{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":14,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":14,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"9c3ad8527e55","filters":{"venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction"}},"results":[{"id":"W1993849568","doi":"10.1061/(asce)la.1943-4170.0000034","title":"Considering Attitudes in Strategic Negotiation over Brownfield Disputes","year":2010,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Brownfield; Negotiation; Computer science; Order (exchange); Process (computing); Management science; Process management; Negotiation theory; Conflict resolution; Decision support system; Operations research; Risk analysis (engineering); Knowledge management; Business; Engineering; Artificial intelligence; Political science; Civil engineering; Law","authors":[{"name":"Saied Yousefi","is_ca":true},{"name":"Keith W. Hipel","is_ca":true},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02124160205001813,"gpt":0.2805425876577525,"spread":0.2593009856077344,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01505031,0.0005395986,0.0003940991,0.002194286,0.001812956,0.00449429,0.001203009,0.00146231,0.002672602],"category_scores_gemma":[0.03513679,0.0003784584,0.000675509,0.001876561,0.004172538,0.006812047,0.002574687,0.001459908,0.0002373038],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00213389,"about_ca_system_score_gemma":0.001591421,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001911146,"about_ca_topic_score_gemma":0.00208512,"domain_scores_codex":[0.9855402,0.01154516,0.0004873124,0.0005038461,0.001471334,0.0004519911],"domain_scores_gemma":[0.974224,0.02150922,0.001757438,0.0005542171,0.001450368,0.0005048038],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","study_design_scores_codex":[0.0003655136,0.0002386385,0.008430991,0.0003841085,0.00009965558,0.0008866099,0.02765404,0.07002461,0.004596826,0.7265097,0.00098688,0.1598224],"study_design_scores_gemma":[0.0001112436,0.0002985422,0.004826302,0.0001989298,0.00009942891,0.0003705985,0.02785737,0.3884964,0.004177331,0.5592921,0.01410233,0.0001694755],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2662069,0.0003009254,0.7034101,0.001334614,0.000100909,0.0003560059,0.00002688121,0.00009048232,0.0281731],"genre_scores_gemma":[0.8911769,0.0001351215,0.1072016,0.00007507495,0.0000202068,0.000153322,0.00002192646,0.00001460361,0.001201337],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01505031,"threshold_uncertainty_score":0.07959455,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2805325611","doi":"10.1061/(asce)la.1943-4170.0000267","title":"Visualization of Delay Claim Analysis Using 4D Simulation","year":2018,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Critical path method; Context (archaeology); Computer science; Visualization; Schedule; Path (computing); Operations research; Data mining; Systems engineering; Engineering","authors":[{"name":"Michel Guévremont","is_ca":false},{"name":"Amin Hammad","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006555455917501233,"gpt":0.2305700170949121,"spread":0.2240145611774109,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006565833,0.0007786516,0.0004334643,0.002228813,0.0004319201,0.001575435,0.0006217586,0.001034668,0.01171101],"category_scores_gemma":[0.002005544,0.0002967923,0.0007163166,0.001053739,0.0004467478,0.0007610132,0.001200234,0.0006315991,0.0007764387],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007135801,"about_ca_system_score_gemma":0.001158915,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004277743,"about_ca_topic_score_gemma":0.002687443,"domain_scores_codex":[0.9996489,0.00008900562,0.00002692304,0.00003634741,0.0001626122,0.00003612979],"domain_scores_gemma":[0.9988881,0.0006606812,0.00007614466,0.000100368,0.0002225637,0.0000522061],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0004495726,0.0001883939,0.006183351,0.0007063475,0.00008251587,0.0009435402,0.002954507,0.8032348,0.02974417,0.04752796,0.008881086,0.0991037],"study_design_scores_gemma":[0.0000455572,0.00006762667,0.001681455,0.0001144273,0.00002983728,0.0001655351,0.0004954411,0.9519399,0.009964691,0.009886768,0.02554061,0.00006814498],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.166291,0.0005246092,0.7841896,0.001185793,0.00029629,0.0003312757,0.002969396,0.007145613,0.03706646],"genre_scores_gemma":[0.7595933,0.0006767366,0.2298903,0.0001452743,0.00004443875,0.0003447997,0.001522106,0.0005835136,0.007199401],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01171101,"threshold_uncertainty_score":0.03917718,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3011216540","doi":"10.1061/(asce)la.1943-4170.0000391","title":"Review