{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":30,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":30,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"2fd57bcb9032","filters":{"venue":"Construction Management and Economics"}},"results":[{"id":"W1988886479","doi":"10.1080/01446190600567977","title":"A systems view of temporary housing projects in post‐disaster reconstruction","year":2006,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Disaster Management and Resilience","field":"Social Sciences","cited_by":148,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université de Montréal","funders":"","keywords":"Context (archaeology); Natural disaster; Human settlement; Term (time); Business; Natural (archaeology); Environmental planning; Engineering; Operations research; Computer science; Operations management; Geography","authors":[{"name":"Cassidy Johnson","is_ca":true},{"name":"Gonzalo Lizarralde","is_ca":true},{"name":"Colin H. Davidson","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01469035132801587,"gpt":0.2235888085568304,"spread":0.2088984572288145,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001558302,0.0003164457,0.0001929065,0.001636135,0.001401043,0.005038515,0.0009857392,0.001019203,0.003941822],"category_scores_gemma":[0.0016067,0.0003072974,0.0004952096,0.001344566,0.004090299,0.002981111,0.00162071,0.0006840602,0.0002543802],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003432074,"about_ca_system_score_gemma":0.00257647,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008547138,"about_ca_topic_score_gemma":0.006580922,"domain_scores_codex":[0.9983926,0.001053274,0.00005854834,0.0001433221,0.0001675882,0.0001845804],"domain_scores_gemma":[0.9987172,0.0005710777,0.0002005492,0.0001215287,0.0001874844,0.0002022349],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","study_design_scores_codex":[0.00004002869,0.00008759226,0.009185676,0.00009463876,0.0000434014,0.0004610728,0.004923326,0.05032549,0.0008121587,0.9183042,0.0008554884,0.01486694],"study_design_scores_gemma":[0.00008216721,0.0004531817,0.02493139,0.0002569642,0.0001192744,0.0008534734,0.02432695,0.1800119,0.001314269,0.6871349,0.08043037,0.00008515811],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.4125012,0.003725646,0.3608813,0.006671449,0.0001387301,0.0003340715,0.0002788515,0.0001426225,0.2153262],"genre_scores_gemma":[0.982049,0.0005200644,0.01392866,0.00004583357,0.00002472239,0.0001185643,0.00004681776,0.000008782781,0.003257446],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.008547138,"threshold_uncertainty_score":0.02490163,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2592108117","doi":"10.1080/01446193.2017.1294257","title":"Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance","year":2017,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Craft; Schedule; Productivity; Economic shortage; Work (physics); Operations management; Engineering; Earned value management; Construction industry; Business; Project management; Economics; Economic growth; Geography; Project planning; Management; Construction engineering","authors":[{"name":"Hossein Karimi","is_ca":false},{"name":"Timothy R. B. Taylor","is_ca":false},{"name":"Paul M. Goodrum","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04773427496663989,"gpt":0.3247412008486878,"spread":0.2770069258820479,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003829772,0.0002497121,0.0002750045,0.001844447,0.0005175931,0.000969255,0.0006009263,0.000260935,0.001283396],"category_scores_gemma":[0.01379079,0.0002245983,0.0003592681,0.00430984,0.0004338242,0.0005441437,0.0009278839,0.0004877715,0.0003054552],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001544136,"about_ca_system_score_gemma":0.002032896,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.1081645,"about_ca_topic_score_gemma":0.1674621,"domain_scores_codex":[0.9970379,0.001204296,0.0001596641,0.0003597368,0.0009046539,0.0003339124],"domain_scores_gemma":[0.9810909,0.008671938,0.0046116,0.0009447406,0.003767742,0.0009131024],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001122696,0.0001220809,0.987754,0.00001843744,0.00006763988,0.00005695474,0.0005494196,0.001401492,0.0001881636,0.00009771813,0.0004307743,0.009201072],"study_design_scores_gemma":[0.000001282106,0.00004861951,0.9971692,0.000004877771,0.00001346421,0.00001457064,0.0009063906,0.001403533,0.0000760832,0.00002666488,0.0003319807,0.000003380783],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9988359,0.00003843502,0.0001517627,0.00004044511,0.000001008771,0.000006574886,0.0003150852,0.000002960502,0.0006078735],"genre_scores_gemma":[0.9982024,0.00008748197,0.00022415,0.00001074078,0.000003455241,0.00002079171,0.001054452,0.000003465319,0.0003930254],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1081645,"threshold_uncertainty_score":0.2150698,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2461666051","doi":"10.1080/01446193.2016.1206660","title":"Collaboration through innovation: implications for expertise in the AEC sector","year":2016,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Complex Systems and Decision Making","field":"Decision Sciences","cited_by":65,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Framing (construction); Knowledge management; Engineering; Body of knowledge; Integrated project delivery; Context (archaeology); Process (computing); Architecture; Process management; Computer science; Project management; Systems engineering","authors":[{"name":"Érik Poirier","is_ca":true},{"name":"Daniel Forgues","is_ca":true},{"name":"Sheryl Staub‐French","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1842498460885814,"gpt":0.3778563005670879,"spread":0.1936064544785065,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01178715,0.0003569593,0.0006104637,0.003525668,0.00809918,0.01349282,0.001495344,0.004792292,0.008023527],"category_scores_gemma":[0.02780832,0.0002367027,0.0005839585,0.003326583,0.03282763,0.01661233,0.01154952,0.0028611,0.0004889714],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.009614854,"about_ca_system_score_gemma":0.0108779,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003928361,"about_ca_topic_score_gemma":0.002854483,"domain_scores_codex":[0.9865032,0.009324688,0.0003972072,0.0009139724,0.001226292,0.00163456],"domain_scores_gemma":[0.9422424,0.04717474,0.003892544,0.001334984,0.0025947,0.002760632],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","study_design_scores_codex":[0.00003367379,0.00006526869,0.002878432,0.0001641209,0.00000812979,0.0004045725,0.02368619,0.001038464,0.00008146995,0.9602675,0.0008076817,0.01056453],"study_design_scores_gemma":[0.00002790863,0.00004669445,0.003003909,0.0004415867,0.00001040597,0.0003195905,0.06268954,0.002815285,0.0001792106,0.9115639,0.01887607,0.00002587818],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.3094408,0.009684413,0.06243728,0.1388692,0.0003010733,0.0003420981,0.0001068621,0.00003733346,0.478781],"genre_scores_gemma":[0.9941146,0.001576478,0.002421956,0.0005839014,0.00006372892,0.00007817104,0.000009745439,0.000004296542,0.001147125],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01349282,"threshold_uncertainty_score":0.06976098,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2143084847","doi":"10.1080/01446190110066713","title":"Schedule-dependent evolution of site layout planning","year":2001,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Computer science; Site planning; Engineering; Engineering drawing; Operating system","authors":[{"name":"Emad Elbeltagi","is_ca":false},{"name":"Tarek Hegazy","is_ca":true},{"name":"Abdel Hady Hosny","is_ca":false},{"name":"Adel