{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":447,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":447,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"5dbc97e62fb7","filters":{"topic":"Power Systems and Technologies"}},"results":[{"id":"W2039760745","doi":"10.1109/tpwrd.2006.886788","title":"Modelling and Simulation for Performance Evaluation of IEC61850-Based Substation Communication Systems","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power Systems and Technologies","field":"Engineering","cited_by":225,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Western University","funders":"","keywords":"IEC 61850; Interoperability; Network topology; Automation; Systems engineering; Construct (python library); Extensibility; Computer science; Telecommunications network; Network simulation; Engineering; Embedded system; Software engineering; Distributed computing; Computer network; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.04072183062404203,"gpt":0.2596746782754892,"spread":0.2189528476514472,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007708268,0.0001035937,0.0001228488,0.0002437635,0.00009509527,0.0000172726,0.00006534896,0.0001101421,0.000003042163],"category_scores_gemma":[0.000003722145,0.0001113646,0.00003967966,0.0001463502,0.00002947079,0.0002145162,3.593928e-7,0.00008878692,0.000001582298],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001053506,"about_ca_system_score_gemma":0.00001631341,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003027828,"about_ca_topic_score_gemma":0.00001471979,"domain_scores_codex":[0.9992134,0.0000229822,0.0003096728,0.0001092098,0.0002201931,0.0001245541],"domain_scores_gemma":[0.9992023,0.0002190945,0.00006832898,0.0002232465,0.0002648153,0.00002225689],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004812914,0.00002104052,0.00001173909,0.00006608605,0.00002296864,4.032506e-8,0.0001793538,0.9896616,0.0006643449,0.00002876078,0.000005158986,0.009290716],"study_design_scores_gemma":[0.0007404659,0.000067519,0.0001031244,0.0001004952,0.00005059775,6.018831e-7,0.0001812971,0.9804326,0.01812156,0.00002054569,0.00007579941,0.0001053457],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4662687,0.0003309179,0.5326685,0.000002353045,0.000201425,0.0003284115,0.00001137252,0.0001068841,0.000081452],"genre_scores_gemma":[0.9980668,0.00007895616,0.001744744,0.000002895381,0.000004857083,0.00006754482,0.000008327156,0.00001920418,0.000006640574],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5317981,"threshold_uncertainty_score":0.4541315,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3097761912","doi":"10.18280/ejee.224-509","title":"A Multi-Objective Hybrid Algorithm for Planning Electrical Distribution System","year":2020,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering","topic":"Power Systems and Technologies","field":"Engineering","cited_by":196,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Computer science; Distribution (mathematics); Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01263240032186364,"gpt":0.1996680300434986,"spread":0.187035629721635,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000364146,0.0002217969,0.0003888008,0.0001371173,0.00004797976,0.00005718211,0.0003169624,0.00004286752,7.613571e-7],"category_scores_gemma":[0.0003387551,0.0002043922,0.0001852258,0.0004289466,0.000009336827,0.0001329281,0.00002843013,0.0005584002,0.000007711064],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002266699,"about_ca_system_score_gemma":0.00001914629,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":3.047487e-7,"about_ca_topic_score_gemma":7.764374e-9,"domain_scores_codex":[0.9986256,0.00004119951,0.0005664582,0.0001531837,0.0002034583,0.0004100722],"domain_scores_gemma":[0.9993763,0.0001098219,0.0001184461,0.00009052716,0.0001065942,0.0001983311],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001791077,0.0001528266,0.0001369074,0.0007609368,0.001434536,0.003781634,0.0007473102,0.5197377,0.09539317,0.001496762,0.01457782,0.3616014],"study_design_scores_gemma":[0.0008310683,0.0004999794,0.0003053995,0.0001132632,0.00003730934,0.0003583584,0.00002810707,0.9805229,0.008152921,0.000001208279,0.008913207,0.0002362226],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.007659269,0.002257698,0.9887975,0.00003581291,0.0003577236,0.0001555272,0.00002157413,0.0006255662,0.0000892973],"genre_scores_gemma":[0.9679036,0.00001994014,0.03145738,0.0000125708,0.0005197772,0.000004832555,0.000005649351,0.0000728084,0.000003421391],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9602444,"threshold_uncertainty_score":0.8334874,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2071801372","doi":"10.1109/cjece.2005.1541746","title":"Canadian Conference on Electrical and Computer Engineering","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Power Systems and Technologies","field":"Engineering","cited_by":151,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Library science; Work (physics); Engineering; Political science; Operations research; Computer science; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.005332368790082714,"gpt":0.1525942146199766,"spread":0.1472618458298939,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001034813,0.0002469498,0.0003383322,0.0007826463,0.00006322646,0.0001489094,0.0002066875,0.0001609759,0.000007986701],"category_scores_gemma":[0.00002144104,0.0002380924,0.00005524332,0.0002974585,0.00001731697,0.0001403911,0.00001276266,0.0005876505,0.000004180081],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003358897,"about_ca_system_score_gemma":0.0001783043,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00255549,"about_ca_topic_score_gemma":0.007614642,"domain_scores_codex":[0.998769,0.000007601612,0.0003214804,0.0001595114,0.0001115555,0.0006308692],"domain_scores_gemma":[0.9987697,0.00007120188,0.00003115204,0.0001119783,0.00005550233,0.0009604698],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001403454,0.00003270777,0.005040663,0.0001969981,0.0005677236,0.001391889,0.0006475373,0.4878483,0.0009093105,0.05572227,0.01503634,0.4325923],"study_design_scores_gemma":[0.0002537252,0.0002221549,0.005955383,0.0001012227,0.00001228202,0.0006277725,0.000001539422,0.9607423,0.0001842885,0.00003081886,0.03156133,0.0003072068],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.702608,0.01047886,0.2824506,0.001307723,0.001847316,0.0003020367,0.00001733922,0.0004194633,0.0005685964],"genre_scores_gemma":[0.9954444,0.0001058945,0.003755528,0.00009896162,0.0005498418,0.000002241353,8.353759e-7,0.00003095557,0.00001129912],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.472894,"threshold_uncertainty_score":0.9709126,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2764803765","doi":"10.1109/pes.2005.1489232","title":"An integrated distributed generation optimization model for distribution system planning","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Power Systems and Technologies","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.01194674809494643,"gpt":0.2227337708635873,"spread":0.2107870227686409,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004176722,0.0003840829,0.0003131817,0.00005825439,0.0001634707,0.0001517988,0.0002609864,0.0003612993,0.000003297537],"category_scores_gemma":[0.00003216455,0.0004048245,0.0001857007,0.0002229412,0.00001992759,0.0003923768,0.00001648525,0.0002348074,0.000003640722],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006998536,"about_ca_system_score_gemma":0.00002804025,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009976202,"about_ca_topic_score_gemma":0.000005033427,"domain_scores_codex":[0.9982964,0.00001578544,0.000493283,0.0003599506,0.0002190468,0.0006155192],"domain_scores_gemma":[0.9993005,0.0000217654,0.0000895359,0.0003331731,0.0001257994,0.0001292141],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00000295139,0.00001780143,0.00001508687,0.00007718886,0.00006580311,5.109237e-7,0.0002423351,0.9556556,0.02599882,0.0002701832,0.0174755,0.0001782469],"study_design_scores_gemma":[0.0003586723,0.00002702618,0.000008407646,0.0001002745,0.00003001203,0.00000695874,0.000115099,0.9780409,0.01257054,9.336491e-7,0.008294587,0.0004465815],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06779657,0.0005242808,0.9267676,0.0000423964,0.0009546227,0.0003687836,0.0004551202,0.003061722,0.00002885755],"genre_scores_gemma":[0.8518116,0.00002757054,0.1459214,0.00001669989,0.0006105771,0.000178198,0.001281378,0.00009601084,0.00005648115],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7840151,"threshold_uncertainty_score":0.9998404,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1982413179","doi":"10.1109/tia.2004.824503","title":"A Grid Information Resource for Nationwide Real-Time Power Monitoring","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power Systems and Technologies","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Software deployment; Event (particle physics); Reliability (semiconductor); The Internet; Computer science; Resource (disambiguation); Grid; Server; Data quality; Database; Power (physics); Engineering; World Wide Web; Computer network; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.01002293927749574,"gpt":0.225670990837393,"spread":0.2156480515598972,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008023936,0.0001501778,0.000120565,0.0002257546,0.0002539944,0.00005640864,0.0001820734,0.0003789222,0.00001906831],"category_scores_gemma":[0.000004154349,0.0001662981,0.00007015256,0.0003986761,0.00003262797,0.0003645319,9.215225e-7,0.0004025744,0.0001628869],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001759169,"about_ca_system_score_gemma":0.00003211365,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000203125,"about_ca_topic_score_gemma":0.00000249807,"domain_scores_codex":[0.999224,0.000004666678,0.0002933231,0.0001330384,0.0001338286,0.0002111387],"domain_scores_gemma":[0.9994128,0.00005530545,0.00004827425,0.0003524826,0.00006782859,0.00006328274],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0000259605,0.00022539,0.0000291498,0.0001454676,0.0002148293,8.14113e-7,0.0008828332,0.9225694,0.01521084,0.00576155,0.004343804,0.05058995],"study_design_scores_gemma":[0.002092687,0.0001856069,0.0006301231,0.0002384906,0.0001038208,0.0000405084,0.001694018,0.003119045,0.3850966,0.002222915,0.603522,0.001054168],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01790892,0.00001979839,0.971072,0.0003619839,0.00039751,0.000958714,0.0002450108,0.001856838,0.007179206],"genre_scores_gemma":[0.993201,0.00002625538,0.003625041,0.00001800852,0.0001087402,0.002736519,0.00001876143,0.00002974086,0.0002359245],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9752921,"threshold_uncertainty_score":0.6781438,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2086309685","doi":"10.1109/tpwrd.2013.2239314","title":"An Optimal Composition and Placement of Automatic Switches in DAS","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power Systems and Technologies","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Ontario Tech University","funders":"","keywords":"Recloser; Automation; Network topology; Electric power system; Power (physics); Circuit breaker; Computer science; Composition (language); Engineering; Electrical engineering; Topology (electrical circuits); Electronic engineering; Computer network","retraction":null,"screen_n_in":null,"score":{"opus":0.007401969759960151,"gpt":0.2105527170071352,"spread":0.203150747247175,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004414692,0.00009950176,0.0001365988,0.0001860898,0.00002417017,0.00001849158,0.00006678054,0.0000733081,0.00008818745],"category_scores_gemma":[2.959038e-7,0.00009779067,0.0000246348,0.00009523563,0.00003088376,0.0002337104,6.180591e-7,0.0001050666,0.00001756604],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004098678,"about_ca_system_score_gemma":0.000004998775,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008541043,"about_ca_topic_score_gemma":0.00001774604,"domain_scores_codex":[0.9994966,0.000009996746,0.0001904755,0.0001019118,0.00008061119,0.0001203525],"domain_scores_gemma":[0.9997535,0.00002281785,0.00001838442,0.0001577759,0.00001695142,0.00003054852],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004960981,0.0007570224,0.0003600058,0.0004417439,0.0002391912,0.00001356174,0.003444571,0.4915352,0.4500349,0.00007379657,0.000507283,0.05254316],"study_design_scores_gemma":[0.001404279,0.0006914233,0.009768591,0.0004357756,0.00004531253,0.00003407216,0.002598522,0.4949181,0.4893565,0.00006627233,0.0000975473,0.0005835933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8757506,0.0001110461,0.1233436,0.00001578111,0.0001755473,0.000169337,0.000009106541,0.0002311872,0.0001938068],"genre_scores_gemma":[0.9988561,0.00004746033,0.001019779,0.000007518213,0.000002111045,0.0000461319,9.463988e-7,0.00001222113,0.00000778609],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1231054,"threshold_uncertainty_score":0.3987788,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1968728900","doi":"10.1109/mpe.2013.2285591","title":"No Light in August: Power System Restoration Following the 2003 North American Blackout","year":2014,"lang":"en","type":"article","venue":"IEEE Power and Energy Magazine","topic":"Power Systems and Technologies","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Blackout; Electric power system; Electric power transmission; Telecommunications; Grid; New