{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":67,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":67,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"2234c4cb0aa2","filters":{"venue":"Engineering Construction & Architectural Management"}},"results":[{"id":"W3045621045","doi":"10.1108/ecam-05-2020-0299","title":"Identifying enablers for coordination across construction supply chain processes: a systematic literature review","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":102,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Supply chain; Interdependence; Knowledge management; Process management; Computer science; Process (computing); Systematic review; Enabling; Stakeholder; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.0390851180062714,"gpt":0.3152694259803482,"spread":0.2761843079740768,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001462152,0.0004074195,0.0006492556,0.0005104473,0.0003841857,0.0007856168,0.0006459748,0.00007830218,0.00009180736],"category_scores_gemma":[0.001449862,0.0003454915,0.0002511985,0.003100754,0.0001115006,0.000845944,0.00023219,0.000283532,0.00005610894],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009924718,"about_ca_system_score_gemma":0.00002784962,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001587875,"about_ca_topic_score_gemma":0.000002573612,"domain_scores_codex":[0.9962414,0.0001112455,0.001256048,0.0008473599,0.001032821,0.0005111484],"domain_scores_gemma":[0.9979858,0.0003298805,0.0005625585,0.0004650932,0.0004838335,0.0001727959],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"systematic_review","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003093457,0.00004640967,0.002048209,0.5728244,0.0009536055,0.00005200307,0.007157323,0.01954829,0.0006865217,0.04045689,0.005198284,0.3507187],"study_design_scores_gemma":[0.01430755,0.001201006,0.003517327,0.2757369,0.002492615,0.003706192,0.03996668,0.4394508,0.003351556,0.01404176,0.1942045,0.008023122],"study_design_candidate":"systematic_review","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03199217,0.01432321,0.9267219,0.009919878,0.004627088,0.009860113,0.0001347556,0.001209241,0.001211673],"genre_scores_gemma":[0.8603834,0.006067504,0.1269387,0.001859081,0.0009393809,0.002021032,0.0001828344,0.0001187142,0.001489332],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8283913,"threshold_uncertainty_score":0.9998997,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2082743576","doi":"10.1108/eb021210","title":"Risk management trends in the construction industry: moving towards joint risk management","year":2002,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":99,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Enthusiasm; Risk management; China; Mainland China; Teamwork; Risk perception; Business; Work (physics); Public relations; Perception; Political science; Psychology; Finance; Engineering; Social psychology; Law","retraction":null,"screen_n_in":null,"score":{"opus":0.03560711379605726,"gpt":0.3334482625079448,"spread":0.2978411487118876,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001597938,0.000432786,0.000374461,0.001537121,0.001093242,0.00005997436,0.0004667886,0.000232468,0.001159716],"category_scores_gemma":[0.00005871009,0.0003536369,0.0001676562,0.001676187,0.0001388819,0.0001765256,0.0003753176,0.002651586,0.0002148944],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005910508,"about_ca_system_score_gemma":0.00001387467,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000313289,"about_ca_topic_score_gemma":0.0000474275,"domain_scores_codex":[0.995367,0.0007217751,0.001058888,0.0006869723,0.0009871275,0.00117827],"domain_scores_gemma":[0.9984201,0.0002205593,0.0003446516,0.0007248257,0.0000625833,0.0002272783],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00007522234,0.00005598161,0.01994164,0.0006291567,0.000221153,0.00006664382,0.0009964831,0.01752792,9.383933e-7,0.0298719,0.0008588696,0.9297541],"study_design_scores_gemma":[0.002965488,0.0001251837,0.9050356,0.0004847158,0.0001857529,0.0000710743,0.005831753,0.03303312,0.000003531683,0.002177959,0.04946822,0.0006175936],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6495375,0.0006014682,0.03138792,0.005882305,0.006323802,0.00717521,0.0001654866,0.001007852,0.2979184],"genre_scores_gemma":[0.9419094,0.001529377,0.05229362,0.0002841517,0.0005112643,0.001290057,0.00005937387,0.00006281411,0.002059985],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9291365,"threshold_uncertainty_score":0.9998916,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3108037149","doi":"10.1108/ecam-01-2020-0027","title":"An integrated BIM-based approach for cost estimation in construction projects","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Agile software development; Process (computing); Estimation; Building information modeling; Computer science; Systems engineering; Cost engineering; TRACE (psycholinguistics); Scheme (mathematics); Industrial engineering; Reliability engineering; Risk analysis (engineering); Engineering; Software engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01155896683256205,"gpt":0.2072388985586022,"spread":0.1956799317260401,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001047935,0.0003095963,0.0002409992,0.0004538264,0.00007336862,0.0001029184,0.0001514086,0.0001041835,0.00002202304],"category_scores_gemma":[0.0000257205,0.0003239896,0.00008101217,0.0007003587,0.00006947185,0.000272186,0.00001266332,0.0002858934,0.000004788089],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000178836,"about_ca_system_score_gemma":0.00002173998,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001008347,"about_ca_topic_score_gemma":0.000003979046,"domain_scores_codex":[0.9986588,0.00002966597,0.000425538,0.0003851528,0.0001838527,0.0003169784],"domain_scores_gemma":[0.999539,0.00002762848,0.00005857776,0.000189773,0.00005369804,0.0001313461],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004503139,0.00001032244,0.0002081311,0.000260264,0.00003389003,0.000001170624,0.0001252963,0.7638572,0.000842048,0.008159918,0.00001821449,0.2264386],"study_design_scores_gemma":[0.001039833,0.00007815482,0.0006835471,0.00005187457,0.00003092145,0.00003509776,0.0005450778,0.993652,0.002215853,0.0001468234,0.001174001,0.000346853],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07114941,0.0000272603,0.9253631,0.0001209624,0.0006258627,0.001289525,0.00002370595,0.001046116,0.0003540167],"genre_scores_gemma":[0.6149518,0.000003591816,0.3843609,0.00003683766,0.00007485879,0.0003607913,0.000175283,0.0000340821,0.00000182853],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5438024,"threshold_uncertainty_score":0.9999212,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1995059863","doi":"10.1108/ecam-03-2014-0039","title":"Contingency modelling for construction projects using fuzzy-set theory","year":2015,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Contingency; Fuzzy set; Set (abstract data type); Originality; Contingency theory; Novelty; Computer science; Contingency management; Operations research; Fuzzy logic; Management science; Engineering; Artificial intelligence; Knowledge management","retraction":null,"screen_n_in":null,"score":{"opus":0.1569074929279649,"gpt":0.3359617105202881,"spread":0.1790542175923232,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00243428,0.0003873011,0.0004071832,0.001240437,0.0003259067,0.0003923666,0.0005279179,0.00009066575,0.00006488342],"category_scores_gemma":[0.0003441919,0.0003466471,0.0001885497,0.001180259,0.0001926121,0.0006067815,0.0002458353,0.0002399383,0.00004064929],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000172076,"about_ca_system_score_gemma":0.00007008228,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002097269,"about_ca_topic_score_gemma":0.000003431488,"domain_scores_codex":[0.9965679,0.0001227451,0.000941923,0.0007896056,0.000999602,0.0005782206],"domain_scores_gemma":[0.9981692,0.0002924559,0.0003781091,0.0005920268,0.0003709339,0.0001972553],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002014963,0.00001280172,0.001091278,0.00009144055,0.0001448838,0.00000491877,0.0007501834,0.5261695,0.0001868228,0.1248883,0.000228497,0.3462299],"study_design_scores_gemma":[0.002519174,0.0001738753,0.00029578,0.0001224696,0.0001898639,0.0004362492,0.005803479,0.8424389,0.001005013,0.09508918,0.05091793,0.001008089],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2927707,0.00008181733,0.69913,0.0001318982,0.003352394,0.001081573,0.00001381395,0.0002873825,0.003150438],"genre_scores_gemma":[0.6632998,0.00001128657,0.3354007,0.0000437234,0.0004161571,0.0001107575,0.00001515557,0.00003900376,0.0006633926],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.3705291,"threshold_uncertainty_score":0.9998986,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3029097617","doi":"10.1108/ecam-01-2020-0017","title":"BIM-based life-cycle environmental assessment of prefabricated buildings","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Prefabrication; Building information modeling; Resource consumption; Life-cycle assessment; Apartment; Environmental impact assessment; Architectural engineering; Resource (disambiguation); Engineering; Construction engineering; Civil engineering; Environmental resource management; Computer science; Environmental science; Operations management; Production (economics)","retraction":null,"screen_n_in":null,"score":{"opus":0.004704900180745781,"gpt":0.1798748500605162,"spread":0.1751699498797704,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004540233,0.0002241514,0.0002034739,0.0001894602,0.00004517762,0.00002825713,0.0001445499,0.00005190416,0.0001879104],"category_scores_gemma":[0.000007247974,0.0002350818,0.00009989167,0.000288977,0.00006549358,0.00009329761,0.00003788803,0.0002123874,0.00001084533],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008736425,"about_ca_system_score_gemma":0.0000099545,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003474208,"about_ca_topic_score_gemma":2.802019e-7,"domain_scores_codex":[0.9989362,0.00001482555,0.0003624762,0.0002329298,0.0002414788,0.000212064],"domain_scores_gemma":[0.9995995,0.00002026269,0.00006188,0.0001620941,0.00001113043,0.0001451223],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000115142,0.00001116825,0.001185982,0.0002264762,0.0001494679,0.000002389385,0.0000646737,0.8988245,0.016703,0.006873889,0.00004365987,0.07590326],"study_design_scores_gemma":[0.000746977,0.00007131667,0.02006696,0.00005261456,0.00006645864,0.00001727754,0.0001090006,0.9678453,0.006713749,0.0001016646,0.003849934,0.0003587776],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4915048,0.0000780171,0.5056533,0.0002457095,0.0004999817,0.0002957039,0.00001863595,0.0006398099,0.00106403],"genre_scores_gemma":[0.9322077,0.00001519821,0.0675438,0.00005654321,0.00007897252,0.00003828507,0.00002311728,0.00003189511,0.000004474771],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4407029,"threshold_uncertainty_score":0.9586359,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2983521989","doi":"10.1108/ecam-03-2019-0119","title":"The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms","year":2019,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Knowledge management; Organizational structure; Informal organization; Perspective (graphical); Social network analysis; Architecture; Organizational network analysis; Digital transformation; Business; Computer science; Organizational learning; Social media; Management; World Wide Web","retraction":null,"screen_n_in":null,"score":{"opus":0.001728591316938917,"gpt":0.1715500017446132,"spread":0.1698214104276743,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000668686,0.0001967473,0.0001622544,0.0002367521,0.00006556996,0.0000577395,0.00007715053,0.00005393991,0.00001979147],"category_scores_gemma":[0.00001098645,0.0001429466,0.0000646127,0.000201297,0.00004949772,0.0002691583,0.00003258362,0.0001838637,0.000001170527],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002942438,"about_ca_system_score_gemma":0.000006741045,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002659761,"about_ca_topic_score_gemma":9.6479e-7,"domain_scores_codex":[0.9991803,0.000004903316,0.0003175222,0.0001081621,0.0001761836,0.0002129579],"domain_scores_gemma":[0.9996815,0.00005420618,0.00005813047,0.0001230217,0.00003487242,0.00004831627],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006454971,0.000005636599,0.002880243,0.0004147476,0.0002716157,3.572382e-7,0.0008527005,0.7510681,0.002270768,0.07467849,0.000005254923,0.1674875],"study_design_scores_gemma":[0.002502983,0.0004735109,0.3631626,0.0002670402,0.00007308266,0.0004514434,0.0009505269,0.6226774,0.00584179,0.001730293,0.001113037,0.0007562649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9650341,0.00008629922,0.0336089,0.00002016943,0.0002849849,0.0002826197,0.00003899404,0.0001073873,0.0005365406],"genre_scores_gemma":[0.9985663,0.0000365553,0.001304545,0.000001866431,0.00003144767,0.000007677454,0.00002329998,0.00001840846,0.00000992574],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3602823,"threshold_uncertainty_score":0.5829193,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3160008510","doi":"10.1108/ecam-11-2020-0986","title":"A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Context (archaeology); Lean