{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":388,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":388,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"40b637905f92","filters":{"topic":"Railway Systems and Energy Efficiency"}},"results":[{"id":"W2097494045","doi":"10.1109/tie.2014.2386794","title":"Power Quality Issues in Railway Electrification: A Comprehensive Perspective","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Electronics","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":338,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Electrification; Perspective (graphical); Quality (philosophy); Engineering; Traction substation; Traction power network; Power (physics); Power quality; Compensation (psychology); Electric power system; Computer science; Transport engineering; Electrical engineering; Electricity; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.02556696157100111,"gpt":0.2690556633314732,"spread":0.2434887017604721,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003356861,0.0002584548,0.0003590696,0.0002573282,0.0001248008,0.00004860054,0.0001966522,0.0003158254,0.00009741583],"category_scores_gemma":[0.00002029736,0.0002719838,0.0001211089,0.0007174491,0.00004557876,0.000132801,3.727431e-7,0.0008908971,0.00006089194],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006604595,"about_ca_system_score_gemma":0.0001061149,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003371714,"about_ca_topic_score_gemma":0.0002949506,"domain_scores_codex":[0.9982285,0.0001848262,0.0004564023,0.0003346309,0.0002684222,0.0005271535],"domain_scores_gemma":[0.9992265,0.0001611782,0.00005464931,0.0003604556,0.0001072157,0.00009000523],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0002012692,0.0003368891,0.00001555033,0.00001937272,0.0001508605,0.000002394832,0.001409033,0.9317591,0.02230662,0.02629751,0.001315587,0.01618577],"study_design_scores_gemma":[0.01382637,0.003727081,0.0007444071,0.0003143379,0.0001327421,0.00006243941,0.004404495,0.1287088,0.4228027,0.004173637,0.4172127,0.0038904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6743346,0.00210987,0.2951845,0.001388087,0.00367501,0.001066699,0.00002943877,0.001151007,0.02106071],"genre_scores_gemma":[0.9990014,0.0001904185,0.00004334814,0.00004316289,0.000181157,0.00007083706,0.000002582784,0.00004268174,0.000424414],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8030504,"threshold_uncertainty_score":0.9999732,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2614791712","doi":"10.1109/tte.2017.2703583","title":"Comprehensive Topological Overview of Rolling Stock Architectures and Recent Trends in Electric Railway Traction Systems","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Transportation Electrification","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":196,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Insulated-gate bipolar transistor; Power electronics; Traction motor; Traction substation; Standardization; Traction (geology); Engineering; Train; Transformer; Traction control system; Electric traction; Electrical engineering; Automotive engineering; Computer science; Mechanical engineering; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.04409467576225608,"gpt":0.2825435967612039,"spread":0.2384489209989478,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000158074,0.0001960547,0.0003021961,0.0004920351,0.000219429,0.00004517903,0.0001297275,0.0001747302,0.00001920672],"category_scores_gemma":[0.000003300353,0.0001944648,0.00007485809,0.0003926718,0.00004363092,0.0001512141,2.157005e-8,0.0003019987,0.000001664164],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009566946,"about_ca_system_score_gemma":0.00001677093,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003609256,"about_ca_topic_score_gemma":0.0003807943,"domain_scores_codex":[0.9986917,0.00005878912,0.0005351771,0.0002722367,0.0002134822,0.0002286087],"domain_scores_gemma":[0.9993318,0.00006390731,0.0001742487,0.0002914043,0.00007970256,0.00005894099],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00008156575,0.0001126824,0.0001294384,0.0001411934,0.0000356437,0.000001690664,0.0004775339,0.6322613,0.2349068,0.0003194784,0.000004745506,0.1315279],"study_design_scores_gemma":[0.002135346,0.0005303852,0.3781911,0.0002448436,0.000127616,0.00002052637,0.0002156896,0.1992484,0.4175463,0.0001636326,0.0008733292,0.0007027948],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8502684,0.001623851,0.1469442,0.00007308128,0.0003994057,0.0003000054,0.00002097782,0.0001169556,0.0002531014],"genre_scores_gemma":[0.9970163,0.002685017,0.00007185063,0.000006141891,0.00002637504,0.0001002954,0.00001974634,0.0000238834,0.00005035367],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4330129,"threshold_uncertainty_score":0.7930044,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2148714761","doi":"10.1002/atr.193","title":"Railway passenger train delay prediction via neural network model","year":2012,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":140,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Overfitting; Computer science; Artificial neural network; Test set; Artificial intelligence; Machine learning; Set (abstract data type); Train; Data mining; Test data; Data set; Time delay neural network","retraction":null,"screen_n_in":null,"score":{"opus":0.00773148274247261,"gpt":0.2049145313019972,"spread":0.1971830485595246,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000257516,0.0001342657,0.0001984605,0.00007727791,0.00004996094,0.000009483304,0.00007068355,0.00007792925,0.00001184655],"category_scores_gemma":[0.000003904219,0.0001194871,0.0001180697,0.0001670301,0.00001171256,0.0008680632,4.916564e-7,0.0001942911,0.000001897658],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005009324,"about_ca_system_score_gemma":0.0000111154,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001467605,"about_ca_topic_score_gemma":0.00001161667,"domain_scores_codex":[0.998835,0.00001575619,0.000562947,0.00006548053,0.0002379494,0.0002828185],"domain_scores_gemma":[0.9995376,0.00002104744,0.0001526542,0.00007895138,0.00007835688,0.0001313928],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002589315,0.00002384223,0.0008602747,0.00002426344,0.00002637518,0.000004074222,0.001178435,0.9789929,0.01052312,0.0001211693,0.0001918829,0.00802781],"study_design_scores_gemma":[0.001357206,0.0001783512,0.1298737,0.0001187453,0.000120538,0.00008982274,0.0003007913,0.8616595,0.001192022,0.0003607359,0.004395214,0.0003533272],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7361521,0.001023562,0.2607796,0.00001994594,0.001698657,0.0000616455,0.000006292909,0.00006075533,0.0001974536],"genre_scores_gemma":[0.9922375,0.0001062774,0.006783903,0.00001677982,0.0007744167,0.000005106332,0.00001525372,0.00003114253,0.00002961037],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2560854,"threshold_uncertainty_score":0.4872544,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2135524714","doi":"10.1287/opre.49.4.531.11226","title":"Simultaneous Assignment of Locomotives and Cars to Passenger Trains","year":2001,"lang":"en","type":"article","venue":"Operations Research","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":136,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Mathematical optimization; Integer programming; Train; Computer science; Context (archaeology); Flow network; Branch and cut; Simplex algorithm; Node (physics); Integer (computer science); Decomposition; Multi-commodity flow problem; Linear programming relaxation; Linear programming; Branch and bound; Tree (set theory); Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03675200780820406,"gpt":0.3223997203708126,"spread":0.2856477125626086,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002883214,0.00005837996,0.00008988585,0.00014937,0.0001153467,0.00004638129,0.00008139152,0.00003452854,0.00007092604],"category_scores_gemma":[0.000081259,0.00005161966,0.00001339809,0.0003275573,0.00004334175,0.00005013489,0.00002340402,0.00009514306,0.00002312016],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004448972,"about_ca_system_score_gemma":0.00002139292,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002079377,"about_ca_topic_score_gemma":0.0004363342,"domain_scores_codex":[0.9992551,0.00004987561,0.0001340799,0.0001133107,0.0002395414,0.0002081107],"domain_scores_gemma":[0.9995537,0.00009446298,0.000002038698,0.0001490857,0.0001064895,0.00009416939],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000001596727,0.00002817423,0.00009936199,0.00001097224,0.00000999334,0.000009965876,0.001444109,0.9338789,0.05408423,0.0006938491,0.0002718553,0.009467011],"study_design_scores_gemma":[0.0003053401,0.00029465,0.002110106,0.0000645204,0.000003749666,0.00002370002,0.002641841,0.9260732,0.01308377,0.00001607415,0.05517194,0.0002110868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9816789,0.0002013851,0.005602073,0.0002171262,0.00005031387,0.0002128412,0.000006960222,0.00003046395,0.01199991],"genre_scores_gemma":[0.9970965,0.0001045255,0.0005627855,0.000004503016,0.00004089798,0.00004205294,0.000002155331,0.00001231798,0.002134232],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.05490009,"threshold_uncertainty_score":0.2104989,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1914666677","doi":"10.1002/atr.1261","title":"Design and analysis of demand‐adapted railway timetables","year":2014,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Process (computing); Quality (philosophy); Integer programming; Service quality; Mathematical model; Public transport; Order (exchange)","retraction":null,"screen_n_in":null,"score":{"opus":0.006452185978115887,"gpt":0.2005948712036713,"spread":0.1941426852255554,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002950873,0.0000752376,0.0003058491,0.0002680815,0.00001775992,0.000005668849,0.00004725147,0.00003472436,0.000009962391],"category_scores_gemma":[0.00001055396,0.00006331562,0.00008144046,0.0003691317,0.00001343657,0.000188982,3.229208e-7,0.00005229128,2.022733e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000008523697,"about_ca_system_score_gemma":0.000006296603,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003187134,"about_ca_topic_score_gemma":0.00001182526,"domain_scores_codex":[0.9992616,0.00002269549,0.0004381174,0.00005420773,0.0001440877,0.00007927218],"domain_scores_gemma":[0.9995568,0.00006877631,0.0001740521,0.00006030582,0.00009535578,0.00004465314],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002222603,0.000008977481,0.0005206974,0.00002798082,0.0002414611,0.000001261571,0.0004719961,0.9599304,0.03266803,0.0001831719,0.000005278748,0.005918549],"study_design_scores_gemma":[0.001776708,0.0004058402,0.4252923,0.0001650219,0.002149598,0.000008241955,0.000337051,0.5354144,0.03171876,0.0003746092,0.002030597,0.00032683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5058663,0.0004707706,0.4934903,0.000004412966,0.00007796346,0.00002283349,0.000001361008,0.000009343102,0.00005670357],"genre_scores_gemma":[0.9787837,0.0001943249,0.02097284,0.000002997271,0.0000198316,8.86424e-7,0.000005352044,0.000009023101,0.00001107077],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4729173,"threshold_uncertainty_score":0.2581936,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2312008557","doi":"10.1109/tpwrd.2015.2472994","title":"Power-Quality Impact Assessment for High-Speed Railway Associated With High-Speed Trains Using Train Timetable—Part I: Methodology and Modeling","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":116,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"National Natural Science Foundation of China; University of Alberta","keywords":"Train; Engineering; Traction power network; Traction substation; Waveform; Transformer; Electric power system; Traction (geology); Power (physics); Power flow; Voltage; Harmonic; Electronic engineering; Automotive engineering; Computer science; Electrical engineering; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.09649870824432084,"gpt":0.3187397702180975,"spread":0.2222410619737766,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001822301,0.0005158175,0.0008602263,0.000353277,0.000238985,0.000104498,0.0001810383,0.00033129,0.00009523607],"category_scores_gemma":[0.00003035801,0.000451314,0.0002218163,0.0004332323,0.00008689766,0.0004174469,0.000002372705,0.0003996486,0.000005117384],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005943578,"about_ca_system_score_gemma":0.0002066548,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000981203,"about_ca_topic_score_gemma":0.0001573723,"domain_scores_codex":[0.9972076,0.0003681413,0.0007068795,0.0005488184,0.0004401797,0.0007283537],"domain_scores_gemma":[0.9983965,0.0004483364,0.0001336084,0.0003944866,0.0002750994,0.0003519402],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001790546,0.0001760716,0.000008008299,0.00002186032,0.0005706862,0.000006915546,0.0008338116,0.9806374,0.01681702,0.000112209,0.000117029,0.0005199829],"study_design_scores_gemma":[0.00463646,0.0009951202,0.0002765391,0.0001276444,0.0002946042,0.00003789544,0.0008025177,0.9872512,0.004334347,0.0001797147,0.0001314347,0.0009325494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4921058,0.00008261106,0.5060368,0.00002628902,0.0007830911,0.0002875845,0.0001953437,0.0002147965,0.0002677067],"genre_scores_gemma":[0.9867211,0.00002247164,0.01276708,0.00005214567,0.00004989852,0.00002312049,0.00002894559,0.0001188862,0.0002163369],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4946153,"threshold_uncertainty_score":0.9997939,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2036221507","doi":"10.1287/opre.1080.0642","title":"Optimal Real-Time Traffic Control in Metro Stations","year":2009,"lang":"en","type":"article","venue":"Operations Research","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":107,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Bombardier (Canada)","funders":"","keywords":"Train; Computer science; Scheduling (production processes); Schedule; Routing (electronic design automation); Real-time computing; Branch and bound; Control (management); Process (computing); Real-time Control System; Column generation; Operations research; Mathematical optimization; Computer network; Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.02200890085576439,"gpt":0.3124288843492416,"spread":0.2904199834934772,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006707108,0.00008209718,0.0001284674,0.0004135602,0.0001886638,0.0001316129,0.0001511757,0.00005836428,0.0002010149],"category_scores_gemma":[0.00006198264,0.00007891757,0.00002775626,0.0008039528,0.00003019703,0.0001796557,0.000005808408,0.0002191014,0.000276114],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001304195,"about_ca_system_score_gemma":0.00006916471,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001989637,"about_ca_topic_score_gemma":0.0006283695,"domain_scores_codex":[0.9988336,0.0001104598,0.0002296183,0.0001517957,0.0002977937,0.0003767253],"domain_scores_gemma":[0.9995019,0.00007725324,0.000002965422,0.0002142276,0.0001204256,0.00008317463],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002793674,0.00004589824,0.00001398461,0.000002768461,0.00000479673,0.000005888758,0.0002959011,0.9790224,0.01599392,0.001247369,0.00135613,0.002008182],"study_design_scores_gemma":[0.0003535631,0.00008269414,0.001676438,0.00001100594,0.000001335233,0.00000121411,0.0002339142,0.996112,0.0002139055,0.000006011913,0.001216657,0.00009122984],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9751032,0.0001290756,0.002785887,0.0004128842,0.00005162316,0.0002705742,0.00001471716,0.0001315616,0.02110048],"genre_scores_gemma":[0.9964749,0.00005556877,0.001579955,0.000009203823,0.00006558932,0.00006885255,0.00001952227,0.00001386928,0.001712522],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02137172,"threshold_uncertainty_score":0.3548979,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3044811479","doi":"10.1016/j.tre.2020.102022","title":"Modeling train operation as sequences: A study of delay prediction with operation and weather data","year":2020,"lang":"en","type":"article","venue":"Transportation Research Part E Logistics and Transportation Review","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Artificial neural network; Computer science; Sensitivity (control systems); Net (polyhedron); Performance prediction; Predictive modelling; State (computer science); Machine learning; Data mining; Artificial intelligence; Simulation; Engineering; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.1680081681407262,"gpt":0.345737131622022,"spread":0.1777289634812958,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006680443,0.0001696327,0.0003235225,0.00006862035,0.0001357504,0.00004753235,0.0001349349,0.00006212105,0.00004740016],"category_scores_gemma":[0.0000191907,0.0001395578,0.00001808442,0.000292861,0.00007645987,0.0003663333,0.000001872863,0.0001921861,0.000002375528],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000009908633,"about_ca_system_score_gemma":0.00005665245,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000660615,"about_ca_topic_score_gemma":0.002837945,"domain_scores_codex":[0.9981424,0.00009158271,0.0006734169,0.0003956004,0.0005136541,0.0001833144],"domain_scores_gemma":[0.9993466,0.00004107566,0.00005077041,0.0002261087,0.0001919418,0.0001435187],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005897116,0.0001276891,0.002702095,0.004133126,0.0001047629,0.00003050514,0.006015733,0.9797325,0.0003953475,0.002947103,0.0001315215,0.00362066],"study_design_scores_gemma":[0.001189124,0.001110751,0.004606273,0.001105456,0.0002450521,0.00000275622,0.002506074,0.9865538,0.00003440766,0.00004870912,0.002314326,0.0002832563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8102264,0.0152686,0.1701289,0.0006121662,0.00007260039,0.002610845,0.0006820456,0.0001696652,0.000228798],"genre_scores_gemma":[0.9730927,0.02519018,0.0004073759,0.00006314235,0.00003665875,0.0001052762,0.001072616,0.0000251542,0.000006922698],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1697215,"threshold_uncertainty_score":0.5691003,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2110804857","doi":"10.1287/trsc.1100.0349","title":"A New Resource-Constrained Multicommodity Flow Model for Conflict-Free Train Routing and Scheduling","year":2010,"lang":"en","type":"article","venue":"Transportation Science","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"D-Wave Systems (Canada)","funders":"","keywords":"Integer programming; Pairwise comparison; Scheduling (production processes); Computer science; Linear programming relaxation; Mathematical optimization; Linear programming; Train; Schedule; Graph; Routing (electronic design automation); Mathematics; Theoretical computer science; Artificial intelligence; Geography; Computer network","retraction":null,"screen_n_in":null,"score":{"opus":0.01927774119824747,"gpt":0.2403110218630045,"spread":0.221033280664757,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005985675,0.0001242759,0.0001382713,0.00009776997,0.0002208239,0.00008057112,0.000280036,0.00006537439,0.000006828253],"category_scores_gemma":[0.00008830952,0.0001227484,0.00003914607,0.0002460208,0.0001685634,0.0002911704,0.000003460062,0.0001381988,8.665206e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001225963,"about_ca_system_score_gemma":0.00009594738,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000577069,"about_ca_topic_score_gemma":0.0003472697,"domain_scores_codex":[0.9989412,0.000003250264,0.00027147,0.0002580402,0.0002258445,0.0003001243],"domain_scores_gemma":[0.999428,0.00005802832,0.00003669824,0.0002339791,0.00005729154,0.000186012],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000004883701,0.000005369252,0.000191232,0.00002646977,0.000002869859,5.023104e-7,0.005275876,0.8955615,0.08377123,0.005560302,0.00002554496,0.009574191],"study_design_scores_gemma":[0.0005818638,0.000009404783,0.002929854,0.00001658304,0.000007424067,0.000001933239,0.0001964125,0.9934136,0.002167455,0.0002192753,0.0003021706,0.0001539825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4895391,0.00001403596,0.5095919,0.00005263518,0.0001285858,0.0001218095,0.00002533239,0.0001231252,0.0004034927],"genre_scores_gemma":[0.8674003,0.000001491793,0.1324286,0.00002005117,0.00005276432,0.00001282326,0.000007498641,0.00001340629,0.00006304396],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.3778612,"threshold_uncertainty_score":0.5005535,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1781051676","doi":"10.1002/atr.1317","title":"A multi‐objective subway timetable optimization approach with minimum passenger time and energy consumption","year":2015,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":90,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"State Key Laboratory of Rail Traffic Control and Safety; China Scholarship Council; National Natural Science Foundation of China","keywords":"Dwell time; Energy consumption; Schedule; Train; Beijing; Genetic algorithm; Computer science; Fuzzy logic; Mathematical optimization; Operations research; Simulation; Real-time computing; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.009070703200376087,"gpt":0.1965674000854321,"spread":0.187496696885056,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001422709,0.0001205772,0.0002069604,0.0001233787,0.00002801362,0.00001880525,0.00003966852,0.00005681777,0.000006726297],"category_scores_gemma":[0.000006065334,0.00009750032,0.00003052053,0.0001411538,0.00002318898,0.000525892,6.091037e-7,0.00007954118,8.222724e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000462857,"about_ca_system_score_gemma":0.00002708689,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009044787,"about_ca_topic_score_gemma":0.00001521371,"domain_scores_codex":[0.9992605,0.00001961272,0.0003090987,0.00009788608,0.0001940957,0.0001188045],"domain_scores_gemma":[0.9994668,0.00001751607,0.0001509761,0.0000596596,0.0002030463,0.0001020243],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008595648,0.00003722557,0.0002239519,0.00002539927,0.00004243536,0.000006536319,0.0009861448,0.9920605,0.005481611,0.00002281944,0.00001926394,0.001008107],"study_design_scores_gemma":[0.003647893,0.000397285,0.0119754,0.0001214029,0.0001267164,0.00009345193,0.0008013221,0.9794107,0.002466822,0.00001158935,0.0006169493,0.0003304585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4558305,0.0009534684,0.5425782,0.000007624321,0.0001656487,0.00005758445,0.000005531843,0.00004472829,0.0003567732],"genre_scores_gemma":[0.8829666,0.0001611632,0.116612,0.000005325455,0.00005560881,0.000005926067,0.0000318421,0.00002593533,0.0001356364],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4271361,"threshold_uncertainty_score":0.3975948,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2505379252","doi":"10.1016/j.trb.2016.07.003","title":"A two-step linear programming model for energy-efficient timetables in metro railway networks","year":2016,"lang":"en","type":"article","venue":"Transportation Research Part B Methodological","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":86,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Thales (Canada); University of Toronto","funders":"","keywords":"Train; Computer science; Linear programming; Compiler; Energy consumption; Energy (signal processing); Service (business); Mathematical optimization; Engineering; Operating system; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.2357454780061053,"gpt":0.4021652464940827,"spread":0.1664197684879773,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006399596,0.000234593,0.000462658,0.0003275149,0.0001351237,0.00003280966,0.0002792382,0.0002226725,0.00006244441],"category_scores_gemma":[0.0003483331,0.0001543015,0.0001664778,0.000732528,0.0001431804,0.0001005102,0.000009405658,0.0002645947,0.000007249255],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009608086,"about_ca_system_score_gemma":0.00004421837,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000110338,"about_ca_topic_score_gemma":0.0008065395,"domain_scores_codex":[0.9966892,0.0006138655,0.0006724137,0.0004933542,0.0005271367,0.001004011],"domain_scores_gemma":[0.9971442,0.002130967,0.00004673673,0.0002755374,0.0001949627,0.0002075443],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009918453,0.0000810323,0.0006089029,0.00004204616,0.00002360919,0.000009435661,0.0001050471,0.9550973,0.00187756,0.01178229,0.0002226951,0.03005087],"study_design_scores_gemma":[0.0009860478,0.0001094379,0.0007799107,0.00007741817,0.00001020703,4.150866e-7,0.00009629902,0.9882574,0.001018163,0.0003756184,0.008057152,0.0002319478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1034338,0.0004840556,0.8948609,0.00009574666,0.0001653751,0.0004599747,0.00002589472,0.0002254574,0.0002487685],"genre_scores_gemma":[0.8531262,0.0001250467,0.1451489,0.00001455933,0.0001719708,0.0009074904,0.00003514951,0.0000450505,0.000425621],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7497119,"threshold_uncertainty_score":0.6292231,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1587383887","doi":"","title":"Stochastic modelling of train delays and delay propagation in stations","year":2006,"lang":"en","type":"article","venue":"Research Repository (Delft University of Technology)","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Fondation du cancer du sein du Québec","keywords":"Punctuality; Train; Weibull distribution; Dwell time; Log-normal distribution; Scheduling (production processes); Computer science; Standard deviation; Stochastic process; Queueing theory; Reliability (semiconductor); Engineering; Mathematical optimization; Transport engineering; Statistics; Mathematics; Computer network","retraction":null,"screen_n_in":null,"score":{"opus":0.01769992892040272,"gpt":0.2099324426616953,"spread":0.1922325137412925,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002555988,0.00006043281,0.00013297,0.0007680802,0.00009822307,0.000004839711,0.000143484,0.0001304622,0.000001103516],"category_scores_gemma":[0.00001226806,0.00007154921,0.00002043549,0.0005880339,0.0002454541,0.00009192323,0.00003403451,0.0001984414,5.887425e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008681425,"about_ca_system_score_gemma":0.00004049202,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00137692,"about_ca_topic_score_gemma":0.0001408935,"domain_scores_codex":[0.9993027,0.00003094303,0.0001651322,0.0001323938,0.0001830976,0.0001857243],"domain_scores_gemma":[0.99963,0.00003920213,0.00003496727,0.0001502037,0.000121383,0.00002428419],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00000840128,0.00003699409,0.0003482079,0.00008140998,0.000009438176,0.00002210225,0.0001762341,0.9539804,0.03865393,0.005736324,0.00002771721,0.000918794],"study_design_scores_gemma":[0.0002805993,0.0000744107,0.0007152826,0.0001071703,0.00000561916,0.00001436657,0.001684654,0.9892464,0.007043997,0.0006654746,0.00008089099,0.00008116949],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8825076,0.0003308902,0.1152961,0.00002448231,0.00001745515,0.0001239123,0.000002992183,0.00006989582,0.001626747],"genre_scores_gemma":[0.9979443,0.00002524047,0.001850982,7.025164e-8,0.000006399227,9.324351e-7,0.000001838917,0.000007104042,0.0001631657],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1154367,"threshold_uncertainty_score":0.2917692,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4390969736","doi":"10.1109/tits.2024.3350743","title":"Power Flow Control-Based Regenerative Braking Energy Utilization in AC Electrified Railways: Review and Future Trends","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Intelligent Transportation Systems","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Innovation and Technology Fund; Universidade de Macau; Natural Science Foundation of Guangdong Province; National Natural