{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":904,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":904,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"1e90e0904200","filters":{"topic":"Electric Power System Optimization"}},"results":[{"id":"W2164802766","doi":"10.1109/tpwrs.2004.831699","title":"Optimal Investment Planning for Distributed Generation in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":528,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Investment (military); Sizing; Electricity; Distributed generation; Capacity planning; Heuristic; Compensation (psychology); Operations research; Computer science; Mathematical optimization; Business; Microeconomics; Economics; Engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01291919921516226,"gpt":0.2218982238745085,"spread":0.2089790246593463,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002520301,0.0002422314,0.0002893368,0.0003327705,0.0001055002,0.00007449801,0.0001075534,0.0001529493,0.00001091601],"category_scores_gemma":[0.000006714275,0.0002680601,0.00007924815,0.0005644544,0.00001393366,0.0001988978,4.327692e-7,0.0002059964,0.00001025133],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009840784,"about_ca_system_score_gemma":0.00005967565,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005457289,"about_ca_topic_score_gemma":0.00003308125,"domain_scores_codex":[0.998596,0.00006701073,0.0004670448,0.0002798226,0.0002111542,0.0003789392],"domain_scores_gemma":[0.9995027,0.00007144098,0.00006265115,0.0002006325,0.00007654571,0.0000860783],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003709841,0.00008777578,0.000006632172,0.0000535332,0.00006224262,0.000006183056,0.000408848,0.9966872,0.001606196,0.0003840239,0.0006415595,0.00001869944],"study_design_scores_gemma":[0.002116866,0.0003280061,0.00006856536,0.0002068531,0.00003285548,0.00003862843,0.0001861567,0.9730916,0.02196588,0.00001062351,0.001532593,0.0004213912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01701155,0.0002294218,0.9783341,0.00002480345,0.001401917,0.001210932,0.0001560258,0.0003005775,0.001330622],"genre_scores_gemma":[0.9977992,0.00001406732,0.001335834,0.00002985635,0.00002621873,0.0005972115,0.00005792647,0.00005088585,0.00008878238],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9807877,"threshold_uncertainty_score":0.9999772,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2113369277","doi":"10.1109/tpwrs.2010.2045663","title":"Optimal Allocation of ESS in Distribution Systems With a High Penetration of Wind Energy","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":466,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Sizing; Installation; Energy storage; Distributed generation; Reliability engineering; Electricity; Computer science; Environmental economics; Renewable energy; Environmental science; Engineering; Electrical engineering; Power (physics); Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.003358343786777668,"gpt":0.1751567484709851,"spread":0.1717984046842075,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002771719,0.0002172593,0.0003793951,0.0003196856,0.00003767961,0.00003386389,0.0001458476,0.000228136,0.000009857367],"category_scores_gemma":[0.000003885882,0.0002122505,0.00005020659,0.0007225751,0.00003953914,0.0002835596,5.122767e-7,0.0002258892,0.000003035911],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001489224,"about_ca_system_score_gemma":0.00006466488,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0011274,"about_ca_topic_score_gemma":0.0002582259,"domain_scores_codex":[0.9983683,0.00008541675,0.0007154312,0.0002285494,0.0003763655,0.0002259421],"domain_scores_gemma":[0.9990755,0.00007087838,0.0002004391,0.0003754904,0.0002159236,0.00006176972],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005136585,0.0001142673,0.00007721996,0.0002023699,0.00006275593,0.000001614624,0.0001910923,0.9703149,0.02770232,0.001190054,0.00003200688,0.00006006411],"study_design_scores_gemma":[0.0016963,0.0006122477,0.00120486,0.000646664,0.00008773122,0.00008998542,0.0003418793,0.8419707,0.1525266,0.000003146141,0.0002876801,0.0005321313],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2443034,0.00007790975,0.7530265,0.00000512005,0.001761477,0.0003668217,0.0000742331,0.00009157395,0.0002929484],"genre_scores_gemma":[0.9995123,0.0000189707,0.0001775537,9.294419e-7,0.00001549701,0.00009831436,0.00004981226,0.0000431508,0.00008343215],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.755209,"threshold_uncertainty_score":0.8655323,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2151027979","doi":"10.1109/59.910787","title":"Z-bus loss allocation","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":405,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Exploit; Computer science; Mathematical optimization; Computation; Context (archaeology); Process (computing); Consistency (knowledge bases); Electric power system; Flow network; Power (physics); Bus network; Matrix (chemical analysis); Set (abstract data type); Algorithm; Mathematics; System bus","retraction":null,"screen_n_in":null,"score":{"opus":0.00764439158587871,"gpt":0.1993012720517173,"spread":0.1916568804658386,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001666526,0.000224756,0.0002201697,0.0002712468,0.0001067306,0.00007932107,0.0001623575,0.0001595309,0.00009142944],"category_scores_gemma":[0.000002149782,0.0002391598,0.00008105715,0.0006132719,0.000017276,0.0002565463,2.793307e-7,0.0001994119,0.0005355298],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002630023,"about_ca_system_score_gemma":0.00002237925,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005060209,"about_ca_topic_score_gemma":0.00001587103,"domain_scores_codex":[0.9986901,0.00005792653,0.0003942783,0.0002364842,0.0002929674,0.000328195],"domain_scores_gemma":[0.9992985,0.00004917784,0.00004622292,0.0004122514,0.00008524173,0.0001086811],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001530719,0.00006454436,0.00002725405,0.00005288155,0.00009115969,0.00001780021,0.0003124826,0.9957805,0.001317638,0.0001281478,0.001554458,0.0006378406],"study_design_scores_gemma":[0.001719831,0.0003525002,0.000192752,0.0003792539,0.0001183971,0.0008961385,0.0003344538,0.9099157,0.01787389,0.00002061483,0.06682145,0.001374982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.007188941,0.0003134665,0.9741222,0.0000422729,0.0052395,0.000424012,0.00001102574,0.0009719146,0.0116867],"genre_scores_gemma":[0.9973081,0.0001468719,0.0001080874,0.00002302138,0.00002907926,0.0001365301,0.000004598478,0.00007149881,0.002172237],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9901192,"threshold_uncertainty_score":0.9752655,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2153268897","doi":"10.1109/tpwrs.2007.907375","title":"Hybrid Particle Swarm Optimization Approach for Solving the Discrete OPF Problem Considering the Valve Loading Effects","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":237,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Particle swarm optimization; Sequential quadratic programming; Robustness (evolution); Electric power system; Quadratic programming; Computer science; Optimization problem; Mathematics; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.009270539254496592,"gpt":0.2115707214931897,"spread":0.2023001822386931,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001310811,0.0003111818,0.0002888709,0.0001220985,0.0005962793,0.0002515324,0.0002743502,0.0001041795,0.000004195135],"category_scores_gemma":[0.00002093023,0.0002181776,0.000205866,0.0004227828,0.0000500747,0.0002972063,0.000002082037,0.0003044485,0.000007909851],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002580036,"about_ca_system_score_gemma":0.00002790128,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003213129,"about_ca_topic_score_gemma":0.000005922609,"domain_scores_codex":[0.9980249,0.0001032388,0.000590214,0.0003294525,0.0003319198,0.0006202146],"domain_scores_gemma":[0.9983702,0.0008083513,0.0001230521,0.0004911579,0.0001045586,0.0001027129],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001973696,0.00003002215,0.000006329832,0.0002290287,0.0001852995,0.000001702016,0.0009923086,0.9965489,0.001449478,0.0001557247,0.000197217,0.0001842581],"study_design_scores_gemma":[0.0004995468,0.00008199362,0.000004155374,0.0001391636,0.0001111809,0.00007418272,0.0003605577,0.9492928,0.04894584,0.000006761797,0.0002113462,0.0002724667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002269439,0.0006010961,0.9903466,0.000043948,0.002203364,0.002658185,0.00001281108,0.0005615832,0.00130299],"genre_scores_gemma":[0.991548,0.0000221784,0.007439553,0.00003628071,0.00005472775,0.0006285587,0.000005590538,0.000109509,0.0001555955],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9892786,"threshold_uncertainty_score":0.8897023,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1978813851","doi":"10.1109/tste.2015.2410760","title":"Flexibility Envelopes for Power System Operational Planning","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":220,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Flexibility (engineering); Computer science; Electric power system; Power (physics); Systems engineering; Reliability engineering; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01704923475985366,"gpt":0.2324540963405534,"spread":0.2154048615806998,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003164195,0.0001965499,0.0002038549,0.0002326709,0.0001889675,0.000080137,0.000131855,0.0001302995,0.00001811726],"category_scores_gemma":[0.00001325521,0.0002072169,0.0000713589,0.0003792061,0.0000166576,0.0003350046,8.359231e-7,0.000101989,0.00000843482],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009509521,"about_ca_system_score_gemma":0.0001877168,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008951464,"about_ca_topic_score_gemma":0.00000771908,"domain_scores_codex":[0.9987641,0.00004139936,0.0003029579,0.0002489087,0.0002283439,0.000414283],"domain_scores_gemma":[0.999136,0.00008602688,0.00002989921,0.0002479919,0.0003529269,0.0001471906],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004905338,0.00003123326,0.000002194288,0.0001019991,0.00005117481,0.000009592416,0.0002745744,0.9906989,0.00007721558,0.005991474,0.002291168,0.000421426],"study_design_scores_gemma":[0.001667778,0.0003292915,0.000007362413,0.00007842394,0.00005112897,0.00005535744,0.004820285,0.8910148,0.03825832,0.0002997467,0.06276646,0.0006510154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002006554,0.0002116622,0.9870201,0.00003473807,0.0008589654,0.0002807958,0.00001537751,0.0006522547,0.008919503],"genre_scores_gemma":[0.9917296,0.000003491569,0.002225831,0.00003871346,0.00006289643,0.0003838652,0.00001435784,0.00005621985,0.005485005],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9897231,"threshold_uncertainty_score":0.8450059,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W643821914","doi":"","title":"Modelling prices in competitive electricity markets","year":2004,"lang":"en","type":"book","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":219,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Electricity market; Bidding; Economics; Spot contract; Autoregressive integrated moving average; Market clearing; Electricity; Economy; Financial economics; Futures contract; Microeconomics; Computer science; Time series; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006381468224098542,"gpt":0.1770013756218224,"spread":0.1706199073977238,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001599087,0.0003207288,0.0004082473,0.0004590441,0.00001971738,0.000035357,0.0001897991,0.0003765589,0.0001058879],"category_scores_gemma":[0.000007125429,0.0003542831,0.00006384694,0.000281774,0.00001083168,0.0001187968,0.00001711914,0.0004849286,0.00005685758],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002594869,"about_ca_system_score_gemma":0.0004067482,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002862563,"about_ca_topic_score_gemma":0.00005300587,"domain_scores_codex":[0.998731,0.00001405797,0.0003982074,0.0002743901,0.0002353258,0.0003469827],"domain_scores_gemma":[0.9995447,0.00008707462,0.00006755921,0.0001961858,0.00005301319,0.00005140293],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003838488,0.000008977176,0.000002274326,0.0001874497,0.00003684546,0.00001502054,0.00008276309,0.9853063,0.000002172153,0.01271585,0.001474435,0.0001641245],"study_design_scores_gemma":[0.0002799921,0.000018156,0.000005074419,0.0004191244,0.00001788455,0.000008692441,0.000002801187,0.9780222,0.0001014726,0.001931753,0.01872321,0.000469708],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"other","genre_gemma":"other","genre_scores_codex":[0.00001083451,0.001150524,0.398809,0.00000313646,0.0001301995,0.0002755937,0.000003475608,0.0003035135,0.5993137],"genre_scores_gemma":[0.03397943,0.002238664,0.02019196,0.00005687727,0.000330892,0.00008710049,0.0002866005,0.0003848202,0.9424437],"genre_candidate":"other","genre_consensus":"other","teacher_disagreement_score":0.378617,"threshold_uncertainty_score":0.9998909,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2109591158","doi":"10.1260/0309-524x.32.4.355","title":"Using Standard Deviation as a Measure of Increased Operational Reserve Requirement for Wind Power","year":2008,"lang":"en","type":"article","venue":"Wind Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":186,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Wind power; Environmental science; Standard deviation; Predictability; Flexibility (engineering); Measure (data