{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":291,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":291,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"14296819cf22","filters":{"venue":"Electric Power Systems Research"}},"results":[{"id":"W1997898472","doi":"10.1016/j.epsr.2008.04.002","title":"A summary of demand response in electricity markets","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1837,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Electricity; Electricity demand; Electricity market; Demand forecasting; Environmental economics; Economics; Microeconomics; Operations research; Business; Engineering; Electricity generation; Operations management; Power (physics); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02635607731178467,"gpt":0.2723813122681655,"spread":0.2460252349563808,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004619536,0.0001770544,0.0003568064,0.00188585,0.00008477584,0.00002143327,0.0004312321,0.000132782,0.0000266535],"category_scores_gemma":[0.0004551671,0.0001820324,0.00005810087,0.003607093,0.00005304808,0.0001193509,0.00008362962,0.0005651878,0.00005137535],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005716675,"about_ca_system_score_gemma":0.0001457752,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002885872,"about_ca_topic_score_gemma":0.00001157258,"domain_scores_codex":[0.9962292,0.001032375,0.0005020097,0.0002989282,0.001000202,0.0009373144],"domain_scores_gemma":[0.9985411,0.0006331152,0.00003380586,0.0005169154,0.0001544057,0.0001206945],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"observational","study_design_scores_codex":[0.008090572,0.001002578,0.04336199,0.001592903,0.0007931399,0.003640312,0.002630522,0.261915,0.2263587,0.00149264,0.4474056,0.001716007],"study_design_scores_gemma":[0.002869866,0.001263792,0.5250642,0.0003971214,0.00001264411,0.0003046335,0.0001605805,0.3547469,0.03668354,0.00007651783,0.07738864,0.00103155],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9701952,0.007532264,0.001886309,0.00002883976,0.0003143704,0.0005352485,0.000002057525,0.0001426243,0.01936307],"genre_scores_gemma":[0.9969748,0.0008322843,0.00002202557,0.000004085172,0.00004310688,0.0001265731,0.000001799025,0.00004777607,0.00194751],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4817022,"threshold_uncertainty_score":0.7423064,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2082811521","doi":"10.1016/j.epsr.2009.10.035","title":"Overview of wind power intermittency impacts on power systems","year":2009,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":350,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Sultan Qaboos University","keywords":"Intermittency; Wind power; Electric power system; Reliability engineering; Power (physics); Base load power plant; Automotive engineering; Environmental science; Computer science; Engineering; Meteorology; Electrical engineering; Geography; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.03424784743146522,"gpt":0.3174047264162942,"spread":0.283156878984829,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002406054,0.0005026218,0.0008602279,0.001762958,0.0001449333,0.0002507206,0.0007779102,0.0004862244,0.0001056948],"category_scores_gemma":[0.0003735593,0.0004388109,0.0001825767,0.003026403,0.00004915264,0.0003592859,0.00004097859,0.001110515,0.0003678549],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001006162,"about_ca_system_score_gemma":0.0002149251,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003866477,"about_ca_topic_score_gemma":0.000004843684,"domain_scores_codex":[0.9943027,0.0007399763,0.001191655,0.0005643521,0.001764796,0.001436557],"domain_scores_gemma":[0.9970856,0.000281233,0.000183975,0.001118479,0.001001581,0.00032916],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0005833982,0.001274761,0.0006447836,0.002865371,0.001500742,0.000593968,0.005807113,0.4957519,0.1777032,0.07039613,0.2414873,0.001391349],"study_design_scores_gemma":[0.00919389,0.02495764,0.01787175,0.02676377,0.0001820536,0.002030028,0.005566678,0.6038601,0.066084,0.000444644,0.2350017,0.008043769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.4327846,0.07853089,0.009081242,0.0001953905,0.00806409,0.004490979,0.00007231,0.001472569,0.465308],"genre_scores_gemma":[0.9966204,0.0004351425,0.00001293992,0.00002190621,0.00007379219,0.0000505132,0.00001535623,0.0001222826,0.002647658],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5638358,"threshold_uncertainty_score":0.9998063,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2050827817","doi":"10.1016/j.epsr.2005.12.001","title":"Optimal coordination of overcurrent relays using a modified particle swarm optimization","year":2006,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":308,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Overcurrent; Particle swarm optimization; Relay; Solver; Mathematical optimization; Electric power system; Multi-swarm optimization; Nonlinear system; Nonlinear programming; Swarm behaviour; Metaheuristic; Computer science; Integer (computer science); Power (physics); Control theory (sociology); Engineering; Mathematics; Current (fluid); Physics; Electrical engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.03455051036713638,"gpt":0.3038128381923793,"spread":0.269262327825243,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001578518,0.00019378,0.000317646,0.0006510073,0.0001488123,0.0001052739,0.00022342,0.0001882589,0.00001389485],"category_scores_gemma":[0.0001141023,0.0002072793,0.00007359743,0.002136082,0.00003750832,0.0003187475,0.00003757079,0.0003876995,0.00002519035],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006956971,"about_ca_system_score_gemma":0.00008906082,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0009298931,"about_ca_topic_score_gemma":0.000008276523,"domain_scores_codex":[0.9969304,0.000351342,0.0006839469,0.0003098717,0.001009532,0.0007149629],"domain_scores_gemma":[0.9987808,0.000145506,0.0001069421,0.0003854437,0.0004844531,0.00009685211],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002513978,0.00006256681,0.0001291071,0.000135174,0.00003211875,0.000005449601,0.000111389,0.9112067,0.08630668,0.0004492646,0.001364236,0.0001722113],"study_design_scores_gemma":[0.0004620909,0.0001261463,0.0001103642,0.00008781832,0.000009627868,0.00003813037,0.00007720986,0.95338,0.04441048,0.00001080008,0.001102754,0.0001845604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5446426,0.002354578,0.448292,0.000008233913,0.0008353253,0.0008941258,0.000007003546,0.0002337261,0.002732333],"genre_scores_gemma":[0.99911,0.00001729251,0.0002591105,5.273688e-7,0.0001218079,0.0001284249,0.00000962229,0.00006149409,0.0002916981],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4544674,"threshold_uncertainty_score":0.8452604,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1995865560","doi":"10.1016/j.epsr.2009.10.008","title":"Asset management techniques for transformers","year":2009,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Transformer Diagnostics and Insulation","field":"Engineering","cited_by":214,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability engineering; Transformer; Asset management; Electric power system; Risk analysis (engineering); Engineering; Reliability (semiconductor); Electric power industry; Computer science; Electrical engineering; Power (physics); Business; Electricity; Finance; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.02411582847917618,"gpt":0.3124442116706486,"spread":0.2883283831914724,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009724908,0.0001503186,0.0001812445,0.0005934029,0.0001338525,0.0001126299,0.0002180898,0.0001123164,0.00001044496],"category_scores_gemma":[0.00001845027,0.0001458636,0.00007210383,0.0008067157,0.0000130845,0.0001618723,0.000003800221,0.0002554611,0.00002887514],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002248359,"about_ca_system_score_gemma":0.00002417167,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001045145,"about_ca_topic_score_gemma":0.000001166021,"domain_scores_codex":[0.9982026,0.00003959125,0.000291387,0.0002151916,0.0005083682,0.000742917],"domain_scores_gemma":[0.9994281,0.0001183094,0.00001205023,0.0001905201,0.0001418252,0.0001091842],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002266205,0.0005440734,0.0001563548,0.001686698,0.0006248883,0.00006860522,0.0009112606,0.002104839,0.08454141,0.09639752,0.2869948,0.525743],"study_design_scores_gemma":[0.001137488,0.001660912,0.003156605,0.0002728112,0.00003517245,0.0000237829,0.0001610044,0.07641429,0.04734794,0.002602867,0.8664318,0.0007553635],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01410996,0.00494704,0.6696886,0.0004040245,0.0008093485,0.005112097,0.0000489346,0.0010619,0.3038181],"genre_scores_gemma":[0.9978117,0.0009652597,0.0003221666,0.00001789072,0.00005875149,0.0003388223,0.00002341396,0.00003245642,0.0004294825],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9837018,"threshold_uncertainty_score":0.5948145,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2040414337","doi":"10.1016/j.epsr.2015.03.027","title":"Improved short-term load forecasting using bagged neural networks","year":2015,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":173,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Artificial neural network; Computer science; Term (time); Range (aeronautics); Set (abstract data type); Artificial intelligence; Machine learning; Data set; Process (computing); Electrical load; Training set; Sampling (signal processing); Data mining; Engineering; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.1009726259969573,"gpt":0.3113299849015657,"spread":0.2103573589046084,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002975729,0.0003413883,0.0004261722,0.0004754463,0.000282458,0.0003498377,0.0005085447,0.0002675714,0.00001269805],"category_scores_gemma":[0.0002851367,0.0003294659,0.0001024172,0.001782343,0.00004993954,0.0003242034,0.0001381778,0.001232732,0.00001419958],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009751271,"about_ca_system_score_gemma":0.0002380425,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004058524,"about_ca_topic_score_gemma":0.00004093755,"domain_scores_codex":[0.995783,0.0003251754,0.0005878999,0.0004467495,0.001066695,0.001790531],"domain_scores_gemma":[0.9980736,0.0002903548,0.00004879022,0.0004902746,0.0005690086,0.0005280023],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001429518,0.00008045237,0.004338809,0.0002898443,0.0002899008,0.0004073489,0.001654876,0.9224864,0.04195885,0.0001596811,0.007020314,0.02117052],"study_design_scores_gemma":[0.0003633894,0.0001754889,0.00003641058,0.0001151103,0.000009156276,0.0002401637,0.0001216932,0.9961034,0.0008021267,0.000007073576,0.001672908,0.0003530547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9144002,0.01619167,0.04376848,0.00001155805,0.003834314,0.0007585983,0.000004695823,0.0007355394,0.02029501],"genre_scores_gemma":[0.9985239,0.00002562864,0.0001214727,0.000005617994,0.0007027214,0.00005445302,0.0000084704,0.0001315059,0.0004262307],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.08412376,"threshold_uncertainty_score":0.9999157,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2074210939","doi":"10.1016/j.epsr.2007.12.005","title":"Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":133,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Pratt and Whitney Canada; National Science Foundation","keywords":"Wind power; Economic dispatch; Particle swarm optimization; Renewable energy; Electric power system; Reliability engineering; Fuzzy logic; Computer science; Energy security; Mathematical optimization; Engineering; Power (physics); Electrical engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.02597597971121387,"gpt":0.2741216598409217,"spread":0.2481456801297078,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002424679,0.0002895887,0.0003900664,0.0009611347,0.0003768469,0.0001780194,0.0002380235,0.0002264752,0.00002668122],"category_scores_gemma":[0.000300658,0.0003123125,0.00004419976,0.001544274,0.00004088569,0.0004260353,0.00003926429,0.0006996725,0.00008285626],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00159644,"about_ca_system_score_gemma":0.0002158344,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005267251,"about_ca_topic_score_gemma":0.00006390658,"domain_scores_codex":[0.9964299,0.0006606383,0.0006769636,0.0005499613,0.0007002147,0.000982305],"domain_scores_gemma":[0.9985173,0.0005757886,0.0001079052,0.0004445276,0.0001445094,0.0002099503],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004742967,0.00004838256,0.02889742,0.00004617348,0.00001903425,0.00002524574,0.0004415791,0.9688843,0.000823739,0.00007788899,0.0005335765,0.0001551677],"study_design_scores_gemma":[0.001016542,0.0002571211,0.01136792,0.0001089251,0.000005119424,0.00003526187,0.0000691943,0.9850928,0.001528085,0.000006313943,0.0002035119,0.000309179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8848726,0.001819612,0.1013384,0.00004723992,0.0006135335,0.001880229,0.00001206249,0.0002964109,0.009119872],"genre_scores_gemma":[0.9989262,0.0004292063,0.000194257,0.00000825706,0.00006323194,0.0001496796,0.00001906964,0.00008862877,0.0001214606],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1140536,"threshold_uncertainty_score":0.9999329,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2077031811","doi":"10.1016/j.epsr.2011.08.007","title":"Short-term wind power forecasting using ridgelet neural network","year":2011,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":128,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Wind power; Wind power forecasting; Artificial neural network; Electric power system; Crossover; Computer science; Term (time); Power (physics); Recurrent neural network; Operator (biology); Artificial intelligence; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.1178178607108047,"gpt":0.2968851132288222,"spread":0.1790672525180176,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001998981,0.0003993677,0.0004707353,0.0005778045,0.0004800984,0.0002122122,0.0006213654,0.0002732165,0.0001417957],"category_scores_gemma":[0.0001107436,0.0003893619,0.000140784,0.00199886,0.00007138525,0.0003544925,0.0001514236,0.001228472,0.00006384811],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003138361,"about_ca_system_score_gemma":0.00008112693,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001763519,"about_ca_topic_score_gemma":0.00001123743,"domain_scores_codex":[0.9953243,0.0003306231,0.000664934,0.0005139995,0.0009144074,0.002251785],"domain_scores_gemma":[0.9984695,0.0002749006,0.00005767664,0.0005830969,0.0002570248,0.00035783],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000493083,0.0004873596,0.1160912,0.001430585,0.001801108,0.003848199,0.0138961,0.7168003,0.05924629,0.005641053,0.05416918,0.02609551],"study_design_scores_gemma":[0.0005412081,0.000510163,0.00600591,0.0005977245,0.00003214586,0.0009707269,0.0002237409,0.9786683,0.002763992,0.00009747322,0.008352729,0.001235839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9268336,0.006283752,0.002035615,0.000003385057,0.002500998,0.0004771141,0.000006286323,0.0004487987,0.06141042],"genre_scores_gemma":[0.9985819,0.00003590334,0.0002156797,0.000007279124,0.0005735396,0.00002881781,0.000007457808,0.0001630668,0.0003862946],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.261868,"threshold_uncertainty_score":0.9998558,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2079033620","doi":"10.1016/j.epsr.2006.03.002","title":"Robust decentralized neural networks based LFC in a deregulated power system","year":2006,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Control theory (sociology); Controller (irrigation); Electric power system; Control engineering; Artificial neural network; Computer science; Decentralised system; Automatic frequency control; Robust control; Automatic Generation Control; Power (physics); Engineering; Control (management); Control system; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.02123584395693074,"gpt":0.2448739038486532,"spread":0.2236380598917224,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003464116,0.0006089237,0.00100407,0.001812117,0.0002138514,0.0004686363,0.0009910228,0.0005939112,0.00006688338],"category_scores_gemma":[0.00013346,0.0006035179,0.0002028638,0.004751248,0.00008710713,0.0003099895,0.00005513024,0.001494534,0.000141021],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002454526,"about_ca_system_score_gemma":0.0002035972,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003285658,"about_ca_topic_score_gemma":0.0003055756,"domain_scores_codex":[0.9914917,0.001541994,0.001518888,0.0008343231,0.001682517,0.00293057],"domain_scores_gemma":[0.9972132,0.0006597149,0.0001241633,0.001166925,0.0005009839,0.0003350047],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001216713,0.0001175397,0.002947127,0.0004474226,0.0001013099,0.0006304558,0.00008898491,0.9665946,0.004584832,0.002142915,0.02211857,0.0001046018],"study_design_scores_gemma":[0.002241326,0.0001396315,0.002355205,0.0004040399,0.0000107133,0.0001306733,0.0001097319,0.989477,0.0003118035,0.000008535045,0.004224713,0.000586642],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5096887,0.1724862,0.1886905,0.0002893127,0.01714485,0.01270293,0.00006264569,0.006571756,0.09236309],"genre_scores_gemma":[0.9983864,0.00001838523,0.00004417591,0.000009986965,0.0002053565,0.0005580233,0.000032975,0.0002199896,0.0005247234],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4886977,"threshold_uncertainty_score":0.9996416,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3201357788","doi":"10.1016/j.epsr.2021.107584","title":"Time series forecasting using ensemble learning methods for emergency prevention in hydroelectric power plants with dam","year":2021,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Regina","funders":"","keywords":"Hydroelectricity; Subspace topology; Ensemble learning; Spillway; Engineering; Generalization; Computer science; Artificial intelligence; Mathematics; Geotechnical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.07279549067791269,"gpt":0.3878217865792382,"spread":0.3150262959013255,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004265535,0.0002467108,0.0004394776,0.0008870826,0.0002227655,0.0001147899,0.0002011515,0.0001823592,0.00005107386],"category_scores_gemma":[0.000892931,0.0002465014,0.00008241091,0.002478892,0.00001426133,0.0003096474,0.00004169339,0.0007577768,0.000009903889],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00035884,"about_ca_system_score_gemma":0.0001795748,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002098818,"about_ca_topic_score_gemma":0.000006829767,"domain_scores_codex":[0.9963633,0.001122117,0.0005498638,0.0004211041,0.0005031581,0.001040501],"domain_scores_gemma":[0.998439,0.0007198905,0.00006195279,0.0003079943,0.0003420943,0.0001290986],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006621769,0.00003005976,0.0002988171,0.0002536033,0.00008706078,0.00003386625,0.0004202117,0.8988509,0.09703094,0.00004927499,0.0001658908,0.002713152],"study_design_scores_gemma":[0.0005451028,0.0003020838,0.00008559505,0.0001793408,0.000007644434,0.000131256,0.00016318,0.977888,0.01688706,0.0001101743,0.003414938,0.0002855558],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4349568,0.005109837,0.5571053,0.000007134266,0.0002819393,0.0005585883,0.000001544643,0.0001781425,0.00180069],"genre_scores_gemma":[0.9509991,0.000140663,0.0430568,6.550075e-7,0.00007876367,0.0001638315,0.000019914,0.0001275286,0.005412694],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5160423,"threshold_uncertainty_score":0.9999987,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1969408611","doi":"10.1016/j.epsr.2009.11.005","title":"Novel power quality indices based on wavelet packet transform for non-stationary sinusoidal and non-sinusoidal disturbances","year":2010,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University; University of New Brunswick","funders":"","keywords":"Crest factor; Wavelet; Wavelet packet decomposition; Waveform; Computer science; Discrete wavelet transform; Daubechies wavelet; Stationary wavelet transform; Measure (data warehouse); Node (physics); Wavelet transform; Smart grid; Electronic engineering; Algorithm; Data mining; Engineering; Telecommunications; Artificial intelligence; Bandwidth (computing); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03939574094487245,"gpt":0.333416120758214,"spread":0.2940203798133415,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003853459,0.0003736984,0.0005171443,0.0006170583,0.000426849,0.0003158984,0.0004849544,0.0003821856,0.00003987887],"category_scores_gemma":[0.0002657797,0.0003464727,0.0001351253,0.0008621916,0.0001610644,0.0003349017,0.00003045199,0.001396814,0.00003640091],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001898729,"about_ca_system_score_gemma":0.0003045758,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002099037,"about_ca_topic_score_gemma":0.0001624861,"domain_scores_codex":[0.9961667,0.000152002,0.00067079,0.0005897856,0.001240871,0.001179853],"domain_scores_gemma":[0.9972137,0.001527977,0.00008465793,0.0005164012,0.0003243058,0.0003329301],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.004977264,0.004315371,0.003915423,0.0111549,0.001497574,0.0001763857,0.02752675,0.00323216,0.761814,0.02385898,0.1300698,0.02746142],"study_design_scores_gemma":[0.01497253,0.005500923,0.1131251,0.001068177,0.00007675627,0.0001368722,0.002881046,0.5690383,0.07114507,0.0014709,0.2160665,0.004517825],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.909492,0.0009549027,0.05842973,0.0009414935,0.001762082,0.003347636,0.000891721,0.0003529926,0.02382747],"genre_scores_gemma":[0.9983696,0.00002967298,0.0003504106,0.00006316757,0.0001671647,0.0003588388,0.00007704907,0.00008105519,0.0005030415],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6906689,"threshold_uncertainty_score":0.9998987,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2163791417","doi":"10.1016/s0378-7796(03)00070-1","title":"Interharmonics: basic concepts and techniques for their detection and measurement","year":2003,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":98,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Harmonics; Terminology; Electronic engineering; Field (mathematics); Computer science; Reliability engineering; Engineering; Mathematics; Electrical engineering; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.0886083052588649,"gpt":0.3318791393039041,"spread":0.2432708340450392,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00385193,0.0001473186,0.0002104391,0.0002757719,0.0001721072,0.0001399882,0.0001064237,0.0001281184,0.000004857613],"category_scores_gemma":[0.0002634415,0.0001344781,0.0000326319,0.0003328429,0.00004898862,0.0001104919,0.00002174984,0.0003705866,0.00000409679],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002810726,"about_ca_system_score_gemma":0.00005630033,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002430324,"about_ca_topic_score_gemma":0.00001499291,"domain_scores_codex":[0.9983209,0.000275913,0.0002459882,0.0002523171,0.0003894948,0.0005153312],"domain_scores_gemma":[0.9991896,0.0002087927,0.00002278755,0.0001983149,0.0002589273,0.0001215439],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001633507,0.000141159,0.0001794475,0.00204525,0.0005021133,0.00001165269,0.004919762,0.00003044981,0.871864,0.01674627,0.01025438,0.09314217],"study_design_scores_gemma":[0.0007978773,0.0008203299,0.0001433452,0.0002017482,0.00001472891,0.00009317464,0.0009413405,0.01575253,0.5573791,0.001436418,0.421951,0.0004683786],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.4535213,0.1698329,0.3452431,0.0002021749,0.001716875,0.006626819,0.00004075456,0.001387714,0.02142846],"genre_scores_gemma":[0.9986041,0.0008467528,0.00006764731,0.000009410101,0.00003036001,0.000309022,6.288708e-7,0.00003346863,0.00009866041],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5450828,"threshold_uncertainty_score":0.5483857,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2067611562","doi":"10.1016/j.epsr.2011.03.001","title":"A generalized power flow analysis for distribution systems with high penetration of distributed generation","year":2011,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":96,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Engineering; Voltage; Distributed generation; Electrical impedance; Three-phase; Power flow; Topology (electrical circuits); Electric power system; Impedance parameters; Control theory (sociology); Electronic engineering; Electrical engineering; Power (physics); Computer science; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.04510539087561297,"gpt":0.2735884062815614,"spread":0.2284830154059485,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001820104,0.0003265369,0.0006490411,0.0007029386,0.0002195302,0.0001697445,0.0003345126,0.0002864943,0.00004666599],"category_scores_gemma":[0.0001569662,0.0002952532,0.00017445,0.00405004,0.00006539572,0.0003492263,0.00002780926,0.000326739,0.00001932706],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007812278,"about_ca_system_score_gemma":0.0001456051,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007679097,"about_ca_topic_score_gemma":0.00005154043,"domain_scores_codex":[0.9962705,0.0003783511,0.0008214611,0.0005170716,0.001110786,0.0009018232],"domain_scores_gemma":[0.9972536,0.00012676,0.0001663431,0.0006394277,0.001617609,0.0001962698],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001689577,0.0009430441,0.007121705,0.001176008,0.006991697,0.00004330289,0.001192208,0.744776,0.158204,0.03393164,0.04351847,0.0004123926],"study_design_scores_gemma":[0.001409976,0.001351041,0.008804731,0.00006008899,0.0003178726,0.00001792972,0.0001398903,0.9584975,0.0272213,0.00002483768,0.001626168,0.0005286701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3610657,0.001170869,0.6340952,0.000008575532,0.0004581499,0.00149254,0.001294461,0.000176494,0.000238035],"genre_scores_gemma":[0.9934866,0.00004316595,0.0004198038,0.000001029139,0.00009980802,0.0006900027,0.005107814,0.00005776354,0.0000940319],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6336754,"threshold_uncertainty_score":0.9999499,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1971625863","doi":"10.1016/j.epsr.2009.10.034","title":"Optimum siting and sizing of a large distributed generator in a mesh connected system","year":2009,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":93,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Sizing; Generator (circuit theory); Computer science; Electrical engineering; Environmental science; Distributed computing; Engineering; Physics; Power (physics); Chemistry","retraction":null,"screen_n_in":null,"score":{"opus":0.01537400996005009,"gpt":0.2830128497792971,"spread":0.267638839819247,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00215631,0.0002143803,0.0004716535,0.0006159928,0.0001129575,0.000113436,0.0002286428,0.0001968991,0.000005377166],"category_scores_gemma":[0.000326137,0.000225217,0.00004719155,0.002300372,0.00002454307,0.0001821383,0.00004731074,0.0005746438,0.0000135672],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006878765,"about_ca_system_score_gemma":0.00008550122,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000568674,"about_ca_topic_score_gemma":0.000005840607,"domain_scores_codex":[0.9970102,0.0003467932,0.0006213283,0.0003435742,0.0006335007,0.001044571],"domain_scores_gemma":[0.9988865,0.000234061,0.00006273027,0.0003112585,0.0003342736,0.000171155],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003057407,0.0004913802,0.004872315,0.002814204,0.000307515,0.000664479,0.001796004,0.01419854,0.9396341,0.02573336,0.007627575,0.001554788],"study_design_scores_gemma":[0.001919822,0.0006106953,0.008056027,0.0007835187,0.0000141566,0.0001275826,0.001304416,0.9656097,0.01983209,0.00001752192,0.001203814,0.0005206451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9757996,0.008374812,0.01289381,0.00003642862,0.0001931033,0.0008132485,0.0001496355,0.0003070995,0.001432292],"genre_scores_gemma":[0.999688,0.0000476292,0.00006024694,0.000002568629,0.00005084218,0.00004493647,0.00005851159,0.00003040336,0.00001682582],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9514112,"threshold_uncertainty_score":0.9184084,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W772334870","doi":"10.1016/j.epsr.2015.06.010","title":"Probabilistic