Science Foundation of China","keywords":"Regenerative brake; Engineering; Energy storage; Energy flow; Power (physics); Control (management); Automotive engineering; Control engineering; Computer science; Energy (signal processing)","retraction":null,"screen_n_in":null,"score":{"opus":0.01467246789999789,"gpt":0.2355543463691428,"spread":0.2208818784691449,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003282821,0.0003447135,0.0004581539,0.0006235542,0.00009273594,0.0001009489,0.00009587884,0.0001991656,0.0001444713],"category_scores_gemma":[0.000001271918,0.0003222938,0.0001539992,0.001120042,0.00002645187,0.0002329567,6.688109e-8,0.0002548181,0.00001034308],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001464111,"about_ca_system_score_gemma":0.00004607325,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001023915,"about_ca_topic_score_gemma":0.0004115148,"domain_scores_codex":[0.9980447,0.0001263835,0.0008160382,0.0004217307,0.0002920487,0.0002990878],"domain_scores_gemma":[0.9994587,0.00009703881,0.00005263656,0.0002112192,0.00007838962,0.0001019691],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000364817,0.00005605568,0.000005019823,0.00122969,0.0001234173,0.00002064976,0.0008126729,0.9648793,0.001048367,0.002591452,0.0003568382,0.02884009],"study_design_scores_gemma":[0.0008435357,0.0002320443,0.0001128842,0.003425245,0.0002599936,0.00002136844,0.0004371521,0.8703648,0.01608875,0.000009481874,0.1073842,0.0008205165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.001333043,0.04579832,0.9485286,0.0001734741,0.002534842,0.0003220814,0.0001413409,0.000461801,0.000706487],"genre_scores_gemma":[0.9913185,0.007461055,0.00004611875,0.0001095392,0.0001165484,0.0003168551,0.00007700136,0.00007039273,0.0004839933],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9899855,"threshold_uncertainty_score":0.9999229,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3008790764","doi":"10.1016/j.trc.2020.02.021","title":"A Bayesian network model to predict the effects of interruptions on train operations","year":2020,"lang":"en","type":"article","venue":"Transportation Research Part C Emerging Technologies","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Train; Bayesian network; Computer science; Line (geometry); Domain (mathematical analysis); Bayesian probability; Domain knowledge; Data mining; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.04830770220749815,"gpt":0.3087129091733793,"spread":0.2604052069658812,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000274661,0.0001190178,0.0001540736,0.0001523269,0.000207389,0.00002310098,0.0003859876,0.00008415894,0.000008159394],"category_scores_gemma":[0.0001947498,0.00009075642,0.00005623968,0.001010711,0.000109889,0.00006982061,0.00001128189,0.0003442614,0.000009608689],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002257072,"about_ca_system_score_gemma":0.00002434983,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003509562,"about_ca_topic_score_gemma":0.0002120219,"domain_scores_codex":[0.9987929,0.00003909957,0.0002947049,0.0001945372,0.0003410549,0.0003377444],"domain_scores_gemma":[0.9994431,0.0001314924,0.00001399442,0.000275776,0.00007676082,0.00005891302],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000006692148,0.0000141042,0.00007232569,0.0001055565,0.00002338478,0.000002393971,0.002540778,0.9728616,0.003067509,0.01229534,0.006413773,0.002596514],"study_design_scores_gemma":[0.0001793746,0.0003182529,0.0006582386,0.0002605824,0.00001133523,1.38265e-7,0.002347726,0.9847833,0.006635361,0.0005137192,0.004140429,0.000151523],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5279903,0.000425168,0.454705,0.01052239,0.0003116096,0.00142208,0.00006217755,0.002922002,0.001639323],"genre_scores_gemma":[0.99793,0.0001368675,0.001382671,0.00003510059,0.000042817,0.000387614,0.00001241577,0.00002284927,0.00004968851],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4699397,"threshold_uncertainty_score":0.3700939,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2969003068","doi":"10.1109/access.2019.2935106","title":"Train Dispatching Management With Data- Driven Approaches: A Comprehensive Review and Appraisal","year":2019,"lang":"en","type":"review","venue":"IEEE Access","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"State Key Laboratory of Rail Traffic Control and Safety; National Natural Science Foundation of China; China Railway","keywords":"Key (lock); Computer science; Operations research; Data science; Industrial engineering; Engineering; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.1993119771729817,"gpt":0.3599851209676399,"spread":0.1606731437946582,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001841754,0.0005896982,0.001959463,0.0001362671,0.00005786937,0.0001931921,0.001403531,0.0001482897,0.00001041509],"category_scores_gemma":[0.000003993105,0.0004141768,0.0001156315,0.0003624603,0.00004409752,0.0003975383,0.0002871015,0.0003506522,0.00003238948],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004494234,"about_ca_system_score_gemma":0.00003033387,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003010527,"about_ca_topic_score_gemma":0.00001441834,"domain_scores_codex":[0.9980173,0.00008652128,0.000554696,0.0007128043,0.0002582119,0.0003705196],"domain_scores_gemma":[0.998313,0.0001187566,0.0001785202,0.001268566,0.00001754647,0.0001036365],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[5.497089e-7,0.00001410976,0.000001056721,0.329608,0.0004688978,0.0000231312,0.00003492716,0.00299381,1.853678e-8,0.00007268115,0.002682045,0.6641008],"study_design_scores_gemma":[0.0001251682,0.0000129571,0.0000040463,0.0443422,0.001574856,0.00006400828,0.00001981879,0.003142185,2.386517e-8,8.659355e-7,0.9501764,0.0005374869],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.000005207246,0.9907188,0.003465031,0.000008502698,0.0005586802,0.001373294,0.0001116185,0.0001679028,0.003590998],"genre_scores_gemma":[0.0000448821,0.9985524,0.0004005831,0.00003167944,0.0001593804,0.0002339897,0.0003336985,0.0001291102,0.0001142101],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.9474943,"threshold_uncertainty_score":0.999831,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2994808218","doi":"10.1002/for.2639","title":"A predictive model of train delays on a railway line","year":2019,"lang":"en","type":"article","venue":"Journal of Forecasting","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Department of Science and Technology of Sichuan Province; China Scholarship Council","keywords":"Computer science; Artificial neural network; Python (programming language); Random forest; Predictive modelling; Artificial intelligence; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.02369394031512286,"gpt":0.201390566858223,"spread":0.1776966265431001,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004150551,0.0001088807,0.0002835632,0.0001603961,0.00001853662,0.000009410122,0.0001265423,0.00006142945,0.00001502718],"category_scores_gemma":[0.00006706815,0.00008609586,0.0001299501,0.0001300062,0.00001202495,0.0001204251,0.000009342201,0.0002097874,0.000003323034],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005079971,"about_ca_system_score_gemma":0.00003335389,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004319441,"about_ca_topic_score_gemma":0.0000023711,"domain_scores_codex":[0.9989864,0.00001319703,0.0005183666,0.00006659755,0.0002436683,0.000171738],"domain_scores_gemma":[0.9994295,0.00007667595,0.0002259503,0.00009492147,0.0001085218,0.00006437684],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003484326,0.00002216772,0.0001015567,0.00006558938,0.00004124928,0.000005186916,0.0007772128,0.9788641,0.01274553,0.0001125252,0.0001025254,0.007127503],"study_design_scores_gemma":[0.0004555056,0.0004865551,0.00006160069,0.0004084885,0.00001326315,0.00006566342,0.0002004426,0.9949042,0.003143899,0.0001062479,0.00007511489,0.00007899907],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9415874,0.0001583455,0.04605033,0.00001236129,0.0003876247,0.00005911412,0.000006666842,0.00001934366,0.01171875],"genre_scores_gemma":[0.997615,0.0000101824,0.002047075,0.000008301729,0.0001763439,9.454014e-7,3.818803e-7,0.00002273114,0.0001189783],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.05602759,"threshold_uncertainty_score":0.3510887,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2082715560","doi":"10.1109/jsac.2012.120512","title":"Efficient On-Demand Data Service Delivery to High-Speed Trains in Cellular/Infostation Integrated Networks","year":2012,"lang":"en","type":"article","venue":"IEEE Journal on Selected Areas in Communications","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Computer network; Bottleneck; Scheduling (production processes); Quality of service; Distributed computing; Provisioning; Schedule; Resource allocation; Mathematical optimization","retraction":null,"screen_n_in":null,"score":{"opus":0.03859112550047582,"gpt":0.2617042065967713,"spread":0.2231130810962955,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008360352,0.0002185662,0.0002573385,0.0005471386,0.000185326,0.00008466159,0.001259016,0.0001336378,0.00001601539],"category_scores_gemma":[0.000104594,0.0002062112,0.0000285446,0.002079271,0.00002059038,0.0001759273,0.00008078769,0.0009669201,0.00004453104],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004068491,"about_ca_system_score_gemma":0.00007224319,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003092637,"about_ca_topic_score_gemma":0.001750773,"domain_scores_codex":[0.9981709,0.0002996431,0.0006383982,0.0001662104,0.0002516786,0.0004731963],"domain_scores_gemma":[0.9977988,0.0003537874,0.0001020387,0.001331711,0.0002019667,0.0002117064],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002478514,0.000311185,0.0004318823,0.000006519504,0.00002326207,0.000002617984,0.001109875,0.9922163,0.002893176,0.0002223448,0.000941469,0.001816525],"study_design_scores_gemma":[0.0005821357,0.00005917451,0.01265146,0.0003605584,0.00001277513,0.00001828576,0.000309242,0.9820607,0.0003052296,0.00000817356,0.003366329,0.0002659135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9845372,0.000720454,0.01189541,0.0005067392,0.00073485,0.0002637178,0.00003566488,0.0001127799,0.001193223],"genre_scores_gemma":[0.9979275,0.0003073669,0.001153859,0.0002027894,0.0001596032,0.00001556074,0.000174276,0.00004034219,0.00001866963],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01339037,"threshold_uncertainty_score":0.8409049,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2026095449","doi":"10.1109/tits.2012.2188288","title":"Handoff Performance Improvements in MIMO-Enabled Communication-Based Train Control Systems","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Intelligent Transportation Systems","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Carleton University","funders":"","keywords":"Handover; Computer network; Computer science; MIMO; Real-time computing; Partially observable Markov decision process; Latency (audio); Wireless; Channel (broadcasting); Markov process; Markov chain; Markov model; Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.01425284474062742,"gpt":0.2142180172546872,"spread":0.1999651725140598,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007007656,0.0003658122,0.0004707077,0.0004408174,0.0001820866,0.00008247393,0.000247368,0.0002068616,0.00004941285],"category_scores_gemma":[0.000001715621,0.0003629145,0.0001501367,0.0005137451,0.00004451104,0.0004230287,1.24164e-7,0.0003320362,0.00009605897],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002781463,"about_ca_system_score_gemma":0.00004089425,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0009515265,"about_ca_topic_score_gemma":0.0002344572,"domain_scores_codex":[0.9974096,0.0001355079,0.001164909,0.0002562223,0.000441773,0.000591965],"domain_scores_gemma":[0.9989265,0.0001499584,0.0001283512,0.0004917737,0.000104982,0.0001984655],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004874703,0.0002231609,0.001183581,0.0004224676,0.00007544908,0.000001247771,0.001172919,0.9938056,0.001615241,0.0001416262,0.00004525257,0.001264642],"study_design_scores_gemma":[0.002349336,0.0001427117,0.002767896,0.0007921772,0.00008189507,0.00000493771,0.001727676,0.9723725,0.01451707,0.000001104036,0.004557252,0.0006854102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3515023,0.001175203,0.6423402,0.00001131724,0.002970689,0.0009821163,0.0001134521,0.000314459,0.0005902689],"genre_scores_gemma":[0.9981586,0.0001752784,0.00005351555,0.00002427734,0.00007337285,0.00104008,0.00004965858,0.00007497276,0.0003502468],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6466563,"threshold_uncertainty_score":0.9998823,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2799346248","doi":"10.1155/2018/7905820","title":"Integrated Optimization on Train Control and Timetable to Minimize Net Energy Consumption of Metro Lines","year":2018,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"Train; Headway; Energy consumption; Regenerative brake; Automotive engineering; Automatic train control; Energy (signal processing); Engineering; Simulation; Efficient energy use; Optimal control; Computer science; Control system; Mathematical