor); Line (geometry); Investment (military); Computer science; Event (particle physics); Industrial engineering; Reliability engineering; Engineering; Manufacturing engineering; Simulation","retraction":null,"screen_n_in":null,"score":{"opus":0.009836404467518203,"gpt":0.2791270726432487,"spread":0.2692906681757305,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003256836,0.0001478826,0.0002274103,0.0003093214,0.00002551305,0.00008075981,0.0001603372,0.00004025059,0.00001395495],"category_scores_gemma":[0.000169711,0.0001524379,0.00005455703,0.0001846527,0.00002420458,0.0003442398,0.00006006189,0.0001258766,0.000001386113],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002162109,"about_ca_system_score_gemma":0.00001870148,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007972763,"about_ca_topic_score_gemma":0.00001328673,"domain_scores_codex":[0.9986654,0.00001994765,0.000640389,0.0001914446,0.000347073,0.0001357664],"domain_scores_gemma":[0.9991555,0.00004693117,0.0002365941,0.00006636024,0.000407058,0.00008753479],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003246619,0.00002870237,0.001210141,0.00006396814,0.0001982218,0.00001334753,0.0002656581,0.9006513,0.01233263,0.000890549,0.0003351846,0.08368565],"study_design_scores_gemma":[0.005918473,0.0007819938,0.007312901,0.0004070716,0.0001378377,0.0000458102,0.001452261,0.9409373,0.02752178,0.0006631871,0.01432395,0.0004974401],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4482268,0.0000222645,0.5492215,0.001263622,0.0007661302,0.0004050214,0.00000929287,0.00003259168,0.00005276547],"genre_scores_gemma":[0.9619321,0.00003615188,0.03739276,0.0001146561,0.0004421805,0.00001620261,0.00001719999,0.0000212794,0.00002751227],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5137053,"threshold_uncertainty_score":0.6216239,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2105046377","doi":"10.1023/a:1024847308982","title":"Cyclic Just-In-Time Sequences Are Optimal","year":2003,"lang":"en","type":"article","venue":"Journal of Global Optimization","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematics; Combinatorics; Sequence (biology); Concatenation (mathematics); Product (mathematics); Integer (computer science); Production (economics); Discrete mathematics; Computer science; Geometry","retraction":null,"screen_n_in":null,"score":{"opus":0.006722708713548566,"gpt":0.2266807671283111,"spread":0.2199580584147625,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003355654,0.0001620255,0.0002896838,0.0001141979,0.00003451549,0.00006587804,0.0001729059,0.0001203239,0.00007219978],"category_scores_gemma":[0.0002160531,0.0001599895,0.00007489696,0.000599469,0.00001946639,0.0005319693,0.000009742296,0.0001526052,0.00001655595],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004286495,"about_ca_system_score_gemma":0.00006765309,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002199254,"about_ca_topic_score_gemma":0.000003977004,"domain_scores_codex":[0.9987045,0.00006603196,0.0005760367,0.0001040289,0.0003226533,0.0002267844],"domain_scores_gemma":[0.9993131,0.00002773524,0.0002737896,0.000109779,0.000182522,0.00009308116],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001224596,0.00003162556,0.01207514,0.00001327567,0.00001968819,0.0000263844,0.00002923994,0.9868906,0.0001255898,0.0001181375,0.0005782093,0.00007984837],"study_design_scores_gemma":[0.001068117,0.00009058259,0.005437273,0.0001650609,0.00004834456,0.0002802865,0.0001385043,0.9913583,0.0005783737,0.00008133797,0.0004659143,0.0002878457],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3182175,0.0008080644,0.6723541,0.0001609428,0.0009309594,0.0001974015,0.000009749713,0.0001377889,0.007183566],"genre_scores_gemma":[0.8627129,0.0002169933,0.1368485,0.00004736895,0.0001110539,0.000001718614,0.000005261543,0.00002549602,0.00003075346],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5444954,"threshold_uncertainty_score":0.6524183,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1968070149","doi":"10.1016/j.compind.2013.07.009","title":"Design of a feature-based order acceptance and scheduling module in an ERP system","year":2013,"lang":"en","type":"article","venue":"Computers in Industry","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Lister Institute of Preventive Medicine","keywords":"Computer science; Build to order; Scheduling (production processes); Systems engineering; Material requirements planning; Software engineering; Industrial engineering; Process management; Manufacturing engineering; Engineering; Production (economics); Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.0133519921219689,"gpt":0.2194179467917544,"spread":0.2060659546697855,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001113461,0.0001134378,0.0001800429,0.0001509826,0.00001262727,0.00003054946,0.0001208943,0.0002693075,0.000002898928],"category_scores_gemma":[0.00001580758,0.00012633,0.000007749583,0.000334,0.00001674871,0.0002080749,0.00002141528,0.0003651947,0.000001354631],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009379952,"about_ca_system_score_gemma":0.00002675358,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001588114,"about_ca_topic_score_gemma":0.000004316626,"domain_scores_codex":[0.9993828,0.00004226962,0.0001899789,0.0001498326,0.00007447252,0.0001606712],"domain_scores_gemma":[0.9996499,0.00005652236,0.00003741987,0.0001709541,0.00004284261,0.00004235963],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002958611,0.00001263593,0.02247201,0.00009879546,0.000003920391,0.000002902721,0.0001008336,0.9756318,0.0005803276,0.0000215919,0.00006030009,0.001011975],"study_design_scores_gemma":[0.0004341205,0.00001714641,0.01390725,0.0003561463,0.000001930723,0.000001997179,0.00009347046,0.9843219,0.0007411491,0.000008353919,9.259136e-7,0.0001156368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5029743,0.00006392942,0.496553,0.00001636816,0.0001201759,0.0001664084,4.269036e-7,0.00007249056,0.00003288392],"genre_scores_gemma":[0.7861171,0.000001199401,0.2137938,0.0000156336,0.00003141606,0.00001810174,0.00000295595,0.00001823671,0.000001525175],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2831428,"threshold_uncertainty_score":0.5151588,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2234671284","doi":"","title":"Resource