Eldosouky","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008054480456798623,"gpt":0.1847942455684726,"spread":0.176739765111674,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004538225,0.000341449,0.0002865119,0.0003688275,0.0002743296,0.000555333,0.0007614499,0.0004928976,0.002836669],"category_scores_gemma":[0.00186485,0.0003817404,0.0004129058,0.0004322471,0.0004382607,0.0005307242,0.0003947833,0.0005189842,0.0002854948],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001272795,"about_ca_system_score_gemma":0.0009332431,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009474385,"about_ca_topic_score_gemma":0.008086877,"domain_scores_codex":[0.9997055,0.00009275136,0.000008194241,0.00005858397,0.0001000031,0.00003494908],"domain_scores_gemma":[0.9995974,0.0001550543,0.00007086265,0.00006882045,0.0000735966,0.00003425057],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.00002531927,0.00001859962,0.0008118283,0.00001043848,0.00001085716,0.00004798673,0.00003367869,0.9814851,0.001426926,0.009152473,0.0002861029,0.006690619],"study_design_scores_gemma":[0.000005145492,0.00001606764,0.0003338852,0.000001153577,0.000004331266,0.00001314728,0.000006893742,0.9961952,0.000377334,0.002272022,0.0007711364,0.000003688631],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2792751,0.0001134412,0.7015277,0.0002130202,0.0000410495,0.0001318598,0.0004948971,0.0004279721,0.01777503],"genre_scores_gemma":[0.9283577,0.000118564,0.06482751,0.00001943259,0.000007385093,0.0001216831,0.0003935063,0.00005733929,0.006096708],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009474385,"threshold_uncertainty_score":0.01883852,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1647761698","doi":"10.1080/01446193.2015.1047879","title":"The influence of green building certifications in collaboration and innovation processes","year":2015,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Université de Montréal","funders":"","keywords":"Certification; Process (computing); Architecture; Sustainable design; Engineering; Product (mathematics); Order (exchange); Process management; Knowledge management; Business; Sustainable development; Engineering management; Systems engineering; Sustainability; Management; Computer science; Political science","authors":[{"name":"Benjamín Herazo","is_ca":true},{"name":"Gonzalo Lizarralde","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01674839573545906,"gpt":0.2297115135380179,"spread":0.2129631178025589,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02501876,0.0003311078,0.0003807792,0.002333273,0.007696819,0.009475114,0.0009684935,0.002266688,0.004035597],"category_scores_gemma":[0.0590121,0.0003479561,0.0005225246,0.001420916,0.01095456,0.004910108,0.01095817,0.001739227,0.0003310904],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.007688204,"about_ca_system_score_gemma":0.01354709,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01219324,"about_ca_topic_score_gemma":0.01468655,"domain_scores_codex":[0.9478055,0.03844358,0.001127997,0.002168214,0.005340399,0.005114306],"domain_scores_gemma":[0.8661044,0.1089557,0.008578108,0.003446265,0.005485415,0.007430165],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"observational","study_design_scores_codex":[0.0007336519,0.0008740001,0.2141312,0.0005404602,0.0001406283,0.002931723,0.5648788,0.003529823,0.005361262,0.09732128,0.001060005,0.1084972],"study_design_scores_gemma":[0.0002040368,0.0008098625,0.2467497,0.0007393633,0.0002011304,0.001250707,0.6430489,0.005485155,0.005047553,0.05379954,0.04247918,0.0001848526],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9440086,0.0004294722,0.003518625,0.001452602,0.00002763113,0.00006355386,0.00001346879,0.00001468609,0.05047122],"genre_scores_gemma":[0.9992773,0.00006359156,0.0002653558,0.00002751702,0.000003801967,0.00001164391,0.000002780891,0.000002815886,0.0003452311],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02501876,"threshold_uncertainty_score":0.1323135,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3097550964","doi":"10.1080/01446193.2020.1831037","title":"Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership","year":2020,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Outsourcing and Supply Chain Management","field":"Business, Management and Accounting","cited_by":39,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Supply chain; General partnership; Order (exchange); Supply chain management; Business; Decision model; Computer science; Third party; Operations research; Engineering; Marketing","authors":[{"name":"Phuoc Luong Le","is_ca":true},{"name":"Imen Jarroudi","is_ca":true},{"name":"Thiên-My Dao","is_ca":true},{"name":"Amin Chaabane","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02554941713987919,"gpt":0.2142147740064871,"spread":0.1886653568666079,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001999254,0.001468497,0.001555863,0.001183901,0.001355407,0.003902973,0.00240783,0.003693495,0.009816331],"category_scores_gemma":[0.003274839,0.001185979,0.002053061,0.001777458,0.001465044,0.002044669,0.002385306,0.002392778,0.0008673118],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.004185162,"about_ca_system_score_gemma":0.004078525,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.03984094,"about_ca_topic_score_gemma":0.02041169,"domain_scores_codex":[0.9987022,0.0005289324,0.00005404843,0.0002587803,0.0001785081,0.0002775445],"domain_scores_gemma":[0.9982898,0.0009493994,0.0002199747,0.00005639728,0.0002938754,0.0001907282],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004959993,0.00003863403,0.0004906297,0.00003234446,0.00002330133,0.0001198254,0.0000638385,0.9855258,0.0001377494,0.01158597,0.0002253375,0.001706916],"study_design_scores_gemma":[0.00002315888,0.00002721812,0.0001329107,0.000009523811,0.00001641149,0.00001198735,0.00004354657,0.9945861,0.00005005252,0.004595781,0.000492701,0.00001057266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2416062,0.001514148,0.6717975,0.002689283,0.0002399209,0.0006085833,0.001782502,0.0003879015,0.07937388],"genre_scores_gemma":[0.9451401,0.0007117305,0.03834537,0.00011036,0.00003947109,0.0004940497,0.0003887847,0.00003673823,0.01473344],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.03984094,"threshold_uncertainty_score":0.07921809,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2058787072","doi":"10.1080/01446190500039911","title":"Deterministic models for assessing productivity and cost of bored piles","year":2005,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Pile; Productivity; Engineering; Scheduling (production processes); Process (computing); Cost estimate; Civil engineering; Operations research; Operations management; Computer science; Geotechnical engineering; Economics","authors":[{"name":"Tarek Zayed","is_ca":true},{"name":"Daniel W. Halpin","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0166157574200885,"gpt":0.2098547012886811,"spread":0.1932389438685926,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00150858,0.001038315,0.0006326037,0.001110881,0.0003511114,0.001387641,0.001602061,0.001034768,0.001840739],"category_scores_gemma":[0.005403183,0.000795615,0.001042118,0.001205796,0.0005555244,0.0009367615,0.0006029814,0.0007935007,0.0002882094],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002284761,"about_ca_system_score_gemma":0.001373147,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02252085,"about_ca_topic_score_gemma":0.01472377,"domain_scores_codex":[0.9991398,0.0002407285,0.00005682885,0.0001717325,0.0002339231,0.0001569628],"domain_scores_gemma":[0.9966393,0.002119825,0.0005941373,0.0002277821,0.000351468,0.0000675401],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001139568,0.000008252487,0.0005660371,0.000007134892,0.00000535108,0.000006857255,0.000005528724,0.9969341,0.0001046757,0.001186179,0.00003555162,0.001129016],"study_design_scores_gemma":[0.000002536519,0.000009827771,0.0003874469,0.000002378856,0.00000481193,0.000003906855,0.000004366012,0.9985096,0.0001460197,0.0008005131,0.0001241701,0.000004463738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.3533258,0.0005893613,0.635312,0.000235369,0.00004635867,0.0001734357,0.001639447,0.0006697127,0.008008436],"genre_scores_gemma":[0.9698061,0.000360361,0.02625269,0.00001595157,0.00001155309,0.0002012538,0.0005617996,0.0000364077,0.002753838],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.02252085,"threshold_uncertainty_score":0.04477948,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2168976754","doi":"10.1080/01446193.2015.1063676","title":"Enhanced heuristic for finance-based scheduling of construction projects","year":2015,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"","keywords":"Scheduling (production processes); Computer science; Integer programming; Payment; Heuristic; Finance; Cash; Job shop scheduling; Linear programming; Cash flow; Operations research; Mathematical optimization; Economics; Engineering; Algorithm; Mathematics; Operating system; Schedule","authors":[{"name":"Yuvraj Gajpal","is_ca":true},{"name":"Ashraf