{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":40,"total_is_capped":false,"direct_labels_cover":1,"predictions_cover":40,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"46c513ad23e3","filters":{"venue":"Journal of Information Technology in Construction"}},"results":[{"id":"W3083778987","doi":"10.36680/j.itcon.2020.024","title":"Construction 4.0: a survey of research trends","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Digitization; Structuring; Construction industry; Quality (philosophy); Engineering; Emerging technologies; Industry 4.0; Construction management; Construction engineering; Business; Engineering management; Computer science; Civil engineering; Telecommunications","authors":[{"name":"Nathalie Perrier","is_ca":true},{"name":"Aristide Bled","is_ca":true},{"name":"Mario Bourgault","is_ca":true},{"name":"Nolwenn Cousin","is_ca":true},{"name":"Christophe Danjou","is_ca":true},{"name":"Robert Pellerin","is_ca":true},{"name":"Thibaut Roland","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0257170335431184,"gpt":0.2774679289700684,"spread":0.2517508954269501,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006747385,0.00009355283,0.0002467776,0.002589987,0.0000391748,0.00002346704,0.0001663283,0.0002746938,0.00007064704],"category_scores_gemma":[0.0004324015,0.00009245958,0.0000467893,0.003033725,0.0003777313,0.001052668,0.00001710301,0.0007015585,0.000009996494],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001112024,"about_ca_system_score_gemma":0.00008970691,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001674943,"about_ca_topic_score_gemma":0.00001358196,"domain_scores_codex":[0.9983929,0.00006909128,0.001047001,0.00005395378,0.0002949358,0.0001421586],"domain_scores_gemma":[0.9984685,0.00006190759,0.0003781672,0.00009823612,0.0009452801,0.00004795792],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001346196,0.00001114285,0.06227644,0.0000775453,0.0000560758,0.000001841051,0.0005360654,0.002333668,0.002670732,0.02884971,0.0009025487,0.9021496],"study_design_scores_gemma":[0.01224403,0.003016279,0.263265,0.001066249,0.000125566,0.008501894,0.04538929,0.1009551,0.4890292,0.05575478,0.01914252,0.001510073],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9316183,0.0002276719,0.06078934,0.001751323,0.001604923,0.0001367935,0.000028674,0.0001942383,0.00364878],"genre_scores_gemma":[0.9909372,0.0001420824,0.008845727,0.00001376724,0.00004377389,0.000002473837,0.000008138903,0.000005642068,0.000001234924],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9006395,"threshold_uncertainty_score":0.3770392,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2145294919","doi":"","title":"Integrating Decision Support System (DSS) and Building Information Modeling (BIM) to Optimize the Selection of Sustainable Building Components","year":2015,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Multiple-criteria decision analysis; Decision support system; Sustainability; Conceptual design; TOPSIS; Engineering; Systems engineering; Sustainable design; Building design; Integrated design; Computer science; Risk analysis (engineering); Management science; Process management; Construction engineering; Architectural engineering; Operations research; Operations management; Civil engineering; Business; Scheduling (production processes)","authors":[{"name":"Farzad Jalaei","is_ca":true},{"name":"Ahmad Jrade","is_ca":false},{"name":"Mahtab Nassiri","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007260838208444934,"gpt":0.216921002667138,"spread":0.2096601644586931,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009634026,0.0001394916,0.0002525881,0.001923188,0.0001096636,0.0001033394,0.0001601405,0.0002198361,0.000002999457],"category_scores_gemma":[0.0003581552,0.0001144201,0.00004279814,0.0009873251,0.00006383689,0.003396349,0.00004435203,0.0004277655,0.00000232815],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004992087,"about_ca_system_score_gemma":0.00009648623,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003200134,"about_ca_topic_score_gemma":0.000003650462,"domain_scores_codex":[0.9981555,0.00002801965,0.001286853,0.0000545735,0.0002940849,0.0001809485],"domain_scores_gemma":[0.9982587,0.00004431881,0.0005297736,0.0001034184,0.001002735,0.00006107244],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001584017,0.000008627574,0.002822515,0.0001498727,0.00005059131,0.000001278585,0.00145417,0.6214259,0.002536641,0.1558508,0.0001310469,0.2154102],"study_design_scores_gemma":[0.001256451,0.0001818726,0.0001986209,0.0003928272,0.00003193431,0.00192731,0.05474927,0.9198231,0.01500843,0.005536245,0.000718057,0.0001759493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4776826,0.00002159131,0.5213742,0.00009241872,0.0004249696,0.0001558178,0.000001276612,0.0000647975,0.0001823765],"genre_scores_gemma":[0.8853449,0.00002195383,0.1145714,0.0000139462,0.00002974968,0.000009115314,0.000002732092,0.000005567436,6.37483e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4076624,"threshold_uncertainty_score":0.4665914,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2106384226","doi":"","title":"CASE STUDIES ON THE USE OF INFORMATION TECHNOLOGY IN THE CANADIAN CONSTRUCTION INDUSTRY","year":2004,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Documentation; Compendium; Engineering; Engineering management; Workflow; Architecture; Computer science; World Wide Web","authors":[{"name":"Hugues Rivard","is_ca":false},{"name":"Thomas Froese","is_ca":false},{"name":"Lloyd Waugh","is_ca":false},{"name":"Tamer E. El-Diraby","is_ca":false},{"name":"Rodrigo Mora","is_ca":false},{"name":"Heli Torres","is_ca":false},{"name":"Sohaib Munir Gill","is_ca":false},{"name":"Tim O'Reilly","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01800397573966054,"gpt":0.2245304942905523,"spread":0.2065265185508918,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005185596,0.0001544529,0.0002300906,0.003730738,0.0001585746,0.00006992761,0.0002117546,0.0006935803,0.000009153671],"category_scores_gemma":[0.0006204105,0.00010728,0.00005029744,0.0019052,0.0005764673,0.002274649,0.00001424905,0.001506877,0.000008243584],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006536573,"about_ca_system_score_gemma":0.0002638141,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005413449,"about_ca_topic_score_gemma":0.004465356,"domain_scores_codex":[0.9982547,0.00004141364,0.001245089,0.00004949042,0.0002244241,0.0001849359],"domain_scores_gemma":[0.9985529,0.00008471139,0.0006496943,0.0002141211,0.0004703724,0.00002826686],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00004293301,0.00001771659,0.009207025,0.00005574702,0.0001039364,0.00005767621,0.003190016,0.07790432,0.0001280031,0.7314002,0.0002714728,0.177621],"study_design_scores_gemma":[0.006439792,0.001022882,0.003919281,0.001474308,0.0001657808,0.1969346,0.3475502,0.008244864,0.07012649,0.3518258,0.01125043,0.001045556],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9888781,0.00004921282,0.00318994,0.005986446,0.001196454,0.0003115153,0.00001338138,0.00006575978,0.0003091889],"genre_scores_gemma":[0.994971,0.00009644773,0.004721717,0.0001570491,0.00002618183,0.00001928586,0.000003591078,0.000004337177,4.351408e-7],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3795744,"threshold_uncertainty_score":0.6546714,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3035817401","doi":"10.36680/j.itcon.2020.019","title":"Change management practices for adopting new technologies in the design and construction industry","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Change management (ITSM); Context (archaeology); Change order; Business; Order (exchange); Critical success factor; Knowledge management; Best practice; Marketing; Operations management; Process management; Engineering; Computer science; Project management; Program management; Management; OPM3; Economics","authors":[{"name":"Omar Maali","is_ca":false},{"name":"Brian Lines","is_ca":false},{"name":"Jake Smithwick","is_ca":false},{"name":"Kristen Hurtado","is_ca":false},{"name":"Kenneth Sullivan","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0348342904175412,"gpt":0.2500013420615346,"spread":0.2151670516439934,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003447506,0.0001024085,0.0001466491,0.0007976342,0.00004863249,0.00006162735,0.0001505901,0.0003663468,0.000003036544],"category_scores_gemma":[0.0002459885,0.00008435149,0.00002397473,0.0007242404,0.0001167691,0.001591069,0.0000162362,0.0006678603,0.000001134255],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006542455,"about_ca_system_score_gemma":0.00002820847,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000002668919,"about_ca_topic_score_gemma":0.000002233147,"domain_scores_codex":[0.999115,0.0000224967,0.0005713948,0.00005940313,0.000114032,0.0001176005],"domain_scores_gemma":[0.9991981,0.00006508551,0.000566247,0.00006986695,0.00008238097,0.00001826517],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"qualitative","study_design_scores_codex":[0.00004785677,0.000003625464,0.005279188,0.00006931188,0.00002290725,0.000001944212,0.0007927446,0.001014173,0.00008898488,0.03060876,0.0001579544,0.9619126],"study_design_scores_gemma":[0.011373,0.001525446,0.007856544,0.001211941,0.0002932865,0.007413216,0.5903031,0.1192853,0.03184792,0.1498215,0.07780089,0.001267858],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2027277,0.0007521214,0.7686825,0.02456109,0.001018164,0.001340438,0.000003964714,0.0004140809,0.0004999665],"genre_scores_gemma":[0.752006,0.0007161146,0.2470102,0.0001277833,0.0000830322,0.00004800798,0.000001915452,0.000006175827,7.107524e-7],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9606447,"threshold_uncertainty_score":0.3439754,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2099215784","doi":"","title":"E-PROCUREMENT IN THE ATLANTIC CANADIAN AEC INDUSTRY","year":2006,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":47,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Procurement; Variety (cybernetics); Presentation (obstetrics); Fragmentation (computing); Business; Housing industry; Engineering; Critical success factor; Engineering management; Process management; Marketing; Industrial organization; Computer science","authors":[{"name":"Jeff H. Rankin","is_ca":true},{"name":"Yongjie Chen","is_ca":true},{"name":"A. John Christian","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0225033410825431,"gpt":0.294447663712378,"spread":0.2719443226298349,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002658085,0.00008347879,0.0001594742,0.004671775,0.00009816274,0.0001575242,0.0005544608,0.0002513929,0.000138678],"category_scores_gemma":[0.0004513462,0.00005654797,0.00005356355,0.002648106,0.000154551,0.001631287,0.00002635725,0.0007328769,0.00004395326],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001972388,"about_ca_system_score_gemma":0.0002586907,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004537677,"about_ca_topic_score_gemma":0.02456925,"domain_scores_codex":[0.9978221,0.00006141065,0.001271069,0.00006959085,0.0005898623,0.0001859578],"domain_scores_gemma":[0.9986324,0.00007922165,0.0007674605,0.0001968246,0.0003005793,0.00002356204],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00001500104,0.00001049922,0.7763933,0.000003352864,0.000004926002,0.000008213849,0.0002233046,0.0004763842,0.00001043623,0.04314098,0.002741077,0.1769726],"study_design_scores_gemma":[0.002741796,0.0002067088,0.4841584,0.0001357056,0.00002510836,0.003426837,0.03758816,0.002347501,0.000891372,0.2581936,0.2099236,0.0003612446],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9808004,0.00002981712,0.00138501,0.009840191,0.0007079946,0.0001807208,0.000001397736,0.00001177939,0.007042725],"genre_scores_gemma":[0.9984931,0.0000160246,0.001236611,0.0001746233,0.00005274501,0.000003827993,0.000001694599,0.000001437699,0.00001996553],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2922349,"threshold_uncertainty_score":0.9932298,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W967810751","doi":"","title":"Truck+ for earthmoving operations","year":2014,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Truck; Global Positioning System; Interface (matter); Graphical user interface; Application programming interface; Geographic information system; Software; Component Object Model; User interface; Engineering; Tracking system; Computer science; Web application; Database; World Wide Web; Operating system; Automotive engineering","authors":[{"name":"Ali Montaser","is_ca":false},{"name":"Osama Moselhi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003287426343077453,"gpt":0.1929169950006865,"spread":0.189629568657609,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002335694,0.0000717581,0.000132516,0.0009898375,0.00005612191,0.00003837012,0.00008433215,0.0001663433,0.00001623196],"category_scores_gemma":[0.0001777201,0.000069531,0.00004499898,0.0003267656,0.00006348186,0.001128363,0.00000469937,0.0002121919,0.000006838923],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007307665,"about_ca_system_score_gemma":0.0000304142,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":9.866408e-7,"about_ca_topic_score_gemma":0.000008244273,"domain_scores_codex":[0.9991848,0.000009645236,0.0005995947,0.00003095866,0.00007997191,0.00009506086],"domain_scores_gemma":[0.9995003,0.00002790841,0.0001269812,0.00007508103,0.0002492275,0.00002047232],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000140747,0.000004510891,0.002096353,0.00002622441,0.00001896442,1.140552e-7,0.0001411414,0.02482484,0.00169982,0.1983933,0.0002318436,0.7725488],"study_design_scores_gemma":[0.005621407,0.0006272883,0.004288563,0.0003148257,0.00007045874,0.003224582,0.006769409,0.6265687,0.1333831,0.1390618,0.07939798,0.0006719102],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2136928,0.00003495593,0.7831827,0.0004986848,0.001322565,0.0001167243,0.000003038487,0.0001112587,0.001037301],"genre_scores_gemma":[0.9375508,0.00003362551,0.0622816,0.00003156545,0.00008026903,0.000009933534,0.00000393414,0.000004726643,0.000003566149],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7718769,"threshold_uncertainty_score":0.2835392,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1472584441","doi":"","title":"Feasibility of In-Plane Articulation Monitoring of Excavator Arm Using Planar Marker Tracking","year":2015,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Lakehead University","funders":"","keywords":"Excavator; Boom; Scalability; Process (computing); Benchmark (surveying); Task (project management); Engineering; Computer science; Simulation; Real-time computing; Systems engineering; Mechanical engineering","authors":[{"name":"Ehsan Rezazadeh Azar","is_ca":true},{"name":"Chen Feng","is_ca":false},{"name":"Vineet R. Kamat","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04543859796117909,"gpt":0.266843757862832,"spread":0.2214051599016529,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008096835,0.00005334989,0.0001725806,0.0004747079,0.00001724915,0.000008681176,0.00007184246,0.000116281,0.0000165153],"category_scores_gemma":[0.0002572313,0.00004483168,0.00002405088,0.0004207346,0.0000805221,0.001000675,0.000002898074,0.0001775832,0.000001211552],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00003204623,"about_ca_system_score_gemma":0.00006323407,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001240986,"about_ca_topic_score_gemma":0.00005714225,"domain_scores_codex":[0.9989344,0.00004564799,0.0007239027,0.0000357403,0.0001757562,0.00008450111],"domain_scores_gemma":[0.9990113,0.00003558824,0.0006591087,0.0000589048,0.0002095301,0.00002558124],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00008586259,0.000008106617,0.9655132,0.00001850608,0.000004378169,0.00000145769,0.0002837633,0.003537752,0.0006453686,0.00003409297,0.000001183119,0.02986637],"study_design_scores_gemma":[0.0005890093,0.0001029629,0.9808022,0.0001333107,0.000005466598,0.0002321724,0.005922036,0.002435914,0.008027769,0.001691743,0.000006034533,0.00005136711],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9987732,0.00007632952,0.0005831856,0.00003645599,0.0003485662,0.00006080044,0.00000529314,0.000007155199,0.0001090756],"genre_scores_gemma":[0.9908541,0.00001311167,0.009110359,0.000001809989,0.00001588509,7.075409e-8,0.00000367798,6.204347e-7,3.203381e-7],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02981501,"threshold_uncertainty_score":0.1828183,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4283011387","doi":"10.36680/j.itcon.2022.028","title":"Construction cybersecurity and critical infrastructure protection: new horizons for Construction 4.0","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"York University; New York University Abu Dhabi","keywords":"Critical infrastructure; Computer security; Work (physics); Plan (archaeology); Asset (computer security); Cyber-physical system; Construction industry; Key (lock); Cyber-attack; Industry 4.0; Engineering; Computer science; Risk analysis (engineering); Construction engineering; Business","authors":[{"name":"Borja García de Soto","is_ca":false},{"name":"Alexandru Georgescu","is_ca":false},{"name":"Bharadwaj R. K. Mantha","is_ca":false},{"name":"Žiga Turk","is_ca":false},{"name":"Abel Maciel","is_ca":false},{"name":"Muammer Semih Sonkor","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004088971274252653,"gpt":0.2167603371283999,"spread":0.2126713658541473,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004107488,0.0001790002,0.0003390207,0.001651726,0.0003345327,0.00006294144,0.0001621834,0.0002687495,0.0001096526],"category_scores_gemma":[0.0004093099,0.0001910775,0.00008771811,0.001047471,0.0004544964,0.001461361,0.00004678606,0.0009741914,9.421461e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004018754,"about_ca_system_score_gemma":0.000180019,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000009408148,"about_ca_topic_score_gemma":0.000005307519,"domain_scores_codex":[0.9983801,0.00004855229,0.0009420799,0.0001202697,0.0002733894,0.0002355834],"domain_scores_gemma":[0.9990589,0.00007042434,0.0003659371,0.0001505197,0.0002767113,0.0000775133],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001900791,0.00001622095,0.005539453,0.0001618962,0.0001053939,0.000003333198,0.0006301702,0.05979134,0.002704685,0.07963806,0.0005833395,0.8506361],"study_design_scores_gemma":[0.00619838,0.002033712,0.005223261,0.0001520836,0.0003773807,0.03177349,0.04877279,0.0593725,0.04329316,0.7614132,0.04016519,0.001224866],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3902148,0.0001667282,0.6041707,0.00203389,0.002510504,0.0004837268,0.00004154197,0.0001760321,0.0002020327],"genre_scores_gemma":[0.9187202,0.00008426014,0.08097003,0.00003206172,0.0001421467,0.0000314061,0.000008923853,0.000009730807,0.000001235996],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8494112,"threshold_uncertainty_score":0.7791915,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W16601101","doi":"10.1073/pnas.0510337103","title":"APPLICATION OF GAMING ENGINES IN SIMULATION DRIVEN VISUALIZATION OF CONSTRUCTION OPERATIONS","year":2011,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Flexibility (engineering); Computer science; Representation (politics); Component (thermodynamics); Systems engineering; Human–computer interaction; Engineering; Data mining","authors":[{"name":"Amr A. El Nimr","is_ca":true},{"name":"Yasser Mohamed","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006411177422959225,"gpt":0.2237875179427445,"spread":0.2173763405197853,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002407546,0.0001167462,0.000267992,0.002577199,0.00002521799,0.000008623551,0.0001157033,0.0002777603,0.00002144365],"category_scores_gemma":[0.0001274692,0.0001244611,0.00005139652,0.00124139,0.0001730993,0.001595207,0.00001051612,0.0002233259,0.000001838402],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001325872,"about_ca_system_score_gemma":0.00005817341,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002382267,"about_ca_topic_score_gemma":0.00003258941,"domain_scores_codex":[0.998144,0.0000284143,0.001492747,0.00006122112,0.0001713641,0.000102298],"domain_scores_gemma":[0.9986634,0.00003035038,0.0005980974,0.0001248816,0.0005632783,0.0000199496],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000675769,0.0000489882,0.1084966,0.0001315916,0.00004039875,4.66427e-7,0.001711683,0.4952335,0.01458889,0.1154903,0.00000359805,0.2641864],"study_design_scores_gemma":[0.001623416,0.0001822969,0.02565481,0.0002896713,0.00004066159,0.0002576597,0.006036176,0.7767718,0.1779239,0.01089249,0.00009214014,0.0002349915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4791922,0.00004366727,0.5198269,0.00001664671,0.0003768931,0.0001600715,0.000003745446,0.00004443248,0.0003354322],"genre_scores_gemma":[0.968321,0.00009822215,0.03152936,0.000002980783,0.00001987709,0.00000935721,0.0000115935,0.000007143482,4.496449e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.4891288,"threshold_uncertainty_score":0.5075375,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4284693610","doi":"10.36680/j.itcon.2022.029","title":"Conceptual estimation of construction duration and cost of public highway projects","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Duration (music); Cost estimate; Estimation; Procurement; Mean absolute percentage error; Scope (computer science); Transport engineering; Payment; Process (computing); Baseline (sea); Project management; Engineering; Operations research; Computer science; Systems engineering; Artificial intelligence; Business","authors":[{"name":"Basma Mohamed","is_ca":true},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007042502944301119,"gpt":0.2046491422610753,"spread":0.1976066393167742,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003821219,0.00008065887,0.0002029876,0.001288565,0.0000573604,0.00001090639,0.0000853707,0.0001058761,0.00001413605],"category_scores_gemma":[0.0001712842,0.00008339407,0.00002752554,0.0005634714,0.000261025,0.00109265,0.00002893493,0.0003277244,2.259464e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001781215,"about_ca_system_score_gemma":0.00007920971,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003338676,"about_ca_topic_score_gemma":0.000001052,"domain_scores_codex":[0.9986855,0.00002672266,0.0009489226,0.00003981437,0.0001945632,0.0001045044],"domain_scores_gemma":[0.9988153,0.00002612296,0.0008194541,0.00007554376,0.00024595,0.0000176028],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00008789451,0.00002160898,0.03074958,0.0001690286,0.00008392861,0.000002413551,0.002576738,0.1054322,0.01777474,0.1359294,0.000124251,0.7070482],"study_design_scores_gemma":[0.00823516,0.001551509,0.01900288,0.0004423453,0.0001219787,0.008920942,0.1262054,0.1250264,0.6736753,0.03174083,0.004333841,0.0007434163],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9225498,0.00007005446,0.07575596,0.0001287569,0.001047668,0.0001869032,0.00001026078,0.0000439779,0.0002065556],"genre_scores_gemma":[0.9801579,0.00006375342,0.01973199,0.000003989856,0.0000208627,0.000008989221,0.000007812208,0.000004226244,4.735199e-7],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7063048,"threshold_uncertainty_score":0.3400712,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3035916000","doi":"10.36680/j.itcon.2020.018","title":"A