{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":14,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":14,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"6594144cf3b2","filters":{"venue":"Built Environment Project and Asset Management"}},"results":[{"id":"W2903256777","doi":"10.1108/bepam-02-2018-0046","title":"Analysis of BIM use for asset management in three public organizations in Québec, Canada","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"École de Technologie Supérieure; HEC Montréal","funders":"","keywords":"Asset (computer security); Building information modeling; Originality; Asset management; Knowledge management; Nuclear decommissioning; Process management; Engineering; Engineering management; Computer science; Business; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01440743842490416,"gpt":0.2110667494847961,"spread":0.1966593110598919,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001195136,0.0001406536,0.0001835214,0.000619143,0.00004303156,0.00004448578,0.0001108701,0.00003782673,0.00009360135],"category_scores_gemma":[0.000005337209,0.0001420659,0.00002967656,0.0008430231,0.00003848273,0.0001617515,0.00006670142,0.00004862821,0.000001576245],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002896225,"about_ca_system_score_gemma":0.00002700144,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.07070136,"about_ca_topic_score_gemma":0.830583,"domain_scores_codex":[0.9990717,0.00001596086,0.0003161572,0.0002283638,0.0001692256,0.0001986081],"domain_scores_gemma":[0.9996538,0.0000207205,0.00004960482,0.0002337361,0.00001353416,0.00002857273],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00003288119,0.0002672299,0.8295723,0.0003561737,0.002792119,0.00001510676,0.0002596864,0.01463852,0.0001718339,0.0328545,0.006777342,0.1122623],"study_design_scores_gemma":[0.0008660131,0.0000531523,0.7937884,0.00002840025,0.000477021,6.862308e-7,0.0007209354,0.07204436,0.0001285287,0.0001916026,0.1313648,0.0003360907],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.926414,0.0001629566,0.06734733,0.0005241242,0.0002175444,0.001756283,0.000116611,0.00006513124,0.00339603],"genre_scores_gemma":[0.9965719,0.0003142171,0.002457878,0.00004543211,0.00001490183,0.0002032329,0.0001157239,0.00001671818,0.0002599796],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7598817,"threshold_uncertainty_score":0.9354869,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2038275092","doi":"10.1108/20441241111143812","title":"Applying just‐in‐time principles in the delivery and management of airport terminal buildings","year":2011,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Context (archaeology); Productivity; Quality (philosophy); Business; Work (physics); Marketing; Operations management; International airport; Transport engineering; Engineering; Process management; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.02607255167923948,"gpt":0.2192267643145724,"spread":0.1931542126353329,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004242406,0.000183601,0.0001761123,0.000193457,0.00003370112,0.00002439535,0.0001954369,0.00004155361,0.00001093344],"category_scores_gemma":[9.307465e-7,0.0001583911,0.00002264608,0.0001265842,0.0000390204,0.0001150867,0.0002276671,0.00008500178,0.00000367401],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005257902,"about_ca_system_score_gemma":0.000001893914,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003362633,"about_ca_topic_score_gemma":0.000006051073,"domain_scores_codex":[0.9989452,0.00002612111,0.0003175705,0.0002526083,0.0002295069,0.0002289415],"domain_scores_gemma":[0.9996648,0.00001346547,0.00006263393,0.0002364888,0.00000202514,0.00002062449],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002370002,0.001355817,0.6488776,0.008417537,0.000828367,0.001358423,0.008981542,0.06350307,0.001391397,0.009703891,0.001585945,0.2537594],"study_design_scores_gemma":[0.001656193,0.0001464448,0.93966,0.0005026864,0.000213632,0.00002344427,0.002459474,0.04207117,0.0004639403,0.0001639544,0.01201747,0.0006216115],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9841236,0.0002580064,0.002670032,0.00001988952,0.00002852662,0.001865779,0.000003413011,0.00004652468,0.01098425],"genre_scores_gemma":[0.9758081,0.003151698,0.02025095,0.00002981255,0.00001211323,0.0005029741,0.0000132711,0.0000256983,0.0002053557],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2907824,"threshold_uncertainty_score":0.6459,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2031552503","doi":"10.1108/bepam-09-2013-0036","title":"The