{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":30,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":30,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"2fd57bcb9032","filters":{"venue":"Construction Management and Economics"}},"results":[{"id":"W1988886479","doi":"10.1080/01446190600567977","title":"A systems view of temporary housing projects in post‐disaster reconstruction","year":2006,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Disaster Management and Resilience","field":"Social Sciences","cited_by":148,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université de Montréal","funders":"","keywords":"Context (archaeology); Natural disaster; Human settlement; Term (time); Business; Natural (archaeology); Environmental planning; Engineering; Operations research; Computer science; Operations management; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.01469035132801587,"gpt":0.2235888085568304,"spread":0.2088984572288145,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002645556,0.00009356145,0.0001619463,0.0002703199,0.00013831,0.000126018,0.00009268616,0.00005136644,0.00002453521],"category_scores_gemma":[0.00000354193,0.0001010704,0.00003109635,0.0001800299,0.000333554,0.0005358261,0.00005626309,0.00004279769,0.000005177169],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006022594,"about_ca_system_score_gemma":0.00002495412,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001172156,"about_ca_topic_score_gemma":0.001077192,"domain_scores_codex":[0.9991251,0.00005973472,0.000338216,0.0002279417,0.00006857397,0.0001804366],"domain_scores_gemma":[0.9996482,0.00001538653,0.0001766174,0.0001073967,0.00002446421,0.00002798258],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","study_design_scores_codex":[0.00004972468,0.00006516801,0.2918416,0.0004230335,0.00005704852,0.00000573666,0.001682751,0.0006405723,0.00002620469,0.4245499,0.0002869847,0.2803713],"study_design_scores_gemma":[0.005706454,0.0002143856,0.2664511,0.001435739,0.0002528233,0.00005556279,0.4958903,0.007885214,0.00009033063,0.04075435,0.179089,0.00217479],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8643785,0.0002347055,0.0001304656,0.0001130511,0.000683832,0.0004309851,0.000001903893,0.00002843479,0.1339981],"genre_scores_gemma":[0.9968351,0.0007298776,0.0008369587,0.00001991057,0.0001069778,0.00001481807,0.000004817893,0.000007095133,0.001444447],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4942075,"threshold_uncertainty_score":0.4121533,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2592108117","doi":"10.1080/01446193.2017.1294257","title":"Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance","year":2017,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Craft; Schedule; Productivity; Economic shortage; Work (physics); Operations management; Engineering; Earned value management; Construction industry; Business; Project management; Economics; Economic growth; Geography; Project planning; Management; Construction engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.04773427496663989,"gpt":0.3247412008486878,"spread":0.2770069258820479,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00104475,0.0001900704,0.0004940615,0.0006980934,0.0005723085,0.0002472356,0.0004639429,0.0000336281,0.00006525662],"category_scores_gemma":[0.0001658058,0.0001348048,0.0001982583,0.0008277018,0.001942454,0.0009104842,0.0003942757,0.0001207944,0.000003062913],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005364618,"about_ca_system_score_gemma":0.0000484241,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002626402,"about_ca_topic_score_gemma":0.0004990915,"domain_scores_codex":[0.9983053,0.00008460129,0.0006365389,0.0005593154,0.0002322312,0.0001820217],"domain_scores_gemma":[0.9970886,0.00008119526,0.001441752,0.001177803,0.0001657408,0.00004493174],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0000873438,0.00001967531,0.7644542,0.00002559226,0.0003641134,5.337208e-8,0.00005933742,0.0007442723,0.000003698665,0.002395285,0.00002430524,0.2318221],"study_design_scores_gemma":[0.0003362269,0.00009910692,0.9867179,0.000008551327,0.0002125673,0.000004112923,0.0004347305,0.0108025,0.0001186599,0.0005380902,0.0005899213,0.0001376331],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9958557,0.000009254735,0.00008708853,0.000166092,0.0003635643,0.0004531194,0.00005218024,0.00001321977,0.002999712],"genre_scores_gemma":[0.9983,0.0002999875,0.0008854417,0.000008140754,0.00003526334,0.00001109054,0.000002861131,0.000005830054,0.0004513655],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2316845,"threshold_uncertainty_score":0.7157053,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2461666051","doi":"10.1080/01446193.2016.1206660","title":"Collaboration through innovation: implications for expertise in the AEC sector","year":2016,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Complex Systems and Decision Making","field":"Decision Sciences","cited_by":65,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Framing (construction); Knowledge management; Engineering; Body of knowledge; Integrated project delivery; Context (archaeology); Process (computing); Architecture; Process management; Computer science; Project management; Systems engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.1842498460885814,"gpt":0.3778563005670879,"spread":0.1936064544785065,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009089479,0.00007849713,0.0001284927,0.0002447806,0.0002075931,0.0003816347,0.0002263301,0.00003304002,0.00007097037],"category_scores_gemma":[0.0001664641,0.00004598766,0.00002992914,0.0005949804,0.00007249428,0.0005846177,0.00005536762,0.00002053607,0.00002095022],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005308169,"about_ca_system_score_gemma":0.00001649617,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003144731,"about_ca_topic_score_gemma":0.00007022282,"domain_scores_codex":[0.9988422,0.00004268598,0.000598743,0.0003139336,0.00009044479,0.0001119257],"domain_scores_gemma":[0.9988167,0.000429963,0.0002289906,0.0003609847,0.0001493799,0.00001403316],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00001184506,0.00000524383,0.00759217,0.000001929105,0.000005110352,8.048976e-8,0.0002217689,0.00002003854,0.00002599807,0.78948,0.01104745,0.1915883],"study_design_scores_gemma":[0.0007185275,0.00001810696,0.03982772,0.00001032231,0.000004651308,0.000007977371,0.003006419,0.0006834767,0.00001306301,0.6520592,0.3035487,0.0001018539],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5117119,0.0002158102,0.4539328,0.01773139,0.001185783,0.001208605,0.00004858032,0.00003223007,0.01393287],"genre_scores_gemma":[0.9923683,0.00004684973,0.005812714,0.00042593,0.0001379899,0.0001583671,0.000002320396,0.000005364247,0.001042109],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4806564,"threshold_uncertainty_score":0.3680113,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2143084847","doi":"10.1080/01446190110066713","title":"Schedule-dependent evolution of site layout planning","year":2001,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Computer science; Site planning; Engineering; Engineering