{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":12,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":12,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"84a98ac0e9dc","filters":{"venue":"Construction Research Congress 2009"}},"results":[{"id":"W2312738360","doi":"10.1061/41020(339)7","title":"Automated Data Acquisition System to Assess Construction Worker Performance","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"Structural Health Monitoring Techniques","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Real-time computing; Productivity; Work (physics); Measure (data warehouse); Idle; Engineering; Data mining","authors":[{"name":"I. P. Tharindu Weerasinghe","is_ca":true},{"name":"Janaka Y. Ruwanpura","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.09297208044110916,"gpt":0.3980709388710827,"spread":0.3050988584299736,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001105452,0.0002786739,0.0003258367,0.0007305128,0.0004477304,0.0002520733,0.0007977361,0.0002652013,0.00006003962],"category_scores_gemma":[0.0001178502,0.0002915341,0.00003448905,0.001278157,0.0002318606,0.00085984,0.0001528638,0.0007040932,0.0001504285],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000660736,"about_ca_system_score_gemma":0.0001170815,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001922683,"about_ca_topic_score_gemma":0.000002284068,"domain_scores_codex":[0.9969292,0.0002192253,0.00054561,0.0005839256,0.0008826751,0.000839418],"domain_scores_gemma":[0.9975221,0.0001224393,0.0000721823,0.001241217,0.0006758362,0.0003661801],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001656568,0.00001840448,0.004765055,0.0004239682,0.00005217243,0.00003713952,0.00007600953,0.002584049,0.003419408,0.003375827,0.04100721,0.9440751],"study_design_scores_gemma":[0.001623223,0.0006675909,0.2420004,0.003001264,0.00005231493,0.001806912,0.001343247,0.6811658,0.04320624,0.0007758557,0.02276045,0.001596741],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9786915,0.0002875072,0.00189799,0.0003194633,0.004506375,0.001155767,0.000108939,0.008215558,0.004816943],"genre_scores_gemma":[0.9661026,0.0001608465,0.03287684,0.00002771744,0.0005932279,0.00005989751,0.00008332483,0.0000395736,0.0000559748],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9424784,"threshold_uncertainty_score":0.9999537,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2129450771","doi":"10.1061/41020(339)18","title":"Overtime and Productivity in Electrical Construction","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Overtime; Productivity; Schedule; Macro; Work (physics); Computer science; Operations management; Business; Labour economics; Engineering; Economics; Economic growth","authors":[{"name":"Awad S. Hanna","is_ca":false},{"name":"Gilbert Haddad","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.09549319000951463,"gpt":0.5018643562838505,"spread":0.4063711662743359,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.003785547,0.0001744034,0.0003474736,0.0009327182,0.001186483,0.0000373485,0.0001804399,0.0003316001,0.0005357812],"category_scores_gemma":[0.002880723,0.0001665191,0.0000374395,0.001511912,0.0007206979,0.0004207354,0.00008880312,0.002451263,0.0002030638],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004556392,"about_ca_system_score_gemma":0.00129142,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000238068,"about_ca_topic_score_gemma":0.0001314503,"domain_scores_codex":[0.9942882,0.002096926,0.0006550369,0.0006385323,0.00103215,0.001289136],"domain_scores_gemma":[0.9966667,0.001373928,0.0001184653,0.0003696374,0.001028106,0.000443163],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.001024072,0.0001210193,0.4302412,0.0001035604,0.000008744203,0.00002177364,0.0001712498,0.000003762852,0.0006961679,0.05692054,0.003738149,0.5069498],"study_design_scores_gemma":[0.002162632,0.0004680997,0.9457155,0.0001932301,0.000003902632,0.00007850326,0.000482847,0.001238111,0.0002066469,0.02951562,0.01969442,0.0002405218],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.948925,0.000889684,0.0001440199,0.01144842,0.001039028,0.002906758,0.00003453675,0.0001357253,0.03447687],"genre_scores_gemma":[0.9949076,0.0006820595,0.001683872,0.0002297951,0.000571815,0.0002053207,0.00002223106,0.00001711105,0.00168021],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5154743,"threshold_uncertainty_score":0.9998501,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2321521001","doi":"10.1061/41020(339)114","title":"Risk