construction; Procurement; Systems engineering; Engineering; Process management; Computer science; Modular design; Bidding; Construction engineering; Construction industry; Operations management; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.006971102520801377,"gpt":0.2044345489290835,"spread":0.1974634464082821,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007682718,0.0002289228,0.0002494064,0.000424669,0.00004749441,0.00005246991,0.00008675156,0.00009173252,0.00005144293],"category_scores_gemma":[0.00004680368,0.0002568217,0.0001200294,0.0004198819,0.00006458787,0.0002106708,0.00002814618,0.0001942321,0.000001986223],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001227322,"about_ca_system_score_gemma":0.00001317241,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005117221,"about_ca_topic_score_gemma":0.00001030962,"domain_scores_codex":[0.9987975,0.00001234377,0.0004874752,0.000268528,0.0001780373,0.000256083],"domain_scores_gemma":[0.9994928,0.00008967847,0.00007722263,0.0002222703,0.00006472838,0.00005325647],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0000389387,0.00002155005,0.000839285,0.000698712,0.0001851029,0.000006816726,0.0003015828,0.3714997,0.003916297,0.1919679,0.00001375377,0.4305103],"study_design_scores_gemma":[0.006330368,0.0002600038,0.0275036,0.003241365,0.0004047321,0.001508645,0.005647475,0.2896184,0.5189868,0.1288695,0.01473755,0.002891692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4419407,0.0001479095,0.5552277,0.00004619077,0.001323664,0.0003261722,0.00002082101,0.0002808547,0.0006859941],"genre_scores_gemma":[0.8158706,0.00004201866,0.1837968,0.00000740381,0.0001091253,0.00008024665,0.00004364512,0.00002802028,0.00002214377],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5150704,"threshold_uncertainty_score":0.9999884,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3009200285","doi":"10.1108/ecam-04-2019-0222","title":"Revolutionising cost structure for integrated project delivery: a BIM-based solution","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Activity-based costing; Integrated project delivery; Building information modeling; Computer science; Estimation; Risk analysis (engineering); Work breakdown structure; Profit (economics); Project management; Reliability engineering; Systems engineering; Operations research; Operations management; Project planning; Engineering; Business; Scheduling (production processes)","retraction":null,"screen_n_in":null,"score":{"opus":0.01121561868925603,"gpt":0.1998241615331839,"spread":0.1886085428439279,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00005975709,0.0003343855,0.0002340661,0.0003142993,0.0001696827,0.0001093398,0.0001531413,0.000105589,0.00006543418],"category_scores_gemma":[0.00002894196,0.0003391408,0.0001377461,0.000613457,0.00006464814,0.0001715427,0.00002584533,0.0002981387,0.000007739296],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002363819,"about_ca_system_score_gemma":0.0000389087,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001167011,"about_ca_topic_score_gemma":0.00001004445,"domain_scores_codex":[0.9986742,0.00002150419,0.0003788227,0.0003516241,0.0002031958,0.0003706623],"domain_scores_gemma":[0.9995303,0.00003364525,0.00006179451,0.0001751901,0.00008968608,0.0001093582],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009676686,0.000006076346,0.00006886414,0.0005352798,0.0001685709,0.000003051595,0.0001516265,0.6215861,0.009522766,0.01316104,0.001126718,0.3535731],"study_design_scores_gemma":[0.0009913193,0.00007185739,0.0003420555,0.00009307252,0.00008419874,0.00004548817,0.0001787562,0.9467561,0.005028575,0.0002914422,0.04566103,0.0004561251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03898685,0.0001573918,0.9556192,0.0005139342,0.001363958,0.001383933,0.0001097862,0.001542172,0.0003227404],"genre_scores_gemma":[0.8197186,0.00001393641,0.1794609,0.00009965646,0.0002723889,0.0001927403,0.0001743079,0.00005584378,0.00001161039],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7807317,"threshold_uncertainty_score":0.9999061,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2052242229","doi":"10.1108/ecam-08-2012-0082","title":"Cash flow modeling for construction projects","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Financial Reporting and Valuation Research","field":"Business, Management and Accounting","cited_by":61,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Cash flow; Cash flow forecasting; Payment; Business; Net present value; Terminal value; Risk analysis (engineering); Actuarial science; Finance; Computer science; Economics; Production (economics)","retraction":null,"screen_n_in":null,"score":{"opus":0.02222690473776936,"gpt":0.2343193183070029,"spread":0.2120924135692336,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006747085,0.0002231186,0.0002047292,0.0005512872,0.0002832928,0.0002499441,0.0001572255,0.00005864988,0.00003147411],"category_scores_gemma":[0.0003885062,0.0002217931,0.0001039428,0.0004321505,0.00004617829,0.0003071773,0.0001128169,0.0001734634,0.00003937051],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006036709,"about_ca_system_score_gemma":0.00001399029,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006550051,"about_ca_topic_score_gemma":0.000008125796,"domain_scores_codex":[0.99839,0.00001051657,0.0004073245,0.0004052045,0.0003651924,0.0004217618],"domain_scores_gemma":[0.9993479,0.00004623302,0.0001496185,0.0002434619,0.0001880639,0.00002476457],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003886252,0.00001205577,0.0004282462,0.0005323616,0.00004542704,0.000002229389,0.00002885327,0.4851305,0.0003852351,0.07821944,0.0001490302,0.4350278],"study_design_scores_gemma":[0.0006005397,0.00001936275,0.0006719776,0.00007724883,0.00004699046,0.00002861557,0.0000856745,0.9728954,0.0001107803,0.004145451,0.02103565,0.0002823134],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2943824,0.00001075794,0.6986706,0.0004385627,0.001604833,0.0008202913,0.000001539704,0.0004633809,0.003607636],"genre_scores_gemma":[0.8882069,0.000002229805,0.1098994,0.0001170682,0.001336269,0.0002063972,0.00003521077,0.00004073039,0.0001558217],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5938244,"threshold_uncertainty_score":0.9044461,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2555012946","doi":"10.1108/ecam-05-2014-0069","title":"Optimized scheduling and buffering of repetitive construction projects under uncertainty","year":2016,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":56,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Computer science; Construction management; Operations research; Industrial engineering; Systems engineering; Risk analysis (engineering); Engineering; Operations management; Business; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.0304027809900025,"gpt":0.2825019141844581,"spread":0.2520991331944556,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001189162,0.0003256588,0.0004640879,0.0009210047,0.0001479549,0.0001374441,0.0003408147,0.0000893223,0.0001227838],"category_scores_gemma":[0.0008681128,0.0002255647,0.0001487228,0.0007323535,0.0004722014,0.0002928905,0.0002962054,0.0002130272,0.00001083634],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001277068,"about_ca_system_score_gemma":0.00003676058,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001949639,"about_ca_topic_score_gemma":0.00000197586,"domain_scores_codex":[0.9969283,0.0001373821,0.0008988943,0.0007684728,0.0008377741,0.0004292147],"domain_scores_gemma":[0.9979118,0.0008701729,0.0003758249,0.0005107606,0.000188545,0.0001428785],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001990058,0.00001425043,0.002109055,0.0001001837,0.0002381031,0.0000141342,0.0005807795,0.4352959,0.01489432,0.04376792,0.000004459185,0.5027819],"study_design_scores_gemma":[0.0318565,0.001446516,0.09185801,0.007577281,0.0009950841,0.007630882,0.05332262,0.5952608,0.09711899,0.09921881,0.00607928,0.007635259],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6276028,0.0000470748,0.3698753,0.0004734198,0.0004892438,0.0004167673,0.000008101367,0.0001490642,0.0009383425],"genre_scores_gemma":[0.7374533,0.00002755019,0.2622936,0.00001658083,0.00007596381,0.00002864136,0.00000131146,0.00002048968,0.00008255606],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4951466,"threshold_uncertainty_score":0.9198262,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2944277995","doi":"10.1108/ecam-05-2018-0217","title":"Multi-objective optimization for repetitive scheduling under uncertainty","year":2019,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":51,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Computer science; Mathematical optimization; Duration (music); Scheduling (production processes); Fuzzy logic; Genetic algorithm; Reliability engineering; Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03050651757581384,"gpt":0.303171025998577,"spread":0.2726645084227631,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001153876,0.0003181984,0.0003592128,0.0007942283,0.0001838497,0.0002839768,0.0004502574,0.00009105472,0.0002675976],"category_scores_gemma":[0.0007037041,0.000278976,0.0002318761,0.0008381004,0.00009655113,0.0002658076,0.0001829494,0.0002765121,0.00007541415],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001974565,"about_ca_system_score_gemma":0.00003522651,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000121497,"about_ca_topic_score_gemma":0.000003222701,"domain_scores_codex":[0.9971356,0.00009188893,0.0006846149,0.0008815442,0.000731027,0.0004752624],"domain_scores_gemma":[0.998025,0.0007774823,0.0002642904,0.0005510921,0.0002659338,0.0001162187],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005971538,0.00001067652,0.0003974872,0.00003415448,0.0001004371,0.00000181548,0.0003117603,0.9611736,0.0005875981,0.005192071,0.000004283041,0.03212643],"study_design_scores_gemma":[0.001295936,0.00007075221,0.002026421,0.00008996367,0.0000337822,0.00005278758,0.002965073,0.9909971,0.0003837079,0.0009998804,0.0007074652,0.0003771744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2861752,0.00002469355,0.7103996,0.0002521921,0.001038074,0.001138798,0.00001271586,0.0002055469,0.0007531901],"genre_scores_gemma":[0.5370542,0.000002908356,0.4623446,0.00005575371,0.00009037171,0.0000750309,0.00001280776,0.0000259502,0.0003383729],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.250879,"threshold_uncertainty_score":0.9999663,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3037746521","doi":"10.1108/ecam-06-2019-0314","title":"Exploring and verifying BIM-based energy simulation for building operations","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Building information modeling; Energy consumption; Unavailability; Simulation software; Computer science; Process (computing); Systems engineering; Schedule; Building energy simulation; Energy modeling; Software; Reliability engineering; Simulation; Engineering; Energy performance; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.03669529932917424,"gpt":0.2111848817000068,"spread":0.1744895823708326,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004103679,0.0001915775,0.000135317,0.0001963955,0.0001347809,0.00009368713,0.00006376275,0.00003574447,0.00001168807],"category_scores_gemma":[0.00001951154,0.0002108557,0.00005961486,0.0002344986,0.00002671488,0.0002539347,0.00002072585,0.0001080532,0.000001360793],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005315552,"about_ca_system_score_gemma":0.000004802729,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004185332,"about_ca_topic_score_gemma":0.000001982215,"domain_scores_codex":[0.9992084,0.000008861491,0.0002485725,0.0002275607,0.000110299,0.0001963003],"domain_scores_gemma":[0.9997101,0.00004972537,0.00001918545,0.00009424888,0.00003059646,0.00009611363],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001275065,0.000001146039,0.00001538573,0.0001240133,0.00003924895,5.73301e-7,0.00007112415,0.8143005,0.002648339,0.02992643,0.000003580553,0.1528569],"study_design_scores_gemma":[0.000605699,0.00002862042,0.0002443465,0.0000441392,0.00003209329,0.00000754435,0.00008905851,0.9882998,0.004002471,0.0001296269,0.006285443,0.0002311136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1448214,0.00008302219,0.8533016,0.0002049649,0.0006144459,0.0002373094,0.000006355574,0.0006387451,0.00009213737],"genre_scores_gemma":[0.8722776,0.0000233657,0.1271828,0.00005945406,0.0001991883,0.0002075781,0.00001523417,0.0000322169,0.000002652936],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7274561,"threshold_uncertainty_score":0.8598445,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2027536824","doi":"10.1108/09699980910988384","title":"Data acquisition from construction sites for tracking purposes","year":2009,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Process (computing); Data acquisition; Identification (biology); Software; Tracking system; Data collection; Radio-frequency identification; Systems engineering; Real-time