{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":174,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":174,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"d295d0798699","filters":{"venue":"Journal of Construction Engineering and Management"}},"results":[{"id":"W1977950491","doi":"10.1061/(asce)co.1943-7862.0000220","title":"Role of Simulation in Construction Engineering and Management","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":356,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Software deployment; Key (lock); Computer science; Construction management; Systems engineering; Construction industry; Management science; Engineering management; Construction engineering; Engineering; Software engineering; Civil engineering; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.002317563432346137,"gpt":0.1732412415014006,"spread":0.1709236780690545,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001713974,0.0001436408,0.0001992534,0.0006218985,0.00002167059,0.0000322431,0.00005161104,0.00007792178,0.00001126493],"category_scores_gemma":[0.000009119068,0.0001517031,0.00004085887,0.0002071646,0.00004302899,0.0002604226,0.00001970002,0.0002390326,4.121111e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003195036,"about_ca_system_score_gemma":0.000003973016,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001906253,"about_ca_topic_score_gemma":0.000002793049,"domain_scores_codex":[0.9991412,0.000006211127,0.0004702885,0.0001014469,0.0001536884,0.0001271621],"domain_scores_gemma":[0.9996578,0.00002386657,0.0001094249,0.00009052073,0.00005645381,0.00006192322],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002024309,0.00001352458,0.001295011,0.0005254542,0.0001652519,0.000009167885,0.0001230097,0.6797855,0.0169438,0.06382434,0.00001006352,0.2372846],"study_design_scores_gemma":[0.001945959,0.0000783594,0.03782704,0.0004798239,0.0001761005,0.001018918,0.001192587,0.9320757,0.004439815,0.001184846,0.01912755,0.0004532455],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9255614,0.0004579329,0.07108206,0.00002539418,0.001595013,0.0001949785,0.00000213741,0.00007812517,0.001002945],"genre_scores_gemma":[0.9626083,0.0009654589,0.03631208,0.000002483676,0.00008081578,0.000006255372,9.232407e-7,0.00001561385,0.000008038811],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2522902,"threshold_uncertainty_score":0.6186274,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2982358567","doi":"10.1061/(asce)co.1943-7862.0001736","title":"Machine Learning Algorithms for Construction Projects Delay Risk Prediction","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":310,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"","keywords":"Machine learning; Computer science; Artificial intelligence; Decision tree; Bayesian network; Set (abstract data type); Interdependence; Online machine learning; Data mining; Algorithm; Active learning (machine learning)","retraction":null,"screen_n_in":null,"score":{"opus":0.02207567151945878,"gpt":0.2701024369812171,"spread":0.2480267654617583,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001984447,0.0001696969,0.0002988765,0.0009647034,0.0001624507,0.0001972309,0.0001750778,0.00006428164,0.00008363104],"category_scores_gemma":[0.0002027878,0.0001403035,0.0001213683,0.0005006912,0.00005574685,0.0006616662,0.00006651385,0.0002636863,0.00001117601],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005322674,"about_ca_system_score_gemma":0.00002240624,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004056686,"about_ca_topic_score_gemma":8.291005e-7,"domain_scores_codex":[0.9980114,0.00005673575,0.0008364982,0.0002721153,0.0006241947,0.0001991004],"domain_scores_gemma":[0.9984612,0.0001833283,0.0007645195,0.0001783676,0.0003315879,0.00008093191],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001620051,0.00002057974,0.04502165,0.0001522573,0.0002693365,0.000005151556,0.0001880786,0.0425467,0.0002014849,0.01259173,0.0004114328,0.8984296],"study_design_scores_gemma":[0.003736141,0.0007746314,0.01132484,0.0001565433,0.00027585,0.001287079,0.002454282,0.4237843,0.0004601708,0.002662799,0.55269,0.0003933276],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.428039,0.0003793261,0.5617484,0.0001899466,0.006468368,0.0008843139,0.00001993451,0.0001006772,0.002170015],"genre_scores_gemma":[0.8512834,0.002657114,0.1435637,0.00002837859,0.0004796138,0.00002811106,0.000007033198,0.00002985618,0.001922813],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8980362,"threshold_uncertainty_score":0.5721411,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2144560128","doi":"10.1061/(asce)co.1943-7862.0000974","title":"Hardhat-Wearing Detection for Enhancing On-Site Safety of Construction Workers","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":221,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Matching (statistics); Construction site safety; Recall; Work (physics); Safety monitoring; Computer science; Occupational safety and health; Precision and recall; Computer security; Risk analysis (engineering); Engineering; Business; Artificial intelligence; Medicine; Psychology","retraction":null,"screen_n_in":null,"score":{"opus":0.03699682308425144,"gpt":0.3618167803672243,"spread":0.3248199572829729,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001306073,0.00009323498,0.0002230724,0.0003760427,0.0001810503,0.000007516869,0.0000480932,0.00007801299,0.00001076401],"category_scores_gemma":[0.000190895,0.00008640202,0.00005978381,0.0001717559,0.00003559942,0.000145183,0.00002723148,0.0002978258,0.000003490362],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002109594,"about_ca_system_score_gemma":0.000111381,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001428052,"about_ca_topic_score_gemma":0.000008916903,"domain_scores_codex":[0.9986441,0.00006447772,0.0006663348,0.0001049271,0.0002980677,0.0002220997],"domain_scores_gemma":[0.9987388,0.0002612508,0.0003599903,0.00008553557,0.0003767681,0.0001776804],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.007713845,0.0001061125,0.05200011,0.006363018,0.0006719693,0.00001479442,0.001817407,0.08280166,0.002743766,0.03521872,0.001077022,0.8094715],"study_design_scores_gemma":[0.04080714,0.005743593,0.4569525,0.01274692,0.0007777721,0.0006844288,0.04505122,0.083294,0.007285674,0.004301799,0.340691,0.001663942],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4245383,0.000218574,0.5660327,0.0005078044,0.005073699,0.001087156,0.00001151952,0.00004555138,0.002484703],"genre_scores_gemma":[0.9684669,0.0003516211,0.03052225,0.00003490979,0.0004257739,0.0000328462,0.000002888472,0.00001591395,0.0001468461],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8078076,"threshold_uncertainty_score":0.3523372,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2019386889","doi":"10.1061/(asce)0733-9364(2002)128:2(174)","title":"Unified Modeling Methodology for Construction Simulation","year":2002,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":193,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Flexibility (engineering); Systems engineering; Software engineering; Software; Management science; Industrial engineering; Engineering; Programming language","retraction":null,"screen_n_in":null,"score":{"opus":0.04004607758693449,"gpt":0.2418517105268874,"spread":0.2018056329399529,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001870339,0.0001144805,0.0001732417,0.0003211993,0.00005027858,0.00003359175,0.00004228871,0.00007144658,0.00002209506],"category_scores_gemma":[0.00002243015,0.0001159438,0.00005672584,0.0001195356,0.00002592494,0.000217721,0.000006217517,0.0001122714,9.210396e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004604672,"about_ca_system_score_gemma":0.000002340235,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":4.073529e-7,"about_ca_topic_score_gemma":2.465115e-7,"domain_scores_codex":[0.9993043,0.00001434563,0.0003832925,0.00008243087,0.00009829619,0.0001173217],"domain_scores_gemma":[0.9996288,0.00005538984,0.00008408347,0.00006591489,0.0001137209,0.00005202847],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008780208,0.000003086893,0.000008171207,0.00009612517,0.0000849478,0.000001011294,0.00004823683,0.7932298,0.0006979335,0.02377599,0.0000522155,0.1819938],"study_design_scores_gemma":[0.0005367608,0.00004296072,0.00001823779,0.00004175127,0.00007900836,0.0002803485,0.0002581274,0.9876022,0.0004693172,0.001289015,0.0092675,0.0001147158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03544824,0.0004418162,0.96145,0.00005469343,0.001891049,0.0001299145,0.000001682934,0.00009294776,0.0004896012],"genre_scores_gemma":[0.7723745,0.0006940801,0.2266754,0.000009111629,0.0001924092,0.000008770994,0.000001139179,0.00001594411,0.00002873006],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7369262,"threshold_uncertainty_score":0.4728052,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2082299583","doi":"10.1061/(asce)0733-9364(2007)133:11(880)","title":"Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources","year":2007,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":186,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"National Institute for Occupational Safety and Health; National Institute of Standards and Technology; National Science Foundation","keywords":"Computer science; Real-time computing; Frame rate; Grid; Frame (networking); Video tracking; Occupancy; Occupancy grid mapping; Range (aeronautics); Tracking (education); Field (mathematics); Object (grammar); Computer vision; Artificial intelligence; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01100886647149361,"gpt":0.1953466806789443,"spread":0.1843378142074507,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000682304,0.00007593341,0.0001214425,0.0001008976,0.0001281805,0.00002998432,0.00003877565,0.00003220401,0.00001032247],"category_scores_gemma":[0.00001756238,0.00005227534,0.00004264005,0.00008264931,0.00004702916,0.0001441846,0.000005261388,0.00007972588,2.174205e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000004539652,"about_ca_system_score_gemma":0.000003978657,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005873004,"about_ca_topic_score_gemma":0.00004935736,"domain_scores_codex":[0.9993808,0.00001072544,0.0002810069,0.00007794419,0.0001419398,0.0001075345],"domain_scores_gemma":[0.9995876,0.000111648,0.0001429593,0.0000420962,0.00007157832,0.00004413544],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002910208,0.000007031088,0.01334844,0.0001945447,0.0001945478,0.000006944371,0.0001913538,0.2195605,0.002552396,0.000241617,0.0000111739,0.7634004],"study_design_scores_gemma":[0.0009488394,0.0002531997,0.238031,0.0002418243,0.0001866004,0.0009518808,0.001331571,0.7558281,0.0004504361,0.0003540904,0.001210898,0.0002115678],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9211671,0.000698458,0.07730724,0.00002962236,0.0005952948,0.00009770232,0.000004697293,0.00001413046,0.00008569879],"genre_scores_gemma":[0.9844822,0.0003436253,0.01500599,0.00000388598,0.0001508213,3.1733e-7,0.000001276919,0.00000257953,0.000009340913],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7631889,"threshold_uncertainty_score":0.2131727,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2139581178","doi":"10.1061/(asce)0733-9364(2003)129:5(518)","title":"Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":152,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; Microsoft Research","keywords":"Schedule; Duration (music); Computer science; Operations research; Risk analysis (engineering); Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.05951054471507437,"gpt":0.3324887915624477,"spread":0.2729782468473733,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004966388,0.0003390229,0.0005515571,0.001804945,0.0003133253,0.0003073789,0.0003151343,0.0001311965,0.0001029598],"category_scores_gemma":[0.0009409906,0.0003103008,0.000198757,0.00123401,0.0002296742,0.001173593,0.0001101665,0.0006585873,0.00001141791],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001518797,"about_ca_system_score_gemma":0.0001233398,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000664836,"about_ca_topic_score_gemma":0.000006170274,"domain_scores_codex":[0.9959424,0.0002306914,0.001696701,0.0005037471,0.001221633,0.0004048364],"domain_scores_gemma":[0.9973117,0.0002020344,0.00142657,0.0004267964,0.0004502769,0.000182593],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006336426,0.0000314846,0.01361744,0.00004778029,0.0001234634,0.000006200652,0.0001774445,0.8183551,0.000120032,0.05151599,0.00008961051,0.1158521],"study_design_scores_gemma":[0.002233849,0.00009688268,0.001689318,0.0001140833,0.0001821103,0.0005748504,0.002338815,0.9680351,0.0002817638,0.02215805,0.00193012,0.0003650312],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6018808,0.0002212922,0.3938779,0.00007184067,0.00139078,0.0002572937,0.000007960191,0.00004488953,0.002247246],"genre_scores_gemma":[0.5500426,0.00152472,0.4481133,0.00001993421,0.00007464741,0.00001384473,8.07348e-7,0.0000196717,0.0001904191],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.14968,"threshold_uncertainty_score":0.9999349,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2105760447","doi":"10.1061/(asce)0733-9364(2001)127:3(183)","title":"Cost Optimization in Projects with Repetitive Nonserial Activities","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":150,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Crew; Scheduling (production processes); Operations research; Novelty; Total cost; Software; Reliability