{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":2,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":2,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"ace4a18197f1","filters":{"venue":"INTEK Jurnal Penelitian"}},"results":[{"id":"W4312335683","doi":"10.31963/intek.v9i1.3789","title":"PVSYST-Based Solar Power Plant Planning","year":2022,"lang":"en","type":"article","venue":"INTEK Jurnal Penelitian","topic":"Engineering and Technology Innovations","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Sizing; Software; Grid; Photovoltaic system; Electricity; Computer science; Controller (irrigation); Engineering; Automotive engineering; Electrical engineering; Operating system","authors":[{"name":"Muhammad Alif Anrizal Akbar","is_ca":false},{"name":"A. M. Shiddiq Yunus","is_ca":false},{"name":"Jumadi Tangko","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009410146401532782,"gpt":0.2043015373793572,"spread":0.1948913909778244,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001466867,0.0001351193,0.0001275138,0.0003065366,0.0001866867,0.0000256461,0.0002473699,0.00005435411,0.0004024737],"category_scores_gemma":[0.00002257773,0.0001545032,0.00005400582,0.0003056331,0.00002221994,0.00005454558,0.00004458933,0.0006582196,0.00003253436],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001237977,"about_ca_system_score_gemma":0.00002717758,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008453112,"about_ca_topic_score_gemma":0.000001838563,"domain_scores_codex":[0.999186,0.00001367256,0.0002234587,0.0001277157,0.0001670158,0.0002820816],"domain_scores_gemma":[0.9996532,0.00003775561,0.00002454402,0.000206946,0.00002567599,0.00005193683],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00002161571,0.00006111919,0.001991565,0.00005950587,0.0001615088,0.0005626734,0.0005582995,0.9402322,0.01487897,0.01199038,0.0281098,0.001372344],"study_design_scores_gemma":[0.0016277,0.0004810157,0.008213073,0.0002243031,0.00005465429,0.001156166,0.001983809,0.3130822,0.02143286,0.001660074,0.6486101,0.001474108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8891696,0.0009691165,0.07756211,0.001104056,0.002746524,0.0002071969,0.0003773758,0.003286464,0.02457752],"genre_scores_gemma":[0.9988578,0.000001367919,0.0006528548,0.0002138936,0.00005180431,0.0000524981,0.00005386132,0.00004097487,0.00007495617],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6271501,"threshold_uncertainty_score":0.6300458,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3207413166","doi":"10.31963/intek.v8i2.2962","title":"Hybrid Electrical System Optimization of Remote Island using HOMER","year":2021,"lang":"en","type":"article","venue":"INTEK Jurnal Penelitian","topic":"Hybrid Renewable Energy Systems","field":"Energy","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Positive Living North","funders":"","keywords":"Cost of electricity by source; Capital cost; Renewable energy; Intermittency; Net present value; Reliability (semiconductor); Electricity; Environmental science; Environmental economics; Automotive engineering; Operating cost; Hybrid system; Electricity generation; Reliability engineering; Business; Computer science; Power (physics); Engineering; Electrical engineering; Production (economics); Meteorology; Economics; Waste management; Geography","authors":[{"name":"Adrian Mansur","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01533747494725638,"gpt":0.2400155090497145,"spread":0.2246780341024581,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002866516,0.00023969,0.0005091166,0.0002158569,0.0001059079,0.00008044299,0.0002409752,0.0001028552,0.0003675001],"category_scores_gemma":[0.0001688342,0.000235306,0.0002057892,0.0004447365,0.00005006651,0.0001756865,0.00007631641,0.0002074919,0.00002964784],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003451653,"about_ca_system_score_gemma":0.000314777,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005041684,"about_ca_topic_score_gemma":0.0004483987,"domain_scores_codex":[0.9975719,0.0003164638,0.0007988592,0.0003978592,0.0004754894,0.0004393612],"domain_scores_gemma":[0.9984901,0.00008041027,0.0002977668,0.0004569921,0.0004895965,0.0001851408],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005893595,0.00004764461,0.0001780902,0.0001427259,0.0001777047,0.0007322679,0.00008707655,0.9715041,0.01847828,0.003209736,0.0004632291,0.004920207],"study_design_scores_gemma":[0.0008441307,0.00006917737,0.00005782083,0.0006309339,0.00009473287,0.003564586,0.000292423,0.8422637,0.1409786,0.0001361202,0.01066796,0.0003998943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5242802,0.001796966,0.4177095,0.0001124739,0.001896293,0.0001663224,0.0000459877,0.000201405,0.0537909],"genre_scores_gemma":[0.989657,0.00003975655,0.008334026,0.00006517867,0.0006139132,0.000002137601,0.00006014151,0.000070316,0.001157568],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4653768,"threshold_uncertainty_score":0.9595498,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}