computing; Engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.0157010747044208,"gpt":0.2220455424673111,"spread":0.2063444677628903,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009828598,0.0003071109,0.0002288447,0.0003057399,0.0001468628,0.000169123,0.0002919516,0.00009711722,0.00007942633],"category_scores_gemma":[0.00001779441,0.0003280536,0.00009061482,0.0002657551,0.0000559204,0.0005023865,0.00004053323,0.0002019864,0.00001447385],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000103812,"about_ca_system_score_gemma":0.000006775977,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004666276,"about_ca_topic_score_gemma":0.000005788342,"domain_scores_codex":[0.9986021,0.0000148307,0.0004126244,0.0004368984,0.0002074394,0.0003260883],"domain_scores_gemma":[0.9992356,0.00005793915,0.00006720499,0.0005000178,0.0000540549,0.00008514027],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003766417,0.00001118795,0.0001543674,0.00008768613,0.0001863597,0.000003182013,0.00008347581,0.07114508,0.01409017,0.02194055,0.00046537,0.8917949],"study_design_scores_gemma":[0.002878878,0.0002145334,0.03284977,0.0004318924,0.0004935727,0.0005102226,0.0008448703,0.8665146,0.02166962,0.0264747,0.04514035,0.001977053],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2698327,0.0004282255,0.7228891,0.0002958594,0.002885344,0.0006960734,0.0002826751,0.001675982,0.001014059],"genre_scores_gemma":[0.8281929,0.00005818361,0.1703176,0.00004700358,0.0005486897,0.00004736739,0.0007345846,0.00003299684,0.00002056214],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8898178,"threshold_uncertainty_score":0.9999171,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1998279864","doi":"10.1108/09699981011038079","title":"A multi‐attribute ranking method for bridge management","year":2010,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Analytic hierarchy process; Ranking (information retrieval); Computer science; Flexibility (engineering); Bridge (graph theory); Rank (graph theory); Asset management; Multiple-criteria decision analysis; Risk analysis (engineering); Decision support system; Operations research; Data mining; Management science; Engineering; Machine learning; Mathematics; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.005851841159420348,"gpt":0.2296191459173643,"spread":0.2237673047579439,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002331912,0.0003615808,0.0002569056,0.0003820331,0.0001415611,0.00009165234,0.0002639274,0.00008288009,0.00002227728],"category_scores_gemma":[0.00001351517,0.0003690353,0.0001622164,0.0002624033,0.00003323088,0.0001179355,0.00009655648,0.0004182267,0.00001059106],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008692703,"about_ca_system_score_gemma":0.000003200931,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005557225,"about_ca_topic_score_gemma":0.000005534156,"domain_scores_codex":[0.9984672,0.00000931852,0.0003460919,0.0003680621,0.0001978164,0.0006115228],"domain_scores_gemma":[0.9994002,0.00004714106,0.000044366,0.0003613931,0.00003878243,0.0001081105],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002719816,0.00001311275,0.0003119415,0.001101935,0.000656621,0.00003677877,0.0002930903,0.4836213,0.03242684,0.01563212,0.0004061377,0.4654729],"study_design_scores_gemma":[0.005766911,0.00008124615,0.07267544,0.0004283609,0.0004656176,0.0008425704,0.0003271277,0.7609208,0.02572812,0.001344678,0.1289696,0.002449566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.08384127,0.00003611364,0.9078658,0.00005548561,0.005792296,0.0008396637,0.00001659254,0.001009915,0.0005428184],"genre_scores_gemma":[0.4209596,0.00001300028,0.5782853,0.00001940878,0.0003546308,0.0002023859,0.00001578472,0.00005783168,0.00009213928],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.4630233,"threshold_uncertainty_score":0.9998761,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1920168922","doi":"10.1108/09699981011074574","title":"Dynamic modeling of construction and demolition waste management processes","year":2010,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"U.S. Environmental Protection Agency","keywords":"Demolition waste; Demolition; Mainland China; Reuse; Construction waste; Construct (python library); Engineering; China; Computer science; Civil engineering; Waste management; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.002534425050343353,"gpt":0.1696511504399611,"spread":0.1671167253896177,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008047873,0.0002557002,0.0002065443,0.0004027922,0.00007232687,0.00004231611,0.0001325856,0.00006443844,0.00001586304],"category_scores_gemma":[0.000008841675,0.0002696657,0.00004398655,0.0003285985,0.0000911072,0.000211098,0.00007588079,0.0002826518,0.000003741624],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004507346,"about_ca_system_score_gemma":0.000004635957,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000365053,"about_ca_topic_score_gemma":0.000004923577,"domain_scores_codex":[0.9988744,0.00000701474,0.0003644742,0.0002627678,0.0001986268,0.0002927733],"domain_scores_gemma":[0.9995611,0.00001871662,0.00005667061,0.0002385191,0.00004442824,0.00008057282],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000133005,0.00000345355,0.0001280601,0.002152304,0.0001499743,0.000006314994,0.0001186088,0.8015778,0.008116188,0.003971573,0.000001958924,0.1837604],"study_design_scores_gemma":[0.0004452841,0.00001775411,0.000467584,0.0002298587,0.00006347132,0.0002942373,0.0002428777,0.9934384,0.003622802,0.0006035388,0.0002490494,0.0003251272],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8614494,0.0001481936,0.1351693,0.00002889038,0.0009670243,0.0003523178,0.000005758033,0.0004269171,0.001452176],"genre_scores_gemma":[0.8698325,0.0003502381,0.1296615,0.000002695772,0.00004528625,0.00004584162,0.00001088106,0.00003506845,0.00001602624],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1918606,"threshold_uncertainty_score":0.9999756,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3042965572","doi":"10.1108/ecam-11-2019-0600","title":"The role of project management office in developing knowledge management infrastructure","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Upstream (networking); Business; Petroleum industry; Phase (matter); Knowledge management; Process management; Engineering management; Engineering; Computer science; Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.0216918728351613,"gpt":0.2806626393875307,"spread":0.2589707665523694,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009220967,0.0003990712,0.0003965913,0.001063083,0.0002655562,0.0002538616,0.001244225,0.00006115391,0.00005685763],"category_scores_gemma":[0.00006892363,0.0003013979,0.0001731856,0.003212918,0.0001746922,0.0002815297,0.0009899804,0.0003358827,0.00007123167],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000140185,"about_ca_system_score_gemma":0.00002714515,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009005141,"about_ca_topic_score_gemma":0.00001462628,"domain_scores_codex":[0.9962999,0.0001217451,0.001215067,0.0007650104,0.001027862,0.000570394],"domain_scores_gemma":[0.998614,0.0002176702,0.0003295389,0.0006382779,0.000104166,0.00009641943],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001393623,0.00001294803,0.002369919,0.0002632923,0.0002217168,0.00001606211,0.0008320807,0.0149512,0.00003899677,0.1939249,0.0004701854,0.7867593],"study_design_scores_gemma":[0.001659035,0.00008344759,0.0572585,0.0002449017,0.00009479147,0.00005077027,0.01103472,0.04408786,0.0004823093,0.006401188,0.8778206,0.0007818266],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5529687,0.002710089,0.1213944,0.004638518,0.006159074,0.009012373,0.00003492777,0.001193097,0.3018888],"genre_scores_gemma":[0.9457223,0.0004614869,0.05257232,0.0001105903,0.0001363004,0.0001639386,0.000007402149,0.00003614751,0.0007895184],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8773504,"threshold_uncertainty_score":0.9999438,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2029178229","doi":"10.1108/09699980410558575","title":"Innovative 3D‐modelling for selecting and locating mobile cranes","year":2004,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta; Concordia University","funders":"","keywords":"Lift (data mining); Animation; Computer science; Selection (genetic algorithm); Graphics; Industrial engineering; Engineering; Systems engineering; Data mining; Artificial intelligence; Computer graphics (images)","retraction":null,"screen_n_in":null,"score":{"opus":0.005183567148387535,"gpt":0.1866415205978619,"spread":0.1814579534494744,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008827689,0.0002120334,0.0001530254,0.0002668818,0.0001458465,0.00007222716,0.00006277322,0.00005138664,0.000006174157],"category_scores_gemma":[0.000009176394,0.0002231182,0.00003694464,0.0003970111,0.00004495034,0.0001448882,0.00002255645,0.0001830003,0.000002359267],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001058643,"about_ca_system_score_gemma":0.000007363343,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000933753,"about_ca_topic_score_gemma":0.000002836678,"domain_scores_codex":[0.999121,0.00000520987,0.0002781662,0.000228688,0.0001068684,0.0002601181],"domain_scores_gemma":[0.9997015,0.00003640661,0.00003949215,0.0001045227,0.00006996439,0.00004809392],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000005208015,0.000002206927,0.00003213247,0.0001885446,0.00006408103,5.84822e-7,0.0002852354,0.8181872,0.001355866,0.01357414,0.000002052405,0.1663028],"study_design_scores_gemma":[0.001513263,0.0001091351,0.000373562,0.0003323706,0.00006626293,0.0003638073,0.001236071,0.9765406,0.009836389,0.00381452,0.005032949,0.0007810697],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3124138,0.0001505348,0.6856334,0.00002469034,0.0005505359,0.000373451,0.000003035489,0.0004845486,0.0003660398],"genre_scores_gemma":[0.7587309,0.00002274962,0.2408704,0.00001004249,0.0001234396,0.0001889047,0.000008739522,0.00002955227,0.00001519645],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4463172,"threshold_uncertainty_score":0.9098498,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3197910768","doi":"10.1108/ecam-11-2020-0955","title":"Integrating lean production strategies, virtual reality technique and building information modeling method for mass customization in cabinet manufacturing","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Product Development and Customization","field":"Business, Management and Accounting","cited_by":28,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Mass customization; Personalization; Computer science; Lean manufacturing; Production (economics); Manufacturing engineering; Process management; Information system; Systems engineering; Knowledge management; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.007329919546447088,"gpt":0.2155225270995873,"spread":0.2081926075531402,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006384457,0.0002405674,0.0002054153,0.0006554265,0.0001774513,0.0003585019,0.00009283952,0.00006896365,0.000007280722],"category_scores_gemma":[0.0001466721,0.0002579643,0.00004228828,0.0004885081,0.00001742404,0.001925745,0.0001086959,0.0002007281,0.000001523305],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001432177,"about_ca_system_score_gemma":0.00002330793,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007558241,"about_ca_topic_score_gemma":0.00003292058,"domain_scores_codex":[0.9986464,0.00001588544,0.0004900131,0.0003778026,0.0001910553,0.0002788283],"domain_scores_gemma":[0.9995117,0.00002229044,0.0001637753,0.0001626501,0.0001243168,0.00001524347],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004054844,0.000007399344,0.0001189918,0.000557567,0.00003086029,0.000001931081,0.0001256022,0.8488165,0.005496208,0.03998512,0.00002342382,0.1047958],"study_design_scores_gemma":[0.000697293,0.000007533599,0.0006071146,0.0002618644,0.0000507767,0.00003603008,0.001575751,0.97933,0.007958575,0.006917021,0.002113982,0.0004440556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1056837,0.00001604252,0.8918126,0.0004250041,0.0005807165,0.0008052162,0.000001540264,0.0002570204,0.0004181653],"genre_scores_gemma":[0.7072702,0.00001101908,0.2919805,0.0000541527,0.0003009429,0.0001808252,0.000156289,0.00002209236,0.00002401137],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6015865,"threshold_uncertainty_score":0.9999872,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2892260798","doi":"10.1108/ecam-04-2017-0068","title":"Quality cost of material procurement in construction projects","year":2018,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Procurement; Quality assurance; Quality (philosophy); Cost reduction; Process (computing); Operations management; Computer science; Business; Risk analysis (engineering); Process management; Engineering; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.05916172171760306,"gpt":0.3398656009049161,"spread":0.280703879187313,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001634012,0.0002776849,0.0004034606,0.001399385,0.0001223505,0.000146175,0.000474448,0.00006788259,0.0006227775],"category_scores_gemma":[0.0002103419,0.0002442341,0.0001142683,0.001643897,0.0003894345,0.0003604532,0.0002760653,0.0001852145,0.00005927582],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001255734,"about_ca_system_score_gemma":0.00003428826,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006230909,"about_ca_topic_score_gemma":0.00006298877,"domain_scores_codex":[0.996491,0.0001292044,0.001268959,0.000620563,0.001075903,0.0004143926],"domain_scores_gemma":[0.9985929,0.0001067065,0.0004251631,0.0005719863,0.0002262765,0.00007695462],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0003681467,0.00005182633,0.04175975,0.000218353,0.0001053059,0.000006233064,0.0007573577,0.00446609,0.002986174,0.05320098,0.0001884551,0.8958913],"study_design_scores_gemma":[0.008607486,0.0009621215,0.7334002,0.0007918314,0.0001474813,0.0005616773,0.008281144,0.04669099,0.06516518,0.02282227,0.1096254,0.002944223],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9539533,0.00001149901,0.03229717,0.0002400408,0.003497854,0.001261703,0.00001620521,0.0001577826,0.008564391],"genre_scores_gemma":[0.9629948,0.0000102167,0.03638029,0.00002299438,0.0002504453,0.00009183856,0.000008029255,0.00001570342,0.0002257257],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8929471,"threshold_uncertainty_score":0.9959578,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4306175755","doi":"10.1108/ecam-05-2022-0476","title":"Pose