{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":2,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":2,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"cdf11bdcf260","filters":{"venue":"Energy systems"}},"results":[{"id":"W1913674463","doi":"10.1007/978-3-642-41080-2_2","title":"The Wind Farm Layout Optimization Problem","year":2013,"lang":"en","type":"book-chapter","venue":"Energy systems","topic":"Wind Energy Research and Development","field":"Engineering","cited_by":135,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Wind power; Production (economics); Wake; Work (physics); Computer science; Operations research; Engineering; Electrical engineering; Economics; Aerospace engineering; Mechanical engineering","authors":[{"name":"Michele Samorani","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008834653011784509,"gpt":0.1723313965962361,"spread":0.1634967435844516,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001580245,0.0003425264,0.0002881226,0.0001064993,0.0001698856,0.0002552958,0.0003124661,0.0003219586,0.000181171],"category_scores_gemma":[0.000004898182,0.0002424741,0.00008206151,0.00003672779,0.00004344258,0.00006084709,0.00006286553,0.0002378694,0.0002871182],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001919874,"about_ca_system_score_gemma":0.00007035892,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001845018,"about_ca_topic_score_gemma":0.00006008425,"domain_scores_codex":[0.9984797,0.00001984164,0.0004053501,0.0002363379,0.0004459828,0.0004127479],"domain_scores_gemma":[0.9992102,0.00005584845,0.0000736741,0.0003989201,0.0001015042,0.0001598123],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000002201333,0.000001738777,4.970418e-7,0.00005962335,0.0001752103,0.000007820302,0.00002801545,0.8731006,0.000003574018,0.0935493,0.02913693,0.003934421],"study_design_scores_gemma":[0.00009736618,0.00001486682,8.661974e-7,0.000158836,0.000007559564,0.00001136633,0.00001231774,0.09854971,0.00001172534,0.0003518978,0.9004907,0.0002927661],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"other","genre_gemma":"other","genre_scores_codex":[0.000002520856,0.006053559,0.005074199,0.00004003389,0.001243852,0.0002051836,0.00001005799,0.0002969131,0.9870737],"genre_scores_gemma":[0.003561354,0.001720336,0.0003121523,0.00001513291,0.0007877811,0.0001188778,0.0001398458,0.0001591994,0.9931853],"genre_candidate":"other","genre_consensus":"other","teacher_disagreement_score":0.8713538,"threshold_uncertainty_score":0.9887807,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1721191018","doi":"10.1007/978-3-642-23193-3_2","title":"Optimization-Based Bidding in Day-Ahead Electricity Auction Markets: A Review of Models for Power Producers","year":2011,"lang":"en","type":"review","venue":"Energy systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Bidding; Mathematical optimization; Competition (biology); Linear programming; Integer programming; Computer science; Electricity; Schedule; Power system simulation; Stochastic programming; Operations research; Microeconomics; Real-time bidding; Electricity market; Economics; Power (physics); Electric power system; Mathematics; Engineering","authors":[{"name":"Roy H. Kwon","is_ca":true},{"name":"Daniel Frances","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02461908673538561,"gpt":0.2457129667967158,"spread":0.2210938800613302,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001475267,0.0005999174,0.002354256,0.0009621652,0.00003889313,0.00002978704,0.000376928,0.0004749985,0.0000200984],"category_scores_gemma":[0.0002040573,0.0005797264,0.0003987571,0.001876133,0.00001510845,0.0002327263,0.00001641341,0.000218843,0.000002028704],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008836979,"about_ca_system_score_gemma":0.0003437528,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001218388,"about_ca_topic_score_gemma":0.00000569458,"domain_scores_codex":[0.9962702,0.0004870342,0.001907896,0.0005643049,0.0002921019,0.0004784212],"domain_scores_gemma":[0.9979556,0.0002575015,0.0007769102,0.0006720734,0.0002555055,0.00008237622],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003867712,0.00002756129,1.689556e-7,0.1472972,0.0001333715,9.480455e-7,0.00001850642,0.8291582,1.565359e-7,0.0003288514,0.001445962,0.02158516],"study_design_scores_gemma":[0.0001600176,0.00003351032,2.508574e-8,0.1124627,0.0002212948,0.00001028584,0.000001573566,0.6206802,0.000003393534,0.000003110154,0.2660135,0.0004104564],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"review","genre_gemma":"review","genre_scores_codex":[1.305759e-8,0.5704158,0.4255424,0.000001355654,0.0008016309,0.001375024,0.00002620867,0.000141238,0.00169631],"genre_scores_gemma":[0.0001736396,0.9956074,0.001292085,0.000009208157,0.000125367,0.001965816,0.0003925625,0.0002213854,0.0002125078],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.4251916,"threshold_uncertainty_score":0.9996654,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}