drawing; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.008054480456798623,"gpt":0.1847942455684726,"spread":0.176739765111674,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003744819,0.00006535726,0.00007585976,0.00009272879,0.00003840847,0.00001573741,0.00002701381,0.00003000588,0.00001409526],"category_scores_gemma":[0.000001699742,0.00007888003,0.00001312625,0.00002915746,0.0000325572,0.0001212639,0.00001970089,0.00003700279,0.000005192572],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005221353,"about_ca_system_score_gemma":0.000001445917,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002003527,"about_ca_topic_score_gemma":0.000001449838,"domain_scores_codex":[0.9996715,0.000002681055,0.0001339461,0.00009079555,0.00001861153,0.00008250663],"domain_scores_gemma":[0.999851,0.000005954673,0.00003649547,0.00007679207,0.000007831954,0.00002190246],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008068905,0.000002422553,0.007708244,0.00003566794,0.00002445312,7.267261e-7,0.00002762004,0.970072,0.000008682038,0.0143463,0.00001897939,0.007746774],"study_design_scores_gemma":[0.001255697,0.0000342287,0.01968554,0.00005663533,0.00009302219,0.0000441819,0.001435522,0.9492013,0.0008235821,0.01802566,0.008889637,0.0004550024],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5038354,0.000149875,0.4864306,0.000007948683,0.0003007807,0.00006354267,0.000002968262,0.0000895791,0.009119281],"genre_scores_gemma":[0.9789183,0.0004802808,0.02038445,0.000003724646,0.00004642319,0.000003234018,0.000009341768,0.000008910167,0.0001453364],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4750829,"threshold_uncertainty_score":0.3216634,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1647761698","doi":"10.1080/01446193.2015.1047879","title":"The influence of green building certifications in collaboration and innovation processes","year":2015,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Université de Montréal","funders":"","keywords":"Certification; Process (computing); Architecture; Sustainable design; Engineering; Product (mathematics); Order (exchange); Process management; Knowledge management; Business; Sustainable development; Engineering management; Systems engineering; Sustainability; Management; Computer science; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.01674839573545906,"gpt":0.2297115135380179,"spread":0.2129631178025589,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001485133,0.00004287724,0.00004790358,0.000156623,0.00004471325,0.00005514477,0.00003110999,0.00001659594,2.803185e-7],"category_scores_gemma":[0.00001547013,0.00004158308,0.00000216821,0.0003509347,0.00004865444,0.0002179056,0.00001653487,0.00002339038,2.010391e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004759001,"about_ca_system_score_gemma":0.00001957958,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007634249,"about_ca_topic_score_gemma":0.00002053282,"domain_scores_codex":[0.9996849,0.00000524709,0.0001645637,0.00006702251,0.00002040021,0.00005781653],"domain_scores_gemma":[0.9998038,0.0000185058,0.00004179446,0.0000557094,0.00006735184,0.00001287019],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00002165031,0.000009705401,0.06319331,0.0004408045,0.00005327845,5.111345e-7,0.0007402694,0.2238992,0.0003092721,0.572975,0.00014986,0.1382071],"study_design_scores_gemma":[0.004096784,0.0001699531,0.2162787,0.000283526,0.0001304448,0.00002904341,0.07100335,0.3066424,0.004733448,0.3114462,0.08404264,0.001143537],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9976352,0.000156907,0.001340522,0.0001372288,0.00006415255,0.0001420706,8.80961e-7,0.00002054919,0.0005024365],"genre_scores_gemma":[0.9972507,0.0005654833,0.002084448,0.000006462092,0.000009696945,0.00002085596,0.000001947284,0.000003894368,0.00005656108],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2615288,"threshold_uncertainty_score":0.1695709,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3097550964","doi":"10.1080/01446193.2020.1831037","title":"Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership","year":2020,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Outsourcing and Supply Chain Management","field":"Business, Management and Accounting","cited_by":39,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Supply chain; General partnership; Order (exchange); Supply chain management; Business; Decision model; Computer science; Third party; Operations research; Engineering; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.02554941713987919,"gpt":0.2142147740064871,"spread":0.1886653568666079,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003064161,0.0003839754,0.0003692058,0.0003198977,0.000419658,0.0008645013,0.0002715289,0.000107183,0.0001477174],"category_scores_gemma":[0.00003318506,0.0003658241,0.00007152026,0.0003281035,0.000318181,0.001337478,0.0002653187,0.0002220189,0.00006587757],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006574057,"about_ca_system_score_gemma":0.00002285583,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001563476,"about_ca_topic_score_gemma":0.00003408299,"domain_scores_codex":[0.9981757,0.00001619995,0.0004823973,0.0007442765,0.0001605906,0.0004208737],"domain_scores_gemma":[0.9991576,0.00003821731,0.0003116819,0.0003232972,0.00009691223,0.0000722903],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0009294893,0.00006362372,0.03858742,0.000348522,0.0002526681,0.00003182077,0.0003146306,0.5216187,0.000003808449,0.2731004,0.003710679,0.1610383],"study_design_scores_gemma":[0.001187255,0.00005080212,0.0007077446,0.00007807741,0.0002171338,0.00001418795,0.006474683,0.9535539,0.000004519448,0.008160428,0.02898761,0.0005636769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.414648,0.00005050554,0.5518762,0.002613763,0.0005693792,0.0008240485,0.00001514636,0.0005896871,0.02881325],"genre_scores_gemma":[0.9254063,0.0001029159,0.07100428,0.002577387,0.0006077138,0.00003003064,0.00008920654,0.00005117353,0.0001310382],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5107582,"threshold_uncertainty_score":0.9998794,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2058787072","doi":"10.1080/01446190500039911","title":"Deterministic models for assessing productivity and cost of bored piles","year":2005,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Pile; Productivity; Engineering; Scheduling (production processes); Process (computing); Cost estimate; Civil engineering; Operations research; Operations management; Computer science; Geotechnical engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.0166157574200885,"gpt":0.2098547012886811,"spread":0.1932389438685926,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006394138,0.00007475889,0.0001034126,0.00007733843,0.00005903675,0.00005544042,0.00002239412,0.0000326461,0.000004559539],"category_scores_gemma":[0.000002163078,0.00008474405,0.00001763762,0.00002445013,0.00008834234,0.0003921109,0.00001207607,0.00002867474,3.828695e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002412369,"about_ca_system_score_gemma":0.000003995414,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001005035,"about_ca_topic_score_gemma":0.00001330863,"domain_scores_codex":[0.9996162,0.000003959228,0.000166081,0.0001231423,0.0000150532,0.00007556783],"domain_scores_gemma":[0.9998303,0.00001348335,0.00004471331,0.00007043217,0.00001731872,0.00002373022],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00000877722,0.000004245649,0.001167477,0.0001257322,0.00003797898,4.031742e-8,0.00004359443,0.0145496,0.00006405394,0.08839419,0.0000625805,0.8955417],"study_design_scores_gemma":[0.0007038648,0.00001606697,0.002997062,0.00002713627,0.00007785206,0.00002790449,0.0006487099,0.9613844,0.00109951,0.02044197,0.01236154,0.0002139915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.84593,0.0001754174,0.147297,0.00006079916,0.0004002995,0.0003315731,0.0000149578,0.00006407378,0.005725897],"genre_scores_gemma":[0.9783139,0.0003096517,0.02118634,0.00000627594,0.00008103022,0.00003157134,0.00000679591,0.000008466347,0.0000560132],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9468348,"threshold_uncertainty_score":0.3455762,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2168976754","doi":"10.1080/01446193.2015.1063676","title":"Enhanced heuristic for finance-based scheduling of construction projects","year":2015,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"","keywords":"Scheduling (production processes); Computer science; Integer programming; Payment; Heuristic; Finance; Cash; Job shop scheduling; Linear programming; Cash flow; Operations research; Mathematical optimization; Economics; Engineering; Algorithm; Mathematics; Operating