coordination of microgrid energy resources operation considering uncertainties","year":2015,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":93,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University; University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Microgrid; Probabilistic logic; Intermittency; Distributed generation; Reliability engineering; Wind power; Benchmark (surveying); Electric power system; Mathematical optimization; Computer science; Reliability (semiconductor); Engineering; Power (physics); Renewable energy; Electrical engineering; Mathematics; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.03116286075287682,"gpt":0.2626994500200961,"spread":0.2315365892672193,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00117446,0.0001203357,0.0002225761,0.0004598063,0.00007879635,0.0001264576,0.000168909,0.0000975446,0.00001078025],"category_scores_gemma":[0.0002697606,0.0001138782,0.00003134468,0.000732853,0.00004759077,0.0001524798,0.0000301251,0.0001732074,0.00001298697],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002630253,"about_ca_system_score_gemma":0.0001181815,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004784215,"about_ca_topic_score_gemma":0.00003056669,"domain_scores_codex":[0.9983222,0.0002525501,0.0003594271,0.0001828787,0.000507823,0.0003750602],"domain_scores_gemma":[0.9988108,0.0001482051,0.00004362412,0.0002096895,0.0006890653,0.00009862034],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001037451,0.00008447988,0.0003128707,0.0003697234,0.0001580187,0.00001268238,0.002615092,0.8477197,0.1022385,0.004541553,0.03113329,0.01071027],"study_design_scores_gemma":[0.0006829001,0.0002618402,0.00005639201,0.00008290773,0.000009697552,0.00002649796,0.0006356921,0.9241054,0.01339815,0.000181455,0.06034122,0.0002178782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6925989,0.2078178,0.07241425,0.0004609408,0.00278492,0.002715982,0.00002832123,0.001083348,0.02009548],"genre_scores_gemma":[0.9991219,0.0002442063,0.00008679517,0.00000325298,0.00008346064,0.000085511,0.0000119637,0.00002732949,0.0003355578],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.306523,"threshold_uncertainty_score":0.464382,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2753283694","doi":"10.1016/j.epsr.2017.08.026","title":"Power transformer differential protection using current and voltage ratios","year":2017,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"Higher Education Press; Ministry of Cultural Affairs; Egyptian Society of Cardiology","keywords":"Inrush current; Current transformer; Differential protection; Relay; Transformer; Protective relay; Distribution transformer; Linear variable differential transformer; Control theory (sociology); Electrical engineering; Voltage; Delta-wye transformer; Isolation transformer; Engineering; Electronic engineering; Computer science; Power (physics); Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.05562448782703699,"gpt":0.3371004143127054,"spread":0.2814759264856684,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001224221,0.0002961769,0.0003734271,0.0006863707,0.001050112,0.0008496396,0.0003990782,0.0002319253,0.0000386734],"category_scores_gemma":[0.0001635479,0.0002825685,0.00008134705,0.0003830885,0.00008513939,0.0006412796,0.00004667036,0.0009987806,0.0000749404],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004996566,"about_ca_system_score_gemma":0.00008595777,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004588109,"about_ca_topic_score_gemma":0.00002824132,"domain_scores_codex":[0.99692,0.0002372926,0.0004719506,0.0004656426,0.0009694732,0.0009356246],"domain_scores_gemma":[0.9986333,0.00005206794,0.00009413168,0.0007486289,0.0002485843,0.0002233166],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001096424,0.00009736422,0.0006564786,0.0008467785,0.0002113226,0.00003011562,0.0012203,0.0001570048,0.9715353,0.0002994088,0.001718149,0.02311811],"study_design_scores_gemma":[0.004299673,0.001293245,0.01447522,0.001363458,0.0000744433,0.0007947115,0.0004815379,0.5792501,0.1296919,0.0001913809,0.2657259,0.002358412],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7539645,0.00452955,0.2289861,0.00002351077,0.005345268,0.002416271,0.00001260685,0.0003561835,0.004365982],"genre_scores_gemma":[0.9988837,0.0001022525,0.000005507992,5.914436e-7,0.0002567356,0.0002487721,0.000001849657,0.00008101192,0.0004196375],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8418434,"threshold_uncertainty_score":0.9999626,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3175763617","doi":"10.1016/j.epsr.2021.107436","title":"Energy management of hybrid energy system sources based on machine learning classification algorithms","year":2021,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Algorithm; Computer science; Naive Bayes classifier; Decision tree; Gaussian; Machine learning; Random forest; Energy (signal processing); Statistical classification; Renewable energy; Artificial intelligence; Energy management; Data mining; Support vector machine; Engineering; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.02691848212310659,"gpt":0.2570791681536534,"spread":0.2301606860305468,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001104035,0.0002406479,0.0003609872,0.0006622897,0.000215395,0.0001111583,0.0003264543,0.00009401414,0.00002938269],"category_scores_gemma":[0.00003046494,0.0002385511,0.0001057062,0.00157302,0.00002855736,0.00007064738,0.00006006176,0.0004401398,0.00001689835],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003751143,"about_ca_system_score_gemma":0.00007744153,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000312781,"about_ca_topic_score_gemma":0.000007342084,"domain_scores_codex":[0.996603,0.0005777849,0.0005247865,0.0004310558,0.00113254,0.0007308149],"domain_scores_gemma":[0.9986606,0.0003109486,0.00008778813,0.0004986491,0.0002913752,0.0001506354],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001418968,0.0003810796,0.0007678555,0.003795253,0.0009452547,0.001551135,0.0002581748,0.7882777,0.03431204,0.09400468,0.004453498,0.07111145],"study_design_scores_gemma":[0.0003375637,0.0001425835,0.00005333584,0.000567237,0.00001160256,0.00004789365,0.0002235386,0.90825,0.03911868,0.000007002058,0.05102751,0.0002130337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06129526,0.04790683,0.5178629,0.0001009821,0.003238717,0.0005250016,0.00005403378,0.00171155,0.3673047],"genre_scores_gemma":[0.9953943,0.0003291434,0.0001273075,0.000005622566,0.000106478,0.0001051229,0.00008710716,0.0000799389,0.003764946],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9340991,"threshold_uncertainty_score":0.972783,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2578461454","doi":"10.1016/j.epsr.2017.01.011","title":"Multi-period stochastic security-constrained OPF considering the uncertainty sources of wind power, load demand and equipment unavailability","year":2017,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Unavailability; Sensitivity (control systems); Electric power system; Computer science; Mathematical optimization; Reliability engineering; Wind power; Power flow; Transmission line; Power (physics); Control theory (sociology); Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.02890879072097084,"gpt":0.2973624972231804,"spread":0.2684537065022095,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.005363174,0.0003683518,0.0006443562,0.0003413656,0.0009448511,0.0005641317,0.0008811727,0.0002416714,0.00003884626],"category_scores_gemma":[0.001765055,0.0002962186,0.000091132,0.0005274476,0.0005458585,0.0002913407,0.000244744,0.0008172008,0.00002133501],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00061283,"about_ca_system_score_gemma":0.0004449258,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005951366,"about_ca_topic_score_gemma":0.00008109929,"domain_scores_codex":[0.9955983,0.000621074,0.0008165554,0.0005827184,0.001265779,0.001115598],"domain_scores_gemma":[0.9967554,0.0007694845,0.0002463972,0.001341055,0.0006421783,0.0002455187],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0013852,0.001936442,0.03941044,0.0105626,0.006346684,0.0007125041,0.09825272,0.6313339,0.179469,0.01125575,0.01273646,0.00659831],"study_design_scores_gemma":[0.003217168,0.0006896675,0.004618269,0.0007277474,0.00006415415,0.0004765624,0.002090378,0.9820074,0.003526129,0.0001940426,0.001455866,0.0009326105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9446173,0.02149756,0.02433889,0.0002220879,0.0009559272,0.003216715,0.000034767,0.0002595315,0.004857218],"genre_scores_gemma":[0.999395,0.0001093315,0.00006303355,0.000003650393,0.00004570155,0.00009710446,0.000002263078,0.00005937037,0.0002245626],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3506735,"threshold_uncertainty_score":0.999949,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2805129967","doi":"10.1016/j.epsr.2018.05.020","title":"Thermal and electrical performance assessments of lithium-ion battery modules for an electric vehicle under actual drive cycles","year":2018,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Advanced Battery Technologies Research","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo; Ontario Tech University","funders":"","keywords":"Battery pack; Battery (electricity); Voltage; Automotive engineering; Driving cycle; Lithium-ion battery; Thermal; Electric vehicle; Lithium (medication); Electrical engineering; State of charge; Acceleration; Nuclear engineering; Engineering; Simulation; Physics; Thermodynamics","retraction":null,"screen_n_in":null,"score":{"opus":0.04333905045398331,"gpt":0.3498183947519075,"spread":0.3064793442979242,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001396511,0.0002980953,0.0004447115,0.001251726,0.0003244693,0.0001334068,0.0007428441,0.0003287598,0.00001575472],"category_scores_gemma":[0.0002008931,0.0002723282,0.00005594871,0.001970532,0.0002354826,0.000571147,0.0001599634,0.0009323207,0.00002774011],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004618394,"about_ca_system_score_gemma":0.0001267106,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003556412,"about_ca_topic_score_gemma":0.00000445987,"domain_scores_codex":[0.9960288,0.0002857209,0.0004903395,0.0005843447,0.001057202,0.001553552],"domain_scores_gemma":[0.9977889,0.000681679,0.00007105724,0.0006551886,0.0006144613,0.0001887255],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000275572,0.0001618186,0.002738019,0.0002642334,0.0001526841,0.000004466622,0.0001818114,0.001591618,0.9472397,0.0005255588,0.001579307,0.04528524],"study_design_scores_gemma":[0.0008503003,0.00484288,0.02139531,0.00007821306,0.00001061465,0.00002692228,0.0001993694,0.6045513,0.3662852,0.000259461,0.001072499,0.000428007],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9775391,0.001396719,0.01812977,0.00003192369,0.0001680028,0.00112333,0.00001009757,0.0003230303,0.001278024],"genre_scores_gemma":[0.9984972,0.0003566759,0.0003192916,0.000009308115,0.0001690494,0.0003012005,0.000008600136,0.00009797451,0.0002407381],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6029596,"threshold_uncertainty_score":0.9999729,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2511296364","doi":"10.1016/j.epsr.2016.08.005","title":"Forecasting day-ahead price spikes for the Ontario electricity market","year":2016,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electricity price forecasting; Electricity; Artificial neural network; Spike (software development); Electricity market; Electricity price; Econometrics; Computer science; Economics; Artificial intelligence; Engineering; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.05089965579623061,"gpt":0.2758124446158092,"spread":0.2249127888195785,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004757407,0.0002994368,0.0003395851,0.0004384353,0.0005938161,0.0002147016,0.0007398121,0.000188088,0.0001567682],"category_scores_gemma":[0.0009524749,0.0001772957,0.0001418662,0.001325835,0.00005801286,0.0002363435,0.00007953992,0.0006548361,0.00004488692],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001005608,"about_ca_system_score_gemma":0.0002525933,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003063198,"about_ca_topic_score_gemma":0.002590795,"domain_scores_codex":[0.9962019,0.0002597089,0.0005059316,0.0004388125,0.0008424093,0.001751274],"domain_scores_gemma":[0.9942404,0.004570464,0.00006923011,0.0005671221,0.0003597706,0.0001929851],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0007247896,0.0003042653,0.0156354,0.001170887,0.001453375,0.0001560039,0.00608394,0.006194997,0.09341335,0.009677022,0.643298,0.221888],"study_design_scores_gemma":[0.001225315,0.0006066968,0.002088318,0.0004921341,0.00003079969,0.000159933,0.00009598141,0.1921275,0.01064053,0.0003326974,0.7914292,0.000770907],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2994702,0.02575119,0.3674125,0.0007368824,0.006350351,0.005360239,0.00005992881,0.001415288,0.2934434],"genre_scores_gemma":[0.9773772,0.0001360826,0.00009769123,0.00001179875,0.0004044983,0.0004450131,0.000002308637,0.00009218697,0.02143326],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6779069,"threshold_uncertainty_score":0.7229909,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3210835446","doi":"10.1016/j.epsr.2021.107645","title":"Energy