{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":1860,"total_is_capped":false,"direct_labels_cover":5,"predictions_cover":1860,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"884bc0837e4c","filters":{"topic":"BIM and Construction Integration"}},"results":[{"id":"W2030212035","doi":"10.1016/j.autcon.2012.12.004","title":"Building Information Modeling (BIM) partnering framework for public construction projects","year":2013,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":473,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Department for Business, Innovation and Skills","keywords":"Building information modeling; Procurement; Rework; Construction industry; Integrated project delivery; Construction management; Productivity; Competition (biology); Pre-construction services; Process management; Project management; Business; Construction engineering; Engineering; Operations management; Project planning; Systems engineering; Marketing; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02211208014133632,"gpt":0.2411965417618213,"spread":0.219084461620485,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002107336,0.0002267551,0.0002070584,0.0006596966,0.0001886554,0.0003711912,0.0001040204,0.0002939878,0.000105587],"category_scores_gemma":[0.0001855358,0.0002555691,0.00007490716,0.0006079029,0.00007335545,0.003973675,0.0000148282,0.0002701378,0.00005575467],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002910554,"about_ca_system_score_gemma":0.0000627947,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004360248,"about_ca_topic_score_gemma":0.00001223312,"domain_scores_codex":[0.9984481,0.00003735716,0.000747136,0.0002056905,0.0002193933,0.00034232],"domain_scores_gemma":[0.9991759,0.00008262956,0.0001559032,0.0001990089,0.0003120523,0.00007450931],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000005898614,0.000006910319,0.001642795,0.0001372429,0.00002486942,7.316034e-8,0.0002672102,0.05292076,0.000975765,0.4840433,0.00008483326,0.4598903],"study_design_scores_gemma":[0.0004175525,0.0000172208,0.0005476911,0.0001068873,0.0000102841,0.00006171816,0.001204332,0.8987951,0.001597079,0.09628364,0.0006913347,0.0002671115],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3019564,0.00002971447,0.6939369,0.0001742548,0.001710884,0.000709101,0.000005792618,0.0007615801,0.0007153067],"genre_scores_gemma":[0.7236932,0.00002220561,0.2753949,0.00002899356,0.0001479672,0.0006445234,0.00004621575,0.00002017951,0.000001849289],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8458744,"threshold_uncertainty_score":0.9999896,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2911311605","doi":"10.1016/j.autcon.2019.01.010","title":"Building information modelling for off-site construction: Review and future directions","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":410,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Data science; Computer science; Scopus; Prefabrication; Engineering; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.005405755476567432,"gpt":0.2094625117056206,"spread":0.2040567562290532,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001835551,0.0001711321,0.0002304973,0.0003376944,0.0001110996,0.00008306214,0.00004541996,0.0001569944,0.000119983],"category_scores_gemma":[0.00001293637,0.0001894416,0.00005615678,0.0004398161,0.00005092057,0.001612333,0.000008479803,0.0001771935,0.00003181203],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001254659,"about_ca_system_score_gemma":0.00002813375,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001072231,"about_ca_topic_score_gemma":0.000007301324,"domain_scores_codex":[0.9989818,0.00002675209,0.0005275387,0.0001708219,0.0001276136,0.0001654892],"domain_scores_gemma":[0.9994673,0.0000440611,0.0001289928,0.0001538155,0.0001622048,0.00004363804],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001021913,0.00000478752,0.001655895,0.001195911,0.00003363543,7.083932e-8,0.0002222676,0.0129795,0.00025208,0.0890227,0.0003342165,0.8942887],"study_design_scores_gemma":[0.0009833403,0.00003423907,0.001703816,0.0005446969,0.0000966424,0.0003251914,0.000525761,0.7005902,0.0004238301,0.004684196,0.2896422,0.0004459123],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.3481217,0.02049174,0.6044734,0.001686415,0.01103777,0.003503394,0.0001239673,0.002087154,0.008474502],"genre_scores_gemma":[0.4338714,0.07638883,0.4853574,0.0007433043,0.001527112,0.001269615,0.0006001376,0.0001260599,0.0001161099],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.8938428,"threshold_uncertainty_score":0.7725205,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1977950491","doi":"10.1061/(asce)co.1943-7862.0000220","title":"Role of Simulation in Construction Engineering and Management","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":356,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Software deployment; Key (lock); Computer science; Construction management; Systems engineering; Construction industry; Management science; Engineering management; Construction engineering; Engineering; Software engineering; Civil engineering; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.002317563432346137,"gpt":0.1732412415014006,"spread":0.1709236780690545,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001713974,0.0001436408,0.0001992534,0.0006218985,0.00002167059,0.0000322431,0.00005161104,0.00007792178,0.00001126493],"category_scores_gemma":[0.000009119068,0.0001517031,0.00004085887,0.0002071646,0.00004302899,0.0002604226,0.00001970002,0.0002390326,4.121111e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003195036,"about_ca_system_score_gemma":0.000003973016,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001906253,"about_ca_topic_score_gemma":0.000002793049,"domain_scores_codex":[0.9991412,0.000006211127,0.0004702885,0.0001014469,0.0001536884,0.0001271621],"domain_scores_gemma":[0.9996578,0.00002386657,0.0001094249,0.00009052073,0.00005645381,0.00006192322],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002024309,0.00001352458,0.001295011,0.0005254542,0.0001652519,0.000009167885,0.0001230097,0.6797855,0.0169438,0.06382434,0.00001006352,0.2372846],"study_design_scores_gemma":[0.001945959,0.0000783594,0.03782704,0.0004798239,0.0001761005,0.001018918,0.001192587,0.9320757,0.004439815,0.001184846,0.01912755,0.0004532455],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9255614,0.0004579329,0.07108206,0.00002539418,0.001595013,0.0001949785,0.00000213741,0.00007812517,0.001002945],"genre_scores_gemma":[0.9626083,0.0009654589,0.03631208,0.000002483676,0.00008081578,0.000006255372,9.232407e-7,0.00001561385,0.000008038811],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2522902,"threshold_uncertainty_score":0.6186274,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2112946342","doi":"10.1108/17538370910971063","title":"Building information modelling demystified: does it make business sense to adopt BIM?","year":2009,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"BIM and Construction Integration","field":"Engineering","cited_by":260,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Originality; Business; Value (mathematics); Process (computing); Project management; Knowledge management; Marketing; Process management; Engineering; Management; Operations management; Computer science; Qualitative research; Sociology; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.01268650983891161,"gpt":0.240496077709121,"spread":0.2278095678702094,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003412645,0.0001752643,0.0001981165,0.001330917,0.00004040224,0.0002549953,0.0002912038,0.00007886432,0.0000107171],"category_scores_gemma":[0.000107796,0.0001489984,0.00004803238,0.0008062974,0.00001666084,0.001255132,0.00002805856,0.0002386818,0.000007747914],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002353314,"about_ca_system_score_gemma":0.0000661666,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004894415,"about_ca_topic_score_gemma":0.00002475259,"domain_scores_codex":[0.9984876,0.00001984256,0.0006999016,0.0001068134,0.0004956016,0.0001902603],"domain_scores_gemma":[0.9983578,0.00003599895,0.0001974388,0.0001042858,0.001251805,0.00005263126],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000861342,0.00002005826,0.0001435985,0.00004240251,0.00003585087,0.00004619665,0.0005376402,0.8486918,0.0004815479,0.005386259,0.0002098445,0.1443186],"study_design_scores_gemma":[0.002995798,0.00007649256,0.02471016,0.004193059,0.00008408918,0.001888532,0.001976678,0.8798986,0.00475079,0.01928563,0.05887011,0.001270056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2435295,0.00006321321,0.7457605,0.005199836,0.003894572,0.0001447117,0.000004519842,0.00008246071,0.001320683],"genre_scores_gemma":[0.9726523,0.0001718347,0.02614694,0.0005268455,0.0004563992,0.000004407423,0.000005680057,0.00001431225,0.00002132942],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7291228,"threshold_uncertainty_score":0.6075976,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2138906600","doi":"10.1061/(asce)0742-597x(2009)25:1(12)","title":"Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance","year":2008,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":212,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Construction management; Process (computing); Engineering; Construction industry; Quality (philosophy); Project management; Integrated project delivery; Simulation modeling; Construction engineering; Computer science; Operations research; Systems engineering; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01192551175875585,"gpt":0.2037258822824726,"spread":0.1918003705237168,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001861794,0.0001082089,0.0001395699,0.0004564491,0.00001486174,0.00001548342,0.00005228089,0.00003920799,0.00001009223],"category_scores_gemma":[0.000005803766,0.00009799077,0.00002843202,0.0001680602,0.000007808852,0.0003153139,0.000006500366,0.000215966,0.000002216247],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001657294,"about_ca_system_score_gemma":0.000006697294,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001343301,"about_ca_topic_score_gemma":3.858309e-7,"domain_scores_codex":[0.9993624,0.000009505349,0.000302621,0.00005934771,0.000134622,0.0001314686],"domain_scores_gemma":[0.9998237,0.0000201524,0.00004840734,0.00004588584,0.00002279765,0.00003907017],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004513086,0.00002003328,0.006819809,0.0000759598,0.0000541908,0.00004015855,0.000159145,0.9802086,0.001094935,0.0006523688,0.00002162254,0.01080803],"study_design_scores_gemma":[0.001777138,0.0002549166,0.3344083,0.0004237354,0.00001553116,0.0001802227,0.000123417,0.6573693,0.004989787,0.00003580998,0.0001897014,0.0002321581],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9830891,0.0003084989,0.01592254,0.00001034338,0.0003481263,0.0001255902,3.327543e-7,0.00002219299,0.0001732423],"genre_scores_gemma":[0.9947141,0.0009594518,0.00425301,0.000005228837,0.00004360294,0.000006482732,2.543372e-7,0.00001118115,0.000006703432],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3275885,"threshold_uncertainty_score":0.3995948,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2061904488","doi":"10.1007/s12273-013-0120-0","title":"Integrating building information modelling with sustainability to design building projects at the conceptual stage","year":2013,"lang":"en","type":"article","venue":"Building Simulation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":205,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Sustainability; Certification; Interoperability; Sustainable design; Systems engineering; Engineering; Construction engineering; Building design; Conceptual design; Information model; Computer science; Architectural engineering; Software engineering; World Wide Web; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01957850118422395,"gpt":0.2428278282080968,"spread":0.2232493270238728,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004519646,0.0002763928,0.0001871374,0.0002166155,0.0004698533,0.0003525351,0.0001689525,0.0001255272,0.00006922649],"category_scores_gemma":[0.0001628232,0.0002054144,0.00005271334,0.0005413,0.00007698358,0.001796628,0.000050062,0.0002755178,0.00002228249],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007901085,"about_ca_system_score_gemma":0.00006865567,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002537102,"about_ca_topic_score_gemma":0.00001849503,"domain_scores_codex":[0.9984409,0.00008878223,0.0004855964,0.0002449113,0.0003483953,0.0003914338],"domain_scores_gemma":[0.998616,0.0003475048,0.0001316526,0.0002910906,0.0005194916,0.00009419651],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002574064,0.000003921494,0.0003701364,0.00004042801,0.00001803717,2.20462e-7,0.002065915,0.9582921,0.003120541,0.0167394,0.00007008254,0.01925353],"study_design_scores_gemma":[0.0002664746,0.00006026049,0.0001777706,0.00007949866,0.00001659821,0.000004186943,0.002549392,0.9839898,0.008951297,0.001356239,0.002267363,0.0002810833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4533113,0.00001951074,0.5451685,0.0000744488,0.0001216051,0.0008798804,0.000002258517,0.000265031,0.0001573946],"genre_scores_gemma":[0.9106672,0.000001685832,0.08885409,0.00006773163,0.00009532531,0.0002111742,0.00001043843,0.00003236143,0.0000599889],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4573559,"threshold_uncertainty_score":0.8376555,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2752201218","doi":"10.1016/j.autcon.2017.08.006","title":"Developing owner information requirements for BIM-enabled project delivery and asset