{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":442,"total_is_capped":false,"direct_labels_cover":1,"predictions_cover":442,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"cdafa585b32b","filters":{"venue":"IEEE Transactions on Power Systems"}},"results":[{"id":"W3110874572","doi":"10.1109/tpwrs.2020.3041774","title":"Definition and Classification of Power System Stability – Revisited &amp; Extended","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":1077,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec; University of Waterloo","funders":"Engineering and Physical Sciences Research Council","keywords":"Electric power system; Stability (learning theory); Computer science; Task (project management); Power transmission; Power (physics); Control engineering; Power electronics; Work (physics); Control theory (sociology); Reliability engineering; Engineering; Electrical engineering; Voltage; Artificial intelligence; Systems engineering; Machine learning; Mechanical engineering; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.02660456380169959,"gpt":0.2050505261884892,"spread":0.1784459623867896,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001421631,0.000152472,0.0002642186,0.00008086915,0.0000564701,0.00003834052,0.00006489081,0.0001098234,0.00004539813],"category_scores_gemma":[0.00000507503,0.000152448,0.00006844894,0.0002396498,0.00002655064,0.0001362669,4.984984e-7,0.0001310142,0.00004162498],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007060557,"about_ca_system_score_gemma":0.00001120545,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009285577,"about_ca_topic_score_gemma":0.00000377076,"domain_scores_codex":[0.9989843,0.00007893247,0.0004264915,0.0002184834,0.0001599021,0.0001319041],"domain_scores_gemma":[0.9994408,0.00004720842,0.00007567851,0.0002339183,0.0001057869,0.00009656155],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001027154,0.0006330261,0.0003365682,0.009607234,0.001096801,0.00001099815,0.01168584,0.3333343,0.6274979,0.007099102,0.002680278,0.004990765],"study_design_scores_gemma":[0.004006451,0.0006656688,0.003836405,0.001090387,0.0004263565,0.00008061093,0.003614168,0.9597285,0.01663517,0.00003174721,0.008482176,0.001402393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02850604,0.0007917465,0.9667614,0.00005684764,0.0005742869,0.0004712644,0.0001428702,0.0003987849,0.002296774],"genre_scores_gemma":[0.9994231,0.00008089613,0.0003778099,0.00001549963,0.000009512552,0.00004570177,0.00001294266,0.0000267259,0.00000782837],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.970917,"threshold_uncertainty_score":0.6216648,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954646619","doi":"10.1109/tpwrs.2019.2925703","title":"Microgrid Stability Definitions, Analysis, and Examples","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":732,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Universitat Politècnica de Catalunya","keywords":"Microgrid; Intermittency; Stability (learning theory); Computer science; Wind power; Task (project management); Inertia; Power (physics); Distributed generation; Control engineering; Reliability engineering; Engineering; Voltage; Renewable energy; Electrical engineering; Systems engineering; Physics; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.01145371878188285,"gpt":0.1799185597675074,"spread":0.1684648409856245,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001246908,0.0001487321,0.0002497752,0.0002162425,0.000066715,0.00008007885,0.00006317301,0.00008302279,0.000246565],"category_scores_gemma":[8.183465e-7,0.0001458684,0.000106625,0.0003608319,0.00002021779,0.0001211622,4.201025e-7,0.0001250656,0.0001023759],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000479552,"about_ca_system_score_gemma":0.000008875427,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008806535,"about_ca_topic_score_gemma":0.00007610412,"domain_scores_codex":[0.9992071,0.00004334299,0.0002515431,0.0002122901,0.0001097444,0.0001759756],"domain_scores_gemma":[0.9995053,0.00007046503,0.00002633827,0.0002878095,0.00004216271,0.0000679228],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004322434,0.00015144,0.002361646,0.0002431862,0.001530404,0.000002593156,0.0007980562,0.9696348,0.02260585,0.0001296139,0.0002303815,0.002268774],"study_design_scores_gemma":[0.003866408,0.0004448588,0.01023091,0.0002167111,0.002241733,0.00007951757,0.00217654,0.8945369,0.04846494,0.00005653762,0.03548807,0.00219686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.178232,0.002561777,0.8164729,0.00001636564,0.001207195,0.0003780813,0.000177338,0.0003164944,0.0006378926],"genre_scores_gemma":[0.9988865,0.0007016557,0.0002719107,0.00001587231,0.000006745164,0.00004373143,0.00001254218,0.00002029963,0.00004072195],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8206546,"threshold_uncertainty_score":0.5948339,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2912753047","doi":"10.1109/tpwrs.2019.2894769","title":"Power System Dynamic State Estimation: Motivations, Definitions, Methodologies, and Future Work","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":703,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"Division of Electrical, Communications and Cyber Systems; Engineering and Physical Sciences Research Council; Office of Electricity Delivery and Energy Reliability","keywords":"Electric power system; Estimation; Reliability (semiconductor); State (computer science); Task (project management); Computer science; Reliability engineering; Resilience (materials science); Work (physics); Industrial engineering; Control engineering; Power (physics); Engineering; Systems engineering; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.01694411709168987,"gpt":0.2280524109415734,"spread":0.2111082938498836,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000598527,0.0003614131,0.0004825183,0.0002984979,0.000195734,0.0001713267,0.0001708634,0.0002249654,0.0001709488],"category_scores_gemma":[0.00001120543,0.0003490139,0.000115805,0.00060411,0.0000431181,0.0003441071,0.000002040341,0.0003359919,0.0002919721],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003726685,"about_ca_system_score_gemma":0.00005348993,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001146743,"about_ca_topic_score_gemma":0.00000519811,"domain_scores_codex":[0.9978886,0.0002927727,0.0006751338,0.0004257445,0.0003324324,0.0003852643],"domain_scores_gemma":[0.9986078,0.0002916331,0.00010361,0.0006625469,0.0001264764,0.0002079271],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005756325,0.00007045634,0.0001960434,0.000757376,0.0002505113,0.000006769682,0.001406491,0.9939161,0.0001219974,0.001792343,0.0009371944,0.0004871637],"study_design_scores_gemma":[0.004138447,0.0005391693,0.005976764,0.001903174,0.0002316059,0.0005400861,0.01489968,0.9253501,0.0009114173,0.0001571965,0.04200251,0.003349822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01069581,0.0009304266,0.9721474,0.0001095546,0.007433005,0.0009622645,0.0002159609,0.001231915,0.006273641],"genre_scores_gemma":[0.9948872,0.00012544,0.004155272,0.00003070592,0.000004766361,0.0001690384,0.00001709063,0.00006808673,0.0005423548],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9841914,"threshold_uncertainty_score":0.9998962,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2157496029","doi":"10.1109/59.910791","title":"Wide-area measurement based stabilizing control of large power systems-a decentralized/hierarchical approach","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":596,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Phasor; Electric power system; Control theory (sociology); Phasor measurement unit; Control engineering; Control system; Computer science; Reliability (semiconductor); Transmission system; Automatic Generation Control; Engineering; Transmission (telecommunications); Power (physics); Control (management); Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.02146627558416366,"gpt":0.2193989605884566,"spread":0.197932685004293,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00153941,0.0004926436,0.000902547,0.0003498557,0.0001839334,0.0001236408,0.0003301543,0.0002887734,0.0002287552],"category_scores_gemma":[0.00003269811,0.0004665552,0.0003436683,0.0005863128,0.00007417868,0.0002252752,0.000001500283,0.0004108645,0.00003214475],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005035243,"about_ca_system_score_gemma":0.0001178979,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006472676,"about_ca_topic_score_gemma":0.00002671092,"domain_scores_codex":[0.9957559,0.0005087255,0.00128812,0.00053345,0.001168055,0.0007457416],"domain_scores_gemma":[0.9979391,0.0002148009,0.0001642635,0.0009141113,0.0004232184,0.0003445804],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002020254,0.0007486413,0.0007808764,0.0006289898,0.0003259762,0.000009174041,0.0006056656,0.9949598,0.0009684321,0.0003053597,0.0004528237,0.00001226495],"study_design_scores_gemma":[0.004613438,0.0002320173,0.0003054685,0.0005015067,0.0001383426,0.00004851463,0.001192448,0.969731,0.0009406651,0.000002464926,0.02149701,0.0007971778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.004096295,0.001151324,0.982309,0.00003667269,0.0038466,0.001636822,0.000292157,0.000587243,0.006043879],"genre_scores_gemma":[0.9992189,0.00002839636,0.0002235839,0.00004085178,0.000004073589,0.0002948486,0.000008164705,0.0000936526,0.00008751083],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9951226,"threshold_uncertainty_score":0.9997786,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2103457274","doi":"10.1109/tpwrs.2004.831280","title":"A Method for Synchronization of Power Electronic Converters in Polluted and Variable-Frequency Environments","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":569,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Converters; Synchronization (alternating current); Computer science; Harmonics; Control theory (sociology); Phase-locked loop; Electronic engineering; Power (physics); Engineering; Jitter; Artificial intelligence; Control (management); Telecommunications; Electrical engineering; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.003110601424939718,"gpt":0.1873534595042197,"spread":0.18424285807928,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001369464,0.0001339217,0.0002045061,0.0001652624,0.00003261638,0.00001568733,0.00005597429,0.0001020385,0.00001849646],"category_scores_gemma":[0.000001383342,0.000142037,0.00003786733,0.0001798533,0.00001472233,0.0001278752,2.87388e-7,0.00009476542,0.000002576329],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002381996,"about_ca_system_score_gemma":0.0000315798,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00009317038,"about_ca_topic_score_gemma":0.00002503693,"domain_scores_codex":[0.9992196,0.00002944633,0.0002879588,0.000160749,0.00008653493,0.0002156853],"domain_scores_gemma":[0.9997407,0.00003413406,0.00004212382,0.0001303114,0.00001550199,0.00003718555],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002759238,0.00005809051,0.000006725167,0.00006996695,0.00008562444,4.936984e-7,0.0003365934,0.9770135,0.02140591,0.0003631762,0.000006653175,0.0006256341],"study_design_scores_gemma":[0.007128717,0.0005716989,0.0001499786,0.0003001416,0.0001324399,0.00003725753,0.0002591724,0.9735056,0.0158791,0.0003473892,0.001135752,0.0005527404],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.001938923,0.00081744,0.9960428,0.00001779861,0.0004222107,0.0005592678,0.00005040992,0.0000541614,0.00009695192],"genre_scores_gemma":[0.9955743,0.0001246326,0.004110761,0.00001683752,0.000003449183,0.000099113,0.000005480547,0.00003023928,0.00003519949],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9936354,"threshold_uncertainty_score":0.5792099,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2164802766","doi":"10.1109/tpwrs.2004.831699","title":"Optimal Investment Planning for Distributed Generation in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":528,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Investment (military); Sizing; Electricity; Distributed generation; Capacity planning; Heuristic; Compensation (psychology); Operations research; Computer science; Mathematical optimization; Business; Microeconomics; Economics; Engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.01291919921516226,"gpt":0.2218982238745085,"spread":0.2089790246593463,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002520301,0.0002422314,0.0002893368,0.0003327705,0.0001055002,0.00007449801,0.0001075534,0.0001529493,0.00001091601],"category_scores_gemma":[0.000006714275,0.0002680601,0.00007924815,0.0005644544,0.00001393366,0.0001988978,4.327692e-7,0.0002059964,0.00001025133],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009840784,"about_ca_system_score_gemma":0.00005967565,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005457289,"about_ca_topic_score_gemma":0.00003308125,"domain_scores_codex":[0.998596,0.00006701073,0.0004670448,0.0002798226,0.0002111542,0.0003789392],"domain_scores_gemma":[0.9995027,0.00007144098,0.00006265115,0.0002006325,0.00007654571,0.0000860783],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003709841,0.00008777578,0.000006632172,0.0000535332,0.00006224262,0.000006183056,0.000408848,0.9966872,0.001606196,0.0003840239,0.0006415595,0.00001869944],"study_design_scores_gemma":[0.002116866,0.0003280061,0.00006856536,0.0002068531,0.00003285548,0.00003862843,0.0001861567,0.9730916,0.02196588,0.00001062351,0.001532593,0.0004213912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01701155,0.0002294218,0.9783341,0.00002480345,0.001401917,0.001210932,0.0001560258,0.0003005775,0.001330622],"genre_scores_gemma":[0.9977992,0.00001406732,0.001335834,0.00002985635,0.00002621873,0.0005972115,0.00005792647,0.00005088585,0.00008878238],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9807877,"threshold_uncertainty_score":0.9999772,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2096720283","doi":"10.1109/tpwrs.2005.846114","title":"An Integrated Distributed Generation Optimization Model for Distribution