{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":164,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":164,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"551296308a21","filters":{"topic":"Resource-Constrained Project Scheduling"}},"results":[{"id":"W2105760447","doi":"10.1061/(asce)0733-9364(2001)127:3(183)","title":"Cost Optimization in Projects with Repetitive Nonserial Activities","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":150,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Crew; Scheduling (production processes); Operations research; Novelty; Total cost; Software; Reliability engineering; Engineering; Operations management","authors":[{"name":"Tarek Hegazy","is_ca":true},{"name":"Nagib Wassef","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03584861632909488,"gpt":0.2890536171455027,"spread":0.2532050008164078,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001163653,0.0008541857,0.0009841645,0.0006869406,0.0004872339,0.001512987,0.001502541,0.001420108,0.0036489],"category_scores_gemma":[0.002306913,0.0008280741,0.0007258668,0.001229823,0.0007463035,0.001396951,0.0006498019,0.0009734965,0.0003971143],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002113035,"about_ca_system_score_gemma":0.002400995,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01404506,"about_ca_topic_score_gemma":0.01169119,"domain_scores_codex":[0.9991977,0.0003224511,0.00002702704,0.0001321783,0.0001926207,0.0001281199],"domain_scores_gemma":[0.9993,0.0003957086,0.0001198213,0.00003706762,0.0000917205,0.00005560907],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.000008097487,0.000008466903,0.00009331236,0.000009552634,0.000003178379,0.00001417731,0.000007176973,0.9940804,0.00008466333,0.003730801,0.00007962734,0.001880427],"study_design_scores_gemma":[0.000006666971,0.00001591472,0.00009888771,0.000003067931,0.000003078811,0.00000722307,0.000009401694,0.9959804,0.00008200526,0.003417781,0.0003723632,0.000003258914],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08966384,0.0002597094,0.8989763,0.0003349065,0.00002647879,0.0001935859,0.0003177308,0.000183438,0.01004395],"genre_scores_gemma":[0.8477278,0.0006683582,0.1386308,0.0000515613,0.00002451165,0.0007451564,0.0004008212,0.0001211771,0.01162967],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01404506,"threshold_uncertainty_score":0.02792662,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2044479004","doi":"10.1061/(asce)0733-9364(2003)129:6(698)","title":"Resource Optimization Using Combined Simulation and Genetic Algorithms","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":132,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Genetic algorithm; Software; Set (abstract data type); Mathematical optimization; Resource (disambiguation); Simulation modeling; Simulation software; Industrial engineering; Engineering; Machine learning","authors":[{"name":"Tarek Hegazy","is_ca":true},{"name":"Moustafa Kassab","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0389053613313472,"gpt":0.3042320755583036,"spread":0.2653267142269564,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001108227,0.001125084,0.001213146,0.001451838,0.0004288371,0.00115076,0.001192787,0.00113222,0.001494896],"category_scores_gemma":[0.002406338,0.0006193405,0.0009794608,0.001040927,0.0008544184,0.00105655,0.0008385385,0.0008554485,0.0002777904],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001142806,"about_ca_system_score_gemma":0.001184028,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008212738,"about_ca_topic_score_gemma":0.005856443,"domain_scores_codex":[0.9990828,0.0004435282,0.00003359208,0.00009286436,0.0002929564,0.0000542778],"domain_scores_gemma":[0.999011,0.000716153,0.0000704432,0.00007684236,0.0001018221,0.00002366235],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001311055,0.00001596031,0.0001452713,0.00001403439,0.000031154,0.00001332314,0.00001126583,0.9817006,0.0004421506,0.004758219,0.00009588231,0.01275904],"study_design_scores_gemma":[0.000006202395,0.000008931765,0.00002284101,0.000002841053,0.000005406767,0.000004076585,0.000001926695,0.9977736,0.0001826465,0.001653745,0.000335032,0.000002794007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.008116313,0.000173776,0.9878934,0.00008558959,0.00002238206,0.00004101932,0.00001682325,0.0004557872,0.003194878],"genre_scores_gemma":[0.4095395,0.0007008302,0.5865725,0.00008138541,0.00006055767,0.0003766645,0.000114068,0.0001510491,0.002403495],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.008212738,"threshold_uncertainty_score":0.01632988,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2894184593","doi":"10.1080/00207543.2018.1524168","title":"A review of methods, techniques and tools for project planning and control","year":2018,"lang":"en","type":"review","venue":"International Journal of Production Research","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":125,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal; SNC-Lavalin (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Project planning; Project management; Control (management); Schedule; Project management triangle; Automated planning and scheduling; Computer science; Management science; Scheduling (production processes); Operations research; Risk analysis (engineering); Plan (archaeology); Process management; Engineering; Systems engineering; Operations management; Business","authors":[{"name":"Robert Pellerin","is_ca":true},{"name":"Nathalie Perrier","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.740716950937955,"gpt":0.7034723258423267,"spread":0.03724462509562831,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002720701,0.001683093,0.001403559,0.005551512,0.0006464263,0.002477128,0.002129611,0.001840261,0.006061597],"category_scores_gemma":[0.005598658,0.0008075602,0.0009531599,0.008151409,0.001392099,0.002703919,0.001158128,0.001801265,0.002585278],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002288341,"about_ca_system_score_gemma":0.00466317,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006110331,"about_ca_topic_score_gemma":0.005342362,"domain_scores_codex":[0.9971777,0.0006099025,0.0004251787,0.0003602472,0.001324431,0.0001024983],"domain_scores_gemma":[0.9956053,0.003009294,0.0003462859,0.0001864162,0.0007716237,0.00008112002],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00002801557,0.00006611687,0.0003536394,0.01528783,0.00006244175,0.0001162993,0.0001617856,0.009420909,0.0007313528,0.059813,0.02528121,0.8886774],"study_design_scores_gemma":[0.00001305828,0.00008607532,0.0009250109,0.006248157,0.00006533482,0.0003858027,0.0001401793,0.003789132,0.0006416957,0.03652972,0.9511022,0.0000738024],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.0004603915,0.9171496,0.06614574,0.001521432,0.0008277008,0.0001050449,0.0002708309,0.0001687865,0.01335049],"genre_scores_gemma":[0.007111285,0.9309409,0.0573893,0.0004570144,0.0007977135,0.0001992056,0.0002751224,0.0000466305,0.002782808],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.006110331,"threshold_uncertainty_score":0.02027804,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2155750016","doi":"10.1061/(asce)0733-9364(2000)126:3(219)","title":"Simplified CPM/PERT Simulation Model","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":99,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Critical path method; Computer science; Complement (music); Criticality; Schedule; Project management; Reliability engineering; Operations research; Systems engineering; Engineering","authors":[{"name":"Ming Lu","is_ca":true},{"name":"Simaan AbouRizk","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04317147818980395,"gpt":0.320221638407086,"spread":0.2770501602172821,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001038158,0.0005910627,0.0006182365,0.0009773509,0.000461943,0.001325671,0.001578201,0.001121297,0.007328209],"category_scores_gemma":[0.003442264,0.0003529923,0.0008110997,0.0009312539,0.0005796482,0.00142435,0.001099843,0.0009524176,0.001053499],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00116409,"about_ca_system_score_gemma":0.001699089,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007754899,"about_ca_topic_score_gemma":0.003446851,"domain_scores_codex":[0.9987369,0.0004867503,0.00006451257,0.0001512531,0.0004436022,0.0001169661],"domain_scores_gemma":[0.9986522,0.0005355612,0.0001788823,0.0001435026,0.0004232777,0.00006657736],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000453601,0.00002954479,0.0005024289,0.00005805574,0.00001531266,0.0001837035,0.0000608723,0.9069023,0.001155597,0.07718441,0.001079584,0.01278281],"study_design_scores_gemma":[0.000009988402,0.00002483212,0.000139931,0.00000742738,0.000008021069,0.00006472382,0.00001180266,0.9844268,0.0003118505,0.01124838,0.003737998,0.0000083525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02290647,0.0001641501,0.9423113,0.0003758218,0.00007070513,0.0001932461,0.0005718985,0.0008308887,0.03257555],"genre_scores_gemma":[0.7997772,0.0006031035,0.1702958,0.0001793437,0.0001041996,0.000966154,0.0009414259,0.0001737024,0.0269591],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007754899,"threshold_uncertainty_score":0.02451533,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1967901027","doi":"10.1061/(asce)0733-9364(2000)126:6(414)","title":"Algorithm for Scheduling with Multiskilled Constrained Resources","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":73,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Heuristics; Economic shortage; Computer science; Scheduling (production processes); Heuristic; Software; Genetic algorithm scheduling; Operations research; Resource (disambiguation); Job shop scheduling; Industrial engineering; Mathematical optimization; Flow shop scheduling; Artificial intelligence; Engineering; Schedule; Operating system","authors":[{"name":"Tarek Hegazy","is_ca":true},{"name":"Abdul Karim Shabeeb","is_ca":true},{"name":"Emad Elbeltagi","is_ca":true},{"name":"Tariq Cheema","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01746976352344148,"gpt":0.2768846448856659,"spread":0.2594148813622245,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008838157,0.0009061991,0.0008167782,0.0009829637,0.0009817329,0.001195967,0.001611841,0.001165723,0.007595773],"category_scores_gemma":[0.001641448,0.0004721453,0.0006279238,0.001284765,0.0005372459,0.0009749611,0.001153834,0.0008802518,0.001452736],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001221892,"about_ca_system_score_gemma":0.003091753,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006799937,"about_ca_topic_score_gemma":0.007375796,"domain_scores_codex":[0.9995368,0.0001065973,0.00003441836,0.00009625035,0.000129147,0.00009679399],"domain_scores_gemma":[0.9995716,0.0002259751,0.00004489256,0.00003891279,0.00008967896,0.00002878439],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002501958,0.0001683902,0.0006308953,0.0003125092,0.00006765147,0.0001391726,0.000219062,0.7214592,0.003762683,0.03840977,0.007795515,0.226785],"study_design_scores_gemma":[0.000152642,0.00005025882,0.0001041011,0.00001729497,0.00001582451,0.00005070714,0.0000369509,0.9814429,0.001151555,0.01079576,0.006170176,0.00001184301],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.006689922,0.0001373364,0.9878498,0.0001584482,0.00004582524,0.0002765685,0.0001479518,0.001019205,0.003675033],"genre_scores_gemma":[0.06580388,0.0001728312,0.9303604,0.00006221697,0.00002473308,0.0005799284,0.0003563255,0.0001225829,0.002516995],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007595773,"threshold_uncertainty_score":0.02541041,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2155654644","doi":"10.1139/l02-034","title":"Application of genetic algorithms to construction scheduling with or without resource constraints","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":72,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Operator (biology); Mathematical optimization; Computer science; Genetic algorithm; Fitness function; Key (lock); Resource leveling; Genetic algorithm scheduling; Genetic operator; Resource constraints; Algorithm; Dynamic priority scheduling; Mathematics; Two-level scheduling; Distributed computing; Resource allocation; Meta-optimization; Schedule","authors":[{"name":"Yusuf Cengiz Toklu","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03595200893317288,"gpt":0.2696699419705341,"spread":0.2337179330373612,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000760075,0.0006315034,0.0006471499,0.0006458,0.0004703758,0.0006515373,0.0005640029,0.0008772421,0.000767774],"category_scores_gemma":[0.003633384,0.0002396498,0.0003971984,0.001298736,0.0009419875,0.0003725652,0.0004774008,0.0007276117,0.00009890739],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008161091,"about_ca_system_score_gemma":0.001272883,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009531881,"about_ca_topic_score_gemma":0.006510278,"domain_scores_codex":[0.9995047,0.0002832544,0.00001634107,0.00003927034,0.0001168016,0.00003972525],"domain_scores_gemma":[0.9989405,0.0008721413,0.0000431736,0.00003758874,0.00008687333,0.00001964741],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002049641,0.0000209133,0.0002271646,0.00003551307,0.00002948607,0.00005479085,0.00003993265,0.9562022,0.0006098818,0.009508215,0.0002094136,0.03304208],"study_design_scores_gemma":[0.00002128361,0.0000350199,0.0001411876,0.00001100549,0.0000171107,0.00003066237,0.00002121775,0.9834802,0.0004906915,0.01458171,0.00116426,0.000005622733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.09210827,0.001657754,0.8954949,0.0005774221,0.00009736823,0.0001138319,0.00003182709,0.0002933684,0.009625276],"genre_scores_gemma":[0.6300302,0.001962194,0.3644513,0.0001280518,0.0001057855,0.0001647041,0.00007637831,0.00006589919,0.003015585],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009531881,"threshold_uncertainty_score":0.01895279,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2141739264","doi":"10.1061/(asce)0733-9364(2008)134:4(253)","title":"Efficient Repetitive Scheduling for High-Rise Construction","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":71,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Schedule; Operations