management","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":199,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Process management; Documentation; Requirements analysis; Asset (computer security); Interoperability; Process (computing); Asset management; Requirements management; Facility management; Integrated project delivery; Usability; Knowledge management; Requirements elicitation; Information model; Systems engineering; Engineering management; Computer science; Project management; Engineering; Business; Software engineering; Operations management; Software","retraction":null,"screen_n_in":null,"score":{"opus":0.0240650905787071,"gpt":0.2669994118936201,"spread":0.242934321314913,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001767131,0.0001145542,0.0001047119,0.0003043409,0.000278143,0.0002761595,0.00007814686,0.00008954739,0.00001117756],"category_scores_gemma":[0.00002942405,0.0001051807,0.00002245825,0.00008893177,0.00005150556,0.00211885,0.00002215411,0.00006240835,0.000008258206],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001651035,"about_ca_system_score_gemma":0.00002747678,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000295408,"about_ca_topic_score_gemma":0.00003193312,"domain_scores_codex":[0.9992741,0.00001365345,0.0003411502,0.0001150082,0.0001174957,0.0001386362],"domain_scores_gemma":[0.9995625,0.00001552931,0.0001445053,0.000168319,0.00009114495,0.00001799505],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001786393,0.00000361133,0.006395709,0.0002854557,0.00004455311,3.63514e-7,0.0001628418,0.0003625755,0.0001658213,0.07990089,0.0004044736,0.9122558],"study_design_scores_gemma":[0.005885058,0.00007795032,0.3449148,0.0005869063,0.000109495,0.0001386352,0.003229029,0.546189,0.007818849,0.03713455,0.05279329,0.001122444],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5902335,0.0000331087,0.3929656,0.0003674706,0.002938406,0.001625516,0.00002864815,0.000605358,0.01120242],"genre_scores_gemma":[0.9386851,0.000138837,0.06066044,0.00003112463,0.0000554878,0.0002959428,0.00008334388,0.00001164785,0.00003810737],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9111334,"threshold_uncertainty_score":0.4289145,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2019386889","doi":"10.1061/(asce)0733-9364(2002)128:2(174)","title":"Unified Modeling Methodology for Construction Simulation","year":2002,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":193,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Flexibility (engineering); Systems engineering; Software engineering; Software; Management science; Industrial engineering; Engineering; Programming language","retraction":null,"screen_n_in":null,"score":{"opus":0.04004607758693449,"gpt":0.2418517105268874,"spread":0.2018056329399529,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001870339,0.0001144805,0.0001732417,0.0003211993,0.00005027858,0.00003359175,0.00004228871,0.00007144658,0.00002209506],"category_scores_gemma":[0.00002243015,0.0001159438,0.00005672584,0.0001195356,0.00002592494,0.000217721,0.000006217517,0.0001122714,9.210396e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004604672,"about_ca_system_score_gemma":0.000002340235,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":4.073529e-7,"about_ca_topic_score_gemma":2.465115e-7,"domain_scores_codex":[0.9993043,0.00001434563,0.0003832925,0.00008243087,0.00009829619,0.0001173217],"domain_scores_gemma":[0.9996288,0.00005538984,0.00008408347,0.00006591489,0.0001137209,0.00005202847],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008780208,0.000003086893,0.000008171207,0.00009612517,0.0000849478,0.000001011294,0.00004823683,0.7932298,0.0006979335,0.02377599,0.0000522155,0.1819938],"study_design_scores_gemma":[0.0005367608,0.00004296072,0.00001823779,0.00004175127,0.00007900836,0.0002803485,0.0002581274,0.9876022,0.0004693172,0.001289015,0.0092675,0.0001147158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03544824,0.0004418162,0.96145,0.00005469343,0.001891049,0.0001299145,0.000001682934,0.00009294776,0.0004896012],"genre_scores_gemma":[0.7723745,0.0006940801,0.2266754,0.000009111629,0.0001924092,0.000008770994,0.000001139179,0.00001594411,0.00002873006],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7369262,"threshold_uncertainty_score":0.4728052,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1938740575","doi":"10.1016/j.proeng.2015.08.450","title":"A Building Information Management (BIM) Framework and Supporting Case Study for Existing Building Operations, Maintenance and Sustainability","year":2015,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":185,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Facility management; Documentation; Systems engineering; Information model; Process (computing); Construction engineering; Process management; Building design; Key (lock); Building management; Sustainability; Computer science; Engineering; Engineering management; Risk analysis (engineering); Scheduling (production processes); Architectural engineering; Software engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01236078932643551,"gpt":0.2648918829771005,"spread":0.252531093650665,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004526633,0.0001646363,0.0001420599,0.0001584902,0.0001224411,0.0001911355,0.00004621346,0.00006196755,7.135212e-7],"category_scores_gemma":[0.0005307267,0.0001754642,0.00001752989,0.0001822506,0.00001441302,0.0007262695,0.00004357136,0.0001545167,2.532561e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001553679,"about_ca_system_score_gemma":0.00002001202,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002593918,"about_ca_topic_score_gemma":0.00000730464,"domain_scores_codex":[0.9991272,0.00000623521,0.0003425624,0.0001637666,0.0001028556,0.0002573811],"domain_scores_gemma":[0.9995113,0.00005969204,0.00003305351,0.0001013664,0.0001846707,0.0001099329],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003197649,0.00004112371,0.01028524,0.003955578,0.0001674983,0.0001073019,0.01486275,0.5668339,0.0002306285,0.1598938,0.00008219686,0.243508],"study_design_scores_gemma":[0.0006208666,0.00006718042,0.0002969123,0.0001118633,0.00004455463,0.000585005,0.02109721,0.9730904,0.0001894374,0.00273388,0.0008560829,0.0003066708],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.46933,0.0001057355,0.5296031,0.0000202244,0.0001685032,0.000534759,0.000002340931,0.0002096061,0.00002572069],"genre_scores_gemma":[0.8470514,0.000007733514,0.1525358,0.000008502535,0.00007562374,0.0002970565,0.000002313612,0.00001814655,0.000003436792],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4062565,"threshold_uncertainty_score":0.7155222,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2115163594","doi":"10.1186/2213-7459-1-9","title":"Review and analysis of augmented reality literature for construction industry","year":2013,"lang":"en","type":"article","venue":"Visualization in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":178,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Augmented reality; Maturity (psychological); Schedule; Virtual reality; Field (mathematics); Building information modeling; Engineering management; Engineering; Computer science; Operations management; Human–computer interaction; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.009240237484538819,"gpt":0.2582947414295159,"spread":0.2490545039449771,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007486793,0.00008371146,0.0001911685,0.0003468896,0.0000110288,0.00001948647,0.0000261946,0.0001260952,0.00004604016],"category_scores_gemma":[0.00004037856,0.00008738491,0.00002992926,0.001136718,0.00001177577,0.0001824494,0.000004349639,0.00008695733,3.03714e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002898856,"about_ca_system_score_gemma":0.00000387864,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009033621,"about_ca_topic_score_gemma":0.000002732341,"domain_scores_codex":[0.9995004,0.000008930684,0.000277344,0.00009060832,0.00004538519,0.00007733708],"domain_scores_gemma":[0.999738,0.00002190872,0.0000372562,0.00007709741,0.00009909004,0.00002668576],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001305583,0.00007884792,0.06196844,0.02471617,0.001969563,6.917534e-7,0.001327844,0.639169,0.04897671,0.130388,0.004529868,0.08686175],"study_design_scores_gemma":[0.000242164,0.00001468621,0.02462237,0.0008533872,0.0003476369,0.000005342438,0.0000543274,0.9693897,0.002742446,0.0001320103,0.001405853,0.0001900167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1451372,0.01330449,0.8394674,0.00009435782,0.0004085895,0.0009476017,0.00007881038,0.0003134071,0.0002481752],"genre_scores_gemma":[0.9944103,0.002618653,0.002443262,0.00004828767,0.0000279865,0.0001790481,0.0002373187,0.00001918935,0.00001590441],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8492731,"threshold_uncertainty_score":0.3563453,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2183649514","doi":"10.5539/ijms.v7n6p162","title":"Critical Barriers to BIM Implementation in the AEC Industry","year":2015,"lang":"en","type":"article","venue":"International Journal of Marketing Studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":165,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Building information modeling; Business; Construction industry; Process management; Engineering management; Knowledge management; Construction engineering; Computer science; Operations management; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02900560390990818,"gpt":0.3598112690651132,"spread":0.330805665155205,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001741262,0.00006057548,0.00008316067,0.0001599908,0.00002695545,0.000051685,0.0001726209,0.00003504589,0.00004247364],"category_scores_gemma":[0.002867737,0.0000436176,0.0000319027,0.0001029523,0.00002990031,0.0001696583,0.0000197034,0.0002445042,0.000003148588],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001447873,"about_ca_system_score_gemma":0.0000446276,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005953542,"about_ca_topic_score_gemma":0.0000371024,"domain_scores_codex":[0.9990876,0.0001252457,0.0003080931,0.00004332703,0.0003546041,0.0000811319],"domain_scores_gemma":[0.9989929,0.0003411932,0.00004650903,0.00003459197,0.000525385,0.00005943959],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"qualitative","study_design_scores_codex":[0.001059282,0.0000783809,0.3095428,0.00007512077,0.001469608,0.0002978571,0.04162357,0.01628635,0.001164555,0.02016643,0.2699755,0.3382606],"study_design_scores_gemma":[0.003759139,0.000395464,0.2578614,0.0009941799,0.0001304249,0.001468653,0.6145653,0.002079178,0.002381663,0.01522874,0.1004272,0.0007086571],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9839817,0.0007670416,0.000848472,0.008441905,0.003484888,0.00005626459,0.000004967284,0.00001698705,0.002397773],"genre_scores_gemma":[0.9985145,0.00004821836,0.0006684532,0.0003466944,0.0004033573,0.000005794375,4.765959e-7,0.000004767185,0.000007744552],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5729417,"threshold_uncertainty_score":0.3433156,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2288806340","doi":"10.1016/j.buildenv.2016.03.002","title":"Sustainability and resiliency metrics for buildings – Critical review","year":2016,"lang":"en","type":"article","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada; McMaster University; U.S. Environmental Protection Agency","keywords":"Sustainability; Certification; Architectural engineering; Engineering; Life-cycle assessment; Construction engineering; Environmental resource management; Risk analysis (engineering); Environmental economics; Business; Production (economics); Environmental science","retraction":null,"screen_n_in":null,"score":{"opus":0.009710414519837993,"gpt":0.2347074923638033,"spread":0.2249970778439653,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001768898,0.00007681611,0.00009656837,0.00003242525,0.00006005934,0.00001234599,0.00002684679,0.00003900018,0.0000256392],"category_scores_gemma":[0.0001887447,0.00005474566,0.00002187234,0.00003340467,0.00008289963,0.00007653399,0.00001671227,0.00003265225,0.000001084485],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007579198,"about_ca_system_score_gemma":0.000003277087,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002112124,"about_ca_topic_score_gemma":1.577953e-7,"domain_scores_codex":[0.9995252,0.000009172669,0.0001249906,0.0001511308,0.00006298588,0.0001264671],"domain_scores_gemma":[0.9997101,0.0001216586,0.000009789039,0.00008915742,0.00001081246,0.00005852419],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000005417475,0.00001113077,0.001591704,0.001025079,0.00001042808,4.838053e-7,0.00002432428,0.00002332579,0.004000952,0.03936152,0.00186458,0.9520811],"study_design_scores_gemma":[0.000969463,0.0002418131,0.0103214,0.001208052,0.0001818767,0.00006988177,0.000151454,0.002851234,0.008513468,0.06995433,0.904806,0.0007310556],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2154074,0.06655371,0.7069531,0.009500344,0.0003112719,0.0006477046,0.00002362454,0.0001873179,0.0004155085],"genre_scores_gemma":[0.9625952,0.02859934,0.008515177,0.00006997435,0.00004247955,0.00007081787,5.565087e-7,0.00001150657,0.00009493502],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.95135,"threshold_uncertainty_score":0.2232463,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2801128291","doi":"10.1016/j.buildenv.2018.04.019","title":"Life cycle sustainability performance assessment framework for residential modular buildings: Aggregated sustainability indices","year":2018,"lang":"en","type":"article","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Sustainability; Analytic hierarchy process; Modular