optimization; Brake; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.00683449849518363,"gpt":0.2115941225268259,"spread":0.2047596240316422,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001396684,0.0001015698,0.0002450024,0.0002062248,0.00002345612,0.000009088527,0.00004616169,0.0000497163,0.00002536739],"category_scores_gemma":[0.00002183382,0.00008621767,0.00004412213,0.0001870673,0.00002360738,0.0001925119,3.271718e-7,0.00005265553,6.556052e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002271041,"about_ca_system_score_gemma":0.00001282829,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001285673,"about_ca_topic_score_gemma":0.00004226421,"domain_scores_codex":[0.9991795,0.00001895708,0.0004821628,0.00007605637,0.0001453789,0.00009794091],"domain_scores_gemma":[0.9994395,0.00004339299,0.0001637029,0.00005697603,0.0002313903,0.00006498387],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002020772,0.00002087117,0.0001879879,0.00002374775,0.0000358199,0.000001568056,0.0003251157,0.9474626,0.04259259,0.0001303495,0.00003376382,0.00898347],"study_design_scores_gemma":[0.01182162,0.003859348,0.1148053,0.001227053,0.0004394409,0.00002795955,0.001408466,0.7136869,0.1430814,0.0001962855,0.008570039,0.0008761576],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5276519,0.0002572492,0.4716085,0.00002315702,0.0003135104,0.00004728831,0.00001404534,0.00001660137,0.00006773757],"genre_scores_gemma":[0.9724307,0.0001483055,0.02724447,0.00002791848,0.00009515346,0.000003057476,0.00001313617,0.00001518494,0.00002208678],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4447788,"threshold_uncertainty_score":0.3515854,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2495222067","doi":"10.1109/tpwrd.2015.2472961","title":"Power-Quality Impact Assessment for High-Speed Railway Associated With High-Speed Trains Using Train Timetable—Part II: Verifications, Estimations and Applications","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"National Natural Science Foundation of China; University of Alberta","keywords":"Harmonics; Train; Harmonic; Engineering; Electric power system; Reliability engineering; Power (physics); Harmonic analysis; Voltage; Power quality; Electronic engineering; Traction power network; Weibull distribution; Automotive engineering; Electrical engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.03077994379494976,"gpt":0.2776267494817535,"spread":0.2468468056868037,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000650176,0.0004237489,0.0005178028,0.0003298069,0.0005892585,0.0001350586,0.0001971528,0.0002181823,0.0001072458],"category_scores_gemma":[0.0000164441,0.0003957281,0.00016093,0.0006764152,0.0001220165,0.0004688475,0.000002324507,0.0002871969,0.00001288478],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006145457,"about_ca_system_score_gemma":0.0002628377,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003155905,"about_ca_topic_score_gemma":0.00009162252,"domain_scores_codex":[0.9978238,0.0001084362,0.0006548785,0.0004821919,0.0004226402,0.0005081038],"domain_scores_gemma":[0.9984002,0.0002407363,0.0001610454,0.0005305202,0.0003322772,0.000335265],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005623777,0.0005342115,0.00001665273,0.0000278096,0.0004757214,0.00000143459,0.0007375435,0.9866198,0.008868913,0.001006643,0.0006604414,0.0009945439],"study_design_scores_gemma":[0.01595867,0.003075265,0.01200937,0.0005298838,0.001418838,0.00009869465,0.002877809,0.9357085,0.01316955,0.0008636892,0.01002341,0.004266342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3826881,0.00008788591,0.6140527,0.00007162258,0.000399207,0.0007863686,0.0008277156,0.0003641577,0.0007222414],"genre_scores_gemma":[0.9925501,0.00002052909,0.00648634,0.00003682611,0.00004498332,0.0001758719,0.0001364771,0.0000932233,0.0004556677],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.609862,"threshold_uncertainty_score":0.9998494,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2981207057","doi":"10.1016/j.ssci.2019.104510","title":"A hybrid model to improve the train running time prediction ability during high-speed railway disruptions","year":2019,"lang":"en","type":"article","venue":"Safety Science","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Support vector machine; Benchmark (surveying); Train; Machine learning; Computer science; Predictive modelling; Kalman filter; Artificial intelligence; Data mining; Simulation","retraction":null,"screen_n_in":null,"score":{"opus":0.005028233187755179,"gpt":0.1967299021950694,"spread":0.1917016690073143,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001000208,0.0001573482,0.0001585528,0.0001088745,0.0004462707,0.00008404265,0.0004992262,0.00003397311,0.00005115731],"category_scores_gemma":[0.00005601296,0.0001179496,0.00006146393,0.0005971737,0.0001492235,0.0004542628,0.00008944525,0.0001581576,0.0002481585],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002481153,"about_ca_system_score_gemma":0.00007147159,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006279873,"about_ca_topic_score_gemma":0.000004855679,"domain_scores_codex":[0.9983401,0.0000151829,0.0003030338,0.0004195251,0.0004320672,0.0004901303],"domain_scores_gemma":[0.9991311,0.0000331257,0.00003325356,0.0005905686,0.00006157358,0.0001503803],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000004702373,0.000006636017,0.0001036628,0.00001137596,0.000002403385,2.66977e-7,0.0005194674,0.6629726,0.3353674,0.0004641227,0.00001421107,0.0005331416],"study_design_scores_gemma":[0.0001883836,0.00002930446,0.03256925,0.00002853646,0.000004044035,0.000007009508,0.0000798064,0.9608803,0.005700046,0.0001404453,0.0002136294,0.0001592138],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9810277,0.00001903422,0.01133983,0.0002071156,0.0008099728,0.0004005283,0.00005117826,0.0003025986,0.005842018],"genre_scores_gemma":[0.9985112,0.000002927347,0.0003926464,0.00002379767,0.00009317176,0.00001894075,0.00000288393,0.00001807713,0.0009363808],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3296674,"threshold_uncertainty_score":0.4809846,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2039435134","doi":"10.1007/s11067-008-9091-6","title":"Design of a Railway Scheduling Model for Dense Services","year":2008,"lang":"en","type":"article","venue":"Networks and Spatial Economics","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"D-Wave Systems (Canada)","funders":"","keywords":"Mathematical optimization; Scheduling (production processes); Discretization; Train; Computer science; Job shop scheduling; Schedule; Network topology; Heuristic; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01643597481285767,"gpt":0.1830659189713709,"spread":0.1666299441585132,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009881993,0.0001002867,0.0001964367,0.0000232302,0.00006808728,0.0000126564,0.00006468922,0.00008816997,0.00000162667],"category_scores_gemma":[0.000001483882,0.0001024572,0.00003661272,0.00002229066,0.00002203463,0.00006242214,0.00001155572,0.00004326943,4.341187e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001346851,"about_ca_system_score_gemma":0.00001428255,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000115589,"about_ca_topic_score_gemma":0.000157599,"domain_scores_codex":[0.9994748,0.000004809006,0.000227161,0.0001130291,0.00001783414,0.0001623916],"domain_scores_gemma":[0.9997532,0.00004093133,0.00004284692,0.00009602647,0.00001870672,0.00004829331],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001504467,0.000004860067,0.0001209311,0.00003649623,0.00001597133,2.574871e-7,0.0002599378,0.9958182,0.0000426045,0.0002072804,0.00001679613,0.003461608],"study_design_scores_gemma":[0.0002698044,0.00002726439,0.00005157737,0.00001581239,0.000006665627,0.00000460757,0.00001422888,0.9992222,0.00005187698,0.00008513889,0.0001393712,0.0001114071],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3660381,0.0004822162,0.6331117,0.00000307696,0.0001395618,0.00008252759,0.000002633155,0.00002573581,0.0001144349],"genre_scores_gemma":[0.9906967,0.001228192,0.007812665,0.00001884346,0.0001680251,0.00001695741,0.000004372997,0.00002333302,0.00003096177],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.625299,"threshold_uncertainty_score":0.4178083,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4401163128","doi":"10.1109/tits.2024.3430031","title":"A Multi-Source Dynamic Temporal Point Process Model for Train Delay Prediction","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Intelligent Transportation Systems","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Process (computing); Point process; Scheduling (production processes); Feature (linguistics); Artificial neural network; Artificial intelligence; Machine learning; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02140228522851453,"gpt":0.2567176209679431,"spread":0.2353153357394286,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002957839,0.0003567667,0.0003144877,0.0004037559,0.0001628231,0.0001295031,0.0001497547,0.0002229542,0.00001862837],"category_scores_gemma":[0.000001272789,0.0003451071,0.0002910676,0.0004187832,0.00003366417,0.0003258405,7.145123e-8,0.0002616589,0.00003549096],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002146412,"about_ca_system_score_gemma":0.00006577012,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00009143069,"about_ca_topic_score_gemma":0.0004139779,"domain_scores_codex":[0.9979109,0.00002464083,0.0008915964,0.0004663665,0.0003393972,0.0003671375],"domain_scores_gemma":[0.9994023,0.00006437505,0.00004820151,0.0002262401,0.0001142061,0.0001446939],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003003682,0.0000894371,0.000003662849,0.001111007,0.0001344427,0.000004474727,0.005466948,0.9864228,0.001946205,0.00007301786,0.00007956519,0.004638413],"study_design_scores_gemma":[0.0002979167,0.00009803744,0.000008956835,0.0004573448,0.00009225489,0.00001654483,0.001189558,0.993417,0.002529734,0.00001577478,0.001553243,0.000323628],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03680548,0.0006302792,0.9556749,0.00002148525,0.003375949,0.001077905,0.0008392539,0.00152263,0.00005207862],"genre_scores_gemma":[0.9953626,0.00008862616,0.0008915829,0.000009168919,0.00007157637,0.001236894,0.0001336898,0.0001380483,0.002067849],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9585571,"threshold_uncertainty_score":0.9999001,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4381786149","doi":"10.1109/tte.2023.3287891","title":"Analysis and Control of Cascaded Energy Storage System for Energy Efficiency and Power Quality Improvement in Electrified Railways","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Transportation Electrification","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Power (physics); Power control; Energy storage; Computer science; Power management; Automotive engineering; Reliability engineering; Electric power system; Grid; AC power; Efficient energy use; Control engineering; Engineering; Electrical engineering; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.008007791120912426,"gpt":0.2183394788076311,"spread":0.2103316876867187,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004382579,0.0001947318,0.0003878013,0.0009248976,0.0001060394,0.00001830226,0.00007243905,0.0001579278,0.000003034269],"category_scores_gemma":[0.000002848729,0.0002073027,0.0001203628,0.00179669,0.00003309931,0.0001103901,1.881821e-8,0.00009301258,3.845234e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001004417,"about_ca_system_score_gemma":0.00002862903,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000638782,"about_ca_topic_score_gemma":0.001077663,"domain_scores_codex":[0.9983919,0.0000558483,0.0007120349,0.0003436368,0.0002156974,0.000280831],"domain_scores_gemma":[0.9993473,0.0001678153,0.0001276857,0.0001954398,0.00009164969,0.00007005363],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001110977,0.00007261182,0.00006440553,0.0001596822,0.0001918119,7.671792e-7,0.000565206,0.350108,0.6336167,0.002871695,0.000002587654,0.01223539],"study_design_scores_gemma":[0.001832194,0.0002688979,0.01116253,0.0000289297,0.0002753967,7.855932e-7,0.0003465645,0.2965804,0.6890976,0.00003604426,0.00006264276,0.0003079193],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3397368,0.000135904,0.6595691,0.00001633316,0.00009326618,0.0001864314,0.00008469765,0.000152482,0.00002502257],"genre_scores_gemma":[0.9991978,0.0002455671,0.00003955052,0.000009473189,0.000009036443,0.0003406175,0.00007191656,0.00002779764,0.00005824361],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6595295,"threshold_uncertainty_score":0.8453557,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2113254970","doi":"10.1109/epec.2010.5697222","title":"Stationary applications of energy storage technologies for transit systems","year":2010,"lang":"en","type":"article","venue":"","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Flywheel; Energy storage; Transit (satellite); Flywheel energy storage; Computer science; Systems engineering; Emerging technologies; Engineering; Transport engineering; Automotive engineering; Public transport","retraction":null,"screen_n_in":null,"score":{"opus":0.004727178565579466,"gpt":0.1888007108483212,"spread":0.1840735322827417,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005342912,0.00006311446,0.00009981971,0.00007913583,0.00003004251,0.000008092082,0.0001112314,0.00007956636,0.000006971282],"category_scores_gemma":[0.000004013926,0.00005502031,0.0000309218,0.0001230674,0.00002555402,0.00004389126,0.000003888116,0.00003992305,0.000001604052],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000006646043,"about_ca_system_score_gemma":0.000009077775,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006533578,"about_ca_topic_score_gemma":0.00005619133,"domain_scores_codex":[0.9995975,0.000001903442,0.0001645593,0.00007832722,0.00006036257,0.00009727004],"domain_scores_gemma":[0.9997066,0.00003656703,0.00001898177,0.0001776164,0.00004538685,0.00001487841],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000001985862,0.00003203625,0.00002777341,0.0002481476,0.00003009261,2.469227e-7,0.00007335387,0.3109049,0.106192,0.5589107,0.001868974,0.02170982],"study_design_scores_gemma":[0.0002929243,0.00004964057,0.0001077773,0.00001674939,0.00001405886,0.000008683292,0.001112899,0.4392617,0.02967008,0.001056895,0.5281273,0.0002812512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01553632,0.0004081306,0.9720503,0.00002696937,0.0003079398,0.0001781944,0.0000322595,0.0006446306,0.01081525],"genre_scores_gemma":[0.9962284,0.00001717381,0.002686816,0.000001504332,0.00003460242,0.0003942368,0.00001267407,0.00001391849,0.000610658],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9806921,"threshold_uncertainty_score":0.2243663,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2924893847","doi":"10.1155/2019/6090742","title":"Genetic