{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":133,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":133,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"d5baabfe471f","filters":{"topic":"Life Cycle Costing Analysis"}},"results":[{"id":"W2578264583","doi":"10.1016/j.enbuild.2017.01.031","title":"Economic evaluation of building energy retrofits: A fuzzy based approach","year":2017,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":102,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"FortisBC","keywords":"Retrofitting; Fuzzy logic; Life-cycle cost analysis; Fuzzy set; Asset (computer security); Engineering; Efficient energy use; Computer science; Operations research; Risk analysis (engineering); Reliability engineering; Business; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.02756361439887615,"gpt":0.2520339927301782,"spread":0.224470378331302,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001118059,0.000174742,0.0002784586,0.0002916929,0.0004849551,0.0004209398,0.0003785633,0.00009423181,0.00004703988],"category_scores_gemma":[0.0003483457,0.0001698526,0.0001034224,0.0001094564,0.0001083732,0.0009654522,0.0002017605,0.00005412731,0.000002003389],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005365969,"about_ca_system_score_gemma":0.00003748254,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004456687,"about_ca_topic_score_gemma":0.0001250669,"domain_scores_codex":[0.99883,0.00002154324,0.0002823347,0.0003877385,0.0002603535,0.0002180502],"domain_scores_gemma":[0.998638,0.00004148356,0.0006175051,0.0004796982,0.0002049965,0.00001828195],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001143163,0.0001535789,0.06753334,0.0002514544,0.0003297224,0.000003408665,0.00004315593,0.02603095,0.006215391,0.7653269,0.006000993,0.1279968],"study_design_scores_gemma":[0.001804624,0.00001478698,0.006417385,0.0001439281,0.0006879435,0.000002155845,0.00007916075,0.9152357,0.004411227,0.0294286,0.04121942,0.0005550816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9158782,0.000346972,0.01065612,0.0006895656,0.0002927808,0.00006107851,0.00000217385,0.00008908204,0.07198396],"genre_scores_gemma":[0.9972546,0.00001226259,0.001193913,0.0005038113,0.0008472055,0.00001929732,0.00001948272,0.00002436955,0.0001250462],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8892047,"threshold_uncertainty_score":0.6926387,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1999867042","doi":"10.1139/l05-061","title":"Comparing life cycle implications of building retrofit and replacement options","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":101,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demolition; Retrofitting; Life-cycle assessment; Masonry; Engineering; Architectural engineering; Civil engineering; Environmental science","retraction":null,"screen_n_in":null,"score":{"opus":0.01585964076735015,"gpt":0.2088192100382251,"spread":0.1929595692708749,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003945064,0.000101393,0.0002279977,0.0006950102,0.0001117857,0.0001194591,0.0001796627,0.00003257999,0.00008277142],"category_scores_gemma":[0.0004632512,0.0001115777,0.00007488466,0.0003970435,0.00002330166,0.0005302834,0.00002920598,0.0001515531,0.000003248318],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001069811,"about_ca_system_score_gemma":0.0000961284,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001446562,"about_ca_topic_score_gemma":0.02595811,"domain_scores_codex":[0.9991323,0.000003645601,0.0004297643,0.00009977199,0.0001132715,0.0002212301],"domain_scores_gemma":[0.9992074,0.00003865725,0.0002818668,0.0001545221,0.0001995919,0.0001179463],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000007021399,0.00001715547,0.2733961,0.0001716892,0.0002238467,0.000006846259,0.0001341894,0.7022728,0.001864161,0.01707484,0.00313986,0.001691556],"study_design_scores_gemma":[0.001196772,0.00002531957,0.4180903,0.0007235509,0.0004948789,0.00006792197,0.0002820086,0.5283284,0.000157569,0.0006537491,0.04938558,0.0005940367],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9778919,0.001117833,0.01524098,0.002465411,0.0001896044,0.00006678549,0.000002539061,0.00002674973,0.002998221],"genre_scores_gemma":[0.9973425,0.00001258776,0.001766359,0.0001645776,0.0006775731,0.000001580264,0.000001558625,0.00001874121,0.00001448216],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1739444,"threshold_uncertainty_score":0.9918156,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2068812879","doi":"10.3141/1769-04","title":"Guidelines for Probabilistic Pavement Life Cycle Cost Analysis","year":2001,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":89,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Waterloo","funders":"","keywords":"Probabilistic logic; Life-cycle cost analysis; Pavement engineering; Probabilistic analysis of algorithms; Probability distribution; Activity-based costing; Variance (accounting); Log-normal distribution; Operations research; Computer science; Engineering; Transport engineering; Econometrics; Reliability engineering; Statistics; Mathematics; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.2130400675031032,"gpt":0.420254585010396,"spread":0.2072145175072928,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008846994,0.0003019491,0.0007031533,0.002747424,0.00100217,0.0004964457,0.00139728,0.0001547159,0.000602133],"category_scores_gemma":[0.002632629,0.0002251453,0.001042591,0.007932382,0.0003931923,0.001188928,0.00001571863,0.001079989,0.00005073699],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002254049,"about_ca_system_score_gemma":0.0004035806,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.01762776,"about_ca_topic_score_gemma":0.07909361,"domain_scores_codex":[0.9920437,0.0003054036,0.002151865,0.0005534707,0.003905048,0.001040555],"domain_scores_gemma":[0.9813722,0.001124736,0.0009330841,0.0006402921,0.01574622,0.0001835047],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.001775099,0.0005899073,0.8501385,0.0006414403,0.002011708,0.0000806357,0.0004652092,0.08615901,0.0005610203,0.006963065,0.03816829,0.01244606],"study_design_scores_gemma":[0.002248183,0.0001497838,0.8511439,0.0002647543,0.001444939,1.888984e-7,0.001906539,0.02138147,0.00006176563,0.009358768,0.1116723,0.0003674089],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9638625,0.0001808645,0.01281149,0.02041452,0.0004768907,0.001858354,0.00004820184,0.00005974138,0.0002874381],"genre_scores_gemma":[0.9942832,0.0003328276,0.002078971,0.0006787812,0.001375449,0.0002634482,0.00008937934,0.000070505,0.0008274555],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.07350401,"threshold_uncertainty_score":0.988914,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2008459439","doi":"10.1139/l04-077","title":"A method-based survey of life cycle costing literature pertinent to infrastructure design and renewal","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":46,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Life cycle costing; Activity-based costing; Key (lock); Process (computing); Computer science; Risk analysis (engineering); Systems engineering; Engineering; Management science; Construction engineering; Business; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.01268309262176008,"gpt":0.206918850888849,"spread":0.1942357582670889,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001408722,0.0001827861,0.0003613019,0.0009816539,0.00007830943,0.00023838,0.0002358081,0.00007629985,0.00006188371],"category_scores_gemma":[0.003401082,0.0001756555,0.00007956376,0.0009547418,0.00001449314,0.0003815538,0.0000247013,0.0002510332,0.000001893203],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009508395,"about_ca_system_score_gemma":0.0002959325,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004116091,"about_ca_topic_score_gemma":0.04139243,"domain_scores_codex":[0.9988095,0.00003472179,0.0004919419,0.0001485661,0.0002061577,0.000309174],"domain_scores_gemma":[0.9985531,0.0002266146,0.0002976115,0.0001458566,0.0005534462,0.0002233485],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001838759,0.0000037831,0.0236719,0.00009560052,0.00005375983,0.0000176696,0.0001310256,0.9710721,0.0004525192,0.00002645775,0.00127479,0.003182056],"study_design_scores_gemma":[0.0006390763,0.00002586667,0.1545244,0.0007921463,0.0001180905,0.00002282326,0.00003891327,0.8367548,0.0001418607,0.00004663158,0.006537294,0.0003580533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7535097,0.001952756,0.2416254,0.001847328,0.000379862,0.0002112046,0.00001720453,0.00004183596,0.0004147336],"genre_scores_gemma":[0.974627,0.000002872656,0.02400317,0.0006733008,0.0006472087,0.000001300216,0.000004953448,0.00003312527,0.000007053839],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2211173,"threshold_uncertainty_score":0.9760997,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4295530084","doi":"10.1016/j.ress.2022.108810","title":"Assessing the impact of maintenance practices on asset's sustainability","year":2022,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":35,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Sustainability; Asset (computer security); Business; Risk analysis (engineering); Environmental resource management; Computer science; Economics; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.01343233815631338,"gpt":0.2793139112017763,"spread":0.2658815730454629,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005911891,0.0002848055,0.0004855932,0.0002097202,0.0005256255,0.0002770138,0.0006548174,0.00005308896,0.00005801444],"category_scores_gemma":[0.007068486,0.0002038299,0.0004290116,0.001358486,0.0000548206,0.0009216052,0.0003466267,0.0005320347,0.00001239087],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001946079,"about_ca_system_score_gemma":0.0001563626,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005106657,"about_ca_topic_score_gemma":0.000004249046,"domain_scores_codex":[0.9974458,0.0001663255,0.0007559182,0.0005141518,0.0006651608,0.000452593],"domain_scores_gemma":[0.9959735,0.001096359,0.001191967,0.001184291,0.000530575,0.00002331261],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006557426,0.0001443716,0.08719823,0.001153597,0.0001067991,0.000007915438,0.00006260715,0.9068385,0.0001322255,0.003237904,0.0004768089,0.0005754337],"study_design_scores_gemma":[0.0004083355,0.00004665163,0.3915783,0.0001738422,0.0001694935,0.00001144119,0.003362069,0.5966731,0.00001483982,0.0001777374,0.006987426,0.00039675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9909414,0.00005624633,0.002830649,0.001485151,0.0004907483,0.0006897528,0.00001573696,0.0004191929,0.003071117],"genre_scores_gemma":[0.9993246,0.000001063087,0.0000995519,0.00004810494,0.0003481202,0.0000800831,0.00001618603,0.00004170219,0.00004060048],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3101655,"threshold_uncertainty_score":0.8462148,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2099852503","doi":"10.1049/cp.2009.0584","title":"CIGRE/CIRED/UIE joint working group C4.110, voltage dip immunity of equipment in installations - main contributions and conclusions","year":2009,"lang":"en","type":"article","venue":"IET Conference Publications","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Mandate; Harmonics; Voltage; Joint (building); Power (physics); Work (physics); Electrical engineering; Czech; Power quality; Computer science; Engineering; Telecommunications; Mechanical engineering; Civil engineering; Physics; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.04325108061214818,"gpt":0.2610262109354317,"spread":0.2177751303232836,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000850534,0.000212231,0.0003790259,0.0008336501,0.0005889416,0.0004580315,0.0003906311,0.0001137682,0.0003400713],"category_scores_gemma":[0.001273257,0.0002235122,0.0000995311,0.001683016,0.0001693981,0.00101155,0.0003396608,0.0003112806,0.00002868769],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001269852,"about_ca_system_score_gemma":0.0001289976,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001345376,"about_ca_topic_score_gemma":0.001557761,"domain_scores_codex":[0.9982175,0.0000492891,0.0007115618,0.0003694339,0.0002588772,0.000393369],"domain_scores_gemma":[0.9981369,0.0001765516,0.0004592056,0.0005872473,0.0005853864,0.00005465588],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","study_design_scores_codex":[0.000009351241,0.0005397607,0.06417966,0.00003088863,0.00006483778,0.000002219927,0.000327666,0.0001274553,0.008414868,0.9107066,0.002040986,0.01355567],"study_design_scores_gemma":[0.001264715,0.00002711693,0.8794011,0.000289735,0.0001932422,0.000003384656,0.001383842,0.02726991,0.00008406127,0.05521262,0.03430661,0.0005636791],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8204044,0.0003205015,0.0378523,0.05829409,0.0002119527,0.001216465,0.0001804059,0.0004746658,0.08104525],"genre_scores_gemma":[0.9978878,0.00004609334,0.00042372,0.0007716803,0.0001112323,0.00009989812,0.0004427367,0.00001290256,0.000203952],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.855494,"threshold_uncertainty_score":0.9114562,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2074313840","doi":"10.3141/2366-02","title":"Toward Sustainable Pavement Management","year":2013,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Greenhouse gas; Environmental impact assessment; Asset management; Environmental economics; Business; Asset (computer security); Transport engineering; Process (computing); Environmental science; Environmental resource management; Engineering; Computer science; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.08005736007619961,"gpt":0.3352042570303386,"spread":0.255146896954139,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.005371377,0.000290116,0.0004546137,0.00215075,0.0009247018,0.0008201887,0.001672169,0.0001341384,0.001672295],"category_scores_gemma":[0.0002175,0.0002151287,0.0004957857,0.004221609,0.0004129191,0.002483643,0.00003668213,0.001574778,0.0004437336],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003209567,"about_ca_system_score_gemma":0.0001809611,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.04386303,"about_ca_topic_score_gemma":0.006620409,"domain_scores_codex":[0.9918035,0.000324947,0.001463233,0.0004758704,0.004593603,0.001338801],"domain_scores_gemma":[0.9908963,0.0004158166,0.0006327357,0.0006173085,0.007295759,0.0001420113],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0007568982,0.001011238,0.6780972,0.003272698,0.001058759,0.0007916727,0.001919537,0.003193121,0.001515458,0.1000349,0.1834677,0.02488072],"study_design_scores_gemma":[0.001548587,0.0001085333,0.8594198,0.0003210643,0.0001613235,2.323178e-7,0.01153088,0.0004540661,0.000224608,0.02457803,0.1013545,0.0002983898],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9802074,0.0001392356,0.001157638,0.01265643,0.000461597,0.001706721,0.00000509495,0.00006388839,0.003602001],"genre_scores_gemma":[0.9926544,0.0002671221,0.001060435,0.0003717389,0.0006585881,0.0002059897,0.00001880974,0.00006867713,0.004694222],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1813225,"threshold_uncertainty_score":0.9992403,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W6992519673","doi":"","title":"Life cycle cost analysis as a decision support tool for managing municipal infrastructure","year":2004,"lang":"en","type":"article","venue":"NPARC","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Life-cycle cost analysis; Decision support system; Cost analysis; Decision analysis; Life cycle costing; Cost–benefit analysis","retraction":null,"screen_n_in":null,"score":{"opus":0.01273015209569444,"gpt":0.2594778993522505,"spread":0.246747747256556,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0005206109,0.0002580702,0.0004458405,0.0008400409,0.0003645153,0.000494355,0.0005052309,0.0001074394,0.001354648],"category_scores_gemma":[0.001612773,0.0002459745,0.0004350499,0.002026416,0.00004881786,0.0007776078,0.0002797693,0.0001667889,0.0003612557],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001009947,"about_ca_system_score_gemma":0.00006984923,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004371919,"about_ca_topic_score_gemma":0.0002064536,"domain_scores_codex":[0.9980626,0.000008347309,0.0004666439,0.0005092222,0.0004629424,0.0004903015],"domain_scores_gemma":[0.998706,0.0001250422,0.0002779182,0.00059722,0.000236643,0.00005710772],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0006812736,0.0003857155,0.1440567,0.0004163499,0.004356333,0.0001268875,0.000774418,0.5235479,0.001633475,0.05186652,0.03565655,0.2364979],"study_design_scores_gemma":[0.006207893,0.00005919913,0.06676418,0.0001734772,0.008715973,0.000007819891,0.001282429,0.378345,0.0001681367,0.4220039,0.114466,0.001806038],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9302712,0.00001777882,0.03941581,0.002758719,0.0002744431,0.0004903204,0.00001324287,0.0002882316,0.02647025],"genre_scores_gemma":[0.9841489,0.000007335179,0.009083549,0.005457653,0.0008452371,0.00006070473,0.0001519998,0.00004518608,0.0001994245],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3701374,"threshold_uncertainty_score":0.9999992,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2478608122","doi":"","title":"Life Cycle Assessment and Life Cycle Cost of Heat Exchangers - A Case for Inter Terminals Sweden AB Located in Port of Gothenburg","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Heat exchanger; Life-cycle assessment; Engineering; Port (circuit theory); Waste management; Environmental science; Environmental engineering; Process engineering; Mechanical engineering; Production (economics)","retraction":null,"screen_n_in":null,"score":{"opus":0.02887194370392072,"gpt":0.3161350904962705,"spread":0.2872631467923498,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007163212,0.0003738629,0.000916774,0.0009493277,0.00007713898,0.0001100847,0.0002444601,0.0002352696,0.0004413805],"category_scores_gemma":[0.0006288959,0.0003073362,0.0002106111,0.0004351317,0.00005217317,0.0004954719,0.0001043488,0.0001362495,0.00000745794],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007225268,"about_ca_system_score_gemma":0.0001530167,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008464787,"about_ca_topic_score_gemma":0.003275976,"domain_scores_codex":[0.9977853,0.00002309001,0.001034118,0.0005171529,0.0003032371,0.0003371004],"domain_scores_gemma":[0.9980426,0.000208182,0.000808898,0.0003819394,0.0004988493,0.0000594826],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.004611623,0.004191995,0.6404623,0.05586189,0.006548193,0.001253497,0.004250979,0.001984772,0.009282654,0.001877797,0.05052026,0.2191541],"study_design_scores_gemma":[0.03555685,0.0007114785,0.4078602,0.03076649,0.01329647,0.0001251885,0.09897494,0.3799565,0.006193628,0.003777874,0.0120876,0.0106928],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9896818,0.0001529331,0.0006513321,0.0004442867,0.0002630406,0.00118948,0.00005439066,0.00005945188,0.007503235],"genre_scores_gemma":[0.9968284,0.00004979414,0.0001477171,0.0004658354,0.0003208844,0.0002135441,0.0004861605,0.00007577516,0.001411873],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3779717,"threshold_uncertainty_score":0.9999379,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2167017799","doi":"10.1139/l09-122","title":"Detailed analysis of electricity, water, and gas consumption quantities and costs in Toronto’s public schools","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Toronto; University of New Brunswick","funders":"","keywords":"Electricity; Consumption (sociology); Gas consumption; Energy consumption; Sample (material); Agricultural economics; Environmental economics; Environmental science; Economics; Environmental engineering; Engineering; Sociology","retraction":null,"screen_n_in":null,"score":{"opus":0.01120276509852024,"gpt":0.2030523703438707,"spread":0.1918496052453504,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006279921,0.0001118929,0.0003358816,0.001636577,0.00005174078,0.000257989,0.0001274184,0.00006038865,0.0001576887],"category_scores_gemma":[0.0005079534,0.0001018217,0.00006955007,0.0004788835,0.00003082535,0.0009407814,0.0000218536,0.0002338462,0.000001036264],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001207899,"about_ca_system_score_gemma":0.00006187207,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.02118944,"about_ca_topic_score_gemma":0.9096289,"domain_scores_codex":[0.9991336,0.000007626576,0.0003627703,0.000103563,0.0001283212,0.0002640959],"domain_scores_gemma":[0.9993994,0.00004697856,0.0001605279,0.00009998856,0.0002010714,0.00009201543],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.000003748167,0.000005914271,0.9912204,0.00006812043,0.0002968534,0.00002068752,0.00005936795,0.001070032,0.004930914,0.001354566,0.00004971939,0.0009196436],"study_design_scores_gemma":[0.0008522411,0.00001819805,0.8621154,0.0001845751,0.001171461,0.00002992873,0.0003022531,0.1330587,0.0003357678,0.0001499901,0.001389145,0.0003922892],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9981999,0.0007548842,0.0002802351,0.0002571807,0.0001370017,0.00003795599,0.00000170108,0.000008212489,0.0003228676],"genre_scores_gemma":[0.9996619,0.00007776232,0.00006516471,0.00004067421,0.0001304582,0.000001027465,0.000005069004,0.00001231099,0.000005629794],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8884394,"threshold_uncertainty_score":0.9853286,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2082167717","doi":"10.1108/17410390610658513","title":"Supply/demand chain modeling utilizing logistical‐based costing","year":2006,"lang":"en","type":"article","venue":"Journal of Enterprise Information Management","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"","keywords":"Activity-based costing; Container (type theory); Supply chain; Factory (object-oriented programming); Computer science; Operations research; Manufacturing engineering; Industrial engineering; Engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.01586604990324274,"gpt":0.2277980553692603,"spread":0.2119320054660175,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00137943,0.0002099878,0.0003001755,0.001172876,0.0002060549,0.0007171344,0.0003747646,0.00005205402,0.00008684779],"category_scores_gemma":[0.0002446348,0.0001895922,0.0002238608,0.0005445476,0.00002883374,0.003287475,0.0001670157,0.0002037909,0.0001382233],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001331365,"about_ca_system_score_gemma":0.0000166029,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001149277,"about_ca_topic_score_gemma":0.000006930399,"domain_scores_codex":[0.9974873,0.00001849292,0.00135357,0.0001181381,0.0007021315,0.0003203614],"domain_scores_gemma":[0.9979883,0.00006123829,0.001207835,0.000219262,0.0004975504,0.0000257495],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001851819,0.0002480618,0.02070506,0.0007385067,0.0001909014,0.00007212539,0.00007070404,0.9359736,0.00003851435,0.01310405,0.01082609,0.01784713],"study_design_scores_gemma":[0.001482369,0.00001242685,0.001792187,0.0003704177,0.0002671994,0.000005171925,0.0005915022,0.9755491,0.00001476679,0.00180901,0.01787635,0.0002294956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1030155,0.00007874933,0.840876,0.001078069,0.000589875,0.0002895945,0.00000274466,0.0001208096,0.05394875],"genre_scores_gemma":[0.9913716,0.00001074567,0.005992358,0.001785133,0.0007322973,0.00000573009,0.00003665471,0.00001586752,0.0000496202],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8883561,"threshold_uncertainty_score":0.7731344,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1794669717","doi":"10.5430/jha.v4n4p92","title":"A life-cycle cost analysis for flooring materials for healthcare facilities","year":2015,"lang":"en","type":"article","venue":"Journal of Hospital Administration","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Total cost of ownership; Operations management; Business; Return on investment; Health care; Sustainability; Investment (military); Risk analysis (engineering); Engineering; Production (economics); Accounting","retraction":null,"screen_n_in":null,"score":{"opus":0.05097810514651036,"gpt":0.2926560065276225,"spread":0.2416779013811122,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001277245,0.0001423109,0.0004197666,0.0003732795,0.0001346674,0.0004895082,0.0001764506,0.00006380368,0.00001988519],"category_scores_gemma":[0.003284727,0.0001280355,0.0003057565,0.0004017099,0.000022983,0.001162116,0.00002685439,0.00006052377,0.000008081922],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001005491,"about_ca_system_score_gemma":0.0002393172,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001237345,"about_ca_topic_score_gemma":0.0001163759,"domain_scores_codex":[0.9984931,0.00001311143,0.0007282134,0.0001601915,0.0003898476,0.000215573],"domain_scores_gemma":[0.9969112,0.00008440793,0.0009687878,0.0001308349,0.001830872,0.00007389064],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.01080417,0.004991561,0.717639,0.007989898,0.01705181,0.0001300528,0.006175546,0.03290712,0.002943262,0.04830456,0.1283524,0.02271061],"study_design_scores_gemma":[0.04123777,0.03142029,0.1486504,0.001632174,0.04220235,0.00007668575,0.1026091,0.1629957,0.02336194,0.1315424,0.3056751,0.008596078],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9779537,0.00008957607,0.0142157,0.006165047,0.0009405757,0.0004070432,0.00006391103,0.00003053804,0.0001339103],"genre_scores_gemma":[0.9953649,0.000003194664,0.001366379,0.0003187575,0.002685306,0.00004137683,0.00008883573,0.00001686343,0.0001143852],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5689886,"threshold_uncertainty_score":0.5221134,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2188511964","doi":"10.1139/cjce-2015-0179","title":"Optimizing the selection of sustainability measures to minimize life-cycle cost of existing buildings","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Upgrade; Sustainability; Installation; Energy consumption; Environmental economics; Total cost; Life-cycle cost analysis; Renewable energy; Operating cost; Risk analysis (engineering); Engineering; Computer science; Reliability engineering; Business; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.03007269100136768,"gpt":0.2291629278552013,"spread":0.1990902368538336,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.001733944,0.0001403223,0.0003402052,0.0007022778,0.00009059393,0.0001117311,0.0003541394,0.00004882806,0.00002588536],"category_scores_gemma":[0.009432928,0.0001232091,0.0001346281,0.001039545,0.00003895189,0.000437197,0.00003880949,0.0002084123,0.000001262945],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000287548,"about_ca_system_score_gemma":0.0005782115,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.008957226,"about_ca_topic_score_gemma":0.0195848,"domain_scores_codex":[0.9986464,0.00001722411,0.0005856481,0.0001180328,0.0003160743,0.000316577],"domain_scores_gemma":[0.997346,0.0001219244,0.0004721371,0.0001615944,0.001719802,0.000178495],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001978979,0.000008765186,0.02305646,0.0001572581,0.00009046102,0.000007804674,0.000563968,0.9727538,0.0004092108,0.0003705219,0.001155926,0.001406042],"study_design_scores_gemma":[0.004076188,0.0001989813,0.07407551,0.002708953,0.001787059,0.0001234105,0.0187919,0.7688881,0.002977593,0.001958823,0.1224306,0.001982851],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8790392,0.0007155378,0.1128136,0.002221399,0.000890803,0.0003865833,0.000004124998,0.00004733157,0.003881442],"genre_scores_gemma":[0.9977298,0.000001059103,0.001535997,0.0001133785,0.0005733176,0.000003044936,5.699102e-7,0.00002575719,0.00001704239],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2038656,"threshold_uncertainty_score":0.998911,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2110703005","doi":"10.5539/emr.v1n2p72","title":"Cost