{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":4,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":4,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"61ca1d7ad9e6","filters":{"venue":"Chinese Journal of Geotechnical Engineering"}},"results":[{"id":"W2371182693","doi":"","title":"Researches on failure criteria of Lade-Duncan,Matsuoka-Nakai and Ottosen","year":2006,"lang":"en","type":"article","venue":"Chinese Journal of Geotechnical Engineering","topic":"Civil and Geotechnical Engineering Research","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"","keywords":"Ridge; Mathematics; Hoek–Brown failure criterion; Structural engineering; Function (biology); Applied mathematics; Geotechnical engineering; Engineering; Geology","retraction":null,"screen_n_in":null,"score":{"opus":0.005228857623999547,"gpt":0.2324348724439066,"spread":0.2272060148199071,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007358364,0.0003415422,0.0006561385,0.0005865915,0.00003652778,0.00005170134,0.0004288238,0.0002623891,0.00004225114],"category_scores_gemma":[0.0006640918,0.0002642567,0.0002147136,0.0006420954,0.00009711306,0.0002504573,0.0001190066,0.001209581,0.000004841301],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008671849,"about_ca_system_score_gemma":0.00003050243,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002197691,"about_ca_topic_score_gemma":0.000004840961,"domain_scores_codex":[0.9978569,0.00002277809,0.0008098339,0.0001874038,0.0006359008,0.0004872111],"domain_scores_gemma":[0.9987198,0.000456048,0.00008658711,0.00033118,0.0001614794,0.0002449379],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007481418,0.00008821925,0.00009469374,0.0005575207,0.0000748227,0.00008885298,0.00002209102,0.8738413,0.1207262,0.001240852,0.001325969,0.001864725],"study_design_scores_gemma":[0.003230976,0.001701868,0.03881426,0.001998635,0.00008933592,0.0008863853,0.00003166244,0.8917914,0.0307778,0.004096824,0.0251226,0.001458236],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9777786,0.001515528,0.01888747,0.0005602216,0.000252852,0.0001849635,0.00002015976,0.0003190794,0.0004810955],"genre_scores_gemma":[0.9973468,0.0001544322,0.001993371,0.000007077117,0.0003774962,0.000006644581,0.000002934891,0.00007530703,0.00003597357],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.08994838,"threshold_uncertainty_score":0.999981,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2391775358","doi":"","title":"Discussion on \"The lowest solution of slice method for slope stability analysis\"","year":2009,"lang":"en","type":"article","venue":"Chinese Journal of Geotechnical Engineering","topic":"Landslides and related hazards","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"SoilVision Systems (Canada)","funders":"","keywords":"Geotechnical engineering; Slope stability; Stability (learning theory); Slope stability analysis; Geology; Mathematics; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.00783273682021793,"gpt":0.251110129190764,"spread":0.243277392370546,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00121384,0.0001179121,0.0002959181,0.0000660756,0.00005356193,0.00001040563,0.0002447399,0.00009775344,0.0001547077],"category_scores_gemma":[0.0004230069,0.00004711232,0.0003421963,0.000551255,0.00002667318,0.0001202438,0.00004106298,0.0003155677,0.000001605367],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008726908,"about_ca_system_score_gemma":0.000007065813,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006725068,"about_ca_topic_score_gemma":0.000002556613,"domain_scores_codex":[0.9989956,0.0000298657,0.0004280408,0.0001138747,0.0002804247,0.0001521747],"domain_scores_gemma":[0.9993017,0.0002042049,0.0001921221,0.0001972464,0.00002385405,0.00008084664],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001156518,0.0001283995,0.000405619,0.000009383242,0.00008555394,0.000002415441,0.00006799354,0.9267717,0.06397313,0.000135041,0.00006765797,0.008237457],"study_design_scores_gemma":[0.0005662781,0.0007028245,0.1413864,0.00006843005,0.000345835,0.0000284569,0.00001538909,0.8490943,0.004565939,0.001370099,0.001650971,0.0002051008],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4424081,0.00003142915,0.5546291,0.002551085,0.0000933625,0.0001268416,0.000003174462,0.00001556498,0.0001413598],"genre_scores_gemma":[0.9913081,0.0000162549,0.008554106,0.00004502331,0.00005455756,0.000001292006,9.874364e-7,0.000005813452,0.00001389678],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5488999,"threshold_uncertainty_score":0.1921185,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2380801291","doi":"","title":"Semi-analytical