estimation method for construction machine based on improved AlphaPose model","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Pose; Normalization (sociology); Computer science; Artificial intelligence; Machine learning; Machine vision; Software; Data mining","retraction":null,"screen_n_in":null,"score":{"opus":0.02545089634535886,"gpt":0.3842897708824968,"spread":0.3588388745371379,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.001011887,0.0002390945,0.0002458016,0.0005960868,0.001423512,0.00001500876,0.0001921667,0.00006430676,0.0002892491],"category_scores_gemma":[0.0001377499,0.0002433724,0.0001033078,0.0003902841,0.00003622669,0.00007925325,0.0001510673,0.000762532,0.00001382161],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005922435,"about_ca_system_score_gemma":0.0001506023,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005404144,"about_ca_topic_score_gemma":0.000005030992,"domain_scores_codex":[0.9976358,0.0002665751,0.0005684765,0.0004463049,0.0004841019,0.0005987795],"domain_scores_gemma":[0.9985279,0.0006873102,0.0001806904,0.0003293947,0.0000984484,0.0001762374],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000633709,0.00002566239,0.0001159325,0.0004263943,0.0000273842,0.000001156443,0.00008687421,0.7420692,0.0002822243,0.0165482,0.0001060251,0.2396773],"study_design_scores_gemma":[0.001968711,0.0002835545,0.001493542,0.00004408422,0.00002896531,0.00001319431,0.000141978,0.9899631,0.00006061447,0.001893058,0.003887965,0.0002212924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01146618,0.00001867547,0.978983,0.002232188,0.001984937,0.003528578,0.0002403265,0.0003265803,0.001219488],"genre_scores_gemma":[0.3142163,0.000003388966,0.6814413,0.0005535093,0.0001677747,0.002884676,0.0003481752,0.00004717609,0.00033773],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.3027501,"threshold_uncertainty_score":0.9998765,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2530165229","doi":"10.1108/ecam-01-2015-0013","title":"Evaluation of automation levels for construction change management","year":2016,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":23,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workflow; Automation; Computer science; Process (computing); Process management; Traceability; Change management (ITSM); Business process; Change order; Risk analysis (engineering); Project management; Systems engineering; Work in process; Engineering; Operations management; Software engineering; Business; Program management; Database","retraction":null,"screen_n_in":null,"score":{"opus":0.1288916654774497,"gpt":0.4272795625396381,"spread":0.2983878970621884,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002025253,0.0001754753,0.0002106382,0.0005155331,0.0002917065,0.00000606999,0.000133495,0.00008669151,0.0003442723],"category_scores_gemma":[0.0001605105,0.0001373784,0.00007265072,0.0003067816,0.00007216754,0.0001833273,0.00008739032,0.0001334863,0.00004395917],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005065622,"about_ca_system_score_gemma":0.0000652929,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001734987,"about_ca_topic_score_gemma":0.000007080958,"domain_scores_codex":[0.9974566,0.0002372912,0.000633028,0.0003177778,0.0008886533,0.0004666967],"domain_scores_gemma":[0.9985222,0.0003566981,0.0002335716,0.0002774278,0.000501455,0.0001086144],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00009013617,0.00001240608,0.001238285,0.001038597,0.0001112037,3.74996e-7,0.0001581374,0.0007173083,0.0004610154,0.04717651,0.00005375429,0.9489422],"study_design_scores_gemma":[0.01045952,0.0003512872,0.9024404,0.002177827,0.0004999617,0.00002501561,0.0009808376,0.04431519,0.001247843,0.01715403,0.01964912,0.0006989397],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4132711,0.0001277789,0.5567332,0.003019248,0.005006196,0.01319118,0.0001930502,0.0004680462,0.007990221],"genre_scores_gemma":[0.924966,0.00004365876,0.07122517,0.00004149318,0.0003609746,0.003094165,0.00003207622,0.00002739287,0.0002090649],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9482433,"threshold_uncertainty_score":0.5602127,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2085746308","doi":"10.1108/09699980610669679","title":"Internet‐based database management system for project control","year":2006,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Advanced Database Systems and Queries","field":"Computer Science","cited_by":23,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Earned value management; Work breakdown structure; Project planning; Computer science; Schedule; Project management triangle; Project management; Integrated project delivery; Database; Procurement; Engineering management; Systems engineering; Project charter; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.007249666930738565,"gpt":0.2032218018514673,"spread":0.1959721349207287,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002005286,0.0002776184,0.0002326788,0.000391355,0.0001106718,0.0001017087,0.000370483,0.00002733215,0.000002033564],"category_scores_gemma":[0.000005201267,0.0002561334,0.0001130173,0.0003152685,0.00003711612,0.0002928906,0.0001813174,0.00009486303,0.00000830869],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001443726,"about_ca_system_score_gemma":0.00001026504,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006168861,"about_ca_topic_score_gemma":0.000005733704,"domain_scores_codex":[0.9983585,0.00002968017,0.0003959452,0.0005464126,0.0002631384,0.0004062926],"domain_scores_gemma":[0.9991226,0.00005571155,0.0001191761,0.000609058,0.00004056758,0.00005283821],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000379735,0.00001988595,0.00004309139,0.00140777,0.0001135897,0.00005152658,0.0000218375,0.08178942,0.0002728438,0.8768984,0.0003963027,0.03894733],"study_design_scores_gemma":[0.003591727,0.0001061096,0.0008169169,0.0006845522,0.00009133919,0.0001878067,0.0001447123,0.819985,0.002111562,0.0002157859,0.1712619,0.0008026269],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.001673061,0.00006865697,0.9935738,0.0001093067,0.001275573,0.00147251,0.00006334467,0.00084288,0.0009209074],"genre_scores_gemma":[0.3311184,0.000001201554,0.6679106,0.00002822649,0.0001353286,0.0004837023,0.00006449241,0.00002026047,0.0002377964],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.8766826,"threshold_uncertainty_score":0.9999891,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2057214931","doi":"10.1108/ecam-08-2012-0080","title":"Framework for enhanced progress tracking and control of linear projects","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":22,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Documentation; Schedule; Computer science; Scheduling (production processes); Project management; Control (management); Operations research; Systems engineering; Industrial engineering; Engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.03030744090744361,"gpt":0.3121128888008352,"spread":0.2818054478933915,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009469903,0.0002015331,0.0003177931,0.0005665016,0.0001482856,0.000114366,0.000278701,0.0000548193,0.00003166634],"category_scores_gemma":[0.0004563381,0.0001677671,0.0001066658,0.0005272535,0.0001628312,0.0001952214,0.00009657096,0.0001445805,0.000004758504],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001738361,"about_ca_system_score_gemma":0.000007833723,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001824845,"about_ca_topic_score_gemma":0.000001141205,"domain_scores_codex":[0.9981614,0.00004917943,0.0005755639,0.0004415258,0.0004893751,0.0002829262],"domain_scores_gemma":[0.9986546,0.0005271933,0.0002628736,0.0003463662,0.0001430443,0.00006591663],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009549972,0.00001016111,0.002547153,0.0002006803,0.00008265579,3.693316e-7,0.0003283763,0.006563367,0.0005010464,0.1056365,0.000009271565,0.884025],"study_design_scores_gemma":[0.008127341,0.00105975,0.07347336,0.0009399332,0.0003816305,0.0001397682,0.002283009,0.7235614,0.02769045,0.1083143,0.05210172,0.001927371],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2876313,0.00004349092,0.7102838,0.0002518265,0.0006848131,0.0006840334,0.000004374929,0.00009343347,0.0003229139],"genre_scores_gemma":[0.8137507,0.000007769467,0.1858883,0.00002904373,0.0001440381,0.00009112365,0.000001774604,0.00001325641,0.00007402805],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8820976,"threshold_uncertainty_score":0.6841342,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296351251","doi":"10.1108/ecam-01-2022-0009","title":"The concept of integration in an IPD context: a grounded theory review","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Context (archaeology); Originality; Construct (python library); Grounded theory; Conceptual blending; Dimension (graph theory); Computer science; Conceptual framework; Process management; Knowledge management; Management science; Engineering; Qualitative research; Psychology; Sociology; Cognition","retraction":null,"screen_n_in":null,"score":{"opus":0.02766794428007901,"gpt":0.3028586137138293,"spread":0.2751906694337503,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002739678,0.0001633655,0.0002455584,0.0004854987,0.0003107609,0.0001017937,0.0006816922,0.00001555468,0.0004683404],"category_scores_gemma":[0.0001893189,0.0001180383,0.0001073167,0.001263782,0.000157087,0.000265809,0.00031608,0.0002941142,0.000006972345],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009503411,"about_ca_system_score_gemma":0.00001530682,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001576239,"about_ca_topic_score_gemma":0.00003334045,"domain_scores_codex":[0.9974049,0.0003872684,0.0007874757,0.000344583,0.0008478394,0.0002279528],"domain_scores_gemma":[0.9986735,0.0003781637,0.0002847302,0.0005456738,0.00007718501,0.00004072994],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00004859978,0.00000992104,0.0002867365,0.00002955616,0.00001970038,0.000002216729,0.0003087395,0.006607944,0.00002929309,0.2214418,0.0001301335,0.7710854],"study_design_scores_gemma":[0.00623038,0.001362179,0.06802489,0.0017504,0.0003141084,0.0006716872,0.06864322,0.167517,0.001224289,0.1626935,0.5190389,0.002529445],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.803797,0.01004874,0.1497073,0.004864306,0.00887944,0.005168236,0.00004603095,0.0004847619,0.0170042],"genre_scores_gemma":[0.9974148,0.0001799226,0.001487019,0.0001649153,0.00003633143,0.0001672443,0.000009701121,0.00001021305,0.0005299021],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7685559,"threshold_uncertainty_score":0.5127999,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4311112516","doi":"10.1108/ecam-02-2022-0138","title":"Moving toward sustainability and circularity in hill road construction: a study of barriers, practices and performance","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Sustainability; Originality; Social sustainability; Resource (disambiguation); Business; Extant taxon; Sustainability organizations; Structural equation modeling; Environmental resource management; Environmental economics; Environmental planning; Economics; Sociology; Qualitative research; Geography; Social science; Computer science; Ecology","retraction":null,"screen_n_in":null,"score":{"opus":0.006529368415366899,"gpt":0.2163675867936844,"spread":0.2098382183783175,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004942092,0.0001870017,0.0002252852,0.0003856819,0.000144519,0.0000420969,0.0001007826,0.00002373034,0.00001988315],"category_scores_gemma":[0.0000615965,0.000214858,0.00002436918,0.0003826307,0.00006616789,0.0001702843,0.0002249477,0.0003480786,5.827023e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003160826,"about_ca_system_score_gemma":0.00002281681,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001140001,"about_ca_topic_score_gemma":0.00000353433,"domain_scores_codex":[0.9988023,0.00008938495,0.0003256818,0.0002946431,0.0002323402,0.0002556378],"domain_scores_gemma":[0.9995613,0.00004983626,0.00009973707,0.0001828995,0.00002974722,0.00007652376],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000511464,0.00004018203,0.09923851,0.001380228,0.0001578555,0.00004210114,0.002627688,0.7296888,0.0001787581,0.001373937,0.000002436065,0.1652184],"study_design_scores_gemma":[0.002274282,0.0004621659,0.3956352,0.00006808514,0.0001101597,0.0004908881,0.08075726,0.5182305,0.0001399001,0.0006088046,0.0005798578,0.0006429006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9953632,0.0002338173,0.003043373,0.0000770998,0.0003010074,0.0007357573,0.000002303628,0.0001568595,0.00008656544],"genre_scores_gemma":[0.9963124,0.0000383173,0.003453582,0.000004255724,0.0000189842,0.0001465077,0.000001626333,0.00001755369,0.000006764864],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2963967,"threshold_uncertainty_score":0.8761656,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3070075040","doi":"10.1108/ecam-10-2019-0590","title":"Optimized