Calculation of Building Structures and Building Works in Polish Conditions","year":2012,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Process (computing); Investment (military); Cost reduction; Publishing; Cost estimate; Computer science; Operations research; Engineering; Architectural engineering; Economics; Systems engineering; Management","retraction":null,"screen_n_in":null,"score":{"opus":0.05292293515835456,"gpt":0.3407519316457482,"spread":0.2878289964873937,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001475716,0.0001278755,0.0001725339,0.001656797,0.0001160565,0.0002157012,0.0001960772,0.00005424211,0.00003899821],"category_scores_gemma":[0.0003182437,0.0001368387,0.00003851076,0.001545069,0.00004636177,0.0009929779,0.0003809613,0.0002705846,0.000006408381],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008920867,"about_ca_system_score_gemma":0.000003425725,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00049931,"about_ca_topic_score_gemma":0.00001114472,"domain_scores_codex":[0.9985084,0.00001985381,0.0002614255,0.0002123661,0.0004503389,0.0005476258],"domain_scores_gemma":[0.9994492,0.0001418729,0.00006520217,0.0002199433,0.00009529523,0.00002850244],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","study_design_scores_codex":[0.00002564029,0.0001435516,0.3747047,0.00182412,0.0002485592,0.00002091815,0.0003559649,0.1637137,0.006141428,0.4316439,0.001830023,0.01934755],"study_design_scores_gemma":[0.0008477011,0.000005761621,0.795342,0.0006861105,0.00009526488,0.000001745621,0.0007327181,0.1917046,0.0005531951,0.002836026,0.00675189,0.0004430256],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9898128,0.0002962818,0.007376793,0.0001708104,0.00014787,0.0003556897,9.784088e-7,0.00008359508,0.001755162],"genre_scores_gemma":[0.9966499,0.00002588939,0.002732788,0.0000271794,0.0004329019,0.00004118131,0.00001420888,0.00002630352,0.00004966454],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4288079,"threshold_uncertainty_score":0.5580118,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1974368920","doi":"10.1007/s00158-006-0026-x","title":"Cost-based, integrated design optimization","year":2006,"lang":"en","type":"article","venue":"Structural and Multidisciplinary Optimization","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Engineering design process; Computer-automated design; Probabilistic design; Systems engineering; Design for X; Product design; Computer science; Engineering optimization; Process (computing); Design process; Iterative design; Manufacturing engineering; Design methods; Design technology; Engineering; Industrial engineering; Work in process; Product (mathematics); Optimization problem; Mechanical engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.02471938895997238,"gpt":0.2460468413167083,"spread":0.2213274523567359,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000165171,0.0002393391,0.0001941028,0.000290016,0.0005568072,0.0003284909,0.0001231481,0.00009270862,0.0001617127],"category_scores_gemma":[0.00007935509,0.0001999921,0.00005704719,0.0006832693,0.00008156289,0.001029607,0.00009580226,0.00009914648,0.00001170306],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004679075,"about_ca_system_score_gemma":0.00002203153,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000444045,"about_ca_topic_score_gemma":0.00002880065,"domain_scores_codex":[0.9988479,0.00002587384,0.0003136799,0.0003742289,0.0001904655,0.0002478473],"domain_scores_gemma":[0.9992713,0.0000480578,0.0002264034,0.0001635768,0.0002730879,0.0000175151],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000610484,0.00001537585,0.006535786,0.00003866629,0.000009188123,0.000003268286,0.0000123452,0.9913293,0.00005979149,0.0003075753,0.0002951211,0.001332552],"study_design_scores_gemma":[0.0006902562,0.00001050919,0.004273719,0.00002910622,0.0001327404,0.000002522795,0.00009048577,0.9938847,0.000051723,0.0004694769,0.00008985987,0.0002749297],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05070063,0.00008565481,0.9465655,0.0007002763,0.0002900955,0.0004844909,0.000007488144,0.0003334925,0.0008323349],"genre_scores_gemma":[0.7882983,0.00000686162,0.2094284,0.0001786515,0.0006356032,0.00003264892,0.001161854,0.00003982468,0.0002178847],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7375976,"threshold_uncertainty_score":0.8155441,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2404158573","doi":"10.1007/s11367-016-1136-3","title":"Comments on the relevance of life cycle costing in sustainability assessment of product systems","year":2016,"lang":"en","type":"article","venue":"The International Journal of Life Cycle Assessment","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":11,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"Alberta Innovates Bio Solutions","keywords":"Sustainability; Relevance (law); Activity-based costing; Life cycle costing; Product (mathematics); Life-cycle assessment; Product lifecycle; Business; New product development; Engineering; Operations management; Economics; Production (economics); Political science; Accounting; Marketing; Mathematics; Microeconomics","retraction":null,"screen_n_in":null,"score":{"opus":0.02589485139504883,"gpt":0.314910982447801,"spread":0.2890161310527522,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005053962,0.0002088292,0.0005062995,0.0003597949,0.0001077364,0.0001566951,0.001472289,0.00003895111,0.00005818977],"category_scores_gemma":[0.005095433,0.0001094172,0.0002131224,0.0004195577,0.0001530956,0.0006494015,0.0003846251,0.0003282604,0.00000438551],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006234542,"about_ca_system_score_gemma":0.0004290656,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007730664,"about_ca_topic_score_gemma":0.00004115436,"domain_scores_codex":[0.9960162,0.0002260667,0.001570352,0.0002400025,0.001684844,0.0002625457],"domain_scores_gemma":[0.9927508,0.001773999,0.002893662,0.0005047594,0.002042468,0.00003432952],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00036232,0.001236078,0.8939193,0.0002577824,0.001037379,0.00002148747,0.0001249346,0.0574605,0.001854256,0.03134391,0.002702772,0.009679297],"study_design_scores_gemma":[0.003362666,0.0001283883,0.9254851,0.001981623,0.0002092809,0.000009049335,0.003121066,0.05438516,0.0002573604,0.007582828,0.003105307,0.000372223],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9548989,0.00009517866,0.001195857,0.04046321,0.000848179,0.0003744677,0.000008637612,0.00001352017,0.002102049],"genre_scores_gemma":[0.9977842,0.00004436472,0.0001596871,0.0009837563,0.0009408968,0.00001960344,0.000002308741,0.00002288238,0.00004230938],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04288528,"threshold_uncertainty_score":0.6100078,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1970328664","doi":"10.3763/inbi.2009.si05/splitsection5","title":"The CABA Building Intelligence Quotient programme","year":2009,"lang":"en","type":"article","venue":"Intelligent Buildings International","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Structural Genomics Consortium","funders":"","keywords":"Building automation; Automation; Knowledge management; Engineering; Computer science; Collective intelligence; Web intelligence; Data science; Artificial intelligence; The Internet; World Wide Web","retraction":null,"screen_n_in":null,"score":{"opus":0.02685765815608331,"gpt":0.2727551135652372,"spread":0.2458974554091539,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0009798324,0.0003082749,0.0002083729,0.0004021861,0.0005445715,0.001583991,0.001572896,0.00008048848,0.000228428],"category_scores_gemma":[0.001447486,0.0002370887,0.0002787515,0.0007201619,0.0001453322,0.0008233802,0.0003122294,0.0003320797,0.0005450654],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002376798,"about_ca_system_score_gemma":0.0000275465,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003868907,"about_ca_topic_score_gemma":0.00004421044,"domain_scores_codex":[0.9972322,0.00001330884,0.0006957676,0.0005396972,0.0008847145,0.0006343107],"domain_scores_gemma":[0.9982749,0.0002008601,0.0004451975,0.0004035267,0.0006345885,0.00004097752],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00006056966,0.0001872407,0.007052763,0.00001012905,0.0001561794,0.00001809759,0.00008511561,0.00189105,0.0007266284,0.4430943,0.006825826,0.5398921],"study_design_scores_gemma":[0.0001589337,0.00003246051,0.001735968,0.0001302945,0.00008791915,0.00001850819,0.0004742677,0.04295861,0.003911499,0.05688932,0.8930503,0.0005519565],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5575287,0.001287443,0.2602366,0.07467863,0.01212038,0.001476074,0.000009727169,0.001923991,0.09073848],"genre_scores_gemma":[0.9907457,0.00008435938,0.00222926,0.00339504,0.002537054,0.00002927351,0.00002058616,0.00003102512,0.000927737],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8862244,"threshold_uncertainty_score":0.9994525,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3005394497","doi":"10.2737/fpl-rp-702","title":"Life-cycle cost analysis of a mass-timber building: methodology and hypothetical case study","year":2019,"lang":"en","type":"report","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"U.S. Forest Service; FPInnovations; U.S. Department of Agriculture","keywords":"Life-cycle cost analysis; Architectural engineering; Computer science; Environmental science; Engineering; Reliability engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.1604885012707539,"gpt":0.3712306068632463,"spread":0.2107421055924924,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.004580823,0.0005558493,0.002494732,0.002859652,0.0001386862,0.0002858439,0.0003807858,0.0004196828,0.001327616],"category_scores_gemma":[0.007214276,0.0004749742,0.0006858908,0.002794661,0.0001566587,0.0002830348,0.0006559429,0.0004618987,0.00006621843],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009248769,"about_ca_system_score_gemma":0.0002516283,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02782809,"about_ca_topic_score_gemma":0.001840897,"domain_scores_codex":[0.995923,0.0001847828,0.001267566,0.001121389,0.001020226,0.0004829661],"domain_scores_gemma":[0.9950901,0.001315527,0.00126103,0.001111372,0.001147751,0.00007423306],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008727081,0.0009735267,0.928647,0.001148393,0.03393146,0.002729863,0.0001814297,0.006807947,0.00006480298,0.0008194078,0.01460653,0.01000233],"study_design_scores_gemma":[0.005334415,0.0002563842,0.06944136,0.0003218246,0.385941,0.00109796,0.01899804,0.3957774,0.000022513,0.001745344,0.1153268,0.005737019],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8978248,0.000323619,0.007127856,0.0003725257,0.0007327595,0.001144954,0.00002796696,0.0002065283,0.09223902],"genre_scores_gemma":[0.9891525,0.0000515281,0.005231857,0.0006087239,0.0009043913,0.00004875137,0.00007353102,0.0001110464,0.003817679],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8592057,"threshold_uncertainty_score":0.9997702,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3108499284","doi":"10.5430/afr.v9n4p85","title":"Can Build-To-Rent Generate Affordable Housing Outcomes? A Whole-Life Costing Approach to Investment Analysis","year":2020,"lang":"en","type":"article","venue":"Accounting and Finance Research","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Affordable housing; Renting; Activity-based costing; Subsidy; Business; Finance; Investment (military); Rental housing; Equity (law); Public economics; Housing industry; Economics; Marketing; Economic growth","retraction":null,"screen_n_in":null,"score":{"opus":0.09497826979284794,"gpt":0.312965744610774,"spread":0.217987474817926,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.002884503,0.0003967264,0.0007939871,0.001467743,0.001034664,0.001868763,0.0007303933,0.0001106139,0.00001305998],"category_scores_gemma":[0.002949741,0.0003730484,0.000204769,0.009445059,0.00009621105,0.0006548848,0.001314471,0.0005901134,0.0002380545],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001421518,"about_ca_system_score_gemma":0.0001115246,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0060333,"about_ca_topic_score_gemma":0.0002757215,"domain_scores_codex":[0.995443,0.00007575223,0.0006534519,0.00125524,0.001245259,0.001327238],"domain_scores_gemma":[0.9980301,0.0001917613,0.0002590318,0.0006078443,0.0007425953,0.0001686473],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008939867,0.0002370209,0.8756526,0.000481735,0.0008724804,0.00003136922,0.001542046,0.09192594,0.00181337,0.003518962,0.01173375,0.01210135],"study_design_scores_gemma":[0.001513028,0.00008237909,0.1471258,0.0002638858,0.001015289,0.000001692659,0.003566087,0.7451462,0.0001544231,0.000716461,0.09852467,0.001890069],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9779494,0.0002002305,0.003204391,0.01427636,0.0000775227,0.0005882104,0.00001215515,0.0001928461,0.003498814],"genre_scores_gemma":[0.9792514,0.00002157475,0.004989181,0.01415364,0.00104946,0.0001358147,0.0000544803,0.00007296039,0.0002714844],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7285268,"threshold_uncertainty_score":0.9998721,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4399843459","doi":"10.1016/j.trd.2024.104295","title":"Life