design; Multiple-criteria decision analysis; Process (computing); Life-cycle assessment; ELECTRE; Engineering; Computer science; Operations research; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.005157188246402178,"gpt":0.2363628578111186,"spread":0.2312056695647164,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003559861,0.0001897237,0.0001764392,0.00007451823,0.0003332424,0.00008488603,0.0001088864,0.0001551248,0.00006919078],"category_scores_gemma":[0.0001494093,0.0001883636,0.00005452601,0.00008721156,0.0002345572,0.0002167041,0.00005526356,0.0001841592,0.00000227433],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004922419,"about_ca_system_score_gemma":0.00005868485,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003372101,"about_ca_topic_score_gemma":0.000002126157,"domain_scores_codex":[0.9988341,0.00003022431,0.00028084,0.0003402003,0.0001827785,0.0003318959],"domain_scores_gemma":[0.9993954,0.00005743579,0.00006314843,0.0002665209,0.00006129296,0.0001562219],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003060841,0.0002867961,0.1165504,0.002095868,0.0003827579,0.000004229609,0.002554573,0.1691781,0.004471796,0.09472405,0.001097781,0.6083475],"study_design_scores_gemma":[0.001769775,0.0009192195,0.2554506,0.0002293671,0.0002029876,0.00001690182,0.004062173,0.4238997,0.01593939,0.2485793,0.04750437,0.001426128],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7185206,0.0001788786,0.2802584,0.0003001124,0.0002239401,0.0003334946,0.000005073503,0.0001204726,0.00005903574],"genre_scores_gemma":[0.9814981,0.0001799794,0.01781701,0.00003968446,0.0002659857,0.0001406605,0.000005666125,0.0000241217,0.00002880673],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6069214,"threshold_uncertainty_score":0.7681244,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2038591776","doi":"10.1016/j.asej.2014.09.006","title":"Reducing the operational energy demand in buildings using building information modeling tools and sustainability approaches","year":2014,"lang":"en","type":"article","venue":"Ain Shams Engineering Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":147,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Sustainability; Building information modeling; Architectural engineering; Energy consumption; Energy demand; Engineering; Efficient energy use; Sustainable design; Energy analysis; Energy modeling; Architecture; Energy (signal processing); Environmental economics; Civil engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01348866226658636,"gpt":0.1952387100470231,"spread":0.1817500477804367,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000791354,0.000145798,0.000131434,0.0002017608,0.0001762346,0.0003962961,0.00009864328,0.00008270135,0.000005339077],"category_scores_gemma":[0.0002003507,0.0001224019,0.00003732065,0.0001862501,0.00002048088,0.001305072,0.00002391113,0.0003458029,2.605591e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002286801,"about_ca_system_score_gemma":0.00003723054,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002800128,"about_ca_topic_score_gemma":0.000001785325,"domain_scores_codex":[0.9991014,0.00003324676,0.0003917777,0.00009544068,0.000153563,0.0002245753],"domain_scores_gemma":[0.9996483,0.0000713753,0.00004154477,0.00009567898,0.00008262795,0.00006050037],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002660727,0.000002127307,0.000192585,0.00003022558,0.00001089543,3.114061e-7,0.0003561401,0.9585742,0.0005045121,0.01415234,0.000008360475,0.02616565],"study_design_scores_gemma":[0.0001898822,0.000008344546,0.0002887282,0.00006870215,0.000007584214,0.0002068668,0.0002404009,0.9968868,0.000299361,0.0009269804,0.0007350829,0.0001412394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3762422,0.000169289,0.6231897,0.00007537213,0.0001726948,0.00004382842,7.346303e-7,0.00004156354,0.00006452441],"genre_scores_gemma":[0.9877137,0.00003981714,0.01196407,0.00002438593,0.0002267767,0.00001078182,0.000003230516,0.00001513328,0.000002116587],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6114715,"threshold_uncertainty_score":0.4991406,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2023346663","doi":"10.1061/(asce)0733-9364(2005)131:3(354)","title":"Change Orders Impact on Labor Productivity","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Concordia University","funders":"National Evidence-based Healthcare Collaborating Agency","keywords":"Productivity; Change order; Field (mathematics); Computer science; Work (physics); Artificial neural network; Operations research; Industrial engineering; Engineering; Economics; Systems engineering; Project management; Economic growth; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.006143367867799938,"gpt":0.2030880454735197,"spread":0.1969446776057198,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001023454,0.0001126385,0.0001219974,0.0002595288,0.00002575058,0.00002964818,0.00003877676,0.00003371522,0.00002321415],"category_scores_gemma":[0.000005011196,0.00009374023,0.00005056672,0.0001350755,0.00001832711,0.0002742994,0.000005834484,0.0001392868,0.000003494511],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007812764,"about_ca_system_score_gemma":0.000004210773,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001170807,"about_ca_topic_score_gemma":7.95474e-7,"domain_scores_codex":[0.9995067,0.000006118441,0.000192175,0.00006664658,0.0001230185,0.0001054048],"domain_scores_gemma":[0.9997617,0.000007868485,0.00005245716,0.0000713773,0.00004842535,0.00005815132],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003289953,0.00002328471,0.0005005134,0.0001206687,0.0002579433,0.000006806532,0.000136577,0.1713992,0.0006671244,0.01447823,0.000975882,0.8114009],"study_design_scores_gemma":[0.004219746,0.0008307858,0.1230636,0.0008250755,0.0004047336,0.003267252,0.0008671012,0.2101638,0.009368289,0.0006708289,0.6449171,0.001401682],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9746234,0.0007474929,0.0203611,0.0006019933,0.001980654,0.0001791907,0.000004030585,0.0001590117,0.001343066],"genre_scores_gemma":[0.9933711,0.000590405,0.005470017,0.00002215269,0.0004968446,0.00000700952,5.137283e-7,0.00001267539,0.00002932437],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8099992,"threshold_uncertainty_score":0.3822616,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4254114611","doi":"10.1115/detc2006-99412","title":"Review of Metamodeling Techniques in Support of Engineering Design Optimization","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"","keywords":"Metamodeling; Scope (computer science); Computer science; Computation; Engineering design process; Process (computing); Systems engineering; Industrial engineering; Management science; Software engineering; Engineering; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.01058306092688496,"gpt":0.2060581054938963,"spread":0.1954750445670114,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001315651,0.00004873192,0.0001182924,0.00009739464,0.000002292879,0.000001693519,0.00002903295,0.0000313505,0.00008649465],"category_scores_gemma":[0.000008387932,0.00004644236,0.00002460215,0.0001607109,0.000004772799,0.00007943907,0.000002482384,0.00003308461,3.415583e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001453292,"about_ca_system_score_gemma":0.000007060153,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002309306,"about_ca_topic_score_gemma":0.000001915401,"domain_scores_codex":[0.9995731,0.00000595209,0.0002883757,0.00003986251,0.00004683917,0.00004587999],"domain_scores_gemma":[0.9998542,0.000009974709,0.00002530101,0.00005801941,0.00004681099,0.000005710614],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[5.847539e-7,0.000004220855,0.00002343389,0.0008416962,0.000003316895,7.909641e-8,0.000003813044,0.9861601,0.007627868,0.001873949,0.0005575883,0.00290333],"study_design_scores_gemma":[0.00004342778,0.00001024784,0.00001077821,0.0007303585,0.00001033291,0.000002784411,0.000003317296,0.7357078,0.2627511,0.00007515016,0.0005879569,0.00006670521],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.000151829,0.002431187,0.9936584,0.00001008559,0.00003047902,0.0001005446,8.618174e-7,0.00009719134,0.00351947],"genre_scores_gemma":[0.2967959,0.006201873,0.6968379,0.00003731547,0.00002361751,0.00003484356,0.00001595693,0.0000198371,0.00003279555],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.2968205,"threshold_uncertainty_score":0.1893865,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2065594418","doi":"10.1061/(asce)0887-3801(2010)24:2(203)","title":"Automated Code Compliance Checking for Building Envelope Design","year":2010,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":139,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Envelope (radar); Building code; Building envelope; Building design; Computer science; Code (set theory); Representation (politics); Process (computing); Building information modeling; Software; Building model; Software engineering; Engineering; Programming language; Architectural engineering; Simulation; Set (abstract data type)","retraction":null,"screen_n_in":null,"score":{"opus":0.02257099712718101,"gpt":0.2565851507594705,"spread":0.2340141536322895,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005980908,0.000148355,0.0002464523,0.0002757484,0.00004317557,0.00006053558,0.0001814228,0.00009786824,0.000006843708],"category_scores_gemma":[0.0001486367,0.0001555965,0.00007481268,0.0002410158,0.00001241778,0.0001759553,0.00001276412,0.0005264812,9.883178e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007801747,"about_ca_system_score_gemma":0.00003208384,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":9.154795e-7,"about_ca_topic_score_gemma":0.00001286703,"domain_scores_codex":[0.9989898,0.000009621375,0.0005397066,0.00008762733,0.0001323093,0.0002408912],"domain_scores_gemma":[0.9993778,0.0002246308,0.0001250665,0.00008666157,0.0001246813,0.00006111523],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000004928845,0.000006444669,0.0003762943,0.00007622524,0.00002237065,0.000004156474,0.0001464514,0.9140741,0.08117563,0.000728566,0.0001766691,0.003208183],"study_design_scores_gemma":[0.000410011,0.00002568103,0.003009329,0.000368603,0.000008031551,0.0001763231,0.00001827881,0.9804088,0.01415921,0.00009214231,0.001163555,0.00016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2568603,0.0001041883,0.740725,0.0000178705,0.001802953,0.00008238816,8.996008e-7,0.0002754766,0.0001308939],"genre_scores_gemma":[0.8038202,0.000006178873,0.1958779,0.000006689694,0.0002544698,0.00000211209,3.976016e-7,0.00002957284,0.000002529891],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5469599,"threshold_uncertainty_score":0.6345043,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2097666093","doi":"","title":"A Survey on the Impact of Information Technology in the Canadian Architecture, Engineering and Construction Industry","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":138,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Productivity; Work (physics); Architecture; Investment (military); The Internet; Quality (philosophy); Information technology; Engineering; Business; Enterprise architecture; Engineering management; Marketing; Operations management; Industrial organization; Computer science; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.005663437810450658,"gpt":0.1879068070921412,"spread":0.1822433692816905,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001252096,0.00005650714,0.00004727123,0.0002158625,0.000030836,0.00002359882,0.00005421205,0.0001337375,0.0001218078],"category_scores_gemma":[0.00002446252,0.0000312659,0.00001178612,0.0003281319,0.00003977831,0.00006815621,0.000001381845,0.000318221,0.000003490378],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004861625,"about_ca_system_score_gemma":0.00003045397,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.04323549,"about_ca_topic_score_gemma":0.05544646,"domain_scores_codex":[0.9997258,0.00001499058,0.0001054716,0.00002823331,0.00004355405,0.00008195979],"domain_scores_gemma":[0.99984,0.00003820767,0.000009710884,0.00008103428,0.00001415752,0.00001685945],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00001647878,0.000006300339,0.07553598,0.0000142425,0.00005294439,6.345298e-7,0.00110433,0.2464816,0.0002031452,0.05886312,0.0007648479,0.6169564],"study_design_scores_gemma":[0.000212149,0.00006823191,0.9284856,0.00003319591,0.000003990016,0.0001024929,0.0005134113,0.06600589,0.0009918713,0.00250328,0.0009234023,0.0001564708],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9935815,0.00001241463,0.0001616576,0.0002075261,0.00003140914,0.00009217239,0.00001294197,0.00003179886,0.005868599],"genre_scores_gemma":[0.9998661,0.000006055657,0.00008011823,0.0000213804,0.000006736928,0.000007607347,0.000005667293,0.000002415133,0.000003885618],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8529496,"threshold_uncertainty_score":0.9631357,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1042486207","doi":"10.1016/j.autcon.2015.07.002","title":"Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Productivity; Prefabrication; Process (computing); Action research; Engineering; Business; Process management; Industrial organization; Operations management; Computer science; Economics; Civil engineering; Management; Economic