research; Industrial engineering; Distributed computing; Mathematical optimization; Real-time computing; Engineering","authors":[{"name":"Tarek Hegazy","is_ca":true},{"name":"Ehab Kamarah","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0286964893377416,"gpt":0.2801634191625897,"spread":0.2514669298248481,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001123865,0.0006682233,0.00108951,0.0005131752,0.0005219357,0.001101197,0.001541195,0.001116472,0.003425932],"category_scores_gemma":[0.001908315,0.0005962476,0.0007584137,0.0009417587,0.0006513039,0.001176412,0.0007987573,0.00109925,0.0003752636],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001985307,"about_ca_system_score_gemma":0.002323855,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01506879,"about_ca_topic_score_gemma":0.01395614,"domain_scores_codex":[0.9990762,0.0003460991,0.00002720974,0.0001419727,0.0002617481,0.0001467185],"domain_scores_gemma":[0.9993815,0.0003196684,0.0001230786,0.00004935958,0.00007605155,0.0000503298],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001091701,0.00001273005,0.00006569241,0.00001084463,0.000003323155,0.00001617205,0.00001297654,0.9933091,0.000205651,0.003716457,0.0001237389,0.00251239],"study_design_scores_gemma":[0.000004546857,0.00001272855,0.00004701941,0.000001343947,0.000002065696,0.000005666901,0.000007145376,0.9974205,0.0000888405,0.00216465,0.0002431959,0.000002248727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04028121,0.0001466985,0.9532245,0.0001851507,0.00002364283,0.0000806492,0.0001115965,0.0002274415,0.005719062],"genre_scores_gemma":[0.811936,0.0003865779,0.1775183,0.00004669439,0.00002820328,0.0002687722,0.0003069447,0.0001213101,0.009387168],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01506879,"threshold_uncertainty_score":0.02996218,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2051204535","doi":"10.1016/j.ejor.2005.10.012","title":"Multi-objectives Tabu Search based algorithm for progressive resource allocation","year":2006,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":67,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"","keywords":"Computer science; Tabu search; Resource allocation; Scheduling (production processes); Operations research; Schedule; Task (project management); Mathematical optimization; Set (abstract data type); Algorithm; Mathematics","authors":[{"name":"L. Belfares","is_ca":true},{"name":"Walid Klibi","is_ca":true},{"name":"Nassirou Lo","is_ca":true},{"name":"Adel Guitouni","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2167307243235256,"gpt":0.4641941235331106,"spread":0.247463399209585,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00177775,0.0008733798,0.001393335,0.001773101,0.0008575926,0.0009010968,0.001986074,0.001560859,0.006496226],"category_scores_gemma":[0.003407007,0.000613409,0.0007352364,0.001949199,0.0005622665,0.0009406937,0.0009705936,0.001183961,0.0008464701],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001007624,"about_ca_system_score_gemma":0.001829451,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006953327,"about_ca_topic_score_gemma":0.00605118,"domain_scores_codex":[0.999473,0.0002304632,0.00002297558,0.00005601607,0.0001491504,0.00006828252],"domain_scores_gemma":[0.9989132,0.0007240347,0.00007169256,0.0000601044,0.0001855282,0.00004552396],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002518633,0.0001473122,0.0003315529,0.0001554336,0.00007831403,0.00005750828,0.00008286699,0.7999526,0.00212937,0.007195865,0.003785084,0.1858323],"study_design_scores_gemma":[0.00004812703,0.00005400536,0.00007703009,0.00000825447,0.00001438989,0.00001544796,0.000007824422,0.997322,0.0004367006,0.00153317,0.0004778838,0.000005201305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02556466,0.0005216666,0.9664835,0.0001676111,0.0000846302,0.0001795773,0.0001475913,0.001370537,0.005480263],"genre_scores_gemma":[0.22739,0.0002458961,0.7676446,0.0001574335,0.00004113924,0.0005528815,0.0002946743,0.0001978042,0.003475482],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006953327,"threshold_uncertainty_score":0.02173203,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1975246199","doi":"10.1061/(asce)0733-9364(2003)129:6(664)","title":"Optimized Scheduling of Linear Projects","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":58,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bidding; Computer science; Scheduling (production processes); Crew; Linear programming; Operations research; Software; Crew scheduling; Process (computing); Industrial engineering; Engineering; Operations management; Algorithm; Programming language","authors":[{"name":"Osama Moselhi","is_ca":true},{"name":"Ahmed Hassanein","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03945352496548811,"gpt":0.3002256918817797,"spread":0.2607721669162916,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007722751,0.00064109,0.0008100106,0.0004399792,0.0004025171,0.001246809,0.001005046,0.0007681817,0.004699005],"category_scores_gemma":[0.00164688,0.0005906398,0.0004915927,0.0007243141,0.0005327986,0.0008329282,0.0005747961,0.000608018,0.0005067417],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001678528,"about_ca_system_score_gemma":0.002238748,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01384945,"about_ca_topic_score_gemma":0.01427151,"domain_scores_codex":[0.999382,0.000251603,0.00001996192,0.0001168294,0.0001237012,0.0001058626],"domain_scores_gemma":[0.999463,0.000277695,0.00009942493,0.00003184589,0.00007431486,0.00005371938],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002346907,0.00001340651,0.0001020201,0.00001708388,0.000003853588,0.00001461467,0.00001002925,0.9949385,0.0001513888,0.002100634,0.0001634785,0.002461553],"study_design_scores_gemma":[0.00001206575,0.00002675406,0.00007511322,0.000002801202,0.000002886717,0.000004103454,0.000008371358,0.9978142,0.0001281005,0.001501258,0.0004214517,0.00000289456],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1321687,0.0003670318,0.8412126,0.0003140794,0.00006245252,0.0002896082,0.0007301213,0.0005722339,0.02428324],"genre_scores_gemma":[0.8567483,0.0003770988,0.129,0.00004958005,0.0000210486,0.0004050249,0.0005688074,0.0001182801,0.01271194],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01384945,"threshold_uncertainty_score":0.02753764,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2555012946","doi":"10.1108/ecam-05-2014-0069","title":"Optimized scheduling and buffering of repetitive construction projects under uncertainty","year":2016,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":56,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Computer science; Construction management; Operations research; Industrial engineering; Systems engineering; Risk analysis (engineering); Engineering; Operations management; Business; Civil engineering","authors":[{"name":"Ibrahim Bakry","is_ca":true},{"name":"Osama Moselhi","is_ca":true},{"name":"Tarek Zayed","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0304027809900025,"gpt":0.2825019141844581,"spread":0.2520991331944556,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009261501,0.0005311546,0.000585677,0.0006375989,0.000432201,0.0007156586,0.0007722666,0.0004242532,0.001375404],"category_scores_gemma":[0.001934171,0.0002936574,0.0003331203,0.0006119008,0.0003650118,0.0004646697,0.0004884141,0.0003752364,0.0001014142],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001159287,"about_ca_system_score_gemma":0.001650442,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007286705,"about_ca_topic_score_gemma":0.005192808,"domain_scores_codex":[0.9996095,0.0001117143,0.00002182439,0.00008164505,0.0001025773,0.00007267813],"domain_scores_gemma":[0.9991486,0.0004614353,0.0001686636,0.00004022858,0.0001334643,0.00004750911],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005149179,0.00002194564,0.0004239283,0.00001719959,0.000006292769,0.00002772116,0.00004015163,0.974973,0.001341899,0.001485691,0.000103546,0.02150718],"study_design_scores_gemma":[0.000006560299,0.00004059474,0.0001797234,0.000003505191,0.000004101166,0.000007674464,0.00002198594,0.9975584,0.001236517,0.0007988266,0.0001387209,0.000003472604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2517897,0.0001049854,0.7442163,0.00008192845,0.00001389418,0.0001624202,0.00007370415,0.0002837947,0.003273285],"genre_scores_gemma":[0.8703021,0.00004652455,0.1286943,0.000009356805,0.000004514884,0.00007432178,0.000067064,0.00002710631,0.0007746537],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007286705,"threshold_uncertainty_score":0.01448858,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1969988169","doi":"10.1061/(asce)me.1943-5479.0000338","title":"Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":53,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo; Golder Associates (Canada)","funders":"","keywords":"Solver; Computer science; Mathematical optimization; Metaheuristic; Scheduling (production processes); Job shop scheduling; Constraint programming; Software; Heuristics; Project management; Heuristic; Industrial engineering; Operations research; Systems engineering; Algorithm; Stochastic programming; Schedule; Mathematics; Engineering; Programming language","authors":[{"name":"Wail Menesi","is_ca":true},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07902712514998302,"gpt":0.3579501755480102,"spread":0.2789230503980272,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002260186,0.0007078474,0.0008570746,0.000919427,0.0008100345,0.001384445,0.001125745,0.0009466814,0.004662792],"category_scores_gemma":[0.005341401,0.0004987771,0.0007141505,0.001663771,0.0004970481,0.001589176,0.00119115,0.001172751,0.0004538651],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001477759,"about_ca_system_score_gemma":0.002443238,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006144783,"about_ca_topic_score_gemma":0.009535105,"domain_scores_codex":[0.9984326,0.0008127698,0.00005937717,0.0002262469,0.0002720037,0.000197035],"domain_scores_gemma":[0.9978388,0.001320243,0.000279159,0.0001718393,0.0002127862,0.0001771192],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009291121,0.00007709723,0.0006226251,0.0001743067,0.00002829689,0.00008352488,0.00006488066,0.8969421,0.002971808,0.01670027,0.001264515,0.08097765],"study_design_scores_gemma":[0.00001857428,0.0001031738,0.000274255,0.00002011638,0.000008623872,0.00004182541,0.00005398177,0.9837102,0.001783281,0.01034177,0.003631649,0.00001256215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03167357,0.000301364,0.9618064,0.0002317521,0.00004020202,0.000151283,0.00008905498,0.0002556009,0.005450765],"genre_scores_gemma":[0.4021274,0.0004120792,0.5938654,0.00007699941,0.0000259084,0.0002643679,0.0001895623,0.0001292597,0.00290904],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006144783,"threshold_uncertainty_score":0.01559854,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2944277995","doi":"10.1108/ecam-05-2018-0217","title":"Multi-objective optimization for repetitive scheduling under uncertainty","year":2019,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":51,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Computer science; Mathematical optimization; Duration (music); Scheduling (production processes); Fuzzy logic; Genetic algorithm; Reliability engineering; Mathematics; Engineering","authors":[{"name":"Tarek Salama","is_ca":false},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03050651757581384,"gpt":0.303171025998577,"spread":0.2726645084227631,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001299328,0.0008680951,0.000836761,0.0008042932,0.0003744371,0.0007190041,0.0008358155,0.0006271991,0.00163988],"category_scores_gemma":[0.00185844,0.0004538995,0.001105385,0.0006583874,0.0003179422,0.000578281,0.0005947472,0.000829794,0.000179893],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009001979,"about_ca_system_score_gemma":0.001336341,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00514874,"about_ca_topic_score_gemma":0.004102808,"domain_scores_codex":[0.9992793,0.0002328813,0.00003187851,0.000108642,0.0002844665,0.00006280924],"domain_scores_gemma":[0.9992705,0.000442838,0.0001224282,0.00002777118,0.0001129905,0.00002334228],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001056351,0.0000122535,0.000121477,0.00003075412,0.00001794836,0.0000187984,0.00001775723,0.9886239,0.0007337931,0.001000573,0.00007000944,0.009342211],"study_design_scores_gemma":[0.000002909633,0.0000182716,0.00008536734,0.000004545491,0.000004310283,0.000006015747,0.000005471265,0.9987769,0.0002824729,0.0006234415,0.0001872696,0.00000309389],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02075614,0.0002012136,0.9762914,0.00004878842,0.00001617741,0.00004867029,0.00003813183,0.0001189108,0.002480506],"genre_scores_gemma":[0.6188334,0.0002723778,0.376638,0.00004855263,0.00003174633,0.00030056,0.0001553852,0.0001302625,0.003589755],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.00514874,"threshold_uncertainty_score":0.01023751,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2062705997","doi":"10.1007/s00500-008-0337-5","title":"Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem","year":2008,"lang":"en","type":"article","venue":"Soft Computing","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":46,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université de Montréal","funders":"","keywords":"Benchmark (surveying); Job shop scheduling; Computer science; Crossover; Mathematical optimization; Algorithm; Scheduling (production processes); Schedule; Computational complexity theory; Mathematics; Artificial intelligence","authors":[{"name":"Mahdi Mobini","is_ca":false},{"name":"Masoud Rabbani","is_ca":false},{"name":"Mohsen Sadegh Amalnik","is_ca":false},{"name":"Jafar Razmi","is_ca":false},{"name":"Alireza