engineering; Engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.03584861632909488,"gpt":0.2890536171455027,"spread":0.2532050008164078,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001001885,0.0001010409,0.0002013999,0.0007787927,0.00004159756,0.000155887,0.0001084292,0.0000337511,0.00002952686],"category_scores_gemma":[0.000192762,0.00007589082,0.00003346193,0.0005209105,0.00006024371,0.000419742,0.00002978873,0.000140227,6.33012e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005205712,"about_ca_system_score_gemma":0.00003324744,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002990387,"about_ca_topic_score_gemma":0.000003421915,"domain_scores_codex":[0.998749,0.00004639115,0.0004422016,0.0001514522,0.0004746648,0.0001362983],"domain_scores_gemma":[0.9992941,0.0001488956,0.0002824451,0.0001057135,0.0001140031,0.00005486917],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002951634,0.00002372889,0.005379486,0.00001920109,0.0000595457,0.000188601,0.0005946686,0.9352342,0.00009463081,0.001595337,0.00003323942,0.05648214],"study_design_scores_gemma":[0.01970434,0.002043013,0.05104965,0.002792661,0.0003633966,0.02494472,0.0988516,0.7273409,0.002497641,0.001183313,0.0672655,0.001963268],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5501083,0.00004243674,0.4463824,0.0002390813,0.0004043957,0.0002426043,8.683464e-7,0.00001767463,0.002562284],"genre_scores_gemma":[0.8808571,0.000286501,0.1185762,0.00001974207,0.0001214381,0.000008593569,3.755062e-7,0.000009674735,0.0001203726],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3307488,"threshold_uncertainty_score":0.3094738,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2023346663","doi":"10.1061/(asce)0733-9364(2005)131:3(354)","title":"Change Orders Impact on Labor Productivity","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Concordia University","funders":"National Evidence-based Healthcare Collaborating Agency","keywords":"Productivity; Change order; Field (mathematics); Computer science; Work (physics); Artificial neural network; Operations research; Industrial engineering; Engineering; Economics; Systems engineering; Project management; Economic growth; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.006143367867799938,"gpt":0.2030880454735197,"spread":0.1969446776057198,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001023454,0.0001126385,0.0001219974,0.0002595288,0.00002575058,0.00002964818,0.00003877676,0.00003371522,0.00002321415],"category_scores_gemma":[0.000005011196,0.00009374023,0.00005056672,0.0001350755,0.00001832711,0.0002742994,0.000005834484,0.0001392868,0.000003494511],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007812764,"about_ca_system_score_gemma":0.000004210773,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001170807,"about_ca_topic_score_gemma":7.95474e-7,"domain_scores_codex":[0.9995067,0.000006118441,0.000192175,0.00006664658,0.0001230185,0.0001054048],"domain_scores_gemma":[0.9997617,0.000007868485,0.00005245716,0.0000713773,0.00004842535,0.00005815132],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003289953,0.00002328471,0.0005005134,0.0001206687,0.0002579433,0.000006806532,0.000136577,0.1713992,0.0006671244,0.01447823,0.000975882,0.8114009],"study_design_scores_gemma":[0.004219746,0.0008307858,0.1230636,0.0008250755,0.0004047336,0.003267252,0.0008671012,0.2101638,0.009368289,0.0006708289,0.6449171,0.001401682],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9746234,0.0007474929,0.0203611,0.0006019933,0.001980654,0.0001791907,0.000004030585,0.0001590117,0.001343066],"genre_scores_gemma":[0.9933711,0.000590405,0.005470017,0.00002215269,0.0004968446,0.00000700952,5.137283e-7,0.00001267539,0.00002932437],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8099992,"threshold_uncertainty_score":0.3822616,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2053272969","doi":"10.1061/(asce)0733-9364(2003)129:4(405)","title":"Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":140,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo; University of Toronto","funders":"","keywords":"Rework; Artificial neural network; Absolute deviation; Computer science; Standard deviation; Regression analysis; Reliability engineering; Engineering; Data mining; Statistics; Artificial intelligence; Machine learning; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.05207126550196439,"gpt":0.3023404797402309,"spread":0.2502692142382665,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002015255,0.0001525949,0.0002486336,0.001065369,0.0001135632,0.0001921267,0.000131394,0.00006790583,0.00004445604],"category_scores_gemma":[0.0004265795,0.0001263084,0.00007366964,0.00089234,0.00005416912,0.0007793339,0.00003937318,0.0002623044,0.00000176791],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000906304,"about_ca_system_score_gemma":0.00002055841,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003318571,"about_ca_topic_score_gemma":0.0000128745,"domain_scores_codex":[0.9980261,0.000106972,0.0009617171,0.0002288284,0.0004677493,0.0002086647],"domain_scores_gemma":[0.9988546,0.0001674062,0.0005769159,0.0001562656,0.0001727888,0.00007197943],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002527125,0.00002304182,0.04970981,0.00003872439,0.00006358405,0.00002026726,0.000150735,0.1084111,0.00004926038,0.01799098,0.00009100816,0.8231988],"study_design_scores_gemma":[0.004663566,0.0003282257,0.03206458,0.0004478271,0.0001407004,0.001411514,0.007444347,0.9303102,0.0003220674,0.002255938,0.02005221,0.0005587626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.913923,0.0002308819,0.07623583,0.0001488512,0.007131695,0.0003600347,6.64351e-7,0.0000364474,0.001932604],"genre_scores_gemma":[0.9926036,0.0003958827,0.006733076,0.00001150452,0.0001813297,0.000009409748,6.284573e-7,0.000008889983,0.0000556547],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.82264,"threshold_uncertainty_score":0.5150706,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2044479004","doi":"10.1061/(asce)0733-9364(2003)129:6(698)","title":"Resource Optimization Using Combined Simulation and Genetic Algorithms","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":132,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Genetic algorithm; Software; Set (abstract data type); Mathematical optimization; Resource (disambiguation); Simulation modeling; Simulation software; Industrial engineering; Engineering; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.0389053613313472,"gpt":0.3042320755583036,"spread":0.2653267142269564,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009303987,0.0001019904,0.0001824316,0.00051505,0.00008564014,0.0001786345,0.00007708313,0.000042108,0.0000172759],"category_scores_gemma":[0.0003654141,0.00008849295,0.00004021825,0.0003247983,0.000048158,0.0002064126,0.00002764184,0.0001006211,3.794644e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000287499,"about_ca_system_score_gemma":0.00001256388,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":6.058299e-7,"about_ca_topic_score_gemma":5.374521e-8,"domain_scores_codex":[0.9986598,0.00007252105,0.000558821,0.0001518322,0.0004407572,0.0001163054],"domain_scores_gemma":[0.999162,0.0001855931,0.0003161977,0.0001112955,0.0001396141,0.00008533857],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001008643,0.000005137109,0.0007779078,0.00001208732,0.00003098803,0.00001219035,0.00008169018,0.9719734,0.00005485505,0.001112917,0.000005077553,0.02592372],"study_design_scores_gemma":[0.0006481069,0.00004936331,0.001184587,0.00004615706,0.00004659368,0.0005583448,0.0006328835,0.9925719,0.00004793208,0.00044299,0.003671282,0.0000998387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2516102,0.0001680916,0.7475903,0.00004804223,0.0002228476,0.00008750956,3.459393e-7,0.00001116385,0.0002614882],"genre_scores_gemma":[0.5897508,0.00005782097,0.4101051,0.00001387187,0.00003999495,5.527329e-7,1.442226e-7,0.000007521536,0.00002420736],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.3381406,"threshold_uncertainty_score":0.3608638,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1987479515","doi":"10.1061/(asce)0733-9364(2004)130:6(853)","title":"Risks in Chinese Construction Market—Contractors’ Perspective","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":131,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"Tsinghua University","keywords":"China; Business; Cronbach's alpha; Government (linguistics); Unanimity; Accession; Index (typography); Industrial organization; Marketing; International trade; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.02489186038364041,"gpt":0.3193339995376016,"spread":0.2944421391539612,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001372849,0.0001719576,0.0003131628,0.001445448,0.00007477732,0.000172257,0.0002033051,0.00005698582,0.0001200222],"category_scores_gemma":[0.0002610278,0.0001372553,0.0001080509,0.000897614,0.0001069997,0.0007569697,0.00006817906,0.0002613653,0.000006139083],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001752247,"about_ca_system_score_gemma":0.00003429219,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003229876,"about_ca_topic_score_gemma":0.00001339355,"domain_scores_codex":[0.9981067,0.00004030504,0.000808742,0.0002337381,0.0006189242,0.000191624],"domain_scores_gemma":[0.9989384,0.0001011095,0.0004327492,0.0001807305,0.0002569508,0.00009010459],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0004458265,0.0001463319,0.1402985,0.0001274569,0.0004436562,0.0002344589,0.001516101,0.08060218,0.0002371617,0.3009735,0.0004183868,0.4745565],"study_design_scores_gemma":[0.006520102,0.0002281703,0.8852092,0.0002916979,0.0001103634,0.002645591,0.01206732,0.005670252,0.0001152538,0.06489567,0.02166441,0.0005819729],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9442535,0.0003295401,0.04149872,0.0007933696,0.002662753,0.0002288646,0.000001922828,0.00003430097,0.01019702],"genre_scores_gemma":[0.9814163,0.0008207696,0.01743565,0.0000270164,0.0001659856,0.000004297858,2.07186e-7,0.000008605129,0.0001211516],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7449107,"threshold_uncertainty_score":0.5597107,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2016010091","doi":"10.1061/(asce)0733-9364(2005)131:8(938)","title":"Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":118,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Relevance (law); Expert system; Fuzzy logic; Productivity; Computer science; Data mining; Industrial engineering; Artificial intelligence; Machine learning; Engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.01197712258640025,"gpt":0.2013805044417287,"spread":0.1894033818553284,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002449968,0.0001757633,0.0002318002,0.0003717205,0.00007937799,0.00009721725,0.00006311416,0.0001030174,0.000008271681],"category_scores_gemma":[0.00001885321,0.0001744224,0.00005703069,0.00023199,0.00005399746,0.0005635066,0.00001642078,0.0002762953,0.000001019259],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001670012,"about_ca_system_score_gemma":0.00001871358,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005819047,"about_ca_topic_score_gemma":9.932397e-7,"domain_scores_codex":[0.9989197,0.00002216393,0.0005220905,0.0001286948,0.0002319501,0.0001753698],"domain_scores_gemma":[0.9994923,0.00001596133,0.0001732126,0.0001057949,0.0001211948,0.00009145941],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003808494,0.00002245602,0.002703701,0.0002224688,0.0004323076,0.00001033523,0.000223206,0.6639026,0.007162725,0.01714364,0.0003646323,0.3077739],"study_design_scores_gemma":[0.004177838,0.0001920923,0.002238185,0.00126567,0.0004650771,0.009479166,0.004663649,0.7962075,0.009138913,0.0002290207,0.1708134,0.00112952],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9199565,0.001686529,0.0696694,0.0001217009,0.007384199,0.0002345799,0.000005097287,0.0002153238,0.0007266662],"genre_scores_gemma":[0.9692214,0.0006700701,0.02796919,0.000006970899,0.002069281,0.000008476779,0.000001092371,0.00002647957,0.00002701336],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3066444,"threshold_uncertainty_score":0.7112738,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2133047147","doi":"10.1061/(asce)0733-9364(2004)130:3(330)","title":"Environmental Management Systems and ISO 14001 Certification for Construction Firms","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Bombardier (Canada)","funders":"","keywords":"Certification; Environmental management system; Business; Work (physics); Management system; Environmental consulting; Environmental resource management; Risk analysis (engineering); Engineering management; Environmental economics; Operations management; Engineering; Environmental science; Management; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.005427593279957059,"gpt":0.1871884097115596,"spread":0.1817608164316026,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001581639,0.0001332407,0.0001527761,0.000246034,0.00006027973,0.00007499057,0.00004686025,0.00003949086,0.000002165677],"category_scores_gemma":[0.000002266226,0.000134834,0.00003328078,0.00006711444,0.00003361098,0.0001730913,0.0000165531,0.00007407278,4.932776e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001840047,"about_ca_system_score_gemma":0.000004584294,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":8.352604e-7,"about_ca_topic_score_gemma":4.903563e-8,"domain_scores_codex":[0.9992912,0.000005258319,0.0003089957,0.0001096986,0.0001335717,0.0001512986],"domain_scores_gemma":[0.9997333,0.00001344169,0.00008386091,0.00007912012,0.00001809924,0.00007220839],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00004217583,0.00004358225,0.0001728298,0.002091373,0.000656775,0.00004042871,0.0001521769,0.741517,0.005316818,0.08030719,0.0002977836,0.1693619],"study_design_scores_gemma":[0.02885136,0.001732275,0.02952383,0.003585412,0.003046331,0.01012691,0.03361633,0.3798499,0.01845463,0.01496995,0.4723812,0.003861897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2327022,0.001322809,0.763719,0.00009063259,0.001377608,0.0004801091,0.00000390863,0.00008664536,0.0002170259],"genre_scores_gemma":[0.9444855,0.00263894,0.05265937,0.000005565361,0.0001067828,0.00003341612,0.000002236564,0.00002083049,0.00004728795],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7117833,"threshold_uncertainty_score":0.5498372,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1982161115","doi":"10.1061/(asce)0733-9364(2000)126:2(137)","title":"Project