england; Span (engineering); Electrical engineering; Interconnection; Power grid; State (computer science); Engineering; Power (physics); Geography; Computer science; Civil engineering; Political science; Law; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.003850184706004732,"gpt":0.1787416041955267,"spread":0.174891419489522,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001834294,0.0002081339,0.0002818316,0.0001329654,0.00006463553,0.00006107223,0.0001780466,0.00007353868,0.000005142431],"category_scores_gemma":[0.00003725557,0.0001515059,0.00004740669,0.0005111987,0.00004834138,0.0001383902,0.00002977916,0.0001485334,0.00006408499],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006400944,"about_ca_system_score_gemma":0.000009720676,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001762179,"about_ca_topic_score_gemma":0.001237559,"domain_scores_codex":[0.9990026,0.00004363151,0.0002782771,0.000213065,0.0001509943,0.0003114427],"domain_scores_gemma":[0.9994451,0.00003054991,0.00004890603,0.0003765784,0.00004342331,0.00005542184],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002616673,0.0003646346,0.136278,0.000949959,0.001315599,0.0006129306,0.005151798,0.04522864,0.04381116,0.08167174,0.6344478,0.04990619],"study_design_scores_gemma":[0.0006943828,0.0002290679,0.0354149,0.0001547718,0.00002744305,0.00002837084,0.0002622084,0.01443884,0.001207524,0.00002766349,0.9468456,0.0006692084],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8609936,0.0009331472,0.007144205,0.0001682107,0.004038078,0.0001252654,0.000006736582,0.001024173,0.1255665],"genre_scores_gemma":[0.9981791,0.0000361792,0.00009688293,0.00005525468,0.00008438488,0.00003287202,0.000003817968,0.00003586469,0.001475585],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3123979,"threshold_uncertainty_score":0.6178232,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4398250261","doi":"10.1109/tsg.2024.3404859","title":"Dynamic Distribution Network Reconfiguration With Generation and Load Uncertainty","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Power Systems and Technologies","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Control reconfiguration; Computer science; Load management; Reliability engineering; Engineering; Electrical engineering; Embedded system","retraction":null,"screen_n_in":null,"score":{"opus":0.008261833726414296,"gpt":0.1977771377716281,"spread":0.1895153040452138,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008219641,0.000118789,0.00009441478,0.00004298448,0.0001106627,0.00008863932,0.00003321078,0.0000884109,0.00001504294],"category_scores_gemma":[8.530795e-7,0.00009987307,0.00002689604,0.0001982024,0.00002879704,0.0001634588,2.577617e-7,0.000167915,0.00002305909],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001685533,"about_ca_system_score_gemma":0.00002036972,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003881242,"about_ca_topic_score_gemma":0.0007445146,"domain_scores_codex":[0.9994569,0.00001088879,0.0001292099,0.0001647091,0.00009676447,0.0001415442],"domain_scores_gemma":[0.9997903,0.00002151565,0.000009602371,0.0001271828,0.00002369687,0.00002766659],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002115793,0.00001741335,0.00001134746,0.0001169869,0.0001409088,0.00001279648,0.00013118,0.8903852,0.005929327,0.0004100528,0.006326829,0.09649684],"study_design_scores_gemma":[0.0001899197,0.0001409791,0.0001719255,0.0001607324,0.00004982745,0.0000566544,0.00004087722,0.9557596,0.008489464,0.00008601051,0.03460067,0.000253282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.09829443,0.0006019709,0.8966763,0.0001523903,0.002708743,0.000167489,0.000100744,0.001010086,0.0002878576],"genre_scores_gemma":[0.999204,0.0002539411,0.0001802561,0.00000709886,0.0000979297,0.00006381622,0.00004439594,0.00001754579,0.0001310453],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9009095,"threshold_uncertainty_score":0.4072706,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2125028769","doi":"10.1109/pes.2006.1708970","title":"IED modelling for IEC61850 based substation automation system performance simulation","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Systems and Technologies","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Western University","funders":"","keywords":"Automation; Network topology; Computer science; Software deployment; Construct (python library); Network simulation; Embedded system; Process automation system; Systems engineering; Computer network; Engineering; Software engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.008504227325915027,"gpt":0.1896301349032208,"spread":0.1811259075773057,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000395471,0.0002925638,0.0002537854,0.00009966335,0.0001547638,0.00008499942,0.000132035,0.000226635,9.740075e-7],"category_scores_gemma":[0.00001237358,0.0003273239,0.0001832081,0.0002734412,0.00001194945,0.0002588977,0.000008169719,0.0001480711,0.000003350093],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003293623,"about_ca_system_score_gemma":0.00001476556,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003970554,"about_ca_topic_score_gemma":0.000002006479,"domain_scores_codex":[0.998546,0.00001027898,0.0004901512,0.0002573059,0.0002280435,0.0004681939],"domain_scores_gemma":[0.9994343,0.0001100536,0.00009479025,0.0002158178,0.0001072101,0.00003781701],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002229731,0.000006491061,0.0001098209,0.0005221404,0.00002331554,3.12544e-7,0.00009379084,0.9752788,0.02313861,0.000211991,0.0004159044,0.0001966023],"study_design_scores_gemma":[0.0003705256,0.00001779828,0.000149445,0.0002046275,0.0000197668,0.000001311106,0.00004646884,0.9689972,0.02894383,0.000005170578,0.0008919064,0.0003519427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4282981,0.0001764021,0.5684105,0.000006307429,0.0007083318,0.0002509206,0.00001414623,0.001967578,0.0001678225],"genre_scores_gemma":[0.9216581,0.000004650035,0.07772706,0.000006338657,0.0002944011,0.0001224255,0.00005737866,0.00009018205,0.00003948815],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.49336,"threshold_uncertainty_score":0.9999179,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2110680040","doi":"10.1109/ccece.2002.1015175","title":"System islanding considerations for improving power system restoration at Manitoba Hydro","year":2003,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Islanding; Electric power system; Forcing (mathematics); Circuit breaker; Load Shedding; Power (physics); Engineering; Computer science; Marine engineering; Electrical engineering; Reliability engineering; Geology; Physics; Atmospheric sciences","retraction":null,"screen_n_in":null,"score":{"opus":0.01625722161214081,"gpt":0.1975531973350557,"spread":0.1812959757229149,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002114136,0.0001464338,0.0001853368,0.0001125045,0.0002329306,0.00008996735,0.00005597108,0.0001328676,0.00001005397],"category_scores_gemma":[0.00007923658,0.0001327229,0.00005338268,0.00008222151,0.00001176193,0.0001529767,0.00001560518,0.00006270947,0.00004718918],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005717476,"about_ca_system_score_gemma":0.00001431669,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000426903,"about_ca_topic_score_gemma":0.0003771735,"domain_scores_codex":[0.9991772,0.00001865097,0.0002992774,0.0001698948,0.00009531833,0.0002396134],"domain_scores_gemma":[0.9995065,0.00009640699,0.0000480397,0.0002655982,0.00004807175,0.00003537826],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000004582654,0.00000992755,0.0007112485,0.001749983,0.00009493255,0.00002410802,0.0003082678,0.002829499,0.03789979,0.9426572,0.01358408,0.0001263474],"study_design_scores_gemma":[0.004482457,0.0004609125,0.0004428555,0.00135651,0.0002679877,0.002003189,0.05952673,0.4601567,0.3921166,0.001560033,0.07433013,0.003295969],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.357654,0.001061436,0.4211362,0.0000525615,0.005752471,0.002056149,0.00005908828,0.009509899,0.2027182],"genre_scores_gemma":[0.9963579,8.373486e-7,0.003118834,0.000004770666,0.00003820375,0.0001543489,0.000003629289,0.0000325096,0.0002889188],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9410972,"threshold_uncertainty_score":0.5412284,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2119351951","doi":"10.1109/tia.2006.872954","title":"Dispersed generation interconnection-utility perspective","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power Systems and Technologies","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Tripping; Interconnection; Transformer; Reliability engineering; Circuit breaker; Grid; Switchgear; Engineering; Ground; Computer science; Electrical engineering; Telecommunications; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.01639554814809758,"gpt":0.2313064277144321,"spread":0.2149108795663345,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005114817,0.0001540668,0.0001165657,0.0001464862,0.0002307904,0.00004240254,0.0001271831,0.0003489424,0.0001529085],"category_scores_gemma":[0.000001433693,0.0001642976,0.00007357391,0.0003945864,0.00006555268,0.0001394308,6.368784e-7,0.0005808831,0.0001058418],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002216138,"about_ca_system_score_gemma":0.00001703222,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002563543,"about_ca_topic_score_gemma":0.0003182416,"domain_scores_codex":[0.9992532,0.00001387577,0.0002184737,0.0002397603,0.000100773,0.0001739604],"domain_scores_gemma":[0.9994634,0.00002777112,0.00002642807,0.000374822,0.0000676272,0.00003989034],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.000031105,0.001851283,0.0004842902,0.0001237439,0.0005491137,0.000007185552,0.0009150855,0.6271359,0.1402812,0.09810793,0.03674506,0.09376811],"study_design_scores_gemma":[0.001399132,0.0001542726,0.002639524,0.00007407877,0.0001943729,0.00008097882,0.005873456,0.1925041,0.6734326,0.007773503,0.1141934,0.001680532],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03965769,0.00005338595,0.9439811,0.0002587172,0.0004273719,0.0004192408,0.00008738033,0.001273945,0.01384117],"genre_scores_gemma":[0.9979534,0.000009068862,0.0003568685,0.00001434452,0.0001820315,0.0009154602,0.000008512794,0.00002342381,0.0005369631],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9582956,"threshold_uncertainty_score":0.6699864,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1943588878","doi":"10.1109/lescpe.2002.1020664","title":"Review of interconnection standards for distributed power generation","year":2003,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Interconnection; Computer science; Distributed power; Power (physics); Electric power system; Electricity generation; Reliability engineering; Electrical engineering; Engineering; Telecommunications; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.01542858118775302,"gpt":0.2501702160820015,"spread":0.2347416348942484,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001525302,0.00004123116,0.00009086412,0.00001962235,0.000008880239,0.000003888422,0.00002464491,0.00003152548,0.00005991974],"category_scores_gemma":[0.0001365887,0.00003357256,0.00003063152,0.00006081912,0.00000474985,0.0000394727,0.000002399833,0.00001863459,8.38185e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000037833,"about_ca_system_score_gemma":0.000007032697,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001645388,"about_ca_topic_score_gemma":0.000004840281,"domain_scores_codex":[0.9997448,0.000004583009,0.0001135149,0.00004322912,0.00004024083,0.00005358666],"domain_scores_gemma":[0.9998075,0.00000726954,0.00001480193,0.0000881522,0.00007512209,0.000007123821],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000003657592,0.00003751859,0.00009022072,0.007818574,0.00012543,4.563213e-7,0.00004764984,0.0003493218,0.02985283,0.2246107,0.7226899,0.01437374],"study_design_scores_gemma":[0.0001427765,0.00004980441,0.00001196731,0.0007269102,0.000008388872,0.000003073966,0.0000388728,0.001058508,0.1444816,0.0001618381,0.8532329,0.00008338593],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.006850942,0.0188274,0.9669093,0.00004340738,0.0005440441,0.0002601794,0.0001065711,0.0002956358,0.006162549],"genre_scores_gemma":[0.9968009,0.002026376,0.001057078,0.00001738209,0.000007394768,0.00003082105,0.00001684708,0.000006367292,0.00003681831],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.98995,"threshold_uncertainty_score":0.1369049,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1969945783","doi":"10.1109/pes.2006.1709113","title":"Gas insulated substation GIS","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Systems and Technologies","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Switchgear; Modular design; Engineering; Reliability engineering; Automotive engineering; Electrical engineering; Power transmission; Power (physics); Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.004411897285943175,"gpt":0.1765875252714136,"spread":0.1721756279854704,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002323804,0.0003191295,0.0002615427,0.00008546215,0.00008777867,0.00007913725,0.0001887835,0.0002453074,0.00001187086],"category_scores_gemma":[0.00002013978,0.0003466784,0.0001886103,0.0004322299,0.00002418243,0.0001702265,0.00002347369,0.0002800693,0.0000303941],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000164932,"about_ca_system_score_gemma":0.000009632703,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002082802,"about_ca_topic_score_gemma":0.00001179885,"domain_scores_codex":[0.9985158,0.00001056743,0.0004114789,0.0002581697,0.000227485,0.0005764299],"domain_scores_gemma":[0.9995297,0.00003994038,0.0000527335,0.0002682469,0.00005457418,0.0000548299],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[7.941614e-7,0.00001371999,0.00061913,0.00008097302,0.00006527395,0.000006710939,0.0002208747,0.6810766,0.3015564,0.0004002735,0.01560115,0.0003580803],"study_design_scores_gemma":[0.00060222,0.00003147138,0.003500822,0.0001715121,0.00003159736,0.0000254322,0.0001193386,0.7888505,0.1791824,0.0001392952,0.02631171,0.001033713],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9598202,0.001518704,0.03089154,0.00004287532,0.00163467,0.0001615896,0.00001901333,0.00337249,0.002538962],"genre_scores_gemma":[0.9857863,0.00005568712,0.01344353,0.00001742351,0.0003128861,0.00003269628,0.0000256008,0.0001015323,0.0002243068],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.122374,"threshold_uncertainty_score":0.9998985,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1925923350","doi":"10.1109/pes.2003.1270979","title":"Considerations for load as a virtual generator for grid security","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Power Systems and Technologies","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Procurement; Spinning; Generator (circuit theory); Grid; Transmission system; Service (business); Government (linguistics); Computer science; Transmission (telecommunications); Electrical engineering; Business; Engineering; Telecommunications; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.009879024373375367,"gpt":0.2169327601056147,"spread":0.2070537357322394,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006695098,0.0007679202,0.0007216359,0.0001154498,0.0004003117,0.0002305991,0.0003983757,0.0006118066,0.00001674202],"category_scores_gemma":[0.000847022,0.0008456839,0.0005823898,0.0004516141,0.0000888074,0.0002893778,0.00004453666,0.0004236854,0.00006242337],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000839358,"about_ca_system_score_gemma":0.0003580076,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008998073,"about_ca_topic_score_gemma":0.0000286239,"domain_scores_codex":[0.9967614,0.00002054882,0.000823547,0.0007290938,0.0004125503,0.001252821],"domain_scores_gemma":[0.9980296,0.0002560025,0.0001330463,0.0006818561,0.0006295132,0.0002699699],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000111485,0.00008140077,0.00001936109,0.0003992463,0.0005031495,0.00001064268,0.001751174,0.5183979,0.3351021,0.004886196,0.1387648,0.00007277793],"study_design_scores_gemma":[0.004645888,0.0006029039,0.00001877508,0.0004257344,0.0002019091,0.0001268707,0.0004107781,0.4727651,0.4177425,0.001553254,0.09873155,0.002774783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7931755,0.001180453,0.1776666,0.0003646307,0.02026656,0.002288379,0.0007070912,0.003916137,0.0004345913],"genre_scores_gemma":[0.7452981,0.0002273111,0.2481246,0.0004491885,0.003144686,0.001672892,0.00007291822,0.0004235662,0.0005866972],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.08264036,"threshold_uncertainty_score":0.9993994,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3202957722","doi":"","title":"Canadian grid code for wind development : review and recommendations","year":2006,"lang":"en","type":"article","venue":"OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)","topic":"Power Systems and Technologies","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Wind power; Grid code; Grid; Interconnection; Electricity; Scale (ratio); Telecommunications; Electric power transmission; Computer science; Meteorology; Engineering; Business; Geography; Electrical engineering; Cartography","retraction":null,"screen_n_in":null,"score":{"opus":0.01142653253133622,"gpt":0.2155589013324631,"spread":0.2041323688011268,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002531581,0.0001035962,0.0001961907,0.0001965706,0.0001325071,0.00003941454,0.0001109497,0.00006970582,0.00001522935],"category_scores_gemma":[0.00003280447,0.00009526204,0.00002783674,0.0002073713,0.0001116776,0.0003133714,0.00003501114,0.00003985204,0.000002229995],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005506754,"about_ca_system_score_gemma":0.00007082018,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003779171,"about_ca_topic_score_gemma":0.005775217,"domain_scores_codex":[0.9991372,0.000003997353,0.0004822958,0.0000970391,0.0001112244,0.000168203],"domain_scores_gemma":[0.9995379,0.00003944801,0.00009860605,0.0001487378,0.0001083044,0.00006698792],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00002305798,0.0002135768,0.002501545,0.005821869,0.0002420741,0.000001556131,0.00002092174,0.0009303701,0.001316579,0.2891989,0.6431824,0.05654713],"study_design_scores_gemma":[0.0001834927,0.0000311283,0.008913786,0.0002446947,0.00003182807,0.000008157876,0.000004233795,0.00003393685,0.002467555,0.0002075462,0.987726,0.0001476437],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.3631287,0.06529877,0.09604133,0.01394991,0.005800113,0.006959317,0.01061694,0.002652654,0.4355523],"genre_scores_gemma":[0.9912371,0.0004614728,0.006570485,0.00005153667,0.000008412869,0.0000569386,0.001474657,0.000005972832,0.0001334056],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6281084,"threshold_uncertainty_score":0.3884673,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1877829864","doi":"10.1109/pes.2005.1489702","title":"Hydro-Quebec grid code for wind farm interconnection","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Power Systems and Technologies","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Hydro-Québec; Energie NB Power (Canada)","funders":"","keywords":"Grid; Wind power; Interconnection; Wind generator; Grid code; Peninsula; Generator (circuit theory); Electricity; Marine engineering; Civil engineering; Computer science; Telecommunications; Environmental science; Engineering; Electrical engineering; Geography; AC power; Power (physics); Archaeology","retraction":null,"screen_n_in":null,"score":{"opus":0.007526724632922273,"gpt":0.2092130118874493,"spread":0.201686287254527,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003546622,0.000417519,0.000362259,0.00009597099,0.0001120312,0.00009260997,0.0003145541,0.0003396746,0.00002440851],"category_scores_gemma":[0.00004617318,0.0004454109,0.000369933,0.0001750928,0.00003441826,0.0002026447,0.00003815498,0.000341875,0.00003768383],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004389904,"about_ca_system_score_gemma":0.00002073386,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001276371,"about_ca_topic_score_gemma":0.000744177,"domain_scores_codex":[0.9981833,0.000009224036,0.0004553511,0.0003721968,0.0001931541,0.0007868459],"domain_scores_gemma":[0.9993314,0.00006268829,0.00006696214,0.0003656396,0.00005281372,0.0001204979],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000004749428,0.00003286657,0.00006617649,0.0001555194,0.0002527259,0.000001666039,0.0008300519,0.7728695,0.1290012,0.0004014827,0.09347878,0.002905254],"study_design_scores_gemma":[0.0004638826,0.00003452055,0.00007861191,0.00009410457,0.00002532277,0.00001521072,0.0001005631,0.3492533,0.08334098,0.00001017135,0.5660431,0.0005402295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7949373,0.003265959,0.1836985,0.0005637268,0.009150893,0.0007796083,0.0001565697,0.005700779,0.001746603],"genre_scores_gemma":[0.9673836,0.0001583098,0.02791825,0.0001251738,0.002180263,0.0001255486,0.00002177754,0.0001831975,0.001903886],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4725643,"threshold_uncertainty_score":0.9997998,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2092420941","doi":"10.1016/s0378-7796(01)00186-9","title":"An AI-based automatic power network topology processor","year":2002,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Systems and Technologies","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Bus network; Circuit breaker; Network topology; Numbering; Topology (electrical circuits); Logical topology; Graph; Representation (politics); Frame (networking); Power (physics); Network processor; Engineering; Theoretical computer science; Algorithm; System bus; Computer hardware; Control bus; Computer network; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.0298499015773646,"gpt":0.2993245575345663,"spread":0.2694746559572017,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001597797,0.0003406946,0.0005501146,0.0008598737,0.0003056088,0.0002698212,0.0009982549,0.0004653875,0.0003937272],"category_scores_gemma":[0.0001946616,0.000306226,0.00008636529,0.002643424,0.0001156703,0.0002721275,0.00005524588,0.001091418,0.0007346896],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003514319,"about_ca_system_score_gemma":0.00008081372,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008798619,"about_ca_topic_score_gemma":0.00001855925,"domain_scores_codex":[0.9957119,0.0003891483,0.0006019511,0.0005218009,0.0009222816,0.001852919],"domain_scores_gemma":[0.9980329,0.0002691547,0.00006195175,0.001092048,0.0002990289,0.0002449235],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005241246,0.0009299899,0.005134145,0.002109132,0.000670216,0.0008200302,0.001893872,0.03603914,0.0143626,0.01952692,0.9012349,0.01722668],"study_design_scores_gemma":[0.000730471,0.001233996,0.0007177961,0.000231583,0.0000112034,0.000143445,0.0002542748,0.8652561,0.001991778,0.0003375388,0.128346,0.0007458144],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6384957,0.1127314,0.06092928,0.001865009,0.009647865,0.006873371,0.00003926681,0.0178718,0.1515462],"genre_scores_gemma":[0.9980765,0.00005590676,0.0000972526,0.00003704948,0.000151568,0.0004303498,0.000003617872,0.0001012459,0.00104649],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.829217,"threshold_uncertainty_score":0.999939,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2155480194","doi":"10.1109/pes.2009.5275396","title":"Next-generation synchronous condenser installation at the VELCO granite substation","year":2009,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"General Electric (Canada)","funders":"","keywords":"Condenser (optics); Electrical engineering; AC power; Engineering; Capacitor; Autotransformer; Voltage regulator; Power factor; Voltage; Electric power system; Permanent magnet synchronous generator; Static VAR compensator; Synchronous motor; High voltage; Automotive engineering; Power (physics); Transformer; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.0249784963971403,"gpt":0.2102968647833219,"spread":0.1853183683861816,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005884268,0.00007283848,0.00005795496,0.00003883239,0.0000808847,0.00005088191,0.00005406053,0.00006021482,0.00006548086],"category_scores_gemma":[0.000007295786,0.00005133364,0.00001996453,0.00009520238,0.00001365741,0.0001660425,0.000006140609,0.00004957672,0.00007908828],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007229158,"about_ca_system_score_gemma":0.000003646034,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000203348,"about_ca_topic_score_gemma":0.0003808173,"domain_scores_codex":[0.9996177,0.000007890387,0.0001191158,0.0000747933,0.00007994095,0.0001005635],"domain_scores_gemma":[0.9997927,0.00001168612,0.00001785062,0.0001446802,0.00002138353,0.0000116811],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008285008,0.00002350528,0.0005518118,0.00002716369,0.00005364676,0.000007924281,0.001249623,0.04299252,0.7499756,0.02955648,0.0229266,0.1526268],"study_design_scores_gemma":[0.001231395,0.0002605408,0.05790019,0.00004602892,0.00004913449,0.00007750491,0.0008330057,0.606093,0.2163538,0.003652669,0.1125426,0.0009600737],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9713986,0.0005525111,0.01500654,0.0002952901,0.0002933294,0.0001605911,0.000002464226,0.0006275813,0.01166308],"genre_scores_gemma":[0.9991792,0.00004379449,0.0001643186,0.00006269624,0.00005320356,0.000006670987,0.00003174335,0.000007247861,0.0004510941],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5631005,"threshold_uncertainty_score":0.2093325,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3207556652","doi":"10.1016/b978-0-12-822054-2.00006-4","title":"Electrical power systems","year":2021,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Power Systems and Technologies","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Canadian Nuclear Safety Commission","funders":"","keywords":"Electrical engineering; Electric power system; Transformer; Engineering; Electric power; Power (physics); Reliability