{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":3,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":3,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"7e649050b413","filters":{"venue":"Journal of Construction in Developing Countries"}},"results":[{"id":"W2405833297","doi":"10.21315/jcdc2016.21.1.4","title":"Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran","year":2016,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":93,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Cost overrun; Bidding; Schedule; Cash flow; Business; Duration (music); Actuarial science; Operations management; Construction industry; Economics; Finance; Marketing; Engineering; Construction engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.09891297228128945,"gpt":0.3655730460287283,"spread":0.2666600737474388,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005040116,0.0001309184,0.0003202486,0.0006841771,0.0002982213,0.0001701103,0.0002974664,0.00006249147,0.00003198252],"category_scores_gemma":[0.001902525,0.00006154101,0.00006834912,0.000931914,0.000847329,0.0008290609,0.00007572203,0.0001610912,0.000001022997],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001190006,"about_ca_system_score_gemma":0.0003730348,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005675535,"about_ca_topic_score_gemma":0.0007858476,"domain_scores_codex":[0.9976508,0.000227873,0.001275843,0.0001884986,0.0004676981,0.0001892621],"domain_scores_gemma":[0.9953382,0.002570353,0.001153747,0.0002151519,0.000696214,0.00002630428],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000331971,0.00001079721,0.5968609,0.00003897508,0.00005715931,0.00003479419,0.002604657,0.0000440091,0.00003429075,0.07263324,0.0006676414,0.3266816],"study_design_scores_gemma":[0.01530303,0.0005690252,0.294322,0.002721827,0.000215944,0.05929119,0.1445146,0.001818813,0.002204835,0.116651,0.3612921,0.00109555],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9704404,0.0002262422,0.02020873,0.006851397,0.001442172,0.0005809402,0.00001058949,0.000006109663,0.0002334339],"genre_scores_gemma":[0.993055,0.0008926628,0.005755298,0.000108219,0.0001107552,0.00002232701,1.397136e-7,0.000006373116,0.00004919455],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3606245,"threshold_uncertainty_score":0.3122019,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2599393935","doi":"10.21315/jcdc2016.21.1.9","title":"Finite Element Modelling of Cyclic Behaviour of Cold-Formed Steel Bolted Moment-Resisting Connections","year":2016,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Structural engineering; Dissipation; Finite element method; Moment (physics); Connection (principal bundle); Cold-formed steel; Beam (structure); Engineering; Element (criminal law); Shell (structure); Mechanical engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.01730974734205747,"gpt":0.2313150804761205,"spread":0.2140053331340631,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003887026,0.0001599615,0.0004743137,0.000711337,0.00007415673,0.000022348,0.0001466317,0.00008574328,0.00003795344],"category_scores_gemma":[0.0001393265,0.0001320836,0.0001130042,0.0004840068,0.0001361064,0.0003041741,0.00002361811,0.0001482814,0.000001017713],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003486589,"about_ca_system_score_gemma":0.0001680534,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003401542,"about_ca_topic_score_gemma":0.00002426355,"domain_scores_codex":[0.9979193,0.00003855349,0.001332607,0.0001064169,0.0003889805,0.0002141766],"domain_scores_gemma":[0.9982607,0.000323767,0.000685231,0.0001310752,0.0005511497,0.00004809739],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.000164842,0.00003189904,0.3499171,0.0006527433,0.001150412,0.00001745544,0.001258132,0.5446674,0.07224908,0.0256422,0.0001512876,0.004097495],"study_design_scores_gemma":[0.004888107,0.0001799546,0.0602117,0.004779693,0.0005050659,0.0002901735,0.002000031,0.03014825,0.8898079,0.003002327,0.003267435,0.0009194022],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8520467,0.0001937826,0.1468272,0.0001699836,0.0005710753,0.00007449879,0.00001566069,0.00002811664,0.00007298013],"genre_scores_gemma":[0.979153,0.0006502316,0.02008734,0.000006678526,0.00005769952,0.000003624096,9.634506e-7,0.00001727005,0.00002312693],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8175588,"threshold_uncertainty_score":0.5386212,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4226169875","doi":"10.21315/jcdc-08-20-0186","title":"Solutions to Overcome Integrated Project Delivery Implementation Barriers: A Meta-Synthesis Approach","year":2022,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Value Engineering and Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Integrated project delivery; Process management; Computer science; Project team; Context (archaeology); Construction industry; Pre-construction services; Project stakeholder; Engineering management; Coding (social sciences); Project charter; Knowledge management; Project planning; Project management; Construction engineering; Systems engineering; Business; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03932731714222512,"gpt":0.2568387702406554,"spread":0.2175114530984303,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001255447,0.0001524977,0.0003155192,0.001366862,0.0003631347,0.0002078505,0.0002135894,0.00002445663,0.0005104002],"category_scores_gemma":[0.0001666765,0.0001437634,0.0001162587,0.001144943,0.00003337026,0.0008755276,0.0001725341,0.000198238,0.000005179532],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004143722,"about_ca_system_score_gemma":0.0003022775,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003441536,"about_ca_topic_score_gemma":0.00003158973,"domain_scores_codex":[0.9985287,0.00004521999,0.0005879437,0.0001518035,0.0004509771,0.000235412],"domain_scores_gemma":[0.9991688,0.00005248268,0.0003826868,0.00009926457,0.000282251,0.00001455696],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0008129333,0.0002378843,0.04611132,0.001443613,0.006413327,0.0001435001,0.005657548,0.2438275,0.0001781096,0.4880134,0.1512064,0.05595447],"study_design_scores_gemma":[0.0008800241,0.00003510684,0.00573593,0.00005739133,0.0007350184,0.000142883,0.01857479,0.002295095,0.00007805268,0.001111833,0.9699057,0.0004481857],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7554548,0.0009227067,0.2208932,0.01234224,0.005833352,0.001613715,0.00005536995,0.0002737302,0.002610814],"genre_scores_gemma":[0.9595322,0.0001094385,0.03710533,0.002057593,0.0005113332,0.0005594921,0.00001684852,0.00003987289,0.00006788575],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8186992,"threshold_uncertainty_score":0.58625,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}