System Planning","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":519,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Distributed generation; Planner; Sizing; Key (lock); Engineering; Purchasing; Mathematical optimization; Operations research; Computer science; Operations management; Renewable energy","retraction":null,"screen_n_in":null,"score":{"opus":0.01855010994245831,"gpt":0.2392403889112767,"spread":0.2206902789688184,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002841697,0.0003481005,0.0003029626,0.0001355334,0.0002990889,0.0002312453,0.0001841173,0.000283416,0.000009887229],"category_scores_gemma":[0.000004884399,0.0003723777,0.0001243838,0.0003293673,0.00002424201,0.000739008,5.622894e-7,0.0002280629,0.00002741393],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00118374,"about_ca_system_score_gemma":0.00004295561,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001436035,"about_ca_topic_score_gemma":0.000009640195,"domain_scores_codex":[0.9982504,0.00006321234,0.0006000865,0.0003835949,0.0002913715,0.0004113427],"domain_scores_gemma":[0.999051,0.00003191361,0.00008852707,0.0003916835,0.0002636932,0.0001731379],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000503452,0.00009369971,0.000001343729,0.00007368928,0.00005621294,8.25937e-7,0.0001465043,0.9948518,0.002470199,0.0001949615,0.00182733,0.0002330945],"study_design_scores_gemma":[0.000623755,0.0001484291,0.000002638654,0.0001082459,0.00006666535,0.00001580557,0.0002353674,0.9927638,0.004374084,4.899888e-7,0.001286695,0.0003740162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.006661817,0.00008781125,0.9825817,0.00002446112,0.002033806,0.0009388424,0.006142603,0.001472458,0.00005652239],"genre_scores_gemma":[0.9907383,0.000005308746,0.004177567,0.000009288117,0.00008651571,0.0004384159,0.004417084,0.00007794495,0.00004960439],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9840764,"threshold_uncertainty_score":0.9998728,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2038417474","doi":"10.1109/tpwrs.2012.2200049","title":"Optimal Placement and Sizing Method to Improve the Voltage Stability Margin in a Distribution System Using Distributed Generation","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":486,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Sizing; Distributed generation; Voltage; Margin (machine learning); Integer programming; Probabilistic logic; Engineering; Control theory (sociology); Electric power system; Linear programming; Voltage regulation; Computer science; Mathematical optimization; Renewable energy; Power (physics); Mathematics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02120393418515787,"gpt":0.2514177080611188,"spread":0.2302137738759609,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001378708,0.0003017864,0.0003067008,0.00009845688,0.0002213669,0.0001513586,0.000123422,0.0001575242,0.00001011745],"category_scores_gemma":[0.00001023598,0.0002677535,0.00007541898,0.0004407376,0.00002773308,0.0003867196,0.000004374378,0.0003089324,0.00001657983],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001621691,"about_ca_system_score_gemma":0.00002523058,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000181157,"about_ca_topic_score_gemma":0.00002512647,"domain_scores_codex":[0.9980158,0.0002253036,0.0005606539,0.0003237409,0.0003227819,0.0005517775],"domain_scores_gemma":[0.9991854,0.0001062315,0.00006601763,0.0003752109,0.00007496502,0.000192131],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005917097,0.0001027443,0.0001397247,0.0001822201,0.00006118437,0.000001851402,0.0007573384,0.9249721,0.07323207,0.0001339851,0.00009405873,0.0002635806],"study_design_scores_gemma":[0.0005490617,0.0001086398,0.0005163419,0.0001253656,0.00007105638,0.00003585681,0.002118543,0.9519432,0.04330213,2.333108e-7,0.0008529227,0.0003766304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3100133,0.0001647726,0.6858304,0.00001705797,0.001781955,0.0009018289,0.001107748,0.000160476,0.00002242694],"genre_scores_gemma":[0.998394,0.000003038208,0.001155389,0.000007012497,0.00005648492,0.0002517398,0.00008896748,0.00003671348,0.00000672435],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6883806,"threshold_uncertainty_score":0.9999775,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2135379734","doi":"10.1109/tpwrs.2008.922232","title":"Control and Power Management of Converter Fed Microgrids","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":485,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Microgrid; Voltage droop; Control theory (sociology); AC power; Converters; Voltage source; Automatic frequency control; Voltage regulation; Controller (irrigation); Voltage; Power control; Engineering; Voltage optimisation; Computer science; Power (physics); Control (management); Electrical engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.005001799427319558,"gpt":0.1710873726584513,"spread":0.1660855732311317,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006260522,0.0001565503,0.0002414732,0.0001058987,0.00006804775,0.00001820916,0.00006960156,0.00007768502,0.00005431469],"category_scores_gemma":[1.67871e-7,0.0001496669,0.00007247401,0.0001054096,0.00004342289,0.0000872884,4.092918e-7,0.00009298933,0.00002975224],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003044991,"about_ca_system_score_gemma":0.000005362162,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001966443,"about_ca_topic_score_gemma":0.000001694692,"domain_scores_codex":[0.9992374,0.00002380966,0.0002856443,0.0001514684,0.0001276256,0.0001740103],"domain_scores_gemma":[0.9996471,0.00002078884,0.0000336565,0.0001935455,0.00004284023,0.00006209776],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001169793,0.001211335,0.0005306352,0.002177818,0.006482431,0.0003176008,0.006241794,0.8936279,0.06171939,0.0006405181,0.0119332,0.01394755],"study_design_scores_gemma":[0.02539781,0.001472545,0.004505577,0.001081062,0.0008835715,0.0008894395,0.001685645,0.8768414,0.02624351,0.00001379142,0.05838947,0.002596227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03253212,0.001606788,0.9621755,0.00002350286,0.001602314,0.0004548327,0.00005583489,0.0001776914,0.001371347],"genre_scores_gemma":[0.998976,0.0004402332,0.0001536638,0.00002990905,0.000005595405,0.0000485232,0.000001337085,0.00002808967,0.0003166449],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9664439,"threshold_uncertainty_score":0.6103238,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2911347525","doi":"10.1109/tpwrs.2019.2897727","title":"A Review of Power System Flexibility With High Penetration of Renewables","year":2019,"lang":"en","type":"review","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":470,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Canadian Internet Registration Authority","keywords":"Flexibility (engineering); Electric power system; Renewable energy; Risk analysis (engineering); Computer science; Volatility (finance); Reliability engineering; Environmental economics; Power (physics); Computer security; Business; Engineering; Economics; Electrical engineering; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.02779842270905443,"gpt":0.2538902912757321,"spread":0.2260918685666777,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000570952,0.0006019815,0.002680283,0.0004012498,0.00003333877,0.00002243811,0.0003782997,0.0002906263,0.00006700131],"category_scores_gemma":[0.000003160391,0.0004747764,0.0005148479,0.0007070187,0.00004542223,0.000128129,0.000002047506,0.0002430648,0.00004732918],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004604959,"about_ca_system_score_gemma":0.0001317967,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001927147,"about_ca_topic_score_gemma":0.00003386006,"domain_scores_codex":[0.9968477,0.0002469595,0.001603355,0.0004792904,0.0005446352,0.0002780319],"domain_scores_gemma":[0.9975925,0.0001390902,0.000528139,0.001481018,0.0001806053,0.00007863675],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0000113225,0.00008874643,1.725663e-7,0.8169004,0.001146278,0.000003859436,0.00003140158,0.1756635,0.00000341543,0.0002140116,0.001547099,0.004389778],"study_design_scores_gemma":[0.0002303075,0.0002594327,6.107205e-7,0.4087788,0.001726072,0.00004186111,0.00005688028,0.0004679202,0.00007776184,2.437422e-7,0.5878309,0.0005292455],"study_design_candidate":"systematic_review","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.00000397653,0.8289093,0.1618827,0.000001643557,0.003745048,0.001895449,0.0002074943,0.0002240111,0.003130356],"genre_scores_gemma":[0.02209541,0.9768229,0.00009054872,0.000005038692,0.00001790052,0.0004205267,0.00003194482,0.0001382659,0.0003775306],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.5862838,"threshold_uncertainty_score":0.9997704,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2113369277","doi":"10.1109/tpwrs.2010.2045663","title":"Optimal Allocation of ESS in Distribution Systems With a High Penetration of Wind Energy","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":466,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Sizing; Installation; Energy storage; Distributed generation; Reliability engineering; Electricity; Computer science; Environmental economics; Renewable energy; Environmental science; Engineering; Electrical engineering; Power (physics); Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.003358343786777668,"gpt":0.1751567484709851,"spread":0.1717984046842075,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002771719,0.0002172593,0.0003793951,0.0003196856,0.00003767961,0.00003386389,0.0001458476,0.000228136,0.000009857367],"category_scores_gemma":[0.000003885882,0.0002122505,0.00005020659,0.0007225751,0.00003953914,0.0002835596,5.122767e-7,0.0002258892,0.000003035911],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001489224,"about_ca_system_score_gemma":0.00006466488,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0011274,"about_ca_topic_score_gemma":0.0002582259,"domain_scores_codex":[0.9983683,0.00008541675,0.0007154312,0.0002285494,0.0003763655,0.0002259421],"domain_scores_gemma":[0.9990755,0.00007087838,0.0002004391,0.0003754904,0.0002159236,0.00006176972],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005136585,0.0001142673,0.00007721996,0.0002023699,0.00006275593,0.000001614624,0.0001910923,0.9703149,0.02770232,0.001190054,0.00003200688,0.00006006411],"study_design_scores_gemma":[0.0016963,0.0006122477,0.00120486,0.000646664,0.00008773122,0.00008998542,0.0003418793,0.8419707,0.1525266,0.000003146141,0.0002876801,0.0005321313],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2443034,0.00007790975,0.7530265,0.00000512005,0.001761477,0.0003668217,0.0000742331,0.00009157395,0.0002929484],"genre_scores_gemma":[0.9995123,0.0000189707,0.0001775537,9.294419e-7,0.00001549701,0.00009831436,0.00004981226,0.0000431508,0.00008343215],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.755209,"threshold_uncertainty_score":0.8655323,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1981074152","doi":"10.1109/tpwrs.2012.2207972","title":"Implementing Virtual Inertia in DFIG-Based Wind Power Generation","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":455,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Control theory (sociology); Inertia; Wind power; Electric power system; Islanding; Capacitor; Computer science; Energy storage; Power (physics); Engineering; Renewable energy; Control engineering; Distributed generation; Voltage; Electrical engineering; Control (management); Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.01008684574244633,"gpt":0.2062978219833697,"spread":0.1962109762409233,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002852374,0.0001783881,0.0001745655,0.0002354955,0.00009211971,0.00006246541,0.00007197804,0.0001061022,0.0001860216],"category_scores_gemma":[0.000001740971,0.0001829952,0.00006736135,0.0002291295,0.000009213239,0.0003097819,4.856959e-7,0.0001669459,0.00007927851],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001293858,"about_ca_system_score_gemma":0.00001560367,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005164455,"about_ca_topic_score_gemma":0.00007567797,"domain_scores_codex":[0.998823,0.00005533721,0.0003745766,0.0001462978,0.0001619013,0.0004388424],"domain_scores_gemma":[0.9996266,0.00002769961,0.00003700623,0.0001921521,0.00003354725,0.00008292913],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001063415,0.00007547556,0.0001620363,0.00001273413,0.00003238956,0.000001062565,0.0004761658,0.9786262,0.01961537,0.00003571487,0.0003261287,0.0006261251],"study_design_scores_gemma":[0.001609283,0.0001092762,0.0004432812,0.00007320328,0.00003708846,0.000009488685,0.0003200611,0.9585901,0.02232454,4.087324e-7,0.01600154,0.0004817193],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1032066,0.0005488153,0.8916325,0.0000221279,0.003414982,0.0003283262,0.00003121187,0.0001994982,0.0006159747],"genre_scores_gemma":[0.9995558,0.00001152159,0.0001258532,0.00004610016,0.00006012967,0.00005469588,0.00001385658,0.00004187961,0.00009020905],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8963492,"threshold_uncertainty_score":0.7462326,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4224237392","doi":"10.1109/tpwrs.2022.3161418","title":"Real-World Subsynchronous Oscillation Events in Power Grids With High Penetrations of Inverter-Based Resources","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":430,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal; Stantec (Canada); Hydro One (Canada)","funders":"U.S. Department of Energy","keywords":"Electric power system; Inverter; Grid; Oscillation (cell signaling); Engineering; Compensation (psychology); Power grid; Reliability engineering; Power (physics); Computer science; Electrical