Assessment for Water Mains Using Fuzzy Approach","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"Water Systems and Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Mains electricity; Dam failure; Risk analysis (engineering); Pipeline transport; Risk assessment; Event (particle physics); Fuzzy logic; Forensic engineering; Reliability engineering; Failure rate; Risk management; Engineering; Failure mode and effects analysis; Computer science; Business; Environmental engineering; Artificial intelligence; Flood myth; Computer security","authors":[{"name":"Hussam Fares","is_ca":true},{"name":"Tarek Zayed","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04244021260309751,"gpt":0.3265345118749977,"spread":0.2840942992719002,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008419994,0.0001443222,0.0001877667,0.0002977693,0.0003268387,0.0002189533,0.0001456579,0.0001281406,0.00003503894],"category_scores_gemma":[0.00002971511,0.0001174604,0.00006332454,0.0002022892,0.00009603144,0.0002865889,0.0000212013,0.0002975407,0.00001112989],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001882409,"about_ca_system_score_gemma":0.0000397698,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001740064,"about_ca_topic_score_gemma":0.000006432598,"domain_scores_codex":[0.9984479,0.0001278815,0.0002758115,0.0002531456,0.0003581615,0.0005370784],"domain_scores_gemma":[0.9991562,0.00003510516,0.00002923717,0.00026108,0.0004004673,0.0001179474],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000841639,0.0001360577,0.003580745,0.0003356043,0.0002152281,0.00001297727,0.0005179506,0.8824321,0.01342808,0.01434994,0.03244486,0.05246231],"study_design_scores_gemma":[0.001268719,0.0001305392,0.001128696,0.00005879528,0.00002771352,0.0000679141,0.0003755212,0.9647784,0.01154257,0.004936901,0.01530565,0.0003785871],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2139178,0.0003287304,0.7310164,0.0002365602,0.002496874,0.002233756,0.0001265159,0.0005793677,0.04906405],"genre_scores_gemma":[0.9339668,0.00007190632,0.06451745,0.00001005553,0.0003919046,0.00006486454,0.00006290439,0.00003271175,0.0008814016],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.720049,"threshold_uncertainty_score":0.4789898,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2130488785","doi":"10.1061/41020(339)75","title":"A Prediction Model for Construction Project Time Contingency","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Contingency","authors":[{"name":"Dalia Mohamed","is_ca":true},{"name":"Florida Srour","is_ca":true},{"name":"Wael Tabra","is_ca":true},{"name":"Tarek Zayed","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04671138233417803,"gpt":0.3137268235767139,"spread":0.2670154412425358,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006703601,0.0002709016,0.0002943019,0.0007255992,0.0004733126,0.0002156722,0.0002093508,0.0003114653,0.000141778],"category_scores_gemma":[0.0001940034,0.0002844396,0.0001193193,0.0006941613,0.0004369768,0.0006399675,0.00001613849,0.0005283268,0.00006765201],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002245482,"about_ca_system_score_gemma":0.000223765,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000556638,"about_ca_topic_score_gemma":0.000006426951,"domain_scores_codex":[0.9976751,0.000106491,0.0005644849,0.000452698,0.000561723,0.0006395478],"domain_scores_gemma":[0.998224,0.0001014164,0.00008632073,0.0003511682,0.001089289,0.0001478464],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001984132,0.00005610055,0.0002861266,0.00009179613,0.00009068428,0.000002712386,0.0002452934,0.006160788,0.0382078,0.0552116,0.05566049,0.8437882],"study_design_scores_gemma":[0.001327086,0.0002767235,0.0001971864,0.00009945177,0.00003693409,0.0002259119,0.0003524613,0.9354481,0.01297815,0.02689606,0.0217646,0.0003973499],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1771253,0.002170046,0.6889221,0.001589141,0.009826057,0.008662084,0.001415045,0.005754796,0.1045354],"genre_scores_gemma":[0.9227906,0.000754679,0.06539287,0.0001069262,0.001680324,0.0009519345,0.0003565212,0.0001338443,0.007832242],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9292873,"threshold_uncertainty_score":0.9999608,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2327525975","doi":"10.1061/41020(339)131","title":"Modeling Architecture for Hybrid System Dynamics and Discrete Event Simulation","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"High-level