{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":6,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":6,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"ca4115576c4a","filters":{"venue":"HPC Bridge Views"}},"results":[{"id":"W566613237","doi":"","title":"HPC for Durability of the Confederation Bridge","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Engineering; Durability; Civil engineering; Mile; Forensic engineering; Geology; Computer science","authors":[{"name":"Laszlo Dunaszegi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03582952964641817,"gpt":0.2609487018900036,"spread":0.2251191722435855,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004024676,0.0003586932,0.0002450324,0.001304168,0.0008303809,0.001179343,0.0009608274,0.0004734847,0.0280925],"category_scores_gemma":[0.001060535,0.0001236808,0.0002436806,0.001232388,0.0005085287,0.001179521,0.001084529,0.000701403,0.004608502],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001185777,"about_ca_system_score_gemma":0.001047295,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008359987,"about_ca_topic_score_gemma":0.007068924,"domain_scores_codex":[0.9993842,0.00004832631,0.00001415836,0.00006160291,0.00044485,0.00004685908],"domain_scores_gemma":[0.999593,0.000071387,0.00002156872,0.0001152037,0.0001685985,0.00003032648],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.000116595,0.00006995934,0.007286411,0.0003235076,0.0000263809,0.0006234561,0.0004679235,0.03796123,0.02464151,0.279566,0.08211482,0.5668021],"study_design_scores_gemma":[0.00002080051,0.0001277422,0.01460104,0.0002036442,0.0000309299,0.001232232,0.0004074275,0.0687007,0.02596286,0.07572667,0.8129197,0.00006626017],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.06237065,0.006821295,0.1141791,0.001908525,0.001031774,0.0001330176,0.003321344,0.001130805,0.8091036],"genre_scores_gemma":[0.7369585,0.005403671,0.04967828,0.0003818296,0.0006894705,0.0002767528,0.003348391,0.0008504512,0.2024125],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.0280925,"threshold_uncertainty_score":0.09397876,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W574372706","doi":"","title":"The Bow River Bridge – A Precast Record","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Precast concrete; Girder; Pier; Structural engineering; Engineering; Prestressed concrete; Bridge (graph theory); Span (engineering); Structural load; Expansion joint; Geotechnical engineering; Forensic engineering","authors":[{"name":"Karen A Bexten","is_ca":false},{"name":"Bill LeBlanc","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04004669420401558,"gpt":0.2555065274500129,"spread":0.2154598332459973,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000345792,0.0002331054,0.0001436562,0.001578819,0.002539014,0.001847017,0.001064408,0.000527996,0.04104496],"category_scores_gemma":[0.0006948098,0.0002608603,0.0001068789,0.001732664,0.000672531,0.001078584,0.00154334,0.0006734684,0.006979926],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001783474,"about_ca_system_score_gemma":0.003625035,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.1050154,"about_ca_topic_score_gemma":0.3919439,"domain_scores_codex":[0.9994037,0.00001569157,0.00001490712,0.00008674212,0.0004170425,0.00006202254],"domain_scores_gemma":[0.9995523,0.00001739587,0.00002784373,0.00007273499,0.0002442762,0.00008541334],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001488505,0.0001173075,0.01393878,0.0003689936,0.00002266764,0.001040553,0.001965202,0.0005891279,0.01013369,0.03554431,0.1872047,0.7489258],"study_design_scores_gemma":[0.000004739321,0.00008020023,0.02063554,0.00008466486,0.000005713802,0.0007359365,0.0005578178,0.0001368091,0.001698904,0.0006522235,0.9753887,0.0000187855],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"other","genre_gemma":"other","genre_scores_codex":[0.1413677,0.008385577,0.005452625,0.003872435,0.0009880478,0.000179596,0.003780018,0.000876477,0.8350974],"genre_scores_gemma":[0.2178557,0.006515081,0.01179979,0.0008136898,0.0003733552,0.00005343654,0.007248457,0.0004493142,0.7548911],"genre_candidate":"other","genre_consensus":"other","teacher_disagreement_score":0.1050154,"threshold_uncertainty_score":0.2088084,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W643813351","doi":"","title":"Ontario’s