Rahimi-Vahed","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2173452877011113,"gpt":0.4178145060016266,"spread":0.2004692183005153,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001689859,0.0007394679,0.001390654,0.001112414,0.0005019188,0.0009731831,0.0009229185,0.001405927,0.00282052],"category_scores_gemma":[0.003978196,0.0005115952,0.0008520241,0.001804384,0.0005652689,0.001264441,0.001242391,0.0008945325,0.0004558583],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005782959,"about_ca_system_score_gemma":0.001690736,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005187766,"about_ca_topic_score_gemma":0.005265683,"domain_scores_codex":[0.9993898,0.0002365673,0.00003241295,0.00007752658,0.0002067656,0.00005688613],"domain_scores_gemma":[0.998316,0.001063826,0.0001120082,0.000105167,0.0003334085,0.00006947654],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001389086,0.00009790372,0.000572112,0.00006450387,0.000056566,0.0000376265,0.00004175532,0.9244375,0.00281572,0.008078942,0.001041236,0.06261741],"study_design_scores_gemma":[0.00001689158,0.00002026926,0.00005232576,0.000003057604,0.000004882684,0.000007642338,0.000003799596,0.9978936,0.0002286234,0.00156623,0.0002004993,0.000002137004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01746812,0.00008586564,0.9810114,0.00008930846,0.00002876221,0.00003938954,0.0000221947,0.000188111,0.001066886],"genre_scores_gemma":[0.2919049,0.0001453679,0.7047252,0.0001065764,0.0000613766,0.0002296055,0.0001866083,0.000133023,0.002507377],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005187766,"threshold_uncertainty_score":0.01031518,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1942626595","doi":"10.15439/2015f273","title":"A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem","year":2015,"lang":"en","type":"article","venue":"Annals of Computer Science and Information Systems","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":39,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Computer science; Benchmark (surveying); Scheduling (production processes); Heuristic; Greedy algorithm; Mathematical optimization; Job shop scheduling; Machine learning; Artificial intelligence; Schedule; Algorithm; Mathematics","authors":[{"name":"Paweł B. Myszkowski","is_ca":true},{"name":"M. Skowroński","is_ca":false},{"name":"Krzysztof Sikora","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2576621045480103,"gpt":0.4199907239378667,"spread":0.1623286193898564,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001006989,0.001043837,0.0006688486,0.001554276,0.0005784685,0.001072199,0.0021507,0.001311214,0.005041502],"category_scores_gemma":[0.004319006,0.0002547095,0.001071073,0.00409772,0.0002927395,0.0009084906,0.0006358514,0.00146573,0.001002594],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001473085,"about_ca_system_score_gemma":0.001383185,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009210302,"about_ca_topic_score_gemma":0.0133656,"domain_scores_codex":[0.9990643,0.0002817088,0.00009740268,0.0002433225,0.0002082062,0.0001051384],"domain_scores_gemma":[0.9981567,0.0007767645,0.0001636479,0.0003391734,0.0004062403,0.0001575084],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001025438,0.00196756,0.01335759,0.002808057,0.0003776354,0.0007961208,0.0001288309,0.3625512,0.003958606,0.01360041,0.4583838,0.1410447],"study_design_scores_gemma":[0.0008127464,0.0008908553,0.03734769,0.00040686,0.0002069103,0.001051758,0.0007341256,0.6077738,0.008781261,0.02588005,0.3159496,0.0001643421],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"dataset","genre_gemma":"dataset","genre_scores_codex":[0.3186678,0.00378683,0.06825618,0.003375476,0.001518172,0.00152537,0.5637575,0.003719729,0.03539294],"genre_scores_gemma":[0.3171459,0.001514954,0.109019,0.0005931537,0.0002023254,0.001709652,0.563963,0.0003433611,0.005508667],"genre_candidate":"dataset","genre_consensus":"dataset","teacher_disagreement_score":0.009210302,"threshold_uncertainty_score":0.01831335,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2081463457","doi":"10.1139/l02-007","title":"An optimal construction resource leveling scheduling simulation model","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":38,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Probabilistic logic; Resource leveling; Scheduling (production processes); Duration (music); Computer science; Resource (disambiguation); Operations research; Schedule; Mathematical optimization; Resource allocation; Engineering; Mathematics; Artificial intelligence","authors":[{"name":"Sou-Sen Leu","is_ca":false},{"name":"Tzung-Heng Hung","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.08089126180476691,"gpt":0.3016304505964292,"spread":0.2207391887916623,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006817167,0.0007252061,0.000944629,0.0007441236,0.0005841505,0.001024786,0.001536914,0.001274398,0.006023274],"category_scores_gemma":[0.001502007,0.0005047974,0.0008078107,0.0009511613,0.0007049382,0.0007564116,0.0006475399,0.0008292604,0.000501635],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001958191,"about_ca_system_score_gemma":0.003618995,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.04052057,"about_ca_topic_score_gemma":0.01683889,"domain_scores_codex":[0.9994919,0.0001747574,0.00002651182,0.00007847944,0.0001284909,0.00009974901],"domain_scores_gemma":[0.999468,0.0002357588,0.00007114037,0.00002656937,0.0001481155,0.00005037482],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001058893,0.000004936848,0.00008349041,0.000005266671,0.000003331372,0.00001246554,0.000005376656,0.9975777,0.00009142481,0.001599126,0.00006707511,0.0005392377],"study_design_scores_gemma":[0.00001060857,0.000006467332,0.00004042249,0.000001204947,0.000002552895,0.000003074094,0.000003742648,0.998678,0.00006168197,0.0008749308,0.000315456,0.000001922259],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1562648,0.0003861542,0.8005244,0.0007357658,0.0001057422,0.0003473858,0.001817537,0.0009878685,0.03883031],"genre_scores_gemma":[0.9107245,0.0003689918,0.07474844,0.00007632156,0.00001992781,0.0007402445,0.001158312,0.00006650179,0.01209662],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.04052057,"threshold_uncertainty_score":0.08056945,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3187738316","doi":"10.1108/ci-05-2018-0046","title":"Integrating critical chain project management with last planner system for linear scheduling of modular construction","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":37,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Modular design; Earned value management; Schedule; Computer science; Scheduling (production processes); Planner; Operations research; Project management; Project planning; Duration (music); Reliability engineering; Systems engineering; Operations management; Engineering","authors":[{"name":"Tarek Salama","is_ca":false},{"name":"Ahmad Salah","is_ca":false},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07567651076534823,"gpt":0.3686380373144393,"spread":0.2929615265490911,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001671023,0.0006737974,0.0003984324,0.001184124,0.0005662498,0.0007926433,0.0008085993,0.0003329492,0.003577194],"category_scores_gemma":[0.003073582,0.0004106193,0.000473865,0.0007959066,0.0003873378,0.0006471302,0.0006990896,0.0005839641,0.0004276987],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001086406,"about_ca_system_score_gemma":0.002780672,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007008092,"about_ca_topic_score_gemma":0.006047651,"domain_scores_codex":[0.9987985,0.000314135,0.00007595544,0.0002616665,0.0004718059,0.0000778466],"domain_scores_gemma":[0.9985912,0.0004649191,0.0002982118,0.0001655703,0.0003992563,0.00008075014],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001945289,0.000103088,0.004564643,0.0002039799,0.00006098935,0.0001585627,0.0003883461,0.6005172,0.009492861,0.01229851,0.002045156,0.3699721],"study_design_scores_gemma":[0.00002742478,0.0001147564,0.0007886569,0.00002406532,0.00002280008,0.00005300845,0.00004294561,0.9879117,0.004505991,0.002869816,0.003617444,0.00002137162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.008121693,0.00004351047,0.9898251,0.00003034243,0.00001469617,0.0001117575,0.00004579862,0.0006540596,0.001153082],"genre_scores_gemma":[0.3991267,0.0001026447,0.5978619,0.00002594148,0.00002760195,0.0004332722,0.0001969831,0.0001074388,0.002117559],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007008092,"threshold_uncertainty_score":0.01393461,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2168976754","doi":"10.1080/01446193.2015.1063676","title":"Enhanced heuristic for finance-based scheduling of construction projects","year":2015,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"","keywords":"Scheduling (production processes); Computer science; Integer programming; Payment; Heuristic; Finance; Cash; Job shop scheduling; Linear programming; Cash flow; Operations research; Mathematical optimization; Economics; Engineering; Algorithm; Mathematics; Operating system; Schedule","authors":[{"name":"Yuvraj Gajpal","is_ca":true},{"name":"Ashraf Elazouni","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1135662989238217,"gpt":0.3207669187765104,"spread":0.2072006198526887,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009761685,0.0006629264,0.0008943608,0.001091644,0.0003619612,0.000662128,0.001036913,0.0007659858,0.002885462],"category_scores_gemma":[0.001894673,0.0004570383,0.0006798828,0.001041285,0.0004014416,0.0006039252,0.0005718305,0.0006668838,0.0002669967],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001352465,"about_ca_system_score_gemma":0.002325448,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006200449,"about_ca_topic_score_gemma":0.00644827,"domain_scores_codex":[0.9994444,0.0002489395,0.00002371544,0.00006513259,0.0001023175,0.000115497],"domain_scores_gemma":[0.9990422,0.0006571025,0.00007785268,0.00005365601,0.0001008887,0.00006824307],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009449614,0.00009411059,0.0003013768,0.00007492539,0.0000167832,0.00006527174,0.00003780053,0.96751,0.00111904,0.003344661,0.0005652093,0.0267763],"study_design_scores_gemma":[0.00003463611,0.00006134788,0.0001570751,0.000009938432,0.00001004353,0.00002063494,0.00001876426,0.9961118,0.0005919014,0.001858367,0.001119366,0.000006202431],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1322784,0.0006166489,0.8542758,0.0002065462,0.00009214987,0.0005224757,0.0003777971,0.0004698763,0.01116028],"genre_scores_gemma":[0.5227175,0.0003130898,0.4731296,0.00006985525,0.00003130891,0.0004322379,0.0004969977,0.00007684906,0.002732586],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006200449,"threshold_uncertainty_score":0.01232874,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2086411192","doi":"10.1061/(asce)co.1943-7862.0000722","title":"Fast and Near-Optimum Schedule Optimization for Large-Scale Projects","year":2013,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Computer science; Mathematical optimization; Metaheuristic; Scheduling (production processes); Set (abstract data type); Scale (ratio); Resource (disambiguation); Operations research; Engineering; Algorithm; Mathematics","authors":[{"name":"Wail Menesi","is_ca":true},{"name":"Behrooz Golzarpoor","is_ca":true},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01978522260025422,"gpt":0.2704363473152965,"spread":0.2506511247150423,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001583672,0.0007276755,0.0008531945,0.0006653839,0.0004623917,0.0007452857,0.0007600804,0.0008616619,0.002071369],"category_scores_gemma":[0.003477573,0.0006366012,0.0007903324,0.001285629,0.0004354938,0.001027703,0.0006620425,0.001279409,0.0002079319],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009698439,"about_ca_system_score_gemma":0.002078696,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00786141,"about_ca_topic_score_gemma":0.008587259,"domain_scores_codex":[0.9994386,0.0002658049,0.00001752774,0.00007294134,0.0001308557,0.00007432772],"domain_scores_gemma":[0.9987117,0.000915064,0.000137958,0.0000573863,0.0001171301,0.0000606824],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001552265,0.00001440579,0.00009018752,0.00002751713,0.000007332889,0.00001293875,0.00001224369,0.9890486,0.0003817586,0.003120263,0.0002784363,0.006990823],"study_design_scores_gemma":[0.000004558747,0.00002146821,0.00005039214,0.000002936009,0.00000215411,0.000005452372,0.00001117208,0.9969237,0.0001854708,0.002432013,0.0003585827,0.000002094391],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03684103,0.0002505362,0.9595012,0.0001406664,0.00002315513,0.00006083914,0.0000852408,0.0001540269,0.002943323],"genre_scores_gemma":[0.5801617,0.0005456641,0.4159595,0.00005869371,0.00002823136,0.0002658246,0.0002687259,0.0001532218,0.002558513],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.00786141,"threshold_uncertainty_score":0.01563132,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1689295453","doi":"10.1061/(asce)co.1943-7862.0001027","title":"Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Scheduling (production processes); Workflow; Executable; Operations research; Schedule; Resource (disambiguation); Traverse; Operations management; Database; Engineering","authors":[{"name":"Ming-Fung Francis Siu","is_ca":true},{"name":"Ming Lu","is_ca":true},{"name":"Simaan AbouRizk","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05922927266322259,"gpt":0.3155213603290505,"spread":0.256292087665828,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001239114,0.0008337295,0.0009277549,0.0009885272,0.0006033412,0.001127039,0.001482518,0.000788613,0.006070918],"category_scores_gemma":[0.001384044,0.0005587478,0.001088078,0.001670372,0.000529171,0.001149966,0.000949773,0.001228909,0.0005966779],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001916226,"about_ca_system_score_gemma":0.002644663,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004707369,"about_ca_topic_score_gemma":0.005562873,"domain_scores_codex":[0.9990737,0.0003547494,0.0000407315,0.0001521143,0.0002662202,0.0001124249],"domain_scores_gemma":[0.9996312,0.0001842405,0.00005032129,0.0000315051,0.00006413478,0.00003864004],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000497232,0.00008809794,0.0002756115,0.0001112934,0.0000277774,0.00009218341,0.00007617024,0.897898,0.001567865,0.05824756,0.00132147,0.04024435],"study_design_scores_gemma":[0.000009775626,0.00004498173,0.00009949101,0.00001019311,0.000009076673,0.00003231306,0.00003141615,0.9785221,0.0005947682,0.01702548,0.003610324,0.00001015551],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.003727687,0.00008288158,0.9920405,0.0001020409,0.00002111785,0.00008270243,0.00005934633,0.00007610554,0.003807511],"genre_scores_gemma":[0.2628889,0.0005481436,0.7302905,0.00008696131,0.00006080508,0.000426858,0.0002889298,0.0001308711,0.005277968],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006070918,"threshold_uncertainty_score":0.02030921,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2085278007","doi":"10.1007/s10479-006-0149-x","title":"Time-cost