management using multi-criteria decision making and machine learning classification algorithms for intelligent system","year":2021,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"TOPSIS; Algorithm; Computer science; Renewable energy; Random forest; Ideal solution; Machine learning; Artificial intelligence; Wind power; Data mining; Engineering; Operations research","retraction":null,"screen_n_in":null,"score":{"opus":0.07020099116547045,"gpt":0.3456872279720671,"spread":0.2754862368065967,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001058143,0.000211529,0.000296773,0.0004441082,0.0003580409,0.0003167511,0.0001957365,0.0001634587,0.00001103763],"category_scores_gemma":[0.00005854268,0.0001871114,0.00006192023,0.00117455,0.00001686215,0.0001181192,0.00009555556,0.0004253926,0.000004488542],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006684398,"about_ca_system_score_gemma":0.00004598958,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006373045,"about_ca_topic_score_gemma":0.000005923187,"domain_scores_codex":[0.9975958,0.0002434734,0.0004557181,0.0004549161,0.0005343027,0.0007157744],"domain_scores_gemma":[0.9989551,0.0002435266,0.00005492038,0.0002918228,0.0003391932,0.0001154361],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001827336,0.0001448165,0.001142968,0.003579543,0.0007733942,0.0003285831,0.0007729543,0.02787752,0.1312623,0.01210002,0.003189273,0.8186458],"study_design_scores_gemma":[0.0003600864,0.00008268812,0.0002999494,0.0003583939,0.00001583914,0.0001802121,0.0004563762,0.978593,0.003084177,0.00004940584,0.01631101,0.0002088754],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02325584,0.02341427,0.9513755,0.00001231798,0.0006177697,0.0005287402,0.000008503258,0.0002045431,0.0005825335],"genre_scores_gemma":[0.9902953,0.0007818784,0.008180302,0.000004788977,0.0001153432,0.000100671,0.00002083915,0.00007371316,0.0004271706],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9670395,"threshold_uncertainty_score":0.7630183,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1969750156","doi":"10.1016/j.epsr.2005.02.008","title":"Reliability optimization using ant colony algorithm under performance and cost constraints","year":2005,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Reliability (semiconductor); Ant colony optimization algorithms; Maximization; Reliability engineering; Computer science; Electric power system; Network topology; Algorithm; Electrical network; Power (physics); Mathematical optimization; Engineering; Mathematics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02812735513222942,"gpt":0.2893135287143249,"spread":0.2611861735820954,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002956252,0.0002284395,0.0003570634,0.0003301128,0.0002805814,0.0001587174,0.0002531667,0.0002172345,0.00004446091],"category_scores_gemma":[0.0001803545,0.0002163948,0.00004261106,0.0009574316,0.0002327745,0.0003983852,0.00006778682,0.0006138575,0.00005022884],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001033156,"about_ca_system_score_gemma":0.0001907781,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001146404,"about_ca_topic_score_gemma":0.000005896178,"domain_scores_codex":[0.9970676,0.0003244906,0.0005187269,0.0004507053,0.0006727779,0.0009657181],"domain_scores_gemma":[0.9985288,0.000269824,0.00005075611,0.0004707349,0.0004436476,0.0002362132],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003640715,0.0001148173,0.0006160529,0.0005484008,0.00007698755,0.0000132245,0.0004561451,0.9744608,0.003114596,0.000357427,0.004374221,0.0158309],"study_design_scores_gemma":[0.0004138454,0.0001026097,0.000662514,0.0001456405,0.000005912666,0.000150084,0.0001334893,0.9844155,0.0004836975,0.000008288633,0.01323399,0.0002444122],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3476517,0.005609417,0.6307029,0.0001302053,0.001288435,0.002759431,0.00003560615,0.000493922,0.01132845],"genre_scores_gemma":[0.9967272,0.0004870713,0.002083819,0.00001427967,0.0001107061,0.00009566971,0.000004714383,0.00004325852,0.0004332558],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6490755,"threshold_uncertainty_score":0.8824322,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2140442243","doi":"10.1016/s0378-7796(02)00214-6","title":"A new expression for the ground transient resistance matrix elements of multiconductor overhead transmission lines","year":2003,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":61,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"Schweizerischer Nationalfonds zur Förderung der Wissenschaftlichen Forschung","keywords":"Singularity; Transient (computer programming); Transmission line; Impedance parameters; Mathematical analysis; Frequency domain; Electrical impedance; Electric power transmission; Matrix (chemical analysis); Mathematics; Time domain; Transient response; Physics; Engineering; Computer science; Telecommunications; Materials science; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03323748761952825,"gpt":0.33640210680369,"spread":0.3031646191841617,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001420048,0.0001847583,0.0002905456,0.0001677919,0.0003651227,0.00008677407,0.000367407,0.00005726559,0.0001559909],"category_scores_gemma":[0.00004332325,0.0001209297,0.0001252528,0.0006550193,0.00003442664,0.00009424408,0.0000141295,0.0003044272,0.000008334951],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006967905,"about_ca_system_score_gemma":0.0003609362,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002895101,"about_ca_topic_score_gemma":0.000002436616,"domain_scores_codex":[0.9973011,0.0003586213,0.0004981558,0.0003577628,0.0007180271,0.0007663103],"domain_scores_gemma":[0.9984159,0.00063109,0.0001193146,0.0004196792,0.0002509788,0.0001630133],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0004940671,0.0004036355,0.00046626,0.0002575161,0.000208447,0.00000124004,0.002784937,0.00004930992,0.9173021,0.0245315,0.04882917,0.004671815],"study_design_scores_gemma":[0.005863999,0.001497134,0.0005864967,0.0005489195,0.00008105282,0.000003853991,0.001731484,0.002390181,0.3259225,0.004156853,0.6565912,0.0006263346],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5461801,0.04903694,0.3656342,0.0008674,0.00138708,0.009787191,0.00007028611,0.0001067729,0.02693011],"genre_scores_gemma":[0.9783971,0.0000328503,0.0009609357,0.000002952145,0.0001510408,0.0002573657,0.000005913239,0.0000315001,0.02016033],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.607762,"threshold_uncertainty_score":0.4931369,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2056204895","doi":"10.1016/s0378-7796(02)00173-6","title":"Power quality event detection using Adaline","year":2002,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Power quality; Event (particle physics); Quality (philosophy); Power (physics); Electric power system; Simple (philosophy); Line (geometry); Wavelet; Artificial intelligence; Machine learning; Engineering; Voltage; Electrical engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.1500631846505895,"gpt":0.374102493973354,"spread":0.2240393093227645,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003648191,0.0002344924,0.0003619313,0.0005850284,0.000298714,0.0001702696,0.000366615,0.0002481239,0.0003785164],"category_scores_gemma":[0.0002624371,0.0002412165,0.0001210768,0.001715411,0.00004482713,0.0002335075,0.00006079397,0.001024307,0.0005354665],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008267537,"about_ca_system_score_gemma":0.00004441806,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003393346,"about_ca_topic_score_gemma":0.00002092102,"domain_scores_codex":[0.9957905,0.0007690418,0.000669737,0.0003792018,0.001266259,0.001125308],"domain_scores_gemma":[0.9985226,0.0002741274,0.00005830018,0.0006074803,0.0002872433,0.0002501895],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002324224,0.001425345,0.0006891153,0.001994861,0.001243241,0.0003204664,0.01147693,0.04132292,0.869271,0.008250583,0.0455638,0.01820926],"study_design_scores_gemma":[0.0010508,0.0004351335,0.001196815,0.0001531253,0.00001679947,0.0001639681,0.000618346,0.821104,0.02718806,0.0001891562,0.1469067,0.0009770504],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8972422,0.01871072,0.05906826,0.0001045616,0.002240263,0.000933771,0.00002091944,0.0007260352,0.02095329],"genre_scores_gemma":[0.9981028,0.0002397789,0.00002895232,0.00001372566,0.0001275367,0.00004404827,0.000002133947,0.00006429711,0.001376725],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.842083,"threshold_uncertainty_score":0.9836522,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2624181130","doi":"10.1016/j.epsr.2017.05.036","title":"A chance constrained programming approach to integrated planning of distributed power generation and natural gas network","year":2017,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":57,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Natural gas; Distributed generation; Time horizon; Integrated business planning; Electricity; Electricity generation; Reliability (semiconductor); Electric power system; Operational planning; Probabilistic logic; Reliability engineering; Engineering; Computer science; Electric power; Power to gas; Pipeline (software); Power (physics); Mathematical optimization; Renewable energy; Electrical engineering; Waste management; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.03035255830166427,"gpt":0.2915042764424272,"spread":0.2611517181407629,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001501537,0.0002494334,0.0004072361,0.0003857013,0.0004594807,0.000466242,0.0004071683,0.0002113148,0.000002702694],"category_scores_gemma":[0.0004576798,0.0002246354,0.00004034786,0.0009588848,0.00008813979,0.0002541911,0.00006583902,0.0005980105,0.000004947575],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002648102,"about_ca_system_score_gemma":0.00009836009,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003286689,"about_ca_topic_score_gemma":0.00001280123,"domain_scores_codex":[0.997539,0.0002411158,0.0004414407,0.0003846491,0.0005631196,0.0008306717],"domain_scores_gemma":[0.9983966,0.00008068264,0.0001296176,0.0005292743,0.0007026073,0.0001612195],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001979336,0.0001510867,0.001604832,0.0004836169,0.0005694226,0.00005153868,0.00278449,0.8728682,0.08531269,0.01294855,0.01751206,0.005515568],"study_design_scores_gemma":[0.000435567,0.0001822511,0.0006815509,0.0003840956,0.000008084613,0.00006644516,0.0004098615,0.9898134,0.003511233,0.000005230557,0.004176717,0.0003255958],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5388345,0.007262822,0.4375219,0.00006804508,0.002079244,0.00287098,0.00004162696,0.0005082762,0.01081257],"genre_scores_gemma":[0.9978076,0.00002128796,0.001357777,0.000002340458,0.0001486322,0.0002352109,0.00009951091,0.00005478989,0.0002728017],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4589731,"threshold_uncertainty_score":0.9160366,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2076908765","doi":"10.1016/j.epsr.2013.08.020","title":"Maximum loadability consideration in droop-controlled islanded microgrids optimal power flow","year":2013,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":57,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Voltage droop; Microgrid; Control theory (sociology); Electric power system; Mathematical optimization; Maximization; Power flow; Power (physics); Engineering; Computer science; Voltage; Control (management); Mathematics; Voltage regulator; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01131131440412608,"gpt":0.2467481944369339,"spread":0.2354368800328078,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002144307,0.0002890274,0.0006150915,0.0007720999,0.000150871,0.0004743549,0.0002883169,0.0002778744,0.0005421817],"category_scores_gemma":[0.000326366,0.0002584451,0.0001158916,0.00117128,0.00005004225,0.0003872282,0.00004605149,0.0007721517,0.0004981374],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000486972,"about_ca_system_score_gemma":0.0001616972,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004639103,"about_ca_topic_score_gemma":0.00005654008,"domain_scores_codex":[0.9963765,0.0005998037,0.000777233,0.0004584401,0.0006727049,0.001115304],"domain_scores_gemma":[0.9983335,0.0004017707,0.00005241958,0.0004855699,0.000549248,0.0001775195],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001507202,0.001090455,0.004951462,0.0006011098,0.0008946372,0.0001850766,0.003628498,0.5404483,0.3017624,0.0005202835,0.1087582,0.03565238],"study_design_scores_gemma":[0.005166811,0.0002786901,0.001759551,0.00004993204,0.000008288516,0.0000369191,0.0001605866,0.9872355,0.001778715,0.0001507346,0.002986031,0.0003882841],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9163006,0.03093483,0.02791439,0.0005164878,0.001723255,0.008461896,0.00001803776,0.0007074361,0.01342307],"genre_scores_gemma":[0.9981241,0.0001858121,0.0003345503,0.00001853214,0.00008963485,0.0007593632,0.00001811114,0.0000541918,0.0004156775],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4467872,"threshold_uncertainty_score":0.9999868,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2532990307","doi":"10.1016/j.epsr.2016.09.030","title":"Transient stability assessment via decision trees and multivariate adaptive regression splines","year":2016,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"BC Hydro","keywords":"Multivariate adaptive regression splines; Phasor; Mars Exploration Program; Transient (computer