HPC Performance Specification","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Christian ministry; Quality assurance; Payment; Work (physics); Engineering; Acceptance testing; Flexibility (engineering); Product (mathematics); Civil engineering; Construction engineering; Operations management; Computer science; Mechanical engineering; Software engineering","authors":[{"name":"H C Schell","is_ca":false},{"name":"Jana Konecny","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02547147474199049,"gpt":0.2179385752258875,"spread":0.192467100483897,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002349755,0.0007495072,0.0002472767,0.001426056,0.003166434,0.002485198,0.002129909,0.0009812397,0.03015526],"category_scores_gemma":[0.003922238,0.0005528253,0.0003888951,0.002166057,0.001030749,0.001500278,0.001181564,0.0008645033,0.01270368],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.02947092,"about_ca_system_score_gemma":0.04171183,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.9133897,"about_ca_topic_score_gemma":0.926115,"domain_scores_codex":[0.9944388,0.0002501356,0.0001746499,0.0002101544,0.004119448,0.0008068465],"domain_scores_gemma":[0.9933969,0.0002441884,0.0001392018,0.0005180696,0.005354355,0.0003473898],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0003849336,0.0001522093,0.01370113,0.0004418516,0.00001555834,0.0004591949,0.001814928,0.02627779,0.01665384,0.1534778,0.6828033,0.1038174],"study_design_scores_gemma":[0.00002103741,0.00003395701,0.005506031,0.00006835931,0.000008568884,0.0001079165,0.0004903629,0.006329907,0.003414439,0.001892474,0.9820816,0.00004530308],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"other","genre_gemma":"other","genre_scores_codex":[0.02869984,0.0003898063,0.03340223,0.003633597,0.0002381816,0.0005564509,0.03261845,0.003649273,0.8968121],"genre_scores_gemma":[0.2912522,0.001520776,0.05333284,0.0009495153,0.0001244865,0.0008219311,0.05605527,0.002191202,0.5937518],"genre_candidate":"other","genre_consensus":"other","teacher_disagreement_score":0.08661026,"threshold_uncertainty_score":0.2138275,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W590758382","doi":"","title":"Sturgeon River Bridge: 100-Year Service Life","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Precast concrete; Girder; Sturgeon; Deck; Bridge (graph theory); Engineering; Structural engineering; Abutment; Civil engineering; Prestressed concrete; Service life; Span (engineering); Culvert; Beam bridge; Bridge deck; Forensic engineering; Fish <Actinopterygii>; Fishery; Mechanical engineering","authors":[{"name":"Dale Serink","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04550532981996951,"gpt":0.2610779696081937,"spread":0.2155726397882242,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003252215,0.0002038747,0.0001446078,0.0003598555,0.0005915556,0.000507639,0.0004146585,0.0005124378,0.005776477],"category_scores_gemma":[0.0002009308,0.00006657124,0.000105933,0.0003661326,0.0001777926,0.0004017088,0.0006927872,0.0002506887,0.001976448],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001102292,"about_ca_system_score_gemma":0.001537513,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.04906836,"about_ca_topic_score_gemma":0.1709409,"domain_scores_codex":[0.9997858,0.000005098782,0.000005607949,0.00001082222,0.0001372713,0.00005530342],"domain_scores_gemma":[0.9998553,0.000002580053,0.000005469229,0.00000497269,0.00006897378,0.00006261488],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0006545712,0.000646143,0.1026782,0.000375861,0.000057426,0.003151985,0.002340247,0.01287551,0.1512364,0.01087425,0.08121806,0.6338913],"study_design_scores_gemma":[0.00009081292,0.002242382,0.3213554,0.0001152391,0.00006548069,0.006010829,0.002015262,0.009336784,0.03193884,0.002294806,0.6244304,0.0001036831],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8635666,0.00152191,0.01317537,0.001058132,0.0001501035,0.0001135684,0.001923729,0.00111726,0.1173733],"genre_scores_gemma":[0.9133825,0.0009662778,0.005577344,0.0002048325,0.00002812306,0.00006581029,0.003503864,0.00009992642,0.07617135],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04906836,"threshold_uncertainty_score":0.09756553,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W642909391","doi":"","title":"Large-Scale