engineering; Voltage; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.00924529649309498,"gpt":0.1924651123924712,"spread":0.1832198158993762,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009392152,0.000457982,0.0006927876,0.0001885987,0.00004368332,0.00009252067,0.0003113619,0.0007522873,0.0001160502],"category_scores_gemma":[0.000009695494,0.0004366858,0.000227377,0.00002001834,0.00004861096,0.00002536492,0.00008969522,0.0007106295,0.0003345333],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001604876,"about_ca_system_score_gemma":0.00004549153,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":3.964551e-7,"about_ca_topic_score_gemma":0.000003752411,"domain_scores_codex":[0.9985447,0.000008990153,0.0004460397,0.0003418805,0.0002826626,0.0003757229],"domain_scores_gemma":[0.9990364,0.00003394729,0.00007289,0.0007068778,0.00006362708,0.00008630217],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000002230182,0.000004946029,0.000002443172,0.0003275267,0.0005736894,0.0004459929,0.00007973996,0.00003047922,0.0002160943,0.216023,0.006942296,0.7753515],"study_design_scores_gemma":[0.00008335627,0.00002577439,0.00000144139,0.0004512649,0.00003969533,0.00009184755,0.000008038094,0.00007080709,0.00009651433,0.0006467365,0.9980085,0.000475947],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"other","genre_gemma":"other","genre_scores_codex":[0.0000193802,0.03227162,0.00006173766,0.000006192293,0.001985031,0.0003056521,0.00002408212,0.001223592,0.9641027],"genre_scores_gemma":[0.01414939,0.0002767943,0.00005923786,0.00001875921,0.0001532253,0.00005031531,0.00001258954,0.0001674316,0.9851122],"genre_candidate":"other","genre_consensus":"other","teacher_disagreement_score":0.9910663,"threshold_uncertainty_score":0.9998085,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2149673871","doi":"10.1109/61.852981","title":"A computer-aided technique for generating substation interlocking schemes","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power Systems and Technologies","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Interlocking; Circuit breaker; Software; Engineering; Computer science; State (computer science); Control reconfiguration; Power (physics); Reliability engineering; Electrical engineering; Embedded system; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.01164224690664692,"gpt":0.2116500854635857,"spread":0.2000078385569388,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008363726,0.0001749723,0.0001664137,0.000177804,0.0001314869,0.0000516916,0.0001265599,0.0001349597,0.0001004018],"category_scores_gemma":[0.000001028853,0.0001834941,0.0001106897,0.0001601869,0.00002385071,0.0001939237,5.381169e-7,0.0001815827,0.00002940881],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008083009,"about_ca_system_score_gemma":0.000009982352,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001608169,"about_ca_topic_score_gemma":0.00001818667,"domain_scores_codex":[0.9992104,0.0000122184,0.0002575731,0.0001971064,0.00009342677,0.0002293144],"domain_scores_gemma":[0.9996308,0.00005786514,0.00002273562,0.000212249,0.00004242366,0.00003392801],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00007210427,0.000153026,0.00000850308,0.0001921666,0.0002927344,0.00001637708,0.00105615,0.3175208,0.2489142,0.0001492449,0.00218828,0.4294364],"study_design_scores_gemma":[0.0006456853,0.0002868171,0.00001683204,0.0002580713,0.00003351584,0.00004058571,0.0001401133,0.2440233,0.7419241,0.00009463013,0.01201043,0.0005259076],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2069069,0.00009596104,0.7909624,0.00001482347,0.0005278651,0.0003412025,0.0000274196,0.0008892231,0.0002341839],"genre_scores_gemma":[0.9739248,0.00005604048,0.02549388,0.00003905301,0.00003168155,0.000278047,0.000003457406,0.00003991511,0.0001330794],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.767018,"threshold_uncertainty_score":0.7482671,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4242164996","doi":"10.1109/ccece20064.2012","title":"2012 25th IEEE Canadian Conference on Electrical and Computer Engineering (CCECE)","year":2012,"lang":"en","type":"paratext","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Computer science; Electrical engineering; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01480774239932292,"gpt":0.1980029804583614,"spread":0.1831952380590385,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00005494728,0.0003720415,0.0004050423,0.0003744142,0.00003565307,0.00008377584,0.0002177407,0.0005982388,0.0009636954],"category_scores_gemma":[0.000003002352,0.0003353257,0.00004363448,0.0001219276,0.0000186652,0.00009198557,0.00002440399,0.000600243,0.003466614],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001762037,"about_ca_system_score_gemma":0.00005314284,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006540672,"about_ca_topic_score_gemma":0.004958178,"domain_scores_codex":[0.9988003,0.000006937434,0.0002013228,0.0002266078,0.0001089819,0.0006558223],"domain_scores_gemma":[0.9993777,0.0000256979,0.00002189153,0.0002800422,0.00002283164,0.0002718312],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[6.997311e-7,0.000005039459,0.000009463004,0.000129527,0.00008668745,0.000008086975,0.00002838811,0.001159687,0.00004914418,0.004013095,0.9906531,0.003857079],"study_design_scores_gemma":[0.0001270935,0.0000553082,0.0002197807,0.0001508849,0.00001580514,0.00003292852,0.000004113824,0.1247451,0.0004154638,0.000003743384,0.8735369,0.0006928327],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.003717081,0.02070014,0.08318926,0.0001511024,0.02292092,0.0009713788,0.0002658607,0.002369622,0.8657146],"genre_scores_gemma":[0.9513347,0.0008432643,0.0009647722,0.00007575806,0.001077288,0.00004448312,0.00005503896,0.0001312433,0.04547346],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9476176,"threshold_uncertainty_score":0.9999496,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1827138354","doi":"10.1109/pica.2001.932337","title":"SCADA EMS DMS-a part of the corporate IT system","year":2002,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"ATS Automation Tooling Systems (Canada)","funders":"","keywords":"SCADA; Flexibility (engineering); Computer science; Incentive; Cost reduction; Risk analysis (engineering); Openness to experience; Information exchange; Systems engineering; Computer security; Process management; Telecommunications; Business; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03284278267808233,"gpt":0.1665992394862991,"spread":0.1337564568082168,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005055546,0.00006758548,0.0001135453,0.00002292843,0.00002125134,0.00001003588,0.0001788146,0.00005772409,0.00007218435],"category_scores_gemma":[0.000006152703,0.00004055914,0.00003929403,0.0001401476,0.00002541374,0.00003439694,0.000030905,0.00005740338,0.00008499041],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001846117,"about_ca_system_score_gemma":0.000001423162,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002716052,"about_ca_topic_score_gemma":0.00002215043,"domain_scores_codex":[0.9995804,0.000006010011,0.0001599535,0.00005947077,0.00008415945,0.0001100275],"domain_scores_gemma":[0.9996236,0.000009326137,0.00004243239,0.0002974459,0.00001420229,0.00001296766],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000001702184,0.00004573263,0.01087018,0.001216018,0.0002564792,0.00002153679,0.0004351392,0.005162388,0.008798852,0.1179391,0.8475854,0.007667513],"study_design_scores_gemma":[0.0006955527,0.00006921763,0.002989658,0.0009293514,0.00004763222,0.00009897799,0.002769714,0.1939996,0.1496134,0.0003723874,0.6476737,0.0007407702],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.4256766,0.00186866,0.00181426,0.0004488331,0.00343183,0.0003675995,0.00001765927,0.002503354,0.5638711],"genre_scores_gemma":[0.9962666,0.00001827959,0.00004592351,0.000007828732,0.00002195888,0.000007811012,1.403438e-7,0.000009410272,0.003622033],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.57059,"threshold_uncertainty_score":0.1653954,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2104087170","doi":"10.1109/tpwrd.2003.820184","title":"IVACE: A Self-Regulating Variable Reactor","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power Systems and Technologies","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Inductance; Electromagnetic coil; Electric power transmission; Electrical engineering; Rectifier (neural networks); Engineering; Variable (mathematics); Voltage; Regulator; Transmission line; Overhead (engineering); Diode; Overhead line; Control theory (sociology); Computer science; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.007044342226779778,"gpt":0.1837708501770771,"spread":0.1767265079502974,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000742136,0.0002055315,0.0001876298,0.0001837988,0.0001039435,0.00004354667,0.0001680212,0.0001864454,0.00009523786],"category_scores_gemma":[0.000002273425,0.0002075216,0.00009237169,0.0003128033,0.00002353705,0.0002411853,0.000001205022,0.000305414,0.0001855871],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002188709,"about_ca_system_score_gemma":0.00003368928,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000083112,"about_ca_topic_score_gemma":0.00001706603,"domain_scores_codex":[0.9990628,0.000009137968,0.0002338772,0.0002101481,0.0001680793,0.0003160079],"domain_scores_gemma":[0.999455,0.00003746017,0.0000258447,0.0003792765,0.00003678159,0.00006558824],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00005491584,0.0006505535,0.00002735189,0.0002613149,0.0009811082,0.00008614031,0.00232326,0.8573742,0.1219383,0.0029816,0.002748531,0.01057267],"study_design_scores_gemma":[0.006198039,0.0009448135,0.0004560199,0.001193648,0.0003730218,0.0004101639,0.001670891,0.02696333,0.859327,0.003348526,0.09567709,0.003437448],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2773531,0.0002335328,0.7087719,0.00005634894,0.002098873,0.0002166826,0.00003545531,0.003771781,0.00746222],"genre_scores_gemma":[0.9939981,0.00005700294,0.005657325,0.00003408568,0.00002151462,0.00003741494,9.103638e-7,0.00004768023,0.0001459367],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8304109,"threshold_uncertainty_score":0.8462486,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2130829232","doi":"10.1109/pess.2000.867529","title":"BC Hydro harmonic resonance experience","year":2002,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"BC Hydro (Canada)","funders":"BC Hydro","keywords":"Harmonics; Tripping; Harmonic; Harmonic analysis; Capacitor; Electrical engineering; Resonance (particle physics); Electric power system; Shunt (medical); Engineering; Electronic engineering; Power (physics); Computer science; Acoustics; Voltage; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.0204915608103062,"gpt":0.199733541356575,"spread":0.1792419805462687,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00001466121,0.00006226004,0.00006516495,0.00002558348,0.0000206291,0.00001412828,0.000133179,0.00004303288,0.0003935178],"category_scores_gemma":[0.000007436178,0.00005326694,0.00001762362,0.00009618912,0.00002041797,0.00007913181,0.00001887373,0.00005632067,0.000401018],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001691839,"about_ca_system_score_gemma":4.901534e-7,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001927042,"about_ca_topic_score_gemma":0.000006626291,"domain_scores_codex":[0.9996292,0.000001589264,0.00008071822,0.00008202197,0.00005632756,0.0001501218],"domain_scores_gemma":[0.9997649,0.000006830896,0.000005138287,0.0002005367,0.000004224459,0.00001842414],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000002503327,0.00008458307,0.007482983,0.0001355925,0.00005656632,0.0001645788,0.005352226,0.0008007033,0.03771747,0.03665212,0.4737851,0.4377655],"study_design_scores_gemma":[0.0001319155,0.00001726876,0.001160653,0.00002377343,0.000001213674,0.00001413674,0.0002315695,0.05405901,0.06276091,0.0001707076,0.8811888,0.000240064],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6599187,0.01253044,0.003861629,0.0001618303,0.0006231976,0.0001040886,0.000001509741,0.00383549,0.3189631],"genre_scores_gemma":[0.9949195,0.0002400534,0.0004341876,0.00001577481,0.00001594425,0.0000210606,8.151302e-8,0.000008605004,0.004344838],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4375255,"threshold_uncertainty_score":0.5154408,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2015087446","doi":"10.1049/cp.2013.0976","title":"Universal IED for distribution smart grids","year":2013,"lang":"en","type":"article","venue":"22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013)","topic":"Power Systems and Technologies","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Interoperability; Smart grid; Computer science; Modular design; Reliability (semiconductor); Service (business); Task (project management); Quality (philosophy); Systems engineering; Plug and play; Quality of service; Embedded system; Computer security; Telecommunications; Engineering; Power (physics); World Wide Web; Electrical engineering; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.01508000396521764,"gpt":0.2172057838312328,"spread":0.2021257798660152,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001004077,0.000197693,0.0001795867,0.00009085474,0.0001460818,0.0001571823,0.0001620987,0.0001767207,0.0002013363],"category_scores_gemma":[0.00007131413,0.0001974478,0.00007307668,0.0001629556,0.00006350276,0.0004249192,0.00002383839,0.0001689738,0.0001025227],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002636234,"about_ca_system_score_gemma":0.00002632963,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001574902,"about_ca_topic_score_gemma":0.00001953968,"domain_scores_codex":[0.9989477,0.00001825926,0.0002724436,0.0002579058,0.0002060868,0.0002976067],"domain_scores_gemma":[0.9993153,0.00004944806,0.00007256115,0.0001362507,0.0003449795,0.00008144828],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001264509,0.0002159414,0.0009376885,0.00009448035,0.0002252053,0.000003269969,0.00006672804,0.000304537,0.02649102,0.6276449,0.2947869,0.04910289],"study_design_scores_gemma":[0.004738424,0.001172003,0.04954607,0.0003504134,0.00009106076,0.00005635428,0.0006345846,0.4308738,0.09409359,0.03994768,0.3766032,0.001892828],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6297943,0.0001613727,0.3541805,0.00286301,0.001414835,0.001026648,0.002929356,0.001090019,0.006540009],"genre_scores_gemma":[0.9957645,0.0002907133,0.00003839854,0.00004784648,0.00009875165,0.00015247,0.003314001,0.0000123948,0.0002809153],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5876972,"threshold_uncertainty_score":0.8051689,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4409353544","doi":"10.2139/ssrn.5214458","title":"Large