and Survey of 4D Simulation Applications in Forensic Investigation of Delay Claims in Construction Projects","year":2020,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Viewpoints; Argument (complex analysis); Computer science; Scope (computer science); Stakeholder; Dispute resolution; Event (particle physics); Risk analysis (engineering); Operations research; Law; Engineering; Business; Political science","authors":[{"name":"Michel Guévremont","is_ca":true},{"name":"Amin Hammad","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01330032548615035,"gpt":0.2156971594177745,"spread":0.2023968339316241,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007593886,0.0007217154,0.001167377,0.0125569,0.0007883204,0.002642498,0.002081513,0.00199595,0.00426552],"category_scores_gemma":[0.02757688,0.0007379287,0.001369028,0.01250048,0.001318817,0.002644662,0.001342328,0.0008361632,0.000993063],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001535789,"about_ca_system_score_gemma":0.004569947,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006461913,"about_ca_topic_score_gemma":0.009146724,"domain_scores_codex":[0.9939032,0.002632394,0.001322447,0.0004351378,0.00155717,0.0001494795],"domain_scores_gemma":[0.9575374,0.03525999,0.002116676,0.0007165398,0.004068825,0.000300692],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00013548,0.00007811266,0.004760972,0.06950381,0.0002131452,0.0005929498,0.002095536,0.001116508,0.0007166654,0.003644638,0.01259929,0.9045429],"study_design_scores_gemma":[0.00002842794,0.0002953047,0.0199291,0.1706375,0.001331625,0.005338804,0.004995049,0.001586218,0.002291637,0.003620595,0.7897744,0.0001712365],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.002983363,0.9889821,0.002300432,0.0007199462,0.0001784339,0.00007674856,0.0001537021,0.00003186084,0.004573338],"genre_scores_gemma":[0.01525759,0.9809726,0.002841616,0.0002713244,0.0001123031,0.00006322125,0.0001564741,0.00001625058,0.0003085279],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.0125569,"threshold_uncertainty_score":0.04016078,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3191066931","doi":"10.1061/(asce)la.1943-4170.0000489","title":"Ontology for Linking Delay Claims with 4D Simulation to Analyze Effects-Causes and Responsibilities","year":2021,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Computer science; GRASP; Causality (physics); Negotiation; Workbench; Taxonomy (biology); Multidisciplinary approach; Liability; Risk analysis (engineering); Knowledge management; Data mining; Visualization; Software engineering; Law; Accounting; Business","authors":[{"name":"Michel Guévremont","is_ca":true},{"name":"Amin Hammad","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004404616675288333,"gpt":0.2102598186231462,"spread":0.2058552019478579,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020432,0.001026771,0.0005851793,0.006857816,0.001750879,0.004500193,0.001623663,0.001473707,0.006023793],"category_scores_gemma":[0.005078365,0.0005716254,0.00312657,0.004782259,0.001952672,0.006147294,0.00489237,0.002002317,0.001027137],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002603789,"about_ca_system_score_gemma":0.004574107,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0154808,"about_ca_topic_score_gemma":0.01748085,"domain_scores_codex":[0.9980739,0.0004565488,0.000341071,0.0002735524,0.0007166824,0.000138067],"domain_scores_gemma":[0.9982396,0.0006767312,0.0002009847,0.0004116103,0.0003474433,0.0001235427],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007860439,0.0002355973,0.005165191,0.0008293324,0.0001434121,0.0008346537,0.007309629,0.03236512,0.006153847,0.779272,0.01449654,0.1531159],"study_design_scores_gemma":[0.00004791918,0.00004147953,0.002625792,0.0006983522,0.0002285435,0.0008161376,0.00424956,0.2149663,0.006245156,0.3795106,0.3904297,0.0001402464],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.006258856,0.0002181198,0.9668161,0.0005847362,0.00009506883,0.0003810253,0.002010984,0.001864725,0.0217705],"genre_scores_gemma":[0.07799211,0.0008839706,0.9103291,0.0001860127,0.00003023529,0.0007568265,0.005010375,0.0004472019,0.004364194],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.0154808,"threshold_uncertainty_score":0.03078139,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2000734092","doi":"10.1061/(asce)la.1943-4170.0000134","title":"Concurrent