{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":732,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":732,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"fbe72cf0b3f3","filters":{"topic":"Reliability and Maintenance Optimization"}},"results":[{"id":"W2043129860","doi":"10.1023/b:lida.0000036389.14073.dd","title":"Covariates and Random Effects in a Gamma Process Model with Application to Degradation and Failure","year":2004,"lang":"en","type":"article","venue":"Lifetime Data Analysis","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":572,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Gamma process; Covariate; Degradation (telecommunications); Process (computing); Random effects model; Econometrics; Goodness of fit; Computer science; Statistics; Sequence (biology); Mathematics; Chemistry","authors":[{"name":"Jerry Lawless","is_ca":true},{"name":"Martin Crowder","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003535797549385565,"gpt":0.210394489702789,"spread":0.2068586921534034,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03936784,0.003244552,0.005863312,0.003072091,0.001720057,0.004925041,0.00700836,0.007999039,0.008627102],"category_scores_gemma":[0.09091551,0.003578316,0.004482674,0.005411151,0.005527259,0.007405141,0.003733291,0.00689942,0.001538003],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002015021,"about_ca_system_score_gemma":0.003882482,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01281606,"about_ca_topic_score_gemma":0.01146219,"domain_scores_codex":[0.9864861,0.009525668,0.0004740997,0.001967163,0.0007488667,0.000798032],"domain_scores_gemma":[0.8803402,0.1067472,0.004070381,0.005547935,0.002184491,0.001109778],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.001328776,0.0003489873,0.01094214,0.0005049058,0.0008475206,0.00112058,0.001087183,0.5040122,0.0009608055,0.4338749,0.003397446,0.04157449],"study_design_scores_gemma":[0.0003579752,0.0002921092,0.003038122,0.00010711,0.000413335,0.0002568067,0.0001378813,0.8038163,0.0002782592,0.1878931,0.003291036,0.0001179468],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03468103,0.001145259,0.9604408,0.0008478563,0.0001580845,0.0001763595,0.001107029,0.0007685441,0.0006750217],"genre_scores_gemma":[0.6495124,0.005329776,0.3088736,0.0006609425,0.0007895742,0.002193462,0.003906576,0.0008478047,0.02788588],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.03936784,"threshold_uncertainty_score":0.2081995,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1973585648","doi":"10.1016/j.jlp.2003.08.011","title":"Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning","year":2003,"lang":"en","type":"article","venue":"Journal of Loss Prevention in the Process Industries","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":405,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Risk analysis (engineering); HVAC; Reliability engineering; Preventive maintenance; Profitability index; Engineering; Scheduling (production processes); Risk management; Asset management; Risk assessment; Reliability (semiconductor); Operations management; Computer science; Air conditioning; Business","authors":[{"name":"Faisal Khan","is_ca":true},{"name":"Mahmoud M. R. Haddara","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02729353277704647,"gpt":0.2894291095724483,"spread":0.2621355767954018,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005494465,0.001804635,0.002139177,0.002462681,0.0004785387,0.001794423,0.002699883,0.001231486,0.002007616],"category_scores_gemma":[0.009644231,0.001186373,0.001573483,0.001801368,0.001244305,0.002439995,0.001220381,0.001640042,0.0002320401],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001935804,"about_ca_system_score_gemma":0.001949433,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003919829,"about_ca_topic_score_gemma":0.003523469,"domain_scores_codex":[0.9969681,0.001455292,0.0001276191,0.0002822207,0.001009329,0.0001574064],"domain_scores_gemma":[0.9955956,0.003059525,0.0005313781,0.0003169429,0.0003990681,0.00009749739],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000288915,0.0000431148,0.0003850517,0.0001037202,0.00007555512,0.00002625949,0.00004829343,0.9115002,0.0008322132,0.04898629,0.0005280678,0.03744246],"study_design_scores_gemma":[0.000005020677,0.00002742613,0.000117485,0.00001009825,0.00001736137,0.00001606148,0.000005930105,0.9777265,0.0002055379,0.02154306,0.0003160136,0.000009435917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002642333,0.0003067442,0.9960001,0.0001027832,0.00002156702,0.00002697042,0.00003784342,0.0001150353,0.0007466523],"genre_scores_gemma":[0.4800703,0.0007903513,0.5163921,0.0001279741,0.0002039675,0.0003121117,0.0001501455,0.0001724397,0.001780621],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005494465,"threshold_uncertainty_score":0.02905786,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2140635263","doi":"10.5267/j.msl.2014.3.028","title":"Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process","year":2014,"lang":"en","type":"article","venue":"Management Science Letters","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":373,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Pairwise comparison; Quality (philosophy); Reliability (semiconductor); Production (economics); Analytic hierarchy process; Computer science; Reliability engineering; Selection (genetic algorithm); Process (computing); Rank (graph theory); Fuzzy logic; Cost reduction; Reduction (mathematics); Operations research; Risk analysis (engineering); Business; Mathematics; Engineering; Marketing; Artificial intelligence","authors":[{"name":"Aida Azizi","is_ca":false},{"name":"Kiumars Fathi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004386457513619024,"gpt":0.2078387690055508,"spread":0.2034523114919318,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001899443,0.0008216414,0.001207954,0.002942266,0.0008058686,0.001352684,0.0008359652,0.0007894205,0.001550213],"category_scores_gemma":[0.005547573,0.0004717518,0.0009853842,0.001099117,0.0004269262,0.0009387187,0.0004853411,0.0005090614,0.0001702929],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001253314,"about_ca_system_score_gemma":0.00199152,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004067274,"about_ca_topic_score_gemma":0.003406447,"domain_scores_codex":[0.9987545,0.000442717,0.00007417215,0.0001323614,0.0004601189,0.0001361297],"domain_scores_gemma":[0.9987506,0.0007421364,0.0001386255,0.00003696829,0.0002857393,0.00004602955],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002836127,0.0004090598,0.00581959,0.0005806939,0.000238444,0.0002263753,0.001236863,0.6046635,0.01199162,0.01747574,0.001329765,0.3557447],"study_design_scores_gemma":[0.00005876424,0.0003511033,0.001542411,0.00004735183,0.00008504459,0.00005286136,0.0002472413,0.9875599,0.002131384,0.007062925,0.0008368822,0.00002414199],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1727889,0.0005377258,0.8196366,0.0002154575,0.00002382982,0.0004459533,0.00006706209,0.0002370916,0.006047351],"genre_scores_gemma":[0.6885132,0.0002493726,0.3103089,0.00003426815,0.00001292262,0.0002707856,0.00007136478,0.00002519003,0.0005140878],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004067274,"threshold_uncertainty_score":0.01004529,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1989618028","doi":"10.1016/j.renene.2010.10.028","title":"Condition based maintenance optimization for wind power generation systems under continuous monitoring","year":2010,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":357,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Fonds Québécois de la Recherche sur la Nature et les Technologies","keywords":"Turbine; Wind power; Prognostics; Condition monitoring; Reliability engineering; Condition-based maintenance; Maintenance actions; Engineering; Maintenance engineering; Interval (graph theory); Computer science; Mechanical engineering","authors":[{"name":"Zhigang Tian","is_ca":true},{"name":"Tongdan Jin","is_ca":false},{"name":"Bairong Wu","is_ca":true},{"name":"Fangfang Ding","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007728710704583281,"gpt":0.2030739373142882,"spread":0.195345226609705,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001047805,0.001044504,0.001366463,0.0007427729,0.0002878063,0.000844894,0.000708681,0.001079446,0.001544264],"category_scores_gemma":[0.003028663,0.0007793709,0.0005506226,0.0005304377,0.0004749978,0.001169271,0.0003711262,0.0006571972,0.0001507312],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006267764,"about_ca_system_score_gemma":0.0005426873,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004785701,"about_ca_topic_score_gemma":0.003745221,"domain_scores_codex":[0.9996879,0.0001237243,0.00001744635,0.00005541298,0.00007462977,0.00004098471],"domain_scores_gemma":[0.9985114,0.001072044,0.0001817506,0.00004718954,0.000146211,0.00004143644],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001097071,0.00003779425,0.0003532771,0.00003015943,0.00002826283,0.00002662715,0.00001121053,0.9922565,0.0006454276,0.0004772734,0.0002140873,0.00580958],"study_design_scores_gemma":[0.000008502891,0.00002597345,0.0002596037,0.000001241548,0.000005664487,0.000004454404,0.000002171166,0.9992601,0.00009642995,0.0003168384,0.00001729189,0.000001723041],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4093872,0.001061194,0.5831575,0.000474027,0.00007483377,0.0001574666,0.0004028574,0.0004777471,0.004807231],"genre_scores_gemma":[0.9863986,0.0001080054,0.01235865,0.00001618982,0.00002257982,0.00004938466,0.0001165029,0.00003235879,0.0008977398],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004785701,"threshold_uncertainty_score":0.009515643,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2790716556","doi":"10.1080/00207543.2018.1436789","title":"Selective maintenance scheduling under stochastic maintenance quality with multiple maintenance actions","year":2018,"lang":"en","type":"article","venue":"International Journal of Production Research","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":268,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"Fundo para o Desenvolvimento das Ciências e da Tecnologia; China Scholarship Council; National Natural Science Foundation of China","keywords":"Maintenance actions; Scheduling (production processes); Optimal maintenance; Reliability engineering; Computer science; Predictive maintenance; Preventive maintenance; Simulated annealing; Condition-based maintenance; Mathematical optimization; Component (thermodynamics); Corrective maintenance; Operations research; Engineering; Mathematics; Algorithm","authors":[{"name":"Chaoqun Duan","is_ca":true},{"name":"Chao Deng","is_ca":false},{"name":"Abolfazl Gharaei","is_ca":true},{"name":"Jun Wu","is_ca":false},{"name":"B. Wang","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07131587596696437,"gpt":0.3766434791121299,"spread":0.3053276031451655,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001382843,0.0008098937,0.001091817,0.0004933341,0.0003584888,0.0007699626,0.001624336,0.0007926694,0.001147696],"category_scores_gemma":[0.00276808,0.0005732892,0.0008649086,0.0005642145,0.0005873076,0.0007684559,0.0006239084,0.0006722808,0.0001279251],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001136925,"about_ca_system_score_gemma":0.001026165,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007447129,"about_ca_topic_score_gemma":0.004459029,"domain_scores_codex":[0.9991973,0.0002030669,0.00004089683,0.0001499993,0.000213659,0.0001950902],"domain_scores_gemma":[0.9982326,0.0008410253,0.0004398355,0.0001311799,0.0002184986,0.0001368305],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004354444,0.00001708202,0.0003161402,0.00002473832,0.00001625206,0.00005371126,0.000017637,0.9933252,0.0009855917,0.001639052,0.00006845454,0.003492537],"study_design_scores_gemma":[0.00001188122,0.00004647288,0.0002797423,0.000001719055,0.00001033747,0.0000171559,0.000005375887,0.9983468,0.0002146087,0.0009897705,0.00007352794,0.00000273877],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2228209,0.0004299874,0.7738059,0.000175581,0.00003723206,0.0001215324,0.0001470505,0.0001930724,0.002268794],"genre_scores_gemma":[0.9824378,0.0001028233,0.01659597,0.00001716641,0.00001203056,0.00005162158,0.00006499352,0.00001552411,0.0007019421],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007447129,"threshold_uncertainty_score":0.01480758,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2040405051","doi":"10.1016/j.ress.2010.12.023","title":"Condition based maintenance optimization for multi-component systems using proportional hazards model","year":2011,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":267,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Condition-based maintenance; Component (thermodynamics); Preventive maintenance; Reliability engineering; Condition monitoring; Dependency (UML); Engineering; Work (physics); Maintenance actions; Unit (ring theory); Computer science; Operations research; Mathematical optimization; Systems engineering; Mathematics","authors":[{"name":"Zhigang Tian","is_ca":true},{"name":"Haitao Liao","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0249531931011578,"gpt":0.2221492380271124,"spread":0.1971960449259546,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001115942,0.0008645217,0.001469828,0.0006056014,0.0003630235,0.0007023591,0.001230457,0.0008614591,0.002515575],"category_scores_gemma":[0.002175747,0.0006067149,0.0008781051,0.0005575699,0.000497514,0.001145283,0.0007088445,0.0007742845,0.000145014],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006998185,"about_ca_system_score_gemma":0.0009146114,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006757489,"about_ca_topic_score_gemma":0.003247695,"domain_scores_codex":[0.9996039,0.000139445,0.00001413325,0.00007216918,0.0001195366,0.00005083991],"domain_scores_gemma":[0.9991211,0.0006498921,0.00006585328,0.00003885284,0.00009756571,0.00002669138],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003551913,0.00001694698,0.00009923439,0.00002372204,0.00001619561,0.00001290587,0.000009772577,0.9942302,0.0004235077,0.001208189,0.0001091983,0.003814595],"study_design_scores_gemma":[0.000004636373,0.000009324984,0.00004795773,5.402677e-7,0.00000367742,0.000001929093,0.000001010266,0.9992287,0.00006234505,0.0006172491,0.00002136675,0.000001250846],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06396613,0.0003514606,0.9326673,0.0001529079,0.00003627245,0.00006133186,0.00008787151,0.0002841146,0.002392704],"genre_scores_gemma":[0.9582708,0.0001796141,0.03840057,0.00002592536,0.00002418635,0.0001209592,0.000113817,0.00005745959,0.002806644],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006757489,"threshold_uncertainty_score":0.01343632,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1969004393","doi":"10.1016/j.renene.2012.02.030","title":"Opportunistic