Constrained Assembly Line Balancing Problem Solved with Ranked Positional Weight Rule","year":2011,"lang":"en","type":"article","venue":"Review of Economics and Finance","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Heuristic; Mathematical optimization; Computer science; Assembly line; Integer programming; Resource (disambiguation); Integer (computer science); Line (geometry); Simple (philosophy); Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.008182766435305695,"gpt":0.1792555538907519,"spread":0.1710727874554462,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001778817,0.0001330634,0.0003451024,0.0000304228,0.0000315561,0.000007280283,0.0000736392,0.00004365004,0.0000130207],"category_scores_gemma":[0.000007671383,0.0001236187,0.00003717419,0.00006515776,0.00003638995,0.0001095284,0.00001522093,0.00007009594,0.000003340241],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002395325,"about_ca_system_score_gemma":0.00003263364,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003756543,"about_ca_topic_score_gemma":0.00000491025,"domain_scores_codex":[0.9993198,0.000009585649,0.000353456,0.0001532362,0.00002688613,0.0001370509],"domain_scores_gemma":[0.9996175,0.00002357795,0.0001381521,0.0001492939,0.00004429225,0.00002718695],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0006013648,0.0007927135,0.01120037,0.0722768,0.001798095,0.00006581674,0.002290346,0.3135663,0.004345218,0.4049509,0.007620067,0.180492],"study_design_scores_gemma":[0.005133493,0.0006884688,0.01769127,0.03532195,0.000424722,0.0002700981,0.00004798023,0.8479732,0.008808814,0.002490543,0.07884029,0.002309166],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.728701,0.1470539,0.05133809,0.0007878871,0.0002578903,0.002119425,0.0002025878,0.0003085892,0.06923065],"genre_scores_gemma":[0.6730675,0.2125636,0.1137781,0.0002552092,0.00008765948,0.00004459116,0.00008965775,0.00005659348,0.00005709726],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5344069,"threshold_uncertainty_score":0.5041026,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2011994858","doi":"10.1080/00207540600857367","title":"A case study in productivity-cost trade-off in the design of paced parallel production systems","year":2006,"lang":"en","type":"article","venue":"International Journal of Production Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"National Science Foundation","keywords":"Machining; Numerical control; Throughput; Flexibility (engineering); Production line; Volume (thermodynamics); Production (economics); Productivity; Computer science; Engineering; Manufacturing engineering; Reliability engineering; Mechanical engineering; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.0868810289921958,"gpt":0.3658798215060534,"spread":0.2789987925138576,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007331288,0.0001235232,0.0002252797,0.001171645,0.00004954011,0.00007485056,0.0003433711,0.00005432062,0.000002783201],"category_scores_gemma":[0.0009467743,0.00009826158,0.00003883499,0.000982166,0.00005832001,0.0005188268,0.0000241734,0.0006592905,0.000001732739],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003968593,"about_ca_system_score_gemma":0.0001160165,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003998892,"about_ca_topic_score_gemma":0.0003488812,"domain_scores_codex":[0.9965264,0.0009283898,0.0008167239,0.000227202,0.001277849,0.0002234507],"domain_scores_gemma":[0.9985438,0.000173282,0.0002047486,0.0002403561,0.000814085,0.00002375281],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001528866,0.0007708574,0.01068718,0.0000367029,0.00004295291,0.0006335016,0.002465521,0.977007,0.005396075,0.00004296316,0.001336719,0.00142761],"study_design_scores_gemma":[0.01201044,0.003114262,0.2576652,0.001868576,0.0001517111,0.07959343,0.1058103,0.499243,0.0334629,0.001798627,0.003615401,0.001666141],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9881103,0.0003231807,0.006361693,0.001810376,0.001691101,0.001625518,0.000001548553,0.00001995438,0.0000562975],"genre_scores_gemma":[0.9977249,0.00006198596,0.0007980058,0.000001281712,0.001262238,0.0000631146,0.000002848793,0.00002217188,0.00006347989],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.477764,"threshold_uncertainty_score":0.4006991,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2790675559","doi":"10.1109/tem.2018.2797223","title":"A Cuckoo Search Algorithm to Solve Transfer Line Balancing Problems With Different Cutting Conditions","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Windsor","funders":"","keywords":"Cuckoo search; Computer science; Cuckoo; Line (geometry); Algorithm; Mathematical