Algorithm-Based Particle Swarm Optimization Approach to Reschedule High-Speed Railway Timetables: A Case Study in China","year":2019,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"National Natural Science Foundation of China","keywords":"Headway; Particle swarm optimization; Genetic algorithm; Solver; Schedule; Mathematical optimization; Computer science; Algorithm; Simulation; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.006056491929442636,"gpt":0.2104259467044872,"spread":0.2043694547750446,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000297007,0.0001482836,0.0002823477,0.0001851676,0.0000439215,0.00003209909,0.00009514158,0.00004888578,0.000007125486],"category_scores_gemma":[0.000009712619,0.0001393997,0.00005843156,0.0004933132,0.000007071263,0.0002977167,0.000001108398,0.0001341264,0.000003005064],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008735334,"about_ca_system_score_gemma":0.00003436214,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00009183384,"about_ca_topic_score_gemma":0.00008160153,"domain_scores_codex":[0.9985944,0.00003716428,0.0007116524,0.000156022,0.0002741325,0.0002266063],"domain_scores_gemma":[0.9994643,0.00002737627,0.0001382716,0.0001503263,0.0001036496,0.0001161134],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005924104,0.0002280173,0.001941108,0.00003519226,0.0000219241,0.0001787049,0.001567479,0.9904377,0.001602512,0.00000905795,0.000002051311,0.003916981],"study_design_scores_gemma":[0.003476971,0.0005353648,0.05407052,0.00006589092,0.00003551927,0.00005889267,0.002804752,0.9371777,0.001495066,0.000006774734,0.0000402872,0.0002322206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.769731,0.000160571,0.2293961,0.000006144512,0.000325253,0.0003132957,0.000002773846,0.00002822482,0.00003656894],"genre_scores_gemma":[0.8791047,0.00001668693,0.1207621,0.000004080874,0.00004306713,0.0000107938,0.000005193841,0.00002985207,0.00002353229],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1093737,"threshold_uncertainty_score":0.5684553,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2790747112","doi":"10.1139/cjce-2017-0642","title":"Forecasting primary delay recovery of high-speed railway using multiple linear regression, supporting vector machine, artificial neural network, and random forest regression","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China; China Railway","keywords":"Support vector machine; Random forest; Artificial neural network; Dwell time; Computer science; Linear regression; Predictive modelling; Reliability (semiconductor); Regression; Regression analysis; Machine learning; Artificial intelligence; Data mining; Statistics; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0151191142122957,"gpt":0.2011211215523934,"spread":0.1860020073400977,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007486211,0.0003069832,0.0006184414,0.0004156301,0.0001855675,0.00006136476,0.0002023604,0.0001610857,0.00003376713],"category_scores_gemma":[0.0004189924,0.0002649093,0.000144221,0.0003620808,0.00007088808,0.0003437539,0.00002600892,0.0003690039,5.650237e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001655717,"about_ca_system_score_gemma":0.000204905,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00150544,"about_ca_topic_score_gemma":0.03054578,"domain_scores_codex":[0.9978641,0.0000393412,0.0010255,0.0001821032,0.0002329002,0.0006560454],"domain_scores_gemma":[0.9985145,0.0001878404,0.0003839022,0.0001914545,0.0002087513,0.0005135157],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005394633,0.000003965752,0.003267114,0.0001487317,0.00005446829,0.00009595345,0.0002607091,0.9856182,0.006699862,0.00001813264,0.0002730923,0.003505822],"study_design_scores_gemma":[0.0007605746,0.0001167542,0.001647966,0.001132957,0.0000395408,0.0004458427,0.00003488112,0.9939249,0.0009526493,0.00002379371,0.0006405049,0.0002796549],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9539192,0.002087299,0.04099338,0.00001855135,0.002621613,0.0001229914,0.00001526424,0.00004013955,0.0001815728],"genre_scores_gemma":[0.9947863,0.0000210635,0.003429326,0.00001054257,0.001642255,0.000001138162,0.000006986435,0.00008605864,0.00001638869],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04086705,"threshold_uncertainty_score":0.9999803,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2952894872","doi":"10.1007/s40534-019-0188-z","title":"Statistical delay distribution analysis on high-speed railway trains","year":2019,"lang":"en","type":"article","venue":"Journal of Modern Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China; China Railway","keywords":"Train; Log-normal distribution; Exponential distribution; Goodness of fit; Distribution fitting; Statistics; Logistic distribution; Gamma distribution; Probability distribution; Mathematics; Distribution (mathematics); Computer science; Logistic regression; Mathematical analysis","retraction":null,"screen_n_in":null,"score":{"opus":0.005781184182445611,"gpt":0.2020242286007375,"spread":0.1962430444182919,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002194073,0.0001250746,0.0003108208,0.000169755,0.00002685603,0.00002218871,0.00008846753,0.00008147209,0.0001054475],"category_scores_gemma":[0.000006431599,0.0001066923,0.0001667068,0.00028798,0.00001162814,0.0001619473,3.995664e-7,0.0001672751,0.00001552996],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008364242,"about_ca_system_score_gemma":0.00002051793,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002291592,"about_ca_topic_score_gemma":0.00006394319,"domain_scores_codex":[0.9987997,0.00002232075,0.0005366235,0.0001048693,0.0003755837,0.0001609317],"domain_scores_gemma":[0.9995281,0.00004853502,0.000131067,0.0001090604,0.00009428058,0.0000890161],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.00004619607,0.000044218,0.002157737,0.00002773197,0.0002654076,0.00002059365,0.0003965475,0.9875071,0.003159497,0.002315017,0.0001145621,0.003945363],"study_design_scores_gemma":[0.001375722,0.0003716619,0.5145442,0.00006718475,0.000650741,0.00001000869,0.00009553468,0.4795453,0.00134341,0.000653037,0.001034776,0.000308392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6232406,0.00005122785,0.3761315,0.00002085096,0.0002505716,0.00003903519,0.0001030778,0.00002192624,0.0001412142],"genre_scores_gemma":[0.9991608,0.00002860554,0.0003925841,0.00001051204,0.00007581761,8.488586e-7,0.0002632157,0.00001684627,0.00005072133],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5123865,"threshold_uncertainty_score":0.4350787,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3169906434","doi":"10.1155/2021/7763126","title":"Prediction of Train Arrival Delay Using Hybrid ELM-PSO Approach","year":2021,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; Huaiyin Institute of Technology","keywords":"Extreme learning machine; Computer science; Particle swarm optimization; Decision tree; Artificial intelligence; Algorithm; Machine learning; Artificial neural network","retraction":null,"screen_n_in":null,"score":{"opus":0.0145545584758293,"gpt":0.2092041216335242,"spread":0.1946495631576949,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001428472,0.00009345379,0.0002218529,0.00009450769,0.00002659033,0.000007168865,0.00005469978,0.0000403514,0.000008691186],"category_scores_gemma":[0.000009107504,0.00009125601,0.0001200199,0.0001874135,0.00001405682,0.000315146,4.885533e-7,0.0001253661,1.689836e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004358036,"about_ca_system_score_gemma":0.00004602256,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003122143,"about_ca_topic_score_gemma":0.000004313863,"domain_scores_codex":[0.998944,0.00001637605,0.0006042441,0.00007885083,0.0002416938,0.0001147987],"domain_scores_gemma":[0.9994936,0.00001349805,0.0001845921,0.00007851457,0.0001763026,0.00005350943],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001490726,0.00003266455,0.0002247551,0.00008846006,0.00003517374,0.00002608029,0.0006406506,0.8324621,0.1638853,0.00007385679,0.000009499449,0.002506563],"study_design_scores_gemma":[0.006559347,0.000615555,0.1725806,0.001169105,0.0005693774,0.001371426,0.007523603,0.4265382,0.3763409,0.0007848446,0.005101666,0.0008454664],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7838429,0.0005588119,0.2147658,0.000003825608,0.00054835,0.00003300032,0.00002532414,0.00001803885,0.0002040421],"genre_scores_gemma":[0.979643,0.0001077046,0.02004926,0.000002694821,0.0001362219,0.000001024259,0.00002999898,0.0000188189,0.00001122168],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4059239,"threshold_uncertainty_score":0.3721312,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2998971297","doi":"10.1155/2020/5081315","title":"Improving Synchronization in an Air and High-Speed Rail Integration Service via Adjusting a Rail Timetable: A Real-World Case Study in China","year":2020,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Higher Education Discipline Innovation Project; Beijing Jiaotong University; National Natural Science Foundation of China","keywords":"Synchronization (alternating current); Subnetwork; Transport engineering; Service (business); Transfer (computing); Transfer station; Focus (optics); Rail network; China; Operations research; Computer science; Engineering; Computer network; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.008266838730882303,"gpt":0.2261389514664262,"spread":0.2178721127355439,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002826229,0.0001536572,0.0002966185,0.0002764422,0.0000412957,0.00002488583,0.00006326809,0.00004723273,0.000004412141],"category_scores_gemma":[0.00002031584,0.0001498219,0.00002293622,0.0009164573,0.000006174841,0.001136074,0.000001449793,0.0002481989,2.739547e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001033051,"about_ca_system_score_gemma":0.00003236918,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002392987,"about_ca_topic_score_gemma":0.0352622,"domain_scores_codex":[0.9986961,0.00004990679,0.0007652356,0.000160425,0.0001764823,0.00015186],"domain_scores_gemma":[0.9994678,0.00002626717,0.0002335194,0.00006960614,0.0001137671,0.00008900931],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006411508,0.00006282406,0.009980759,0.0001564445,0.000009123339,0.0004632843,0.01702361,0.9217446,0.02233457,0.000007503583,3.6244e-7,0.02815282],"study_design_scores_gemma":[0.002863747,0.000414998,0.3241579,0.0002153618,0.00005247309,0.00007713898,0.009989908,0.6609997,0.0009786437,0.00001534645,0.000004906099,0.0002298459],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9681002,0.0001268277,0.03127741,0.00004945074,0.0001582629,0.0002304098,0.000002548331,0.00004175559,0.00001306143],"genre_scores_gemma":[0.9976772,0.00003437661,0.002123851,0.00001855894,0.00009260177,0.000005118477,0.00001752069,0.00002860457,0.000002182395],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3141771,"threshold_uncertainty_score":0.9823418,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2942910330","doi":"10.1155/2019/7258986","title":"Discrete Train Speed Profile Optimization for Urban Rail Transit: A Data-Driven Model and Integrated Algorithms Based on Machine Learning","year":2019,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Beijing Municipal Natural Science Foundation; China National Funds for Distinguished Young Scientists; National Natural Science Foundation of China","keywords":"Energy consumption; Support vector machine; Heuristic; Energy (signal processing); Computer science; Algorithm; Regression analysis; Mathematical optimization; Engineering; Simulation; Artificial intelligence; Machine learning; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.01071325137345116,"gpt":0.2251636260240443,"spread":0.2144503746505931,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002011738,0.000151737,0.0002592059,0.0001385901,0.00004293489,0.00002210457,0.0001084394,0.00006275,0.00001753236],"category_scores_gemma":[0.00001282869,0.0001286895,0.0000629241,0.000136235,0.00001150076,0.0004608556,6.703254e-7,0.0001868036,4.027254e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003379182,"about_ca_system_score_gemma":0.00003216513,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004351879,"about_ca_topic_score_gemma":0.00001998051,"domain_scores_codex":[0.9990568,0.00001715751,0.0004359421,0.0001585377,0.0001873784,0.0001442378],"domain_scores_gemma":[0.9995239,0.00004106515,0.0001553138,0.0001169685,0.00009734944,0.00006545304],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001816596,0.00001976561,0.00008409101,0.0001072499,0.00002284172,0.000002288733,0.000697494,0.9882093,0.006963219,0.00003482875,0.00001394845,0.003663314],"study_design_scores_gemma":[0.002065232,0.0003113803,0.0005080767,0.0001602098,0.00004208514,0.00000221251,0.0001868452,0.9958531,0.0004010759,0.00001151716,0.0003125597,0.0001457482],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2068012,0.0001229369,0.7922958,0.00003732541,0.0001927481,0.0002725135,0.0001679482,0.00004674884,0.00006278355],"genre_scores_gemma":[0.9092218,0.000044098,0.08987676,0.00001115605,0.00004488445,0.000004496491,0.0006935649,0.0000389449,0.00006431185],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7024206,"threshold_uncertainty_score":0.5247806,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2923933476","doi":"10.1155/2019/8639589","title":"Modeling the Influence of Disturbances in High-Speed Railway Systems","year":2019,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Department of Science and Technology of Sichuan Province; Southwest Jiaotong University; National Natural Science Foundation of China","keywords":"Train; Cluster analysis; Nonparametric statistics; Parametric statistics; Goodness of fit; Computer science; Disturbance (geology); Data mining; Probability