growth","retraction":null,"screen_n_in":null,"score":{"opus":0.1052956615077434,"gpt":0.341895599603656,"spread":0.2365999380959126,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009954182,0.0001379248,0.0001830822,0.0003982374,0.0000745573,0.00005519083,0.0001039519,0.0001137547,0.00002869216],"category_scores_gemma":[0.0004588573,0.0001125854,0.00005683994,0.0009641594,0.0001301658,0.0005580019,0.00001409622,0.0004965105,0.00001576236],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007167095,"about_ca_system_score_gemma":0.0001575518,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001256994,"about_ca_topic_score_gemma":0.001547813,"domain_scores_codex":[0.9985622,0.0002783348,0.0004460832,0.0001993837,0.000289771,0.0002241919],"domain_scores_gemma":[0.99913,0.0001957256,0.0001207367,0.0002302247,0.0002859742,0.00003735023],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0004057235,0.0002792783,0.3172991,0.0001508428,0.0001227372,0.000005129579,0.009222324,0.2457516,0.01509667,0.02527572,0.0005568333,0.3858341],"study_design_scores_gemma":[0.003353961,0.000296923,0.6952466,0.0006067033,0.00002075668,0.0001889353,0.01220699,0.1867267,0.06681846,0.03329698,0.0006548632,0.0005820511],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9933693,0.00005779911,0.001852723,0.0001834573,0.001049521,0.0004200963,0.000007031692,0.0001334287,0.002926686],"genre_scores_gemma":[0.9989658,0.00002368991,0.0007011004,0.000003202026,0.000210027,0.00006657346,0.000005333992,0.00001513636,0.000009156827],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.385252,"threshold_uncertainty_score":0.4591101,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2307011503","doi":"10.1016/j.aei.2016.03.001","title":"Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry","year":2016,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":129,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Ontology; Information model; Computer science; Domain (mathematical analysis); Frame (networking); Building model; Semantics (computer science); Vocabulary; Building design; Systems engineering; Software engineering; Engineering; Architectural engineering; Simulation","retraction":null,"screen_n_in":null,"score":{"opus":0.009765036172923854,"gpt":0.2095457740070934,"spread":0.1997807378341696,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001482874,0.0002259215,0.0002275029,0.0001422231,0.00006683508,0.0000377691,0.0001993458,0.0002895311,0.000005073127],"category_scores_gemma":[0.00006528432,0.0001614123,0.00006128531,0.0002907162,0.00004018325,0.0006842076,0.00001262456,0.0003693634,0.000003066406],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001121805,"about_ca_system_score_gemma":0.00002274242,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006700428,"about_ca_topic_score_gemma":0.000009074575,"domain_scores_codex":[0.9988588,0.000009810135,0.0005256521,0.0001132517,0.0001569706,0.0003355157],"domain_scores_gemma":[0.9993536,0.0001476537,0.00007991469,0.0003023976,0.00006506255,0.00005132211],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001066843,0.00001138154,0.00031731,0.0001118084,0.00002801336,3.376973e-7,0.0005833615,0.9335318,0.002472616,0.0401172,0.00002986361,0.02278561],"study_design_scores_gemma":[0.0008937354,0.00002407693,0.0002142175,0.0001345095,0.00001628753,0.00001247167,0.0008294305,0.988387,0.004486816,0.001084215,0.003650281,0.0002669071],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2189864,0.00007302483,0.7795374,0.00005388468,0.0005193331,0.0002792378,0.000046148,0.0002707336,0.0002337545],"genre_scores_gemma":[0.7279177,0.00001565679,0.2717845,0.00004177292,0.00005559619,0.000134899,0.00002529881,0.00002192299,0.000002633289],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5089313,"threshold_uncertainty_score":0.6582203,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2406231571","doi":"10.1016/j.proeng.2016.04.166","title":"Analysis of Costs and Benefits of Panelized and Modular Prefabricated Homes","year":2016,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":123,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Modular design; Engineering; Cost–benefit analysis; Quality (philosophy); Prefabrication; Cost analysis; Quantitative analysis (chemistry); Risk analysis (engineering); Transport engineering; Construction engineering; Work (physics); Architectural engineering; Operations management; Computer science; Operations research; Civil engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.006088195311162842,"gpt":0.1754742909787577,"spread":0.1693860956675949,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003647548,0.00007784808,0.0001832116,0.0002288388,0.00000609116,0.000004557121,0.00002909791,0.00004419535,0.000007669775],"category_scores_gemma":[0.00003285446,0.00006068293,0.00002506207,0.0003006588,0.00001859255,0.00008332802,0.000009490673,0.000027062,2.180886e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001272416,"about_ca_system_score_gemma":0.000003061725,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004739397,"about_ca_topic_score_gemma":0.000002404388,"domain_scores_codex":[0.9996172,0.000001963833,0.0001575852,0.00008402477,0.00006250025,0.00007678257],"domain_scores_gemma":[0.9997888,0.00003535365,0.00002569851,0.00006719698,0.00004817449,0.00003474447],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001947572,0.0000144405,0.06467383,0.0006014245,0.001298084,3.923667e-7,0.0006160433,0.06673975,0.6609861,0.004916956,0.00001171798,0.2001217],"study_design_scores_gemma":[0.0007261278,0.00003850111,0.3434984,0.0002174658,0.0005330088,0.000008937261,0.00006418505,0.4288425,0.2255916,0.00005080449,0.0001322035,0.0002963317],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9857691,0.001746701,0.01222248,0.000008993632,0.00004556065,0.00005178473,0.00001702452,0.00008323709,0.00005512736],"genre_scores_gemma":[0.9986952,0.0005842844,0.0006814251,7.210425e-7,0.00001057739,0.000009430403,0.000002475687,0.00001002632,0.000005879518],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4353946,"threshold_uncertainty_score":0.2474578,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2096080276","doi":"10.14359/20198","title":"Design of Green Engineered Cementitious Composites for Improved Sustainability","year":2008,"lang":"en","type":"article","venue":"ACI Materials Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":122,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Composite material; Materials science; Sustainability; Cementitious; Cement","retraction":null,"screen_n_in":null,"score":{"opus":0.0130775160155586,"gpt":0.2111128434678588,"spread":0.1980353274523002,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001663733,0.00008417558,0.0001555598,0.00006289325,0.00008204367,0.00002734327,0.00007073896,0.00005047573,0.0001317813],"category_scores_gemma":[0.00002191821,0.00007659548,0.00003875044,0.00004226547,0.00003196946,0.0001415871,0.000005612329,0.00004690528,0.000001404334],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005943552,"about_ca_system_score_gemma":0.00003396193,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009664401,"about_ca_topic_score_gemma":6.536328e-7,"domain_scores_codex":[0.9994252,0.00002701417,0.0003059107,0.00005412026,0.00005628859,0.0001314939],"domain_scores_gemma":[0.9995725,0.00002754202,0.00006357439,0.0000746111,0.0002263173,0.0000354715],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00005463314,0.00001133401,0.00002936537,0.00007119488,0.00004497097,0.000001293261,0.0001437859,0.002328003,0.9956,0.0002293815,0.0004932676,0.0009927152],"study_design_scores_gemma":[0.0007190611,0.0001336634,0.0004479976,0.00001420154,0.00002734122,0.0003180929,0.00008108777,0.005561238,0.9883749,0.003747305,0.0004443664,0.0001307297],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5912148,0.00007883138,0.4076654,0.00005324165,0.0006620535,0.0002228773,0.00002744674,0.00005364324,0.00002174077],"genre_scores_gemma":[0.9919257,0.00005269449,0.007757773,0.00000831999,0.0001664799,0.0000190422,0.000008965818,0.00001323823,0.00004779714],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4007109,"threshold_uncertainty_score":0.3123473,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1500035233","doi":"10.1108/ci-01-2014-0013","title":"Embedded contexts of innovation","year":2015,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Originality; Leverage (statistics); Process (computing); Business; Innovation process; Process management; Knowledge management; Bridge (graph theory); Perspective (graphical); Marketing; Computer science; Work in process; Qualitative research; Sociology","retraction":null,"screen_n_in":null,"score":{"opus":0.02258167117858278,"gpt":0.2423899414925268,"spread":0.219808270313944,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002408599,0.000116921,0.0001443318,0.0007022712,0.00003480269,0.00002359974,0.00006085885,0.0001234848,0.00007648005],"category_scores_gemma":[0.0001558008,0.0001268083,0.0000168462,0.003148031,0.0001165915,0.0004029809,0.000007839083,0.0001266662,0.00002666492],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008909059,"about_ca_system_score_gemma":0.00008630666,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004008775,"about_ca_topic_score_gemma":0.00000187946,"domain_scores_codex":[0.998837,0.00001868482,0.0007158431,0.0001172847,0.0002043095,0.0001068743],"domain_scores_gemma":[0.9979398,0.00001221747,0.0001931373,0.0001566893,0.001675255,0.00002291944],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00002209902,0.00001044218,0.00304376,0.00003117426,0.00003037097,2.350351e-7,0.0002207933,0.00112666,0.04399719,0.7354639,0.004253281,0.2118001],"study_design_scores_gemma":[0.004957868,0.0002652243,0.008424296,0.0001896002,0.00007034461,0.0003579535,0.004947643,0.03384002,0.7247078,0.1568186,0.06425102,0.00116962],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.798555,0.00006306567,0.17095,0.00006910771,0.002953966,0.0001764273,0.00001131635,0.0003975042,0.02682358],"genre_scores_gemma":[0.993763,0.000004418294,0.005818653,0.00003853921,0.0001462144,0.00002091779,0.0000930543,0.00001586812,0.00009931579],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6807107,"threshold_uncertainty_score":0.5171093,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4293566659","doi":"10.1108/sasbe-03-2022-0050","title":"Industry 4.0 and the circular economy: using design-stage digital technology to reduce construction waste","year":2022,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Reuse; Circular economy; Originality; Big data; Analytics; Design technology; Engineering; Computer science; Engineering management; Manufacturing engineering; Systems engineering; Data science; Waste management","retraction":null,"screen_n_in":null,"score":{"opus":0.007369698120115759,"gpt":0.1887937069776201,"spread":0.1814240088575043,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001780107,0.0001148986,0.000117329,0.000124229,0.000397926,0.00008261317,0.00006569737,0.0001112708,0.00008457987],"category_scores_gemma":[0.000007214328,0.0001052047,0.00001974403,0.0001178645,0.0002002384,0.0001510637,0.0001592293,0.0003666291,0.000001607025],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000234926,"about_ca_system_score_gemma":0.00002398017,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000196199,"about_ca_topic_score_gemma":2.24685e-7,"domain_scores_codex":[0.9993507,0.0000300028,0.0001441197,0.0001757496,0.0000708464,0.0002285467],"domain_scores_gemma":[0.9997439,0.00001505386,0.0000263919,0.0001556368,0.000007329256,0.00005163866],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002867528,0.00006272104,0.01565709,0.0002632168,0.0003202902,0.0000902572,0.002124283,0.7128401,0.006705751,0.160357,0.000833661,0.1004588],"study_design_scores_gemma":[0.003764278,0.00029233,0.0005457549,0.00002069276,0.0001367424,0.001026154,0.1797834,0.132547,0.01003278,0.04208457,0.6286768,0.001089544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9634956,0.0007454361,0.03327931,0.0007540174,0.0001293229,0.0004725847,0.000006205696,0.00006928566,0.001048276],"genre_scores_gemma":[0.9983647,0.00003336939,0.0005453198,0.00005079348,0.00003170257,0.0001255294,0.000002908973,0.00001541954,0.0008302407],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6278431,"threshold_uncertainty_score":0.4290121,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1986507000","doi":"10.1139/l10-007","title":"A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Korea Institute of Construction Technology","keywords":"Duration (music); Case-based reasoning; Genetic algorithm; Process (computing); Project management; Project planning; Computer science; Artificial neural network; Operations research; Engineering; Machine learning; Systems engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01659848994407038,"gpt":0.2055518498871956,"spread":0.1889533599431253,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002439289,0.0001508492,0.0001816176,0.000688897,0.00006479018,0.00008768302,0.00005608404,0.0000900188,0.000002741803],"category_scores_gemma":[0.00022189,0.000164316,0.00004534466,0.0001480549,0.0000284147,0.000198358,0.000001337729,0.0004020896,1.389447e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001671546,"about_ca_system_score_gemma":0.0005985793,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001058045,"about_ca_topic_score_gemma":0.02553319,"domain_scores_codex":[0.9991523,0.000008041681,0.000418189,0.0001033937,0.00009197155,0.0002260806],"domain_scores_gemma":[0.9994767,0.00005113078,0.0001091101,0.00007812493,0.0001304604,0.0001545321],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003256313,0.000008375639,0.006588194,0.0002031212,0.00001723909,0.00001824383,0.0003205619,0.9633319,0.01728883,0.0002643583,0.00004325505,0.01188336],"study_design_scores_gemma":[0.0008250568,0.00004039708,0.002163776,0.000249462,0.00001523575,0.00005950507,0.00005928579,0.9952243,0.0009516454,0.00001055727,0.0002500413,0.0001507281],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4581677,0.00002374647,0.5404377,0.00002885866,0.0008645644,0.0003130413,0.00004494658,0.00003938521,0.00008004823],"genre_scores_gemma":[0.9826192,0.000002776804,0.01714825,0.00002591563,0.0001261691,0.00003048175,0.00001046731,0.00003484371,0.000001873519],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5244515,"threshold_uncertainty_score":0.9922483,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2016010091","doi":"10.1061/(asce)0733-9364(2005)131:8(938)","title":"Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":118,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Relevance (law); Expert system; Fuzzy logic; Productivity; Computer science; Data mining; Industrial engineering; Artificial intelligence; Machine learning; Engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.01197712258640025,"gpt":0.2013805044417287,"spread":0.1894033818553284,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002449968,0.0001757633,0.0002318002,0.0003717205,0.00007937799,0.00009721725,0.00006311416,0.0001030174,0.000008271681],"category_scores_gemma":[0.00001885321,0.0001744224,0.00005703069,0.00023199,0.00005399746,0.0005635066,0.00001642078,0.0002762953,0.000001019259],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001670012,"about_ca_system_score_gemma":0.00001871358,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005819047,"about_ca_topic_score_gemma":9.932397e-7,"domain_scores_codex":[0.9989197,0.00002216393,0.0005220905,0.0001286948,0.0002319501,0.0001753698],"domain_scores_gemma":[0.9994923,0.00001596133,0.0001732126,0.0001057949,0.0001211948,0.00009145941],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003808494,0.00002245602,0.002703701,0.0002224688,0.0004323076,0.00001033523,0.000223206,0.6639026,0.007162725,0.01714364,0.0003646323,0.3077739],"study_design_scores_gemma":[0.004177838,0.0001920923,0.002238185,0.00126567,0.0004650771,0.009479166,0.004663649,0.7962075,0.009138913,0.0002290207,0.1708134,0.00112952],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9199565,0.001686529,0.0696694,0.0001217009,0.007384199,0.0002345799,0.000005097287,0.0002153238,0.0007266662],"genre_scores_gemma":[0.9692214,0.0006700701,0.02796919,0.000006970899,0.002069281,0.000008476779,0.000001092371,0.00002647957,0.00002701336],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3066444,"threshold_uncertainty_score":0.7112738,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3082354722","doi":"10.1016/j.autcon.2020.103368","title":"Rule-based compliance checking and generative design for building interiors using BIM","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta; Athabasca University","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates - Technology Futures; CRDF Global","keywords":"Building information modeling; Generative Design; Computer science; Process (computing); Building design; Design language; Set (abstract data type); Modeling language; Representation (politics); Software engineering; Engineering design process; Design process; Systems engineering; Human–computer interaction; Engineering; Programming language; Architectural engineering; Software; Work in process","retraction":null,"screen_n_in":null,"score":{"opus":0.06662640949856635,"gpt":0.2762750582442213,"spread":0.209648648745655,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009235375,0.0001191887,0.0001338362,0.0001245231,0.00009175304,0.00007165781,0.00003826612,0.00007806398,0.00001362057],"category_scores_gemma":[0.00004120559,0.0001371758,0.00002682523,0.0002314267,0.00006009232,0.0003006461,0.000005934153,0.00009128349,0.000001518674],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001041636,"about_ca_system_score_gemma":0.00002885861,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005245772,"about_ca_topic_score_gemma":0.000002406659,"domain_scores_codex":[0.9993636,0.00003493617,0.0002459955,0.0001687228,0.00007041241,0.0001163613],"domain_scores_gemma":[0.9997212,0.00005397983,0.00007023948,0.00005237541,0.00006189638,0.00004028165],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005813402,0.000006566086,0.003586997,0.0002904596,0.00003704791,9.092806e-7,0.0007527206,0.5026658,0.2645723,0.01484248,0.00006097063,0.2131257],"study_design_scores_gemma":[0.0004584232,0.00001984096,0.000559346,0.00009414574,0.000009899758,0.00001559908,0.0002197085,0.9422458,0.05506214,0.001077572,0.0001044286,0.0001330901],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3330351,0.00005004603,0.6659943,0.0001582293,0.0003299144,0.0002095826,0.000004528065,0.0001925147,0.00002585008],"genre_scores_gemma":[0.7089757,0.000004547409,0.2908337,0.00005771156,0.00007288424,0.00003622987,0.000005989108,0.00001284366,4.253971e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4395801,"threshold_uncertainty_score":0.5593867,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2067503067","doi":"10.3763/aedm.2010.idds1","title":"Challenges for Integrated Design and Delivery Solutions","year":2010,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"National Research Council Canada","funders":"","keywords":"Interoperability; Process (computing); Bridge (graph theory); Knowledge management; Workforce; Engineering; Process management; Integrated project delivery; Engineering management; Isolation (microbiology); Systems engineering; Project management; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.02280809838162373,"gpt":0.194623944328585,"spread":0.1718158459469613,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001542091,0.0001449131,0.00009655106,0.0001374784,0.00007667307,0.00004396734,0.00005035003,0.0000503204,0.000003827601],"category_scores_gemma":[0.00001049259,0.0001301283,0.00002339789,0.00006085599,0.00002759578,0.00006440229,0.00001819574,0.0001418561,0.000001595408],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000104735,"about_ca_system_score_gemma":0.000003002317,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002956524,"about_ca_topic_score_gemma":0.000004639826,"domain_scores_codex":[0.9994776,0.00001022519,0.0001117615,0.0001545375,0.000051009,0.0001948871],"domain_scores_gemma":[0.9997147,0.00009866368,0.000009569339,0.000096601,0.00001835697,0.00006210808],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002000892,0.000004964907,0.000002212879,0.0001515352,0.00009617068,0.000001812381,0.0001997813,0.2159853,0.01241566,0.02456165,0.0001746622,0.7463862],"study_design_scores_gemma":[0.000345249,0.0000615333,0.0006598774,0.00003453639,0.00003947959,0.00005290539,0.00007621286,0.9888985,0.001531602,0.001893635,0.006168415,0.0002380741],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01786477,0.00112591,0.9795292,0.0001114782,0.000342131,0.0004024195,0.000002280741,0.0003774474,0.0002443847],"genre_scores_gemma":[0.7959378,0.0004944115,0.2032734,0.00001157992,0.00005037214,0.0001605727,0.000003667292,0.00002173789,0.00004650056],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.778073,"threshold_uncertainty_score":0.5306477,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955275722","doi":"10.1016/j.jclepro.2019.07.055","title":"Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings","year":2019,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Construction waste; Engineering; Building information modeling; Roof; Construction engineering; Construction industry; Sustainable design; Automation; Civil engineering; Sustainability; Architectural engineering; Waste management; Mechanical engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01162213609036846,"gpt":0.2225778540527953,"spread":0.2109557179624268,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005798049,0.0001071553,0.0002180396,0.0002921423,0.00006322841,0.00004327739,0.00005196636,0.00008857273,0.00001499005],"category_scores_gemma":[0.0001179258,0.00009807017,0.00005313127,0.0002034151,0.00003662964,0.0008189534,0.000008088991,0.0001657288,4.056977e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001019152,"about_ca_system_score_gemma":0.00005828697,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006219149,"about_ca_topic_score_gemma":2.058812e-7,"domain_scores_codex":[0.999082,0.000031731,0.0004643146,0.0001190861,0.0001672411,0.0001355855],"domain_scores_gemma":[0.9989329,0.00003099615,0.0002879425,0.00008745647,0.0006224146,0.00003829675],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0005682281,0.00003116518,0.003805815,0.0007822521,0.000192317,0.000002196299,0.001617724,0.7766767,0.1175249,0.006514457,0.001225111,0.09105916],"study_design_scores_gemma":[0.004701052,0.001668792,0.008552527,0.001040358,0.0004349647,0.002735103,0.01658979,0.1576303,0.7457693,0.0265619,0.0333883,0.0009276316],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7112666,0.0003233591,0.2864083,0.0001259099,0.001080345,0.0003386632,5.478169e-7,0.00004259868,0.0004136704],"genre_scores_gemma":[0.9698457,0.00005137619,0.02957549,0.000004908244,0.0003310034,0.000004928233,0.00000196519,0.00001863345,0.0001660445],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6282443,"threshold_uncertainty_score":0.3999186,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1982161115","doi":"10.1061/(asce)0733-9364(2000)126:2(137)","title":"Project Performance Control in Reconstruction Projects","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Control (management); Quality (philosophy); Earned value management; Process management; Performance indicator; Engineering; Project planning; Construction engineering; Engineering management; Computer science; Project management; Transport engineering; Operations management; Systems engineering; Business; Project charter; Artificial intelligence; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.004215611017472729,"gpt":0.1708797082740432,"spread":0.1666640972565705,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001469003,0.0001131536,0.0001584983,0.0004045289,0.00002495408,0.00003178311,0.00004490919,0.00005062348,0.00004092031],"category_scores_gemma":[0.000002802006,0.0001079168,0.00003627697,0.0002228457,0.00002834778,0.0003312814,0.000002803331,0.0001728094,0.000002405817],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006393577,"about_ca_system_score_gemma":0.00001086608,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001869921,"about_ca_topic_score_gemma":0.000001170337,"domain_scores_codex":[0.9993058,0.00001080036,0.000363235,0.00007769746,0.0001143448,0.0001281644],"domain_scores_gemma":[0.9998103,0.000008935283,0.00005104069,0.0000612316,0.00003494912,0.00003352472],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004255387,0.00000912807,0.001666439,0.0001996195,0.00008285904,0.00001017103,0.00009675046,0.0799426,0.000455035,0.00119537,0.0001416162,0.9161578],"study_design_scores_gemma":[0.007564518,0.000414508,0.03823579,0.001522235,0.0002213079,0.01106352,0.001419094,0.8325909,0.002179385,0.0003037397,0.1035087,0.0009762888],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9847239,0.0003692328,0.008890842,0.00003894941,0.001073684,0.0002064854,0.000001197494,0.00009174133,0.004603953],"genre_scores_gemma":[0.990295,0.00281719,0.006674134,0.00001036921,0.0001064091,0.00001287386,4.21996e-7,0.00001213013,0.00007147276],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9151816,"threshold_uncertainty_score":0.4400718,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1506789237","doi":"10.1111/j.1467-8667.2010.00650.x","title":"Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction","year":2010,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; U.S. Department of Defense","keywords":"Computer science; System dynamics; Context (archaeology); Hybrid system; Architecture; Event (particle physics); Discrete event simulation; Systems engineering; Complex system; Distributed computing; Systems modeling; Industrial engineering; Simulation; Artificial intelligence; Engineering; Software engineering; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.002402853640755542,"gpt":0.1818860790829981,"spread":0.1794832254422426,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000664964,0.0002094664,0.0002342073,0.0001344273,0.00007205219,0.00005922371,0.00004911092,0.0001300188,0.000002240384],"category_scores_gemma":[0.00002108712,0.0002007103,0.00003464784,0.00007366517,0.00004841799,0.0001423155,0.00002983971,0.0003250256,4.783798e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000249509,"about_ca_system_score_gemma":0.000007371602,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002786187,"about_ca_topic_score_gemma":0.00000677646,"domain_scores_codex":[0.9992638,0.000006370083,0.0002922689,0.000201592,0.00008012727,0.0001558553],"domain_scores_gemma":[0.9996064,0.00008648737,0.00004532791,0.0001232917,0.00005694953,0.00008159781],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008639777,8.12903e-7,0.0001249225,0.0004350146,0.00002864585,2.982964e-7,0.0001111661,0.8983681,0.002286941,0.01872374,0.000001759678,0.07990993],"study_design_scores_gemma":[0.0003178221,0.00003576385,0.0005223913,0.0001649534,0.00002832298,0.0001580703,0.00005361675,0.9954267,0.000673442,0.002353205,0.00007441452,0.000191372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4052852,0.000117239,0.5936753,0.000006979311,0.0006368684,0.0001344443,0.00002060629,0.0001111797,0.0000122274],"genre_scores_gemma":[0.8919475,0.0000205079,0.1077238,0.000004077282,0.0002492067,0.00001189021,0.00001710608,0.00002529941,6.588602e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4866623,"threshold_uncertainty_score":0.8184729,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3016837706","doi":"10.1061/(asce)co.1943-7862.0001854","title":"Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Fuzzy