warehouse); Electric power system; Power (physics); Statistics; Computer science; Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02622954555920999,"gpt":0.2344191804871257,"spread":0.2081896349279157,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002877521,0.0001642021,0.0002224979,0.0001801177,0.00006606935,0.00001742147,0.00009665293,0.0000961946,0.00002532749],"category_scores_gemma":[0.0001645318,0.0001875186,0.00006164984,0.0002912761,0.000008688169,0.0002701965,0.00001227579,0.00008246896,0.000002288444],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000303466,"about_ca_system_score_gemma":0.00009190336,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002914958,"about_ca_topic_score_gemma":0.000002730644,"domain_scores_codex":[0.9988877,0.00001431694,0.0003701818,0.000149939,0.0003396014,0.0002383048],"domain_scores_gemma":[0.9994676,0.0000473331,0.00004826134,0.0001719939,0.0001979405,0.00006686424],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002508507,0.000008814006,0.0004982431,0.0001001875,0.00007010355,0.000002525143,0.000290849,0.9409019,0.05761741,0.0002891238,0.000165663,0.00003011812],"study_design_scores_gemma":[0.001067267,0.0001152735,0.001162937,0.0002019236,0.00003183135,0.00004290108,0.00002233486,0.94438,0.05154899,0.00001465498,0.001093593,0.0003182833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5241191,0.0003882557,0.4741256,0.0000129815,0.0002811567,0.0004348493,0.00002446759,0.000159377,0.0004542496],"genre_scores_gemma":[0.9789097,0.000009965268,0.02088441,0.000007139602,0.00007176244,0.00001265233,0.00003278693,0.00005538781,0.00001619296],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4547906,"threshold_uncertainty_score":0.7646786,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2098970646","doi":"10.3386/w17086","title":"Intermittency and the Value of Renewable Energy","year":2011,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":179,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"HEC Montréal","funders":"Arizona Research Institute for Solar Energy","keywords":"Intermittency; Renewable energy; Value (mathematics); Economics; Environmental science; Physics; Mathematics; Statistics; Meteorology; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.1509725198905855,"gpt":0.4041374440730765,"spread":0.253164924182491,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003575308,0.0001311582,0.0004088221,0.0005290224,0.00003582416,0.00001730217,0.00035728,0.0002322904,0.0001451117],"category_scores_gemma":[0.0004455776,0.0001079788,0.00008504657,0.0001397365,0.0002095884,0.00008339194,0.00008923162,0.0002615719,0.000006628917],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000553518,"about_ca_system_score_gemma":0.0009457174,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007522012,"about_ca_topic_score_gemma":0.0002222304,"domain_scores_codex":[0.9981886,0.0001401587,0.0006271388,0.000196655,0.0006486904,0.00019874],"domain_scores_gemma":[0.99801,0.0006645488,0.0001852346,0.0002531097,0.0008483737,0.00003875091],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001227185,0.00004918109,0.0003419025,0.001240784,0.001014661,0.000002349753,0.0003395276,0.09180167,0.0001503694,0.6228583,0.2782925,0.003786003],"study_design_scores_gemma":[0.003110818,0.0002638063,0.0005250814,0.001070518,0.0001148626,0.0001684799,0.00008230479,0.2917739,0.006248099,0.615876,0.07994562,0.0008204808],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.0001397758,0.004540103,0.0006097945,0.00004078121,0.000452855,0.0003169114,0.00002350126,0.00001888492,0.9938574],"genre_scores_gemma":[0.9762636,0.009533686,0.0002578493,0.000003625659,0.0003297803,0.0001516689,0.0001050684,0.00006041514,0.01329433],"genre_candidate":"other","genre_consensus":null,"teacher_disagreement_score":0.980563,"threshold_uncertainty_score":0.999087,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2097192841","doi":"10.1109/tpwrs.2003.818689","title":"Transmission network cost allocation based on equivalent bilateral exchanges","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":175,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Fraction (chemistry); Transmission (telecommunications); Generator (circuit theory); Computer science; Transmission network; Independence (probability theory); Mathematical optimization; Power flow; Economic dispatch; Power (physics); Electric power system; Telecommunications; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.01304444955954724,"gpt":0.213739998805969,"spread":0.2006955492464218,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000403838,0.000353295,0.0003140594,0.0003002711,0.0001818224,0.00009297524,0.0001481357,0.0002289708,0.0001586923],"category_scores_gemma":[0.000002879574,0.0003441485,0.0001301149,0.0006192061,0.00001690895,0.0001634613,2.017099e-7,0.0002796048,0.0001408369],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003725701,"about_ca_system_score_gemma":0.00004404648,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001861658,"about_ca_topic_score_gemma":0.000007477826,"domain_scores_codex":[0.9979674,0.0002339445,0.0004876171,0.0003604963,0.0004396131,0.0005109914],"domain_scores_gemma":[0.9990964,0.0001147095,0.00006835169,0.0004675673,0.00007540391,0.0001775715],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003318011,0.00009309301,0.000006662817,0.0001080501,0.0000453405,0.000004657657,0.0001641116,0.9962193,0.0008069384,0.00009726593,0.001520336,0.0009010877],"study_design_scores_gemma":[0.001139125,0.0003888668,0.00002356049,0.0005977142,0.00005880799,0.00002882692,0.00005529328,0.9497982,0.01495378,0.000007479331,0.03234963,0.0005987432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0006988386,0.0003750685,0.9847347,0.00005484501,0.005239346,0.001071405,0.00001634587,0.0006697846,0.007139722],"genre_scores_gemma":[0.9982103,0.00007455896,0.0004763489,0.00006962752,0.00003362758,0.0003402205,0.00001086704,0.0001040502,0.0006804767],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9975114,"threshold_uncertainty_score":0.9999011,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2110167161","doi":"10.1109/59.852113","title":"Allocation of transmission losses to bilateral contracts in a competitive environment","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":170,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Database transaction; Infinitesimal; Computer science; Component (thermodynamics); Set (abstract data type); Path (computing); Transmission loss; Transmission (telecommunications); Cover (algebra); Transaction cost; Argument (complex analysis); Electric power system; Power (physics); Economics; Mathematics; Microeconomics; Engineering; Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.005060380664373658,"gpt":0.1880829258552522,"spread":0.1830225451908785,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001450218,0.0001843545,0.0002770063,0.0002806521,0.00003173755,0.00002143262,0.0001026746,0.0001100067,0.0002636572],"category_scores_gemma":[7.866633e-7,0.0001889841,0.00005734587,0.0003219091,0.00001495882,0.0001512806,1.780078e-7,0.0001344654,0.0001293629],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002182613,"about_ca_system_score_gemma":0.00001697663,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001329423,"about_ca_topic_score_gemma":0.00001706384,"domain_scores_codex":[0.9987354,0.00007572138,0.0005015645,0.0002102218,0.0002442077,0.0002329012],"domain_scores_gemma":[0.9995669,0.0000556527,0.00003468358,0.0002201515,0.00002424293,0.000098379],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005863539,0.0001300944,0.00001035713,0.00005973728,0.00003346283,0.000004437659,0.001208732,0.985315,0.01076895,0.00002779056,0.00004803994,0.002334822],"study_design_scores_gemma":[0.004975397,0.001665653,0.002622416,0.002872175,0.0001268406,0.0001287406,0.0006470911,0.6539404,0.2838697,0.00001419737,0.04733259,0.001804818],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0738568,0.0001889891,0.9206261,0.00004393471,0.0004907422,0.0008350973,0.00003305056,0.0001535261,0.003771737],"genre_scores_gemma":[0.9989412,0.0001278866,0.0002779564,0.00001563109,0.0000054567,0.0001117376,0.000004544407,0.00003649032,0.0004790674],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9250844,"threshold_uncertainty_score":0.770655,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2087848664","doi":"10.1109/tpwrs.2011.2180935","title":"Time-of-Use Pricing in Electricity Markets Under Different Market Structures","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":165,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Electricity pricing; Electricity; Economics; Context (archaeology); Microeconomics; Variable pricing; Welfare; Scheme (mathematics); Market power; Econometrics; Industrial organization; Monopoly; Engineering; Market economy; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.00840577856234772,"gpt":0.2008765161251298,"spread":0.1924707375627821,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003152065,0.0003019005,0.0004286109,0.0005596533,0.00005324847,0.00004327671,0.0001547796,0.000201019,0.0001527395],"category_scores_gemma":[0.000008133453,0.0002848866,0.00009900574,0.0006545762,0.0000210763,0.00038395,9.959645e-7,0.0003116486,0.0000224459],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004094722,"about_ca_system_score_gemma":0.00001857536,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005954654,"about_ca_topic_score_gemma":0.00001043288,"domain_scores_codex":[0.9981107,0.00021382,0.0005919251,0.0002091671,0.0003394993,0.0005348569],"domain_scores_gemma":[0.9990934,0.0002673428,0.00009535654,0.0003694977,0.00004959497,0.0001248119],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001709321,0.0004427592,0.002248407,0.0005066792,0.0004127838,0.000005745232,0.001743824,0.9779093,0.01306414,0.0001636192,0.002808962,0.0005228038],"study_design_scores_gemma":[0.002657811,0.0003170099,0.0638404,0.0008741656,0.0002173671,0.0002109527,0.0004140997,0.8537775,0.07470097,0.00002652315,0.001026666,0.001936493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2597654,0.0004503366,0.7349544,0.000004824531,0.002199281,0.000541745,0.00002044682,0.0002420386,0.00182153],"genre_scores_gemma":[0.9989923,0.00004689438,0.0001033139,0.00001007019,0.00001809102,0.00005716815,0.000002570812,0.00007094634,0.0006986084],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7392269,"threshold_uncertainty_score":0.9999603,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1991053377","doi":"10.1109/tpwrs.2014.2360369","title":"A Fully Decentralized Approach for Solving the Economic Dispatch Problem","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":162,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Economic dispatch; Mathematical optimization; Computer science; Nondeterministic algorithm; Flooding (psychology); Electric power system; Power (physics); Mathematics; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.006813465047826147,"gpt":0.1927440587862599,"spread":0.1859305937384337,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004866356,0.0002589455,0.000309561,0.0001235897,0.000220884,0.0001630301,0.0002746026,0.0001374574,0.00001569753],"category_scores_gemma":[0.000003495679,0.0002093313,0.0001559358,0.000169622,0.00002140096,0.0001712718,6.473616e-7,0.000179977,0.00005657345],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003693672,"about_ca_system_score_gemma":0.0000386316,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005829932,"about_ca_topic_score_gemma":0.00002248499,"domain_scores_codex":[0.9985547,0.00008055506,0.0004703107,0.0002944971,0.000156783,0.000443137],"domain_scores_gemma":[0.9991446,0.0001823134,0.00008039949,0.0004558133,0.00004550674,0.00009136127],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001869209,0.00002608699,0.000006695552,0.0001597183,0.0001135824,1.23942e-7,0.0003855598,0.9959628,0.0003796789,0.0004654205,0.002137484,0.0003441698],"study_design_scores_gemma":[0.0006777066,0.00008559896,0.000005140439,0.00005428665,0.0000523446,0.00002363804,0.00008766568,0.9867501,0.001398686,0.00001267189,0.01057967,0.0002725556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0009355586,0.0001750786,0.9900269,0.00003851618,0.002643012,0.001582642,0.00003355916,0.0005011322,0.00406363],"genre_scores_gemma":[0.995688,0.00002761849,0.002570618,0.0000201513,0.00003814173,0.001012919,0.000007879593,0.00009350086,0.0005411315],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9947525,"threshold_uncertainty_score":0.8536283,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2133886886","doi":"10.1109/tpwrs.2002.800909","title":"Network-constrained multiperiod auction for a pool-based electricity market","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":156,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Electricity market; Computer science; Electricity; Scheduling (production processes); Power system simulation; Operations research; Flexibility (engineering); Industrial organization; Operator (biology); Microeconomics; Transparency (behavior); Mathematical optimization; Economics; Electric power system; Operations management; Engineering; Power (physics); Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.01113205585415513,"gpt":0.1912697928451542,"spread":0.180137736990999,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003292045,0.0003649771,0.0004028209,0.0003250902,0.0002548612,0.0001153807,0.0001741107,0.0002721642,0.0002270272],"category_scores_gemma":[0.00001028912,0.0003976603,0.0002026365,0.000782088,0.00002771168,0.0002131688,3.064189e-7,0.0002733722,0.0000668465],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000378579,"about_ca_system_score_gemma":0.00002730696,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002828282,"about_ca_topic_score_gemma":0.00001403197,"domain_scores_codex":[0.9979798,0.0001149532,0.0005924085,0.0003816074,0.000292973,0.0006383269],"domain_scores_gemma":[0.9989887,0.000219707,0.00009890691,0.0004136309,0.0001341435,0.0001448996],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000544434,0.0001036752,0.00000527137,0.0001273603,0.0001165656,0.000002826095,0.0001083158,0.9827157,0.0005997551,0.00001771029,0.01531902,0.000829395],"study_design_scores_gemma":[0.001255418,0.0002534134,0.00001134664,0.0001011332,0.00006247336,0.00004063082,0.00002381713,0.9895505,0.002179349,0.000003070393,0.006109185,0.000409661],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0006385705,0.0004364683,0.9882247,0.00005779679,0.004841697,0.001515143,0.00007640965,0.001153645,0.003055571],"genre_scores_gemma":[0.9963565,0.00002275199,0.001097577,0.0000570203,0.00007531401,0.0006883887,0.000007351994,0.0001107049,0.001584393],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9957179,"threshold_uncertainty_score":0.9998475,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1992972827","doi":"10.1109/tpwrs.2012.2186155","title":"Fast Heuristics for Transmission-Line Switching","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Heuristics; Heuristic; Mathematical optimization; Computer science; Line (geometry); Linear programming; Integer programming; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01293502941038859,"gpt":0.2277453718067167,"spread":0.2148103423963281,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003156709,0.0002767345,0.0003072014,0.0002268608,0.0001732856,0.00006185398,0.0001489175,0.0001813608,0.00002539728],"category_scores_gemma":[0.000004302312,0.0002726129,0.0001405049,0.000310458,0.000009039452,0.0002820943,2.904395e-7,0.0002318549,0.00007148249],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001760798,"about_ca_system_score_gemma":0.00002108834,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001270856,"about_ca_topic_score_gemma":0.000001508124,"domain_scores_codex":[0.9984697,0.00004825481,0.0004988599,0.0001955775,0.0002536496,0.0005339429],"domain_scores_gemma":[0.9991781,0.0001580063,0.00005690277,0.0003084985,0.00007693032,0.0002216363],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003463523,0.0001637506,0.000009675835,0.0002984837,0.0001569783,0.00000133793,0.001321896,0.9874339,0.005235215,0.000199278,0.002356838,0.002788014],"study_design_scores_gemma":[0.001158743,0.0002241171,0.00001301715,0.0002476154,0.0001360814,0.00009329325,0.0002392707,0.9354877,0.01981588,0.000009054727,0.04184844,0.0007268167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0008595323,0.001067551,0.9877833,0.00002340046,0.007138419,0.0007741483,0.000056727,0.0006751404,0.001621786],"genre_scores_gemma":[0.996609,0.00005460691,0.002146627,0.00001946451,0.0000887066,0.0002271244,0.000006938773,0.0001151594,0.0007323296],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9957495,"threshold_uncertainty_score":0.9999726,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3023110014","doi":"10.1016/j.engappai.2020.103666","title":"A novel and effective optimization algorithm for global optimization and its engineering applications: Turbulent Flow of Water-based Optimization (TFWO)","year":2020,"lang":"en","type":"article","venue":"Engineering Applications of Artificial Intelligence","topic":"Electric Power System Optimization","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Guelph","funders":"","keywords":"Computer science; Benchmark (surveying); Mathematical optimization; Robustness (evolution); Optimization problem; Engineering optimization; Meta-optimization; Convergence (economics); Global optimization; Algorithm; Continuous optimization; Multi-swarm optimization; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01009660585038938,"gpt":0.2219573292095198,"spread":0.2118607233591304,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001883288,0.0002897257,0.0003520549,0.0001919283,0.00007081176,0.00004639517,0.0001870855,0.0001609893,0.000006804612],"category_scores_gemma":[0.00008500657,0.0003242707,0.00006060896,0.000826114,0.00003305693,0.000216335,0.0000346437,0.0001088095,0.000001186928],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001022745,"about_ca_system_score_gemma":0.00002440954,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003959182,"about_ca_topic_score_gemma":2.993067e-7,"domain_scores_codex":[0.9984323,0.00001256671,0.0007046658,0.0003926064,0.000190766,0.0002671236],"domain_scores_gemma":[0.9990131,0.0001569844,0.0001291839,0.0002155221,0.0003456863,0.0001394707],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001035405,0.00004058284,0.000001774835,0.0005020007,0.00004725253,8.970499e-8,0.0001471758,0.9766145,0.005656952,0.001263955,0.000001711702,0.01571367],"study_design_scores_gemma":[0.0001315613,0.00008466744,0.000001739547,0.00006188291,0.00006038253,0.000004063394,0.00002518225,0.9186408,0.08065896,0.00002154555,0.00004985515,0.0002593454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.0001678179,0.0006473676,0.9960759,0.00008903795,0.00005554045,0.002533375,0.00009898032,0.0003238299,0.000008125502],"genre_scores_gemma":[0.2302357,0.0001264924,0.7676994,0.00001111602,0.0000874113,0.001590629,0.0001868421,0.00006153621,9.634472e-7],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.2300678,"threshold_uncertainty_score":0.999921,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2180269203","doi":"10.1109/tpwrs.2013.2271980","title":"Identification of Umbrella Constraints in DC-Based Security-Constrained Optimal Power Flow","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Power flow; Constraint (computer-aided design); Set (abstract data type); Optimization problem; Computer science; Power (physics); Mathematics; Electric power system","retraction":null,"screen_n_in":null,"score":{"opus":0.005698909431682394,"gpt":0.2006481221674286,"spread":0.1949492127357462,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004027388,0.000319419,0.0004506749,0.0006454442,0.00005863438,0.00009421963,0.000239313,0.0002714751,0.0003392246],"category_scores_gemma":[0.00001053016,0.0003553737,0.0001415573,0.0007520352,0.000119629,0.0003188552,7.091193e-7,0.0003249712,0.00021303],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002392136,"about_ca_system_score_gemma":0.00008483829,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007129192,"about_ca_topic_score_gemma":0.00001461043,"domain_scores_codex":[0.9975727,0.0001461398,0.001116513,0.0003542097,0.000393968,0.0004165191],"domain_scores_gemma":[0.99886,0.0001411665,0.0001667638,0.0005080018,0.0001976606,0.0001264185],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000137485,0.0001694122,0.00002557244,0.0002034262,0.00008348536,0.000005369993,0.0007232483,0.9731491,0.02495573,0.00007818525,0.0003593659,0.0002334078],"study_design_scores_gemma":[0.00123294,0.0001123412,0.0001021855,0.0002991807,0.00003051821,0.00003724658,0.000417988,0.9456374,0.0515724,0.000009586111,0.0001061361,0.0004420965],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.055633,0.0001243641,0.9375338,0.00004130797,0.00253999,0.001196393,0.0001017037,0.0003341181,0.002495328],"genre_scores_gemma":[0.9990644,0.00001029946,0.0004012122,0.00001350155,0.000007779093,0.0002632926,0.000009286799,0.00006859995,0.0001616354],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9434314,"threshold_uncertainty_score":0.9998899,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2127664368","doi":"10.1109/tpwrs.2007.894867","title":"Pricing Energy and Reserves Using Stochastic Optimization in an Alternative Electricity Market","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":141,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Waterloo","funders":"Independent Electricity System Operator","keywords":"Activity-based costing; Electricity market; Electric power system; Linear programming; Energy market; Stochastic programming; Electricity; Electricity pricing; Computer science; Profit (economics); Mathematical optimization; Contingency; Operations research; Economics; Microeconomics; Engineering; Electrical engineering; Mathematics; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.01221753262752926,"gpt":0.2313100404976195,"spread":0.2190925078700902,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005902925,0.0002420926,0.0002740725,0.0007894248,0.0001069704,0.00009134356,0.0001206955,0.0001569807,0.00001282425],"category_scores_gemma":[0.00001232809,0.000269222,0.00003439748,0.00087809,0.00001977823,0.0005037672,8.82524e-7,0.0001909953,8.07762e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000465784,"about_ca_system_score_gemma":0.00002549136,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004493978,"about_ca_topic_score_gemma":0.0002753945,"domain_scores_codex":[0.9983566,0.0001382019,0.0005099151,0.0003133303,0.0002738693,0.0004080754],"domain_scores_gemma":[0.9992415,0.0002399309,0.00008490375,0.0002392719,0.00007248505,0.0001218825],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004489634,0.00004953478,0.00002885594,0.00003598782,0.00003330043,0.00000858267,0.0004809169,0.997996,0.0009906325,0.00003659185,0.000009395267,0.0002853585],"study_design_scores_gemma":[0.000408412,0.0001172367,0.00005767115,0.0001355967,0.00001769663,0.0000464064,0.0001559943,0.996062,0.002717296,0.000003605318,0.00001782159,0.0002602185],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04991868,0.0002600942,0.947126,0.000002210777,0.001334154,0.0003029871,0.000006374788,0.0002251052,0.0008243835],"genre_scores_gemma":[0.9984024,0.00004890281,0.00135459,0.000006236826,0.00002297232,0.00002557594,0.000002567845,0.00006570751,0.00007106809],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9484837,"threshold_uncertainty_score":0.999976,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2074210939","doi":"10.1016/j.epsr.2007.12.005","title":"Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":133,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Pratt and Whitney Canada; National Science Foundation","keywords":"Wind power; Economic dispatch; Particle swarm optimization; Renewable energy; Electric power system; Reliability engineering; Fuzzy logic; Computer science; Energy security; Mathematical optimization; Engineering; Power (physics); Electrical engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.02597597971121387,"gpt":0.2741216598409217,"spread":0.2481456801297078,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002424679,0.0002895887,0.0003900664,0.0009611347,0.0003768469,0.0001780194,0.0002380235,0.0002264752,0.00002668122],"category_scores_gemma":[0.000300658,0.0003123125,0.00004419976,0.001544274,0.00004088569,0.0004260353,0.00003926429,0.0006996725,0.00008285626],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00159644,"about_ca_system_score_gemma":0.0002158344,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005267251,"about_ca_topic_score_gemma":0.00006390658,"domain_scores_codex":[0.9964299,0.0006606383,0.0006769636,0.0005499613,0.0007002147,0.000982305],"domain_scores_gemma":[0.9985173,0.0005757886,0.0001079052,0.0004445276,0.0001445094,0.0002099503],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004742967,0.00004838256,0.02889742,0.00004617348,0.00001903425,0.00002524574,0.0004415791,0.9688843,0.000823739,0.00007788899,0.0005335765,0.0001551677],"study_design_scores_gemma":[0.001016542,0.0002571211,0.01136792,0.0001089251,0.000005119424,0.00003526187,0.0000691943,0.9850928,0.001528085,0.000006313943,0.0002035119,0.000309179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8848726,0.001819612,0.1013384,0.00004723992,0.0006135335,0.001880229,0.00001206249,0.0002964109,0.009119872],"genre_scores_gemma":[0.9989262,0.0004292063,0.000194257,0.00000825706,0.00006323194,0.0001496796,0.00001906964,0.00008862877,0.0001214606],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1140536,"threshold_uncertainty_score":0.9999329,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2148835898","doi":"10.1109/tpwrs.2008.2007001","title":"A Generic Operations Framework for Discos in Retail Electricity Markets","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"King Abdulaziz City for Science and Technology","keywords":"Electricity; Scheduling (production processes); Grid; Operations research; Electricity market; Computer science; Electricity retailing; Context (archaeology); Operations management; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01225402772100849,"gpt":0.2263664480501993,"spread":0.2141124203291908,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002767943,0.0002730314,0.0003463677,0.0004350405,0.0001372842,0.0001160926,0.0001947983,0.0002444599,0.00002986684],"category_scores_gemma":[0.00001623094,0.0002856878,0.0001191847,0.00104438,0.00001036645,0.0002600784,2.830569e-7,0.000331749,0.00002908066],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003876065,"about_ca_system_score_gemma":0.00004768576,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002495107,"about_ca_topic_score_gemma":0.00003820539,"domain_scores_codex":[0.99834,0.00009267478,0.0005539077,0.0003240308,0.0002303154,0.000459091],"domain_scores_gemma":[0.9992439,0.0001356924,0.00003908241,0.0004080471,0.000072731,0.0001005674],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004198374,0.000142349,0.000008367132,0.00005359497,0.00005135173,0.0000042068,0.0003375209,0.9950493,0.001666219,0.0008920125,0.0005493499,0.001203757],"study_design_scores_gemma":[0.0007489058,0.000315331,0.0002311968,0.0002301899,0.00004095597,0.00003745387,0.00006826776,0.9907422,0.005590458,0.00009927016,0.001352145,0.0005436271],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.007406691,0.0004830438,0.9871603,0.0001007027,0.001945776,0.001294304,0.00003897563,0.0004368411,0.001133394],"genre_scores_gemma":[0.995423,0.00008047846,0.003398923,0.00006093672,0.00002959279,0.0004604036,0.000007010115,0.00005606023,0.0004836016],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9880163,"threshold_uncertainty_score":0.9999595,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2134704122","doi":"10.1109/tpwrs.2006.888956","title":"A