Language Models Integration in Smart Grids","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Power Systems and Technologies","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"HEC Montréal","funders":"","keywords":"Computer science; Smart grid; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006651095923551171,"gpt":0.2273201266377804,"spread":0.2206690307142292,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0009426629,0.000247591,0.0003264693,0.0004431519,0.00003976647,0.00006842548,0.0004326744,0.0004062057,0.000007283112],"category_scores_gemma":[0.00002801798,0.000229233,0.0001263229,0.0001717482,0.00001059939,0.0001217548,0.0001645874,0.005476474,0.000006668219],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001541035,"about_ca_system_score_gemma":0.0006463386,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001849934,"about_ca_topic_score_gemma":0.008325472,"domain_scores_codex":[0.9977624,0.00003617955,0.0003786085,0.00018928,0.0001513496,0.001482149],"domain_scores_gemma":[0.9995599,0.00001579904,0.00007086718,0.0002957797,0.00003186479,0.00002575893],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00002810582,0.0001199807,0.0007110398,0.0004049451,0.0006804055,0.00006379055,0.003729031,0.07985549,0.0005952833,0.813522,0.001676714,0.09861321],"study_design_scores_gemma":[0.000828632,0.00007212153,0.000116885,0.001145937,0.00005026584,0.0001418721,0.007932904,0.1446449,0.0007973012,0.8414994,0.002080421,0.0006893357],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2615464,0.05949971,0.6554554,0.0002976436,0.00318845,0.0004940465,0.00008677333,0.001038172,0.01839342],"genre_scores_gemma":[0.9911442,0.007405992,0.0001178489,0.00001018124,0.0001250974,0.00003069025,0.00002629652,0.00002441715,0.001115217],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7295979,"threshold_uncertainty_score":0.9968179,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2358818510","doi":"","title":"Reviews of the Meta-heuristic Algorithms for TSP","year":2006,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"CAE (Canada)","funders":"","keywords":"Tabu search; Travelling salesman problem; Simulated annealing; Ant colony optimization algorithms; Metaheuristic; Mathematical optimization; Meta heuristic; Computer science; Heuristic; Particle swarm optimization; Parallel metaheuristic; Genetic algorithm; Extremal optimization; Artificial neural network; Algorithm; Meta-optimization; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.04700734658145899,"gpt":0.2397030181427817,"spread":0.1926956715613227,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000979416,0.00005819736,0.0001929148,0.00001567177,0.00001298321,0.000004284198,0.0001226816,0.00003057126,0.00002881205],"category_scores_gemma":[0.00002580151,0.0000288955,0.00013419,0.00006864468,0.00001363261,0.00001569423,0.00001400195,0.00002736548,0.000005786221],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000006100892,"about_ca_system_score_gemma":0.000001579475,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000515245,"about_ca_topic_score_gemma":0.00002349966,"domain_scores_codex":[0.9996611,0.000004499891,0.0001733692,0.000046585,0.00003652604,0.0000779335],"domain_scores_gemma":[0.9997312,0.00002407196,0.00002357721,0.0002058043,0.0000110344,0.000004327816],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000001962532,0.00006347669,0.000427144,0.001612874,0.0008854135,0.000001318903,0.00005718766,0.002496334,0.01112855,0.2253785,0.7084254,0.04952184],"study_design_scores_gemma":[0.00009391773,0.00001155907,0.000344471,0.00001489855,0.0001698619,0.000002139119,0.00001004518,0.004048273,0.02336873,0.004557087,0.967285,0.00009398729],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.005089775,0.06805822,0.716392,0.0005933332,0.002418592,0.002560991,0.00008002124,0.001732958,0.2030741],"genre_scores_gemma":[0.9846938,0.0001318062,0.01122906,0.00001391007,0.00005328297,0.0001611221,0.000001230993,0.00001556928,0.003700275],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9796039,"threshold_uncertainty_score":0.1178324,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1498290481","doi":"10.1049/cp.2010.0236","title":"Using a real time digital simulator to affect the quality of IEC 61850 GOOSE and sampled value data","year":2010,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"RTDS Technologies (Canada)","funders":"Areva","keywords":"IEC 61850; Goose; Computer science; Affect (linguistics); Value (mathematics); Quality (philosophy); Real-time computing; Simulation; Engineering; Automation; Psychology; Communication","retraction":null,"screen_n_in":null,"score":{"opus":0.0627574513712314,"gpt":0.3264232028458853,"spread":0.2636657514746539,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000300703,0.00008948597,0.0001704375,0.00003223439,0.0000278084,0.00005559855,0.0002963965,0.00006751591,0.00001294484],"category_scores_gemma":[0.0002357149,0.00005774174,0.00001971248,0.00009087292,0.00004178342,0.0001638023,0.0002764075,0.00009290847,0.000008944699],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000007826426,"about_ca_system_score_gemma":0.000008572094,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0006123538,"about_ca_topic_score_gemma":0.0001322473,"domain_scores_codex":[0.9994566,0.00001044368,0.0001716981,0.0001376701,0.00009286498,0.0001307561],"domain_scores_gemma":[0.9989825,0.000194324,0.00002363009,0.0007514555,0.00001339011,0.00003464429],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004065917,0.00007958587,0.01821032,0.0003352221,0.0003298585,0.000005847805,0.0007962508,0.005083201,0.9249532,0.02135126,0.003336854,0.0254778],"study_design_scores_gemma":[0.001501431,0.000181928,0.07871858,0.0001326817,0.00007939945,0.00004335763,0.0006405089,0.8538077,0.03794271,0.002050012,0.02363398,0.001267731],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9925233,0.00002274022,0.004137878,0.00003075578,0.0001263242,0.0001731158,0.0001222442,0.0003117542,0.002551874],"genre_scores_gemma":[0.9980676,0.000001437131,0.001826092,0.000004664497,0.00002905579,0.000001530635,0.000006097866,0.00001227113,0.00005124144],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8870105,"threshold_uncertainty_score":0.235464,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2372354105","doi":"","title":"Analysis on Fault Trips Caused by Forest Fire in CSG in the First Quarter of Year 2010","year":2011,"lang":"en","type":"article","venue":"Guangdong Electric Power","topic":"Power Systems and Technologies","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"TRIPS architecture; Fault (geology); Engineering; Electric power transmission; Quarter (Canadian coin); Line (geometry); Transmission line; Forensic engineering; Transport engineering; Electrical engineering; Geography; Seismology; Geology; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.009525908735944704,"gpt":0.1913988487053769,"spread":0.1818729399694322,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002189484,0.0001457631,0.0002761093,0.0004649421,0.0000178755,0.00001116328,0.0003235803,0.000157819,0.00005145735],"category_scores_gemma":[0.00003415132,0.0001067161,0.00009218552,0.001642862,0.00001846559,0.00006278354,0.0000120301,0.0002657251,0.00002506161],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000563023,"about_ca_system_score_gemma":0.000007766485,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0008800033,"about_ca_topic_score_gemma":0.002163842,"domain_scores_codex":[0.9990562,0.00002331637,0.0002884994,0.0001625824,0.0001601598,0.0003092438],"domain_scores_gemma":[0.9994558,0.0000592551,0.00004836418,0.0004049066,0.00001404979,0.00001760625],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001157642,0.0008452517,0.7888415,0.0001356803,0.001036369,0.0001811425,0.01142639,0.001629617,0.001458331,0.002023675,0.1875195,0.004786759],"study_design_scores_gemma":[0.001320847,0.0004386128,0.9723051,0.00007124343,0.0001145986,0.000003997501,0.0007476565,0.009602046,0.003823021,0.0003093772,0.01070842,0.0005551046],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9930309,0.0006175151,0.0001644656,0.00007551145,0.000129623,0.000193893,0.00001018393,0.0001172733,0.005660619],"genre_scores_gemma":[0.999783,0.00003760561,0.0000124841,0.00002737861,0.000007061537,0.00003782737,0.000004521793,0.00001541154,0.00007468917],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1834636,"threshold_uncertainty_score":0.4351755,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2317905135","doi":"10.3166/ejee.13.675-698","title":"IREQ's innovations in power system simulation","year":2010,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering","topic":"Power Systems and Technologies","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Power (physics); Computer science; Business; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.004877275428478225,"gpt":0.1821925747143726,"spread":0.1773152992858944,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004436993,0.0001069285,0.0001690842,0.0004855834,0.00001462588,0.0000289437,0.000184069,0.00004172071,0.00000468082],"category_scores_gemma":[0.0002182259,0.00009843938,0.0000463137,0.0006649375,0.000006363539,0.0001426638,0.00001390509,0.0006800204,0.00001187652],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006434901,"about_ca_system_score_gemma":0.000009138389,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":4.352061e-7,"about_ca_topic_score_gemma":3.87528e-7,"domain_scores_codex":[0.9991284,0.00001639602,0.0004756264,0.00006044479,0.0001272975,0.0001918599],"domain_scores_gemma":[0.9996421,0.00006323431,0.00006447426,0.0001169265,0.00006559558,0.00004761498],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000004609901,0.0000193972,0.0004105067,0.00004303933,0.00003484839,0.0002625787,0.00009095261,0.899622,0.0844664,0.007134238,0.0001838056,0.007727598],"study_design_scores_gemma":[0.0007447563,0.0001622443,0.02468315,0.0001966553,0.00001126205,0.0003242298,0.00003718891,0.9457158,0.00357965,0.00001542411,0.02416978,0.0003598004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8332804,0.0003019057,0.1595032,0.00002804372,0.00129336,0.00006883794,7.987712e-7,0.0004141053,0.005109303],"genre_scores_gemma":[0.9981528,0.000003782302,0.001678087,0.00000286046,0.0001206271,5.970406e-7,2.581717e-7,0.00003430323,0.000006718253],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1648723,"threshold_uncertainty_score":0.4014242,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2113398049","doi":"10.1109/ccece.1998.685589","title":"Elimination of algebraic constraints in power system studies","year":2002,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Algebraic number; Computer science; Power (physics); Algebra over a field; Mathematical optimization; Mathematics; Physics; Pure mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0222417395429268,"gpt":0.2125100260244504,"spread":0.1902682864815236,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005604675,0.00005750149,0.0001388554,0.0001113066,0.000005905544,0.000003045741,0.00005470623,0.0000463545,0.00004020497],"category_scores_gemma":[0.0000236828,0.00004817842,0.00001666204,0.0001167606,0.00004285014,0.00004682212,0.00001265265,0.0000379497,0.00002528594],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004339766,"about_ca_system_score_gemma":7.482591e-7,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000394168,"about_ca_topic_score_gemma":0.000009192514,"domain_scores_codex":[0.9996182,0.000004955842,0.0001742666,0.0000551668,0.00005867004,0.00008876554],"domain_scores_gemma":[0.9998354,0.00002381786,0.00001644544,0.00009604824,0.00002095184,0.000007320178],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","study_design_scores_codex":[0.00000459777,0.000171994,0.01123809,0.003979742,0.0006610262,0.0001367797,0.01185288,0.002120138,0.01984238,0.8449062,0.02504583,0.08004031],"study_design_scores_gemma":[0.007659714,0.0008914614,0.07487345,0.006688298,0.0001187157,0.0003800787,0.3190418,0.2609477,0.3101047,0.003086526,0.0126329,0.003574629],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8401135,0.006765739,0.001200111,0.00008885797,0.000617698,0.0002084078,0.000004113745,0.001065012,0.1499366],"genre_scores_gemma":[0.9996656,0.0000540752,0.0001602003,0.000001793616,0.000003269189,0.000008729256,1.416423e-7,0.000005418302,0.0001007396],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8418197,"threshold_uncertainty_score":0.1964659,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2073102200","doi":"10.1049/cp:20051311","title":"Creating tomorrow's intelligent electric power delivery system","year":2005,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Computer science; Electric power system; Electric power; Power (physics); Electrical engineering; Systems