Performance Control in Reconstruction Projects","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Control (management); Quality (philosophy); Earned value management; Process management; Performance indicator; Engineering; Project planning; Construction engineering; Engineering management; Computer science; Project management; Transport engineering; Operations management; Systems engineering; Business; Project charter; Artificial intelligence; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.004215611017472729,"gpt":0.1708797082740432,"spread":0.1666640972565705,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001469003,0.0001131536,0.0001584983,0.0004045289,0.00002495408,0.00003178311,0.00004490919,0.00005062348,0.00004092031],"category_scores_gemma":[0.000002802006,0.0001079168,0.00003627697,0.0002228457,0.00002834778,0.0003312814,0.000002803331,0.0001728094,0.000002405817],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006393577,"about_ca_system_score_gemma":0.00001086608,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001869921,"about_ca_topic_score_gemma":0.000001170337,"domain_scores_codex":[0.9993058,0.00001080036,0.000363235,0.00007769746,0.0001143448,0.0001281644],"domain_scores_gemma":[0.9998103,0.000008935283,0.00005104069,0.0000612316,0.00003494912,0.00003352472],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004255387,0.00000912807,0.001666439,0.0001996195,0.00008285904,0.00001017103,0.00009675046,0.0799426,0.000455035,0.00119537,0.0001416162,0.9161578],"study_design_scores_gemma":[0.007564518,0.000414508,0.03823579,0.001522235,0.0002213079,0.01106352,0.001419094,0.8325909,0.002179385,0.0003037397,0.1035087,0.0009762888],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9847239,0.0003692328,0.008890842,0.00003894941,0.001073684,0.0002064854,0.000001197494,0.00009174133,0.004603953],"genre_scores_gemma":[0.990295,0.00281719,0.006674134,0.00001036921,0.0001064091,0.00001287386,4.21996e-7,0.00001213013,0.00007147276],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9151816,"threshold_uncertainty_score":0.4400718,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2031945081","doi":"10.1061/(asce)0733-9364(2005)131:5(591)","title":"Distributed Ontology Architecture for Knowledge Management in Highway Construction","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":104,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Ontology; Domain knowledge; Open Knowledge Base Connectivity; Computer science; Knowledge management; Domain (mathematical analysis); Knowledge base; Architecture; Knowledge integration; Knowledge engineering; Knowledge representation and reasoning; Software engineering; Systems engineering; Personal knowledge management; Engineering; World Wide Web; Organizational learning; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.007548012099128317,"gpt":0.2204947219589279,"spread":0.2129467098597996,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002204393,0.0001101967,0.0001908825,0.0003934257,0.00003737224,0.00004814277,0.0001885867,0.00004314749,0.000001280001],"category_scores_gemma":[0.00001276741,0.00009893825,0.00005438192,0.0001772559,0.00003722487,0.0001881395,0.00006620924,0.0001023569,7.220941e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006586468,"about_ca_system_score_gemma":0.00000866802,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":7.765531e-7,"about_ca_topic_score_gemma":0.000006114908,"domain_scores_codex":[0.9992321,0.00001588295,0.0003358985,0.0001466127,0.00009385003,0.0001757193],"domain_scores_gemma":[0.9996054,0.00004965947,0.0001269233,0.0001221886,0.00004821401,0.0000476023],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00002458911,0.00003793907,0.0001651904,0.0001669613,0.0001351958,0.0000270345,0.0001568525,0.01519139,0.00004888788,0.3998148,0.0003285296,0.5839027],"study_design_scores_gemma":[0.01035174,0.0005445991,0.03468854,0.0006631252,0.0002939421,0.004897578,0.00222132,0.1726364,0.001434706,0.01603173,0.7552188,0.001017507],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01667342,0.0005059864,0.9797086,0.001173839,0.001027061,0.0001787929,0.000001133726,0.00005244789,0.0006787067],"genre_scores_gemma":[0.4117263,0.0004399413,0.5876192,0.00003304811,0.0001201961,0.00001385426,0.000001018022,0.000005451835,0.00004105441],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.7548903,"threshold_uncertainty_score":0.4034585,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3016837706","doi":"10.1061/(asce)co.1943-7862.0001854","title":"Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Fuzzy logic; Construction management; Computer science; Face (sociological concept); Management science; Engineering management; Construction industry; Systems engineering; Construction engineering; Engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.007015348348031508,"gpt":0.189499886061984,"spread":0.1824845377139525,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001408558,0.0002214371,0.0002632384,0.0003046128,0.000064485,0.00009884509,0.0000596418,0.00006300346,0.000003498994],"category_scores_gemma":[0.00001168965,0.0002241866,0.00005186728,0.0001350231,0.00005641672,0.0002773788,0.00003581587,0.0001719372,4.39448e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004352331,"about_ca_system_score_gemma":0.000004096193,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":5.256836e-7,"about_ca_topic_score_gemma":1.494952e-7,"domain_scores_codex":[0.999065,0.000007129634,0.0004279665,0.0001783702,0.0001417907,0.0001796889],"domain_scores_gemma":[0.9995872,0.00002179288,0.0001037733,0.00007490968,0.00006606706,0.0001462683],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00007550732,0.00001298224,0.0001520508,0.003166644,0.0006908957,0.00004921635,0.0001591626,0.02176461,0.006153568,0.2267483,0.0009162416,0.7401109],"study_design_scores_gemma":[0.009409704,0.001694842,0.004946731,0.002311776,0.002261379,0.01552819,0.004635142,0.3363492,0.03365851,0.01685791,0.5688921,0.003454537],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08583883,0.002692866,0.9051033,0.000867196,0.001888547,0.0008560728,0.00001695007,0.0005754132,0.002160808],"genre_scores_gemma":[0.690496,0.009971118,0.2988342,0.0001003628,0.000452555,0.00006048944,0.0000049696,0.00005464648,0.00002559813],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7366563,"threshold_uncertainty_score":0.9142064,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2155750016","doi":"10.1061/(asce)0733-9364(2000)126:3(219)","title":"Simplified CPM/PERT Simulation Model","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":99,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Critical path method; Computer science; Complement (music); Criticality; Schedule; Project management; Reliability engineering; Operations research; Systems engineering; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.04317147818980395,"gpt":0.320221638407086,"spread":0.2770501602172821,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001016266,0.0001069011,0.0002014191,0.0004273646,0.00006668315,0.0001583473,0.0001698477,0.00004362575,0.0001429697],"category_scores_gemma":[0.0001472656,0.00008551082,0.00008442355,0.000281762,0.0000380766,0.0003169455,0.00002437401,0.0001355759,0.00001021337],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002815707,"about_ca_system_score_gemma":0.00001501922,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":6.046623e-7,"about_ca_topic_score_gemma":1.005865e-7,"domain_scores_codex":[0.9984469,0.00002619388,0.0006328597,0.0001516843,0.0006034951,0.0001388993],"domain_scores_gemma":[0.9992634,0.0001624522,0.0001947613,0.000156606,0.0001280334,0.00009474569],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002101508,0.000005491238,0.0000601184,0.000006766075,0.00002750396,0.000006968879,0.00009417764,0.7666928,0.0000945117,0.001296084,0.00005507883,0.2316395],"study_design_scores_gemma":[0.0004779802,0.00003058144,0.0007774518,0.00003635521,0.0000290261,0.0001754457,0.0002779385,0.9784319,0.00004367071,0.001872113,0.01774399,0.0001035798],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5023365,0.00009791707,0.4922121,0.0002545143,0.0002754985,0.0001024068,0.00000118508,0.00003012217,0.004689784],"genre_scores_gemma":[0.9494264,0.0001358096,0.04977892,0.00005174685,0.00009834697,0.000001201709,2.232696e-7,0.000008129896,0.0004992106],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4470899,"threshold_uncertainty_score":0.348703,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2096977665","doi":"10.1061/(asce)0733-9364(2003)129:2(173)","title":"Object-oriented Simulation Model for Earthmoving Operations","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Simulation Techniques and Applications","field":"Decision Sciences","cited_by":97,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Component (thermodynamics); Process (computing); Software; Object (grammar); Discrete event simulation; Component Object Model; Computer science; Object-oriented programming; Engineering; Simulation software; Event (particle physics); Orientation (vector space); Simulation; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.04217604010851288,"gpt":0.339975003183009,"spread":0.2977989630744961,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000708013,0.0000618985,0.0001109836,0.0002880008,0.0001034281,0.00008621142,0.00006209606,0.00002604495,0.00001244121],"category_scores_gemma":[0.0002864182,0.00005251128,0.00005930677,0.0002245374,0.00001475774,0.0002214194,0.00001090503,0.00004896679,8.845997e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001994459,"about_ca_system_score_gemma":0.00001429742,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":2.597443e-7,"about_ca_topic_score_gemma":3.630213e-7,"domain_scores_codex":[0.9991135,0.00001385824,0.0004426737,0.0001034045,0.0002516692,0.00007490555],"domain_scores_gemma":[0.999272,0.0001408907,0.0001207943,0.000112447,0.0003039271,0.00004995946],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003158785,0.000007072728,0.0000570029,0.000004329502,0.00001167402,1.941161e-7,0.00004461819,0.8766216,0.0001111441,0.1121503,0.00008229031,0.01090656],"study_design_scores_gemma":[0.0002927709,0.0000197487,0.0002478273,0.00001173505,0.0000187476,0.00001652875,0.0001617573,0.966464,0.0001591768,0.004380018,0.02817184,0.0000557784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03552207,0.00003498358,0.9636332,0.00009145816,0.0001759693,0.0001781677,0.000002032017,0.00002126527,0.0003408022],"genre_scores_gemma":[0.7698073,0.0000261241,0.2298136,0.00002175337,0.00002620579,0.000009325719,4.542717e-7,0.000004607423,0.0002905726],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7342852,"threshold_uncertainty_score":0.2141348,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2094757630","doi":"10.1061/(asce)0733-9364(2001)127:6(502)","title":"Estimating Labor Production Rates for Industrial Construction Activities","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":96,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Artificial neural network; Multiplier (economics); Production (economics); Estimator; Industrial production index; Production rate; Computer science; Index (typography); Industrial engineering; Econometrics; Engineering; Operations research; Statistics; Artificial intelligence; Economics; Mathematics; Microeconomics","retraction":null,"screen_n_in":null,"score":{"opus":0.009529319624809076,"gpt":0.2138179442426485,"spread":0.2042886246178395,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001505942,0.0001092611,0.0001434361,0.0002296403,0.00006117718,0.00005975672,0.000036745,0.00004882759,0.000006276675],"category_scores_gemma":[0.00002842555,0.0001083672,0.00003381011,0.0001129011,0.00002205324,0.0003200537,0.000007849558,0.0001044777,1.65592e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004218097,"about_ca_system_score_gemma":0.000006482498,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":4.936098e-7,"about_ca_topic_score_gemma":2.038432e-7,"domain_scores_codex":[0.9994296,0.000004966258,0.0002695362,0.00008035958,0.00009966685,0.0001158825],"domain_scores_gemma":[0.999724,0.00001914927,0.0001072367,0.00005046979,0.00005866601,0.00004046177],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002821885,0.000005728501,0.0002397106,0.0002709361,0.0001020281,0.000002247787,0.00006231799,0.8859596,0.0002399827,0.000915324,0.0001939039,0.11198],"study_design_scores_gemma":[0.003216882,0.0002368678,0.001567845,0.0008468684,0.0003807405,0.001843705,0.001506818,0.9141918,0.01713797,0.001081261,0.05726579,0.0007234556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4349611,0.0001919298,0.5603418,0.000120766,0.003924113,0.0002001718,0.000001955817,0.0001184185,0.0001396822],"genre_scores_gemma":[0.7405104,0.001131624,0.2570599,0.000007709084,0.001143182,0.00002435878,0.000003642788,0.00003167177,0.00008751995],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.3055493,"threshold_uncertainty_score":0.4419085,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2000923597","doi":"10.1061/(asce)0733-9364(2001)127:4(322)","title":"Improving