Delays in Construction: International Legal Perspective","year":2013,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Apportionment; Damages; Business; Perspective (graphical); Law; Term (time); Breach of contract; Political science; Computer science","authors":[{"name":"Farrukh Arif","is_ca":false},{"name":"Ayman A. Morad","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01402566161470264,"gpt":0.2745337551130599,"spread":0.2605080934983572,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003737625,0.0005398309,0.0003559927,0.005147363,0.004612501,0.01048323,0.001219667,0.00529226,0.005379419],"category_scores_gemma":[0.004838021,0.0002973497,0.0006608382,0.005207018,0.01526952,0.007112857,0.003133206,0.005223613,0.0003949013],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.01266258,"about_ca_system_score_gemma":0.008158027,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02329074,"about_ca_topic_score_gemma":0.01787366,"domain_scores_codex":[0.9965876,0.001200147,0.0002140163,0.0004145796,0.0009904567,0.0005931985],"domain_scores_gemma":[0.9956156,0.002565296,0.0005836441,0.0002685038,0.0007637621,0.0002031826],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000003304569,0.00001222863,0.0002992613,0.00003798938,0.000001789553,0.000086063,0.0009072003,0.0005147042,0.0000329036,0.9901447,0.001317094,0.006642646],"study_design_scores_gemma":[0.000009938908,0.0000864696,0.003976193,0.001400744,0.00003232631,0.0009234902,0.00722961,0.002971506,0.0004300971,0.5119835,0.4709006,0.0000556292],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"other","genre_gemma":"other","genre_scores_codex":[0.01859719,0.04937551,0.01728677,0.02344715,0.0006426329,0.00004450055,0.00007552882,0.00003084418,0.8904998],"genre_scores_gemma":[0.8845835,0.06269187,0.01190637,0.004292555,0.001541137,0.0001136235,0.00008223032,0.00004649169,0.03474215],"genre_candidate":"other","genre_consensus":"other","teacher_disagreement_score":0.02329074,"threshold_uncertainty_score":0.09187382,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3005950680","doi":"10.1061/(asce)la.1943-4170.0000378","title":"Improving Concurrency Assessment and Resolving Misconceptions about But-For Delay Analysis Technique","year":2020,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Network Traffic and Congestion Control","field":"Computer Science","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Concurrency; Computer science; Reliability engineering; Programming language; Engineering","authors":[{"name":"Moneer Bhih","is_ca":false},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006239242962251285,"gpt":0.2217282029730976,"spread":0.2154889600108463,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02957094,0.001523106,0.001462475,0.004220934,0.002024656,0.007814769,0.003595274,0.001303357,0.004995421],"category_scores_gemma":[0.1108732,0.0008468864,0.001667361,0.002249242,0.003277734,0.01271975,0.004200462,0.004254727,0.0007794519],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003658338,"about_ca_system_score_gemma":0.006557374,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005717443,"about_ca_topic_score_gemma":0.004972068,"domain_scores_codex":[0.9633833,0.01535033,0.002608098,0.004156916,0.01232802,0.002173254],"domain_scores_gemma":[0.9076446,0.05255486,0.008171001,0.01197186,0.01886632,0.000791283],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0006082102,0.0002047125,0.01089897,0.0007406486,0.0002164959,0.0006592788,0.005736557,0.06092784,0.01640193,0.4963621,0.004445282,0.4027981],"study_design_scores_gemma":[0.000108801,0.0004805243,0.004055397,0.0006743115,0.0003455233,0.0008815878,0.003132958,0.4432895,0.04748209,0.4583366,0.04082265,0.0003899459],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01134265,0.0001893947,0.982734,0.0005154463,0.0001262907,0.0001229822,0.00004832968,0.0007029902,0.004217833],"genre_scores_gemma":[0.3616316,0.000259365,0.6345906,0.0002195333,0.0000707895,0.000178492,0.0001153281,0.0004494514,0.00248481],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.02957094,"threshold_uncertainty_score":0.1563879,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3006753349","doi":"10.1061/(asce)la.1943-4170.0000388","title":"Characteristics