Elazouni","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1135662989238217,"gpt":0.3207669187765104,"spread":0.2072006198526887,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009761685,0.0006629264,0.0008943608,0.001091644,0.0003619612,0.000662128,0.001036913,0.0007659858,0.002885462],"category_scores_gemma":[0.001894673,0.0004570383,0.0006798828,0.001041285,0.0004014416,0.0006039252,0.0005718305,0.0006668838,0.0002669967],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001352465,"about_ca_system_score_gemma":0.002325448,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006200449,"about_ca_topic_score_gemma":0.00644827,"domain_scores_codex":[0.9994444,0.0002489395,0.00002371544,0.00006513259,0.0001023175,0.000115497],"domain_scores_gemma":[0.9990422,0.0006571025,0.00007785268,0.00005365601,0.0001008887,0.00006824307],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009449614,0.00009411059,0.0003013768,0.00007492539,0.0000167832,0.00006527174,0.00003780053,0.96751,0.00111904,0.003344661,0.0005652093,0.0267763],"study_design_scores_gemma":[0.00003463611,0.00006134788,0.0001570751,0.000009938432,0.00001004353,0.00002063494,0.00001876426,0.9961118,0.0005919014,0.001858367,0.001119366,0.000006202431],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1322784,0.0006166489,0.8542758,0.0002065462,0.00009214987,0.0005224757,0.0003777971,0.0004698763,0.01116028],"genre_scores_gemma":[0.5227175,0.0003130898,0.4731296,0.00006985525,0.00003130891,0.0004322379,0.0004969977,0.00007684906,0.002732586],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006200449,"threshold_uncertainty_score":0.01232874,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3045066834","doi":"10.1080/01446193.2020.1795217","title":"Assessing the impact of social procurement policies for Indigenous people","year":2020,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Community Development and Social Impact","field":"Economics, Econometrics and Finance","cited_by":28,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Indigenous; Procurement; Value (mathematics); Conceptual framework; Accountability; Social impact assessment; Economic growth; Public relations; Business; Political science; Sociology; Economics; Marketing; Social science","authors":[{"name":"George Denny‐Smith","is_ca":false},{"name":"Megan Williams","is_ca":false},{"name":"Martin Loosemore","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0687312696853455,"gpt":0.2903295940541011,"spread":0.2215983243687556,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008539755,0.0002453073,0.0002834012,0.001007059,0.001281204,0.002356004,0.0004827687,0.0008332966,0.002995956],"category_scores_gemma":[0.01959257,0.0001525533,0.0004340409,0.001148474,0.002290519,0.001714837,0.002781807,0.0009949873,0.0001700937],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.009184763,"about_ca_system_score_gemma":0.008758589,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.05583219,"about_ca_topic_score_gemma":0.06502537,"domain_scores_codex":[0.9933214,0.004059696,0.0001658315,0.0001439233,0.001046931,0.001262305],"domain_scores_gemma":[0.9900653,0.005731427,0.001471586,0.0003695652,0.001668749,0.0006933908],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.001243017,0.001749329,0.6130096,0.0009400948,0.0005636275,0.00103142,0.02810035,0.05027576,0.002686867,0.1355265,0.002128857,0.1627446],"study_design_scores_gemma":[0.00009180474,0.002756205,0.8013251,0.0007168509,0.0004266588,0.000166698,0.09135492,0.03202887,0.004147519,0.05165575,0.01522088,0.0001086677],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9801906,0.0002168583,0.0007263551,0.001068142,0.000008749273,0.00006895165,0.00006773528,0.000005421554,0.0176472],"genre_scores_gemma":[0.9989676,0.0001489606,0.0002612077,0.00003779854,0.000005587267,0.00002749354,0.00001843633,8.738921e-7,0.0005320869],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.05583219,"threshold_uncertainty_score":0.1110144,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2061323651","doi":"10.1080/01446190410001673571","title":"Accelerating linear projects","year":2005,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Business; Engineering; Construction engineering; Process management; Systems engineering","authors":[{"name":"Ahmed Hassanein","is_ca":true},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1231112855323806,"gpt":0.3266476792046519,"spread":0.2035363936722713,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001414952,0.000669907,0.0004823092,0.0008868111,0.0005899469,0.0010661,0.001065816,0.000453723,0.01021744],"category_scores_gemma":[0.00362823,0.0003313175,0.0004072834,0.001333552,0.0003563816,0.0008660083,0.001249145,0.0006749298,0.001663875],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008041978,"about_ca_system_score_gemma":0.001924595,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003979481,"about_ca_topic_score_gemma":0.005914418,"domain_scores_codex":[0.9988849,0.0002995504,0.00005981172,0.0002184396,0.000404634,0.0001327319],"domain_scores_gemma":[0.9981878,0.0007394422,0.0003063273,0.0002747673,0.0003578819,0.0001337623],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002309563,0.0001510714,0.003565983,0.0004640779,0.00003508094,0.0001493586,0.0002673359,0.3689207,0.01074242,0.04281985,0.00499749,0.5676556],"study_design_scores_gemma":[0.0001222747,0.00100928,0.005796472,0.0001196107,0.00006319833,0.0004370917,0.0004236757,0.8467687,0.01655594,0.04842173,0.08021885,0.00006323113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04564683,0.0002621142,0.9343921,0.0001174069,0.00005674794,0.0004391583,0.0001665683,0.001179629,0.01773945],"genre_scores_gemma":[0.39001,0.0006234138,0.5870467,0.00004597335,0.00004703737,0.0004351179,0.000454132,0.0001958603,0.0211418],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01021744,"threshold_uncertainty_score":0.0341807,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4293068753","doi":"10.1080/01446193.2022.2110273","title":"Twenty-year application of logistics and supply chain management in the construction industry","year":2022,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"HEC Montréal","funders":"","keywords":"Supply chain management; Procurement; Supply chain; Construction industry; Construction management; Process management; Business; Computer science; Operations management; Knowledge management; Engineering; Construction engineering; Marketing; Civil engineering","authors":[{"name":"Duy Tân Nguyên","is_ca":true},{"name":"Phuoc Luong Le","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04027309551272337,"gpt":0.2837457886716672,"spread":0.2434726931589438,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02075014,0.0005501686,0.0007576405,0.01699436,0.001897171,0.006584099,0.001066705,0.001987521,0.003326204],"category_scores_gemma":[0.03758227,0.0005096731,0.001014902,0.0249126,0.002820567,0.005328645,0.003471133,0.001600731,0.0004823262],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.01270613,"about_ca_system_score_gemma":0.02611404,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0101994,"about_ca_topic_score_gemma":0.02669898,"domain_scores_codex":[0.9832323,0.006784531,0.0031307,0.00140013,0.004971142,0.0004812116],"domain_scores_gemma":[0.9360025,0.03561339,0.008624363,0.002459326,0.01617204,0.001128475],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0002061459,0.0001344871,0.02971834,0.02962998,0.000409026,0.0005844111,0.0145632,0.002054568,0.002984543,0.07838183,0.009056902,0.8322766],"study_design_scores_gemma":[0.00002150357,0.0006283151,0.1097679,0.04611247,0.0004824765,0.001460062,0.0263105,0.001852457,0.005325383,0.02724905,0.7805298,0.0002601257],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"review","genre_gemma":"empirical","genre_scores_codex":[0.06902246,0.8479823,0.02285866,0.01567628,0.002352001,0.0004928167,0.0009956937,0.00008521076,0.04053459],"genre_scores_gemma":[0.3524818,0.5967847,0.03697957,0.004076175,0.0009903689,0.0006536111,0.0009320959,0.0000597391,0.007042018],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.02075014,"threshold_uncertainty_score":0.1097386,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2078068035","doi":"10.1080/01446193.2013.825044","title":"Understanding differences in construction project governance between developed and developing