review of augmented reality applied to underground construction","year":2020,"lang":"en","type":"review","venue":"Journal of Information Technology in Construction","topic":"Augmented Reality Applications","field":"Computer Science","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Augmented reality; Construction industry; Visualization; State (computer science); Construction engineering; Computer science; Engineering; Data science; Risk analysis (engineering); Engineering management; Systems engineering; Business; Human–computer interaction; Artificial intelligence","authors":[{"name":"Amr Fenais","is_ca":false},{"name":"Samuel T. Ariaratnam","is_ca":false},{"name":"Steven K. Ayer","is_ca":false},{"name":"Nikolas Smilovsky","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02433877903417433,"gpt":0.315576564056094,"spread":0.2912377850219197,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008789655,0.0002915259,0.001624763,0.002254938,0.00006316441,0.00004758259,0.001200307,0.0004922935,0.000009648586],"category_scores_gemma":[0.0004247364,0.0002672141,0.0002656757,0.004222186,0.0002323572,0.001005285,0.0002683324,0.0009016361,0.00003448963],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006643381,"about_ca_system_score_gemma":0.0008991188,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004777489,"about_ca_topic_score_gemma":0.000001231136,"domain_scores_codex":[0.995728,0.0001198801,0.003324022,0.0002086976,0.0004211941,0.000198229],"domain_scores_gemma":[0.9934605,0.0001064365,0.005150355,0.0006221753,0.0005596838,0.0001008655],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000004152952,0.00001772447,0.000001277814,0.01135492,0.00007844066,0.000001244361,0.00003258485,0.000008417354,0.000001672009,0.113724,0.000605635,0.8741699],"study_design_scores_gemma":[0.0003690719,0.0001151431,0.000002393754,0.03958005,0.000220181,0.002879609,0.0002035487,0.00007797405,0.00006421519,0.009729712,0.9464994,0.000258713],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"review","genre_scores_codex":[5.232923e-7,0.4528133,0.542679,0.002796143,0.000309907,0.0008604038,0.00001744842,0.00007223695,0.0004509797],"genre_scores_gemma":[0.00001811599,0.9319172,0.06769755,0.0002447759,0.00003255853,0.00005420586,0.00002701808,0.00000779538,7.667421e-7],"genre_candidate":"review","genre_consensus":null,"teacher_disagreement_score":0.9458938,"threshold_uncertainty_score":0.999978,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2164195028","doi":"","title":"AUTOMATED RETRIEVAL OF PROJECT THREE-DIMENSIONAL CAD OBJECTS IN RANGE POINT CLOUDS TO SUPPORT AUTOMATED DIMENSIONAL QA/QC","year":2008,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"CAD; Point cloud; Computer science; Rework; Segmentation; Scanner; Quality (philosophy); Quality assurance; Engineering drawing; Data mining; Artificial intelligence; Engineering","authors":[{"name":"Frédéric Bosché","is_ca":false},{"name":"Carl T. Haas","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01471692264896897,"gpt":0.2379229730317514,"spread":0.2232060503827825,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000758169,0.0001355095,0.0003324196,0.001272896,0.00008569958,0.00001236671,0.0001657461,0.0002679013,0.0001213184],"category_scores_gemma":[0.0003183667,0.0001085789,0.00005973908,0.001398823,0.0001890846,0.0009075475,0.00001761608,0.0003925435,0.00003536144],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004864584,"about_ca_system_score_gemma":0.0003553947,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003261469,"about_ca_topic_score_gemma":0.0005227243,"domain_scores_codex":[0.9981208,0.00006919198,0.001082093,0.00009344776,0.000407825,0.0002266428],"domain_scores_gemma":[0.9988478,0.00006976962,0.0005996906,0.0001039108,0.0003239926,0.00005487536],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0008592343,0.00004490175,0.9729842,0.00003913882,0.00003467554,0.0001155738,0.0009123457,0.009270166,0.0007592477,0.00006390607,0.001502179,0.01341442],"study_design_scores_gemma":[0.002215566,0.001248657,0.9302981,0.000208417,0.0000114897,0.006424466,0.0009610865,0.05407647,0.003797458,0.00043041,0.00008951663,0.0002383078],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9984922,0.00004032684,0.00003701009,0.0002666677,0.0005144908,0.0002161057,0.00003887346,0.0001938267,0.000200535],"genre_scores_gemma":[0.9935085,0.00001328821,0.006341661,0.00007025351,0.00001827166,5.836597e-7,0.00004105683,0.000002147527,0.000004193297],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.0448063,"threshold_uncertainty_score":0.4427719,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2989704363","doi":"10.36680/j.itcon.2019.025","title":"A lean approach to optimize BIM information flow using value stream mapping","year":2019,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Value stream mapping; Building information modeling; Identification (biology); Process (computing); Productivity; Lean construction; Architecture; Process management; Engineering; Systems engineering; Information flow; Lean manufacturing; Computer science; Construction engineering; Knowledge management; Manufacturing engineering; Construction industry; Operations management","authors":[{"name":"Martin Michaud","is_ca":true},{"name":"Éva-Charlotte Forgues","is_ca":true},{"name":"Vincent Carignan","is_ca":true},{"name":"Daniel Forgues","is_ca":true},{"name":"Claudiane Ouellet‐Plamondon","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005768202103328022,"gpt":0.1882079597696939,"spread":0.1824397576663659,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000283896,0.0001500162,0.0002472801,0.002779557,0.00004984,0.00007822771,0.0001683513,0.000299202,0.00002621476],"category_scores_gemma":[0.00006935179,0.0001495203,0.00006507218,0.001114905,0.00005132529,0.003726736,0.00002251758,0.000469573,0.00005644413],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003855094,"about_ca_system_score_gemma":0.00008453846,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006205401,"about_ca_topic_score_gemma":5.905262e-7,"domain_scores_codex":[0.998484,0.00001298485,0.001040315,0.00005486663,0.000226716,0.0001811784],"domain_scores_gemma":[0.9990823,0.00001454782,0.0003993535,0.0001532574,0.0003017808,0.00004879556],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003179981,0.00001013011,0.002543967,0.00007405871,0.00004294098,2.883929e-7,0.0008478439,0.634569,0.0008135574,0.02315045,0.00008533997,0.3378306],"study_design_scores_gemma":[0.001821929,0.0001227831,0.0007307291,0.0002698208,0.00002463385,0.001998511,0.0146338,0.9601652,0.009398032,0.004682173,0.005779757,0.0003726371],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4783896,0.00001980769,0.5170364,0.00009659002,0.001210292,0.0002299711,0.000004964212,0.0001309354,0.002881428],"genre_scores_gemma":[0.7468155,0.00002871773,0.2530303,0.00005583116,0.00004420868,0.000005542107,0.00001113744,0.000006885091,0.00000187757],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.337458,"threshold_uncertainty_score":0.609726,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2993682673","doi":"10.36680/j.itcon.2019.031","title":"From BIM to VR: defining a level of detail to guide virtual reality narratives","year":2019,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Carleton University","funders":"","keywords":"Virtual reality; Building information modeling; Cultural heritage; Procurement; Narrative; Augmented reality; Process (computing); Engineering; Architectural engineering; Computer science; Human–computer interaction; Archaeology; Business; Geography; Operations management; Art","authors":[{"name":"Katie Graham","is_ca":true},{"name":"L. Chow","is_ca":true},{"name":"Stephen Fai","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02652735743962066,"gpt":0.2543996283394094,"spread":0.2278722708997887,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004803724,0.00006991997,0.0001954553,0.0005024613,0.00003655269,0.00002020893,0.0001615187,0.0001186537,0.0001975727],"category_scores_gemma":[0.0002631034,0.00005590982,0.00003364577,0.0005113697,0.00005183037,0.000771431,0.00001173577,0.0001924307,0.0001188667],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001858818,"about_ca_system_score_gemma":0.00007027458,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004564389,"about_ca_topic_score_gemma":0.0005689391,"domain_scores_codex":[0.9989507,0.00004184817,0.0006689949,0.0000567709,0.000174952,0.0001067689],"domain_scores_gemma":[0.9992132,0.00005676787,0.0004033719,0.00009346136,0.0001880649,0.00004513932],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001325963,0.00000687426,0.5767999,0.00000842912,0.00002233016,0.000001336973,0.003729058,0.004516172,0.001132189,0.001164893,0.0002934582,0.4121927],"study_design_scores_gemma":[0.001027685,0.001165781,0.8774949,0.0002999195,0.00001001061,0.0002588774,0.09507497,0.0007676679,0.0100625,0.008295755,0.005273601,0.0002683337],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9913213,0.00002081336,0.005989646,0.0008603876,0.0004453842,0.00008583427,0.00007188819,0.00001553081,0.001189254],"genre_scores_gemma":[0.9757528,0.000007232136,0.02410893,0.00008699961,0.00001646239,2.690646e-7,0.00001278549,7.832084e-7,0.00001368775],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4119244,"threshold_uncertainty_score":0.2279936,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3186607705","doi":"10.36680/j.itcon.2021.021","title":"Maturity-based mapping of technology and method innovation in off-site construction: conceptual frameworks","year":2021,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Benchmarking; Maturity (psychological); Scope (computer science); Context (archaeology); Capability Maturity Model; Conceptual framework; Process management; Technology roadmap; Knowledge management; Computer science; Systems engineering; Engineering; Business; Marketing; Geography","authors":[{"name":"Alaeldin Suliman","is_ca":true},{"name":"Jeff H. Rankin","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.00559397306745559,"gpt":0.2239009163395017,"spread":0.2183069432720461,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004045465,0.0001416192,0.0003565132,0.005481416,0.00003859523,0.00002734024,0.00009406712,0.0009135108,0.00003532142],"category_scores_gemma":[0.0003393091,0.0001556387,0.00003920856,0.004280914,0.0004336734,0.000921346,0.0000230061,0.001212733,0.000001662003],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001530002,"about_ca_system_score_gemma":0.0001622531,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001895035,"about_ca_topic_score_gemma":0.000007036721,"domain_scores_codex":[0.9980491,0.00004004228,0.001504318,0.00008993786,0.0001670847,0.000149463],"domain_scores_gemma":[0.9983407,0.00005858859,0.0006785566,0.0001433521,0.0007590826,0.00001973926],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00003532934,0.00001596624,0.04485434,0.00009253524,0.00003758966,0.000007347956,0.0004019126,0.003798953,0.009454235,0.2804818,0.00003088036,0.6607891],"study_design_scores_gemma":[0.008404269,0.0003357233,0.01458702,0.002147968,0.00008003573,0.0136966,0.06684637,0.0686749,0.5834196,0.2280748,0.01280337,0.0009293681],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6597995,0.0004173956,0.3373032,0.001198207,0.0007721842,0.000101291,0.000008084755,0.00008654348,0.0003135919],"genre_scores_gemma":[0.7619689,0.0001703317,0.2377648,0.00004719509,0.00002531891,0.000006122859,0.00001016522,0.000006173266,0.00000109258],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6598597,"threshold_uncertainty_score":0.7045832,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4225088704","doi":"10.36680/j.itcon.2022.007","title":"A