engineering; Engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.006280684966815643,"gpt":0.1839105603630465,"spread":0.1776298753962308,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008264466,0.0001265655,0.0001463694,0.0001282158,0.00004837722,0.00003613815,0.0001511997,0.00008922704,0.00007995804],"category_scores_gemma":[0.00001102771,0.0001075451,0.00004924443,0.0001921788,0.000007445482,0.0001034453,0.00002969388,0.0001114033,0.0003703047],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001804536,"about_ca_system_score_gemma":0.000006130409,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003543966,"about_ca_topic_score_gemma":0.00001621246,"domain_scores_codex":[0.9992929,0.000006024684,0.0002171291,0.000120449,0.0001015325,0.0002619697],"domain_scores_gemma":[0.9996792,0.00002522864,0.00001802037,0.0002160057,0.00002331989,0.00003823651],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00002360426,0.0001834066,0.004218708,0.001147819,0.0007675242,0.0001932089,0.002418248,0.06010703,0.1125138,0.1843539,0.07233533,0.5617375],"study_design_scores_gemma":[0.0003699564,0.0001467593,0.0009146999,0.0002927361,0.00003557546,0.0002272523,0.00342369,0.3822106,0.4387083,0.00005351771,0.1725453,0.001071592],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5900409,0.003613399,0.03892168,0.00004250433,0.0005158586,0.0001980084,0.000001647127,0.005727694,0.3609383],"genre_scores_gemma":[0.9977703,0.00003676547,0.001416666,0.00001445814,0.00006554362,0.00001663478,5.969007e-7,0.0000225287,0.0006564777],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5606659,"threshold_uncertainty_score":0.4759641,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3132016143","doi":"10.1109/ei250167.2020.9346920","title":"Method for Calculating Text Similarity Of Cross-Weighted Products Applied To Power Grid Model Search","year":2020,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Ontario Power Generation","funders":"","keywords":"Similarity (geometry); Ranking (information retrieval); Matching (statistics); Computer science; Nearest neighbor search; Product (mathematics); Grid; Word (group theory); Filter (signal processing); Field (mathematics); Value (mathematics); Data mining; Search engine; Hyperparameter optimization; Pattern recognition (psychology); Artificial intelligence; Algorithm; Mathematics; Information retrieval; Statistics; Machine learning; Image (mathematics)","retraction":null,"screen_n_in":null,"score":{"opus":0.04738765898444775,"gpt":0.3116290846784406,"spread":0.2642414256939929,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002251299,0.0001322684,0.000263784,0.00005711376,0.00003778995,0.00002810851,0.0001994022,0.0001054473,0.0000128326],"category_scores_gemma":[0.0000920395,0.0001142203,0.00004640835,0.0003028337,0.0000186746,0.00006034561,0.0001011544,0.0001239299,0.000007626518],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002369728,"about_ca_system_score_gemma":0.00001933359,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001781948,"about_ca_topic_score_gemma":0.000003222499,"domain_scores_codex":[0.999074,0.000006030165,0.000263824,0.0002513334,0.0001414207,0.00026337],"domain_scores_gemma":[0.9995109,0.00004799665,0.00001954004,0.0002408614,0.000111266,0.00006937594],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005100448,0.0000318191,0.0002387504,0.0009621494,0.0001171201,0.000001505043,0.001608036,0.4760486,0.4745933,0.03178149,0.007422324,0.007143895],"study_design_scores_gemma":[0.0001875441,0.00003761581,0.00008302417,0.000007901284,0.000004457188,4.327678e-7,0.00009389043,0.6314601,0.3661078,0.0002175869,0.001662483,0.000137141],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0857473,0.00004138081,0.9037606,0.0005737646,0.00008861954,0.0007439585,0.00004807342,0.0008025762,0.008193691],"genre_scores_gemma":[0.7164721,5.152278e-7,0.2833075,0.00006117126,0.00003302331,0.00004063625,0.000003193116,0.00002322945,0.00005859967],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6307248,"threshold_uncertainty_score":0.465777,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2117183718","doi":"","title":"Modelling of Voltage regulation in SWER Systems using PSCAD/EMTDC","year":2006,"lang":"en","type":"article","venue":"eSpace (Curtin University)","topic":"Power Systems and Technologies","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Emtp; Software; Engineering; Voltage; Energy (signal processing); Key (lock); Systems engineering; Reliability engineering; Computer science; Operations research; Electrical engineering; Electric power system; Computer security; Power (physics); Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.01470068481158275,"gpt":0.162045123430917,"spread":0.1473444386193342,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007868746,0.00009937917,0.0001696206,0.0004339493,0.00002769945,0.00001185292,0.0001190829,0.0001198776,0.000003433989],"category_scores_gemma":[0.000004178771,0.0001178169,0.00003683377,0.0005055491,0.00002679696,0.000176497,0.000031451,0.00009345835,0.000002956903],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000152501,"about_ca_system_score_gemma":0.000009654786,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001263634,"about_ca_topic_score_gemma":0.0001467916,"domain_scores_codex":[0.9994504,0.00001429743,0.0001488898,0.0001194867,0.00009387993,0.0001729873],"domain_scores_gemma":[0.9996983,0.00001817104,0.00006409579,0.0001729596,0.00002994733,0.00001653008],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000004632167,0.00000823446,0.001837049,0.00006135889,0.000007878047,0.00001333272,0.0000854988,0.9790659,0.00759899,0.01121399,0.0000807596,0.00002235837],"study_design_scores_gemma":[0.0002770429,0.000009065531,0.0004689496,0.0001544288,0.00001132768,0.000002363198,0.0007415949,0.9859326,0.003986649,0.0000809589,0.008173738,0.0001612229],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6873921,0.0002336311,0.3053059,0.000006793096,0.0001746062,0.0001041711,0.000003793557,0.0002329408,0.006546051],"genre_scores_gemma":[0.9978315,0.00001071591,0.000734441,2.590337e-7,0.00002535913,2.025863e-7,0.000001797988,0.00001420927,0.001381489],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3104394,"threshold_uncertainty_score":0.4804433,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2548254300","doi":"10.1109/dmca.1998.703482","title":"Dynamic system load control through use of optimal voltage and VAr control","year":2002,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Automation; Transformer; Voltage; Engineering; Capacitor; Voltage regulation; Control engineering; Control system; Control (management); Control theory (sociology); Computer science; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.0095131980768493,"gpt":0.1779861024543163,"spread":0.168472904377467,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005969694,0.0001399637,0.0003216567,0.00003947637,0.0000224828,0.00002928332,0.00009269473,0.0001177191,0.00002778673],"category_scores_gemma":[0.00002199249,0.0001143742,0.00004491941,0.0000680401,0.00004671449,0.0001874893,0.00001552027,0.00008502767,0.00002218905],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005975147,"about_ca_system_score_gemma":0.000002449759,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001066804,"about_ca_topic_score_gemma":0.00001667837,"domain_scores_codex":[0.9993042,0.000008861511,0.0002475443,0.0001269601,0.0001115763,0.0002007952],"domain_scores_gemma":[0.9995844,0.00007164886,0.00003638407,0.0002455426,0.00003455919,0.00002743231],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002577108,0.0005758102,0.0269623,0.009933465,0.006246512,0.0008558073,0.005450305,0.1995883,0.2557192,0.3965572,0.05322814,0.04462525],"study_design_scores_gemma":[0.001997722,0.00007937638,0.0006875696,0.00009517717,0.00004588878,0.00004720101,0.0002951243,0.9892873,0.001025616,0.00002416067,0.00618056,0.0002342769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1898436,0.004572189,0.7955298,0.00007067208,0.0003934489,0.0005184534,0.00009087721,0.001895584,0.007085365],"genre_scores_gemma":[0.9977508,0.00005398336,0.001822021,0.00001256124,0.000008361651,0.00001757128,3.749904e-7,0.00001923614,0.0003151443],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8079072,"threshold_uncertainty_score":0.4664043,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1982974016","doi":"10.2316/journal.206.2011.1.206-3376","title":"GLOBAL ROBUST STABILIZATION FOR A CLASS OF TIME-VARYING OUTPUT FEEDBACK SYSTEMS","year":2011,"lang":"en","type":"article","venue":"International Journal of Robotics and Automation","topic":"Power Systems and Technologies","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Control theory (sociology); Class (philosophy); Output feedback; Computer science; Artificial intelligence; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.02516581097096753,"gpt":0.2280937945129761,"spread":0.2029279835420085,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001556204,0.00006758702,0.0001430928,0.0001077682,0.00001433063,0.00003489727,0.0001288425,0.00006114955,0.000002809945],"category_scores_gemma":[0.00004878462,0.00006019945,0.00004452204,0.00005749105,0.00001783677,0.0002065615,0.00001642964,0.00003471565,8.399862e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007096175,"about_ca_system_score_gemma":0.00001573992,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008651392,"about_ca_topic_score_gemma":0.000001486761,"domain_scores_codex":[0.9993129,0.000008119321,0.0003961558,0.00004661567,0.0001705444,0.00006560938],"domain_scores_gemma":[0.9993019,0.00002575551,0.0002402682,0.00004822115,0.0003623906,0.00002153858],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000326397,0.00005196369,0.003729547,0.0001827877,0.0002881504,0.000005214014,0.00034584,0.969366,0.001209366,0.01524438,0.0006733419,0.008870797],"study_design_scores_gemma":[0.0005711943,0.0001043341,0.004032196,0.000276942,0.00003190092,0.0001142583,0.0001457914,0.9922593,0.0007731853,0.001306219,0.0002877794,0.00009685504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1266231,0.0005905179,0.8695241,0.00006128654,0.001744894,0.0001457287,0.00003267854,0.00008098626,0.001196705],"genre_scores_gemma":[0.9896454,0.00006213749,0.01019179,0.0000025785,0.00006827252,0.000001926868,0.000004819016,0.000007440239,0.00001568439],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8630222,"threshold_uncertainty_score":0.2454862,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2058728412","doi":"10.1109/pes.2008.4596770","title":"Performance of Today's Intelligent Controllers and Meters, Elements of an Integrated Monitoring System for ADA","year":2008,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Systems engineering; Computer science; Quality (philosophy); Product (mathematics); Intelligent Network; Intelligent sensor; Embedded system; Engineering; Wireless sensor network; Telecommunications; Computer network","retraction":null,"screen_n_in":null,"score":{"opus":0.01814205886359568,"gpt":0.2135429438343075,"spread":0.1954008849707118,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009323836,0.00008715507,0.000231746,0.00008117712,0.00002095844,0.000003187974,0.00008831042,0.00004816593,0.000001424482],"category_scores_gemma":[0.00000860381,0.00006857641,0.00002743168,0.00006826953,0.0000262516,0.00008402369,0.00001393603,0.00003569598,2.709989e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003383307,"about_ca_system_score_gemma":0.000005839677,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000604966,"about_ca_topic_score_gemma":0.000004634021,"domain_scores_codex":[0.9994455,0.000004914887,0.0002892071,0.00007587861,0.00006893111,0.0001155556],"domain_scores_gemma":[0.999734,0.00002107346,0.0000480318,0.0001267202,0.00004710036,0.00002300452],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0007056724,0.0002600281,0.334748,0.01163143,0.002694424,0.00002136134,0.004359195,0.02492168,0.3489986,0.002527424,0.0009784567,0.2681538],"study_design_scores_gemma":[0.0007974607,0.0003974618,0.002133872,0.0002758324,0.00002025013,0.00001114644,0.003684708,0.1266467,0.8652238,0.000002056952,0.0006574591,0.0001493143],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9932698,0.0003296844,0.00537713,0.000001379438,0.0002712634,0.0002333257,0.00001021709,0.000180608,0.000326583],"genre_scores_gemma":[0.9956374,0.0001089363,0.004169999,3.054244e-7,0.00001005007,0.00002697151,0.000001557545,0.00001023513,0.0000345487],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5162252,"threshold_uncertainty_score":0.2796465,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2013500965","doi":"10.1109/tpwrd.2007.893384","title":"Characteristics of Voltage Swell in Multigrounded Systems","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power Systems and Technologies","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Swell; Voltage; Conductor; Software deployment; Electrical conductor; Electrical engineering; Phase (matter); Engineering; Computer science; Physics; Materials