maintenance for wind farms considering multi-level imperfect maintenance thresholds","year":2012,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":190,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Corrective maintenance; Maintenance actions; Preventive maintenance; Wind power; Proactive maintenance; Imperfect; Reliability engineering; Turbine; Predictive maintenance; Optimal maintenance; Risk analysis (engineering); Component (thermodynamics); Planned maintenance; Computer science; Engineering; Business","authors":[{"name":"Fangfang Ding","is_ca":true},{"name":"Zhigang Tian","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03896343840959492,"gpt":0.2386543358455003,"spread":0.1996908974359054,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010679,0.0005314866,0.001026921,0.0003727229,0.0003878684,0.0008295979,0.00109273,0.0008797638,0.001562666],"category_scores_gemma":[0.003663818,0.0005866921,0.0004285741,0.0006829434,0.0004128943,0.001036377,0.0004556936,0.0004332047,0.0001017822],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007453738,"about_ca_system_score_gemma":0.0006938633,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003580051,"about_ca_topic_score_gemma":0.006583176,"domain_scores_codex":[0.9995957,0.0001229343,0.00002138059,0.00006700492,0.00006711261,0.0001260118],"domain_scores_gemma":[0.9975924,0.00165234,0.0003318284,0.0001402092,0.0001855099,0.00009771137],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001853626,0.00004384149,0.001301908,0.00003874426,0.00003591167,0.0001518698,0.00001646607,0.98678,0.0006752123,0.002925184,0.0003575321,0.007487863],"study_design_scores_gemma":[0.000009456486,0.00003163238,0.0007319961,0.000002584877,0.00001302913,0.00002962574,0.0000106973,0.9972665,0.0001146686,0.001742091,0.00004442167,0.000003199617],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6949719,0.0006273548,0.2966008,0.0004430159,0.00007480908,0.00008154564,0.0002887933,0.0002631525,0.006648606],"genre_scores_gemma":[0.997267,0.00003290437,0.002239339,0.000006874771,0.000006562324,0.000008998936,0.00002080526,0.000008084307,0.000409535],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.003580051,"threshold_uncertainty_score":0.007118464,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1983371987","doi":"10.1080/15732470601012154","title":"The influence of temporal uncertainty of deterioration on life-cycle management of structures","year":2008,"lang":"en","type":"article","venue":"Structure and Infrastructure Engineering","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":187,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"University Network of Excellence in Nuclear Engineering","keywords":"Probabilistic logic; Reliability (semiconductor); Reliability engineering; Gamma process; Stochastic modelling; Process (computing); Random variable; Preventive maintenance; Stochastic process; Computer science; Product life-cycle management; Conceptual model; Risk analysis (engineering); Engineering; Econometrics; Mathematics; Statistics; Artificial intelligence; Business","authors":[{"name":"Mahesh D. Pandey","is_ca":true},{"name":"Xian‐Xun Yuan","is_ca":true},{"name":"Jan M. van Noortwijk","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.002446432957465737,"gpt":0.1731256776319262,"spread":0.1706792446744604,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003749704,0.0006058649,0.0005983502,0.0005796697,0.0004151952,0.001468698,0.0009270281,0.0009591486,0.0008299308],"category_scores_gemma":[0.02068931,0.0004167117,0.0005608567,0.0007212971,0.00105358,0.002716755,0.00101435,0.0008393328,0.00009383435],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001342473,"about_ca_system_score_gemma":0.000905742,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003964917,"about_ca_topic_score_gemma":0.003691757,"domain_scores_codex":[0.9985263,0.000549995,0.00006738342,0.0002412299,0.0004292276,0.0001857645],"domain_scores_gemma":[0.9869016,0.009674596,0.002174666,0.0004433175,0.0006286827,0.0001771023],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009166501,0.00002357122,0.00602203,0.00007280666,0.00005942278,0.0001848781,0.0001222012,0.9278863,0.001068681,0.05059221,0.0002524202,0.01362382],"study_design_scores_gemma":[0.000009970255,0.0001056982,0.006376307,0.00003173824,0.00005838908,0.0001177819,0.00007646257,0.9141167,0.001074575,0.0771213,0.0008716208,0.00003944057],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3554574,0.003943067,0.6287202,0.002291903,0.0001102358,0.00003275001,0.0005514728,0.0001144309,0.008778451],"genre_scores_gemma":[0.9942459,0.0009620262,0.004122126,0.00004571331,0.000048756,0.00001308462,0.00006228296,0.00001505878,0.0004850049],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.003964917,"threshold_uncertainty_score":0.01983052,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2399793648","doi":"10.1080/03155986.2001.11732424","title":"A Control-Limit Policy And Software For Condition-Based Maintenance Optimization","year":2001,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":185,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Toronto","funders":"University of Toronto; Nanyang Technological University","keywords":"Limit (mathematics); Control (management); Software; Computer science; Control limits; Reliability engineering; Engineering; Mathematics; Operating system; Artificial intelligence; Control chart","authors":[{"name":"Dragan Banjević","is_ca":true},{"name":"Andrew Jardine","is_ca":true},{"name":"Viliam Makiš","is_ca":true},{"name":"Marguerite Ennis","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02083121742888067,"gpt":0.2946814852633072,"spread":0.2738502678344265,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003396304,0.0009846073,0.00112295,0.0008753676,0.0003763822,0.001170478,0.001127472,0.001284088,0.009427807],"category_scores_gemma":[0.009025848,0.0005897895,0.0007507742,0.0005761755,0.0008840557,0.0007657015,0.001012853,0.001678234,0.0009890571],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00114788,"about_ca_system_score_gemma":0.001549015,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004447801,"about_ca_topic_score_gemma":0.002360641,"domain_scores_codex":[0.9989458,0.0005204817,0.00005340111,0.0001330355,0.0002684653,0.00007892203],"domain_scores_gemma":[0.9965991,0.002748244,0.0001627529,0.0001282188,0.0003140423,0.00004764536],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007849098,0.00007317329,0.0003658253,0.00006956058,0.00002663026,0.00004890918,0.00004268856,0.9116715,0.0007593657,0.03936747,0.0011893,0.04630723],"study_design_scores_gemma":[0.000009258353,0.00001402242,0.0000333885,0.000006824619,0.000003997893,0.00000485895,0.000001930583,0.9955806,0.0002281942,0.003595432,0.000518735,0.000002704821],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.002949992,0.00008013108,0.9940298,0.00009602937,0.00002311685,0.00004609245,0.00003156943,0.0007251,0.002018304],"genre_scores_gemma":[0.330137,0.0002888358,0.6593409,0.0001763565,0.0001013899,0.0008163658,0.0001620671,0.000524314,0.008452667],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.009427807,"threshold_uncertainty_score":0.0315392,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2005362891","doi":"10.1142/s0218539300000213","title":"GENERAL SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE MODELS","year":2000,"lang":"en","type":"article","venue":"International Journal of Reliability Quality and Safety Engineering","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":176,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto; University of Alberta; University of New Brunswick","funders":"University of Hong Kong; University of Windsor; City University of Hong Kong","keywords":"Weibull distribution; Imperfect; Preventive maintenance; Schedule; Hazard ratio; Hazard; Statistics; Reliability engineering; Reduction (mathematics); Computer science; Mathematics; Econometrics; Engineering; Confidence interval; Biology","authors":[{"name":"Daming Lin","is_ca":true},{"name":"Ming J. Zuo","is_ca":true},{"name":"Richard C.M. Yam","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01041670103590322,"gpt":0.248793112411156,"spread":0.2383764113752528,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001218404,0.001375621,0.001286514,0.0008342103,0.0003899515,0.001186523,0.003517639,0.001343763,0.008195108],"category_scores_gemma":[0.00262923,0.000766004,0.001066956,0.0009510081,0.0009466201,0.002100287,0.0009622873,0.001329615,0.00106139],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001058821,"about_ca_system_score_gemma":0.001001931,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006995547,"about_ca_topic_score_gemma":0.004756671,"domain_scores_codex":[0.9991046,0.0001622062,0.00005332827,0.0002331539,0.0002798383,0.0001667749],"domain_scores_gemma":[0.9986674,0.0004833547,0.0003661811,0.0001738058,0.0002079417,0.0001013135],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00009658456,0.0000536739,0.0005956696,0.00009554903,0.0000356381,0.0001295896,0.00006116911,0.9441948,0.0009584089,0.04132109,0.001554517,0.01090334],"study_design_scores_gemma":[0.00002441664,0.00005108144,0.0002576022,0.000008913133,0.0000276398,0.00006638453,0.00001002254,0.9778709,0.0002311983,0.01916631,0.002272676,0.00001273577],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05412094,0.001046769,0.9209729,0.0005587226,0.0002097519,0.0001248168,0.001192047,0.0006224661,0.02115161],"genre_scores_gemma":[0.8924771,0.001448804,0.06391245,0.0002135305,0.0002342518,0.0002806596,0.0008572114,0.0001275572,0.04044834],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008195108,"threshold_uncertainty_score":0.02741534,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2059795097","doi":"10.1109/24.855543","title":"Generalized multi-state k-out-of-n:G systems","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":176,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"State (computer science); Reliability (semiconductor); Component (thermodynamics); Mathematics; Binary number; Discrete mathematics; Reliability engineering; Computer science; Combinatorics; Algorithm; Physics; Engineering; Arithmetic; Thermodynamics","authors":[{"name":"Jian Huang","is_ca":true},{"name":"Ming J. Zuo","is_ca":true},{"name":"Yanhong Wu","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01491835992754301,"gpt":0.2291471955575747,"spread":0.2142288356300317,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007812082,0.0007193266,0.001004334,0.0006777928,0.0009168747,0.001447344,0.001592433,0.0009735312,0.003736533],"category_scores_gemma":[0.001679778,0.000295595,0.0005692461,0.0007372354,0.001420814,0.002112971,0.001498975,0.0007564776,0.0007233077],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001245885,"about_ca_system_score_gemma":0.0007464603,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003730758,"about_ca_topic_score_gemma":0.005573859,"domain_scores_codex":[0.9990343,0.0001767961,0.00006937432,0.0003143736,0.0001776511,0.0002274174],"domain_scores_gemma":[0.9986876,0.0002998688,0.0002538774,0.0003136556,0.0003389876,0.0001061126],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.001396601,0.0001809679,0.005326974,0.0006188947,0.0001294571,0.001681208,0.00121688,0.6400896,0.03821165,0.2110798,0.007262675,0.09280526],"study_design_scores_gemma":[0.00005822278,0.0001841077,0.001548096,0.0000343408,0.000043437,0.0003246703,0.0000974076,0.9018824,0.005811475,0.0839677,0.005982545,0.00006560212],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3460715,0.0009116343,0.635561,0.0005213699,0.0001814643,0.0002207691,0.000862313,0.002371595,0.01329844],"genre_scores_gemma":[0.9415013,0.0001750284,0.05378284,0.0001454595,0.00004664424,0.0001209029,0.0003080179,0.00007452563,0.003845241],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.003736533,"threshold_uncertainty_score":0.01249993,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2052304942","doi":"10.1080/02664760903406488","title":"Optimal design of accelerated degradation tests based on Wiener process models","year":2010,"lang":"en","type":"article","venue":"Journal of Applied Statistics","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":170,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Kootenay Association for Science & Technology","funders":"","keywords":"Quantile; Wiener process; Estimator; Mathematics; Robustness (evolution); Delta method; Statistics; Random variable; Sensitivity (control systems); Mathematical optimization; Range (aeronautics); Computer science; Applied mathematics; Engineering","authors":[{"name":"H.S. Lim","is_ca":true},{"name":"Bong‐Jin Yum","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01996768820333731,"gpt":0.2430872403094555,"spread":0.2231195521061182,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002336841,0.001199879,0.001484363,0.001009883,0.0003400933,0.001219067,0.0008862186,0.00082708,0.001083972],"category_scores_gemma":[0.004910352,0.0008290707,0.0006743158,0.0005103063,0.00100188,0.001037478,0.0009268192,0.000825298,0.0001999715],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009982859,"about_ca_system_score_gemma":0.001353223,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001442771,"about_ca_topic_score_gemma":0.001163582,"domain_scores_codex":[0.9984747,0.0006170445,0.00006653101,0.0002445953,0.000379749,0.0002174783],"domain_scores_gemma":[0.9973342,0.001536077,0.0005387954,0.00008691273,0.000377211,0.0001267616],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001631432,0.00003986213,0.0003019129,0.00003464323,0.00002151626,0.00003404121,0.0000283978,0.9808851,0.003404386,0.003496744,0.00008837925,0.01150192],"study_design_scores_gemma":[0.0000248368,0.0002063717,0.0002678584,0.000007965726,0.00001418918,0.00001147082,0.000011242,0.9945368,0.001968998,0.002720902,0.0002191749,0.00001013724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08554415,0.000407221,0.9108085,0.0001033805,0.00002201316,0.0001603783,0.00005133612,0.0002508528,0.002652152],"genre_scores_gemma":[0.9211235,0.0001843657,0.07708611,0.00002957505,0.00001248809,0.0002939022,0.00005817247,0.00003340474,0.001178474],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.002336841,"threshold_uncertainty_score":0.01235855,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2023345879","doi":"10.1057/palgrave.jors.2601261","title":"Optimal component replacement decisions using vibration monitoring and the proportional-hazards model","year":2002,"lang":"en","type":"article","venue":"Journal of the Operational Research