Design Coordination for Building Projects. I: Information Model","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Component (thermodynamics); Consistency (knowledge bases); Computer science; Process (computing); Set (abstract data type); Design process; Systems engineering; Building information modeling; Conceptual design; Engineering design process; Information model; Hierarchy; Software engineering; Process management; Human–computer interaction; Engineering; Work in process; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.008737578101451553,"gpt":0.1905701503927888,"spread":0.1818325722913373,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002002638,0.00009193249,0.0001027462,0.0003435454,0.00004705149,0.00006819767,0.00004036368,0.00004319278,0.000001666563],"category_scores_gemma":[0.00001672328,0.00009115673,0.00003942482,0.0001190747,0.00001183457,0.0007379541,0.000006312466,0.00007935773,2.934258e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006899549,"about_ca_system_score_gemma":0.000009766198,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":6.28721e-7,"about_ca_topic_score_gemma":1.23337e-7,"domain_scores_codex":[0.9994366,0.000004213623,0.0003088822,0.00004567009,0.0001028935,0.0001017457],"domain_scores_gemma":[0.9996805,0.00001569968,0.0001017703,0.00004458812,0.0001195972,0.0000378287],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000185426,0.000002559071,0.0000129621,0.0001471146,0.00004994731,6.576874e-7,0.00006055846,0.7080759,0.001564165,0.02106968,0.0002314052,0.2687665],"study_design_scores_gemma":[0.0005138124,0.00003680586,0.00004365585,0.0000521037,0.00004626446,0.0002333291,0.0001942881,0.9908881,0.0009463031,0.0004995362,0.006446614,0.00009918091],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01682907,0.00009863813,0.981855,0.00004724794,0.0006865341,0.00019876,0.000001281756,0.00008280088,0.0002007136],"genre_scores_gemma":[0.6710424,0.0003146172,0.3284695,0.00001245374,0.00009906481,0.00002621273,0.000001943035,0.00001168759,0.00002215803],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6542133,"threshold_uncertainty_score":0.3717264,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4320524425","doi":"10.1061/jcemd4.coeng-11929","title":"Blockchain Technology toward Smart Construction: Review and Future Directions","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Blockchain Technology Applications and Security","field":"Computer Science","cited_by":88,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Blockchain; Scopus; Supply chain; Supply chain management; Knowledge management; Computer science; Smart contract; Building information modeling; Data science; Business; Process management; Engineering management; Engineering; Operations management; Marketing; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.005044733868482049,"gpt":0.2056755970127164,"spread":0.2006308631442344,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002530285,0.00009465825,0.000187921,0.000582536,0.00009932604,0.00002786817,0.0001637667,0.00007438952,0.000003197146],"category_scores_gemma":[0.00001029038,0.0000890981,0.00003356112,0.0009867765,0.00008602119,0.00007426701,0.000122436,0.0001965827,0.00000178401],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001698071,"about_ca_system_score_gemma":0.000009440497,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":4.709699e-7,"about_ca_topic_score_gemma":2.01766e-7,"domain_scores_codex":[0.9993614,0.00001009795,0.0002619234,0.0001493362,0.0000937429,0.0001235231],"domain_scores_gemma":[0.9995517,0.00001415654,0.0001252131,0.000179459,0.0000773946,0.00005210729],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000001002765,0.00001032675,0.0001643358,0.0003746607,0.0001151064,0.0000208985,0.00005169244,0.00005731813,0.00003200413,0.5924403,0.0008325503,0.4058998],"study_design_scores_gemma":[0.0005454629,0.00009206702,0.002348542,0.0003310932,0.0001743555,0.006051478,0.0005214848,0.007915559,0.0001157036,0.01237158,0.96926,0.000272722],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.06322379,0.08666589,0.6498603,0.1909297,0.004822974,0.001055421,0.000006627018,0.002312401,0.001122874],"genre_scores_gemma":[0.1515429,0.4218705,0.4253578,0.0004833932,0.0004404663,0.0001122472,0.000001583574,0.000027781,0.0001632941],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.9684274,"threshold_uncertainty_score":0.3633315,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2051691704","doi":"10.1061/(asce)0733-9364(2006)132:8(882)","title":"Bayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Geotechnical Engineering and Analysis","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bayesian probability; Novelty; Computer science; Bayesian inference; Quality (philosophy); Variable-order Bayesian network; Data mining; Machine learning; Industrial engineering; Artificial intelligence; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.002525864651896722,"gpt":0.1827780644273754,"spread":0.1802521997754787,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002198389,0.0001116972,0.0001404875,0.0003179224,0.00003370699,0.00003505143,0.00008658689,0.00003653994,0.000001128163],"category_scores_gemma":[0.000008827886,0.00009314421,0.0000510543,0.0003630187,0.00001195681,0.0001321436,0.00001018693,0.0001724731,4.161193e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005145122,"about_ca_system_score_gemma":0.000003880241,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003562517,"about_ca_topic_score_gemma":0.00001767654,"domain_scores_codex":[0.9992699,0.00001103026,0.0003638323,0.00007872149,0.0001585856,0.0001179459],"domain_scores_gemma":[0.9997579,0.00003354966,0.00006455676,0.00009714744,0.00002599541,0.00002089249],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000002323127,0.000009127909,0.0002231949,0.0001066805,0.00002874405,0.00000621673,0.00005000736,0.9806361,0.0002100295,0.0008300217,0.00004507458,0.01785252],"study_design_scores_gemma":[0.0002406244,0.00001715357,0.0142863,0.0000522738,0.00005293663,0.00003734755,0.0002082657,0.9804397,0.00001641632,0.0001537853,0.004384882,0.0001103121],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1792568,0.0002893642,0.8196384,0.00006861718,0.000135441,0.0001545923,6.859316e-7,0.00009086108,0.0003651971],"genre_scores_gemma":[0.9903217,0.0001267871,0.009384437,0.000006508604,0.0001295411,0.00001060607,0.000004138333,0.00001237828,0.000003906045],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8110649,"threshold_uncertainty_score":0.3798311,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2007945516","doi":"10.1061/(asce)0733-9364(2006)132:10(1043)","title":"Conflict Resolution in Construction Disputes Using the Graph Model","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Game Theory and Applications","field":"Decision Sciences","cited_by":83,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Compromise; Conflict resolution; Conflict analysis; Order (exchange); Operations research; Resolution (logic); Dispute resolution; Management science; Computer science; Economics; Engineering; Political science; Artificial intelligence; Law; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.03678763473961073,"gpt":0.2930288349763592,"spread":0.2562412002367485,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001061148,0.00007313878,0.0001276033,0.0003742899,0.00009035125,0.00008810031,0.0001322969,0.00002360855,0.000005586813],"category_scores_gemma":[0.00004098122,0.00005024429,0.00005249144,0.0003969675,0.0001077818,0.0002085491,0.00002956041,0.0001137498,7.625128e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002898448,"about_ca_system_score_gemma":0.00001021634,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006770911,"about_ca_topic_score_gemma":0.000002343388,"domain_scores_codex":[0.9989606,0.00003742469,0.0004927911,0.0001045439,0.0003052853,0.00009937574],"domain_scores_gemma":[0.9994048,0.00009791967,0.0002458529,0.0001320857,0.00009077606,0.0000285869],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001111271,0.000009997858,0.0005060813,0.000005383904,0.00001153576,0.000002530423,0.00004027808,0.728786,0.0007560376,0.2621531,0.00009791958,0.007619994],"study_design_scores_gemma":[0.0007567001,0.00002563373,0.0100357,0.00008252954,0.00006579578,0.0007833843,0.001596945,0.8481249,0.0003513643,0.1287018,0.009314333,0.0001608996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4598202,0.000145777,0.5389931,0.000303277,0.0002190903,0.00007753189,0.00000116844,0.000008680076,0.0004311028],"genre_scores_gemma":[0.964942,0.000106568,0.03479356,0.0000146284,0.0000745947,0.00000277898,2.773281e-7,0.000004011354,0.00006156271],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5051218,"threshold_uncertainty_score":0.2048903,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3042358698","doi":"10.1061/(asce)co.1943-7862.0001909","title":"Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta; St. Joseph’s Healthcare Hamilton; Concordia University; University of New Brunswick; Alberta Energy","funders":"","keywords":"Modular design; Productivity; Value stream mapping; Process (computing); Lean manufacturing; Performance indicator; Manufacturing engineering; Production line; Engineering; Lean construction; Production (economics); Quality (philosophy); Prefabrication; Systems engineering; Computer science; Construction industry; Construction engineering; Civil engineering; Mechanical engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.003026643427788348,"gpt":0.1731532312349105,"spread":0.1701265878071221,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000713083,0.0001510458,0.0001812365,0.000196437,0.00005292356,0.00004919663,0.00004954654,0.00006156111,0.00000976388],"category_scores_gemma":[0.00001096462,0.0001499618,0.00003287287,0.000154751,0.00003190355,0.0002899437,0.00001940651,0.0002294387,0.000001745778],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003271597,"about_ca_system_score_gemma":0.000005363366,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":3.159199e-7,"about_ca_topic_score_gemma":7.198079e-8,"domain_scores_codex":[0.9992436,0.000005478554,0.0003248704,0.0001297017,0.0001607363,0.0001356513],"domain_scores_gemma":[0.9996213,0.000009269952,0.00007746732,0.00006451536,0.00006167988,0.0001657646],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009006165,0.000008679502,0.00124154,0.001400159,0.0003464322,0.00001559881,0.0007657122,0.3301265,0.004290222,0.01292877,0.00008819212,0.6486982],"study_design_scores_gemma":[0.003763667,0.001022848,0.02215025,0.001795234,0.0006010431,0.003178882,0.005982231,0.7727644,0.09729935,0.001253317,0.08836917,0.001819571],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6589408,0.0001506942,0.3394876,0.0001772987,0.000894375,0.0001130452,0.000001785844,0.00009139234,0.0001430375],"genre_scores_gemma":[0.9436243,0.0005834055,0.05548812,0.00005383935,0.0002196313,0.000007162855,6.443963e-7,0.00001722892,0.000005655477],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6468786,"threshold_uncertainty_score":0.6115266,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2077431125","doi":"10.1061/(asce)0733-9364(2009)135:10(948)","title":"Optimization of Earthmoving Operations in Heavy Civil Engineering Projects","year":2009,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Scope (computer science); Engineering; Heavy equipment; Earthworks; Linear programming; Work (physics); Operations research; Transport engineering; Civil engineering; Construction engineering; Industrial engineering; Computer science; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.00511049594227624,"gpt":0.1759203848760534,"spread":0.1708098889337771,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001469938,0.00008132757,0.0001515169,0.0003663229,0.00001076375,0.00002097416,0.00004435056,0.00003411214,0.000005863172],"category_scores_gemma":[0.000009587417,0.0000897984,0.00002844447,0.0001262936,0.000005539355,0.0001762922,0.000008479024,0.00009625168,8.987404e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004064001,"about_ca_system_score_gemma":0.000004833203,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001265013,"about_ca_topic_score_gemma":0.000001789108,"domain_scores_codex":[0.999458,0.000002828744,0.0003364057,0.00005227933,0.00005589462,0.0000945775],"domain_scores_gemma":[0.9998369,0.000007367417,0.00004001425,0.00006045749,0.00002334608,0.00003187693],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000003109998,0.000006472206,0.00004900471,0.00008190435,0.00001989715,0.000004260234,0.00007894541,0.9932135,0.0004560402,0.002298973,0.00003236515,0.003755567],"study_design_scores_gemma":[0.0002712125,0.00005659099,0.0009950767,0.0002181443,0.00001426013,0.00008867964,0.00006748464,0.9966394,0.0008449835,0.00001723891,0.0006904674,0.00009651438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3253991,0.0002762353,0.6731731,0.00005756844,0.0003631676,0.0001337349,9.19242e-7,0.00009225374,0.0005039063],"genre_scores_gemma":[0.7947565,0.0008796686,0.2043086,0.000004597718,0.00003569241,0.000001886825,5.333137e-7,0.000008533673,0.00000397152],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4693574,"threshold_uncertainty_score":0.3661872,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2089830378","doi":"10.1061/(asce)0733-9364(2005)131:1(42)","title":"Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":82,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Fuzzy