engineering; Voltage; Physics; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.005471184505285036,"gpt":0.1832562145377157,"spread":0.1777850300324307,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001634636,0.0001688466,0.0002374167,0.0005284841,0.0001367703,0.00001784892,0.0001238246,0.0000486671,0.0002285772],"category_scores_gemma":[5.900246e-7,0.0001703367,0.00005972706,0.0007145307,0.00002181489,0.0001227365,7.995772e-7,0.000212028,0.000006416549],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002770481,"about_ca_system_score_gemma":0.00004919626,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001149601,"about_ca_topic_score_gemma":0.001389524,"domain_scores_codex":[0.9987836,0.0001121171,0.0003980078,0.0002008819,0.0003106793,0.0001947403],"domain_scores_gemma":[0.9995021,0.00005323843,0.00007987793,0.0002665511,0.00004865192,0.00004956259],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007781853,0.0001114425,0.0007790674,0.00003480049,0.00004242542,0.000002562346,0.0005110802,0.9972063,0.001091937,0.00002061453,0.00006900127,0.00005299265],"study_design_scores_gemma":[0.004052935,0.001044131,0.01991663,0.0002255807,0.00009947319,0.00001879605,0.001086436,0.9676805,0.00320661,0.00001152561,0.001916386,0.0007410232],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6169609,0.000164629,0.379136,0.0000462233,0.001485717,0.0006938908,0.0001569905,0.0002250656,0.001130565],"genre_scores_gemma":[0.9994363,0.00001639481,0.0001132871,0.00001451046,0.000007826992,0.0002012735,0.0000197776,0.0000403405,0.0001503331],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3824753,"threshold_uncertainty_score":0.694613,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2107843419","doi":"10.1109/tpwrs.2010.2045773","title":"Potential-Function Based Control of a Microgrid in Islanded and Grid-Connected Modes","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":427,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Microgrid; Grid; Function (biology); Control theory (sociology); Voltage; Engineering; Control (management); Control engineering; Computer science; Mathematics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.002169613193037892,"gpt":0.1585681025312088,"spread":0.1563984893381709,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001327923,0.0001543775,0.000248299,0.000253273,0.00004138692,0.00003554786,0.00005864311,0.0001467642,0.00004482656],"category_scores_gemma":[0.000002364534,0.0001506851,0.00006363806,0.0001726783,0.00002798938,0.0001088352,1.833826e-7,0.0002331138,0.000005419362],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002011804,"about_ca_system_score_gemma":0.00001618467,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001088839,"about_ca_topic_score_gemma":0.0001848887,"domain_scores_codex":[0.9992024,0.00004064465,0.0003160557,0.0001652511,0.0001056083,0.0001700494],"domain_scores_gemma":[0.9996127,0.00005077238,0.00004491661,0.0001787222,0.00006088188,0.00005203141],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001223536,0.0000651993,0.00005372446,0.0000641307,0.00005417519,0.000002056473,0.00006686095,0.7211457,0.2776484,0.00001291048,0.00003758509,0.0007269694],"study_design_scores_gemma":[0.002812885,0.00009721097,0.0004614689,0.00005703604,0.00005764419,0.00001343869,0.00006044692,0.9767892,0.01911119,0.000005223244,0.0003494745,0.0001848317],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1234284,0.0003742377,0.8733276,0.00002613841,0.002134348,0.000376229,0.00008382806,0.0001446344,0.0001045848],"genre_scores_gemma":[0.9996881,0.00003675191,0.0001232443,0.00001864743,0.00002245175,0.00006288248,0.000005814712,0.00002671218,0.00001536491],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8762597,"threshold_uncertainty_score":0.614476,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2095731600","doi":"10.1109/tpwrs.2008.2008606","title":"Applying Wavelets to Short-Term Load Forecasting Using PSO-Based Neural Networks","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":409,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Particle swarm optimization; Artificial neural network; Computer science; Wavelet; Term (time); Backpropagation; Algorithm; Preprocessor; Data pre-processing; Mathematical optimization; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.02992717806607406,"gpt":0.2363314054395546,"spread":0.2064042273734805,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002315648,0.000418758,0.0003896028,0.0002628601,0.0003048522,0.0001722639,0.0002203486,0.0001963344,0.00002129599],"category_scores_gemma":[0.000003781847,0.0004410168,0.0001867273,0.000515827,0.00001753401,0.0002103971,0.000001064924,0.0004511068,0.00001258763],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003114624,"about_ca_system_score_gemma":0.00002960537,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004323651,"about_ca_topic_score_gemma":0.00002559103,"domain_scores_codex":[0.9979218,0.00004770915,0.0005522955,0.0003847852,0.0003752381,0.0007181792],"domain_scores_gemma":[0.9991202,0.00009293454,0.00004734596,0.0003873473,0.00007792655,0.0002742081],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000176704,0.00003334003,0.0000308396,0.0000389201,0.00003485485,0.00003765108,0.0001880977,0.9834571,0.003915721,0.000006478907,0.00006022615,0.01217903],"study_design_scores_gemma":[0.0002799643,0.0001381172,0.00003029031,0.0004137303,0.00003569369,0.00009394097,0.00005071099,0.9945646,0.003216794,0.000001022114,0.0006937014,0.0004814602],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1451431,0.0001957094,0.8478839,0.00001353726,0.004160905,0.0005220104,0.00001482064,0.000619096,0.001446904],"genre_scores_gemma":[0.9986382,0.00000280607,0.0008261927,0.0001432506,0.0001269044,0.0001050265,0.000003680652,0.00009040718,0.00006354479],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8534951,"threshold_uncertainty_score":0.9998041,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2151027979","doi":"10.1109/59.910787","title":"Z-bus loss allocation","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":405,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Exploit; Computer science; Mathematical optimization; Computation; Context (archaeology); Process (computing); Consistency (knowledge bases); Electric power system; Flow network; Power (physics); Bus network; Matrix (chemical analysis); Set (abstract data type); Algorithm; Mathematics; System bus","retraction":null,"screen_n_in":null,"score":{"opus":0.00764439158587871,"gpt":0.1993012720517173,"spread":0.1916568804658386,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001666526,0.000224756,0.0002201697,0.0002712468,0.0001067306,0.00007932107,0.0001623575,0.0001595309,0.00009142944],"category_scores_gemma":[0.000002149782,0.0002391598,0.00008105715,0.0006132719,0.000017276,0.0002565463,2.793307e-7,0.0001994119,0.0005355298],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002630023,"about_ca_system_score_gemma":0.00002237925,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005060209,"about_ca_topic_score_gemma":0.00001587103,"domain_scores_codex":[0.9986901,0.00005792653,0.0003942783,0.0002364842,0.0002929674,0.000328195],"domain_scores_gemma":[0.9992985,0.00004917784,0.00004622292,0.0004122514,0.00008524173,0.0001086811],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001530719,0.00006454436,0.00002725405,0.00005288155,0.00009115969,0.00001780021,0.0003124826,0.9957805,0.001317638,0.0001281478,0.001554458,0.0006378406],"study_design_scores_gemma":[0.001719831,0.0003525002,0.000192752,0.0003792539,0.0001183971,0.0008961385,0.0003344538,0.9099157,0.01787389,0.00002061483,0.06682145,0.001374982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.007188941,0.0003134665,0.9741222,0.0000422729,0.0052395,0.000424012,0.00001102574,0.0009719146,0.0116867],"genre_scores_gemma":[0.9973081,0.0001468719,0.0001080874,0.00002302138,0.00002907926,0.0001365301,0.000004598478,0.00007149881,0.002172237],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9901192,"threshold_uncertainty_score":0.9752655,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4254562070","doi":"10.1109/59.910786","title":"Enforcing passivity for admittance matrices approximated by rational functions","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":376,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Passivity; Admittance; Rational function; Admittance parameters; Linearization; Positive-definite matrix; Control theory (sociology); Mathematics; Frequency domain; Quadratic equation; Jacobian matrix and determinant; Electric power system; Applied mathematics; Quadratic programming; Mathematical optimization; Voltage; Power (physics); Mathematical analysis; Computer science; Electrical impedance; Engineering; Physics; Nonlinear system","retraction":null,"screen_n_in":null,"score":{"opus":0.008349758174591377,"gpt":0.2219992354729647,"spread":0.2136494772983733,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001177008,0.0001758327,0.0001906357,0.00007947485,0.0004222605,0.0001039561,0.0001045947,0.00004715703,0.0002429709],"category_scores_gemma":[8.314079e-7,0.0001643861,0.0001119283,0.0002346127,0.00002268336,0.0001820546,4.683782e-7,0.0001376936,0.00006536084],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005345922,"about_ca_system_score_gemma":0.00005001342,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001739691,"about_ca_topic_score_gemma":0.000004463002,"domain_scores_codex":[0.9989367,0.00003543706,0.0002692958,0.0002736975,0.0001697558,0.0003151668],"domain_scores_gemma":[0.9994117,0.0001095947,0.0001014152,0.0002016876,0.00008003464,0.00009559307],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.002177883,0.009840319,0.007340905,0.0006624951,0.004433563,0.00001053578,0.006200914,0.1495576,0.2126202,0.04933343,0.5304433,0.02737889],"study_design_scores_gemma":[0.009999231,0.003194194,0.0005333743,0.0004791779,0.0007166001,0.00007358316,0.003746065,0.129649,0.054602,0.001854821,0.7917213,0.003430624],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03743276,0.0000994435,0.9543565,0.0001560691,0.001209464,0.0004366793,0.0002894935,0.0001156736,0.005903928],"genre_scores_gemma":[0.9884184,0.000002969872,0.0001378691,0.00003077376,0.00008024938,0.0004861509,0.00004360813,0.00002415963,0.01077581],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9542186,"threshold_uncertainty_score":0.6703472,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2125656363","doi":"10.1109/tpwrs.2008.2004827","title":"Kinetic Energy of Wind-Turbine Generators for System Frequency Support","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":347,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Turbine; Kinetic energy; Electric power system; Computer science; Marine engineering; Power (physics); Electrical engineering; Engineering; Environmental science; Simulation; Aerospace engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.01045633144932118,"gpt":0.1873718977095816,"spread":0.1769155662602604,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001828005,0.0003966649,0.000729563,0.0003698915,0.0001371051,0.0000243406,0.0002711407,0.0002499563,0.00003446032],"category_scores_gemma":[0.000003131962,0.0003834957,0.0003183486,0.0003577839,0.00005136038,0.0001494441,6.878097e-7,0.0001614522,0.00004202557],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002448728,"about_ca_system_score_gemma":0.00007030016,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000302287,"about_ca_topic_score_gemma":0.00002304838,"domain_scores_codex":[0.9977568,0.00007331625,0.0009600474,0.000350703,0.000395096,0.0004640489],"domain_scores_gemma":[0.9987495,0.0001013374,0.0001408831,0.0006324595,0.000191295,0.0001845388],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001343896,0.0003831463,0.0002082413,0.002983866,0.001664544,0.0001531319,0.001671487,0.8557114,0.1191351,0.00517016,0.01242991,0.0003546349],"study_design_scores_gemma":[0.01787085,0.004597437,0.0006540113,0.002580691,0.001185625,0.004416217,0.001574103,0.3220245,0.568392,0.00005216531,0.07095344,0.005699015],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03685418,0.0009739529,0.9453762,0.00001291028,0.01009428,0.0008815383,0.0003307692,0.0007287437,0.004747497],"genre_scores_gemma":[0.9983513,0.00001967123,0.0001861769,0.00001236129,0.0001380122,0.0003408569,0.00001054891,0.000133544,0.0008074854],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9614972,"threshold_uncertainty_score":0.9998617,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2125135194","doi":"10.1109/tpwrs.2012.2213309","title":"DG allocation for benefit maximization in distribution networks","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":293,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Distributed generation; Renewable energy; Installation; Maximization; Reliability engineering; Reliability (semiconductor); Computer science; Mathematical optimization; Upgrade; Reduction (mathematics); Integer programming; Power (physics); Engineering; Mathematics; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006693980631605308,"gpt":0.1936410292391505,"spread":0.1869470486075452,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001458422,0.0002056887,0.0001982045,0.0001183679,0.00008704677,0.0001069814,0.0001071143,0.000207502,0.00004987897],"category_scores_gemma":[0.000004232142,0.0002298765,0.00008058843,0.0003504692,0.00001706339,0.0004225029,4.644855e-7,0.0001753711,0.0001089818],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004413998,"about_ca_system_score_gemma":0.00001061958,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000123799,"about_ca_topic_score_gemma":0.00004488408,"domain_scores_codex":[0.9988266,0.00002369462,0.0004237304,0.0002345051,0.0001554301,0.0003360599],"domain_scores_gemma":[0.9994282,0.00005773486,0.00004704904,0.0002489909,0.0001375523,0.00008049934],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001472574,0.00006138789,0.00002647555,0.00004601836,0.00002324755,2.767691e-7,0.00004683982,0.996324,0.0005847684,0.0003092959,0.001466144,0.001096791],"study_design_scores_gemma":[0.0005576634,0.0001004718,0.0009471596,0.00008515677,0.00001850843,0.000004741198,0.00007851831,0.9947639,0.001627026,0.00003739252,0.001515987,0.0002635519],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02339356,0.0001217069,0.9717346,0.0000585522,0.002652674,0.001271461,0.0002179253,0.0003423577,0.000207165],"genre_scores_gemma":[0.9983321,0.00003193422,0.0001337595,0.0000122368,0.000025598,0.0009546456,0.0003325909,0.00004423152,0.0001328753],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9749386,"threshold_uncertainty_score":0.9374091,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2161877694","doi":"10.1109/tpwrs.2009.2038059","title":"Online