countries","year":2013,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Structuring; Developing country; Corporate governance; Project governance; Order (exchange); Business; Knowledge management; Public relations; Process management; Political science; Economic growth; Computer science; Economics; Finance","authors":[{"name":"Gonzalo Lizarralde","is_ca":true},{"name":"Stella Tomiyoshi","is_ca":true},{"name":"Mario Bourgault","is_ca":true},{"name":"Juan S. Malo","is_ca":true},{"name":"Georgia Cardosi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2182641771756977,"gpt":0.3068836148289379,"spread":0.08861943765324024,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004611014,0.0001482125,0.0002478779,0.001805755,0.0008624878,0.002485501,0.0002601914,0.00029352,0.0009129272],"category_scores_gemma":[0.009810127,0.0001965103,0.000138889,0.003320758,0.002578855,0.002114516,0.00196683,0.0004280226,0.00007273598],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001769055,"about_ca_system_score_gemma":0.001678667,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006465137,"about_ca_topic_score_gemma":0.00740567,"domain_scores_codex":[0.9965552,0.001922036,0.0002990856,0.0002142343,0.0004143262,0.0005950052],"domain_scores_gemma":[0.9953321,0.002419458,0.001183009,0.0002729878,0.0005145003,0.0002780777],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002174491,0.0001068144,0.6009593,0.0006256321,0.00008033169,0.001169213,0.1675347,0.00295818,0.002356032,0.0997058,0.001213426,0.1230731],"study_design_scores_gemma":[0.00001679312,0.0001464467,0.7456522,0.0006505154,0.00003394485,0.0006481913,0.2137755,0.001056835,0.0007276296,0.01386492,0.02339485,0.00003213953],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9778952,0.001582125,0.002831589,0.00091413,0.000009712751,0.00003596535,0.00006782795,0.000004293814,0.01665915],"genre_scores_gemma":[0.9984669,0.0007489804,0.000531618,0.00005247669,0.000001829586,0.00001464338,0.00002859515,0.000001540081,0.000153377],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.006465137,"threshold_uncertainty_score":0.02438569,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3207962055","doi":"10.1080/01446193.2021.1983851","title":"Transforming construction: heterarchical megaproject ecologies and the management of innovation","year":2021,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"HEC Montréal","funders":"","keywords":"Megaproject; Conceptualization; Knowledge management; Corporate governance; Business; Process management; Engineering; Computer science; Systems engineering","authors":[{"name":"Maude Brunet","is_ca":true},{"name":"Patrick Cohendet","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05685157115821082,"gpt":0.3015648291996323,"spread":0.2447132580414215,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005222927,0.000239542,0.0004191619,0.002503899,0.00277329,0.007904827,0.001147179,0.001110249,0.003329126],"category_scores_gemma":[0.008360493,0.0003212598,0.0004263728,0.00231945,0.01506672,0.006138328,0.007957183,0.0009380901,0.0002183091],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.004859345,"about_ca_system_score_gemma":0.004122768,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003307239,"about_ca_topic_score_gemma":0.006714824,"domain_scores_codex":[0.9946858,0.003115451,0.0002192981,0.0006728608,0.0006105493,0.0006960849],"domain_scores_gemma":[0.9915702,0.00332182,0.001630384,0.001461685,0.0005643315,0.001451512],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00007434248,0.0001885735,0.07253098,0.0001460544,0.0001164215,0.000516464,0.01825499,0.01835249,0.001249309,0.8259297,0.0009918032,0.06164898],"study_design_scores_gemma":[0.0000502749,0.0002355547,0.1209009,0.0003127201,0.0000504349,0.0005232408,0.04331612,0.02790046,0.0006583732,0.7522489,0.05372041,0.00008257834],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7668332,0.001065692,0.1350278,0.0046854,0.0000430941,0.0002566538,0.0001330977,0.0001095375,0.09184561],"genre_scores_gemma":[0.9918611,0.0001594466,0.006424333,0.00005663879,0.00001011012,0.00008623742,0.00002486702,0.00001142831,0.001365718],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.007904827,"threshold_uncertainty_score":0.03525716,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2075116457","doi":"10.1080/01446193.2011.637568","title":"A correlated bidding model for markup size decisions","year":2011,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Consumer Market Behavior and Pricing","field":"Business, Management and Accounting","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Bidding; Markup language; Bayesian probability; A priori and a posteriori; Econometrics; Computer science; Statistical model; Probabilistic logic; Correlation; Data mining; Operations research; Machine learning; Artificial intelligence; Economics; Mathematics; Microeconomics; XML","authors":[{"name":"Xian‐Xun Yuan","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05063624431448106,"gpt":0.2132746729793665,"spread":0.1626384286648854,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007177034,0.001442932,0.002325518,0.001494839,0.0007639829,0.00271878,0.004906221,0.003217068,0.009653216],"category_scores_gemma":[0.01327351,0.001286428,0.001883219,0.002330704,0.001825362,0.003971647,0.001401381,0.003343035,0.002437294],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002358629,"about_ca_system_score_gemma":0.001999125,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007816162,"about_ca_topic_score_gemma":0.008021026,"domain_scores_codex":[0.9956533,0.001734509,0.0001765112,0.0008938652,0.0009496562,0.0005921677],"domain_scores_gemma":[0.9925552,0.004438266,0.001308008,0.0004598389,0.000945825,0.0002927515],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001920412,0.0001355797,0.002338989,0.0001049034,0.0001111914,0.0004062649,0.0002750169,0.69213,0.001432894,0.2860211,0.002535327,0.01431668],"study_design_scores_gemma":[0.00002620703,0.00005384369,0.0005779365,0.000008814623,0.00003254961,0.00009667863,0.00002483483,0.9663376,0.0001425241,0.03179721,0.0008644132,0.00003731956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06199146,0.0004069977,0.9199349,0.001316596,0.0000858109,0.0002427374,0.0008572416,0.0002787407,0.01488563],"genre_scores_gemma":[0.8679475,0.0008678236,0.08960167,0.000336591,0.0001869827,0.0006217598,0.0008166069,0.0001237956,0.03949731],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009653216,"threshold_uncertainty_score":0.0379563,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1979987888","doi":"10.1080/0144619032000111232","title":"Innovation in clean-room construction: a case study of co-operation between firms","year":2003,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Carleton University","funders":"","keywords":"Liminality; Multinational corporation; Negotiation; Business; Process (computing); Function (biology); Construct (python library); Flexibility (engineering); Workspace; Industrial organization; Knowledge management; Management; Finance; Sociology; Economics; Computer science","authors":[{"name":"Rob Shields","is_ca":true},{"name":"Kevin R. West","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.09243541628620355,"gpt":0.3367056255101551,"spread":0.2442702092239515,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009526736,0.0004991238,0.0006483936,0.002238413,0.01466971,0.006530798,0.002809604,0.004748491,0.002773726],"category_scores_gemma":[0.01617165,0.0005664928,0.0005783099,0.003070137,0.008321349,0.004323731,0.006864614,0.002594407,0.0004982266],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.005450495,"about_ca_system_score_gemma":0.004170553,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01231742,"about_ca_topic_score_gemma":0.03076804,"domain_scores_codex":[0.9810136,0.01362935,0.0003159043,0.001006604,0.001677049,0.002357549],"domain_scores_gemma":[0.9697108,0.02319038,0.001738023,0.001526947,0.00118875,0.002645234],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"qualitative","study_design_scores_codex":[0.0005838386,0.002575415,0.05912132,0.0004953634,0.00008174596,0.03875758,0.7749946,0.003902013,0.003994625,0.03515374,0.002098121,0.07824168],"study_design_scores_gemma":[0.0001497073,0.001107287,0.02501206,0.0002967508,0.00006228796,0.006610561,0.9056202,0.006067687,0.00315042,0.005503508,0.04629526,0.0001243211],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.986931,0.0003170714,0.003110663,0.0007272373,0.00001421014,0.0001028544,0.00001443155,0.00001432069,0.008768355],"genre_scores_gemma":[0.9951559,0.0003240504,0.001943629,0.00009237928,0.00001224442,0.00007775918,0.00002165153,0.000009994561,0.002362474],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01466971,"threshold_uncertainty_score":0.05038279,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2001286129","doi":"10.1080/01446193.2012.690883","title":"Risk