architecture; Computer science; Context (archaeology); Architecture; Hybrid system; Discrete event simulation; Systems engineering; Set (abstract data type); Systems architecture; Event (particle physics); Distributed computing; System dynamics; Software engineering; Industrial engineering; Simulation; Engineering; Artificial intelligence; Interoperability; Operating system","authors":[{"name":"Amin Alvanchi","is_ca":true},{"name":"Sang Hyun Lee","is_ca":true},{"name":"Simaan AbouRizk","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0181500311724507,"gpt":0.3002952469232337,"spread":0.2821452157507831,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003561298,0.0001614896,0.0001783488,0.0003248908,0.000299241,0.0001584641,0.00009808975,0.0001087928,0.00001202246],"category_scores_gemma":[0.00007031557,0.0001580159,0.00006119177,0.0002033248,0.0001285544,0.0002168282,0.00001359287,0.0003459961,0.000004414796],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002139338,"about_ca_system_score_gemma":0.00003796662,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007663786,"about_ca_topic_score_gemma":0.00002201716,"domain_scores_codex":[0.9986919,0.00007015821,0.0003072623,0.0002667126,0.0003207278,0.0003433032],"domain_scores_gemma":[0.9991411,0.0000953977,0.00003007573,0.0001990387,0.0004076785,0.0001266987],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004711074,0.000003927571,0.00004721521,0.00008604877,0.00002010122,0.000001652188,0.00003283328,0.6103334,0.0002446024,0.03937149,0.0001107933,0.3497008],"study_design_scores_gemma":[0.0004084971,0.0000639468,0.00004833611,0.0001079367,0.00001188756,0.00009475008,0.0004513778,0.9913309,0.0004735206,0.006213758,0.0006340728,0.0001610647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.118917,0.0005137446,0.8768487,0.0002672845,0.0008446012,0.0006516185,0.00009164053,0.0003677714,0.001497639],"genre_scores_gemma":[0.9964508,0.00005517943,0.003046131,0.000009114162,0.0002011077,0.00004915212,0.00004985308,0.00001998088,0.000118645],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8775339,"threshold_uncertainty_score":0.64437,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W101405778","doi":"10.1061/41020(339)52","title":"Querying IFC-Based Building Information Models to Support Construction Management Functions","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Computer science; Information model; Ontology; Feature (linguistics); Product (mathematics); Software engineering; Domain (mathematical analysis); Systems engineering; Function (biology); Engineering","authors":[{"name":"Madhav Prasad Nepal","is_ca":true},{"name":"J. Zhang","is_ca":true},{"name":"April Webster","is_ca":true},{"name":"Sheryl Staub‐French","is_ca":true},{"name":"Rachel Pottinger","is_ca":true},{"name":"Michael A. Lawrence","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03556985509435197,"gpt":0.2964561372768781,"spread":0.2608862821825262,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005482956,0.0002957943,0.0002581947,0.001721145,0.0005873442,0.0004590908,0.0002644569,0.0002194939,0.0003941468],"category_scores_gemma":[0.00004667752,0.0003296213,0.0001117055,0.001478649,0.0002500528,0.001850809,0.00003581983,0.00061586,0.0003396969],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004408556,"about_ca_system_score_gemma":0.0001251246,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002134303,"about_ca_topic_score_gemma":0.00001468847,"domain_scores_codex":[0.9972656,0.0001152871,0.0006694237,0.0003598616,0.0008988861,0.00069097],"domain_scores_gemma":[0.9982396,0.00006210923,0.0000836509,0.0004653108,0.0008225581,0.0003268006],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007617605,0.00002145632,0.0001601941,0.00006450994,0.00005166201,0.00000631459,0.00009986603,0.08191107,0.001545442,0.1110792,0.01332657,0.7916575],"study_design_scores_gemma":[0.005582437,0.001181187,0.003107519,0.0008762325,0.0001830969,0.0008481756,0.00974501,0.515536,0.03975198,0.06997144,0.3504492,0.002767732],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08278015,0.0001336056,0.7886317,0.001121949,0.005642967,0.001752553,0.0001060574,0.001823071,0.1180079],"genre_scores_gemma":[0.9576787,0.000127164,0.04079786,0.0002781689,0.0002698448,0.0002249879,0.0001198257,0.0000339107,0.0004694872],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8748986,"threshold_uncertainty_score":0.9999156,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2323843643","doi":"10.1061/41020(339)50","title":"Virtual