of Stipends and Their Value-Adding Potential in Design-Build US Highway Construction","year":2020,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"","keywords":"Stipend; Procurement; Agency (philosophy); Competition (biology); Process (computing); Work (physics); Value (mathematics); Funding Agency; Business; Finance; Computer science; Engineering; Marketing","authors":[{"name":"Douglas Alleman","is_ca":false},{"name":"M. Scott Stanford","is_ca":false},{"name":"Dean Papajohn","is_ca":false},{"name":"Gabriel Jobidon","is_ca":true},{"name":"Keith R. Molenaar","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01878310457725002,"gpt":0.2416275187227361,"spread":0.2228444141454861,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01588028,0.0001906666,0.0001696527,0.001910797,0.002368941,0.004776678,0.001173563,0.000821425,0.005809474],"category_scores_gemma":[0.07402233,0.0004854019,0.0003178713,0.002219748,0.002287224,0.002927774,0.002884073,0.001121117,0.0006300588],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.004303826,"about_ca_system_score_gemma":0.003762844,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003034566,"about_ca_topic_score_gemma":0.007002088,"domain_scores_codex":[0.9799239,0.01149826,0.001093843,0.000645364,0.005176196,0.001662344],"domain_scores_gemma":[0.9148542,0.05241378,0.01313229,0.004979651,0.008929096,0.005691075],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0008000609,0.001504036,0.6602119,0.0005133353,0.00008016051,0.000983323,0.05820155,0.006761722,0.005881842,0.05240285,0.003429621,0.2092297],"study_design_scores_gemma":[0.00003615967,0.0008918971,0.8159099,0.000413041,0.00004864085,0.0009429991,0.10783,0.007194452,0.003414716,0.01754912,0.04561996,0.0001490143],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9724114,0.0001396421,0.00305534,0.000367343,0.00001034269,0.0001282124,0.0000590342,0.00003471064,0.02379403],"genre_scores_gemma":[0.9966515,0.00005153441,0.001978119,0.0000216892,0.000003853727,0.00004908888,0.00004544979,0.00001325384,0.001185583],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01588028,"threshold_uncertainty_score":0.08398396,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4365140265","doi":"10.1061/jladah.ladr-948","title":"System Dynamics as an Assistive Tool to Delay Analysis in Identifying Productivity Losses","year":2023,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Complement (music); System dynamics; Computer science; Change order; Order (exchange); Industrial engineering; Operations research; Risk analysis (engineering); Reliability engineering; Systems engineering; Project management; Engineering; Economics; Business; Artificial intelligence; Project planning","authors":[{"name":"Shrouk Gharib","is_ca":true},{"name":"Ossama Hosny","is_ca":false},{"name":"Ahmed F. Waly","is_ca":false},{"name":"Ibrahim Abotaleb","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01900701687505179,"gpt":0.2951036740359024,"spread":0.2760966571608506,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001809599,0.001064338,0.0006398655,0.002274462,0.0004844306,0.001446633,0.0006351519,0.0007762468,0.004614467],"category_scores_gemma":[0.006321418,0.0004488349,0.0008300673,0.001088335,0.0007210054,0.001918182,0.001360576,0.001374128,0.0003442667],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009634541,"about_ca_system_score_gemma":0.001372726,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005330959,"about_ca_topic_score_gemma":0.003181798,"domain_scores_codex":[0.9993236,0.0002931164,0.00004563714,0.0001119981,0.0001785564,0.0000471351],"domain_scores_gemma":[0.9965749,0.002547481,0.0003565274,0.0001470974,0.00031999,0.00005397684],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000480661,0.00005226988,0.004180237,0.0001664344,0.0000480446,0.0001400362,0.0002486288,0.9154102,0.00305684,0.04573039,0.0006417318,0.03027712],"study_design_scores_gemma":[0.000004532495,0.00003738317,0.0004642091,0.00002294512,0.000009366261,0.00002998905,0.00008908948,0.9850218,0.0007462608,0.01183715,0.001725314,0.00001193409],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01611949,0.000118077,0.9804325,0.0001553706,0.00002655102,0.00006347775,0.0001467632,0.0002710556,0.002666708],"genre_scores_gemma":[0.7849199,0.0006350987,0.2107269,0.00007799947,0.00003690011,0.0003328772,0.0002968543,0.0001080557,0.002865595],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005330959,"threshold_uncertainty_score":0.01543695,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2158543786","doi":"10.1061/(asce)1943-4162(2009)1:2(67)","title":"Teaching