trade-off via optimal control theory in Markov PERT networks","year":2007,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Theory of computation; Mathematical optimization; Minification; Erlang (programming language); Markov decision process; Computer science; Optimal control; Control (management); Markov chain; Variance (accounting); Stochastic programming; Function (biology); Markov process; Mathematics; Statistics; Economics; Artificial intelligence; Algorithm","authors":[{"name":"Amir Azaron","is_ca":true},{"name":"Hideki Katagiri","is_ca":false},{"name":"Masatoshi Sakawa","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2152292989356169,"gpt":0.4958663595598718,"spread":0.280637060624255,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004854346,0.001813933,0.002995384,0.002097247,0.001127595,0.003507473,0.002316364,0.003248452,0.006310859],"category_scores_gemma":[0.01917746,0.001560451,0.001039966,0.002029503,0.00311873,0.005120925,0.002423315,0.002249778,0.0003460607],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003901509,"about_ca_system_score_gemma":0.002169416,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008969381,"about_ca_topic_score_gemma":0.005354949,"domain_scores_codex":[0.997849,0.001176499,0.00007671478,0.0002573455,0.0002983795,0.0003421326],"domain_scores_gemma":[0.9805895,0.01698992,0.0009747001,0.0002617717,0.0007101551,0.0004739677],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000613506,0.00004354555,0.0002018427,0.00006038556,0.00003058347,0.00003978883,0.00004047724,0.8835844,0.0002037544,0.1105251,0.0007842226,0.004424588],"study_design_scores_gemma":[0.00001206831,0.00001384871,0.00006534807,0.000008746893,0.000009334411,0.000007307188,0.000009943606,0.9365743,0.00005358612,0.06309041,0.0001451821,0.000009918176],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05478029,0.001375735,0.9275128,0.001793019,0.0001412643,0.0001002148,0.0002568184,0.0001536009,0.01388632],"genre_scores_gemma":[0.950421,0.001489534,0.03673809,0.0002394609,0.0001982302,0.000286869,0.0001428938,0.0001219066,0.01036202],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.008969381,"threshold_uncertainty_score":0.02830756,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2097369068","doi":"10.1061/(asce)co.1943-7862.0000483","title":"Heuristic Method for Satisfying Both Deadlines and Resource Constraints","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":28,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Heuristic; Scheduling (production processes); Software; Resource (disambiguation); Process (computing); Set (abstract data type); Operations research; Software engineering; Mathematical optimization; Operating system; Programming language; Artificial intelligence; Engineering","authors":[{"name":"Tarek Hegazy","is_ca":true},{"name":"Wail Menesi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0693014588953265,"gpt":0.3304401048909163,"spread":0.2611386459955898,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002089235,0.0008610435,0.0007854556,0.001713091,0.0006375794,0.0009271823,0.001312693,0.0007394961,0.003973196],"category_scores_gemma":[0.00423569,0.0004865584,0.0007973242,0.001345238,0.0005723717,0.0009390398,0.0007466346,0.0008090695,0.0004493986],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009814841,"about_ca_system_score_gemma":0.003389608,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002909281,"about_ca_topic_score_gemma":0.004326142,"domain_scores_codex":[0.9984364,0.0006378267,0.00009932583,0.0001794857,0.0005002313,0.000146634],"domain_scores_gemma":[0.9977977,0.001526239,0.0002138838,0.000117106,0.0002600098,0.00008511538],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001996642,0.000209424,0.0009717512,0.0004618574,0.00009669957,0.0002230485,0.0002580505,0.7271671,0.006815198,0.03707452,0.002957855,0.2235648],"study_design_scores_gemma":[0.0001089796,0.0001758204,0.0002501985,0.00004926874,0.00004457058,0.0001835521,0.00009715855,0.9747505,0.003728036,0.01397645,0.006605307,0.00003022721],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.009493223,0.0001991461,0.9865736,0.00006334636,0.00003466509,0.0002226248,0.00005259151,0.0002451433,0.003115766],"genre_scores_gemma":[0.15276,0.0002525838,0.8447287,0.00005650249,0.00002422904,0.0004577914,0.0001591085,0.00007288616,0.001488236],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.003973196,"threshold_uncertainty_score":0.01329166,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2046023406","doi":"10.1016/j.advengsoft.2010.05.010","title":"A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks","year":2010,"lang":"en","type":"article","venue":"Advances in Engineering Software","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":28,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Metaheuristic; Job shop scheduling; Mathematical optimization; Computer science; Crossover; Scheduling (production processes); Critical path method; Local search (optimization); Benchmark (surveying); Algorithm; Mathematics; Artificial intelligence; Engineering; Schedule","authors":[{"name":"Siamak Baradaran","is_ca":false},{"name":"S.M.T. Fatemi Ghomi","is_ca":false},{"name":"Mahdi Mobini","is_ca":true},{"name":"Seyed Saeid Hashemin","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03298794965464718,"gpt":0.3305595728414295,"spread":0.2975716231867823,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001248776,0.000734513,0.001602644,0.0013169,0.0006540989,0.00110935,0.001413224,0.00158479,0.003081314],"category_scores_gemma":[0.002162928,0.0006402056,0.0008956694,0.001890588,0.0005826711,0.001354971,0.001177754,0.0006860534,0.0003129134],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006637932,"about_ca_system_score_gemma":0.001200728,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006771813,"about_ca_topic_score_gemma":0.007335344,"domain_scores_codex":[0.9995638,0.0001816774,0.00001979142,0.00005778457,0.0001139115,0.00006304277],"domain_scores_gemma":[0.9988255,0.0007955576,0.00007306203,0.00005122239,0.0001788417,0.00007573818],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006217822,0.00004734693,0.0003284399,0.00004140513,0.0000340132,0.00003214588,0.00002618996,0.9719909,0.0005749649,0.00561126,0.0006201791,0.020631],"study_design_scores_gemma":[0.000007469997,0.00001235741,0.00003074859,0.000002181318,0.000003838663,0.000004953392,0.000005400491,0.9983097,0.00005716055,0.001453383,0.0001114469,0.000001322784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02900069,0.0002591512,0.9680378,0.0001708074,0.00003118979,0.0000560534,0.00005349418,0.0001446466,0.002246097],"genre_scores_gemma":[0.6425206,0.0004539874,0.3490237,0.0002050207,0.0001294954,0.000455974,0.0003256497,0.0001339129,0.00675169],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006771813,"threshold_uncertainty_score":0.01346475,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2886699219","doi":"10.1139/cjce-2017-0670","title":"Resource leveling in construction projects with activity splitting and resource constraints: a simulated annealing optimization","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Resource leveling; Simulated annealing; Resource (disambiguation); Overtime; Computer science; Novelty; Operations research; Heuristic; Stakeholder; Industrial engineering; Project management; Engineering; Systems engineering; Economics","authors":[{"name":"S. Madeh Piryonesi","is_ca":true},{"name":"Mehran Nasseri","is_ca":false},{"name":"Abdollah Ramezani","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03741523378493097,"gpt":0.2731750177899749,"spread":0.2357597840050439,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007562634,0.0006563094,0.001050228,0.0006209896,0.0005512115,0.001076268,0.0008868965,0.00146023,0.002433207],"category_scores_gemma":[0.001634556,0.0007468328,0.0009135925,0.0008014708,0.0008268665,0.0007008964,0.0006189352,0.0009236623,0.0001767642],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001480961,"about_ca_system_score_gemma":0.001731635,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01732616,"about_ca_topic_score_gemma":0.009411599,"domain_scores_codex":[0.9996139,0.0001994215,0.00001219409,0.00005168982,0.00005239867,0.00007036153],"domain_scores_gemma":[0.9993272,0.0004856873,0.00005443506,0.00002763558,0.00006003804,0.00004499155],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001272186,0.000008351991,0.0001068981,0.000008081312,0.000005236406,0.00001117987,0.000008816532,0.9975661,0.0001887767,0.000985604,0.00004852678,0.001049665],"study_design_scores_gemma":[0.000005951622,0.00001633235,0.00007301888,0.000002750744,0.000004634483,0.000003399972,0.000008566111,0.9988937,0.0001000041,0.0007414377,0.0001482676,0.00000199125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2298073,0.0004967338,0.7536876,0.0004806955,0.00004731764,0.0002020923,0.0001852198,0.0002310281,0.01486198],"genre_scores_gemma":[0.9047443,0.0003062503,0.08957902,0.00005522499,0.00001155868,0.0002833378,0.0001184577,0.00005416051,0.004847737],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01732616,"threshold_uncertainty_score":0.03445065,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2061323651","doi":"10.1080/01446190410001673571","title":"Accelerating linear projects","year":2005,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Business; Engineering; Construction engineering; Process management; Systems engineering","authors":[{"name":"Ahmed Hassanein","is_ca":true},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1231112855323806,"gpt":0.3266476792046519,"spread":0.2035363936722713,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001414952,0.000669907,0.0004823092,0.0008868111,0.0005899469,0.0010661,0.001065816,0.000453723,0.01021744],"category_scores_gemma":[0.00362823,0.0003313175,0.0004072834,0.001333552,0.0003563816,0.0008660083,0.001249145,0.0006749298,0.001663875],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008041978,"about_ca_system_score_gemma":0.001924595,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003979481,"about_ca_topic_score_gemma":0.005914418,"domain_scores_codex":[0.9988849,0.0002995504,0.00005981172,0.0002184396,0.000404634,0.0001327319],"domain_scores_gemma":[0.9981878,0.0007394422,0.0003063273,0.0002747673,0.0003578819,0.0001337623],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002309563,0.0001510714,0.003565983,0.0004640779,0.00003508094,0.0001493586,0.0002673359,0.3689207,0.01074242,0.04281985,0.00499749,0.5676556],"study_design_scores_gemma":[0.0001222747,0.00100928,0.005796472,0.0001196107,0.00006319833,0.0004370917,0.0004236757,0.8467687,0.01655594,0.04842173,0.08021885,0.00006323113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04564683,0.0002621142,0.9343921,0.0001174069,0.00005674794,0.0004391583,0.0001665683,0.001179629,0.01773945],"genre_scores_gemma":[0.39001,0.0006234138,0.5870467,0.00004597335,0.00004703737,0.0004351179,0.000454132,0.0001958603,0.0211418],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01021744,"threshold_uncertainty_score":0.0341807,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3129503847","doi":"10.1016/j.autcon.2021.103616","title":"Hybrid multi-mode simulation and optimization for subarea scheduling in heavy industrial construction","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":25,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bidding; Scheduling (production processes); Interdependence; Schedule; Computer science; Industrial engineering; Operations research; Engineering; Operations management","authors":[{"name":"Maedeh Taghaddos","is_ca":true},{"name":"Hosein Taghaddos","is_ca":false},{"name":"Ulrich Hermann","is_ca":true},{"name":"Yasser Mohamed","is_ca":true},{"name":"Simaan AbouRizk","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.127387408194525,"gpt":0.39216551898767,"spread":0.2647781107931451,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009001388,0.0006255815,0.001201561,0.0005272351,0.0006286998,0.000842519,0.0009964658,0.0009749272,0.00238686],"category_scores_gemma":[0.001690263,0.0006509843,0.0008565824,0.0005597387,0.0006028787,0.000606091,0.0007469797,0.0008232959,0.0001604011],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001198873,"about_ca_system_score_gemma":0.001755043,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.03950337,"about_ca_topic_score_gemma":0.02179594,"domain_scores_codex":[0.9996645,0.0001708164,0.00001053181,0.00004137056,0.00004718461,0.00006560368],"domain_scores_gemma":[0.9986413,0.00102428,0.00007789227,0.00004501211,0.0001186522,0.00009288725],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002312285,0.00001472306,0.0001412285,0.000004658094,0.000005144964,0.0000052261,0.00000610725,0.9985429,0.0001334538,0.0002600961,0.00002922904,0.0008340118],"study_design_scores_gemma":[0.000002182871,0.000004173732,0.00002373068,3.468761e-7,7.646101e-7,3.578222e-7,0.000001664484,0.9998378,0.00003483822,0.00007997655,0.00001348284,6.727805e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4780278,0.0003541013,0.5085949,0.0003358356,0.00009826326,0.0001260587,0.00025809,0.0005995344,0.01160535],"genre_scores_gemma":[0.9788739,0.00006137939,0.01952547,0.00003258038,0.000008882906,0.00007702401,0.00006400031,0.00003712438,0.001319668],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.03950337,"threshold_uncertainty_score":0.07854688,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1595750606","doi":"10.1061/(asce)cp.1943-5487.0000498","title":"Zero-One Programming Approach to Determine Optimum Resource Supply under Time-Dependent Resource