system; Schedule","retraction":null,"screen_n_in":null,"score":{"opus":0.1135662989238217,"gpt":0.3207669187765104,"spread":0.2072006198526887,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001497896,0.0001827605,0.0003759772,0.0005044161,0.0001430735,0.0001920694,0.0002578106,0.00009245379,0.00002204103],"category_scores_gemma":[0.0005784917,0.0001793606,0.0001055322,0.0003206366,0.0004393927,0.0003286349,0.00008595345,0.00008436189,0.00001381553],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006774721,"about_ca_system_score_gemma":0.0001356909,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004574949,"about_ca_topic_score_gemma":0.000004804473,"domain_scores_codex":[0.9981014,0.00005839264,0.0008251449,0.0005551922,0.0002086276,0.0002513022],"domain_scores_gemma":[0.9983056,0.0003391124,0.0006127664,0.0003682564,0.0002789884,0.00009532693],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0007142656,0.00005962338,0.01908356,0.0002018323,0.0001518278,0.000002055076,0.000833729,0.07091419,0.0001783789,0.2015871,0.0002985951,0.7059749],"study_design_scores_gemma":[0.013376,0.0006888048,0.00249603,0.0002336468,0.0003092042,0.00009945983,0.04779597,0.6318948,0.01928552,0.2585554,0.02378382,0.001481408],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7182462,0.00006094031,0.2746641,0.0001450318,0.000818954,0.0006375416,0.00001698865,0.00003549865,0.0053748],"genre_scores_gemma":[0.7404532,0.00004069142,0.2591629,0.00004399699,0.00008801432,0.00004681398,0.000008200978,0.00001223469,0.0001439064],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7044935,"threshold_uncertainty_score":0.7314112,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3045066834","doi":"10.1080/01446193.2020.1795217","title":"Assessing the impact of social procurement policies for Indigenous people","year":2020,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Community Development and Social Impact","field":"Economics, Econometrics and Finance","cited_by":28,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Indigenous; Procurement; Value (mathematics); Conceptual framework; Accountability; Social impact assessment; Economic growth; Public relations; Business; Political science; Sociology; Economics; Marketing; Social science","retraction":null,"screen_n_in":null,"score":{"opus":0.0687312696853455,"gpt":0.2903295940541011,"spread":0.2215983243687556,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002228271,0.00009915214,0.0002421539,0.00007798304,0.0003673519,0.0001851856,0.00013277,0.00003937944,0.00005229097],"category_scores_gemma":[0.00001357973,0.00009592615,0.0001193813,0.0001083105,0.00007749857,0.0002582888,0.00008455299,0.00005957465,0.000006468097],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008339439,"about_ca_system_score_gemma":0.00002008838,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001071469,"about_ca_topic_score_gemma":0.00001677928,"domain_scores_codex":[0.9993435,0.000008304285,0.0003420756,0.0001338431,0.00001170058,0.0001606285],"domain_scores_gemma":[0.9995518,0.00002494678,0.0002879495,0.0000796684,0.00001743142,0.00003823673],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00006414423,0.00006520018,0.5102739,0.0002625532,0.0008699764,1.577238e-7,0.0451855,0.0002338826,0.000009568688,0.3960625,0.001132068,0.04584062],"study_design_scores_gemma":[0.001502468,0.0001765472,0.9106383,0.00001005322,0.00004873444,0.00000240087,0.02060184,0.003890231,0.00002823355,0.0535883,0.009075624,0.0004373149],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9891162,0.000116774,0.001776145,0.001115873,0.0001077111,0.0004096215,0.00003143779,0.00001730132,0.007308944],"genre_scores_gemma":[0.9986405,0.0002026607,0.0008460952,0.0001147786,0.00009499848,0.00001999951,0.00001410688,0.00001034896,0.00005652727],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4003644,"threshold_uncertainty_score":0.3911754,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2061323651","doi":"10.1080/01446190410001673571","title":"Accelerating linear projects","year":2005,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Business; Engineering; Construction engineering; Process management; Systems engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.1231112855323806,"gpt":0.3266476792046519,"spread":0.2035363936722713,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001044056,0.00013724,0.00019103,0.000340409,0.0002518963,0.0004741885,0.0002609833,0.00005817219,0.0002981086],"category_scores_gemma":[0.0001202956,0.0001262063,0.00005917828,0.000211556,0.0001485753,0.000605528,0.0001886107,0.0001083729,0.0002349517],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004192564,"about_ca_system_score_gemma":0.00002018549,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000258393,"about_ca_topic_score_gemma":0.00001092384,"domain_scores_codex":[0.9985526,0.00004204513,0.0005522566,0.0004761507,0.0001515214,0.0002254376],"domain_scores_gemma":[0.9991998,0.0001374361,0.0002220356,0.0003092318,0.00005013448,0.00008134949],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00001550584,0.000009264629,0.02316943,0.000007518207,0.00003453571,0.000001485425,0.0003354198,0.002578958,0.00001436165,0.04535921,0.0004453409,0.928029],"study_design_scores_gemma":[0.002564547,0.00008529531,0.01020313,0.00004056399,0.00007585933,0.0002218628,0.02118919,0.3875372,0.001048846,0.02634302,0.5496757,0.001014815],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9038743,0.00005544891,0.004668319,0.0008474637,0.0003414205,0.0002803045,0.000002898126,0.00006802506,0.08986179],"genre_scores_gemma":[0.8098863,0.0001565564,0.1865588,0.0003827983,0.000477331,0.000016646,0.000003410262,0.00001439354,0.002503722],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9270142,"threshold_uncertainty_score":0.5146543,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4293068753","doi":"10.1080/01446193.2022.2110273","title":"Twenty-year application of logistics and supply chain management in the construction industry","year":2022,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"HEC Montréal","funders":"","keywords":"Supply chain management; Procurement; Supply chain; Construction industry; Construction management; Process management; Business; Computer science; Operations management; Knowledge management; Engineering; Construction engineering; Marketing; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.04027309551272337,"gpt":0.2837457886716672,"spread":0.2434726931589438,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001880938,0.0001500658,0.00021504,0.0007062712,0.0003706864,0.0001625939,0.0003940144,0.00006011286,0.000220675],"category_scores_gemma":[0.0000156133,0.0001366442,0.00004416041,0.0006699002,0.0003978984,0.0002869542,0.0005035001,0.0002706512,0.000007732277],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005973179,"about_ca_system_score_gemma":0.00001083589,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002222957,"about_ca_topic_score_gemma":0.00002099173,"domain_scores_codex":[0.9982186,0.0001367539,0.0006763068,0.0004673138,0.0003095352,0.0001914845],"domain_scores_gemma":[0.9989913,0.0001116274,0.0004002265,0.0004260082,0.00003380429,0.00003709822],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00004949421,0.00002126458,0.2073596,0.00002875582,0.00003796801,0.000001607514,0.0002095392,0.001230924,0.000001240555,0.4145611,0.0003735875,0.3761249],"study_design_scores_gemma":[0.003709209,0.0001791089,0.2518665,0.00002044211,0.0001942061,0.0002414685,0.137577,0.04740619,0.00002277856,0.23351,0.3245562,0.000716857],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9581127,0.0001113622,0.007767241,0.001257718,0.0009097435,0.001093961,0.00003569029,0.00003121523,0.03068033],"genre_scores_gemma":[0.9929546,0.0008053334,0.00528498,0.0001836838,0.00004818289,0.0001312157,0.00001693417,0.000008147959,0.000566885],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3754081,"threshold_uncertainty_score":0.5572188,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2078068035","doi":"10.1080/01446193.2013.825044","title":"Understanding differences in construction project