Monitoring of Voltage Stability Margin Using an Artificial Neural Network","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":277,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"","keywords":"Phasor; Margin (machine learning); Voltage; Artificial neural network; Control theory (sociology); Electric power system; Generator (circuit theory); Units of measurement; Engineering; Stability (learning theory); AC power; Power (physics); Computer science; Control (management); Artificial intelligence; Electrical engineering; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.0357732314883415,"gpt":0.258220370076061,"spread":0.2224471385877195,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004630697,0.0002519249,0.0003917358,0.0001155217,0.0001396174,0.00006370925,0.000199236,0.0001977997,0.0001264338],"category_scores_gemma":[0.000006639368,0.0002605071,0.0001325262,0.0003577062,0.0000646731,0.0002961514,0.000001204205,0.0004724791,0.000006270837],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008984419,"about_ca_system_score_gemma":0.00003529814,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001371666,"about_ca_topic_score_gemma":0.0002153833,"domain_scores_codex":[0.9982142,0.0001120585,0.0007199522,0.0003005165,0.000296554,0.0003566937],"domain_scores_gemma":[0.9988374,0.00007816913,0.00008939932,0.0006774529,0.0001374283,0.0001802134],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002704832,0.0002855618,0.0009371422,0.0001082482,0.00003650795,0.000001932298,0.0004873495,0.9557893,0.04215404,0.00002713798,0.000007880602,0.000137817],"study_design_scores_gemma":[0.0002813252,0.00009913567,0.001151241,0.00007356828,0.00003767282,0.0000180945,0.0008397467,0.9742185,0.02261053,0.000007764781,0.0002784377,0.0003839724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5000024,0.0000290368,0.4907022,0.000002450892,0.008594469,0.0002458321,0.0001045039,0.0002135118,0.0001056258],"genre_scores_gemma":[0.9989183,0.000002242137,0.0009041306,0.000002747217,0.00007556369,0.00001946068,0.000004816423,0.00005226224,0.00002048125],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4989159,"threshold_uncertainty_score":0.9999847,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2167885813","doi":"10.1109/tpwrs.2003.818587","title":"An Electricity Market With a Probabilistic Spinning Reserve Criterion","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":269,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Probabilistic logic; Clearing; Reliability (semiconductor); Mathematical optimization; Electricity market; Market clearing; Electric power system; Power system simulation; Computation; Computer science; Electricity; Reliability engineering; Mathematics; Engineering; Power (physics); Algorithm; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.007810291990077612,"gpt":0.2096130371799929,"spread":0.2018027451899153,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003924668,0.0002951069,0.0003381445,0.0001831606,0.0001557172,0.0001235145,0.0002386696,0.0001491909,0.00003229573],"category_scores_gemma":[0.00001084275,0.000254411,0.00008363838,0.0004677387,0.00005625603,0.0003895658,5.48047e-7,0.0003577,0.00004446675],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004486338,"about_ca_system_score_gemma":0.00006592809,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003883681,"about_ca_topic_score_gemma":0.000255351,"domain_scores_codex":[0.9983049,0.00009779085,0.0004013435,0.0003972511,0.0003225908,0.0004761381],"domain_scores_gemma":[0.9988922,0.00004633508,0.00004924172,0.0006596156,0.0001697278,0.0001828134],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002267747,0.0003310912,0.00002544456,0.0007194709,0.0001180857,0.00004825032,0.001350372,0.9928009,0.003501368,0.000290087,0.0004335998,0.0001545538],"study_design_scores_gemma":[0.01929349,0.01969938,0.004237692,0.01719929,0.0008040949,0.002663888,0.00514436,0.7430811,0.1021471,0.001116297,0.07426272,0.01035061],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.09276207,0.0001685308,0.8996679,0.00003409393,0.002197002,0.0007687917,0.00003769295,0.0007851508,0.003578816],"genre_scores_gemma":[0.9991263,0.0000132596,0.0002857644,0.00002548039,0.00002581399,0.0002334657,0.000001805449,0.0000645503,0.0002235793],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9063642,"threshold_uncertainty_score":0.9999908,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2595259167","doi":"10.1109/tpwrs.2017.2682110","title":"A Pole-to-Pole Short-Circuit Fault Current Calculation Method for DC Grids","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":249,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Global Energy Interconnection Research Institute North America; University of Manitoba","keywords":"Fault current limiter; Converters; Fault (geology); Control theory (sociology); Modular design; RLC circuit; Voltage; Topology (electrical circuits); Grid; Equivalent circuit; Circuit breaker; Electronic engineering; Engineering; Partial element equivalent circuit; Transient (computer programming); Computer science; Capacitor; Electric power system; Mathematics; Electrical engineering; Power (physics); Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.0374666538765643,"gpt":0.314239241943974,"spread":0.2767725880674097,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004724342,0.0002966814,0.0003757765,0.0002407551,0.0006108974,0.0002956007,0.000263811,0.0002087303,0.00001449641],"category_scores_gemma":[0.00001112954,0.0002953373,0.0002271535,0.0001263052,0.00001871293,0.0002944175,0.000001275371,0.000271049,0.0001204896],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000326374,"about_ca_system_score_gemma":0.00003060142,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005229879,"about_ca_topic_score_gemma":0.0001383519,"domain_scores_codex":[0.9983435,0.00006440049,0.000503616,0.0003872235,0.0003027519,0.0003984846],"domain_scores_gemma":[0.998761,0.00005439598,0.00007941074,0.0007755517,0.000128419,0.0002012224],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008552853,0.0001548117,0.00004040183,0.0008700643,0.0003612479,0.000004426173,0.001906134,0.8733776,0.04052119,0.0005390588,0.003136015,0.07900351],"study_design_scores_gemma":[0.001503847,0.000439032,0.0006854077,0.0009040509,0.0001732054,0.00008033714,0.0003290462,0.7038614,0.03079957,0.00004598411,0.2599094,0.001268685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.00407172,0.0001888355,0.9789144,0.00004032724,0.01313762,0.001764399,0.0001978296,0.0004209543,0.001263853],"genre_scores_gemma":[0.9973145,0.000009424075,0.0005542018,0.000009902042,0.0001842342,0.001116267,0.000005436897,0.00008357136,0.0007224269],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9932428,"threshold_uncertainty_score":0.9999499,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2004675218","doi":"10.1109/tpwrs.2015.2400633","title":"Local and Wide-Area PMU-Based Decentralized Dynamic State Estimation in Multi-Machine Power Systems","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":247,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Phasor measurement unit; Electric power system; Phasor; Control theory (sociology); Extended Kalman filter; Context (archaeology); Synchronous motor; Permanent magnet synchronous generator; AC power; Control engineering; Rotor (electric); Computer science; Kalman filter; Fault (geology); Engineering; Synchronization (alternating current); Power (physics); Voltage; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.0163193889599815,"gpt":0.2386965375682077,"spread":0.2223771486082262,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006312116,0.0003945734,0.0005517567,0.0003746268,0.00008198035,0.0001617046,0.0001526958,0.0001981027,0.00002759314],"category_scores_gemma":[0.00001947344,0.0003861547,0.00008545535,0.0004345068,0.00007352975,0.0003205454,0.000001413735,0.0003009319,0.00005103942],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006025462,"about_ca_system_score_gemma":0.00008979334,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005742859,"about_ca_topic_score_gemma":0.0005695418,"domain_scores_codex":[0.9976214,0.0002724988,0.0008383162,0.0004155974,0.0004075503,0.0004446176],"domain_scores_gemma":[0.9987938,0.000144875,0.00009766697,0.0004728306,0.0001403105,0.0003505119],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008182369,0.000148058,0.0002264221,0.0001841352,0.00005213,0.00001296856,0.0009227041,0.9982094,0.00005497443,0.000009254195,0.00008290089,0.00001527975],"study_design_scores_gemma":[0.002478131,0.00008795633,0.000239816,0.0002415846,0.00002392777,0.00002581816,0.0005354095,0.9951096,0.0001257896,0.000001754072,0.0007490417,0.0003812067],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.007023159,0.001263262,0.9863536,0.00003545708,0.003223134,0.001061243,0.0002023977,0.0005293329,0.0003084482],"genre_scores_gemma":[0.998947,0.00002466725,0.0005433168,0.00002129545,8.230879e-8,0.0001693588,0.00002208009,0.00007300836,0.0001991474],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9919239,"threshold_uncertainty_score":0.999859,"prediction_status":"machine_predicted_unvalidated"},"labels":[{"model":"gemma","categories":[],"domain":null,"study_design":"simulation_or_modeling","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":[],"domain":null,"study_design":"simulation_or_modeling","genre":"methods","about_ca_system":false,"about_ca_topic":false,"confidence":"low"}],"label_agreement":"agree"},{"id":"W2153268897","doi":"10.1109/tpwrs.2007.907375","title":"Hybrid Particle Swarm Optimization Approach for Solving the Discrete OPF Problem Considering the Valve Loading Effects","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":237,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Particle swarm optimization; Sequential quadratic programming; Robustness (evolution); Electric power system; Quadratic programming; Computer science; Optimization problem; Mathematics; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.009270539254496592,"gpt":0.2115707214931897,"spread":0.2023001822386931,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001310811,0.0003111818,0.0002888709,0.0001220985,0.0005962793,0.0002515324,0.0002743502,0.0001041795,0.000004195135],"category_scores_gemma":[0.00002093023,0.0002181776,0.000205866,0.0004227828,0.0000500747,0.0002972063,0.000002082037,0.0003044485,0.000007909851],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002580036,"about_ca_system_score_gemma":0.00002790128,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003213129,"about_ca_topic_score_gemma":0.000005922609,"domain_scores_codex":[0.9980249,0.0001032388,0.000590214,0.0003294525,0.0003319198,0.0006202146],"domain_scores_gemma":[0.9983702,0.0008083513,0.0001230521,0.0004911579,0.0001045586,0.0001027129],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001973696,0.00003002215,0.000006329832,0.0002290287,0.0001852995,0.000001702016,0.0009923086,0.9965489,0.001449478,0.0001557247,0.000197217,0.0001842581],"study_design_scores_gemma":[0.0004995468,0.00008199362,0.000004155374,0.0001391636,0.0001111809,0.00007418272,0.0003605577,0.9492928,0.04894584,0.000006761797,0.0002113462,0.0002724667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002269439,0.0006010961,0.9903466,0.000043948,0.002203364,0.002658185,0.00001281108,0.0005615832,0.00130299],"genre_scores_gemma":[0.991548,0.0000221784,0.007439553,0.00003628071,0.00005472775,0.0006285587,0.000005590538,0.000109509,0.0001555955],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9892786,"threshold_uncertainty_score":0.8897023,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3024258530","doi":"10.1109/tpwrs.2020.3028047","title":"Roles of Dynamic State Estimation in Power System Modeling, Monitoring and Operation","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":226,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"Savannah River Operations Office, U.S. Department of Energy; U.S. Department of Energy","keywords":"Robustness (evolution); Electric power system; Scalability; Computer science; Reliability engineering; Software; Resilience (materials science); System dynamics; Control engineering; State (computer science); Power system simulation; Distributed computing; Systems engineering; Engineering; Real-time computing; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.01041024463268735,"gpt":0.2180914886589071,"spread":0.2076812440262198,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001978739,0.0001791961,0.0003070188,0.0001513714,0.00004975008,0.00005761188,0.00008096987,0.00009098791,0.000006489161],"category_scores_gemma":[0.000003966315,0.000187069,0.00004541922,0.0002177261,0.00001485629,0.0002664975,9.290471e-7,0.0001512433,0.00001084837],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001627885,"about_ca_system_score_gemma":0.00001923961,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004261005,"about_ca_topic_score_gemma":0.00002197564,"domain_scores_codex":[0.998728,0.0000806227,0.0005900819,0.0002305078,0.0002089909,0.0001617649],"domain_scores_gemma":[0.9995744,0.00002774605,0.00005147973,0.0001856717,0.00006175692,0.00009890737],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002046162,0.00001943841,0.00005246422,0.0003582946,0.00002498414,0.000001565458,0.003128286,0.9949231,0.001361643,0.00001952251,0.000002316161,0.00008795985],"study_design_scores_gemma":[0.0003622974,0.00005758766,0.00006092379,0.0002351263,0.000009469799,0.000005377681,0.001563765,0.9962028,0.001340001,8.596868e-7,0.000009877345,0.0001519762],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1588318,0.0002889795,0.839069,0.00001988666,0.0008854786,0.000376725,0.00004160434,0.0002324899,0.000254006],"genre_scores_gemma":[0.9994906,0.00002779843,0.0003783904,0.00000278966,0.00000131599,0.00005098121,0.000002172306,0.00003274065,0.00001323373],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8406588,"threshold_uncertainty_score":0.7628454,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2341910059","doi":"10.1109/tpwrs.2015.2438322","title":"A