distribution; Distribution (mathematics); Statistics; Algorithm; Simulation; Artificial intelligence; Mathematics; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.004668963179794669,"gpt":0.1962389927600934,"spread":0.1915700295802987,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002148557,0.00008422415,0.0002337534,0.00009084811,0.00001331103,0.000008702433,0.0001295541,0.00003695289,0.000001989223],"category_scores_gemma":[0.000006844385,0.00005764873,0.00005360783,0.0002051518,0.0000117094,0.0003676859,5.909074e-7,0.0001298073,0.000001093438],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003138962,"about_ca_system_score_gemma":0.00001572483,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008883159,"about_ca_topic_score_gemma":0.00006235009,"domain_scores_codex":[0.9989558,0.00001414154,0.0006365047,0.00006036257,0.0002255039,0.0001077275],"domain_scores_gemma":[0.9995756,0.00003441498,0.0001639428,0.00009589937,0.0001070311,0.00002308433],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002329726,0.000008986086,0.002819716,0.0001125943,0.00001177013,0.00000268569,0.001044784,0.9746695,0.02063888,0.0004442897,0.000001052531,0.0002224783],"study_design_scores_gemma":[0.00229681,0.0002331737,0.4734631,0.001544091,0.00004104691,0.0000144376,0.003671411,0.5158021,0.001974531,0.00027872,0.0003546798,0.0003258959],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9952924,0.001245093,0.002637782,0.00001233294,0.000640961,0.0001020015,0.000002953123,0.00001088007,0.00005561761],"genre_scores_gemma":[0.999558,0.0001869941,0.0001827775,0.000002501007,0.0000407348,0.000001763663,0.000001934123,0.00001131454,0.00001396253],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4706433,"threshold_uncertainty_score":0.2350847,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2809840499","doi":"10.1177/0361198118780830","title":"Stochastic Model of Train Running Time and Arrival Delay: A Case Study of Wuhan–Guangzhou High-Speed Rail","year":2018,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Punctuality; Computer science; Correctness; Quality of service; Track (disk drive); Stochastic modelling; Probability distribution; Service (business); Service quality; Distribution (mathematics); Real-time computing; Transport engineering; Algorithm; Telecommunications; Engineering; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.06698981994734515,"gpt":0.3321532086004317,"spread":0.2651633886530866,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00355101,0.0002423301,0.0006146393,0.001026797,0.0003327336,0.00004689121,0.0005516604,0.000149622,0.00008206995],"category_scores_gemma":[0.0000753117,0.00019098,0.00018755,0.001381182,0.0006173617,0.0003685175,0.000006751909,0.001010342,0.000003464334],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009181585,"about_ca_system_score_gemma":0.0002588443,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.01179081,"about_ca_topic_score_gemma":0.02410347,"domain_scores_codex":[0.9947613,0.0004222362,0.001570782,0.0002937753,0.002328887,0.0006230579],"domain_scores_gemma":[0.9962372,0.0004511617,0.0003326563,0.0003973929,0.002286312,0.0002952852],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001382257,0.000709408,0.01225657,0.0006847936,0.0005295387,0.0005976402,0.04806143,0.8699625,0.0598385,0.0004965867,0.000479391,0.005001394],"study_design_scores_gemma":[0.01212145,0.009403231,0.2538674,0.001968831,0.0004148698,0.00006280556,0.04890569,0.6623279,0.008100286,0.001702442,0.0001511046,0.0009740678],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9935362,0.0001563937,0.005115524,0.0000843845,0.0002185383,0.0007501057,0.00005479536,0.00002845333,0.00005559209],"genre_scores_gemma":[0.9986208,0.00005887961,0.0009489497,0.000002906896,0.0001221937,0.0000193954,0.000003953635,0.00006261644,0.0001603132],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2416108,"threshold_uncertainty_score":0.9947898,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2943611693","doi":"10.1155/2019/7261726","title":"Adaptive Model Predictive Control for Cruise Control of High-Speed Trains with Time-Varying Parameters","year":2019,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"National Natural Science Foundation of China","keywords":"Cruise control; Train; Model predictive control; Control theory (sociology); Computer science; Adaptive control; PID controller; Bounded function; Engineering; Control engineering; Control (management); Temperature control; Mathematics; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.006130368930116196,"gpt":0.1930859945601792,"spread":0.186955625630063,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001346576,0.0001448509,0.0004398563,0.0001137591,0.00002143415,0.000005988185,0.00008041858,0.00005851753,0.000004034048],"category_scores_gemma":[0.000007626126,0.0001169572,0.0001311876,0.00009672739,0.00002289914,0.0003856639,2.145833e-7,0.0001097792,6.246707e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004925408,"about_ca_system_score_gemma":0.00004349268,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005155434,"about_ca_topic_score_gemma":0.000005728447,"domain_scores_codex":[0.9989606,0.00001186215,0.0005271393,0.0001039412,0.0002298045,0.000166687],"domain_scores_gemma":[0.9991454,0.0001116225,0.000327417,0.00008262481,0.0002678683,0.00006510652],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001571864,0.00003245753,0.00008917911,0.00006250735,0.0001961542,0.000002909855,0.001051224,0.9559048,0.04018762,0.0002174645,0.000004206004,0.0006795415],"study_design_scores_gemma":[0.008927206,0.001289609,0.003283165,0.0002316957,0.0001776045,0.000004292288,0.0003622542,0.9821085,0.003201532,0.0002441152,0.0000119938,0.000157982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4922099,0.00007512442,0.5071676,0.000009711775,0.0001162589,0.0002729534,0.00007721793,0.00001588303,0.00005529963],"genre_scores_gemma":[0.986006,0.00001389609,0.01385809,0.00001214057,0.00003349562,0.00001139844,0.000009811697,0.00003127002,0.00002387654],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4937961,"threshold_uncertainty_score":0.4769376,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4311813654","doi":"10.1155/2022/9604362","title":"Train Scheduling Optimization for an Urban Rail Transit Line: A Simulated-Annealing Algorithm Using a Large Neighborhood Search Metaheuristic","year":2022,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Chengdu Science and Technology Program; Sichuan Province Science and Technology Support Program; National Key Research and Development Program of China; Jiangsu Development and Reform Commission; National Natural Science Foundation of China; China Railway","keywords":"Headway; Simulated annealing; Urban rail transit; Dwell time; Train; Schedule; Metaheuristic; Scheduling (production processes); Interval (graph theory); Urban transit; Simulation; Computer science; Heuristic; Mathematical optimization; Engineering; Algorithm; Mathematics; Transport engineering; Public transport","retraction":null,"screen_n_in":null,"score":{"opus":0.01767333477595389,"gpt":0.2630737296550005,"spread":0.2454003948790466,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006642042,0.0001817867,0.0003416903,0.0002744264,0.0002794667,0.00003416864,0.0001490191,0.000060624,0.00002798349],"category_scores_gemma":[0.00001467964,0.0001955071,0.0001868066,0.0004215205,0.000009942973,0.0005726456,0.000001506306,0.0003064316,1.018089e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001272405,"about_ca_system_score_gemma":0.00007491255,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006785049,"about_ca_topic_score_gemma":0.000006794431,"domain_scores_codex":[0.9982553,0.0000595214,0.000798371,0.0001728994,0.0003995323,0.0003143565],"domain_scores_gemma":[0.9992799,0.00006066994,0.0002011044,0.0001079337,0.0002289292,0.0001214465],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009202197,0.00007772585,0.00002138485,0.00009243268,0.00007380825,0.00001652699,0.003934987,0.9827557,0.008650895,0.0001020569,0.000001305076,0.004181195],"study_design_scores_gemma":[0.002025202,0.0004103905,0.00009750415,0.0000555613,0.0001297279,0.00002169527,0.00213022,0.9939693,0.000714753,0.00007022334,0.0001695449,0.0002058981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3194488,0.00057483,0.6792082,0.00001053456,0.0004373779,0.0001860855,0.00007798176,0.00005049268,0.000005648431],"genre_scores_gemma":[0.8744349,0.00003291066,0.1251055,0.0000125553,0.0002150376,0.000009188007,0.000122164,0.00006275447,0.000004954069],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5549861,"threshold_uncertainty_score":0.7972547,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2794184436","doi":"10.1109/tits.2017.2777982","title":"Physics-Based Optimization of Access Point Placement for Train Communication Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Intelligent Transportation Systems","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Software deployment; Point (geometry); Wireless; Computer science; Communications system; Optimization problem; Point-to-point; Engineering; Simulation; Mathematical optimization; Computer network; Telecommunications; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0390187158355367,"gpt":0.2704808224902892,"spread":0.2314621066547525,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003650374,0.0002651716,0.0003682068,0.0002416752,0.0001826991,0.00008745005,0.0002901076,0.0001440951,0.00004071257],"category_scores_gemma":[0.0000020007,0.0002703258,0.0001770598,0.000429747,0.00008092699,0.0002724267,1.872641e-7,0.0001082906,0.00001067693],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001450948,"about_ca_system_score_gemma":0.0000448391,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003063779,"about_ca_topic_score_gemma":0.0001023637,"domain_scores_codex":[0.9980721,0.00007001036,0.0009967565,0.0002634744,0.0003445096,0.000253189],"domain_scores_gemma":[0.9987288,0.0001364489,0.0002027644,0.0004458977,0.0003987359,0.000087427],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007304028,0.0001344192,0.000008228157,0.0004581057,0.0000931707,1.897954e-7,0.0009191415,0.9956666,0.0009279528,0.0007969593,0.0001222408,0.0007999414],"study_design_scores_gemma":[0.0005660259,0.0002380124,0.00001637008,0.0004118295,0.00006996901,8.69391e-7,0.0008015053,0.9491912,0.04752502,0.000006670288,0.0009124383,0.0002600894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.009426559,0.0001793209,0.9858412,0.00001503262,0.002280476,0.001299627,0.0002992883,0.0002810527,0.0003774163],"genre_scores_gemma":[0.9974911,0.00007137346,0.001217817,0.00001092147,0.000109195,0.0007682936,0.0001372671,0.00006858713,0.0001254625],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9880645,"threshold_uncertainty_score":0.9999749,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1606659221","doi":"10.1002/atr.1183","title":"Solving train formation problem using simulated annealing algorithm in a simplex framework","year":2012,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Simulated annealing; Simplex; Simplex algorithm; Computer science; Mathematical optimization; Algorithm; Mathematics; Linear programming; Combinatorics","retraction":null,"screen_n_in":null,"score":{"opus":0.01279159767992844,"gpt":0.2500228988191111,"spread":0.2372313011391826,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000329845,0.0001166694,0.0002068477,0.0002105973,0.00003994884,0.00001532158,0.00005766568,0.00008949146,0.000006810348],"category_scores_gemma":[0.00001300477,0.0001134104,0.00006868909,0.0003288398,0.000007124845,0.001362882,5.766792e-7,0.0002162999,5.547838e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000114668,"about_ca_system_score_gemma":0.00001364147,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001137737,"about_ca_topic_score_gemma":0.00001088336,"domain_scores_codex":[0.9987591,0.00001795104,0.0007107164,0.00005341849,0.0001943287,0.0002645163],"domain_scores_gemma":[0.9995471,0.00004286356,0.0002037933,0.00005414393,0.00007633368,0.00007572645],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000009424981,0.00001938059,0.0004316392,0.00007262197,0.00001010655,0.000005888127,0.008032187,0.9600995,0.008500502,0.00005642289,0.000001295236,0.02276099],"study_design_scores_gemma":[0.00116417,0.00007748143,0.02312592,0.0009974192,0.00004101286,0.00004098658,0.002722198,0.9659324,0.004019485,0.0006944857,0.0008473154,0.0003371585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6523769,0.0005162598,0.3466866,0.000005013683,0.000300482,0.00006667449,0.000002480798,0.00002555995,0.00002004789],"genre_scores_gemma":[0.9045082,0.00005117116,0.09524109,0.00000640225,0.0001605957,7.544788e-7,0.000008604785,0.00002211274,0.000001045793],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2521313,"threshold_uncertainty_score":0.462474,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2887005990","doi":"10.1155/2018/5367295","title":"A Short Turning Strategy for Train Scheduling Optimization in an Urban Rail Transit Line: The Case of Beijing Subway Line 4","year":2018,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; Beijing Municipal Natural Science Foundation; National Natural Science Foundation of China","keywords":"Train; Beijing; Headway; Urban rail transit; Scheduling (production processes); Integer programming; Engineering; Transport engineering; Computer science; Rail transit; Operations research; Mathematical optimization; Operations management; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01618374074154215,"gpt":0.2641890731711867,"spread":0.2480053324296446,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004824765,0.000131529,0.0002522635,0.0001656935,0.00006787193,0.00001872709,0.00009753363,0.00009745588,0.000004825152],"category_scores_gemma":[0.0000187912,0.0001060812,0.00009582767,0.0002848439,0.00003245633,0.0005315705,3.894287e-7,0.0002131644,5.699328e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003476351,"about_ca_system_score_gemma":0.00003211535,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009479075,"about_ca_topic_score_gemma":0.0006964759,"domain_scores_codex":[0.9987614,0.00002473295,0.0008106841,0.0001049383,0.000126459,0.0001717745],"domain_scores_gemma":[0.9993568,0.00005976357,0.0001737125,0.00009199051,0.0002615031,0.00005624864],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009916707,0.00003188022,0.0001456487,0.00008460898,0.00001937758,0.00004015534,0.003917152,0.9586155,0.02665938,0.000128705,7.847294e-7,0.0102576],"study_design_scores_gemma":[0.001394635,0.0007744573,0.002862693,0.000331049,0.00007182168,0.0001040513,0.004487483,0.9780827,0.01158936,0.00005989225,0.00004677865,0.0001951175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5916295,0.0002273788,0.4077992,0.00001325104,0.0001740925,0.0001258809,0.000006548127,0.00001313641,0.00001099727],"genre_scores_gemma":[0.9754997,0.00004803272,0.02409278,0.000005581281,0.0002897368,0.00001070257,0.00002037074,0.00003004339,0.000003080994],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3838702,"threshold_uncertainty_score":0.4325866,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3198376353","doi":"10.1609/icaps.v31i1.15994","title":"Scalable Rail Planning and Replanning: Winning the 2020 Flatland Challenge","year":2021,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Automated Planning and Scheduling","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Simon Fraser University","funders":"Australian Research Council; Natural Sciences and Engineering Research Council of Canada; Monash University; National Science Foundation; Deutsche Bahn; University of Southern California; Simon Fraser University","keywords":"Scalability; Computer science; Train; Distributed computing; Deadlock; Simulated annealing; Software; Motion planning; Plan (archaeology); Graph; Mathematical optimization; Operations research; Engineering; Robot; Artificial intelligence; Theoretical computer science; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.02591758923968751,"gpt":0.2511828116355023,"spread":0.2252652223958148,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000382186,0.0001986271,0.0002220986,0.00007061094,0.0002548542,0.000285998,0.0003132951,0.0001024432,0.00001308205],"category_scores_gemma":[0.000174094,0.0001368554,0.00004376313,0.0001721825,0.00007455957,0.0001659148,0.0001291726,0.0003438722,0.000001398667],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002480263,"about_ca_system_score_gemma":0.000030131,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001117042,"about_ca_topic_score_gemma":5.83796e-7,"domain_scores_codex":[0.9988198,0.000009684366,0.0003231833,0.0002801394,0.0003324393,0.0002348105],"domain_scores_gemma":[0.9994016,0.00009401662,0.0001346205,0.00009773963,0.000208369,0.00006369296],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002056142,0.0001198593,0.1876523,0.001045147,0.0009812032,0.0001028664,0.0236004,0.45797,0.245684,0.07246553,0.006966949,0.003206099],"study_design_scores_gemma":[0.0003529586,0.00003551831,0.00878494,0.001624839,0.00002240112,0.0001524965,0.003386586,0.977812,0.006346699,0.0003533284,0.0008995116,0.000228734],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9704375,0.001605492,0.00006273169,0.001542093,0.0004562552,0.00007133053,0.000005078355,0.0003204172,0.02549911],"genre_scores_gemma":[0.9988547,0.00008731157,0.0005513473,0.0000650068,0.0001240601,0.000009637234,0.00000417816,0.00002244483,0.0002813113],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.519842,"threshold_uncertainty_score":0.5580803,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3033137653","doi":"10.1155/2020/5609524","title":"A Fast Approach for Reoptimization of Railway Train Platforming in Case of Train Delays","year":2020,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"National Natural Science Foundation of China","keywords":"Heuristic; Mathematical optimization; Integer programming; Discretization; Track (disk drive); Computer science; Linear programming; Process (computing); Engineering; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01267819178568201,"gpt":0.2175481366615628,"spread":0.2048699448758808,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002020873,0.00009616993,0.0003106551,0.0001388774,0.00001389777,0.000003052143,0.0000610599,0.00005914986,0.000002736327],"category_scores_gemma":[0.00002426414,0.0000925131,0.0001090291,0.0002816566,0.00001399127,0.0003149919,3.966935e-7,0.00009384059,2.705277e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002385255,"about_ca_system_score_gemma":0.00002385028,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008802455,"about_ca_topic_score_gemma":0.00005046468,"domain_scores_codex":[0.998838,0.00000851305,0.0008452515,0.00007638173,0.0001219341,0.0001098877],"domain_scores_gemma":[0.9994645,0.00003684043,0.0002973833,0.00004521268,0.0001027331,0.00005335382],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001148202,0.00003186101,0.00006792149,0.000413659,0.00001989198,0.00002732868,0.01023665,0.950263,0.02759062,0.0001808054,0.000003496607,0.01104991],"study_design_scores_gemma":[0.005866669,0.0009325089,0.002973314,0.0003824245,0.0001011571,0.000172129,0.01973948,0.9460497,0.02319028,0.0001519132,0.0001056479,0.0003347826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5573034,0.0001254474,0.4423063,0.00001064587,0.00005432592,0.0001117666,0.00001923551,0.000007361512,0.0000614539],"genre_scores_gemma":[0.9323675,0.00003804074,0.06750084,0.00000451988,0.00004121662,0.000006107826,0.0000216527,0.00001838885,0.000001699396],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3750641,"threshold_uncertainty_score":0.3772574,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3084069757","doi":"10.1109/tpwrd.2020.3022750","title":"Real-Time Hierarchical Neural Network Based Fault Detection and Isolation for High-Speed Railway System Under Hybrid AC/DC Grid","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Field-programmable gate array; Fault detection and isolation; Artificial neural network; Grid; Real-time computing; Computer science; Transient (computer programming); Fault (geology); Engineering; Embedded system; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.009189231743255524,"gpt":0.1887990820464837,"spread":0.1796098503032282,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001268138,0.0002754934,0.0003003049,0.0001136526,0.000272554,0.00007366046,0.0001007717,0.0001414601,0.00004033551],"category_scores_gemma":[0.000002776501,0.0002797366,0.0001422154,0.0002562455,0.00003678496,0.0002087224,0.000001209219,0.0002460607,0.00003748412],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001263073,"about_ca_system_score_gemma":0.00002179447,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007125608,"about_ca_topic_score_gemma":0.00001468169,"domain_scores_codex":[0.9986327,0.00006534034,0.0003791018,0.0003701525,0.0001867679,0.0003659088],"domain_scores_gemma":[0.999355,0.0001656288,0.00004990769,0.0001965535,0.000064728,0.0001681859],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001589802,0.00002201868,0.000001053428,0.00009837894,0.00005574126,0.000003715092,0.00007872076,0.9457405,0.05122017,0.00001814205,0.0004828546,0.002119789],"study_design_scores_gemma":[0.0009419417,0.0002829261,0.0001287934,0.00006168817,0.00006371175,0.00001633925,0.0000525184,0.9814245,0.01621374,0.000005462918,0.0004977123,0.0003106305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3737576,0.00004797937,0.6232429,0.0001293927,0.001679391,0.000316246,0.00006850106,0.0005978686,0.0001600499],"genre_scores_gemma":[0.9988472,0.00002000965,0.0005743189,0.0000908751,0.0002456657,0.00005078453,0.00001616862,0.00007315631,0.00008179652],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6250896,"threshold_uncertainty_score":0.9999655,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2801314480","doi":"10.1155/2018/5983250","title":"Defining Reserve Times for Metro Systems: An Analytical Approach","year":2018,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Headway; Flexibility (engineering); Robustness (evolution); Computer science; Energy consumption; Context (archaeology); Exploit; Operations research; Energy (signal processing); Transport engineering; Simulation; Engineering; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.01482684820899085,"gpt":0.2594946885040685,"spread":0.2446678402950776,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003312462,0.0001019574,0.0002376195,0.0001449961,0.00005423517,0.00002619905,0.0001075483,0.00005981086,0.000004823547],"category_scores_gemma":[0.0000218533,0.00008685527,0.00009120041,0.0001819156,0.00002294867,0.0004550429,4.597766e-7,0.00008745201,0.000001407922],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004106445,"about_ca_system_score_gemma":0.00002075201,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000779467,"about_ca_topic_score_gemma":0.00002385479,"domain_scores_codex":[0.9990041,0.00001460568,0.0005191844,0.00009472619,0.0001997283,0.0001677072],"domain_scores_gemma":[0.9993741,0.00003982971,0.0001373326,0.00009962955,0.0002596195,0.00008946979],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007189903,0.00003058758,0.0003603678,0.0001187206,0.00005243936,0.000003064435,0.0007141149,0.9893771,0.001131471,0.006577714,0.0001235032,0.001438989],"study_design_scores_gemma":[0.00324309,0.002397198,0.02837716,0.0004053811,0.0002897105,0.0000493405,0.0077871,0.9397093,0.003427751,0.0006506665,0.01302132,0.0006419685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7415319,0.0008455103,0.2555156,0.000009293208,0.0008114025,0.0001145602,0.00001391584,0.0000524615,0.001105306],"genre_scores_gemma":[0.9757671,0.00001586331,0.02378508,0.000003991709,0.0003351239,0.000007542881,0.00002268906,0.00002503616,0.00003753023],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2342352,"threshold_uncertainty_score":0.3541855,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2530791898","doi":"10.1109/tits.2016.2586938","title":"A Cognitive Control Method for Cost-Efficient CBTC Systems With Smart Grids","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Intelligent Transportation Systems","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Carleton University","funders":"Natural Science Foundation of Beijing Municipality; Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China","keywords":"Train; Computer science; Engineering; Traction power network; Wireless; Automotive engineering; Simulation; Power (physics); Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.01977650117178836,"gpt":0.2524450183603485,"spread":0.2326685171885602,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000503839,0.0004552285,0.0005865307,0.0003368215,0.0002072552,0.00008668855,0.0001668686,0.0002046061,0.00003382915],"category_scores_gemma":[0.000004017606,0.0003136885,0.000241531,0.0003699901,0.00006369485,0.0001458683,9.194427e-8,0.0001541805,0.00007900803],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002173379,"about_ca_system_score_gemma":0.00005720555,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003094306,"about_ca_topic_score_gemma":0.0001914598,"domain_scores_codex":[0.9973848,0.0001065569,0.0009445617,0.0005180978,0.0005016563,0.0005443293],"domain_scores_gemma":[0.99831,0.0006121795,0.0001422699,0.0003031014,0.000399019,0.0002334893],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000275547,0.0001301302,0.00003381475,0.0003148749,0.000362095,0.000007129402,0.0006085654,0.9859833,0.001897147,0.0005287145,0.00005649075,0.009802266],"study_design_scores_gemma":[0.005374605,0.0009718735,0.0001629564,0.002527058,0.0005709434,0.00006346173,0.002877201,0.9365307,0.03644433,0.000006005113,0.01318671,0.00128416],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01081788,0.0002837466,0.979945,0.00002996711,0.003799642,0.00296148,0.001300898,0.0005694767,0.0002918839],"genre_scores_gemma":[0.9947855,0.00005722962,0.0003975987,0.00001798858,0.0001307909,0.00381922,0.00002527779,0.0001192052,0.0006471464],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9839677,"threshold_uncertainty_score":0.9999315,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2912117457","doi":"10.1109/tits.2018.2846480","title":"An On-Line Optimal Controller for a Commuter Train","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Intelligent Transportation Systems","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Solver; Robustness (evolution); Optimal control; Track (disk drive); Convex optimization; Vehicle dynamics; Propulsion; Computation; Computer science; Control theory (sociology); Control engineering; Optimization problem; Engineering; Controller (irrigation); Mathematical optimization; Simulation; Regular polygon; Automotive engineering; Algorithm; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.02238994411276676,"gpt":0.2524808852117469,"spread":0.2300909410989801,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002556052,0.0003090068,0.0004149103,0.0002419863,0.0001096981,0.0000712554,0.0001955597,0.0001757115,0.0001166827],"category_scores_gemma":[5.888159e-7,0.0002866528,0.0002464332,0.0001884991,0.00002226802,0.00018115,3.979189e-8,0.0002023415,0.0001838122],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008537964,"about_ca_system_score_gemma":0.00001775661,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008515472,"about_ca_topic_score_gemma":0.00007671594,"domain_scores_codex":[0.9982838,0.00004319632,0.0007034244,0.0003354895,0.0002968851,0.000337218],"domain_scores_gemma":[0.9992148,0.0001289147,0.00006250982,0.000345507,0.0001022185,0.0001460717],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001534449,0.0001766573,0.000009430015,0.0001503703,0.0001108388,0.000001442987,0.001131987,0.9902231,0.003479194,0.0007851732,0.00009191377,0.003686466],"study_design_scores_gemma":[0.001416274,0.0010365,0.0000531718,0.0001780758,0.00005233135,0.000004413514,0.001110259,0.9665421,0.01900037,0.000006686378,0.01015307,0.0004467604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1725648,0.00005862589,0.8225234,0.00001777037,0.002759601,0.001063638,0.0002961653,0.0003590358,0.000357036],"genre_scores_gemma":[0.9979092,0.00002822148,0.0002531557,0.00005156916,0.0001197035,0.0005524798,0.00006389104,0.00008596352,0.000935744],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8253445,"threshold_uncertainty_score":0.9999586,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4285303486","doi":"10.1109/tpel.2022.3189006","title":"Admittance