{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":2,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":2,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"82f4c7c900e1","filters":{"venue":"Journal of Electrical Power Control and Automation (JEPCA)"}},"results":[{"id":"W2907076185","doi":"10.33087/jepca.v1i1.2","title":"Listrik mikro hidro berdasarkan Potensi debit andalan sungai batanghari kota jambi","year":2018,"lang":"en","type":"article","venue":"Journal of Electrical Power Control and Automation (JEPCA)","topic":"Engineering and Technology Innovations","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Encana (Canada)","funders":"","keywords":"Tributary; Hydroelectricity; Environmental science; Hydrology (agriculture); Electricity generation; Streamflow; Renewable energy; Watershed; Power station; Electric power; Drainage basin; Power (physics); Geology; Geography; Engineering; Computer science; Geotechnical engineering","authors":[{"name":"Hendi Matalata","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003135815769965252,"gpt":0.1924124111381178,"spread":0.1892765953681526,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002459771,0.0001787057,0.0003288382,0.0003908151,0.0001118573,0.00006635232,0.0001528207,0.0001991836,0.00005443917],"category_scores_gemma":[0.0002430258,0.0001564042,0.00008040918,0.0005226178,0.00006245346,0.0002200445,0.00001164647,0.0004743734,0.00001944693],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007044468,"about_ca_system_score_gemma":0.00003592564,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002648466,"about_ca_topic_score_gemma":0.000002315237,"domain_scores_codex":[0.9988196,0.00002415577,0.0005274204,0.000118416,0.0002135775,0.0002967782],"domain_scores_gemma":[0.9991478,0.0001143411,0.0001439905,0.0001507493,0.0003278753,0.0001151957],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0005221963,0.0008496671,0.01275682,0.0002152799,0.003359276,0.0005338392,0.001334013,0.005628818,0.4650676,0.0413264,0.2738381,0.1945681],"study_design_scores_gemma":[0.01328079,0.003836183,0.1862072,0.0003671371,0.0006020087,0.003122139,0.0001247472,0.6073419,0.01891792,0.009985438,0.1542857,0.001928845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8643315,0.002339286,0.1245303,0.003729378,0.0009672922,0.0002178719,0.00002974843,0.0007288704,0.003125733],"genre_scores_gemma":[0.9982703,0.0000478679,0.001104982,0.0002120089,0.0002405239,0.00000212464,0.000004451018,0.00002458506,0.00009316278],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6017131,"threshold_uncertainty_score":0.6377977,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2908505011","doi":"10.33087/jepca.v1i1.5","title":"Analisis Awal Potensi Renewable Energy di Bawah Jembatan Aur Duri II Jambi","year":2018,"lang":"en","type":"article","venue":"Journal of Electrical Power Control and Automation (JEPCA)","topic":"Water and Land Management","field":"Environmental Science","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Encana (Canada)","funders":"","keywords":"Environmental science; Hydropower; Renewable energy; Power station; Hydrology (agriculture); Streamflow; STREAMS; Electric power; Electricity; Electricity generation; Channel (broadcasting); Water resource management; Power (physics); Geology; Engineering; Computer science; Drainage basin; Geography; Geotechnical engineering; Electrical engineering","authors":[{"name":"S Umar Djufri","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003094190813273652,"gpt":0.1893869869063482,"spread":0.1862927960930745,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003508267,0.0001505494,0.0002787629,0.0001174706,0.0002599447,0.00007948425,0.0001751387,0.00007387489,0.0008133658],"category_scores_gemma":[0.00005689979,0.0001064482,0.0001057177,0.0002731522,0.00008156849,0.0003629687,0.0000716814,0.0001137387,0.00002245309],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009379975,"about_ca_system_score_gemma":0.00001651913,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003781303,"about_ca_topic_score_gemma":0.00007681233,"domain_scores_codex":[0.9985262,0.00008835296,0.0004424803,0.0001897686,0.0004369398,0.0003162757],"domain_scores_gemma":[0.9993066,0.00004241403,0.0002629454,0.0001330025,0.00005991552,0.0001951238],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"observational","study_design_scores_codex":[0.001712597,0.0017362,0.05331223,0.00002725401,0.0009686274,0.0003615496,0.001835304,0.004765554,0.120514,0.002783998,0.7188255,0.09315714],"study_design_scores_gemma":[0.007677569,0.00496628,0.6372354,0.00005732915,0.000381358,0.0003189013,0.0001393657,0.0681266,0.00624919,0.005829903,0.2681964,0.0008217352],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.906042,0.0005979179,0.05632362,0.007027506,0.000659755,0.0002430818,0.000008927101,0.00009463463,0.02900257],"genre_scores_gemma":[0.9970934,0.0000472148,0.0001543975,0.001257132,0.0002067022,0.000001582819,0.000001793059,0.000009830541,0.001227904],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5839232,"threshold_uncertainty_score":0.8905785,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}