Constraints","year":2015,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"National Research Council Canada","keywords":"Schedule; Scheduling (production processes); Resource leveling; Duration (music); Computer science; Turnaround time; Operations research; Resource (disambiguation); Mathematical optimization; Project management; Resource allocation; Engineering; Systems engineering; Mathematics","authors":[{"name":"Ming-Fung Francis Siu","is_ca":true},{"name":"Ming Lu","is_ca":true},{"name":"Simaan AbouRizk","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07749233858812359,"gpt":0.3110297004792523,"spread":0.2335373618911287,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001834859,0.001384602,0.001452139,0.001063165,0.0005527644,0.001730249,0.001413457,0.001050093,0.003904002],"category_scores_gemma":[0.00420842,0.001014607,0.001147463,0.001312052,0.001052668,0.001231862,0.001069287,0.002241889,0.0003967106],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001461054,"about_ca_system_score_gemma":0.003332167,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006598233,"about_ca_topic_score_gemma":0.005570184,"domain_scores_codex":[0.9992436,0.0003122247,0.00002420827,0.0001208815,0.0001675181,0.0001316493],"domain_scores_gemma":[0.9978628,0.001700674,0.0001549479,0.00003415255,0.0001859797,0.00006146703],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001939257,0.00002696932,0.0001438045,0.00007949989,0.00001182804,0.0000406327,0.0000350245,0.9765124,0.0003667263,0.01674615,0.0003263878,0.005691187],"study_design_scores_gemma":[0.000006893786,0.00002470519,0.00004157869,0.00001087826,0.000004706743,0.000008179519,0.00001920154,0.9913946,0.0002298366,0.007818649,0.0004348497,0.000005876044],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.008419557,0.0001810218,0.9854489,0.0001876724,0.00002726557,0.00008678269,0.00008796767,0.00009137869,0.005469481],"genre_scores_gemma":[0.4734034,0.001218,0.5144611,0.0001963439,0.00007968082,0.0009354131,0.0003370321,0.0001977145,0.009171404],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006598233,"threshold_uncertainty_score":0.01311964,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2757346420","doi":"10.1139/cjce-2017-0020","title":"Integration of linear scheduling method and the critical chain project management","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Scheduling (production processes); Two-level scheduling; Industrial engineering; Dynamic priority scheduling; Distributed computing; Operations research; Mathematical optimization; Schedule; Engineering; Mathematics","authors":[{"name":"Tarek Salama","is_ca":true},{"name":"Ahmad Salah","is_ca":false},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0713092974417582,"gpt":0.3719281797955934,"spread":0.3006188823538352,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002129969,0.0007193835,0.0004625657,0.001800902,0.0005900178,0.0009314819,0.001209208,0.0004475637,0.003863055],"category_scores_gemma":[0.004172885,0.0004175372,0.0005263411,0.001744706,0.0007680894,0.001200658,0.0009011316,0.0007544926,0.0004894023],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00139071,"about_ca_system_score_gemma":0.003176596,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006435626,"about_ca_topic_score_gemma":0.00531246,"domain_scores_codex":[0.9975017,0.0009304695,0.000140181,0.0003621186,0.0009367255,0.0001288081],"domain_scores_gemma":[0.9975176,0.001376552,0.0003088611,0.0001923634,0.0005127187,0.00009188912],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00009895403,0.0001028616,0.001355427,0.0004149502,0.00006623791,0.0001363262,0.0003757037,0.3019051,0.006583577,0.08044212,0.001841868,0.6066768],"study_design_scores_gemma":[0.00003493632,0.0002473191,0.0006051733,0.00007822996,0.00003411999,0.0001749218,0.0001162134,0.9404936,0.006664008,0.03617003,0.01533302,0.00004830868],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002206496,0.0001432342,0.9954601,0.0000461244,0.00002204605,0.00005570944,0.00001141326,0.0002112491,0.001843645],"genre_scores_gemma":[0.1628552,0.0004161162,0.8335765,0.00005424112,0.00006115709,0.0002189737,0.00007458289,0.00009679896,0.002646426],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006435626,"threshold_uncertainty_score":0.01292324,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2026357126","doi":"10.1007/s10845-012-0719-5","title":"CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping","year":2012,"lang":"en","type":"article","venue":"Journal of Intelligent Manufacturing","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal; SNC-Lavalin (Canada)","funders":"","keywords":"Rework; Computer science; Schedule; Scheduling (production processes); Duration (music); Heuristic; Downstream (manufacturing); Upstream (networking); Set (abstract data type); Resource consumption; Resource (disambiguation); Operations research; Mathematical optimization; Industrial engineering; Operations management; Engineering; Mathematics; Artificial intelligence; Embedded system; Computer network","authors":[{"name":"Lucas Grèze","is_ca":true},{"name":"Robert Pellerin","is_ca":true},{"name":"Patrice Leclaire","is_ca":false},{"name":"Nathalie Perrier","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1218321197176,"gpt":0.4027743370761721,"spread":0.2809422173585721,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001545401,0.00128844,0.001698298,0.002338965,0.0009811887,0.00135377,0.002701698,0.001547335,0.00692741],"category_scores_gemma":[0.002737414,0.000875215,0.00149809,0.003003816,0.0005676105,0.0008887572,0.001195281,0.001535642,0.0009337079],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00219921,"about_ca_system_score_gemma":0.004622382,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01744408,"about_ca_topic_score_gemma":0.01942996,"domain_scores_codex":[0.9993748,0.0001936474,0.00002744729,0.00007822472,0.0002008277,0.0001250655],"domain_scores_gemma":[0.9991629,0.0003975939,0.00004846283,0.00008820666,0.0002162407,0.00008662492],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000206888,0.0002072571,0.0006007263,0.000217261,0.00009223284,0.0001034409,0.00007679607,0.7558573,0.002851407,0.0082358,0.006616714,0.2249342],"study_design_scores_gemma":[0.00005922097,0.00004379354,0.0001197607,0.00001579165,0.00002211829,0.00002269181,0.00001221362,0.9946007,0.0008157811,0.001711755,0.002564916,0.0000113508],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.0185661,0.0004583283,0.9672711,0.0001980922,0.0002677744,0.000378569,0.0003503512,0.002142528,0.01036715],"genre_scores_gemma":[0.1261473,0.0002463294,0.867238,0.0002247177,0.00008719649,0.0007096144,0.000760388,0.0005000115,0.004086391],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01744408,"threshold_uncertainty_score":0.03468508,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2074314438","doi":"10.1016/j.ejor.2008.10.030","title":"Activity list representation for a generalization of the resource-constrained project scheduling problem","year":2008,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université de Montréal","funders":"","keywords":"Scheduling (production processes); Computer science; Generalization; Mathematical optimization; Representation (politics); Resource constraints; Mathematics","authors":[{"name":"Khaled Moumene","is_ca":true},{"name":"Jacques A. Ferland","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.3762451047095662,"gpt":0.47259360421699,"spread":0.09634849950742386,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007879497,0.0006908298,0.0007813668,0.001252327,0.000561452,0.002284667,0.001534769,0.00108408,0.008837342],"category_scores_gemma":[0.00213881,0.0002569917,0.001417139,0.002321113,0.0003853622,0.002405638,0.0009069736,0.001373292,0.00143352],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009035097,"about_ca_system_score_gemma":0.00174251,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008634984,"about_ca_topic_score_gemma":0.01247665,"domain_scores_codex":[0.9994,0.0001578232,0.00007654908,0.0001102961,0.000151318,0.000103919],"domain_scores_gemma":[0.9990965,0.0003984426,0.00009624071,0.0001594611,0.0001907397,0.00005866599],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0004993712,0.0004904552,0.001351011,0.0005670234,0.00007943551,0.0005975531,0.0004160565,0.397304,0.005491216,0.3455386,0.020561,0.2271043],"study_design_scores_gemma":[0.00006505165,0.0000555068,0.0002190794,0.00004764921,0.00004756798,0.0001167106,0.00008007704,0.8409196,0.00145662,0.1412375,0.01572764,0.00002707128],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01991608,0.0002237265,0.9640803,0.0005444843,0.0001200041,0.0002111459,0.002795419,0.001760324,0.01034861],"genre_scores_gemma":[0.288725,0.0005384389,0.6919138,0.0002128401,0.0001059271,0.000528356,0.006857296,0.0002742221,0.01084402],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.008837342,"threshold_uncertainty_score":0.02956384,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2021216055","doi":"10.5539/cis.v2n1p188","title":"Stochastic Programming Models and Hybrid Intelligent Algorithm for Unbalanced Bidding Problem","year":2009,"lang":"en","type":"article","venue":"Computer and Information Science","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Division of Graduate Education; Natural Science Foundation of Guangxi Province; National Natural Science Foundation of China","keywords":"Bidding; Computer science; Mathematical optimization; Stochastic programming; Genetic algorithm; Artificial neural network; Genetic programming; Value (mathematics); Order (exchange); Hybrid algorithm (constraint satisfaction); Stochastic optimization; Algorithm; Artificial intelligence; Machine learning; Mathematics; Constraint programming","authors":[{"name":"Xingzi Liu","is_ca":false},{"name":"Lin Liang","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.06573409781362602,"gpt":0.3486509251111805,"spread":0.2829168272975545,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001289002,0.0007643281,0.0008781085,0.0005775385,0.000375469,0.001030248,0.001187646,0.0008654111,0.001600799],"category_scores_gemma":[0.002273537,0.000473654,0.0007062309,0.0008214281,0.0006019922,0.001220812,0.000667862,0.001070933,0.0002032118],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008583111,"about_ca_system_score_gemma":0.001073253,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005323785,"about_ca_topic_score_gemma":0.003407512,"domain_scores_codex":[0.9993773,0.0002850579,0.00002610738,0.00006903798,0.0001769577,0.00006565204],"domain_scores_gemma":[0.9993207,0.0004413694,0.00008930556,0.00002347132,0.00009633055,0.00002869569],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001188998,0.00001314455,0.00009381564,0.00001154007,0.000009804243,0.00001995116,0.00001586766,0.974898,0.000166949,0.01914527,0.0002077471,0.005405985],"study_design_scores_gemma":[0.000003030594,0.000003992898,0.00001404103,8.704436e-7,0.000001179028,0.00000313838,0.00000147419,0.996353,0.0000272494,0.003511092,0.00007937392,0.000001505326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01049532,0.0001021213,0.9870772,0.0001273845,0.00001339681,0.00001873158,0.00001558494,0.00006883848,0.002081316],"genre_scores_gemma":[0.7395433,0.0004779747,0.2539635,0.0001383054,0.0000617064,0.0004222554,0.0001536912,0.00007178405,0.005167414],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005323785,"threshold_uncertainty_score":0.01058561,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1974202129","doi":"10.1016/j.autcon.2014.03.008","title":"Construction spatial modeling and scheduling with three-dimensional singularity functions","year":2014,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Scheduling (production processes); Cartesian coordinate system; Mathematical optimization; Computer science; Singularity; Dimension (graph theory); Fourth Dimension; Mathematics; Spacetime; Geometry","authors":[{"name":"Gunnar Lucko","is_ca":false},{"name":"Hisham Said","is_ca":false},{"name":"Ahmed Bouferguène","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04101644279093249,"gpt":0.2994533535044828,"spread":0.2584369107135503,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001121176,0.0008957356,0.001469058,0.001008396,0.0007336711,0.001886181,0.001521246,0.001100302,0.001682913],"category_scores_gemma":[0.003229042,0.0008059439,0.001454633,0.001817303,0.001664118,0.001602328,0.001341567,0.001159818,0.0002343312],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002178208,"about_ca_system_score_gemma":0.001891231,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02532728,"about_ca_topic_score_gemma":0.01109257,"domain_scores_codex":[0.9994393,0.0002158735,0.00003314643,0.0001064969,0.0001023306,0.0001028221],"domain_scores_gemma":[0.9987801,0.0007257466,0.0001778741,0.00006872865,0.0001458809,0.0001016843],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001330393,0.00001022984,0.0001951145,0.000008105811,0.000004935302,0.0000177897,0.00001635479,0.982786,0.0001373037,0.01511453,0.00006900012,0.001627249],"study_design_scores_gemma":[0.000001509734,0.000002976683,0.0000305504,9.114867e-7,0.000001607459,0.000002163766,0.000003477066,0.9962562,0.00004264269,0.003584142,0.00007160901,0.000002153752],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.06803415,0.0001992349,0.9276259,0.0001810669,0.00003325783,0.00003136748,0.0001017685,0.00009993924,0.003693292],"genre_scores_gemma":[0.9154685,0.0003099116,0.08075895,0.00003801717,0.00002902096,0.00009104967,0.000122194,0.00005619999,0.003126152],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.02532728,"threshold_uncertainty_score":0.05035967,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3070075040","doi":"10.1108/ecam-10-2019-0590","title":"Optimized crew selection for scheduling of repetitive projects","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Crew; Duration (music); Operations research; Crew scheduling; Float (project management); Computer science; Operations management; Scheduling (production processes); Engineering; Aeronautics; Systems engineering","authors":[{"name":"Mohammadjavad Arabpour