optimization; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.00708168314418536,"gpt":0.2061752349621996,"spread":0.1990935518180142,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001265557,0.0003807089,0.000270066,0.0005230316,0.0001887299,0.00008044983,0.0001862643,0.0000776296,0.00007146134],"category_scores_gemma":[0.000001216636,0.000373594,0.00007647871,0.0006515825,0.0000246528,0.0001684116,0.00000311815,0.0003049198,0.00008281783],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002617828,"about_ca_system_score_gemma":0.000008854468,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001085974,"about_ca_topic_score_gemma":0.00003574578,"domain_scores_codex":[0.9983245,0.00001025982,0.0003310514,0.0003875393,0.0003735139,0.0005731235],"domain_scores_gemma":[0.9992933,0.00004010172,0.0000119863,0.0003761251,0.00008500992,0.0001934683],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000009248739,0.00008000177,0.000003830681,0.0001763815,0.0002115471,0.000009270125,0.0004677249,0.9876309,0.00240593,0.00007930517,0.00005592962,0.008869942],"study_design_scores_gemma":[0.0006756151,0.0003159613,0.0002668156,0.0004076141,0.0001053534,0.00001045714,0.00009506138,0.9602578,0.03679188,0.000003700532,0.0005961882,0.0004735152],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03130439,0.00001045199,0.9652562,0.0000856701,0.0006096305,0.0008448324,0.00003091409,0.001236662,0.0006212459],"genre_scores_gemma":[0.9381253,0.00003195406,0.06094114,0.00005974873,0.0001679302,0.000324896,0.00001732439,0.0001454414,0.0001862215],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.906821,"threshold_uncertainty_score":0.9998716,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1533885788","doi":"10.5772/5558","title":"Multi-Objective Simulated Annealing for a Maintenance Workforce Scheduling Problem: A Case Study","year":2008,"lang":"en","type":"book-chapter","venue":"InTech eBooks","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Workforce; Job shop scheduling; Simulated annealing; Operations research; Scheduling (production processes); Computer science; Workforce management; Operations management; Engineering; Schedule; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.02952359334522259,"gpt":0.2641881518009691,"spread":0.2346645584557465,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002209593,0.0007161953,0.0007315271,0.0003470654,0.000216339,0.00006325649,0.0002425031,0.0005464444,0.000005349408],"category_scores_gemma":[0.00009468193,0.0007710999,0.0002258525,0.00004761848,0.00006430757,0.00007905367,0.00008872139,0.0008195371,0.00001745409],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004383891,"about_ca_system_score_gemma":0.00009515628,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007407161,"about_ca_topic_score_gemma":0.0002168517,"domain_scores_codex":[0.9978104,0.00001586492,0.0007730183,0.0006417204,0.0002278049,0.0005311708],"domain_scores_gemma":[0.9984505,0.0001840962,0.0002441692,0.0005181188,0.0004841623,0.0001189589],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001502736,0.00008471348,0.00003297896,0.0004998904,0.0009802444,0.004680727,0.01080349,0.9688236,0.002248643,0.000134918,0.0001622307,0.0113983],"study_design_scores_gemma":[0.003089132,0.0004376525,0.000001274471,0.002237773,0.0003022172,0.001899273,0.001117494,0.9791181,0.002901327,0.0002996117,0.006845794,0.001750354],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01138836,0.00060582,0.9111379,0.000007341544,0.0007061006,0.008156484,0.0001070897,0.003029354,0.0648615],"genre_scores_gemma":[0.8461931,0.00003136405,0.08159135,0.00003246024,0.0003111504,0.0002880962,0.00004797376,0.0005994812,0.07090506],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8348047,"threshold_uncertainty_score":0.999474,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2049343437","doi":"10.1016/j.ejor.2010.02.011","title":"Constrained group balancing: Why does it work","year":2010,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Group (periodic table); Work (physics); Computer science; Group work; Mathematics; Operations research; Engineering; Mathematics education","retraction":null,"screen_n_in":null,"score":{"opus":0.02731246704259544,"gpt":0.2964095329615896,"spread":0.2690970659189941,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003988183,0.0001138035,0.0001493269,0.000266256,0.0001652831,0.0002107611,0.0003519814,0.00003483991,0.0005737882],"category_scores_gemma":[0.0009332852,0.0000856333,0.00005836157,0.0003541823,0.0001012873,0.0003303339,0.00004830188,0.001089638,0.0001063679],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005013785,"about_ca_system_score_gemma":0.0001010621,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001140166,"about_ca_topic_score_gemma":0.00001246866,"domain_scores_codex":[0.9980285,0.0003170332,0.0004756741,0.0001144456,0.0007863741,0.0002779559],"domain_scores_gemma":[0.9985399,0.0002765542,0.00005563955,0.0001660026,0.0007819352,0.0001800311],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002463096,0.0002672474,0.01226484,0.0001079951,0.0002818011,0.0009826509,0.002280497,0.238167,0.440816,0.01500348,0.2776037,0.01197845],"study_design_scores_gemma":[0.005267472,0.0009797266,0.07977844,0.0007140243,0.00004666253,0.001031643,0.001188853,0.1362108,0.01355793,0.0005526807,0.7593926,0.00127919],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7839374,0.0002570157,0.1054477,0.006817909,0.003116805,0.0003841199,0.00001667586,0.0001550979,0.09986728],"genre_scores_gemma":[0.9783861,0.00003933734,0.01972272,0.0001217918,0.001258491,0.00000137597,0.00001101646,0.00004919899,0.0004099646],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4817889,"threshold_uncertainty_score":0.6282579,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2072947809","doi":"10.1139/l09-072","title":"Formulation of a pull production system for optimal inventory control of temporary rebar assembly plants","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Agencia Estatal de Investigación","keywords":"Procurement; Rebar; Inventory control; Production (economics); Precast concrete; Control (management); Computer science; Raw material; Operations management; Operations research; Reliability engineering; Manufacturing engineering; Engineering; Business; Civil engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.007065920851720069,"gpt":0.1832324377589183,"spread":0.1761665169071982,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003626252,0.0001351079,0.0003415875,0.0004962924,0.00002480465,0.0000115348,0.0001169549,0.00009171348,0.000001990155],"category_scores_gemma":[0.000144493,0.0001506685,0.00009507449,0.0001578835,0.000006482855,0.0003278675,0.000001523015,0.0001201618,2.151682e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00024801,"about_ca_system_score_gemma":0.0002422745,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005563823,"about_ca_topic_score_gemma":0.0007805285,"domain_scores_codex":[0.9989278,0.00001056889,0.0006220251,0.00007741191,0.0001451273,0.0002170806],"domain_scores_gemma":[0.9991868,0.00002981113,0.0002520365,0.0001224492,0.0002235279,0.0001854442],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001950246,0.000004851745,0.0006168669,0.0003255187,0.00005181795,0.000005469366,0.000148568,0.976572,0.0215455,0.0001465339,0.0003543884,0.0002089883],"study_design_scores_gemma":[0.0009190271,0.0002192939,0.003706177,0.0009179284,0.00005427987,0.0001068491,0.0000970999,0.9724925,0.02083955,0.00001354158,0.0004300066,0.0002037347],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4417101,0.001147148,0.5552765,0.00005242752,0.00107158,0.0003840001,0.00003466528,0.00006009851,0.0002635585],"genre_scores_gemma":[0.9973438,0.000007655041,0.002341006,0.00000308526,0.0002542489,0.000003050647,0.000009639817,0.00003160999,0.000005863185],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5556338,"threshold_uncertainty_score":0.6144084,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1965219379","doi":"10.1287/msom.1070.0178","title":"Just-in-Time Smoothing Through Batching","year":2008,"lang":"en","type":"article","venue":"Manufacturing & Service Operations Management","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Korea Institute of Machinery and Materials","keywords":"Smoothing; Computer science; Operations management; Business; Operations research; Microeconomics; Economics; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01268790881181887,"gpt":0.213028733798536,"spread":0.2003408249867171,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001441521,0.0002556388,0.0002094946,0.0001900864,0.0003090082,0.0001198152,0.0003276347,0.00006828359,0.0001247176],"category_scores_gemma":[0.000004259876,0.0002874967,0.00004101501,0.0002884941,0.000009880197,0.0006910368,0.000143942,0.0002069299,0.0004175568],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002236984,"about_ca_system_score_gemma":0.00000922627,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002210711,"about_ca_topic_score_gemma":0.0002658895,"domain_scores_codex":[0.9986318,0.00002876055,0.0003790667,0.0003086639,0.0002816732,0.0003699818],"domain_scores_gemma":[0.9994611,0.00002295226,0.00002329829,0.000416841,0.0000270445,0.00004878034],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002258191,0.00003323961,0.0001544973,0.0001220556,0.00003416536,0.0000399759,0.001819935,0.9966373,0.0001892374,0.000175207,0.0003344124,0.000457705],"study_design_scores_gemma":[0.001112713,0.00001812094,0.02396339,0.0002269309,0.00005856368,0.00003010387,0.0006760592,0.9517269,0.01071069,0.0001141305,0.0104956,0.0008667824],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9071614,0.00007073431,0.06148315,0.000658174,0.0003614609,0.0006435277,0.000003880806,0.0009582415,0.02865947],"genre_scores_gemma":[0.9553053,0.0001559068,0.0423681,0.0007598801,0.0001116364,0.00008615102,0.00007627414,0.00008022008,0.001056572],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.0481439,"threshold_uncertainty_score":0.9999577,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4313130329","doi":"10.1016/j.ifacol.2022.10.151","title":"A Review on Collaborative Robot Assembly Line Balancing Problems","year":2022,"lang":"en","type":"review","venue":"IFAC-PapersOnLine","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Assembly line; Workload; Scheduling (production processes); Computer science; Robot; Task (project management); Distributed computing; Engineering; Systems engineering; Operations management; Artificial intelligence; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03539782864909231,"gpt":0.3026670222448766,"spread":0.2672691935957843,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0007134977,0.001304465,0.003453309,0.0003948886,0.0002257408,0.00008511818,0.0007062426,0.0004402226,0.0006112698],"category_scores_gemma":[0.0004720675,0.001178112,0.0006141503,0.002294934,0.00003334153,0.0001966153,0.0001676237,0.00157764,0.0003081312],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001018028,"about_ca_system_score_gemma":0.0004567752,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009229408,"about_ca_topic_score_gemma":0.00003609514,"domain_scores_codex":[0.9957358,0.0003434335,0.001514853,0.000939645,0.0006894713,0.0007768094],"domain_scores_gemma":[0.9975344,0.000507009,0.000588778,0.000987294,0.000150421,0.0002321032],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000005696974,0.0001561702,5.352166e-7,0.1347727,0.0005484664,0.00006559819,0.0001321642,0.07724115,0.00001052379,0.00003375199,0.00137811,0.7856551],"study_design_scores_gemma":[0.0002714333,0.0001910573,3.147024e-7,0.07191411,0.0008917869,0.00005252374,0.00002185288,0.01128601,0.000002041695,0.000001637788,0.9143072,0.001060073],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[5.1398e-7,0.9893797,0.001534977,0.000146793,0.001051344,0.003038817,0.0005229632,0.001104834,0.003220065],"genre_scores_gemma":[3.674058e-7,0.9499867,0.04324395,0.0004972919,0.0007399626,0.0009734982,0.003512014,0.000455876,0.0005903444],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.9129291,"threshold_uncertainty_score":0.9999707,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2126013441","doi":"10.5267/j.msl.2010.01.003","title":"A multi attribute decision making method for selection of optimal assembly line","year":2010,"lang":"en","type":"article","venue":"Management Science Letters","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Selection (genetic algorithm); Computer science; Line (geometry); Assembly line; Operations research; Data mining; Artificial intelligence; Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01233796925214669,"gpt":0.2953588079939834,"spread":0.2830208387418367,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009949758,0.0001222849,0.0001337798,0.0003623304,0.0001318583,0.00006761227,0.0003173366,0.00003770892,0.000006555547],"category_scores_gemma":[0.00009561841,0.0001258145,0.00004714497,0.0007995863,0.00004909272,0.0003517458,0.00007464125,0.0001108449,0.000004217489],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007039907,"about_ca_system_score_gemma":0.000004737905,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002833794,"about_ca_topic_score_gemma":0.000009991726,"domain_scores_codex":[0.9988493,0.000008280136,0.0002415407,0.0002816551,0.0003075124,0.0003117637],"domain_scores_gemma":[0.9995624,0.00006915566,0.00007040857,0.0002119152,0.00004858867,0.00003748872],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000005547756,0.00001191489,0.0009621869,0.00004170796,0.000009673311,6.313421e-7,0.00003890712,0.6199371,0.3693669,0.00009672466,0.0004951351,0.009033622],"study_design_scores_gemma":[0.0003169294,0.00002011988,0.01100462,0.00003376196,0.0000219532,0.000001906086,0.00002098111,0.9586473,0.02934013,0.000007062403,0.0004525952,0.0001327001],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.2340616,0.000001697125,0.7647172,0.0001701987,0.0005460973,0.0003166042,0.000002130391,0.00013725,0.00004730827],"genre_scores_gemma":[0.4494686,0.000001110285,0.5503354,0.0001092602,0.00003856648,0.00002115775,0.000002238567,0.00001245105,0.00001119627],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.3400267,"threshold_uncertainty_score":0.5130566,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4388440352","doi":"10.1016/j.compind.2023.104036","title":"Deep reinforcement learning for continuous wood drying production line control","year":2023,"lang":"en","type":"article","venue":"Computers in Industry","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Canadian Institute for Advanced Research; Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reinforcement learning; Exploit; Heuristic; Production line; Production (economics); Computer science; Process (computing); Routing (electronic design automation); Control (management); Process engineering; Industrial engineering; Productivity; Continuous production; Manufacturing engineering; Artificial intelligence; Engineering; Mechanical engineering; Embedded system","retraction":null,"screen_n_in":null,"score":{"opus":0.0127509093557793,"gpt":0.2335348358543591,"spread":0.2207839264985798,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002451582,0.0001323266,0.0001868866,0.0001955634,0.00006740636,0.00003303684,0.000100575,0.0002155475,0.000003314152],"category_scores_gemma":[0.0001548309,0.0001567685,0.0000333934,0.0003854403,0.00001145053,0.0001146964,0.0000278905,0.0004684751,0.00001335304],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001233328,"about_ca_system_score_gemma":0.00001457311,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002534466,"about_ca_topic_score_gemma":0.000002238136,"domain_scores_codex":[0.9991182,0.00001882529,0.0002778933,0.0001875775,0.0001037231,0.0002937527],"domain_scores_gemma":[0.9996294,0.00009453687,0.00005099494,0.0001360377,0.000048684,0.00004035535],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000089263,0.00000560924,0.001796399,0.00005459854,0.00001969879,0.000003315392,0.0002404866,0.9893691,0.0004765697,0.00002493253,0.001138615,0.006861759],"study_design_scores_gemma":[0.0008394226,0.00004408711,0.000575098,0.00011675,0.000008674325,0.000002998176,0.0001325981,0.9965556,0.0008097106,0.00002290805,0.0007343128,0.0001577961],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1432652,0.00003800017,0.8530674,0.0002016018,0.001776534,0.0005149836,3.897759e-7,0.0008865672,0.0002492693],"genre_scores_gemma":[0.995631,0.00001064606,0.003383426,0.00003672539,0.0005481987,0.00008464974,0.00005490777,0.00004227913,0.0002082021],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8523657,"threshold_uncertainty_score":0.6392834,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2020990525","doi":"10.1016/j.ejor.2013.09.002","title":"Choosing the optimal intervention method to reduce human-related machine failures","year":2013,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto; Bombardier (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Revenue; Operator (biology); Intervention (counseling); Risk analysis (engineering); Operations research; Decision maker; Cost–benefit analysis; Reliability engineering; Engineering; Economics; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.04300486630016078,"gpt":0.374856443525975,"spread":0.3318515772258143,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005295433,0.0001051294,0.0001269713,0.0002916389,0.0002865701,0.0003460354,0.0004095626,0.00002168732,0.000501971],"category_scores_gemma":[0.0004511624,0.00007519669,0.00007604754,0.0003742472,0.00003329353,0.0004269325,0.0000933412,0.0006684716,0.0002914151],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001162972,"about_ca_system_score_gemma":0.00003520685,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002252612,"about_ca_topic_score_gemma":0.000002295337,"domain_scores_codex":[0.9973153,0.001134564,0.0005639168,0.0001114922,0.0006447908,0.0002299117],"domain_scores_gemma":[0.9986116,0.0001742621,0.00006501939,0.0001525503,0.0008719277,0.0001246857],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001446259,0.0000334106,0.00006176342,0.00001153962,0.00006693629,0.00001759097,0.0005985852,0.8715055,0.09652927,0.0007890148,0.01790324,0.0124687],"study_design_scores_gemma":[0.002459224,0.00115743,0.0690836,0.0006648314,0.00004110991,0.0005340164,0.001116891,0.8630634,0.03082872,0.0003151935,0.03017238,0.0005631932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4275827,0.0005923421,0.550572,0.0073959,0.0003841484,0.0006045702,0.00000448137,0.00007630634,0.01278748],"genre_scores_gemma":[0.9437698,0.0000104791,0.0549355,0.00003947536,0.000348971,0.000005414775,0.00001033092,0.00004700184,0.000833104],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.516187,"threshold_uncertainty_score":0.5496231,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4407932111","doi":"10.1080/00207543.2025.2469288","title":"Safety-driven