Law on Engineering and Construction Programs","year":2009,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Legal Education and Practice Innovations","field":"Social Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Law; Patience; Publication; Dispute resolution; Revelation; Sociology; Political science; Engineering; Psychology","authors":[{"name":"Brodie McAdam","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009108507558005574,"gpt":0.2661414183617926,"spread":0.257032910803787,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003163303,0.0004169006,0.0003635442,0.001166507,0.005702383,0.005967373,0.0009084179,0.003306865,0.03191543],"category_scores_gemma":[0.009071782,0.000390694,0.0003133263,0.001130729,0.01043274,0.004844725,0.004302674,0.006757684,0.005702476],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.009557286,"about_ca_system_score_gemma":0.01676591,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01579307,"about_ca_topic_score_gemma":0.0462478,"domain_scores_codex":[0.9966698,0.001103356,0.0001185477,0.0002835778,0.001225835,0.0005989064],"domain_scores_gemma":[0.9943112,0.002639674,0.0004070319,0.0003592116,0.0006504798,0.001632342],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00001177161,0.0001841265,0.002484219,0.0002191079,0.000004302876,0.0001637856,0.011304,0.0002654268,0.0006312045,0.335082,0.5085149,0.1411351],"study_design_scores_gemma":[0.000003095257,0.00002845301,0.002433044,0.000281878,0.000001830079,0.00009220182,0.005054696,0.0001339859,0.0003022362,0.0230215,0.96864,0.000007098282],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.01898352,0.02584649,0.008171573,0.3605147,0.005878435,0.00006968372,0.0001173907,0.0003703556,0.580048],"genre_scores_gemma":[0.358504,0.02849333,0.005856519,0.0828325,0.005300318,0.0001424574,0.0001803219,0.0003312129,0.5183594],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.03191543,"threshold_uncertainty_score":0.1067677,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4388745081","doi":"10.1061/jladah.ladr-1059","title":"Evolvement of Excusable Delay Clauses in Government Contracts since the COVID-19 Pandemic","year":2023,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Law, Economics, and Judicial Systems","field":"Economics, Econometrics and Finance","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Coronavirus disease 2019 (COVID-19); Pandemic; Government (linguistics); 2019-20 coronavirus outbreak; Severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2); Business; Virology; Medicine; Disease; Outbreak","authors":[{"name":"Jung Hyun Lee","is_ca":false},{"name":"Yunping Liang","is_ca":true},{"name":"Seyed Mohammad Ehsan Tabatabaee","is_ca":true},{"name":"Bryce Riccitelli","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02024745126409833,"gpt":0.2115614357606682,"spread":0.1913139844965699,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01017945,0.000133958,0.0001745219,0.001559848,0.002503693,0.003807126,0.0008754873,0.00120681,0.002785628],"category_scores_gemma":[0.04951751,0.0003230288,0.0001807668,0.002619796,0.003776181,0.003943436,0.002611567,0.001810813,0.0003051638],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.01090449,"about_ca_system_score_gemma":0.008808756,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.03292685,"about_ca_topic_score_gemma":0.03531742,"domain_scores_codex":[0.9917027,0.003309639,0.0006831011,0.0006303921,0.002612929,0.001061225],"domain_scores_gemma":[0.9540405,0.02002295,0.01239981,0.002953195,0.008592609,0.001990991],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0003715842,0.000315375,0.3304798,0.0004315079,0.0000357364,0.002757947,0.3635884,0.00322621,0.008877739,0.1245314,0.007990126,0.1573943],"study_design_scores_gemma":[0.00002533475,0.0002227991,0.5054637,0.0006505715,0.00002495673,0.0011512,0.288963,0.00455539,0.003236797,0.009924338,0.1856119,0.0001699024],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9771757,0.0003496608,0.002259977,0.002824087,0.00004380188,0.00008100776,0.000223211,0.00002881202,0.01701377],"genre_scores_gemma":[0.9955986,0.0001927579,0.001232197,0.0002608939,0.00001690221,0.0000396547,0.0001648546,0.00002270046,0.002471537],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.03292685,"threshold_uncertainty_score":0.07911801,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4414354050","doi":"10.1061/jladah.ladr-1335","title":"Framework