Roghabadi","is_ca":true},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.06415923892039745,"gpt":0.3106000499711349,"spread":0.2464408110507375,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005400229,0.0006543245,0.0007408059,0.0007519281,0.0003519301,0.0007927861,0.0008750111,0.0005249372,0.002839998],"category_scores_gemma":[0.001437573,0.0004208098,0.0005435738,0.0005203059,0.0002720542,0.0006987046,0.0005643365,0.0005995744,0.000392956],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007202513,"about_ca_system_score_gemma":0.001343185,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006722407,"about_ca_topic_score_gemma":0.006615145,"domain_scores_codex":[0.9995017,0.0001359021,0.00001410906,0.0001037066,0.0001407851,0.0001037904],"domain_scores_gemma":[0.9996363,0.0001162633,0.0001025597,0.00003781908,0.00006705417,0.00003994571],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009634048,0.00005727866,0.0009305348,0.00005903273,0.0000233871,0.00005593457,0.00004418173,0.9659874,0.0035875,0.001556967,0.0003075076,0.02729387],"study_design_scores_gemma":[0.00001229047,0.0001600309,0.0009356568,0.00001202909,0.00001056753,0.00002491791,0.00004140052,0.9952729,0.001646279,0.001127017,0.0007481686,0.000008782961],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2252437,0.0003687637,0.7636092,0.0001019109,0.00003259597,0.0002307156,0.0001614256,0.000320506,0.009931133],"genre_scores_gemma":[0.9198456,0.000130951,0.07604982,0.0000238649,0.000008381749,0.0001531697,0.0001521221,0.00006556896,0.00357044],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006722407,"threshold_uncertainty_score":0.01336658,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2529544702","doi":"10.1007/s10479-016-2336-8","title":"An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources","year":2016,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"University of Calgary","keywords":"Computer science; Schedule; Scheduling (production processes); Operations research; Mathematical optimization; Operating system; Mathematics","authors":[{"name":"Aidin Delgoshaei","is_ca":false},{"name":"Timon Rabczuk","is_ca":false},{"name":"Ahad Ali","is_ca":false},{"name":"Mohd Khairol Anuar Mohd Ariffin","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.4946935409284301,"gpt":0.5864833560107651,"spread":0.09178981508233497,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001718978,0.0009802231,0.0009520811,0.0009077127,0.0006289041,0.0007793155,0.001735538,0.0008065707,0.004174363],"category_scores_gemma":[0.005694827,0.0005770156,0.001117356,0.0009234669,0.0005805754,0.001020133,0.001348103,0.001738177,0.0008616146],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006329815,"about_ca_system_score_gemma":0.001756751,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003978521,"about_ca_topic_score_gemma":0.005609845,"domain_scores_codex":[0.9989836,0.0002570513,0.00006429532,0.0001766162,0.0004154392,0.0001029732],"domain_scores_gemma":[0.9976692,0.001220225,0.0001674289,0.0003456749,0.0005055239,0.00009192079],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003263189,0.0002540608,0.0009269846,0.0002777817,0.0001229978,0.0003668834,0.0003223376,0.2682481,0.02867439,0.04080928,0.004428902,0.655242],"study_design_scores_gemma":[0.00004732907,0.00007627529,0.0001860452,0.00001973758,0.00003980732,0.0001255034,0.00003193591,0.9716346,0.005850419,0.01614773,0.005810494,0.00003019177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.001799248,0.00002402254,0.9971039,0.00001763418,0.00003889038,0.00006001505,0.0000238166,0.0003527594,0.0005797877],"genre_scores_gemma":[0.04916803,0.00006577246,0.9481149,0.00003654562,0.00003622182,0.0001672076,0.0000852853,0.0002558738,0.002069996],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004174363,"threshold_uncertainty_score":0.01396459,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2766525559","doi":"10.1080/01446193.2017.1390241","title":"A simulation-based method for effective workface planning of industrial construction projects","year":2017,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); Discrete event simulation; Work (physics); Plan (archaeology); Computer science; Workforce planning; Process (computing); Scale (ratio); Industrial engineering; Operations research; Workforce; Engineering; Simulation; Operations management","authors":[{"name":"Di Hu","is_ca":true},{"name":"Yasser Mohamed","is_ca":true},{"name":"Hosein Taghaddos","is_ca":false},{"name":"Ulrich Hermann","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1670221460818022,"gpt":0.4017609918205162,"spread":0.234738845738714,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006958572,0.0007100659,0.0008349391,0.0006905451,0.0005117901,0.0006957564,0.001201882,0.0007535822,0.003843906],"category_scores_gemma":[0.001278742,0.0005486926,0.0009885657,0.0008378948,0.000493338,0.0005550949,0.0008015098,0.0007545638,0.0003819564],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009174844,"about_ca_system_score_gemma":0.001875814,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01107023,"about_ca_topic_score_gemma":0.009824858,"domain_scores_codex":[0.9996411,0.0001273722,0.00001959905,0.00005730806,0.0001152339,0.00003943751],"domain_scores_gemma":[0.9995064,0.0002758928,0.00004844787,0.00003552244,0.00009595753,0.00003783447],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001849077,0.00001391644,0.0001631018,0.00002275497,0.0000110082,0.00002923803,0.00001908272,0.9851504,0.0008730932,0.004025286,0.0001739939,0.009499665],"study_design_scores_gemma":[0.000003998816,0.000004994569,0.00001890106,0.000003072493,0.000002079766,0.0000046481,0.00000276345,0.9987407,0.0001562408,0.0006500419,0.0004101677,0.000002441324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.004247876,0.00004843047,0.99369,0.00003416454,0.00001798498,0.00004518656,0.00003589384,0.0002684938,0.001611938],"genre_scores_gemma":[0.3582376,0.0002370991,0.6377834,0.00004115553,0.00002350982,0.0005193944,0.0002181216,0.0001217041,0.002817931],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01107023,"threshold_uncertainty_score":0.02201158,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2049149460","doi":"10.1007/s10845-006-0034-0","title":"Project-driven planning and scheduling support for virtual manufacturing","year":2006,"lang":"en","type":"article","venue":"Journal of Intelligent Manufacturing","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec en Outaouais","funders":"","keywords":"Computer science; Scheduling (production processes); Critical path method; Schedule; Production planning; Dynamic priority scheduling; Two-level scheduling; Mathematical optimization; Industrial engineering; Distributed computing; Operations research; Engineering; Production (economics); Systems engineering; Operating system; Mathematics","authors":[{"name":"Zbigniew Banaszak","is_ca":false},{"name":"Marek B. Zaremba","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.08940917395364503,"gpt":0.372529907051988,"spread":0.283120733098343,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001377351,0.0003592147,0.0005198031,0.0005523955,0.0005249897,0.001224115,0.001310642,0.0005462905,0.002422974],"category_scores_gemma":[0.002742093,0.0004689745,0.0003973483,0.0007459568,0.0002733235,0.00100193,0.001020135,0.0005085104,0.0003433951],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004812952,"about_ca_system_score_gemma":0.001251462,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002350261,"about_ca_topic_score_gemma":0.004260451,"domain_scores_codex":[0.9992908,0.0003148634,0.00004129408,0.0000772782,0.0001766424,0.00009897284],"domain_scores_gemma":[0.9988095,0.0005481773,0.0001194112,0.0001999064,0.0001812995,0.0001416957],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0008035356,0.0002822314,0.002195801,0.00009405735,0.000073187,0.0002651112,0.0002193393,0.7658385,0.01441244,0.01830889,0.004042345,0.1934645],"study_design_scores_gemma":[0.00002662504,0.0000637792,0.0003068709,0.000003050115,0.000008770589,0.00002842983,0.0000282229,0.9896017,0.003074155,0.005517599,0.001332144,0.000008580912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1801252,0.0001787966,0.8100759,0.0002562352,0.00008542896,0.0001360471,0.0002230024,0.001704958,0.007214397],"genre_scores_gemma":[0.8750916,0.00005471787,0.1236569,0.00002691632,0.00001246836,0.00008059799,0.0001578495,0.0000498516,0.0008691177],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.002422974,"threshold_uncertainty_score":0.008105695,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4388091559","doi":"10.1016/j.ijpe.2023.109077","title":"Integrated planning and scheduling of engineer-to-order projects using a Lamarckian Layered Genetic Algorithm","year":2023,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal; Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Mathematical optimization; Schedule; Robustness (evolution); Scheduling (production processes); Genetic algorithm; Machine learning; Mathematics","authors":[{"name":"Anas Neumann","is_ca":true},{"name":"Adnène Hajji","is_ca":true},{"name":"Monia Rekik","is_ca":true},{"name":"Robert Pellerin","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1207855348625341,"gpt":0.3748450309318462,"spread":0.2540594960693121,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001527031,0.0005956747,0.001249797,0.001272626,0.000810185,0.001608347,0.001908432,0.001549735,0.001794662],"category_scores_gemma":[0.002980569,0.0008778709,0.001028743,0.00135847,0.0007064389,0.001158557,0.001443525,0.001081479,0.0002777581],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002092839,"about_ca_system_score_gemma":0.003763881,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.03222291,"about_ca_topic_score_gemma":0.02668884,"domain_scores_codex":[0.9993717,0.0002191008,0.00003459768,0.00008009074,0.0001608071,0.0001337334],"domain_scores_gemma":[0.9991618,0.0004385349,0.0001089688,0.00004756296,0.0001711294,0.00007191395],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003130914,0.00004416981,0.0003386014,0.00001175151,0.00002037781,0.0000170385,0.00002700783,0.986515,0.0007072459,0.001663749,0.00009509576,0.01052866],"study_design_scores_gemma":[0.000005692579,0.00001580824,0.00004633623,0.000001578755,0.000005250065,0.000001819999,0.000004459795,0.9993138,0.0001425454,0.0004169926,0.00004311962,0.000002536977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0903641,0.0001348435,0.9039456,0.0001935724,0.0000294225,0.0001209464,0.00006373688,0.0004915489,0.004656189],"genre_scores_gemma":[0.6103988,0.0001176334,0.3862761,0.00008644824,0.00001564685,0.0002757701,0.0001335679,0.00006462866,0.002631372],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.03222291,"threshold_uncertainty_score":0.0640707,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2100941354","doi":"10.5267/j.dsl.2015.5.005","title":"A study on the performance of differential search algorithm for single mode resource constrained project scheduling problem","year":2015,"lang":"en","type":"article","venue":"Decision Science Letters","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Mathematical optimization; Computer science; Scheduling (production processes); Mode (computer interface); Resource (disambiguation); Algorithm; Differential evolution; Resource constraints; Operations research; Mathematics; Distributed computing","authors":[{"name":"Nazanin Rahmani","is_ca":false},{"name":"Vahid Zeighami","is_ca":true},{"name":"Reza Akbari","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2050226183755664,"gpt":0.4111129716131563,"spread":0.2060903532375899,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001967031,0.0005961432,0.0008321627,0.0009271124,0.0004087739,0.0009632013,0.0007394271,0.0007138933,0.002168095],"category_scores_gemma":[0.008099436,0.0002023344,0.0004840013,0.001135691,0.0003977944,0.001189691,0.0004389665,0.0007027866,0.0001727283],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008888105,"about_ca_system_score_gemma":0.001163312,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002867761,"about_ca_topic_score_gemma":0.001517163,"domain_scores_codex":[0.9988839,0.0005029658,0.00005990956,0.0001385514,0.0002961529,0.0001185543],"domain_scores_gemma":[0.9936888,0.005272295,0.0001624918,0.0001820114,0.0005661384,0.0001282729],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0004407984,0.000239517,0.004103855,0.0004767572,0.0001356994,0.0001277653,0.00009660201,0.7961232,0.005205345,0.01758101,0.002099593,0.1733698],"study_design_scores_gemma":[0.0000214002,0.0001471788,0.0005356188,0.00001404796,0.00001817622,0.00005444457,0.00002636783,0.9952635,0.001340612,0.001783763,0.0007895508,0.00000537117],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4249095,0.007584204,0.5286348,0.0008698314,0.0002538514,0.0001436544,0.0001580307,0.0005070087,0.036939],"genre_scores_gemma":[0.9193212,0.001788388,0.07684563,0.00009226199,0.00003443596,0.00005785679,0.0001765981,0.0000601262,0.00162356],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.002867761,"threshold_uncertainty_score":0.01040274,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4242958581","doi":"10.1504/ijpom.2018.090372","title":"A path relinking-based scatter search for the resource-constrained project scheduling problem","year":2018,"lang":"en","type":"article","venue":"International Journal of Project Organisation and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval; Polytechnique Montréal; SNC-Lavalin (Canada)","funders":"","keywords":"Metaheuristic; Computer science; Critical path method; Benchmark (surveying); Mathematical optimization; Scheduling (production processes); Tabu search; Project management; Path (computing); Job shop scheduling; Schedule; Algorithm; Mathematics; Systems engineering; Engineering","authors":[{"name":"François Berthaut","is_ca":true},{"name":"Robert Pellerin","is_ca":true},{"name":"Adnène Hajji","is_ca":true},{"name":"Nathalie