Supervision in Construction Projects","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia; University of Calgary","funders":"","keywords":"Popularity; Key (lock); Computer science; Focus (optics); Information flow; Construction industry; Construction management; Engineering management; Process management; Knowledge management; Engineering; Construction engineering; Computer security","authors":[{"name":"Lahiru P. Silva","is_ca":true},{"name":"Janaka Y. Ruwanpura","is_ca":true},{"name":"Kasun Hewage","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03109051985310798,"gpt":0.3028601175795606,"spread":0.2717695977264526,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006277034,0.0002370336,0.0002641038,0.001134933,0.0002179301,0.0001859546,0.0002246798,0.00028571,0.0004025297],"category_scores_gemma":[0.0001477884,0.000244715,0.00007145287,0.001360626,0.0004735659,0.0006770489,0.00002434859,0.000907959,0.0001406016],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002691671,"about_ca_system_score_gemma":0.0001381064,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002599899,"about_ca_topic_score_gemma":0.0000561007,"domain_scores_codex":[0.9975941,0.0002117947,0.0005032996,0.0004062824,0.0006740468,0.0006104385],"domain_scores_gemma":[0.9989025,0.00009214996,0.00004225328,0.0003529148,0.0004440675,0.0001661067],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007686515,0.00004230586,0.004588906,0.00002236007,0.00001670945,0.00002256679,0.0001984303,0.001001478,0.008315414,0.07402451,0.003890316,0.9078001],"study_design_scores_gemma":[0.01836628,0.003718474,0.124723,0.002559557,0.00009590406,0.005509958,0.03638037,0.2494233,0.2063622,0.1617306,0.1852587,0.005871618],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9467167,0.0008674809,0.003167088,0.0006766198,0.00403879,0.0009115976,0.00002697546,0.0008176684,0.04277713],"genre_scores_gemma":[0.9967606,0.0004819117,0.002027864,0.0000354479,0.0002671986,0.00004872543,0.00002361199,0.000023779,0.0003308328],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9019285,"threshold_uncertainty_score":0.9979189,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2334906368","doi":"10.1061/41020(339)8","title":"Project Information Management in Mega Oil Sands Projects","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Project management triangle; Project management; Work (physics); Extreme project management; Knowledge management; Information management; Information system; Program management; Computer science; Project management 2.0; Project charter; Engineering management; Process management; Information technology; Project planning; Project stakeholder; OPM3; Business; Engineering; Systems engineering","authors":[{"name":"Zonghai Han","is_ca":true},{"name":"Thomas Froese","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04338482670113609,"gpt":0.351581489196109,"spread":0.3081966624949729,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00104808,0.0001508302,0.0001713576,0.001279388,0.00008870183,0.0001687584,0.0001974079,0.0001168649,0.00004593978],"category_scores_gemma":[0.0001343528,0.0001539275,0.00003932317,0.001250652,0.00006839588,0.0007024886,0.00002664681,0.0004541411,0.00003229013],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001697643,"about_ca_system_score_gemma":0.00004496258,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001098643,"about_ca_topic_score_gemma":0.000003041541,"domain_scores_codex":[0.9983138,0.0001386009,0.000360863,0.0001651728,0.0005540223,0.0004675494],"domain_scores_gemma":[0.9993335,0.00007605054,0.00002547873,0.0002913889,0.0001918151,0.00008173956],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006175348,0.00002702731,0.0004391139,0.0002551511,0.00003591207,0.00002691977,0.0003583111,0.3289475,0.0002695395,0.007352425,0.006673314,0.655553],"study_design_scores_gemma":[0.004579661,0.0002011439,0.01022387,0.000426305,0.00001429585,0.00006967341,0.001537282,0.7316196,0.003889329,0.002756659,0.243844,0.0008382346],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.4815585,0.001087464,0.02919182,0.0007659447,0.002706699,0.001780891,0.00003330268,0.001915906,0.4809594],"genre_scores_gemma":[0.9296208,0.001605394,0.06607475,0.00006168024,0.0002019981,0.0002189815,0.00005782524,0.00003706106,0.002121479],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6547148,"threshold_uncertainty_score":0.6276982,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2327441640","doi":"10.1061/41020(339)95","title":"Mapping