role of team leadership in achieving LEED certification in a green building project","year":2015,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Centennial College","funders":"","keywords":"Certification; Teamwork; Knowledge management; Engineering management; Green building; Engineering; Process management; Computer science; Management; Architectural engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.2233197569751404,"gpt":0.3467700373519561,"spread":0.1234502803768156,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004683074,0.0001996865,0.0002526154,0.0008386361,0.00012445,0.00019683,0.0006199468,0.00005673161,0.00001320658],"category_scores_gemma":[0.0001092012,0.0001421339,0.00005482298,0.0009155608,0.0001567191,0.0004774257,0.0004877071,0.0001726594,0.00001876905],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001270986,"about_ca_system_score_gemma":0.00003462737,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0006487898,"about_ca_topic_score_gemma":0.0003712268,"domain_scores_codex":[0.997012,0.0002681499,0.0008057143,0.0005486775,0.0009731039,0.0003923408],"domain_scores_gemma":[0.9988532,0.0001878233,0.0003232926,0.0005746345,0.0000200479,0.00004096875],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001682336,0.000138344,0.3306588,0.0000553863,0.00003443697,0.000004307482,0.001942642,0.0002742514,0.0003505346,0.007780287,0.00068974,0.657903],"study_design_scores_gemma":[0.003038496,0.0003458417,0.3639494,0.0002025804,0.00006226691,0.000009021963,0.07895958,0.02741951,0.0007664949,0.01703161,0.5074759,0.000739228],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9617869,0.00129216,0.0009598701,0.002108516,0.0002049837,0.002992341,0.000005655359,0.0000430812,0.0306065],"genre_scores_gemma":[0.9957679,0.0004020176,0.00113065,0.00004425807,0.00003001503,0.0001904719,0.000004699365,0.00001221561,0.00241776],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6571638,"threshold_uncertainty_score":0.5796051,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2901090113","doi":"10.1108/bepam-01-2018-0002","title":"BIM-based energy consumption assessment of the on-site construction of building structural systems","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Lakehead University","funders":"","keywords":"Energy consumption; Structural system; Building information modeling; Key (lock); Productivity; Consumption (sociology); Environmental impact assessment; Computer science; Engineering; Construction engineering; Systems engineering; Civil engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01100631526017475,"gpt":0.2359621314522624,"spread":0.2249558161920877,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001020539,0.0001415073,0.0001438393,0.0001322109,0.00007867248,0.00002451967,0.00008753622,0.00005139489,0.00004512087],"category_scores_gemma":[0.000001089722,0.0001070627,0.00004721917,0.00009082951,0.0001953365,0.00006896649,0.00004125251,0.00006227207,0.000001202785],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007826527,"about_ca_system_score_gemma":0.000007805785,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003791205,"about_ca_topic_score_gemma":0.0000051885,"domain_scores_codex":[0.9991346,0.00004656468,0.0002837451,0.0001663222,0.000249571,0.0001191803],"domain_scores_gemma":[0.9995832,0.00001610787,0.0001301485,0.0002386936,0.00001295039,0.00001887784],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008815552,0.0001164201,0.1531254,0.001475608,0.0006609665,0.000002266766,0.0001519797,0.04605352,0.04340146,0.5951586,0.0008040421,0.1589616],"study_design_scores_gemma":[0.002722928,0.0006617808,0.3261606,0.0007360804,0.0003975722,0.00002750586,0.0006814444,0.5673589,0.07403919,0.001196291,0.0252033,0.0008144095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.932152,0.0001076177,0.06391212,0.00002698983,0.0007610492,0.0004266861,0.00003300501,0.00004954984,0.002530961],"genre_scores_gemma":[0.9956482,0.0001248379,0.004059398,0.00001262047,0.0000491672,0.00004526844,0.00001140234,0.00001162632,0.0000374582],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5939623,"threshold_uncertainty_score":0.436589,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3194394674","doi":"10.1108/bepam-11-2020-0180","title":"Integrating