Society","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":157,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Weibull distribution; Context (archaeology); Purchasing; Computer science; Preventive maintenance; Reliability engineering; Operations research; Operations management; Engineering; Statistics; Mathematics","authors":[{"name":"P. J. Vlok","is_ca":false},{"name":"Jasper L. Coetzee","is_ca":false},{"name":"Dragan Banjević","is_ca":true},{"name":"Andrew Jardine","is_ca":true},{"name":"Viliam Makiš","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07724871446964189,"gpt":0.3347167128229625,"spread":0.2574679983533206,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003352538,0.0009242737,0.001264631,0.000948591,0.000391248,0.000934369,0.0011545,0.001073367,0.001899034],"category_scores_gemma":[0.008140991,0.000716986,0.0006797269,0.0004452689,0.0007623669,0.001011637,0.0007622108,0.0008712922,0.0001661816],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009161854,"about_ca_system_score_gemma":0.001342945,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004695156,"about_ca_topic_score_gemma":0.003449536,"domain_scores_codex":[0.9987335,0.0006355959,0.0000501208,0.000173659,0.0002269698,0.0001801855],"domain_scores_gemma":[0.9966044,0.002819269,0.0002476916,0.00008721566,0.0001440882,0.00009729889],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009207574,0.0000285289,0.0005748934,0.00001874141,0.00001940642,0.00004264388,0.00002363319,0.9889438,0.0003251292,0.002314365,0.00009472731,0.007522109],"study_design_scores_gemma":[0.00002077891,0.00008160292,0.0002415632,0.000003313562,0.00001390197,0.00001724682,0.00001303257,0.9958585,0.0001916262,0.003452607,0.00009865849,0.000007108975],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.215735,0.0004796846,0.780016,0.0003872542,0.00003302395,0.0001756452,0.0001015793,0.0002091316,0.002862772],"genre_scores_gemma":[0.970414,0.0001392596,0.02799607,0.00002653449,0.00001363038,0.00007302121,0.00004541385,0.000015966,0.001276143],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004695156,"threshold_uncertainty_score":0.01773012,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3018718829","doi":"10.1109/tste.2020.2986586","title":"Operations &amp; Maintenance Optimization of Wind Turbines Integrating Wind and Aging Information","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":147,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China","keywords":"Wind power; Offshore wind power; Turbine; Reliability engineering; Revenue; Optimal maintenance; Production (economics); Maintenance engineering; Reliability (semiconductor); Renewable energy; Engineering; Computer science; Marine engineering; Power (physics); Business","authors":[{"name":"Li Yang","is_ca":false},{"name":"Gaoyang Li","is_ca":false},{"name":"Zihan Zhang","is_ca":true},{"name":"Xiaobing Ma","is_ca":false},{"name":"Yu Zhao","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005592530214258211,"gpt":0.1885301410360039,"spread":0.1829376108217457,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001075706,0.0007329335,0.0007471606,0.0003794184,0.0003057536,0.0007564955,0.0007074852,0.0006080478,0.001162826],"category_scores_gemma":[0.002377879,0.0003239827,0.0003635882,0.0005769842,0.0003442283,0.0009958275,0.000613198,0.0005581127,0.000111585],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007741182,"about_ca_system_score_gemma":0.00122114,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004516933,"about_ca_topic_score_gemma":0.00413118,"domain_scores_codex":[0.9995373,0.0001921192,0.00001911711,0.00007980709,0.00007466416,0.0000969844],"domain_scores_gemma":[0.9990606,0.0005343606,0.0001942952,0.00005996383,0.00007085912,0.00008001879],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006024939,0.00005191762,0.0008436948,0.00002559156,0.00001278762,0.00004949141,0.00001414762,0.9794956,0.0008979068,0.002985336,0.0003266654,0.0152365],"study_design_scores_gemma":[0.000004468727,0.00003487636,0.0002703166,0.000002106596,0.000004424696,0.00001213152,0.000009805689,0.9980785,0.0002148474,0.001245277,0.0001214608,0.000001854612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3965967,0.0006571196,0.5926428,0.0004883101,0.00004761478,0.0001691645,0.0003295961,0.0002011129,0.008867575],"genre_scores_gemma":[0.9829161,0.0001550561,0.01586992,0.00001500269,0.000008624507,0.00002947159,0.00007229467,0.00001670994,0.0009168767],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004516933,"threshold_uncertainty_score":0.008981287,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1995373625","doi":"10.1080/00949655.2012.658805","title":"Bivariate degradation analysis of products based on Wiener processes and copulas","year":2012,"lang":"en","type":"article","venue":"Journal of Statistical Computation and Simulation","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":146,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"National Natural Science Foundation of China","keywords":"Bivariate analysis; Copula (linguistics); Mathematics; Joint probability distribution; Markov chain Monte Carlo; Markov chain; Dependency (UML); Bayesian probability; Applied mathematics; Mathematical optimization; Algorithm; Computer science; Econometrics; Statistics; Artificial intelligence","authors":[{"name":"Zhengqiang Pan","is_ca":false},{"name":"N. Balakrishnan","is_ca":true},{"name":"Quan Sun","is_ca":false},{"name":"Zhou Jing-lun","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01587334204348506,"gpt":0.2693712940123766,"spread":0.2534979519688915,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002365772,0.001190585,0.001056111,0.001561829,0.0003550507,0.001378264,0.0008379247,0.0006829733,0.001347926],"category_scores_gemma":[0.00598253,0.000621047,0.001541764,0.001497009,0.0009184084,0.001853596,0.0009337376,0.001163632,0.0003098666],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007850126,"about_ca_system_score_gemma":0.0006319989,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004087528,"about_ca_topic_score_gemma":0.002017732,"domain_scores_codex":[0.9992769,0.0003066638,0.00003891082,0.0001385156,0.0001630078,0.00007598791],"domain_scores_gemma":[0.9980595,0.001205401,0.0002914436,0.0001072225,0.0002741747,0.00006228552],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00002572724,0.00001741726,0.001192701,0.00006841258,0.0000879046,0.0001555969,0.0001037548,0.9007911,0.001848506,0.08494646,0.0004890043,0.01027348],"study_design_scores_gemma":[0.000001388826,0.000008217852,0.0003128273,0.000004331441,0.000011772,0.00001904357,0.000007396021,0.9893165,0.0001359599,0.00998562,0.0001896216,0.000007441677],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01705151,0.0005249085,0.9808842,0.00006720135,0.00001379744,0.00001551882,0.00005934199,0.00006515404,0.001318426],"genre_scores_gemma":[0.8923062,0.003187363,0.09853341,0.00006499234,0.0001008832,0.0001367572,0.0003369621,0.0001600938,0.005173465],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004087528,"threshold_uncertainty_score":0.01251155,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2172471105","doi":"10.1016/j.ress.2015.11.015","title":"Integrated preventive maintenance and production decisions for imperfect processes","year":2015,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Preventive maintenance; Reliability engineering; Imperfect; Quality (philosophy); Production (economics); Sizing; Context (archaeology); Selection (genetic algorithm); Control (management); Operations research; Point (geometry); Engineering; Computer science; Operations management; Risk analysis (engineering); Mathematics; Economics","authors":[{"name":"Mustapha Nourelfath","is_ca":true},{"name":"Nabil Nahas","is_ca":false},{"name":"Mohamed Ben‐Daya","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009712888612852624,"gpt":0.202891605786752,"spread":0.1931787171738994,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002284542,0.0008854399,0.001217237,0.0007782468,0.0004727156,0.001531958,0.001022412,0.001203661,0.002033448],"category_scores_gemma":[0.007161514,0.0007997551,0.0006386671,0.0005402031,0.0006644242,0.001473979,0.0007084747,0.001076255,0.0002005298],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001173633,"about_ca_system_score_gemma":0.00217248,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005104831,"about_ca_topic_score_gemma":0.007055091,"domain_scores_codex":[0.9990469,0.0002042141,0.00005223546,0.000177684,0.000287202,0.0002316449],"domain_scores_gemma":[0.9969726,0.00193453,0.0004880369,0.0001720824,0.0003136633,0.0001191576],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003919644,0.0001505451,0.001900839,0.00006364433,0.00003781426,0.0001070399,0.00004835202,0.9600309,0.003060282,0.003842739,0.0003222913,0.03004347],"study_design_scores_gemma":[0.00002236617,0.0001317526,0.001909639,0.000007190908,0.00004991013,0.00002323967,0.00001861246,0.9921255,0.002136312,0.003440456,0.0001235242,0.00001162968],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5162966,0.0005724937,0.4765436,0.0005426535,0.00006426272,0.0001295971,0.0002162166,0.0004738286,0.005160804],"genre_scores_gemma":[0.9845025,0.00006908472,0.01404678,0.00002273055,0.00001484543,0.00002176154,0.0000593288,0.00001946243,0.001243562],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.005104831,"threshold_uncertainty_score":0.01208198,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2060250681","doi":"10.1016/j.ress.2013.09.003","title":"Selective maintenance for multi-state series–parallel systems under economic dependence","year":2013,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":138,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Component (thermodynamics); Series and parallel circuits; Reliability engineering; Series (stratigraphy); State (computer science); Maintenance actions; Resource (disambiguation); Computer science; Genetic algorithm; Mathematical optimization; Operations research; Engineering; Algorithm; Mathematics","authors":[{"name":"Cuong D. Dao","is_ca":true},{"name":"Ming J. Zuo","is_ca":true},{"name":"Mayank Pandey","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007771529503925715,"gpt":0.1949150969736654,"spread":0.1871435674697397,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001402942,0.0007035834,0.001247631,0.0007388371,0.0005261357,0.0007542206,0.001060072,0.000594981,0.00172922],"category_scores_gemma":[0.004330246,0.000454086,0.0006994208,0.0005363848,0.001029242,0.00118554,0.0009380468,0.0006342225,0.0001088782],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001018142,"about_ca_system_score_gemma":0.0006409807,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003897384,"about_ca_topic_score_gemma":0.004013889,"domain_scores_codex":[0.9996359,0.0001097131,0.0000182958,0.00006014113,0.00006691348,0.00010884],"domain_scores_gemma":[0.9969483,0.002015892,0.0004661414,0.0001684696,0.0002714155,0.0001298072],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0003326542,0.00006596721,0.001218249,0.00007157178,0.00007490678,0.0002926424,0.00003893246,0.9727165,0.003156662,0.0147686,0.0005101357,0.006753091],"study_design_scores_gemma":[0.000008252327,0.00002282116,0.0004815946,0.000001417749,0.00001393241,0.00002535516,0.000008052802,0.9961506,0.0002014226,0.003050507,0.00003260377,0.000003402141],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7442911,0.0004928232,0.2475033,0.0006986777,0.0000513324,0.00005535597,0.0001935136,0.000197507,0.006516429],"genre_scores_gemma":[0.9972448,0.00007079776,0.001666402,0.000009968324,0.00001360095,0.00001326593,0.00002710873,0.00001160098,0.0009425209],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.003897384,"threshold_uncertainty_score":0.007749379,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2052461311","doi":"10.1016/j.ress.2009.08.004","title":"Performance evaluation of multi-state degraded systems with minimal repairs and imperfect preventive maintenance","year":2009,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":137,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"","keywords":"Preventive maintenance; Reliability engineering; Reliability (semiconductor); Imperfect; Maintenance actions; Limit (mathematics); Markov process; Failure rate; State (computer science); Degradation (telecommunications); Process (computing); Function (biology); Renewal theory; Markov chain; Mathematical optimization; Inspection time; Production (economics); Computer science; Engineering; Mathematics; Statistics; Algorithm; Economics","authors":[{"name":"Isaac Wassy Soro","is_ca":true},{"name":"Mustapha Nourelfath","is_ca":true},{"name":"Daoud Aı̈t-Kadi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006999054080612516,"gpt":0.1978709968814139,"spread":0.1908719428008014,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002438647,0.0008283542,0.001029641,0.0007035187,0.000514687,0.001045219,0.000768599,0.0008387719,0.001518534],"category_scores_gemma":[0.007374246,0.0002515453,0.0004092297,0.0004634881,0.0007708715,0.0009642555,0.0007396106,0.0004683827,0.0001738824],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001132882,"about_ca_system_score_gemma":0.0007691441,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004928868,"about_ca_topic_score_gemma":0.002027606,"domain_scores_codex":[0.9987324,0.0004770409,0.000077682,0.0001854074,0.0002472881,0.0002803135],"domain_scores_gemma":[0.9924388,0.004974304,0.0007068212,0.0004934172,0.0009969203,0.0003897705],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001660039,0.0001134848,0.001316269,0.0001208616,0.00006047688,0.0000770613,0.00005454249,0.9805692,0.004472717,0.0008722123,0.0001934009,0.01048962],"study_design_scores_gemma":[0.00002714353,0.0004909881,0.00115337,0.000005263188,0.00003076081,0.00003531029,0.0000255678,0.9954765,0.002336153,0.0003637197,0.00004595568,0.000009220644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9443628,0.0006916897,0.0511861,0.0002344546,0.00003337426,0.00004569327,0.0001271335,0.000399246,0.002919674],"genre_scores_gemma":[0.9985697,0.00002561747,0.001163567,0.0000052392,0.000004321283,0.000005464792,0.00002556653,0.000007621559,0.0001929583],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.004928868,"threshold_uncertainty_score":0.01289696,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2036815968","doi":"10.1016/j.jhazmat.2004.01.011","title":"Risk-based maintenance of ethylene oxide production facilities","year":2004,"lang":"en","type":"review","venue":"Journal of Hazardous Materials","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":130,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Fault tree analysis; Reliability engineering; Reliability (semiconductor); Engineering; Risk assessment; Interval (graph theory); Risk analysis (engineering); Schedule; Preventive maintenance; Computer science; Mathematics","authors":[{"name":"Fayek Tasneem Khan","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01552794783487907,"gpt":0.2454631130824683,"spread":0.2299351652475893,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064788,0.0008865559,0.001540362,0.00134365,0.000148873,0.0006480977,0.001833284,0.0009607619,0.001211165],"category_scores_gemma":[0.001342871,0.0003349032,0.00044033,0.001634442,0.000199816,0.0008509111,0.0003138806,0.0004652925,0.0003612431],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004172599,"about_ca_system_score_gemma":0.0005715556,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00133223,"about_ca_topic_score_gemma":0.002522606,"domain_scores_codex":[0.9996687,0.00006109417,0.000040366,0.00004690381,0.0001648596,0.00001811875],"domain_scores_gemma":[0.9990808,0.0004813502,0.0002135514,0.00002655665,0.000182868,0.00001495863],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0000782292,0.0000771322,0.000399333,0.007617738,0.0001438477,0.0001100158,0.00002106052,0.007282395,0.001634727,0.002223861,0.00433445,0.9760773],"study_design_scores_gemma":[0.0001489138,0.001718877,0.01181018,0.01081193,0.001355871,0.004855412,0.0002345887,0.02212966,0.01290778,0.01354621,0.9203367,0.0001441159],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.001422062,0.9946526,0.002733548,0.0001461895,0.00007702081,0.000007126947,0.00001594834,0.00001563541,0.0009298506],"genre_scores_gemma":[0.01617749,0.979728,0.002772882,0.00008510416,0.0001598717,0.00001270415,0.00007299205,0.000004371494,0.000986538],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.001833284,"threshold_uncertainty_score":0.004051745,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1601712886","doi":"10.1109/tr.2015.2430491","title":"Ordering Heuristics for Reliability Evaluation of Multistate Networks","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":130,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Heuristics; Reliability (semiconductor); Disjoint sets; Heuristic; Computer science; Path (computing); Terminal (telecommunication); Mathematical optimization; Reliability engineering; Algorithm; Mathematics; Artificial intelligence; Discrete mathematics; Engineering","authors":[{"name":"Guanghan Bai","is_ca":true},{"name":"Ming J. Zuo","is_ca":true},{"name":"Zhigang Tian","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03342313046835089,"gpt":0.2706196956357848,"spread":0.2371965651674339,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001921618,0.001248458,0.0008665806,0.002246777,0.0006117824,0.0009703314,0.001123692,0.0005498782,0.001949103],"category_scores_gemma":[0.00580563,0.0005891178,0.0007748307,0.001630862,0.0006592969,0.001669635,0.0006898019,0.0009347631,0.0002911923],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001763069,"about_ca_system_score_gemma":0.001585871,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005618938,"about_ca_topic_score_gemma":0.006742964,"domain_scores_codex":[0.9985317,0.0006130692,0.00008246354,0.0001760414,0.0004589952,0.0001376951],"domain_scores_gemma":[0.9961456,0.002591622,0.0002828746,0.0002109995,0.000672947,0.00009589078],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009904116,0.00004387847,0.0007337351,0.0001759909,0.00003310327,0.00007174384,0.0001093504,0.8821346,0.003433145,0.01804214,0.001343016,0.09378017],"study_design_scores_gemma":[0.0000114716,0.00003926039,0.0001488544,0.00001982268,0.00001453426,0.00002317322,0.00002681197,0.9865716,0.002291955,0.009946249,0.0008944508,0.00001185385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01468937,0.0003794743,0.9822221,0.0000522644,0.00002428991,0.0000859185,0.00008120912,0.0003716491,0.002093687],"genre_scores_gemma":[0.3490629,0.000558122,0.6480523,0.00006228192,0.00003752101,0.0001904005,0.0003622119,0.0002357448,0.001438437],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.005618938,"threshold_uncertainty_score":0.01279205,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2153591206","doi":"10.1109/tr.2010.2103596","title":"Periodic Inspection Optimization Models for a Repairable System Subject to Hidden Failures","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":130,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Interval (graph theory); Component (thermodynamics); Reliability engineering; Maintenance engineering; Mathematical optimization; Computer science; Algorithm; Engineering; Mathematics","authors":[{"name":"Sharareh Taghipour","is_ca":true},{"name":"Dragan Banjević","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01786902427402762,"gpt":0.2025127870691147,"spread":0.1846437627950871,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001888802,0.001230458,0.00145345,0.0007070498,0.0003763574,0.0009490222,0.002045435,0.001681456,0.003507951],"category_scores_gemma":[0.004365384,0.0008411122,0.001141195,0.0005725889,0.001157531,0.001377045,0.0008309662,0.001484349,0.0003780426],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001340522,"about_ca_system_score_gemma":0.001055756,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00748159,"about_ca_topic_score_gemma":0.004054548,"domain_scores_codex":[0.9992798,0.0002547521,0.00002888517,0.0001584771,0.0001559102,0.0001222133],"domain_scores_gemma":[0.997991,0.00127359,0.0003822542,0.000089908,0.0001719936,0.0000912629],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001834965,0.0000104234,0.0001079837,0.00001617617,0.000008479191,0.00003664972,0.00001910266,0.9903225,0.0001934098,0.008012285,0.0001499782,0.001104732],"study_design_scores_gemma":[0.000006207768,0.00001150555,0.00007480064,0.000002593999,0.000004508006,0.000006837792,0.000004694135,0.9957184,0.00004472369,0.004030189,0.00009194102,0.000003611874],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06660353,0.0006135342,0.9265379,0.0005082799,0.00004108781,0.00005244167,0.0002133539,0.0002287369,0.005201102],"genre_scores_gemma":[0.9363633,0.0006712406,0.0501968,0.00007837063,0.00004970868,0.0002359055,0.0002664679,0.0001151209,0.0120232],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.00748159,"threshold_uncertainty_score":0.01487613,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2041628555","doi":"10.1016/j.ijpe.2011.12.021","title":"Integrating noncyclical preventive maintenance scheduling and production planning for a single machine","year":2011,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":126,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Preventive maintenance; Time horizon; Production (economics); Sizing; Production planning; Scheduling (production processes); Computer science; Operations research; Planned maintenance; Holding cost; Corrective maintenance; Reliability engineering; Total cost; Constraint (computer-aided design); Operations management; Mathematical optimization; Engineering; Economics; Mathematics; Microeconomics","authors":[{"name":"Mohamed-Chahir Fitouhi","is_ca":true},{"name":"Mustapha Nourelfath","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02160655366941448,"gpt":0.2315704345962995,"spread":0.209963880926885,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001422049,0.0007693479,0.001555464,0.0005072617,0.0004820445,0.001168491,0.001820393,0.0009399874,0.001715881],"category_scores_gemma":[0.003337862,0.000904882,0.000819927,0.001014299,0.0005140858,0.001246913,0.0007089623,0.0008956745,0.0001711097],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001224569,"about_ca_system_score_gemma":0.002335068,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01351694,"about_ca_topic_score_gemma":0.01565556,"domain_scores_codex":[0.9993357,0.0001925766,0.00003278356,0.0001509645,0.0001597841,0.0001282445],"domain_scores_gemma":[0.9982697,0.001022985,0.0002798883,0.0001617921,0.0001675173,0.00009808283],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007412682,0.00005710443,0.000277273,0.00003007399,0.00002511707,0.00003369277,0.00001255113,0.9863781,0.0007614802,0.001413555,0.00009891416,0.01083794],"study_design_scores_gemma":[0.000006110772,0.0000400558,0.0002104733,0.000001522701,0.00001235619,0.000006608183,0.000002923841,0.9984719,0.0001858934,0.001003866,0.00005478838,0.000003441113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2123995,0.0005891127,0.7808053,0.0003305138,0.0001332518,0.0001314865,0.000162198,0.0004516379,0.004996924],"genre_scores_gemma":[0.961302,0.0001218759,0.03723874,0.0000182166,0.00003666119,0.0000403854,0.00004357575,0.00003347936,0.001164945],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01351694,"threshold_uncertainty_score":0.02687651,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2076529707","doi":"10.1080/00207540600596882","title":"Optimal condition based maintenance with imperfect information and the proportional hazards model","year":2006,"lang":"en","type":"article","venue":"International Journal of Production Research","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":124,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Condition-based maintenance; Optimal maintenance; Partially observable Markov decision process; Markov decision process; Dynamic programming; Reliability engineering; Preventive maintenance; Mathematical optimization; Maintenance actions; Markov process; State (computer science); Process (computing); Computer science; Engineering; Mathematics; Statistics; Algorithm","authors":[{"name":"Alireza Ghasemi","is_ca":true},{"name":"Soumaya Yacout","is_ca":true},{"name":"Mohamed‐Salah Ouali","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01045369359090833,"gpt":0.2776738950681543,"spread":0.267220201477246,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002830395,0.00105079,0.001588968,0.0007119136,0.000367735,0.001272042,0.001641546,0.001368345,0.003423377],"category_scores_gemma":[0.009198781,0.0008561049,0.0008601726,0.000686596,0.001641779,0.002077469,0.001288716,0.001523325,0.0002494838],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001787861,"about_ca_system_score_gemma":0.001981506,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008753709,"about_ca_topic_score_gemma":0.004101736,"domain_scores_codex":[0.9981951,0.0006071621,0.00006488376,0.0003747583,0.0004577343,0.0003003974],"domain_scores_gemma":[0.9947885,0.004064209,0.0004889445,0.0002122784,0.0003012622,0.0001448776],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008721319,0.0000354594,0.0005312933,0.00005037087,0.00003353011,0.00008924002,0.00003791551,0.9656145,0.0003722301,0.02551344,0.0004904144,0.007144378],"study_design_scores_gemma":[0.00002382183,0.00003504545,0.0002318687,0.000005576379,0.00001308441,0.00002108252,0.000006914956,0.9784757,0.0001376554,0.02082867,0.0002104639,0.00001011323],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04141643,0.0006367186,0.9524753,0.0007622247,0.00006753583,0.00008216331,0.0003820007,0.0002739239,0.003903687],"genre_scores_gemma":[0.9512989,0.0005023638,0.04351786,0.0001047621,0.00006380982,0.0001771709,0.0002836851,0.00003862017,0.004012648],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008753709,"threshold_uncertainty_score":0.01740551,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2067640696","doi":"10.1080/0740817x.2012.761371","title":"Selective maintenance modeling for a multistate system with multistate components under imperfect maintenance","year":2013,"lang":"en","type":"article","venue":"IIE Transactions","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":116,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Imperfect; Component (thermodynamics); Maintenance actions; Reliability (semiconductor); Function (biology); Computer science; Predictive maintenance; Engineering","authors":[{"name":"Mayank Pandey","is_ca":true},{"name":"Ming J. Zuo","is_ca":true},{"name":"Ramin Moghaddass","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01019662276905371,"gpt":0.1972156953615536,"spread":0.1870190725924999,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007995189,0.0007618981,0.0006375414,0.0006962423,0.0004213786,0.0007779025,0.0009679754,0.0007161747,0.001842562],"category_scores_gemma":[0.001278204,0.0003079074,0.0007074306,0.0005090624,0.0008856736,0.0009351096,0.0006111006,0.000560332,0.0001848288],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009687767,"about_ca_system_score_gemma":0.0005794868,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01094488,"about_ca_topic_score_gemma":0.007150991,"domain_scores_codex":[0.99966,0.00006755965,0.00001876375,0.00009782476,0.00008784205,0.00006810771],"domain_scores_gemma":[0.9993549,0.0003104047,0.0001574021,0.00004367181,0.0001048464,0.00002877313],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003686889,0.00001312899,0.00051057,0.00002547844,0.00001364422,0.00008250245,0.00005090513,0.9888294,0.001050142,0.006509059,0.0001321139,0.002746211],"study_design_scores_gemma":[0.000002121843,0.0000131797,0.0001700999,0.000001679227,0.000006390263,0.000008699504,0.000006694326,0.9983222,0.0001157939,0.00126804,0.00008291706,0.000002168334],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2459176,0.0006125231,0.7431317,0.0003352143,0.00003995044,0.00008327506,0.0003196515,0.0004057687,0.009154384],"genre_scores_gemma":[0.9893713,0.000172294,0.00772187,0.00001671479,0.00001004916,0.00004834421,0.00007399955,0.00001681207,0.002568655],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01094488,"threshold_uncertainty_score":0.02176231,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2053510719","doi":"10.1016/j.ress.2010.04.003","title":"Periodic inspection optimization model for a complex repairable system","year":2010,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":116,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Interval (graph theory); Reliability engineering; Computer science; Mathematical optimization; Mathematics; Engineering","authors":[{"name":"Sharareh Taghipour","is_ca":true},{"name":"Dragan Banjević","is_ca":true},{"name":"Andrew