for 4D Simulation Collaboration in Construction Delay Claims","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec","funders":"","keywords":"Negotiation; Scheme (mathematics); Construction management; Construction industry; Key (lock)","authors":[{"name":"Michel Guévremont","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004342310570247853,"gpt":0.2348013242266912,"spread":0.2304590136564434,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009411304,0.001192048,0.000553573,0.005024248,0.002548771,0.006618098,0.003294067,0.003098937,0.01559184],"category_scores_gemma":[0.01247817,0.0007888647,0.002275653,0.002833191,0.00471,0.00511736,0.007059783,0.002264645,0.002524102],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.004570149,"about_ca_system_score_gemma":0.007746307,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01668909,"about_ca_topic_score_gemma":0.01196539,"domain_scores_codex":[0.9911953,0.00495764,0.0006806562,0.0009810511,0.001649767,0.00053562],"domain_scores_gemma":[0.9932863,0.003553876,0.000696252,0.0006531276,0.00133169,0.0004787121],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002319022,0.00006273852,0.001262826,0.0001495975,0.0000193523,0.0004236893,0.002216311,0.02258362,0.0004167086,0.9525772,0.002053354,0.01821144],"study_design_scores_gemma":[0.00008025538,0.0001360691,0.001124813,0.0008577554,0.00009134709,0.0007476141,0.004213264,0.2650591,0.001239611,0.545893,0.180441,0.0001161882],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.003433873,0.0003852491,0.9454678,0.001560158,0.0001183778,0.0005095886,0.0002280554,0.0004590146,0.04783799],"genre_scores_gemma":[0.1733709,0.000764318,0.8130125,0.0002663882,0.00008975784,0.00144326,0.0005501352,0.0001686145,0.01033421],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01668909,"threshold_uncertainty_score":0.05215985,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W7117310311","doi":"10.1061/jladah.ladr-1420","title":"Exploring Teaching Methods for Construction Contract Law Using Analytic Hierarchy Process","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"WSP (Canada)","funders":"","keywords":"Construction contract; Process (computing); Subject (documents); Hierarchy; Analytic hierarchy process; Rank (graph theory); Construction management; Construction industry","authors":[{"name":"D. A. Patel","is_ca":false},{"name":"Harshini S. Kolte","is_ca":true},{"name":"Ulrike Quapp","is_ca":false},{"name":"K. Holschemacher","is_ca":false},{"name":"K. A. Patel","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07719071824035535,"gpt":0.3895350119398864,"spread":0.312344293699531,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009471297,0.0005699745,0.000343267,0.002522605,0.001505871,0.003813507,0.001553211,0.000639918,0.004263023],"category_scores_gemma":[0.01595381,0.0002866657,0.0005685976,0.0025866,0.001674671,0.002371185,0.001969017,0.001976469,0.0006887902],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002934846,"about_ca_system_score_gemma":0.005401789,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002113384,"about_ca_topic_score_gemma":0.004015258,"domain_scores_codex":[0.9912976,0.005674599,0.0003089904,0.0004390851,0.001970071,0.0003097224],"domain_scores_gemma":[0.9825456,0.01413679,0.0009113157,0.0006792818,0.00133931,0.0003876301],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001505184,0.002326247,0.01412115,0.00206359,0.00005887976,0.0005557778,0.1021671,0.007697626,0.008824543,0.1008444,0.005014758,0.7561755],"study_design_scores_gemma":[0.000587794,0.00349041,0.03041538,0.004680972,0.0002065425,0.002432353,0.25769,0.1659376,0.03405007,0.2327785,0.2673984,0.0003321133],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2341044,0.0008395921,0.7036232,0.002794925,0.0001160182,0.003325992,0.0001975433,0.0003861941,0.05461223],"genre_scores_gemma":[0.402139,0.0009757692,0.5915347,0.0002476126,0.00002766812,0.001590855,0.0001057157,0.00005047018,0.003328085],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009471297,"threshold_uncertainty_score":0.0500896,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W7117316631","doi":"10.1061/jladah.ladr-1320","title":"Governance Strategies for Execution of Public Building