{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":594,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":594,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"5d9e2b4a2aff","filters":{"topic":"Power System Reliability and Maintenance"}},"results":[{"id":"W2153672555","doi":"10.1109/tec.2006.874233","title":"A Simplified Wind Power Generation Model for Reliability Evaluation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":586,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Turbine; Renewable energy; Reliability (semiconductor); Electric power system; Reliability engineering; Monte Carlo method; Electricity generation; Computer science; Engineering; Marine engineering; Meteorology; Power (physics); Electrical engineering; Aerospace engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01718282201504666,"gpt":0.2201616292721756,"spread":0.202978807257129,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003468553,0.0001743966,0.0001592024,0.0001005265,0.0001567323,0.00002297288,0.00008699173,0.0001658635,0.00005405173],"category_scores_gemma":[0.000005980342,0.0001788677,0.000140147,0.0001270686,0.00003083982,0.00021852,5.46873e-7,0.00009149942,0.00001332208],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003473966,"about_ca_system_score_gemma":0.00004903212,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007946245,"about_ca_topic_score_gemma":0.0001106577,"domain_scores_codex":[0.9988839,0.0000456913,0.0002879525,0.0002985741,0.0002560606,0.0002278087],"domain_scores_gemma":[0.9993311,0.00006122015,0.00003580649,0.0003269115,0.0001907507,0.00005417491],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004299168,0.00006950343,0.000001344,0.0000247038,0.00001207598,1.634853e-7,0.00005437369,0.9811526,0.0143267,0.0003837266,0.00250888,0.001422968],"study_design_scores_gemma":[0.0007538848,0.00005306947,0.00001203714,0.00001539988,0.00004041968,0.000001231538,0.00001363954,0.9214786,0.07354865,0.0005609457,0.003341974,0.0001802033],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08355982,0.00003542763,0.9134817,0.00008741723,0.001346094,0.0003379874,0.000044975,0.0002208808,0.0008856933],"genre_scores_gemma":[0.9981849,0.00001629635,0.0007789484,0.00007136589,0.00006085242,0.0001214641,0.00003709693,0.00002894565,0.0007001461],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.914625,"threshold_uncertainty_score":0.7294013,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2231928583","doi":"10.1016/j.rser.2015.12.070","title":"A comprehensive review on uncertainty modeling techniques in power system studies","year":2016,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":409,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"","keywords":"Probabilistic logic; Electric power system; Context (archaeology); Computer science; Restructuring; Probability density function; Uncertainty quantification; Work (physics); Power (physics); Mathematical optimization; Engineering; Machine learning; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.03734299939859377,"gpt":0.2988336187393824,"spread":0.2614906193407887,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001559819,0.001073109,0.00609864,0.0004104597,0.0001323142,0.00005062463,0.0004346415,0.0004193956,0.000008604155],"category_scores_gemma":[0.0002288865,0.0006710974,0.0006204675,0.0007520964,0.00007313937,0.0001984087,0.000223896,0.0003505278,0.00002182692],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001516556,"about_ca_system_score_gemma":0.0001714035,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002941098,"about_ca_topic_score_gemma":0.00002816173,"domain_scores_codex":[0.9951536,0.0006407428,0.002031123,0.0008417218,0.0002386892,0.001094144],"domain_scores_gemma":[0.9978767,0.0002839853,0.0003361484,0.001068604,0.0002638914,0.0001706448],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00000310295,0.0000140313,2.880415e-8,0.6159775,0.0001282686,0.00009262928,0.0000271705,0.0007097592,1.781236e-7,0.002662124,0.007571018,0.3728142],"study_design_scores_gemma":[0.00006832516,0.0000379343,1.182381e-9,0.356937,0.000133589,0.00004430248,0.0001970004,0.0001829952,6.189562e-7,0.0000992841,0.6418284,0.0004705713],"study_design_candidate":"systematic_review","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[1.813284e-7,0.9901713,0.001041028,0.00002374792,0.0002775823,0.002144048,0.00001387682,0.0003375459,0.005990743],"genre_scores_gemma":[0.00001240817,0.9941975,0.0000695243,0.0001571802,0.0001029226,0.00246729,0.00001969158,0.0001190473,0.002854442],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.6342574,"threshold_uncertainty_score":0.999574,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2114661994","doi":"10.1109/tec.2004.827718","title":"Generating Capacity Adequacy Associated With Wind Energy","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":345,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Reliability (semiconductor); Monte Carlo method; Range (aeronautics); Electricity generation; Reliability engineering; Energy (signal processing); Computer science; Environmental science; Engineering; Power (physics); Meteorology; Statistics; Electrical engineering; Mathematics; Aerospace engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.008797977929852582,"gpt":0.1713806469302396,"spread":0.162582669000387,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008972097,0.0002241018,0.000210078,0.0001115314,0.0001993968,0.00002578582,0.0001225175,0.0001647555,0.00006245659],"category_scores_gemma":[0.000003867266,0.0002066859,0.00009413211,0.0002751046,0.0000624563,0.0002199198,7.698717e-7,0.000186342,0.00001706682],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004181296,"about_ca_system_score_gemma":0.00004424504,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0006797246,"about_ca_topic_score_gemma":0.0006261661,"domain_scores_codex":[0.998939,0.00004355838,0.0002124818,0.0002581245,0.0002282847,0.0003185096],"domain_scores_gemma":[0.9994589,0.00005407661,0.00004146913,0.000256676,0.00006740705,0.0001214896],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00002400974,0.00008863526,0.000003230463,0.00001920896,0.00008990809,0.0000117403,0.0001580247,0.9877158,0.0099391,0.0003241854,0.0001102611,0.0015159],"study_design_scores_gemma":[0.004027606,0.0005336434,0.000069748,0.0006430761,0.0001225105,0.00004722296,0.0001986034,0.1567193,0.8254547,0.0002517872,0.01086633,0.001065471],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1893141,0.00004500003,0.8084423,0.00006140194,0.0008749025,0.00004495385,0.00001864129,0.0003995397,0.0007992052],"genre_scores_gemma":[0.9989469,0.00007263177,0.0003470303,0.000184323,0.00003835777,0.00001504665,0.00000757613,0.00003838023,0.0003497704],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8309965,"threshold_uncertainty_score":0.8428409,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2100935434","doi":"10.1109/tec.2006.882415","title":"Multistate Wind Energy Conversion System Models for Adequacy Assessment of Generating Systems Incorporating Wind Energy","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":313,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Monte Carlo method; Reliability (semiconductor); Reliability engineering; Energy transformation; Sampling (signal processing); Electricity generation; Energy (signal processing); Computer science; Wind speed; Engineering; Power (physics); Electrical engineering; Meteorology","retraction":null,"screen_n_in":null,"score":{"opus":0.01647586914828242,"gpt":0.2119082690651478,"spread":0.1954323999168654,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003049367,0.0004608087,0.0006889688,0.0003310144,0.0004864825,0.00003507281,0.0002809127,0.0003193339,0.00001094208],"category_scores_gemma":[0.00000369558,0.0004760668,0.0002996888,0.0003328692,0.0001161222,0.0005180452,0.000006008062,0.0001909435,0.000002530952],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006797839,"about_ca_system_score_gemma":0.0001535467,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002307646,"about_ca_topic_score_gemma":0.00006274098,"domain_scores_codex":[0.9973193,0.0001794435,0.0009480049,0.0005608404,0.0004911214,0.0005012321],"domain_scores_gemma":[0.9983735,0.0002624517,0.000311031,0.0005354715,0.0003034122,0.000214129],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008169817,0.00009270906,0.000006496567,0.0006907681,0.0001450465,0.00001928762,0.000153116,0.9689804,0.025608,0.003003704,0.0003389135,0.0008799174],"study_design_scores_gemma":[0.00148396,0.0002105251,0.000003562417,0.0004983685,0.00006432536,0.00005310835,0.0004381028,0.8971146,0.09749842,0.00001428776,0.00219937,0.0004213865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02894824,0.0002932192,0.9662132,0.00001351734,0.003186072,0.0002330809,0.0001432152,0.0003663719,0.0006031122],"genre_scores_gemma":[0.9961022,0.0003270672,0.002578357,0.00003931738,0.0001238508,0.00008361472,0.00005016,0.00009217039,0.000603292],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9671539,"threshold_uncertainty_score":0.9997691,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2168062099","doi":"10.1109/5.823995","title":"Probabilistic assessment of power systems","year":2000,"lang":"en","type":"article","venue":"Proceedings of the IEEE","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":294,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Computer science; Quality (philosophy); Electricity; Mains electricity; Reliability engineering; Risk analysis (engineering); Electric power system; Operations research; Electric power industry; Range (aeronautics); Power (physics); Business; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.005623405441678421,"gpt":0.201631032463538,"spread":0.1960076270218596,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000262861,0.00009721978,0.0002140201,0.00002267149,0.0000203272,0.00001248339,0.000304789,0.00005012902,0.00003111175],"category_scores_gemma":[0.00002747121,0.0000670185,0.00007440742,0.0001508161,0.00006317491,0.00008857957,0.00001413151,0.00009359796,0.000004944678],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005809635,"about_ca_system_score_gemma":0.00001479146,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000163469,"about_ca_topic_score_gemma":5.448469e-7,"domain_scores_codex":[0.9992265,0.000003327768,0.0003071299,0.0001047985,0.0002034725,0.0001548265],"domain_scores_gemma":[0.999632,0.00002105271,0.00006868655,0.0001291252,0.0001195542,0.00002958099],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001374048,0.0009212152,0.02578631,0.0351603,0.0008201308,0.00000204857,0.00642053,0.2891176,0.4670489,0.09222517,0.0794274,0.002933008],"study_design_scores_gemma":[0.004360887,0.001246272,0.1263405,0.01348803,0.0005759241,0.0002547854,0.002718369,0.411503,0.270375,0.01289727,0.1531126,0.003127425],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9137701,0.0001459554,0.00006122768,0.000039841,0.000657703,0.0003815758,0.000009137766,0.00007829408,0.08485614],"genre_scores_gemma":[0.9990628,0.00001607609,0.0001114333,0.000005211963,0.00001755544,0.00002787442,8.208896e-8,0.00001397245,0.0007449581],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1966739,"threshold_uncertainty_score":0.2732935,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2099240939","doi":"10.1109/mper.2001.4311233","title":"The Present Status of Maintenance Strategies and the Impact of Maintenance on Reliability","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":294,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Ontario Power Generation","funders":"","keywords":"Component (thermodynamics); Reliability engineering; Reliability (semiconductor); Probabilistic logic; Heuristic; Computer science; Predictive maintenance; Preventive maintenance; Maintenance actions; Condition-based maintenance; Operations research; Engineering; Artificial intelligence; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.007946417662619292,"gpt":0.2446190430590184,"spread":0.2366726253963991,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001237799,0.0003008258,0.0006801224,0.00003423058,0.00004485717,0.00003461733,0.0003704277,0.00006199754,0.00001239095],"category_scores_gemma":[0.0005729889,0.0001509359,0.0002996609,0.0003124809,0.0002857843,0.0001584128,0.00003788491,0.000296624,0.000005232454],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001343967,"about_ca_system_score_gemma":0.00006061928,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001616079,"about_ca_topic_score_gemma":0.000006412474,"domain_scores_codex":[0.9981037,0.00008429211,0.0007354324,0.0002324008,0.0002529534,0.0005912646],"domain_scores_gemma":[0.9980068,0.0006555913,0.0001485782,0.0009194943,0.0001598649,0.0001096236],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0006612154,0.0002401776,0.00119907,0.02411679,0.0009395737,0.00003021777,0.00163764,0.8780651,0.001984363,0.03956702,0.03234545,0.01921339],"study_design_scores_gemma":[0.006561778,0.001387964,0.05488851,0.05619497,0.0004070925,0.0003442547,0.0007211663,0.160348,0.002280119,0.003971423,0.7103388,0.002555904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"review","genre_gemma":"empirical","genre_scores_codex":[0.3209954,0.6291603,0.02703607,0.001444323,0.002827063,0.004662778,0.0001246688,0.0005313989,0.01321796],"genre_scores_gemma":[0.8392754,0.1604485,0.00007026826,0.00001587535,0.00002423251,0.00007267587,7.145283e-7,0.00002779671,0.00006455625],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7177171,"threshold_uncertainty_score":0.6154986,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2167885813","doi":"10.1109/tpwrs.2003.818587","title":"An