crew selection for scheduling of repetitive projects","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Crew; Duration (music); Operations research; Crew scheduling; Float (project management); Computer science; Operations management; Scheduling (production processes); Engineering; Aeronautics; Systems engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.06415923892039745,"gpt":0.3106000499711349,"spread":0.2464408110507375,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009361425,0.0002620554,0.0004320782,0.0005469832,0.0001312274,0.0001376696,0.0004197835,0.00006842096,0.00008880627],"category_scores_gemma":[0.002062793,0.0002323043,0.0002507279,0.001224768,0.0001043928,0.0001872713,0.0001530457,0.0002444372,0.00001321338],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005705633,"about_ca_system_score_gemma":0.00004040285,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006714088,"about_ca_topic_score_gemma":5.134043e-7,"domain_scores_codex":[0.9972665,0.00008744148,0.0008542884,0.0006852844,0.0007425044,0.0003640077],"domain_scores_gemma":[0.9983958,0.000595284,0.0003479887,0.0002686172,0.0002456583,0.000146667],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002974916,0.00001280551,0.0004615199,0.000213637,0.0001729547,0.000003212758,0.001238178,0.8781381,0.005843398,0.00821845,0.00003708924,0.1053631],"study_design_scores_gemma":[0.002444295,0.0003490564,0.001174241,0.0001721784,0.0001135846,0.0001070798,0.002924833,0.9667542,0.01999214,0.001430395,0.003962459,0.0005755187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2564586,0.00003580474,0.7398543,0.0008750855,0.0003584008,0.001052686,0.0000109301,0.0002268275,0.001127352],"genre_scores_gemma":[0.5448115,0.000003314961,0.4548527,0.00005408642,0.0001448068,0.00006603533,0.000004121671,0.00001980242,0.00004367896],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.2883529,"threshold_uncertainty_score":0.9473095,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4408119161","doi":"10.1108/ecam-11-2024-1517","title":"Enhancing construction workers’ health and safety: mechanisms for implementing Construction 4.0 technologies in construction organizations","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Economic and Technological Systems Analysis","field":"Business, Management and Accounting","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"York University","funders":"","keywords":"Construction site safety; Business; Construction engineering; Construction industry; Occupational safety and health; Engineering; Engineering management; Medicine","retraction":null,"screen_n_in":null,"score":{"opus":0.004505919126639348,"gpt":0.1932083672691746,"spread":0.1887024481425353,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004458433,0.0003458394,0.0004892116,0.001657465,0.0005295732,0.0002629089,0.0001926404,0.0001495971,0.00003031553],"category_scores_gemma":[0.0001636455,0.0003611479,0.00009636729,0.001773189,0.0002006673,0.0004454673,0.0003062131,0.0002690906,0.000005555583],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002770105,"about_ca_system_score_gemma":0.00003286383,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000196903,"about_ca_topic_score_gemma":0.0001626069,"domain_scores_codex":[0.9977483,0.00001515167,0.0008991871,0.0006406662,0.0001400926,0.0005566389],"domain_scores_gemma":[0.9991179,0.00006907927,0.0004106326,0.0002734112,0.0001052167,0.00002378391],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00003239091,0.00001193949,0.01608295,0.0006264019,0.0001792613,0.000001444066,0.00003389406,0.002038649,0.0003626868,0.7146819,0.00002814767,0.2659204],"study_design_scores_gemma":[0.0150674,0.0002542992,0.02795682,0.005424589,0.001235929,0.0006523848,0.146728,0.1325743,0.004783996,0.555591,0.1046313,0.005099977],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.187392,0.0002198784,0.8037375,0.003337957,0.001351863,0.001532502,0.000009455371,0.001363149,0.001055771],"genre_scores_gemma":[0.7979621,0.00008253039,0.2013215,0.0001415804,0.0001313532,0.0002012623,0.00006832196,0.00003361362,0.00005770112],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6105702,"threshold_uncertainty_score":0.9998841,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2060277803","doi":"10.1108/09699980710760676","title":"Issues in the selection of fall prevention and arrest equipment","year":2007,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Legislature; Selection (genetic algorithm); Variety (cybernetics); Risk analysis (engineering); Legislation; Originality; Operations management; Data collection; Production (economics); Engineering; Process management; Engineering management; Operations research; Computer science; Business; Psychology; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.02409767681588508,"gpt":0.3865660229024658,"spread":0.3624683460865807,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001254596,0.00008839744,0.0001109232,0.0002785907,0.000163254,0.000005316879,0.00007989085,0.00004440967,0.00003275275],"category_scores_gemma":[0.00004699246,0.00006818784,0.00002442774,0.0003158776,0.00003614718,0.00005195317,0.00005210943,0.0003285837,0.000006562685],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009049077,"about_ca_system_score_gemma":0.00002095697,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001878073,"about_ca_topic_score_gemma":0.0002478739,"domain_scores_codex":[0.9987617,0.0001188544,0.0003926378,0.0001459825,0.0002676334,0.0003132135],"domain_scores_gemma":[0.9994555,0.000281736,0.00007530343,0.0001005346,0.00003793767,0.00004904164],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0004771054,0.00008248415,0.3543418,0.002529901,0.00007653213,0.000009387322,0.003478019,0.005517034,0.000644475,0.06719777,0.0001287001,0.5655168],"study_design_scores_gemma":[0.0005234889,0.00009774821,0.9913927,0.0001969638,0.000007674472,0.000008341114,0.001069778,0.001832215,0.0000430821,0.0006904669,0.004058945,0.00007858824],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9796363,0.0001018282,0.01570414,0.0008653302,0.0004892363,0.00116372,0.000001702968,0.0000423177,0.001995497],"genre_scores_gemma":[0.990765,0.00007038158,0.008728961,0.00004155518,0.0001365573,0.0000834512,0.000008126153,0.000007165435,0.0001587422],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6370509,"threshold_uncertainty_score":0.278062,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4320186808","doi":"10.1108/ecam-10-2022-0941","title":"A supply chain perspective of prefabricated housebuilding diffusion in New Zealand","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Supply chain; Context (archaeology); Originality; Business; Marketing; Perspective (graphical); Stakeholder; Industrial organization; Sustainability; Perception; Exploratory research; Qualitative research; Economics; Management; Psychology; Sociology; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.02427958436359527,"gpt":0.2879980251642769,"spread":0.2637184408006816,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007817087,0.0002126778,0.0003005826,0.002555698,0.00007490595,0.00009267587,0.0004244822,0.00004587494,0.0001588765],"category_scores_gemma":[0.0002078818,0.0001860081,0.0001123059,0.003701414,0.0000746625,0.0002195519,0.0003203219,0.0002017548,0.00006427783],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001092806,"about_ca_system_score_gemma":0.00002784236,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002665182,"about_ca_topic_score_gemma":0.00005473451,"domain_scores_codex":[0.9976662,0.00005881165,0.0006507186,0.0005084716,0.0007492836,0.0003665596],"domain_scores_gemma":[0.9990531,0.0001987261,0.0001883807,0.0004000939,0.00007229724,0.00008736458],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0001882803,0.00003546292,0.1058627,0.00009005012,0.0001466301,0.00003734168,0.004286414,0.1654215,0.003077918,0.0527754,0.002306443,0.6657718],"study_design_scores_gemma":[0.003015175,0.000144389,0.7861804,0.0002974322,0.00004760975,0.00009071573,0.005104939,0.1583806,0.001269157,0.02160636,0.02309844,0.0007648222],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9873394,0.00003563537,0.007947801,0.001183348,0.0008567828,0.0005346866,0.00000513465,0.0003331293,0.001764103],"genre_scores_gemma":[0.9903462,0.00006106171,0.005863944,0.00001411481,0.00008399537,0.00002012764,0.0000056518,0.00001873538,0.003586147],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6803176,"threshold_uncertainty_score":0.758519,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4210545694","doi":"10.1108/ecam-02-2021-0177","title":"A multiproject scheduling and resource management model in projects construction","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Vehicle Routing Optimization Methods","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Profit (economics); Scheduling (production processes); Exploit; Computer science; Multimodal transport; Operations research; Project management; Transport engineering; Operations management; Engineering; Systems engineering; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.009417982647277704,"gpt":0.2104723002423825,"spread":0.2010543175951048,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004058857,0.0002810389,0.0002230282,0.0008996881,0.0001897247,0.00005956671,0.0001669528,0.00003973258,0.00001781853],"category_scores_gemma":[0.00001229971,0.0003446173,0.00005197188,0.0007542635,0.00005214996,0.0001114739,0.0002927919,0.0004638308,0.000001207823],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003046433,"about_ca_system_score_gemma":0.000006850447,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005442968,"about_ca_topic_score_gemma":0.000001145712,"domain_scores_codex":[0.9983961,0.00007245417,0.0003945159,0.0004195201,0.0003073397,0.0004100784],"domain_scores_gemma":[0.9995678,0.00003903294,0.00005325636,0.0002567603,0.00001159843,0.00007155593],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001807086,0.000008153957,0.0003165516,0.0002505234,0.00006714267,0.000018361,0.0004157543,0.9027901,0.0002245464,0.004281864,0.000007603749,0.09160136],"study_design_scores_gemma":[0.000874298,0.00001914622,0.0008350067,0.00005871009,0.00003280472,0.000201926,0.001226292,0.9955399,0.0001236674,0.0001582324,0.0005807758,0.0003492166],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"methods","genre_scores_codex":[0.501015,0.0001297776,0.4940073,0.00007340016,0.0004624704,0.0008139037,0.000007141903,0.0009222925,0.002568669],"genre_scores_gemma":[0.4935803,0.00002662495,0.5060626,0.00001623632,0.00002458643,0.0001911305,0.000009160191,0.00004357194,0.0000458073],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.09274986,"threshold_uncertainty_score":0.9999006,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3149191354","doi":"10.1046/j.1365-232x.2001.00198.x","title":"Construction claims management: towards an agent-based approach","year":2001,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Auction Theory and Applications","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"Engineering and Physical Sciences Research Council","keywords":"Computer science; Business; Process management","retraction":null,"screen_n_in":null,"score":{"opus":0.03442545050934148,"gpt":0.2947078189600658,"spread":0.2602823684507243,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001009373,0.0003539108,0.0002973197,0.0009510151,0.0004238276,0.0003305394,0.0007402081,0.00008570022,0.000523439],"category_scores_gemma":[0.00004106924,0.0003177804,0.0001940394,0.001624844,0.0002476572,0.0003953828,0.0001622199,0.0002777842,0.0002132455],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001337868,"about_ca_system_score_gemma":0.00001499623,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009383456,"about_ca_topic_score_gemma":0.000001675111,"domain_scores_codex":[0.9966737,0.0001418872,0.0007344147,0.0009062076,0.001005826,0.0005379496],"domain_scores_gemma":[0.9983175,0.00008111878,0.0002247709,0.0009966424,0.0001047849,0.0002751807],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005598439,0.00005973329,0.0003398346,0.00003014301,0.00008206554,0.00001368128,0.00009157831,0.2185217,0.0001043399,0.222777,0.0001029894,0.557821],"study_design_scores_gemma":[0.005018871,0.0003147722,0.06984721,0.0001425973,0.0004330844,0.002194609,0.009694812,0.4595121,0.001682296,0.1793483,0.2689183,0.002893073],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1797684,0.0000174557,0.7997122,0.0004613973,0.001027386,0.0006218055,0.00001017277,0.0005535662,0.01782759],"genre_scores_gemma":[0.80101,0.00001421722,0.1972481,0.0001138542,0.0002066501,0.0001723057,0.00004092054,0.00003027643,0.001163658],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6212416,"threshold_uncertainty_score":0.9999274,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3168304808","doi":"10.1108/ecam-10-2020-0810","title":"Formalizing knowledge representation in earthwork operations through