Perrier","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.09024689563341826,"gpt":0.3932375767276911,"spread":0.3029906810942728,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009355316,0.0008011658,0.001050232,0.001226815,0.0004960156,0.0006066154,0.0009469147,0.001244452,0.002427003],"category_scores_gemma":[0.002114431,0.0004415029,0.0009402847,0.001526964,0.0005779419,0.00081842,0.0009425581,0.0008880833,0.0002868916],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005531049,"about_ca_system_score_gemma":0.00164052,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005317655,"about_ca_topic_score_gemma":0.004741897,"domain_scores_codex":[0.9996759,0.0001445312,0.00001258693,0.00004763411,0.00008199794,0.00003736776],"domain_scores_gemma":[0.9993655,0.0003860313,0.0000619708,0.00003505086,0.0001070459,0.0000443294],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005376112,0.00004995108,0.0005160356,0.00006311187,0.00003357451,0.0000380628,0.0000383554,0.9640775,0.001251575,0.004505952,0.000623946,0.02874821],"study_design_scores_gemma":[0.00002156345,0.00005659506,0.0001028383,0.000009817973,0.000009162403,0.000017729,0.00001287562,0.9973494,0.0002244125,0.001723103,0.0004682488,0.000004170299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05746839,0.0004173781,0.9383332,0.0001879561,0.00004255949,0.0001234698,0.00008798647,0.0002597986,0.003079202],"genre_scores_gemma":[0.44373,0.0005026713,0.5507752,0.000118529,0.00004157128,0.0005333024,0.0004163192,0.0001264406,0.003755903],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005317655,"threshold_uncertainty_score":0.01057339,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2072148912","doi":"10.3141/1761-16","title":"Critical Path Method–Line of Balance Model for Efficient Scheduling of Repetitive Construction Projects","year":2001,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Critical path method; Scheduling (production processes); Computer science; Schedule; Operations research; Pipeline transport; Path (computing); Industrial engineering; Engineering; Systems engineering; Operations management; Computer network","authors":[{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2671081567740019,"gpt":0.5032961908038592,"spread":0.2361880340298573,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001124944,0.001083267,0.0007638223,0.0009840713,0.0005337997,0.000923197,0.0016641,0.0009599303,0.009014987],"category_scores_gemma":[0.001736394,0.0006038581,0.0007536307,0.001265408,0.0006014818,0.00128661,0.0006047762,0.001214611,0.001098762],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001688915,"about_ca_system_score_gemma":0.002726595,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01289307,"about_ca_topic_score_gemma":0.00928446,"domain_scores_codex":[0.9995622,0.0001616432,0.00001236499,0.00005837949,0.0001355266,0.00006986897],"domain_scores_gemma":[0.9995982,0.0002221452,0.00006177497,0.0000162368,0.00007399308,0.00002775365],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001933673,0.00001526994,0.0001055602,0.00003615424,0.000009200749,0.00003278184,0.00002811834,0.962144,0.0004660695,0.02799622,0.001130563,0.008016672],"study_design_scores_gemma":[0.000008163533,0.00002155402,0.00003381804,0.000006240198,0.000003929054,0.00001123327,0.000008037085,0.9895884,0.0001174897,0.008248036,0.001949007,0.00000412838],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002737118,0.00007551943,0.9933075,0.00007800827,0.00001739586,0.00006598277,0.00009998985,0.0001202194,0.003498373],"genre_scores_gemma":[0.4342998,0.001051312,0.5448695,0.000143165,0.00009106085,0.001365391,0.0007950498,0.0003323018,0.01705251],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01289307,"threshold_uncertainty_score":0.03015816,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3205823175","doi":"10.1016/j.autcon.2021.104002","title":"Streamlined project time-cost tradeoff optimization methodology: Algorithm, automation, and application","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Automation; Computer science; Industrial engineering; Engineering; Optimization algorithm; Algorithm; Mathematical optimization; Systems engineering; Mathematics; Mechanical engineering","authors":[{"name":"Sasan Nasiri","is_ca":true},{"name":"Ming Lu","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.08429030014314813,"gpt":0.3876300114976504,"spread":0.3033397113545022,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001870616,0.0008407852,0.001253696,0.001063257,0.0004287819,0.0009715548,0.001045107,0.0007916187,0.003572707],"category_scores_gemma":[0.00340639,0.0005643801,0.0006814707,0.001561608,0.0004158946,0.001005479,0.0008699926,0.0009958219,0.000558108],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001149665,"about_ca_system_score_gemma":0.002336595,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00485943,"about_ca_topic_score_gemma":0.00444982,"domain_scores_codex":[0.9992626,0.000292133,0.0000383417,0.0001014447,0.0002506823,0.00005478975],"domain_scores_gemma":[0.9982204,0.0009721665,0.0001951779,0.0001309993,0.0004311026,0.00005016811],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006620429,0.00007789279,0.0006693494,0.00009505311,0.00002724123,0.00002755942,0.00004117262,0.8629516,0.001763018,0.006094659,0.0009553828,0.1272309],"study_design_scores_gemma":[0.00001262363,0.00003069015,0.00007230061,0.000004870069,0.00000519186,0.000007389459,0.00000292629,0.9970903,0.0004444277,0.002001229,0.0003257596,0.0000022647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.008900023,0.00009347762,0.9896935,0.00006141781,0.00001363261,0.00005834486,0.00005040051,0.0003091074,0.0008201763],"genre_scores_gemma":[0.2063663,0.0002041836,0.7911109,0.00006610646,0.00003117464,0.0003421499,0.0001737289,0.0001091208,0.00159643],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.00485943,"threshold_uncertainty_score":0.01195186,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2144411460","doi":"10.1139/l2012-053","title":"Generational differences on craft workers’ perceptions of the factors affecting labour productivity<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Craft; Productivity; Workforce; Baby boomers; Economic shortage; Labour economics; Engineering; Layoff; Business; Economics; Operations management; Economic growth; Unemployment; Government (linguistics); Geography","authors":[{"name":"Jiukun Dai","is_ca":false},{"name":"Paul M. Goodrum","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0223260061047597,"gpt":0.2409645919002186,"spread":0.2186385857954589,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001126512,0.0001540226,0.0001247201,0.0004838767,0.0004729829,0.0008628581,0.0001614911,0.0002656408,0.003076942],"category_scores_gemma":[0.002827239,0.0001342251,0.0002082584,0.0004407149,0.0005340409,0.0004155692,0.0005843969,0.0004010337,0.0002235691],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004765441,"about_ca_system_score_gemma":0.0002580566,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01736636,"about_ca_topic_score_gemma":0.04649849,"domain_scores_codex":[0.9995288,0.0001613017,0.00002946441,0.00005030693,0.0001119786,0.0001181819],"domain_scores_gemma":[0.997286,0.001131525,0.0009026923,0.0001206264,0.0002865246,0.0002727076],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001199449,0.00006689179,0.955172,0.00002036982,0.00003223989,0.0001346338,0.03235584,0.0000996759,0.000756248,0.000179637,0.0002916441,0.01077088],"study_design_scores_gemma":[0.000002346639,0.00007810022,0.967366,0.00001131812,0.000007054666,0.00004893977,0.03175828,0.00008236496,0.00007015368,0.00006101455,0.0005065565,0.000007858911],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9993363,0.00005064331,0.00002972723,0.00003822083,0.000002133764,0.000002153696,0.0000192239,4.524125e-7,0.000521088],"genre_scores_gemma":[0.9995198,0.00007148935,0.00002744925,0.00001981981,0.000001765468,0.000002573242,0.00004061839,5.802993e-7,0.0003159234],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01736636,"threshold_uncertainty_score":0.03453052,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1969628616","doi":"10.1111/itor.12071","title":"A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem","year":2014,"lang":"en","type":"article","venue":"International Transactions in Operational Research","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Victoria","funders":"","keywords":"Mathematical optimization; Computer science; Ant colony optimization algorithms; Scheduling (production processes); Job shop scheduling; Multi-objective optimization; Set (abstract data type); Convergence (economics); Ant colony; Pareto principle; Local search (optimization); Pareto optimal; Mathematics; Routing (electronic design automation)","authors":[{"name":"Olfa Dridi","is_ca":false},{"name":"Saoussen Krichen","is_ca":false},{"name":"Adel Guitouni","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1385527995478368,"gpt":0.433266879528203,"spread":0.2947140799803662,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007449154,0.0007462277,0.0007626114,0.0008258318,0.0004961689,0.0008781043,0.001129505,0.001031356,0.001852492],"category_scores_gemma":[0.001032076,0.0003729943,0.0005249295,0.0009249261,0.000514238,0.0004353869,0.0009543174,0.0006362504,0.0002509685],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005257923,"about_ca_system_score_gemma":0.001023092,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006533864,"about_ca_topic_score_gemma":0.005535433,"domain_scores_codex":[0.9995888,0.00019252,0.00001502382,0.00003701594,0.0001306866,0.00003599222],"domain_scores_gemma":[0.9996252,0.0002201081,0.00003284796,0.0000160466,0.00007523836,0.00003048434],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002319379,0.00003044852,0.0001455384,0.00004365637,0.00002135455,0.00006406143,0.00002862391,0.974,0.001119095,0.007178069,0.0003585833,0.01698749],"study_design_scores_gemma":[0.000003445438,0.000007083036,0.0000136678,0.000001519331,0.000002058322,0.000005342815,0.000003273902,0.998925,0.00008122154,0.0007572107,0.0001989439,0.000001194364],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01812886,0.0002153871,0.9756104,0.0001770418,0.00004957088,0.0000780247,0.00002592368,0.0001244868,0.005590447],"genre_scores_gemma":[0.5645778,0.0003882875,0.4286621,0.0001036662,0.00004980671,0.000369152,0.00006454749,0.0000748934,0.005709877],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006533864,"threshold_uncertainty_score":0.01299167,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3156898704","doi":"10.1016/j.ifacol.2020.12.2858","title":"Collaborative supply chain planning and scheduling of construction projects","year":2020,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Supply chain; Scheduling (production processes); Integer programming; IBM; Production planning; Computer science; Linear programming; Supply chain management; Operations research; Project management; Process management; Manufacturing engineering; Operations management; Production (economics); Systems engineering; Business; Engineering","authors":[{"name":"Walid Elmughrabi","is_ca":true},{"name":"Oumaima Ben Sassi","is_ca":true},{"name":"Thiên-My Dao","is_ca":true},{"name":"Amin Chabaane","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07845513194151653,"gpt":0.3529724922949883,"spread":0.2745173603534718,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001681916,0.001190753,0.001331595,0.0009400375,0.0008650515,0.001969313,0.00173282,0.001417312,0.003527791],"category_scores_gemma":[0.002316543,0.0008705093,0.001231977,0.002152543,0.0008350318,0.001358034,0.001290325,0.001088805,0.0004371938],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001958148,"about_ca_system_score_gemma":0.003578774,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01476716,"about_ca_topic_score_gemma":0.01093462,"domain_scores_codex":[0.9983229,0.0006344948,0.0000769028,0.0003259577,0.0003591863,0.0002806099],"domain_scores_gemma":[0.9991067,0.000432291,0.0001452624,0.00007336256,0.0001307128,0.0001116776],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002176827,0.00001750832,0.0001676607,0.00002419967,0.00001198699,0.00004678411,0.00002674744,0.9890388,0.0001864076,0.00547436,0.0001502522,0.004833433],"study_design_scores_gemma":[0.000008671221,0.00002565229,0.00008687714,0.00000797791,0.00000831271,0.00001137143,0.00002293939,0.9936634,0.000220445,0.00501074,0.0009280908,0.000005444277],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03446583,0.000336636,0.9561281,0.0002090023,0.00004348011,0.0001849422,0.0001830389,0.0001361181,0.008312816],"genre_scores_gemma":[0.7959179,0.0008434568,0.1939932,0.00004477494,0.00004682463,0.0006157756,0.0004384019,0.00006303605,0.00803656],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01476716,"threshold_uncertainty_score":0.02936244,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296579871","doi":"10.1139/cjce-2022-0029","title":"Enhanced repetitive scheduling formulation for meeting deadlines and resource constraints in linear and scattered projects","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Scheduling (production processes); Computer science; Linear programming; Schedule; Crew; Critical path method; Operations research; Mathematical optimization; Distributed computing; Industrial engineering; Engineering; Systems engineering; Algorithm; Mathematics","authors":[{"name":"Kareem Mostafa","is_ca":true},{"name":"Sayeeda Ojulari","is_ca":true},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04169050765308387,"gpt":0.2898501007558356,"spread":0.2481595931027518,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001160823,0.0008331541,0.0007434825,0.0005384535,0.0004310891,0.0008218599,0.001287431,0.0007552401,0.004375904],"category_scores_gemma":[0.001961373,0.0004401464,0.0006535834,0.000744518,0.000490454,0.0006197669,0.0007256942,0.0008999556,0.0003928587],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001088331,"about_ca_system_score_gemma":0.002236882,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009067313,"about_ca_topic_score_gemma":0.009409118,"domain_scores_codex":[0.999365,0.0001921306,0.00002892777,0.0001081718,0.0001817489,0.0001239443],"domain_scores_gemma":[0.9993483,0.000314271,0.00009522434,0.00003438416,0.0001443224,0.00006348077],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0000402482,0.00002724212,0.0001361989,0.00007112748,0.000008020864,0.0001098733,0.00005270402,0.9741111,0.001665023,0.01260142,0.0005927954,0.01058413],"study_design_scores_gemma":[0.00001189602,0.00004577241,0.00005813089,0.00000543881,0.000004276505,0.00001735518,0.0000185982,0.9955761,0.0003886357,0.002914162,0.000955326,0.000004290677],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02065688,0.0001538358,0.9719791,0.0001167405,0.00004694099,0.0001218479,0.0001084935,0.000132159,0.00668414],"genre_scores_gemma":[0.6366543,0.0004531677,0.3518684,0.00008686965,0.0000921664,0.000437076,0.0003425759,0.0001795219,0.009885928],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009067313,"threshold_uncertainty_score":0.01802909,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4284993186","doi":"10.1016/j.ijpe.2022.108557","title":"A