cycle costing analysis of a retrofitted hydrogen-powered locomotive: Canadian context","year":2024,"lang":"en","type":"article","venue":"Transportation Research Part D Transport and Environment","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"Transport Canada","keywords":"Context (archaeology); Activity-based costing; Life cycle costing; Engineering; Life-cycle cost analysis; Aeronautics; Transport engineering; Automotive engineering; Business; Geography; Reliability engineering; Accounting","retraction":null,"screen_n_in":null,"score":{"opus":0.03835311015030152,"gpt":0.2755126112532011,"spread":0.2371595011028996,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001212042,0.0002384435,0.0004756436,0.001754267,0.0002983701,0.0001020859,0.0002038915,0.000116207,0.001840669],"category_scores_gemma":[0.00005109415,0.0002385594,0.0002666484,0.002340294,0.0002660701,0.0004815945,0.000007955103,0.0003373422,0.0001093805],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009722712,"about_ca_system_score_gemma":0.0001272353,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.1029182,"about_ca_topic_score_gemma":0.1169243,"domain_scores_codex":[0.9972417,0.00003386541,0.0006739496,0.0006220185,0.0008393196,0.0005891321],"domain_scores_gemma":[0.9991546,0.0001269168,0.000100612,0.0003063524,0.000104226,0.0002073149],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00008597312,0.000135282,0.9717026,0.0005433677,0.002822864,0.0002223724,0.001210134,0.01174057,0.0005425707,0.003540643,0.0006027161,0.006850892],"study_design_scores_gemma":[0.0005074758,0.00002849449,0.8942814,0.0001725177,0.002498146,2.366956e-7,0.001116014,0.03797774,0.0001068326,0.0002984919,0.06261367,0.000399008],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9949912,0.0008513264,0.0003825784,0.001677733,0.00006609924,0.0003844209,0.000170703,0.00009265452,0.001383248],"genre_scores_gemma":[0.9978415,0.0003126417,0.00003973974,0.0002780129,0.0001334602,0.00005819246,0.001114829,0.00004076,0.0001808846],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.07742125,"threshold_uncertainty_score":0.9990718,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2053614829","doi":"10.3763/asre.2005.4807","title":"Maintenance of Plastered and Painted Facades for Singapore Public Housing: A Predictive Life Cycle Cost-Based Approach","year":2005,"lang":"en","type":"article","venue":"Architectural Science Review","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"University of Waterloo","keywords":"Order (exchange); High rise; Operations management; Engineering; Architectural engineering; Business; Structural engineering; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.04307529215023818,"gpt":0.2720311848586469,"spread":0.2289558927084087,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001599463,0.0002007638,0.0004312428,0.0003043345,0.0003166008,0.0002077692,0.0004998583,0.00003082934,0.00001749518],"category_scores_gemma":[0.003672103,0.0001451812,0.0001384709,0.001428164,0.0006468643,0.0007658845,0.0001805484,0.0001307143,0.000007410071],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005496422,"about_ca_system_score_gemma":0.0001129916,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005683833,"about_ca_topic_score_gemma":0.00002650472,"domain_scores_codex":[0.9981156,0.0000288838,0.0004399341,0.0004976149,0.0004204834,0.0004974959],"domain_scores_gemma":[0.998687,0.000174158,0.0004500345,0.0002615088,0.0003610025,0.00006628738],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009132169,0.0001954341,0.01473952,0.008742546,0.00008542051,0.000001256039,0.0001621241,0.005372361,0.001152616,0.002455808,0.001019636,0.965982],"study_design_scores_gemma":[0.001160823,0.00005271018,0.008993316,0.003882942,0.000330905,0.000008995303,0.0001977714,0.9578388,0.0001387115,0.0004682678,0.02632164,0.0006051487],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8529483,0.01473094,0.08297101,0.03933286,0.0001710981,0.005135597,0.00004164372,0.0004771234,0.004191417],"genre_scores_gemma":[0.9904859,0.0001767968,0.005337326,0.003683597,0.0001853389,0.00008465096,0.00001632574,0.00001574342,0.00001428609],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9653768,"threshold_uncertainty_score":0.5920318,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2122203423","doi":"10.1061/40792(173)196","title":"International Perspective on BMPs/SUDS: UK — Sustainable Stormwater Management in the UK","year":2005,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"American Water (Canada)","funders":"","keywords":"Statutory law; Activity-based costing; Stormwater management; Perspective (graphical); Stormwater; Variety (cybernetics); Environmental planning; Sustainable development; Life cycle costing; Business; Engineering; Political science; Construction engineering; Computer science; Environmental science; Accounting; Surface runoff; Law","retraction":null,"screen_n_in":null,"score":{"opus":0.01177755872296957,"gpt":0.2486739588504307,"spread":0.2368964001274612,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0006009056,0.0001469949,0.000112021,0.0004778894,0.0001412806,0.0004659847,0.0005332846,0.00003096347,0.001904663],"category_scores_gemma":[0.00008828499,0.0000990241,0.00008184257,0.0004967346,0.00002643323,0.0005148245,0.0002201172,0.0001369965,0.0008761139],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003407769,"about_ca_system_score_gemma":0.000005227236,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002581603,"about_ca_topic_score_gemma":0.0004911456,"domain_scores_codex":[0.9987631,0.00001361776,0.0001974985,0.0003004309,0.0004114887,0.0003139008],"domain_scores_gemma":[0.9993974,0.0000408738,0.00008296272,0.0002858579,0.0001864716,0.000006454768],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00008502141,0.0003418285,0.03695682,0.00003986234,0.0002590841,0.0001303861,0.0009982624,0.003933559,0.000007706564,0.8395935,0.1115284,0.006125522],"study_design_scores_gemma":[0.00164001,0.00001579156,0.05101733,0.00004632363,0.0001652414,0.000002163311,0.07179452,0.01483045,0.00003053961,0.01033313,0.8495678,0.0005567053],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.1251714,0.00001776307,0.0001775963,0.02320016,0.0001199604,0.0002552622,3.49159e-7,0.00007374557,0.8509837],"genre_scores_gemma":[0.9684229,0.000007635651,0.0002239495,0.009238935,0.001162279,0.00003994446,0.00001103997,0.00001364858,0.02087969],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8432515,"threshold_uncertainty_score":0.9999018,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1934592853","doi":"10.1061/9780784479360.142","title":"Oil and Gas Pipeline Technology Finds Uses in the Water and Wastewater Industry","year":2015,"lang":"en","type":"article","venue":"Pipelines 2015","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Wastewater; Pipeline (software); Petroleum engineering; Petroleum industry; Gas industry; Pipeline transport; Environmental science; Waste management; Fossil fuel; Computer science; Environmental engineering; Engineering; Natural gas; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.03491720452046322,"gpt":0.2561352091093385,"spread":0.2212180045888753,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009068619,0.0001875826,0.0002293652,0.0003406171,0.00007690136,0.0002418112,0.0002538273,0.000213001,0.00002615243],"category_scores_gemma":[0.0004688595,0.00009575098,0.0000235785,0.0004474595,0.000130609,0.0004444134,0.0003453157,0.0003320572,0.0001176488],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001188116,"about_ca_system_score_gemma":0.00001103418,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004852621,"about_ca_topic_score_gemma":0.0002061429,"domain_scores_codex":[0.9988663,0.0000227529,0.0002901539,0.0002918743,0.0002103536,0.0003186319],"domain_scores_gemma":[0.9993775,0.0000391574,0.00007765392,0.0002968656,0.0001875856,0.00002127285],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001066364,0.0002275828,0.7612559,0.0002553953,0.00005727247,0.000115374,0.001214362,0.0002215896,0.001367135,0.0008633659,0.143785,0.09053046],"study_design_scores_gemma":[0.00359723,0.00003332662,0.005906183,0.0002013021,0.0003652539,0.00010064,0.00812923,0.02201071,0.0009055816,0.01496761,0.9427409,0.001042053],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9300686,0.0003760204,0.00001190692,0.06712576,0.0001358889,0.00003451252,0.000001393419,0.00008894564,0.002156976],"genre_scores_gemma":[0.9927879,0.0000416002,0.0001439293,0.002004632,0.001147089,0.00001898436,0.00002866057,0.00002482686,0.00380236],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7989559,"threshold_uncertainty_score":0.3904611,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2055293293","doi":"10.4236/jtts.2015.52006","title":"Containerization of Grain: Emergence of a New Supply Chain Market","year":2015,"lang":"en","type":"article","venue":"Journal of Transportation Technologies","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Manitoba","funders":"","keywords":"Containerization; Supply chain; Business; Service (business); Supply and demand; Container (type theory); Industrial organization; Engineering; Economics; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.02573799790660464,"gpt":0.2366344877706784,"spread":0.2108964898640737,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004857587,0.00009223472,0.0002914272,0.0005744506,0.00001875086,0.00001535176,0.0002787608,0.00007462277,0.00005357041],"category_scores_gemma":[0.0006068626,0.00007882374,0.0001187352,0.0007521724,0.00006508626,0.0006007605,0.000008724017,0.00009625304,0.000001400348],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001046072,"about_ca_system_score_gemma":0.00005817611,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001997791,"about_ca_topic_score_gemma":0.00008365411,"domain_scores_codex":[0.9987592,0.000006120627,0.0007137845,0.00008167024,0.0003439254,0.00009532797],"domain_scores_gemma":[0.9977927,0.0000234429,0.001381294,0.0001287822,0.0006641858,0.000009562919],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0004959297,0.0002345777,0.8625382,0.000555481,0.0003484264,0.0000359826,0.0009335234,0.004570325,0.01616874,0.01100394,0.06096595,0.04214895],"study_design_scores_gemma":[0.009590293,0.0007620597,0.6558478,0.001775117,0.002469767,0.00001889117,0.08854997,0.01107491,0.09581117,0.097841,0.03487301,0.001385938],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9778896,0.000532763,0.01660336,0.003781622,0.0002761956,0.000119833,0.00000841827,0.0001336259,0.0006545862],"genre_scores_gemma":[0.9975086,0.00008110348,0.002204672,0.00003545087,0.00007456872,0.00000108784,0.00001203534,0.0000090158,0.00007350442],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2066903,"threshold_uncertainty_score":0.3214339,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1995810991","doi":"10.1016/s0019-0578(00)00005-7","title":"Foundation fieldbus economics comparison","year":2000,"lang":"en","type":"article","venue":"ISA Transactions","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Syncrude (Canada)","funders":"","keywords":"Foundation (evidence); FOUNDATION fieldbus; Fieldbus; Engineering; Computer science; Electrical engineering; Control system; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.02501770087203712,"gpt":0.2357178774493627,"spread":0.2107001765773256,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00007773055,0.00008715582,0.0001187605,0.0001136707,0.0002440674,0.0002187416,0.0001072735,0.00004566955,0.009010572],"category_scores_gemma":[0.000008414986,0.00009589088,0.00009209314,0.0002422156,0.00002224475,0.0007254361,0.000002261174,0.0001005846,0.002482024],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002629219,"about_ca_system_score_gemma":0.000008564163,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0009185573,"about_ca_topic_score_gemma":0.0007146482,"domain_scores_codex":[0.9994311,0.000004329887,0.0001996445,0.0001638117,0.00006099706,0.0001401435],"domain_scores_gemma":[0.9996963,0.00003248549,0.00005420738,0.0001706373,0.00003749937,0.000008939022],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003593149,0.0002389141,0.009773974,0.00004294608,0.0001383598,0.000001625333,0.0001965605,0.08921,0.00005680695,0.001283476,0.002888536,0.8961329],"study_design_scores_gemma":[0.0006180605,0.000007263685,0.009776063,0.0000207952,0.0003566801,0.000002367341,0.0003221337,0.258298,0.000107696,0.00203099,0.7280547,0.0004053195],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7779069,0.00002984773,0.06028069,0.003402807,0.0005635679,0.0001568505,0.000003043666,0.0004093723,0.1572469],"genre_scores_gemma":[0.9961311,0.00001880772,0.0002755474,0.0008530318,0.0004738055,0.00001068923,0.00002627143,0.0000133204,0.002197442],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8957276,"threshold_uncertainty_score":0.9982947,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2307390752","doi":"","title":"Development of Wastewater Collection Network Asset Database, Deterioration Models and Management Framework","year":2010,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; University