development of domain ontology","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Earthworks; Computer science; Context (archaeology); Domain (mathematical analysis); Interoperability; Software engineering; Engineering; World Wide Web; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01068785708514852,"gpt":0.2299542889999015,"spread":0.219266431914753,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007773752,0.0001576565,0.0001850826,0.0002371002,0.00006693258,0.00002715408,0.00007350356,0.0000587132,0.00006112148],"category_scores_gemma":[0.00001000553,0.0001758484,0.00005381762,0.0005316422,0.0000359325,0.0001772923,0.00004163793,0.0001676807,0.000009151244],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001116929,"about_ca_system_score_gemma":0.00002582357,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006057939,"about_ca_topic_score_gemma":0.0002413992,"domain_scores_codex":[0.9989687,0.00002864593,0.0004803915,0.0001961321,0.0001170812,0.0002090165],"domain_scores_gemma":[0.999696,0.00002332284,0.0000272892,0.0001715553,0.00004966974,0.00003215848],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00001118927,0.00002563164,0.0008731063,0.0002798417,0.0001570867,0.00001255545,0.005369597,0.6450561,0.01137182,0.06638203,0.00002169426,0.2704394],"study_design_scores_gemma":[0.006325692,0.0001031231,0.1133718,0.001813546,0.0001683277,0.001613596,0.02159381,0.3588137,0.4151963,0.009703028,0.0684669,0.00283021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6643913,0.0003329208,0.3289923,0.00004533964,0.0009765513,0.0001782949,0.000001879155,0.0001842533,0.00489714],"genre_scores_gemma":[0.7532808,0.00002787382,0.2464994,0.000005436017,0.00004190917,0.00005830529,0.0000254469,0.00001452895,0.00004632153],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4038245,"threshold_uncertainty_score":0.7170889,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2081367740","doi":"10.1108/09699981211192562","title":"New life‐cycle costing approach for infrastructure rehabilitation","year":2012,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Markov decision process; Life cycle costing; Markov chain; Process (computing); Activity-based costing; Computer science; Probabilistic logic; Rehabilitation; Operations research; Markov model; Originality; Risk analysis (engineering); Plan (archaeology); Markov process; Engineering; Operations management; Artificial intelligence; Business; Mathematics; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.00324109585649292,"gpt":0.1856974878522549,"spread":0.1824563919957619,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001431354,0.000301417,0.0002180956,0.0002551348,0.0001088055,0.00005504836,0.0001494436,0.0000826894,0.000027468],"category_scores_gemma":[0.00006976917,0.0003014827,0.0001144324,0.000258269,0.00002719871,0.000264885,0.00005084149,0.0002466467,0.000004702956],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001655428,"about_ca_system_score_gemma":0.000008755975,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004478832,"about_ca_topic_score_gemma":2.158092e-7,"domain_scores_codex":[0.9986513,0.00001043478,0.0003187918,0.0002232895,0.0001814573,0.0006147666],"domain_scores_gemma":[0.9993892,0.00007325241,0.00004656148,0.0002335979,0.00002992458,0.0002275214],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001388788,0.000003456644,0.0008073967,0.0003858311,0.0001101027,2.716544e-7,0.0004714258,0.8255976,0.0008226644,0.005744615,0.0007955982,0.1652472],"study_design_scores_gemma":[0.00390345,0.0001988367,0.1128178,0.0003733169,0.0003750536,0.0002885474,0.002600983,0.7866794,0.004133301,0.003560628,0.08237328,0.002695312],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1080408,0.0002084388,0.8852044,0.00004244471,0.003071383,0.0006705882,0.000006660176,0.0008262,0.001929143],"genre_scores_gemma":[0.5536943,0.000004778091,0.4452491,0.00001340699,0.0008786613,0.00007101644,0.00001817483,0.00004282801,0.00002776197],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.4456536,"threshold_uncertainty_score":0.9999437,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2102270393","doi":"10.1108/09699980310478412","title":"Photo‐net: an integrated system for controlling construction progress","year":2003,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Network for Business Sustainability","funders":"","keywords":"Computer science; Critical path method; Animation; Scheduling (production processes); Path (computing); Real-time computing; Systems engineering; Operating system; Computer graphics (images); Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.00492735959806024,"gpt":0.1873248076471325,"spread":0.1823974480490722,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002070272,0.0003922768,0.0003273792,0.0004403829,0.0001848234,0.0001554713,0.0001332839,0.0001246746,0.0000475662],"category_scores_gemma":[0.00001637001,0.0003911458,0.0001436208,0.000383864,0.000112138,0.0002616272,0.00001143009,0.0002611114,0.00001049801],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000259579,"about_ca_system_score_gemma":0.00001625704,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004973076,"about_ca_topic_score_gemma":0.000003551149,"domain_scores_codex":[0.9983667,0.00004563269,0.0005315612,0.0003910881,0.0002175902,0.0004474753],"domain_scores_gemma":[0.9993299,0.00003028741,0.00008661664,0.0002966813,0.0001095751,0.0001469163],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006665508,0.00001911928,0.0002503656,0.0008262415,0.000441204,0.000007306679,0.0001720502,0.337538,0.004094727,0.2453676,0.00005344795,0.4111632],"study_design_scores_gemma":[0.005145491,0.0002769034,0.0008226752,0.0006188602,0.0003778093,0.001981722,0.004494896,0.8758987,0.03943796,0.001369277,0.06764828,0.001927403],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1848154,0.0002807491,0.8034587,0.00002421433,0.005404793,0.001347379,0.00003430026,0.002433873,0.0022006],"genre_scores_gemma":[0.8392906,0.00001192552,0.1599265,0.000008176717,0.0001623343,0.000445502,0.00005230522,0.00006556918,0.00003714352],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6544752,"threshold_uncertainty_score":0.999854,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3167790180","doi":"10.1108/ecam-12-2020-1060","title":"Mixed qualitative–quantitative approach for bidding decisions in construction","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Computer science; Quantitative analysis (chemistry); Decision support system; Reuse; Qualitative property; Operations research; Management science; Knowledge management; Data mining; Machine learning; Business; Engineering; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.02858960551835073,"gpt":0.2619158157200169,"spread":0.2333262102016661,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002143965,0.000276034,0.0002781544,0.0005431867,0.0001078018,0.00008495778,0.0001088275,0.0000914509,0.00003011547],"category_scores_gemma":[0.0001000686,0.0003014294,0.0001339272,0.0007431793,0.00008571807,0.0002017158,0.00003863585,0.000267527,0.000006613939],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001820926,"about_ca_system_score_gemma":0.00001730394,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000411133,"about_ca_topic_score_gemma":0.00001193221,"domain_scores_codex":[0.9985155,0.00006064506,0.0004922503,0.0003803963,0.0002035163,0.0003476164],"domain_scores_gemma":[0.9993373,0.0002148833,0.00005486286,0.0002185624,0.00009641249,0.00007800142],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002679582,0.00001646411,0.00006396793,0.0001632116,0.0001590592,0.000006087158,0.0009876055,0.5644432,0.003166012,0.2116225,0.00006569405,0.2192794],"study_design_scores_gemma":[0.002182923,0.00006378002,0.002432759,0.0002921473,0.00009419511,0.000486641,0.02152132,0.9487471,0.009158118,0.008061107,0.005988647,0.0009712318],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.1860704,0.0002406584,0.8088487,0.00006623884,0.00166227,0.0004095037,0.00002600996,0.0004005493,0.00227566],"genre_scores_gemma":[0.4692879,0.00006387263,0.5302103,0.000008823671,0.00006502754,0.0002012622,0.00007904486,0.00003257952,0.0000511959],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.3843039,"threshold_uncertainty_score":0.9999438,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4244522544","doi":"10.1046/j.1365-232x.2002.00242.x","title":"Risk management trends in the construction industry: moving towards joint risk management","year":2002,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Joint (building); Risk management; Business; Risk analysis (engineering); Operations management; Engineering; Finance; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03564944935920262,"gpt":0.2709889764711231,"spread":0.2353395271119205,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002858029,0.0006802283,0.0005461088,0.00388899,0.0006632139,0.0007623944,0.001350273,0.0001855682,0.001791492],"category_scores_gemma":[0.00009644918,0.0005262952,0.0003726945,0.004730257,0.0002985674,0.0006176919,0.0006950314,0.001430543,0.0002637975],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002745224,"about_ca_system_score_gemma":0.000005161075,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00009643409,"about_ca_topic_score_gemma":0.00003470113,"domain_scores_codex":[0.9936033,0.0004425195,0.001555216,0.001285923,0.002168273,0.0009447733],"domain_scores_gemma":[0.9974166,0.0001657869,0.0006821507,0.001487219,0.00008345342,0.0001647738],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00002971174,0.00004676008,0.007925226,0.00006267652,0.0002775151,0.00007387996,0.0006605636,0.03742681,0.000001590193,0.0289658,0.001372665,0.9231568],"study_design_scores_gemma":[0.005136297,0.0002313559,0.5074151,0.0003383445,0.0007773455,0.000824033,0.01535449,0.1734328,0.00006097138,0.01922901,0.2749045,0.002295618],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6634604,0.00042909,0.06688942,0.002556153,0.00668608,0.002697335,0.0000656774,0.0009348425,0.256281],"genre_scores_gemma":[0.932269,0.0009318119,0.0622475,0.0001616512,0.0003072488,0.0002967779,0.00001616028,0.00005109346,0.003718702],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9208612,"threshold_uncertainty_score":0.9997188,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4282564378","doi":"10.1108/ecam-02-2022-0170","title":"The latest operational, contractual and organizational trends in IPD literature: review and future directions","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Originality; Context (archaeology); Thematic analysis; Systematic review; Domain (mathematical analysis); Knowledge management; Management science; Computer science; Data science; Political science; Qualitative research; Engineering; Sociology; Social science; Geography; MEDLINE","retraction":null,"screen_n_in":null,"score":{"opus":0.002117895599477319,"gpt":0.1735087081763441,"spread":0.1713908125768668,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001118981,0.0001476228,0.0001154459,0.0002367346,0.0003332147,0.0001007105,0.00006644096,0.00002434441,0.0001168419],"category_scores_gemma":[0.000006740788,0.0001268791,0.00002393281,0.0006580853,0.00004508563,0.0001081232,0.000051697,0.0003093024,8.415838e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007248145,"about_ca_system_score_gemma":0.000004559731,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001893502,"about_ca_topic_score_gemma":0.000009538068,"domain_scores_codex":[0.9992969,0.00003053838,0.0002199444,0.0001698039,0.0001389055,0.0001439135],"domain_scores_gemma":[0.999774,0.00003486624,0.00002414745,0.0001017309,0.00002452983,0.00004071037],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00001339331,0.00001315677,0.0005546274,0.0003561554,0.0001797687,0.00001207524,0.0005227353,0.0476756,0.0001475597,0.1324581,0.001255521,0.8168113],"study_design_scores_gemma":[0.001183591,0.00006826774,0.05813329,0.000282167,0.0001524301,0.00317848,0.0006024315,0.05559808,0.00003954866,0.001246954,0.8787341,0.0007806325],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"empirical","genre_scores_codex":[0.2506754,0.6453558,0.01078804,0.056292,0.01671825,0.003736272,0.0003836814,0.003226583,0.01282401],"genre_scores_gemma":[0.9492016,0.04457457,0.004272102,0.000327251,0.0004393025,0.0004437634,0.0001965289,0.00005495787,0.0004898941],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8774786,"threshold_uncertainty_score":0.5173979,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3196867374","doi":"10.1108/ecam-02-2021-0145","title":"An empirical study on non-physical waste factors in the construction industry","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Ranking (information retrieval); Sample (material); Empirical research; Quality (philosophy); Population; Process management; Index (typography); Operations management; Performance indicator; Engineering; Computer