programming); Phasor measurement unit; Multivariate statistics; Stability (learning theory); Cart; Regression; Computer science; Control theory (sociology); Electric power system; Engineering; Regression analysis; Artificial intelligence; Machine learning; Statistics; Mathematics; Bayesian multivariate linear regression","retraction":null,"screen_n_in":null,"score":{"opus":0.04444648713072474,"gpt":0.3336429915336942,"spread":0.2891965044029695,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003382893,0.0002777771,0.0004425794,0.0004186699,0.0002281728,0.0001095722,0.0002717601,0.0001950915,0.0001300287],"category_scores_gemma":[0.0002624331,0.0001710407,0.00007445132,0.0008501604,0.00008925484,0.0002838456,0.00007535579,0.0003487832,0.0000354437],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006537595,"about_ca_system_score_gemma":0.0001138775,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001215389,"about_ca_topic_score_gemma":0.00005251803,"domain_scores_codex":[0.9961181,0.0008140433,0.0006397901,0.0005968303,0.001079494,0.0007517353],"domain_scores_gemma":[0.9974084,0.00110753,0.00005554956,0.0006323695,0.0004876663,0.0003085189],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.002288268,0.00167393,0.03270571,0.001404686,0.0008295075,0.0001645479,0.00727887,0.008178454,0.7411499,0.004576296,0.0201528,0.179597],"study_design_scores_gemma":[0.004900556,0.001333101,0.1158437,0.001400494,0.0000277762,0.00008276891,0.0008167808,0.840517,0.01308872,0.0004691075,0.02020651,0.00131342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2429362,0.002586307,0.7486643,0.0001070673,0.0007927884,0.001229443,0.00003148534,0.0002936593,0.003358733],"genre_scores_gemma":[0.9986203,0.0002263072,0.0006204108,0.000002218232,0.00003104587,0.0002187588,0.000002252028,0.00004296352,0.0002357509],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8323386,"threshold_uncertainty_score":0.6974838,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2042253414","doi":"10.1016/j.epsr.2009.05.003","title":"Application of continuation power flow method in radial distribution systems","year":2009,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University; Toronto Metropolitan University","funders":"","keywords":"Jacobian matrix and determinant; Newton's method; Control theory (sociology); Continuation; AC power; Mathematics; Voltage; Shunt (medical); Electric power system; Capacitor; Mathematical analysis; Power (physics); Applied mathematics; Engineering; Computer science; Physics; Nonlinear system; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01434492121380124,"gpt":0.3124631498068117,"spread":0.2981182285930105,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003777231,0.0002245434,0.0004559978,0.0005950651,0.00007889286,0.0001080377,0.0003326152,0.0002950694,0.00000862514],"category_scores_gemma":[0.0003123661,0.0002401812,0.00007677511,0.002566596,0.00002944804,0.0002854754,0.00002101086,0.0006084404,0.00008153032],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00110982,"about_ca_system_score_gemma":0.00009168497,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002956474,"about_ca_topic_score_gemma":0.000005617311,"domain_scores_codex":[0.9963745,0.0005947543,0.0008091855,0.0003936175,0.001021303,0.0008066322],"domain_scores_gemma":[0.9984853,0.0002544673,0.0001034847,0.0004903824,0.0005306129,0.0001357899],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0005806211,0.0009220258,0.002597967,0.0007593003,0.0002203598,0.00004778592,0.001297664,0.4218013,0.4475093,0.04290464,0.04244916,0.03890989],"study_design_scores_gemma":[0.0008099168,0.000454341,0.0113088,0.0001092246,0.00000878645,0.00002461291,0.0001198524,0.9722728,0.005473548,0.0001043131,0.009014677,0.0002991713],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.09521411,0.004489958,0.8930041,0.00007577482,0.0007910101,0.002232573,0.0001435253,0.0002753961,0.00377361],"genre_scores_gemma":[0.9991619,0.0000469675,0.0001475966,0.000001969601,0.00008231547,0.0001795771,0.0002830982,0.00002899169,0.00006755954],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9039478,"threshold_uncertainty_score":0.9794303,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2272172222","doi":"10.1016/j.epsr.2016.01.013","title":"Fuzzy logic based speed control of indirect field oriented controlled Double Star Induction Motors connected in parallel to a single six-phase inverter supply","year":2016,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Multilevel Inverters and Converters","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Control theory (sociology); Induction motor; Electronic speed control; Pulse-width modulation; Inverter; Fuzzy logic; Double star; Vector control; Star (game theory); Computer science; Control engineering; Engineering; Control (management); Physics; Voltage; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.04167408445595809,"gpt":0.2967288059720943,"spread":0.2550547215161362,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001367699,0.0003181966,0.0008861875,0.001626476,0.00006856852,0.00008478888,0.0003849641,0.0002893144,0.0001824162],"category_scores_gemma":[0.000461645,0.0002361768,0.0001343057,0.001652069,0.00004921819,0.0002663092,0.00003259841,0.000436638,0.00007841755],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005973775,"about_ca_system_score_gemma":0.0001708156,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0009031825,"about_ca_topic_score_gemma":0.00009743909,"domain_scores_codex":[0.9962723,0.0005012764,0.0008422133,0.0004800489,0.0008594617,0.001044684],"domain_scores_gemma":[0.9978118,0.0008213957,0.00009913521,0.0004973213,0.0004763005,0.0002940397],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.01257686,0.0008303448,0.004745545,0.0002551834,0.0004660628,0.0001122273,0.0009767764,0.001254175,0.9559671,0.0004290942,0.01426261,0.00812405],"study_design_scores_gemma":[0.1186589,0.005004985,0.002124728,0.0009225338,0.0000545228,0.00002074864,0.0005243742,0.7578406,0.109816,0.0001030441,0.003730439,0.001199153],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9519272,0.0006255512,0.03975866,0.0006628126,0.0009822543,0.004148747,0.00004212847,0.0002289387,0.001623665],"genre_scores_gemma":[0.9990587,0.00001551184,0.00003322246,0.0001268054,0.00005680994,0.0003459035,0.000007825456,0.00005358339,0.0003016313],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8461511,"threshold_uncertainty_score":0.9631011,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2022923972","doi":"10.1016/j.epsr.2005.10.002","title":"Reactive current control through SVC for load power factor correction","year":2005,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Static VAR compensator; AC power; Control theory (sociology); Harmonics; Thyristor; Power factor; Controller (irrigation); Capacitor; Harmonic; Computer science; Engineering; Voltage; Control (management); Electrical engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.04091708086818331,"gpt":0.3374922307710997,"spread":0.2965751499029164,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001663259,0.0002944592,0.000474131,0.000311573,0.0002575803,0.0001916729,0.0003311181,0.0002146711,0.000167239],"category_scores_gemma":[0.000620012,0.0002753463,0.0001579764,0.001002612,0.0000422001,0.000450864,0.00002514469,0.0007057867,0.0002787842],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00208146,"about_ca_system_score_gemma":0.000289205,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000723393,"about_ca_topic_score_gemma":0.00002836013,"domain_scores_codex":[0.9963101,0.0004164303,0.0006251659,0.0005094701,0.001082005,0.001056896],"domain_scores_gemma":[0.9973785,0.0006821647,0.00007863683,0.0005501133,0.001101107,0.0002094722],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.001780077,0.001837914,0.002657459,0.001645569,0.001457106,0.00001913841,0.02053538,0.08826271,0.02838887,0.005401892,0.8129017,0.03511218],"study_design_scores_gemma":[0.00176969,0.0003472871,0.0007115683,0.00009975127,0.00001197715,0.00002517053,0.0002950898,0.2900594,0.00252681,0.00002576126,0.7036451,0.0004824256],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01771037,0.01986564,0.8976133,0.0002220867,0.01119147,0.005513389,0.0002021938,0.001068184,0.04661333],"genre_scores_gemma":[0.9973144,0.00009409703,0.00006050922,0.00001219063,0.0001771466,0.0005814107,0.000009133957,0.00007140872,0.001679689],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9796041,"threshold_uncertainty_score":0.9999699,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2568500497","doi":"10.1016/j.epsr.2016.12.029","title":"Online parameter and state estimation of lithium-ion batteries under temperature effects","year":2017,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Advanced Battery Technologies Research","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Carleton University","funders":"","keywords":"Control theory (sociology); Computer science; Observer (physics); Battery (electricity); Compensation (psychology); Stability (learning theory); Lyapunov stability; Estimation theory; Control engineering; Algorithm; Engineering; Power (physics); Control (management); Artificial intelligence; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.02444952455330662,"gpt":0.3305944719863773,"spread":0.3061449474330706,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007480661,0.0001902141,0.0003316904,0.0005606399,0.000299434,0.0002995458,0.0005558109,0.0002016158,0.000006040111],"category_scores_gemma":[0.001039672,0.0001641609,0.00003124119,0.0004025888,0.0002464267,0.0004058385,0.0002303037,0.0009213274,0.0000176405],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001723313,"about_ca_system_score_gemma":0.00004288201,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006883679,"about_ca_topic_score_gemma":0.000008172798,"domain_scores_codex":[0.9978201,0.000176453,0.0002895002,0.0003119278,0.0007097099,0.0006922787],"domain_scores_gemma":[0.9980619,0.0006338955,0.00006560318,0.0009145794,0.0002301387,0.00009387645],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001699325,0.0002215807,0.002570731,0.0039539,0.0003491596,0.0001469876,0.0006339548,0.02247548,0.9035023,0.0007854942,0.008336826,0.05685367],"study_design_scores_gemma":[0.001892698,0.001757683,0.06887674,0.001231158,0.00001777985,0.0001343328,0.0003959636,0.2361658,0.6808962,0.003979833,0.003656087,0.0009957372],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9886658,0.002766205,0.006711525,0.0002069546,0.0002679677,0.0007343183,0.00001932841,0.0002153112,0.0004125478],"genre_scores_gemma":[0.9982749,0.000462139,0.000339345,0.000004510054,0.00002245724,0.00009054373,0.000008244015,0.00004806637,0.0007497923],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2226061,"threshold_uncertainty_score":0.6694289,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1972687330","doi":"10.1016/j.epsr.2013.05.019","title":"Optimal allocation of distributed energy resources through simulation-based optimization","year":2013,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Particle swarm optimization; Grid; Distributed generation; Reliability (semiconductor); Computer science; Mathematical optimization; Wind power; Grid connection; Set (abstract data type); Reliability engineering; Power (physics); Distributed computing; Engineering; Renewable energy; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.01909107613423212,"gpt":0.2775414928268997,"spread":0.2584504166926676,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006188896,0.0002096404,0.0002861727,0.0003890223,0.0001438674,0.0001572992,0.0003352816,0.0002176425,0.0001583943],"category_scores_gemma":[0.0003639963,0.0002150732,0.00007121726,0.002069589,0.0000669498,0.0004358406,0.00003378597,0.0002925918,0.00007214769],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004512457,"about_ca_system_score_gemma":0.00009793294,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0006802937,"about_ca_topic_score_gemma":0.000002292507,"domain_scores_codex":[0.9972016,0.0002939846,0.0005805547,0.0003071227,0.0009541391,0.0006626608],"domain_scores_gemma":[0.9976569,0.0005835905,0.0000901278,0.000451312,0.001099564,0.0001184587],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002016761,0.00005802776,0.00007095622,0.00007576633,0.00003966772,0.000001146706,0.0000833719,0.9904345,0.0051789,0.0003733966,0.003519573,0.0001445739],"study_design_scores_gemma":[0.0003340248,0.0001894596,0.000280159,0.00005289225,0.000006967146,0.00000123583,0.00007716128,0.9874701,0.007292206,0.00001818582,0.004082823,0.0001948156],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07177056,0.001311814,0.9237391,0.00006256557,0.0002325967,0.0006257544,0.00005202452,0.0002851821,0.001920427],"genre_scores_gemma":[0.9984032,0.00003010165,0.0007943662,0.000004852836,0.00006009208,0.0002042459,0.000351436,0.00005203826,0.00009966578],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9266326,"threshold_uncertainty_score":0.8770429,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3098331686","doi":"10.1016/j.epsr.2020.106927","title":"Insight into impact of geomagnetically induced currents on power systems: Overview, challenges and mitigation","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Ionosphere and magnetosphere dynamics","field":"Physics and Astronomy","cited_by":47,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Geomagnetically induced current; Electric power system; Transformer; Earth's magnetic field; Electrical engineering; Current transformer; Power engineering; Engineering; Voltage; Power (physics); Geomagnetic storm; Power factor; Physics; Magnetic