Decomposition for Assessment of APF and STATCOM Impact on the Low-Frequency Stability of Railway Vehicle-Grid Systems","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Electronics","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Admittance; Electrical impedance; Phasor; Control theory (sociology); Stability (learning theory); Grid; Coupling (piping); Engineering; Electric power system; Power (physics); Electronic engineering; Computer science; Control engineering; Electrical engineering; Mathematics; Control (management); Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.01001304807473186,"gpt":0.2548870244951179,"spread":0.2448739764203861,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004872651,0.0001792169,0.0002770266,0.00009284715,0.0002019947,0.00001653226,0.0001625569,0.00004834401,0.00005784796],"category_scores_gemma":[0.000002478754,0.0001416901,0.0001475593,0.000247174,0.00003928639,0.00007163004,0.000001244066,0.0003132954,3.473645e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004738382,"about_ca_system_score_gemma":0.0001279516,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007259105,"about_ca_topic_score_gemma":0.0000309407,"domain_scores_codex":[0.9987001,0.0001046949,0.0004047299,0.0001989184,0.0002898178,0.000301726],"domain_scores_gemma":[0.9991658,0.0002649651,0.0001002927,0.0003529413,0.00006618039,0.00004986064],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007741737,0.000277122,0.00005725908,0.0001497271,0.000132975,3.910601e-7,0.0002757336,0.932097,0.06443334,0.002013889,0.00007805855,0.0004071512],"study_design_scores_gemma":[0.002227966,0.007376405,0.002099645,0.0001928557,0.0001532927,0.00003087488,0.001137971,0.7931136,0.1910615,0.0003759079,0.001436527,0.0007934706],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8122448,0.0005460226,0.1853963,0.00004190913,0.0005919023,0.0005130214,0.0003566161,0.00005359159,0.0002558332],"genre_scores_gemma":[0.9995304,0.00007913249,0.00008155839,0.00001003198,0.00001082714,0.0002368164,0.00000699107,0.00003131233,0.00001297352],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1872855,"threshold_uncertainty_score":0.5777953,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2523094825","doi":"10.3390/en9100762","title":"Energy-Efficient Speed Profile Approximation: An Optimal Switching Region-Based Approach with Adaptive Resolution","year":2016,"lang":"en","type":"article","venue":"Energies","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"National Natural Science Foundation of China","keywords":"Regenerative brake; Mode (computer interface); Control theory (sociology); Brake; Point (geometry); Computer science; Energy (signal processing); Optimal control; Energy consumption; Automotive engineering; Mathematical optimization; Engineering; Control (management); Mathematics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01335329172057272,"gpt":0.1853548307640979,"spread":0.1720015390435252,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001648229,0.0002681052,0.0002251282,0.0001668823,0.0001644223,0.00005932417,0.0002008226,0.0001055056,0.00001399983],"category_scores_gemma":[0.000008452344,0.0001720219,0.00005675212,0.0002879621,0.00006783778,0.0002502899,0.00001993949,0.00007690053,0.000007379026],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001390804,"about_ca_system_score_gemma":0.00005147626,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008706923,"about_ca_topic_score_gemma":0.00001100546,"domain_scores_codex":[0.9985961,0.00005169481,0.0002634552,0.0003676616,0.0003263605,0.0003946808],"domain_scores_gemma":[0.9992855,0.00004390634,0.00007292512,0.000410557,0.0000772152,0.0001099235],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006600509,0.00006049747,0.00001700322,0.00002323856,0.00002017168,0.000005958761,0.0002689889,0.980159,0.004117475,0.007148132,0.0002010684,0.007912503],"study_design_scores_gemma":[0.0005737836,0.0001564828,0.00009180712,0.0001096912,0.00001176393,0.0000230447,0.0004449705,0.9766858,0.02032847,0.00001489423,0.001207093,0.0003521745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3216152,0.0001793438,0.6661736,0.00003168019,0.0001644717,0.000104488,0.00000408008,0.0005911906,0.01113598],"genre_scores_gemma":[0.9844459,0.000005851408,0.01466099,0.0000119273,0.0002339019,0.00008259717,0.0000182121,0.00005999146,0.0004805914],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6628308,"threshold_uncertainty_score":0.701485,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2997344316","doi":"10.1155/2020/3474020","title":"Integrated Optimization on Energy Saving and Quality of Service of Urban Rail Transit System","year":2020,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Train; Urban rail transit; Energy consumption; Sorting; Genetic algorithm; Energy (signal processing); Service quality; Service (business); Transport engineering; Beijing; Regenerative brake; Quality (philosophy); Mathematical optimization; Quality of service; Computer science; Engineering; Automotive engineering; Operations research; Mathematics; Computer network; Economics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01271545108329511,"gpt":0.2079001109548587,"spread":0.1951846598715636,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001266684,0.00009780875,0.0003198794,0.00007695222,0.00001494251,0.000004213418,0.00006016492,0.00005177928,0.000003370763],"category_scores_gemma":[0.000009213447,0.00008768098,0.00006135953,0.0002785594,0.00001043383,0.0001945979,4.022473e-7,0.00007814451,6.146846e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002459245,"about_ca_system_score_gemma":0.00001757661,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005210596,"about_ca_topic_score_gemma":0.00006313106,"domain_scores_codex":[0.9988602,0.00002815895,0.0007706415,0.00007282339,0.0001975681,0.00007059355],"domain_scores_gemma":[0.9993033,0.00003455075,0.0003253393,0.00005298339,0.0002227424,0.00006110266],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001497064,0.00001336539,0.0001229212,0.0006190715,0.00003090577,0.000001851691,0.002503027,0.9157142,0.07871098,0.001134333,0.000002564648,0.0009970638],"study_design_scores_gemma":[0.008557745,0.00221386,0.07212804,0.004593053,0.0003484096,0.00001917841,0.01960848,0.7038301,0.1867206,0.00004973656,0.000998623,0.0009321908],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7493299,0.0003391128,0.249971,0.00004504453,0.0001367033,0.00003745167,0.00001489681,0.00002419807,0.000101778],"genre_scores_gemma":[0.9960253,0.00007968828,0.00380849,0.00001864308,0.00003624181,9.312066e-7,0.00001389775,0.00001508366,0.000001763289],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2466954,"threshold_uncertainty_score":0.3575526,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3087780323","doi":"10.1155/2020/8867404","title":"Equity-Oriented Train Timetabling with Collaborative Passenger Flow Control: A Spatial Rebalance of Service on an Oversaturated Urban Rail Transit Line","year":2020,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"Train; Solver; Weighting; Computer science; Tabu search; Service (business); Service level; Integer programming; Heuristic; Transport engineering; Urban rail transit; Operations research; Mathematical optimization; Engineering; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.007321100585265899,"gpt":0.2177197759545639,"spread":0.210398675369298,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001760812,0.0001982821,0.0004693981,0.00009467587,0.0000397739,0.00001402275,0.0001065954,0.00007545856,0.00001380121],"category_scores_gemma":[0.00001732653,0.0001631771,0.00006988696,0.000709374,0.00001908611,0.0004851244,5.005336e-7,0.0002490038,6.237253e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000371513,"about_ca_system_score_gemma":0.00007326107,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001650837,"about_ca_topic_score_gemma":0.000278954,"domain_scores_codex":[0.9985529,0.00004827463,0.0006564268,0.0001530049,0.0004047362,0.0001846133],"domain_scores_gemma":[0.9988256,0.00004874946,0.0003295366,0.00009240441,0.0005489838,0.0001547267],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001653774,0.00005741899,0.00004116161,0.0001041371,0.000102267,0.00003329138,0.008018814,0.8394073,0.148359,0.00005565985,0.000008676365,0.002158507],"study_design_scores_gemma":[0.02957408,0.009175329,0.03737638,0.001402418,0.0006475091,0.00002820853,0.007787454,0.8088707,0.1005357,0.00004648097,0.003380972,0.001174744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7601704,0.000245244,0.2385098,0.000347074,0.0002493213,0.0002126958,0.0001222654,0.00006113655,0.00008202198],"genre_scores_gemma":[0.9937516,0.00003302301,0.005799668,0.0001308393,0.0001856764,0.00000372874,0.00005763929,0.00003479019,0.000003052772],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2335812,"threshold_uncertainty_score":0.6654171,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4394987665","doi":"10.1016/j.asoc.2024.111640","title":"Railway network delay evolution: A heterogeneous graph neural network approach","year":2024,"lang":"en","type":"article","venue":"Applied Soft Computing","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Canadian Pacific Railway (Canada)","funders":"","keywords":"Train; Computer science; Scalability; Robustness (evolution); Artificial neural network; Graph; Network architecture; Distributed computing; Artificial intelligence; Theoretical computer science; Computer network","retraction":null,"screen_n_in":null,"score":{"opus":0.007382969826896788,"gpt":0.1888585971402182,"spread":0.1814756273133214,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004251956,0.0003607573,0.0003507123,0.00008769196,0.0003387802,0.0002125037,0.0002928141,0.0001690742,0.00001183595],"category_scores_gemma":[0.000003444756,0.0003539386,0.0001735399,0.0009522752,0.00005064153,0.00006315707,0.000101262,0.0003911914,0.00006961181],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001005528,"about_ca_system_score_gemma":0.00002272587,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001758847,"about_ca_topic_score_gemma":0.00000521203,"domain_scores_codex":[0.9977949,0.00003214955,0.0004812345,0.0004994549,0.0002577891,0.0009344303],"domain_scores_gemma":[0.9993191,0.0001365997,0.0000392135,0.0003402444,0.00002113049,0.0001437575],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003191906,0.000006938752,0.00006248602,0.000123031,0.0000846058,0.00002429107,0.0002219705,0.9681553,0.00007581474,0.01081032,0.003617051,0.01681506],"study_design_scores_gemma":[0.0001245152,0.00001587422,0.00009456749,0.00007782868,0.00002401435,0.0001387423,0.00003339434,0.9884191,0.000009106519,0.0008130518,0.009852009,0.0003977512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08846603,0.01433577,0.8632534,0.0000167296,0.003713342,0.0003323977,0.000002042512,0.003352674,0.02652768],"genre_scores_gemma":[0.9889765,0.00001006152,0.007125725,0.00005381918,0.003609951,0.0000317257,0.00001831889,0.0001101775,0.00006375447],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9005104,"threshold_uncertainty_score":0.9998913,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2811448823","doi":"10.1155/2018/3179321","title":"Stop Plan of Express and Local Train for Regional Rail Transit Line","year":2018,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Natural Science Foundation of Guangdong Province; Shenzhen Technology University","keywords":"Train; Energy consumption; Urban rail transit; Transport engineering; Genetic algorithm; Transit (satellite); Plan (archaeology); Line (geometry); Computer science; Operations research; Engineering; Public transport; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01256910237876,"gpt":0.2253448543765567,"spread":0.2127757519977967,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001196488,0.0000793086,0.0001888507,0.00007462207,0.00002437284,0.000003619914,0.00005058045,0.00004747295,0.000005281117],"category_scores_gemma":[0.000003631612,0.00007017679,0.00006514857,0.00006563943,0.00005294398,0.0001744492,1.955864e-7,0.00005918513,1.050326e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001124237,"about_ca_system_score_gemma":0.00001464643,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003190697,"about_ca_topic_score_gemma":0.00004438579,"domain_scores_codex":[0.9992987,0.000005568434,0.0004067534,0.00006163899,0.0001313862,0.00009594368],"domain_scores_gemma":[0.999627,0.00003388262,0.000112044,0.00004452491,0.00013118,0.00005138499],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.000342035,0.00003442807,0.00004403354,0.0002110153,0.00004602829,0.000004842233,0.00574397,0.8563062,0.1096968,0.0008197288,0.00009695227,0.02665392],"study_design_scores_gemma":[0.03800394,0.01263805,0.1814222,0.003799967,0.0007652192,0.0003969455,0.02272248,0.1464622,0.4341458,0.008096362,0.1491507,0.002396114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5950112,0.0003353718,0.4043214,0.00003279871,0.0001970567,0.00005217851,0.00001489936,0.000009375753,0.00002568268],"genre_scores_gemma":[0.9926751,0.00008289044,0.00700922,0.000009110361,0.00018123,0.000002802391,0.000009710593,0.00001408911,0.00001582636],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7098439,"threshold_uncertainty_score":0.2861726,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}