Jardine","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006478532688058146,"gpt":0.185568211057742,"spread":0.1790896783696838,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001153023,0.001257845,0.001916197,0.0008437326,0.0005187117,0.001591816,0.00218503,0.003259365,0.007373513],"category_scores_gemma":[0.002963801,0.001066463,0.001051625,0.0009157193,0.001085339,0.001198353,0.0009656993,0.001479181,0.0005874576],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00161574,"about_ca_system_score_gemma":0.001646282,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02242423,"about_ca_topic_score_gemma":0.01035044,"domain_scores_codex":[0.9994243,0.0001718537,0.00001992947,0.0001499562,0.0001270491,0.0001069566],"domain_scores_gemma":[0.9987832,0.0006909469,0.0002099138,0.00005973329,0.0001831735,0.00007310695],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002436408,0.00001648663,0.00008839015,0.00002169238,0.00001139709,0.0000527606,0.00001200682,0.9955106,0.000242752,0.002782166,0.0002355502,0.001001928],"study_design_scores_gemma":[0.000007231265,0.000009604295,0.00006479966,0.000001718364,0.000005854477,0.000005797621,0.000002519663,0.998978,0.00003253153,0.0008230748,0.00006589692,0.00000293505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1603751,0.0009241974,0.8049621,0.001369667,0.0001408445,0.0002197907,0.001119119,0.0006891205,0.03020012],"genre_scores_gemma":[0.9440058,0.0004322527,0.02795899,0.0001278803,0.00005225689,0.0002585859,0.0004387232,0.0001350174,0.02659049],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.02242423,"threshold_uncertainty_score":0.04458737,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3033721775","doi":"10.1109/tr.2020.2995277","title":"State-Based Opportunistic Maintenance With Multifunctional Maintenance Windows","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":114,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"Fok Ying Tung Education Foundation; National Natural Science Foundation of China","keywords":"Reliability engineering; Initialization; Spare part; Scheduling (production processes); Maintenance engineering; Computer science; Probabilistic logic; Maintenance actions; Preventive maintenance; Interval (graph theory); Software maintenance; Corrective maintenance; Engineering; Real-time computing; Operations management; Mathematics; Artificial intelligence","authors":[{"name":"Zihan Zhang","is_ca":true},{"name":"Li Yang","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01348958919451938,"gpt":0.1960511003331629,"spread":0.1825615111386435,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007187562,0.0005476494,0.0005757564,0.0003955073,0.0002741113,0.000604216,0.00112276,0.0004798168,0.001144112],"category_scores_gemma":[0.002233692,0.0002388681,0.0003139063,0.000292649,0.0004125029,0.0008469764,0.0006577486,0.00045689,0.0001503647],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005018366,"about_ca_system_score_gemma":0.0006557754,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001763799,"about_ca_topic_score_gemma":0.001914499,"domain_scores_codex":[0.9994447,0.00009232215,0.0000419038,0.0001803134,0.0001262641,0.0001145177],"domain_scores_gemma":[0.9984437,0.0006038781,0.0003756264,0.0002688239,0.0001720102,0.0001360272],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0005422864,0.0002370783,0.004028699,0.00009620428,0.00005685571,0.0001838911,0.0001602528,0.8475422,0.01965053,0.01335183,0.001087871,0.1130624],"study_design_scores_gemma":[0.00001721236,0.0001469528,0.0009956034,0.000006113318,0.00002122166,0.00006522396,0.00001452099,0.9926518,0.002378924,0.003197657,0.0004949446,0.000009824814],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2341349,0.0003952121,0.7614315,0.0001746474,0.00005876573,0.00009905803,0.0001221069,0.0008896526,0.002694207],"genre_scores_gemma":[0.9877248,0.00004174873,0.01156022,0.00001738346,0.000009639624,0.00002309312,0.00002901815,0.00001252345,0.000581486],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.001763799,"threshold_uncertainty_score":0.003827453,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2126691367","doi":"10.1109/tr.2010.2056412","title":"An Integrated Model for Production and Preventive Maintenance Planning in Multi-State Systems","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Université Laval","keywords":"Preventive maintenance; Corrective maintenance; Time horizon; Production (economics); Sizing; Reliability engineering; Operations research; Holding cost; State (computer science); Engineering; Planned maintenance; Genetic algorithm; Computer science; Production planning; Total cost; Operations management; Mathematical optimization; Mathematics; Economics","authors":[{"name":"Mustapha Nourelfath","is_ca":true},{"name":"Mohamed-Chahir Fitouhi","is_ca":true},{"name":"Mahdi Machani","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01622437822571341,"gpt":0.2547837867690253,"spread":0.2385594085433119,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000865033,0.001002623,0.001126832,0.0006787941,0.000649901,0.00199311,0.002164773,0.001703703,0.00451366],"category_scores_gemma":[0.001471933,0.000719132,0.001409923,0.001120642,0.0009853345,0.001982729,0.001105285,0.00165349,0.0006093058],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001947834,"about_ca_system_score_gemma":0.002126459,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01175949,"about_ca_topic_score_gemma":0.01074795,"domain_scores_codex":[0.9992867,0.0001984175,0.00003569797,0.0001708299,0.0002065424,0.0001017203],"domain_scores_gemma":[0.999393,0.0003106582,0.00007987719,0.00006491462,0.0001035733,0.00004802809],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001951886,0.00002254129,0.0001159859,0.00002505377,0.0000130688,0.00004573917,0.00002695479,0.9776573,0.0004273908,0.01743837,0.0002762387,0.003931939],"study_design_scores_gemma":[0.000009629303,0.00001772408,0.00004165756,0.00000376727,0.000007966431,0.000009762249,0.000004785873,0.9945234,0.0001284881,0.004558173,0.0006898722,0.000004768806],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01146728,0.0002443006,0.9822917,0.0002575417,0.00004822075,0.00007373256,0.0002103771,0.0003603337,0.005046415],"genre_scores_gemma":[0.7242792,0.0007923731,0.2604977,0.0001182186,0.00008725232,0.000676745,0.0006046031,0.0001283419,0.01281545],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01175949,"threshold_uncertainty_score":0.02338207,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2025521447","doi":"10.1111/j.1937-5956.2000.tb00465.x","title":"COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT, SINGLE‐ MACHINE PRODUCTION SYSTEM","year":2000,"lang":"en","type":"article","venue":"Production and Operations Management","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec","funders":"","keywords":"Computer science; Scheduling (production processes); Markov decision process; Production (economics); Product (mathematics); Reliability engineering; Operations research; Industrial engineering; Markov process; Operations management; Mathematics; Engineering; Economics; Statistics; Microeconomics","authors":[{"name":"Thomas Sloan","is_ca":false},{"name":"J. George Shanthikumar","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.00848559295328552,"gpt":0.1934608859521583,"spread":0.1849752929988727,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002299359,0.0006937085,0.001414017,0.0007775886,0.0005094089,0.0008587415,0.001118609,0.0007963326,0.001854743],"category_scores_gemma":[0.003775419,0.0009317571,0.001148561,0.0006523696,0.0006430743,0.00118487,0.001017136,0.001192867,0.0002027355],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0015107,"about_ca_system_score_gemma":0.002416296,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005500853,"about_ca_topic_score_gemma":0.007230238,"domain_scores_codex":[0.9986827,0.0004195818,0.00004552157,0.0002284728,0.0004195518,0.0002041946],"domain_scores_gemma":[0.9967405,0.002205,0.0003882562,0.0002174678,0.0002319578,0.0002168304],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001183177,0.00006052249,0.0006351594,0.00003676108,0.00003875456,0.00004135083,0.00002147091,0.9808231,0.00121512,0.001324477,0.0001215534,0.01556352],"study_design_scores_gemma":[0.00002349834,0.00007855798,0.0003623351,0.000002523656,0.00001660242,0.00001676245,0.000004060635,0.9976749,0.0005863495,0.001080897,0.0001483083,0.000005152177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2593476,0.0005209696,0.7367769,0.0002058001,0.00004387583,0.0001373676,0.00009058153,0.0003439306,0.002532979],"genre_scores_gemma":[0.9108927,0.0001438482,0.0876488,0.00002310645,0.0000318019,0.00009044126,0.00006234186,0.00002833585,0.001078606],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005500853,"threshold_uncertainty_score":0.0121603,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2165933339","doi":"10.1023/a:1009616111968","title":"Alternative time scales and failure time models.","year":2000,"lang":"en","type":"article","venue":"Lifetime Data Analysis","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo; University of Toronto","funders":"","keywords":"Reliability (semiconductor); Scale (ratio); Computer science; Measure (data warehouse); Accelerated failure time model; Statistics; Reliability engineering; Econometrics; Survival analysis; Data mining; Mathematics; Engineering; Geography; Cartography","authors":[{"name":"Thierry Duchesne","is_ca":true},{"name":"Jerry Lawless","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006880506656244254,"gpt":0.1997418170113651,"spread":0.1928613103551208,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004685034,0.001109575,0.0008116613,0.00165585,0.0004519256,0.002232279,0.003070642,0.001790532,0.009608925],"category_scores_gemma":[0.02055886,0.0005539561,0.001337144,0.002109904,0.001067382,0.004036858,0.001070828,0.002940932,0.002151138],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001671282,"about_ca_system_score_gemma":0.0009487416,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003565747,"about_ca_topic_score_gemma":0.002648349,"domain_scores_codex":[0.9980143,0.0009861208,0.00007833443,0.0002713885,0.0004168302,0.0002330207],"domain_scores_gemma":[0.9903203,0.006927656,0.0009481616,0.0008605055,0.0006330775,0.0003102849],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001564418,0.0001165006,0.00136442,0.0001503514,0.0001082025,0.0001139662,0.0001974979,0.296321,0.0006284661,0.6649293,0.006940394,0.02897341],"study_design_scores_gemma":[0.00002286718,0.00003945055,0.0006031704,0.00002616435,0.00004281193,0.00005766868,0.00004530582,0.7541376,0.0001628754,0.2390489,0.005793886,0.00001934028],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.03756141,0.005835136,0.9316247,0.001925777,0.000603251,0.00008704963,0.0008007333,0.000380331,0.02118159],"genre_scores_gemma":[0.8173877,0.005411941,0.1315891,0.0005206855,0.0007256845,0.0004871086,0.001585456,0.0004186778,0.04187362],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.009608925,"threshold_uncertainty_score":0.03214508,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2169572499","doi":"10.1287/moor.28.2.382.14484","title":"Optimal Replacement Under Partial Observations","year":2003,"lang":"en","type":"article","venue":"Mathematics of Operations Research","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Mathematical optimization; Mathematics; Optimal stopping; Bellman equation; Piecewise; State (computer science); Projection (relational algebra); Markov process; Algorithm","authors":[{"name":"Viliam Makiš","is_ca":true},{"name":"Xiangqian Jiang","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.109759728247854,"gpt":0.3453108476573518,"spread":0.2355511194094978,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00216916,0.0006839816,0.001529677,0.0004829844,0.0003530106,0.001062693,0.001037371,0.001073668,0.002215477],"category_scores_gemma":[0.00855651,0.0006153282,0.0006823416,0.0005136436,0.001220659,0.002262143,0.001088403,0.001020269,0.0002621571],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00106453,"about_ca_system_score_gemma":0.001364433,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001793074,"about_ca_topic_score_gemma":0.001069294,"domain_scores_codex":[0.9988368,0.0004688479,0.00005297233,0.0002367121,0.0002497486,0.0001549376],"domain_scores_gemma":[0.9973046,0.001844383,0.0002979037,0.0002375743,0.0001939939,0.0001215343],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001619414,0.00005178453,0.0007558794,0.0001123904,0.000036202,0.0001812769,0.00009423161,0.8597538,0.001399339,0.1047957,0.001083176,0.03157409],"study_design_scores_gemma":[0.00002354286,0.00006397171,0.000231048,0.00001193002,0.000009457142,0.00004431639,0.00001493967,0.9453894,0.0004859284,0.05302495,0.0006906811,0.000009691824],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0638251,0.000673069,0.9320916,0.0005289922,0.00004481043,0.00002979393,0.0001062336,0.0001726563,0.002527803],"genre_scores_gemma":[0.8990273,0.0006523757,0.09451003,0.00009877591,0.00008844797,0.0001225031,0.0002614165,0.00008939709,0.005149694],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.002215477,"threshold_uncertainty_score":0.01147175,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2343581650","doi":"10.1109/tr.2015.2494689","title":"Selective Maintenance for Multistate Series Systems With S-Dependent Components","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Component (thermodynamics); Series (stratigraphy); Computer science; Reliability (semiconductor); Stochastic process; Context (archaeology); Maintenance engineering; Failure rate; Mathematical optimization; Engineering; Mathematics; Statistics","authors":[{"name":"Cuong D. Dao","is_ca":true},{"name":"Ming J. Zuo","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01649225922313175,"gpt":0.2131802180610275,"spread":0.1966879588378957,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008418979,0.0007897888,0.001020164,0.0005324957,0.0004705814,0.0007398813,0.001065462,0.0007878942,0.001530796],"category_scores_gemma":[0.001615003,0.0003825927,0.0009088546,0.0005121554,0.0006749768,0.001018533,0.0007099292,0.0005259915,0.0001293983],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000767292,"about_ca_system_score_gemma":0.0004771861,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004679806,"about_ca_topic_score_gemma":0.003612059,"domain_scores_codex":[0.9996303,0.00007792495,0.00002147206,0.0001140844,0.0000769859,0.00007916478],"domain_scores_gemma":[0.9988877,0.0005687071,0.0002644648,0.00008494006,0.0001346765,0.00005944844],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001221314,0.00004905181,0.001594258,0.0001125761,0.00005754674,0.000344337,0.00006930336,0.9689668,0.005651162,0.009746325,0.0005466666,0.01273988],"study_design_scores_gemma":[0.000007047958,0.00005080568,0.0004295176,0.00000342493,0.00001868463,0.00006588659,0.00001692815,0.9950374,0.0005533523,0.003664813,0.0001470286,0.000005105443],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.318327,0.0006380004,0.6769413,0.0003296594,0.00004813076,0.00006945148,0.0001731656,0.0002096319,0.003263513],"genre_scores_gemma":[0.9904395,0.0001415628,0.007604303,0.00002471432,0.00001804784,0.00003092008,0.00006356731,0.00001860218,0.001658651],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004679806,"threshold_uncertainty_score":0.00930512,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2759313934","doi":"10.1016/j.ress.2017.09.010","title":"General model for the risk priority number