risk management's best practices to estimate deep excavation projects’ time and cost","year":2021,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Fault tree analysis; Best practice; Identification (biology); Excavation; Risk management; Risk analysis (engineering); Engineering; Bayesian network; Project management; Estimation; Cost estimate; Computer science; Operations research; Reliability engineering; Systems engineering; Artificial intelligence; Business; Management","retraction":null,"screen_n_in":null,"score":{"opus":0.09254565975037203,"gpt":0.4649248228798091,"spread":0.372379163129437,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001441644,0.0002561418,0.000262771,0.000240522,0.001080622,0.00008909912,0.0001485277,0.0001013114,0.0003012476],"category_scores_gemma":[0.0002051251,0.0002313249,0.00003191996,0.0003070645,0.00005167319,0.0003136167,0.0008435491,0.0004334597,0.0005125671],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002055839,"about_ca_system_score_gemma":0.00006892262,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000408322,"about_ca_topic_score_gemma":0.0002557604,"domain_scores_codex":[0.9969498,0.0005745658,0.0005378512,0.0007155608,0.0005567622,0.0006654751],"domain_scores_gemma":[0.9985359,0.0004034444,0.0004044184,0.0003965148,0.00004691304,0.0002127607],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000403588,0.0005183647,0.2251745,0.002695108,0.0002895215,0.0001567873,0.001797667,0.0001545022,0.0001404529,0.00582268,0.005378019,0.7574688],"study_design_scores_gemma":[0.002861608,0.0005798902,0.4310504,0.0007374451,0.000294222,0.00001058064,0.01062576,0.01043229,0.00004397811,0.0006666545,0.5419775,0.0007197067],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"methods","genre_scores_codex":[0.6611634,0.001676333,0.01696286,0.008558275,0.000559138,0.02469182,0.0002330997,0.0002769238,0.2858781],"genre_scores_gemma":[0.3663455,0.04295681,0.3830442,0.005192365,0.001090377,0.01765578,0.002573234,0.0003393652,0.1808024],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7567491,"threshold_uncertainty_score":0.9433154,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1674731675","doi":"10.1108/bepam-02-2014-0012","title":"An ontology-supported asset information integrator system in infrastructure management","year":2015,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Ontology; Asset (computer security); Knowledge management; Information system; Database transaction; Asset management; Database; Software engineering; Computer security; Engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.01478590161910739,"gpt":0.2456061592549524,"spread":0.230820257635845,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006098606,0.0002763604,0.0002657897,0.0004182832,0.00007652857,0.0002718233,0.0007136319,0.0001012784,0.000005862021],"category_scores_gemma":[0.000005887372,0.0002320556,0.00003526333,0.0002491602,0.00005226528,0.001314543,0.0005795748,0.0001590548,0.00004439383],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002535255,"about_ca_system_score_gemma":0.00002190758,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001112128,"about_ca_topic_score_gemma":0.00002952232,"domain_scores_codex":[0.9981391,0.000130468,0.000438701,0.000455125,0.0004386501,0.0003979851],"domain_scores_gemma":[0.9990495,0.00001367745,0.0001614538,0.0006476303,0.00001342648,0.0001142484],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0001476225,0.0006025784,0.1499414,0.0010893,0.0004150023,0.0007490353,0.005273725,0.002302088,0.00005578227,0.2513265,0.01770681,0.5703901],"study_design_scores_gemma":[0.004879262,0.001041889,0.6015561,0.0001848374,0.0001370229,0.00009365355,0.02737028,0.08240743,0.0001744108,0.00362462,0.2772665,0.001263968],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.533657,0.0003164562,0.4099104,0.0009905619,0.001072533,0.004330974,0.00002039851,0.0009703983,0.0487313],"genre_scores_gemma":[0.9581475,0.0001594695,0.04092481,0.0002605725,0.00002312043,0.0002132787,0.00007801491,0.000009448599,0.0001837832],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5691261,"threshold_uncertainty_score":0.9462952,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4206913871","doi":"10.1108/bepam-08-2021-0104","title":"Challenges