field","retraction":null,"screen_n_in":null,"score":{"opus":0.0435351410483887,"gpt":0.3316139718481764,"spread":0.2880788307997877,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005985692,0.0002652482,0.0004788626,0.0001413654,0.0001226112,0.0001169627,0.0003070683,0.0001349797,0.0001481017],"category_scores_gemma":[0.0000921233,0.000221498,0.0001206013,0.0006746655,0.0000543401,0.0001725424,0.0001178752,0.000585523,0.000087006],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000116089,"about_ca_system_score_gemma":0.0002887155,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001117092,"about_ca_topic_score_gemma":0.000003744768,"domain_scores_codex":[0.9970599,0.0005476681,0.0004954688,0.0004961188,0.0008065921,0.0005942824],"domain_scores_gemma":[0.9983916,0.000303581,0.000154159,0.0003529671,0.0004733264,0.0003243267],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.002273503,0.004201095,0.03094348,0.005182352,0.003499517,0.0001063606,0.05114754,0.001970769,0.1233722,0.5790895,0.03018407,0.1680297],"study_design_scores_gemma":[0.02726132,0.1232771,0.2563098,0.00679519,0.000457481,0.00006562663,0.02509267,0.3868588,0.01051315,0.008056654,0.1459,0.009412132],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9427154,0.0238935,0.0004049947,0.0002320646,0.0003425305,0.001065446,0.00002120335,0.00003950445,0.03128538],"genre_scores_gemma":[0.9992364,0.0003412883,0.000008861214,0.000008434678,0.0001125855,0.00007523524,0.00001790375,0.00003863849,0.0001606743],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5710328,"threshold_uncertainty_score":0.9032428,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3044544175","doi":"10.1016/j.epsr.2020.106573","title":"Negative sequence quantities-based protection under inverter-based resources Challenges and impact of the German grid code","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"German; Sequence (biology); Code (set theory); Grid; Inverter; Grid code; Computer science; Reliability engineering; Electronic engineering; Electrical engineering; Telecommunications; Engineering; Mathematics; Geography; Voltage; Programming language; AC power; Biology; Set (abstract data type)","retraction":null,"screen_n_in":null,"score":{"opus":0.1221523591255515,"gpt":0.3420217467042641,"spread":0.2198693875787126,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009712575,0.0001869865,0.0002900818,0.0002633105,0.0001811213,0.00007993617,0.0002458576,0.0001544466,0.000008169483],"category_scores_gemma":[0.0001743995,0.0001319436,0.00009533748,0.0009678728,0.00009853285,0.0001211046,0.00002962455,0.0006191575,0.00001064723],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003220819,"about_ca_system_score_gemma":0.0001630332,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001489129,"about_ca_topic_score_gemma":0.00006686801,"domain_scores_codex":[0.9975557,0.0007103306,0.0003297372,0.0002922815,0.0006756676,0.0004363008],"domain_scores_gemma":[0.9990736,0.0001860763,0.00008435956,0.0003007624,0.000220642,0.0001345529],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0007448563,0.0001673951,0.001080286,0.006154578,0.0006850771,0.00002820829,0.01809933,0.108204,0.8521893,0.0008432234,0.003471768,0.008331971],"study_design_scores_gemma":[0.0008610729,0.001482269,0.007361906,0.0004663407,0.0000105003,0.00002077272,0.0007200952,0.9572437,0.02925781,0.00007239367,0.002189765,0.000313385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9806128,0.007168679,0.007546076,0.0006407826,0.000324452,0.002344047,0.00003655446,0.0002501988,0.00107643],"genre_scores_gemma":[0.9995187,0.00007823369,0.000005889282,0.00001065916,0.0001100768,0.0002028279,0.000001088569,0.00003907847,0.00003347771],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8490397,"threshold_uncertainty_score":0.5380502,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1966883992","doi":"10.1016/j.epsr.2006.08.034","title":"Effects of main and leakage flux saturation on the transient performances of doubly-fed wind driven induction generator","year":2006,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Windsor","funders":"","keywords":"Saturation (graph theory); Induction generator; Control theory (sociology); Flux (metallurgy); Transient (computer programming); Leakage (economics); Voltage; Engineering; Materials science; Electrical engineering; Computer science; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01091625298020413,"gpt":0.229463047259092,"spread":0.2185467942788879,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001144817,0.0001494413,0.0002907037,0.0004165158,0.000108694,0.00005404029,0.0001677999,0.0001237971,0.000004556552],"category_scores_gemma":[0.00005805489,0.0001045115,0.000047632,0.0007874299,0.00004895627,0.0001215434,0.00001209789,0.0003658093,0.000008322979],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000149277,"about_ca_system_score_gemma":0.00005084425,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002519805,"about_ca_topic_score_gemma":0.00001704125,"domain_scores_codex":[0.9979154,0.0003970561,0.0004025505,0.0001919343,0.0007185781,0.0003744444],"domain_scores_gemma":[0.9991269,0.0003619489,0.00007151105,0.0002375676,0.0001555942,0.00004644654],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00007062352,0.00004446221,0.0002539844,0.0006036535,0.00007144587,0.000004642274,0.0004753006,0.007132703,0.9859679,0.00102172,0.004036867,0.0003167271],"study_design_scores_gemma":[0.002898233,0.001816237,0.06532404,0.0006811394,0.00004312476,0.00005533455,0.0003334951,0.157617,0.7656553,0.00004558284,0.005045197,0.0004852847],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9921398,0.003990653,0.0003550483,0.00005334459,0.0004285883,0.001225922,0.000004275193,0.00004068072,0.001761723],"genre_scores_gemma":[0.9993094,0.00003239392,0.000004314221,0.000001497128,0.0002245328,0.0000786936,0.000004439317,0.00002685925,0.0003178543],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2203126,"threshold_uncertainty_score":0.4261855,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2024358532","doi":"10.1016/j.epsr.2005.06.003","title":"Novel reactive power controllers for the STATCOM and SSSC","year":2005,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Control theory (sociology); Electric power system; AC power; Flexible AC transmission system; Electric power transmission; Transmission line; Transient (computer programming); Transmission system; Static VAR compensator; Controller (irrigation); Computer science; Voltage source; Voltage; Engineering; Power (physics); Transmission (telecommunications); Electrical engineering; Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.03547660269045091,"gpt":0.307512868710677,"spread":0.272036266020226,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002751052,0.0001943896,0.0003227022,0.0002596191,0.0003184764,0.0002144314,0.0003057875,0.0001295945,0.00004144606],"category_scores_gemma":[0.0003651571,0.0001406812,0.00007489501,0.0006477032,0.00007256894,0.0001924622,0.00003878983,0.0004361428,0.00003633603],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003785172,"about_ca_system_score_gemma":0.0001051399,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00009419987,"about_ca_topic_score_gemma":0.00003386702,"domain_scores_codex":[0.9977278,0.0001838001,0.0004023121,0.0003264458,0.0005896472,0.0007700419],"domain_scores_gemma":[0.997404,0.001510618,0.00004275105,0.0004671665,0.0004044464,0.0001709701],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.002805767,0.001475701,0.002613911,0.001703893,0.004821428,0.00003082021,0.03495699,0.2039309,0.1206082,0.05407713,0.5528878,0.02008752],"study_design_scores_gemma":[0.002340586,0.0002390895,0.001261433,0.00003883243,0.00001583938,0.00004475251,0.001507698,0.565398,0.0006741717,0.00002257172,0.4280995,0.0003574307],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03088778,0.03122504,0.8727658,0.002080085,0.002104473,0.007880246,0.0001701026,0.0006760372,0.05221045],"genre_scores_gemma":[0.9973366,0.0001121502,0.0001474633,0.00002769912,0.00005885684,0.0004199333,0.000003327005,0.0000476812,0.001846273],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9664488,"threshold_uncertainty_score":0.5736812,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2073639793","doi":"10.1016/j.epsr.2006.11.010","title":"Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques","year":2007,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Electric power system; Reliability engineering; Computer science; Monte Carlo method; Markov process; Markov chain; Power system simulation; Markov model; Transmission system; Power (physics); Transmission (telecommunications); Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.03536785874771406,"gpt":0.3604968159351793,"spread":0.3251289571874653,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.01787838,0.0004617036,0.0009665304,0.0005982257,0.0003161888,0.0001863732,0.0005447334,0.0005781616,0.00001624487],"category_scores_gemma":[0.0008320832,0.0004243987,0.0001664434,0.001896088,0.0002818257,0.0003898418,0.00021883,0.001186359,0.000003997995],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001882036,"about_ca_system_score_gemma":0.0003167166,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0009301113,"about_ca_topic_score_gemma":0.00001362459,"domain_scores_codex":[0.9924398,0.001243201,0.001837515,0.0009182047,0.001846036,0.001715224],"domain_scores_gemma":[0.9952837,0.001305552,0.0002814714,0.001438371,0.001328588,0.0003623285],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003746594,0.0003158116,0.02050373,0.005398866,0.0002999856,0.00007731448,0.0007937858,0.8443729,0.1181024,0.00672167,0.002477077,0.0005618014],"study_design_scores_gemma":[0.000874345,0.0008339147,0.03131798,0.001345769,0.00005582217,0.000137682,0.0004013345,0.9459147,0.004622523,0.0007634789,0.01270416,0.001028279],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7156747,0.003986741,0.2692132,0.00001665612,0.002554116,0.003323948,0.00002615057,0.0004911525,0.004713392],"genre_scores_gemma":[0.9981358,0.000106652,0.001274711,0.000003725582,0.0001825216,0.00008725139,0.000006857786,0.00008584741,0.0001166188],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2824611,"threshold_uncertainty_score":0.9998208,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3047791577","doi":"10.1016/j.epsr.2020.106595","title":"Electromagnetic transient modeling of grounding electrodes buried in frequency dependent soil with variable water content","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":42,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba; Manitoba Hydro","funders":"Mitacs; Canada Foundation for Innovation","keywords":"Soil resistivity; Ground; Earthing system; Transient (computer programming); Lightning strike; Lightning (connector); Electrical engineering; Electric power transmission; Transmission line; Environmental science; Engineering; Acoustics; Power (physics); Soil science; Mechanics; Physics; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.04404063403519753,"gpt":0.2588528069915701,"spread":0.2148121729563726,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001374779,0.0003189874,0.0006100375,0.0004407851,0.0002149207,0.0001434887,0.0005059881,0.00008259445,0.0001353532],"category_scores_gemma":[0.00002264218,0.0002340461,0.00007482387,0.001414262,0.0000498753,0.0001853527,0.00005268493,0.0009193443,0.00002254372],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002322576,"about_ca_system_score_gemma":0.0004041912,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004955003,"about_ca_topic_score_gemma":0.00001323516,"domain_scores_codex":[0.9952229,0.0004931458,0.000720085,0.0006913184,0.001088292,0.001784231],"domain_scores_gemma":[0.9987918,0.0001201428,0.00008510086,0.0003612681,0.0003643418,0.0002774136],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0003200326,0.0002988827,0.002162226,0.000137949,0.0001845816,0.00001907032,0.00287874,0.003674332,0.9724565,0.01767222,0.00009128852,0.0001041521],"study_design_scores_gemma":[0.01498795,0.03029039,0.001002483,0.001017044,0.0002582055,0.0001013993,0.006420603,0.3899193,0.5353976,0.01663633,0.0006541036,0.003314658],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9621203,0.001269348,0.01890533,0.0003833745,0.00006227232,0.00084526,0.00000495396,0.00004874942,0.01636044],"genre_scores_gemma":[0.9989918,0.00001182733,0.0001874278,0.00001862266,0.000163344,0.0002199079,0.00001832267,0.00005879856,0.000329947],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.437059,"threshold_uncertainty_score":0.9544121,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2063136160","doi":"10.1016/j.epsr.2014.12.005","title":"Dynamic state estimation in power systems: Modeling, and challenges","year":2014,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Else Kröner-Fresenius-Stiftung","keywords":"Electric power system; Kalman filter; Extended Kalman filter; Phasor measurement unit; Phasor; Control engineering; Control theory (sociology); Computer science; Estimator; State-space representation; State space; Generator (circuit theory); Noise (video); State (computer science); System model; Engineering; Power (physics); Control (management); Algorithm; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.03081203500327594,"gpt":0.2887662695702642,"spread":0.2579542345669883,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00446037,0.0002521088,0.0004601254,0.000900395,0.0001151534,0.0002314578,0.0002726433,0.0001885631,0.00001011752],"category_scores_gemma":[0.0003006375,0.0002451508,0.00003639954,0.0008453475,0.00003531054,0.00027491,0.00005407379,0.0005226774,0.00006567377],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004914831,"about_ca_system_score_gemma":0.00006690784,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000237648,"about_ca_topic_score_gemma":0.00007202748,"domain_scores_codex":[0.9963632,0.0008616074,0.000672622,0.0004836335,0.0007816735,0.0008372341],"domain_scores_gemma":[0.998669,0.0002788544,0.00004792451,0.0005524774,0.000244323,0.0002074628],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000025427,0.00005859439,0.0002302631,0.00112459,0.0000455406,0.000009065625,0.001868415,0.9930162,0.0002360614,0.002311585,0.0002975264,0.0007767706],"study_design_scores_gemma":[0.0003872251,0.0001155412,0.0003688038,0.0001686276,0.000002082567,0.0000238441,0.0003820061,0.9955824,0.000007308844,0.0000851274,0.002636967,0.0002400379],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1779631,0.07429399,0.7182794,0.0001698452,0.001427679,0.002172409,0.00001489937,0.0006805013,0.02499824],"genre_scores_gemma":[0.9975157,0.001833136,0.00007218886,0.000002473113,0.000004273459,0.0001840599,0.000005839905,0.00006063412,0.0003216806],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8195527,"threshold_uncertainty_score":0.999696,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2101571777","doi":"10.1016/j.epsr.2004.06.005","title":"Comparing secondary voltage regulation and shunt compensation for improving voltage stability and transfer capability in the Italian power system","year":2004,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Control theory (sociology); Maximum power transfer theorem; Shunt (medical); Compensation (psychology); Electric power system; Static VAR compensator; Voltage; Capacitor; Control engineering; Computer science; Engineering; AC power; Voltage regulation; Power (physics); Control (management); Electrical engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.03123020090651111,"gpt":0.2633171188389057,"spread":0.2320869179323946,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007445254,0.0002694852,0.0004855316,0.0003644277,0.000350473,0.0003424418,0.0002580951,0.0002007899,0.00001155626],"category_scores_gemma":[0.0002267551,0.0002276115,0.00006405944,0.0008206748,0.0001187336,0.0004067814,0.00003845465,0.0005804658,0.00000335738],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001029827,"about_ca_system_score_gemma":0.0001407978,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007805498,"about_ca_topic_score_gemma":0.0005073562,"domain_scores_codex":[0.9967042,0.0005417753,0.0008010913,0.0005862958,0.0006568196,0.0007097817],"domain_scores_gemma":[0.9983411,0.0005821887,0.00004568947,0.0005791965,0.0003003522,0.0001514997],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.002315223,0.002033793,0.1815883,0.06497389,0.0007434639,0.0001086135,0.1807215,0.08433007,0.2799379,0.1955175,0.00124919,0.006480536],"study_design_scores_gemma":[0.006063218,0.0007353062,0.2924153,0.0004813884,0.00003903084,0.0001514678,0.01817007,0.6748263,0.003724017,0.0005119225,0.001734306,0.001147658],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8081203,0.001518339,0.1842714,0.00005328301,0.000309442,0.003173402,0.0000342967,0.000169816,0.002349714],"genre_scores_gemma":[0.9995096,0.000007257592,0.00004536406,0.000006309722,0.00002320144,0.0003311211,0.00001977679,0.00003844979,0.00001889266],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5904963,"threshold_uncertainty_score":0.9281726,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2058874774","doi":"10.1016/j.epsr.2005.04.007","title":"Doubly-fed induction generator (DFIG) as a hybrid of asynchronous and synchronous machines","year":2005,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"Tsinghua University; McGill University","keywords":"Induction generator; Asynchronous communication; Doubly fed electric machine; Wind power; Rotor (electric); Control theory (sociology); Voltage; AC power; Permanent magnet synchronous generator; Power (physics); Electric generator; Generator (circuit theory); Slip (aerodynamics); Computer science; Engineering; Electrical engineering; Physics; Telecommunications; Aerospace engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01391667713293692,"gpt":0.2673988521553721,"spread":0.2534821750224352,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00152343,0.0002994481,0.0005684734,0.000884298,0.0001640378,0.0001589922,0.0003431149,0.0001777049,0.00005077029],"category_scores_gemma":[0.000175991,0.0002796512,0.00007708936,0.0009336136,0.00006281332,0.000279818,0.00006650372,0.0006565268,0.0002028362],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005602185,"about_ca_system_score_gemma":0.0001997188,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0008505507,"about_ca_topic_score_gemma":0.0000293983,"domain_scores_codex":[0.9967274,0.0003626637,0.0006619047,0.0004371153,0.0009094915,0.0009014136],"domain_scores_gemma":[0.9985743,0.0001926198,0.0000877131,0.0005464678,0.000345301,0.0002536025],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003383205,0.0003933455,0.002280216,0.001831053,0.001153756,0.000204563,0.001804897,0.02013663,0.875981,0.002124226,0.03784839,0.05590359],"study_design_scores_gemma":[0.006438116,0.002900192,0.004498376,0.0006094514,0.00009243375,0.003524557,0.000310645,0.7258271,0.145691,0.0001337113,0.1079637,0.002010775],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9562818,0.03299025,0.001429095,0.0001014844,0.0008124542,0.001158253,0.0000133858,0.0002860841,0.006927231],"genre_scores_gemma":[0.9979361,0.0001661478,0.00004740292,0.00000620942,0.0008544801,0.0001964957,0.000007240761,0.0000916664,0.0006943005],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.73029,"threshold_uncertainty_score":0.9999655,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2080177875","doi":"10.1016/j.epsr.2014.03.027","title":"Transformer differential protection with phase angle difference based inrush restraint","year":2014,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Ontario Tech University","funders":"","keywords":"Inrush current; Transformer; Current transformer; Relay; Protective relay; Linear variable differential transformer; Delta-wye transformer; Engineering; Emtp; Isolation transformer; Electrical engineering; Control theory (sociology); Distribution transformer; Electric power system; Voltage; Computer science; Physics; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.02849008466576161,"gpt":0.288675917616493,"spread":0.2601858329507314,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001403329,0.0003626311,0.0004425324,0.0009868388,0.0002938049,0.0002603346,0.0003846529,0.0002714697,0.00005131959],"category_scores_gemma":[0.0001192183,0.0003004877,0.00008571156,0.001746367,0.00007530276,0.0001961782,0.00001208343,0.001095273,0.0001185945],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005525069,"about_ca_system_score_gemma":0.0001278384,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004147848,"about_ca_topic_score_gemma":0.00008464551,"domain_scores_codex":[0.9956577,0.0006987262,0.0005070799,0.0005462546,0.001407838,0.001182407],"domain_scores_gemma":[0.9985324,0.0001703541,0.00006055449,0.0006421629,0.0003025132,0.0002919949],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0006872775,0.000466183,0.000136605,0.0009834407,0.0002147882,0.00004045114,0.0007319251,0.00156834,0.9356632,0.0004313539,0.001514324,0.05756209],"study_design_scores_gemma":[0.005959955,0.005145866,0.001799069,0.0005695765,0.00003285245,0.0001926282,0.0001516987,0.7789736,0.1456509,0.00005219668,0.060392,0.001079625],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4497004,0.0002321414,0.5424069,0.0000355533,0.0007851193,0.001624948,0.000009189092,0.0006133831,0.004592326],"genre_scores_gemma":[0.9981737,0.000007359592,0.00002515232,0.000004360286,0.0002255028,0.0009054915,0.00001039303,0.0001090992,0.0005389036],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7900123,"threshold_uncertainty_score":0.9999447,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2913704436","doi":"10.1016/j.epsr.2019.01.012","title":"Monte-Carlo simulation based multi-objective optimum allocation of renewable distributed generation using OpenCL","year":2019,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Computer science; Renewable energy; Distributed generation; Monte Carlo method; Mathematical optimization; Exploit; Distributed computing; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.06036606160303094,"gpt":0.3294006299961333,"spread":0.2690345683931024,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001575715,0.0002261542,0.0003512437,0.0005586046,0.0001372515,0.0001334622,0.0002802217,0.0002389317,0.00004040524],"category_scores_gemma":[0.0003472581,0.0002452195,0.00007895661,0.001917307,0.00002908751,0.0004799613,0.00004478905,0.0003701876,0.00007236607],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001341025,"about_ca_system_score_gemma":0.0002330206,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001095446,"about_ca_topic_score_gemma":0.00002381704,"domain_scores_codex":[0.9971002,0.0003894171,0.0005783024,0.0004120898,0.0008658423,0.0006541244],"domain_scores_gemma":[0.9978604,0.0002772055,0.0001111205,0.0005261495,0.001109729,0.0001153364],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003377711,0.00006046916,0.0004544986,0.00009229643,0.00003897199,0.00000136614,0.00005950248,0.7951753,0.2036867,0.00001492797,0.0003330429,0.00004926473],"study_design_scores_gemma":[0.0007351042,0.000215178,0.0006168237,0.00008233917,0.00001150017,0.000001738533,0.00007999119,0.9624186,0.03534414,0.000001445506,0.0002730668,0.0002201092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.550274,0.0007982159,0.4463808,0.000008763165,0.0005402089,0.001480084,0.00008352027,0.0001371411,0.0002973381],"genre_scores_gemma":[0.9989291,0.00001088245,0.0005550946,0.000001923734,0.00006366781,0.00006628414,0.0001541459,0.00005605862,0.0001628364],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4486551,"threshold_uncertainty_score":0.999976,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2296699648","doi":"10.1016/j.epsr.2016.02.029","title":"Interactions studies of HVDC–MMC link embedded in an AC grid","year":2016,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Converters; Modular design; Grid; Voltage source; Topology (electrical circuits); Parametric statistics; Electronic engineering; Computer science; Link (geometry); Voltage; Engineering; Electrical engineering; Mathematics; Computer network","retraction":null,"screen_n_in":null,"score":{"opus":0.1029461972476221,"gpt":0.4110531690080962,"spread":0.3081069717604742,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001919095,0.0001521089,0.0003662168,0.0009767119,0.00008556028,0.00004193293,0.0002452703,0.0001227637,0.0000297116],"category_scores_gemma":[0.0003513957,0.0001087741,0.00005270178,0.001333682,0.00004390624,0.0003570984,0.00004092536,0.0004347543,0.0001185785],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004986487,"about_ca_system_score_gemma":0.00006102791,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002537687,"about_ca_topic_score_gemma":0.0001661998,"domain_scores_codex":[0.9975981,0.0004551676,0.0005642551,0.0002725972,0.0005296151,0.0005802807],"domain_scores_gemma":[0.9986072,0.0003766972,0.00005392014,0.0004294859,0.0004294272,0.0001033001],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001070437,0.0001592251,0.002029335,0.0007966643,0.0003158358,0.0000446495,0.004587318,0.0009653894,0.948998,0.0008599673,0.01268118,0.02845537],"study_design_scores_gemma":[0.01068327,0.007895401,0.02958013,0.01198972,0.00007171235,0.0006525267,0.02364559,0.125965,0.3663562,0.001218302,0.4178783,0.004063885],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9738424,0.009790472,0.005090078,0.0001795598,0.003402358,0.001522145,0.00001772477,0.0003257501,0.005829554],"genre_scores_gemma":[0.9977441,0.0002967304,0.00001693284,0.000001163791,0.0003169282,0.0003018394,0.000001205403,0.00003825063,0.001282877],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5826418,"threshold_uncertainty_score":0.443568,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2017035216","doi":"10.1016/j.epsr.2015.01.017","title":"High performance operation for a four-leg NPC inverter with two-sample-ahead predictive control strategy","year":2015,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Multilevel Inverters and Converters","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"Comisión Nacional de Investigación Científica y Tecnológica; Natural Sciences and Engineering Research Council of Canada; Qatar National Research Fund","keywords":"Control theory (sociology); Model predictive control; Total harmonic distortion; Inverter; Voltage; Capacitor; Sample (material); Transient (computer programming); Engineering; Power (physics); Control (management); Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.06256205182936034,"gpt":0.2895785804733593,"spread":0.227016528643999,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001154663,0.0002587479,0.0003705184,0.0003679279,0.0001661711,0.0002359177,0.0003293599,0.0001343381,0.00002113279],"category_scores_gemma":[0.00007008755,0.0002076766,0.00004407396,0.0005076536,0.00005338426,0.0004384808,0.00001971381,0.000453512,0.0000719692],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004984458,"about_ca_system_score_gemma":0.000318913,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0008274606,"about_ca_topic_score_gemma":0.0000487701,"domain_scores_codex":[0.9973192,0.000189993,0.0003500755,0.0003780554,0.0008325673,0.0009301376],"domain_scores_gemma":[0.998367,0.0002692176,0.00003912516,0.0003688927,0.0006522068,0.0003035819],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.006562322,0.0004987738,0.01068419,0.001957718,0.002863013,0.0001405972,0.008445731,0.6467093,0.02354806,0.006436884,0.2127423,0.07941118],"study_design_scores_gemma":[0.003505296,0.00147553,0.0004777243,0.0000721274,0.00001541923,0.00003306376,0.0002910152,0.9910446,0.001027721,0.00003166818,0.001758583,0.0002671943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2388041,0.000851583,0.7522821,0.0001102795,0.001003522,0.003548074,0.0001007732,0.0003508705,0.002948668],"genre_scores_gemma":[0.9980324,0.00002135226,0.00009957383,0.0000401714,0.0001972711,0.001016345,0.00002490466,0.00007159193,0.0004964124],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7592282,"threshold_uncertainty_score":0.8468806,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2015218157","doi":"10.1016/j.epsr.2009.04.018","title":"A