Management for Design and Construction","year":2012,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Construction engineering; Engineering; Risk management; Risk analysis (engineering); Business; Architectural engineering; Computer science","authors":[{"name":"Samin Shokri","is_ca":true},{"name":"Carl T. Haas","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.06757338119077164,"gpt":0.2962281247227335,"spread":0.2286547435319619,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004594984,0.001322547,0.0012325,0.001891331,0.001380337,0.00449741,0.001198767,0.002707411,0.005293131],"category_scores_gemma":[0.01341259,0.0005323523,0.0008207408,0.001556408,0.003148235,0.003773805,0.002104549,0.002563565,0.0005848182],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00378613,"about_ca_system_score_gemma":0.003539312,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005109907,"about_ca_topic_score_gemma":0.004720107,"domain_scores_codex":[0.996456,0.001608223,0.0002379102,0.0002951722,0.001215034,0.0001876143],"domain_scores_gemma":[0.9933904,0.004048412,0.0007382535,0.0005845504,0.0009909723,0.0002473882],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00004065622,0.00007839083,0.001476262,0.0003540619,0.00009614103,0.0001283296,0.0005029824,0.07098482,0.0006064172,0.7908754,0.008800911,0.1260556],"study_design_scores_gemma":[0.000008588679,0.00004736404,0.0007330264,0.0001886418,0.000031088,0.00006697835,0.0002539855,0.05676526,0.0002810087,0.9207163,0.02087536,0.00003229177],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02637009,0.04682105,0.8401158,0.0220835,0.001365295,0.0001422452,0.0002003203,0.0003813321,0.06252044],"genre_scores_gemma":[0.7720311,0.02196204,0.1633665,0.001430736,0.002193653,0.0003167475,0.0002225164,0.000167343,0.0383095],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005293131,"threshold_uncertainty_score":0.02747041,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2766525559","doi":"10.1080/01446193.2017.1390241","title":"A simulation-based method for effective workface planning of industrial construction projects","year":2017,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); Discrete event simulation; Work (physics); Plan (archaeology); Computer science; Workforce planning; Process (computing); Scale (ratio); Industrial engineering; Operations research; Workforce; Engineering; Simulation; Operations management","authors":[{"name":"Di Hu","is_ca":true},{"name":"Yasser Mohamed","is_ca":true},{"name":"Hosein Taghaddos","is_ca":false},{"name":"Ulrich Hermann","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1670221460818022,"gpt":0.4017609918205162,"spread":0.234738845738714,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006958572,0.0007100659,0.0008349391,0.0006905451,0.0005117901,0.0006957564,0.001201882,0.0007535822,0.003843906],"category_scores_gemma":[0.001278742,0.0005486926,0.0009885657,0.0008378948,0.000493338,0.0005550949,0.0008015098,0.0007545638,0.0003819564],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009174844,"about_ca_system_score_gemma":0.001875814,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01107023,"about_ca_topic_score_gemma":0.009824858,"domain_scores_codex":[0.9996411,0.0001273722,0.00001959905,0.00005730806,0.0001152339,0.00003943751],"domain_scores_gemma":[0.9995064,0.0002758928,0.00004844787,0.00003552244,0.00009595753,0.00003783447],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001849077,0.00001391644,0.0001631018,0.00002275497,0.0000110082,0.00002923803,0.00001908272,0.9851504,0.0008730932,0.004025286,0.0001739939,0.009499665],"study_design_scores_gemma":[0.000003998816,0.000004994569,0.00001890106,0.000003072493,0.000002079766,0.0000046481,0.00000276345,0.9987407,0.0001562408,0.0006500419,0.0004101677,0.000002441324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.004247876,0.00004843047,0.99369,0.00003416454,0.00001798498,0.00004518656,0.00003589384,0.0002684938,0.001611938],"genre_scores_gemma":[0.3582376,0.0002370991,0.6377834,0.00004115553,0.00002350982,0.0005193944,0.0002181216,0.0001217041,0.002817931],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01107023,"threshold_uncertainty_score":0.02201158,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2027778440","doi":"10.1080/01446190410001673562","title":"Global performance measures for transnational construction corporations","year":2004,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Leadership, Human Resources, Global Affairs","field":"Social Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Industry Canada","keywords":"Salient; Revenue; Ranking (information retrieval); Business; Global strategy; Work (physics); Industrial organization; International trade; Marketing; Engineering; Finance; Computer science","authors":[{"name":"Javier Calero Cuervo","is_ca":false},{"name":"Low Sui Pheng","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03101219343476243,"gpt":0.242165099014789,"spread":0.2111529055800266,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003570156,0.0007391657,0.0003852522,0.01354583,0.0005946307,0.002095618,0.0003996531,0.0004197153,0.005193129],"category_scores_gemma":[0.009176678,0.0001065564,0.0005722086,0.01313591,0.001055134,0.002308524,0.002532511,0.0006721686,0.0008924647],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001133775,"about_ca_system_score_gemma":0.0006316334,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002091957,"about_ca_topic_score_gemma":0.003295572,"domain_scores_codex":[0.9970616,0.000796289,0.0004395165,0.0002140599,0.001182107,0.0003064448],"domain_scores_gemma":[0.9899765,0.001992439,0.003398584,0.0008319396,0.003022848,0.0007778279],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0004122526,0.0003983332,0.7259163,0.0006189937,0.0004241423,0.0003051501,0.004360042,0.01265157,0.002093741,0.0383621,0.02168838,0.1927689],"study_design_scores_gemma":[0.00002364486,0.0008421777,0.9267717,0.0001904011,0.000106085,0.0003875464,0.00747891,0.00481413,0.001675428,0.007644498,0.04999064,0.00007485652],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7603911,0.001788634,0.01442768,0.0008320491,0.0002528931,0.0003471371,0.008893038,0.0003947641,0.2126728],"genre_scores_gemma":[0.9780989,0.0006114115,0.008421974,0.00009407503,0.0001015912,0.0003318178,0.007135265,0.00006829089,0.00513661],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01354583,"threshold_uncertainty_score":0.01888102,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4385732832","doi":"10.1080/01446193.2023.2239381","title":"Integration mechanisms for material suppliers in the construction supply chain: a systematic literature review","year":2023,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Supply chain; Systematic review; Business; Supply chain management; Process management; Knowledge management; Computer science; Marketing","authors":[{"name":"Basma Ben Mahmoud","is_ca":true},{"name":"Nadia Lehoux","is_ca":true},{"name":"Pierre Blanchet","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01483715433581101,"gpt":0.2134359953773196,"spread":0.1985988410415086,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01522359,0.001382719,0.00334355,0.02899027,0.001367797,0.004084945,0.001617481,0.002426039,0.003526923],"category_scores_gemma":[0.05491131,0.001137856,0.004403829,0.02342226,0.001574409,0.004995644,0.002129522,0.001312933,0.0004039584],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.005925354,"about_ca_system_score_gemma":0.03009498,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01091586,"about_ca_topic_score_gemma":0.02910864,"domain_scores_codex":[0.9874645,0.004760148,0.004123074,0.0007540934,0.002532765,0.0003654087],"domain_scores_gemma":[0.9266872,0.05456942,0.01002342,0.0009249331,0.007209177,0.0005858524],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001314887,0.00007246205,0.003958863,0.833538,0.002333781,0.0004558311,0.002211254,0.0002523,0.000236406,0.001987344,0.002845841,0.1519765],"study_design_scores_gemma":[0.00005647814,0.0001444189,0.006200504,0.9404883,0.01215065,0.0009328911,0.003416138,0.000157181,0.0002747763,0.0008323324,0.03528788,0.00005843935],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.003610432,0.9930693,0.000641495,0.0005921113,0.0000948103,0.0005485849,0.0003309305,0.000009480573,0.001102801],"genre_scores_gemma":[0.03017247,0.9659282,0.002239378,0.0004444095,0.00005870999,0.0006419693,0.0003375659,0.000006179614,0.0001711922],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.02899027,"threshold_uncertainty_score":0.08051103,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3111133871","doi":"10.1080/01446193.2020.1855666","title":"Stochastic