governance between developed and developing countries","year":2013,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Structuring; Developing country; Corporate governance; Project governance; Order (exchange); Business; Knowledge management; Public relations; Process management; Political science; Economic growth; Computer science; Economics; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.2182641771756977,"gpt":0.3068836148289379,"spread":0.08861943765324024,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007055647,0.0002164743,0.0003480044,0.0005743167,0.0003393262,0.0008812674,0.0002111495,0.00008008934,0.000172045],"category_scores_gemma":[0.00004442421,0.0002004737,0.00003004165,0.0004835603,0.0004773326,0.001562795,0.0002621296,0.0001162217,0.00004446755],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001812958,"about_ca_system_score_gemma":0.00005082553,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007198012,"about_ca_topic_score_gemma":0.0001322878,"domain_scores_codex":[0.9981264,0.00005874295,0.0007375452,0.0005792746,0.0002079939,0.0002899976],"domain_scores_gemma":[0.9991184,0.000206806,0.0003562461,0.0002043006,0.00005992623,0.00005432374],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.000009042361,0.000001521334,0.6627312,0.000027005,0.00002940813,4.680069e-7,0.0001538146,0.000003171159,2.61455e-7,0.2221053,0.000210743,0.1147281],"study_design_scores_gemma":[0.001067221,0.00002612738,0.8235725,0.00007373071,0.00002874423,0.00003346961,0.0103937,0.002712874,0.00001584346,0.1309213,0.03064969,0.0005047639],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9738752,0.00008216143,0.01214482,0.001313153,0.00063794,0.000637962,0.00000701902,0.00004930612,0.01125247],"genre_scores_gemma":[0.9769389,0.004892795,0.01721854,0.0001247166,0.00007334306,0.00005020511,0.000004698168,0.00001050531,0.0006863173],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1608413,"threshold_uncertainty_score":0.8498082,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3207962055","doi":"10.1080/01446193.2021.1983851","title":"Transforming construction: heterarchical megaproject ecologies and the management of innovation","year":2021,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"HEC Montréal","funders":"","keywords":"Megaproject; Conceptualization; Knowledge management; Corporate governance; Business; Process management; Engineering; Computer science; Systems engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.05685157115821082,"gpt":0.3015648291996323,"spread":0.2447132580414215,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001510135,0.0001747332,0.0003478801,0.0004480163,0.0003635836,0.0003345571,0.0002197188,0.00006073179,0.0002376335],"category_scores_gemma":[0.00003839446,0.0001338434,0.00007337484,0.0009595018,0.001075204,0.000560434,0.0003361937,0.000126366,0.000008113872],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002542198,"about_ca_system_score_gemma":0.0000258846,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002964164,"about_ca_topic_score_gemma":0.00001157351,"domain_scores_codex":[0.9979842,0.00009911747,0.0009967051,0.0004944348,0.0002284325,0.0001971394],"domain_scores_gemma":[0.9988287,0.0002037883,0.0003768591,0.000381048,0.0001765966,0.00003301236],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00008743205,0.000005994496,0.006782357,0.00006087581,0.000151609,0.000002337115,0.000112876,0.00004165066,0.000002659667,0.5701577,0.00006652264,0.422528],"study_design_scores_gemma":[0.01091051,0.00009796868,0.0272616,0.0001369795,0.0005427854,0.0006762738,0.04763217,0.01000796,0.001501924,0.680435,0.2199484,0.0008483783],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9161597,0.0002974102,0.01007721,0.002101816,0.001256849,0.0006346977,0.000009640923,0.00004776171,0.06941485],"genre_scores_gemma":[0.9502226,0.00795024,0.03903783,0.0002414009,0.00009042615,0.00006473733,0.00001448842,0.00001294901,0.002365391],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4216796,"threshold_uncertainty_score":0.5457973,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2075116457","doi":"10.1080/01446193.2011.637568","title":"A correlated bidding model for markup size decisions","year":2011,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Consumer Market Behavior and Pricing","field":"Business, Management and Accounting","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Bidding; Markup language; Bayesian probability; A priori and a posteriori; Econometrics; Computer science; Statistical model; Probabilistic logic; Correlation; Data mining; Operations research; Machine learning; Artificial intelligence; Economics; Mathematics; Microeconomics; XML","retraction":null,"screen_n_in":null,"score":{"opus":0.05063624431448106,"gpt":0.2132746729793665,"spread":0.1626384286648854,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002321273,0.0001576723,0.0001656675,0.0002345382,0.0002814509,0.0001836184,0.0001219975,0.00006008129,0.0002833306],"category_scores_gemma":[0.00003363205,0.0001731578,0.00007570399,0.0001227296,0.00006967349,0.0007010286,0.0001720444,0.00006395935,0.00003511454],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001980821,"about_ca_system_score_gemma":0.000006737909,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003221119,"about_ca_topic_score_gemma":0.0000390907,"domain_scores_codex":[0.9991484,0.000002875744,0.0002852689,0.00030465,0.00003523919,0.0002235156],"domain_scores_gemma":[0.9995439,0.00006365753,0.0001516743,0.0001773294,0.00004432888,0.000019078],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003364556,0.0000574744,0.1054006,0.0001452773,0.0001680799,0.000003718508,0.0001556728,0.0003774813,0.0000154083,0.2821991,0.00207925,0.6090614],"study_design_scores_gemma":[0.002551609,0.00001158955,0.05432036,0.0000772622,0.0006642879,0.00001340173,0.001227278,0.8207317,0.000009073209,0.08442571,0.03520019,0.0007675419],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8728412,0.00006006984,0.03724035,0.0001038358,0.001258677,0.000684209,0.000007939258,0.0001834008,0.08762033],"genre_scores_gemma":[0.974109,0.0002448677,0.02323988,0.0004186945,0.0001476118,0.00006339233,0.00001698152,0.00003240949,0.001727176],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8203542,"threshold_uncertainty_score":0.706117,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1979987888","doi":"10.1080/0144619032000111232","title":"Innovation in clean-room construction: a case study of co-operation between firms","year":2003,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Carleton University","funders":"","keywords":"Liminality; Multinational corporation; Negotiation; Business; Process (computing); Function (biology); Construct (python library); Flexibility (engineering); Workspace; Industrial organization; Knowledge management; Management; Finance; Sociology; Economics; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.09243541628620355,"gpt":0.3367056255101551,"spread":0.2442702092239515,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001872937,0.0001840005,0.0003497193,0.001472277,0.000245588,0.0002392415,0.0001551785,0.00007476543,0.000352872],"category_scores_gemma":[0.00006649704,0.0001856322,0.00003908217,0.0009768454,0.000178844,0.0007205189,0.00007760175,0.0001319509,0.00002723087],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006097938,"about_ca_system_score_gemma":0.00002808459,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006331309,"about_ca_topic_score_gemma":0.0002786324,"domain_scores_codex":[0.9974866,0.0001500909,0.001421637,0.0005284426,0.0002224335,0.0001908197],"domain_scores_gemma":[0.9987649,0.0001276083,0.0005619312,0.000395822,0.0001062655,0.00004342406],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"qualitative","study_design_scores_codex":[0.00001954349,0.00003978795,0.6280048,0.00001463211,0.00004592276,0.00001467353,0.000532657,0.0003757182,0.000001382232,0.05199956,0.00006851061,0.3188827],"study_design_scores_gemma":[0.01579512,0.000935702,0.264918,0.00005957766,0.000306348,0.002530502,0.54979,0.009188025,0.000657324,0.07853416,0.0755294,0.001755865],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9832067,0.00001419469,0.002281928,0.0000530376,0.0006479052,0.0006974803,0.000006557351,0.00002688402,0.01306525],"genre_scores_gemma":[0.9961526,0.00008271802,0.003302339,0.0000281877,0.00005311039,0.00002560832,0.000007971736,0.000009179837,0.0003382997],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5492573,"threshold_uncertainty_score":0.756986,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2001286129","doi":"10.1080/01446193.2012.690883","title":"Risk