logic; Computer science; Relevance (law); Scheduling (production processes); Operations research; Logic model; Industrial engineering; Reliability engineering; Systems engineering; Artificial intelligence; Engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.0318510078920894,"gpt":0.2972117784881596,"spread":0.2653607705960702,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001286649,0.0001133629,0.0002658482,0.001036685,0.0001269568,0.0001927825,0.0001272635,0.00003579475,0.000008354304],"category_scores_gemma":[0.0000910965,0.00009048919,0.0001167236,0.0008012273,0.00005554977,0.0004546432,0.00006945734,0.000104433,5.624285e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003209421,"about_ca_system_score_gemma":0.00001177497,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002735331,"about_ca_topic_score_gemma":0.000001254889,"domain_scores_codex":[0.9988512,0.0000170657,0.000432541,0.000198879,0.0003625301,0.0001377632],"domain_scores_gemma":[0.9992433,0.00006480034,0.000339229,0.0001334849,0.0001473043,0.00007183973],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001251968,0.00006516357,0.009142506,0.0002007017,0.00155186,0.00001027431,0.0002051129,0.2809762,0.0003968343,0.1781401,0.00009139424,0.5290946],"study_design_scores_gemma":[0.01944432,0.00148219,0.2152,0.0003242864,0.007502708,0.003083503,0.01478356,0.5766068,0.003045901,0.09413825,0.06166938,0.002719095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3222414,0.00008614101,0.6760104,0.000174417,0.0002518184,0.0001248752,0.000001457712,0.0000147556,0.001094761],"genre_scores_gemma":[0.7794952,0.0001831484,0.2201646,0.00001990616,0.00006437666,0.000005631892,6.451832e-7,0.000004172335,0.00006240339],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5263755,"threshold_uncertainty_score":0.3690042,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1981796902","doi":"10.1061/(asce)0733-9364(2005)131:5(505)","title":"Daily Windows Delay Analysis","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":80,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Computer science; Critical path method; Schedule; Window (computing); Software; Compensation (psychology); Microsoft Windows; Software engineering; Operations research; Industrial engineering; Systems engineering; Operating system; Engineering; World Wide Web","retraction":null,"screen_n_in":null,"score":{"opus":0.01914998068231857,"gpt":0.281156245578874,"spread":0.2620062648965554,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001279486,0.0001120625,0.0002650284,0.001675542,0.00007691968,0.0001866761,0.0002219829,0.00003090668,0.0002362186],"category_scores_gemma":[0.00005830617,0.00008860525,0.0001656658,0.001238885,0.00004417877,0.0005754576,0.00006981893,0.0001213579,0.00001747578],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003322072,"about_ca_system_score_gemma":0.000009889241,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001292903,"about_ca_topic_score_gemma":0.000003422022,"domain_scores_codex":[0.9983158,0.00002552065,0.000712412,0.0001623951,0.0006434971,0.0001403843],"domain_scores_gemma":[0.9991025,0.00007255792,0.000362494,0.0001984211,0.0001758561,0.00008822338],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003893277,0.00002060271,0.01310034,0.00001977311,0.001045965,0.0000194493,0.0001623502,0.1604356,0.00004334443,0.01748731,0.002347048,0.8052793],"study_design_scores_gemma":[0.001085095,0.00007013747,0.04215817,0.00002839479,0.0007903518,0.000459942,0.0008394447,0.1027282,0.00009459613,0.0006021709,0.8508829,0.0002606314],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5448766,0.0005027215,0.4417376,0.001365209,0.001578091,0.0001638295,0.000002290635,0.00005297564,0.009720695],"genre_scores_gemma":[0.9588457,0.0005044573,0.03919793,0.00006943909,0.0002285921,0.000002125534,4.328442e-7,0.000005431957,0.001145863],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8485358,"threshold_uncertainty_score":0.3613217,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2043222413","doi":"10.1061/(asce)0733-9364(2008)134:8(653)","title":"New Mathematical Optimization Model for Construction Site Layout","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Adjacency list; Object (grammar); Process (computing); Function (biology); Visibility; Genetic algorithm; Orientation (vector space); Mathematical optimization; Algorithm; Artificial intelligence; Mathematics; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.00806788335009506,"gpt":0.1839031038185611,"spread":0.1758352204684661,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008030337,0.0001239306,0.000171652,0.0002412994,0.00006033493,0.00002858757,0.00004198035,0.0000636495,0.00002036537],"category_scores_gemma":[0.000009791865,0.0001218583,0.00006110557,0.0001042001,0.00003279377,0.0002578713,0.000007592735,0.0000994667,0.000001302447],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004734751,"about_ca_system_score_gemma":0.00001672795,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":3.412531e-7,"about_ca_topic_score_gemma":1.738223e-7,"domain_scores_codex":[0.9992954,0.00000398764,0.0003712745,0.00007933765,0.0001354228,0.000114587],"domain_scores_gemma":[0.9996482,0.00001566097,0.00008786491,0.00006943625,0.00008912637,0.00008972194],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001272386,0.000003836379,0.00002418222,0.0001076584,0.00007139816,0.000002142419,0.0001095217,0.9493567,0.0002174417,0.02574882,0.0006092237,0.0237364],"study_design_scores_gemma":[0.0006243669,0.00003027848,0.00003437815,0.00005748494,0.00006878341,0.001331694,0.00008442684,0.9941875,0.0002746786,0.0009664065,0.002215412,0.0001246125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01157599,0.0001469073,0.9867235,0.00004986012,0.000758155,0.0001372979,0.000002913218,0.00009805155,0.0005073439],"genre_scores_gemma":[0.1271713,0.0007704085,0.871581,0.00001121779,0.0002131435,0.000009443403,0.000003373592,0.00002401606,0.0002161183],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.1155953,"threshold_uncertainty_score":0.4969236,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1982902830","doi":"10.1061/(asce)co.1943-7862.0000576","title":"Fuzzy-Based Life-Cycle Cost Model for Decision Making under Subjectivity","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Vagueness; Probabilistic logic; Computer science; Fuzzy logic; Interval (graph theory); Fuzzy set; Operations research; Monte Carlo method; Mathematical optimization; Artificial intelligence; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.07605789002646528,"gpt":0.3634604772301947,"spread":0.2874025872037294,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031378,0.0001630273,0.0003247083,0.0007831351,0.0001293513,0.0002380015,0.0002459488,0.00006587791,0.00002709994],"category_scores_gemma":[0.001189558,0.0001320606,0.0001611621,0.0003160966,0.00003733827,0.0006310903,0.00008920879,0.0001395707,0.000004584484],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008739033,"about_ca_system_score_gemma":0.00003267513,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":3.816468e-7,"about_ca_topic_score_gemma":7.906361e-7,"domain_scores_codex":[0.9977724,0.00004270562,0.0008131149,0.0002040608,0.0008809206,0.0002867888],"domain_scores_gemma":[0.9976775,0.001124206,0.0004499534,0.0002567062,0.0002874824,0.0002041725],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000146613,0.00004184167,0.0007765417,0.0000267164,0.00004470175,0.000002463765,0.00006735732,0.7577504,0.0001606123,0.008776111,0.0006335462,0.2315731],"study_design_scores_gemma":[0.001124512,0.00003415622,0.01042057,0.0001887234,0.00006013242,0.00009353541,0.0003107491,0.9722045,0.00004472229,0.01075072,0.004578389,0.0001893075],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1502999,0.0001844974,0.8473729,0.0001259401,0.001609925,0.0002106501,0.000004629271,0.00002131086,0.0001702798],"genre_scores_gemma":[0.7460549,0.00002015647,0.2536225,0.00009916761,0.0001578208,0.000007402858,1.791826e-7,0.0000134575,0.00002440918],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.595755,"threshold_uncertainty_score":0.5385273,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1967901027","doi":"10.1061/(asce)0733-9364(2000)126:6(414)","title":"Algorithm for Scheduling with Multiskilled Constrained Resources","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":73,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Heuristics; Economic shortage; Computer science; Scheduling (production processes); Heuristic; Software; Genetic algorithm scheduling; Operations research; Resource (disambiguation); Job shop scheduling; Industrial engineering; Mathematical optimization; Flow shop scheduling; Artificial intelligence; Engineering; Schedule; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.01746976352344148,"gpt":0.2768846448856659,"spread":0.2594148813622245,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001553304,0.0001777826,0.0003619163,0.0005546131,0.0001290672,0.0002491895,0.0002381221,0.00005713431,0.0001119471],"category_scores_gemma":[0.0001791225,0.0001286249,0.0001178581,0.0003784472,0.0001356304,0.0002717489,0.00002333517,0.0001732978,0.000003347936],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000027616,"about_ca_system_score_gemma":0.0000256375,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001411363,"about_ca_topic_score_gemma":3.872151e-7,"domain_scores_codex":[0.9980562,0.00003921431,0.0007690975,0.0002469114,0.0006504608,0.0002381577],"domain_scores_gemma":[0.9986889,0.0003910527,0.0003427429,0.0001774024,0.0002534706,0.0001464834],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008771033,0.00001572554,0.0001337542,0.00002298995,0.0001648275,0.00003278223,0.0002605779,0.06539351,0.00008776467,0.0007576864,0.00003274074,0.9330099],"study_design_scores_gemma":[0.0123011,0.001046771,0.002594208,0.0008176974,0.0004356065,0.006546951,0.01084691,0.7411351,0.0007078408,0.002355921,0.220222,0.0009898532],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.3294394,0.0002110276,0.6684068,0.0002685953,0.0002796144,0.0002950797,0.000005551405,0.00003953588,0.001054416],"genre_scores_gemma":[0.214354,0.0001530054,0.784848,0.00003869635,0.0002010832,0.00001014841,5.803385e-7,0.00001763253,0.0003768767],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.9320201,"threshold_uncertainty_score":0.5245171,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2107379846","doi":"10.1061/(asce)co.1943-7862.0000556","title":"Ergonomic Analysis and the Need for Its Integration for Planning and Assessing Construction Tasks","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Musculoskeletal pain and rehabilitation","field":"Medicine","cited_by":73,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Legislation; Human factors and ergonomics; Productivity; Occupational safety and health; Work (physics); Musculoskeletal disorder; Engineering; Risk analysis (engineering); Work-related musculoskeletal disorders; Business; Operations management; Poison control; Applied psychology; Environmental health; Psychology; Medicine; Economics; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.009226625003204321,"gpt":0.2688850631574302,"spread":0.2596584381542258,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006121713,0.00006873627,0.0001892998,0.0002708888,0.00007270953,0.00004012175,0.0000110285,0.00003182367,0.000001007092],"category_scores_gemma":[0.00008404085,0.00004617559,0.0000749707,0.00009200174,0.00005710074,0.0001936785,0.000007015262,0.00006291999,2.155716e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002425012,"about_ca_system_score_gemma":0.00000513587,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":7.700839e-7,"about_ca_topic_score_gemma":1.388144e-7,"domain_scores_codex":[0.9995494,0.00001554689,0.0002336072,0.00006064915,0.00006031624,0.00008049039],"domain_scores_gemma":[0.9995572,0.0001409317,0.0001432616,0.00003675348,0.00006856352,0.00005329922],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.002279585,0.00009333259,0.04764404,0.007040517,0.007409133,0.000001521747,0.003673597,0.01058302,0.02393474,0.2068263,0.0002231924,0.690291],"study_design_scores_gemma":[0.0160916,0.0005089993,0.6077675,0.001024624,0.007742133,0.0005758897,0.01556624,0.3437913,0.001388159,0.0009153993,0.004226584,0.0004015467],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5400284,0.0006053924,0.4584225,0.0003629841,0.0002681064,0.0002734528,7.010746e-7,0.000006836082,0.00003163889],"genre_scores_gemma":[0.9389693,0.0001608449,0.0606564,0.00002213922,0.0001565725,0.00001048465,0.00000259097,0.000005123204,0.00001653422],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6898895,"threshold_uncertainty_score":0.1882986,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2141739264","doi":"10.1061/(asce)0733-9364(2008)134:4(253)","title":"Efficient Repetitive Scheduling for High-Rise Construction","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":71,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Schedule; Operations research; Industrial engineering; Distributed computing; Mathematical optimization; Real-time