modelling of maintenance flexibility in Value for Money assessment of PPP road projects","year":2020,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Flexibility (engineering); Value for money; Value (mathematics); Business; Engineering; Transport engineering; Risk analysis (engineering); Computer science; Operations research; Operations management; Economics; Management; Public economics","authors":[{"name":"Jing Zhang","is_ca":true},{"name":"Xian‐Xun Yuan","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.08115104627357217,"gpt":0.2631303750703781,"spread":0.1819793287968059,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002521855,0.000728913,0.0008324751,0.0007438212,0.0004256133,0.001704547,0.001342228,0.001276499,0.001555068],"category_scores_gemma":[0.006088148,0.0006005979,0.0009702413,0.001005947,0.001007569,0.001236924,0.001092406,0.001114262,0.0001106836],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001987861,"about_ca_system_score_gemma":0.001460932,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01376509,"about_ca_topic_score_gemma":0.006998399,"domain_scores_codex":[0.9988587,0.0005975157,0.00004596219,0.0001302695,0.0001812154,0.0001863755],"domain_scores_gemma":[0.9968889,0.002134578,0.0005089369,0.0001023357,0.0002541278,0.0001111344],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000007331937,0.000005845379,0.0004686862,0.000005729931,0.000004239338,0.00003120503,0.00001173493,0.9933655,0.00007076495,0.005128876,0.00005327344,0.0008468729],"study_design_scores_gemma":[0.000001549226,0.000007333761,0.0001734101,0.000002193183,0.000002843972,0.000006512861,0.000009742013,0.9975357,0.00003401941,0.002155286,0.00006802225,0.000003350411],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3826391,0.0004154758,0.6056365,0.0007064927,0.00004328799,0.0001364591,0.0003593395,0.0001191128,0.009944193],"genre_scores_gemma":[0.9905771,0.0001632629,0.00747253,0.00001839985,0.000009006149,0.00007701316,0.00008100783,0.00001233994,0.001589437],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01376509,"threshold_uncertainty_score":0.02736998,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2014042223","doi":"10.1080/01446190701670381","title":"An analysis of infrastructure development based on national competitiveness perspectives","year":2008,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Global Trade and Competitiveness","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Ranking (information retrieval); Performance indicator; Selection (genetic algorithm); Linear discriminant analysis; Business; Set (abstract data type); Representation (politics); Regional science; Industrial organization; Environmental economics; Computer science; Economics; Marketing; Geography; Political science","authors":[{"name":"Ren‐Jye Dzeng","is_ca":false},{"name":"Shyh‐Shiuh Wang","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01280144593013777,"gpt":0.1987990598545089,"spread":0.1859976139243711,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007082425,0.0002491237,0.00022538,0.00398009,0.0003906562,0.001971774,0.0001792187,0.0001541521,0.004106278],"category_scores_gemma":[0.001672515,0.00009187572,0.0004738362,0.003787384,0.0004843962,0.0009044278,0.0009009831,0.0003426512,0.0001685876],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002097612,"about_ca_system_score_gemma":0.00124642,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01168951,"about_ca_topic_score_gemma":0.01684953,"domain_scores_codex":[0.9995543,0.0001132023,0.00001303108,0.00004968589,0.0001647278,0.0001051073],"domain_scores_gemma":[0.9993463,0.0001915537,0.0001066957,0.00002568414,0.0002586326,0.00007107976],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002684481,0.0001479942,0.3655201,0.0002765847,0.0002897368,0.0006987583,0.001096893,0.06562599,0.006629853,0.4240792,0.003999364,0.1313671],"study_design_scores_gemma":[0.0000299579,0.0002575986,0.8051831,0.0000864788,0.0002182804,0.0003158854,0.004299142,0.1130611,0.003885776,0.04001055,0.03259075,0.00006141196],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8443563,0.0005355731,0.01121651,0.000519736,0.00001733854,0.00004795102,0.001037494,0.00003875149,0.1422303],"genre_scores_gemma":[0.9945733,0.0003261042,0.002785051,0.00001433967,0.000009154484,0.00002036733,0.0004376979,0.0000109166,0.001823102],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01168951,"threshold_uncertainty_score":0.02324295,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4401843417","doi":"10.1080/01446193.2024.2390529","title":"A research and development framework for integrated project delivery","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Integrated project delivery; Process management; Systems engineering; Engineering management; Business; Development (topology); Engineering; Computer science; Knowledge management; Project management","authors":[{"name":"Ahmad J. Arar","is_ca":true},{"name":"Érik Poirier","is_ca":true},{"name":"Sheryl Staub‐French","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.2060080579618077,"gpt":0.4052166303004449,"spread":0.1992085723386372,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.09669138,0.002519549,0.001527392,0.01811395,0.006631026,0.01892236,0.007271942,0.007341881,0.00991608],"category_scores_gemma":[0.05364574,0.001395482,0.003414708,0.01818242,0.01900476,0.01888538,0.01084541,0.005848585,0.003464854],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0307683,"about_ca_system_score_gemma":0.07030759,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01872018,"about_ca_topic_score_gemma":0.0152669,"domain_scores_codex":[0.916094,0.06350826,0.006151461,0.004508019,0.007061076,0.00267718],"domain_scores_gemma":[0.9231442,0.05173893,0.00523453,0.00416925,0.01262479,0.003088279],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00001037596,0.00005524789,0.000469801,0.0007341176,0.00002080061,0.0002134621,0.004199412,0.001977834,0.000123911,0.9620869,0.003400147,0.02670806],"study_design_scores_gemma":[0.00007286851,0.0001417259,0.0009763293,0.004335949,0.00006364421,0.0003794497,0.0110307,0.007554298,0.000496082,0.6391891,0.3356813,0.00007857983],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.003527252,0.006213401,0.8184283,0.03091663,0.0005580136,0.005778044,0.0008979032,0.0004269453,0.1332535],"genre_scores_gemma":[0.06319077,0.004376453,0.9172571,0.001261592,0.0001293808,0.00760717,0.0006950563,0.00008897398,0.005393492],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.09669138,"threshold_uncertainty_score":0.511359,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4404645866","doi":"10.1080/01446193.2024.2431280","title":"Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia; University of New Brunswick","funders":"Mitacs","keywords":"Productivity; Estimation; Engineering; Construction industry; Construction engineering; Computer science; Industrial engineering; Architectural engineering; Business; Civil engineering; Economics; Systems engineering; Economic growth","authors":[{"name":"Kamyab Aghajamali","is_ca":true},{"name":"Saeid Metvaei","is_ca":true},{"name":"Alaeldin Suliman","is_ca":false},{"name":"Zhen Lei","is_ca":true},{"name":"Qian