Electricity Market With a Probabilistic Spinning Reserve Criterion","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":269,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Probabilistic logic; Clearing; Reliability (semiconductor); Mathematical optimization; Electricity market; Market clearing; Electric power system; Power system simulation; Computation; Computer science; Electricity; Reliability engineering; Mathematics; Engineering; Power (physics); Algorithm; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.007810291990077612,"gpt":0.2096130371799929,"spread":0.2018027451899153,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003924668,0.0002951069,0.0003381445,0.0001831606,0.0001557172,0.0001235145,0.0002386696,0.0001491909,0.00003229573],"category_scores_gemma":[0.00001084275,0.000254411,0.00008363838,0.0004677387,0.00005625603,0.0003895658,5.48047e-7,0.0003577,0.00004446675],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004486338,"about_ca_system_score_gemma":0.00006592809,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003883681,"about_ca_topic_score_gemma":0.000255351,"domain_scores_codex":[0.9983049,0.00009779085,0.0004013435,0.0003972511,0.0003225908,0.0004761381],"domain_scores_gemma":[0.9988922,0.00004633508,0.00004924172,0.0006596156,0.0001697278,0.0001828134],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002267747,0.0003310912,0.00002544456,0.0007194709,0.0001180857,0.00004825032,0.001350372,0.9928009,0.003501368,0.000290087,0.0004335998,0.0001545538],"study_design_scores_gemma":[0.01929349,0.01969938,0.004237692,0.01719929,0.0008040949,0.002663888,0.00514436,0.7430811,0.1021471,0.001116297,0.07426272,0.01035061],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.09276207,0.0001685308,0.8996679,0.00003409393,0.002197002,0.0007687917,0.00003769295,0.0007851508,0.003578816],"genre_scores_gemma":[0.9991263,0.0000132596,0.0002857644,0.00002548039,0.00002581399,0.0002334657,0.000001805449,0.0000645503,0.0002235793],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9063642,"threshold_uncertainty_score":0.9999908,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2046869866","doi":"10.1049/iet-gtd.2008.0639","title":"Reliability evaluation of generating systems containing wind power and energy storage","year":2009,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":247,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Energy storage; Pumped-storage hydroelectricity; Electric power system; Reliability engineering; Intermittent energy source; Wind speed; Reliability (semiconductor); Distributed generation; Environmental science; Automotive engineering; Engineering; Computer science; Renewable energy; Power (physics); Electrical engineering; Meteorology","retraction":null,"screen_n_in":null,"score":{"opus":0.01468960272640409,"gpt":0.2337976380686591,"spread":0.219108035342255,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001490375,0.0001909386,0.0002663403,0.00004547526,0.0001395655,0.00005827875,0.00006996868,0.0001722678,0.00002474736],"category_scores_gemma":[0.00008713146,0.0001807439,0.00006580532,0.0001715975,0.00003427654,0.0002923822,0.000004813458,0.0001058533,9.94148e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002256305,"about_ca_system_score_gemma":0.00006336564,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002951284,"about_ca_topic_score_gemma":0.00000371497,"domain_scores_codex":[0.9981638,0.0002512033,0.0005965537,0.000295139,0.0004803299,0.0002130174],"domain_scores_gemma":[0.9990829,0.00003166382,0.0001040415,0.0002469552,0.0004229544,0.0001114621],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003321128,0.00006504684,0.00005295191,0.00009558338,0.00002011164,8.817683e-7,0.0004351391,0.57675,0.3852594,0.002969973,0.001430585,0.03288718],"study_design_scores_gemma":[0.0006740256,0.0001516955,0.002061459,0.0001164373,0.00005197135,0.000008210318,0.00009860835,0.967254,0.02260414,0.000137019,0.006624834,0.0002175571],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5077562,0.002256191,0.4887681,0.00007340265,0.0004284447,0.0002186613,0.00006592279,0.0001095888,0.0003234523],"genre_scores_gemma":[0.9990169,0.0001126984,0.0002785335,0.00002046048,0.00009987417,0.00002004424,0.0004161243,0.0000116157,0.00002377569],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4912606,"threshold_uncertainty_score":0.7370521,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2149172856","doi":"10.1109/tia.2003.816554","title":"Reliability modeling of distributed generation in conventional distribution systems planning and analysis","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":244,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Distributed generation; Electric utility; Deferral; Maintenance engineering; Electric power system; Equivalence (formal languages); Order (exchange); Electric power industry; Computer science; Engineering; Electricity; Power (physics); Economics; Electrical engineering; Renewable energy; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.02157100798530468,"gpt":0.2431833835739649,"spread":0.2216123755886602,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003159349,0.0001182949,0.0002132342,0.0001286446,0.00009459555,0.00001929225,0.00005976137,0.0002453881,0.00001217604],"category_scores_gemma":[0.000009648187,0.0001308941,0.00006852941,0.0008346677,0.00004583902,0.0001151808,4.894054e-7,0.0003573115,0.000001869744],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001615458,"about_ca_system_score_gemma":0.00002685312,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004568589,"about_ca_topic_score_gemma":0.0000144372,"domain_scores_codex":[0.9989871,0.00006422879,0.0004487104,0.000224964,0.0001251695,0.0001498615],"domain_scores_gemma":[0.9994796,0.00005505074,0.0000491905,0.0002642672,0.00008820801,0.00006368529],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003221099,0.00007329042,0.0005476883,0.00005397866,0.00005947605,1.624818e-7,0.00003066996,0.9973199,0.0004547762,0.001358618,0.00002276558,0.000075402],"study_design_scores_gemma":[0.0002151996,0.00001044089,0.0007328322,0.00003251494,0.0001054028,0.000003483047,0.0001520484,0.9962021,0.001791277,0.000103908,0.0005247461,0.0001260062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.143947,0.0001052355,0.8547314,0.00001330623,0.0001075632,0.0003416693,0.0005746008,0.00006052948,0.000118682],"genre_scores_gemma":[0.9990912,0.00001614155,0.0002203863,0.000002237487,0.00001304254,0.0004598116,0.0001718023,0.00000811452,0.00001727006],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8551441,"threshold_uncertainty_score":0.5337706,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4246247914","doi":"10.1109/60.969477","title":"Reliability/cost implications of PV and wind energy utilization in small isolated power systems","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":240,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Renewable energy; Reliability (semiconductor); Electric power system; Energy source; Electricity generation; Environmental science; Photovoltaics; Computer science; Photovoltaic system; Environmental economics; Engineering; Automotive engineering; Power (physics); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01321043943066802,"gpt":0.201135004258081,"spread":0.187924564827413,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001357858,0.0001699282,0.0002366795,0.0002463349,0.0000649943,0.00001437676,0.0001072803,0.0001837262,0.0000332278],"category_scores_gemma":[0.000005259162,0.0001760817,0.00006085538,0.0004722119,0.00006089937,0.0001620109,0.000001632224,0.0001148961,0.000003574611],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001631958,"about_ca_system_score_gemma":0.00002428532,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0008843391,"about_ca_topic_score_gemma":0.0003875948,"domain_scores_codex":[0.9989654,0.00007040866,0.0003856006,0.0002694089,0.00008935962,0.000219785],"domain_scores_gemma":[0.9993138,0.00009906708,0.00005211816,0.0003505982,0.00009772523,0.00008666386],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001974422,0.0003378573,0.0004965317,0.0002302096,0.0000650414,0.000006698978,0.0004206181,0.9678599,0.02042981,0.00224846,0.0002228967,0.007484591],"study_design_scores_gemma":[0.003327974,0.0005661322,0.005923592,0.0008258006,0.0001056893,0.0001201554,0.0006964386,0.8531674,0.05626498,0.0004525174,0.07745888,0.001090507],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1416534,0.0002507753,0.8556591,0.00006963398,0.0007670097,0.0001569458,0.0000234292,0.0001437634,0.001275865],"genre_scores_gemma":[0.9984328,0.001101556,0.00003599151,0.00003311934,0.00000671757,0.00003455095,0.000008159144,0.00002405408,0.0003231112],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8567793,"threshold_uncertainty_score":0.7180405,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2133633527","doi":"10.1109/tec.2006.875475","title":"Considering Load-Carrying Capability and Wind Speed Correlation of WECS in Generation Adequacy Assessment","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":218,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Reliability (semiconductor); Monte Carlo method; Electric power system; Reliability engineering; Renewable energy; Engineering; Power (physics); Environmental science; Meteorology; Statistics; Electrical engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01002003879108586,"gpt":0.2050442218495926,"spread":0.1950241830585067,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002109392,0.0001302775,0.0001855625,0.0001209266,0.00006024492,0.00001273938,0.00003998118,0.0001124234,0.00002548449],"category_scores_gemma":[0.000003527905,0.0001432797,0.00004825288,0.0001522737,0.00005087689,0.00021012,0.000001014157,0.000135078,0.000001659281],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003449136,"about_ca_system_score_gemma":0.00004203504,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001156245,"about_ca_topic_score_gemma":0.0005253947,"domain_scores_codex":[0.9990883,0.00005571631,0.0003335121,0.0002003092,0.0001736002,0.0001485053],"domain_scores_gemma":[0.9996131,0.0000812436,0.0000472475,0.0001660906,0.00005603679,0.00003629405],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001639975,0.00005604282,0.0007092203,0.00008918536,0.000009330434,0.000002125597,0.000126136,0.9336433,0.06348431,0.0001847802,0.00004165257,0.001637468],"study_design_scores_gemma":[0.0009636275,0.00005560603,0.003036997,0.0001170104,0.00002226281,0.000006582776,0.0001175938,0.8559307,0.1389192,0.0001055629,0.0005257899,0.0001989909],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6089447,0.00006360782,0.3894387,0.00002899244,0.0007819018,0.00009380691,0.00000610092,0.00005668881,0.0005854959],"genre_scores_gemma":[0.9994215,0.0000622116,0.0003841984,0.00001142589,0.0000241497,0.000003251523,0.000005581257,0.00001312411,0.00007459401],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3904768,"threshold_uncertainty_score":0.5842775,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2153991772","doi":"10.1109/tec.2003.822293","title":"Cost-Effective Wind Energy Utilization for Reliable Power Supply","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":217,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Reliability (semiconductor); Electric power system; Probabilistic logic; Computer science; Engineering; Automotive engineering; Power (physics); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.0135003558490306,"gpt":0.2185861255398744,"spread":0.2050857696908438,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009847549,0.000221195,0.0002110537,0.000156612,0.0001713453,0.00002288988,0.0001239826,0.0001948571,0.00007604122],"category_scores_gemma":[0.00000409922,0.0002280913,0.0001566398,0.0002435936,0.00004606481,0.000258573,9.610608e-7,0.0001080729,0.00002600304],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004190644,"about_ca_system_score_gemma":0.00003984738,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002453839,"about_ca_topic_score_gemma":0.0001057373,"domain_scores_codex":[0.9989671,0.0000235083,0.0002224209,0.0003011153,0.0001611924,0.0003247073],"domain_scores_gemma":[0.9993758,0.00008687383,0.00003397686,0.0002847055,0.0001061746,0.0001124461],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001965446,0.0001605122,0.000002679976,0.00008555091,0.00008567649,0.000004320967,0.0002378281,0.9755775,0.005528964,0.002817418,0.001620783,0.01368223],"study_design_scores_gemma":[0.002716832,0.0004315006,0.00003499565,0.0002079566,0.00005797915,0.00001339192,0.0001394346,0.03352736,0.6625638,0.0006976132,0.2991522,0.0004569693],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.004257302,0.0001162075,0.9907963,0.0001037175,0.002654614,0.0004450988,0.00005549182,0.0003481121,0.001223156],"genre_scores_gemma":[0.9979768,0.0002573504,0.0003554051,0.0001962169,0.00003508111,0.0003042825,0.00002113865,0.00004812779,0.0008055902],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9937195,"threshold_uncertainty_score":0.9301292,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2162558293","doi":"10.1109/mper.2001.4311229","title":"Reliability/Cost Implications of PV and Wind Energy Utilization in Small Isolated Power Systems","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":206,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Wind power; Reliability (semiconductor); Photovoltaic system; Power (physics); Environmental science; Computer science; Engineering; Electrical engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.01654238425649153,"gpt":0.2254732279178404,"spread":0.2089308436613488,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004392005,0.0002490852,0.0005486499,0.0001408525,0.00001707329,0.00001853197,0.0001790885,0.0001261501,0.00001934408],"category_scores_gemma":[0.0001397699,0.0002460317,0.00007701832,0.0006478898,0.0000267465,0.000141574,0.00002185057,0.0001579369,0.000006931363],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001209398,"about_ca_system_score_gemma":0.00001914775,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005407863,"about_ca_topic_score_gemma":0.00001693653,"domain_scores_codex":[0.9985158,0.00004078314,0.0007372565,0.0002872739,0.00009394905,0.0003249309],"domain_scores_gemma":[0.9990601,0.00009980953,0.00007427669,0.0005474695,0.0001113475,0.0001070296],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00004946608,0.0004969876,0.009138631,0.05006701,0.0003322802,0.00005527911,0.00117572,0.8781739,0.0297808,0.01452091,0.006018078,0.0101909],"study_design_scores_gemma":[0.001244682,0.0002288854,0.03097973,0.03135469,0.0001590735,0.000414475,0.00005082383,0.1734805,0.0008833887,0.0001632748,0.7591873,0.001853154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1367555,0.3956528,0.4566448,0.0003421744,0.002976369,0.002560077,0.00006590518,0.0009222495,0.004080084],"genre_scores_gemma":[0.9594379,0.04019529,0.0001158333,0.00004221911,0.00001210343,0.00009133261,0.000007855411,0.00004473616,0.00005269224],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8226824,"threshold_uncertainty_score":0.9999992,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2061948033","doi":"10.1109/tpwrs.2012.2214447","title":"Probabilistic Power Flow by Monte Carlo Simulation With Latin Supercube Sampling","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":205,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Latin hypercube sampling; Monte Carlo method; Slice sampling; Bin; Sampling (signal processing); Probabilistic logic; Computer science; Histogram; Rejection sampling; Simple random sample; Monte Carlo integration; Importance sampling; Random variable; Algorithm; Mathematical optimization; Mathematics; Hybrid Monte Carlo; Statistics; Markov chain Monte Carlo; Artificial intelligence; Detector","retraction":null,"screen_n_in":null,"score":{"opus":0.01075760215590273,"gpt":0.1990213242482729,"spread":0.1882637220923702,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001979201,0.000374181,0.0004109881,0.0001226085,0.00015264,0.0001639036,0.0001882758,0.0001989581,0.0001512456],"category_scores_gemma":[0.00001005982,0.0003163751,0.0001133526,0.0002859828,0.00005871369,0.0004454587,9.941808e-7,0.0003392365,0.0003028498],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002763646,"about_ca_system_score_gemma":0.00002856969,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003760878,"about_ca_topic_score_gemma":0.00007194793,"domain_scores_codex":[0.9980987,0.00007666525,0.0005405734,0.0004174426,0.0003706686,0.0004959512],"domain_scores_gemma":[0.9987649,0.0002034302,0.00005218235,0.0005958945,0.0001956833,0.0001878656],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001838228,0.00006920232,0.0000245642,0.0001785857,0.00008075019,0.000001906172,0.0007644628,0.9970159,0.0007569756,0.00001509566,0.00096887,0.0001053138],"study_design_scores_gemma":[0.0006542029,0.0002634618,0.0001913559,0.0004718232,0.00004525851,0.00002451602,0.0005520788,0.987504,0.0004985889,0.000009597872,0.009150083,0.0006350292],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1686455,0.0002357182,0.8251684,0.00004048373,0.002388039,0.001390885,0.0001270981,0.0006728775,0.001331035],"genre_scores_gemma":[0.9982679,0.000007286184,0.0002479136,0.00002926879,0.00001491138,0.0004377665,0.000003420991,0.00009095048,0.0009006014],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8296224,"threshold_uncertainty_score":0.9999288,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2131439847","doi":"10.1109/tpwrs.2009.2016458","title":"Reliability Evaluation for Distribution System With Renewable Distributed Generation During Islanded Mode of Operation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":190,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Wind power; Renewable energy; Electric power system; Distributed generation; Electricity; Electricity generation; Computer science; Electricity market; Limiting; Engineering; Power (physics); Risk analysis (engineering); Electrical engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.01090697636025558,"gpt":0.2260919295911663,"spread":0.2151849532309107,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006349473,0.0002422823,0.0003744369,0.00008194175,0.0001956865,0.00006597192,0.0001209478,0.0001708152,0.000004499125],"category_scores_gemma":[0.00001386702,0.0002120815,0.0001088216,0.0002506338,0.00002639662,0.0003481696,4.171351e-7,0.0001156337,0.000004117071],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008189377,"about_ca_system_score_gemma":0.00006447845,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001486051,"about_ca_topic_score_gemma":0.0001063156,"domain_scores_codex":[0.9981408,0.0001245637,0.0006525804,0.0003521094,0.0004494448,0.0002804628],"domain_scores_gemma":[0.998771,0.00004441659,0.0001235308,0.0004998375,0.0004840312,0.00007724894],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001453665,0.00008582562,0.000004055819,0.0003981761,0.00004176793,4.109055e-7,0.0001794957,0.96582,0.03285803,0.0001409171,0.0002601032,0.00006586363],"study_design_scores_gemma":[0.001347305,0.0003360899,0.0001840446,0.0003378866,0.00008668251,0.00001988914,0.0002059539,0.9002035,0.09680916,0.00000899438,0.0002110639,0.0002494084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1390087,0.00006861747,0.8565598,0.00002685571,0.001305708,0.001764329,0.0008226365,0.000286453,0.0001569726],"genre_scores_gemma":[0.998996,0.000008192545,0.0001480162,0.000002802794,0.00003134123,0.0004703108,0.0002615188,0.00002376768,0.00005811887],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8599873,"threshold_uncertainty_score":0.8648434,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2053598626","doi":"10.1109/tpwrd.2011.2171060","title":"Optimized Sectionalizing Switch Placement Strategy in Distribution Systems","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":187,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Automation; Reliability (semiconductor); Integer programming; Linear programming; Reliability engineering; Process automation system; Engineering; Computer science; Process (computing); Mathematical optimization; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.02011447678765636,"gpt":0.2022323514059335,"spread":0.1821178746182771,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000243885,0.0002047859,0.0002302926,0.0001289245,0.00007579559,0.00002996066,0.0001196657,0.0001376358,0.0001830878],"category_scores_gemma":[0.000002012072,0.0002121754,0.0001010639,0.0002456377,0.00002956563,0.0002469516,8.646358e-7,0.0002873927,0.0001027741],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004127519,"about_ca_system_score_gemma":0.00003279537,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003242868,"about_ca_topic_score_gemma":0.00005962968,"domain_scores_codex":[0.9987697,0.00005741469,0.0004027055,0.0002518367,0.0001929064,0.0003254504],"domain_scores_gemma":[0.9995133,0.00004732591,0.00003438121,0.0002571945,0.00006180597,0.00008601372],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001607241,0.0001997132,0.00001985521,0.0000954342,0.00007974389,0.00001939087,0.0004800101,0.9971846,0.0007518131,0.0001734097,0.0005770891,0.0002582239],"study_design_scores_gemma":[0.01157492,0.001537806,0.005378585,0.00234357,0.0002801814,0.0003523411,0.008120369,0.8782645,0.07529142,0.0003065629,0.01269131,0.003858446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1139177,0.0002411251,0.8770252,0.000006818665,0.002563165,0.0004038372,0.0001217742,0.0003301749,0.005390244],"genre_scores_gemma":[0.9993104,0.0001212779,0.0001141783,0.00001355488,0.00001445215,0.0001410654,0.00000889222,0.00002573359,0.0002504542],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8853927,"threshold_uncertainty_score":0.8652263,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1506342128","doi":"10.2172/834270","title":"Understanding the cost of power interruptions to U.S. electricity consumers","year":2004,"lang":"en","type":"report","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":181,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Blackout; Electricity; Reliability (semiconductor); Electric power industry; Quality (philosophy); Reliability engineering; Electricity market; Environmental economics; Electric power system; Power (physics); Business; Computer science; Engineering; Economics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.09768550781516999,"gpt":0.2871544068848088,"spread":0.1894688990696388,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006005049,0.000238872,0.0004243044,0.0001631522,0.00005486441,0.00002594797,0.0003000388,0.0002134821,0.0001480659],"category_scores_gemma":[0.000234035,0.0001689015,0.0001825622,0.0003529447,0.00008296109,0.00004231387,0.00005114554,0.0004011878,0.00004932594],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002382864,"about_ca_system_score_gemma":0.0004329694,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004205902,"about_ca_topic_score_gemma":0.0006747955,"domain_scores_codex":[0.9985232,0.00002356281,0.0004970677,0.0002130425,0.0004122031,0.0003309122],"domain_scores_gemma":[0.9990374,0.0001222064,0.0000832065,0.0004855741,0.0001788811,0.00009273612],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00006592029,0.0002415236,0.0008473376,0.004809954,0.002548578,0.00004712881,0.004483648,0.07514519,0.001646821,0.04472378,0.8625019,0.002938211],"study_design_scores_gemma":[0.0005195105,0.0001792783,0.0008639062,0.002566562,0.0002386335,0.0001965787,0.001915385,0.000734373,0.001521787,0.001871962,0.9881522,0.001239819],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0002365602,0.0006340301,0.5346152,0.0002205769,0.002525745,0.0008771086,0.00008042122,0.0002338797,0.4605765],"genre_scores_gemma":[0.9970371,0.0004803179,0.0001172415,0.0000499103,0.00003098568,0.00005067512,0.000009057129,0.00004159819,0.002183137],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9968005,"threshold_uncertainty_score":0.6887604,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4247981495","doi":"10.1109/59.962402","title":"Bibliography on the application of probability methods in power system reliability evaluation 1996-1999","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":168,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Reliability engineering; Electric power system; Activity-based costing; Computer science; Bibliography; Power (physics); Engineering; Library science; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.0224727554939105,"gpt":0.2832649286506527,"spread":0.2607921731567422,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.006120388,0.0003454438,0.0005464436,0.00211064,0.0001179191,0.00004720134,0.0003931291,0.0002656719,0.00003176468],"category_scores_gemma":[0.00004354946,0.0002633953,0.0002930624,0.006562083,0.0001263184,0.0002092711,0.000002104985,0.0004574944,0.00004468601],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003759013,"about_ca_system_score_gemma":0.00004051676,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000777119,"about_ca_topic_score_gemma":0.0001272738,"domain_scores_codex":[0.9960447,0.001139796,0.001141739,0.0005730074,0.0006951451,0.0004056019],"domain_scores_gemma":[0.9971797,0.0006835435,0.0001865834,0.001535311,0.0003147618,0.0001001269],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000306125,0.0009928399,0.001974864,0.001567073,0.0002140421,0.00000296818,0.00128749,0.9806383,0.005711879,0.00328611,0.001499569,0.002518703],"study_design_scores_gemma":[0.003108952,0.001111755,0.01932747,0.002727198,0.0002997292,0.0001080666,0.004010136,0.9092693,0.02385468,0.001310823,0.0330214,0.00185051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07383221,0.0003830159,0.9101333,0.0001053201,0.002937702,0.003476794,0.0000556802,0.0003773951,0.008698553],"genre_scores_gemma":[0.9976056,0.00009976269,0.0005417358,0.00001804127,0.00001098679,0.001659775,0.000002550447,0.0000427274,0.00001878963],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9237734,"threshold_uncertainty_score":0.9999818,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2135335961","doi":"10.1109/tec.2005.847996","title":"Evaluation of Different Operating Strategies in Small Stand-Alone Power Systems","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":158,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Diesel fuel; Automotive engineering; Reliability (semiconductor); Energy storage; Wind power; Reliability engineering; Engineering; Environmental science; Power (physics); Computer science; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01621384360418802,"gpt":0.2184865631251436,"spread":0.2022727195209556,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004403654,0.0001440672,0.0002117229,0.0001516698,0.00004186011,0.00002243111,0.00008737003,0.0001003128,0.0000603294],"category_scores_gemma":[0.000003379551,0.0001332978,0.00005919861,0.0001357333,0.00002417941,0.0001967657,7.342916e-7,0.0001204973,0.000006436342],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003824849,"about_ca_system_score_gemma":0.00005613548,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002279966,"about_ca_topic_score_gemma":0.0005132147,"domain_scores_codex":[0.9989119,0.0001284637,0.0003257395,0.0001637138,0.0002968083,0.0001733607],"domain_scores_gemma":[0.9995346,0.00005102795,0.00003674715,0.0001998107,0.0001336237,0.0000441642],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000014589,0.0000841845,0.000005513314,0.00007566909,0.00002948606,6.540804e-7,0.0003547819,0.9848039,0.01128105,0.0002615543,0.00002268789,0.003065931],"study_design_scores_gemma":[0.001281359,0.0001051195,0.0001130318,0.0003604356,0.00005014521,0.000003611656,0.001204877,0.8774655,0.1186249,0.00002879113,0.0005598712,0.0002024396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5388223,0.0004021237,0.4575766,0.00002328786,0.000972987,0.0001602104,0.000009850071,0.00008449714,0.001948163],"genre_scores_gemma":[0.9996427,0.0001262626,0.00006086617,0.000006902882,0.00001319982,0.00004189496,0.000001855111,0.00001600302,0.00009035708],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4608204,"threshold_uncertainty_score":0.5435726,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2166418605","doi":"10.1109/tpwrs.2007.901741","title":"Generation and Transmission Expansion Under Risk Using Stochastic Programming","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":154,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Mathematical optimization; Probabilistic logic; Stochastic programming; Linear programming; Nonlinear programming; Variance (accounting); Transmission (telecommunications); Node (physics); Computer science; Expected value; Stochastic process; Random variable; Stochastic optimization; Nonlinear system; Mathematics; Engineering; Statistics; Telecommunications; Artificial intelligence; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.02205254868347343,"gpt":0.2409611745651408,"spread":0.2189086258816673,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005944298,0.0002298318,0.0002353314,0.0001785592,0.0002396957,0.00007374609,0.00006975893,0.0001792635,0.000008550324],"category_scores_gemma":[0.000002774455,0.0002133453,0.00007697903,0.0002117402,0.00004102257,0.0002090398,5.179573e-7,0.0002653632,0.00001104709],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001768544,"about_ca_system_score_gemma":0.00001910177,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001371984,"about_ca_topic_score_gemma":0.00004376502,"domain_scores_codex":[0.9986137,0.0000615742,0.0004292556,0.0002918608,0.0002446797,0.0003588886],"domain_scores_gemma":[0.9993981,0.00007574561,0.00005487854,0.0002508219,0.00005645068,0.0001640341],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000315206,0.00006475004,0.000005039633,0.000152664,0.00005684358,0.000006357376,0.001055194,0.9536453,0.03582534,0.00004563061,0.00003153042,0.009079854],"study_design_scores_gemma":[0.0008662006,0.000208182,0.00009941167,0.0005882047,0.0001133269,0.0002040625,0.001169048,0.9773012,0.01632121,0.00001648075,0.002492856,0.0006198473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1846426,0.0006441717,0.8113676,0.000006528867,0.002492669,0.00047576,0.00001060071,0.0002848201,0.00007530551],"genre_scores_gemma":[0.9987029,0.00003317538,0.001072074,0.000007825051,0.00003395148,0.00002764448,0.000001451086,0.00004711183,0.00007381345],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8140603,"threshold_uncertainty_score":0.869997,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2002651923","doi":"10.1260/030952407783123060","title":"Quantification of Condition Monitoring Benefit for Offshore Wind Turbines","year":2007,"lang":"en","type":"article","venue":"Wind Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Royal College of Physicians and Surgeons of Canada","funders":"","keywords":"Offshore wind power; Flexibility (engineering); Turbine; Wind power; Probabilistic logic; Reliability engineering; Baseline (sea); Condition monitoring; Submarine pipeline; Markov chain; Marine engineering; Variety (cybernetics); Engineering; Risk analysis (engineering); Computer science; Operations research; Environmental science; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.011866763125866,"gpt":0.2296276090420428,"spread":0.2177608459161768,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003121024,0.0001361095,0.0001854563,0.0001139025,0.0000257085,0.00001235574,0.0001027731,0.00009694655,0.000003481803],"category_scores_gemma":[0.00005516811,0.0001483619,0.00007001916,0.0001509233,0.0000124302,0.0001427838,0.000008487893,0.00008266985,0.000004064568],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006968484,"about_ca_system_score_gemma":0.000004624748,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005825658,"about_ca_topic_score_gemma":0.000002492933,"domain_scores_codex":[0.9991586,0.000001702637,0.0003309175,0.0001363913,0.0001075027,0.000264884],"domain_scores_gemma":[0.9995385,0.00009404909,0.00003717768,0.0001986065,0.00007504749,0.0000565828],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00001892556,0.00002071558,0.002790592,0.001237132,0.00006279529,0.000001624363,0.0004352593,0.7116641,0.2778302,0.002819976,0.0001173888,0.003001253],"study_design_scores_gemma":[0.0007408175,0.00007586809,0.1350324,0.0007475767,0.00004740044,0.00001448659,0.0003002971,0.126567,0.722136,0.0002292648,0.01351697,0.0005920283],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7734633,0.0004969771,0.2237407,0.00001161602,0.001524638,0.0002532762,0.00002211745,0.0002288573,0.0002585661],"genre_scores_gemma":[0.9973104,0.00001615254,0.002313525,0.000001331534,0.0002554526,0.000008746002,0.00001718179,0.00003438165,0.00004280202],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5850971,"threshold_uncertainty_score":0.6050022,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2038409208","doi":"10.1049/ip-gtd:20045058","title":"Application of adverse and extreme adverse weather: modelling in transmission and distribution system reliability evaluation","year":2006,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":142,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Adverse weather; Reliability (semiconductor); Reliability engineering; Extreme weather; Transmission (telecommunications); Computer science; Environmental science; Transmission system; Meteorology; Engineering; Telecommunications; Climate change; Geography; Ecology","retraction":null,"screen_n_in":null,"score":{"opus":0.01289635902124462,"gpt":0.2059004522262654,"spread":0.1930040932050208,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001108684,0.0002359811,0.0002800512,0.00007276669,0.0001506234,0.00002713568,0.0000534384,0.0002336613,0.000003670836],"category_scores_gemma":[0.000018876,0.0002250077,0.00004827507,0.0002581181,0.00007654208,0.0004669504,0.000009298394,0.0001388622,6.351414e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002558793,"about_ca_system_score_gemma":0.00002707842,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001424704,"about_ca_topic_score_gemma":0.000008705127,"domain_scores_codex":[0.9982569,0.00004396228,0.0006880168,0.0004489647,0.0003406276,0.0002215331],"domain_scores_gemma":[0.9993708,0.00002232241,0.000126114,0.0001020466,0.0002618144,0.0001169279],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0005879446,0.0004712349,0.01681969,0.007731353,0.00003815741,0.000001925571,0.002208952,0.2564847,0.5616428,0.02496557,0.0006361422,0.1284115],"study_design_scores_gemma":[0.001141777,0.00004403574,0.007430744,0.0002843644,0.00005813263,0.0000109173,0.0002378344,0.9702159,0.01756771,0.0004972405,0.002285423,0.0002259188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4956595,0.0009044148,0.5024742,0.00007092561,0.00004700893,0.0005980276,0.00006225215,0.00008845315,0.00009519132],"genre_scores_gemma":[0.9979553,0.0004264915,0.0007934967,0.000003166417,0.00005355187,0.0001144177,0.000628467,0.00001543727,0.000009644041],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7137312,"threshold_uncertainty_score":0.9175547,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2129651074","doi":"10.1109/tpwrs.2008.920078","title":"Effects of Load Forecast Uncertainty on Bulk Electric System Reliability Evaluation","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":126,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Range (aeronautics); Electric power system; Load factor; Transmission system; Load management; Computer science; Transmission (telecommunications); Engineering; Power (physics); Electrical engineering; Structural engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.009881543955925448,"gpt":0.2064224155983556,"spread":0.1965408716424302,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001073225,0.0003741522,0.0006232865,0.0002430134,0.000174788,0.00002014586,0.0002500856,0.0002611007,0.00001358208],"category_scores_gemma":[0.00005063934,0.0003397831,0.0002695763,0.0006131831,0.00006807585,0.0001585555,9.871318e-7,0.0003688067,0.0001350831],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00196986,"about_ca_system_score_gemma":0.0001881753,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003077795,"about_ca_topic_score_gemma":0.00002102344,"domain_scores_codex":[0.9969399,0.0003225461,0.000798926,0.0004723642,0.001003136,0.0004631346],"domain_scores_gemma":[0.9980306,0.000442045,0.0001428308,0.0007895876,0.0004441059,0.0001508079],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001734154,0.0003212093,0.00001408346,0.002687132,0.0001575748,0.00001619982,0.001000522,0.9858111,0.008196126,0.0001681607,0.0009911458,0.000463398],"study_design_scores_gemma":[0.004095231,0.001841085,0.0007431516,0.003242455,0.0003369884,0.0002981539,0.0004485066,0.8075151,0.1749993,0.00002710211,0.005162461,0.001290479],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4241839,0.0008610727,0.5558213,0.00001806925,0.009159358,0.002860357,0.00005935985,0.0007674194,0.006269161],"genre_scores_gemma":[0.9990591,0.00005122916,0.00002505749,0.000009593162,0.00002633844,0.000548753,0.000002014982,0.00005489338,0.0002230513],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5748752,"threshold_uncertainty_score":0.9999054,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2151469760","doi":"10.1049/iet-rpg:20080036","title":"Adequacy assessment of generating systems containing wind power considering wind speed correlation","year":2009,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":120,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Monte Carlo method; Renewable energy; Electric power system; Environmental science; Reliability (semiconductor); Meteorology; Computer science; Power (physics); Mathematics; Engineering; Statistics; Physics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01712590334463535,"gpt":0.2448132684524766,"spread":0.2276873651078413,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007475257,0.0003071743,0.0004762613,0.0001534373,0.0001520438,0.0001602977,0.0001399391,0.0002102245,0.00005448884],"category_scores_gemma":[0.00009028514,0.0003227175,0.0001018467,0.0002477468,0.00003450912,0.0005115547,0.00002116248,0.0001956208,0.00000855795],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002326359,"about_ca_system_score_gemma":0.000113265,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001420087,"about_ca_topic_score_gemma":0.00003974432,"domain_scores_codex":[0.9977791,0.0001175399,0.0009090842,0.0003749796,0.000399107,0.0004201551],"domain_scores_gemma":[0.9988967,0.00007110213,0.0002390284,0.0004465213,0.0002306721,0.0001160196],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000006357159,0.0000251321,0.0007189747,0.0000355942,0.00003430342,0.000004432944,0.0004566227,0.7571191,0.2394275,0.0009524649,0.001129959,0.00008958457],"study_design_scores_gemma":[0.0007985193,0.0003011031,0.001516101,0.0002481163,0.00003364034,0.00003289553,0.0004722172,0.9758006,0.01699507,0.00006265566,0.003291806,0.0004473204],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7808239,0.001388012,0.199154,0.00008126638,0.004363936,0.0007147253,0.00002067244,0.0003088051,0.01314474],"genre_scores_gemma":[0.9963765,0.00003160393,0.002864121,0.00006967799,0.0002390282,0.000004214183,0.00006556485,0.00003802447,0.0003112256],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2224325,"threshold_uncertainty_score":0.9999225,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2134515451","doi":"10.1109/tpel.2002.800995","title":"Multiterminal LVDC system for optimal acquisition of power in wind-farm using induction generators","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Electronics","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Power optimizer; Wind speed; Turbine; Induction generator; Engineering; Automotive engineering; Voltage; Control theory (sociology); Converters; AC power; Power (physics); Electrical engineering; Maximum power point tracking; Computer science; Meteorology; Physics; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01209077141974694,"gpt":0.2171327434362241,"spread":0.2050419720164772,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002101474,0.0002242791,0.0002947319,0.0002676363,0.00008174094,0.00002013778,0.0001192148,0.0002093895,0.00003624283],"category_scores_gemma":[0.000002756582,0.0002461641,0.0001539876,0.0003384333,0.00003592003,0.0001964677,6.98734e-7,0.0002991579,0.000007946295],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007815248,"about_ca_system_score_gemma":0.00003380631,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001667314,"about_ca_topic_score_gemma":0.0000332489,"domain_scores_codex":[0.9985884,0.0000411164,0.0004661948,0.0002658624,0.0001780118,0.0004604342],"domain_scores_gemma":[0.9994696,0.00003955214,0.00006976071,0.0002725909,0.0000863305,0.00006212029],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001471901,0.0003787513,0.00001735037,0.0004137236,0.0001202869,0.000006310622,0.001276661,0.890463,0.1042346,0.0003981565,0.00006285354,0.002481071],"study_design_scores_gemma":[0.001892753,0.0007140643,0.00005648956,0.000388098,0.00008640937,0.0001226118,0.0004700322,0.6025054,0.391231,0.00001925999,0.001924232,0.0005896365],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5433676,0.0003862715,0.4544779,0.00001234917,0.001100506,0.0003683945,0.00003990778,0.0001201413,0.0001269396],"genre_scores_gemma":[0.9983397,0.00004513882,0.001442967,0.00001331087,0.00002560473,0.00004542997,0.000002223393,0.0000482433,0.00003738255],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4549721,"threshold_uncertainty_score":0.999999,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2034258068","doi":"10.1080/00401706.2000.10485995","title":"Progressively