science","retraction":null,"screen_n_in":null,"score":{"opus":0.009720002445938508,"gpt":0.2009557476682584,"spread":0.1912357452223199,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002008763,0.000163662,0.0002675671,0.0003932307,0.00002776056,0.00001573242,0.0001477592,0.0001848625,0.00002168023],"category_scores_gemma":[0.000002718712,0.0001690466,0.00007681362,0.000271828,0.00004251708,0.0001194007,8.622072e-7,0.0002614532,0.00004126909],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001139811,"about_ca_system_score_gemma":0.00001000302,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001926861,"about_ca_topic_score_gemma":0.0001120786,"domain_scores_codex":[0.998966,0.000009440488,0.0004524616,0.0001474115,0.0001544941,0.0002701405],"domain_scores_gemma":[0.9994931,0.00008474894,0.00004755364,0.0002891169,0.00004111964,0.00004435827],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0009130086,0.003293227,0.007529296,0.003541676,0.001489574,0.001379907,0.008262745,0.1682509,0.6610799,0.002750705,0.002797147,0.1387118],"study_design_scores_gemma":[0.006686222,0.001258015,0.08445372,0.002508932,0.0002164746,0.000210149,0.0070306,0.08731027,0.7702,0.0001236969,0.03623939,0.003762553],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.554482,0.0001811281,0.4419974,0.000002111029,0.001700984,0.0001477657,0.00004145664,0.0002875835,0.001159574],"genre_scores_gemma":[0.9995384,0.0001309969,0.0001023465,0.000006526078,0.00001162258,0.00001284474,0.000001245015,0.00002874978,0.0001672842],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4450564,"threshold_uncertainty_score":0.689352,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W16049454","doi":"","title":"E-Serials Cataloging: Access to Continuing and Integrating Resources via the Catalog and the Web","year":2002,"lang":"en","type":"book","venue":"CERN Document Server (European Organization for Nuclear Research)","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Queen's University","funders":"","keywords":"Cataloging; World Wide Web; Computer science; Library catalog","retraction":null,"screen_n_in":null,"score":{"opus":0.02040285554616345,"gpt":0.2369765315387572,"spread":0.2165736759925937,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.001358719,0.0002897041,0.0003348863,0.0002028198,0.0007018999,0.00211992,0.001303378,0.0001371453,0.0001586355],"category_scores_gemma":[0.0004792472,0.0001863642,0.00004626736,0.00026209,0.0003092622,0.0003022531,0.001828985,0.0005416669,0.0001993859],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001656826,"about_ca_system_score_gemma":0.00000660396,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004672115,"about_ca_topic_score_gemma":0.00002762018,"domain_scores_codex":[0.9983287,0.0002090291,0.0003845044,0.0003849094,0.0003300709,0.0003627207],"domain_scores_gemma":[0.9988553,0.0001670185,0.0001184535,0.000588036,0.0001796756,0.00009150624],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002103169,0.00005893038,0.0001876914,0.003056234,0.001373875,0.00009971418,0.04390042,0.0004949592,0.0007045076,0.2831509,0.6285104,0.03825207],"study_design_scores_gemma":[0.001107265,0.000104999,0.0002208332,0.0006652132,0.00007631908,0.00006995937,0.001141125,0.0001317432,0.0002748758,0.007275362,0.988378,0.0005542842],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7562174,0.01862352,0.0002971726,0.01700873,0.00276642,0.01645601,0.0001785806,0.008494138,0.179958],"genre_scores_gemma":[0.9678273,0.0008203734,0.000008113693,0.00009470008,0.0002240565,0.000005829646,0.0001066846,0.0004642683,0.03044864],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3598676,"threshold_uncertainty_score":0.998916,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1841941055","doi":"10.1109/tdc.2006.1668516","title":"Feeder and Network Evolution for the Distribution System of the Future","year":2006,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Merge (version control); Automation; Electric power distribution; Electric power system; Telecommunications; Distribution (mathematics); Electric power; Computer science; Decentralization; Systems engineering; Engineering; Operations research; Power (physics); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.002151646146720005,"gpt":0.1494482080541855,"spread":0.1472965619074655,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006932583,0.00003933598,0.00005139365,0.000003583245,0.00006655233,0.000009799367,0.00006398034,0.00004885458,4.013533e-7],"category_scores_gemma":[0.000002099995,0.00001832685,0.00002364472,0.0000666765,0.00001740215,0.00001864659,0.00001476,0.00002909188,2.664483e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002813249,"about_ca_system_score_gemma":0.000001831652,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004888115,"about_ca_topic_score_gemma":0.000108224,"domain_scores_codex":[0.9997719,0.00000345894,0.00007635184,0.00003504334,0.00003802719,0.00007522284],"domain_scores_gemma":[0.999835,0.00002140473,0.00001604699,0.0001110202,0.00001354911,0.000003016389],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","study_design_scores_codex":[0.000002986105,0.00000345693,0.00654487,0.0002154682,0.00003380543,8.778879e-8,0.00001115897,0.01855649,0.0003164905,0.8774808,0.09516954,0.001664833],"study_design_scores_gemma":[0.0006064522,0.00003856076,0.4496675,0.0002085363,0.00008772254,0.00003425341,0.002373418,0.3019165,0.00343806,0.005144686,0.236199,0.0002853269],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1335166,0.01856356,0.8389814,0.0008032468,0.002880559,0.0008631098,0.00006531095,0.0008239771,0.003502203],"genre_scores_gemma":[0.9996299,0.000007388106,0.0000610108,0.000001161425,0.0001978382,0.00001995223,0.000002181857,0.000003575034,0.00007699055],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8723361,"threshold_uncertainty_score":0.07473474,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4243655333","doi":"10.1201/9781482266481-249","title":"Application of the fault tree analysis for assessment of the power system reliability","year":2008,"lang":"en","type":"book-chapter","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Fault tree analysis; Reliability engineering; Reliability (semiconductor); Fault (geology); Computer science; Power (physics); Engineering; Geology; Seismology; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.0120568232795926,"gpt":0.2220985835040963,"spread":0.2100417602245037,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001553958,0.0001681543,0.0004609739,0.00008486263,0.00003450516,0.000003846889,0.0004488571,0.000272551,0.000007211916],"category_scores_gemma":[0.00001068932,0.00008736855,0.0005296138,0.0001139435,0.00007658556,0.00001627947,0.00007597593,0.0001355255,7.325228e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001398558,"about_ca_system_score_gemma":0.00002192286,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005964209,"about_ca_topic_score_gemma":0.0000955174,"domain_scores_codex":[0.9990316,0.000007212564,0.0004742034,0.0001714031,0.0002263808,0.0000891894],"domain_scores_gemma":[0.9983081,0.00005924376,0.0002469807,0.0012608,0.0001147349,0.00001012667],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000009079503,0.00006405402,0.0114235,0.003735404,0.005537269,4.099784e-7,0.00021562,0.03941616,0.001196779,0.9242579,0.008273844,0.005869918],"study_design_scores_gemma":[0.001107861,0.0001924272,0.1109942,0.001153198,0.004662924,0.00001418642,0.0006604872,0.2320186,0.01221272,0.004074899,0.6312029,0.001705514],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.001538285,0.0003886638,0.175718,0.00007727535,0.0004455711,0.001876261,0.0002278277,0.0003799123,0.8193482],"genre_scores_gemma":[0.9836828,0.00002148162,0.0004888192,0.000001927111,0.0000106323,0.00008166736,0.000004818937,0.00002132141,0.01568651],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9821445,"threshold_uncertainty_score":0.3562786,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4406948271","doi":"10.1109/tpwrs.2025.3535863","title":"Interharmonic Power–A New Concept for Power System Oscillation Source Location","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro One (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electric power system; Oscillation (cell signaling); Power (physics); Computer science; Engineering; Electronic engineering; Electrical engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.00916806219983402,"gpt":0.2177203592772903,"spread":0.2085522970774563,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002251668,0.0003818172,0.000479041,0.0005106684,0.0002018363,0.0001686299,0.0003347028,0.0003753913,0.0000235242],"category_scores_gemma":[0.00001103364,0.000380755,0.0002051696,0.0006369214,0.00004931623,0.0002447366,0.000002552546,0.0002869212,0.00009764466],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005931116,"about_ca_system_score_gemma":0.00009535786,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000137836,"about_ca_topic_score_gemma":0.00002413236,"domain_scores_codex":[0.998115,0.0000476394,0.0007123963,0.0004318592,0.0002486112,0.0004444877],"domain_scores_gemma":[0.9988006,0.0001394564,0.0001113643,0.000676737,0.0001677961,0.0001040605],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002464622,0.0002573046,0.00006690585,0.002636449,0.001892985,0.00001195122,0.005744711,0.8523803,0.01036765,0.02428959,0.09358259,0.008523066],"study_design_scores_gemma":[0.006779755,0.001369797,0.0002830198,0.00686767,0.0004632214,0.0001784109,0.0220827,0.259043,0.07017327,0.0001625625,0.6295942,0.003002308],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.004628957,0.001885312,0.9714432,0.0001146563,0.01304205,0.001326441,0.00006153726,0.002518009,0.004979847],"genre_scores_gemma":[0.9945438,0.00001149958,0.0001447946,0.00002715575,0.00002381124,0.0002992811,0.000005509955,0.00007219048,0.004871988],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9899148,"threshold_uncertainty_score":0.9998645,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W584917086","doi":"","title":"CIGRE/IEEE PES International Symposium : quality and security of electric power delivery systems : CIGRE/PES 2003, 08-10 October 2003, Montréal, Canada","year":2003,"lang":"en","type":"book","venue":"IEEE eBooks","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Electric power; Environmental science; Power (physics); Operations research; Engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.008222570547587231,"gpt":0.1928253553645904,"spread":0.1846027848170032,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003435547,0.0007178414,0.001089615,0.0003011782,0.00008982325,0.00009531865,0.0005690875,0.0007894479,0.00007873136],"category_scores_gemma":[0.00005373777,0.0007261491,0.0001217902,0.0001271702,0.0001116209,0.00009569508,0.0000628366,0.0007346446,0.00002116797],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008571063,"about_ca_system_score_gemma":0.0009628368,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.1074096,"about_ca_topic_score_gemma":0.1029544,"domain_scores_codex":[0.99699,0.00008927277,0.001080258,0.0005838581,0.0006636286,0.0005930125],"domain_scores_gemma":[0.9978749,0.0001082188,0.0004225678,0.0007166723,0.0007213131,0.0001563307],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003508666,0.00003494668,0.0001020525,0.001304053,0.001218771,0.0001594457,0.0002901944,0.0004739946,0.002412899,0.002288902,0.9909596,0.0007200014],"study_design_scores_gemma":[0.0008567231,0.0001217583,0.00009226293,0.0007703735,0.0001817066,0.0001468161,0.000183389,0.001897944,0.007643496,0.0003666333,0.9860572,0.001681662],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.09565623,0.04389229,0.0003349592,0.00005565831,0.02236455,0.002111223,0.001817936,0.001192514,0.8325746],"genre_scores_gemma":[0.6284239,0.001121873,0.00005776453,0.00006530483,0.000419042,0.0001384851,0.00005763207,0.0002119833,0.3695041],"genre_candidate":"other","genre_consensus":null,"teacher_disagreement_score":0.5327676,"threshold_uncertainty_score":0.9995189,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2358927977","doi":"","title":"Problems on protection relay & urgency control system in interconnected power network of China and studies needed","year":2004,"lang":"en","type":"article","venue":"Dianli zidonghua shebei","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Electric power system; Relay; Electronic stability control; Maximum power transfer theorem; China; Interconnection; Reliability engineering; Engineering; Power (physics); Computer science; Computer security; Telecommunications; Automotive engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.009611889068478114,"gpt":0.1941909198840897,"spread":0.1845790308156116,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002026097,0.0002233194,0.0004565713,0.0001725112,0.00004478588,0.00001725733,0.0001142494,0.0001708971,0.000002337413],"category_scores_gemma":[0.00009319615,0.0001901799,0.00005461528,0.0003830203,0.00005732449,0.0001168419,0.00003131541,0.0002485341,0.000007643854],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001931978,"about_ca_system_score_gemma":0.00001139449,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003229329,"about_ca_topic_score_gemma":0.0002516639,"domain_scores_codex":[0.9988806,0.00003134869,0.0004388876,0.0002223195,0.0001187291,0.0003080973],"domain_scores_gemma":[0.9995586,0.00003334868,0.00008303664,0.000241371,0.00004302342,0.00004060148],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.000495656,0.0006018262,0.02603122,0.008751671,0.002640049,0.0002658132,0.02869634,0.7767242,0.02982197,0.1017618,0.002311106,0.02189837],"study_design_scores_gemma":[0.06832667,0.01359301,0.5221476,0.07932448,0.0008149155,0.0007235812,0.09064399,0.1022703,0.06664744,0.02922732,0.01459864,0.011682],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9867059,0.006706316,0.002436836,0.000143413,0.001009556,0.001069019,0.000008194024,0.0007241163,0.001196663],"genre_scores_gemma":[0.999467,0.0001281372,0.00009211988,0.000008840389,0.00004349536,0.0002130803,0.000001375313,0.00003220404,0.00001373522],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6744538,"threshold_uncertainty_score":0.775531,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1670938767","doi":"10.1109/pesgm.2015.7286635","title":"Bibliography