simulation-based statistical method for planning modular construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workstation; Modular design; Process (computing); Engineering; Production line; Crew; Wafer fabrication; Production (economics); Reliability engineering; Industrial engineering; Computer science; Mechanical engineering; Operating system","authors":[{"name":"Angat Pal Singh Bhatia","is_ca":true},{"name":"SangHyeok Han","is_ca":true},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007430963568854501,"gpt":0.2555881924478268,"spread":0.2481572288789723,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004204522,0.0001223905,0.00021395,0.001301129,0.0001772154,0.00003630546,0.0001224914,0.0001447815,0.00008151223],"category_scores_gemma":[0.0001796285,0.0001351721,0.00006405786,0.0003805872,0.00007951299,0.0006952195,0.00001445809,0.0005213065,0.000001437225],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003618847,"about_ca_system_score_gemma":0.00008700044,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001993086,"about_ca_topic_score_gemma":5.92238e-7,"domain_scores_codex":[0.9986516,0.00004053563,0.0008566421,0.00007012637,0.0002242348,0.0001569087],"domain_scores_gemma":[0.9990286,0.0002559712,0.0004073203,0.00009778228,0.0001790073,0.0000313842],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005866385,0.000005384966,0.00061862,0.00002526819,0.00002071662,0.000001173187,0.00009001797,0.792336,0.0001984299,0.01184804,0.00003202894,0.1947656],"study_design_scores_gemma":[0.001190662,0.0001311565,0.0001825045,0.00002680097,0.00002317163,0.0003765719,0.003533307,0.9585935,0.009655838,0.0217814,0.004365068,0.000140022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06456313,0.00003976923,0.933401,0.0001934992,0.001329186,0.0002040347,0.00003642741,0.0001321967,0.0001007403],"genre_scores_gemma":[0.7038039,0.000002277254,0.296067,0.00002975925,0.00003635286,0.00003061223,0.00002174787,0.000007586961,7.613871e-7],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.6392407,"threshold_uncertainty_score":0.5512157,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3005434831","doi":"10.36680/j.itcon.2020.005","title":"Risk quantification using fuzzy-based Monte Carlo simulation","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Monte Carlo method; Cost estimate; Cost contingency; Computer science; Variance (accounting); Contingency; Contingency table; Fuzzy logic; Covariance matrix; Estimation; Data mining; Econometrics; Operations research; Reliability engineering; Statistics; Mathematical optimization; Algorithm; Mathematics; Engineering; Machine learning; Artificial intelligence","authors":[{"name":"Osama Moselhi","is_ca":true},{"name":"Mohammadjavad Arabpour Roghabadi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07772291270651605,"gpt":0.3542710614909876,"spread":0.2765481487844715,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001589255,0.000116779,0.0002610189,0.002506805,0.0001443458,0.0001585519,0.0003815596,0.0001824843,0.00006690896],"category_scores_gemma":[0.002836199,0.0001015001,0.00009577236,0.00272971,0.0001651401,0.003045758,0.00004121213,0.0004220301,0.00004870934],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001081295,"about_ca_system_score_gemma":0.0001533664,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001001985,"about_ca_topic_score_gemma":0.000004253926,"domain_scores_codex":[0.997224,0.0001012255,0.001722495,0.0001263864,0.0006884262,0.0001374856],"domain_scores_gemma":[0.9959543,0.0001918215,0.002634499,0.0002145704,0.0009543312,0.00005050944],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001387634,0.000008510036,0.1326571,0.000008276724,0.00001278806,0.000001043608,0.0003132781,0.5313538,0.0001717615,0.001595547,0.00008703781,0.3336521],"study_design_scores_gemma":[0.001122536,0.0001244613,0.006422318,0.00002858396,0.0000260114,0.00005281778,0.003623206,0.9752129,0.002055565,0.006462978,0.004732809,0.0001358485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6859351,0.00002409237,0.3109254,0.002136795,0.0005958482,0.0001584181,0.000005600773,0.00004431287,0.0001744475],"genre_scores_gemma":[0.9773901,0.00002316963,0.02237212,0.0001427812,0.00006346663,0.00000137705,0.00000118772,0.000003668292,0.000002184243],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4438591,"threshold_uncertainty_score":0.4139053,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4287921475","doi":"10.36680/j.itcon.2022.032","title":"An integrated RFID–UWB method for indoor localization of materials in construction","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Indoor and Outdoor Localization Technologies","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Trilateration; Radio-frequency identification; Global Positioning System; Computer science; Leverage (statistics); Identification (biology); Ultra-wideband; Radio frequency; Wideband; Tracking (education); Ranging; Real-time computing; Electronic engineering; Engineering; Telecommunications; Artificial intelligence","authors":[{"name":"Hassan Bardareh","is_ca":true},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005014984277418305,"gpt":0.2381066890808076,"spread":0.2330917048033893,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008423723,0.0001431088,0.0003763198,0.00324374,0.00007807272,0.00002576704,0.0002573278,0.0003042297,0.00005879306],"category_scores_gemma":[0.0002634711,0.0001508782,0.00004734205,0.001550106,0.0001434103,0.001108145,0.00003218915,0.000401208,8.125734e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003843687,"about_ca_system_score_gemma":0.00009790847,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001730207,"about_ca_topic_score_gemma":0.000009561326,"domain_scores_codex":[0.9980229,0.00007643107,0.00144336,0.00007992494,0.0002010324,0.0001763135],"domain_scores_gemma":[0.9986804,0.00004699536,0.0007426839,0.000160433,0.0003496182,0.00001986318],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0003886939,0.00007777134,0.01329409,0.0002407485,0.00007138498,0.000003802677,0.001091239,0.5453357,0.02410056,0.05341913,0.0002035173,0.3617733],"study_design_scores_gemma":[0.003246513,0.0006153962,0.00043585,0.0001141813,0.0000334157,0.0009187949,0.02705542,0.1415464,0.7959956,0.02696472,0.002764395,0.0003093465],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2753012,0.0000348386,0.7230582,0.0001206084,0.0009341568,0.000302134,0.00005018046,0.0001608934,0.0000378606],"genre_scores_gemma":[0.9089087,0.00006703805,0.09086186,0.00002440797,0.00001819345,0.00004251161,0.00006417082,0.00001244911,6.957152e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7718951,"threshold_uncertainty_score":0.6152635,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4224210734","doi":"10.36680/j.itcon.2022.022","title":"Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"Istanbul Teknik Üniversitesi; Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Facility management; Building information modeling; Software deployment; Occupancy; Process (computing); Post-occupancy evaluation; Systems engineering; Resource (disambiguation); System deployment; Engineering; Computer science; Architectural engineering; Process management; Software engineering; Operations management","authors":[{"name":"Deniz Artan","is_ca":true},{"name":"Esin Ergen","is_ca":true},{"name":"Behlul Kula","is_ca":true},{"name":"Gürşans Güven","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005306839171041152,"gpt":0.2184612841904609,"spread":0.2131544450194197,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008819076,0.0001312334,0.0002198243,0.002018934,0.0001670207,0.0000470361,0.0001804462,0.0001953533,0.00006199113],"category_scores_gemma":[0.0001863493,0.0001335797,0.00007753065,0.001056066,0.00006397578,0.001151335,0.00001985536,0.0005996504,0.000004613443],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009844338,"about_ca_system_score_gemma":0.0001928365,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005707295,"about_ca_topic_score_gemma":0.000004032797,"domain_scores_codex":[0.9984739,0.00004952923,0.0009394244,0.00006796352,0.0003132118,0.0001559662],"domain_scores_gemma":[0.998295,0.00004305986,0.000581271,0.0001186275,0.0009342772,0.00002777973],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003634526,0.0000232594,0.001714912,0.0001364025,0.0001062552,0.000001671329,0.0004146649,0.07178172,0.006240464,0.09958822,0.001145117,0.8184839],"study_design_scores_gemma":[0.01309919,0.001717018,0.001921418,0.0006931111,0.0003935304,0.01385769,0.1831023,0.5878465,0.1029637,0.02271381,0.07039221,0.001299521],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6565511,0.0003011187,0.335705,0.0006702144,0.005219773,0.0006806467,0.00005263229,0.0003523778,0.0004671385],"genre_scores_gemma":[0.9836782,0.00002452476,0.01606008,0.0000256919,0.00005172932,0.0001010536,0.00004573241,0.0000102149,0.000002806104],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8171843,"threshold_uncertainty_score":0.5447224,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4394927140","doi":"10.36680/j.itcon.2024.014","title":"Development of standard-based information requirements for the facility management of a canteen","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"MIT Portugal; Fundação para a Ciência e a Tecnologia; Ministério da Ciência, Tecnologia e Ensino Superior","keywords":"Systems engineering; Facility management; Engineering; Engineering management; Computer science; Software engineering; Business","authors":[{"name":"Andressa Oliveira","is_ca":true},{"name":"José Granja","is_ca":true},{"name":"Marzia Bolpagni","is_ca":true},{"name":"Ali Motamedi","is_ca":true},{"name":"Miguel Azenha","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009104826860086975,"gpt":0.2316689763949585,"spread":0.2225641495348715,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004338362,0.00007258201,0.0001348466,0.0008099863,0.0000347256,0.00002135988,0.0001065759,0.0001020179,0.00001661833],"category_scores_gemma":[0.00002480882,0.00005570761,0.00004994045,0.0004428345,0.00008896019,0.001026855,0.000009024136,0.0001452161,0.000001704407],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000196008,"about_ca_system_score_gemma":0.0001236398,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001207279,"about_ca_topic_score_gemma":0.000003356479,"domain_scores_codex":[0.9986294,0.00000554266,0.00106942,0.00002556991,0.0001949206,0.00007517225],"domain_scores_gemma":[0.9992746,0.00002353673,0.0003107138,0.00008253061,0.0002983392,0.00001026848],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0000704852,0.000003764367,0.0003357616,0.0005678327,0.0001172397,1.464729e-7,0.0005343279,0.004102124,0.000364285,0.01952203,0.0001032483,0.9742787],"study_design_scores_gemma":[0.005940504,0.0004963073,0.003994112,0.003019403,0.0002971767,0.0003011236,0.05030399,0.1805085,0.5904326,0.01631773,0.1478272,0.0005613349],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1342918,0.000143457,0.8637264,0.0002319893,0.0009408061,0.0002938273,0.00004516894,0.00005685094,0.0002696313],"genre_scores_gemma":[0.9463075,0.00005905674,0.0535876,0.000005269051,0.000006379285,0.00001928919,0.00001192546,0.000002029955,8.936012e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9737175,"threshold_uncertainty_score":0.227169,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4220695606","doi":"10.36680/j.itcon.2022.013","title":"Evaluating