negating virtual construction project team performance in the Middle East","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Team Dynamics and Performance","field":"Psychology","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Durham College","funders":"","keywords":"Virtual team; Originality; Middle East; Project team; Knowledge management; Team effectiveness; Business; Psychological safety; Engineering; Psychology; Computer science; Political science; Creativity","retraction":null,"screen_n_in":null,"score":{"opus":0.06219230117728574,"gpt":0.2734953304615382,"spread":0.2113030292842524,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007773116,0.0001964447,0.0001509172,0.0001927943,0.0003685979,0.00004419338,0.000310176,0.00003663831,0.0001483572],"category_scores_gemma":[0.00000155593,0.0001616898,0.00003938819,0.0001705344,0.00008431946,0.0001176451,0.0003530821,0.0003171519,0.00002164145],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009215593,"about_ca_system_score_gemma":0.00001004233,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008456007,"about_ca_topic_score_gemma":0.00002135415,"domain_scores_codex":[0.9983723,0.0002069927,0.0002701842,0.0004483551,0.0003486026,0.000353535],"domain_scores_gemma":[0.999426,0.0000285666,0.0001268319,0.0003983169,0.000002205407,0.00001805307],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002584802,0.001071367,0.06847357,0.0002522666,0.0002034662,0.00006110491,0.04088331,0.00111802,0.00002797897,0.04075772,0.001929039,0.8449637],"study_design_scores_gemma":[0.002315529,0.001588942,0.3389511,0.00005389904,0.00007627422,0.0001863294,0.1847851,0.007340442,0.000003348988,0.000160684,0.4638827,0.0006555887],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9271883,0.0005248282,0.00005510299,0.000442988,0.0003044141,0.001280875,0.0000198846,0.00003512025,0.07014853],"genre_scores_gemma":[0.9953362,0.001347393,0.0004005705,0.0001631916,0.0000707035,0.001161757,0.00003713135,0.00001964084,0.001463444],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8443081,"threshold_uncertainty_score":0.6593519,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4281391534","doi":"10.1108/bepam-12-2021-0150","title":"The new-normal challenges and IPD solutions: a Canadian case study","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Originality; Context (archaeology); Knowledge management; Process management; Project management; Management science; Computer science; Engineering; Sociology; Qualitative research; Systems engineering; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.1087610256947582,"gpt":0.3220051485567991,"spread":0.2132441228620409,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.003230449,0.0002060266,0.0001709728,0.0004915828,0.002627323,0.0004140741,0.0004696996,0.00002171249,0.0003300521],"category_scores_gemma":[0.00002328037,0.0001519728,0.00004650241,0.0003025359,0.0001221461,0.0003043678,0.00158352,0.0001904943,0.00002838621],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001171455,"about_ca_system_score_gemma":0.00006239413,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.01408479,"about_ca_topic_score_gemma":0.04289773,"domain_scores_codex":[0.9972302,0.0003065407,0.0004257387,0.0006280427,0.0009369096,0.0004725866],"domain_scores_gemma":[0.9988803,0.000150867,0.0001490057,0.0006560255,0.000009776996,0.0001540682],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00002902999,0.00009663133,0.008196046,0.00000817282,0.000119679,0.0005304019,0.002788578,0.00008536878,7.642096e-7,0.005945322,0.01383248,0.9683675],"study_design_scores_gemma":[0.0006976588,0.0003036763,0.02130576,0.000002065313,0.0000586574,0.0003969822,0.09534848,0.0009572664,3.824696e-7,0.001340098,0.8793654,0.0002235837],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9289238,0.01026663,0.0003067975,0.01227633,0.0009304237,0.005163613,0.00003885105,0.00009380281,0.0419998],"genre_scores_gemma":[0.980782,0.004205079,0.0002011362,0.0001688075,0.00006379194,0.0004274892,0.000003791939,0.00001304255,0.01413488],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9681439,"threshold_uncertainty_score":0.9986711,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2527908636","doi":"10.1108/bepam-10-2015-0056","title":"Analyzing