Novel Wavelet-Based Ensemble Method for Short-Term Load Forecasting with Hybrid Neural Networks and Feature Selection","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":226,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Taiyuan University of Technology; University of Saskatchewan","keywords":"Extreme learning machine; Artificial neural network; Computer science; Feature selection; Ensemble learning; Artificial intelligence; Ensemble forecasting; Machine learning; Feature (linguistics); Wavelet; Wavelet transform; Term (time); Data mining","retraction":null,"screen_n_in":null,"score":{"opus":0.02736188120161452,"gpt":0.2353228971134645,"spread":0.20796101591185,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003385655,0.0003243207,0.0003229131,0.000136579,0.0001823608,0.0001269841,0.00008508766,0.0001473565,0.000001907256],"category_scores_gemma":[0.000005405484,0.0002884368,0.00008657173,0.0002455944,0.0000221481,0.0001853983,7.460793e-7,0.0003376134,7.132565e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001756977,"about_ca_system_score_gemma":0.00004964696,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005559153,"about_ca_topic_score_gemma":0.0002037729,"domain_scores_codex":[0.9986954,0.00003842872,0.000260839,0.0003312414,0.0002389618,0.0004351584],"domain_scores_gemma":[0.9992273,0.000174593,0.00004991918,0.0001791505,0.0001644212,0.0002046513],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001430704,0.00003321112,0.00002040413,0.0001044862,0.00009313408,0.000006737609,0.0001792722,0.9904041,0.0025233,0.00001072442,0.0003503957,0.006131137],"study_design_scores_gemma":[0.001056957,0.0003768578,0.000008060791,0.0001949619,0.00007337019,0.0005102577,0.00006866475,0.9900423,0.006139831,0.000001189214,0.00118211,0.0003454094],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02164055,0.0002487608,0.9748194,0.00002108993,0.001926917,0.000444001,0.00004087422,0.0003852373,0.0004731301],"genre_scores_gemma":[0.9836295,0.000002299701,0.01576251,0.0000288127,0.00009109134,0.0001709626,0.000009894373,0.0000980515,0.0002068952],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9619889,"threshold_uncertainty_score":0.9999568,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2168492352","doi":"10.1109/tpwrs.2008.2004840","title":"A Stochastic Optimization Approach to Rating of Energy Storage Systems in Wind-Diesel Isolated Grids","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":222,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Sizing; Diesel fuel; Wind power; Energy storage; Automotive engineering; Stochastic optimization; Engineering; Operating cost; Computer science; Environmental science; Waste management; Mathematical optimization; Electrical engineering; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.008460705945810195,"gpt":0.1773709523064089,"spread":0.1689102463605987,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001485719,0.0002414222,0.000413407,0.0004831799,0.00009792943,0.00003518672,0.0001346847,0.0001599247,0.000007825492],"category_scores_gemma":[0.000004186665,0.0002519678,0.00007425713,0.00070573,0.00002151152,0.0001817067,9.701778e-7,0.0001702482,0.000005062609],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001662778,"about_ca_system_score_gemma":0.00003169992,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002866321,"about_ca_topic_score_gemma":0.00001076035,"domain_scores_codex":[0.9985183,0.00008755544,0.0006145633,0.0002572874,0.0002396009,0.0002826368],"domain_scores_gemma":[0.9993913,0.00005007079,0.00008044927,0.0002700519,0.0001112027,0.00009692884],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004108771,0.0001005792,0.000002569625,0.00009244296,0.00006062875,0.000003252655,0.001043899,0.9975361,0.0009758716,0.00002013804,0.00007723695,0.00004617877],"study_design_scores_gemma":[0.0006237356,0.00009706398,0.000006913109,0.0001573154,0.0000181199,0.0000455866,0.0002708194,0.9983597,0.0001355511,1.784073e-7,0.00005348575,0.0002315618],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.003544363,0.000907049,0.992501,0.000005011736,0.001635969,0.0005363679,0.00003797305,0.000233144,0.0005991398],"genre_scores_gemma":[0.998535,0.00006087242,0.0009937532,0.000008591833,0.00002391354,0.000145868,0.0000114611,0.00005933642,0.0001611708],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9949906,"threshold_uncertainty_score":0.9999933,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1981725366","doi":"10.1109/tpwrs.2014.2332058","title":"Power Quality Assessment in Distribution Systems Embedded With Plug-In Hybrid and Battery Electric Vehicles","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Advanced Battery Technologies Research","field":"Engineering","cited_by":214,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Monte Carlo method; Automotive engineering; Voltage; Transformer; Electric vehicle; Engineering; Distribution transformer; Electrical engineering; Power quality; Plug-in; Power (physics); Computer science; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.01266936654757077,"gpt":0.2657765350403873,"spread":0.2531071684928166,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005649162,0.0002701185,0.0004282946,0.0004017181,0.00006943745,0.0001004022,0.0001872191,0.0001423546,0.000006717166],"category_scores_gemma":[0.00001026952,0.0002475552,0.0000369046,0.0005566371,0.00005542552,0.0002575256,0.000002483175,0.0006968915,0.00001348584],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006631293,"about_ca_system_score_gemma":0.0000298,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001476404,"about_ca_topic_score_gemma":0.0000627494,"domain_scores_codex":[0.9979687,0.0002166224,0.0005130767,0.0003926179,0.0003904151,0.0005185537],"domain_scores_gemma":[0.9990681,0.0002639941,0.00005851963,0.000479633,0.00005016604,0.00007958233],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001529045,0.0003666473,0.005843678,0.0007531888,0.0001354843,0.00007357827,0.0002086627,0.9711543,0.01812629,0.0005638393,0.0002866172,0.0023348],"study_design_scores_gemma":[0.006234862,0.001660516,0.07409861,0.001827553,0.00004140866,0.0003483685,0.002656827,0.8701402,0.03697601,0.0001108135,0.003480447,0.002424391],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4363593,0.0001212516,0.5621749,0.00003463472,0.0003499861,0.0004119285,0.00004228027,0.0002638212,0.0002417961],"genre_scores_gemma":[0.9994629,0.00004392684,0.00005167766,0.000007394399,0.000006630862,0.0003183437,0.000007625986,0.00004528074,0.00005623601],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5631036,"threshold_uncertainty_score":0.9999977,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2793107922","doi":"10.1109/tpwrs.2018.2810161","title":"Attack Detection and Identification for Automatic Generation Control Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Security and Resilience","field":"Engineering","cited_by":213,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Automatic Generation Control; Electric power system; Identification (biology); Residual; Computer science; Observer (physics); Function (biology); Real-time computing; Engineering; Reliability engineering; Power (physics); Control theory (sociology); Control (management); Algorithm; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.01528892193492103,"gpt":0.2327031541380924,"spread":0.2174142322031713,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002357555,0.0001358988,0.0001631616,0.0001338924,0.0002670847,0.0001526352,0.00006443398,0.0001242932,0.000005785553],"category_scores_gemma":[0.00000438569,0.0001324998,0.00004678051,0.0001301805,0.00004838584,0.0002111036,1.971365e-7,0.00008425654,0.00005814015],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007855581,"about_ca_system_score_gemma":0.000009057921,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002631968,"about_ca_topic_score_gemma":0.00006167418,"domain_scores_codex":[0.9991056,0.00004907615,0.0003228055,0.0002020829,0.0001481006,0.0001723514],"domain_scores_gemma":[0.9995128,0.0000644891,0.00005037196,0.0002057527,0.0001036483,0.00006293158],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004822791,0.00009942996,0.0000110605,0.0008530306,0.0002509604,0.000001344694,0.002028874,0.6750839,0.3165673,0.0001621578,0.00190903,0.002984661],"study_design_scores_gemma":[0.0004203397,0.0001386868,0.00007654449,0.0000562159,0.00003936842,0.00002811328,0.0001491466,0.9744427,0.02223128,0.000001592103,0.002265617,0.000150382],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1616781,0.0002538127,0.8276225,0.00001183831,0.009296728,0.0007502111,0.00003830765,0.0002820042,0.0000665765],"genre_scores_gemma":[0.9992223,0.00001917877,0.00002692781,0.00000941004,0.0001493581,0.0003684611,0.000002071662,0.00002631819,0.0001759156],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8375443,"threshold_uncertainty_score":0.5403183,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2129747445","doi":"10.1109/tpwrs.2005.846197","title":"IEEE PSS2B Versus PSS4B: The Limits of Performance of Modern Power System Stabilizers","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":212,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"Polytechnique Montréal","keywords":"Electric power system; Governor; Computer science; Low-frequency oscillation; Emphasis (telecommunications); Power (physics); Point (geometry); Engineering; Control theory (sociology); Control engineering; Reliability engineering; Electrical engineering; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.01865629815236078,"gpt":0.2245493177953787,"spread":0.205893019643018,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004911895,0.0003194733,0.0005400252,0.000189187,0.0001242846,0.00003224832,0.0003775634,0.0001870422,0.00006599358],"category_scores_gemma":[0.000005119899,0.0002565344,0.000235365,0.0004178984,0.0001094781,0.0002687512,0.000001209186,0.0002708213,0.00005217957],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002964118,"about_ca_system_score_gemma":0.00005993449,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002288944,"about_ca_topic_score_gemma":0.00003805908,"domain_scores_codex":[0.9976854,0.0001483264,0.0009755486,0.0002924426,0.0005440444,0.0003542308],"domain_scores_gemma":[0.998368,0.0002037824,0.0001777385,0.0009127985,0.0002186772,0.0001189746],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002155449,0.0001141853,0.00003056483,0.0005703913,0.000184631,5.426432e-7,0.00206452,0.9942794,0.001984406,0.0001369113,0.000152283,0.000266594],"study_design_scores_gemma":[0.002381942,0.0005614971,0.0001358476,0.0005604209,0.0001328058,0.000031538,0.002491364,0.9442055,0.04365879,6.126333e-7,0.005230119,0.000609533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2252388,0.0006237374,0.7540268,0.00003214446,0.007604602,0.0008613887,0.0001733652,0.0004051362,0.01103399],"genre_scores_gemma":[0.999457,0.0000384197,0.0001111043,0.00000564417,0.00001159803,0.00009150169,0.000001355266,0.00006063692,0.0002227529],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7742182,"threshold_uncertainty_score":0.9999887,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2139535657","doi":"10.1109/tpwrs.2005.856996","title":"Novel Controllers for the 48-Pulse VSC STATCOM and SSSC for Voltage Regulation and Reactive Power Compensation","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":207,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Control theory (sociology); AC power; Static VAR compensator; Electric power system; Compensation (psychology); Voltage source; Thyristor; MATLAB; Computer science; Voltage; Engineering; Power (physics); Electrical engineering; Control (management); Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.0137534938140014,"gpt":0.2253426517468168,"spread":0.2115891579328154,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004301903,0.0002154741,0.0002916757,0.0001051724,0.0002825401,0.0001188922,0.00007140964,0.0001242497,0.00002427263],"category_scores_gemma":[0.00001318806,0.0001774659,0.00008976607,0.0001018465,0.00005601246,0.0002909583,7.402188e-7,0.0001121589,0.000004213323],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001455701,"about_ca_system_score_gemma":0.00001898408,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003979559,"about_ca_topic_score_gemma":0.0001151226,"domain_scores_codex":[0.9988993,0.00003554648,0.0004147958,0.0002676502,0.0001585679,0.0002240866],"domain_scores_gemma":[0.9988896,0.00051801,0.00008483423,0.0002675745,0.0001522996,0.00008764573],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0007959174,0.0002242424,0.00004459323,0.0003502116,0.0005857677,3.064991e-7,0.007919813,0.9696621,0.01339825,0.002337664,0.002405489,0.002275633],"study_design_scores_gemma":[0.003517598,0.0001362639,0.0007741796,0.0000604354,0.00009673177,0.00001860244,0.001591405,0.9622495,0.001235921,0.0000175063,0.02997618,0.0003256946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.005106931,0.0002743507,0.9893238,0.0002513091,0.001678453,0.002316818,0.0003658964,0.0001703114,0.0005121483],"genre_scores_gemma":[0.998107,0.00001879865,0.0007637223,0.00005034767,0.00001621242,0.0004425677,0.00001065457,0.0000426996,0.0005480224],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.993,"threshold_uncertainty_score":0.7236851,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2061948033","doi":"10.1109/tpwrs.2012.2214447","title":"Probabilistic Power Flow by Monte Carlo Simulation With Latin Supercube Sampling","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":205,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Latin hypercube sampling; Monte Carlo method; Slice sampling; Bin; Sampling (signal processing); Probabilistic logic; Computer science; Histogram; Rejection