the use of virtual reality for maintainability-focused design reviews","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Maintainability; Usability; Virtual reality; Engineering; Human–computer interaction; Computer science; Systems engineering; Reliability engineering; Software engineering","authors":[{"name":"Devarsh Bhonde","is_ca":true},{"name":"Puyan A. Zadeh","is_ca":true},{"name":"Sheryl Staub‐French","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07157249765784443,"gpt":0.3037117611674438,"spread":0.2321392635095994,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001902609,0.00007821579,0.000202283,0.0005822009,0.0001242574,0.00001953024,0.0001523468,0.00008815829,0.00002889063],"category_scores_gemma":[0.0008141223,0.00006256391,0.00007823088,0.0005605799,0.0001305199,0.0007750756,0.00002172284,0.0003997557,5.90249e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002803683,"about_ca_system_score_gemma":0.00008950013,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000003532372,"about_ca_topic_score_gemma":0.000001687419,"domain_scores_codex":[0.9984226,0.0001438352,0.001119162,0.0000408542,0.0001771283,0.00009642727],"domain_scores_gemma":[0.9986761,0.0001772616,0.0006962054,0.0001498452,0.0002880931,0.00001247691],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001239146,0.000008840501,0.0004216754,0.00003386906,0.00002105623,1.147558e-7,0.0003064419,0.1842581,0.001015714,0.03270489,0.0005955009,0.7805098],"study_design_scores_gemma":[0.004317306,0.003367291,0.001077367,0.0002112442,0.0001614394,0.002162444,0.01704961,0.7086045,0.03148914,0.1562294,0.07483815,0.0004921769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1284762,0.0001052019,0.869018,0.0008212532,0.0008779092,0.0006183421,0.00001230713,0.00004757407,0.00002318637],"genre_scores_gemma":[0.8767035,0.0001398668,0.1228974,0.00005980602,0.00004026563,0.0001396185,0.00000708318,0.000007764733,0.000004706447],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7800177,"threshold_uncertainty_score":0.2551282,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1457225595","doi":"","title":"Validating ontologies in informatics systems: approaches and lessons learned for AEC","year":2014,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Benchmarking; Scope (computer science); Computer science; Construct (python library); Ontology; Dimension (graph theory); Data science; Set (abstract data type); Knowledge management; Informatics; Artificial intelligence; Software engineering; Engineering; Mathematics","authors":[{"name":"Tamer E. El-Diraby","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04730560788840749,"gpt":0.2756129068634334,"spread":0.2283072989750259,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001070515,0.00008330822,0.0002484749,0.001155935,0.00005542729,0.0001204702,0.0003226479,0.0001925636,1.749332e-7],"category_scores_gemma":[0.001085601,0.00007060626,0.00002523949,0.0003711774,0.0001238143,0.002176748,0.00007539992,0.0002301077,8.212095e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006765837,"about_ca_system_score_gemma":0.00005868486,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007862495,"about_ca_topic_score_gemma":0.000009806667,"domain_scores_codex":[0.9987767,0.0000355522,0.0008736743,0.00005108426,0.0001121859,0.0001507906],"domain_scores_gemma":[0.9986933,0.0001999506,0.0008183633,0.0001438592,0.0001280758,0.00001647418],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001103348,0.000007797305,0.01275741,0.00008513682,0.000008409428,4.070709e-7,0.001160343,0.001448798,0.00002454393,0.4405581,0.00001827322,0.5439198],"study_design_scores_gemma":[0.004075916,0.0006223611,0.01065573,0.000494783,0.00002040737,0.002274895,0.06704501,0.6690238,0.00548619,0.2375296,0.002360057,0.0004112674],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2372993,0.00007174412,0.7588316,0.002943969,0.0003431633,0.000141075,5.402345e-7,0.00005771998,0.0003108616],"genre_scores_gemma":[0.8079144,0.00005430218,0.1919846,0.00002535914,0.00001100221,0.000007444851,6.4177e-7,0.000001275817,9.046007e-7],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.667575,"threshold_uncertainty_score":0.287924,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4386967114","doi":"10.36680/j.itcon.2023.030","title":"Utilizing augmented reality for the assembly and disassembly of panelized construction","year":2023,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Augmented Reality Applications","field":"Computer Science","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"University of Seoul; Chung-Ang University","keywords":"Prefabrication; Workflow; Workforce; Engineering; Construction management; Construction engineering; Resource (disambiguation); Supply chain; Architectural engineering; Systems engineering; Computer science; Civil engineering; Business; Database","authors":[{"name":"Kantheepan Yogeeswaran","is_ca":false},{"name":"Qian Chen","is_ca":true},{"name":"Borja García de Soto","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0221478355370922,"gpt":0.2892901876763418,"spread":0.2671423521392496,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009808614,0.00008279637,0.0001950785,0.0008987378,0.000139573,0.00004593125,0.000366863,0.0001484316,8.353289e-7],"category_scores_gemma":[0.0003784696,0.00006524142,0.00005341351,0.001406026,0.0002926832,0.001174815,0.00009630739,0.0001952123,0.000001556581],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007719135,"about_ca_system_score_gemma":0.0001002486,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001184977,"about_ca_topic_score_gemma":0.000004983014,"domain_scores_codex":[0.9986622,0.00003701927,0.000882374,0.00008117204,0.0001982484,0.0001390065],"domain_scores_gemma":[0.9979576,0.0002768967,0.001118122,0.0002503746,0.0003719753,0.00002505768],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00004618425,0.00001863232,0.001972681,0.00005585292,0.00006397867,5.074458e-7,0.0005247643,0.000645271,0.005572722,0.5104307,0.0002910034,0.4803777],"study_design_scores_gemma":[0.007807411,0.0006558835,0.03809893,0.0004509213,0.000172213,0.003498333,0.0428325,0.356402,0.1542144,0.3888449,0.006464555,0.0005580185],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1102493,0.00003282527,0.8801017,0.008750789,0.0003462975,0.0003331254,0.000006803559,0.00009388924,0.00008527998],"genre_scores_gemma":[0.9604717,0.0003214902,0.0391199,0.00003321342,0.00001729043,0.00002624483,0.000005415725,0.000002959708,0.000001779964],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8502224,"threshold_uncertainty_score":0.2660468,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4409046432","doi":"10.36680/j.itcon.2025.019","title":"A review of machine learning for analysing accident reports in the construction industry","year":2025,"lang":"en","type":"review","venue":"Journal of Information Technology in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Innovation Cluster (Canada)","funders":"","keywords":"Context (archaeology); Computer science; CLARITY; Artificial intelligence; Machine learning; Structuring; Unstructured data; Unsupervised learning; Data science; Accident (philosophy); Natural language processing; Data mining; Big data","authors":[{"name":"May Shayboun","is_ca":false},{"name":"Dimosthenis Kifokeris","is_ca":false},{"name":"Christian Koch","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.06125469995933066,"gpt":0.4964780754303192,"spread":0.4352233754709886,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.006483407,0.0001920775,0.001435875,0.003893601,0.0002421331,0.00000905974,0.0003003896,0.001247438,0.00004525099],"category_scores_gemma":[0.008287677,0.0001350344,0.0002741087,0.002791459,0.0001453507,0.0005160191,0.00006740316,0.004804149,0.000002483191],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006053777,"about_ca_system_score_gemma":0.003215994,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003392067,"about_ca_topic_score_gemma":0.00002248052,"domain_scores_codex":[0.9933247,0.0008117639,0.0050682,0.000115363,0.0003891852,0.0002908083],"domain_scores_gemma":[0.9900948,0.001636867,0.006887691,0.0002623963,0.001080608,0.00003759703],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003255674,0.00001259085,0.01239169,0.08505653,0.00003622739,0.000003275923,0.00006532302,0.00001013218,3.889588e-8,0.001281698,0.0002095443,0.9009004],"study_design_scores_gemma":[0.0007803648,0.0001827228,0.0004964792,0.3528751,0.0003258433,0.001588995,0.002610183,0.00007282374,0.000001455657,0.002851169,0.6380458,0.0001690133],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.00009382205,0.9922484,0.001884297,0.001624405,0.0009545564,0.00267873,0.00001653988,0.00001581574,0.0004834582],"genre_scores_gemma":[0.0001615731,0.9964037,0.002869734,0.0001726777,0.0000777337,0.0001940958,0.0001061835,0.000006200557,0.000008109318],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.9007314,"threshold_uncertainty_score":0.9974918,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4309541269","doi":"10.36680/j.itcon.2022.050","title":"Hybrid feature selection framework for predicting bridge deck conditions","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Artificial neural network; Feature selection; Engineering; Serviceability (structure); Random forest; Hyperparameter; Computer science; Selection (genetic algorithm); Bridge deck; Deck; Machine learning; Artificial intelligence; Structural engineering","authors":[{"name":"Abdelhady Omar","is_ca":false},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003672905132079263,"gpt":0.2211650730778662,"spread":0.2174921679457869,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002175927,0.00008782397,0.0001456893,0.000990757,0.0001992555,0.0000243242,0.0001210485,0.0001158827,0.00001854743],"category_scores_gemma":[0.000178188,0.0000959923,0.00005546032,0.0004334038,0.00003980827,0.0007167927,0.0000206599,0.0008223283,8.73211e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003709091,"about_ca_system_score_gemma":0.00005010786,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":9.299067e-7,"about_ca_topic_score_gemma":5.864379e-7,"domain_scores_codex":[0.9991962,0.00001032878,0.0004507568,0.0000425519,0.0001361502,0.0001640293],"domain_scores_gemma":[0.9993907,0.0000434661,0.0003083588,0.00006557437,0.0001716363,0.00002029964],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0003170397,0.00004954381,0.1680437,0.0003184723,0.0003624597,0.00001866367,0.002052416,0.3873805,0.01173238,0.1807614,0.01740073,0.2315628],"study_design_scores_gemma":[0.005847842,0.00139199,0.07920707,0.0006057232,0.0001811074,0.02587849,0.01803763,0.07949457,0.1251983,0.6025139,0.06053298,0.00111039],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7000526,0.00004446603,0.2964703,0.0003950803,0.002604227,0.0001775727,0.00003007977,0.0001504667,0.00007517763],"genre_scores_gemma":[0.9566998,0.0000229092,0.0430254,0.00003435366,0.0001630001,0.00003167278,0.00001337755,0.000008209534,0.000001205056],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4217525,"threshold_uncertainty_score":0.3914452,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4399204586","doi":"10.36680/j.itcon.2024.018","title":"A