in failure mode and effects analysis","year":2017,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Konkuk University","keywords":"Failure mode and effects analysis; Reliability engineering; Mode (computer interface); Computer science; Risk analysis (engineering); Econometrics; Mathematics; Engineering; Business","authors":[{"name":"Kyungmee O. Kim","is_ca":false},{"name":"Ming J. Zuo","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003492155636325762,"gpt":0.2105865770698364,"spread":0.2070944214335107,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002080944,0.001270139,0.001475858,0.001306918,0.0007134767,0.001622554,0.004290894,0.002879976,0.01485641],"category_scores_gemma":[0.005383503,0.0008832104,0.001787296,0.00134733,0.001061332,0.003170494,0.001137603,0.002389768,0.002516373],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001905027,"about_ca_system_score_gemma":0.00189523,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01112435,"about_ca_topic_score_gemma":0.01076381,"domain_scores_codex":[0.9992322,0.0002771074,0.00002965536,0.0001404514,0.0001944255,0.0001262697],"domain_scores_gemma":[0.9986172,0.000798494,0.0001109085,0.0001415243,0.0002705335,0.00006132149],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00002442574,0.00003741041,0.000284519,0.0000671029,0.00003495094,0.00009966106,0.00004757074,0.7987643,0.001010069,0.1909782,0.002243957,0.006407726],"study_design_scores_gemma":[0.000009914593,0.00000610099,0.0000913528,0.000008093968,0.00001151133,0.00002820736,0.00000466143,0.9527079,0.00008984735,0.04608363,0.0009492817,0.000009465137],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.005263826,0.0004328658,0.9822037,0.0005401712,0.00008924134,0.00005917423,0.0003829146,0.0002244948,0.0108037],"genre_scores_gemma":[0.5867354,0.002301036,0.3203876,0.0008992095,0.0007034142,0.001066599,0.001507794,0.0007755256,0.0856234],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01485641,"threshold_uncertainty_score":0.0496996,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2043475556","doi":"10.1016/j.ress.2005.12.002","title":"Coupling ant colony and the degraded ceiling algorithm for the redundancy allocation problem of series–parallel systems","year":2006,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Redundancy (engineering); Computer science; Ant colony optimization algorithms; Heuristics; Mathematical optimization; Metaheuristic; Distributed computing; Algorithm; Mathematics","authors":[{"name":"Nabil Nahas","is_ca":true},{"name":"Mustapha Nourelfath","is_ca":true},{"name":"Daoud Aı̈t-Kadi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003239535675779656,"gpt":0.1668358979205964,"spread":0.1635963622448168,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001247267,0.0006911633,0.001354021,0.0005245258,0.0004522163,0.000766841,0.001306496,0.0007143759,0.001755955],"category_scores_gemma":[0.003239159,0.0004662408,0.0004352833,0.0006634994,0.0006688827,0.0008361469,0.001073854,0.0009127481,0.0001823824],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005608663,"about_ca_system_score_gemma":0.001243987,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004371913,"about_ca_topic_score_gemma":0.003227971,"domain_scores_codex":[0.9994451,0.0002340321,0.00003075764,0.0000704925,0.0001529709,0.00006666303],"domain_scores_gemma":[0.9988702,0.0006210393,0.0001369229,0.00008760991,0.0002063408,0.00007789675],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007914463,0.00003330142,0.0002172752,0.00004375035,0.00002940508,0.00002361118,0.00002245455,0.9727041,0.0008304052,0.003323733,0.0005201256,0.02217259],"study_design_scores_gemma":[0.000008800404,0.00001754784,0.0000386679,0.000001598754,0.000003647716,0.000006413491,0.000002121376,0.9984571,0.0001063778,0.001250677,0.000105298,0.000001748809],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06690212,0.0004568244,0.9280883,0.0002434233,0.00009901226,0.00005242258,0.00003230145,0.0002788456,0.003846735],"genre_scores_gemma":[0.8006108,0.0002367067,0.1959473,0.0001034227,0.00006876906,0.0001160989,0.00007826988,0.00009139982,0.002747194],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004371913,"threshold_uncertainty_score":0.00869292,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4385603717","doi":"10.1016/j.jmsy.2023.07.014","title":"Reinforcement and deep reinforcement learning-based solutions for machine maintenance planning, scheduling policies, and optimization","year":2023,"lang":"en","type":"article","venue":"Journal of Manufacturing Systems","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Victoria","funders":"","keywords":"Reinforcement learning; Computer science; Categorization; Risk analysis (engineering); Asset (computer security); Scheduling (production processes); Predictive maintenance; Artificial intelligence; Machine learning; Engineering; Reliability engineering; Operations management; Computer security","authors":[{"name":"Oluwaseyi Ogunfowora","is_ca":true},{"name":"Homayoun Najjaran","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01570343180326461,"gpt":0.2321526244594865,"spread":0.2164491926562219,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001484943,0.0009338765,0.001247016,0.000522755,0.0003680322,0.0007258837,0.001362134,0.001535028,0.002465084],"category_scores_gemma":[0.006443882,0.0005789431,0.0005026037,0.000477939,0.0008736044,0.001052098,0.001043866,0.002109601,0.0002711538],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001374682,"about_ca_system_score_gemma":0.002010437,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01222776,"about_ca_topic_score_gemma":0.01021436,"domain_scores_codex":[0.999617,0.0001484392,0.00001995812,0.00007381228,0.00006378369,0.00007712779],"domain_scores_gemma":[0.9968162,0.002411489,0.0002082026,0.0001040691,0.0003341115,0.0001259635],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000044687,0.00004001613,0.0002415434,0.0000254069,0.00001363917,0.00001157511,0.00001539297,0.9820129,0.0001488038,0.003302192,0.0006207855,0.01352297],"study_design_scores_gemma":[0.000003955088,0.00000590253,0.00001982764,0.000001892323,0.000001280913,0.000001106493,0.000001213968,0.9982413,0.00003174747,0.001657092,0.00003389016,8.515614e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05840689,0.001069731,0.9344943,0.001188226,0.0001550727,0.00005858151,0.0001550602,0.000546915,0.003925331],"genre_scores_gemma":[0.9087179,0.0003024533,0.08698742,0.000232937,0.0001063365,0.000126306,0.0001817714,0.00008216505,0.003262659],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01222776,"threshold_uncertainty_score":0.02431315,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1978269173","doi":"10.1007/s00170-013-4730-6","title":"A hybrid GA–PSO approach for reliability optimization in redundancy allocation problem","year":2013,"lang":"en","type":"article","venue":"The International Journal of Advanced Manufacturing Technology","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Particle swarm optimization; Redundancy (engineering); Mathematical optimization; Reliability (semiconductor); Computer science; Computation; Nonlinear system; Genetic algorithm; Reliability engineering; Engineering; Mathematics; Algorithm","authors":[{"name":"Mohammad Sheikhalishahi","is_ca":false},{"name":"V. Ebrahimipour","is_ca":true},{"name":"Hiva Shiri","is_ca":false},{"name":"Hamid Reza Rafat Zaman","is_ca":false},{"name":"M. Jeihoonian","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004808010910748596,"gpt":0.2089082066542618,"spread":0.2041001957435132,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004724775,0.0007350459,0.0009609107,0.0006611695,0.0003562784,0.0006877361,0.001068979,0.001254337,0.002092367],"category_scores_gemma":[0.0008196368,0.0004408834,0.0008421459,0.0007745037,0.0002747461,0.0004135575,0.0005648168,0.0006723214,0.0003567284],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003148567,"about_ca_system_score_gemma":0.0007415264,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004447043,"about_ca_topic_score_gemma":0.004194768,"domain_scores_codex":[0.9997247,0.00009438673,0.00001247622,0.00003619557,0.00009808631,0.00003413031],"domain_scores_gemma":[0.9997658,0.0001119782,0.00001654429,0.00001614505,0.0000725572,0.00001688378],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004478477,0.00006642252,0.0002676945,0.0000732352,0.00009596968,0.00007354141,0.00001878104,0.9455395,0.002823218,0.002784886,0.001062189,0.04714971],"study_design_scores_gemma":[0.000008524198,0.00002687067,0.00006711589,0.000003243741,0.0000089732,0.00001553257,0.000002662308,0.9990069,0.0001607273,0.0003862276,0.0003106116,0.000002590117],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02656262,0.001010137,0.9610006,0.0002246786,0.0002284152,0.0000861856,0.00004921546,0.0003133283,0.01052477],"genre_scores_gemma":[0.5830646,0.0006508125,0.4070679,0.0002597042,0.0001788071,0.0003090556,0.0001525433,0.0001011564,0.008215481],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004447043,"threshold_uncertainty_score":0.008842289,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2123870732","doi":"10.1057/jors.2010.49","title":"Optimization models for critical spare parts inventories—a reliability approach","year":2010,"lang":"en","type":"article","venue":"Journal of the Operational Research Society","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Spare part; Reliability (semiconductor); Computer science; Project management; Operations research; Reliability engineering; Purchasing; Scheduling (production processes); Systems engineering; Operations management; Engineering","authors":[{"name":"Darko Louit","is_ca":false},{"name":"Rodrigo Pascual","is_ca":false},{"name":"Dragan Banjević","is_ca":true},{"name":"Andrew Jardine","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05358588123528438,"gpt":0.3332193809567216,"spread":0.2796334997214372,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002570429,0.001778072,0.001788224,0.001704113,0.0005097324,0.001723934,0.00191219,0.002103959,0.005054269],"category_scores_gemma":[0.005764809,0.001429358,0.001549809,0.001436329,0.000952975,0.001624425,0.001297547,0.001823781,0.0007323379],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001786828,"about_ca_system_score_gemma":0.002243155,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0155252,"about_ca_topic_score_gemma":0.01084684,"domain_scores_codex":[0.9992653,0.0003754472,0.00003060331,0.0001155129,0.0001142033,0.00009894418],"domain_scores_gemma":[0.9970271,0.002234607,0.0002433266,0.00007485854,0.000339693,0.00008042707],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008180453,0.000007165516,0.0001019524,0.00002016907,0.00001433634,0.00001429421,0.000009192838,0.9923724,0.00005735539,0.00493965,0.0003456341,0.002109671],"study_design_scores_gemma":[0.000001954749,0.000005443714,0.00004351988,0.000007425731,0.000005258355,0.000004183891,0.000006527076,0.9955781,0.00002612063,0.003990013,0.0003284497,0.000003170709],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01987127,0.002548596,0.9652597,0.001192048,0.0001222064,0.000100254,0.0004706334,0.0002275121,0.01020775],"genre_scores_gemma":[0.780627,0.004750517,0.1787993,0.0005046244,0.0003880235,0.0008160487,0.001271261,0.0003820262,0.03246128],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.0155252,"threshold_uncertainty_score":0.03086966,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2106687296","doi":"10.1109/tr.2009.2034947","title":"Evaluating the Reliability Function and the Mean Residual Life for Equipment With Unobservable States","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":93,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Unobservable; Residual; Moment (physics); Markov process; Reliability (semiconductor); Degradation (telecommunications); Markov chain; State (computer science); Stochastic process; Continuous-time Markov chain; Bayes' theorem; Applied mathematics; Computer science; Mathematics; Reliability engineering; Markov model; Statistics; Econometrics; Markov property; Algorithm; Engineering; Bayesian probability","authors":[{"name":"Alireza Ghasemi","is_ca":true},{"name":"Soumaya Yacout","is_ca":true},{"name":"Mohamed-Salah Ouali","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02228747341722617,"gpt":0.2583616720662186,"spread":0.2360741986489924,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003369734,0.0007700073,0.001089116,0.0009328235,0.0002335789,0.0009051188,0.001323291,0.001252873,0.0009184079],"category_scores_gemma":[0.01357433,0.0004620958,0.0009280236,0.0005860382,0.000782104,0.001716386,0.0005915975,0.0006610883,0.0002144195],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001387806,"about_ca_system_score_gemma":0.001295628,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008305655,"about_ca_topic_score_gemma":0.004341384,"domain_scores_codex":[0.9990294,0.0004103135,0.00003884505,0.0001685351,0.0002555193,0.00009739973],"domain_scores_gemma":[0.9953724,0.003631605,0.0004325543,0.0002390832,0.0002682804,0.0000561205],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00002497426,0.00001183864,0.001091291,0.00002650408,0.00001590567,0.00003707516,0.00002367963,0.9875911,0.0004348246,0.004741391,0.00007576117,0.005925526],"study_design_scores_gemma":[0.000001881843,0.0000138914,0.0004920022,0.000003181671,0.000005215978,0.00001159353,0.000005510169,0.9965576,0.0002748882,0.002569515,0.00005956462,0.000005162944],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1341203,0.0005412417,0.863787,0.0001889201,0.00001260203,0.00002159761,0.00009904989,0.0002096182,0.001019665],"genre_scores_gemma":[0.9373475,0.0003958657,0.06070716,0.00001672902,0.00002015543,0.00007420723,0.0001813607,0.00005017953,0.001206783],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008305655,"threshold_uncertainty_score":0.01782107,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2124019770","doi":"10.1109/tr.2006.874916","title":"Performance Evaluation of Generalized Multi-State&lt;tex&gt;$k$&lt;/tex&gt;-Out-of-&lt;tex&gt;$n$&lt;/tex&gt;Systems","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":93,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary; University of Alberta","funders":"","keywords":"State (computer science); Mathematics; Monotonic function; State vector; Discrete mathematics; Algorithm; Applied mathematics; Mathematical analysis; Physics","authors":[{"name":"Ming J. Zuo","is_ca":true},{"name":"Zhigang