relationships between project team compositions and green building certification in green building projects","year":2016,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Certification; Green building; Project team; Project management; Project stakeholder; Engineering management; Project management triangle; Knowledge management; Engineering; Project charter; Business; Architectural engineering; Computer science; Management; Systems engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03855807610709506,"gpt":0.2659583078171557,"spread":0.2274002317100607,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007668423,0.0003795871,0.0003293218,0.0008139377,0.0002780312,0.0001321699,0.0002070786,0.0001225857,0.000007652352],"category_scores_gemma":[0.00001330003,0.0003261754,0.00005379407,0.000418385,0.00008628429,0.0005013655,0.0002466861,0.0002464488,0.000005692726],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004532287,"about_ca_system_score_gemma":0.00002115187,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002709656,"about_ca_topic_score_gemma":0.00002035867,"domain_scores_codex":[0.9978062,0.0001646143,0.0005198395,0.0006440316,0.000300693,0.0005646386],"domain_scores_gemma":[0.9992388,0.0001590388,0.000109816,0.0003886534,0.00001118864,0.00009248316],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00006562772,0.0003312963,0.5534819,0.001801283,0.0007674395,0.00009130039,0.001695973,0.00181334,0.0347844,0.01320354,0.001400012,0.3905639],"study_design_scores_gemma":[0.006508222,0.0005751048,0.8632959,0.002231236,0.000947548,0.00004735844,0.004593429,0.02920097,0.006164183,0.01007494,0.07278197,0.003579102],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9223511,0.000465684,0.07174554,0.000709833,0.00006551999,0.002623293,0.00003308218,0.0003314376,0.001674558],"genre_scores_gemma":[0.9846132,0.0008725169,0.01320543,0.00001221249,0.00009009863,0.0004560454,0.00003185273,0.0000615851,0.0006570852],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3869848,"threshold_uncertainty_score":0.9999191,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2777689208","doi":"10.1108/bepam-03-2017-0017","title":"Model for developing trust on US construction projects","year":2017,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"National Research Council Canada","funders":"","keywords":"Originality; Business; Measure (data warehouse); Phone; Value (mathematics); Integrated project delivery; Knowledge management; Process management; Computer science; Project management; Engineering; Systems engineering; Qualitative research","retraction":null,"screen_n_in":null,"score":{"opus":0.1927443699126818,"gpt":0.3801893441129762,"spread":0.1874449742002944,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.001439465,0.000312854,0.0003093049,0.0004792601,0.001348719,0.001036713,0.0008148429,0.0000801667,0.00005460684],"category_scores_gemma":[0.0001122959,0.0002535298,0.0001152656,0.000118485,0.0002582262,0.0007367152,0.0006506907,0.0001168897,0.00007780806],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009753034,"about_ca_system_score_gemma":0.00003757636,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002118057,"about_ca_topic_score_gemma":0.00002094618,"domain_scores_codex":[0.997155,0.00004747026,0.0005585456,0.0009231246,0.0008933206,0.0004225273],"domain_scores_gemma":[0.998131,0.00008798244,0.0005263105,0.001161138,0.0000347188,0.00005881294],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002881113,0.0001083125,0.07130524,0.0001420488,0.0001670324,0.000009414936,0.0003253521,0.0008648639,0.00006349583,0.08790532,0.009669592,0.8291512],"study_design_scores_gemma":[0.004002301,0.0004312558,0.1208521,0.0001311622,0.0001755176,0.00001868362,0.00160537,0.3033493,0.0005107017,0.03045734,0.5372152,0.00125103],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7747445,0.00005706411,0.1420291,0.003145595,0.001175014,0.005273595,0.00007044578,0.0001460214,0.07335869],"genre_scores_gemma":[0.9195676,0.0006678645,0.0558698,0.0004290132,0.0001601249,0.000662007,0.00002354138,0.00003376858,0.02258632],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8279002,"threshold_uncertainty_score":0.9999917,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1525972495","doi":"10.1108/bepam-03-2013-0004","title":"A game-theoretic model for roadway performance