Actors and Roles in Construction Knowledge","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Process (computing); Knowledge management; Computer science; Product (mathematics); Root (linguistics); Data science","authors":[{"name":"Jie Zhang","is_ca":true},{"name":"Tamer E. El-Diraby","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02711752455771348,"gpt":0.3020181346145985,"spread":0.274900610056885,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004719993,0.0001972621,0.0002311784,0.001070176,0.0002008833,0.0001673154,0.0001301385,0.0002195541,0.000193303],"category_scores_gemma":[0.00009287416,0.0002085701,0.0000423634,0.0009476919,0.0005330443,0.0004697428,0.0000239189,0.0006805658,0.00005331167],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001690052,"about_ca_system_score_gemma":0.00007622879,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001129382,"about_ca_topic_score_gemma":0.00007532895,"domain_scores_codex":[0.9983843,0.0001522313,0.0003846211,0.0003222187,0.0002969845,0.00045964],"domain_scores_gemma":[0.9992098,0.0000975501,0.00003918218,0.000215591,0.0002827097,0.0001552082],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00002325446,0.00002137953,0.0101543,0.00003734571,0.00001886719,0.000007634837,0.0003891018,0.0001255337,0.005908516,0.03556379,0.001331444,0.9464188],"study_design_scores_gemma":[0.009951553,0.0007687394,0.3497838,0.002276729,0.0000533562,0.003625721,0.03928339,0.1133815,0.06637379,0.1761419,0.2344883,0.003871192],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9398344,0.003411606,0.001762358,0.0004176547,0.001897394,0.000463138,0.00001560187,0.0003971402,0.05180077],"genre_scores_gemma":[0.9970104,0.000907267,0.001565813,0.00001397467,0.0001914881,0.00002735764,0.00000752036,0.00001698159,0.0002591714],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9425476,"threshold_uncertainty_score":0.8505241,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2324386762","doi":"10.1061/41020(339)100","title":"Stakeholder Views on IT in Construction: A North American Perspective","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Calgary; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Resistance (ecology); Business; Productivity; Stakeholder; Work (physics); Construction industry; Unavailability; Knowledge management; Perspective (graphical); Information technology; Information and Communications Technology; Key (lock); Public relations; Engineering; Computer science; Construction engineering; Political science","authors":[{"name":"Kasun Hewage","is_ca":true},{"name":"Janaka Y. Ruwanpura","is_ca":true},{"name":"George Jergeas","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07589979151414869,"gpt":0.3389094073999082,"spread":0.2630096158857596,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004279395,0.0002959612,0.0003732418,0.001087315,0.0002374397,0.0001764323,0.0002453568,0.0001225487,0.0003780238],"category_scores_gemma":[0.0001684373,0.0003002562,0.00009059435,0.002077685,0.001025906,0.000372841,0.00001769465,0.00116683,0.0001873939],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006130771,"about_ca_system_score_gemma":0.0001455519,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008648208,"about_ca_topic_score_gemma":0.001037754,"domain_scores_codex":[0.9972956,0.0002566104,0.0005570634,0.0005157281,0.0007185935,0.0006563998],"domain_scores_gemma":[0.9984518,0.0001220322,0.00009200556,0.0004454818,0.0006759741,0.0002126816],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002115852,0.0001126939,0.0145598,0.00002404429,0.00006769059,0.00005957021,0.0007136021,0.002044333,0.0004630626,0.1305378,0.0181888,0.8330171],"study_design_scores_gemma":[0.01022165,0.003802635,0.3769448,0.001082934,0.00009738038,0.00238178,0.08505122,0.02403354,0.01278277,0.05090606,0.4279595,0.004735762],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7929952,0.0007373561,0.001488229,0.004740139,0.003003579,0.001347875,0.00009769011,0.000797066,0.1947929],"genre_scores_gemma":[0.9965646,0.0005399697,0.001715441,0.0002078498,0.0003297727,0.00008331703,0.00001580136,0.00003085733,0.0005124093],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8282813,"threshold_uncertainty_score":0.999945,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2149517209","doi":"10.1061/41020(339)11","title":"Evaluation of