Censored Reliability Sampling Plans for the Weibull Distribution","year":2000,"lang":"en","type":"article","venue":"Technometrics","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":118,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Weibull distribution; Censoring (clinical trials); Estimator; Statistics; Monte Carlo method; Sampling (signal processing); Acceptance sampling; Mathematics; Importance sampling; Sample size determination; Reliability (semiconductor); Maximum likelihood; Sample (material); Log-logistic distribution; Computer science; Exponential distribution; Distribution fitting","retraction":null,"screen_n_in":null,"score":{"opus":0.01494537874168674,"gpt":0.2338291098628337,"spread":0.218883731121147,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005174524,0.0001464744,0.0001728311,0.00008454653,0.0001540542,0.00004298321,0.0003314552,0.0001358374,0.00003933174],"category_scores_gemma":[0.0005612995,0.0001069992,0.00009421966,0.001292392,0.00008181219,0.00008085201,0.00001930625,0.0001894726,0.00003870662],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001860653,"about_ca_system_score_gemma":0.00001249159,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009407147,"about_ca_topic_score_gemma":0.000002848356,"domain_scores_codex":[0.9989718,0.000008503762,0.0002830024,0.0002156368,0.000168203,0.0003528173],"domain_scores_gemma":[0.9989576,0.0003856004,0.00003419265,0.0004918353,0.00007962099,0.00005116076],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001498814,0.0002840974,0.004686356,0.001173936,0.0001296606,0.000004156029,0.0002892769,0.05731455,0.0003236552,0.009980449,0.02645637,0.8992076],"study_design_scores_gemma":[0.0004242021,0.0000794616,0.008310899,0.00006163919,0.00003847427,0.000007634726,0.00006552019,0.04779609,0.00159662,0.001962198,0.9393365,0.0003207466],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1979764,0.003160849,0.7885824,0.0008198839,0.0008523512,0.002466128,0.001625501,0.002538534,0.001977938],"genre_scores_gemma":[0.9965533,0.0002397896,0.002601797,0.00001586404,0.00006629968,0.0002481836,0.00006088318,0.00002326109,0.0001906402],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9128801,"threshold_uncertainty_score":0.4363301,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2089419227","doi":"10.1109/tste.2011.2181878","title":"Computation of Dynamic Operating Balancing Reserve for Wind Power Integration for the Time-Horizon 1–48 Hours","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":116,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Unavailability; Time horizon; Wind power; Electric power system; Computer science; Reliability (semiconductor); Computation; Horizon; Reliability engineering; Power (physics); Mathematical optimization; Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.006012515770543302,"gpt":0.2249616056121116,"spread":0.2189490898415683,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005920127,0.0001531752,0.0001914201,0.0001077946,0.0002366003,0.00003400682,0.0001160492,0.00009893004,0.000009569795],"category_scores_gemma":[0.00005264161,0.0001243529,0.000128902,0.0002104334,0.0000313946,0.0003500173,0.000001150452,0.0001033284,0.00000177793],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00031136,"about_ca_system_score_gemma":0.00005368041,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001623621,"about_ca_topic_score_gemma":0.00006268972,"domain_scores_codex":[0.9989548,0.00003573282,0.0003013446,0.0001401537,0.0001229974,0.000445026],"domain_scores_gemma":[0.9990777,0.0003338058,0.00005662502,0.0001951941,0.000268509,0.00006810263],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007877581,0.00007753231,0.000002435165,0.000275424,0.00008807987,3.12072e-7,0.0008381294,0.9759047,0.007458688,0.001977467,0.0009984663,0.01229997],"study_design_scores_gemma":[0.0008153091,0.0003398847,0.00003616677,0.0001609575,0.00008115795,0.00000538835,0.00593337,0.925439,0.06153091,0.0004252268,0.004939955,0.0002926622],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01771912,0.0002820363,0.9799626,0.0001036992,0.0009394652,0.0005349059,0.00002880076,0.0001042567,0.0003250621],"genre_scores_gemma":[0.9968391,0.00001765718,0.001320027,0.00002534558,0.00004778401,0.0002423606,0.00001040091,0.0000409101,0.001456384],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.97912,"threshold_uncertainty_score":0.5070965,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2024825567","doi":"10.1109/tpwrs.2012.2205022","title":"Adequacy Assessment Considerations in Wind Integrated Power Systems","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"BC Hydro (Canada); Manitoba Hydro; University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Electricity generation; Wind speed; Engineering; Electric power transmission; Range (aeronautics); Computer science; Power (physics); Electrical engineering; Meteorology; Aerospace engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01429391360885355,"gpt":0.2375751768300504,"spread":0.2232812632211969,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008365539,0.0004286933,0.0005989763,0.0004000557,0.000156675,0.0001781081,0.0001814465,0.0003019952,0.0001801883],"category_scores_gemma":[0.00001518512,0.0004021284,0.0001574249,0.000484887,0.00006640393,0.0006434681,0.000001616467,0.0006774895,0.0003252048],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007592238,"about_ca_system_score_gemma":0.0001065758,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004192627,"about_ca_topic_score_gemma":0.00008080346,"domain_scores_codex":[0.997193,0.0002838713,0.0009694488,0.000355895,0.000410976,0.0007868172],"domain_scores_gemma":[0.9985265,0.0002746509,0.0000926674,0.0006866875,0.0001330314,0.0002865022],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00004693296,0.00138009,0.001649594,0.0009069294,0.0005983803,0.00006782656,0.006817609,0.9588903,0.005291193,0.01154119,0.01272931,0.00008068798],"study_design_scores_gemma":[0.01368347,0.001953202,0.01763632,0.01114408,0.0006290909,0.002922472,0.04518885,0.3951565,0.01148738,0.0002203534,0.4896823,0.01029602],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03688632,0.001878381,0.9209751,0.0000887905,0.02252442,0.001551557,0.0002148915,0.000745806,0.01513468],"genre_scores_gemma":[0.9986518,0.00002900421,0.0001103698,0.00004143178,0.00002270261,0.000317281,0.000005961113,0.0000784791,0.0007429671],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9617655,"threshold_uncertainty_score":0.9998431,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2124543688","doi":"10.1109/tpwrs.2009.2032758","title":"Reliability Evaluation Considering Wind and Hydro Power Coordination","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":111,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Reliability (semiconductor); Monte Carlo method; Wind speed; Engineering; Automotive engineering; Power (physics); Electrical engineering; Meteorology","retraction":null,"screen_n_in":null,"score":{"opus":0.01199656211813875,"gpt":0.2292736440673071,"spread":0.2172770819491684,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000988576,0.0002609121,0.0003211437,0.0001620356,0.0001504882,0.00009558637,0.0001031844,0.0001863182,0.00006401401],"category_scores_gemma":[0.00002979649,0.0002593711,0.00008866197,0.0002300774,0.00005641724,0.0003843074,6.906453e-7,0.0002674879,0.00005358641],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003045009,"about_ca_system_score_gemma":0.00003534319,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000286714,"about_ca_topic_score_gemma":0.00000724974,"domain_scores_codex":[0.9982492,0.0001427224,0.000497969,0.0003860635,0.0004059281,0.0003180881],"domain_scores_gemma":[0.9990162,0.0001187127,0.00006142216,0.0004843655,0.0001850662,0.0001342341],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001081596,0.0003707702,0.0000764562,0.0004116256,0.0001775715,0.00001465932,0.003636481,0.959502,0.02618479,0.000730315,0.00316433,0.005622812],"study_design_scores_gemma":[0.00583202,0.001682575,0.01071682,0.00178803,0.0003893311,0.0005149716,0.002402052,0.8909957,0.03396897,0.001560363,0.04724342,0.002905702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3717571,0.0006895734,0.6101654,0.0002534619,0.00530375,0.001416254,0.00003895375,0.0006793613,0.009696255],"genre_scores_gemma":[0.99955,0.00002165995,0.00008055428,0.00005103405,0.00001230229,0.0000528266,0.000001939322,0.00002646323,0.0002032122],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.627793,"threshold_uncertainty_score":0.9999859,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2120431356","doi":"10.1109/tpwrs.2009.2023263","title":"Composite System Adequacy Assessment Incorporating Large-Scale Wind Energy Conversion Systems Considering Wind Speed Correlation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Reliability (semiconductor); Monte Carlo method; Electric power system; Scale (ratio); Transmission system; Reliability engineering; Engineering; Transmission (telecommunications); Computer science; Automotive engineering; Power (physics); Meteorology; Mathematics; Statistics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.007928361752800176,"gpt":0.2093767540059205,"spread":0.2014483922531203,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007386176,0.0005562778,0.0008272406,0.0003502293,0.0004393893,0.0002813588,0.0002742848,0.0003852861,0.00001428477],"category_scores_gemma":[0.000003511461,0.0005720049,0.0002305696,0.0004667063,0.00005375576,0.0005780553,0.000003154739,0.0005342606,0.0001008627],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00105967,"about_ca_system_score_gemma":0.00008156966,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002341153,"about_ca_topic_score_gemma":0.00002013862,"domain_scores_codex":[0.9965255,0.0003016454,0.001215524,0.000611102,0.0006672285,0.000678976],"domain_scores_gemma":[0.998282,0.0001822471,0.0003030619,0.0007423616,0.0001949597,0.0002954017],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000434198,0.0001446634,0.0001256846,0.0006448005,0.0001375391,0.0000464921,0.0006839335,0.9879918,0.008323289,0.001292299,0.0005049902,0.00006105784],"study_design_scores_gemma":[0.001677316,0.0003116319,0.0002864744,0.002416869,0.0001104042,0.0003226809,0.004132782,0.9825456,0.002406068,0.000008233537,0.004957691,0.0008242397],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04638718,0.0005620609,0.928499,0.00004163366,0.01574494,0.0009324152,0.0001318311,0.001214103,0.006486827],"genre_scores_gemma":[0.9990159,0.00001835302,0.0001914047,0.00004053935,0.00007556686,0.00001738226,0.00002194255,0.00007790573,0.0005410465],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9526287,"threshold_uncertainty_score":0.9996731,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2105697967","doi":"10.1109/wescan.1995.493961","title":"A comparison of Monte Carlo simulation techniques for composite power system reliability assessment","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Reliability (semiconductor); Computer science; Reliability engineering; Electric power system; Sampling (signal processing); Composite number; Power (physics); Simulation; Algorithm; Engineering; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.02066600492102644,"gpt":0.2967674092996149,"spread":0.2761014043785885,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003203685,0.0001435888,0.0003942446,0.00005084056,0.00003910301,0.00001599494,0.0001247906,0.0001017523,0.00001884925],"category_scores_gemma":[0.00002443468,0.0001272954,0.0001155343,0.00009938271,0.00002913165,0.0001162774,0.00001968288,0.00008836569,0.000004248507],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002360513,"about_ca_system_score_gemma":0.000004546967,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002925067,"about_ca_topic_score_gemma":0.000008301798,"domain_scores_codex":[0.9988744,0.00003555951,0.0005498639,0.0001848542,0.0001608491,0.000194467],"domain_scores_gemma":[0.9991508,0.0001762512,0.00007576933,0.0003778986,0.0001691568,0.00005010912],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003252356,0.0003071881,0.01445131,0.00334845,0.00008536605,8.28688e-7,0.001061158,0.966126,0.005156515,0.002229855,0.005037257,0.002163527],"study_design_scores_gemma":[0.0001854632,0.0001057645,0.001316308,0.0001486731,0.00001603559,8.383872e-7,0.0001850319,0.9846045,0.006608605,0.000013883,0.006672328,0.0001425633],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2244133,0.0003474895,0.7414761,0.00007251589,0.000587951,0.001887628,0.00005609441,0.001433785,0.02972511],"genre_scores_gemma":[0.9874491,0.000002839396,0.01227835,0.000007209273,0.00001725422,0.00009927145,0.000001695947,0.00001946393,0.0001247732],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7630358,"threshold_uncertainty_score":0.5190957,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2127512607","doi":"10.1109/tpwrs.2003.814909","title":"Software