management","year":2014,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Toronto","funders":"","keywords":"Asset (computer security); Asset management; Multitude; Computer science; Game theory; Set (abstract data type); IT asset management; Risk analysis (engineering); Management science; Operations research; Knowledge management; Business; Microeconomics; Economics; Computer security; Engineering; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.01831175807892299,"gpt":0.2655456986617421,"spread":0.2472339405828191,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006219704,0.0001335944,0.0001132022,0.000105985,0.0003223517,0.00007460633,0.0001479267,0.00004525916,0.00002392839],"category_scores_gemma":[0.00000309342,0.0001305421,0.000040063,0.00007709661,0.0001011473,0.0001478495,0.00003390038,0.00004179641,0.00001282426],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000473843,"about_ca_system_score_gemma":0.000006807823,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001859964,"about_ca_topic_score_gemma":0.00001243889,"domain_scores_codex":[0.9988775,0.00004677992,0.0001839094,0.000312956,0.000292863,0.000286052],"domain_scores_gemma":[0.9996688,0.00002341043,0.00007468337,0.0001707085,0.000006994743,0.00005534101],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001658257,0.0003772614,0.01347831,0.001040131,0.0002240627,0.000004592533,0.01189022,0.1891428,0.000009368325,0.5115967,0.004013963,0.2680567],"study_design_scores_gemma":[0.001750191,0.0001810611,0.01899694,0.0001056925,0.0002512922,3.333555e-7,0.002182578,0.5858943,0.00001833961,0.00459694,0.3854748,0.0005475769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1235459,0.00007833892,0.778339,0.000720132,0.0001461165,0.002709155,0.00001790477,0.0001890436,0.09425435],"genre_scores_gemma":[0.9563211,0.001762384,0.02563705,0.0001858341,0.0000461243,0.0003757052,0.00008261607,0.00001743248,0.01557173],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8327752,"threshold_uncertainty_score":0.5323351,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2742566035","doi":"10.1108/bepam-11-2016-0061","title":"An eco asset ontology towards effective eco asset management","year":2017,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Cumulative Environmental Management Association","funders":"","keywords":"Ontology; Computer science; IT asset management; Asset (computer security); Asset management; Knowledge management; Risk analysis (engineering); Alternative asset; Business; Consumption-based capital asset pricing model; Computer security; Capital asset pricing model; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.01953844444456498,"gpt":0.2923590342071806,"spread":0.2728205897626156,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009251424,0.0005419203,0.0005289256,0.0002940549,0.0007842147,0.001008921,0.002501963,0.0001560447,0.00005005137],"category_scores_gemma":[0.00001609033,0.0004768937,0.0001350498,0.0000907779,0.0002396117,0.001151772,0.002538803,0.0002219327,0.0001306089],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001739568,"about_ca_system_score_gemma":0.00001848736,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003018552,"about_ca_topic_score_gemma":0.0001260078,"domain_scores_codex":[0.9964652,0.000234751,0.0004330752,0.001428305,0.0005998716,0.0008387959],"domain_scores_gemma":[0.9967232,0.00005692531,0.0003571715,0.002685502,0.00001409832,0.0001630926],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00008014723,0.001080316,0.04192086,0.0004133388,0.0009403567,0.001072563,0.0005551928,0.0001101274,0.0001436068,0.06449211,0.01029305,0.8788983],"study_design_scores_gemma":[0.00194004,0.0008326566,0.8711463,0.00006694868,0.0002073447,0.00003567708,0.0004535692,0.005373521,0.0004503526,0.004987987,0.1136024,0.0009032331],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5172849,0.0009086044,0.2976356,0.007568446,0.00277943,0.009365787,0.00008284562,0.001072731,0.1633016],"genre_scores_gemma":[0.9490693,0.00140207,0.04573976,0.0005411551,0.0001260163,0.0007086028,0.00005072847,0.00003693346,0.002325395],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8779951,"threshold_uncertainty_score":0.9997683,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296211515","doi":"10.1108/bepam-11-2021-0138","title":"Analysing value creation in social housing construction