new reactive, distortion and non-active power measurement method for nonstationary waveforms using wavelet packet transform","year":2009,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"Killam Trusts","keywords":"Wavelet packet decomposition; Distortion (music); Wavelet transform; Wavelet; Waveform; Electronic engineering; AC power; Computer science; Power (physics); Acoustics; Engineering; Physics; Telecommunications; Artificial intelligence; Bandwidth (computing)","retraction":null,"screen_n_in":null,"score":{"opus":0.08192722393916242,"gpt":0.3593579239844564,"spread":0.277430700045294,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00297232,0.0002571051,0.0003870727,0.0005105307,0.000276295,0.0001217646,0.0001819652,0.0001954002,0.00001242924],"category_scores_gemma":[0.0001356478,0.0002388934,0.00009994086,0.0007775904,0.00002355643,0.0004444934,0.00001344378,0.0005472292,0.000008491723],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001392029,"about_ca_system_score_gemma":0.0003745006,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002469415,"about_ca_topic_score_gemma":0.00001889463,"domain_scores_codex":[0.997035,0.0001753875,0.0004642396,0.0003937032,0.001102493,0.0008291202],"domain_scores_gemma":[0.9987152,0.000212179,0.00006167354,0.0002754589,0.0004497711,0.0002856936],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.002665047,0.0007117375,0.00004158047,0.001257185,0.001492869,0.00008362462,0.0249942,0.002069059,0.5511363,0.01093853,0.03565154,0.3689584],"study_design_scores_gemma":[0.009282915,0.005977471,0.01196134,0.00113914,0.0002262876,0.0004686851,0.005176632,0.6103613,0.2343988,0.01743475,0.1001828,0.003389815],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0227097,0.002246094,0.9644189,0.0002957408,0.0003872212,0.00197198,0.00005318745,0.0001404979,0.00777672],"genre_scores_gemma":[0.9956933,0.00009292171,0.003766039,0.00002089958,0.00007802217,0.00008115517,0.00001826246,0.00004659273,0.000202822],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9729836,"threshold_uncertainty_score":0.9741791,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2905262574","doi":"10.1016/j.epsr.2018.11.016","title":"A novel Decoupled Trigonometric Saturated droop controller for power sharing in islanded low-voltage microgrids","year":2018,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Carleton University; Université du Québec à Trois-Rivières","funders":"","keywords":"Voltage droop; Microgrid; Control theory (sociology); AC power; Decoupling (probability); Controller (irrigation); Phasor; Inverter; Engineering; Computer science; Voltage; Electric power system; Electronic engineering; Power (physics); Control engineering; Voltage source; Control (management); Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02370166464602122,"gpt":0.2890901231461242,"spread":0.265388458500103,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002354598,0.0003177998,0.0006058924,0.002502144,0.0002013933,0.0003551767,0.0005632987,0.0003038236,0.00008682012],"category_scores_gemma":[0.0004735502,0.0002963884,0.000128169,0.004974237,0.00004994402,0.0002271884,0.0000631325,0.0005853025,0.0001158725],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005812648,"about_ca_system_score_gemma":0.0001270647,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001892147,"about_ca_topic_score_gemma":0.00009068802,"domain_scores_codex":[0.9966465,0.00008254385,0.0007421373,0.0005935142,0.000497681,0.001437676],"domain_scores_gemma":[0.9981568,0.0004544095,0.00007439547,0.0004201751,0.0007087082,0.0001854822],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.002178135,0.0006823369,0.002059882,0.0005819874,0.0007780171,0.00003627547,0.001402888,0.0161574,0.9463894,0.0007403427,0.01797888,0.01101441],"study_design_scores_gemma":[0.007388328,0.0004726034,0.001232449,0.0001259331,0.00001264456,0.00001826353,0.00009063532,0.9745786,0.004650658,0.00003512264,0.01093258,0.0004621394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5885791,0.04173463,0.3524546,0.0001138953,0.00274737,0.008709777,0.0001048926,0.0008699287,0.004685798],"genre_scores_gemma":[0.9978429,0.0002205192,0.0001712397,0.0000177634,0.0002404381,0.000517664,0.00002863458,0.00009999202,0.0008608151],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9584212,"threshold_uncertainty_score":0.9999488,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2069878827","doi":"10.1016/j.epsr.2012.08.015","title":"A robust approach for planning electric power systems associated with environmental policy analysis","year":2012,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Water resources management and optimization","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Regina","funders":"Program for New Century Excellent Talents in University; Ministry of Education, India; Ministry of Earth Sciences","keywords":"Greenhouse gas; Probabilistic logic; Electric power; Energy consumption; Environmental economics; Electric power system; Population; Operations research; Computer science; Engineering; Power (physics); Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.03902211909736994,"gpt":0.2579374992178718,"spread":0.2189153801205019,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002045228,0.0003246068,0.0005090611,0.002660978,0.0003112664,0.0003479046,0.0003973754,0.0002068969,0.00001434145],"category_scores_gemma":[0.00008428215,0.0002808425,0.0001323661,0.004914949,0.00002725136,0.000340733,0.0000573786,0.000453253,0.00002379029],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00108264,"about_ca_system_score_gemma":0.00003478656,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001355607,"about_ca_topic_score_gemma":0.00000123079,"domain_scores_codex":[0.9960143,0.0003420841,0.000432548,0.0004055779,0.001077912,0.001727587],"domain_scores_gemma":[0.9989521,0.0001923198,0.0001036153,0.000411662,0.0000829348,0.0002573672],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006317898,0.0002006588,0.01457527,0.00014687,0.002266566,0.000004661266,0.001079885,0.9763112,0.0009263655,0.0001876389,0.004193502,0.00004419796],"study_design_scores_gemma":[0.000666948,0.0002753789,0.005871823,0.00003903569,0.000204618,0.000008096599,0.0006286207,0.9883162,0.0001336501,0.000001044358,0.00340802,0.0004465387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3650978,0.01491655,0.5899293,0.00002235263,0.0003248297,0.004247055,0.00004428024,0.0007259549,0.02469179],"genre_scores_gemma":[0.9955167,0.00003326843,0.0001194676,0.000004523895,0.0001542788,0.0005416354,0.0002241587,0.0001121725,0.003293835],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6304188,"threshold_uncertainty_score":0.9999644,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3194996785","doi":"10.1016/j.epsr.2021.107467","title":"A multi-objective AVR-LFC optimization scheme for multi-area power systems","year":2021,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of New Brunswick; Université de Moncton","funders":"","keywords":"Electric power system; Particle swarm optimization; Control theory (sociology); Heuristics; Heuristic; Stability (learning theory); Differential evolution; Mathematical optimization; Optimization problem; Computer science; Automatic Generation Control; Scheme (mathematics); Control engineering; Engineering; Power (physics); Control (management); Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0638793460652833,"gpt":0.3258961045258555,"spread":0.2620167584605723,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003384842,0.0006580696,0.001094451,0.001212654,0.0004614521,0.0007804883,0.0008580186,0.0006549124,0.00007484805],"category_scores_gemma":[0.001818587,0.0006793978,0.0003032877,0.003183221,0.00008670399,0.0005373558,0.0001213792,0.001187387,0.0002442054],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001926982,"about_ca_system_score_gemma":0.0006828965,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004405931,"about_ca_topic_score_gemma":0.0000494222,"domain_scores_codex":[0.9925667,0.001058332,0.00132103,0.001193334,0.001616113,0.002244481],"domain_scores_gemma":[0.9938907,0.0009073585,0.0001740286,0.00141041,0.003149998,0.0004674758],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002785208,0.001174611,0.001196329,0.003640566,0.002994732,0.0007409311,0.004616153,0.5899066,0.2983154,0.003865796,0.09304734,0.0002229784],"study_design_scores_gemma":[0.002703953,0.00026291,0.00009807613,0.0004278141,0.00002437521,0.0001991947,0.00102538,0.9699486,0.003031256,0.000004144435,0.02153835,0.0007359806],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.003756999,0.06142949,0.9123169,0.00005770078,0.007859045,0.005404138,0.0001556591,0.001082884,0.007937162],"genre_scores_gemma":[0.9814941,0.0002132555,0.005502843,0.00001417646,0.0002312172,0.003048655,0.00008023742,0.0003314609,0.00908404],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9777371,"threshold_uncertainty_score":0.9995657,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2028981493","doi":"10.1016/s0378-7796(99)00058-9","title":"High-speed transmission line relaying using artificial neural networks","year":2000,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Artificial neural network; Relay; Fault (geology); Transmission line; Transient (computer programming); Line (geometry); Electric power transmission; Electronic engineering; Transmission (telecommunications); Feedforward neural network; Digital protective relay; Engineering; Emtp; Computer science; Protective relay; Feed forward; Electrical engineering; Artificial intelligence; Control engineering; Electric power system","retraction":null,"screen_n_in":null,"score":{"opus":0.04046502954662237,"gpt":0.3070035859578155,"spread":0.2665385564111931,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002167271,0.0003554639,0.000501747,0.0008159885,0.0004728536,0.0003020023,0.0004287781,0.0004225278,0.0002393089],"category_scores_gemma":[0.0000417675,0.0003525139,0.0001286878,0.002828768,0.00004327886,0.0003507603,0.00002405176,0.001504671,0.0002090985],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007090827,"about_ca_system_score_gemma":0.00006654863,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000825462,"about_ca_topic_score_gemma":0.000009229798,"domain_scores_codex":[0.9951674,0.0006924753,0.000845109,0.0005477775,0.001207643,0.00153959],"domain_scores_gemma":[0.9986132,0.0002140535,0.00005126694,0.0005821458,0.0002050154,0.0003343475],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001959631,0.00007128462,0.00003481006,0.0001602112,0.000112522,0.0001487153,0.0003191869,0.798584,0.1026223,0.0001075956,0.001942903,0.09570058],"study_design_scores_gemma":[0.0003345084,0.0002085633,0.00003826039,0.0001332595,0.00001121605,0.0001918417,0.00004297067,0.9782575,0.004916294,0.00002433514,0.01548689,0.0003543091],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8083864,0.009037312,0.1734627,0.00004569745,0.003170354,0.001315165,0.000005145097,0.001106325,0.00347087],"genre_scores_gemma":[0.9979637,0.0001212492,0.00006129655,0.000006214083,0.000789876,0.00004026254,0.00000835644,0.000146047,0.0008629921],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1895773,"threshold_uncertainty_score":0.9998927,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2044245157","doi":"10.1016/j.epsr.2014.07.008","title":"PMU based observability reliability evaluation in electric power systems","year":2014,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Observability; Phasor measurement unit; Reliability (semiconductor); Electric power system; Phasor; Reliability engineering; Control theory (sociology); Transmission system; Transmission (telecommunications); Engineering; Units of measurement; Power (physics); Power transmission; Computer science; Mathematics; Electrical engineering; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.04146050304150967,"gpt":0.3111201147942634,"spread":0.2696596117527538,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaresearch","metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0318708,0.0005248755,0.0009697963,0.001400866,0.0002716335,0.0003933393,0.0008868538,0.0005517412,0.0002021836],"category_scores_gemma":[0.004733182,0.0005112274,0.0001860966,0.005529262,0.0000825688,0.0004329948,0.00007548018,0.001400649,0.0002731873],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003572617,"about_ca_system_score_gemma":0.0006859264,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0008432887,"about_ca_topic_score_gemma":0.00006718226,"domain_scores_codex":[0.9854175,0.006638771,0.001699443,0.001211594,0.003172319,0.001860406],"domain_scores_gemma":[0.9937094,0.001767687,0.0001482798,0.002107958,0.001823467,0.0004432049],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000254434,0.0008817158,0.04494141,0.002134686,0.0001089399,0.00001430314,0.0009255908,0.9302393,0.006523113,0.001660179,0.01159781,0.000718502],"study_design_scores_gemma":[0.001136505,0.0002970446,0.02305737,0.0001297457,0.00001124108,0.000009430545,0.0001171551,0.962006,0.0003526655,0.00007615863,0.01230411,0.0005026343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7704673,0.008991451,0.1524238,0.0002239488,0.004520235,0.009216717,0.00003124036,0.001325344,0.05279994],"genre_scores_gemma":[0.9983149,0.00002935099,0.00005369131,0.0000150344,0.00003598369,0.001139192,0.00002898046,0.0001023746,0.0002805173],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2278476,"threshold_uncertainty_score":0.9997339,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}