Model for Efficient Consumer Pricing Schemes in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Complementarity (molecular biology); Electricity market; Marginal cost; Economics; Microeconomics; Electricity pricing; Electricity retailing; Variable pricing; Ex-ante; Industrial organization; Welfare; Business; Market economy","retraction":null,"screen_n_in":null,"score":{"opus":0.01198364933982861,"gpt":0.2273628684716118,"spread":0.2153792191317832,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008320367,0.0002565032,0.0003224172,0.0006388642,0.00009421408,0.00004622357,0.0001422102,0.0001905133,0.000006012456],"category_scores_gemma":[0.00001140517,0.0002745236,0.0001032603,0.0007712023,0.00001488331,0.0001010608,4.842279e-7,0.0002559373,0.00001704406],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005277288,"about_ca_system_score_gemma":0.0000479835,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002428174,"about_ca_topic_score_gemma":0.00003316416,"domain_scores_codex":[0.9981853,0.00003833018,0.0006144883,0.000303086,0.0002732949,0.0005854815],"domain_scores_gemma":[0.9992071,0.0002365846,0.0000662077,0.0002901582,0.00009653722,0.0001033657],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006656664,0.00009302324,0.00001942495,0.0001311933,0.00005100191,0.000003246247,0.000368181,0.9960563,0.002568085,0.00007785804,0.0001795197,0.0003856616],"study_design_scores_gemma":[0.0007382914,0.00004251046,0.0000284262,0.0001229577,0.0000207601,0.00001778925,0.00004706315,0.9875706,0.01074078,0.000002575546,0.0003903187,0.0002779321],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0349801,0.0004621043,0.9601823,0.000006808915,0.001497891,0.001195286,0.00001978332,0.0003998737,0.001255829],"genre_scores_gemma":[0.9977752,0.00002037313,0.001530993,0.00001542974,0.000009385799,0.0001899834,0.000002103478,0.00007302385,0.0003835224],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9627951,"threshold_uncertainty_score":0.9999707,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2606383594","doi":"10.1109/tii.2017.2695122","title":"Improved Random Drift Particle Swarm Optimization With Self-Adaptive Mechanism for Solving the Power Economic Dispatch Problem","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Economic dispatch; Crossover; Benchmark (surveying); Multi-swarm optimization; Position (finance); Computer science; Metaheuristic; Imperialist competitive algorithm; Meta-optimization; Power (physics); Electric power system; Algorithm; Mathematics; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.01552880190210809,"gpt":0.2090435726441396,"spread":0.1935147707420315,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003475809,0.0002450413,0.0002591867,0.0000743791,0.0007657853,0.0003857545,0.0003118854,0.0002141659,0.00001487924],"category_scores_gemma":[0.0000134254,0.0001873353,0.00008901924,0.00008978237,0.0000355642,0.0009758156,0.000002219694,0.0003228105,0.00001326123],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002627173,"about_ca_system_score_gemma":0.0001135586,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003689869,"about_ca_topic_score_gemma":0.00005979184,"domain_scores_codex":[0.9987834,0.00002148718,0.0005763561,0.0001170743,0.0001486615,0.0003530347],"domain_scores_gemma":[0.9988703,0.0001585332,0.0002892595,0.0004876732,0.0001093484,0.00008486622],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001792543,0.00002740051,0.000002221867,0.00002001455,0.0001821241,1.522783e-7,0.001266996,0.9967589,0.00003439313,0.0004631642,0.0001641483,0.0009011989],"study_design_scores_gemma":[0.004216126,0.0002967422,6.187498e-7,0.00005479039,0.0001254396,0.000005655205,0.0003288402,0.9707751,0.02385536,0.00003645219,0.00006107245,0.0002438151],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.008122041,0.00000290239,0.9876363,0.0001247734,0.00112249,0.001902272,0.00004847272,0.0003060682,0.0007346651],"genre_scores_gemma":[0.9751917,0.00002054183,0.02408331,0.0000296963,0.00008822508,0.0004538737,0.000004949924,0.00005393698,0.0000738078],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9670696,"threshold_uncertainty_score":0.7639312,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1966716856","doi":"10.1109/tpwrs.2012.2194517","title":"An Optimal Power Flow Algorithm to Achieve Robust Operation Considering Load and Renewable Generation Uncertainties","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Probabilistic logic; Mathematical optimization; Electric power system; Generator (circuit theory); Electricity generation; Computer science; Power (physics); Power flow; Economic dispatch; Taguchi methods; Control theory (sociology); Reliability engineering; Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01527990527553444,"gpt":0.2163551612215254,"spread":0.201075255945991,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004686877,0.0003350476,0.0003175735,0.0002821081,0.0002661813,0.0002900794,0.0001126153,0.00020455,0.00006315162],"category_scores_gemma":[0.000005261389,0.0003569753,0.00005207361,0.0003270716,0.00002194486,0.001089702,0.000001448777,0.0001943739,0.00005978051],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004363978,"about_ca_system_score_gemma":0.00005387185,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002004073,"about_ca_topic_score_gemma":0.0000639283,"domain_scores_codex":[0.9981732,0.0001313465,0.0004755792,0.0003423862,0.0003731948,0.0005042302],"domain_scores_gemma":[0.999054,0.00004158182,0.00005053821,0.0004024525,0.0001499063,0.0003015703],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001772275,0.00005750613,0.000006594983,0.00002909933,0.00006835716,0.000001636652,0.002358701,0.9869055,0.008903949,0.00001212076,0.0008325434,0.000806282],"study_design_scores_gemma":[0.0003506008,0.0002973123,0.00001009238,0.00006466165,0.00003666359,0.00008747215,0.0005396187,0.9786302,0.01789647,4.354819e-7,0.001650053,0.0004364648],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01528625,0.0006611643,0.9771246,0.00003381972,0.004912099,0.000711206,0.00004425085,0.0004909235,0.0007356964],"genre_scores_gemma":[0.9791731,0.00004683232,0.01998625,0.00004354338,0.0001028868,0.0001890843,0.0000160694,0.00008880362,0.0003534558],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9638868,"threshold_uncertainty_score":0.9998882,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2160807713","doi":"10.1109/tpwrs.2003.810998","title":"Competitive framework for procurement of interruptible load services","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Electric power system; Computer science; Service (business); Load management; Reliability engineering; Electricity market; Operations research; Load factor; Electricity; Power (physics); Business; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01073150578366552,"gpt":0.2308834690714656,"spread":0.2201519632878001,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002345316,0.0001992783,0.0002963427,0.0001582972,0.00005948853,0.00003596466,0.0001340803,0.0001425696,0.00003979519],"category_scores_gemma":[0.000005013145,0.0002028487,0.0001029598,0.0003224473,0.00001505351,0.0001278611,2.825786e-7,0.000146452,0.00002523012],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002412561,"about_ca_system_score_gemma":0.00004372833,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001907403,"about_ca_topic_score_gemma":0.00001670317,"domain_scores_codex":[0.9987832,0.00005352017,0.0004358201,0.0002021014,0.0002727018,0.0002526634],"domain_scores_gemma":[0.9992434,0.0001140035,0.00009057049,0.0002805922,0.0002075784,0.00006385676],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00008692028,0.0003588196,0.00002758023,0.002708227,0.0006703296,0.000002401665,0.004511622,0.9428182,0.004649515,0.0436228,0.0003562052,0.0001874086],"study_design_scores_gemma":[0.005292612,0.003001493,0.00003436894,0.007287198,0.0005148886,0.0001710716,0.00800602,0.2832018,0.5972204,0.0007613325,0.0918138,0.002694971],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0008564577,0.0004266377,0.9861016,0.000007396286,0.003222111,0.0009840856,0.00005371921,0.0002258975,0.008122048],"genre_scores_gemma":[0.9959429,0.00002457911,0.003413598,0.00001319682,0.000008694887,0.0002914848,0.0000021262,0.00005254031,0.0002508937],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9950864,"threshold_uncertainty_score":0.827193,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2084187431","doi":"10.1016/j.enpol.2011.01.033","title":"Ontario feed-in-tariff programs","year":2011,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Toronto","funders":"Government of Ontario","keywords":"Tariff; Photovoltaic system; Feed-in tariff; Electricity; Legislation; Wind power; Sustainability; Mains electricity; Business; Engineering; Environmental economics; Operations management; Renewable energy; Economics; Political science; Energy policy; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01349109683821603,"gpt":0.1768530695870335,"spread":0.1633619727488175,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004755293,0.0001169853,0.0001184565,0.0002205679,0.00001630619,0.00001449093,0.0001271091,0.00008451455,0.00008015273],"category_scores_gemma":[0.000006355609,0.0001239421,0.00003078548,0.0004114597,0.000009318361,0.00009936029,0.00001372693,0.0000892611,0.00004091334],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003855567,"about_ca_system_score_gemma":0.00007937065,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.1603373,"about_ca_topic_score_gemma":0.1333667,"domain_scores_codex":[0.9993109,0.00001389947,0.0001715686,0.0001157024,0.00008178847,0.0003061771],"domain_scores_gemma":[0.9997075,0.000004886326,0.00001871038,0.0001909704,0.00001297523,0.00006491823],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00006565325,0.0007245959,0.09724168,0.0001662812,0.000391288,0.0001967505,0.04445835,0.08135705,0.001161308,0.4839578,0.009216495,0.2810627],"study_design_scores_gemma":[0.004088316,0.0006603416,0.1290977,0.0003329976,0.00006660754,0.0002010513,0.0001644477,0.1113361,0.0257024,0.009854744,0.7151926,0.003302701],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.07369931,0.0002576686,0.02162668,0.00003844191,0.0005409107,0.0001471635,7.435293e-7,0.0007443628,0.9029447],"genre_scores_gemma":[0.9936591,0.00001310386,0.001402655,0.00004507359,0.0001133172,0.00003904034,0.000008332388,0.00003075412,0.00468863],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9199598,"threshold_uncertainty_score":0.8824471,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2264863617","doi":"10.1109/tsg.2015.2445794","title":"Distributed Real-Time Power Balancing in Renewable-Integrated Power Grids With Storage and Flexible Loads","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Ontario Tech University; University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"News aggregator; Renewable energy; Grid; Distributed generation; Energy storage; Distributed power; Power (physics); Power Balance; Reliability (semiconductor); Load balancing (electrical power)","retraction":null,"screen_n_in":null,"score":{"opus":0.006950663272304577,"gpt":0.1956413682936879,"spread":0.1886907050213833,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002757746,0.000292571,0.000332428,0.0003315398,0.000068937,0.00006653724,0.0001092495,0.0001579568,0.00007155614],"category_scores_gemma":[0.000007282825,0.0002716616,0.00003829234,0.001014868,0.00003402029,0.0003220278,0.000001091325,0.0002979288,0.00004941951],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004540803,"about_ca_system_score_gemma":0.00009986577,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005456453,"about_ca_topic_score_gemma":0.0003266431,"domain_scores_codex":[0.9985973,0.00007112183,0.0003374772,0.0003139348,0.0002750795,0.0004051291],"domain_scores_gemma":[0.9992545,0.0000592125,0.00004349461,0.0003228771,0.0001126017,0.0002072661],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001660243,0.00008730699,0.0003349815,0.00002520284,0.00007104602,0.00003843548,0.0004217388,0.9902331,0.003779477,0.000004092176,0.004715888,0.0001227662],"study_design_scores_gemma":[0.01139436,0.002689793,0.003727087,0.001193535,0.0002502883,0.0005421932,0.001008498,0.8555868,0.1048305,0.00004805638,0.01563646,0.003092474],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1437558,0.00009315111,0.8493032,0.00006689988,0.001142338,0.0003955109,0.0001514415,0.0008241344,0.004267512],"genre_scores_gemma":[0.9980183,0.00004485564,0.001082118,0.0000180835,0.00002627314,0.00005134708,0.00005238287,0.0000727552,0.0006339024],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8542625,"threshold_uncertainty_score":0.9999735,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2105225820","doi":"10.1016/j.enpol.2009.07.064","title":"Complementarity of hydro and wind power: Improving the risk profile of energy