Chen","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03252959761123006,"gpt":0.2414101653934843,"spread":0.2088805677822542,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001073455,0.000625758,0.0004416397,0.0009134663,0.0002874468,0.001119488,0.001197896,0.0006753667,0.001434105],"category_scores_gemma":[0.001737171,0.0006876221,0.0006716688,0.001067241,0.0003611262,0.001236041,0.0008273232,0.0009596444,0.0004925001],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008841184,"about_ca_system_score_gemma":0.001574479,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009910174,"about_ca_topic_score_gemma":0.009580565,"domain_scores_codex":[0.9995498,0.00007559199,0.00002959522,0.0001265551,0.0001769155,0.0000414882],"domain_scores_gemma":[0.9994167,0.000192772,0.00008389782,0.00006979594,0.0002169618,0.00001988812],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002494314,0.00004663948,0.002215653,0.00002815134,0.00001266175,0.00003892506,0.00003876459,0.958703,0.001665736,0.001746649,0.000345004,0.03513389],"study_design_scores_gemma":[0.000001417163,0.000007467488,0.0003933542,0.000003455538,0.0000033873,0.000006539954,0.000007125078,0.9979525,0.0006034137,0.0005366392,0.000481063,0.000003555776],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05386987,0.00007952681,0.9415628,0.0001509995,0.00002676869,0.00007838248,0.0004206036,0.000926274,0.002884764],"genre_scores_gemma":[0.693251,0.0002214454,0.3017298,0.00004590108,0.00001798251,0.0002983232,0.001064566,0.00008189848,0.003289098],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009910174,"threshold_uncertainty_score":0.01970494,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4405494818","doi":"10.1080/01446193.2024.2436395","title":"The legitimation of private net zero emission building standards in the context of global decarbonization goals","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université de Montréal","funders":"","keywords":"Legitimation; Context (archaeology); Zero (linguistics); Zero emission; Net (polyhedron); Business; Environmental science; Engineering; Political science; Mathematics; Geology; Electrical engineering","authors":[{"name":"Lisa N. Hasan","is_ca":true},{"name":"Gonzalo Lizarralde","is_ca":true},{"name":"Érick Lachapelle","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004717918680604848,"gpt":0.230032252197225,"spread":0.2253143335166201,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02812943,0.0002847073,0.0005068886,0.002147248,0.005696476,0.01250459,0.001362134,0.003444956,0.003140373],"category_scores_gemma":[0.05653073,0.0002983499,0.0002809308,0.001815178,0.05479516,0.01127431,0.01041554,0.005165135,0.0002285551],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00937436,"about_ca_system_score_gemma":0.00760525,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00517349,"about_ca_topic_score_gemma":0.007067736,"domain_scores_codex":[0.9797366,0.01128676,0.000639273,0.001841652,0.00468167,0.001813948],"domain_scores_gemma":[0.9280529,0.05602647,0.005227336,0.005607675,0.003926332,0.001159201],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","study_design_scores_codex":[0.00005563769,0.00003336783,0.008566484,0.00008275323,0.0000124594,0.0003357082,0.1623582,0.000556852,0.0006390587,0.8141102,0.001041564,0.01220769],"study_design_scores_gemma":[0.00004507655,0.00006173509,0.01840767,0.0006039441,0.00004156382,0.000347168,0.2331962,0.003379684,0.002259781,0.6597452,0.08181881,0.00009332297],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7275828,0.0007249254,0.0151465,0.03054243,0.0001923969,0.00005178218,0.00005878875,0.0000545242,0.2256458],"genre_scores_gemma":[0.9986582,0.00005735116,0.0003761011,0.0001635189,0.00001120452,0.000006862003,0.000007870747,0.00001221547,0.000706666],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02812943,"threshold_uncertainty_score":0.1487644,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4409618273","doi":"10.1080/01446193.2025.2479764","title":"Machine learning and optimization strategies for infrastructure projects risk management","year":2025,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"","keywords":"Risk management; Computer science; Business; Risk analysis (engineering); Engineering management; Engineering; Knowledge management; Finance","authors":[{"name":"Ahmed Moussa","is_ca":true},{"name":"Mohamed Ezzeldin","is_ca":true},{"name":"Wael El‐Dakhakhni","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0211767701845107,"gpt":0.2836591872622158,"spread":0.2624824170777051,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00220875,0.001301378,0.001162084,0.001163582,0.000452953,0.001439789,0.001148408,0.001304782,0.002039589],"category_scores_gemma":[0.005029399,0.0005768731,0.0006925684,0.001068026,0.0008208151,0.001148631,0.001366924,0.001761605,0.0003046891],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001322482,"about_ca_system_score_gemma":0.001888802,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006425173,"about_ca_topic_score_gemma":0.005080683,"domain_scores_codex":[0.9991969,0.0004134038,0.00004451017,0.000125388,0.0001475367,0.0000721976],"domain_scores_gemma":[0.9977435,0.001673803,0.0002046155,0.0000712664,0.0002426564,0.00006422788],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008863768,0.00002319175,0.0003289279,0.00003163165,0.00002421952,0.0000158707,0.00001489774,0.9799466,0.0001211648,0.004707945,0.0003251263,0.01445154],"study_design_scores_gemma":[0.000002501915,0.00001082,0.00005589031,0.000007071665,0.000003781095,0.000002712179,0.000005991705,0.9953176,0.00006316428,0.004319168,0.0002088764,0.000002493216],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02067803,0.001802841,0.9707163,0.001436211,0.00006319305,0.00009531744,0.00008471873,0.0002166585,0.004906707],"genre_scores_gemma":[0.7961717,0.001782122,0.1970775,0.0003521044,0.0001764538,0.0003772755,0.0002504239,0.00007756121,0.003734759],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006425173,"threshold_uncertainty_score":0.01277554,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4392003120","doi":"10.1080/01446193.2024.2314079","title":"Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Auction Theory and Applications","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Metropolitan area; SAINT; State (computer science); Labour economics; Economics; Business; Engineering; Art; History; Computer science; Art history; Archaeology","authors":[{"name":"Kevin Duncan","is_ca":false},{"name":"Adam Case","is_ca":false},{"name":"Frank Manzo","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05298611275529041,"gpt":0.3084399775242874,"spread":0.255453864768997,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001798072,0.0001728189,0.0002728603,0.001190406,0.0014674,0.001593622,0.0007744296,0.0003426217,0.001776556],"category_scores_gemma":[0.007141612,0.000360054,0.0002621061,0.00206241,0.001144804,0.0005723273,0.001086531,0.000689306,0.0002311344],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001437823,"about_ca_system_score_gemma":0.001025577,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.1884787,"about_ca_topic_score_gemma":0.4385189,"domain_scores_codex":[0.998063,0.0007795254,0.0001431124,0.000319569,0.0003834835,0.0003112257],"domain_scores_gemma":[0.9879825,0.002802851,0.005382597,0.0007162307,0.0013812,0.001734569],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00005369996,0.0000746675,0.9970553,0.000006052196,0.00002928009,0.0000271697,0.001161995,0.0000562826,0.00007641428,0.0001173228,0.0001628505,0.001179043],"study_design_scores_gemma":[0.000003811941,0.00002487172,0.9962107,0.000006038805,0.00001494897,0.00001982754,0.003151192,0.0001707755,0.00005695274,0.00002734747,0.0003109281,0.000002532924],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9994656,0.00003450847,0.00003251027,0.00004293911,0.000001221973,0.000002358255,0.0000723402,3.934419e-7,0.0003481865],"genre_scores_gemma":[0.999427,0.0000552315,0.00003798174,0.00001598586,0.000003171262,0.000003024335,0.0001899113,0.000001294214,0.0002663941],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1884787,"threshold_uncertainty_score":0.3747633,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4413977029","doi":"10.1080/01446193.2025.2511833","title":"Identifying early warning signs of construction labor shortages","year":2025,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Economic shortage; Warning signs; Warning system; Business; Forensic engineering; Engineering; Construction engineering; Operations management; Risk analysis (engineering); Transport engineering; Telecommunications","authors":[{"name":"Ahmed Shiha","is_ca":false},{"name":"Islam