Management for Design and Construction","year":2012,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Construction engineering; Engineering; Risk management; Risk analysis (engineering); Business; Architectural engineering; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.06757338119077164,"gpt":0.2962281247227335,"spread":0.2286547435319619,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002222857,0.000231246,0.000270333,0.0006160358,0.0005665338,0.0004175747,0.0001981278,0.00007504296,0.0001617203],"category_scores_gemma":[0.00003977036,0.0002209073,0.00007849991,0.0002713861,0.0003410917,0.001176381,0.0002476095,0.00008954865,0.0000598374],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004649064,"about_ca_system_score_gemma":0.000006426119,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003142315,"about_ca_topic_score_gemma":0.000002226253,"domain_scores_codex":[0.9981869,0.00008649936,0.0006181516,0.0005407524,0.0001723494,0.000395282],"domain_scores_gemma":[0.9987789,0.0002445334,0.0003919885,0.0003675075,0.00006251716,0.0001545816],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00007184695,0.00001011906,0.07118408,0.00003068948,0.0001112747,1.888493e-7,0.00008633427,0.00009842553,4.45521e-7,0.2802795,0.001214403,0.6469127],"study_design_scores_gemma":[0.003097095,0.0001008868,0.04696482,0.00002364748,0.0004397797,0.0001305793,0.008574243,0.02399233,0.0000676822,0.2413676,0.6744349,0.000806407],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.4505755,0.0006076945,0.5067191,0.0003517494,0.004128546,0.002154111,0.00002726781,0.0001481884,0.03528784],"genre_scores_gemma":[0.274302,0.009940084,0.7100671,0.0002304853,0.0004640125,0.0002526389,0.00001538077,0.00003622244,0.004692042],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.6732205,"threshold_uncertainty_score":0.9008337,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2766525559","doi":"10.1080/01446193.2017.1390241","title":"A simulation-based method for effective workface planning of industrial construction projects","year":2017,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); Discrete event simulation; Work (physics); Plan (archaeology); Computer science; Workforce planning; Process (computing); Scale (ratio); Industrial engineering; Operations research; Workforce; Engineering; Simulation; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.1670221460818022,"gpt":0.4017609918205162,"spread":0.234738845738714,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002141494,0.0001796361,0.0003862024,0.0004487488,0.0006198677,0.0005588094,0.0003605344,0.0001442255,0.00002940579],"category_scores_gemma":[0.001961794,0.0001738458,0.0001252284,0.0001231201,0.000417705,0.0004833596,0.0001282534,0.000122056,0.000003719346],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005369746,"about_ca_system_score_gemma":0.00005858997,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000114792,"about_ca_topic_score_gemma":0.000003730332,"domain_scores_codex":[0.9982946,0.0001105195,0.0006556097,0.0005531956,0.0001714319,0.0002146725],"domain_scores_gemma":[0.9956376,0.002480828,0.001121448,0.0005320512,0.0001581035,0.00006994967],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003098524,0.00001007401,0.1074555,0.0000264899,0.00009803105,6.471612e-7,0.0001881853,0.2330521,0.00001227082,0.01108422,0.00003061844,0.647732],"study_design_scores_gemma":[0.004199188,0.0001286725,0.005409925,0.0001090913,0.0001257722,0.000006651372,0.004397727,0.9531263,0.0009729824,0.02585521,0.005321375,0.0003471032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4944202,0.00001831288,0.4997674,0.0001785172,0.0009120843,0.001364932,0.00002387493,0.00002938816,0.00328529],"genre_scores_gemma":[0.7787375,0.000003734415,0.2209188,0.0000262233,0.0001605115,0.00006379573,0.000005397217,0.00001207127,0.00007195906],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7200742,"threshold_uncertainty_score":0.7089224,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2027778440","doi":"10.1080/01446190410001673562","title":"Global performance measures for transnational construction corporations","year":2004,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Leadership, Human Resources, Global Affairs","field":"Social Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Industry Canada","keywords":"Salient; Revenue; Ranking (information retrieval); Business; Global strategy; Work (physics); Industrial organization; International trade; Marketing; Engineering; Finance; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.03101219343476243,"gpt":0.242165099014789,"spread":0.2111529055800266,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002347132,0.0001039307,0.0001080067,0.00007888702,0.0007574674,0.0001639697,0.0001068262,0.0000742156,0.0000390463],"category_scores_gemma":[0.000009154926,0.0001261269,0.00005310645,0.0001190147,0.0006457368,0.0004316914,0.00001535335,0.00003870801,0.000007470173],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003417862,"about_ca_system_score_gemma":0.00008045547,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002747995,"about_ca_topic_score_gemma":0.000807569,"domain_scores_codex":[0.9992182,0.00001946457,0.0002128812,0.0002403745,0.00009893617,0.0002100998],"domain_scores_gemma":[0.9996452,0.00001523815,0.0001099663,0.00008192011,0.00006463093,0.00008298599],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00002239582,0.00001021699,0.007839346,0.00001997497,0.00004289956,1.538586e-7,0.0004604184,0.002047956,3.02542e-7,0.9473728,0.00007276828,0.04211078],"study_design_scores_gemma":[0.00442294,0.0001090019,0.02194259,0.00003137648,0.0002063595,0.00003751855,0.05612825,0.000879385,0.00002938703,0.5633773,0.352097,0.0007388706],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8831559,0.00006638434,0.04046438,0.006496727,0.00135144,0.0009660729,0.00006260489,0.0001748678,0.06726167],"genre_scores_gemma":[0.980494,0.0002161975,0.01870112,0.00009515866,0.0001955885,0.00004116696,0.00002672672,0.000006144131,0.000223957],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3839955,"threshold_uncertainty_score":0.5825903,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4385732832","doi":"10.1080/01446193.2023.2239381","title":"Integration mechanisms for material suppliers in the construction supply chain: a systematic literature review","year":2023,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Supply chain; Systematic review; Business; Supply chain management; Process management; Knowledge management; Computer science; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.01483715433581101,"gpt":0.2134359953773196,"spread":0.1985988410415086,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001414329,0.000213211,0.0003355905,0.0005006426,0.0002480342,0.0006962773,0.0002168627,0.00007060989,0.00005652884],"category_scores_gemma":[0.00003277688,0.0001748249,0.00009320685,0.000545331,0.00008142191,0.000835284,0.0001120305,0.00008990298,0.00005845767],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004372458,"about_ca_system_score_gemma":0.000004608225,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001089479,"about_ca_topic_score_gemma":0.00004070987,"domain_scores_codex":[0.9986845,0.00003675389,0.0005535067,0.0003538531,0.0001042857,0.0002671423],"domain_scores_gemma":[0.9993796,0.00004870892,0.0002530815,0.0002638369,0.00004396565,0.00001083048],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00004019144,0.00001272606,0.0001293863,0.04598444,0.00005387136,0.000005023926,0.0001093985,0.00004437406,0.000007269822,0.9410558,0.004909061,0.00764846],"study_design_scores_gemma":[0.005517289,0.000106047,0.003736178,0.04146501,0.001703327,0.0001453317,0.04601182,0.05595159,0.000057251,0.7006957,0.1424537,0.002156756],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5181992,0.01145254,0.1349503,0.1426129,0.03752832,0.08348072,0.0006757316,0.003393974,0.06770626],"genre_scores_gemma":[0.7457318,0.1505572,0.02862635,0.04470201,0.005273036,0.01234247,0.008748992,0.0003144394,0.003703684],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2403601,"threshold_uncertainty_score":0.7129151,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3111133871","doi":"10.1080/01446193.2020.1855666","title":"Stochastic modelling of maintenance flexibility in Value for Money assessment of PPP road projects","year":2020,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Flexibility (engineering); Value for money; Value (mathematics); Business; Engineering; Transport engineering; Risk analysis (engineering); Computer science; Operations research; Operations management; Economics; Management; Public economics","retraction":null,"screen_n_in":null,"score":{"opus":0.08115104627357217,"gpt":0.2631303750703781,"spread":0.1819793287968059,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004005274,0.0001471599,0.0003095859,0.0002496426,0.00004595198,0.00006946606,0.0001572043,0.00004857359,0.000008989023],"category_scores_gemma":[0.00003652282,0.0001626399,0.00006176157,0.0002354118,0.0001063821,0.0006897178,0.0001799927,0.00007113285,0.00000186396],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005022294,"about_ca_system_score_gemma":0.00002718865,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006749599,"about_ca_topic_score_gemma":0.00001384463,"domain_scores_codex":[0.9988515,0.000008272787,0.0004988584,0.0003648245,0.00006523275,0.000211281],"domain_scores_gemma":[0.9993244,0.00002573627,0.0003903923,0.0001694851,0.00007300753,0.00001696799],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001869239,0.00006708666,0.02326398,0.001951776,0.00009349335,6.175794e-7,0.0001217666,0.2683799,0.0000464886,0.6957144,0.00009998169,0.01007356],"study_design_scores_gemma":[0.001266609,0.00002090147,0.004571628,0.0000547993,0.0000520375,4.175066e-7,0.000890492,0.9810428,0.00004419276,0.01119702,0.0006820803,0.0001770327],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8763344,0.00002605169,0.1132456,0.0005183702,0.0002252032,0.00116726,0.000008328259,0.0000391332,0.008435679],"genre_scores_gemma":[0.9859278,0.0000282447,0.01364169,0.0001870749,0.0001094253,0.0000522345,0.00001687066,0.00001532714,0.00002129959],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7126629,"threshold_uncertainty_score":0.6632261,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2014042223","doi":"10.1080/01446190701670381","title":"An analysis of infrastructure development based on national competitiveness perspectives","year":2008,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Global Trade and Competitiveness","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Ranking (information retrieval); Performance indicator; Selection (genetic algorithm); Linear discriminant analysis; Business; Set (abstract data type); Representation (politics); Regional science; Industrial organization; Environmental economics; Computer science; Economics; Marketing; Geography; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.01280144593013777,"gpt":0.1987990598545089,"spread":0.1859976139243711,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001096908,0.000140659,0.000219807,0.0006840609,0.0002067649,0.00006493679,0.0001206359,0.00003816054,0.0002588674],"category_scores_gemma":[0.000004168476,0.0001505385,0.00006574336,0.0003814849,0.0001651237,0.0004303953,0.00004285974,0.00004635873,0.000009291711],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006667514,"about_ca_system_score_gemma":0.00002507926,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001546793,"about_ca_topic_score_gemma":0.00001508016,"domain_scores_codex":[0.9992422,0.000008069592,0.0002213955,0.0002915534,0.0001160981,0.0001206777],"domain_scores_gemma":[0.9995648,0.00001574973,0.0001615658,0.0001205704,0.0001226891,0.00001467086],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00006793602,0.00008210164,0.4898965,0.00004915851,0.0003967976,0.000002359801,0.00006943673,0.04433079,0.000004263826,0.4623228,0.00001042902,0.00276744],"study_design_scores_gemma":[0.0005070419,0.000009898198,0.9368924,0.00001413576,0.0001885549,0.000001583365,0.001641046,0.04649541,0.00002376441,0.001073013,0.0129582,0.0001949838],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9663415,0.00001578287,0.002184953,0.00006815208,0.0001395461,0.000119964,0.000008648209,0.00003944523,0.03108202],"genre_scores_gemma":[0.9972022,0.00003234227,0.002183327,0.000350249,0.00009916433,0.000009939456,0.00008374314,0.000007747702,0.00003128696],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4612498,"threshold_uncertainty_score":0.6138782,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4401843417","doi":"10.1080/01446193.2024.2390529","title":"A research and development framework for integrated project delivery","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Integrated project delivery; Process management; Systems engineering; Engineering management; Business; Development (topology); Engineering; Computer science; Knowledge management; Project management","retraction":null,"screen_n_in":null,"score":{"opus":0.2060080579618077,"gpt":0.4052166303004449,"spread":0.1992085723386372,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.002142425,0.0001407163,0.000172004,0.001188298,0.0004417383,0.001319742,0.0001936555,0.00007581726,0.0001692286],"category_scores_gemma":[0.00005707364,0.0001210575,0.00003400058,0.0005756486,0.0003068933,0.0005605701,0.0002632539,0.0001681404,0.00007338056],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006890659,"about_ca_system_score_gemma":0.00008032066,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007157133,"about_ca_topic_score_gemma":0.0000216689,"domain_scores_codex":[0.998427,0.00003971548,0.0004622528,0.0006209571,0.0001878208,0.0002622795],"domain_scores_gemma":[0.9990457,0.0004811372,0.00006455993,0.0002205175,0.0001321054,0.00005601207],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003869938,0.000004460073,0.002852229,0.00006352549,0.0000580179,0.000001007145,0.0002317977,0.000004680518,4.185912e-7,0.3074599,0.002314378,0.6869709],"study_design_scores_gemma":[0.000241539,0.00004725959,0.001412534,0.00004982647,0.00001388244,0.0000194334,0.007759552,0.008226806,0.0000361715,0.1415197,0.8404965,0.0001768138],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8672681,0.001172825,0.1073556,0.0009220243,0.002914125,0.001763934,0.00002366477,0.0002076158,0.01837207],"genre_scores_gemma":[0.6242964,0.00535551,0.3523374,0.0001827624,0.000446724,0.0004957876,0.00004057,0.00004766459,0.01679712],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8381821,"threshold_uncertainty_score":0.999717,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4404645866","doi":"10.1080/01446193.2024.2431280","title":"Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia; University of New Brunswick","funders":"Mitacs","keywords":"Productivity; Estimation; Engineering; Construction industry; Construction engineering; Computer science; Industrial engineering; Architectural engineering; Business; Civil engineering; Economics; Systems engineering; Economic