in remote communities – application to Nunavik (Canada)","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Value Engineering and Management","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Université Laval","funders":"","keywords":"Causal loop diagram; Value (mathematics); Conceptual framework; Business; SWOT analysis; Supply chain; Indigenous; Environmental economics; Computer science; Environmental resource management; Process management; Architectural engineering; Engineering; Marketing; Economics; Sociology; System dynamics","retraction":null,"screen_n_in":null,"score":{"opus":0.01159993663558156,"gpt":0.2216819235691829,"spread":0.2100819869336014,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005793854,0.0001908164,0.0001978532,0.0007280027,0.0004025393,0.0001299581,0.0001919206,0.00002410931,0.00002959758],"category_scores_gemma":[0.000003531674,0.0002330367,0.00003146935,0.0006098056,0.00002553375,0.0002522846,0.0006432757,0.0001719301,0.00000423809],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005881204,"about_ca_system_score_gemma":0.00001420043,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.2272885,"about_ca_topic_score_gemma":0.02746453,"domain_scores_codex":[0.9986015,0.00004502659,0.0003181335,0.0003063856,0.0004393041,0.0002896626],"domain_scores_gemma":[0.9996225,0.00001318361,0.0001295865,0.00021929,0.000005557838,0.000009853153],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001106598,0.0002809397,0.05268069,0.0004931627,0.0001126678,0.00004920647,0.0007239575,0.6589681,0.0002005742,0.02753658,0.001337164,0.2575063],"study_design_scores_gemma":[0.002060778,0.00004803701,0.2838327,0.0001039791,0.0001956863,0.000003313745,0.02100385,0.4331704,0.00001516574,0.002830217,0.2557282,0.00100767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9702851,0.00005087079,0.01841643,0.001489044,0.0001709095,0.001435847,0.00000565706,0.00008116963,0.008064985],"genre_scores_gemma":[0.9967015,0.0000313461,0.002124631,0.0005661143,0.0001195682,0.0001953664,0.000115545,0.00002615786,0.0001197265],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2564986,"threshold_uncertainty_score":0.9902817,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3212537810","doi":"10.1108/bepam-04-2021-0063","title":"Framework for identification of performance metrics for research and development collaborations: Construction Innovation Centre","year":2021,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Identification (biology); Originality; Context (archaeology); Knowledge management; Outreach; Computer science; Process management; Engineering management; Management science; Engineering; Qualitative research","retraction":null,"screen_n_in":null,"score":{"opus":0.2631372235762758,"gpt":0.4285962629288709,"spread":0.1654590393525951,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003595813,0.0001428151,0.0002095315,0.001016536,0.0004984929,0.0002991431,0.0001873461,0.00007672719,0.00003967834],"category_scores_gemma":[0.0004628551,0.0001337558,0.00002579566,0.001927389,0.000173978,0.0004180642,0.0002594164,0.00008765658,0.000006462536],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000767505,"about_ca_system_score_gemma":0.00008194269,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001414943,"about_ca_topic_score_gemma":0.000004519569,"domain_scores_codex":[0.9973393,0.00007962087,0.0009005812,0.0005861369,0.0008415533,0.0002527733],"domain_scores_gemma":[0.9981893,0.0004900905,0.0003909536,0.0003765184,0.0005229683,0.00003020311],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001195237,0.0001543418,0.03421986,0.0004503928,0.0001122827,5.538533e-7,0.0005831518,0.00007829104,0.0004947906,0.2331951,0.001620167,0.7289715],"study_design_scores_gemma":[0.001870097,0.0002892743,0.04071161,0.0001166041,0.00008115107,0.00000624971,0.01585529,0.00801149,0.02204826,0.04626043,0.8642821,0.0004674285],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5043313,0.0003078076,0.490241,0.0009332637,0.00038294,0.003014982,0.00006583724,0.00002566284,0.000697169],"genre_scores_gemma":[0.6963834,0.001789109,0.295429,0.00005349144,0.00008158186,0.0007131699,0.0002038072,0.00002014427,0.005326298],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.862662,"threshold_uncertainty_score":0.5454401,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}