sampling; Simple random sample; Monte Carlo integration; Importance sampling; Random variable; Algorithm; Mathematical optimization; Mathematics; Hybrid Monte Carlo; Statistics; Markov chain Monte Carlo; Artificial intelligence; Detector","retraction":null,"screen_n_in":null,"score":{"opus":0.01075760215590273,"gpt":0.1990213242482729,"spread":0.1882637220923702,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001979201,0.000374181,0.0004109881,0.0001226085,0.00015264,0.0001639036,0.0001882758,0.0001989581,0.0001512456],"category_scores_gemma":[0.00001005982,0.0003163751,0.0001133526,0.0002859828,0.00005871369,0.0004454587,9.941808e-7,0.0003392365,0.0003028498],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002763646,"about_ca_system_score_gemma":0.00002856969,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003760878,"about_ca_topic_score_gemma":0.00007194793,"domain_scores_codex":[0.9980987,0.00007666525,0.0005405734,0.0004174426,0.0003706686,0.0004959512],"domain_scores_gemma":[0.9987649,0.0002034302,0.00005218235,0.0005958945,0.0001956833,0.0001878656],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001838228,0.00006920232,0.0000245642,0.0001785857,0.00008075019,0.000001906172,0.0007644628,0.9970159,0.0007569756,0.00001509566,0.00096887,0.0001053138],"study_design_scores_gemma":[0.0006542029,0.0002634618,0.0001913559,0.0004718232,0.00004525851,0.00002451602,0.0005520788,0.987504,0.0004985889,0.000009597872,0.009150083,0.0006350292],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1686455,0.0002357182,0.8251684,0.00004048373,0.002388039,0.001390885,0.0001270981,0.0006728775,0.001331035],"genre_scores_gemma":[0.9982679,0.000007286184,0.0002479136,0.00002926879,0.00001491138,0.0004377665,0.000003420991,0.00009095048,0.0009006014],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8296224,"threshold_uncertainty_score":0.9999288,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2149906128","doi":"10.1109/tpwrs.2014.2299801","title":"A Hybrid Intelligent Model for Deterministic and Quantile Regression Approach for Probabilistic Wind Power Forecasting","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":203,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Teshmont (Canada)","funders":"National Renewable Energy Laboratory","keywords":"Wind power; Wind power forecasting; Probabilistic forecasting; Probabilistic logic; Support vector machine; Electric power system; Wind speed; Computer science; Particle swarm optimization; Quantile regression; Engineering; Mathematical optimization; Artificial intelligence; Machine learning; Power (physics); Meteorology; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.03460675173194757,"gpt":0.23671738082361,"spread":0.2021106290916624,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003748692,0.0003389133,0.0003918911,0.0001602921,0.0002685345,0.0001067,0.0001392933,0.0001275864,0.000003433476],"category_scores_gemma":[0.0000336226,0.000301105,0.000155247,0.00008078141,0.00004615732,0.0001270219,0.000001699962,0.0001750069,0.000002104667],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007112372,"about_ca_system_score_gemma":0.00002096138,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000523565,"about_ca_topic_score_gemma":0.000003993004,"domain_scores_codex":[0.9984524,0.00003292207,0.0004916869,0.0004120065,0.0001638458,0.0004471148],"domain_scores_gemma":[0.9989933,0.0003835235,0.00008514799,0.0003013482,0.00008385942,0.0001528159],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006670842,0.00005986791,0.000001677205,0.0006777244,0.00004979908,7.082615e-7,0.0006904277,0.9951965,0.000442406,0.0003807804,0.0001679538,0.002265457],"study_design_scores_gemma":[0.0005111979,0.0002844676,6.373169e-7,0.0003486301,0.00006140007,0.00006217514,0.00009957259,0.9956656,0.001421148,0.0001333919,0.001062028,0.0003497862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03162325,0.0001351691,0.9642396,0.000004569795,0.001599723,0.001035406,0.0001431764,0.0002554624,0.0009636327],"genre_scores_gemma":[0.9932534,0.000006008884,0.005696605,0.00001445513,0.0000394591,0.0004624079,0.00001464007,0.0001093062,0.0004037712],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9616301,"threshold_uncertainty_score":0.9999441,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2110787312","doi":"10.1109/tpwrs.2005.857011","title":"Unit Commitment With Primary Frequency Regulation Constraints","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":197,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Scheduling (production processes); Frequency regulation; Automatic frequency control; Contingency; Control theory (sociology); Unit (ring theory); Electric power system; Computer science; Mathematical optimization; Operations research; Engineering; Operations management; Power (physics); Mathematics; Control (management); Telecommunications; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.01058297570497701,"gpt":0.2003909528053372,"spread":0.1898079771003602,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002542713,0.0003872424,0.0004195439,0.0002721354,0.0001490088,0.0001027192,0.0002401925,0.0001901453,0.0002643608],"category_scores_gemma":[0.000001300255,0.0003550946,0.0001036942,0.0003186509,0.0001276019,0.0004024305,4.992389e-7,0.0003565314,0.0004517076],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005473045,"about_ca_system_score_gemma":0.00006510174,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006309401,"about_ca_topic_score_gemma":0.00009522493,"domain_scores_codex":[0.997999,0.0001082609,0.0006191286,0.0003363611,0.0004944373,0.0004427718],"domain_scores_gemma":[0.9988267,0.0000936866,0.00009004425,0.0006950281,0.0001206806,0.000173903],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007729727,0.0003332545,0.000195528,0.0003888533,0.0008688368,0.00004772302,0.001604272,0.9673539,0.01809997,0.002283396,0.003627757,0.00511925],"study_design_scores_gemma":[0.03340935,0.005395281,0.008684669,0.0082591,0.001662131,0.004782029,0.004328832,0.4317772,0.08847664,0.000333408,0.399615,0.01327625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.008305647,0.0007668631,0.9178098,0.0001044624,0.00408213,0.001093716,0.000106453,0.001062916,0.06666796],"genre_scores_gemma":[0.9974637,0.00001654408,0.0007186859,0.00006674234,0.00006400928,0.0002768884,0.000009562282,0.0000989786,0.001284895],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.989158,"threshold_uncertainty_score":0.9998901,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2143695659","doi":"10.1109/tpwrs.2006.881126","title":"Slow-Coherency-Based Controlled Islanding—A Demonstration of the Approach on the August 14, 2003 Blackout Scenario","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Islanding Detection in Power Systems","field":"Engineering","cited_by":192,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Blackout; Islanding; Load Shedding; Control theory (sociology); Voltage; Interconnection; Generator (circuit theory); Computer science; Electric power transmission; Automatic frequency control; Reduction (mathematics); Electric power system; Engineering; Power (physics); Control (management); Electrical engineering; Telecommunications; Mathematics; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.008697234314654556,"gpt":0.1837280721778685,"spread":0.175030837863214,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000648062,0.00038521,0.000521281,0.0002544392,0.0004408791,0.0001783986,0.0003825728,0.0002671521,0.00007579115],"category_scores_gemma":[0.00001335353,0.0002405384,0.000304337,0.0008196087,0.0001387927,0.00009574484,9.680829e-7,0.0005433122,0.00008453094],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002561683,"about_ca_system_score_gemma":0.000105021,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002484152,"about_ca_topic_score_gemma":0.00009663307,"domain_scores_codex":[0.9974623,0.0003352397,0.0008541315,0.000317933,0.0006526302,0.000377801],"domain_scores_gemma":[0.9984512,0.0002604009,0.0002346849,0.0008129111,0.0001889857,0.00005181551],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002223148,0.0002801077,0.0001833671,0.000189838,0.0002827167,0.000001961485,0.000458284,0.970062,0.004167614,0.001778608,0.02234563,0.00002759322],"study_design_scores_gemma":[0.01459548,0.0007517488,0.0007620899,0.001643288,0.0005322106,0.0001399562,0.001310411,0.8596811,0.100965,0.00006777262,0.01768487,0.001866139],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01996007,0.0001368948,0.8951391,0.0000660111,0.01252356,0.002481373,0.0001003361,0.000440243,0.06915242],"genre_scores_gemma":[0.9947587,0.000001946989,0.00003472149,0.00002563274,0.00007361028,0.0005094181,0.000003852476,0.00007453319,0.004517591],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9747986,"threshold_uncertainty_score":0.9808869,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2149177425","doi":"10.1109/tpwrs.2008.920718","title":"Models for Quantifying the Economic Benefits of Distributed Generation","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":192,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Distributed generation; Economic dispatch; Distributed power generation; Cost–benefit analysis; Economic impact analysis; Industrial organization; Business; Environmental economics; Computer science; Economics; Electric power system; Risk analysis (engineering); Power (physics); Microeconomics; Engineering; Renewable energy","retraction":null,"screen_n_in":null,"score":{"opus":0.05702831784412495,"gpt":0.2394714822999688,"spread":0.1824431644558438,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001302645,0.0001528973,0.0001955122,0.00006691647,0.000188345,0.00002521554,0.0001242595,0.00009628965,0.000008985642],"category_scores_gemma":[0.000001507779,0.0001347011,0.0001268193,0.00009626008,0.0000341507,0.0002160688,4.240239e-7,0.0001020551,0.00002160174],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002186386,"about_ca_system_score_gemma":0.00002921196,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005492004,"about_ca_topic_score_gemma":0.00003090052,"domain_scores_codex":[0.9991415,0.00002265408,0.0003673376,0.0001594352,0.0001142796,0.0001948408],"domain_scores_gemma":[0.9994946,0.00006549037,0.00005522638,0.0002774153,0.00006490252,0.00004241128],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001362293,0.00001882653,0.000002250904,0.00002788397,0.00005735094,1.997334e-7,0.0001604617,0.9956571,0.002084566,0.0006781861,0.001215854,0.0000837388],"study_design_scores_gemma":[0.0003152768,0.00007548359,0.00002512766,0.00003046147,0.0000278891,0.00001824945,0.00006259025,0.9747338,0.02396522,0.000004976291,0.0005924603,0.0001484693],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1509907,0.0002510599,0.8441417,0.0000199374,0.002383349,0.0004547882,0.001515244,0.0001348568,0.0001083402],"genre_scores_gemma":[0.9994996,0.00006301892,0.0001203732,0.000004241392,0.00003207383,0.0001540677,0.00006568896,0.00003223453,0.00002867139],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8485089,"threshold_uncertainty_score":0.5492952,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2131439847","doi":"10.1109/tpwrs.2009.2016458","title":"Reliability Evaluation for Distribution System With Renewable Distributed Generation During Islanded Mode of Operation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":190,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Wind power; Renewable energy; Electric power system; Distributed generation; Electricity; Electricity generation; Computer science; Electricity market; Limiting; Engineering; Power (physics); Risk analysis (engineering); Electrical engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.01090697636025558,"gpt":0.2260919295911663,"spread":0.2151849532309107,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006349473,0.0002422823,0.0003744369,0.00008194175,0.0001956865,0.00006597192,0.0001209478,0.0001708152,0.000004499125],"category_scores_gemma":[0.00001386702,0.0002120815,0.0001088216,0.0002506338,0.00002639662,0.0003481696,4.171351e-7,0.0001156337,0.000004117071],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008189377,"about_ca_system_score_gemma":0.00006447845,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001486051,"about_ca_topic_score_gemma":0.0001063156,"domain_scores_codex":[0.9981408,0.0001245637,0.0006525804,0.0003521094,0.0004494448,0.0002804628],"domain_scores_gemma":[0.998771,0.00004441659,0.0001235308,0.0004998375,0.0004840312,0.00007724894],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001453665,0.00008582562,0.000004055819,0.0003981761,0.00004176793,4.109055e-7,0.0001794957,0.96582,0.03285803,0.0001409171,0.0002601032,0.00006586363],"study_design_scores_gemma":[0.001347305,0.0003360899,0.0001840446,0.0003378866,0.00008668251,0.00001988914,0.0002059539,0.9002035,0.09680916,0.00000899438,0.0002110639,0.0002494084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1390087,0.00006861747,0.8565598,0.00002685571,0.001305708,0.001764329,0.0008226365,0.000286453,0.0001569726],"genre_scores_gemma":[0.998996,0.000008192545,0.0001480162,0.000002802794,0.00003134123,0.0004703108,0.0002615188,0.00002376768,0.00005811887],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8599873,"threshold_uncertainty_score":0.8648434,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2749664490","doi":"10.1109/tpwrs.2017.2741920","title":"Optimal Regulation of Virtual Power Plants","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":188,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"Advanced Research Projects Agency - Energy; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Dispatchable generation; Distributed generation; Computer science; Mathematical optimization; Convergence (economics); Virtual power plant; AC power; Optimization problem; Distributed computing; Control engineering; Linear programming; Engineering; Voltage; Renewable