implementation of online risk-based security assessment","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":98,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"PricewaterhouseCoopers (Canada)","funders":"","keywords":"Computer science; Visualization; Software security assurance; Software; Probabilistic risk assessment; Probabilistic logic; Security management; Network security; Risk management; Risk analysis (engineering); Computer security; Risk assessment; Software engineering; Reliability engineering; Data mining; Information security; Engineering; Security service; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.007663946340115724,"gpt":0.2540567788291577,"spread":0.246392832489042,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000401585,0.0002007128,0.0003024573,0.0001342952,0.00007860878,0.00002239739,0.0001150916,0.000105318,0.0001107634],"category_scores_gemma":[0.000006152336,0.0001974032,0.0001459222,0.0002578327,0.00003084114,0.0001124919,3.051961e-7,0.0002473204,0.00001588978],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002150424,"about_ca_system_score_gemma":0.00009346601,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002610767,"about_ca_topic_score_gemma":0.000284611,"domain_scores_codex":[0.9985266,0.0001743224,0.0005362858,0.0002206474,0.0002843904,0.0002577175],"domain_scores_gemma":[0.9991596,0.0001117622,0.0001137994,0.0004195527,0.0001070348,0.00008830478],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00005164076,0.001348573,0.003745807,0.002444788,0.0006673225,0.00001412718,0.002320611,0.9798385,0.003179701,0.00113705,0.002485899,0.002765962],"study_design_scores_gemma":[0.0238711,0.004913223,0.02701242,0.004002673,0.001431449,0.0002069057,0.02956392,0.3029847,0.3703758,0.0008280833,0.2279351,0.006874536],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08978137,0.0001688006,0.9050523,0.00001135749,0.00311689,0.0005127318,0.0006332776,0.0002648205,0.0004584597],"genre_scores_gemma":[0.9988424,0.00003114256,0.0009310212,0.00001280933,0.000006111243,0.0000954295,0.00000806329,0.00003338652,0.00003968004],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.909061,"threshold_uncertainty_score":0.8049868,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2132745496","doi":"10.1109/tpwrs.2009.2016485","title":"Unit Commitment Risk Analysis of Wind Integrated Power Systems","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Power system simulation; Electric power system; Reliability engineering; Power (physics); Wind speed; Engineering; Automotive engineering; Nameplate capacity; Base load power plant; Electricity generation; Computer science; Operations research; Control theory (sociology); Electrical engineering; Meteorology; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.009659329868559023,"gpt":0.2152592002114046,"spread":0.2055998703428456,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006380145,0.0004201279,0.001001477,0.0007955057,0.000127978,0.00008628359,0.0003560431,0.0002675758,0.00008217269],"category_scores_gemma":[0.000009057156,0.0003715527,0.0004503911,0.001799742,0.00006555243,0.0001875466,9.548969e-7,0.0004619479,0.00008362737],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002862596,"about_ca_system_score_gemma":0.00003968575,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007158093,"about_ca_topic_score_gemma":0.00009338553,"domain_scores_codex":[0.9973354,0.0002679926,0.001048575,0.000401774,0.0004782743,0.0004679576],"domain_scores_gemma":[0.9981699,0.0001590755,0.0002080477,0.001023039,0.0002396033,0.0002003316],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005321983,0.0002878269,0.0001552154,0.0001224427,0.002331557,0.00001019375,0.001037504,0.9936765,0.0009467532,0.0003302148,0.0009280427,0.0001205447],"study_design_scores_gemma":[0.003802923,0.002603285,0.009548048,0.002510338,0.006281618,0.0001082348,0.009653671,0.8346276,0.009446509,0.00003542084,0.1182946,0.003087742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.09292133,0.001101766,0.892267,0.00002597456,0.005393737,0.0008811096,0.0007316615,0.0005271898,0.006150168],"genre_scores_gemma":[0.998912,0.00009211993,0.00003366561,0.00001856071,0.000006100199,0.0000462617,0.00001239094,0.00003949388,0.000839354],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9059907,"threshold_uncertainty_score":0.9998736,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2154860395","doi":"10.1109/tpwrs.2009.2030282","title":"Supply Adequacy Assessment of Distribution System Including Wind-Based DG During Different Modes of Operation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Islanding; Reliability engineering; Wind power; Monte Carlo method; Distributed generation; Reliability (semiconductor); Electric power system; Computer science; Engineering; Power (physics); Renewable energy; Electrical engineering; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.01038387597177884,"gpt":0.234414646585318,"spread":0.2240307706135392,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003021384,0.0002662613,0.0005416639,0.000163873,0.0001184479,0.00003875681,0.0001893272,0.0001505847,0.000008487349],"category_scores_gemma":[0.000003431497,0.0002444163,0.0001835794,0.0002136778,0.0000332698,0.0002113425,0.00000107657,0.0002057662,0.000003450429],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006397814,"about_ca_system_score_gemma":0.00004320213,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004580083,"about_ca_topic_score_gemma":0.000007946763,"domain_scores_codex":[0.9980509,0.0001193195,0.0008512344,0.0002589355,0.000435211,0.000284457],"domain_scores_gemma":[0.9991128,0.00006767699,0.0001519081,0.0004490532,0.0001298351,0.00008869535],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004031323,0.000206016,0.00009902522,0.001657949,0.00006913792,0.000002487378,0.0001940907,0.8956911,0.100822,0.001135813,0.0000217468,0.00006032254],"study_design_scores_gemma":[0.001322782,0.0004006991,0.004633999,0.003015662,0.00008088555,0.00001867244,0.0006710995,0.6370978,0.3522949,0.000005159723,0.00006279074,0.0003955394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3333623,0.0001078219,0.6641965,0.00002139583,0.00102928,0.0004834665,0.0002230428,0.0001912839,0.0003848649],"genre_scores_gemma":[0.9997632,0.00001448376,0.00007123634,0.000002852249,0.00001325193,0.00005330471,0.00001848699,0.0000244794,0.00003869214],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6664008,"threshold_uncertainty_score":0.9967006,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2150928659","doi":"10.1109/mper.2001.4311101","title":"Capacity Expansion of Small Isolated Power Systems Using PV and Wind Energy","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":89,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Wind power; Offset (computer science); Reliability engineering; Photovoltaics; Environmental science; Reliability (semiconductor); Electric power system; Photovoltaic system; Intermittent energy source; Energy source; Nameplate capacity; Computer science; Electricity generation; Engineering; Distributed generation; Power (physics); Electrical engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.01611767008338263,"gpt":0.1995532904571926,"spread":0.1834356203738099,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000373845,0.000317635,0.0007023689,0.0001039426,0.00002617085,0.00002192564,0.0001681259,0.0001411584,0.00001963224],"category_scores_gemma":[0.00005879624,0.0003000325,0.0001161186,0.0003430295,0.00003172992,0.0001461457,0.00002648722,0.0001787883,0.000005895814],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009252829,"about_ca_system_score_gemma":0.00001644943,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008600434,"about_ca_topic_score_gemma":0.000002430796,"domain_scores_codex":[0.9985076,0.00003806646,0.000633654,0.0002681321,0.0001684867,0.0003841245],"domain_scores_gemma":[0.9991471,0.0000600682,0.00008573,0.0004618956,0.00009777881,0.0001474799],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004182606,0.0001567423,0.0008382323,0.05901961,0.0007188038,0.00018026,0.001073309,0.7130414,0.2174029,0.002326944,0.002601075,0.002598847],"study_design_scores_gemma":[0.001042722,0.0002681424,0.0008885902,0.05959797,0.0003186346,0.001476863,0.00004727205,0.6409321,0.005240849,0.00002720161,0.2879405,0.002219202],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.4046364,0.2688654,0.3212455,0.00003274206,0.00331212,0.0005933968,0.00002224658,0.0005197302,0.0007724081],"genre_scores_gemma":[0.9779688,0.0213421,0.0005117843,0.00003640879,0.00002748908,0.00001257936,0.000001852663,0.00006100328,0.00003795046],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5733324,"threshold_uncertainty_score":0.9999452,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2033205122","doi":"10.1109/tpwrs.2011.2164425","title":"Effects of Load Sector Demand Side Management Applications in Generating Capacity Adequacy Assessment","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Load management; Reliability engineering; Demand side; Reliability (semiconductor); Electric power system; Environmental economics; Investment (military); Load shifting; Electric power; Risk analysis (engineering); Electric power industry; Energy management; Computer science; Business; Engineering; Power (physics); Economics; Electricity; Energy (signal processing); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01290199061013688,"gpt":0.2082459314531117,"spread":0.1953439408429748,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003208128,0.0002132425,0.0003305965,0.0001608025,0.00006445649,0.00001848888,0.0001757426,0.0001045718,0.00001445909],"category_scores_gemma":[0.000001930744,0.0002062136,0.0001011579,0.0002771545,0.00003510313,0.0001288422,0.00000145326,0.0002105512,0.00001882073],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003447558,"about_ca_system_score_gemma":0.00002315602,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003339725,"about_ca_topic_score_gemma":0.0001413804,"domain_scores_codex":[0.9985827,0.00009392815,0.0005267936,0.0002663986,0.000250281,0.0002799259],"domain_scores_gemma":[0.9992903,0.00009749251,0.00007259844,0.0004014292,0.0000562699,0.00008188369],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001022543,0.003243919,0.001067449,0.02323532,0.001604818,0.00009283892,0.01921158,0.836679,0.1027585,0.008518777,0.0005564209,0.002929155],"study_design_scores_gemma":[0.009688556,0.001271449,0.02816099,0.007755321,0.0008129622,0.0001109185,0.006311196,0.3490522,0.5790126,0.0004334871,0.0130777,0.004312646],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08410209,0.0002455875,0.9064895,0.000002009946,0.001364043,0.001259523,0.00002165723,0.0001633289,0.006352287],"genre_scores_gemma":[0.9972618,0.00003718389,0.001615844,0.000007091914,0.000008631457,0.0008994256,7.268645e-7,0.00003059513,0.0001387098],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9131597,"threshold_uncertainty_score":0.8409147,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4255251875","doi":"10.1109/59.962442","title":"Capacity expansion of small isolated power systems using PV and wind energy","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Wind power; Reliability engineering; Electric power system; Offset (computer science); Intermittent energy source; Photovoltaic system; Reliability (semiconductor); Photovoltaics; Energy source; Electricity generation; Variable renewable energy; Environmental science; Engineering; Computer science; Distributed generation; Power (physics); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01745417003444114,"gpt":0.1961598202366276,"spread":0.1787056502021864,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003403097,0.0003639521,0.0006118352,0.0002662158,0.0001333264,0.00006939049,0.0001773772,0.0003170461,0.00002130311],"category_scores_gemma":[0.00000492904,0.0003488407,0.0001407643,0.0003885819,0.00009375665,0.0002349239,0.000002056916,0.0002595557,0.00001196087],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001964656,"about_ca_system_score_gemma":0.00003525514,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001641991,"about_ca_topic_score_gemma":0.00007470751,"domain_scores_codex":[0.9979523,0.0001491546,0.0007646192,0.0003934496,0.0002867637,0.0004536585],"domain_scores_gemma":[0.9988389,0.00009706878,0.0001284372,0.0005833683,0.0001606305,0.0001915946],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001613221,0.000210631,0.0001271107,0.0009828935,0.0003990475,0.00004571797,0.002049691,0.9251889,0.06996557,0.0004622716,0.0002377507,0.0001690785],"study_design_scores_gemma":[0.002199769,0.0007542213,0.0002528011,0.003317233,0.0002088883,0.001533071,0.002190337,0.9481852,0.01679273,0.00002474876,0.02293823,0.001602779],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3049688,0.0009790997,0.6878188,0.000007704843,0.004588805,0.0003105473,0.00005761776,0.0002279114,0.001040697],"genre_scores_gemma":[0.9992715,0.0001365385,0.00007475861,0.00001188722,0.00001460564,0.00002745411,0.000001374122,0.00006700541,0.0003949362],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6943026,"threshold_uncertainty_score":0.9998963,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1999912552","doi":"10.1109/tpwrs.2011.2120633","title":"Incorporating Wind Power in Generating Capacity Reliability Evaluation Using Different Models","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Reliability (semiconductor); Autoregressive–moving-average model; Autoregressive model; Monte Carlo method; Electric power system; Markov chain; Time series; Series (stratigraphy); Moving