Use of HPC for Bridges at Toronto Airport","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Innovative concrete reinforcement materials","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Precast concrete; Deck; Christian ministry; Bridge (graph theory); Civil engineering; Transport engineering; Engineering; Redevelopment; International airport; Forensic engineering; Structural engineering","authors":[{"name":"Ken Bontius","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05158768257150693,"gpt":0.2789606063105013,"spread":0.2273729237389944,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005580925,0.0002196332,0.00008837461,0.0004288461,0.001319235,0.0004971083,0.0005908129,0.0002532947,0.004505535],"category_scores_gemma":[0.0005935022,0.0001192271,0.0001642321,0.000591584,0.0003928972,0.0003286137,0.0006081284,0.0003326214,0.0007470844],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003060893,"about_ca_system_score_gemma":0.004042704,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.2011557,"about_ca_topic_score_gemma":0.5028358,"domain_scores_codex":[0.999518,0.00004447914,0.000007832757,0.00004351065,0.0002677871,0.0001184074],"domain_scores_gemma":[0.999577,0.00002881192,0.00001326039,0.00008844939,0.0001793612,0.0001131962],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0008171095,0.0008521166,0.08498964,0.0003890672,0.00008248993,0.005900774,0.009536575,0.09053327,0.1918896,0.02363339,0.07142987,0.519946],"study_design_scores_gemma":[0.0003132396,0.003087931,0.2690139,0.0001760319,0.0001341699,0.002189313,0.009804907,0.06582499,0.1346495,0.003112548,0.5115083,0.000185206],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8841131,0.0001904998,0.01102211,0.0003071392,0.00004918235,0.0002376928,0.0006082307,0.0008314662,0.1026406],"genre_scores_gemma":[0.9812874,0.0001410923,0.007849808,0.00002115595,0.00001028935,0.00005485682,0.0005867732,0.00005401598,0.009994502],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7988443,"threshold_uncertainty_score":0.3999698,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W610655545","doi":"","title":"HPC Deck Panels for Jacques Cartier Bridge","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Precast concrete; Deck; Bridge (graph theory); Bridge deck; Durability; Structural engineering; Slab; Engineering; Prestressed concrete; Forensic engineering; Geotechnical engineering; Civil engineering; Computer science","authors":[{"name":"Adel R. Zaki","is_ca":false},{"name":"Bernard Breault","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.06676663726339349,"gpt":0.2888088354447209,"spread":0.2220421981813274,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001765326,0.000330267,0.00009029142,0.0003922881,0.0009718552,0.0004686617,0.0004009312,0.0004030756,0.01371013],"category_scores_gemma":[0.0002765209,0.0001294632,0.000174024,0.0001663487,0.0002270299,0.0002107542,0.0004069106,0.0003722337,0.001392326],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009769291,"about_ca_system_score_gemma":0.001532006,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.06360436,"about_ca_topic_score_gemma":0.2092557,"domain_scores_codex":[0.9997709,0.00001225355,0.000004090959,0.00002315689,0.0001544632,0.00003515843],"domain_scores_gemma":[0.999882,0.000007930696,0.000008082734,0.00001534047,0.0000626319,0.00002403559],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0005428341,0.0004613935,0.0412135,0.0002661449,0.00003935297,0.01382884,0.001596725,0.02118124,0.2193963,0.01599383,0.1087894,0.5766903],"study_design_scores_gemma":[0.0000438969,0.0008047032,0.08292299,0.0000604402,0.00002711405,0.006380538,0.0005721857,0.010914,0.06540708,0.0007778374,0.8320277,0.00006153579],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"other","genre_scores_codex":[0.7112015,0.001499498,0.02135995,0.002069294,0.0008103285,0.0003539737,0.0008622209,0.001487646,0.2603556],"genre_scores_gemma":[0.7897239,0.0009142737,0.02713963,0.0002497974,0.0001459704,0.00004878826,0.001040412,0.0001558007,0.1805813],"genre_candidate":"other","genre_consensus":null,"teacher_disagreement_score":0.9363956,"threshold_uncertainty_score":0.1264683,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}