energy; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.01136892703573598,"gpt":0.2111366544788678,"spread":0.1997677274431319,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001280106,0.0001602053,0.000203283,0.0001475552,0.0001546741,0.0000704094,0.0002481079,0.00009411625,0.0001168089],"category_scores_gemma":[0.000001947595,0.0001659585,0.00008112914,0.00004219094,0.00004195846,0.0002372686,0.000001405811,0.0001124197,0.0001014741],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007322065,"about_ca_system_score_gemma":0.000007746368,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005989103,"about_ca_topic_score_gemma":0.00001333288,"domain_scores_codex":[0.9990776,0.00002045037,0.0002845134,0.0001673828,0.0002588304,0.000191189],"domain_scores_gemma":[0.9990963,0.00002515459,0.00007819952,0.0007088433,0.0000312017,0.00006029797],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002283838,0.00003778481,0.00001192228,0.00002538943,0.0001251501,0.000003636368,0.0002075565,0.9935197,0.003664545,0.0002047215,0.002005272,0.0001715497],"study_design_scores_gemma":[0.003214728,0.0008281886,0.0190286,0.0007829248,0.0001585518,0.00006422595,0.001190252,0.7509767,0.1704569,0.00001522767,0.05176355,0.001520211],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1819464,0.00003668732,0.7940646,0.0000188706,0.008597135,0.0001986659,0.00004390573,0.0002215705,0.01487218],"genre_scores_gemma":[0.9983245,0.00001266826,0.00009011463,0.000004321955,0.00002274203,0.00003433034,0.000001942423,0.00003918045,0.001470257],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8163781,"threshold_uncertainty_score":0.6767589,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2149111570","doi":"10.1109/tpwrs.2009.2036265","title":"Rotor Angle Instability Prediction Using Post-Disturbance Voltage Trajectories","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":184,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"Engineering and Physical Sciences Research Council","keywords":"Control theory (sociology); Robustness (evolution); Electric power system; Voltage; Computer science; Fuzzy logic; Cluster analysis; Instability; Engineering; Artificial intelligence; Power (physics)","retraction":null,"screen_n_in":null,"score":{"opus":0.01016548861620412,"gpt":0.212058072529353,"spread":0.2018925839131489,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003464942,0.0003051759,0.0003410603,0.0001571721,0.0002442825,0.0001220151,0.0001866579,0.0002581854,0.0002211408],"category_scores_gemma":[0.00001588827,0.0003052848,0.0001562236,0.000373074,0.00008547326,0.0004548157,9.691039e-7,0.0005016,0.00003859647],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002304891,"about_ca_system_score_gemma":0.00006258456,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002050773,"about_ca_topic_score_gemma":0.0002453705,"domain_scores_codex":[0.9982806,0.00007664275,0.0005804246,0.0003843611,0.0003350766,0.0003428614],"domain_scores_gemma":[0.9987839,0.00007127658,0.00006694072,0.0006892393,0.0002076673,0.0001809211],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001817957,0.0007468282,0.003223114,0.0008904657,0.0002914201,0.00001172972,0.005183047,0.8123735,0.1758466,0.0003380344,0.0005567435,0.0003567752],"study_design_scores_gemma":[0.002461998,0.0005224751,0.01078458,0.0002926293,0.0001644234,0.0002064853,0.002348059,0.8959928,0.04803964,0.00002177282,0.0371788,0.001986344],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2551453,0.0000707311,0.7281389,0.000007493631,0.01319623,0.0007010774,0.0005168015,0.0007816207,0.001441839],"genre_scores_gemma":[0.9992701,0.000003578595,0.0002483843,0.00001248126,0.00002967001,0.0001384317,0.000008530958,0.00005834005,0.0002304521],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7441248,"threshold_uncertainty_score":0.9999399,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2142815812","doi":"10.1109/tpwrs.2006.881158","title":"On the Quantification of the Network Capacity Deferral Value of Distributed Generation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":180,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Deferral; Distributed generation; Reliability engineering; Transformer; Electricity; Risk analysis (engineering); Reliability (semiconductor); Electricity market; Computer science; Environmental economics; Cost–benefit analysis; Business; Engineering; Power (physics); Economics; Renewable energy; Electrical engineering; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.01971650168968756,"gpt":0.2045652789474013,"spread":0.1848487772577138,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003776496,0.0001717678,0.0002157881,0.00005483696,0.0001690915,0.00002847644,0.0001939963,0.0001363339,0.000009797238],"category_scores_gemma":[0.00000682614,0.0001164182,0.0001562929,0.0004693097,0.00007135835,0.00007945059,6.180886e-7,0.0002188809,0.00001429016],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001467158,"about_ca_system_score_gemma":0.00001612025,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005753271,"about_ca_topic_score_gemma":0.0002128721,"domain_scores_codex":[0.9985116,0.0002324428,0.0005572375,0.0001647382,0.0003478116,0.0001862026],"domain_scores_gemma":[0.9989914,0.0001196504,0.0001725204,0.0005984342,0.00009435244,0.00002363979],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001133138,0.00004992133,0.00003518093,0.00004498328,0.00005330421,8.413723e-8,0.0001012144,0.9525173,0.04073556,0.003713716,0.002712019,0.00002535362],"study_design_scores_gemma":[0.0004769102,0.0001549097,0.003469072,0.0003608738,0.0001067789,0.00002416257,0.0001451812,0.5551037,0.4359003,0.0001467918,0.003744258,0.000367026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3039277,0.00005537479,0.6884937,0.00003021139,0.00646143,0.0004493429,0.0001276863,0.00009211368,0.0003623302],"genre_scores_gemma":[0.9996915,0.000002241767,0.00001601561,0.000004878895,0.00007655915,0.00008708372,0.000007005705,0.00002819239,0.00008650299],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6957638,"threshold_uncertainty_score":0.4747395,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2127925682","doi":"10.1109/tpwrs.2006.879246","title":"Grey Predictor for Wind Energy Conversion Systems Output Power Prediction","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Grey System Theory Applications","field":"Decision Sciences","cited_by":179,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Wind speed; Electric power system; Electricity generation; Electricity; Wind power forecasting; Power (physics); Computer science; Meteorology; Engineering; Econometrics; Control theory (sociology); Mathematics; Artificial intelligence; Electrical engineering; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.03374458741587683,"gpt":0.2776303715371636,"spread":0.2438857841212868,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00271997,0.0005081528,0.0007745691,0.0009057674,0.000805955,0.0007205816,0.0009799248,0.0004642054,0.000167723],"category_scores_gemma":[0.00006967683,0.0004290111,0.0004827282,0.001079296,0.0001736301,0.0007304663,0.000005188674,0.0002440434,0.0007685985],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003789706,"about_ca_system_score_gemma":0.0001562696,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007487503,"about_ca_topic_score_gemma":0.00005321863,"domain_scores_codex":[0.9933436,0.0006541737,0.002002186,0.001288061,0.002054486,0.000657508],"domain_scores_gemma":[0.9944291,0.001576933,0.0007484801,0.001770082,0.001170603,0.0003048311],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00164166,0.002982567,0.002374404,0.0003967224,0.0008901512,0.00003453953,0.002424735,0.5093976,0.01149052,0.08700502,0.3804817,0.0008803856],"study_design_scores_gemma":[0.004444161,0.001376968,0.001737579,0.0004710971,0.000278458,0.0003175551,0.004942089,0.08740446,0.004731752,0.002348231,0.8905386,0.001409102],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02288417,0.000319136,0.9502423,0.0001797561,0.015641,0.002184142,0.001943959,0.0004629747,0.006142531],"genre_scores_gemma":[0.9648551,0.000003929413,0.00005949919,0.00005374524,0.0001748711,0.0008484815,0.00003327856,0.0000856844,0.03388543],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9501829,"threshold_uncertainty_score":0.9998162,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2157212792","doi":"10.1109/tpwrs.2003.810897","title":"Multiobjective optimization for pricing system security in electricity markets","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":179,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Bidding; Electric power system; Electricity market; Computer science; Mathematical optimization; Electricity; Transmission system; Database transaction; Transmission (telecommunications); Reliability engineering; Power (physics); Economics; Engineering; Microeconomics; Electrical engineering; Mathematics; Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.005668262670152979,"gpt":0.2034886952799706,"spread":0.1978204326098176,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004474446,0.0002503729,0.0003018226,0.0002949532,0.0001200551,0.00006215645,0.00009197038,0.0001980992,0.00001473714],"category_scores_gemma":[0.00001767129,0.0002834724,0.0001092438,0.0005728677,0.00001425143,0.0002515374,3.003498e-7,0.0002576718,0.00001774921],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001121258,"about_ca_system_score_gemma":0.00003512867,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004405201,"about_ca_topic_score_gemma":0.00002108106,"domain_scores_codex":[0.9985103,0.0001342161,0.0004470976,0.0003077669,0.0001983337,0.0004022914],"domain_scores_gemma":[0.999361,0.0001356976,0.00005890695,0.0002408857,0.0001215289,0.00008196809],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005188835,0.00009134984,0.00001733587,0.0002559917,0.00004791114,0.000002695966,0.0002759102,0.9983671,0.0004532165,0.0002761566,0.0001099007,0.00005050944],"study_design_scores_gemma":[0.001025991,0.0001121623,0.00005408771,0.0001792866,0.00002967166,0.00002511335,0.0004832235,0.9853224,0.01206317,0.000004391065,0.0003778502,0.0003226484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02746003,0.0001424314,0.965022,0.00000347118,0.002657413,0.001348124,0.0001446807,0.0004778237,0.002744028],"genre_scores_gemma":[0.9987243,0.00001093186,0.0007511586,0.000004235211,0.000009587989,0.0003992706,0.00001020146,0.00005432474,0.00003602995],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9712642,"threshold_uncertainty_score":0.9999617,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2162230409","doi":"10.1109/tpwrs.2013.2296696","title":"Introducing Dynamic Demand Response in the LFC Model","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":177,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"University of Toronto; Montana State University","keywords":"Demand response; Electric power system; Dynamic demand; Automatic frequency control; Control theory (sociology); Controller (irrigation); Computer science; Control engineering; Stability (learning theory); Power demand; Control (management); Power (physics); Grid; Load regulation; Automatic Generation Control; Power control; Engineering; Telecommunications; Electricity; Voltage; Electrical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006557968031031862,"gpt":0.2095035081102631,"spread":0.2029455400792312,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002055084,0.0002997485,0.0003661685,0.0003504434,0.0001231322,0.0001271339,0.0004407245,0.0001709208,0.00001122895],"category_scores_gemma":[0.00002255217,0.000243195,0.0001201114,0.0003772562,0.00004268661,0.0002064015,6.592892e-7,0.0004960288,0.0001461954],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000281889,"about_ca_system_score_gemma":0.00003003966,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007366707,"about_ca_topic_score_gemma":0.0001154878,"domain_scores_codex":[0.9976701,0.0005684776,0.0005930612,0.0003471282,0.0003783771,0.0004428767],"domain_scores_gemma":[0.9984114,0.0004766358,0.00005275691,0.0009400878,0.00004493887,0.00007420337],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008900167,0.00003571793,0.000003093932,0.0000594982,0.00003798793,0.000006195073,0.00203992,0.991029,0.005935698,0.0001826078,0.0004775595,0.0001037527],"study_design_scores_gemma":[0.0005831749,0.0001134821,0.00004868757,0.0001411187,0.0000210373,0.00005964043,0.0003094329,0.9960675,0.0003254359,0.00004605495,0.002006641,0.0002778386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03883069,0.0004520496,0.95205,0.0001991634,0.00474496,0.0005950069,0.00002205857,0.0003439855,0.002762071],"genre_scores_gemma":[0.9989278,0.00001273,0.0001504532,0.00007460328,0.00002902174,0.0002787644,9.319982e-7,0.00007361067,0.0004521166],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9600971,"threshold_uncertainty_score":0.9917204,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2342715674","doi":"10.1109/tpwrs.2015.2514240","title":"Frequency Control Support of a Doubly-Fed Induction Generator Based on the Torque Limit","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":176,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Control theory (sociology); Induction generator; Torque; Automatic frequency control; Decoupling (probability); Wind power; Frequency deviation; Maximum power point tracking; Maximum power principle; Limit (mathematics); Rotor (electric); Power (physics); Engineering; Computer science; Mathematics; Physics; Control engineering; Inverter; Electrical engineering; Control (management)","retraction":null,"screen_n_in":null,"score":{"opus":0.01131405642120944,"gpt":0.1897808415028867,"spread":0.1784667850816772,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000440135,0.0003197256,0.0004381224,0.0002415475,0.00009746656,0.00004682377,0.0002602389,0.0002210236,0.000277725],"category_scores_gemma":[0.00001315842,0.0001938415,0.0002249669,0.0002522758,0.00005431727,0.0001736482,3.912904e-7,0.0002384064,0.0002476828],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000256807,"about_ca_system_score_gemma":0.00007743361,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001132888,"about_ca_topic_score_gemma":0.00002899428,"domain_scores_codex":[0.9980668,0.0001980091,0.0006492974,0.0002948114,0.0004397795,0.0003512743],"domain_scores_gemma":[0.9985208,0.0003163523,0.0001299256,0.0007629385,0.0001468109,0.0001231801],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0003713578,0.0004397677,0.0002370825,0.0002873113,0.0009486246,0.0000292565,0.0005665374,0.2640548,0.7177349,0.001393269,0.01283657,0.001100561],"study_design_scores_gemma":[0.03515727,0.006108074,0.001848562,0.003387775,0.001013389,0.0002970663,0.0005810938,0.319756,0.5599614,0.0001066602,0.06700732,0.004775394],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07339697,0.0001222612,0.9080714,0.0009378048,0.01061983,0.001600493,0.0003523313,0.0005209807,0.004377911],"genre_scores_gemma":[0.9987194,0.000004214877,0.00001723393,0.0001078796,0.0001307116,0.0003842946,0.000001338425,0.00007875747,0.0005561926],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9253224,"threshold_uncertainty_score":0.7904629,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2097192841","doi":"10.1109/tpwrs.2003.818689","title":"Transmission network cost allocation based on equivalent bilateral exchanges","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":175,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Fraction (chemistry); Transmission (telecommunications); Generator (circuit theory); Computer science; Transmission network; Independence (probability theory); Mathematical optimization; Power flow; Economic dispatch; Power (physics); Electric power system; Telecommunications; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.01304444955954724,"gpt":0.213739998805969,"spread":0.2006955492464218,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000403838,0.000353295,0.0003140594,0.0003002711,0.0001818224,0.00009297524,0.0001481357,0.0002289708,0.0001586923],"category_scores_gemma":[0.000002879574,0.0003441485,0.0001301149,0.0006192061,0.00001690895,0.0001634613,2.017099e-7,0.0002796048,0.0001408369],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003725701,"about_ca_system_score_gemma":0.00004404648,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001861658,"about_ca_topic_score_gemma":0.000007477826,"domain_scores_codex":[0.9979674,0.0002339445,0.0004876171,0.0003604963,0.0004396131,0.0005109914],"domain_scores_gemma":[0.9990964,0.0001147095,0.00006835169,0.0004675673,0.00007540391,0.0001775715],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003318011,0.00009309301,0.000006662817,0.0001080501,0.0000453405,0.000004657657,0.0001641116,0.9962193,0.0008069384,0.00009726593,0.001520336,0.0009010877],"study_design_scores_gemma":[0.001139125,0.0003888668,0.00002356049,0.0005977142,0.00005880799,0.00002882692,0.00005529328,0.9497982,0.01495378,0.000007479331,0.03234963,0.0005987432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0006988386,0.0003750685,0.9847347,0.00005484501,0.005239346,0.001071405,0.00001634587,0.0006697846,0.007139722],"genre_scores_gemma":[0.9982103,0.00007455896,0.0004763489,0.00006962752,0.00003362758,0.0003402205,0.00001086704,0.0001040502,0.0006804767],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9975114,"threshold_uncertainty_score":0.9999011,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2110167161","doi":"10.1109/59.852113","title":"Allocation of transmission losses to bilateral contracts in a competitive environment","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":170,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Database transaction; Infinitesimal; Computer science; Component (thermodynamics); Set (abstract data type); Path (computing); Transmission loss; Transmission (telecommunications); Cover (algebra); Transaction cost; Argument (complex analysis); Electric power system; Power (physics); Economics; Mathematics; Microeconomics; Engineering; Telecommunications","retraction":null,"screen_n_in":null,"score":{"opus":0.005060380664373658,"gpt":0.1880829258552522,"spread":0.1830225451908785,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001450218,0.0001843545,0.0002770063,0.0002806521,0.00003173755,0.00002143262,0.0001026746,0.0001100067,0.0002636572],"category_scores_gemma":[7.866633e-7,0.0001889841,0.00005734587,0.0003219091,0.00001495882,0.0001512806,1.780078e-7,0.0001344654,0.0001293629],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002182613,"about_ca_system_score_gemma":0.00001697663,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001329423,"about_ca_topic_score_gemma":0.00001706384,"domain_scores_codex":[0.9987354,0.00007572138,0.0005015645,0.0002102218,0.0002442077,0.0002329012],"domain_scores_gemma":[0.9995669,0.0000556527,0.00003468358,0.0002201515,0.00002424293,0.000098379],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005863539,0.0001300944,0.00001035713,0.00005973728,0.00003346283,0.000004437659,0.001208732,0.985315,0.01076895,0.00002779056,0.00004803994,0.002334822],"study_design_scores_gemma":[0.004975397,0.001665653,0.002622416,0.002872175,0.0001268406,0.0001287406,0.0006470911,0.6539404,0.2838697,0.00001419737,0.04733259,0.001804818],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0738568,0.0001889891,0.9206261,0.00004393471,0.0004907422,0.0008350973,0.00003305056,0.0001535261,0.003771737],"genre_scores_gemma":[0.9989412,0.0001278866,0.0002779564,0.00001563109,0.0000054567,0.0001117376,0.000004544407,0.00003649032,0.0004790674],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9250844,"threshold_uncertainty_score":0.770655,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4247981495","doi":"10.1109/59.962402","title":"Bibliography on the application of probability methods in power system reliability evaluation 1996-1999","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":168,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Reliability engineering; Electric power system; Activity-based costing; Computer science; Bibliography; Power (physics); Engineering; Library science; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.0224727554939105,"gpt":0.2832649286506527,"spread":0.2607921731567422,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.006120388,0.0003454438,0.0005464436,0.00211064,0.0001179191,0.00004720134,0.0003931291,0.0002656719,0.00003176468],"category_scores_gemma":[0.00004354946,0.0002633953,0.0002930624,0.006562083,0.0001263184,0.0002092711,0.000002104985,0.0004574944,0.00004468601],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003759013,"about_ca_system_score_gemma":0.00004051676,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000777119,"about_ca_topic_score_gemma":0.0001272738,"domain_scores_codex":[0.9960447,0.001139796,0.001141739,0.0005730074,0.0006951451,0.0004056019],"domain_scores_gemma":[0.9971797,0.0006835435,0.0001865834,0.001535311,0.0003147618,0.0001001269],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000306125,0.0009928399,0.001974864,0.001567073,0.0002140421,0.00000296818,0.00128749,0.9806383,0.005711879,0.00328611,0.001499569,0.002518703],"study_design_scores_gemma":[0.003108952,0.001111755,0.01932747,0.002727198,0.0002997292,0.0001080666,0.004010136,0.9092693,0.02385468,0.001310823,0.0330214,0.00185051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07383221,0.0003830159,0.9101333,0.0001053201,0.002937702,0.003476794,0.0000556802,0.0003773951,0.008698553],"genre_scores_gemma":[0.9976056,0.00009976269,0.0005417358,0.00001804127,0.00001098679,0.001659775,0.000002550447,0.0000427274,0.00001878963],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9237734,"threshold_uncertainty_score":0.9999818,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2087848664","doi":"10.1109/tpwrs.2011.2180935","title":"Time-of-Use Pricing in Electricity Markets Under Different Market Structures","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":165,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Electricity pricing; Electricity; Economics; Context (archaeology); Microeconomics; Variable pricing; Welfare; Scheme (mathematics); Market power; Econometrics; Industrial organization; Monopoly; Engineering; Market economy; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.00840577856234772,"gpt":0.2008765161251298,"spread":0.1924707375627821,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003152065,0.0003019005,0.0004286109,0.0005596533,0.00005324847,0.00004327671,0.0001547796,0.000201019,0.0001527395],"category_scores_gemma":[0.000008133453,0.0002848866,0.00009900574,0.0006545762,0.0000210763,0.00038395,9.959645e-7,0.0003116486,0.0000224459],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004094722,"about_ca_system_score_gemma":0.00001857536,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005954654,"about_ca_topic_score_gemma":0.00001043288,"domain_scores_codex":[0.9981107,0.00021382,0.0005919251,0.0002091671,0.0003394993,0.0005348569],"domain_scores_gemma":[0.9990934,0.0002673428,0.00009535654,0.0003694977,0.00004959497,0.0001248119],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001709321,0.0004427592,0.002248407,0.0005066792,0.0004127838,0.000005745232,0.001743824,0.9779093,0.01306414,0.0001636192,0.002808962,0.0005228038],"study_design_scores_gemma":[0.002657811,0.0003170099,0.0638404,0.0008741656,0.0002173671,0.0002109527,0.0004140997,0.8537775,0.07470097,0.00002652315,0.001026666,0.001936493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2597654,0.0004503366,0.7349544,0.000004824531,0.002199281,0.000541745,0.00002044682,0.0002420386,0.00182153],"genre_scores_gemma":[0.9989923,0.00004689438,0.0001033139,0.00001007019,0.00001809102,0.00005716815,0.000002570812,0.00007094634,0.0006986084],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7392269,"threshold_uncertainty_score":0.9999603,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2321805541","doi":"10.1109/tpwrs.2016.2540959","title":"Analysis and Performance Enhancement of Vector-Controlled VSC in HVDC Links Connected to Very Weak Grids","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":163,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Voltage source; Grid; Control theory (sociology); AC power; Transmission system; Computer science; Synchronization (alternating current); Nonlinear system; Vector control; Electronic engineering; Transmission (telecommunications); Engineering; Voltage; Control engineering; Topology (electrical circuits); Control (management); Electrical engineering; Mathematics; Telecommunications; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.00594297433072664,"gpt":0.2014190599180895,"spread":0.1954760855873629,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003107107,0.0001852628,0.0005523821,0.0006053373,0.00004647274,0.00002257021,0.00007675587,0.0001788635,0.00005003766],"category_scores_gemma":[0.000004799893,0.000139529,0.0001156023,0.0006786418,0.00001710743,0.0001341825,7.402463e-7,0.0001556975,0.00003325679],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000150859,"about_ca_system_score_gemma":0.00001361838,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002125782,"about_ca_topic_score_gemma":0.0001646065,"domain_scores_codex":[0.998707,0.00006693317,0.0005684972,0.00023152,0.0002011415,0.0002249121],"domain_scores_gemma":[0.9994379,0.00007756404,0.00006334755,0.000269635,0.00006489858,0.00008663534],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0022671,0.0004995925,0.004524778,0.001235172,0.004858145,0.00001196316,0.004647477,0.2332501,0.7287076,0.00007332433,0.0001872529,0.01973747],"study_design_scores_gemma":[0.0274887,0.004098192,0.04051422,0.004605555,0.001389269,0.00006619911,0.001438516,0.3520055,0.559659,0.000004730377,0.00603818,0.002691894],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5023702,0.00009587447,0.4956887,0.00002013508,0.0009773351,0.000491353,0.00001244536,0.00006629131,0.0002776065],"genre_scores_gemma":[0.9990364,0.00006264595,0.000031187,0.000004378972,0.00001693345,0.0003541041,5.852367e-7,0.00002195818,0.0004718242],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4966662,"threshold_uncertainty_score":0.5689827,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1991053377","doi":"10.1109/tpwrs.2014.2360369","title":"A Fully Decentralized Approach for Solving the Economic Dispatch Problem","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":162,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Economic dispatch; Mathematical optimization; Computer science; Nondeterministic algorithm; Flooding (psychology); Electric power system; Power (physics); Mathematics; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.006813465047826147,"gpt":0.1927440587862599,"spread":0.1859305937384337,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004866356,0.0002589455,0.000309561,0.0001235897,0.000220884,0.0001630301,0.0002746026,0.0001374574,0.00001569753],"category_scores_gemma":[0.000003495679,0.0002093313,0.0001559358,0.000169622,0.00002140096,0.0001712718,6.473616e-7,0.000179977,0.00005657345],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003693672,"about_ca_system_score_gemma":0.0000386316,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005829932,"about_ca_topic_score_gemma":0.00002248499,"domain_scores_codex":[0.9985547,0.00008055506,0.0004703107,0.0002944971,0.000156783,0.000443137],"domain_scores_gemma":[0.9991446,0.0001823134,0.00008039949,0.0004558133,0.00004550674,0.00009136127],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001869209,0.00002608699,0.000006695552,0.0001597183,0.0001135824,1.23942e-7,0.0003855598,0.9959628,0.0003796789,0.0004654205,0.002137484,0.0003441698],"study_design_scores_gemma":[0.0006777066,0.00008559896,0.000005140439,0.00005428665,0.0000523446,0.00002363804,0.00008766568,0.9867501,0.001398686,0.00001267189,0.01057967,0.0002725556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0009355586,0.0001750786,0.9900269,0.00003851618,0.002643012,0.001582642,0.00003355916,0.0005011322,0.00406363],"genre_scores_gemma":[0.995688,0.00002761849,0.002570618,0.0000201513,0.00003814173,0.001012919,0.000007879593,0.00009350086,0.0005411315],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9947525,"threshold_uncertainty_score":0.8536283,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}