computing; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.0286964893377416,"gpt":0.2801634191625897,"spread":0.2514669298248481,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001630509,0.0001642064,0.0003449423,0.0008115064,0.0002041997,0.0001047265,0.0001926371,0.00006586101,0.00002050345],"category_scores_gemma":[0.0007505341,0.0001378075,0.0001455556,0.0004185469,0.0001830219,0.000153086,0.00005616574,0.0001905554,0.000003521043],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000636451,"about_ca_system_score_gemma":0.00004347187,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001640372,"about_ca_topic_score_gemma":1.752527e-7,"domain_scores_codex":[0.9978442,0.00004532549,0.0009139589,0.0002685632,0.0007074599,0.0002205541],"domain_scores_gemma":[0.9982671,0.0003674637,0.0005782529,0.0001936386,0.0004605658,0.0001330297],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00023177,0.00005481952,0.002099102,0.0001065967,0.0003301499,0.00012665,0.0006593952,0.7896373,0.001403224,0.07388553,0.0002290288,0.1312364],"study_design_scores_gemma":[0.01900251,0.001730499,0.03501663,0.001621806,0.0009677558,0.04043693,0.0292667,0.7636731,0.01195133,0.0173551,0.07642144,0.002556229],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5661624,0.000156424,0.4318874,0.0002106482,0.001082499,0.0001808805,0.000003177169,0.00002558925,0.0002909997],"genre_scores_gemma":[0.692428,0.0001375852,0.3071289,0.00001653493,0.0002120576,0.000006932787,3.918546e-7,0.00001103103,0.00005852907],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1286802,"threshold_uncertainty_score":0.5619628,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2052764147","doi":"10.1061/(asce)0733-9364(2006)132:2(143)","title":"Computer-Aided Site Layout Planning","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Representation (politics); Reuse; Interconnectivity; Computer Aided Design; Visualization; Object (grammar); Domain (mathematical analysis); Knowledge base; Process (computing); Engineering drawing; Data mining; Programming language; Artificial intelligence; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.003312205326125199,"gpt":0.1683909668029515,"spread":0.1650787614768263,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007694784,0.00009687649,0.0001232488,0.0002344496,0.00003058799,0.00004958516,0.00003595439,0.00003583531,0.00000833517],"category_scores_gemma":[0.000001112915,0.00009436988,0.00004266242,0.0000986876,0.00001769508,0.0001584875,0.000008882377,0.0001127988,0.00000196166],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003264972,"about_ca_system_score_gemma":0.00000279925,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000178392,"about_ca_topic_score_gemma":3.577036e-7,"domain_scores_codex":[0.9994478,0.000004798285,0.0002826684,0.00005704483,0.0001096676,0.00009802599],"domain_scores_gemma":[0.9998003,0.000009686485,0.0000618856,0.00005132674,0.00003949947,0.00003727867],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008029677,0.000007731488,0.001247436,0.0001505023,0.0001168891,0.00003398477,0.00005887715,0.9040738,0.001335065,0.02600535,0.001837006,0.06512527],"study_design_scores_gemma":[0.00246215,0.0001568611,0.04586051,0.0006759156,0.0002408403,0.003893694,0.0004365201,0.7644177,0.002024118,0.001462368,0.1776456,0.0007237489],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4218049,0.0006434039,0.5732341,0.00003488666,0.001985356,0.00005595968,0.000001341204,0.0001382003,0.002101887],"genre_scores_gemma":[0.9591044,0.0001217074,0.04027091,0.000009584576,0.0004251549,0.00000205942,0.000001798307,0.00001337318,0.00005106446],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5372995,"threshold_uncertainty_score":0.3848292,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2127396715","doi":"10.1061/(asce)0733-9364(2003)129:4(396)","title":"Genetic Optimization for Dynamic Project Control","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Schedule; Computer science; Earned value management; Cash flow; Scheduling (production processes); Resource leveling; Genetic algorithm; Project management; Operations research; Project planning; Industrial engineering; Mathematical optimization; Systems engineering; Engineering; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.002866054542077819,"gpt":0.1788050161498938,"spread":0.175938961607816,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009403328,0.00008457941,0.0001105007,0.0002117089,0.00002867127,0.00003106359,0.00002720761,0.00003508607,0.000008424114],"category_scores_gemma":[0.0000107179,0.00008160136,0.0000448269,0.00008806823,0.00001356571,0.0001037992,0.000001588805,0.00005957329,2.321721e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003948023,"about_ca_system_score_gemma":0.000008032117,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":1.589991e-7,"about_ca_topic_score_gemma":1.86597e-7,"domain_scores_codex":[0.9995335,0.000007323001,0.000244467,0.00005457343,0.00007231257,0.00008778679],"domain_scores_gemma":[0.9997884,0.00001349347,0.00005841142,0.00004589885,0.00006391959,0.00002989945],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008377079,0.000004248083,0.00005701416,0.0001404255,0.0001243128,0.00000169554,0.00001894092,0.9503536,0.0002062074,0.01144518,0.0001325148,0.03750753],"study_design_scores_gemma":[0.001453175,0.00006919279,0.0003504221,0.00006450043,0.0001294947,0.000601225,0.0001956261,0.9638563,0.0001614284,0.0002729901,0.03268876,0.0001568818],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01442034,0.0004966564,0.9832988,0.00001578844,0.001142664,0.0001849195,0.000001967444,0.00005022128,0.00038861],"genre_scores_gemma":[0.7258996,0.0008667683,0.2730975,0.000009387525,0.00005577119,0.00002271713,7.593353e-7,0.00001739995,0.00003009569],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7114793,"threshold_uncertainty_score":0.3327607,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2773979636","doi":"10.1061/(asce)co.1943-7862.0001435","title":"Maintenance Cost Optimization for Bridge Structures Using System Reliability Analysis and Genetic Algorithms","year":2017,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Reliability (semiconductor); Schedule; Time horizon; Reliability engineering; Genetic algorithm; Optimal maintenance; Asset (computer security); Asset management; Engineering; Bridge maintenance; Computer science; Operations research; Mathematical optimization; Structural engineering; Business; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.007440519031566896,"gpt":0.2223069129795192,"spread":0.2148663939479523,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001465989,0.0001324252,0.0002481403,0.0002315214,0.0001549885,0.0001392381,0.00008993084,0.00004689116,0.000001058656],"category_scores_gemma":[0.00002297566,0.0001218112,0.00007153591,0.00007129042,0.00004365805,0.0001965949,0.00002877972,0.00008831153,2.535799e-8],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009896505,"about_ca_system_score_gemma":0.000004424047,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006866369,"about_ca_topic_score_gemma":5.122386e-7,"domain_scores_codex":[0.9993097,0.000005351866,0.0003048709,0.0001165735,0.0001039273,0.0001595827],"domain_scores_gemma":[0.9994634,0.00001338644,0.0001790383,0.0001693004,0.0001085296,0.00006637414],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00000952516,0.000001171964,0.00121631,0.0003959442,0.0003471476,0.00001051838,0.00002864858,0.9745309,0.0001238203,0.0005045403,0.00001149319,0.02282002],"study_design_scores_gemma":[0.0005100613,0.00001798892,0.06215614,0.0001257408,0.0005171277,0.000245542,0.00009650116,0.9354351,0.0002160366,0.00004978577,0.0004907005,0.0001393299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2018587,0.0001305213,0.7967038,0.00001102915,0.001076588,0.0001529008,0.0000054093,0.00003100023,0.00003007893],"genre_scores_gemma":[0.7233274,0.0003124149,0.2761655,0.000001743251,0.0001721182,0.000004535983,6.627921e-7,0.00001248495,0.000003087266],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5214688,"threshold_uncertainty_score":0.4967316,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3209324647","doi":"10.1061/(asce)co.1943-7862.0002214","title":"Digital Transformation in the Australian AEC Industry: Prevailing Issues and Prospective Leadership Thinking","year":2021,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Organizational Leadership and Management Strategies","field":"Business, Management and Accounting","cited_by":61,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Institute on Governance","funders":"","keywords":"Digital transformation; Knowledge management; Systems thinking; Strategic thinking; Soft systems methodology; Business; Engineering; Process management; Marketing; Computer science; Strategic planning; Information system; Management information systems","retraction":null,"screen_n_in":null,"score":{"opus":0.01944689527516763,"gpt":0.2123391267236565,"spread":0.1928922314484889,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002903438,0.0001038705,0.000116372,0.000247755,0.00007608541,0.0006081238,0.00007556546,0.00004959908,0.00001250963],"category_scores_gemma":[0.00003050072,0.00008561386,0.00002608929,0.0003407026,0.00003526646,0.00154775,0.00002735595,0.0002247769,0.000001274378],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001838644,"about_ca_system_score_gemma":0.000006752621,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003480818,"about_ca_topic_score_gemma":0.000003437072,"domain_scores_codex":[0.999306,0.000006828528,0.0002482699,0.00009814417,0.0002168566,0.0001239012],"domain_scores_gemma":[0.9997286,0.00001703039,0.0001170238,0.00005297079,0.00007525851,0.000009073343],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","study_design_scores_codex":[0.00003680355,0.00007830105,0.02401426,0.002005918,0.0002400828,0.0001457069,0.002064672,0.007563433,0.00008867744,0.937666,0.0006681758,0.02542795],"study_design_scores_gemma":[0.00596499,0.0001198536,0.3582396,0.002499205,0.0008631786,0.001233856,0.3323141,0.006345999,0.0004549745,0.03961039,0.2509873,0.001366524],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8642434,0.002217284,0.02531582,0.06721959,0.001913514,0.00118547,0.000003682202,0.0002034733,0.03769781],"genre_scores_gemma":[0.9982954,0.0001454017,0.0008010739,0.000253929,0.0003064081,0.000002931996,0.000003554626,0.000008466988,0.0001827834],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8980556,"threshold_uncertainty_score":0.5864152,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2003671662","doi":"10.1061/(asce)co.1943-7862.0000471","title":"Comprehensive Hybrid Framework for Risk Analysis in the Construction Industry Using Combined Failure Mode and Effect Analysis, Fault Trees, Event Trees, and Fuzzy Logic","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":61,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta; Athabasca University","funders":"","keywords":"Fault tree analysis; Event tree analysis; Event tree; Event (particle physics); Fuzzy logic; Computer science; Failure mode and effects analysis; Risk analysis (engineering); Reliability engineering; Risk management; Reliability (semiconductor); Data mining; Tree (set theory); Engineering; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0309184730156564,"gpt":0.3055400824909871,"spread":0.2746216094753307,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001597172,0.0002071586,0.0007022331,0.001718672,0.0001795537,0.0001570568,0.0001856137,0.0001258604,0.00001162865],"category_scores_gemma":[0.0001875937,0.0001380768,0.0003100889,0.00180234,0.0001396131,0.0002461449,0.00005593835,0.0004192059,1.397433e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003634228,"about_ca_system_score_gemma":0.0000106832,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008177702,"about_ca_topic_score_gemma":0.00006898349,"domain_scores_codex":[0.9979545,0.0002440308,0.0008191361,0.0003030105,0.0004918253,0.0001875075],"domain_scores_gemma":[0.9982514,0.0005675012,0.0006563525,0.0002512011,0.0001699719,0.0001036099],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003332422,0.00006297191,0.2260348,0.0000554061,0.007075375,0.00004901655,0.0008262972,0.6664847,0.00003768664,0.01517236,0.00004143939,0.08382672],"study_design_scores_gemma":[0.001931319,0.00035314,0.3752862,0.00008030659,0.01321094,0.000317641,0.008071222,0.5603187,0.00004635936,0.03948022,0.0005386988,0.0003652652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6216074,0.0004051136,0.3775541,0.000146563,0.0001073595,0.0001466942,0.0000106797,0.0000064118,0.00001568378],"genre_scores_gemma":[0.9254498,0.001160437,0.07330783,0.00002130207,0.00004149571,0.00000559074,0.000002598813,0.000005734127,0.000005135901],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3042463,"threshold_uncertainty_score":0.5630609,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2443310345","doi":"10.1061/(asce)co.1943-7862.0001191","title":"Fuzzy Arithmetic Risk Analysis Approach to Determine Construction Project Contingency","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":60,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Fuzzy logic; Defuzzification; Fuzzy number; Computer science; Contingency table; Contingency; Fuzzy set; Probabilistic logic; Data mining; Machine