cloud-based integration of Building Information Modeling and Virtual Reality through game engine to facilitate the design of Age-in-Place homes at the conceptual stage","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Ottawa","funders":"","keywords":"Game engine; Building information modeling; Virtual reality; Conceptual model; Cloud computing; Conceptual design; Engineering; Architectural engineering; Stage (stratigraphy); Computer science; Human–computer interaction; Systems engineering; Operations management; Database; Operating system; Geology","authors":[{"name":"Vafa Rostamiasl","is_ca":true},{"name":"Ahmad Jrade","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02191497428802042,"gpt":0.2415291363109446,"spread":0.2196141620229242,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007765777,0.0001191693,0.000207937,0.0007988749,0.0000414293,0.00004294429,0.0001228465,0.0001657704,0.000009687018],"category_scores_gemma":[0.0002200107,0.00008145824,0.0000444525,0.0007467777,0.0002520124,0.001634069,0.00002095262,0.000406203,0.000001372067],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002185712,"about_ca_system_score_gemma":0.00007967056,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003052229,"about_ca_topic_score_gemma":0.00003803963,"domain_scores_codex":[0.9984976,0.00005778244,0.00108176,0.00005008552,0.0002043748,0.0001083975],"domain_scores_gemma":[0.9992106,0.0001562409,0.0002774565,0.0001206727,0.0002189359,0.00001612696],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000114423,0.000003162991,0.00009387731,0.00006702932,0.00002423506,4.911399e-7,0.005230038,0.8650106,0.004388938,0.03309071,0.00005507048,0.09192142],"study_design_scores_gemma":[0.0006744695,0.000228409,0.00009319863,0.0003773854,0.00002113658,0.0001439942,0.02051445,0.9228922,0.04972514,0.004200856,0.001008208,0.0001205343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4205987,0.000122046,0.5782668,0.0004202658,0.0003347979,0.0001768437,0.00001483922,0.00003404249,0.00003168354],"genre_scores_gemma":[0.9935231,0.0001670515,0.006247232,0.00002156223,0.0000157418,0.00001208462,0.000006071027,0.000004018124,0.00000310482],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5729244,"threshold_uncertainty_score":0.332177,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4317829607","doi":"10.36680/j.itcon.2023.002","title":"How typical is your project? The need for a no-model approach for information management in AEC","year":2023,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Knowledge management; Computer science; Stakeholder; Scope (computer science); Data science; Process management; Engineering","authors":[{"name":"Tamer E. El-Diraby","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02572671975251101,"gpt":0.2697647287416491,"spread":0.2440380089891381,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006668561,0.00008496986,0.0001554154,0.00174039,0.00007778979,0.0001571148,0.0004950102,0.0001653916,1.788102e-7],"category_scores_gemma":[0.0002789793,0.00006118979,0.00006091933,0.001065741,0.00007316411,0.002988391,0.00008389613,0.0001907453,0.000003302677],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008851002,"about_ca_system_score_gemma":0.00008472159,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001611505,"about_ca_topic_score_gemma":0.000001017545,"domain_scores_codex":[0.9989992,0.00001177395,0.0005728982,0.00006024426,0.0001695528,0.0001862985],"domain_scores_gemma":[0.9989897,0.00005146212,0.0004871384,0.0001730005,0.0002874282,0.00001127275],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001939547,0.00002638562,0.001026689,0.0001727697,0.00004477675,7.80191e-7,0.002583826,0.003145431,0.0000284312,0.3512513,0.004901018,0.6366247],"study_design_scores_gemma":[0.00193992,0.0001485369,0.0008768795,0.00003290386,0.00001057369,0.0001363835,0.01230302,0.9265942,0.0006054522,0.051953,0.005289606,0.0001095611],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01294502,0.00000845915,0.9757354,0.009788731,0.0003636452,0.0007663878,0.000003536205,0.00008888861,0.0002999827],"genre_scores_gemma":[0.2838791,0.00008502298,0.7153601,0.0004080127,0.0000350783,0.0001883865,0.00001170546,0.000003460008,0.00002907966],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.9234487,"threshold_uncertainty_score":0.2495247,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4391564779","doi":"10.36680/j.itcon.2024.002","title":"Construction 4.0: A comparative analysis of research and practice","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Engineering; Engineering ethics","authors":[{"name":"Nathalie Perrier","is_ca":true},{"name":"Aristide Bled First","is_ca":true},{"name":"Mario Bourgault","is_ca":true},{"name":"Nolwenn Cousin","is_ca":true},{"name":"Christophe Danjou","is_ca":true},{"name":"Robert Pellerin","is_ca":true},{"name":"Thibaut Roland","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02198345678699289,"gpt":0.3298038680227176,"spread":0.3078204112357247,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007795945,0.00007745939,0.0002474281,0.006349811,0.00003821181,0.00006054121,0.0000713183,0.000197307,0.00002272837],"category_scores_gemma":[0.0002041075,0.0000722172,0.00004780426,0.0038473,0.0005046405,0.001886309,0.00001269048,0.0005618045,0.000003692496],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001361676,"about_ca_system_score_gemma":0.00006843942,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006129681,"about_ca_topic_score_gemma":0.000007211145,"domain_scores_codex":[0.9987968,0.00004901947,0.0007669397,0.00005524875,0.0002318038,0.0001001401],"domain_scores_gemma":[0.9987039,0.0002534932,0.0002044846,0.00008254704,0.000731485,0.00002408622],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00012319,0.00001891301,0.004935753,0.0001527454,0.00119237,0.000006092054,0.002514783,0.005169546,0.00325547,0.5937937,0.0002851486,0.3885523],"study_design_scores_gemma":[0.002942544,0.001519477,0.0118653,0.001743504,0.002109941,0.02251341,0.2550232,0.3450642,0.1164679,0.1976952,0.04215471,0.0009006569],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8755836,0.001908092,0.1103937,0.001307167,0.001834839,0.000214713,0.00001896582,0.0002113895,0.008527437],"genre_scores_gemma":[0.9815495,0.0005470091,0.01786231,0.000004357914,0.0000246622,0.000003597105,0.000003988819,0.000002552776,0.000001996519],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3960985,"threshold_uncertainty_score":0.566587,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2096208965","doi":"","title":"Emerging technologies in a tele-collaborative design studio between the Pennsylvania State University and Carleton University","year":2008,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Design Education and Practice","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Carleton University; McGill University","funders":"","keywords":"Studio; Multimedia; Computer science; Telecommunications","authors":[{"name":"Katsuhiko Muramoto","is_ca":false},{"name":"Michael Jemtrud","is_ca":true},{"name":"Sonali Kumar","is_ca":false},{"name":"Bimal Balakrishnan","is_ca":false},{"name":"Danielle Wiley","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008413984081638327,"gpt":0.2013948201487096,"spread":0.1929808360670713,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003353168,0.00007228603,0.0001356284,0.001173805,0.0001000806,0.00001100331,0.000142154,0.0001186311,0.000003030621],"category_scores_gemma":[0.0001452084,0.00006734103,0.00001270812,0.001235997,0.0001969067,0.001394697,0.0000243805,0.0004558415,0.000002742521],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002369531,"about_ca_system_score_gemma":0.0001048522,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007757185,"about_ca_topic_score_gemma":0.000009487146,"domain_scores_codex":[0.999464,0.00006031107,0.0002552946,0.00003950841,0.00008358865,0.00009733986],"domain_scores_gemma":[0.9994083,0.0001282502,0.0002313803,0.00007341676,0.0001452069,0.00001342353],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"qualitative","study_design_scores_codex":[0.0003132268,0.00004201189,0.3711096,0.00006306501,0.0002345682,0.0001599969,0.01853734,0.02225775,0.0009484048,0.00454056,0.001437916,0.5803556],"study_design_scores_gemma":[0.007268913,0.0006221228,0.236212,0.0002864958,0.0001476525,0.004738324,0.6169228,0.006609473,0.02374252,0.009137838,0.0933634,0.0009484153],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9507886,0.0001223257,0.0467865,0.001508564,0.0001539689,0.0001668832,0.000003396042,0.0001115046,0.0003582307],"genre_scores_gemma":[0.9902813,0.001708536,0.007991387,0.000004700076,0.000005211873,2.48625e-7,5.174105e-7,0.000002394728,0.00000568216],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5983855,"threshold_uncertainty_score":0.2746087,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3156421604","doi":"10.36680/j.itcon.2021.029","title":"Ontology-based approach to data exchanges for robot navigation on construction sites","year":2021,"lang":"en","type":"preprint","venue":"Journal of Information Technology in Construction","topic":"Modular Robots and Swarm Intelligence","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Ontology; Interoperability; Robot; Building information modeling; Human–computer interaction; Software engineering; Systems engineering; Database; World Wide Web; Artificial intelligence; Engineering","authors":[{"name":"Sina Karimi","is_ca":true},{"name":"Ivanka Iordanova","is_ca":true},{"name":"David St-Onge","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03869984458902712,"gpt":0.2740566149552088,"spread":0.2353567703661817,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005132145,0.0002463615,0.00046905,0.001768151,0.00005947668,0.0001075721,0.0005523044,0.0007738356,0.00001040647],"category_scores_gemma":[0.0003069523,0.0002548175,0.00008331918,0.0004429449,0.0001144496,0.0006797121,0.0001288864,0.0009555992,0.000003678376],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003011166,"about_ca_system_score_gemma":0.0001564495,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005123085,"about_ca_topic_score_gemma":0.000008667248,"domain_scores_codex":[0.9982218,0.00003133047,0.00110086,0.0002010171,0.0002371692,0.0002078016],"domain_scores_gemma":[0.9981645,0.00005918607,0.0006471165,0.0005733626,0.0005040963,0.00005168509],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007836321,0.00004329729,0.0005867268,0.0006125201,0.0001036906,0.000002759658,0.0003213066,0.7063323,0.000819785,0.003587874,0.0005255431,0.2869858],"study_design_scores_gemma":[0.001726839,0.0004816412,0.0005372454,0.002058485,0.0001655093,0.001481843,0.006711305,0.8724208,0.09912507,0.011902,0.002405368,0.0009838872],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08808164,0.0001776779,0.9080142,0.0006581645,0.002097051,0.0005413482,0.000072726,0.0001321573,0.0002250122],"genre_scores_gemma":[0.5819176,0.0001321417,0.4170367,0.0000700331,0.0001181949,0.00004501999,0.0006630599,0.0000162703,0.000001032215],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.4938359,"threshold_uncertainty_score":0.9999904,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3127643406","doi":"10.36680/j.itcon.2021.002","title":"Open access to Construction IT research articles – developments over the past 25 years","year":2021,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Intellectual Capital and