inflows","year":2009,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"National Bank of Canada; Bank of Canada; Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Wind power; Renewable energy; Portfolio; Hydropower; Hydroelectricity; Environmental science; Diversification (marketing strategy); Inflow; Risk measure; Wind speed; Value at risk; Natural resource economics; Economics; Meteorology; Risk management; Business; Engineering; Geography; Financial economics; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.0037814979305988,"gpt":0.1962701835115138,"spread":0.192488685580915,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001263649,0.0001181371,0.0001830778,0.000135967,0.00004552821,0.00001018302,0.0001348969,0.00005327961,0.00001730852],"category_scores_gemma":[0.0000340373,0.000097618,0.00003766264,0.0003116177,0.00002991789,0.00008047614,0.00002786157,0.00006464391,3.051814e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005129861,"about_ca_system_score_gemma":0.00003551753,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005053227,"about_ca_topic_score_gemma":0.0001888174,"domain_scores_codex":[0.9992224,0.00005132771,0.0002981876,0.0001055025,0.0001296485,0.0001929381],"domain_scores_gemma":[0.9995145,0.00004766736,0.0001206327,0.0002440971,0.00003226065,0.00004088346],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007390767,0.0002490396,0.008050114,0.0002237106,0.0005544756,0.000004651256,0.004121638,0.4340011,0.1200799,0.2759475,0.005618513,0.1510755],"study_design_scores_gemma":[0.002258605,0.0008303012,0.0370621,0.0001151646,0.0001350619,0.000033737,0.0001485177,0.5801871,0.3508562,0.00393344,0.02357197,0.000867881],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.906735,0.002377856,0.04674403,0.000290977,0.0002438553,0.0002506862,0.0001073907,0.0002496582,0.04300055],"genre_scores_gemma":[0.999077,0.0001128419,0.000564823,0.00006578151,0.0000705337,0.000003707233,0.0000108919,0.00001478478,0.00007969758],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.272014,"threshold_uncertainty_score":0.7639001,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2139030509","doi":"10.1287/opre.1040.0117","title":"Valuation and Optimal Operation of Electric Power Plants in Competitive Markets","year":2004,"lang":"en","type":"article","venue":"Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Western University; Queen's University","funders":"","keywords":"Hydroelectricity; Valuation (finance); Electricity; Spot contract; Computer science; Nonlinear system; Thermal power station; Mathematical optimization; Electricity market; Mean reversion; Economics; Econometrics; Mathematics; Futures contract; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02460379229547448,"gpt":0.3068818606813805,"spread":0.282278068385906,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007661891,0.00007992302,0.000118583,0.0005377858,0.0000899251,0.00007726041,0.00008149529,0.00007262673,0.00006400755],"category_scores_gemma":[0.0001147545,0.00008479414,0.00001093104,0.0006036855,0.00002772145,0.0003512283,0.00001956753,0.0002029525,0.00003126149],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002407667,"about_ca_system_score_gemma":0.0001218985,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000156399,"about_ca_topic_score_gemma":0.0001596544,"domain_scores_codex":[0.9988659,0.0001571016,0.0002558335,0.0001535792,0.0003385863,0.0002290006],"domain_scores_gemma":[0.9995172,0.00007372104,0.00000765576,0.0001275991,0.0002304853,0.00004331585],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001085455,0.00004783509,0.0002192847,0.0000194374,0.00001170544,0.000002141256,0.0009566639,0.9515928,0.0421559,0.004268126,0.00004713747,0.0006681312],"study_design_scores_gemma":[0.001020008,0.0001652878,0.01884213,0.00008649326,0.000002652557,0.00001573621,0.0003647411,0.9447401,0.0344013,0.0001757,0.00003225252,0.0001536499],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9511321,0.00043426,0.04154669,0.0001338624,0.00005185496,0.0008055666,0.00000664373,0.00004049281,0.005848561],"genre_scores_gemma":[0.9968567,0.000201733,0.002702856,0.000004190722,0.00001251463,0.0001067292,0.0000341067,0.00001634586,0.0000648415],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04572462,"threshold_uncertainty_score":0.3457805,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2166464259","doi":"10.1109/tpwrs.2010.2048345","title":"Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Wind power; Mathematical optimization; Probabilistic logic; Electric power system; Probability density function; Schedule; Residual; Economic dispatch; Reliability engineering; Computer science; Operations research; Power (physics); Engineering; Mathematics; Algorithm; Electrical engineering; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.01803096460695567,"gpt":0.2782537888367499,"spread":0.2602228242297943,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002583475,0.000322406,0.0003808184,0.0001713341,0.0001565056,0.0002159451,0.0003232392,0.0001385087,0.0001376368],"category_scores_gemma":[0.00001216368,0.0002489112,0.0002126156,0.0004144337,0.00006023471,0.0003983898,0.000001543276,0.0005397125,0.00007597364],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001557989,"about_ca_system_score_gemma":0.0001705978,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003299832,"about_ca_topic_score_gemma":0.00002219853,"domain_scores_codex":[0.9983224,0.00009371658,0.0005768406,0.000240562,0.0003833426,0.0003831997],"domain_scores_gemma":[0.9986467,0.0002548042,0.0001452622,0.0007149927,0.0001048561,0.0001333697],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002092104,0.0001364816,0.00004104018,0.00006547271,0.0004248912,0.0000139212,0.001650543,0.9864079,0.009337876,0.0001067297,0.001458858,0.0003353571],"study_design_scores_gemma":[0.006030182,0.002832971,0.004708524,0.001793897,0.001080854,0.002343216,0.002027904,0.9383047,0.03094458,0.0001808185,0.00630347,0.003448857],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1036345,0.0001038749,0.8880982,0.00001865779,0.004454587,0.0006404617,0.00004716872,0.0002266354,0.00277594],"genre_scores_gemma":[0.9991782,0.000003641034,0.0002745208,0.0000111112,0.00003527328,0.00003148023,0.000003173585,0.0000855784,0.0003769936],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8955438,"threshold_uncertainty_score":0.9999963,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2150823515","doi":"10.1016/j.jup.2014.03.006","title":"The EU internal electricity market: Done forever?","year":2014,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":98,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Electricity; Decentralization; Electricity market; Domestic market; Quarter (Canadian coin); Consumption (sociology); Economics; Market economy; Renewable energy; Business; Payment; Industrial organization; Economic policy; International trade; Finance; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.003202275714546914,"gpt":0.1913101816904742,"spread":0.1881079059759273,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003214435,0.0001395275,0.0001322076,0.0001180566,0.0001226495,0.0000772176,0.0002672968,0.00006145457,0.00004549317],"category_scores_gemma":[0.0002505583,0.0001098657,0.00005671433,0.0003026667,0.00003976545,0.0000967765,0.00002992331,0.0001432368,0.00004589052],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001914206,"about_ca_system_score_gemma":0.00003191651,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003468622,"about_ca_topic_score_gemma":0.00008543972,"domain_scores_codex":[0.9990137,0.00007302123,0.0002276227,0.0001113039,0.000155654,0.0004187598],"domain_scores_gemma":[0.9993376,0.0002353562,0.00003346026,0.0002935868,0.00003706983,0.00006292728],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001241419,0.0000506675,0.001817979,0.0003885605,0.0003768873,0.000003616419,0.002530091,0.006762538,0.0009272162,0.289444,0.4935666,0.2040077],"study_design_scores_gemma":[0.0004170403,0.00008434619,0.002728368,0.00003598609,0.00001402498,0.00002994062,0.00006696593,0.4136934,0.003212086,0.004055977,0.5753356,0.000326208],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.0294062,0.00130479,0.1050382,0.001108119,0.000968458,0.0003912481,0.00001437884,0.0009902072,0.8607784],"genre_scores_gemma":[0.9883077,0.0001498604,0.0001368502,0.0001626898,0.000546152,0.00002383706,0.00000242579,0.00003269175,0.01063781],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9589015,"threshold_uncertainty_score":0.4480192,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2152974989","doi":"10.1109/tpwrs.2002.1007890","title":"Development of a hybrid model for electrical power spot prices","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Actua; Western University","funders":"","keywords":"Spot contract; Electricity; Electricity market; Electricity price; Economics; Econometrics; Stochastic modelling; Electricity pricing; Forward contract; Electricity generation; Electric power system; Electric power; Forward price; Computer science; Microeconomics; Power (physics); Financial economics; Engineering; Electrical engineering; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.01820611343287834,"gpt":0.2098214870508341,"spread":0.1916153736179558,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002010644,0.0002666982,0.0003778521,0.0003580303,0.0001109199,0.00003883717,0.0001998204,0.0001050408,0.00004579972],"category_scores_gemma":[0.000004558444,0.0002724085,0.0001309893,0.0004023703,0.00001461187,0.000172272,5.745693e-7,0.0001639372,0.00005112909],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000262558,"about_ca_system_score_gemma":0.00004066456,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002633956,"about_ca_topic_score_gemma":0.000002802464,"domain_scores_codex":[0.9982383,0.0000227584,0.0007093915,0.0002772782,0.0003450536,0.000407201],"domain_scores_gemma":[0.9992669,0.00008525323,0.0001018346,0.0003143829,0.0001226243,0.0001089609],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002578547,0.0002005024,9.87979e-7,0.000146981,0.0001913003,0.000002098285,0.001559043,0.9905457,0.004552678,0.0001440157,0.001970751,0.0006601262],"study_design_scores_gemma":[0.0004793157,0.00009284115,0.000001421055,0.00007568748,0.00002915458,0.00002925778,0.00003218081,0.9582239,0.03775611,0.000002971899,0.002990255,0.0002868845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.009020033,0.0004414047,0.9858257,0.000008859717,0.001258234,0.0008350207,0.00003863891,0.0003679221,0.002204255],"genre_scores_gemma":[0.9903904,0.00002422727,0.008161739,0.000009688045,0.000007753626,0.0003232548,0.000002734874,0.00007759072,0.00100266],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9813703,"threshold_uncertainty_score":0.9999728,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2515536272","doi":"10.5547/01956574.38.3.tjam","title":"A Quarter Century Effort Yet to Come of Age: A Survey of Electricity Sector Reform in Developing Countries","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Electricity; Equity (law); Economics; Developing country; Poverty; Business; Economic reform; Public economics; Energy poverty; Quarter (Canadian coin); Economic policy; Economic growth; Development economics; Political science; Politics","retraction":null,"screen_n_in":null,"score":{"opus":0.00918684849521107,"gpt":0.2072214291472784,"spread":0.1980345806520673,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008333766,0.0001004908,0.0002330072,0.0002144909,0.0000286083,0.000012636,0.0002107797,0.00005179306,0.00001408693],"category_scores_gemma":[0.00005195109,0.0000582261,0.0000302104,0.0005115487,0.00001583498,0.0001004857,0.00001632568,0.00008735289,0.000001549012],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000438423,"about_ca_system_score_gemma":0.00008279506,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003974724,"about_ca_topic_score_gemma":0.0008320644,"domain_scores_codex":[0.9989554,0.00009534627,0.0004417806,0.00006369883,0.0002113,0.0002324583],"domain_scores_gemma":[0.9994788,0.00009300626,0.0001176066,0.0001379781,0.0001304365,0.00004219806],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00334954,0.0005100799,0.3731576,0.001221873,0.002985491,0.0002773697,0.02205333,0.2465066,0.2205057,0.06158634,0.02409115,0.04375489],"study_design_scores_gemma":[0.004047305,0.0006861554,0.7560524,0.00201111,0.00005390478,0.0005247399,0.0001345427,0.01074363,0.2139886,0.000725607,0.00989492,0.001137125],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8708237,0.000526362,0.1271961,0.0002129534,0.0004410873,0.00008826673,0.00001014173,0.00003330807,0.0006680982],"genre_scores_gemma":[0.9991634,0.0004515147,0.0002619763,0.00003588197,0.00003157946,0.000003799199,0.000001503274,0.00001715929,0.00003313077],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3828948,"threshold_uncertainty_score":0.2374391,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2914259667","doi":"10.1016/j.rser.2019.109275","title":"Short-term electricity trading for system balancing: An empirical analysis of the role of intraday trading in balancing Germany's electricity system","year":2019,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Electric Power System Optimization","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Electricity; Term (time); Incentive; Quarter (Canadian coin); Electricity system; Work (physics); Electricity market; Wind power; Business; Economics; Microeconomics; Electricity generation; Engineering; Electrical