{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":3,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":3,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"ab26a5463c30","filters":{"venue":"2022 Annual Reliability and Maintainability Symposium (RAMS)"}},"results":[{"id":"W4296508665","doi":"10.1109/rams51457.2022.9894015","title":"Using Big Data and Machine Learning to Improve Aircraft Reliability and Safety","year":2022,"lang":"en","type":"article","venue":"2022 Annual Reliability and Maintainability Symposium (RAMS)","topic":"Fault Detection and Control Systems","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Reliability (semiconductor); Computer science; Big data; Reliability engineering; Engineering; Data mining","authors":[{"name":"Marcos Salvador","is_ca":false},{"name":"Soumaya Yacout","is_ca":true},{"name":"Ayman AboElHassan","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01193833521540442,"gpt":0.2346658893638711,"spread":0.2227275541484667,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003210201,0.001017525,0.0009433675,0.002379311,0.0005105055,0.003565886,0.00139587,0.00143624,0.001266744],"category_scores_gemma":[0.01187796,0.0003925324,0.0006119862,0.002530297,0.001487112,0.005085492,0.001694753,0.002196587,0.0006450192],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009333579,"about_ca_system_score_gemma":0.001232889,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001985345,"about_ca_topic_score_gemma":0.001927135,"domain_scores_codex":[0.998123,0.0006727997,0.0001260296,0.0002637263,0.0007208771,0.00009347942],"domain_scores_gemma":[0.9908203,0.005793511,0.000693402,0.001324561,0.001134361,0.0002337807],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0004042767,0.0004819561,0.02115119,0.001454168,0.0004572579,0.0003312477,0.000465864,0.1697625,0.008980016,0.05638832,0.02284923,0.7172739],"study_design_scores_gemma":[0.00004848594,0.0003048802,0.01101295,0.000450304,0.0001251574,0.0001714895,0.0004617236,0.6867546,0.01689893,0.2401613,0.04348434,0.0001259387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08693822,0.03229344,0.8176244,0.0301098,0.001728075,0.0002900307,0.002857742,0.004761444,0.02339678],"genre_scores_gemma":[0.7501482,0.01567411,0.2253039,0.001992664,0.001354972,0.0001855107,0.002110586,0.0002353676,0.002994598],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.003565886,"threshold_uncertainty_score":0.01697737,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296426248","doi":"10.1109/rams51457.2022.9894014","title":"General Transitions Probabilities and Maintenance Inspection Interval Optimization of a Weighted k-out-of-n System","year":2022,"lang":"en","type":"article","venue":"2022 Annual Reliability and Maintainability Symposium (RAMS)","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Reliability engineering; Production (economics); Interval (graph theory); Production line; Maintenance engineering; Preventive maintenance; Planned maintenance; Computer science; Line (geometry); Operational maintenance; Operations management; Risk analysis (engineering); Engineering; Business; Mathematics; Computerized maintenance management system; Mechanical engineering","authors":[{"name":"Mani Sharifi","is_ca":true},{"name":"Sharareh Taghipour","is_ca":true},{"name":"Abdolreza Abhari","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003880012021495324,"gpt":0.1904228210579949,"spread":0.1865428090364996,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001545842,0.001614385,0.001834229,0.001171108,0.0006829659,0.001306072,0.002446792,0.001480791,0.007363494],"category_scores_gemma":[0.005387702,0.0008593774,0.001098229,0.001399312,0.001133386,0.001590437,0.0009615435,0.001231187,0.0005427186],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001777771,"about_ca_system_score_gemma":0.001557488,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01176229,"about_ca_topic_score_gemma":0.007696882,"domain_scores_codex":[0.9989807,0.0002504773,0.00003766086,0.0003114661,0.0001847266,0.0002349399],"domain_scores_gemma":[0.9978381,0.001313724,0.0003286206,0.00007663015,0.0003311387,0.0001117704],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008312189,0.00002838881,0.0005039639,0.00006980626,0.00003874322,0.00007706787,0.00003834352,0.9851119,0.0007551532,0.007477376,0.0005408198,0.00527532],"study_design_scores_gemma":[0.000007309992,0.00001903385,0.0002271261,0.000004142955,0.00001355109,0.0000172923,0.000004974885,0.9958819,0.0001071301,0.003593725,0.000118821,0.000004991937],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07760618,0.00066203,0.9128843,0.0004549684,0.00008028731,0.0001304301,0.000452944,0.0004463615,0.00728259],"genre_scores_gemma":[0.9227234,0.0005932786,0.06316726,0.0001057151,0.0001012443,0.0002440322,0.0005807935,0.0001715624,0.01231281],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01176229,"threshold_uncertainty_score":0.02463335,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296474017","doi":"10.1109/rams51457.2022.9894004","title":"Dynamic k-out-of-n System Reliability under Uncertain Conditions","year":2022,"lang":"en","type":"article","venue":"2022 Annual Reliability and Maintainability Symposium (RAMS)","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Engineering; Physics; Thermodynamics","authors":[{"name":"Aliakbar Eslami Baladeh","is_ca":true},{"name":"Sharareh Taghipour","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004461345621007182,"gpt":0.2215358693150681,"spread":0.2170745236940609,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002570762,0.0009784069,0.00202849,0.0007248354,0.001040655,0.001318954,0.001687714,0.00170066,0.002097739],"category_scores_gemma":[0.01022121,0.0007890539,0.0007691313,0.0006250705,0.001323642,0.002112468,0.001448857,0.00146183,0.0002585617],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001455728,"about_ca_system_score_gemma":0.0008917672,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01134813,"about_ca_topic_score_gemma":0.00884496,"domain_scores_codex":[0.9986456,0.00029538,0.00007924957,0.0004027872,0.0002622385,0.0003147423],"domain_scores_gemma":[0.9938906,0.004021529,0.0008940482,0.0002262269,0.0008023564,0.0001651362],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001300924,0.00001659,0.001206762,0.00009369029,0.00004203096,0.000276404,0.00009345684,0.9902673,0.0009724941,0.003386445,0.0003827698,0.003131895],"study_design_scores_gemma":[0.00000630356,0.00002865572,0.000705556,0.00000772962,0.00001579328,0.00007396156,0.00002793667,0.9959748,0.0001969968,0.002834363,0.0001164127,0.00001137229],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3752543,0.001260106,0.6100501,0.001913548,0.0002345109,0.0001754303,0.0007695892,0.000554617,0.009787798],"genre_scores_gemma":[0.9939508,0.0001616688,0.004180638,0.00004771393,0.00002614535,0.0000471719,0.00008420567,0.00002354432,0.001478013],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01134813,"threshold_uncertainty_score":0.02256417,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}