Tian","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0206599683264571,"gpt":0.2454927015663153,"spread":0.2248327332398582,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009592249,0.0006224384,0.000567023,0.0003415862,0.0003489576,0.0006120399,0.0006802518,0.0004447647,0.001467169],"category_scores_gemma":[0.001518925,0.0001066271,0.000403312,0.000310195,0.0004040252,0.0006834919,0.0006082229,0.0003653207,0.0001545737],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009187773,"about_ca_system_score_gemma":0.0005172712,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007167212,"about_ca_topic_score_gemma":0.005314841,"domain_scores_codex":[0.9995583,0.0001711079,0.00002185205,0.00007309841,0.0001051143,0.00007056283],"domain_scores_gemma":[0.999202,0.0003506145,0.00009249181,0.0001156396,0.0002041093,0.00003527259],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001118615,0.00002417277,0.0008957461,0.000039374,0.00001988254,0.0000411146,0.000035024,0.9734441,0.003423994,0.002686424,0.0002627491,0.01901539],"study_design_scores_gemma":[0.000001925084,0.00003355939,0.0001950788,0.000001255462,0.000003396717,0.00000533798,0.000005660243,0.9987372,0.0006134713,0.0003500716,0.00005077548,0.000002287804],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5870001,0.0003934921,0.402709,0.000157883,0.00003368557,0.00008645424,0.0001225483,0.0008284388,0.00866841],"genre_scores_gemma":[0.9903847,0.00004006525,0.009148668,0.00000822999,0.000002800957,0.00001424284,0.00005838378,0.00001738158,0.0003254933],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.007167212,"threshold_uncertainty_score":0.01425099,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2007073703","doi":"10.1007/s10479-011-0885-4","title":"Workforce-constrained maintenance scheduling for military aircraft fleet: a case study","year":2011,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":90,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Schedule; Theory of computation; Integer programming; Operations research; Computer science; Scheduling (production processes); Aircraft maintenance; Job shop scheduling; Constraint (computer-aided design); Workforce; Constraint programming; Fleet management; Mathematical optimization; Engineering; Aeronautics; Operations management; Stochastic programming; Mathematics; Algorithm","authors":[{"name":"Nima Safaei","is_ca":true},{"name":"Dragan Banjević","is_ca":true},{"name":"Andrew Jardine","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2253498403542211,"gpt":0.399505614178517,"spread":0.1741557738242959,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001213786,0.0008374964,0.0005891144,0.0008221826,0.0009286131,0.0007885942,0.001520373,0.002289136,0.003262597],"category_scores_gemma":[0.003130708,0.0004172854,0.000785371,0.001006786,0.0005484617,0.0006441201,0.000464827,0.0008032297,0.0002474857],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001258411,"about_ca_system_score_gemma":0.0009480633,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0157574,"about_ca_topic_score_gemma":0.01913416,"domain_scores_codex":[0.9995215,0.0001810552,0.00001620511,0.00007109086,0.0000741597,0.0001360335],"domain_scores_gemma":[0.996733,0.002444209,0.0002314633,0.0001561568,0.0001867901,0.0002484709],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.0008205892,0.001096027,0.008673612,0.0002494376,0.0001055517,0.00457381,0.0003193906,0.9520833,0.004024324,0.003605542,0.002999679,0.02144876],"study_design_scores_gemma":[0.0002242657,0.0008711213,0.007707471,0.00002399867,0.00007487542,0.001134204,0.0007453882,0.9824578,0.002278596,0.002565305,0.001875743,0.00004119634],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9818676,0.0002326083,0.0121061,0.0003521454,0.00003302478,0.00009917847,0.0003723897,0.00009067063,0.00484637],"genre_scores_gemma":[0.9904224,0.0001145078,0.007321381,0.0000179977,0.00001342187,0.00003830424,0.0001761138,0.00002295896,0.001872897],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.0157574,"threshold_uncertainty_score":0.0313313,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2057320483","doi":"10.1016/j.ress.2005.12.001","title":"Reliability optimization using multiobjective ant colony system approaches","year":2006,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Mathematical optimization; Redundancy (engineering); Ant colony optimization algorithms; Computer science; Reliability (semiconductor); Probabilistic logic; Multi-objective optimization; Heuristic; Optimization problem; Mathematics; Artificial intelligence","authors":[{"name":"Jianhua Zhao","is_ca":true},{"name":"Zhaoheng Liu","is_ca":true},{"name":"My-Thien Dao","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007849150253308916,"gpt":0.1696887581511154,"spread":0.1618396078978064,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000937562,0.0009659331,0.0008851599,0.0008762322,0.0004376422,0.001038235,0.001055837,0.001034315,0.002387115],"category_scores_gemma":[0.002545187,0.0006454992,0.0006131369,0.0008967081,0.0004716415,0.0008257626,0.0007550328,0.0007618854,0.0003072368],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005234326,"about_ca_system_score_gemma":0.0005560621,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001858645,"about_ca_topic_score_gemma":0.001776822,"domain_scores_codex":[0.9994672,0.0002456662,0.00001898029,0.00004858264,0.0001863658,0.00003330846],"domain_scores_gemma":[0.9991473,0.0005391974,0.00008354032,0.00004458667,0.0001574811,0.00002790426],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001794179,0.0000185528,0.0000761742,0.00002631122,0.00001903496,0.00001894689,0.00001361478,0.9861701,0.000655142,0.002781088,0.0001807064,0.0100224],"study_design_scores_gemma":[0.000003909728,0.000008953749,0.00001901745,0.000001553144,0.000003056493,0.000003666347,0.000001893365,0.9987713,0.0001244395,0.0009586168,0.0001023604,0.000001311644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02751573,0.0004658255,0.9620903,0.0001446471,0.00007653718,0.00006518009,0.00002655366,0.0001954406,0.009419703],"genre_scores_gemma":[0.6750937,0.0005001346,0.3152391,0.00008267743,0.00006710688,0.000278802,0.00006149212,0.0001715999,0.008505366],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.002387115,"threshold_uncertainty_score":0.007985651,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2998897999","doi":"10.1016/j.cie.2020.106273","title":"Joint optimization of production and maintenance strategies considering a dynamic sampling strategy for a deteriorating system","year":2020,"lang":"en","type":"article","venue":"Computers & Industrial Engineering","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Flexibility (engineering); Preventive maintenance; Quality (philosophy); Production (economics); Reliability engineering; Sampling (signal processing); Control (management); Constraint (computer-aided design); Production planning; Computer science; Engineering; Production manager; Operations research; Risk analysis (engineering); Industrial engineering; Mathematics","authors":[{"name":"Héctor Rivera-Gómez","is_ca":false},{"name":"Ali Gharbi","is_ca":true},{"name":"Jean‐Pierre Kenné","is_ca":true},{"name":"Óscar Montaño-Arango","is_ca":false},{"name":"José Ramón Corona Armenta","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04787367796418796,"gpt":0.221256481003804,"spread":0.1733828030396161,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00123061,0.0011092,0.00142183,0.0006886041,0.0004551469,0.001136493,0.0008562065,0.001492629,0.001403962],"category_scores_gemma":[0.002496189,0.0007469719,0.0006519367,0.0007439464,0.0006519215,0.0007214332,0.0006074958,0.0006645809,0.0001445853],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001054812,"about_ca_system_score_gemma":0.001294661,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0107241,"about_ca_topic_score_gemma":0.005122845,"domain_scores_codex":[0.9996287,0.0001160828,0.00001798917,0.00006683099,0.00007761244,0.00009285237],"domain_scores_gemma":[0.9988405,0.0007033278,0.0001571189,0.00003970234,0.0001845657,0.00007474143],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009584722,0.00003925123,0.0002392049,0.00003596304,0.00002257541,0.0000359556,0.00001527243,0.9930957,0.001258205,0.0005481051,0.00009615264,0.004517809],"study_design_scores_gemma":[0.000007260616,0.00004021659,0.0001617646,0.00000175106,0.00001067123,0.000004163425,0.00000367291,0.999411,0.0001916896,0.0001415632,0.00002403309,0.00000212471],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3655164,0.0008589081,0.6270483,0.0004581188,0.00006712312,0.0001697306,0.0001294223,0.0002717865,0.00548017],"genre_scores_gemma":[0.98608,0.000110112,0.01257325,0.00002608631,0.00001604774,0.00005325115,0.00003804418,0.0000171776,0.001085891],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.0107241,"threshold_uncertainty_score":0.02132332,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1975782246","doi":"10.1016/j.jairtraman.2014.09.006","title":"Efficient aircraft spare parts inventory management under demand uncertainty","year":2014,"lang":"en","type":"article","venue":"Journal of Air Transport Management","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Windsor","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Spare part; Mean time between failures; Operations research; Reorder point; Economic shortage; Computer science; Total cost; Point (geometry); Economic order quantity; Order (exchange); Reduction (mathematics); Reliability engineering; Mathematical optimization; Linear programming; Cost reduction; Operations management; Failure rate; Engineering; Mathematics; Economics; Supply chain; Algorithm","authors":[{"name":"Jingyao Gu","is_ca":true},{"name":"Guoqing Zhang","is_ca":true},{"name":"Kevin Li","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.00586787784124496,"gpt":0.1888684523639723,"spread":0.1830005745227273,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001191762,0.0007417215,0.00162086,0.0006765955,0.0004369839,0.001623481,0.001093354,0.001000248,0.00116078],"category_scores_gemma":[0.002400049,0.001043532,0.000581182,0.001104008,0.0004828722,0.001617366,0.0007205537,0.0007834138,0.0001477788],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009537626,"about_ca_system_score_gemma":0.001140056,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004220371,"about_ca_topic_score_gemma":0.003389089,"domain_scores_codex":[0.9994592,0.0001541537,0.00003372069,0.00007936483,0.0001342209,0.0001392762],"domain_scores_gemma":[0.9986481,0.0009050009,0.0001718048,0.0000771248,0.0001370934,0.00006079769],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005794851,0.00001904868,0.0001998655,0.00001864137,0.00001821102,0.00003159049,0.00001167747,0.9939389,0.0006500558,0.0009130524,0.0001323028,0.004008667],"study_design_scores_gemma":[0.00000285746,0.00001398233,0.0001214118,0.000001358263,0.000004698744,0.000005541492,0.000006433548,0.9989305,0.0001629034,0.0007168007,0.00003174265,0.00000168067],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3897777,0.0008094306,0.6027732,0.0004812672,0.00009394871,0.0001042867,0.0003855818,0.000272822,0.005301755],"genre_scores_gemma":[0.9870046,0.0001025328,0.01186372,0.00002270918,0.00002034939,0.00002013,0.00007890577,0.0000220288,0.0008650873],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004220371,"threshold_uncertainty_score":0.008391619,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3212263828","doi":"10.1016/j.ress.2021.108191","title":"A deep learning predictive model for selective maintenance optimization","year":2021,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Predictive maintenance; Component (thermodynamics); Benchmarking; Modular design; Reliability engineering; Turbofan; Computer science; Set (abstract data type); Maintenance actions; Engineering; Machine learning","authors":[{"name":"Hadis Hesabi","is_ca":true},{"name":"Mustapha Nourelfath","is_ca":true},{"name":"Adnène Hajji","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.00378129399622761,"gpt":0.177417110569024,"spread":0.1736358165727964,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004929592,0.0006056473,0.0008429515,0.0004486647,0.0002705444,0.0006434093,0.00158167,0.001184976,0.002899228],"category_scores_gemma":[0.001571284,0.0005512155,0.0005487545,0.0006190499,0.0003677294,0.0009273809,0.0007273357,0.001749431,0.0006761292],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008123039,"about_ca_system_score_gemma":0.001123568,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01605339,"about_ca_topic_score_gemma":0.01973684,"domain_scores_codex":[0.9998286,0.00002562414,0.000008208039,0.00005765223,0.00004661648,0.00003323995],"domain_scores_gemma":[0.9995009,0.0002576234,0.00004269529,0.00004512567,0.0001295457,0.00002419013],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005505064,0.0000582852,0.0004206104,0.00002857826,0.00003015186,0.00002752387,0.00000918007,0.9418269,0.0008207437,0.002547251,0.002248606,0.05192716],"study_design_scores_gemma":[0.00000150009,0.000003212977,0.00003135212,0.000001268809,0.000002314424,0.000001587769,3.860957e-7,0.9992231,0.00008948156,0.0005708769,0.00007406428,8.973674e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06429047,0.001543347,0.9242557,0.0008616763,0.0002066736,0.00004257655,0.0009370067,0.001949849,0.005912764],"genre_scores_gemma":[0.9174051,0.0004758428,0.06969254,0.0003630251,0.0001242483,0.0001156938,0.001258634,0.0001274022,0.0104376],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01605339,"threshold_uncertainty_score":0.0319199,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2061267743","doi":"10.1007/s10845-009-0358-7","title":"Condition based maintenance optimization considering multiple objectives","year":2009,"lang":"en","type":"article","venue":"Journal of Intelligent Manufacturing","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto; Concordia University","funders":"","keywords":"Reliability (semiconductor); Condition-based maintenance; Reliability engineering; Multi-objective optimization; Decision maker; Process (computing); Optimization problem; Computer science; Mathematical optimization; Production (economics); Preventive maintenance; Engineering; Operations research; Mathematics","authors":[{"name":"Zhigang Tian","is_ca":true},{"name":"Daming Lin","is_ca":true},{"name":"Bairong