optimisation of human–robot collaborative assembly line balancing","year":2025,"lang":"en","type":"article","venue":"International Journal of Production Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workstation; Context (archaeology); Robot; Computer science; Context switch; Industrial engineering; Engineering; Artificial intelligence; Embedded system","retraction":null,"screen_n_in":null,"score":{"opus":0.03216667936143437,"gpt":0.382151288217758,"spread":0.3499846088563236,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00161134,0.0001069034,0.0002279212,0.0010933,0.0000924444,0.00005841548,0.0003823639,0.00008121024,0.00004132089],"category_scores_gemma":[0.001081646,0.0001075906,0.00006420004,0.0008458563,0.00007132853,0.0004252652,0.00006289754,0.0004475595,0.000005395236],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005000968,"about_ca_system_score_gemma":0.0002570367,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001070849,"about_ca_topic_score_gemma":0.00001600697,"domain_scores_codex":[0.9978102,0.0001596256,0.0007514072,0.0001493918,0.0009592932,0.000170066],"domain_scores_gemma":[0.9942257,0.0001480737,0.0002290522,0.0001589357,0.005193029,0.00004519362],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001167201,0.00007946702,0.001043072,0.00005028867,0.0002410561,0.000006512221,0.0003764192,0.7381894,0.2503926,0.00113412,0.004475459,0.003894855],"study_design_scores_gemma":[0.002462768,0.0005061427,0.01494379,0.001486692,0.0000696144,0.00007870112,0.001895432,0.122495,0.8459344,0.001668587,0.008102141,0.0003567377],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7294582,0.001173307,0.2368025,0.009821291,0.009038681,0.0008774946,0.00003011957,0.0001639198,0.01263454],"genre_scores_gemma":[0.9888911,0.0003925948,0.009287039,0.0000110468,0.0007537584,0.000006094004,0.00001933787,0.00001895826,0.0006200833],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6156945,"threshold_uncertainty_score":0.4387419,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1585183431","doi":"","title":"Cutting Caseloads by Design: The Impact of the New Service Delivery Model for Ontario Works","year":2003,"lang":"en","type":"article","venue":"Canadian Review of Social Policy / Revue canadienne de politique sociale","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Service delivery framework; Service (business); Service model; Business; Computer science; Operations management; Marketing; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01765528558667037,"gpt":0.2515180798675141,"spread":0.2338627942808437,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006758095,0.0002572165,0.0005074005,0.00009623323,0.0003040362,0.00002318632,0.0004159271,0.0002265691,0.00002518176],"category_scores_gemma":[0.0007167167,0.0002278503,0.0003632485,0.0006795758,0.00007379342,0.0001044105,0.00001470489,0.0002916089,7.701732e-7],"about_ca_system_candidate":true,"about_ca_system_consensus":true,"about_ca_system_score_codex":0.006469514,"about_ca_system_score_gemma":0.01315069,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.9181231,"about_ca_topic_score_gemma":0.9718434,"domain_scores_codex":[0.9981093,0.0001602339,0.0005056592,0.0001684919,0.00007202896,0.0009842482],"domain_scores_gemma":[0.9984857,0.0001174492,0.0002425795,0.0002996718,0.0003407222,0.0005138206],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001947688,0.00005118443,0.001757219,0.01238892,0.001045427,0.000008161956,0.08341662,0.3218036,0.0007858277,0.1101069,0.4582544,0.01036227],"study_design_scores_gemma":[0.00762203,0.0005087708,0.02032097,0.04795009,0.004004875,0.0004576804,0.009926047,0.6111171,0.00445079,0.1081626,0.1761036,0.009375481],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7438748,0.06208666,0.06863469,0.07453901,0.001508395,0.01628232,0.006296792,0.0003978758,0.02637945],"genre_scores_gemma":[0.9925981,0.001467461,0.001468979,0.002867709,0.0005716248,0.0001037652,0.00005657951,0.0001192535,0.000746547],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2893135,"threshold_uncertainty_score":0.9973445,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2104642814","doi":"10.3138/infor.48.1.023","title":"Genetic Algorithm with Hybrid Integer Linear Programming Crossover Operators for the Car-Sequencing Problem","year":2010,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Crossover; Genetic algorithm; Algorithm; Hybrid algorithm (constraint satisfaction); Integer (computer science); Integer programming; Limit (mathematics); Computer science; Process (computing); Mathematical optimization; Linear programming; Mathematics; Artificial intelligence; Stochastic