Projects","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Victoria","funders":"","keywords":"Project governance; Corporate governance; Integrated project delivery; Transaction cost; Database transaction; Project management; Good governance; Building information modeling","authors":[{"name":"Olalekan Emmanuel Akintan","is_ca":false},{"name":"Victor Adetunji Arowoiya","is_ca":false},{"name":"Melissa Chan","is_ca":true},{"name":"David Kan","is_ca":true},{"name":"Wei Yang","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02547037696629685,"gpt":0.2941280663628407,"spread":0.2686576893965439,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006430113,0.0002253364,0.000132315,0.001543548,0.002133633,0.004416432,0.0005301751,0.0006579508,0.002659098],"category_scores_gemma":[0.009088631,0.000205037,0.0001703038,0.001600983,0.001682902,0.001835199,0.002565863,0.0006301392,0.0003071322],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002897911,"about_ca_system_score_gemma":0.007329506,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002982028,"about_ca_topic_score_gemma":0.00713228,"domain_scores_codex":[0.9931688,0.00368311,0.0005043045,0.0003897657,0.001210654,0.00104326],"domain_scores_gemma":[0.9936737,0.001355489,0.00223033,0.0005053658,0.001141006,0.001094244],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","study_design_scores_codex":[0.00009921203,0.000550719,0.1647599,0.0005551214,0.00009782882,0.002583252,0.02659172,0.02991975,0.006360874,0.3995503,0.008427764,0.3605036],"study_design_scores_gemma":[0.0001295036,0.001222849,0.2581368,0.001960205,0.0001300168,0.002346786,0.139989,0.05271764,0.008426277,0.2186898,0.3160338,0.0002172757],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7396026,0.001017983,0.09715167,0.005993031,0.00006223232,0.001639633,0.0001013927,0.0001462762,0.1542851],"genre_scores_gemma":[0.9843634,0.0002836476,0.01069082,0.00005857906,0.000008565531,0.0001445024,0.000028706,0.000009677568,0.004412138],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.006430113,"threshold_uncertainty_score":0.03400612,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4414351927","doi":"10.1061/jladah.ladr-1319","title":"Analysis of Three-Party Contracts and Their Impact on Project Costs and Timelines: A Case Study of Construction Delays","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Victoria","funders":"","keywords":"Construction contract; Contract management; Project management; Construction industry; Construction management","authors":[{"name":"Melissa Chan","is_ca":true},{"name":"Sina Fard Moradinia","is_ca":false},{"name":"Niloufar Bagherifam","is_ca":false},{"name":"Milad Baghalzadeh Shishehgarkhaneh","is_ca":false},{"name":"Hongyu Jin","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01993907450508224,"gpt":0.3093890547857437,"spread":0.2894499802806614,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01088983,0.0004293953,0.0004107767,0.002029797,0.003916468,0.002515364,0.001494683,0.001506521,0.002091111],"category_scores_gemma":[0.03339094,0.0004490491,0.000468146,0.0034173,0.001917399,0.002160434,0.00190885,0.001829638,0.0001822663],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.006953933,"about_ca_system_score_gemma":0.006402717,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01904817,"about_ca_topic_score_gemma":0.02590128,"domain_scores_codex":[0.9876089,0.007675457,0.0005669718,0.0004336063,0.00260071,0.001114306],"domain_scores_gemma":[0.8897448,0.0934334,0.007297164,0.00201665,0.00607733,0.001430684],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"case_report","study_design_scores_codex":[0.002599611,0.007718174,0.3802867,0.001865273,0.0002686051,0.02243229,0.1381091,0.09658559,0.01206613,0.07974792,0.004040278,0.2542804],"study_design_scores_gemma":[0.0004511019,0.005141816,0.2903125,0.0007198235,0.0004088896,0.006300599,0.4022325,0.2190418,0.02008565,0.01574924,0.03907277,0.0004833519],"study_design_candidate":"case_report","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9922937,0.00005643602,0.003325607,0.0002016908,0.000003787159,0.0001629384,0.00006329684,0.00000862759,0.003883806],"genre_scores_gemma":[0.9940186,0.0001151824,0.004571641,0.00002223183,0.000003436866,0.0001548014,0.00003941376,0.00001008811,0.001064693],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01904817,"threshold_uncertainty_score":0.05759162,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}