model for advanced planning systems dedicated to the Engineer-To-Order context","year":2022,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal; Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Scheduling (production processes); Build to order; Production planning; Concurrent engineering; Context (archaeology); Industrial engineering; Order fulfillment; Integrated business planning; Operations research; Order (exchange); Production (economics); Operations management; Supply chain; Engineering","authors":[{"name":"Anas Neumann","is_ca":true},{"name":"Adnène Hajji","is_ca":true},{"name":"Monia Rekik","is_ca":true},{"name":"Robert Pellerin","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1231063701010345,"gpt":0.3784389776266892,"spread":0.2553326075256546,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009119575,0.001012498,0.001202695,0.0007713385,0.0009243899,0.002913817,0.002038935,0.00239865,0.009622758],"category_scores_gemma":[0.002600668,0.0006299924,0.001094217,0.001413197,0.001179222,0.002202258,0.001572216,0.001892042,0.001055178],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001847599,"about_ca_system_score_gemma":0.002707379,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01380694,"about_ca_topic_score_gemma":0.008984949,"domain_scores_codex":[0.9993601,0.0002125113,0.00003625176,0.0001457749,0.0001269929,0.0001183614],"domain_scores_gemma":[0.9989842,0.0005789,0.0001078089,0.0000644033,0.0001346903,0.0001301073],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003517267,0.0000320631,0.0001942998,0.00004259061,0.00001595172,0.0001286197,0.000039529,0.8850898,0.0004507416,0.1090146,0.001190707,0.00376594],"study_design_scores_gemma":[0.00002051175,0.00002145439,0.00006185782,0.000007066847,0.000008289367,0.00002253064,0.0000137436,0.9648359,0.00007618421,0.0333479,0.001576668,0.000007910426],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03475794,0.0005274907,0.934686,0.001780421,0.0001650836,0.0001635596,0.001222728,0.0003540122,0.02634273],"genre_scores_gemma":[0.8226654,0.001138161,0.1444353,0.0002941807,0.0002039888,0.000579406,0.001026947,0.0001637673,0.02949286],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01380694,"threshold_uncertainty_score":0.03219134,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1994453397","doi":"10.1139/l08-135","title":"Robust global and local search approach to resource-constrained project scheduling","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Mathematical optimization; Computer science; Local search (optimization); Guided Local Search; Scheduling (production processes); Genetic algorithm; Premature convergence; Tabu search; Heuristic; Algorithm; Mathematics","authors":[{"name":"Jin-Lee Kim","is_ca":false},{"name":"Ralph D. Ellis","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.06983607493615519,"gpt":0.296244105261282,"spread":0.2264080303251268,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001377264,0.0007274495,0.001280731,0.0009413411,0.0003868704,0.0007104797,0.001379182,0.0008946927,0.001896803],"category_scores_gemma":[0.002165074,0.000437245,0.0007920375,0.0008786827,0.0009708405,0.0008241849,0.0008573094,0.0007625631,0.0003487286],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008451697,"about_ca_system_score_gemma":0.001313989,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004824327,"about_ca_topic_score_gemma":0.00361261,"domain_scores_codex":[0.999429,0.0002615173,0.00001793315,0.00008498349,0.0001552338,0.00005121181],"domain_scores_gemma":[0.999217,0.0004694953,0.00008947137,0.0000545128,0.0001259575,0.00004360013],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001549865,0.000008038753,0.0000676713,0.00001527687,0.00001873093,0.00001454937,0.00001119249,0.9862413,0.0002988441,0.003548847,0.000202511,0.009557574],"study_design_scores_gemma":[0.000005620014,0.0000133299,0.00001919875,0.000001493674,0.000003649248,0.000004053762,0.000002958361,0.9981868,0.0001035195,0.001495712,0.0001614447,0.000002200332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.008968034,0.0002114347,0.9879023,0.00008777421,0.00002060052,0.00002621382,0.0000230868,0.0002760799,0.002484442],"genre_scores_gemma":[0.7027261,0.0003522816,0.2922614,0.0001278725,0.00006128677,0.0002479795,0.0001327482,0.000147754,0.003942514],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004824327,"threshold_uncertainty_score":0.009592533,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3093058335","doi":"10.1155/2020/8897710","title":"Effective Evolutionary Algorithm for Solving the Real-Resource-Constrained Scheduling Problem","year":2020,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Computer science; Evolutionary algorithm; Scheduling (production processes); Cuckoo search; Algorithm; Mathematical optimization; Artificial intelligence; Mathematics","authors":[{"name":"Huu Dang Quoc","is_ca":false},{"name":"Loc Nguyen The","is_ca":false},{"name":"Cuong Nguyen Doan","is_ca":false},{"name":"Naixue Xiong","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03489116857546906,"gpt":0.3284135591069907,"spread":0.2935223905315216,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00105487,0.001072764,0.001059236,0.00103434,0.0005462973,0.0008268558,0.001110736,0.001246862,0.002062972],"category_scores_gemma":[0.002438587,0.0003802253,0.00081554,0.001278219,0.0004885624,0.0009297874,0.0007114164,0.00116778,0.0002970191],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006905257,"about_ca_system_score_gemma":0.001591281,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004019213,"about_ca_topic_score_gemma":0.003140754,"domain_scores_codex":[0.9994455,0.0001858444,0.00003327174,0.0001054706,0.0001581648,0.00007176046],"domain_scores_gemma":[0.9994684,0.0003109579,0.00004603338,0.00003119641,0.0001140287,0.00002940256],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003484463,0.00005170311,0.0004584184,0.0001128965,0.00005034522,0.00007963875,0.00005151706,0.9088002,0.0009684525,0.01962015,0.001959773,0.06781192],"study_design_scores_gemma":[0.00001823194,0.00002263238,0.00007959155,0.00001073537,0.000009233092,0.00002914228,0.0000133363,0.9933795,0.0002269518,0.00440599,0.001799632,0.000005064594],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01262329,0.0008958312,0.9806788,0.0002695615,0.0001078579,0.00007414221,0.00005319819,0.0001607648,0.005136571],"genre_scores_gemma":[0.296213,0.001494197,0.6953878,0.0002965198,0.0001204709,0.0004970795,0.0003880631,0.0001069717,0.005495857],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004019213,"threshold_uncertainty_score":0.007991612,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2012605577","doi":"10.1139/l09-049","title":"Improved genetic algorithm for resource-constrained scheduling of large projects","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"University of Florida","keywords":"Computer science; Scheduling (production processes); Schedule; Mathematical optimization; Genetic algorithm scheduling; Genetic algorithm; Project management; Algorithm; Dynamic priority scheduling; Two-level scheduling; Engineering; Systems engineering; Mathematics; Machine learning","authors":[{"name":"Jin-Lee Kim","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02988674346614349,"gpt":0.28485290728277,"spread":0.2549661638166265,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089964,0.0004762062,0.0007783889,0.0007002489,0.0003567976,0.0005045165,0.0008718827,0.0007096153,0.001250962],"category_scores_gemma":[0.001836466,0.0002945991,0.0005081061,0.00100613,0.0005077922,0.0004800938,0.0005348838,0.0006942539,0.000242359],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001001075,"about_ca_system_score_gemma":0.001759416,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009497217,"about_ca_topic_score_gemma":0.007435457,"domain_scores_codex":[0.9995177,0.0001603552,0.00001702939,0.00007158137,0.000181413,0.00005185052],"domain_scores_gemma":[0.9995893,0.000222468,0.00004722296,0.00003719955,0.0000889309,0.00001500778],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001375269,0.00001083311,0.00008579547,0.00000943584,0.000009239455,0.00001558753,0.00001477613,0.9747766,0.0004501036,0.003437957,0.0002562645,0.02091963],"study_design_scores_gemma":[0.00001053452,0.000008543724,0.00003494598,0.000001403117,0.000002900138,0.000005198092,0.000001743555,0.9980872,0.0001157407,0.001461796,0.0002685038,0.000001515687],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02381163,0.0001632289,0.97257,0.0001073228,0.00002397985,0.00004693143,0.000037307,0.0003056318,0.002933952],"genre_scores_gemma":[0.4296472,0.0002997112,0.5654296,0.00009212623,0.00003681903,0.0003063836,0.0002143169,0.00009335006,0.003880454],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009497217,"threshold_uncertainty_score":0.01888388,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1994525790","doi":"10.1111/j.1475-3995.2012.00842.x","title":"Resource‐constrained project scheduling through the goal programming model: integration of the manager's preferences","year":2012,"lang":"en","type":"article","venue":"International Transactions in Operational Research","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Laurentian University; Université Laval; Golder Associates (Canada)","funders":"","keywords":"Goal programming; Computer science; Scheduling (production processes); Operations research; Process management; Mathematical optimization; Business; Mathematics","authors":[{"name":"Michel Gagnon","is_ca":true},{"name":"Gilles D'Avignon","is_ca":true},{"name":"Belaı̈d Aouni","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.3098998449138487,"gpt":0.4917509864743744,"spread":0.1818511415605257,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002095355,0.0004603202,0.0005633348,0.0003677955,0.0002966292,0.001472455,0.000908668,0.0005489044,0.00146733],"category_scores_gemma":[0.002443434,0.0003617019,0.0004403781,0.0007289658,0.0003910323,0.001034587,0.0005784064,0.0009845312,0.0002078976],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007492293,"about_ca_system_score_gemma":0.001850546,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003598551,"about_ca_topic_score_gemma":0.003946003,"domain_scores_codex":[0.9988828,0.000757071,0.0000235857,0.0000608808,0.0001978929,0.00007777125],"domain_scores_gemma":[0.999231,0.0004972572,0.0000775556,0.00003224703,0.0001041365,0.00005784174],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006774761,0.00006506338,0.0003144221,0.00003572916,0.00002878985,0.00005439231,0.00009109797,0.9552032,0.0009407465,0.02874286,0.000441558,0.01401445],"study_design_scores_gemma":[0.000009816249,0.00002352217,0.00006622517,0.000005700509,0.000005091875,0.000006714728,0.00001741928,0.9931343,0.0001685231,0.006211705,0.0003468966,0.000004179126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03072606,0.00007086217,0.9647529,0.0002625763,0.00001096233,0.00004109743,0.00003661397,0.00007181662,0.004027197],"genre_scores_gemma":[0.7526555,0.0002129025,0.2447296,0.0000676276,0.00001911698,0.0002113563,0.00006221241,0.00004245521,0.00199935],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.003598551,"threshold_uncertainty_score":0.01108146,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4360591935","doi":"10.5267/j.dsl.2023.2.002","title":"A convolutional neural network for the resource-constrained project scheduling problem (RCPSP): A new approach","year":2023,"lang":"en","type":"article","venue":"Decision Science Letters","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Computer science; Schedule; Project management; Scheduling (production processes); Project planning; Artificial neural network; Operations research; Mathematical optimization; Artificial intelligence; Systems engineering; Engineering","authors":[{"name":"Amir Golab","is_ca":false},{"name":"Ehsan Sedgh Gooya","is_ca":false},{"name":"Ayman Al Falou","is_ca":false},{"name":"M. Cabon","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1474752084462414,"gpt":0.3875546990255678,"spread":0.2400794905793263,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006159384,0.0009775069,0.0006999839,0.0006513303,0.0003598853,0.000894273,0.001518004,0.001510694,0.001729224],"category_scores_gemma":[0.001159992,0.0005092511,0.0006414519,0.0008059058,0.00050005,0.001093599,0.0009211514,0.001443117,0.0002577369],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001706846,"about_ca_system_score_gemma":0.001843456,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01803836,"about_ca_topic_score_gemma":0.01575163,"domain_scores_codex":[0.999726,0.00005114097,0.00001715463,0.00008425362,0.00006871892,0.00005269657],"domain_scores_gemma":[0.9997472,0.0001038455,0.00003201239,0.00001635114,0.00007940648,0.00002120051],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004028952,0.00005288674,0.0006487041,0.00006714897,0.00004571788,0.00006921486,0.00003093143,0.9050165,0.001720232,0.007200355,0.001554003,0.08355393],"study_design_scores_gemma":[0.000001865895,0.000007595318,0.0000507548,0.000003972509,0.000004012373,0.000006060126,0.000001904719,0.9985369,0.000161554,0.0009136335,0.0003101382,0.000001652364],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01929388,0.0008569215,0.9731911,0.0005962541,0.00009411993,0.00007876737,0.0001230619,0.0004681364,0.005297669],"genre_scores_gemma":[0.5435005,0.001420995,0.4405282,0.0005364688,0.0001571675,0.0003883128,0.0007784337,0.0001099558,0.01258003],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01803836,"threshold_uncertainty_score":0.03586674,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}