programming","retraction":null,"screen_n_in":null,"score":{"opus":0.01888008692403693,"gpt":0.2856617774670546,"spread":0.2667816905430177,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001120207,0.0001463153,0.0001352337,0.0001729271,0.0006072433,0.001008284,0.000165779,0.00008382293,0.000008600013],"category_scores_gemma":[0.0001538861,0.00009567377,0.00002449736,0.0002588801,0.00009471114,0.001483126,0.0000408767,0.0003984316,0.0000231209],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001023931,"about_ca_system_score_gemma":0.0002786688,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001979474,"about_ca_topic_score_gemma":0.00004424201,"domain_scores_codex":[0.9984828,0.00001957979,0.0004635079,0.0001078426,0.0005951044,0.0003312029],"domain_scores_gemma":[0.998178,0.0002275643,0.00004935167,0.0001891747,0.001264685,0.00009123373],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003076913,0.000006497928,0.0006714885,0.000317988,0.00007092355,9.91812e-7,0.002072978,0.9592776,0.0003655083,0.005997942,0.001417668,0.02976961],"study_design_scores_gemma":[0.000433535,0.00006080578,0.000273471,0.00004321973,0.000004981219,0.00005312865,0.0007599371,0.9013388,0.000424048,0.00000553992,0.09646624,0.0001363191],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0929291,0.0001570615,0.9005784,0.0001641569,0.0005478715,0.003795318,0.0001110405,0.0001990832,0.001517998],"genre_scores_gemma":[0.9277046,0.00002789121,0.0701244,0.00005703636,0.0004418265,0.001252917,0.0001538293,0.00003243109,0.0002050833],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8347755,"threshold_uncertainty_score":0.9722903,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2131119553","doi":"10.5539/mas.v4n7p130","title":"Design and Analysis of Automobiles Manufacturing System Based on Simulation Model","year":2010,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Automotive industry; Benchmark (surveying); Computer science; Key (lock); Set (abstract data type); Manufacturing engineering; Industrial engineering; Supply chain; Engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.009423905634500108,"gpt":0.2201362704440548,"spread":0.2107123648095547,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003778409,0.00009373239,0.0001492557,0.0003777381,0.00008406803,0.00003629596,0.0001351431,0.00004515887,0.00000131365],"category_scores_gemma":[0.000009733752,0.00009051163,0.00001821661,0.0004153152,0.00006385175,0.00009298183,0.00001675452,0.00008058402,0.000001012383],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004686196,"about_ca_system_score_gemma":0.00002635446,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001707796,"about_ca_topic_score_gemma":0.000002109041,"domain_scores_codex":[0.999226,0.000004548014,0.0001490492,0.0002127682,0.0002642347,0.0001433858],"domain_scores_gemma":[0.9995553,0.00007708008,0.00004292851,0.000245938,0.00003019921,0.00004858058],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003263528,0.000003968566,0.00002990281,0.00001598149,0.0000059843,7.306354e-8,0.00009788763,0.7753048,0.2234393,0.0001377805,2.088485e-7,0.0009608054],"study_design_scores_gemma":[0.00007458036,0.00000398649,0.0009862276,0.000005803737,0.00004449766,7.110108e-8,0.000005188136,0.9073387,0.09141956,0.00004021275,1.998039e-7,0.00008094328],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2699002,0.000001126916,0.7292854,0.000001379204,0.000024688,0.0001218808,0.000001661895,0.0001496054,0.0005141223],"genre_scores_gemma":[0.9293789,2.118944e-7,0.07058185,0.000005487213,0.000005524748,0.00001211138,0.000002706134,0.00001111417,0.000002061577],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6594788,"threshold_uncertainty_score":0.3690957,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3088971836","doi":"10.24928/2020/0030","title":"Integrated Simulation and Lean Approach for Production Line Improvement in a Prefabricated Panelized Homebuilding Facility","year":2020,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Production line; Manufacturing engineering; Production (economics); Lean manufacturing; Computer science; Engineering; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.0334510452088457,"gpt":0.2470443670197935,"spread":0.2135933218109478,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001861727,0.0001337457,0.0001757828,0.00008329633,0.00004672124,0.00002916624,0.0001525,0.0000703122,0.000003214268],"category_scores_gemma":[0.0004585606,0.0001190737,0.00005273338,0.0001742864,0.00006950889,0.0002924486,0.00003714801,0.0001126428,1.78315e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001000513,"about_ca_system_score_gemma":0.00002633239,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000257446,"about_ca_topic_score_gemma":0.00001348729,"domain_scores_codex":[0.9990945,0.00001205676,0.0003793887,0.0002500894,0.0001472742,0.0001166772],"domain_scores_gemma":[0.9992459,0.00005561942,0.0001400111,0.00009454587,0.0004339497,0.0000299078],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0004320122,0.00004681463,0.002733667,0.0002562469,0.00008508396,4.658631e-8,0.001527384,0.8863338,0.0660551,0.001309473,0.00007017297,0.04115024],"study_design_scores_gemma":[0.0008134633,0.0001027077,0.0005689836,0.00003774961,0.00002020017,0.000001801681,0.001204926,0.9826953,0.01366562,0.0005665656,0.0002025423,0.0001201554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5407977,0.000006872824,0.4577892,0.0002217449,0.0002627631,0.0006962081,0.0001329883,0.00006610948,0.00002649135],"genre_scores_gemma":[0.9837089,0.000007735469,0.01577247,0.00002012902,0.0000890986,0.00007666581,0.0002961064,0.00001320691,0.0000156464],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4429113,"threshold_uncertainty_score":0.4855683,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2093784897","doi":"10.1080/00207540410001671697","title":"Production planning for surface mount technology lines","year":2004,"lang":"en","type":"article","venue":"International Journal of Production Research","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Mount; Production (economics); Production planning; Surface-mount technology; Hierarchy; Operations research; Production line; Engineering; Mathematical model; Industrial engineering; Computer science; Mechanical