{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":6,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":6,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"7faec8dcfbdd","filters":{"venue":"Journal of Construction Engineering"}},"results":[{"id":"W2157838605","doi":"10.1155/2014/672896","title":"An Automated BIM Model to Conceptually Design, Analyze, Simulate, and Assess Sustainable Building Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Embodied energy; Sustainability; Energy consumption; Certification; Systems engineering; Environmental design; Energy modeling; Building design; Conceptual design; Sustainable design; Architectural engineering; Design tool; Computer science; Life-cycle assessment; Engineering; Civil engineering; Operations management; Production (economics); Human–computer interaction","retraction":null,"screen_n_in":null,"score":{"opus":0.01240270344785303,"gpt":0.2478339491887843,"spread":0.2354312457409313,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003648815,0.0001821186,0.0002626963,0.0005338101,0.00007991977,0.0001410252,0.0001069672,0.0001068772,0.00000712121],"category_scores_gemma":[0.0001036496,0.0001813426,0.00004752855,0.0003676206,0.00003028429,0.0007969233,0.000011443,0.0002297458,7.829661e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001164301,"about_ca_system_score_gemma":0.00005519422,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002615015,"about_ca_topic_score_gemma":7.587797e-7,"domain_scores_codex":[0.9989727,0.00002851757,0.000442597,0.0001246043,0.0001872868,0.0002442547],"domain_scores_gemma":[0.9991761,0.0000633544,0.0001048233,0.0001175789,0.000344691,0.0001934177],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001569338,0.000004814855,0.0001369074,0.00005258723,0.00004187113,0.00000401269,0.0001425506,0.9641034,0.0218352,0.01022526,0.0000452426,0.003392447],"study_design_scores_gemma":[0.0003601607,0.0001269708,0.0002164786,0.00007022061,0.00003261953,0.0003889264,0.0003243042,0.9902655,0.007293083,0.000300259,0.0004243504,0.0001971256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3691092,0.00004522884,0.6300977,0.0000147812,0.0003040074,0.00008490287,6.111376e-7,0.000278194,0.00006535101],"genre_scores_gemma":[0.8495319,0.0000143566,0.1502648,0.00001229649,0.0001355127,0.00000460502,5.28391e-7,0.00002851047,0.000007504467],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4804227,"threshold_uncertainty_score":0.7394935,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2180715974","doi":"10.1155/2015/579486","title":"An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Schedule; Building information modeling; Earned value management; Project management; Process (computing); Project planning; Construction management; Pre-construction services; Systems engineering; Cost estimate; Project management triangle; Track (disk drive); Computer science; Engineering management; Engineering; Operations management; Scheduling (production processes); Project charter; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01213662361098052,"gpt":0.2220072029992322,"spread":0.2098705793882516,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004851668,0.0001766682,0.0003024183,0.0004002858,0.00005164209,0.0000741131,0.00009866909,0.00008170633,0.0000076297],"category_scores_gemma":[0.00005901837,0.0001341646,0.00005171111,0.0004755606,0.00006649442,0.0004432742,0.000009307252,0.0002917685,0.000002293046],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001582087,"about_ca_system_score_gemma":0.00008095668,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005001893,"about_ca_topic_score_gemma":0.00001161372,"domain_scores_codex":[0.9987966,0.00006341565,0.0006521425,0.0001087937,0.0002433531,0.0001357258],"domain_scores_gemma":[0.9989426,0.0000412823,0.0001851222,0.0001606463,0.0004873082,0.0001830529],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000226675,0.0001216366,0.006077777,0.0002722224,0.0006489487,0.0004868724,0.008883253,0.7639942,0.02115603,0.003153908,0.0002509171,0.1947275],"study_design_scores_gemma":[0.002947076,0.001318876,0.0008594795,0.0004371593,0.0003490935,0.216609,0.1978331,0.5708825,0.00627191,0.0000300666,0.001890937,0.0005708518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.93174,0.0001079874,0.06614727,0.0000184863,0.001405922,0.0003593368,0.000009243438,0.0001251664,0.00008655985],"genre_scores_gemma":[0.9899336,0.000005410761,0.009826134,0.000003119464,0.0001926212,0.0000115603,0.00000101717,0.00002318347,0.000003349131],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2161221,"threshold_uncertainty_score":0.5471072,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2041663300","doi":"10.1155/2014/703084","title":"Motivating