{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":2,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":2,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"e105162c7f95","filters":{"venue":"International Journal of Planning and Scheduling"}},"results":[{"id":"W2083859858","doi":"10.1504/ijps.2011.044546","title":"Inter-domain translational research on planning and scheduling: operating rooms vs. job shops","year":2011,"lang":"en","type":"article","venue":"International Journal of Planning and Scheduling","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Industrial engineering; Translational research; Field (mathematics); Operations research; Operations management; Engineering; Mathematics; Medicine","authors":[{"name":"Kenneth N. McKay","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.08679686363456976,"gpt":0.3415164192481073,"spread":0.2547195556135375,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001594174,0.0002223133,0.0002809726,0.0007256815,0.0002233077,0.0002629472,0.0003267287,0.0001466138,0.00004435166],"category_scores_gemma":[0.0002308888,0.0002107172,0.00007434721,0.0001716619,0.00009793908,0.0003955297,0.00005312759,0.001007711,0.000005127177],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005755016,"about_ca_system_score_gemma":0.00005568524,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007550183,"about_ca_topic_score_gemma":9.225996e-7,"domain_scores_codex":[0.9980163,0.0001017308,0.0006560641,0.0002365149,0.0006774814,0.000311921],"domain_scores_gemma":[0.9987705,0.0003592441,0.0001366952,0.00009678928,0.0004298209,0.000206992],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000305171,0.00006371252,0.05038443,0.00004237392,0.0003928818,0.0003415873,0.01470507,0.9239975,0.00130075,0.001787692,0.00006569998,0.006613088],"study_design_scores_gemma":[0.002555416,0.0004249875,0.01509109,0.002457226,0.00004035982,0.0008969745,0.008156057,0.9647503,0.002504607,0.00211043,0.0004266804,0.0005858095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8403015,0.001915028,0.1543324,0.0002997485,0.001023831,0.00006680243,0.000007397425,0.00007020499,0.001983174],"genre_scores_gemma":[0.8139542,0.00005791988,0.1852525,0.00008287301,0.0005826399,0.000002991044,0.000007089256,0.00003502218,0.0000247672],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04075282,"threshold_uncertainty_score":0.8592799,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2285536374","doi":"10.1504/ijps.2015.072107","title":"Mine production scheduling for poly-metallic mineral deposits: extension to multiple processes","year":2015,"lang":"en","type":"article","venue":"International Journal of Planning and Scheduling","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"","keywords":"Heuristics; Scheduling (production processes); Block (permutation group theory); Computer science; Sequence (biology); Mathematical optimization; Extension (predicate logic); Mathematics; Chemistry","authors":[{"name":"Yuksel Asli Sari","is_ca":true},{"name":"Mustafa Kumral","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04702184344644901,"gpt":0.2886992622629689,"spread":0.2416774188165199,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003871078,0.0001061967,0.0001631432,0.0002084991,0.00003642486,0.00008875596,0.0001419359,0.00005046547,8.551051e-7],"category_scores_gemma":[0.0007861962,0.0001017969,0.00003866755,0.00006074681,0.000009251588,0.0002552072,0.00002641236,0.0001215364,0.000001032647],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006139703,"about_ca_system_score_gemma":0.00003817656,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005496536,"about_ca_topic_score_gemma":0.000005917542,"domain_scores_codex":[0.9992631,0.000006098487,0.0003431407,0.0001155136,0.000142129,0.0001300061],"domain_scores_gemma":[0.9992071,0.00006269824,0.0001129502,0.00005280974,0.0004400191,0.0001244619],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0004146673,0.00004771246,0.01657128,0.0001131474,0.0002210655,0.00003564552,0.002809482,0.923986,0.04430456,0.00006878399,0.001046157,0.01038156],"study_design_scores_gemma":[0.003529199,0.0009772719,0.003370964,0.00328472,0.000155341,0.002404477,0.003319024,0.858944,0.1071756,0.001594005,0.01416784,0.001077535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8872685,0.001681635,0.1095547,0.0003142901,0.001026192,0.00007220468,0.000003605241,0.00005283425,0.00002603409],"genre_scores_gemma":[0.7728031,0.00003205514,0.2263512,0.00004529444,0.0007174682,0.000004669285,0.000005765224,0.00001695605,0.00002340087],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1167965,"threshold_uncertainty_score":0.4151157,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}