of FACTS 2013–2014: IEEE working group report","year":2015,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Western University","funders":"","keywords":"Bibliography; Scopus; Computer science; Library science; Selection (genetic algorithm); Group (periodic table); Information retrieval; World Wide Web; MEDLINE; Political science; Artificial intelligence; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.03302751393806787,"gpt":0.2264723711471263,"spread":0.1934448572090585,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001867021,0.00009320582,0.0001611655,0.004885381,0.000009530498,0.00001750313,0.0001367006,0.00009312841,0.0000131322],"category_scores_gemma":[0.000009035882,0.00007642803,0.00005814329,0.003899074,0.00002528934,0.00009506609,0.00002485135,0.00007547436,0.00003029361],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000003727294,"about_ca_system_score_gemma":0.000002582662,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003234542,"about_ca_topic_score_gemma":0.00006127518,"domain_scores_codex":[0.999354,0.000004244182,0.0002326667,0.0001033591,0.0001417615,0.0001639692],"domain_scores_gemma":[0.9995416,0.00001323931,0.0000435844,0.0003184669,0.00003136693,0.00005177595],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000001406126,0.00001188969,0.03566731,0.00003210427,0.00005832679,0.00004832187,0.00002927849,0.0004157369,0.002254075,0.0003569462,0.9600197,0.001104901],"study_design_scores_gemma":[0.0007423954,0.0001543251,0.01885371,0.0001971558,0.00003295852,0.0002538957,0.0007329194,0.00234475,0.0555272,0.003157565,0.9172166,0.000786504],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5254547,0.005135543,0.06861626,0.0001127424,0.005062053,0.0003234184,0.000004306567,0.004454711,0.3908362],"genre_scores_gemma":[0.9971178,0.000963679,0.001770819,0.000004175186,0.00003761801,0.000007413455,0.000001499155,0.00001508041,0.00008192829],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4716631,"threshold_uncertainty_score":0.4359175,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2062701211","doi":"10.1007/s11771-011-0679-5","title":"Power interconnected system clustering with advanced fuzzy C-mean algorithm","year":2011,"lang":"en","type":"article","venue":"Journal of Central South University of Technology","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Cluster analysis; Measure (data warehouse); Similarity (geometry); Fuzzy logic; Node (physics); Electric power system; Fuzzy clustering; Similarity measure; Point (geometry); Computer science; Data mining; Algorithm; Power (physics); Mathematical optimization; Mathematics; Engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.005262079172538874,"gpt":0.1467115888374175,"spread":0.1414495096648786,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006484591,0.0001357754,0.0003688279,0.0004716304,0.00003770691,0.000003964521,0.000459714,0.0002051914,0.00001921544],"category_scores_gemma":[0.000008004126,0.000123133,0.00008659814,0.0002851284,0.0001387288,0.0001636176,0.00007962526,0.0003103587,0.000003359961],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001392156,"about_ca_system_score_gemma":0.00002103375,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001337222,"about_ca_topic_score_gemma":0.00001926848,"domain_scores_codex":[0.9992564,0.00001001705,0.0002414321,0.00009759593,0.000114691,0.0002798704],"domain_scores_gemma":[0.9993639,0.000006602632,0.0002477514,0.0001958896,0.0001250891,0.0000607838],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"qualitative","study_design_scores_codex":[0.004635457,0.001306197,0.1487148,0.004164542,0.01260193,0.01890962,0.1235037,0.01511582,0.06092424,0.04342803,0.002065193,0.5646304],"study_design_scores_gemma":[0.02093985,0.01054065,0.05766255,0.007810588,0.0009541066,0.008070639,0.7413564,0.01595833,0.1090048,0.001250939,0.02300171,0.003449498],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8972257,0.0003006637,0.09883289,0.0000270756,0.0004460984,0.00009687556,0.00001129437,0.0005107994,0.002548604],"genre_scores_gemma":[0.975303,0.0000210581,0.02463659,0.000001015387,0.000008571992,6.759065e-8,2.525045e-7,0.00001372441,0.00001572165],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6178526,"threshold_uncertainty_score":0.5021219,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2139476903","doi":"10.1109/pes.2009.5275546","title":"Distribution automation: Applications to move from today's distribution system to tomorrow's smartgrid","year":2009,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"Hydro-Québec","funders":"Bureau of Safety and Environmental Enforcement; Hydro-Québec; BC Hydro; Université de Sherbrooke; Électricité de France; Université Laval","keywords":"Distribution (mathematics); Automation; Context (archaeology); Technology roadmap; Engineering; Smart grid; Systems engineering; Engineering management; Computer science; Business; Electrical engineering; Marketing; Geography; Mechanical engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.005848469350226416,"gpt":0.2065436669178373,"spread":0.2006951975676109,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008616411,0.0001675618,0.0001902569,0.00005143248,0.00009055201,0.00009101204,0.0002349198,0.0001255882,0.00001967011],"category_scores_gemma":[0.00002133693,0.0001608903,0.00004880801,0.0004711864,0.000006996296,0.0001292623,0.00003613726,0.00008247855,0.0005740588],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004182142,"about_ca_system_score_gemma":0.000008676521,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001029688,"about_ca_topic_score_gemma":0.00002412276,"domain_scores_codex":[0.9990154,0.000009496977,0.0002983335,0.0002388806,0.0001789869,0.0002588939],"domain_scores_gemma":[0.9993106,0.00002082322,0.00002686335,0.0004497863,0.00006308403,0.0001289158],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00002397119,0.0001403225,0.0006549835,0.0001888861,0.0001183675,0.0000148131,0.0003268203,0.02087978,0.02224499,0.3389798,0.3091369,0.3072903],"study_design_scores_gemma":[0.000585062,0.0002021979,0.1187839,0.0003417555,0.00006161548,0.00002413469,0.001111668,0.04272843,0.1060139,0.00139761,0.7274153,0.001334487],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05329963,0.00009520298,0.9355223,0.001091082,0.0003524726,0.0007434261,0.0008928971,0.004245364,0.003757626],"genre_scores_gemma":[0.9970554,0.000002497342,0.001537634,0.0000574918,0.0001528903,0.000279407,0.0008159059,0.00001105098,0.00008775997],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9437557,"threshold_uncertainty_score":0.7378556,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4234959101","doi":"10.1049/pe:20030502","title":"The US blackout timeline","year":2003,"lang":"en","type":"article","venue":"Power Engineering Journal","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Blackout; Timeline; Time line; Event (particle physics); Operations research; Computer science; Reliability (semiconductor); Aeronautics; Task (project management); History; Power (physics); Electric power system; Engineering; Systems engineering; Archaeology","retraction":null,"screen_n_in":null,"score":{"opus":0.003205944913154751,"gpt":0.1671260599958939,"spread":0.1639201150827392,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003554932,0.0001584112,0.0001329425,0.00008417182,0.0001235071,0.0001448195,0.0002374016,0.00007555218,0.00004823767],"category_scores_gemma":[0.0001483983,0.0001104164,0.0000785438,0.0001503233,0.00001943053,0.00009616892,0.00001504021,0.0004569227,0.00007593278],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006398787,"about_ca_system_score_gemma":0.00001312949,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":5.45297e-7,"about_ca_topic_score_gemma":7.698061e-7,"domain_scores_codex":[0.999117,0.00001019223,0.0002565955,0.00007408745,0.0001586709,0.0003834584],"domain_scores_gemma":[0.9995691,0.00005258999,0.00002729168,0.0002283286,0.00003615993,0.00008657293],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00001223994,0.00006312353,0.002842876,0.0001129718,0.0009703009,0.0003986096,0.0006927408,0.799471,0.02208229,0.06047358,0.1012039,0.01167636],"study_design_scores_gemma":[0.0002578828,0.00003046032,0.0007730147,0.00004456875,0.000008768353,0.0008165474,0.00005109454,0.01704186,0.004007893,0.0002198612,0.9764789,0.0002690931],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.4502043,0.04532964,0.4186754,0.0005398694,0.02329724,0.0004163681,0.00001032505,0.004628178,0.05689864],"genre_scores_gemma":[0.9976149,0.0003248928,0.001620354,0.000009272383,0.0001004617,0.000005412682,1.951167e-7,0.00004314175,0.0002813835],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.875275,"threshold_uncertainty_score":0.4502648,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2032831889","doi":"10.1109/pes.2007.385582","title":"Hydro-Qu补c's Economic and Technical Approach to Justify its Distribution Automation Program","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Power Systems and Technologies","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Automation; Distribution (mathematics); Reliability (semiconductor); Software deployment; Computer science; Process automation system; Systems engineering; Engineering; Operations research; Engineering management; Software engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.007624129526399521,"gpt":0.224776012566857,"spread":0.2171518830404575,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000608569,0.0002724951,0.0002467621,0.00006224331,0.00008591244,0.0000883072,0.0001687562,0.0002863581,0.000001086207],"category_scores_gemma":[0.00004212149,0.0002943306,0.0001116861,0.0002195319,0.00002198322,0.000150135,0.00005819802,0.000281203,0.0000116379],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003381304,"about_ca_system_score_gemma":0.000009028692,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001063888,"about_ca_topic_score_gemma":0.000002081351,"domain_scores_codex":[0.9986076,0.000006320216,0.0003749286,0.0003128287,0.0001406162,0.0005577433],"domain_scores_gemma":[0.9995473,0.0000409305,0.00003994154,0.000211101,0.00002509349,0.0001356414],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000004698215,0.00006282997,0.0002077964,0.0004858616,0.0001546298,0.000004527715,0.0006815491,0.7048414,0.271071,0.003360194,0.009072594,0.01005291],"study_design_scores_gemma":[0.0002957712,0.00006861278,0.004208463,0.0001264888,0.00002849285,0.00006469213,0.000134822,0.9288865,0.04504431,0.000008565681,0.02040945,0.0007238066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7911729,0.0005073802,0.2010944,0.00006298147,0.001035222,0.000524096,0.00002098825,0.004344901,0.001237092],"genre_scores_gemma":[0.9512108,0.00002681886,0.04833038,0.00001135722,0.000226939,0.000094826,0.00002196135,0.00005609416,0.00002080975],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2260267,"threshold_uncertainty_score":0.9999509,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2898495177","doi":"10.1109/ppic.2018.8502239","title":"Basics of Communication Networks for Electrical Engineers in the Forest Products Industries","year":2018,"lang":"en","type":"article","venue":"","topic":"Power Systems and Technologies","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Rockwell Automation (Canada)","funders":"","keywords":"Automation; Communications protocol; Computer science; Process (computing); Process automation system; Protocol (science); Communications system; Automatic meter reading; Embedded system; Systems engineering; Software engineering; Telecommunications; Engineering; Computer network; Wireless; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.0175457323565588,"gpt":0.2156775999529296,"spread":0.1981318675963709,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001778755,0.00004896352,0.00007428291,0.00004391416,0.00001806831,0.00000858136,0.0002091909,0.00007996668,8.58054e-7],"category_scores_gemma":[0.00009445206,0.00003307066,0.00001025853,0.0002937798,0.00004376627,0.00004096648,0.00001360428,0.0001026182,5.64198e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001313617,"about_ca_system_score_gemma":0.00000864076,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001568857,"about_ca_topic_score_gemma":0.0001410626,"domain_scores_codex":[0.9996797,0.000007535989,0.0001181378,0.00004395494,0.00003994741,0.0001106643],"domain_scores_gemma":[0.9995992,0.00008554712,0.00001415589,0.0002599413,0.00003625843,0.000004889575],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003912067,0.0001446252,0.02627376,0.0001989398,0.0001419031,0.000001255766,0.002307412,0.05936268,0.0006422828,0.6482218,0.1848938,0.07777245],"study_design_scores_gemma":[0.0008435376,0.0004672426,0.02923267,0.0001121444,0.00002553972,0.000009431323,0.00141363,0.7306944,0.03276832,0.003000308,0.2009936,0.0004391742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5766897,0.003919948,0.3933071,0.002240004,0.0006596766,0.002192718,0.000008214278,0.001174667,0.01980804],"genre_scores_gemma":[0.9988484,0.00003446335,0.0009933332,0.000009017995,0.00004089707,0.00003476839,0.000003457141,0.000006711191,0.00002891206],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6713318,"threshold_uncertainty_score":0.1348583,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}