growth","retraction":null,"screen_n_in":null,"score":{"opus":0.03252959761123006,"gpt":0.2414101653934843,"spread":0.2088805677822542,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001142432,0.0001328371,0.0001262791,0.0001516918,0.00009368086,0.0001183065,0.0000640304,0.00005366482,0.0000097297],"category_scores_gemma":[0.000005541277,0.0001435346,0.00001022788,0.0001674103,0.0001356254,0.001181653,0.00005883436,0.000064448,0.000002964263],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005691428,"about_ca_system_score_gemma":0.00004257855,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002264343,"about_ca_topic_score_gemma":0.00001465922,"domain_scores_codex":[0.9991991,0.000006883675,0.0003283055,0.0003202217,0.00005112273,0.00009438021],"domain_scores_gemma":[0.9996963,0.00001166516,0.0000614843,0.0001722825,0.00003268796,0.00002563202],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001564685,0.000009113352,0.0004160253,0.001482624,0.0001833762,2.110456e-7,0.0006483729,0.01431537,0.000266967,0.08171331,0.00009879051,0.9008502],"study_design_scores_gemma":[0.0002554242,0.000008063544,0.0003723956,0.000101055,0.00009917996,0.00004697904,0.001016302,0.9742745,0.003454464,0.01659047,0.003568569,0.0002125623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5553921,0.0005985564,0.4412359,0.00005675745,0.0005391422,0.0002952569,0.00002936062,0.0002370115,0.001615851],"genre_scores_gemma":[0.7143173,0.001373364,0.2840177,0.000004499836,0.00003771008,0.00003490283,0.000154699,0.0000165058,0.00004328355],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9599591,"threshold_uncertainty_score":0.585317,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4405494818","doi":"10.1080/01446193.2024.2436395","title":"The legitimation of private net zero emission building standards in the context of global decarbonization goals","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université de Montréal","funders":"","keywords":"Legitimation; Context (archaeology); Zero (linguistics); Zero emission; Net (polyhedron); Business; Environmental science; Engineering; Political science; Mathematics; Geology; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.004717918680604848,"gpt":0.230032252197225,"spread":0.2253143335166201,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005259031,0.00006087039,0.0000718114,0.00001494432,0.00007548551,0.00005566646,0.00008621303,0.00002441097,0.00002579854],"category_scores_gemma":[0.0000124075,0.00004212912,0.00002396838,0.0001047565,0.0002698531,0.0002203001,0.00008689627,0.00003394378,8.992435e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002763493,"about_ca_system_score_gemma":0.000005479396,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003574999,"about_ca_topic_score_gemma":0.00002109618,"domain_scores_codex":[0.9994519,0.0000343338,0.0002260402,0.0001190188,0.00008072098,0.0000879341],"domain_scores_gemma":[0.9997647,0.00003183729,0.00007001567,0.0001148525,0.00000289961,0.00001573637],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0000477908,0.00002117528,0.5619794,0.0001051097,0.00002735526,9.607166e-7,0.000561972,0.002422361,0.0001632097,0.1492545,0.0003237653,0.2850924],"study_design_scores_gemma":[0.0009639484,0.000130672,0.755884,0.0001188057,0.00009143977,0.00001896707,0.01285514,0.04989934,0.0023727,0.1441106,0.03324807,0.00030635],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9929804,0.0001271446,0.002652866,0.0002219679,0.0001057912,0.0002563745,0.00001065962,0.000006287344,0.003638556],"genre_scores_gemma":[0.9990159,0.0004621563,0.0004503431,0.00002108334,0.000006081992,0.000005593621,0.000003038345,0.000002698127,0.00003306537],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2847861,"threshold_uncertainty_score":0.1717976,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4409618273","doi":"10.1080/01446193.2025.2479764","title":"Machine learning and optimization strategies for infrastructure projects risk management","year":2025,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"","keywords":"Risk management; Computer science; Business; Risk analysis (engineering); Engineering management; Engineering; Knowledge management; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.0211767701845107,"gpt":0.2836591872622158,"spread":0.2624824170777051,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008122463,0.0002103394,0.0002471909,0.0008334891,0.0006301375,0.0008913668,0.0001911928,0.00007204198,0.0001103728],"category_scores_gemma":[0.00003978945,0.0001975314,0.0000592004,0.0004173083,0.0001980876,0.0007501286,0.0003019548,0.0001284216,0.00000471045],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004186457,"about_ca_system_score_gemma":0.00002064764,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007457773,"about_ca_topic_score_gemma":0.0000185174,"domain_scores_codex":[0.9984587,0.00005624254,0.0005299841,0.0006093172,0.0001217444,0.0002239708],"domain_scores_gemma":[0.9992034,0.0001222277,0.0003142992,0.0002331581,0.00007901778,0.00004782457],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000821747,0.000005727219,0.0615184,0.0001075149,0.0001462681,4.193158e-7,0.00009255691,0.02909197,2.520227e-7,0.3322569,0.0006177743,0.57608],"study_design_scores_gemma":[0.001959779,0.00005637882,0.006662612,0.00003386603,0.0002019703,0.000009623453,0.01189038,0.4496465,0.000005996366,0.1818928,0.3472969,0.0003431764],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1435437,0.0008618612,0.6883285,0.0005982918,0.002270344,0.002415866,0.00004034029,0.0002244077,0.1617167],"genre_scores_gemma":[0.5483146,0.03549591,0.38717,0.0004319746,0.0002075092,0.0003445274,0.0000975855,0.00004648215,0.02789148],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5757368,"threshold_uncertainty_score":0.8595471,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4392003120","doi":"10.1080/01446193.2024.2314079","title":"Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Auction Theory and Applications","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Metropolitan area; SAINT; State (computer science); Labour economics; Economics; Business; Engineering; Art; History; Computer science; Art history; Archaeology","retraction":null,"screen_n_in":null,"score":{"opus":0.05298611275529041,"gpt":0.3084399775242874,"spread":0.255453864768997,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001102183,0.0001692042,0.0002459734,0.0001664572,0.0002928642,0.0006677355,0.0002575746,0.00006546661,0.0002627612],"category_scores_gemma":[0.0002231097,0.0001323187,0.00007339868,0.0002292885,0.0007088017,0.0007359658,0.0001487334,0.0001597606,0.00006089688],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00017681,"about_ca_system_score_gemma":0.00002763414,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001092766,"about_ca_topic_score_gemma":0.00004601241,"domain_scores_codex":[0.9983149,0.0001185205,0.0006663785,0.0005667554,0.0001572811,0.0001761747],"domain_scores_gemma":[0.9980228,0.001105736,0.0002713636,0.0004078905,0.00007285902,0.0001193617],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00008830244,0.00002091817,0.03039876,0.00004518909,0.000354636,0.000001941959,0.0004914374,0.00008821763,0.0004880583,0.32344,0.01543917,0.6291434],"study_design_scores_gemma":[0.0008707657,0.00009073285,0.009956433,0.0003654811,0.0004159576,0.0000599072,0.03880876,0.0159278,0.002810255,0.5536285,0.3763403,0.0007250527],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9606953,0.004460299,0.02907431,0.002235925,0.001481305,0.0004769078,0.0003311807,0.00007185961,0.001172938],"genre_scores_gemma":[0.989014,0.006729829,0.00294738,0.0001167094,0.0001669523,0.00003558275,0.0000273653,0.00001384026,0.0009482824],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6284184,"threshold_uncertainty_score":0.6438989,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4413977029","doi":"10.1080/01446193.2025.2511833","title":"Identifying early warning signs of construction labor shortages","year":2025,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Economic shortage; Warning signs; Warning system; Business; Forensic engineering; Engineering; Construction engineering; Operations management; Risk analysis (engineering); Transport