{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":29,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":29,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"5272a675250b","filters":{"venue":"Journal of Management in Engineering"}},"results":[{"id":"W2138906600","doi":"10.1061/(asce)0742-597x(2009)25:1(12)","title":"Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance","year":2008,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":212,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Construction management; Process (computing); Engineering; Construction industry; Quality (philosophy); Project management; Integrated project delivery; Simulation modeling; Construction engineering; Computer science; Operations research; Systems engineering; Civil engineering","authors":[{"name":"Lingguang Song","is_ca":true},{"name":"Yasser Mohamed","is_ca":true},{"name":"Simaan AbouRizk","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01192551175875585,"gpt":0.2037258822824726,"spread":0.1918003705237168,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01458069,0.0005869852,0.0003619601,0.001223654,0.001494784,0.002442403,0.00105414,0.0008851899,0.005496057],"category_scores_gemma":[0.04716228,0.0004137212,0.0003381589,0.0009569497,0.001149266,0.001336944,0.001923814,0.001244062,0.000770946],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002606498,"about_ca_system_score_gemma":0.003496201,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007618723,"about_ca_topic_score_gemma":0.008877306,"domain_scores_codex":[0.9815655,0.01126089,0.0006940518,0.0007480109,0.004013247,0.001718304],"domain_scores_gemma":[0.9019159,0.06317972,0.0134498,0.005403545,0.008561256,0.007489748],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.005037501,0.0071365,0.575343,0.0003694275,0.0002233397,0.002138905,0.025722,0.06617775,0.02659862,0.009408455,0.001469185,0.2803754],"study_design_scores_gemma":[0.0002421806,0.007620848,0.8346663,0.0002535638,0.0001744265,0.001306158,0.03231038,0.08430506,0.01834058,0.004226043,0.01626192,0.0002925672],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9889599,0.00006192442,0.003013537,0.000102458,0.000005132091,0.00002705946,0.00001978259,0.00002612891,0.007784081],"genre_scores_gemma":[0.9974632,0.0000463805,0.001140512,0.00001050058,0.000002543336,0.00001697832,0.0000387316,0.00001168502,0.00126957],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01458069,"threshold_uncertainty_score":0.07711095,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2022168955","doi":"10.1061/(asce)me.1943-5479.0000279","title":"Review of Contemporary Construction Procurement Practices","year":2013,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Public Procurement and Policy","field":"Business, Management and Accounting","cited_by":130,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Okanagan University College","funders":"","keywords":"Procurement; Process management; Request for proposal; Standardization; Construction industry; Process (computing); Business; Construction management; Chief procurement officer; Engineering management; Knowledge management; Engineering; Construction engineering; Computer science; Marketing; Civil engineering","authors":[{"name":"Rajeev Ruparathna","is_ca":true},{"name":"Kasun Hewage","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02786410010238504,"gpt":0.2527995101850429,"spread":0.2249354100826578,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003481611,0.0006184743,0.001021962,0.01261485,0.0007721423,0.00233997,0.001339564,0.0008869151,0.004963102],"category_scores_gemma":[0.006897345,0.0004555065,0.0007035221,0.02512178,0.001139262,0.002586003,0.0009242904,0.0007672153,0.001255642],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002660388,"about_ca_system_score_gemma":0.006214336,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006608841,"about_ca_topic_score_gemma":0.0101331,"domain_scores_codex":[0.9966981,0.0009048399,0.0006639342,0.0002976822,0.001274748,0.0001606469],"domain_scores_gemma":[0.9910132,0.005673111,0.0009821791,0.0002028534,0.001998183,0.0001304319],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00007756208,0.00004308968,0.002239641,0.05849432,0.0001375628,0.0005300047,0.002688075,0.001131053,0.0005629912,0.01319668,0.0415441,0.8793548],"study_design_scores_gemma":[0.000003912724,0.00004831139,0.009778449,0.03029959,0.0001334621,0.001099598,0.002037793,0.0002078683,0.0003257856,0.002329109,0.9536956,0.0000405467],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.002194403,0.9887859,0.0008274352,0.001186273,0.0001926798,0.00001739866,0.0001927316,0.00001922304,0.006583972],"genre_scores_gemma":[0.007144229,0.9909025,0.000775548,0.0002542704,0.0001262469,0.00001509703,0.000187628,0.000007107637,0.0005873287],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.01261485,"threshold_uncertainty_score":0.01930261,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2776348486","doi":"10.1061/(asce)me.1943-5479.0000587","title":"Sustainable