Performance Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Dozen; Publishing; Quarter (Canadian coin); Quality (philosophy); Business model; Engineering; Library science; Political science; Engineering ethics; World Wide Web; Business; History; Computer science; Marketing","authors":[{"name":"Bo‐Christer Björk","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04679358624725741,"gpt":0.331948027033694,"spread":0.2851544407864366,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.001028179,0.00007248887,0.0001487537,0.001960536,0.0002048711,0.001105616,0.0007330214,0.000100107,0.0003783091],"category_scores_gemma":[0.000621676,0.00005666784,0.00003812394,0.00330358,0.000150708,0.007022476,0.0006826519,0.0003924564,0.0001979852],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001064422,"about_ca_system_score_gemma":0.0001247659,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006381617,"about_ca_topic_score_gemma":0.00009472696,"domain_scores_codex":[0.9987561,0.00001802792,0.0006400056,0.00007387797,0.0003340082,0.0001780113],"domain_scores_gemma":[0.9982947,0.00003834402,0.0004371708,0.0001349976,0.00108492,0.000009945001],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001722782,0.0000483109,0.3075266,0.00005345738,0.0001027929,0.00001689064,0.0007738639,0.0003559118,0.0004210894,0.0501097,0.02842238,0.6119967],"study_design_scores_gemma":[0.002751309,0.0001132068,0.3481483,0.0005139946,0.0000994246,0.001124768,0.05961755,0.002106517,0.01287642,0.1156192,0.4564519,0.0005774174],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9812782,0.00001593682,0.001156571,0.011977,0.0004844512,0.0001477159,7.391411e-7,0.00001445746,0.004924937],"genre_scores_gemma":[0.9963303,0.0000522851,0.00195145,0.001447509,0.0001716982,0.000008377558,0.000005025512,0.000003768184,0.00002957015],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6114193,"threshold_uncertainty_score":0.9999313,"prediction_status":"machine_predicted_unvalidated"},"labels":[{"model":"gemma","categories":["metaresearch","open_science"],"domain":"reporting","study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics","scholarly_communication","open_science"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"medium"}],"label_agreement":"split"},{"id":"W4402703473","doi":"10.36680/j.itcon.2024.053","title":"From NLP to Taxonomy: Identifying and Classifying Key Functionality Concepts of Multi-level Project Planning and Control Systems","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Business Process Modeling and Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Agence Nationale de la Recherche","keywords":"Taxonomy (biology); Computer science; Key (lock); Artificial intelligence; Natural language processing; Information retrieval; Biology","authors":[{"name":"Moslem Sheikhkhoshkar","is_ca":false},{"name":"Hind Bril El Haouzi","is_ca":false},{"name":"Alexis Aubry","is_ca":false},{"name":"Farook Hamzeh","is_ca":true},{"name":"Farzad Pour Rahimian","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.058454173091675,"gpt":0.2924758451990114,"spread":0.2340216721073364,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004739992,0.00009863781,0.0002643386,0.001809541,0.00007470476,0.0002647963,0.00007527797,0.0001333518,0.000003420137],"category_scores_gemma":[0.000206216,0.00008745108,0.00003259819,0.000694139,0.00009491546,0.002674188,0.00004264117,0.0002316781,0.000002219238],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004283886,"about_ca_system_score_gemma":0.00005465136,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002272776,"about_ca_topic_score_gemma":0.000006018324,"domain_scores_codex":[0.9989399,0.000008277551,0.0007154727,0.00009357854,0.000147794,0.00009502924],"domain_scores_gemma":[0.9989156,0.000044174,0.0005913467,0.00005806186,0.0003828692,0.000007934444],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003165545,0.00005386833,0.3151926,0.002891538,0.0006013361,0.00002043329,0.001618165,0.0192988,0.004333707,0.02149585,0.0003609359,0.6338162],"study_design_scores_gemma":[0.00444153,0.00005932695,0.02554878,0.00530725,0.0005408333,0.0003871023,0.04974133,0.8952429,0.0007404016,0.009112792,0.008283152,0.0005945601],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5384434,0.000946348,0.4592437,0.0005812894,0.0005455437,0.0001434387,0.00000859242,0.00004774364,0.00003992233],"genre_scores_gemma":[0.9945908,0.00002525302,0.005144993,0.00005833175,0.0001583987,0.000009929606,0.000005665285,0.000004345053,0.000002330204],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8759441,"threshold_uncertainty_score":0.3566152,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4284899645","doi":"10.36680/j.itcon.2022.031","title":"An earned-value-analysis (EVA)-based project control framework in large-scale scaffolding projects using linear regression modeling","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Earned value management; Schedule; Productivity; Computer science; Project management; Scale (ratio); Scaffold; Engineering; Industrial engineering; Systems engineering; Operations research; Project planning; OPM3","authors":[{"name":"Zhen Lei","is_ca":true},{"name":"Yongde Hu","is_ca":true},{"name":"Jialiang Hua","is_ca":true},{"name":"Brandon Marton","is_ca":true},{"name":"Noah Marton Peter Goldberg","is_ca":true},{"name":"Noah Marton","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01029885393373263,"gpt":0.2622751645378014,"spread":0.2519763106040688,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008938323,0.0001633463,0.0003758025,0.005367152,0.0001842656,0.00004808509,0.0002086871,0.0002943433,0.00003409493],"category_scores_gemma":[0.00009951542,0.0001622743,0.0001223912,0.002815953,0.00005273469,0.001396393,0.00002116924,0.001054836,8.39601e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005799502,"about_ca_system_score_gemma":0.0001954036,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000244335,"about_ca_topic_score_gemma":0.00001657731,"domain_scores_codex":[0.9980527,0.000116205,0.001131466,0.0001097723,0.000354456,0.0002354209],"domain_scores_gemma":[0.9990004,0.00003292855,0.000528647,0.0001982999,0.0002077021,0.00003197082],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008614712,0.00002840871,0.02382735,0.00002018341,0.00006071709,0.000002942237,0.0005590872,0.9607036,0.0009242632,0.001812572,0.000003111045,0.01197164],"study_design_scores_gemma":[0.001096018,0.00009923409,0.0001637706,0.00009906242,0.0000919846,0.0001999819,0.009474494,0.9849226,0.001892088,0.001763798,0.00004632873,0.0001506812],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5436639,0.00005233456,0.455553,0.00008629052,0.0003658981,0.0001576467,0.00000796631,0.00008625576,0.00002666827],"genre_scores_gemma":[0.9299853,0.00001832939,0.0698673,0.00004169276,0.00004188777,0.00002135691,0.00001301407,0.00001078738,2.936758e-7],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3863214,"threshold_uncertainty_score":0.6617352,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W135582993","doi":"","title":"Editorial - Use of Gaming Technology in Architecture, Engineering and Construction","year":2011,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Scope (computer science); Architecture; Engineering; Multimedia; Visualization; Engineering management; Computer science","authors":[{"name":"Pathmeswaran Raju","is_ca":false},{"name":"Chimay Anumba","is_ca":false},{"name":"Vian Ahmed","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003169617475852064,"gpt":0.1802410623213675,"spread":0.1770714448455154,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0003370291,0.0003085324,0.0006524601,0.007478985,0.00002982201,0.00004617187,0.0002117087,0.002464089,0.000008769424],"category_scores_gemma":[0.001061147,0.0003261284,0.00007589962,0.00121974,0.0003790485,0.001441108,0.00004531391,0.002480146,0.000001540172],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003037485,"about_ca_system_score_gemma":0.0001916854,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002254218,"about_ca_topic_score_gemma":0.00001899204,"domain_scores_codex":[0.9974527,0.00002416194,0.001784061,0.000127372,0.0003706555,0.0002410838],"domain_scores_gemma":[0.9979411,0.0001526167,0.001052211,0.0001981395,0.0006163752,0.00003960589],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0004746008,0.00005983126,0.007056428,0.001328412,0.000412629,0.00001619134,0.001006209,0.01411017,0.004246515,0.03649437,0.1274916,0.8073031],"study_design_scores_gemma":[0.006824582,0.0008514892,0.0003766294,0.00433947,0.0002523997,0.003382982,0.003609648,0.006264548,0.03273956,0.05552458,0.884155,0.001679061],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"editorial","genre_gemma":"editorial","genre_scores_codex":[0.03208439,0.0003104508,0.01814079,0.00005515318,0.9488984,0.0002307035,0.00003795951,0.000174381,0.00006773545],"genre_scores_gemma":[0.1023676,0.00593401,0.1803119,0.000007950082,0.711036,0.0000749764,0.000122268,0.000138013,0.00000726441],"genre_candidate":"editorial","genre_consensus":"editorial","teacher_disagreement_score":0.805624,"threshold_uncertainty_score":0.9999191,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W958625388","doi":"","title":"Editorial: special issue on use of virtual world technology in architecture, engineering and construction","year":2011,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Metaverse; Virtual world; Architecture; Virtual reality; Dominance (genetics); Visualization; Computer science; Engineering; World Wide Web; Multimedia; Human–computer interaction; Geography","authors":[{"name":"Pathmeswaran Raju","is_ca":false},{"name":"Vian Ahmed","is_ca":false},{"name":"Chimay Anumba","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003383589176464001,"gpt":0.1873349206994785,"spread":0.1839513315230145,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0003219156,0.0003646392,0.0007203968,0.010509,0.00003480967,0.00005322135,0.0002395646,0.002084024,0.00003812961],"category_scores_gemma":[0.0009344977,0.0003795433,0.00008570115,0.001588876,0.0004210298,0.001144936,0.00004257883,0.002918205,0.000006159317],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003844366,"about_ca_system_score_gemma":0.0001748212,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000152542,"about_ca_topic_score_gemma":0.00005046675,"domain_scores_codex":[0.9972836,0.00003041203,0.001816325,0.0001540862,0.0004582472,0.000257353],"domain_scores_gemma":[0.9979317,0.0001971342,0.001051615,0.0002291646,0.00054301,0.0000473629],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0004324485,0.00004124625,0.001134163,0.0002700388,0.0001689198,0.000007890033,0.0003608141,0.009022586,0.0004334805,0.033661,0.3727876,0.5816798],"study_design_scores_gemma":[0.001824285,0.0004429996,0.00007260589,0.001074716,0.00005419373,0.000376726,0.0007453191,0.0006287964,0.007248288,0.009754417,0.9773202,0.0004574813],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"editorial","genre_gemma":"editorial","genre_scores_codex":[0.01073264,0.00008107856,0.003338991,0.0001103381,0.9848836,0.0002666006,0.00005147206,0.0001678653,0.00036739],"genre_scores_gemma":[0.009255035,0.001253923,0.02157622,0.000007230609,0.9677513,0.00002888835,0.00005075645,0.00005940198,0.00001721346],"genre_candidate":"editorial","genre_consensus":"editorial","teacher_disagreement_score":0.6045325,"threshold_uncertainty_score":0.9998657,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W7128178412","doi":"10.36680/j.itcon.2025.046","title":"Decentralized and Collaborative Information Management System in