science; Business; Marketing; Statistics; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.04625605768393713,"gpt":0.3546766156124662,"spread":0.308420557928529,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000918389,0.0003347769,0.0003362639,0.0008478478,0.0002501124,0.0004653039,0.0006683982,0.00009205718,0.0001376389],"category_scores_gemma":[0.0001393105,0.000232504,0.0001437239,0.002206216,0.0001299097,0.0003778131,0.000179986,0.0009057436,0.0000452875],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008561695,"about_ca_system_score_gemma":0.00003047365,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001524195,"about_ca_topic_score_gemma":0.00002454253,"domain_scores_codex":[0.9965197,0.0003149583,0.0006328868,0.0007864271,0.00134639,0.0003995887],"domain_scores_gemma":[0.9983745,0.0003437759,0.0001498735,0.000938461,0.00009110499,0.0001022729],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001173027,0.0006271101,0.563578,0.00003949218,0.0001934318,0.0002087873,0.008940865,0.1391724,0.0004274025,0.00723505,0.0002893636,0.2791708],"study_design_scores_gemma":[0.001591067,0.000456689,0.8791245,0.00005596804,0.00007398937,0.0002286148,0.07227625,0.03885234,0.0009465788,0.002018791,0.003715803,0.000659359],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9907248,0.000003931293,0.004284897,0.0005985236,0.001524197,0.0006180213,0.00000481565,0.0001091988,0.002131607],"genre_scores_gemma":[0.9976709,0.00000169019,0.001710907,0.0001159198,0.0002756113,0.00005827116,0.000009271515,0.00001701328,0.0001404193],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3155466,"threshold_uncertainty_score":0.9481239,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4408500828","doi":"10.1108/ecam-05-2024-0678","title":"Construction and demolition waste circulation and its sustainability performance in the building sector: current trend and future directions","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Demolition; Sustainability; Current (fluid); Demolition waste; Circulation (fluid dynamics); Business; Environmental planning; Environmental science; Civil engineering; Engineering; Ecology","retraction":null,"screen_n_in":null,"score":{"opus":0.00365149513996828,"gpt":0.1989553797399151,"spread":0.1953038845999468,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001536279,0.0002038093,0.0001492782,0.000409735,0.0001694959,0.00008365148,0.0000608521,0.00004988548,0.000002297621],"category_scores_gemma":[0.00001114648,0.0001839366,0.00002319149,0.0004320246,0.00006881483,0.0002485612,0.00005024365,0.0002873889,1.780568e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001555951,"about_ca_system_score_gemma":0.000005894602,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003604462,"about_ca_topic_score_gemma":0.000005671086,"domain_scores_codex":[0.9991208,0.00003366262,0.00024614,0.0002558289,0.0001106689,0.00023294],"domain_scores_gemma":[0.9997256,0.00004647495,0.00003276272,0.0001333294,0.00002182905,0.00003995769],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001286923,0.000003272019,0.006464901,0.001366108,0.00004440678,0.000001615149,0.0005615668,0.05448383,0.0003669784,0.0128422,0.000002022537,0.9238502],"study_design_scores_gemma":[0.0009300574,0.00002830394,0.3710556,0.0003990563,0.00008662012,0.000372286,0.001309457,0.6107743,0.00049453,0.001176399,0.01291144,0.0004619791],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9896724,0.003014622,0.005343371,0.0002547334,0.0008366003,0.0004908219,0.000003378297,0.0001828174,0.0002012925],"genre_scores_gemma":[0.9952827,0.002727166,0.001761124,0.000005168925,0.0001289043,0.00007421505,0.000005660697,0.00001174082,0.000003333832],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9233882,"threshold_uncertainty_score":0.7500718,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2005733202","doi":"10.1108/09699981211237111","title":"Modelling industrial construction operations using a multi‐agent resource allocation framework","year":2012,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer science; Resource allocation; Schedule; Scheduling (production processes); Process (computing); Set (abstract data type); Resource (disambiguation); Function (biology); Operations research; Industrial engineering; Mathematical optimization; Distributed computing; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02877703997040957,"gpt":0.223013673967337,"spread":0.1942366339969274,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001813486,0.0003580316,0.0002280742,0.0004790922,0.0002576102,0.0001285607,0.0001418216,0.0001982407,0.00008062667],"category_scores_gemma":[0.00002059027,0.0003917421,0.0001157843,0.0005343032,0.00008823007,0.000451307,0.00003910018,0.0005419047,0.00002798684],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003349891,"about_ca_system_score_gemma":0.00001368278,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002671179,"about_ca_topic_score_gemma":0.00000204108,"domain_scores_codex":[0.9983386,0.00004571315,0.0005217738,0.0002849321,0.0002952261,0.0005136986],"domain_scores_gemma":[0.9993649,0.00003496762,0.00005608906,0.0003061022,0.00005136897,0.0001865725],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008886999,0.00001319218,0.0003191959,0.00004868857,0.0001208081,7.905301e-7,0.0003313679,0.9212713,0.0007975851,0.02833128,0.00001607317,0.04874082],"study_design_scores_gemma":[0.0004666491,0.00001294154,0.0001863789,0.0001508076,0.0001002907,0.0002647802,0.0007147086,0.9901294,0.001419698,0.0001320335,0.005952293,0.0004700832],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2706702,0.000193069,0.7246673,0.00004243906,0.002992335,0.0003787361,0.00000757099,0.0006863895,0.0003619936],"genre_scores_gemma":[0.6709132,0.00002019631,0.3282402,0.00001501367,0.000645435,0.00006327151,0.00002831584,0.00004650822,0.0000277602],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.400243,"threshold_uncertainty_score":0.9998534,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2034659495","doi":"10.1108/ecam-02-2012-0015","title":"A case productivity model for automatic climbing system","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"SNC-Lavalin (Canada); Concordia University","funders":"","keywords":"Productivity; Formwork; Bottleneck; Originality; Engineering; Scheduling (production processes); Benchmarking; Futures studies; Industrial engineering; Computer science; Operations research; Operations management; Civil engineering; Artificial intelligence; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.006901710517178255,"gpt":0.1804127465982569,"spread":0.1735110360810787,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001879087,0.0002420192,0.0002031,0.0002643431,0.0001432198,0.00007087889,0.00009007426,0.00005655078,0.000005176473],"category_scores_gemma":[0.00001813141,0.0002463344,0.0001010561,0.0001889307,0.00003427039,0.0001376256,0.00002582545,0.0001552841,0.000007827814],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001591753,"about_ca_system_score_gemma":0.000004773377,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002888199,"about_ca_topic_score_gemma":0.000004504642,"domain_scores_codex":[0.9989606,0.00001697449,0.0003161393,0.0002725325,0.000135542,0.0002981873],"domain_scores_gemma":[0.9995339,0.00003961122,0.0000447322,0.0002674251,0.00003791061,0.0000764263],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003707925,0.000003080677,0.00001062428,0.0007731589,0.00006800174,0.000006942904,0.0001094468,0.6922594,0.0003847726,0.04364638,0.0000265803,0.2627079],"study_design_scores_gemma":[0.0003472344,0.00001834165,0.00005502981,0.0000877839,0.00005767517,0.002556097,0.0001280005,0.9950426,0.0004769732,0.0003987178,0.0005624766,0.0002691284],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2752103,0.00001847781,0.7206894,0.00002885837,0.001226164,0.0004671284,0.000006195561,0.001486313,0.0008671861],"genre_scores_gemma":[0.8856649,0.000001234234,0.1137728,0.000005289931,0.0001859145,0.0002618912,0.000007036437,0.00004008982,0.00006081516],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6104546,"threshold_uncertainty_score":0.9999989,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3039556242","doi":"10.1108/ecam-01-2019-0069","title":"A decision support tool for planning module installation in industrial construction","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Plan (archaeology); Heuristic; Swing; Systems engineering; Engineering; Computer science; Industrial engineering; Operations research; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01595300863223689,"gpt":0.2118610136929956,"spread":0.1959080050607587,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001092071,0.0002641258,0.0002350354,0.0003824382,0.00007315937,0.00008137844,0.0001165355,0.0001273049,0.0000614548],"category_scores_gemma":[0.00004563716,0.0002926283,0.00009600422,0.0004772595,0.00004138659,0.0002665913,0.00003484512,0.0003033544,0.00001147442],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001534719,"about_ca_system_score_gemma":0.0000141947,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002630051,"about_ca_topic_score_gemma":0.00000226492,"domain_scores_codex":[0.9986208,0.00001407382,0.0005202613,0.0003240543,0.0002150458,0.0003057831],"domain_scores_gemma":[0.9996208,0.00005462614,0.00006010249,0.0001387199,0.00003416722,0.0000915806],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008213044,0.000003426312,0.001045771,0.00008991083,0.00004578375,0.000003803759,0.0001849807,0.5607569,0.0008042082,0.00624834,0.0001421019,0.4305926],"study_design_scores_gemma":[0.003943417,0.0001748083,0.006287543,0.0002813292,0.00006521936,0.0001680796,0.0004939988,0.9583103,0.002489718,0.001719204,0.02520867,0.0008576748],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4254545,0.00003587706,0.5705274,0.000137383,0.001899366,0.0006693862,0.00001571255,0.0005799144,0.0006804391],"genre_scores_gemma":[0.903357,0.00001268531,0.09598414,0.00004036097,0.0003676897,0.0001340473,0.00005278569,0.00004017387,0.0000110784],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4779026,"threshold_uncertainty_score":0.9999526,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4380372743","doi":"10.1108/ecam-12-2022-1121","title":"Schedule compression and emerging waste in construction: an assessment of overlapping activities","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Compression (physics); Computer science; Operations management; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006656517620452095,"gpt":0.2399072260888694,"spread":0.2332507084684173,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001330458,0.0002061028,0.0002253797,0.0007719566,0.00007326555,0.00004488061,0.00008459869,0.00005954966,0.00002688858],"category_scores_gemma":[0.000004655731,0.0002210799,0.00004407166,0.0005696217,0.00009284577,0.0002959748,0.00005981053,0.0002379308,0.000001324999],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000764358,"about_ca_system_score_gemma":0.000007857199,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008738571,"about_ca_topic_score_gemma":0.000006107013,"domain_scores_codex":[0.9989222,0.00002772065,0.0003582246,0.0002359705,0.0002060695,0.0002498612],"domain_scores_gemma":[0.9996486,0.00003389182,0.00005602832,0.000179605,0.00001845417,0.00006339458],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000009343115,0.000007765171,0.004239888,0.0004331782,0.00008357818,0.00000635347,0.0003211718,0.7053861,0.02288615,0.0262249,0.00001229291,0.2403893],"study_design_scores_gemma":[0.0007731296,0.00004416151,0.05009736,0.0003772374,0.00002754814,0.0001271835,0.003971277,0.9383737,0.004555786,0.0007117512,0.0005402493,0.0004005626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9619999,0.00005750549,0.03485143,0.00004712693,0.001144707,0.0002230139,0.000006129748,0.000558294,0.001111885],"genre_scores_gemma":[0.9676349,0.00007854878,0.03208304,0.000003288269,0.00009479586,0.0000455925,0.00001687216,0.00002524218,0.00001770903],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2399887,"threshold_uncertainty_score":0.9015375,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3167143037","doi":"10.1108/ecam-12-2020-1019","title":"Optimized resource-constrained method for project schedule compression","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Mathematical optimization; Schedule; Genetic algorithm; Scheduling (production processes); Python (programming language); Metaheuristic; Fuzzy logic; Algorithm; Mathematics; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.04989989109981235,"gpt":0.3592777978312351,"spread":0.3093779067314228,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002367509,0.0004748638,0.0006760673,0.00100389,0.0003698007,0.000550802,0.0007432628,0.0001432175,0.0002106864],"category_scores_gemma":[0.001516333,0.0004094515,0.0004746651,0.001537023,0.000158146,0.000221049,0.0004459569,0.0004459678,0.00002485196],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001106598,"about_ca_system_score_gemma":0.0001103104,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007404541,"about_ca_topic_score_gemma":0.000001615581,"domain_scores_codex":[0.9952666,0.0003762791,0.001175086,0.001239559,0.001197316,0.0007451483],"domain_scores_gemma":[0.9963659,0.00180692,0.0003347857,0.0009793217,0.0003132474,0.0001998299],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002566888,0.00005016249,0.00009182891,0.0001617071,0.0003255797,0.00006911571,0.000635655,0.4695217,0.008687925,0.0225278,0.0006675008,0.4970043],"study_design_scores_gemma":[0.006537768,0.0001664945,0.0006908244,0.0004203107,0.0002269751,0.001680207,0.005848948,0.7864229,0.02873662,0.004967377,0.1628316,0.001470016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.03211244,0.0001423221,0.9568204,0.001191391,0.000969396,0.001377633,0.00004405001,0.0004713498,0.006871046],"genre_scores_gemma":[0.06535991,0.000005866603,0.9327806,0.0001498747,0.0002744426,0.0002330298,0.00005219259,0.00005736673,0.00108667],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.4955343,"threshold_uncertainty_score":0.9998357,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2071095200","doi":"10.1108/09699980910970851","title":"Integrating