Delivery of Megaprojects in Iran: Integrated Model of Contextual Factors","year":2017,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":120,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Megaproject; Sustainability; Triple bottom line; Context (archaeology); Business; Structural equation modeling; Environmental economics; Supply chain; Sustainable development; Process management; Environmental resource management; Economics; Marketing; Computer science; Management; Political science","authors":[{"name":"M. Reza Hosseini","is_ca":false},{"name":"Saeed Banihashemi","is_ca":false},{"name":"Igor Martek","is_ca":false},{"name":"Hamed Golizadeh","is_ca":false},{"name":"Farzad Ghodoosi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.08472870886236886,"gpt":0.3227454332777561,"spread":0.2380167244153873,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001094402,0.0008146166,0.0005921845,0.001784179,0.0009982721,0.003093164,0.001566006,0.001109607,0.004535402],"category_scores_gemma":[0.002515825,0.00047005,0.001304373,0.002201271,0.001198472,0.002528825,0.002120977,0.001100049,0.0004832167],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.004798272,"about_ca_system_score_gemma":0.006924633,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.04179201,"about_ca_topic_score_gemma":0.03636646,"domain_scores_codex":[0.9989846,0.0004099814,0.00003141232,0.0001700925,0.0001667762,0.0002370856],"domain_scores_gemma":[0.9988251,0.0004717611,0.0002615106,0.00004577788,0.0002361259,0.0001597619],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.0002930749,0.00149153,0.2428804,0.000599369,0.0005047911,0.002020106,0.0100959,0.4172908,0.001607593,0.2492563,0.004779352,0.06918081],"study_design_scores_gemma":[0.0001722629,0.0008798146,0.1192787,0.0004357329,0.0006942726,0.0006953228,0.01798422,0.7525228,0.000684996,0.08494109,0.02153161,0.0001792058],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8351321,0.001089638,0.08766849,0.004162426,0.0001074714,0.0006839923,0.0009587723,0.0002296634,0.0699674],"genre_scores_gemma":[0.9870957,0.0006460773,0.009066836,0.0000692109,0.00001590257,0.0002309341,0.0001569392,0.00001255195,0.002705841],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04179201,"threshold_uncertainty_score":0.08309752,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2937847675","doi":"10.1061/(asce)me.1943-5479.0000698","title":"Integrated Risk Management Framework for Tolerance-Based Mitigation Strategy Decision Support in Modular Construction Projects","year":2019,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Rework; Risk analysis (engineering); Schedule; Modular programming; Modular design; Identification (biology); Risk management; Process (computing); Computer science; Engineering; Systems engineering; Reliability engineering; Business","authors":[{"name":"Mohammed S. A. Enshassi","is_ca":false},{"name":"Scott Walbridge","is_ca":true},{"name":"Jeffrey West","is_ca":true},{"name":"Carl T. Haas","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006958685917370178,"gpt":0.2139265249411759,"spread":0.2069678390238057,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009508935,0.002158372,0.00158675,0.005292187,0.0013403,0.005015564,0.003204613,0.002214372,0.002435225],"category_scores_gemma":[0.008878502,0.0009151005,0.001766159,0.002153786,0.001726919,0.003484408,0.004364085,0.001800024,0.0003917263],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003507185,"about_ca_system_score_gemma":0.006853196,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008582234,"about_ca_topic_score_gemma":0.00769406,"domain_scores_codex":[0.9937205,0.002519527,0.0005350579,0.0007283659,0.001968503,0.0005280126],"domain_scores_gemma":[0.9952545,0.001967354,0.000948409,0.0002195947,0.001347043,0.0002630095],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004489084,0.0001503525,0.00171068,0.0001480081,0.0001295855,0.0002205682,0.000435767,0.881272,0.00114706,0.07645189,0.0008592759,0.03742994],"study_design_scores_gemma":[0.00001804236,0.00008820117,0.000423869,0.00008723589,0.00007040412,0.00006848483,0.0002152419,0.9596371,0.0005070247,0.03676281,0.002084284,0.00003731173],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.007119654,0.0001990111,0.9883404,0.0003998291,0.00002110472,0.0002040992,0.00006798135,0.0002272217,0.003420637],"genre_scores_gemma":[0.430809,0.0006143631,0.5651007,0.0001276581,0.00007810645,0.0009273488,0.0003272477,0.00005863672,0.001956985],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.009508935,"threshold_uncertainty_score":0.05028868,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2097096836","doi":"10.1061/(asce)0742-597x(2007)23:4(200)","title":"Project Delivery System Selection under Uncertainty: Multicriteria Multilevel Decision Aid Model","year":2007,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":93,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Regina","funders":"","keywords":"Analytic