H. El-adaway","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05202782319514264,"gpt":0.4035603939195201,"spread":0.3515325707243775,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00189214,0.0002527608,0.0002873512,0.002123728,0.0003023971,0.0009985213,0.0003378338,0.000369422,0.004061902],"category_scores_gemma":[0.007226723,0.0002248432,0.0001757375,0.001381184,0.0002148769,0.0007853276,0.0009619773,0.0004403892,0.0005269751],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005200424,"about_ca_system_score_gemma":0.0011652,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003994256,"about_ca_topic_score_gemma":0.01507239,"domain_scores_codex":[0.9993566,0.000164552,0.00009158487,0.00007612221,0.0001943017,0.0001168413],"domain_scores_gemma":[0.9917285,0.002537932,0.00398491,0.000291494,0.001102972,0.0003541327],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001755751,0.0001050035,0.9615433,0.0001821581,0.00002043085,0.0002051575,0.0005627215,0.002356975,0.001213428,0.000897197,0.001954133,0.03078389],"study_design_scores_gemma":[0.000006920247,0.0001857415,0.9855453,0.0001349646,0.0000152098,0.00007078646,0.002706192,0.005180764,0.001017875,0.001109157,0.004008533,0.00001856481],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.983732,0.0002677538,0.006252059,0.0003323903,0.00003786126,0.00008652572,0.002894698,0.00007520404,0.006321516],"genre_scores_gemma":[0.9939528,0.0001919423,0.003186938,0.00004005008,0.00001837013,0.00004069304,0.001526635,0.000006595461,0.001035957],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.004061902,"threshold_uncertainty_score":0.01358843,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4403440710","doi":"10.1080/01446193.2024.2411409","title":"Economic impacts of large dams on downstream brickmaking in developing countries","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Water resources management and optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; International Fine Particle Research Institute; United States Agency for International Development","keywords":"Downstream (manufacturing); Developing country; Business; Natural resource economics; Environmental science; Economics; Economic growth; Marketing","authors":[{"name":"Mohammed Basheer","is_ca":true},{"name":"Zuhal Elnour","is_ca":false},{"name":"Khalid Siddig","is_ca":false},{"name":"Harald Grethe","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005514772145681038,"gpt":0.1980530947241077,"spread":0.1925383225784266,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007397735,0.0004198908,0.0002151089,0.0007418731,0.000523704,0.001164554,0.0002444182,0.0003843502,0.002278435],"category_scores_gemma":[0.001296007,0.0002283507,0.0004665368,0.001132074,0.0008496062,0.000686843,0.0009456709,0.0005399181,0.00008847715],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002085343,"about_ca_system_score_gemma":0.001142052,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01458482,"about_ca_topic_score_gemma":0.02715141,"domain_scores_codex":[0.9996005,0.0001722586,0.00001451031,0.0000261373,0.00006771301,0.0001189172],"domain_scores_gemma":[0.9994967,0.0001925728,0.0001718009,0.00002395161,0.00007735843,0.00003767924],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.0002659703,0.0001660572,0.1842245,0.0002302789,0.0001597164,0.002514102,0.0003081198,0.7088488,0.006424618,0.0575635,0.001802551,0.03749174],"study_design_scores_gemma":[0.00009866806,0.0008062374,0.5567537,0.0004598595,0.0004554001,0.001047023,0.01277071,0.3284552,0.01854572,0.05132634,0.02909627,0.000184799],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9827769,0.0004163936,0.003931258,0.0004070545,0.00001186112,0.00002064262,0.000423215,0.00001384993,0.01199885],"genre_scores_gemma":[0.9982682,0.0004910668,0.0006075324,0.00002451981,0.000002287712,0.000006461455,0.00006564218,0.000002797974,0.000531409],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01458482,"threshold_uncertainty_score":0.02899981,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4409798847","doi":"10.1080/01446193.2025.2492011","title":"Trajectories of innovation in wood construction: an actor-network analysis of building decarbonization practices in Canada","year":2025,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Sustainable Industrial Ecology","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Architectural engineering; Industrial organization; Engineering; Business; Construction engineering","authors":[{"name":"Gonzalo Lizarralde","is_ca":true},{"name":"Arturo Valladares","is_ca":true},{"name":"Aye-Henri Okoman","is_ca":true},{"name":"Mario Bourgault","is_ca":true},{"name":"Justine Binet","is_ca":true},{"name":"Lisa N. Hasan","is_ca":true},{"name":"Daniel Pearl","is_ca":true},{"name":"Benjamín Herazo","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01134469225372745,"gpt":0.2216208858961546,"spread":0.2102761936424272,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.001206675,0.0002436674,0.0002824059,0.00222334,0.003917912,0.002937717,0.001014406,0.0006526333,0.003651732],"category_scores_gemma":[0.003899271,0.0002173696,0.0004623351,0.004618575,0.002060638,0.001308252,0.001839667,0.000772508,0.0002464583],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.05520834,"about_ca_system_score_gemma":0.03611286,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.9908441,"about_ca_topic_score_gemma":0.9917313,"domain_scores_codex":[0.9991876,0.0002105093,0.00002000205,0.0001214076,0.0001237605,0.0003366958],"domain_scores_gemma":[0.997879,0.000753671,0.0002279667,0.00007558736,0.0006069004,0.0004568725],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"qualitative","study_design_scores_codex":[0.0003612076,0.0002983508,0.7103002,0.0002050879,0.0001516604,0.001301956,0.1109378,0.04263807,0.001900659,0.07706217,0.007340029,0.04750278],"study_design_scores_gemma":[0.00004967793,0.00007817336,0.6265559,0.0002518579,0.000109273,0.0001575594,0.1739828,0.1477958,0.0006403009,0.009065199,0.04118082,0.000132663],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9844313,0.0002935946,0.002257184,0.001292572,0.000006810263,0.00009191917,0.001267372,0.00001869868,0.0103405],"genre_scores_gemma":[0.9953201,0.0002261473,0.00127404,0.00005545102,0.000001574973,0.00003817946,0.0006370168,0.000009023541,0.002438524],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9960821,"threshold_uncertainty_score":0.4005664,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W610494263","doi":"","title":"Incentives, Results and Possible Success Factors for Rail Maintenance Performance-Based Contracting : Case Study","year":2010,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Incentive; Bidding; Payment; Prestige; Business; Industrial organization; Economics; Finance; Marketing; Microeconomics","authors":[{"name":"Torbjörn Stenbeck","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0578544046570519,"gpt":0.3118049390794062,"spread":0.2539505344223543,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01395901,0.0003695278,0.0003789024,0.001625345,0.003292893,0.002719036,0.001195365,0.002724558,0.0054052],"category_scores_gemma":[0.0206028,0.0003395956,0.0006720767,0.001842447,0.001519202,0.001764655,0.001440979,0.001084745,0.0004337665],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.005251966,"about_ca_system_score_gemma":0.0026929,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006077684,"about_ca_topic_score_gemma":0.009414413,"domain_scores_codex":[0.9919786,0.005098142,0.0003855205,0.000320341,0.0008892037,0.001328166],"domain_scores_gemma":[0.9693934,0.02287217,0.002964811,0.001219876,0.001572319,0.001977444],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"qualitative","study_design_scores_codex":[0.003509052,0.02502766,0.5163589,0.001856117,0.0003350198,0.0351942,0.07548632,0.03137777,0.006845028,0.1379279,0.006665707,0.1594164],"study_design_scores_gemma":[0.001040186,0.01294825,0.4906537,0.001496739,0.0005536276,0.019471,0.2907735,0.08466931,0.01678981,0.02901545,0.05212101,0.0004674762],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9884863,0.0001835936,0.002003556,0.0004601234,0.000006234526,0.0002545801,0.00006139494,0.000009113984,0.008535061],"genre_scores_gemma":[0.9949463,0.0001674805,0.002453975,0.00003577955,0.000006334992,0.0001261877,0.00003313223,0.000004692875,0.002226198],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01395901,"threshold_uncertainty_score":0.07382315,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}