average; Computer science; Reliability engineering; Meteorology; Power (physics); Engineering; Statistics; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.06147942038732376,"gpt":0.2339921772494952,"spread":0.1725127568621715,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001455972,0.000378746,0.0004887286,0.0002464476,0.0001618957,0.00006335389,0.0002112916,0.0002555353,0.00005580362],"category_scores_gemma":[0.00001881931,0.0003603522,0.0001475411,0.0003470829,0.00006797942,0.0005688987,0.000002384678,0.0004881165,0.00001825099],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009143983,"about_ca_system_score_gemma":0.00006204808,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0008339686,"about_ca_topic_score_gemma":0.0002682265,"domain_scores_codex":[0.9971756,0.0003732241,0.0009460818,0.0005098252,0.0005290317,0.0004662465],"domain_scores_gemma":[0.9987628,0.0000793332,0.0001362129,0.0006824856,0.000199072,0.0001401084],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002188832,0.00016705,0.0001944893,0.0001472194,0.00003740857,0.000003467304,0.003396311,0.9901988,0.005588723,0.0001225333,0.00001296045,0.000109131],"study_design_scores_gemma":[0.0005275244,0.00008088652,0.0003350875,0.0003882125,0.00003388479,0.00002152412,0.000589552,0.9924551,0.004912954,0.0002369759,0.00001515724,0.0004031717],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4967632,0.00008067834,0.4980889,0.00000246575,0.002699535,0.0006528689,0.00002376458,0.0001603762,0.001528202],"genre_scores_gemma":[0.9986119,0.000004412426,0.001137459,0.00001285841,0.00001607288,0.0001313514,0.000001691163,0.0000586547,0.00002565143],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5018487,"threshold_uncertainty_score":0.9998848,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2059411722","doi":"10.1049/iet-rpg.2009.0070","title":"Reliability assessment of a wind-power system with integrated energy storage","year":2010,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Western University","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Wind power; Electric power system; MATLAB; Computer science; Battery (electricity); Energy storage; Power (physics); Automotive engineering; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.005143726594463599,"gpt":0.2004560894448711,"spread":0.1953123628504075,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006095616,0.0002813109,0.0003955104,0.0001080955,0.00007780642,0.0000610691,0.0002109588,0.0002228188,0.00009679083],"category_scores_gemma":[0.00003822588,0.0002252603,0.00008324407,0.0003380689,0.00008340429,0.0002882855,0.00002708154,0.0002440405,0.000004752041],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001949257,"about_ca_system_score_gemma":0.0001776841,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0009250983,"about_ca_topic_score_gemma":0.001980312,"domain_scores_codex":[0.9983014,0.00008974701,0.0005377503,0.0003875803,0.0003570163,0.0003264648],"domain_scores_gemma":[0.9985303,0.0000386714,0.0001279465,0.0008195366,0.0003606283,0.0001229232],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000308746,0.0001254762,0.001002596,0.0002155247,0.00008485697,0.000009499116,0.0003043828,0.4026323,0.5826803,0.007841069,0.004947891,0.0001252303],"study_design_scores_gemma":[0.001662581,0.000678578,0.004713977,0.0003699373,0.00007963285,0.00008282955,0.0006412485,0.679004,0.1969361,0.00007462985,0.1146149,0.00114168],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6324372,0.00009704755,0.3458713,0.00003344479,0.00265415,0.000324712,0.00004770785,0.0004056316,0.01812875],"genre_scores_gemma":[0.9946246,0.000008863351,0.004615403,0.00002040692,0.00009056819,0.00006007967,0.00005747452,0.00004642336,0.0004761998],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3857442,"threshold_uncertainty_score":0.9185849,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2075286451","doi":"10.1049/ip-gid:20030068","title":"Reliability evaluation of small stand-alone wind energy conversion systems using a time series simulation model","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability (semiconductor); Turbine; Reliability engineering; Wind speed; Battery (electricity); Series (stratigraphy); Small wind turbine; Margin (machine learning); Electric power system; Electricity; Automotive engineering; Engineering; Power (physics); Environmental science; Marine engineering; Computer science; Meteorology; Electrical engineering; Aerospace engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02850920002622523,"gpt":0.2343124024471626,"spread":0.2058032024209374,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001376222,0.000137435,0.0002565056,0.00005851034,0.00004101082,0.00001650171,0.00006259193,0.000117766,0.00003950718],"category_scores_gemma":[0.0001743743,0.0001285481,0.00005394272,0.0001470246,0.00003692524,0.0002709188,0.00001174911,0.00005044359,0.000005238263],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003291683,"about_ca_system_score_gemma":0.00009958443,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001071869,"about_ca_topic_score_gemma":0.000007303169,"domain_scores_codex":[0.9987234,0.0001739548,0.0004018462,0.0001911771,0.0003328902,0.0001767134],"domain_scores_gemma":[0.9990435,0.00006766131,0.00007227158,0.0003209843,0.0004443583,0.00005120559],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001661717,0.00001891788,0.00005980001,0.0002412689,0.00001498259,1.423334e-7,0.0001153411,0.9911791,0.00742826,0.0008513589,0.00003386888,0.00004031255],"study_design_scores_gemma":[0.000413771,0.00002396663,0.00003510811,0.00009399786,0.00004554584,0.000002507902,0.00008284504,0.9915849,0.006646859,0.0004787878,0.0004533851,0.0001383503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5264207,0.0004015425,0.4673735,0.000003071434,0.0003066115,0.0003224948,0.00001187594,0.000119704,0.00504048],"genre_scores_gemma":[0.9977788,0.00001153319,0.001805854,0.000003251336,0.00001177104,0.000005823163,0.000005613076,0.00001744451,0.0003599187],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4713581,"threshold_uncertainty_score":0.5242037,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2087568097","doi":"10.1049/ip-gtd:20010562","title":"Maintaining supply reliability of small isolated power systems using renewable energy","year":2001,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Reliability engineering; Wind power; Probabilistic logic; Electric power system; Environmental economics; Photovoltaics; Intermittent energy source; Reliability (semiconductor); Energy source; Computer science; Environmental science; Distributed generation; Photovoltaic system; Engineering; Power (physics); Electrical engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.01343802668126073,"gpt":0.2049613155547858,"spread":0.1915232888735251,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004350034,0.0002051877,0.0002751237,0.00006448792,0.0001529575,0.0000813899,0.00008155352,0.0002031442,0.00002669141],"category_scores_gemma":[0.00003834372,0.000191657,0.00006380806,0.0002888189,0.00004998525,0.0002952345,0.0000112625,0.0001023438,7.610312e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001449472,"about_ca_system_score_gemma":0.0000326195,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003519809,"about_ca_topic_score_gemma":0.000009050284,"domain_scores_codex":[0.9986613,0.00002344429,0.0005453391,0.0003041985,0.000179488,0.0002861729],"domain_scores_gemma":[0.9993218,0.00001649539,0.00009758669,0.0001074572,0.0003011934,0.0001555175],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002375595,0.0001493847,0.004347794,0.0007847495,0.00004836317,0.000004543538,0.0007589315,0.177128,0.8049303,0.005579375,0.003803281,0.002227705],"study_design_scores_gemma":[0.0005375285,0.0001071922,0.0003580762,0.0002638644,0.00003252,0.00006040634,0.0002339676,0.9248202,0.04321603,0.0002182107,0.02987328,0.0002787673],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3813335,0.0007749359,0.6165223,0.00005516335,0.0002667307,0.0001701748,0.00003400349,0.0001536198,0.000689665],"genre_scores_gemma":[0.9986329,0.0004529455,0.0005665781,0.00001374781,0.00005913739,0.00001983727,0.0001158253,0.00001986341,0.000119162],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7617143,"threshold_uncertainty_score":0.7815547,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2062341738","doi":"10.1049/ip-gtd:20010406","title":"Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply","year":2001,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Turbine; Computer science; Wind speed; Engineering; Power (physics); Meteorology; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02955151057475275,"gpt":0.284202469252431,"spread":0.2546509586776783,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001749463,0.0003558511,0.0003222394,0.00008520098,0.0005796642,0.0002406017,0.0001198312,0.0003311667,0.00003981427],"category_scores_gemma":[0.0002089414,0.0003517471,0.0001241842,0.0003294781,0.00007306483,0.0009628211,0.00001893858,0.0001861152,0.00001121276],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001113381,"about_ca_system_score_gemma":0.00007831905,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002891913,"about_ca_topic_score_gemma":0.000003789484,"domain_scores_codex":[0.997667,0.00007963577,0.0007548773,0.000531656,0.0005745867,0.0003922728],"domain_scores_gemma":[0.9984015,0.00004851828,0.0001939436,0.0001467006,0.001009251,0.0002001173],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003481748,0.0001317173,0.0003741939,0.0006452245,0.00005675681,0.00000128925,0.000655039,0.2946909,0.6722347,0.00337017,0.003640946,0.02385093],"study_design_scores_gemma":[0.001108367,0.0001276321,0.0003074746,0.0001944542,0.00009834589,0.00002984229,0.0001278501,0.8725486,0.1158592,0.0002852448,0.008961933,0.0003509797],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3682574,0.0001642115,0.6276455,0.0001686751,0.0004052547,0.002648454,0.0002812028,0.0002844503,0.0001448814],"genre_scores_gemma":[0.991079,0.0001304224,0.0004690391,0.00001930287,0.000529666,0.0007363147,0.00694707,0.00003387446,0.00005529914],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6271765,"threshold_uncertainty_score":0.9998934,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2162673969","doi":"10.1109/59.867185","title":"Impact of load management on composite system reliability evaluation short-term operating benefits","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Load management; Electric power system; Computer science; Term (time); Operating cost; Operations research; Engineering; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.01367309599947074,"gpt":0.2490008423499346,"spread":0.2353277463504639,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001061879,0.000373916,0.0005279189,0.0001563565,0.0001496848,0.00007240868,0.0002569023,0.0001679389,0.0001369536],"category_scores_gemma":[0.000002852226,0.0003299368,0.0003174658,0.0003225297,0.00004102639,0.0002139041,0.000001212345,0.0002587371,0.0001661417],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001662911,"about_ca_system_score_gemma":0.00004704734,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001965421,"about_ca_topic_score_gemma":0.00001618656,"domain_scores_codex":[0.9972093,0.0002184207,0.0008813942,0.0004683537,0.0008197195,0.0004028089],"domain_scores_gemma":[0.9985834,0.00008384672,0.00006475962,0.0008863696,0.0002391451,0.0001424182],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007729218,0.000193802,0.0001196231,0.000711166,0.0002341806,0.000004412756,0.0004323521,0.9930789,0.0009016555,0.00007847982,0.0001197257,0.00404842],"study_design_scores_gemma":[0.003215869,0.001733085,0.02077531,0.008192716,0.0005307063,0.0001565586,0.0007850616,0.9519835,0.01020432,0.000005830776,0.0007588518,0.001658266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8653734,0.000341538,0.1035076,0.000007316627,0.002814979,0.002027573,0.0002042564,0.0005065745,0.02521675],"genre_scores_gemma":[0.9992699,0.00004390031,0.0000589898,0.00000436508,0.00001746183,0.0002986671,0.000005953281,0.00005203637,0.0002487262],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1338965,"threshold_uncertainty_score":0.9999152,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2170320502","doi":"10.1109/tpwrs.2005.862000","title":"Bulk Electric System Well-Being Analysis Using Sequential Monte Carlo Simulation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Electric power system; Probabilistic logic; Computer science; Reliability engineering; Transmission system; Transmission (telecommunications); Engineering; Power (physics); Statistics; Mathematics; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.00725077268151302,"gpt":0.2108392822657237,"spread":0.2035885095842106,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003729756,0.0003657949,0.0005985828,0.0007287985,0.0002397017,0.0001538098,0.0001930723,0.0002422063,0.00001896938],"category_scores_gemma":[0.000002061876,0.0003784485,0.0004190063,0.0015547,0.00003189107,0.0002862298,0.000001003918,0.0002859141,0.00008181939],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001056857,"about_ca_system_score_gemma":0.00003681206,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002701404,"about_ca_topic_score_gemma":0.0002167004,"domain_scores_codex":[0.9976088,0.0001449068,0.0008168318,0.0004411051,0.0004454284,0.0005429109],"domain_scores_gemma":[0.9989401,0.0001035271,0.000121595,0.0005786275,0.0001451519,0.0001110772],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001699644,0.00003909817,0.00004551759,0.000254917,0.0004502404,0.00001571761,0.0001907018,0.9966375,0.002160228,0.0001298932,0.0000409407,0.00001831017],"study_design_scores_gemma":[0.0003007365,0.00003533119,0.00004593561,0.0001719554,0.0005484687,0.00003184194,0.0002259552,0.9945885,0.002796777,0.000002306395,0.0008717259,0.0003804438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1608658,0.0003107509,0.8308706,0.000004724082,0.003793714,0.0004904382,0.00003004791,0.0008022006,0.002831656],"genre_scores_gemma":[0.9992266,0.000005096996,0.00007559164,0.000005187967,0.00006975501,0.00006058958,0.000002263727,0.00006937178,0.0004856002],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8383607,"threshold_uncertainty_score":0.9998667,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2146292227","doi":"10.1109/tec.2004.842376","title":"Incorporating