engineering; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.007356296106826883,"gpt":0.2243196095912892,"spread":0.2169633134844623,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001806949,0.000326994,0.00153606,0.000723324,0.000105408,0.00004540808,0.0003197716,0.0001987049,0.000003406129],"category_scores_gemma":[0.00006221044,0.0002645367,0.0002996627,0.003585336,0.0000165403,0.0003046416,0.00003476763,0.0001485378,1.13422e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009254373,"about_ca_system_score_gemma":0.0001060946,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007829214,"about_ca_topic_score_gemma":0.0002044399,"domain_scores_codex":[0.9970025,0.0003246604,0.001236193,0.0004286976,0.0002600194,0.0007479158],"domain_scores_gemma":[0.9987228,0.0001831523,0.0003088282,0.0005432631,0.0001356232,0.000106316],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001198871,0.0002074179,0.2065389,0.02639179,0.001450667,0.00001798767,0.001768229,0.6577755,0.0762992,0.01130843,0.0003196068,0.01780242],"study_design_scores_gemma":[0.0002940993,0.00009072515,0.001299133,0.0005080085,0.00049928,0.00001597569,0.0008022603,0.9778598,0.01669713,0.0000231787,0.001612718,0.0002977102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8755112,0.03720209,0.0820645,0.00000510879,0.0001621764,0.001549748,0.000009293212,0.0001493887,0.003346553],"genre_scores_gemma":[0.9984432,0.0009734762,0.0001713104,0.000006229874,0.00004070843,0.0001188253,0.00002043094,0.00004587279,0.0001799142],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3200843,"threshold_uncertainty_score":0.9999807,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1976455025","doi":"10.1049/iet-gtd.2010.0109","title":"Dynamic adaptive bacterial foraging algorithm for optimum economic dispatch with valve-point effects and wind power","year":2010,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Foraging; Economic dispatch; Convergence (economics); Computer science; Wind power; Power (physics); Point (geometry); Electric power system; Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.003183709972350708,"gpt":0.1920290019726325,"spread":0.1888452920002818,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002114749,0.0002664753,0.0002338513,0.0000656811,0.0001976177,0.0001277207,0.00007481369,0.0001893771,0.00003469197],"category_scores_gemma":[0.000007954518,0.0002479343,0.00007693892,0.0001031039,0.00002882361,0.0004236024,0.000006412214,0.0001729812,0.000004373477],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001856416,"about_ca_system_score_gemma":0.00005662233,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008377917,"about_ca_topic_score_gemma":0.00002281284,"domain_scores_codex":[0.9988755,0.00003836199,0.0003084881,0.0003499861,0.0001293897,0.0002982877],"domain_scores_gemma":[0.999475,0.00005199726,0.00007404206,0.0001730245,0.00008077719,0.000145176],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002333354,0.0001278079,0.0001259832,0.0002709534,0.000289793,0.000005314182,0.0006885946,0.1812696,0.6203263,0.0008314545,0.002993626,0.1928373],"study_design_scores_gemma":[0.001428895,0.0002386732,0.0005238472,0.00004503987,0.00006639155,0.00002056964,0.00001292481,0.9500476,0.04580484,0.00004776882,0.001444202,0.0003192112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2114691,0.00009461478,0.7864318,0.00007027908,0.0007959613,0.0007533368,0.0001925462,0.000163661,0.00002868247],"genre_scores_gemma":[0.9588707,0.00003812694,0.03860951,0.0000085855,0.0001490914,0.0001123986,0.002138006,0.00005262394,0.00002095248],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7687781,"threshold_uncertainty_score":0.9999973,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3152578958","doi":"10.1016/j.eneco.2021.105275","title":"On the long-term merit order effect of renewable energies","year":2021,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":91,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"Bundesministerium für Wirtschaft und Energie","keywords":"Renewable energy; Economics; Investment (military); Term (time); Portfolio; Electricity; Order (exchange); Renewable portfolio standard; Nameplate capacity; Microeconomics; Environmental economics; Natural resource economics; Electricity generation; Power (physics); Feed-in tariff; Energy policy; Engineering; Financial economics; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.003468122777088683,"gpt":0.1673633775218497,"spread":0.163895254744761,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001034409,0.0001143339,0.0001840662,0.00004255234,0.00002945425,0.00002518684,0.0001179466,0.00006094334,0.0001055962],"category_scores_gemma":[0.00004041867,0.00009573102,0.00004831925,0.0001381543,0.00001299261,0.00005859675,0.00002097661,0.00004387388,0.000005382932],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006989138,"about_ca_system_score_gemma":0.00002273675,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003865066,"about_ca_topic_score_gemma":0.0001457761,"domain_scores_codex":[0.9994735,0.00004535781,0.0001861683,0.000120949,0.00003366101,0.0001403865],"domain_scores_gemma":[0.9993941,0.0002053525,0.00004227207,0.0003092335,0.00002576813,0.00002324818],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.000006563903,0.00000663381,0.0007154965,0.00002728573,0.00008472781,0.000002562606,0.00002197485,0.991405,0.0009091084,0.004867059,0.0009094267,0.001044238],"study_design_scores_gemma":[0.0003679746,0.00008313751,0.0001195285,0.00004392682,0.00002681651,0.00001309232,0.000006913835,0.2284517,0.7668656,0.0002010403,0.003592852,0.0002274808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9582992,0.001079891,0.01274513,0.00006253047,0.0008007328,0.00005375373,0.000004875107,0.0001131661,0.02684075],"genre_scores_gemma":[0.997914,0.0005721723,0.0001383073,0.00003975718,0.0000632363,0.00002211447,0.0000232557,0.0000358599,0.001191341],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7659565,"threshold_uncertainty_score":0.3903798,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2117181535","doi":"10.1109/tpwrs.2004.825823","title":"Assessment of Transmission Congestion Cost and Locational Marginal Pricing in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Computer science; Electricity market; Transmission (telecommunications); Electric power transmission; Reliability (semiconductor); Transmission system; Marginal cost; Transmission network; Network topology; Power system simulation; Electric power system; Reliability engineering; Electricity; Network congestion; Computer network; Engineering; Power (physics); Telecommunications; Economics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.00631179647743849,"gpt":0.2235933090035715,"spread":0.217281512526133,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003437899,0.0001872406,0.0002907671,0.0004191712,0.00005827642,0.00002834272,0.00007382094,0.0001226543,0.00002502855],"category_scores_gemma":[0.000002822308,0.00019971,0.00004163359,0.0005729353,0.00002916323,0.0001820265,4.100979e-7,0.0002550503,0.000002184335],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005718202,"about_ca_system_score_gemma":0.00009986963,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001174637,"about_ca_topic_score_gemma":0.00003135475,"domain_scores_codex":[0.9986868,0.00009792534,0.0004631839,0.0002237571,0.0002985054,0.0002298463],"domain_scores_gemma":[0.9995023,0.0001110978,0.00007571428,0.0001394766,0.00009406926,0.00007732998],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003955173,0.0001651838,0.0002553563,0.0002484846,0.00005577335,0.000005735113,0.0003235523,0.9915936,0.005440771,0.001239625,0.00001949583,0.0006128909],"study_design_scores_gemma":[0.004434438,0.000584898,0.03740119,0.001999273,0.00008155414,0.0001967701,0.000357558,0.939706,0.01395282,0.00004286338,0.0005390049,0.0007036802],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01962491,0.0002354749,0.9743987,0.00003239725,0.0004648617,0.0007522459,0.00002116518,0.0001103108,0.004359934],"genre_scores_gemma":[0.9986275,0.0001318492,0.001028749,0.000006556048,0.000005310239,0.000108869,0.000005037226,0.000028527,0.00005756904],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9790027,"threshold_uncertainty_score":0.8143939,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2790780473","doi":"10.1109/tpwrs.2018.2805322","title":"An Incentive-Based Multistage Expansion Planning Model for Smart Distribution Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"King Saud University","keywords":"Incentive; Distributed generation; Software deployment; Profit (economics); Payback period; Bidding; Linearization; Electric power system; Investment (military); Operations research; Computer science; Environmental economics; Business; Finance; Economics; Microeconomics; Renewable energy; Engineering; Power (physics); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01739433024462106,"gpt":0.2507417635762862,"spread":0.2333474333316652,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003870117,0.0003590301,0.0003773757,0.0002465742,0.0003682281,0.0001915904,0.0002258689,0.00027275,0.000006317523],"category_scores_gemma":[0.000005698371,0.0003801371,0.0001167899,0.0003845858,0.00004559191,0.0004378483,5.706426e-7,0.0001977958,0.0000377775],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005456717,"about_ca_system_score_gemma":0.0000685635,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008324592,"about_ca_topic_score_gemma":0.00001501968,"domain_scores_codex":[0.9979379,0.0001151369,0.0006149265,0.0004522882,0.0003630357,0.0005167194],"domain_scores_gemma":[0.9987369,0.0000985976,0.0001207121,0.0005673485,0.0002929362,0.0001835004],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008675435,0.0001097905,0.00001766942,0.0002038428,0.00005497958,0.000002128259,0.0004892349,0.9930778,0.005035472,0.00007769951,0.0007656461,0.00007899322],"study_design_scores_gemma":[0.000900046,0.0003605399,0.00001435387,0.0003429238,0.0000449346,0.00000803134,0.0001667062,0.9888529,0.007986071,0.000001627846,0.0009212316,0.0004006981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01167403,0.0001655173,0.9790483,0.000005549686,0.00574455,0.001492503,0.000643628,0.001016948,0.0002089344],"genre_scores_gemma":[0.9980946,0.000004082718,0.0006922362,0.00001172066,0.00005446141,0.0005892791,0.0001469943,0.0001130776,0.0002935769],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9864206,"threshold_uncertainty_score":0.9998651,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2172171685","doi":"10.1109/tpwrs.2007.894858","title":"Negotiating Bilateral Contracts in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Spot contract; Forward contract; Negotiation; Regret; Spot market; Electricity; Electricity market; Microeconomics; Vendor; Generator (circuit theory); Economics; Forward price; Business; Computer science; Finance; Marketing; Power (physics); Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.005562499567008695,"gpt":0.2010916986959861,"spread":0.1955291991289774,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008213517,0.0002798814,0.000343488,0.0006480549,0.0000862851,0.0001032862,0.0001597909,0.0002331514,0.00002511232],"category_scores_gemma":[0.00001038815,0.0002992813,0.00007765969,0.0009682598,0.00001313641,0.000303268,4.562655e-7,0.0004527705,0.00006629222],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000510924,"about_ca_system_score_gemma":0.00003046519,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001836338,"about_ca_topic_score_gemma":0.00007301513,"domain_scores_codex":[0.9979005,0.00009745132,0.0007235344,0.000286648,0.0003269226,0.0006649065],"domain_scores_gemma":[0.9991699,0.0002431406,0.00008190118,0.0002992238,0.00006966987,0.0001361747],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007379927,0.0001205274,0.0002734053,0.00007840516,0.0000812742,0.00006319114,0.000503078,0.9920919,0.005411284,0.00006321153,0.0003576566,0.0008822437],"study_design_scores_gemma":[0.002180001,0.0002272727,0.004371773,0.0003781109,0.0000436024,0.0002392816,0.0002169088,0.9652561,0.023171,0.00000633131,0.00286536,0.001044291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08303551,0.0004211616,0.9033157,0.000008934987,0.004417129,0.0006120413,0.00001010611,0.0005255113,0.00765392],"genre_scores_gemma":[0.9992878,0.00003323125,0.0001386425,0.00002111894,0.00002653215,0.00004910354,0.000002482574,0.00007144108,0.0003696803],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9162523,"threshold_uncertainty_score":0.9999459,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1966990634","doi":"10.1016/j.enpol.2010.03.004","title":"The large-scale integration of wind generation: Impacts on price, reliability and dispatchable conventional suppliers","year":2010,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Dispatchable generation; Wind power; Electricity market; Electricity; Electricity generation; Residual; Reliability (semiconductor); Reliability engineering; Economics; Renewable energy; Distributed generation; Engineering; Power (physics); Computer science; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.003994478879115779,"gpt":0.2137128345674377,"spread":0.2097183556883219,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002369639,0.00009579105,0.00009442596,0.00007695587,0.0001085401,0.00003407563,0.00007492865,0.0000820742,0.00002068093],"category_scores_gemma":[0.00009639231,0.00007339541,0.00002903371,0.0002152002,0.00003812233,0.000105749,0.00001270795,0.0001110995,0.000002252921],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005730193,"about_ca_system_score_gemma":0.00004850594,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001484621,"about_ca_topic_score_gemma":0.0004758817,"domain_scores_codex":[0.999342,0.00002898183,0.0002004793,0.0001147956,0.0001355188,0.0001782187],"domain_scores_gemma":[0.9995492,0.00006302385,0.00005080291,0.0002194469,0.00005550833,0.00006204866],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006051835,0.0001920792,0.002781393,0.00009505937,0.0001136998,9.834871e-7,0.001432673,0.2469961,0.1868608,0.528526,0.02460662,0.008334067],"study_design_scores_gemma":[0.0008747515,0.0001340372,0.01253153,0.00002784231,0.00001649767,0.00001192525,0.00005182563,0.8211538,0.1075762,0.001720097,0.05559485,0.0003066055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8951597,0.0002442087,0.08470097,0.001031634,0.001089383,0.0002463307,0.00004360907,0.0001497668,0.01733445],"genre_scores_gemma":[0.998361,0.00009686058,0.0006121584,0.00003791329,0.0003026955,0.00001324029,0.0000436863,0.00001561971,0.0005168616],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5741577,"threshold_uncertainty_score":0.2992978,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2149649017","doi":"10.1109/tpwrs.2011.2146796","title":"Large-Scale Solar PV Investment Models, Tools, and Analysis: The Ontario Case","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Investment (military); Sizing; Profit (economics); Operations research; Computer science; Return on investment; Environmental economics; Engineering; Mathematical optimization; Industrial engineering; Economics; Microeconomics; Mathematics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02260273309979893,"gpt":0.1901624172439537,"spread":0.1675596841441548,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000326354,0.0002575779,0.0003219631,0.0002811353,0.000235765,0.0001144634,0.0001460774,0.0001434761,0.00006620253],"category_scores_gemma":[9.143214e-7,0.0002075013,0.0001373648,0.0005910429,0.00002411111,0.000370271,0.000001374725,0.0002944786,0.00002635539],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002566131,"about_ca_system_score_gemma":0.0000358114,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00425745,"about_ca_topic_score_gemma":0.0181468,"domain_scores_codex":[0.9986042,0.000103322,0.0004235533,0.0002915504,0.0002312109,0.0003461709],"domain_scores_gemma":[0.9991418,0.0000427249,0.00006040055,0.0005594244,0.00006132701,0.0001343147],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002036439,0.0001486753,0.0000749249,0.00005762977,0.00168051,0.0001227614,0.03106518,0.9659935,0.00003619563,0.0002824933,0.0004280258,0.00008973487],"study_design_scores_gemma":[0.0005985827,0.0001342749,0.0001273804,0.0000526025,0.001161286,0.0007687691,0.002219552,0.9912881,0.0008243331,0.00002902502,0.002327499,0.000468578],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0149711,0.000642738,0.9752991,0.000008739466,0.001240593,0.0005418119,0.00008000188,0.0002912074,0.006924732],"genre_scores_gemma":[0.9983442,0.00003629406,0.0004381021,0.00004781556,0.000008034634,0.0001735561,0.000005971228,0.00004345835,0.0009025951],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.983373,"threshold_uncertainty_score":0.9997694,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2135395455","doi":"10.1109/tpwrs.2002.800947","title":"Equilibrium of auction markets with unit commitment: the need for augmented pricing","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Profit (economics); Microeconomics; Computer science; Scope (computer science); Unit (ring theory); Competition (biology); Economics; Work (physics); Market power; Mathematical economics; Electric power system; Operations research; Mathematical optimization; Power (physics); Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01453428199598955,"gpt":0.1980662993196752,"spread":0.1835320173236857,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002325704,0.0002100758,0.0002560762,0.0002138783,0.0001046714,0.00004524099,0.000160266,0.00009454448,0.00004347175],"category_scores_gemma":[0.000002793086,0.0001594565,0.00008125236,0.0005798803,0.00003017768,0.0001793812,5.247078e-7,0.0001504614,0.00001327522],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001394636,"about_ca_system_score_gemma":0.00001016016,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003041188,"about_ca_topic_score_gemma":0.00000825181,"domain_scores_codex":[0.99878,0.0000864325,0.0004172667,0.0001765387,0.0002656089,0.000274201],"domain_scores_gemma":[0.9991582,0.0001657273,0.000110155,0.0003934963,0.0001179836,0.00005441908],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008879463,0.0001126084,0.00001787495,0.0002876777,0.0003472786,0.000001148894,0.0008733004,0.9932415,0.002719292,0.00004657825,0.001928994,0.0003349491],"study_design_scores_gemma":[0.001436756,0.0004082205,0.00004476723,0.0003137894,0.0001366598,0.00005846773,0.0004659674,0.9772165,0.01565184,0.000001809801,0.003976424,0.0002887385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.008605152,0.0002972881,0.9848962,0.00006776808,0.001874179,0.00139565,0.00004213924,0.0003134685,0.002508143],"genre_scores_gemma":[0.9980087,0.00002133854,0.0001759553,0.00001091118,0.0000155858,0.0002821952,0.000003856485,0.0000648796,0.001416585],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9894035,"threshold_uncertainty_score":0.6502449,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3121913816","doi":"10.1287/opre.2017.1606","title":"Inverse Optimization for the Recovery of Market Structure from Market Outcomes: An Application to the MISO Electricity Market","year":2017,"lang":"en","type":"article","venue":"Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Wilfrid Laurier University","funders":"","keywords":"Electricity market; Residual; Market power; Commodity; Spot contract; Economics; Market price; Econometrics; Commodity market; Shadow price; Electricity; Derivatives market; Microeconomics; Mathematical optimization; Computer science; Futures contract; Financial economics; Mathematics; Algorithm; Monopoly","retraction":null,"screen_n_in":null,"score":{"opus":0.02638904219566832,"gpt":0.3199694111104669,"spread":0.2935803689147986,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00178087,0.000160014,0.0001943978,0.0001840168,0.001258319,0.000476923,0.001050954,0.0001365855,0.0007029172],"category_scores_gemma":[0.001382998,0.0001091851,0.00005900797,0.0004405038,0.00006460764,0.0004890754,0.00008685221,0.0002828349,0.000008421967],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001970981,"about_ca_system_score_gemma":0.0001205123,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0008380468,"about_ca_topic_score_gemma":0.003172482,"domain_scores_codex":[0.9981959,0.000327809,0.000348528,0.0003054739,0.0004782039,0.0003440487],"domain_scores_gemma":[0.9970652,0.0006945825,0.00005391637,0.001518343,0.0005820739,0.00008585811],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008467434,0.00002715422,0.0006378168,0.00002653407,0.00008779822,1.723001e-7,0.0002437122,0.9163118,0.001060512,0.00009691776,0.07475253,0.00667036],"study_design_scores_gemma":[0.0002714382,0.0000616037,0.007755678,0.00001409047,0.00002136371,8.647621e-7,0.00009352573,0.9868587,0.000806621,0.00007036866,0.003923714,0.0001220443],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01819013,0.0001577343,0.96753,0.002506275,0.0003778276,0.004111036,0.0005295441,0.0000897581,0.006507738],"genre_scores_gemma":[0.9679907,0.0002654276,0.02617525,0.00009032877,0.000249188,0.001031767,0.0002038622,0.00007476333,0.003918698],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9498006,"threshold_uncertainty_score":0.9678099,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1552630275","doi":"10.1023/a:1023307319633","title":"An Oligopolistic Investment Model of the Finnish Electricity Market","year":2003,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Victoria","funders":"","keywords":"Oligopoly; Economics; Microeconomics; Investment (military); Electricity market; Mixed complementarity problem; Production (economics); Stochastic programming; Market power; Complementarity (molecular biology); Industrial organization; Electricity; Mathematical optimization; Cournot competition; Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.1255670274870545,"gpt":0.3778045452850975,"spread":0.252237517798043,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001127326,0.00007492432,0.0001249031,0.000194934,0.0001303452,0.00003265295,0.0002754274,0.00005793477,0.0000670331],"category_scores_gemma":[0.0004671841,0.00006177615,0.00003732978,0.0008744274,0.00006780493,0.0001624001,0.00001683147,0.0001783233,0.000003823217],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004001451,"about_ca_system_score_gemma":0.0002111869,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000869186,"about_ca_topic_score_gemma":0.00005610067,"domain_scores_codex":[0.9985654,0.0003403962,0.0002801816,0.0001145062,0.0004298906,0.0002696493],"domain_scores_gemma":[0.9988033,0.00007013919,0.00001496211,0.0004511368,0.0005973569,0.00006311165],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002772616,0.00007340722,0.0001149642,0.00003633664,0.00002093655,1.367658e-7,0.0001807936,0.955979,0.01019481,0.02384201,0.009482115,0.00007276621],"study_design_scores_gemma":[0.00007192756,0.00005518549,0.0002566787,0.00001572469,0.000002818326,0.000001084803,0.00002032711,0.8998146,0.09886017,0.000682366,0.0001630183,0.00005606518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7461169,0.001395268,0.09345528,0.0005384859,0.00017246,0.001631322,0.0000890156,0.0001098166,0.1564914],"genre_scores_gemma":[0.9975349,0.0001745989,0.001437196,0.00004586382,0.00001045164,0.00004462354,0.000004349335,0.00001678867,0.0007312396],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2514179,"threshold_uncertainty_score":0.2519158,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2469738517","doi":"10.1002/wene.220","title":"Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration","year":2016,"lang":"en","type":"article","venue":"Wiley Interdisciplinary Reviews Energy and Environment","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Renewable energy; Variable renewable energy; Wind power; Electric power system; Variable (mathematics); Pumped-storage hydroelectricity; Flexibility (engineering); Inflow; Electricity generation; Grid; Solar power; Environmental science; Computer science; Energy storage; Power (physics); Distributed generation; Engineering; Meteorology; Electrical engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.00850343474755512,"gpt":0.2137051076759707,"spread":0.2052016729284156,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004988354,0.0003880941,0.0005418353,0.00009115566,0.0001929918,0.00007289752,0.0001905445,0.0001679648,0.0001210362],"category_scores_gemma":[0.000008416853,0.0002581973,0.00006555506,0.000176748,0.00006982496,0.0005217689,0.0001105417,0.00004743095,0.000009925623],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003432615,"about_ca_system_score_gemma":0.00002240752,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000399185,"about_ca_topic_score_gemma":0.00006730147,"domain_scores_codex":[0.9979948,0.0001681955,0.0006602296,0.0005786469,0.0001938703,0.000404212],"domain_scores_gemma":[0.9988723,0.00006961189,0.0001768129,0.0006657052,0.00002755453,0.0001880404],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0005264576,0.000563157,0.0004180214,0.0008828253,0.0005622983,0.00001378896,0.002197128,0.9131763,0.0230724,0.005233421,0.03914778,0.01420641],"study_design_scores_gemma":[0.00129308,0.001675494,0.00003204547,0.001486229,0.0001504964,0.00006100652,0.0002191308,0.07169098,0.001670179,0.0009968395,0.9197261,0.0009984293],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002767665,0.02149633,0.9698594,0.0001154654,0.0004822046,0.000647502,0.00005593167,0.0002342156,0.004341234],"genre_scores_gemma":[0.9844386,0.008264984,0.002405693,0.00006260766,0.000102799,0.001085236,0.00009129826,0.0001268645,0.003421918],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9816709,"threshold_uncertainty_score":0.999987,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3088725794","doi":"10.1109/tste.2020.3026370","title":"Addressing the Conditional and Correlated Wind Power Forecast Errors in Unit Commitment by Distributionally Robust Optimization","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"National Science Foundation","keywords":"Mathematical optimization; Semidefinite programming; Robust optimization; Covariance matrix; Robustness (evolution); Power system simulation; Wind power; Stochastic programming; Estimator; Ambiguity; Covariance; Mathematics; Integer programming; Optimization problem; Computer science; Electric power system; Algorithm; Power (physics); Statistics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02103097784858049,"gpt":0.2130901661902146,"spread":0.1920591883416341,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001108093,0.0001973571,0.0001646541,0.0001247851,0.0002631022,0.000078946,0.0001112712,0.0001262194,0.0001495146],"category_scores_gemma":[0.00001056087,0.0001869803,0.00003814142,0.0007621476,0.00005570698,0.00028583,0.000002142169,0.0002523952,0.000002156283],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002996082,"about_ca_system_score_gemma":0.00006309776,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007637768,"about_ca_topic_score_gemma":0.00001865054,"domain_scores_codex":[0.9988668,0.00007674393,0.0002934301,0.0002162695,0.0002195597,0.0003272185],"domain_scores_gemma":[0.9995033,0.0001028209,0.00005045636,0.0001223551,0.0001161501,0.0001048981],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003663236,0.0000452197,0.0000175595,0.00002470868,0.0000459966,0.00001208838,0.0001879854,0.9968686,0.00004937134,0.0007440296,0.001769349,0.0001984689],"study_design_scores_gemma":[0.0008374776,0.00009168755,0.00004605014,0.0000300839,0.00002826706,0.00001524064,0.0008259065,0.9930218,0.001365678,0.00004955485,0.003460326,0.0002278759],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.003513726,0.0002646146,0.9940854,0.0006802632,0.0001310956,0.0002378459,0.00008890731,0.0001566381,0.0008415247],"genre_scores_gemma":[0.9986649,0.00007299781,0.000272041,0.0001932209,0.00001494883,0.00006109435,0.0002237599,0.00003889089,0.0004581607],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9951512,"threshold_uncertainty_score":0.7624834,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2172125678","doi":"10.1109/mper.2001.4311150","title":"Valuation