engineering; Mathematics; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.05822485377476629,"gpt":0.3944845113907983,"spread":0.336259657616032,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001233458,0.00008999477,0.0001289255,0.0007652471,0.00008836445,0.00005623609,0.000306268,0.00008442613,0.000005686779],"category_scores_gemma":[0.00133995,0.00008721959,0.00004843771,0.0004610792,0.00006122595,0.000404212,0.00003161709,0.0004004358,0.000009552834],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006387144,"about_ca_system_score_gemma":0.0001225474,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004978926,"about_ca_topic_score_gemma":0.000002967379,"domain_scores_codex":[0.9985546,0.00002510907,0.0003944003,0.0001608486,0.0006607043,0.0002043735],"domain_scores_gemma":[0.996536,0.00003946125,0.0001123916,0.000130088,0.003141355,0.00004073621],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0000716133,0.00004776184,0.0005736956,0.00002383403,0.00007578438,0.000006519052,0.0001776315,0.889936,0.1043817,0.0006059256,0.00238335,0.001716144],"study_design_scores_gemma":[0.001748196,0.0004494948,0.001790485,0.0006855467,0.00002825598,0.001118562,0.001350957,0.01828737,0.9214842,0.01305965,0.0396243,0.0003730278],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9095654,0.0005798787,0.06979442,0.0137039,0.005824999,0.0003144446,0.000003012168,0.0001262602,0.00008767217],"genre_scores_gemma":[0.969224,0.0001836351,0.02767946,0.000005973831,0.002672186,0.00001209203,0.000007282082,0.00003020392,0.0001851249],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8716486,"threshold_uncertainty_score":0.3556712,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1973319605","doi":"","title":"Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem","year":2006,"lang":"en","type":"article","venue":"RECERCAT (Consorci de Serveis Universitaris de Catalunya)","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bottleneck; Variation (astronomy); Minimax; Mathematical optimization; Product (mathematics); Mathematics; Computer science; Combinatorics","retraction":null,"screen_n_in":null,"score":{"opus":0.00413106595315407,"gpt":0.1758374073728904,"spread":0.1717063414197363,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001005124,0.0004041163,0.0003176123,0.0002784244,0.0004379606,0.0001643468,0.0005072405,0.0002205303,0.00009207643],"category_scores_gemma":[0.00007539584,0.0004008675,0.0001309389,0.000822776,0.00006324883,0.0006332272,0.0001222267,0.0004950713,0.0001233398],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001849339,"about_ca_system_score_gemma":0.0003077755,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001344241,"about_ca_topic_score_gemma":0.0003529713,"domain_scores_codex":[0.9977828,0.0002596932,0.0003861527,0.0005133682,0.0003018793,0.0007561499],"domain_scores_gemma":[0.998691,0.0001783401,0.0001758557,0.0006207476,0.0001900195,0.0001441035],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000597855,0.0001274162,0.006806307,0.0003146077,0.0002393805,0.00004333802,0.002431437,0.9391073,0.02461461,0.003918113,0.0205293,0.001808426],"study_design_scores_gemma":[0.005033947,0.0004424507,0.09413853,0.0008234746,0.001385965,0.0004325123,0.003296224,0.6853514,0.07567501,0.007271132,0.1222263,0.003922978],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7691446,0.002308161,0.1491854,0.009509574,0.0008167135,0.004127226,0.0001206728,0.002808477,0.06197917],"genre_scores_gemma":[0.9751679,0.0002043265,0.02076945,0.0001095024,0.0002731238,0.00005411853,0.000272703,0.0001235878,0.003025324],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2537558,"threshold_uncertainty_score":0.9998443,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2141880454","doi":"10.5772/6122","title":"Design of an Efficient Genetic Algorithm to Solve the Industrial Car Sequencing Problem","year":2008,"lang":"en","type":"book-chapter","venue":"InTech eBooks","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Automotive industry; Context (archaeology); Assembly line; Scheduling (production processes); Job shop scheduling; Set (abstract data type); Genetic algorithm; Computer science; Workstation; Engineering; Operations research; Industrial engineering; Manufacturing engineering; Operations management; Schedule","retraction":null,"screen_n_in":null,"score":{"opus":0.03285533271466088,"gpt":0.2176038709627463,"spread":0.1847485382480854,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002068811,0.0003859634,0.0004029959,0.000220737,0.00007252368,0.00002650214,0.0003856448,0.0004636597,0.00001265068],"category_scores_gemma":[0.00002103314,0.0003342893,0.00008930994,0.00003436142,0.00006967267,0.00001776897,0.00007938042,0.0005730705,0.00002431467],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003707808,"about_ca_system_score_gemma":0.0002159274,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003398757,"about_ca_topic_score_gemma":0.000006031912,"domain_scores_codex":[0.9984816,0.00001956687,0.00054796,0.0003082902,0.0003568574,0.0002857577],"domain_scores_gemma":[0.9989877,0.00007435773,0.0001434869,0.0005332379,0.00016275,0.00009850907],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001102827,0.000004412858,1.503124e-7,0.00003093427,0.00009166256,0.00003315933,0.001413689,0.9502428,0.01067279,0.00008009822,0.0002807359,0.03713852],"study_design_scores_gemma":[0.0007838155,0.0006680806,0.000001668467,0.001333128,0.0002354825,0.0002245106,0.0001066795,0.7683924,0.2149481,0.0006315475,0.01123847,0.001436135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.0004231523,0.0001092749,0.9577015,0.000006396167,0.0004104694,0.001520847,0.00002877799,0.0003631144,0.03943647],"genre_scores_gemma":[0.06829918,0.00006770819,0.8991924,0.0001379748,0.002236376,0.0003415018,0.00007623867,0.0009778596,0.02867077],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.2042753,"threshold_uncertainty_score":0.9999109,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}