Construction Contract Administration: A change management case study","year":2025,"lang":"","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Smart contract; Ontology; Information management; Context (archaeology); Information system; Process (computing); Management information systems; Blockchain; Information security management","authors":[{"name":"Navid Torkanfar","is_ca":true},{"name":"Ehsan Rezazadeh Azar","is_ca":true},{"name":"Brenda McCabe","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005514737249226615,"gpt":0.2369117797793338,"spread":0.2313970425301071,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009556151,0.0004365322,0.0007088286,0.00720743,0.0002215867,0.0003592148,0.0002058061,0.0006078776,0.00002288566],"category_scores_gemma":[0.00005843952,0.0004773456,0.00008312041,0.003595134,0.0003184162,0.006418646,0.0000765064,0.0008860144,0.000008051788],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001392813,"about_ca_system_score_gemma":0.0001917143,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005500808,"about_ca_topic_score_gemma":0.0001646872,"domain_scores_codex":[0.9954258,0.0001679537,0.003424164,0.0001968909,0.000412725,0.0003724435],"domain_scores_gemma":[0.9971437,0.00005717273,0.001646011,0.0002884895,0.0007814199,0.0000832441],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"qualitative","study_design_scores_codex":[0.0005244408,0.0001161183,0.02967134,0.001107922,0.000457812,0.0005170692,0.003023634,0.0004500548,0.000005163996,0.1689918,0.00003398072,0.7951007],"study_design_scores_gemma":[0.02296993,0.001050813,0.02070791,0.00430893,0.0008071117,0.04177183,0.8764393,0.02013286,0.0009003293,0.003934979,0.006077133,0.0008989109],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8979295,0.001358759,0.08206285,0.001223268,0.006988921,0.005440838,0.00005377043,0.0002477382,0.004694286],"genre_scores_gemma":[0.9798424,0.002241076,0.01760976,0.00004644659,0.0000398814,0.0001931167,0.00001439942,0.000009036728,0.000003903693],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8734156,"threshold_uncertainty_score":0.9997678,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2154614316","doi":"","title":"COMPUTER-AIDED MODELING APPLIED TO ARCHITECTURAL KNOW-HOW: THE GOTHIC ROSE WINDOW","year":2006,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Architecture and Art History Studies","field":"Arts and Humanities","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"GRASP; TRACE (psycholinguistics); Window (computing); Process (computing); Computer science; Software; Interface (matter); Computer Aided Design; Software engineering; Engineering; Human–computer interaction; Architectural engineering; World Wide Web; Programming language","authors":[{"name":"Nathalie Charbonneau","is_ca":false},{"name":"Dominic Boulerice","is_ca":false},{"name":"David Booth","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008542302820292622,"gpt":0.1852186608017844,"spread":0.1766763579814918,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002041693,0.0001098301,0.000188349,0.0008271446,0.0003395213,0.000068585,0.0001821065,0.00006345057,0.00001379251],"category_scores_gemma":[0.00002642492,0.00007394208,0.00005640834,0.0001312699,0.0003088891,0.0003764896,0.00004871357,0.0004025264,0.00001414449],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007566254,"about_ca_system_score_gemma":0.00003210059,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001867145,"about_ca_topic_score_gemma":0.0001804733,"domain_scores_codex":[0.9991164,0.00001786078,0.0005108182,0.0000546646,0.0001537976,0.0001464207],"domain_scores_gemma":[0.9993296,0.00003463071,0.0003444074,0.0001036313,0.0001708889,0.00001678664],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001372505,0.00003109906,0.0005347828,0.00002988552,0.0000631931,0.000003547372,0.02952074,0.06749637,0.0003628784,0.3767591,0.002068483,0.5229927],"study_design_scores_gemma":[0.005909706,0.001375296,0.002633897,0.0005848969,0.0001723676,0.002924448,0.09208307,0.03786335,0.005058356,0.3550114,0.4949264,0.001456841],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8670364,0.0002094914,0.1091713,0.01571394,0.001500186,0.0003453972,0.000005893909,0.0001217392,0.005895681],"genre_scores_gemma":[0.9940673,0.000007815534,0.005187421,0.0002854214,0.0004071689,0.000005767539,0.00000202504,0.000004317808,0.00003283602],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5215358,"threshold_uncertainty_score":0.3015271,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4411805355","doi":"10.36680/j.itcon.2025.044","title":"Process time estimation for workstations in modular construction production line","year":2025,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Workstation; Modular design; Production (economics); Process (computing); Production line; Estimation; Computer science; Line (geometry); Engineering; Manufacturing engineering; Industrial engineering; Systems engineering; Engineering drawing; Mechanical engineering; Operating system; Mathematics","authors":[{"name":"Angat Pal Singh Bhatia","is_ca":false},{"name":"Osama Moselhi","is_ca":true},{"name":"SangHyeok Han","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.002803335195913912,"gpt":0.2199780160392228,"spread":0.2171746808433088,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002946656,0.0001089736,0.0001954314,0.002481849,0.00005455761,0.0000346345,0.0000968951,0.0002281799,0.000006269073],"category_scores_gemma":[0.0003593268,0.0001164478,0.00003253769,0.001108699,0.00007034664,0.001615826,0.00000688967,0.000274901,0.000002273802],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002153139,"about_ca_system_score_gemma":0.00008067553,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001149424,"about_ca_topic_score_gemma":0.000003533539,"domain_scores_codex":[0.9988338,0.00001027108,0.0008527156,0.00007006856,0.0001050952,0.0001280609],"domain_scores_gemma":[0.9991872,0.00002694695,0.0003272892,0.00008930778,0.0003545316,0.00001471983],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004008082,0.00001260544,0.001129014,0.0001638867,0.00001413075,1.937787e-7,0.0001426842,0.8290884,0.0001730749,0.0023472,0.00003116897,0.1668575],"study_design_scores_gemma":[0.001490516,0.00007369262,0.001809988,0.0005270481,0.0000305144,0.0001370313,0.001182154,0.86928,0.05464884,0.07038996,0.0002468928,0.000183382],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.331273,0.00006026009,0.6662948,0.0009329873,0.0007805573,0.0003623583,0.000003211512,0.0001195726,0.000173279],"genre_scores_gemma":[0.9178609,0.0001023545,0.08191733,0.00001172697,0.00002852802,0.00003898624,0.0000245613,0.000006553483,0.000009105073],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5865879,"threshold_uncertainty_score":0.4748604,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4413982218","doi":"10.36680/j.itcon.2025.056","title":"A Deployable Solution for Indoor Tracking of Workers in Construction Sites through Bluetooth Low Energy Technology","year":2025,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Indoor and Outdoor Localization Technologies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bluetooth Low Energy; Bluetooth; Architectural engineering; Tracking (education); Engineering; Low energy; Energy (signal processing); Systems engineering; Automotive engineering; Embedded system; Computer science; Civil engineering; Telecommunications; Wireless; Physics","authors":[{"name":"Mohammadali Khazen","is_ca":true},{"name":"Mazdak Nik‐Bakht","is_ca":true},{"name":"Osama Moselhi","is_ca":true},{"name":"Jeffrey Dungen","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005253542803384822,"gpt":0.2200820198336596,"spread":0.2148284770302748,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002899504,0.0001832471,0.0004353741,0.004744755,0.0000697123,0.00002783771,0.0002692443,0.000799443,0.000006235124],"category_scores_gemma":[0.0004832314,0.0001938348,0.00008436714,0.002736731,0.0004077638,0.00137233,0.00003907711,0.0004778078,9.334829e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003822139,"about_ca_system_score_gemma":0.0001446202,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002089764,"about_ca_topic_score_gemma":0.00006191358,"domain_scores_codex":[0.9980468,0.00001778631,0.001412829,0.0001026788,0.0001427163,0.0002771606],"domain_scores_gemma":[0.9986778,0.00007307754,0.0006280341,0.0001852916,0.0004221693,0.00001360166],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0002265146,0.00006501058,0.1675297,0.0004567612,0.0001522161,0.00000373768,0.000352964,0.02885982,0.01119472,0.1956513,0.000489897,0.5950173],"study_design_scores_gemma":[0.004282419,0.0002518711,0.001588108,0.001077601,0.00005982559,0.0003959545,0.01366715,0.03669327,0.7309688,0.2087759,0.001856586,0.0003824549],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3324738,0.000328896,0.6648583,0.0006890859,0.0007604677,0.0002410625,0.000007118927,0.0003233622,0.0003178053],"genre_scores_gemma":[0.9495409,0.0003670004,0.04999728,0.00002637589,0.00001618943,0.00003010329,0.000008504031,0.00001073106,0.000002980188],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7197741,"threshold_uncertainty_score":0.7904354,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2583128632","doi":"","title":"Editorial - Technology Strategies for Collaborative Working","year":2010,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Interoperability; Context (archaeology); Productivity; Workforce; Business; Information and Communications Technology; Knowledge management; Best practice; Engineering; Process management; Engineering management; Management; Political science; Economic growth; Computer science; Economics","authors":[{"name":"Kirti Ruikar","is_ca":false},{"name":"Stephen Emmitt","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.003260751857332548,"gpt":0.2170475122511115,"spread":0.213786760393779,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0004264796,0.0003040752,0.0005586302,0.003242853,0.0001011488,0.0001742576,0.0003819235,0.004449079,0.00001363018],"category_scores_gemma":[0.0008029843,0.0003052424,0.0001067079,0.001379266,0.0003552439,0.00162147,0.00002447524,0.003246157,0.000006607041],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003537863,"about_ca_system_score_gemma":0.0009707928,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001838422,"about_ca_topic_score_gemma":0.00003574818,"domain_scores_codex":[0.9977237,0.00001621818,0.001464351,0.0001115314,0.0004260098,0.0002581689],"domain_scores_gemma":[0.9962322,0.0001756268,0.00120055,0.0002009049,0.002154997,0.00003573348],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00009634598,0.000008106761,0.00004525178,0.000087824,0.00009402374,8.307367e-7,0.0001399721,0.000524332,0.0004694954,0.02410333,0.843502,0.1309285],"study_design_scores_gemma":[0.001200282,0.0001725322,9.289766e-7,0.0002249245,0.00004564003,0.00009197215,0.004850549,0.0002752601,0.002239339,0.05254593,0.938099,0.0002536959],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"editorial","genre_gemma":"editorial","genre_scores_codex":[0.0006010565,0.0002181188,0.03938207,0.0002031356,0.9582873,0.0003274378,0.00006743692,0.0002692445,0.0006441846],"genre_scores_gemma":[0.007277311,0.0005581005,0.02817564,0.000004535572,0.9637638,0.00008676988,0.00009360448,0.00003432629,0.000005887137],"genre_candidate":"editorial","genre_consensus":"editorial","teacher_disagreement_score":0.1306748,"threshold_uncertainty_score":0.99994,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}