of Dynamic Reactive Power Support Services for Transmission Access","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Powertech Labs (Canada)","funders":"","keywords":"Valuation (finance); AC power; Procurement; Risk analysis (engineering); Business; Electricity; Computer science; Environmental economics; Economics; Finance; Engineering; Marketing; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01344425459126157,"gpt":0.270687639826537,"spread":0.2572433852352755,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004199395,0.0002591141,0.0004716107,0.0001698694,0.00002178857,0.00002376698,0.0002855441,0.0001050118,0.00008049078],"category_scores_gemma":[0.00002579247,0.0002589586,0.0001497759,0.000544782,0.000005886625,0.0004317689,0.000009373844,0.0001167296,0.000012974],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001325831,"about_ca_system_score_gemma":0.0000267123,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003451573,"about_ca_topic_score_gemma":0.000001019973,"domain_scores_codex":[0.9986185,0.00001952932,0.0005745071,0.0002297673,0.0002611428,0.0002965155],"domain_scores_gemma":[0.9992463,0.00007787471,0.0001110991,0.0003127499,0.0001680901,0.00008386411],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001026225,0.000312023,0.0003270653,0.07533585,0.0009946462,0.00003029922,0.001911202,0.6883542,0.1226099,0.000338777,0.005749296,0.1039341],"study_design_scores_gemma":[0.001308204,0.0003484147,0.001552089,0.0149308,0.0004884899,0.0001229541,0.00001565469,0.818729,0.01865822,0.00006560313,0.1424274,0.001353171],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.00818795,0.04170299,0.9455021,0.00009243769,0.001056,0.001655106,0.00001982684,0.0005200764,0.001263526],"genre_scores_gemma":[0.9651828,0.03026576,0.003950618,0.00007027628,0.00002853839,0.0002187211,0.00007100147,0.000124811,0.00008747695],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9569948,"threshold_uncertainty_score":0.9999863,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4232668127","doi":"10.1109/access.2017.2768522","title":"Solution of an Economic Dispatch Problem Through Particle Swarm Optimization: A Detailed Survey – Part II","year":2017,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Particle swarm optimization; Mathematical optimization; Premature convergence; Convergence (economics); Computer science; Optimization problem; Multi-swarm optimization; Economic dispatch; Metaheuristic; Mathematics; Electric power system","retraction":null,"screen_n_in":null,"score":{"opus":0.0379337132394792,"gpt":0.2884766003349423,"spread":0.2505428870954631,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003596183,0.0001514325,0.0002417005,0.00003262638,0.0002694252,0.0002067094,0.0005889298,0.00009388138,0.00005642099],"category_scores_gemma":[0.00003338686,0.0001617052,0.00003735444,0.00009466623,0.00003837726,0.002107775,0.00006362702,0.00007186132,0.00001653427],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001071313,"about_ca_system_score_gemma":0.00004316717,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005900116,"about_ca_topic_score_gemma":0.001762778,"domain_scores_codex":[0.9989216,0.00007073754,0.0003903804,0.0002270467,0.0001176976,0.0002724979],"domain_scores_gemma":[0.9989421,0.00003174726,0.0002156422,0.0006626023,0.00008358381,0.00006426019],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001465983,0.00003745606,0.02384358,0.00004281877,0.0000361139,8.812719e-7,0.0001480941,0.9745444,0.0001621321,0.00004287073,0.0007789314,0.0003480543],"study_design_scores_gemma":[0.0005219714,0.00005669888,0.01323166,0.00003582065,0.00002230402,0.000002711714,0.000003186447,0.9568568,0.02887605,0.00006861878,0.0001051734,0.0002189455],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7411565,0.00007995227,0.2554841,0.00004463299,0.0009266526,0.0003748791,0.0000307163,0.0001962863,0.001706278],"genre_scores_gemma":[0.9967819,0.00007195779,0.002808727,0.000007583156,0.0001080293,0.00004833951,0.00004576618,0.00004039566,0.00008728323],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2556254,"threshold_uncertainty_score":0.6594145,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2152585623","doi":"10.1109/tpwrs.2003.810676","title":"Reconciling social welfare, agent profits, and consumer payments in electricity pools","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Microeconomics; Economics; Revenue; Electricity; Profit (economics); Electricity market; Marginal cost; Marginal profit; Payment; Transfer payment; Schedule; Social Welfare; Welfare; Engineering; Market economy; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.01237499828632671,"gpt":0.2153342786589737,"spread":0.202959280372647,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003679022,0.0002510142,0.0003295054,0.0003232258,0.0001627437,0.00007610758,0.00008295352,0.0001923096,0.00003459584],"category_scores_gemma":[0.000008005359,0.0002716921,0.00005824077,0.0005749927,0.00001816842,0.0001820398,4.132058e-7,0.0003136844,0.0000259625],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003916119,"about_ca_system_score_gemma":0.00003550115,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005186424,"about_ca_topic_score_gemma":0.00002980248,"domain_scores_codex":[0.9983439,0.0001812584,0.0005075227,0.000301051,0.000250036,0.0004162714],"domain_scores_gemma":[0.9995632,0.00005095096,0.00006357043,0.0001780883,0.00005484033,0.00008934967],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002906909,0.001487793,0.007078299,0.00257516,0.002086701,0.0001984644,0.01078217,0.9333447,0.016457,0.006662762,0.00601786,0.01301846],"study_design_scores_gemma":[0.02299301,0.001749545,0.006385062,0.001823549,0.0007654342,0.001349507,0.004429977,0.6470907,0.1734148,0.0001426461,0.1304746,0.00938111],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1179375,0.001411585,0.8684786,0.00006131828,0.003833713,0.001521241,0.00003963264,0.0004930558,0.006223348],"genre_scores_gemma":[0.9992176,0.00008353153,0.00009277761,0.00001704029,0.000007046001,0.00017965,0.000002131052,0.00005358033,0.0003466322],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8812801,"threshold_uncertainty_score":0.9999735,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2069999654","doi":"10.1016/j.eneco.2014.09.001","title":"Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach","year":2014,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Ottawa","funders":"National Key Research and Development Program of China; China Scholarship Council; National Natural Science Foundation of China","keywords":"Hydropower; Environmental economics; Viewpoints; Efficient energy use; Electricity generation; Business; Profitability index; Renewable energy; Economic efficiency; Production (economics); Electricity; Economics; Environmental resource management; Power (physics); Engineering; Finance; Microeconomics","retraction":null,"screen_n_in":null,"score":{"opus":0.005290216809612416,"gpt":0.2005929786251398,"spread":0.1953027618155273,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001976026,0.0001306031,0.0002514785,0.0002101546,0.00001796414,0.00001465942,0.0001728053,0.00005941431,0.0000106341],"category_scores_gemma":[0.00001887153,0.0001494233,0.00002392018,0.0001673468,0.000004861255,0.00007672265,0.00002072402,0.00007343772,3.00874e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009615006,"about_ca_system_score_gemma":0.0001797679,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.03186046,"about_ca_topic_score_gemma":0.1358642,"domain_scores_codex":[0.9990656,0.00003179166,0.0004081205,0.0001824037,0.00006480606,0.0002472334],"domain_scores_gemma":[0.9995742,0.00008739984,0.00008049996,0.0002072259,0.00001308662,0.00003756908],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003854571,0.00002478829,0.005506109,0.00001408962,0.00001191937,8.5699e-7,0.00003780584,0.9883918,0.0001161555,0.0005241997,0.00008378176,0.005284642],"study_design_scores_gemma":[0.0003070956,0.00001690575,0.003723717,0.00002353478,0.000002207443,0.000005545859,0.00001527503,0.9951322,0.0003344416,0.00002778978,0.0002674887,0.0001437892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5149105,0.00009901671,0.4788295,0.000001420473,0.0003165808,0.00005151597,0.00000488464,0.00002559586,0.00576091],"genre_scores_gemma":[0.989373,0.00004262561,0.01048902,0.00001738174,0.00001685851,0.00001241817,0.00001010821,0.00002884304,0.000009696394],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4744625,"threshold_uncertainty_score":0.9745865,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4245783092","doi":"10.1109/59.932289","title":"Inter-utilities power-exchange coordination: a market-oriented approach","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Electric power system; Scheduling (production processes); Computer science; Decomposition; Grid; Power system simulation; Independence (probability theory); Power market; Economic dispatch; Mathematical optimization; Market oriented; Power (physics); Economics; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.009348881120758408,"gpt":0.1990735005602454,"spread":0.189724619439487,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003753008,0.0004016068,0.0004177876,0.0005564159,0.0001763849,0.0001279371,0.0002526777,0.0002453091,0.0004667798],"category_scores_gemma":[0.000006970236,0.000422259,0.0001596662,0.001009454,0.00004415881,0.0004077663,0.000001551092,0.0003460074,0.0001452825],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004431702,"about_ca_system_score_gemma":0.00002973123,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006217921,"about_ca_topic_score_gemma":0.00001186938,"domain_scores_codex":[0.9978373,0.0001653051,0.000613408,0.000418968,0.0004358132,0.0005292136],"domain_scores_gemma":[0.9988801,0.00009861556,0.00008628165,0.0005970399,0.000171741,0.0001662383],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0007877724,0.002442676,0.0005136528,0.002888665,0.002763401,0.0002028106,0.0212035,0.7614866,0.002083799,0.00248912,0.1969244,0.006213574],"study_design_scores_gemma":[0.002179769,0.0005463229,0.0001361455,0.0004693903,0.0001200769,0.0006835462,0.003059095,0.789516,0.001281714,0.000009187674,0.2005788,0.001419892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.001707934,0.0006127467,0.8906262,0.00004130751,0.00563521,0.000770285,0.00004868014,0.001132607,0.09942506],"genre_scores_gemma":[0.9836178,0.00007400153,0.0002723834,0.00002656816,0.00003404645,0.0003999925,0.00001175132,0.0001078111,0.01545559],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9819099,"threshold_uncertainty_score":0.9998229,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2109107914","doi":"10.1109/tpwrs.2004.835638","title":"Pay-as-Bid versus Marginal Pricing—Part I: Strategic Generator Offers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"Tsinghua University","keywords":"Payment; Generator (circuit theory); Economics; Marginal cost; Microeconomics; Electricity market; Yield (engineering); Electricity; Marginal utility; Econometrics; Power (physics); Finance; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01594394157016829,"gpt":0.2158812997562269,"spread":0.1999373581860586,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000184575,0.0003833474,0.0003620236,0.0003245038,0.0001739237,0.0001524406,0.0002269965,0.0002377932,0.0001059776],"category_scores_gemma":[0.000002642107,0.0003575835,0.0001403419,0.0006593384,0.0000301835,0.0002554251,6.802035e-7,0.0004074431,0.0006391641],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009640171,"about_ca_system_score_gemma":0.0001461438,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001942083,"about_ca_topic_score_gemma":0.00004250003,"domain_scores_codex":[0.9980186,0.00006653077,0.000531451,0.0003873695,0.0004661619,0.0005298999],"domain_scores_gemma":[0.9990594,0.00005433242,0.000076966,0.0005016048,0.00009670978,0.0002109923],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008601996,0.00009269238,0.000002239585,0.0001136849,0.0002155714,0.00003517045,0.0002539798,0.9951869,0.002586776,0.0009146341,0.0004538109,0.00005849207],"study_design_scores_gemma":[0.04472581,0.01000681,0.00009690732,0.00380024,0.001553083,0.002175412,0.007942368,0.5004562,0.3432288,0.0003681083,0.07466903,0.01097731],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03866385,0.0003505478,0.922338,0.00006412107,0.01824052,0.0007594337,0.00004491639,0.001132534,0.01840607],"genre_scores_gemma":[0.9985027,0.00007536244,0.0001892813,0.00002572204,0.00007981972,0.0001492254,0.000007900338,0.0001096052,0.0008603448],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9598389,"threshold_uncertainty_score":0.9998876,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}