learning; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.03038955228908361,"gpt":0.2815618999536438,"spread":0.2511723476645602,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002026821,0.0002027764,0.0004533819,0.002996209,0.0001305812,0.0002075012,0.0003007217,0.00005381778,0.00003835384],"category_scores_gemma":[0.0003600864,0.0001319466,0.0002740738,0.002125051,0.0001005425,0.000536317,0.0001215424,0.0001334189,0.00001079231],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005946382,"about_ca_system_score_gemma":0.00002276354,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007321007,"about_ca_topic_score_gemma":0.000002699584,"domain_scores_codex":[0.9974647,0.00008426631,0.001038557,0.0003589009,0.0008084911,0.0002450434],"domain_scores_gemma":[0.9983085,0.0001720033,0.000711413,0.0003260435,0.0003461486,0.0001359243],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00008036255,0.00003498482,0.02747687,0.0000429403,0.001178773,0.000008985367,0.000188708,0.004048737,0.0001635837,0.01472268,0.0006721414,0.9513813],"study_design_scores_gemma":[0.01204386,0.00144851,0.3216287,0.0007080803,0.01043892,0.004277634,0.01131708,0.05622539,0.001103934,0.0174403,0.5601972,0.003170421],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3632683,0.0001061929,0.6279305,0.0002615276,0.001396004,0.0003444377,0.000008665328,0.00005231194,0.006632069],"genre_scores_gemma":[0.8525216,0.0007903989,0.1457135,0.00002371205,0.0002025032,0.00001580776,5.817435e-7,0.00001241037,0.0007194373],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9482108,"threshold_uncertainty_score":0.5380628,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2135181737","doi":"10.1061/(asce)co.1943-7862.0000212","title":"Critical Path Segments Scheduling Technique","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Critical path method; Computer science; Path (computing); Scheduling (production processes); Computer network; Operations management; Engineering; Economics; Management","retraction":null,"screen_n_in":null,"score":{"opus":0.002922300650782879,"gpt":0.1936891978571608,"spread":0.1907668972063779,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001289635,0.00007933738,0.00009355602,0.0001555426,0.00002782509,0.00004477934,0.00004716266,0.00004348458,0.00001697509],"category_scores_gemma":[0.00001735181,0.00007630981,0.00002503304,0.00005625793,0.00001667956,0.0001634421,0.00001327577,0.0002053564,5.77611e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001182922,"about_ca_system_score_gemma":0.000002927418,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":1.958154e-7,"about_ca_topic_score_gemma":6.660608e-8,"domain_scores_codex":[0.9995601,0.000002324376,0.0001924783,0.00005174079,0.00009931915,0.00009402812],"domain_scores_gemma":[0.9998002,0.000011494,0.00003088381,0.00005450039,0.00004269107,0.00006024571],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001066828,0.00002559787,0.0002158736,0.001314786,0.0001567178,0.00004866417,0.00008471969,0.8821906,0.01571511,0.02427116,0.0001266583,0.07583947],"study_design_scores_gemma":[0.002185817,0.0002003815,0.005924932,0.001134244,0.0003518481,0.003376646,0.0003822588,0.8507309,0.07259293,0.002706999,0.05919949,0.001213555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07292135,0.0001111477,0.9246548,0.00004113021,0.001372569,0.0000709064,5.981907e-7,0.0000961345,0.0007313809],"genre_scores_gemma":[0.7487862,0.0002916157,0.2507977,0.000005305376,0.00009511958,0.000004564503,2.903768e-7,0.00001110057,0.000008057264],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6758649,"threshold_uncertainty_score":0.3111823,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1982536982","doi":"10.1061/(asce)0733-9364(2007)133:10(761)","title":"Integrating Value Analysis and Quality Function Deployment for Evaluating Design Alternatives","year":2007,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Quality Function Deployment in Product Design","field":"Business, Management and Accounting","cited_by":59,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Quality function deployment; Data envelopment analysis; Computer science; House of Quality; Function (biology); Software deployment; Measure (data warehouse); Quality (philosophy); Index (typography); Customer needs; Systems engineering; Operations research; Risk analysis (engineering); Reliability engineering; Value engineering; Engineering; Operations management; Service quality; Data mining; Mathematics; Software engineering; Mathematical optimization; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.04553745116822039,"gpt":0.2964246706994016,"spread":0.2508872195311813,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005391838,0.0001720701,0.0002950676,0.001003995,0.0001432233,0.000204111,0.00007609944,0.00003979886,0.00001041689],"category_scores_gemma":[0.0002865374,0.000158654,0.0001130207,0.0005176095,0.0000378118,0.0006979306,0.0000488061,0.0001212107,7.661929e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006084732,"about_ca_system_score_gemma":0.000007010125,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002092418,"about_ca_topic_score_gemma":0.000003062685,"domain_scores_codex":[0.9984382,0.00002911991,0.0007595678,0.0002209301,0.0003556987,0.0001965243],"domain_scores_gemma":[0.9986896,0.0002207453,0.0006712227,0.0001117468,0.0002785223,0.00002820061],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00123411,0.0001565313,0.02143198,0.001741882,0.005827491,0.00001353183,0.0002714789,0.11915,0.009298326,0.4334509,0.0003877708,0.407036],"study_design_scores_gemma":[0.01178391,0.001158872,0.3050246,0.0009865479,0.01683629,0.00018791,0.01062523,0.5712621,0.005541349,0.02904619,0.04508473,0.002462311],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1433853,0.0001719422,0.85491,0.0001846295,0.0008428296,0.0002992394,4.287077e-7,0.00005629687,0.0001493109],"genre_scores_gemma":[0.8212523,0.0000952238,0.1775073,0.0002566124,0.0007616873,0.00001657441,0.000003209955,0.00002602642,0.00008104717],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6778671,"threshold_uncertainty_score":0.6469722,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1975246199","doi":"10.1061/(asce)0733-9364(2003)129:6(664)","title":"Optimized Scheduling of Linear Projects","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":58,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bidding; Computer science; Scheduling (production processes); Crew; Linear programming; Operations research; Software; Crew scheduling; Process (computing); Industrial engineering; Engineering; Operations management; Algorithm; Programming language","retraction":null,"screen_n_in":null,"score":{"opus":0.03945352496548811,"gpt":0.3002256918817797,"spread":0.2607721669162916,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002487235,0.0001183324,0.000332237,0.0007393776,0.00005146863,0.00006700362,0.0001791858,0.00004762364,0.00003590887],"category_scores_gemma":[0.001098836,0.00009296198,0.0001174961,0.0004935043,0.00006662005,0.0002162277,0.00003628145,0.0001714839,0.000001875362],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002117265,"about_ca_system_score_gemma":0.00004105227,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":6.887681e-7,"about_ca_topic_score_gemma":4.731006e-8,"domain_scores_codex":[0.9980925,0.00007130326,0.0008759837,0.000154923,0.0006533352,0.0001519209],"domain_scores_gemma":[0.9986925,0.0002237047,0.0005427504,0.0001748892,0.0002760242,0.00009014193],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001067955,0.00005676323,0.001592677,0.0001693188,0.0003557129,0.0000641306,0.0007180191,0.8813429,0.002642311,0.04836489,0.00009922672,0.06448723],"study_design_scores_gemma":[0.02546219,0.001686937,0.006018401,0.002892378,0.001178965,0.01293459,0.05550046,0.6424152,0.06175191,0.01355618,0.1740112,0.002591593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4498217,0.0003761553,0.5457373,0.0001198935,0.0008194331,0.0001734991,8.772115e-7,0.00001959209,0.002931594],"genre_scores_gemma":[0.512991,0.0001419554,0.4867409,0.000009502225,0.00004575656,0.000001381289,7.477023e-8,0.00000720653,0.0000622711],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.2389278,"threshold_uncertainty_score":0.379088,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2091432426","doi":"10.1061/(asce)co.1943-7862.0000250","title":"Tunnel-Boring Machine Positioning during Microtunneling Operations through Integrating Automated Data Collection with Real-Time Computing","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Inertial Sensor and Navigation","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Computer science; Point (geometry); Software; Simulation; Field (mathematics); Rotation (mathematics); Position (finance); Monte Carlo method; Real-time computing; Computer vision","retraction":null,"screen_n_in":null,"score":{"opus":0.003674104205924724,"gpt":0.2057101735860974,"spread":0.2020360693801727,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001912336,0.0001616424,0.0001891092,0.0002146626,0.0002303813,0.0001311932,0.0001084122,0.00005411435,0.000008214086],"category_scores_gemma":[0.00001671332,0.0001516304,0.00002711866,0.0002718324,0.00002304977,0.0005676808,0.00004334626,0.0003394628,0.000001041684],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005959513,"about_ca_system_score_gemma":0.000008836522,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003584356,"about_ca_topic_score_gemma":0.00001256397,"domain_scores_codex":[0.9991069,0.00001233394,0.0004168423,0.0001398061,0.0001524586,0.0001716292],"domain_scores_gemma":[0.9995765,0.00002409602,0.00008981588,0.0001530055,0.0001000879,0.00005645595],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000212007,0.000009920705,0.0001479468,0.0001601754,0.0001695021,0.00002400067,0.0003028632,0.6578654,0.338215,0.00046433,0.00002918783,0.002590429],"study_design_scores_gemma":[0.0006929603,0.00003474958,0.001939218,0.0003384508,0.00009245017,0.001116986,0.0002133157,0.984772,0.01048224,0.000005695149,0.0001208052,0.0001911171],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8854855,0.00005116187,0.1127877,0.00003520714,0.0007081338,0.0001335107,0.000003607767,0.0004099992,0.0003851365],"genre_scores_gemma":[0.82688,0.000180896,0.1726724,0.000003042896,0.0002047951,0.000001685073,0.00001822843,0.00002748562,0.00001138465],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3277328,"threshold_uncertainty_score":0.6183307,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2141122753","doi":"10.1061/(asce)0733-9364(2004)130:5(638)","title":"Planning and Scheduling Highway Construction","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Unavailability; Scheduling (production processes); Computer science; Software; Project planning; Operations research; Transport engineering; Software engineering; Systems engineering; Industrial engineering; Project management; Engineering; Operations management; Operating system; Reliability engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.004811195081526139,"gpt":0.1839922106397136,"spread":0.1791810155581874,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001034294,0.0001186615,0.0001446016,0.000292278,0.00005473698,0.00006015478,0.00003383676,0.00005404782,0.00000477597],"category_scores_gemma":[0.000006255861,0.0001171025,0.00003275711,0.0001162864,0.00005273092,0.0002675065,0.00001149834,0.0001689938,7.563552e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005398175,"about_ca_system_score_gemma":0.000007434717,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":8.832699e-7,"about_ca_topic_score_gemma":2.053584e-7,"domain_scores_codex":[0.9993936,0.000004526994,0.0002936765,0.00007994428,0.000117187,0.0001110354],"domain_scores_gemma":[0.9997419,0.000009731634,0.0000737864,0.00005279768,0.00004730567,0.0000745502],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000189325,0.000007927574,0.0007379617,0.0003188301,0.0002796704,0.00003412143,0.0002465868,0.674271,0.003589121,0.1579854,0.00003834782,0.162472],"study_design_scores_gemma":[0.03469101,0.001625296,0.08006507,0.01088247,0.002636038,0.09827259,0.0305359,0.4053777,0.06701378,0.06506993,0.1974222,0.006408062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5425531,0.001693795,0.4526379,0.000100495,0.001948455,0.00007413596,9.607128e-7,0.0001392112,0.0008519805],"genre_scores_gemma":[0.899281,0.0008930751,0.09964068,0.000009524832,0.0001525686,0.00000268448,5.688976e-7,0.00001322235,0.0000066839],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3567279,"threshold_uncertainty_score":0.4775303,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2804288272","doi":"10.1061/(asce)co.1943-7862.0001513","title":"Measuring and Predicting Fatigue in Construction: Empirical Field Study","year":2018,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":51,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Lockheed Martin (Canada)","funders":"","keywords":"Predictive validity; Predictive modelling; Field (mathematics); Set (abstract data type); Construction industry; Intervention (counseling); Engineering; Computer science; Psychology; Clinical psychology; Mathematics; Machine learning; Construction engineering; Psychiatry","retraction":null,"screen_n_in":null,"score":{"opus":0.1027921156011424,"gpt":0.4297694035487382,"spread":0.3269772879475958,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000891914,0.00007273614,0.0001622818,0.0003160694,0.0002077295,0.00001078936,0.00004311365,0.00005205339,0.00003081317],"category_scores_gemma":[0.000156357,0.00006507072,0.00001550023,0.000170436,0.00004181471,0.0001252802,0.00005569466,0.0003823875,0.00000138523],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006273861,"about_ca_system_score_gemma":0.00004826448,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001891672,"about_ca_topic_score_gemma":0.00001908085,"domain_scores_codex":[0.9988858,0.00009249097,0.0004970068,0.0001044276,0.0002284771,0.0001917959],"domain_scores_gemma":[0.9993069,0.0002343692,0.0001324919,0.00006460492,0.0001455981,0.0001160411],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001312495,0.00002921701,0.9472812,0.0003409114,0.00004852685,0.00001895924,0.001051839,0.0001445172,0.00001089406,0.001128351,0.0001078062,0.04970653],"study_design_scores_gemma":[0.002197756,0.0005214947,0.9804354,0.0006109461,0.00002481208,0.0001371136,0.008370697,0.004118797,0.00001267033,0.0001659994,0.003301693,0.0001026114],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9890814,0.00009227217,0.007421552,0.0006634506,0.000926454,0.0003949796,6.462341e-7,0.00001659673,0.001402634],"genre_scores_gemma":[0.9930802,0.0001817434,0.006236888,0.00005644808,0.0003976685,0.00001465881,1.899183e-7,0.000005868816,0.00002635081],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04960392,"threshold_uncertainty_score":0.2653507,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1997673132","doi":"10.1061/(asce)co.1943-7862.0000329","title":"Differences