numerical tools in underground construction process","year":2009,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Process (computing); Frame (networking); Reduction (mathematics); Computer science; Cost reduction; Pre-construction services; Construction management; Quality (philosophy); Excavation; Control (management); Industrial engineering; Project management; Construction engineering; Systems engineering; Engineering; Civil engineering; Project planning","retraction":null,"screen_n_in":null,"score":{"opus":0.006681775821354997,"gpt":0.2114515623756062,"spread":0.2047697865542512,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009746778,0.0003187416,0.0002503863,0.0005139199,0.000080183,0.0001446088,0.0001541323,0.00009809694,0.0000624274],"category_scores_gemma":[0.00002259616,0.0003269542,0.00008386277,0.0007079753,0.00005550638,0.0003996991,0.00001607254,0.0004575996,0.00001736858],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002380833,"about_ca_system_score_gemma":0.00001146772,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005546665,"about_ca_topic_score_gemma":0.00000573337,"domain_scores_codex":[0.9985366,0.00002236601,0.0004886598,0.0003184713,0.0002455343,0.000388309],"domain_scores_gemma":[0.999585,0.00003467769,0.00005382903,0.0002014731,0.00003634141,0.00008870094],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001631304,0.00001209778,0.0004358926,0.00008728613,0.00004535181,0.00001120633,0.0002017268,0.2665191,0.0009429979,0.07468373,0.0000208369,0.6570234],"study_design_scores_gemma":[0.003443531,0.0003184422,0.06731626,0.001006469,0.0001364126,0.002607959,0.004540058,0.8674334,0.007170766,0.03674641,0.006461722,0.00281854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5370835,0.0001458068,0.4454973,0.000317813,0.00212979,0.0005518401,0.00000515076,0.001481422,0.0127874],"genre_scores_gemma":[0.9591407,0.00002293783,0.04052982,0.00003758867,0.0001493033,0.00005062512,0.00001744248,0.00002617404,0.00002543822],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6542049,"threshold_uncertainty_score":0.9999182,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4365814559","doi":"10.1108/ecam-07-2022-0674","title":"Formalizing the information requirements for decision-making of field managers during indoor construction activities","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Scope (computer science); Computer science; Decision support system; Field (mathematics); Quality (philosophy); Work (physics); Task (project management); Originality; Information system; Statement of work; Knowledge management; Information quality; Business decision mapping; Process management; Risk analysis (engineering); Management science; Systems engineering; Engineering; Business; Qualitative research","retraction":null,"screen_n_in":null,"score":{"opus":0.005332218608330148,"gpt":0.2117097870337296,"spread":0.2063775684253995,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001692905,0.0002145932,0.0001778039,0.000642648,0.0002198494,0.0000893415,0.0001729502,0.00006931457,0.00002507001],"category_scores_gemma":[0.00005859638,0.0001903369,0.0001265314,0.0005834428,0.00006516256,0.0006106669,0.00006521683,0.0001752648,0.000007954797],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009882617,"about_ca_system_score_gemma":0.000006623646,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003120553,"about_ca_topic_score_gemma":0.000002899191,"domain_scores_codex":[0.9987676,0.00001191187,0.0004962253,0.0001473728,0.0002671244,0.0003097248],"domain_scores_gemma":[0.9994031,0.0001766844,0.0001162197,0.0002276059,0.00004651078,0.00002991827],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007814638,0.000002311107,0.0003606243,0.000659931,0.0002188687,0.000001116862,0.0005541834,0.2705457,0.001274499,0.01542166,0.0002269078,0.710656],"study_design_scores_gemma":[0.003788803,0.0002617693,0.0398455,0.002948948,0.000445411,0.0006044062,0.01862119,0.854938,0.04291422,0.01094479,0.02255083,0.002136197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.620546,0.00003089397,0.3742512,0.0001019953,0.002584434,0.0006773525,0.00001800599,0.0007506132,0.00103946],"genre_scores_gemma":[0.9745979,0.00004549346,0.02499174,0.00001969315,0.0001026032,0.0001846003,0.00001643353,0.00002364444,0.00001789642],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7085199,"threshold_uncertainty_score":0.7761711,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4377239071","doi":"10.1108/ecam-11-2022-1036","title":"A real options-based investment-income valuation model for old community renewal projects in China","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Capital Investment and Risk Analysis","field":"Economics, Econometrics and Finance","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Valuation (finance); Net present value; Capital budgeting; Government (linguistics); Economics; Business; Finance; Microeconomics; Debt","retraction":null,"screen_n_in":null,"score":{"opus":0.03811778677951144,"gpt":0.2354925853605532,"spread":0.1973747985810418,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005783155,0.0001766654,0.000251689,0.001166536,0.0001597519,0.00005900431,0.000156206,0.00005121867,0.0000105819],"category_scores_gemma":[0.0000367892,0.0002010231,0.0001414741,0.000747301,0.00004048315,0.0001136908,0.00007235794,0.0001781336,0.00002827822],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002274437,"about_ca_system_score_gemma":0.00001003812,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004557771,"about_ca_topic_score_gemma":0.00009713266,"domain_scores_codex":[0.9988889,0.00002489402,0.0004578879,0.0002742833,0.00006451827,0.0002895833],"domain_scores_gemma":[0.9994661,0.00004436061,0.000130237,0.0002900783,0.0000131253,0.00005608747],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001335393,0.00002158384,0.001597749,0.0001018607,0.00005453929,9.329144e-7,0.0004517719,0.6076022,0.00003495018,0.3895845,0.00001721221,0.0005192535],"study_design_scores_gemma":[0.0007453011,0.00003818559,0.03015015,0.00003436261,0.00001834845,0.000001213123,0.00008271422,0.8741526,0.00003544437,0.09448709,0.00005245314,0.0002021278],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9688438,0.0001463902,0.02855284,0.0003386191,0.0003183211,0.0008001287,0.000054828,0.0002718927,0.0006732047],"genre_scores_gemma":[0.9656804,0.0001979934,0.03276378,0.00004619731,0.00004600353,0.0003927836,0.0002081847,0.0000277791,0.0006369308],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2950974,"threshold_uncertainty_score":0.8197484,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3091273865","doi":"10.1108/ecam-05-2020-0296","title":"A qualitative approach to investigate emergency preparedness state for the built environment in the UAE","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Disaster Management and Resilience","field":"Social Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Preparedness; Documentation; Interview; Emergency management; Crisis management; Business; Content analysis; Public relations; Phase (matter); Political science; Process management; Computer science; Sociology","retraction":null,"screen_n_in":null,"score":{"opus":0.04324240858889051,"gpt":0.3068025868429159,"spread":0.2635601782540254,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005905504,0.0001415446,0.0001060133,0.00007906789,0.0002673643,0.00007938344,0.0005304145,0.00001575765,0.00001807997],"category_scores_gemma":[0.000070731,0.00009295964,0.00006322303,0.0004313792,0.0001467335,0.00008849172,0.0001297581,0.0001089632,0.00001144227],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005392266,"about_ca_system_score_gemma":0.000009013694,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001345012,"about_ca_topic_score_gemma":0.00005121991,"domain_scores_codex":[0.9986564,0.0001426147,0.0002325832,0.0002943919,0.0003574967,0.0003165213],"domain_scores_gemma":[0.9995724,0.0001011861,0.00005305856,0.0001759544,0.00001044074,0.00008699163],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"qualitative","study_design_scores_codex":[0.00004397501,0.00002765572,0.00008915138,0.0001325397,0.0000965466,0.000001818236,0.5334281,0.3536564,0.00005377237,0.05731526,0.0007711479,0.0543836],"study_design_scores_gemma":[0.001188307,0.0002066866,0.01038265,0.00007869255,0.0001503571,0.000003406197,0.5814846,0.05651459,0.00004106431,0.009951016,0.3390232,0.000975474],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4431522,0.0001665943,0.5124074,0.0262218,0.0009415354,0.005535528,0.00001521138,0.0002046161,0.01135513],"genre_scores_gemma":[0.9846697,0.00006948614,0.01349124,0.0003791034,0.0001426146,0.0006862705,0.000004270816,0.00001349897,0.0005438608],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5415174,"threshold_uncertainty_score":0.3790784,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4404599295","doi":"10.1108/ecam-02-2024-0268","title":"Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: a machine learning approach","year":2024,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Dashboard; Productivity; Computer science; Analytics; Warning system; Data science; Control (management); Identification (biology); Knowledge management; Risk analysis (engineering); Process management; Engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.04757929926056179,"gpt":0.3788594621024531,"spread":0.3312801628418913,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007079361,0.0002085842,0.0002500911,0.0003409773,0.0006211561,0.00006430121,0.0001211878,0.00007744168,0.000005429841],"category_scores_gemma":[0.0003155236,0.0001795034,0.00002979673,0.0002803692,0.0000946427,0.0002518439,0.0002194825,0.0007390602,0.00000181853],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001288279,"about_ca_system_score_gemma":0.00005683877,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007562889,"about_ca_topic_score_gemma":0.000008069011,"domain_scores_codex":[0.998174,0.0001383276,0.0003978774,0.0006098737,0.0002278145,0.0004520722],"domain_scores_gemma":[0.9988356,0.000603298,0.00007282654,0.0002554535,0.00007528163,0.0001575041],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003635445,0.00002108459,0.008152974,0.006325762,0.0003685887,0.000005356919,0.002728213,0.008314583,0.004519914,0.02376417,0.00002072873,0.9454151],"study_design_scores_gemma":[0.001474621,0.0001389716,0.01920901,0.0008531269,0.00008412539,0.00006302854,0.002030804,0.9667674,0.0002562133,0.000732846,0.007996727,0.0003931835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3268121,0.001946498,0.666011,0.0006688167,0.001617274,0.002124752,0.00004456696,0.0003833683,0.0003916009],"genre_scores_gemma":[0.897063,0.0002765104,0.1015249,0.00001090668,0.0006033332,0.000308268,0.00008543643,0.00002868425,0.00009897858],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9584528,"threshold_uncertainty_score":0.7319934,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2579467647","doi":"10.1108/ecam-10-2015-0165","title":"A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects","year":2017,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Interdependence; Computer science; Workflow; Limit (mathematics); Operations research; Project planning; Time limit; Industrial engineering; Project management; Risk analysis (engineering); Reliability engineering; Systems engineering; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.1283831108112378,"gpt":0.3491864539085802,"spread":0.2208033430973424,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001103052,0.0002640671,0.0003538064,0.0004442309,0.001000551,0.0006762379,0.0009986886,0.00005050222,0.00001261684],"category_scores_gemma":[0.001134209,0.0001823657,0.0002593575,0.0003015562,0.0001277159,0.0002270601,0.0004259866,0.0002073906,0.00002802904],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006897061,"about_ca_system_score_gemma":0.00002575054,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007296552,"about_ca_topic_score_gemma":0.00001468709,"domain_scores_codex":[0.9973865,0.0000593357,0.0005765319,0.0006942894,0.0008628693,0.0004205388],"domain_scores_gemma":[0.998056,0.0002894454,0.0002682879,0.001050942,0.0001545245,0.0001807909],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005785354,0.00002024511,0.0001707524,0.00002523122,0.0001425277,0.000004451241,0.0006198242,0.9285563,0.0005414053,0.00689473,0.0003778278,0.06258886],"study_design_scores_gemma":[0.0006794751,0.00004983861,0.02051085,0.00007191118,0.00007831782,0.00007168476,0.0008295487,0.9697664,0.0003866834,0.002431677,0.0047639,0.000359731],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1739997,0.00005068743,0.8213583,0.002077961,0.0008821714,0.0009370755,0.00001196401,0.0001010123,0.0005810863],"genre_scores_gemma":[0.7043067,0.000003007725,0.2944652,0.00007552962,0.0001139006,0.0001670422,0.000004845967,0.00001514047,0.0008486017],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.530307,"threshold_uncertainty_score":0.7695527,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}