Work Zone Capacity Models","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Waterloo; University of Toronto","funders":"","keywords":"Work (physics); Productivity; Computer science; Order (exchange); Transport engineering; Quality (philosophy); Operations research; Engineering; Business; Economics","authors":[{"name":"Carolyn Hicks","is_ca":true},{"name":"Brenda McCabe","is_ca":true},{"name":"Susan Tighe","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.09369292155567013,"gpt":0.3348541737820192,"spread":0.2411612522263491,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002129177,0.000120982,0.0001772917,0.0003003183,0.0001053996,0.00004452494,0.0001810734,0.0001176736,0.0001047557],"category_scores_gemma":[0.0001684909,0.000120455,0.00004903507,0.0005584622,0.0002221885,0.0002910327,0.00001800687,0.0004033252,0.00001185281],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002122397,"about_ca_system_score_gemma":0.00008842869,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000113818,"about_ca_topic_score_gemma":0.00000400047,"domain_scores_codex":[0.9976108,0.0001696428,0.0002643199,0.0001773531,0.001386591,0.0003912853],"domain_scores_gemma":[0.9978389,0.00004769249,0.00003919585,0.0002950094,0.001689019,0.00009018599],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003563226,0.00002126924,0.0004413152,0.00003479437,0.00006341264,0.000003326987,0.0002754529,0.1648553,0.009421065,0.01051076,0.005353501,0.8089841],"study_design_scores_gemma":[0.004050677,0.0003331155,0.02175549,0.000935351,0.0001933933,0.0001163149,0.001441816,0.5006098,0.2143703,0.247325,0.007759988,0.001108679],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9426349,0.001081895,0.01343596,0.0001265848,0.002122898,0.0005782075,0.00001516289,0.0002183875,0.039786],"genre_scores_gemma":[0.9965109,0.0001018308,0.003052328,0.000005688652,0.0002236148,0.00001808928,0.00000324572,0.00001212815,0.00007215783],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8078755,"threshold_uncertainty_score":0.4912015,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2326743463","doi":"10.1061/41020(339)99","title":"Visualization Configuration Model for Integrating Presentation of Construction Project Management Data","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"Data Visualization and Analytics","field":"Computer Science","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Visualization; Computer science; Flexibility (engineering); Information visualization; Domain (mathematical analysis); Data visualization; Focus (optics); Software visualization; Software; Human–computer interaction; Software engineering; Data science; Data mining; Software development; Component-based software engineering","authors":[{"name":"Jianguo David Ye","is_ca":true},{"name":"Thomas Froese","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.148539980396032,"gpt":0.455847474439159,"spread":0.3073074940431271,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001344625,0.0001567515,0.0002136289,0.0007839406,0.0003224405,0.0003910845,0.001004954,0.00009847293,0.00001351841],"category_scores_gemma":[0.0004639643,0.0001581488,0.00004676079,0.001293043,0.0002545697,0.001923679,0.000200122,0.000149431,0.000004794757],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007141535,"about_ca_system_score_gemma":0.0002625881,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000156933,"about_ca_topic_score_gemma":0.0000116392,"domain_scores_codex":[0.9973482,0.0002450345,0.0006192764,0.0006346709,0.000823645,0.0003291121],"domain_scores_gemma":[0.9970324,0.0001348805,0.0003312581,0.0009499657,0.001474056,0.00007742251],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003854324,0.00008149952,0.0001272021,0.0000859331,0.00003169173,0.000001109531,0.0002013817,0.0005560582,0.001219282,0.7666642,0.008209221,0.2227839],"study_design_scores_gemma":[0.000737659,0.0001183381,0.0001064771,0.00009447729,0.00001835153,0.00001261106,0.0006301263,0.9731086,0.005512507,0.01731943,0.002185598,0.0001557873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.0005194935,0.00004575,0.9947872,0.0003659542,0.0003466506,0.001125262,0.0001257129,0.0001284527,0.002555593],"genre_scores_gemma":[0.3440128,0.0005792857,0.6495669,0.0002027543,0.000229982,0.0001222438,0.00274565,0.00003261548,0.002507711],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.9725526,"threshold_uncertainty_score":0.6449122,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}