Wu","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008533576907598112,"gpt":0.2159324134761419,"spread":0.2073988365685437,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018343,0.001536145,0.00254154,0.001383597,0.0004822031,0.001490317,0.001597128,0.0023392,0.003025881],"category_scores_gemma":[0.003842741,0.0008309749,0.001043806,0.001339716,0.0006221893,0.001910847,0.0007446046,0.0009645458,0.0002135291],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009347274,"about_ca_system_score_gemma":0.0008229885,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002820294,"about_ca_topic_score_gemma":0.001607349,"domain_scores_codex":[0.999193,0.0002508892,0.00003844671,0.0001456201,0.0002460931,0.0001259707],"domain_scores_gemma":[0.9977336,0.001527835,0.0002390058,0.00009536086,0.0003166982,0.00008752256],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001442004,0.0001092321,0.0004417082,0.0000595421,0.00006241988,0.00005220601,0.00001587554,0.9809039,0.001123253,0.001594633,0.0003523219,0.0151407],"study_design_scores_gemma":[0.0000200561,0.00007158589,0.0002391662,0.000003040766,0.00001593009,0.00001114669,0.000003871554,0.9985082,0.000238279,0.0008378084,0.0000473232,0.000003542196],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2383263,0.0009564647,0.7529854,0.0004089233,0.0001518341,0.0002014536,0.0002412565,0.0004745571,0.006253842],"genre_scores_gemma":[0.947861,0.0001413063,0.04990195,0.00003944269,0.00006728266,0.0001404695,0.0001453105,0.00004867393,0.001654619],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.003025881,"threshold_uncertainty_score":0.0101226,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2066074156","doi":"10.1109/tr.2015.2421819","title":"Periodic Inspection Optimization of a k-Out-of-n Load-Sharing System","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Load sharing; Interval (graph theory); Component (thermodynamics); Reliability engineering; Poisson distribution; Function (biology); Hazard; Process (computing); Moment (physics); Poisson process; Mathematical optimization; Interval arithmetic; Computer science; Mathematics; Engineering; Distributed computing; Statistics","authors":[{"name":"Sharareh Taghipour","is_ca":true},{"name":"Maryam L Kassaei","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01683839238325013,"gpt":0.2205046413844796,"spread":0.2036662490012295,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00152929,0.001059511,0.001816326,0.0005958374,0.0006622901,0.0009864734,0.00164792,0.001298588,0.003305943],"category_scores_gemma":[0.003205521,0.0007044493,0.0007491705,0.0006216641,0.0009542761,0.001097563,0.001062036,0.0006707774,0.0002577507],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001377067,"about_ca_system_score_gemma":0.0009866247,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01090549,"about_ca_topic_score_gemma":0.005446784,"domain_scores_codex":[0.9993591,0.0001838304,0.00002693768,0.0001537395,0.0001080287,0.0001683968],"domain_scores_gemma":[0.9985743,0.0006097897,0.0003643718,0.00007703617,0.0001880372,0.0001864451],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000089387,0.00002779995,0.0005486289,0.0000299008,0.00001996722,0.0001460885,0.00003142465,0.9938983,0.0007887743,0.001770493,0.0001897808,0.002459442],"study_design_scores_gemma":[0.000008763232,0.00003021642,0.0002332156,0.000001783572,0.000007198099,0.00001656993,0.00001135114,0.9988033,0.0000849081,0.0007489741,0.00005038738,0.000003463924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5163028,0.0005950555,0.4740422,0.0005958253,0.0000751448,0.0001522165,0.0002311881,0.0003896538,0.007615984],"genre_scores_gemma":[0.9884382,0.00008394902,0.008879723,0.00002404228,0.00001239622,0.00004486736,0.00005666494,0.00002332183,0.002436913],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01090549,"threshold_uncertainty_score":0.02168405,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2093664936","doi":"10.1016/j.ijpe.2011.07.011","title":"Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems","year":2011,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"","keywords":"Preventive maintenance; Reliability engineering; Production (economics); Reliability (semiconductor); Maintenance actions; Computer science; Markov decision process; Time horizon; Sensitivity (control systems); Order (exchange); Failure rate; Operations research; Planned maintenance; Markov process; Risk analysis (engineering); Mathematical optimization; Engineering; Business; Economics; Mathematics","authors":[{"name":"F.I. Dehayem Nodem","is_ca":true},{"name":"Jean‐Pierre Kenné","is_ca":true},{"name":"Ali Gharbi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007545413346551625,"gpt":0.1901403065791052,"spread":0.1825948932325536,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009008882,0.0007445414,0.0006418701,0.0003195903,0.0002795236,0.0009644341,0.0007921933,0.0003526789,0.0009390523],"category_scores_gemma":[0.002027486,0.000331092,0.0003088821,0.0002487812,0.0004315731,0.0004863319,0.0004610471,0.0004822134,0.0001071162],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004048136,"about_ca_system_score_gemma":0.0006383467,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001719236,"about_ca_topic_score_gemma":0.001617281,"domain_scores_codex":[0.9995744,0.00008722499,0.00002568436,0.0001039406,0.0001162933,0.00009246234],"domain_scores_gemma":[0.9986789,0.0005820108,0.0003406429,0.00008491703,0.0002284603,0.00008507859],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001859773,0.0004271003,0.003023064,0.0003077365,0.0001366481,0.0002323622,0.0001717108,0.7464084,0.1276686,0.008018055,0.0008001432,0.1109464],"study_design_scores_gemma":[0.00007105999,0.0004613958,0.00385682,0.000005788803,0.00008427862,0.00005659175,0.00001722823,0.9811004,0.01155618,0.002412383,0.0003638481,0.00001398598],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6613268,0.0005896926,0.3336667,0.0002741285,0.0001230321,0.0000535669,0.00005786485,0.0003346431,0.003573593],"genre_scores_gemma":[0.9970386,0.00004492582,0.002507603,0.000006688831,0.00001616082,0.000007681577,0.000007462656,0.0000060318,0.0003647624],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.001719236,"threshold_uncertainty_score":0.004764438,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2265194661","doi":"10.1016/j.psep.2015.11.011","title":"A risk-based shutdown inspection and maintenance interval estimation considering human error","year":2015,"lang":"en","type":"article","venue":"Process Safety and Environmental Protection","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Shutdown; Reliability engineering; Interval (graph theory); Criticality; Human error; Engineering; Reliability (semiconductor); Process (computing); Computer science; Power (physics)","authors":[{"name":"Abdul Hameed","is_ca":true},{"name":"Faisal Khan","is_ca":true},{"name":"Salim Ahmed","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01227864041269068,"gpt":0.2075917494950508,"spread":0.1953131090823602,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001672808,0.001213661,0.001840175,0.001198758,0.0003620003,0.001073939,0.001296025,0.001261655,0.0007673458],"category_scores_gemma":[0.005348819,0.0008218627,0.001089287,0.0007903501,0.0003905125,0.001221718,0.000957642,0.0007049688,0.0001263679],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007372382,"about_ca_system_score_gemma":0.001479497,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00827154,"about_ca_topic_score_gemma":0.003728272,"domain_scores_codex":[0.9988342,0.0002916173,0.00008731365,0.0003062171,0.000366605,0.0001140426],"domain_scores_gemma":[0.9973323,0.001618003,0.0003519348,0.0001156226,0.0004895221,0.00009271527],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001893243,0.00009843028,0.002364537,0.00009085047,0.00009366209,0.0001001405,0.00006161695,0.9467674,0.002909778,0.001275369,0.0003290736,0.04571981],"study_design_scores_gemma":[0.000004377135,0.00002671865,0.0004196749,0.000003166342,0.00001514644,0.00001251149,0.000003686986,0.9989163,0.0003079529,0.0002484981,0.00003783002,0.000004177671],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05039824,0.0004083839,0.9482502,0.00008456308,0.00002566757,0.00003383809,0.00004615393,0.0001971066,0.0005558609],"genre_scores_gemma":[0.8984146,0.0002246065,0.09988052,0.00003706256,0.00004861836,0.00008452485,0.0001330465,0.00003059028,0.001146441],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.00827154,"threshold_uncertainty_score":0.01644677,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2002736705","doi":"10.1016/j.apnum.2006.11.010","title":"Simultaneous control of production, preventive and corrective maintenance rates of a failure-prone manufacturing system","year":2007,"lang":"en","type":"article","venue":"Applied Numerical Mathematics","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Corrective maintenance; Preventive maintenance; Production (economics); Reliability engineering; Productivity; Failure rate; Control (management); Production planning; Computer science; Operations research; Operations management; Engineering; Economics","authors":[{"name":"Jean‐Pierre Kenné","is_ca":true},{"name":"L. J. Nkeungoué","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003525842608239134,"gpt":0.1948739825486563,"spread":0.1913481399404171,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008585287,0.0004851882,0.0003767686,0.0003435256,0.0002448084,0.0006496178,0.0006485271,0.0004606972,0.0005263464],"category_scores_gemma":[0.003965465,0.0002549255,0.0002365886,0.0001973763,0.0003876629,0.0003660757,0.0003521622,0.0004264857,0.00007154047],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003072722,"about_ca_system_score_gemma":0.0004512166,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001109784,"about_ca_topic_score_gemma":0.0006167317,"domain_scores_codex":[0.9997509,0.00006738729,0.00001490067,0.00005900628,0.00006733865,0.00004046977],"domain_scores_gemma":[0.9976785,0.001252682,0.000565461,0.0001304037,0.0002584976,0.000114617],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0008156651,0.0001203812,0.002254122,0.000126602,0.00005986021,0.0001496086,0.0001337049,0.8672521,0.08683539,0.006200051,0.0002904316,0.03576215],"study_design_scores_gemma":[0.00002128625,0.000131959,0.001020151,0.000003217313,0.00002705997,0.0000294747,0.000006664501,0.9893333,0.00821976,0.001097791,0.0001004223,0.000008858143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6440611,0.0002811331,0.353155,0.0002787615,0.00004991482,0.00003212243,0.00004072515,0.0003303281,0.001771039],"genre_scores_gemma":[0.9960611,0.00003820326,0.003600218,0.000007006704,0.00001139607,0.000009471891,0.000006228611,0.000006819387,0.0002594449],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.001109784,"threshold_uncertainty_score":0.004540384,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2731618922","doi":"10.1109/tr.2017.2711621","title":"Two-Phase Degradation Process Model With Abrupt Jump at Change Point Governed by Wiener Process","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Degradation (telecommunications); Wiener process; Unobservable; Jump; Process (computing); Point process; Maximization; Computer science; Stochastic process; Gamma process; Jump process; Mathematics; Control theory (sociology); Mathematical optimization; Applied mathematics; Statistics; Econometrics; Artificial intelligence; Physics","authors":[{"name":"Dejing Kong","is_ca":false},{"name":"N. Balakrishnan","is_ca":true},{"name":"Lirong Cui","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01802597597072788,"gpt":0.2736218958871999,"spread":0.2555959199164721,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001537859,0.001404301,0.001837223,0.001073226,0.0004956699,0.001722006,0.002478174,0.002451145,0.002724984],"category_scores_gemma":[0.002981087,0.0006548942,0.0014931,0.001213662,0.001005103,0.00181528,0.0009699002,0.002072357,0.0006316162],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009723359,"about_ca_system_score_gemma":0.0007642191,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0076498,"about_ca_topic_score_gemma":0.003740108,"domain_scores_codex":[0.998916,0.0001562303,0.00007768666,0.0003781604,0.0003125265,0.0001593279],"domain_scores_gemma":[0.9986531,0.0006108567,0.0002788499,0.00007049361,0.0003429105,0.00004390878],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001176913,0.00007473124,0.00260292,0.0002019155,0.00008203475,0.0005041402,0.0001786403,0.9483891,0.006521157,0.02985661,0.0007872516,0.01068374],"study_design_scores_gemma":[0.000008255393,0.000026856,0.0004149557,0.000004668619,0.00001984185,0.00004883582,0.000008298444,0.9961997,0.0004306263,0.002590961,0.0002318213,0.00001520031],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06587002,0.001013192,0.9255887,0.000444271,0.0001346685,0.0001141812,0.0004506607,0.0004699621,0.005914345],"genre_scores_gemma":[0.9615416,0.001098812,0.02028798,0.000100953,0.00008176792,0.0002655481,0.0004716449,0.00004814922,0.01610362],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.0076498,"threshold_uncertainty_score":0.01521057,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W317510280","doi":"10.1016/j.ress.2015.04.013","title":"Search for all d-MPs for all d levels in multistate two-terminal networks","year":2015,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Path (computing); Binary number; Heuristic; Reliability (semiconductor); Algorithm; Binary search algorithm; Value (mathematics); Mathematics; Integer (computer science); Computer science; Mathematical optimization; Search algorithm; Statistics; Arithmetic; Power (physics); Physics","authors":[{"name":"Guanghan Bai","is_ca":true},{"name":"Ming J. Zuo","is_ca":true},{"name":"Zhigang Tian","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02387257834581962,"gpt":0.2593243840548468,"spread":0.2354518057090272,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008379802,0.001240019,0.00132696,0.001642198,0.0006854137,0.001073638,0.001297034,0.002084395,0.005437408],"category_scores_gemma":[0.004596673,0.0009554552,0.0008239787,0.0009119731,0.0008587865,0.001971302,0.001368601,0.0008872349,0.0004052428],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008348711,"about_ca_system_score_gemma":0.001181677,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004606715,"about_ca_topic_score_gemma":0.006102474,"domain_scores_codex":[0.9997258,0.0001060798,0.0000180427,0.00006650456,0.00002604614,0.00005753744],"domain_scores_gemma":[0.9974624,0.001978482,0.0002025871,0.00008872932,0.0001414503,0.0001262902],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0004415792,0.0001216239,0.001949197,0.0002137088,0.00008568465,0.000103424,0.0001180354,0.9489731,0.001151439,0.009148413,0.002025909,0.03566792],"study_design_scores_gemma":[0.00004730214,0.00008464714,0.0003297245,0.00002081636,0.00002241316,0.00002027867,0.00008761827,0.9884089,0.0005766475,0.01016623,0.0002271941,0.000008255783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.4962969,0.000866446,0.4859183,0.002477144,0.00007827623,0.0002679167,0.001394575,0.0008403791,0.01186007],"genre_scores_gemma":[0.8910581,0.0001732705,0.1035976,0.0002451759,0.00003075276,0.0001644869,0.0006278551,0.00009076226,0.004012071],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.005437408,"threshold_uncertainty_score":0.01818991,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}