Workers in Construction","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":36,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Productivity; Incentive; Employee motivation; Empowerment; Knowledge management; Work (physics); Knowledge worker; Business; Key (lock); Marketing; Public relations; Engineering; Computer science; Economics; Political science; Economic growth","retraction":null,"screen_n_in":null,"score":{"opus":0.02693080923066126,"gpt":0.3794471159201871,"spread":0.3525163066895258,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001413501,0.00008210658,0.0002241931,0.0004449979,0.000139723,0.000005978442,0.00007949129,0.0001131009,0.0001463554],"category_scores_gemma":[0.001271497,0.00007672518,0.00005052601,0.0003616581,0.00003502264,0.0002326872,0.00001741823,0.0009053956,0.00001830552],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002136154,"about_ca_system_score_gemma":0.0002816978,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002872153,"about_ca_topic_score_gemma":0.000005915942,"domain_scores_codex":[0.9983475,0.0001763729,0.0008146627,0.00008015693,0.0002844057,0.0002968626],"domain_scores_gemma":[0.9983366,0.0008168649,0.000346931,0.00008016344,0.0002774553,0.0001420233],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001018352,0.0000093816,0.9140896,0.0001825043,0.00001262661,0.000003441075,0.0001791048,0.01346954,0.0004988132,0.006102324,0.00008745038,0.06526338],"study_design_scores_gemma":[0.002385262,0.0001417476,0.9573889,0.00114244,0.000009130532,0.0002552858,0.002485357,0.02704741,0.00009738539,0.0008609142,0.00800649,0.000179634],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9332882,0.00004843516,0.06024088,0.0005093121,0.002691648,0.0001814218,0.000001120349,0.00002556688,0.003013485],"genre_scores_gemma":[0.9689358,0.00002371883,0.03022134,0.00004050053,0.0007329453,0.000007044094,9.836045e-7,0.00001218995,0.00002541051],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.06508375,"threshold_uncertainty_score":0.3933544,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1999129289","doi":"10.1155/2014/847430","title":"Hybrid Simulation Environment for Construction Projects: Identification of System Design Criteria","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Schedule; Identification (biology); Process (computing); Systems engineering; Computer science; Simulation modeling; Risk analysis (engineering); Modeling and simulation; System lifecycle; Process management; Engineering; Software engineering; Application lifecycle management; Software","retraction":null,"screen_n_in":null,"score":{"opus":0.01120037529320345,"gpt":0.2072075331829719,"spread":0.1960071578897684,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004867289,0.0001535748,0.0002709182,0.000338987,0.00004711014,0.00003844441,0.00008190837,0.00008349887,0.00001220163],"category_scores_gemma":[0.00006598062,0.0001599246,0.0001048066,0.0000952037,0.00004747161,0.0004030985,0.000004646567,0.0001256291,0.000002174639],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001714571,"about_ca_system_score_gemma":0.00002381955,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":4.740851e-7,"about_ca_topic_score_gemma":3.559208e-8,"domain_scores_codex":[0.9985733,0.00003819438,0.0009455872,0.0001055459,0.0002084957,0.0001288783],"domain_scores_gemma":[0.99901,0.0001222943,0.0004384239,0.0001307247,0.0002438156,0.00005476022],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002825254,0.000005539984,0.00002847845,0.0002627739,0.00004492498,2.575439e-7,0.0000435883,0.8058422,0.1492948,0.003130657,0.00001832755,0.04130024],"study_design_scores_gemma":[0.000469851,0.00009107427,0.0001080071,0.0001283866,0.00007224614,0.0004203129,0.0001756523,0.7898737,0.2068909,0.0001790838,0.001457639,0.0001332434],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.09024215,0.00009928097,0.906987,0.000007509517,0.002302821,0.0002227403,0.000009335354,0.00009287777,0.00003623935],"genre_scores_gemma":[0.8968315,0.00001903511,0.1027813,0.00000123641,0.0003177935,0.00001588237,0.000004826567,0.00002535782,0.000003097081],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8065894,"threshold_uncertainty_score":0.6521536,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1689201003","doi":"10.1155/2015/752674","title":"Development