solution to cavity expansion in crushable sands","year":2009,"lang":"en","type":"article","venue":"Chinese Journal of Geotechnical Engineering","topic":"Geotechnical Engineering and Soil Mechanics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Geotechnical engineering; Deformation (meteorology); Mechanics; Particle flow; Materials science; Solver; Stress (linguistics); Particle (ecology); Geology; Mathematics; Physics; Composite material","retraction":null,"screen_n_in":null,"score":{"opus":0.00593591608881926,"gpt":0.2217862938930991,"spread":0.2158503778042798,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007128997,0.0003464215,0.0006700212,0.0005925057,0.00002831263,0.00003704106,0.0003911426,0.0003198571,0.00001319239],"category_scores_gemma":[0.0007411672,0.0002953453,0.0002403653,0.001039861,0.000009972465,0.0002953357,0.00004920958,0.001160158,0.00001182526],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002736394,"about_ca_system_score_gemma":0.00002926489,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005244263,"about_ca_topic_score_gemma":0.000001708241,"domain_scores_codex":[0.9979548,0.00001465128,0.0008768417,0.0001937194,0.0004228216,0.0005371485],"domain_scores_gemma":[0.9990323,0.0001035536,0.000057451,0.0003174107,0.0000893361,0.0003999495],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002025221,0.00005518397,0.000008419772,0.00003368682,0.00001441682,0.00006714732,0.00002960364,0.9757961,0.01908164,0.0002693807,0.0001835659,0.004440595],"study_design_scores_gemma":[0.0004935586,0.0002613704,0.004851174,0.0002580436,0.00002061473,0.0001590256,0.000004372723,0.9910699,0.001066066,0.0004071339,0.00106035,0.0003484493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7647313,0.0004218808,0.2332129,0.0004659167,0.0004958421,0.0001336594,0.000002300442,0.0003913858,0.0001447975],"genre_scores_gemma":[0.9974833,0.00007846447,0.002078687,0.00006979872,0.000226602,0.000004013856,0.00000149549,0.00004271081,0.00001498943],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2327519,"threshold_uncertainty_score":0.9999499,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2351143608","doi":"","title":"Seismic upgrade of Coquitlam Dam","year":2008,"lang":"en","type":"article","venue":"Chinese Journal of Geotechnical Engineering","topic":"Dam Engineering and Safety","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Levee; Geotechnical engineering; Geology; Abutment; Embankment dam; Engineering; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.00612318235060869,"gpt":0.1963065606054781,"spread":0.1901833782548694,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002665581,0.0002759867,0.0006013017,0.0003200993,0.00002751036,0.000007209066,0.0003818535,0.0001619794,0.00001662308],"category_scores_gemma":[0.0002345554,0.0002252049,0.0002888631,0.0004758205,0.00004596257,0.0002361854,0.00004431246,0.0006756234,0.000005859414],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007153827,"about_ca_system_score_gemma":0.00003051712,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002025633,"about_ca_topic_score_gemma":1.251039e-7,"domain_scores_codex":[0.9984596,0.000008296421,0.0007935837,0.0001008585,0.0003355345,0.0003021254],"domain_scores_gemma":[0.9992187,0.0001270226,0.0001055958,0.0002702979,0.00009015609,0.0001882375],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000009309955,0.00002852907,0.0001414731,0.0001197083,0.00007549662,0.00006381417,0.00006999977,0.9809702,0.01767769,0.00005779718,0.0003763508,0.0004096531],"study_design_scores_gemma":[0.0008632978,0.0001417087,0.0149426,0.0002479961,0.00004166421,0.002021539,0.000007823216,0.9702911,0.005084085,0.00009647744,0.005829775,0.0004319282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8271656,0.001183409,0.1703359,0.00004737845,0.0006942798,0.00006002883,0.000006105669,0.0002763057,0.0002309842],"genre_scores_gemma":[0.9959109,0.0005029775,0.003200706,0.000007752036,0.0002796825,0.000002033024,0.000001712797,0.00006646487,0.00002779234],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1687453,"threshold_uncertainty_score":0.9183588,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}