of Waterloo; Canadian Water Network","keywords":"Wastewater; Asset management; Asset (computer security); Database; Computer science; Business; Environmental science; Environmental engineering; Computer security; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.01660184315976101,"gpt":0.2055133005852315,"spread":0.1889114574254705,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003273281,0.00025251,0.0004134967,0.0005325883,0.0003718837,0.00008646533,0.0002776298,0.0002864653,0.0000914251],"category_scores_gemma":[0.00001372542,0.0002900188,0.00009121483,0.0005247371,0.000046535,0.0008332554,0.0002146872,0.0002468143,0.00002095786],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004326568,"about_ca_system_score_gemma":0.00003075735,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005979766,"about_ca_topic_score_gemma":0.05083703,"domain_scores_codex":[0.9987145,0.00001559488,0.0002597759,0.000409794,0.0003594593,0.0002408492],"domain_scores_gemma":[0.9987168,0.00002101113,0.0006571984,0.000328324,0.0002561633,0.00002051152],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"qualitative","study_design_scores_codex":[0.008798388,0.002696392,0.05314734,0.07974929,0.01440216,0.0004044329,0.4183212,0.02240574,0.1225861,0.03686379,0.07899369,0.1616315],"study_design_scores_gemma":[0.008423211,0.000196291,0.1500597,0.01744287,0.0147899,0.000007416753,0.5556707,0.1739634,0.009308659,0.02353849,0.03832207,0.008277234],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9976454,0.00003805085,0.0006615057,0.0001187557,0.0003863124,0.0003170663,0.000006712748,0.00005626674,0.0007699406],"genre_scores_gemma":[0.6415516,0.0003651846,0.2333806,0.0001032538,0.0007093941,0.000008370736,0.006410674,0.0001471687,0.1173237],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3560938,"threshold_uncertainty_score":0.9999552,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3178683931","doi":"10.47992/ijmts.2581.6012.0145","title":"Time and Cost Performance Status of Sikta Irrigation Contract","year":2021,"lang":"en","type":"article","venue":"International Journal of Management Technology and Social Sciences","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Schedule; Business; Operations management; Documentation; Population; Government (linguistics); Project management; Irrigation; Earned value management; Project planning; Computer science; Economics; Management; Project charter","retraction":null,"screen_n_in":null,"score":{"opus":0.01545331445725761,"gpt":0.2679717652985701,"spread":0.2525184508413125,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004498125,0.00005488808,0.0001268459,0.0005080953,0.000156846,0.0001072786,0.0002170948,0.00004122499,0.00003982987],"category_scores_gemma":[0.0001127833,0.00004829322,0.00003070702,0.0004283529,0.0003888158,0.0005771936,0.0001705981,0.00007732835,0.000003819103],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001977242,"about_ca_system_score_gemma":0.00001895386,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001985852,"about_ca_topic_score_gemma":0.00001049368,"domain_scores_codex":[0.9992283,0.00000778072,0.0002366782,0.0001033262,0.0003066865,0.0001172245],"domain_scores_gemma":[0.9992,0.00002962328,0.0003840449,0.00003061146,0.0003501404,0.000005551933],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00005889176,0.0001474545,0.4518492,0.00007888495,0.0005152512,0.00006816199,0.0002154711,0.0001712028,0.00108935,0.1796736,0.00105081,0.3650818],"study_design_scores_gemma":[0.003975872,0.0001401223,0.7784902,0.000511661,0.0007007422,0.000104832,0.008258586,0.03016761,0.001701985,0.0627415,0.1125679,0.0006388907],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9846627,0.0001790872,0.0000867087,0.005059688,0.0001713403,0.00003667018,0.000001217936,0.00001385212,0.009788739],"genre_scores_gemma":[0.9988707,0.0002111486,0.0003327179,0.0003349676,0.0001472801,8.364417e-7,0.000002235243,0.000002192067,0.00009793829],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3644429,"threshold_uncertainty_score":0.196934,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2311786210","doi":"10.14288/1.0167331","title":"Application of life-cycle approaches for the evaluation of high performance buildings","year":2014,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Architectural engineering; Computer science; Environmental science; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02311537799904528,"gpt":0.1857585948575608,"spread":0.1626432168585155,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001195218,0.00003280133,0.0001997821,0.00006054549,0.0001875395,0.00004511698,0.0003330234,0.00004766912,0.00001958118],"category_scores_gemma":[0.0002594492,0.00008138288,0.00009358634,0.0003881649,0.0001446973,0.0004293697,0.00009575378,0.00004217921,0.000004133441],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000218477,"about_ca_system_score_gemma":0.00002411856,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.07139866,"about_ca_topic_score_gemma":0.01590513,"domain_scores_codex":[0.9991791,0.00001721808,0.0001533272,0.0002013917,0.0003413406,0.0001075994],"domain_scores_gemma":[0.9985462,0.00009672055,0.0004658056,0.0002647421,0.0006175863,0.000008964616],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00001185113,0.00006158511,0.04948631,0.000313529,0.00005982352,2.509166e-8,0.00003262844,0.005964057,0.00009978799,0.00007117895,0.0003709946,0.9435282],"study_design_scores_gemma":[0.0004975676,0.000007022383,0.6246645,0.0000343487,0.0002494712,1.650591e-7,0.0002815417,0.3734494,0.000002123018,0.000602987,0.0001560946,0.00005481022],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9798195,0.00004791815,0.01896014,0.0001476672,0.00004220038,0.0003446998,0.000009342734,0.00002371386,0.0006048008],"genre_scores_gemma":[0.9993283,0.000008849932,0.0004599247,0.00003292878,0.0001060695,0.000003503907,0.00002333832,0.000009310193,0.00002784514],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9434734,"threshold_uncertainty_score":0.9347849,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2118065619","doi":"","title":"GENERIC PROTOCOL FOR LONG LIFE PAVEMENTS COST ANALYSIS","year":2003,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Protocol (science); Life-cycle cost analysis; Computer science; Operations research; Transport engineering; Engineering; Reliability engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.06772026965899668,"gpt":0.3069961613411761,"spread":0.2392758916821794,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000565441,0.0002043681,0.0003233676,0.0005768961,0.0002473213,0.0004154607,0.0002366566,0.00005543133,0.001628471],"category_scores_gemma":[0.0006324766,0.0001739605,0.0003317631,0.002390392,0.00002240431,0.0005174651,0.00006843467,0.00005591536,0.0002856292],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003747433,"about_ca_system_score_gemma":0.00002764668,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002448305,"about_ca_topic_score_gemma":0.000230114,"domain_scores_codex":[0.9984909,0.00001563419,0.0004029033,0.0004123303,0.0002918662,0.00038635],"domain_scores_gemma":[0.9989585,0.00005386212,0.0002729283,0.0003913405,0.000292403,0.00003098357],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003116188,0.0002528389,0.9573222,0.0002458617,0.001604532,0.000003782312,0.000008557809,0.003202619,0.00005568382,0.005676476,0.02872751,0.002868802],"study_design_scores_gemma":[0.004456533,0.00002007808,0.07021882,0.00003534578,0.00431654,4.422212e-7,0.0002245089,0.1261485,0.0004780533,0.00123434,0.7916947,0.001172138],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"protocol","genre_scores_codex":[0.03499388,0.00001464201,0.4231631,0.001566099,0.0004001996,0.3562765,0.000008771615,0.001178909,0.182398],"genre_scores_gemma":[0.4510482,4.34646e-7,0.004956688,0.0105919,0.001261745,0.5245057,0.0001091512,0.00009165248,0.007434545],"genre_candidate":"protocol","genre_consensus":null,"teacher_disagreement_score":0.8871034,"threshold_uncertainty_score":0.9992841,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1977287090","doi":"10.1016/s0019-0578(99)00039-7","title":"Process control reliability: the key to investing in your infrastructure","year":2000,"lang":"en","type":"article","venue":"ISA Transactions","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Weyerhauser (Canada)","funders":"","keywords":"Life cycle costing; Key (lock); Reliability (semiconductor); Control (management); Activity-based costing; Process (computing); Process management; Computer science; Engineering; Business; Reliability engineering; Operations management; Risk analysis (engineering); Marketing; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.01257741869377674,"gpt":0.2331052543211257,"spread":0.220527835627349,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003265932,0.0001457538,0.0001731223,0.0001886984,0.0003071721,0.0001928926,0.0002717378,0.00005875005,0.0009988152],"category_scores_gemma":[0.0001985895,0.0001122869,0.00008235905,0.001386745,0.00004816265,0.0005744116,0.000004656521,0.0002850196,0.0002479922],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004188991,"about_ca_system_score_gemma":0.00002781055,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001559016,"about_ca_topic_score_gemma":0.0009253884,"domain_scores_codex":[0.9989304,0.00002072326,0.0002860112,0.0002783841,0.000211708,0.0002727935],"domain_scores_gemma":[0.9994431,0.00008557027,0.00005718713,0.0002891086,0.0001049651,0.00002011218],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.0000877705,0.0001396279,0.08964134,0.0001428413,0.00007829261,0.000008845125,0.002798222,0.8196597,0.0002719865,0.0001110244,0.001143262,0.08591711],"study_design_scores_gemma":[0.004066746,0.00003450677,0.4775946,0.0004195088,0.001081391,0.00001919756,0.006295087,0.2590839,0.0001549748,0.01455887,0.2350355,0.001655687],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9708021,0.00001767298,0.005109337,0.01159935,0.000131169,0.0003531521,0.000005904164,0.0001913588,0.01178997],"genre_scores_gemma":[0.9941979,0.00000194386,0.0001456482,0.004758637,0.0003600053,0.00006519835,0.000003279965,0.0000208566,0.0004465328],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5605757,"threshold_uncertainty_score":0.9999144,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4391617776","doi":"10.1007/s12008-023-01622-z","title":"Interactive design on the product life cycle costs: a case study","year":2024,"lang":"en","type":"article","venue":"International Journal on Interactive Design and Manufacturing (IJIDeM)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Profitability index; Component (thermodynamics); Context (archaeology); Product (mathematics); Computer science; Train; Reliability (semiconductor); Product lifecycle; Reliability engineering; Industrial engineering; Systems engineering; Manufacturing engineering; Risk analysis (engineering); Operations research; Engineering; New product development","retraction":null,"screen_n_in":null,"score":{"opus":0.04269718965670009,"gpt":0.2993737576071334,"spread":0.2566765679504333,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.001872248,0.0004565504,0.0003452826,0.001055289,0.000515818,0.003263994,0.0006433347,0.00005630226,0.0004231179],"category_scores_gemma":[0.001720497,0.0003056367,0.0002300439,0.0002165494,0.00007336925,0.00191386,0.0002636751,0.001302847,0.0004678548],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005212426,"about_ca_system_score_gemma":0.00007248859,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005797589,"about_ca_topic_score_gemma":0.00002269046,"domain_scores_codex":[0.9971598,0.000335081,0.0006283341,0.0006850805,0.0008300623,0.0003616196],"domain_scores_gemma":[0.9958243,0.002911518,0.0004712511,0.0002915801,0.000427645,0.00007374644],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.01692656,0.007388385,0.003170928,0.0002506597,0.02994526,0.1311531,0.01627122,0.1246031,0.002778259,0.01004875,0.1804325,0.4770313],"study_design_scores_gemma":[0.01224702,0.003757848,0.01726844,0.01163911,0.00446402,0.03250612,0.09013224,0.592271,0.04636914,0.03473987,0.147422,0.007183197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9520676,0.0001453294,0.0270325,0.01176554,0.00470597,0.00110966,0.000007573689,0.0002572743,0.002908597],"genre_scores_gemma":[0.9913481,0.00003184436,0.0002191494,0.004656208,0.003239454,0.00008080072,0.000003724414,0.00007131949,0.0003493772],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4698481,"threshold_uncertainty_score":0.9999396,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2969932592","doi":"10.1680/jinam.18.00036","title":"Value-based optimisation for cross-asset maintenance in a Canadian municipality","year":2019,"lang":"en","type":"article","venue":"Infrastructure Asset Management","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Concordia University","funders":"","keywords":"Asset (computer security); Value (mathematics); Investment (military); Present value; Value engineering; Disconnection; Return on investment; Operations research; Investment value; Computer science; Business; Environmental economics; Finance; Economics; Operations management; Microeconomics; Production (economics); Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.009394812492116605,"gpt":0.2548876425698507,"spread":0.2454928300777341,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001028816,0.0003142526,0.0003449222,0.0008591756,0.0001701505,0.0005749683,0.0006366433,0.0001316584,0.0003441661],"category_scores_gemma":[0.0001838345,0.0003140653,0.0001606232,0.0009272586,0.0000450089,0.000688463,0.000164892,0.0001995583,0.0001855593],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005757228,"about_ca_system_score_gemma":0.0000847942,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.122096,"about_ca_topic_score_gemma":0.07651565,"domain_scores_codex":[0.997662,0.00002464474,0.0005014493,0.0006198972,0.0003665701,0.0008254416],"domain_scores_gemma":[0.9986174,0.00007296543,0.000297661,0.0007662245,0.0001934257,0.00005229802],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00007847343,0.00003948757,0.7008823,0.0006586146,0.000117208,0.00002182984,0.00003566517,0.2456061,0.00002754537,0.03616218,0.01257712,0.003793488],"study_design_scores_gemma":[0.001864879,0.00001075155,0.5705025,0.0001168761,0.0001081593,4.89202e-7,0.0001616164,0.236789,0.00001044949,0.006876493,0.1831044,0.0004544574],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9433094,0.00002066076,0.002361438,0.002091828,0.0009250693,0.001979349,0.00005631552,0.0001800592,0.04907585],"genre_scores_gemma":[0.9892881,0.000001845732,0.00430919,0.004950342,0.0002661858,0.0001332155,0.0004010519,0.00004797291,0.0006020867],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1705273,"threshold_uncertainty_score":0.9999312,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4311169078","doi":"10.1088/1755-1315/1101/5/052011","title":"Exploring the synergies between Life Cycle cost / Whole Life Cost and Building Information Modeling: A Systematic Literature Review","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; GDG Environnement","funders":"","keywords":"Building information modeling; Context (archaeology); Product life-cycle management; Risk analysis (engineering); Life-cycle cost analysis; Asset (computer security); Computer science; Activity-based costing; Identification (biology); Asset management; Process management; Life-cycle assessment; Externality; Management science; Operations management; Business; Engineering; Production (economics); Economics; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.03764619123368495,"gpt":0.2135727889430533,"spread":0.1759265977093683,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00100784,0.0001787009,0.0002759391,0.0001530155,0.001592632,0.001155469,0.0003821749,0.00001586304,0.00004083072],"category_scores_gemma":[0.0004094164,0.0001355732,0.00003775796,0.0006618503,0.0003249124,0.005768794,0.0008080632,0.0002038579,0.00001714103],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002712339,"about_ca_system_score_gemma":0.00003279461,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000760081,"about_ca_topic_score_gemma":0.000006988381,"domain_scores_codex":[0.9984403,0.00003534091,0.0003553482,0.0002861219,0.0005703553,0.0003125182],"domain_scores_gemma":[0.999381,0.000046584,0.0002098395,0.0002603694,0.00003089925,0.00007127445],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0004324995,0.0004715138,0.1455458,0.2220483,0.0009323161,0.00010455,0.03331679,0.2230077,0.02547347,0.04347612,0.001760223,0.3034307],"study_design_scores_gemma":[0.001596712,0.0001658396,0.07820318,0.02752341,0.001062891,0.0001135021,0.07519814,0.7776399,0.0004670994,0.0007316075,0.03448118,0.002816559],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9929794,0.003954887,0.000189949,0.001749306,0.0001082065,0.0006164374,0.00002501621,0.00005420697,0.0003225694],"genre_scores_gemma":[0.9944417,0.003599291,0.00005498998,0.001558767,0.00008828729,0.0001866929,0.0000382952,0.000007287174,0.00002470203],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5546321,"threshold_uncertainty_score":0.9998814,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4406642494","doi":"10.20944/preprints202410.1766.v3","title":"The Urban Building Energy Retrofitting Tool: An Open-Source Framework to Help Foster Building Retrofitting Using a Life Cycle Costing Perspective. First Results for Montréal","year":2025,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Retrofitting; Perspective (graphical); Activity-based costing; Architectural engineering; Life cycle costing; Energy (signal processing); Business; Construction engineering; Engineering; Computer science; Marketing; Structural engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.09276066678319196,"gpt":0.3417687550261163,"spread":0.2490080882429244,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaresearch","metaepi_narrow","sts","scholarly_communication","open_science"],"consensus_categories":[],"category_scores_codex":[0.009417711,0.001273418,0.001553767,0.0009876088,0.004455818,0.003557107,0.004844244,0.0008321456,0.00002609177],"category_scores_gemma":[0.06027747,0.001270803,0.0007049877,0.001945204,0.0001434514,0.001563093,0.02065603,0.002052751,0.00004727859],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001354047,"about_ca_system_score_gemma":0.0003328201,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02577769,"about_ca_topic_score_gemma":0.0009395182,"domain_scores_codex":[0.9904928,0.0003268087,0.00247602,0.003787287,0.001074348,0.001842786],"domain_scores_gemma":[0.9877272,0.003400323,0.002934644,0.003760208,0.001974875,0.0002027659],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.003057721,0.000524796,0.5294179,0.001986711,0.002764917,0.00005124887,0.006186137,0.3891737,0.005746843,0.04189386,0.002964375,0.01623186],"study_design_scores_gemma":[0.003109425,0.00006363101,0.02009702,0.01282504,0.002239385,0.000009135731,0.01158767,0.8388065,0.00269737,0.02616184,0.07776422,0.004638727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8971707,0.0005343459,0.08462753,0.007313101,0.002111504,0.002506948,0.00006408583,0.001068261,0.004603565],"genre_scores_gemma":[0.957577,0.00003365096,0.02999222,0.003591549,0.007118614,0.0005225193,0.00006537898,0.0003049652,0.0007940322],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5093209,"threshold_uncertainty_score":0.9989741,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3169531117","doi":"10.1061/(asce)ae.1943-5568.0000470","title":"Innovative Construction Products: From Qualification and Performance Assessment to Quality Control","year":2021,"lang":"en","type":"article","venue":"Journal of Architectural Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"National Research Council Canada","funders":"","keywords":"Building envelope; Engineering; Quality (philosophy); Vendor; Risk analysis (engineering); Architectural engineering; Operations management; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.01390523379254983,"gpt":0.2452467966411322,"spread":0.2313415628485823,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004667876,0.0001031807,0.0002278792,0.0002341611,0.0000564664,0.0001358369,0.00008055446,0.00002159264,0.00000863069],"category_scores_gemma":[0.001038086,0.0000900603,0.00003544007,0.0006746929,0.00001431905,0.0004305585,0.0000443377,0.0001977968,0.000002270456],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004747852,"about_ca_system_score_gemma":0.00003524017,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005266574,"about_ca_topic_score_gemma":0.000003779435,"domain_scores_codex":[0.9990989,0.00001651398,0.0004276342,0.0001378565,0.0002018408,0.0001172619],"domain_scores_gemma":[0.9987341,0.0001034157,0.0003295164,0.0001107429,0.0007051704,0.00001704077],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","study_design_scores_codex":[0.0002437835,0.00008272506,0.2608255,0.0005653837,0.0007187351,0.00002459398,0.0007062166,0.2287877,0.2630398,0.003942179,0.0001138065,0.2409497],"study_design_scores_gemma":[0.0009310908,0.0000277306,0.9411788,0.0002348264,0.0001097919,0.00005217892,0.0003413727,0.05085894,0.004016498,0.0002154471,0.001755261,0.0002780498],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9712154,0.0000579529,0.02555368,0.002706432,0.0003211614,0.00005511198,0.000002103395,0.00002366163,0.00006449754],"genre_scores_gemma":[0.9804044,0.000005358008,0.01833434,0.0002641199,0.0009674014,0.000001992361,0.000006408698,0.000009882724,0.00000613612],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6803533,"threshold_uncertainty_score":0.3672552,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4252612491","doi":"10.1504/ijpd.2016.083624","title":"Life-cycle costing of an aircraft wing project with innovative materials using an eco-demonstrator","year":2016,"lang":"en","type":"article","venue":"International Journal of Product Development","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Activity-based costing; Life cycle costing; Cost driver; Engineering; Process (computing); Systems engineering; Manufacturing engineering; Transport engineering; Computer science; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.03873166319522733,"gpt":0.2848560346973472,"spread":0.2461243715021199,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001488876,0.0001965433,0.0003330705,0.0007726321,0.00009989772,0.0002255124,0.0005432511,0.00003334696,0.0000781722],"category_scores_gemma":[0.0013275,0.0001301768,0.00003797285,0.0005197911,0.00006961341,0.002678,0.0001303271,0.00009586964,0.000007055743],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001812912,"about_ca_system_score_gemma":0.0007645939,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001148819,"about_ca_topic_score_gemma":0.00002171661,"domain_scores_codex":[0.9976609,0.00004167901,0.0009901169,0.0002779435,0.0008151584,0.0002141551],"domain_scores_gemma":[0.9949678,0.00004628672,0.00164787,0.0001603206,0.003143209,0.00003451949],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.001017106,0.0009708557,0.1756923,0.0001814835,0.002070555,0.0002147806,0.001374859,0.001364791,0.7028223,0.0004859889,0.0003498613,0.1134551],"study_design_scores_gemma":[0.007920324,0.0003506973,0.26264,0.006388024,0.0005354316,0.0005816926,0.003748254,0.002206327,0.7022218,0.001230924,0.009933757,0.002242849],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9958341,0.00001482133,0.002496697,0.0007506094,0.0005752737,0.0001418379,0.000004321498,0.0000279785,0.0001543473],"genre_scores_gemma":[0.9705105,0.000001844579,0.02725248,0.0002667078,0.001904651,0.00000334668,0.000009846241,0.00003065882,0.00001992098],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1112122,"threshold_uncertainty_score":0.5308456,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2037273951","doi":"10.5539/mas.v8n1p104","title":"Selection of Non-Repairable Series Systems’ Components with Weibull-Life and Lognormal-Repair Distributions through Minimizing Expected Total Cost of Ownership Approach","year":2014,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Weibull distribution; Log-normal distribution; Reliability engineering; Series (stratigraphy); Statistics; Total cost; Purchasing; Computer science; Reliability (semiconductor); Mathematics; Econometrics; Mathematical optimization; Operations management; Economics; Engineering; Power (physics); Microeconomics","retraction":null,"screen_n_in":null,"score":{"opus":0.02379594045138223,"gpt":0.2149496251082992,"spread":0.1911536846569169,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000745296,0.0001880906,0.0003736113,0.000211321,0.0004799814,0.0001712194,0.0002613668,0.0000521365,0.000003563179],"category_scores_gemma":[0.0001455727,0.0001554721,0.00004814833,0.001414881,0.0006145885,0.0009642527,0.0001831336,0.0001056074,0.000002928952],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004781891,"about_ca_system_score_gemma":0.00005378506,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0006684675,"about_ca_topic_score_gemma":0.00002044226,"domain_scores_codex":[0.9982213,0.00001556836,0.0003778288,0.0004886645,0.0005404762,0.0003561536],"domain_scores_gemma":[0.9988431,0.00005198257,0.0004471878,0.0002959753,0.0003279303,0.00003385741],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0007079797,0.001027436,0.3009368,0.002974119,0.000378465,0.000001852899,0.002137264,0.1446681,0.4992069,0.04637803,0.0005984214,0.0009846173],"study_design_scores_gemma":[0.0005178395,0.00002072545,0.02008476,0.00007035276,0.0001035616,0.000004882033,0.0009367878,0.9760594,0.001760092,0.000131987,0.00007671657,0.0002329415],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7230152,0.00001506622,0.2708323,0.00003822278,0.00004650479,0.0003251519,0.000005132118,0.0001463692,0.005576028],"genre_scores_gemma":[0.995251,0.000001061137,0.004479423,0.00003545132,0.00009680486,0.00005301847,0.00003014628,0.00001511407,0.00003795773],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8313913,"threshold_uncertainty_score":0.6339968,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W839301564","doi":"","title":"Life Cycle Cost Analysis of Pavements: State-of-the-Practice","year":2006,"lang":"en","type":"article","venue":"TigerPrints (Clemson University)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"South Carolina Department of Transportation; U.S. Department of Transportation","keywords":"Transport engineering; Life-cycle cost analysis; Process (computing); Computer science; Engineering; Operations research; Operations management; Risk analysis (engineering); Business","retraction":null,"screen_n_in":null,"score":{"opus":0.009861513557493363,"gpt":0.2033565236975869,"spread":0.1934950101400935,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003728127,0.0001583971,0.00037496,0.001180784,0.0001668673,0.0000537527,0.0006065942,0.00004805099,0.0003314304],"category_scores_gemma":[0.0005244107,0.0001550139,0.0003355766,0.005244087,0.0001244445,0.0008105235,0.0004072098,0.0001194997,0.00008508117],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008660481,"about_ca_system_score_gemma":0.00005245106,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008520856,"about_ca_topic_score_gemma":0.0007331252,"domain_scores_codex":[0.9986098,0.00004928149,0.0003622217,0.0003019806,0.0004266591,0.0002500263],"domain_scores_gemma":[0.9980028,0.0001495711,0.0008138337,0.0005489739,0.0004578086,0.00002700135],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002070652,0.0008382305,0.8811138,0.0001657564,0.003665943,0.00003765104,0.0001308574,0.08023366,0.001880859,0.01946444,0.002433415,0.009828288],"study_design_scores_gemma":[0.001680626,0.00001263493,0.6979474,0.0001062753,0.00967878,3.942104e-7,0.001273181,0.03972678,0.001153954,0.0007144221,0.2470284,0.0006770916],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9333066,0.0000141453,0.001498663,0.0005534174,0.0001193213,0.000177864,0.00001575096,0.00006911429,0.06424517],"genre_scores_gemma":[0.9974682,0.000007509857,0.0001480621,0.0003748125,0.00007566688,4.423309e-7,0.00001961422,0.00001509903,0.001890577],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.244595,"threshold_uncertainty_score":0.9980815,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4385344155","doi":"10.5539/mas.v17n2p13","title":"Aircraft Ground Support Equipment: A Framework for Maintenance Strategies","year":2023,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Downtime; Standardization; Aircraft maintenance; Business; Service (business); Aviation; Asset (computer security); Operations management; Computer science; Marketing; Engineering; Computer security; Aeronautics","retraction":null,"screen_n_in":null,"score":{"opus":0.03726412641887565,"gpt":0.2803485829836084,"spread":0.2430844565647327,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["scholarly_communication","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001358913,0.0001944152,0.0002171213,0.0004542483,0.0007331508,0.00130233,0.0009152159,0.0000599009,0.00004899743],"category_scores_gemma":[0.0002843202,0.0001796921,0.00008423448,0.002605048,0.0003688639,0.001205171,0.0004128607,0.0001335637,0.0007988672],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006979515,"about_ca_system_score_gemma":0.0001224412,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006718078,"about_ca_topic_score_gemma":0.00002165157,"domain_scores_codex":[0.9975618,0.000002139026,0.0002692045,0.0007029843,0.0006484959,0.0008153876],"domain_scores_gemma":[0.9990354,0.0001074096,0.0001762943,0.0004674305,0.0001822695,0.00003119385],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00005548006,0.00007644456,0.001348263,0.0002596167,0.00003573438,0.00001425326,0.0006653195,0.005026165,0.03909425,0.9254768,0.00671683,0.02123081],"study_design_scores_gemma":[0.0003032898,0.000007340496,0.003332158,0.00003883533,0.00004361584,6.894795e-7,0.001260258,0.3716636,0.0001644105,0.6152889,0.007512989,0.0003839324],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1409304,0.00001105667,0.8136098,0.001947945,0.0005233899,0.0006365476,0.000006520253,0.001077501,0.04125682],"genre_scores_gemma":[0.9926105,0.000002520045,0.004537499,0.001561409,0.000515767,0.0001678532,0.00001823444,0.00003069198,0.0005555153],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8516802,"threshold_uncertainty_score":0.9999791,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4246038617","doi":"10.1504/ijsa.2016.080244","title":"Feasibility of green composite aircraft wing projects for unmanned aircraft vehicles","year":2016,"lang":"en","type":"article","venue":"International Journal of Sustainable Aviation","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Activity-based costing; Durability; Fuel efficiency; Aeronautics; Life cycle costing; Environmental science; Engineering; Automotive engineering; Transport engineering; Computer science; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.02512780524497618,"gpt":0.2744238027676145,"spread":0.2492959975226383,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00114141,0.00012829,0.0002511763,0.000676496,0.00009407695,0.000131732,0.0004466617,0.00005702766,0.00002776459],"category_scores_gemma":[0.001329049,0.00009734401,0.0002220569,0.0003015738,0.00004667623,0.002245471,0.0001210322,0.00007467733,0.000007062241],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003400601,"about_ca_system_score_gemma":0.00009904645,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005234436,"about_ca_topic_score_gemma":0.00002233156,"domain_scores_codex":[0.9982896,0.00002410004,0.00069069,0.0001708714,0.0006048921,0.0002198669],"domain_scores_gemma":[0.9937614,0.0002236456,0.001237581,0.0001317385,0.004628269,0.00001743064],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.001236081,0.0004184203,0.9367363,0.0004636366,0.0006235131,0.00007076285,0.0003408967,0.0009315043,0.02239865,0.01705675,0.002459192,0.01726425],"study_design_scores_gemma":[0.01448027,0.0002976165,0.7928473,0.001610814,0.001020339,0.00005165419,0.006466052,0.01171095,0.01325843,0.1377685,0.01946379,0.001024339],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9725268,0.00004472011,0.01952625,0.006976361,0.0003260061,0.0002804433,0.000005958915,0.00002905895,0.0002843554],"genre_scores_gemma":[0.9968773,0.000005782589,0.0008506888,0.0002754541,0.001250232,0.00001050638,0.00001086584,0.00001890276,0.0007003235],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1438891,"threshold_uncertainty_score":0.3969574,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4388376394","doi":"10.1080/13467581.2023.2278461","title":"Assessing life cycle cost and environmental impact for office building construction in Saudi Arabia","year":2023,"lang":"en","type":"article","venue":"Journal of Asian Architecture and Building Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"King Saud University","keywords":"Glazing; Masonry; Building envelope; Architectural engineering; Engineering; Life-cycle assessment; Cladding (metalworking); Reinforced concrete; Sustainability; Software; Life-cycle cost analysis; Environmental impact assessment; Civil engineering; Construction engineering; Computer science; Reliability engineering; Structural engineering; Production (economics)","retraction":null,"screen_n_in":null,"score":{"opus":0.009278814597773912,"gpt":0.2399531684478326,"spread":0.2306743538500587,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000586529,0.0001775682,0.0003051808,0.0009444476,0.0001152349,0.000368443,0.00009855891,0.0000611911,0.000003744763],"category_scores_gemma":[0.0004293694,0.0001584492,0.0001073771,0.000450709,0.00003110762,0.0006971515,0.00007481848,0.000285547,6.398089e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006148412,"about_ca_system_score_gemma":0.0000158939,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002167089,"about_ca_topic_score_gemma":0.000003380065,"domain_scores_codex":[0.9989903,0.000008281513,0.0003622175,0.0001774716,0.0001726723,0.0002890703],"domain_scores_gemma":[0.9994293,0.0001547626,0.0002703772,0.00007553885,0.00002252696,0.00004745128],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.0001219171,0.00004133255,0.08972377,0.0006024906,0.0002745416,0.00007624371,0.0003083699,0.6029827,0.1033655,0.0003038346,0.0002022433,0.2019971],"study_design_scores_gemma":[0.002300326,0.00005760021,0.5461009,0.001269476,0.0002985115,0.0003347275,0.0009982443,0.4437227,0.0006072414,0.001313552,0.002309552,0.0006872198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9716087,0.0001959943,0.02736065,0.0004601193,0.0001815451,0.0001102909,0.000002732183,0.00004981334,0.00003012729],"genre_scores_gemma":[0.9879676,0.0000268019,0.01106313,0.00006516514,0.0008355393,0.000002898652,0.000004734679,0.00003235875,0.000001825052],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4563771,"threshold_uncertainty_score":0.6461369,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2160043248","doi":"10.1109/revet.2012.6195304","title":"Fully burdened cost of energy in military operations","year":2012,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Defence Research and Development Canada","funders":"","keywords":"Renewable energy; Investment (military); Risk analysis (engineering); Computer science; Cost estimate; Energy (signal processing); Commodity; Environmental economics; Operations research; Systems engineering; Engineering; Business; Economics; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.01949936238879306,"gpt":0.2314269738534657,"spread":0.2119276114646726,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002498303,0.00007581481,0.0001346067,0.0002586546,0.00004559441,0.00002117824,0.0001234283,0.00003216769,0.0004823997],"category_scores_gemma":[0.0001643469,0.0000679057,0.00004881772,0.0005278382,0.00002122506,0.0007823451,0.00008719574,0.00003623424,0.00009190322],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001962563,"about_ca_system_score_gemma":0.000008438433,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01849807,"about_ca_topic_score_gemma":0.006007841,"domain_scores_codex":[0.9993461,0.00000863449,0.0002309701,0.0001023413,0.0001230481,0.0001888681],"domain_scores_gemma":[0.9996691,0.00002588183,0.00002576071,0.0001765186,0.00009319153,0.0000095176],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00002581026,0.0004856737,0.8846703,0.0001003065,0.00009112046,0.000003307286,0.0001682232,0.02263333,0.003419344,0.06760784,0.01004155,0.01075318],"study_design_scores_gemma":[0.002256915,0.00001482363,0.5224066,0.0001463294,0.0003534053,0.000002321903,0.002436905,0.3382824,0.002621542,0.001144496,0.1292046,0.001129618],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9522455,0.0003301566,0.001920105,0.000960284,0.0001736729,0.00007663309,0.000001184611,0.00006676008,0.04422575],"genre_scores_gemma":[0.9970148,0.000007965271,0.0004520083,0.001085905,0.0005166025,0.00001272407,0.00002872513,0.000009640192,0.0008716225],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3622637,"threshold_uncertainty_score":0.9880378,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4412343513","doi":"","title":"IEA EBC Annex 55 - Reliability of Energy Efficient Building Retrofitting - Probability Assessment of Performance and Cost (RAP-RETRO) - Stochastic Data","year":2015,"lang":"en","type":"report","venue":"VBN Forskningsportal (Aalborg Universitet)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"British Columbia Institute of Technology","funders":"","keywords":"Retrofitting; Reliability (semiconductor); Reliability engineering; Computer science; Environmental science; Engineering; Structural engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.04886820650559093,"gpt":0.2771003972469857,"spread":0.2282321907413948,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00556858,0.0007437049,0.001653033,0.001152221,0.0003363077,0.0001277732,0.001455643,0.0004581107,0.0001124422],"category_scores_gemma":[0.003081047,0.0007592416,0.0003021701,0.001813366,0.0005660933,0.001310249,0.002501967,0.0006826543,0.000004087983],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009934306,"about_ca_system_score_gemma":0.001359823,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009808074,"about_ca_topic_score_gemma":0.0001876327,"domain_scores_codex":[0.9933912,0.0000558928,0.001580829,0.001603495,0.002652382,0.0007162547],"domain_scores_gemma":[0.9896697,0.0002227848,0.003874032,0.002119493,0.004000821,0.0001131298],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002032392,0.000766604,0.9296251,0.00717778,0.0008744165,0.00006925603,0.0001650094,0.04065612,0.0001772245,0.002201684,0.01367505,0.004408523],"study_design_scores_gemma":[0.003252698,0.0002474832,0.1032562,0.005070555,0.006451767,0.00003796344,0.002236544,0.7621654,0.00007468899,0.0004392066,0.1135542,0.003213345],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9681889,0.0002664805,0.002742944,0.00005593315,0.0006492805,0.0006943169,0.0002695321,0.0001794315,0.02695316],"genre_scores_gemma":[0.9955829,0.00006436604,0.001606295,0.00002539528,0.0005463277,0.000006759784,0.001484114,0.00009760974,0.0005862017],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8263689,"threshold_uncertainty_score":0.9994859,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W631045022","doi":"","title":"A Survey of Current State of the Practice for Winter Maintenance of Parking Lots and Sidewalks","year":2013,"lang":"en","type":"article","venue":"Transportation Research Board 92nd Annual MeetingTransportation Research Board","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Sustainability; Transport engineering; Field survey; Engineering; Field (mathematics); Business; Computer science; Civil engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.08138362605460377,"gpt":0.3749699449100334,"spread":0.2935863188554296,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009748911,0.000263515,0.0005978137,0.0009542252,0.0003494517,0.0001371044,0.000691679,0.00009252375,0.0000536844],"category_scores_gemma":[0.005568373,0.0002138338,0.0002288398,0.002698028,0.001046688,0.001483217,0.0000447109,0.0007178463,0.000009602095],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004799959,"about_ca_system_score_gemma":0.0002570403,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.04533184,"about_ca_topic_score_gemma":0.02014441,"domain_scores_codex":[0.9937802,0.0005437864,0.001560736,0.0006444218,0.002623289,0.0008475997],"domain_scores_gemma":[0.9792053,0.003322688,0.0009689983,0.0005174031,0.01590611,0.0000795086],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.001878515,0.0008496479,0.9268973,0.005842307,0.0003763028,0.000006384485,0.00507545,0.001585642,0.0104587,0.002645465,0.008544979,0.03583923],"study_design_scores_gemma":[0.001101673,0.0001234769,0.9858565,0.0008229582,0.00008953702,7.936858e-8,0.002831736,0.001539432,0.002022813,0.001843156,0.003547117,0.0002215723],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9944104,0.0003307744,0.0008217769,0.001603199,0.0001252665,0.001992016,0.0003365955,0.00003390976,0.0003460533],"genre_scores_gemma":[0.9983956,0.0001636571,0.0006851651,0.00005472056,0.0000901287,0.0002562931,0.0001390895,0.00005745871,0.000157933],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.05895907,"threshold_uncertainty_score":0.9977354,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4236081256","doi":"10.18280/ijsdp.160220","title":"Possibilities