of the Asphalt Multi-Integrated Roller Field and Experimental Studies","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"Asphalt Pavement Performance Evaluation","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"Carleton University; Stantec (Canada)","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada; Ministère des Transports; Carleton University","keywords":"Asphalt; Engineering; Civil engineering; Compaction; Asphalt pavement; Work (physics); Sight; Forensic engineering; Mechanical engineering; Geotechnical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.04272614212842171,"gpt":0.2813857461627965,"spread":0.2386596040343748,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002529256,0.00008587278,0.0001489398,0.00008916605,0.00002422899,0.000007355175,0.00005830845,0.00003253801,0.000007267221],"category_scores_gemma":[0.00006718672,0.00006248686,0.00002667087,0.000103676,0.00002006561,0.0002000267,0.00001862959,0.0001229128,5.8048e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001232202,"about_ca_system_score_gemma":0.00004852564,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":3.132533e-7,"about_ca_topic_score_gemma":6.843095e-7,"domain_scores_codex":[0.9993007,0.00000829505,0.0003790099,0.0000372809,0.0001979021,0.00007678629],"domain_scores_gemma":[0.9996302,0.00002003143,0.0001092807,0.00005139557,0.0001467512,0.00004237746],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00005421539,0.00004335803,0.006768655,0.0001898025,0.0006587797,0.000003426914,0.01093862,0.7741401,0.1743913,0.0001136305,0.0004538547,0.03224428],"study_design_scores_gemma":[0.001783751,0.00007446131,0.002889941,0.0002673051,0.00003822712,0.0001752742,0.006504634,0.1785869,0.8078398,0.000006194436,0.001665667,0.0001678553],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9722697,0.001570618,0.0246519,0.00001789514,0.001374522,0.00006220213,2.736532e-7,0.00002022429,0.00003264825],"genre_scores_gemma":[0.9502574,0.00002865398,0.04963076,0.000005029113,0.00005810301,0.000002500775,1.587753e-7,0.000008487703,0.000008890826],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6334485,"threshold_uncertainty_score":0.254814,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2504132119","doi":"10.1155/2016/2312057","title":"An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Scheduling (production processes); Schedule; Operations research; Parametric statistics; Randomness; Conceptual design; Industrial engineering; Engineering; Computer science; Systems engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.008098464830622399,"gpt":0.2172555379556571,"spread":0.2091570731250346,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002071796,0.0001619194,0.0002274953,0.0003107582,0.00008238066,0.00006302688,0.0001066412,0.0001115111,0.00002636725],"category_scores_gemma":[0.00006806949,0.0001221746,0.0001166371,0.0001732462,0.00002930975,0.0008211626,0.000003841522,0.0001621534,0.000003704678],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001871467,"about_ca_system_score_gemma":0.00006136889,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002314561,"about_ca_topic_score_gemma":0.000002483168,"domain_scores_codex":[0.9989856,0.00001688431,0.0005719762,0.0001018005,0.0001460548,0.0001776783],"domain_scores_gemma":[0.9992273,0.0000537471,0.0000775486,0.0001264243,0.0003909116,0.000124075],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003486494,0.000009378291,0.00009898838,0.00006563902,0.0001033197,0.000003392537,0.000125374,0.5820675,0.3043192,0.008039973,0.00003664981,0.1050957],"study_design_scores_gemma":[0.001186903,0.0001490453,0.00008595343,0.0007455617,0.00003968786,0.001748395,0.001263646,0.8503665,0.1351711,0.00002762165,0.008878131,0.0003374081],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1892436,0.0002056747,0.8073021,0.00005431229,0.002833834,0.00008640387,0.000009444062,0.0002333077,0.00003133677],"genre_scores_gemma":[0.82687,0.00004479855,0.1722453,0.000005493917,0.0007786991,0.00001237369,0.000002023151,0.00003312277,0.000008137043],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6376264,"threshold_uncertainty_score":0.4982135,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}