logic; Construction management; Computer science; Face (sociological concept); Management science; Engineering management; Construction industry; Systems engineering; Construction engineering; Engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.007015348348031508,"gpt":0.189499886061984,"spread":0.1824845377139525,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001408558,0.0002214371,0.0002632384,0.0003046128,0.000064485,0.00009884509,0.0000596418,0.00006300346,0.000003498994],"category_scores_gemma":[0.00001168965,0.0002241866,0.00005186728,0.0001350231,0.00005641672,0.0002773788,0.00003581587,0.0001719372,4.39448e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004352331,"about_ca_system_score_gemma":0.000004096193,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":5.256836e-7,"about_ca_topic_score_gemma":1.494952e-7,"domain_scores_codex":[0.999065,0.000007129634,0.0004279665,0.0001783702,0.0001417907,0.0001796889],"domain_scores_gemma":[0.9995872,0.00002179288,0.0001037733,0.00007490968,0.00006606706,0.0001462683],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00007550732,0.00001298224,0.0001520508,0.003166644,0.0006908957,0.00004921635,0.0001591626,0.02176461,0.006153568,0.2267483,0.0009162416,0.7401109],"study_design_scores_gemma":[0.009409704,0.001694842,0.004946731,0.002311776,0.002261379,0.01552819,0.004635142,0.3363492,0.03365851,0.01685791,0.5688921,0.003454537],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08583883,0.002692866,0.9051033,0.000867196,0.001888547,0.0008560728,0.00001695007,0.0005754132,0.002160808],"genre_scores_gemma":[0.690496,0.009971118,0.2988342,0.0001003628,0.000452555,0.00006048944,0.0000049696,0.00005464648,0.00002559813],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7366563,"threshold_uncertainty_score":0.9142064,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2157838605","doi":"10.1155/2014/672896","title":"An Automated BIM Model to Conceptually Design, Analyze, Simulate, and Assess Sustainable Building Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Embodied energy; Sustainability; Energy consumption; Certification; Systems engineering; Environmental design; Energy modeling; Building design; Conceptual design; Sustainable design; Architectural engineering; Design tool; Computer science; Life-cycle assessment; Engineering; Civil engineering; Operations management; Production (economics); Human–computer interaction","retraction":null,"screen_n_in":null,"score":{"opus":0.01240270344785303,"gpt":0.2478339491887843,"spread":0.2354312457409313,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003648815,0.0001821186,0.0002626963,0.0005338101,0.00007991977,0.0001410252,0.0001069672,0.0001068772,0.00000712121],"category_scores_gemma":[0.0001036496,0.0001813426,0.00004752855,0.0003676206,0.00003028429,0.0007969233,0.000011443,0.0002297458,7.829661e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001164301,"about_ca_system_score_gemma":0.00005519422,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002615015,"about_ca_topic_score_gemma":7.587797e-7,"domain_scores_codex":[0.9989727,0.00002851757,0.000442597,0.0001246043,0.0001872868,0.0002442547],"domain_scores_gemma":[0.9991761,0.0000633544,0.0001048233,0.0001175789,0.000344691,0.0001934177],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001569338,0.000004814855,0.0001369074,0.00005258723,0.00004187113,0.00000401269,0.0001425506,0.9641034,0.0218352,0.01022526,0.0000452426,0.003392447],"study_design_scores_gemma":[0.0003601607,0.0001269708,0.0002164786,0.00007022061,0.00003261953,0.0003889264,0.0003243042,0.9902655,0.007293083,0.000300259,0.0004243504,0.0001971256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3691092,0.00004522884,0.6300977,0.0000147812,0.0003040074,0.00008490287,6.111376e-7,0.000278194,0.00006535101],"genre_scores_gemma":[0.8495319,0.0000143566,0.1502648,0.00001229649,0.0001355127,0.00000460502,5.28391e-7,0.00002851047,0.000007504467],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4804227,"threshold_uncertainty_score":0.7394935,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2590775636","doi":"10.1061/(asce)cp.1943-5487.0000660","title":"Automated Schedule and Progress Updating of IFC-Based 4D BIMs","year":2017,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Building information modeling; Computer science; Schedule; Exploit; Field (mathematics); Task (project management); Hierarchy; Systems engineering; Data mining; Scheduling (production processes); Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.007272320727445325,"gpt":0.2323999859188683,"spread":0.225127665191423,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003275637,0.0001063737,0.0002244395,0.000224693,0.00006296567,0.00009752445,0.0001498628,0.00006320107,0.000003943363],"category_scores_gemma":[0.00009888323,0.000104616,0.00004507212,0.00008511361,0.00004315038,0.0001907319,0.00002187399,0.0002477982,2.241175e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003748243,"about_ca_system_score_gemma":0.00002850058,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003004131,"about_ca_topic_score_gemma":0.000006887306,"domain_scores_codex":[0.9992064,0.000009218145,0.0004488744,0.00006114474,0.0001363408,0.0001380336],"domain_scores_gemma":[0.999446,0.00005341647,0.0002461551,0.0001221916,0.00008687191,0.00004535358],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000005432616,0.00001441096,0.02865319,0.0002506383,0.00003797968,0.00001112052,0.0001570507,0.9536654,0.006415633,0.0008170253,0.00001886721,0.009953246],"study_design_scores_gemma":[0.000445857,0.00002798697,0.03947505,0.0007119181,0.000008422979,0.00004817346,0.00003516165,0.9522913,0.006794184,0.00001555174,0.00005271519,0.00009371266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9548091,0.0003709574,0.04383685,0.00003144068,0.0005506913,0.00004128213,6.290308e-7,0.0001197509,0.0002392475],"genre_scores_gemma":[0.9779856,0.000006460906,0.02189425,0.000002225839,0.00009272825,5.41822e-7,3.5477e-7,0.00001733131,5.463734e-7],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02317641,"threshold_uncertainty_score":0.4266115,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2019060119","doi":"10.1016/j.autcon.2008.08.001","title":"Visualizing high-rise building construction strategies using linear scheduling and 4D CAD","year":2008,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Schedule; Scheduling (production processes); Computer science; Visualization; CAD; Project management; Software engineering; Systems engineering; Industrial engineering; Engineering; Engineering drawing; Operations management; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.0170725969977628,"gpt":0.2583357278586067,"spread":0.2412631308608439,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001580003,0.0002306543,0.0002382162,0.0005046401,0.0003703772,0.0001272734,0.00005735173,0.0002224409,0.00004135364],"category_scores_gemma":[0.00003365789,0.000270441,0.0000421615,0.0005124837,0.0003448224,0.00136139,0.00001715878,0.0002831456,0.000005494883],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002012292,"about_ca_system_score_gemma":0.000100858,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002040386,"about_ca_topic_score_gemma":0.00003224182,"domain_scores_codex":[0.9986453,0.00006416807,0.0005612218,0.0002774962,0.0002082129,0.0002436072],"domain_scores_gemma":[0.9994963,0.00004839412,0.0001362538,0.0001419233,0.0001117066,0.0000654398],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003764695,0.00002704844,0.0431518,0.0002773595,0.00009982519,0.00001816673,0.001660453,0.4398618,0.107704,0.2661276,0.00002057637,0.1410137],"study_design_scores_gemma":[0.0007793187,0.00002289723,0.007667032,0.0001728374,0.00002886668,0.001664917,0.002730438,0.9669169,0.01447495,0.005003714,0.0001340345,0.0004041338],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.770069,0.000209253,0.227538,0.00002370586,0.001236647,0.0001562452,0.000004620058,0.0005290281,0.0002334585],"genre_scores_gemma":[0.8396603,0.000146145,0.1599433,0.000008430344,0.0001857239,0.00001665411,0.00001074991,0.00002645193,0.000002254345],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5270551,"threshold_uncertainty_score":0.9999748,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2144433307","doi":"10.1016/s0926-5805(99)00002-3","title":"A development framework for data models for computer-integrated facilities management","year":2000,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Interoperability; Engineering management; Facility management; Data management; Architecture; Construction management; Computer science; Systems engineering; Engineering; Data sharing; Software engineering; Database; Business; World Wide Web","retraction":null,"screen_n_in":null,"score":{"opus":0.03096221014164092,"gpt":0.2450433658332571,"spread":0.2140811556916162,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001430703,0.0001401629,0.0001357318,0.0001608024,0.0001003179,0.00007175696,0.0001416425,0.0001160928,0.0001355537],"category_scores_gemma":[0.000005909761,0.0001520236,0.00002959218,0.0001764973,0.00003512799,0.0004949071,0.00001094031,0.00007728292,0.00001379611],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001333356,"about_ca_system_score_gemma":0.00002754933,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008521292,"about_ca_topic_score_gemma":0.00002996939,"domain_scores_codex":[0.9990648,0.00001276707,0.0004077715,0.0002396503,0.000105707,0.0001693206],"domain_scores_gemma":[0.9995698,0.00005754279,0.00003890632,0.0002484716,0.00005837423,0.00002690364],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001877088,0.000008109108,0.00002154133,0.0001238636,0.00003653956,1.041603e-7,0.0002823306,0.04259928,0.00000925917,0.07965817,0.0005330952,0.8767089],"study_design_scores_gemma":[0.0004396948,0.00001076904,0.0001254099,0.00009191473,0.00001051826,0.000009849009,0.0004483689,0.9163877,0.0002300945,0.02865886,0.05342542,0.0001614362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.03926494,0.00003487806,0.9574333,0.00004121575,0.0008255682,0.0007042401,0.0001069974,0.0004900767,0.001098779],"genre_scores_gemma":[0.08148102,0.00004089078,0.917065,0.00002109308,0.00008400288,0.0004659108,0.0006664561,0.00001826414,0.0001573366],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.8765475,"threshold_uncertainty_score":0.6199343,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2991942790","doi":"10.5381/jot","title":"The Journal of Object Technology","year":2017,"lang":"en","type":"paratext","venue":"The Journal of Object Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto; University of Victoria; Université de Montréal","funders":"","keywords":"Computer science; Object (grammar); Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.007350684574505722,"gpt":0.2371860836578299,"spread":0.2298353990833241,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.001303142,0.0003791345,0.0008245094,0.001500447,0.0004681765,0.00007329215,0.002640612,0.001292893,0.0001894247],"category_scores_gemma":[0.0003932637,0.0002071513,0.0002751511,0.000540733,0.0009935191,0.0001632903,0.0001281019,0.003956967,0.0002062283],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002152693,"about_ca_system_score_gemma":0.0004182057,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006358629,"about_ca_topic_score_gemma":0.00004539699,"domain_scores_codex":[0.9977042,0.0001294189,0.001267615,0.00009614244,0.0003841602,0.0004184655],"domain_scores_gemma":[0.995831,0.0002335881,0.002159778,0.000866666,0.0008578596,0.0000510749],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0003587102,0.00005609115,0.00009867398,0.0001342208,0.00231665,0.00008456942,0.0003980223,0.002192719,0.0242076,0.003580817,0.5400848,0.4264871],"study_design_scores_gemma":[0.001179875,0.001277524,0.00005830282,0.0007889085,0.0007086609,0.03084192,0.002859339,0.000186925,0.06337084,0.01379238,0.8844305,0.0005048765],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"review","genre_gemma":"empirical","genre_scores_codex":[0.2210779,0.4240165,0.05975909,0.0275095,0.1071632,0.001728736,0.0001285226,0.0008807317,0.1577359],"genre_scores_gemma":[0.9303613,0.05882065,0.0006791109,0.00003549107,0.00166023,0.000008164073,0.00000200104,0.0001224148,0.008310609],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7092834,"threshold_uncertainty_score":0.998341,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4321768227","doi":"10.1016/j.autcon.2023.104808","title":"Optimized decision support for BIM maturity assessment","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Research Grants Council, University Grants Committee; National Social Science Fund of China; National Natural Science Foundation of China; City University of Hong Kong","keywords":"Maturity (psychological); Capability Maturity Model; Building information modeling; Process (computing); Function (biology); Engineering; Process management; Systems engineering; Risk analysis (engineering); Computer science; Operations