engineering; Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.05202782319514264,"gpt":0.4035603939195201,"spread":0.3515325707243775,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004451669,0.00009529203,0.0002008702,0.0003382556,0.0005908147,0.00001830889,0.00008271755,0.0001001942,0.0001960391],"category_scores_gemma":[0.0000332957,0.0001046566,0.00003549797,0.0001917668,0.0001699716,0.0002091617,0.0001251087,0.0002308555,0.00002913544],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000920637,"about_ca_system_score_gemma":0.000103133,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006739443,"about_ca_topic_score_gemma":0.00003285674,"domain_scores_codex":[0.9988034,0.0001004125,0.0005369323,0.0002324029,0.00006369157,0.000263099],"domain_scores_gemma":[0.9992688,0.0002099848,0.0001940565,0.0001564874,0.0001014229,0.00006930561],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00008243881,0.000006273528,0.6682059,0.00059454,0.00005845656,3.50965e-7,0.0001633673,0.00002345272,0.00001819034,0.2433992,0.0001782337,0.08726963],"study_design_scores_gemma":[0.001453937,0.00005508768,0.9437694,0.0003096048,0.00006559671,0.000001779413,0.009161905,0.0009131074,0.00007395147,0.02497617,0.0190333,0.0001861556],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9530196,0.0001758334,0.004325244,0.0005313318,0.001529672,0.0006831539,0.00002257198,0.00004404916,0.03966853],"genre_scores_gemma":[0.9838448,0.002396436,0.01006123,0.0001971373,0.000128591,0.00009988084,0.00003057505,0.00001136684,0.00322996],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2755636,"threshold_uncertainty_score":0.4544129,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4403440710","doi":"10.1080/01446193.2024.2411409","title":"Economic impacts of large dams on downstream brickmaking in developing countries","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Water resources management and optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; International Fine Particle Research Institute; United States Agency for International Development","keywords":"Downstream (manufacturing); Developing country; Business; Natural resource economics; Environmental science; Economics; Economic growth; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.005514772145681038,"gpt":0.1980530947241077,"spread":0.1925383225784266,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001004493,0.0001058594,0.0001193181,0.0003390509,0.00002842821,0.0001170586,0.0000505845,0.00003329467,0.00003577454],"category_scores_gemma":[5.547818e-7,0.0001182859,0.00002252871,0.00006409184,0.00002703671,0.0002465221,0.00003905666,0.00004257803,0.0000237117],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001324863,"about_ca_system_score_gemma":0.000004459879,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005897914,"about_ca_topic_score_gemma":0.00004943157,"domain_scores_codex":[0.9994541,0.000004590812,0.0002250291,0.0001499408,0.00002123575,0.0001451435],"domain_scores_gemma":[0.9998591,0.00001230612,0.00002664088,0.00008064087,0.000002793831,0.0000185004],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003107412,0.00000942956,0.03927066,0.001509157,0.0003069921,0.00001109235,0.0006770896,0.3134393,0.000003411091,0.5777929,0.0009461821,0.06600271],"study_design_scores_gemma":[0.001266982,0.00004156866,0.0186053,0.0006271959,0.00007908363,0.00001058063,0.0009638996,0.6666076,0.0006657094,0.003459179,0.3070194,0.0006535632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9763026,0.0002933966,0.003760765,0.00009464611,0.000674541,0.0001723873,0.000009503394,0.0001253255,0.01856683],"genre_scores_gemma":[0.9931133,0.005252383,0.001423978,0.00003550969,0.00004926047,0.000007245485,0.000019516,0.00001808684,0.00008069707],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5743337,"threshold_uncertainty_score":0.4823559,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4409798847","doi":"10.1080/01446193.2025.2492011","title":"Trajectories of innovation in wood construction: an actor-network analysis of building decarbonization practices in Canada","year":2025,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Sustainable Industrial Ecology","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Architectural engineering; Industrial organization; Engineering; Business; Construction engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01134469225372745,"gpt":0.2216208858961546,"spread":0.2102761936424272,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002222774,0.00007681856,0.0002474893,0.0009352907,0.00002292153,0.00001444244,0.00005513234,0.00006238634,0.00001512476],"category_scores_gemma":[0.00004688252,0.0001037699,0.00001113989,0.002066391,0.00004828119,0.0002570525,0.00002186933,0.0000714592,1.454601e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006380881,"about_ca_system_score_gemma":0.000171958,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.03352109,"about_ca_topic_score_gemma":0.4447427,"domain_scores_codex":[0.9991317,0.00002515225,0.0005694248,0.0001323704,0.00002665381,0.0001146568],"domain_scores_gemma":[0.9994845,0.00006451362,0.0002895535,0.0001012115,0.00004936286,0.00001083483],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001698684,0.000003575205,0.4326316,0.00005847192,0.0002180515,5.172055e-7,0.00003543606,0.5070133,0.000007507156,0.04652906,0.00000545183,0.01348007],"study_design_scores_gemma":[0.001548007,0.00002657803,0.456104,0.00006727537,0.0005423764,0.000002481988,0.01611463,0.5163643,0.0006294569,0.007484092,0.000810009,0.0003067951],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9968154,0.00004638798,0.001455261,0.00003706571,0.0005987558,0.0001491126,0.000003391684,0.00001148954,0.0008831447],"genre_scores_gemma":[0.9971317,0.0001775455,0.002628741,0.000006762142,0.00001998051,0.000008626515,0.00001649468,0.000004466973,0.000005698194],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4112216,"threshold_uncertainty_score":0.9729148,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W610494263","doi":"","title":"Incentives, Results and Possible Success Factors for Rail Maintenance Performance-Based Contracting : Case Study","year":2010,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Incentive; Bidding; Payment; Prestige; Business; Industrial organization; Economics; Finance; Marketing; Microeconomics","retraction":null,"screen_n_in":null,"score":{"opus":0.0578544046570519,"gpt":0.3118049390794062,"spread":0.2539505344223543,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001851112,0.0002317097,0.0003008961,0.000503846,0.000800663,0.0007817931,0.0002347311,0.00006950367,0.00005308561],"category_scores_gemma":[0.0001688648,0.0002022217,0.00006164042,0.0002648181,0.0003105116,0.00111938,0.0001791896,0.0001860773,0.000006209038],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002820759,"about_ca_system_score_gemma":0.00002899189,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007757518,"about_ca_topic_score_gemma":0.0005488259,"domain_scores_codex":[0.998019,0.00004154872,0.0007605582,0.0007117441,0.0001579607,0.0003092011],"domain_scores_gemma":[0.9983808,0.0004704247,0.0004833196,0.0004096842,0.0001446665,0.0001111068],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002429995,0.00003939954,0.670616,0.00003551423,0.00006010622,0.00001265686,0.000392614,0.00009148022,0.000005638979,0.004569756,0.0001602043,0.3237736],"study_design_scores_gemma":[0.02364134,0.000777851,0.4775479,0.00006999731,0.0003910642,0.001110538,0.1678594,0.2008384,0.0003660372,0.00543982,0.120049,0.001908591],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9918411,0.00001228325,0.001353486,0.000188862,0.001725213,0.001079627,0.00003127995,0.00005431695,0.003713879],"genre_scores_gemma":[0.9943909,0.00008943149,0.004066218,0.000051332,0.00009710129,0.00004923453,0.000009536762,0.00001280888,0.001233456],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.321865,"threshold_uncertainty_score":0.8246361,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}