of Increasing of Energy Efficiency in a Small Enterprises - Case Study","year":2021,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"European Regional Development Fund; Kultúrna a Edukacná Grantová Agentúra MŠVVaŠ SR; Agentúra na Podporu Výskumu a Vývoja; Ministerstvo školstva, vedy, výskumu a športu Slovenskej republiky","keywords":"Environmental economics; Work (physics); Energy consumption; Electricity; Statistic; Consumption (sociology); Order (exchange); Efficient energy use; Process (computing); Production (economics); Legislation; Business; Risk analysis (engineering); Computer science; Economics; Engineering; Microeconomics; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01928819660706024,"gpt":0.2525954272909214,"spread":0.2333072306838612,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009644642,0.00009497575,0.000251188,0.0008646755,0.00005309264,0.0001129301,0.0001654241,0.00002488599,0.00001490928],"category_scores_gemma":[0.0008564041,0.00008895246,0.0000468862,0.0003641231,0.00002659978,0.0004369571,0.0002018923,0.00008371545,1.041237e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006774867,"about_ca_system_score_gemma":0.000189798,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002198105,"about_ca_topic_score_gemma":0.0001159696,"domain_scores_codex":[0.9987419,0.00003253,0.0006925803,0.0001135782,0.0002798793,0.0001395846],"domain_scores_gemma":[0.9977139,0.0001958628,0.0005891557,0.00005418945,0.001435091,0.00001181211],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"qualitative","study_design_scores_codex":[0.0001589127,0.000336941,0.9594207,0.0001421591,0.0002297353,0.02693833,0.008204177,0.001195508,0.0001072034,0.0006246406,0.00001442284,0.002627298],"study_design_scores_gemma":[0.002624887,0.00005648798,0.1746795,0.001203044,0.0001455881,0.00165032,0.8138227,0.001576135,0.00178514,0.0012458,0.0008796825,0.0003307714],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9982002,0.0004577327,0.0004831272,0.00003856628,0.0001197275,0.00003432026,3.602366e-7,0.000004008288,0.0006619978],"genre_scores_gemma":[0.9989387,0.00000600536,0.000757594,0.00004874724,0.0001248101,0.00000121589,0.000003378796,0.000006497815,0.0001130679],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8056185,"threshold_uncertainty_score":0.3627376,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3111949393","doi":"10.14288/1.0394833","title":"Whole building life cycle assessment for residential buildings : a design improvement framework","year":2020,"lang":"en","type":"article","venue":"Open Collections","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Architectural engineering; Building design; Environmental science; Engineering; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.03968247135318766,"gpt":0.2991490318437182,"spread":0.2594665604905306,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0006213545,0.0002192067,0.00033344,0.0001524015,0.003306369,0.006662567,0.0007342524,0.00009105967,0.0006457735],"category_scores_gemma":[0.001655072,0.0002370763,0.0001781001,0.002328036,0.00002979568,0.001141796,0.0006902291,0.0002322864,0.00004550788],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001256461,"about_ca_system_score_gemma":0.000180815,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004515204,"about_ca_topic_score_gemma":0.0001542089,"domain_scores_codex":[0.9982449,0.00002443159,0.0004364869,0.0005912342,0.0003046701,0.0003982619],"domain_scores_gemma":[0.9987758,0.000258462,0.0003134871,0.0002924451,0.0002910165,0.00006874747],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001748737,0.0001980589,0.0002545769,0.0001171888,0.0003793816,0.000004436284,0.00008738208,0.02502445,0.004341566,0.003595088,0.9632874,0.002535653],"study_design_scores_gemma":[0.002918631,0.0002208454,0.0003635135,0.000206645,0.001079544,0.000001196383,0.00122642,0.4872141,0.0009840208,0.04338396,0.4613179,0.001083232],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.00259973,0.00002119842,0.9562775,0.01558376,0.0005581066,0.002079466,0.00001790244,0.0002818074,0.0225805],"genre_scores_gemma":[0.5418935,0.00001037101,0.4074014,0.02362593,0.007221801,0.002465775,0.00006021949,0.0002109851,0.01710995],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5488761,"threshold_uncertainty_score":0.9979912,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4412369275","doi":"10.3390/buildings15142381","title":"A Core Ontology for Whole Life Costing in Construction Projects","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; GDG Environnement","funders":"Natural Sciences and Engineering Research Council of Canada; Fonds de recherche du Québec","keywords":"Ontology-based data integration; Computer science; Ontology; Upper ontology; Process ontology; Interoperability; Software engineering; Ontology engineering; Scripting language; Suggested Upper Merged Ontology; Semantic Web; Knowledge management; World Wide Web; Programming language","retraction":null,"screen_n_in":null,"score":{"opus":0.04939558611674932,"gpt":0.2850973088894359,"spread":0.2357017227726865,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003779238,0.0001258664,0.0002396928,0.0005737026,0.0001517926,0.0001610444,0.0001715934,0.00008381925,0.00001098591],"category_scores_gemma":[0.002533504,0.000131839,0.00007302744,0.0009594886,0.00005251126,0.0003751045,0.0001072145,0.0001117374,0.00002024821],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005930225,"about_ca_system_score_gemma":0.00005208388,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007867418,"about_ca_topic_score_gemma":0.0002375102,"domain_scores_codex":[0.9990308,0.000005570592,0.0002915573,0.0003169931,0.00007759721,0.0002774402],"domain_scores_gemma":[0.99932,0.0001452069,0.0001889859,0.0001489282,0.0001884093,0.00000844472],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001090664,0.00007369456,0.8272461,0.000716228,0.00007984658,0.000005915542,0.00008044508,0.0002550078,0.002711128,0.1182922,0.02698056,0.02344978],"study_design_scores_gemma":[0.007426552,0.0000390377,0.08346602,0.001452854,0.000590877,0.000009342628,0.00381332,0.1720793,0.0005759437,0.08022469,0.6490296,0.001292541],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9687741,0.0001069975,0.004911264,0.004414263,0.0004417107,0.0005154812,0.000001571737,0.0002136422,0.02062094],"genre_scores_gemma":[0.9920511,0.000001315299,0.003427566,0.003636498,0.000437135,0.0000897807,0.00001969515,0.00001595671,0.0003210173],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7437801,"threshold_uncertainty_score":0.5376237,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4391890452","doi":"10.1016/b978-0-323-95122-7.00002-2","title":"Life cycle thinking and its application to the built environment","year":2024,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.01401118445146103,"gpt":0.2144683046730232,"spread":0.2004571202215622,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004705299,0.000356749,0.0003240548,0.0002388223,0.0002933037,0.0004428596,0.0004414962,0.000150589,0.0001223665],"category_scores_gemma":[0.00006570372,0.0002721123,0.0001519349,0.00003809551,0.00003937447,0.0001071255,0.0007985788,0.0003608344,0.004827132],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005741622,"about_ca_system_score_gemma":0.00001871177,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009554545,"about_ca_topic_score_gemma":0.00004237812,"domain_scores_codex":[0.9983369,0.000004807765,0.000361417,0.0006090604,0.00045333,0.0002345039],"domain_scores_gemma":[0.9990625,0.00004661507,0.0002385324,0.000560125,0.00004810313,0.00004407455],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000005428637,0.000004824801,0.00002325124,0.0002670735,0.0002067255,0.0000074282,0.0001440127,0.0001687802,0.00002491011,0.05355338,0.000976241,0.9446179],"study_design_scores_gemma":[0.00005653157,0.000002908398,0.00003782125,0.0002266017,0.0005169204,0.000001157213,0.00001495093,0.002098749,0.000002622468,0.03172848,0.9649974,0.0003158655],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"other","genre_gemma":"other","genre_scores_codex":[0.0003955375,0.002651704,0.00004326264,0.00446247,0.0002297922,0.0007509048,0.000007166501,0.0001742673,0.9912849],"genre_scores_gemma":[0.02872372,0.00009077072,0.00005614318,0.008891544,0.003773562,0.0001416156,0.0000339729,0.0001515321,0.9581372],"genre_candidate":"other","genre_consensus":"other","teacher_disagreement_score":0.9640211,"threshold_uncertainty_score":0.9999731,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2001481856","doi":"10.2514/6.2005-7438","title":"Development of a Precise Manufacturing Cost Model for the Optimisation of Aircraft Structures","year":2005,"lang":"en","type":"article","venue":"AIAA 5th ATIO and16th Lighter-Than-Air Sys Tech. and Balloon Systems Conferences","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Queen's University","funders":"","keywords":"Computer science; Manufacturing engineering; Systems engineering; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.04108101564635157,"gpt":0.2561607085258037,"spread":0.2150796928794522,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007250892,0.0003083769,0.0005456743,0.0003023731,0.0003450253,0.0002463327,0.0004143019,0.0001313641,0.00001536151],"category_scores_gemma":[0.00007852324,0.0002071749,0.0001235954,0.0002001567,0.0001052954,0.0006279563,0.0001295196,0.00009679514,0.000004299626],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003448643,"about_ca_system_score_gemma":0.0001169393,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005116944,"about_ca_topic_score_gemma":0.0005555623,"domain_scores_codex":[0.9978821,0.00002245106,0.0009382812,0.0003996975,0.0004576185,0.000299852],"domain_scores_gemma":[0.9981565,0.0001796636,0.0009236232,0.0003160444,0.0003953783,0.0000288167],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001270564,0.0009259842,0.126268,0.01592627,0.004319941,0.000005091589,0.01744718,0.1933805,0.02414407,0.06181064,0.005126029,0.5493757],"study_design_scores_gemma":[0.00195054,0.00005383407,0.01678835,0.001161384,0.000681671,0.000004924062,0.004598363,0.9249046,0.02765929,0.0007763201,0.02051065,0.000910043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9120302,0.0006785081,0.08394092,0.0003838387,0.0002526594,0.001349887,0.00002240792,0.00011878,0.001222867],"genre_scores_gemma":[0.9951296,0.00004029656,0.003823832,0.00006907633,0.0003973921,0.0001773613,0.00004448535,0.00002262895,0.0002952639],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7315241,"threshold_uncertainty_score":0.8448349,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2748344119","doi":"","title":"Decision-making for UBC High Performance Buildings: Multi-criteria Analysis for Integrated Life Cycle Models","year":2010,"lang":"en","type":"article","venue":"IIASA PURE (International Institute of Applied Systems Analysis)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Decision support system; Sustainability; ASHRAE 90.1; Benchmark (surveying); Decision analysis; Computer science; Management science; Life-cycle assessment; Building information modeling; Process management; Systems engineering; Engineering; Data mining; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.0234007494667518,"gpt":0.2735058879620942,"spread":0.2501051384953424,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001488679,0.0004927478,0.001353421,0.003215681,0.0004069461,0.0007978413,0.001287321,0.0002664775,0.00010887],"category_scores_gemma":[0.0007593595,0.0004543735,0.001097657,0.0036645,0.0001223006,0.001624069,0.0002301568,0.0002668591,0.00002062956],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001202075,"about_ca_system_score_gemma":0.0000856952,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001593139,"about_ca_topic_score_gemma":0.002060788,"domain_scores_codex":[0.9961079,0.000009230889,0.001582288,0.0009809559,0.0008413162,0.0004782955],"domain_scores_gemma":[0.9954029,0.0003033489,0.001532169,0.0007671247,0.001930656,0.00006374352],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003471773,0.0002078098,0.005266585,0.0002177184,0.01216002,0.000001670906,0.00007303709,0.9199533,0.001708324,0.05691132,0.0006016366,0.002551348],"study_design_scores_gemma":[0.001143832,0.000007722473,0.002060411,0.0001025669,0.007389935,6.344983e-7,0.0002082277,0.9771539,0.00005000394,0.001406803,0.009990947,0.0004850019],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5120871,0.00002510992,0.4842855,0.0001132299,0.001619157,0.0006068104,0.0001539866,0.0001216098,0.0009874597],"genre_scores_gemma":[0.9626148,0.000007441798,0.03391348,0.0002639695,0.001578652,0.0004072997,0.001017913,0.00005820098,0.00013823],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4505277,"threshold_uncertainty_score":0.9997908,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}