in Perspectives regarding Labor Productivity between Spanish- and English-Speaking Craft Workers","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":44,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Craft; Productivity; Workforce; Quarter (Canadian coin); Demographic economics; Business; Public relations; Labour economics; Political science; Economic growth; Geography; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.02315434474093346,"gpt":0.3411535557226765,"spread":0.317999210981743,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001025013,0.00008612943,0.0002093206,0.0003215355,0.0001767125,0.00001911356,0.00005580346,0.00006571185,0.00001522231],"category_scores_gemma":[0.0003337305,0.00007329896,0.00002071567,0.0001803425,0.00005547998,0.0002265379,0.00005218122,0.0007751741,5.147046e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005598706,"about_ca_system_score_gemma":0.00005502938,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002527042,"about_ca_topic_score_gemma":0.00002831495,"domain_scores_codex":[0.9990143,0.00007425826,0.0003478086,0.000134263,0.0002051144,0.0002243143],"domain_scores_gemma":[0.9992037,0.0002617401,0.0001519311,0.00007242285,0.0001896308,0.0001206109],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00005985018,0.00001286102,0.9653953,0.0004114819,0.00004543787,0.000006681296,0.00259321,0.00003672539,0.00006855286,0.004362682,0.0000261896,0.02698109],"study_design_scores_gemma":[0.0006197431,0.00004033424,0.9873857,0.0002771694,0.00001509206,0.00001012263,0.006029079,0.0001810782,0.000006941878,0.00009598025,0.005265384,0.00007331792],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9955744,0.0002122846,0.0009841985,0.001126316,0.0009739572,0.0002720878,0.000002305152,0.00001818738,0.0008362417],"genre_scores_gemma":[0.9934182,0.0004397131,0.005404902,0.000007148545,0.000643565,0.0000112711,3.999317e-7,0.000007340339,0.00006749998],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02690777,"threshold_uncertainty_score":0.3367788,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1975392223","doi":"10.1061/(asce)co.1943-7862.0000364","title":"Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visibility; Supply network; Dependency (UML); Work (physics); Computer science; Tracking (education); Supply chain; Field (mathematics); Risk analysis (engineering); Systems engineering; Business; Engineering; Artificial intelligence; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.006045387046516512,"gpt":0.1855300363718357,"spread":0.1794846493253192,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002573527,0.0001662164,0.0002339465,0.0002897578,0.00008812802,0.00006740406,0.00005533802,0.0001109095,0.00001752242],"category_scores_gemma":[0.0000136136,0.0001695496,0.00002822086,0.0002243686,0.00009390858,0.0003452783,0.00002548683,0.0001675932,3.081286e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006714213,"about_ca_system_score_gemma":0.000008601384,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008784401,"about_ca_topic_score_gemma":6.946553e-7,"domain_scores_codex":[0.9990337,0.00001618278,0.0005219809,0.0001336562,0.0001041636,0.0001903346],"domain_scores_gemma":[0.9995511,0.00001147585,0.0001952742,0.00009008681,0.00008928617,0.0000627692],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000734638,0.00003062806,0.008263956,0.001237816,0.0006910736,0.00003164023,0.0004020206,0.03822875,0.1669617,0.02656725,0.0002388386,0.7572729],"study_design_scores_gemma":[0.003499197,0.0003582875,0.01024451,0.001728993,0.0008629093,0.0132862,0.005371437,0.8281143,0.129259,0.003495417,0.002183174,0.001596588],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.815094,0.0007680196,0.1819932,0.0000129198,0.001525043,0.0001263393,0.000003427657,0.000361148,0.0001159124],"genre_scores_gemma":[0.9069264,0.0003236306,0.0926236,0.000004299558,0.00009586804,0.000003711589,0.000001149858,0.00001916477,0.000002206819],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7898855,"threshold_uncertainty_score":0.6914032,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4376506236","doi":"10.1061/jcemd4.coeng-13100","title":"Identification and Classification of Physical Fatigue in Construction Workers Using Linear and Nonlinear Heart Rate Variability Measurements","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Heart Rate Variability and Autonomic Control","field":"Medicine","cited_by":40,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Detrended fluctuation analysis; Approximate entropy; Sample entropy; Heart rate variability; Correlation dimension; Poincaré plot; Nonlinear system; Artificial intelligence; Frequency domain; Pattern recognition (psychology); Mathematics; Linear discriminant analysis; Statistics; Computer science; Medicine; Heart rate; Fractal dimension; Fractal","retraction":null,"screen_n_in":null,"score":{"opus":0.03942482051562823,"gpt":0.2889582415955577,"spread":0.2495334210799294,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001115298,0.00007713921,0.0002340852,0.0002821418,0.00002824841,0.00001519088,0.00001564685,0.00003992325,0.000001288954],"category_scores_gemma":[0.00009998447,0.00007434586,0.00003116837,0.0002199297,0.00007727244,0.0001273903,0.00001598012,0.0001136769,2.315144e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005333235,"about_ca_system_score_gemma":0.00003009037,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006333904,"about_ca_topic_score_gemma":5.155752e-7,"domain_scores_codex":[0.999202,0.00005189399,0.000415354,0.0001266575,0.0001193872,0.00008476599],"domain_scores_gemma":[0.9995655,0.00006159888,0.0001454102,0.0000809371,0.00008843628,0.00005812676],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","study_design_scores_codex":[0.0002112326,0.0002083213,0.1423062,0.001803281,0.0003848018,0.000009430758,0.0005637088,0.0305664,0.7492425,0.002243172,0.00001395505,0.07244705],"study_design_scores_gemma":[0.001512025,0.00007377964,0.5137374,0.0003184393,0.0001511617,0.0001017033,0.0004686337,0.481081,0.001952488,0.000153015,0.0003651662,0.00008519422],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9862958,0.00002544081,0.01289466,0.0003924808,0.0001548743,0.0002096118,0.000001597116,0.00001395687,0.00001156783],"genre_scores_gemma":[0.9908612,0.00009118762,0.008966946,0.000006176753,0.00005879586,0.000002706392,0.000001484528,0.000005591774,0.00000584805],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.74729,"threshold_uncertainty_score":0.3031736,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3009442424","doi":"10.1061/(asce)co.1943-7862.0001826","title":"Fuzzy Monte Carlo Agent-Based Simulation of Construction Crew Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Monte Carlo method; Crew; Fuzzy logic; Computer science; Scope (computer science); Industrial engineering; Artificial intelligence; Engineering; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.00796218826544233,"gpt":0.182919652335149,"spread":0.1749574640697066,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009016097,0.0001354453,0.0002075215,0.0002233358,0.00003394379,0.00002609225,0.0000583761,0.00005781479,0.00001437894],"category_scores_gemma":[0.00001164502,0.0001368168,0.0000735943,0.0002122798,0.00004736628,0.0002529278,0.000009435737,0.0001523732,0.000001245701],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000432072,"about_ca_system_score_gemma":0.00001187995,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":8.963233e-7,"about_ca_topic_score_gemma":1.997693e-7,"domain_scores_codex":[0.9991223,0.00001067545,0.0004746595,0.00008853131,0.00019797,0.0001058295],"domain_scores_gemma":[0.9995353,0.00001832124,0.0001666544,0.00007103477,0.0001208428,0.00008781143],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002953023,0.000004216959,0.0004794563,0.0003795166,0.00009685088,0.000002505154,0.00006641368,0.9126093,0.0008570845,0.001328036,0.00005102169,0.08409601],"study_design_scores_gemma":[0.0008903573,0.0001207952,0.002173876,0.0001746082,0.0001203392,0.00009083912,0.0003337471,0.9869882,0.002799783,0.00003384415,0.00610184,0.0001717579],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7090287,0.0005003705,0.2875235,0.0001311789,0.001512406,0.0001563705,0.000004755618,0.0001282168,0.001014521],"genre_scores_gemma":[0.9846666,0.0004054202,0.01474739,0.00002026411,0.0001356722,0.000002961355,0.000001030141,0.00001483309,0.00000578823],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.275638,"threshold_uncertainty_score":0.5579227,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2170231646","doi":"10.1061/(asce)0733-9364(2007)133:2(169)","title":"Decision Making in Flexible Mine Production System Design Using Real Options","year":2007,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Capital Investment and Risk Analysis","field":"Economics, Econometrics and Finance","cited_by":40,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Laurentian University","funders":"","keywords":"Flexibility (engineering); Risk analysis (engineering); Profitability index; Schedule; Production (economics); Engineering; Computer science; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.02623529148179403,"gpt":0.2313566467946199,"spread":0.2051213553128259,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009063354,0.00007248926,0.0001885926,0.0009201469,0.00004195698,0.00003489248,0.00003997533,0.00003254908,0.000005052987],"category_scores_gemma":[0.00001448964,0.00007654062,0.00005324602,0.0002994064,0.00001454176,0.0001983066,0.00001571789,0.00007114834,0.000001880586],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001813483,"about_ca_system_score_gemma":0.000003755912,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001645041,"about_ca_topic_score_gemma":0.000003025862,"domain_scores_codex":[0.9991775,0.000004550088,0.0005506942,0.0001095789,0.00004448047,0.0001132269],"domain_scores_gemma":[0.999591,0.00001740651,0.0002629824,0.00006852253,0.00002557953,0.00003454078],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006140317,0.00003811282,0.004642397,0.0001401172,0.0001549396,0.00004315393,0.0001439538,0.451378,0.0002241407,0.5360605,0.00005032532,0.007063007],"study_design_scores_gemma":[0.003335653,0.0003078143,0.1272003,0.002455638,0.0003679464,0.001991868,0.004695254,0.8300948,0.0008695342,0.02243115,0.005180287,0.001069702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.502334,0.003268074,0.4930459,0.00002418438,0.0009357979,0.00009104498,6.427256e-7,0.00001564052,0.0002847332],"genre_scores_gemma":[0.8483099,0.003295673,0.1482079,0.00000313832,0.0001237423,0.00000102571,2.97554e-7,0.000007670073,0.00005059347],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5136293,"threshold_uncertainty_score":0.3121236,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2036178893","doi":"10.1061/(asce)0733-9364(2001)127:4(330)","title":"Improving Design Coordination for Building Projects. II: A Collaborative System","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Process (computing); The Internet; Domain (mathematical analysis); Collaborative design; Information sharing; Building information modeling; Design technology; Systems design; Systems engineering; Engineering management; Knowledge management; Software engineering; World Wide Web; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006750662511390033,"gpt":0.1921372916591349,"spread":0.1853866291477448,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002370909,0.000114178,0.0001514602,0.0003171072,0.00009523037,0.00005599589,0.00004444096,0.00004759005,0.000001724566],"category_scores_gemma":[0.00001467013,0.0001104959,0.00004133352,0.0002277456,0.00001587444,0.0003448445,0.000009385077,0.00008438495,1.976397e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001303297,"about_ca_system_score_gemma":0.00001358145,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":6.868463e-7,"about_ca_topic_score_gemma":1.947226e-7,"domain_scores_codex":[0.9993681,0.00001021244,0.000312121,0.0000801871,0.000110608,0.000118722],"domain_scores_gemma":[0.9995799,0.0000253024,0.0001185494,0.0000511212,0.0001794136,0.00004571532],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001210496,0.00001857999,0.00006106214,0.001132816,0.0004897125,0.00002089623,0.0003421823,0.385547,0.02086149,0.1443434,0.0008569515,0.4462049],"study_design_scores_gemma":[0.001748706,0.0002706621,0.0001583354,0.0004232943,0.000206011,0.00144222,0.003023812,0.9504334,0.005553501,0.0001898752,0.03623406,0.0003160701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02509724,0.0003963436,0.9724535,0.00005105679,0.001317102,0.0003102765,0.000001661098,0.000122924,0.0002499272],"genre_scores_gemma":[0.7897152,0.0002437407,0.2097228,0.000005134653,0.0002007525,0.00004521274,8.304237e-7,0.00001932967,0.0000469355],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.764618,"threshold_uncertainty_score":0.4505894,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}