Well-Being Considerations in Generating Systems Using Energy Storage","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Reliability engineering; Electric power system; Computer science; Wind power; Energy storage; Engineering; Power (physics); Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.009437024073364463,"gpt":0.1945912948282542,"spread":0.1851542707548897,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002263499,0.0002521625,0.0002829759,0.0003219006,0.0002846365,0.00007401243,0.00009642676,0.0001792846,0.0000524588],"category_scores_gemma":[0.000005432266,0.0002819067,0.00009074812,0.0003041735,0.00004335932,0.0004352648,0.000002053653,0.0002308494,0.0000161202],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005596823,"about_ca_system_score_gemma":0.00006149342,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001039625,"about_ca_topic_score_gemma":0.0008414369,"domain_scores_codex":[0.9984878,0.0001256531,0.0005227052,0.0003132542,0.0002116099,0.0003389898],"domain_scores_gemma":[0.9993252,0.0001405759,0.00007459372,0.0002879994,0.00006429865,0.0001073982],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000005752753,0.00003975517,0.000009028077,0.00004380759,0.00002181034,0.00001648986,0.000193757,0.974682,0.02220037,0.001521111,0.0001092831,0.00115685],"study_design_scores_gemma":[0.0004494219,0.00002488831,0.000002442486,0.0001997874,0.00001596942,0.00003852264,0.0001952838,0.9492028,0.04702105,0.00003976551,0.002526077,0.0002840298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0769804,0.0002257835,0.9187778,0.00004843937,0.001895955,0.00009462098,0.00000675637,0.0002954897,0.00167473],"genre_scores_gemma":[0.9968421,0.00005884569,0.002442624,0.0001591191,0.0001494883,0.00003515616,0.000004151543,0.00004584302,0.0002626592],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9198617,"threshold_uncertainty_score":0.9999633,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2154642422","doi":"10.1049/iet-rpg.2009.0031","title":"Probabilistic evaluation of transient stability of a power system incorporating wind farms","year":2010,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Transient (computer programming); Electric power system; Fault (geology); Control theory (sociology); Context (archaeology); Turbine; Wind power; Probabilistic logic; Time domain; Engineering; Stability (learning theory); Computer science; Power (physics); Reliability engineering; Electrical engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.02105830052246839,"gpt":0.2258978143989827,"spread":0.2048395138765143,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002578016,0.0001983165,0.0003578436,0.00009057152,0.00005221851,0.00002469076,0.0001525815,0.0001758519,0.00007814402],"category_scores_gemma":[0.0002458607,0.0001863512,0.0001010563,0.0002764755,0.00009180924,0.0002194592,0.00001732045,0.0001483291,0.000003641074],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001547137,"about_ca_system_score_gemma":0.0001815798,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001603023,"about_ca_topic_score_gemma":0.001102302,"domain_scores_codex":[0.9978511,0.0001605472,0.0008378188,0.0003029891,0.0006270917,0.0002204192],"domain_scores_gemma":[0.9982674,0.00004814751,0.0002166045,0.0006012756,0.0007920475,0.00007458119],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00001509317,0.00008196121,0.000694108,0.0004411834,0.00003169949,3.264573e-7,0.001262088,0.2403894,0.7558264,0.0009207655,0.0001332478,0.0002037426],"study_design_scores_gemma":[0.0009432598,0.0001877067,0.002320417,0.0001873996,0.0001089688,0.00001113686,0.0007032827,0.4762833,0.5181717,0.0003097495,0.0004226137,0.0003504228],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.975843,0.0001591886,0.01577074,0.00001966497,0.001902915,0.000937765,0.00004679308,0.0001123891,0.005207532],"genre_scores_gemma":[0.9986893,0.000001694058,0.001113645,0.000003514826,0.00005930565,0.00006299739,0.0000329254,0.0000257171,0.00001087802],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2376546,"threshold_uncertainty_score":0.7599183,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2900400407","doi":"","title":"Understanding the cost of power interruptions to U.S. electricity consumers","year":2004,"lang":"en","type":"article","venue":"Lawrence Berkeley National Laboratory","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Blackout; Electricity; Reliability (semiconductor); Electric power industry; Reliability engineering; Quality (philosophy); Computer science; Environmental economics; Electricity market; Electric power system; Power (physics); Electricity generation; Business; Risk analysis (engineering); Economics; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03548939390424717,"gpt":0.251232083713723,"spread":0.2157426898094758,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003917147,0.0001085626,0.0001278328,0.00009208629,0.00008738572,0.00002064563,0.0002143322,0.00005744101,0.0000277593],"category_scores_gemma":[0.0002296238,0.00009115846,0.00004054215,0.000695209,0.0001114632,0.0001481812,0.00002174432,0.0001539372,0.00004461214],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006346094,"about_ca_system_score_gemma":0.0002171423,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002037667,"about_ca_topic_score_gemma":0.0001385174,"domain_scores_codex":[0.9990588,0.00002991621,0.0002459958,0.0001379439,0.0003266633,0.0002007159],"domain_scores_gemma":[0.9992905,0.000136732,0.00004233596,0.00015809,0.0002986653,0.00007369172],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00002304875,0.00008123586,0.0009956916,0.00007062485,0.0001015508,0.000002620204,0.001161938,0.08820307,0.01264651,0.8896873,0.006925165,0.0001012307],"study_design_scores_gemma":[0.006995957,0.000912977,0.09072787,0.002481832,0.0002186006,0.00008718178,0.006873128,0.009766343,0.1194318,0.1786173,0.5794449,0.004442123],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2687774,0.001323815,0.6608437,0.004284226,0.002777321,0.002047779,0.001499545,0.0007550652,0.05769105],"genre_scores_gemma":[0.9992056,0.00001945007,0.0003909958,0.000285314,0.00001784419,0.0000440081,0.000006158977,0.00001199405,0.00001859156],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7304282,"threshold_uncertainty_score":0.3717334,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1980372699","doi":"10.1109/tpwrs.2002.800871","title":"Determination of the optimum routine test and self-checking intervals in protective relaying using a reliability model","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Dependability; Relay; Reliability (semiconductor); Protective relay; Computer science; Markov model; Markov chain; Markov process; Engineering; Power (physics); Statistics; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0171299439962037,"gpt":0.2177357559578925,"spread":0.2006058119616888,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005558044,0.0001906095,0.0003018502,0.0001319179,0.00009238119,0.00003073337,0.0001457922,0.0001429502,0.000003642733],"category_scores_gemma":[0.00004262645,0.0001577396,0.00009292953,0.0003199328,0.00005444416,0.0002464361,0.000003125265,0.0003268501,0.000002096532],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003685142,"about_ca_system_score_gemma":0.00001400314,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001289209,"about_ca_topic_score_gemma":0.00003567976,"domain_scores_codex":[0.9986359,0.0001161413,0.0005544048,0.0002647379,0.000195471,0.000233321],"domain_scores_gemma":[0.9992164,0.0001485757,0.0001038151,0.0004026339,0.00008420421,0.00004434209],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008230009,0.0002209112,0.0003794544,0.0006065204,0.00002064378,0.000001700745,0.005348154,0.9879848,0.005157318,0.00001584039,0.000005847498,0.0002505954],"study_design_scores_gemma":[0.0003269628,0.00004813875,0.0001821976,0.0007964926,0.00002076192,0.00002933923,0.0002667392,0.9935253,0.00460637,0.00002407002,0.00001751602,0.0001561456],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2817175,0.0001353769,0.716116,0.00002381225,0.0006611708,0.0008180619,0.00002017946,0.0001192116,0.0003886411],"genre_scores_gemma":[0.998798,0.00001669041,0.0009858023,0.000005898688,0.000004416482,0.0001040502,7.414083e-8,0.00002890773,0.000056163],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7170805,"threshold_uncertainty_score":0.6432435,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4237602079","doi":"10.1049/ip-gtd:20030068","title":"Reliability evaluation of small stand-alone wind energy conversion systems using a time series simulation model","year":2003,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability (semiconductor); Turbine; Reliability engineering; Wind speed; Small wind turbine; Margin (machine learning); Battery (electricity); Series (stratigraphy); Electric power system; Environmental science; Electricity; Automotive engineering; Computer science; Power (physics); Marine engineering; Simulation; Engineering; Meteorology; Electrical engineering; Aerospace engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02865673324261425,"gpt":0.2344354697669899,"spread":0.2057787365243756,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001179692,0.0001966307,0.0002564386,0.00006179461,0.0001621519,0.0000649474,0.00004743664,0.0001979369,0.00001559472],"category_scores_gemma":[0.0001091809,0.0001880336,0.00005504983,0.0002081583,0.00005189052,0.0005119884,0.000005655144,0.00007785529,9.576567e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00027116,"about_ca_system_score_gemma":0.00009433531,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001646399,"about_ca_topic_score_gemma":6.500891e-7,"domain_scores_codex":[0.9985407,0.00006660834,0.0005041597,0.0002955269,0.0004006202,0.0001923859],"domain_scores_gemma":[0.9988462,0.00001882371,0.0001218643,0.0001009923,0.0007988404,0.0001132871],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004203124,0.00003382032,0.00005038506,0.0003560194,0.00001064783,7.165185e-8,0.0001921508,0.8022803,0.1949501,0.001376336,0.0001413931,0.0005667777],"study_design_scores_gemma":[0.0006866347,0.000044605,0.00005601177,0.0001300018,0.00008015017,0.000005972305,0.00007679358,0.9140007,0.08268324,0.0003630685,0.001690699,0.0001821686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4738671,0.0007753205,0.5245154,0.00001257728,0.0001457089,0.0003202967,0.00004952338,0.00008030856,0.0002337334],"genre_scores_gemma":[0.9986739,0.0001351917,0.0009187901,0.00000438857,0.00003638096,0.0000163788,0.0001379191,0.00001645543,0.00006055233],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5248068,"threshold_uncertainty_score":0.7667786,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2097775822","doi":"10.1109/tpwrd.2004.832404","title":"Historic Performance-Based Distribution System Risk Assessment","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Incentive; IT service continuity; Reliability engineering; Electricity; Service (business); Work (physics); Order (exchange); Risk analysis (engineering); Remedial education; Engineering; Electricity market; Computer science; Operations research; Economics; Business; Finance; Power (physics); Microeconomics; Economy","retraction":null,"screen_n_in":null,"score":{"opus":0.004954793871317489,"gpt":0.176758634165352,"spread":0.1718038402940345,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002252835,0.0002279051,0.0002195551,0.0001041827,0.0002221111,0.0000336894,0.0001593894,0.0001310324,0.0000318944],"category_scores_gemma":[0.000001657542,0.0002271031,0.0001646982,0.0002551544,0.00004070273,0.0002317353,6.081055e-7,0.0003715043,0.0001930688],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002598247,"about_ca_system_score_gemma":0.00009629314,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008805617,"about_ca_topic_score_gemma":0.00001954282,"domain_scores_codex":[0.9987662,0.00003925403,0.0003222615,0.0002526967,0.0002949919,0.0003246201],"domain_scores_gemma":[0.999302,0.00004076238,0.00004988761,0.0004032164,0.00008980374,0.0001143078],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003811028,0.0001482706,0.00003846054,0.0002515375,0.00006111447,0.000009663064,0.00009272395,0.9963499,0.0004550263,0.00009100272,0.0004380294,0.002026215],"study_design_scores_gemma":[0.01287276,0.002761387,0.01280465,0.003708984,0.0009054451,0.0001925728,0.001048292,0.7290514,0.1421745,0.00009707819,0.09012213,0.004260813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.213902,0.00009068492,0.7802559,0.00002753138,0.003314743,0.0002296378,0.0001947665,0.0006679682,0.001316778],"genre_scores_gemma":[0.9992371,0.0001012909,0.0004117619,0.00002474747,0.00002404289,0.00009475441,0.00001217298,0.0000317087,0.00006241338],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7853351,"threshold_uncertainty_score":0.9260995,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}