management; Business; Software","retraction":null,"screen_n_in":null,"score":{"opus":0.01209271287198242,"gpt":0.2770197122604636,"spread":0.2649269993884812,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002921398,0.0001202392,0.000147946,0.0004321615,0.00008487094,0.00006306452,0.00006381575,0.0001400229,0.0001810469],"category_scores_gemma":[0.00003967718,0.0001294151,0.00006231379,0.0005781708,0.00003689533,0.0003576194,0.000009992572,0.0001174015,0.00007853813],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001610952,"about_ca_system_score_gemma":0.0000435656,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005426945,"about_ca_topic_score_gemma":0.00001011367,"domain_scores_codex":[0.9990606,0.0000227476,0.0003982137,0.0001715258,0.0001691043,0.0001778513],"domain_scores_gemma":[0.9995615,0.0001192045,0.00005727372,0.0001444636,0.00008115788,0.00003633207],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004189756,0.0000174985,0.002780077,0.0001124888,0.00003475096,0.000001830962,0.0001461825,0.08575352,0.002366714,0.07163573,0.006083649,0.8310257],"study_design_scores_gemma":[0.001255393,0.00002666595,0.02709858,0.00004362488,0.00001228956,0.00003803474,0.0003011662,0.9436489,0.001703851,0.02113257,0.004541962,0.000196976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2814943,0.00001436526,0.7069924,0.000164194,0.004548749,0.0006219972,0.00003705447,0.002047244,0.004079585],"genre_scores_gemma":[0.7868032,0.00008325064,0.2121873,0.00002362543,0.0001378997,0.0003898253,0.0002649895,0.00003174271,0.00007804984],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8578954,"threshold_uncertainty_score":0.5277393,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4313201678","doi":"10.1016/j.cscm.2022.e01755","title":"Bim-based energy analysis and optimization using insight 360 (case study)","year":2022,"lang":"en","type":"article","venue":"Case Studies in Construction Materials","topic":"BIM and Construction Integration","field":"Engineering","cited_by":96,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Abbott (Canada)","funders":"King Khalid University; Najran University; Deanship of Scientific Research, King Faisal University","keywords":"Building information modeling; Energy consumption; Sustainability; Environmental economics; Energy management; Energy modeling; Consumption (sociology); Efficient energy use; Engineering; Green building; Civil engineering; Energy (signal processing); Architectural engineering; Environmental resource management; Operations management; Environmental science; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.02881465003547695,"gpt":0.2713294658113661,"spread":0.2425148157758891,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002287311,0.0001740891,0.0003436676,0.0006917921,0.0003969577,0.00006399884,0.00003276507,0.0000434385,0.0003898497],"category_scores_gemma":[0.0000222265,0.0001863177,0.00003963427,0.0009736453,0.0001532019,0.0001564046,0.00006058464,0.00007845034,2.444028e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001967398,"about_ca_system_score_gemma":0.00002000127,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003254304,"about_ca_topic_score_gemma":0.0002837509,"domain_scores_codex":[0.9988113,0.0002258811,0.0004531896,0.0002483123,0.0001228005,0.0001384865],"domain_scores_gemma":[0.9995706,0.00005449064,0.00009494823,0.0001623583,0.00008521628,0.00003235806],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003123276,0.00003290691,0.003247622,0.00004897858,0.0006853956,0.004977582,0.001064418,0.9830738,0.001310389,0.000884656,0.0000189463,0.004624045],"study_design_scores_gemma":[0.004079923,0.000272137,0.000097359,0.00005355828,0.002468211,0.1370132,0.1832479,0.6518254,0.0181888,0.0007066973,0.0005853926,0.001461472],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9618066,0.0005042963,0.03560703,0.000006766171,0.001674677,0.0001707629,0.00005299896,0.0001275511,0.00004932281],"genre_scores_gemma":[0.9916073,0.00006447089,0.008080627,0.00001766454,0.00006145657,0.0001315296,0.00001429698,0.00001805015,0.000004609694],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3312485,"threshold_uncertainty_score":0.7597814,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2992543799","doi":"10.1016/j.resconrec.2019.104605","title":"A selective disassembly multi-objective optimization approach for adaptive reuse of building components","year":2019,"lang":"en","type":"article","venue":"Resources Conservation and Recycling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Energy Council of Canada; Consejo Nacional de Ciencia y Tecnología","keywords":"Deconstruction (building); Reuse; Adaptive reuse; Component (thermodynamics); Key (lock); Process (computing); Sustainability; Asset (computer security); Risk analysis (engineering); Resource (disambiguation); Resource efficiency; Computer science; Engineering; Business; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02063901231298593,"gpt":0.2269061181614099,"spread":0.2062671058484239,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001367548,0.0001154268,0.0001804796,0.0001266859,0.00007939729,0.00002658856,0.00006649952,0.0001022588,0.000003065202],"category_scores_gemma":[0.00005837746,0.0001116308,0.00004707219,0.0001851754,0.0000363115,0.0001662825,0.00001652007,0.00009244924,3.391656e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004245729,"about_ca_system_score_gemma":0.000009828603,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003530239,"about_ca_topic_score_gemma":0.00000404501,"domain_scores_codex":[0.9993325,0.00003640442,0.0002537683,0.0001764172,0.0000880539,0.0001128449],"domain_scores_gemma":[0.9994686,0.0001306865,0.0001068898,0.0001113287,0.0001503365,0.00003216946],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000272801,0.00006642201,0.02636372,0.0003181463,0.0002153424,9.807049e-8,0.004766872,0.8692128,0.09095079,0.002356983,0.0000564314,0.005419567],"study_design_scores_gemma":[0.0007506878,0.00004525273,0.003923121,0.00008035664,0.0000205311,0.000002649885,0.001094598,0.9867206,0.007043481,0.00006406863,0.0001240531,0.0001306632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5404938,0.0001087057,0.458443,0.00001655153,0.00009077388,0.0003290756,0.000007127641,0.00006758465,0.0004433511],"genre_scores_gemma":[0.8624394,0.00003618139,0.1373311,0.00002165935,0.00002972439,0.0000373822,0.00002560464,0.0000184999,0.00006049289],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3219456,"threshold_uncertainty_score":0.4552171,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2923839026","doi":"10.1139/cjce-2018-0408","title":"Lean construction and BIM in small and medium-sized enterprises (SMEs) in construction: a systematic literature review","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Lean construction; Business; Construction industry; Building information modeling; Small and medium-sized enterprises; Systematic review; Process management; Knowledge management; Operations management; Construction engineering; Computer science; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.003770900837719926,"gpt":0.1653101364662113,"spread":0.1615392356284914,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002417367,0.0001444625,0.0003925064,0.0006279539,0.00001452362,0.00006219088,0.00006212189,0.00009311481,0.00004486768],"category_scores_gemma":[0.00008437147,0.000139162,0.00003853366,0.0003272142,0.00003320456,0.0002431101,0.00000389143,0.0003506353,0.000001105423],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001277218,"about_ca_system_score_gemma":0.0001153769,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005393291,"about_ca_topic_score_gemma":0.01816696,"domain_scores_codex":[0.9991481,0.00002150636,0.000503714,0.00009145838,0.00006761687,0.000167611],"domain_scores_gemma":[0.9995415,0.00004575989,0.00008094179,0.00008352706,0.00006304611,0.0001852535],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","study_design_scores_codex":[0.00008351122,0.00002803318,0.3769223,0.4814626,0.0007682858,0.001372467,0.007710269,0.05668202,0.007765335,0.03523913,0.0008655473,0.03110048],"study_design_scores_gemma":[0.007486068,0.0003017781,0.0404397,0.8431453,0.0003699203,0.04826631,0.003841935,0.04554673,0.0008907742,0.002034843,0.005477923,0.002198705],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7141241,0.2763635,0.00375325,0.0003513456,0.003467196,0.000759522,0.00001447671,0.00005687857,0.001109763],"genre_scores_gemma":[0.9887915,0.01025145,0.0008265416,0.00003230126,0.0000634539,0.000007308019,0.000001527481,0.00001760056,0.000008296254],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3616827,"threshold_uncertainty_score":0.9997489,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2937847675","doi":"10.1061/(asce)me.1943-5479.0000698","title":"Integrated Risk Management Framework for Tolerance-Based Mitigation Strategy Decision Support in Modular Construction Projects","year":2019,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Rework; Risk analysis (engineering); Schedule; Modular programming; Modular design; Identification (biology); Risk management; Process (computing); Computer science; Engineering; Systems engineering; Reliability engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.006958685917370178,"gpt":0.2139265249411759,"spread":0.2069678390238057,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003959714,0.0001763494,0.000238603,0.0008707276,0.00001567359,0.00005330133,0.0001318466,0.0001059151,0.00003603392],"category_scores_gemma":[0.0000186239,0.0001777128,0.00008774709,0.0004977642,0.000008928767,0.0003116474,0.00001003961,0.0003375741,0.000005141935],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002813505,"about_ca_system_score_gemma":0.00001388392,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000262685,"about_ca_topic_score_gemma":0.000005174425,"domain_scores_codex":[0.9987432,0.00001655039,0.0006407904,0.0001477815,0.00023866,0.0002130287],"domain_scores_gemma":[0.9995484,0.0000601043,0.000141724,0.0001430221,0.00006828509,0.0000384681],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006554726,0.0000227962,0.003039929,0.0003095751,0.00005685883,0.00001411042,0.00004333567,0.8662273,0.0001483208,0.008579146,0.00003545965,0.1214577],"study_design_scores_gemma":[0.002332567,0.0001384947,0.01386617,0.001158702,0.00004947125,0.00001531077,0.000775818,0.9735484,0.001040879,0.005030884,0.001773036,0.0002702645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4265008,0.00008077017,0.5714212,0.000009364308,0.001076125,0.000449144,0.000002925208,0.00004106221,0.0004185842],"genre_scores_gemma":[0.8085615,0.0002129707,0.1910802,0.000007902788,0.00005210547,0.00004088108,0.00000717415,0.00002448857,0.0000128159],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.3820607,"threshold_uncertainty_score":0.7246916,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3034774777","doi":"10.1108/ci-11-2019-0133","title":"Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies","year":2020,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Workflow; Building information modeling; Workflow technology; Computer science; Workflow engine; Systems engineering; Process (computing); Information flow; Business process; Workflow management system; Process management; Software engineering; Engineering; Database; Operations management; Work in process","retraction":null,"screen_n_in":null,"score":{"opus":0.03393388412887537,"gpt":0.2387419833636484,"spread":0.204808099234773,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007859196,0.0002755729,0.0002371062,0.0005663597,0.0002074318,0.0001867139,0.00008703458,0.000252479,0.00003793738],"category_scores_gemma":[0.000157947,0.0002896629,0.00002084664,0.00144407,0.0001983818,0.00055637,0.00003472761,0.0002404893,0.000008948033],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000146951,"about_ca_system_score_gemma":0.0001132363,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001333162,"about_ca_topic_score_gemma":0.000005457232,"domain_scores_codex":[0.9986213,0.0000204704,0.00051295,0.0004042001,0.0002062289,0.0002348924],"domain_scores_gemma":[0.999233,0.00001762486,0.000150252,0.0001577046,0.000391821,0.00004961743],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.000215398,0.00001371144,0.00320971,0.0005582867,0.00007827253,0.000002637283,0.0006551801,0.007510697,0.6314598,0.03197621,0.0002205018,0.3240996],"study_design_scores_gemma":[0.001184924,0.0003244418,0.000206542,0.0003330085,0.00008497331,0.0005094275,0.006516412,0.1444889,0.8354292,0.007027522,0.002926994,0.0009677188],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8224196,0.00002203629,0.1733295,0.0003921083,0.001855872,0.0005183934,0.000104095,0.001079513,0.000278854],"genre_scores_gemma":[0.9036163,0.00001553749,0.09564368,0.0001480967,0.0004351957,0.00004556343,0.00004923143,0.00004293587,0.000003432411],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3231319,"threshold_uncertainty_score":0.9999555,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2000923597","doi":"10.1061/(asce)0733-9364(2001)127:4(322)","title":"Improving Design Coordination for Building Projects. I: Information Model","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Component (thermodynamics); Consistency (knowledge bases); Computer science; Process (computing); Set (abstract data type); Design process; Systems engineering; Building information modeling; Conceptual design; Engineering design process; Information model; Hierarchy; Software engineering; Process management; Human–computer interaction; Engineering; Work in process; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.008737578101451553,"gpt":0.1905701503927888,"spread":0.1818325722913373,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002002638,0.00009193249,0.0001027462,0.0003435454,0.00004705149,0.00006819767,0.00004036368,0.00004319278,0.000001666563],"category_scores_gemma":[0.00001672328,0.00009115673,0.00003942482,0.0001190747,0.00001183457,0.0007379541,0.000006312466,0.00007935773,2.934258e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006899549,"about_ca_system_score_gemma":0.000009766198,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":6.28721e-7,"about_ca_topic_score_gemma":1.23337e-7,"domain_scores_codex":[0.9994366,0.000004213623,0.0003088822,0.00004567009,0.0001028935,0.0001017457],"domain_scores_gemma":[0.9996805,0.00001569968,0.0001017703,0.00004458812,0.0001195972,0.0000378287],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000185426,0.000002559071,0.0000129621,0.0001471146,0.00004994731,6.576874e-7,0.00006055846,0.7080759,0.001564165,0.02106968,0.0002314052,0.2687665],"study_design_scores_gemma":[0.0005138124,0.00003680586,0.00004365585,0.0000521037,0.00004626446,0.0002333291,0.0001942881,0.9908881,0.0009463031,0.0004995362,0.006446614,0.00009918091],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01682907,0.00009863813,0.981855,0.00004724794,0.0006865341,0.00019876,0.000001281756,0.00008280088,0.0002007136],"genre_scores_gemma":[0.6710424,0.0003146172,0.3284695,0.00001245374,0.00009906481,0.00002621273,0.000001943035,0.00001168759,0.00002215803],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6542133,"threshold_uncertainty_score":0.3717264,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2106145744","doi":"10.5555/510378.510656","title":"Simphony: an integrated environment for construction simulation","year":2000,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Animation; Software engineering; Systems engineering; Representation (politics); User Friendly; Computer animation; Human–computer interaction; Engineering; Programming language","retraction":null,"screen_n_in":null,"score":{"opus":0.01976129083914012,"gpt":0.2403198047283354,"spread":0.2205585138891953,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006894801,0.0001866299,0.0001438142,0.00008945489,0.00009413428,0.0001000951,0.00009235633,0.0001331934,0.004022745],"category_scores_gemma":[0.00001164707,0.0001908807,0.00005058074,0.0000900981,0.00006267615,0.0005473049,0.00000422833,0.0001079277,0.0001258349],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009387146,"about_ca_system_score_gemma":0.00001933723,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007442429,"about_ca_topic_score_gemma":0.00001430212,"domain_scores_codex":[0.9990878,0.00003243284,0.0003317278,0.0002447171,0.0001307722,0.0001726161],"domain_scores_gemma":[0.9994863,0.00007301975,0.00004202168,0.0002129639,0.0001097892,0.00007585623],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003116538,0.000008763371,0.00006524513,0.000005995466,0.000009642392,8.764876e-8,0.0001427556,0.6007956,0.0004697899,0.0004493684,0.00001934822,0.3980023],"study_design_scores_gemma":[0.0004190367,0.00007318583,0.0005036709,0.00001734285,0.00001629766,0.000002320207,0.0001069972,0.9115245,0.001366211,0.00099359,0.08477616,0.0002006393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1495079,0.00001537084,0.8477055,0.00003224338,0.0003914056,0.0003495586,0.00004135954,0.0003789505,0.001577769],"genre_scores_gemma":[0.9930558,0.0000110139,0.006092035,0.00004765435,0.0001434086,0.00004903613,0.0002123814,0.00002656855,0.0003621144],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8435479,"threshold_uncertainty_score":0.9968877,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3033110589","doi":"10.1016/j.autcon.2020.103257","title":"Building automation system - BIM integration using a linked data structure","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"York University; Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Research Foundation","keywords":"Building information modeling; Automation; Systems engineering; Engineering; System integration; Building automation; Computer science; Construction engineering; Manufacturing engineering; Software engineering; Database; Operations management; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03048398115970122,"gpt":0.2548315629115585,"spread":0.2243475817518572,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001710299,0.0002524116,0.0002582375,0.0003428931,0.0001336506,0.0001733695,0.0002553179,0.0002660783,0.00007423141],"category_scores_gemma":[0.00009070153,0.0002740692,0.00004229823,0.0009366881,0.00006315985,0.001635658,0.00004577193,0.0003315845,0.00002155],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003869423,"about_ca_system_score_gemma":0.00006983471,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005118138,"about_ca_topic_score_gemma":0.00003665501,"domain_scores_codex":[0.9982499,0.00009733551,0.0007305926,0.0004077711,0.0002962088,0.0002181473],"domain_scores_gemma":[0.9991792,0.000039432,0.0001931513,0.0003804313,0.0001192621,0.00008852832],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000414573,0.00001484925,0.002908139,0.0006332931,0.00009768954,0.000006628048,0.00122546,0.1596031,0.2339039,0.1269556,0.000398844,0.4742111],"study_design_scores_gemma":[0.000442387,0.00001476475,0.002109885,0.0001692025,0.0000341965,0.0001270824,0.0008945487,0.9890841,0.0057971,0.0007856178,0.0002829902,0.0002580832],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4702045,0.00006678576,0.5259746,0.0001390495,0.001462214,0.0003307821,0.00006725153,0.001469045,0.0002857955],"genre_scores_gemma":[0.9066363,0.000008336766,0.09264437,0.00003761427,0.0003526144,0.00001449114,0.0002712134,0.00003419927,8.645993e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.829481,"threshold_uncertainty_score":0.9999712,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1981172092","doi":"10.1061/(asce)cp.1943-5487.0000123","title":"Near Real-Time Motion Planning and Simulation of Cranes in Construction: Framework and System Architecture","year":2012,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Planner; Motion planning; Motion (physics); Engineering; Automation; Architecture; Systems engineering; Computer science; Simulation; Artificial intelligence; Robot","retraction":null,"screen_n_in":null,"score":{"opus":0.005447623349515008,"gpt":0.209963585215207,"spread":0.204515961865692,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002949793,0.0000912393,0.0002048604,0.0002533798,0.00001872938,0.00002136567,0.00002872397,0.00009079056,0.000001968234],"category_scores_gemma":[0.00004567796,0.00009241496,0.00002123007,0.0001721151,0.00001942782,0.0001602616,0.000008792958,0.0002749491,1.276859e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005251569,"about_ca_system_score_gemma":0.000006011066,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003375877,"about_ca_topic_score_gemma":0.000001022259,"domain_scores_codex":[0.9993174,0.0000195963,0.0003982618,0.00004818184,0.0000975389,0.0001190285],"domain_scores_gemma":[0.9995977,0.000181897,0.0001054829,0.00004123427,0.00003257124,0.0000411205],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000005883093,0.000003137162,0.03479101,0.0002061131,0.00001017138,0.000001751136,0.001220274,0.9580411,0.001263879,0.0003493227,4.894115e-7,0.004106846],"study_design_scores_gemma":[0.0002103372,0.00001486161,0.07839333,0.001180226,0.000007827034,0.0002623072,0.000222933,0.9194007,0.000169621,0.00004653308,0.00001492919,0.00007639644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7951049,0.0006046333,0.2038064,0.000004396971,0.0003136267,0.00003426723,3.384453e-7,0.00003037985,0.0001010667],"genre_scores_gemma":[0.9831844,0.00001413548,0.01662899,7.491012e-7,0.0001595151,2.942577e-7,3.016366e-7,0.00001136585,2.67828e-7],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1880795,"threshold_uncertainty_score":0.3768573,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2021332829","doi":"10.1016/j.ejor.2011.06.011","title":"Models and algorithms to improve earthwork operations in road design using mixed integer linear programming","year":2011,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Earthworks; Integer programming; Linear programming; Integer (computer science); Mathematical optimization; Computer science; Set (abstract data type); Process (computing); Linear model; Algorithm; Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.1680866997214263,"gpt":0.3352637438034483,"spread":0.1671770440820219,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002549634,0.00009897904,0.0001260907,0.0004209068,0.00014004,0.0001444216,0.0001452267,0.0000294225,0.0000558866],"category_scores_gemma":[0.0001532637,0.00008633138,0.00003098713,0.0003446268,0.00005930872,0.0005459121,0.0000391106,0.0004977677,0.00001911886],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007657062,"about_ca_system_score_gemma":0.0001219191,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002516619,"about_ca_topic_score_gemma":0.00001731401,"domain_scores_codex":[0.998388,0.0004640082,0.0004436438,0.0001268585,0.00036609,0.0002114183],"domain_scores_gemma":[0.9990744,0.00004668056,0.00002167022,0.00009016827,0.0006187436,0.0001483138],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001207304,0.00008097159,0.0001606698,0.00001444996,0.00005903562,0.0001053671,0.005307798,0.7810577,0.02428047,0.004867355,0.0002473795,0.1836981],"study_design_scores_gemma":[0.0005327512,0.0003796762,0.001546309,0.0001457676,0.000006215883,0.0001680558,0.0009867179,0.9895888,0.005484005,0.0002209378,0.0007698796,0.000170916],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.271713,0.0002664045,0.7258987,0.0001039348,0.0003033016,0.000283061,0.000003104988,0.00001757796,0.001410903],"genre_scores_gemma":[0.8124061,0.00003733459,0.1872221,0.00001678202,0.0002177021,0.000005962915,0.000001257586,0.00002407244,0.00006871978],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5406931,"threshold_uncertainty_score":0.3520492,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3083778987","doi":"10.36680/j.itcon.2020.024","title":"Construction 4.0: a survey of research trends","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Digitization; Structuring; Construction industry; Quality (philosophy); Engineering; Emerging technologies; Industry 4.0; Construction management; Construction engineering; Business; Engineering management; Computer science; Civil engineering; Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.0257170335431184,"gpt":0.2774679289700684,"spread":0.2517508954269501,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006747385,0.00009355283,0.0002467776,0.002589987,0.0000391748,0.00002346704,0.0001663283,0.0002746938,0.00007064704],"category_scores_gemma":[0.0004324015,0.00009245958,0.0000467893,0.003033725,0.0003777313,0.001052668,0.00001710301,0.0007015585,0.000009996494],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001112024,"about_ca_system_score_gemma":0.00008970691,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001674943,"about_ca_topic_score_gemma":0.00001358196,"domain_scores_codex":[0.9983929,0.00006909128,0.001047001,0.00005395378,0.0002949358,0.0001421586],"domain_scores_gemma":[0.9984685,0.00006190759,0.0003781672,0.00009823612,0.0009452801,0.00004795792],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001346196,0.00001114285,0.06227644,0.0000775453,0.0000560758,0.000001841051,0.0005360654,0.002333668,0.002670732,0.02884971,0.0009025487,0.9021496],"study_design_scores_gemma":[0.01224403,0.003016279,0.263265,0.001066249,0.000125566,0.008501894,0.04538929,0.1009551,0.4890292,0.05575478,0.01914252,0.001510073],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9316183,0.0002276719,0.06078934,0.001751323,0.001604923,0.0001367935,0.000028674,0.0001942383,0.00364878],"genre_scores_gemma":[0.9909372,0.0001420824,0.008845727,0.00001376724,0.00004377389,0.000002473837,0.000008138903,0.000005642068,0.000001234924],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9006395,"threshold_uncertainty_score":0.3770392,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3041435860","doi":"10.1007/s11831-020-09457-7","title":"What is at the Root of Construction 4.0: A Systematic Review of the Recent Research Effort","year":2020,"lang":"en","type":"review","venue":"Archives of Computational Methods in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Data science; Emerging technologies; Computer science; Big data; Order (exchange); The Internet; Domain (mathematical analysis); Position (finance); Meaning (existential); Knowledge management; Business; World Wide Web; Data mining; Epistemology; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.05266108419311241,"gpt":0.3889398032345506,"spread":0.3362787190414381,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001156365,0.0002233887,0.001327797,0.0002787414,0.00003290327,0.00001235508,0.0004116717,0.00008259476,0.00001929305],"category_scores_gemma":[0.0004538702,0.0001418378,0.0003875744,0.0009333433,0.0001922405,0.00007397932,0.0001262403,0.0005135718,0.000001205227],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008522024,"about_ca_system_score_gemma":0.0001183514,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002008438,"about_ca_topic_score_gemma":0.000001007154,"domain_scores_codex":[0.9972066,0.0006503059,0.001389233,0.0001751046,0.0004362968,0.0001424105],"domain_scores_gemma":[0.9961092,0.003024369,0.000376176,0.0003380076,0.0001214431,0.00003075133],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","study_design_scores_codex":[0.000001363748,0.000004107809,9.785193e-7,0.619693,0.0001534326,1.708017e-7,0.0001879058,0.0162634,0.000009294851,0.002522395,0.00001352987,0.3611504],"study_design_scores_gemma":[0.00009926801,0.00002131856,0.00001341753,0.9190702,0.0004075056,0.00008338723,0.0000932734,0.03855165,0.0003483657,0.002737175,0.03837486,0.00019953],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.000003863513,0.9318047,0.06615687,0.00006693333,0.0006186067,0.001107087,0.00002171678,0.00001892508,0.000201249],"genre_scores_gemma":[0.00001774536,0.9375752,0.06218045,0.000006843979,0.00002921743,0.0001379358,0.00001338177,0.00003046157,0.000008722664],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.3609509,"threshold_uncertainty_score":0.5783978,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}