hierarchy process; Computer science; Operations research; Selection (genetic algorithm); Benchmark (surveying); Rank (graph theory); Process (computing); Interval (graph theory); Linear programming; Hierarchy; Set (abstract data type); Goal programming; Task (project management); Management science; Engineering; Artificial intelligence; Mathematics; Systems engineering","authors":[{"name":"Fereshteh Mafakheri","is_ca":true},{"name":"Liming Dai","is_ca":true},{"name":"Dominik Ślȩzak","is_ca":true},{"name":"Fuzhan Nasiri","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.1010875135900634,"gpt":0.3838952219365119,"spread":0.2828077083464485,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002655899,0.0007802559,0.001512127,0.001508648,0.0008279458,0.002664235,0.002137412,0.001869621,0.005305497],"category_scores_gemma":[0.004503858,0.0006606886,0.00132707,0.001630786,0.0008547878,0.00155873,0.001652806,0.001673645,0.0005153543],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002441425,"about_ca_system_score_gemma":0.001585279,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.012995,"about_ca_topic_score_gemma":0.009070081,"domain_scores_codex":[0.9983021,0.0007876245,0.00007299604,0.0001887901,0.0004049026,0.0002436424],"domain_scores_gemma":[0.9977392,0.00136179,0.0003360549,0.00006375124,0.0003678766,0.0001313572],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000587678,0.00004233834,0.0007214025,0.00004649142,0.00004600011,0.0001187566,0.00008142288,0.9826985,0.0004066569,0.01031394,0.0003008499,0.005164873],"study_design_scores_gemma":[0.000008547751,0.00002045384,0.0001108914,0.000004154435,0.000009242402,0.00000755817,0.00001130648,0.9977372,0.00004230732,0.00191023,0.0001335373,0.000004656111],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1281525,0.0005164581,0.8536353,0.001460838,0.00006484707,0.0002855871,0.0005416808,0.0004229459,0.01491995],"genre_scores_gemma":[0.9230839,0.0004524479,0.07034741,0.0001190212,0.00004786448,0.0004110037,0.000233602,0.00003020059,0.005274516],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.012995,"threshold_uncertainty_score":0.02583873,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2098088157","doi":"10.1061/(asce)me.1943-5479.0000013","title":"Attitude-Based Negotiation Methodology for the Management of Construction Disputes","year":2010,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":60,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Negotiation; Conflict resolution; Management science; Computer science; Resolution (logic); Process management; Operations research; Knowledge management; Business; Engineering; Political science; Artificial intelligence","authors":[{"name":"Saied Yousefi","is_ca":true},{"name":"Keith W. Hipel","is_ca":true},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.09458566992212401,"gpt":0.3721384459201362,"spread":0.2775527759980122,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01691413,0.001170844,0.001153806,0.003333556,0.002277182,0.003494759,0.003399715,0.002030568,0.00647133],"category_scores_gemma":[0.02478381,0.0006683204,0.001552719,0.003006095,0.002992012,0.005074186,0.003218374,0.002401447,0.0009466932],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002112209,"about_ca_system_score_gemma":0.003917232,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001149078,"about_ca_topic_score_gemma":0.001643903,"domain_scores_codex":[0.9807267,0.01468907,0.0008696676,0.0007274943,0.002672952,0.0003141559],"domain_scores_gemma":[0.987763,0.008916735,0.0008652366,0.0005736089,0.001580814,0.0003005835],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001000252,0.0003169727,0.001005313,0.0005259169,0.0001349306,0.000340494,0.00363053,0.08338007,0.003267695,0.7006913,0.0028911,0.2037157],"study_design_scores_gemma":[0.00008372144,0.0002150455,0.0003303913,0.0001816585,0.00006256122,0.0002894054,0.001323776,0.6760819,0.001769507,0.3004589,0.01910716,0.00009589522],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.001291812,0.00005112719,0.9963114,0.0001152692,0.00002739247,0.0002842935,0.00001311178,0.00006062096,0.001845024],"genre_scores_gemma":[0.04404369,0.0001085565,0.9536667,0.00005423572,0.00003039129,0.001087219,0.00004102087,0.00002745695,0.0009407061],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01691413,"threshold_uncertainty_score":0.08945155,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1969988169","doi":"10.1061/(asce)me.1943-5479.0000338","title":"Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":53,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo; Golder Associates (Canada)","funders":"","keywords":"Solver; Computer science; Mathematical optimization; Metaheuristic; Scheduling (production processes); Job shop scheduling; Constraint programming; Software; Heuristics; Project management; Heuristic; Industrial engineering; Operations research; Systems engineering; Algorithm; Stochastic programming; Schedule; Mathematics; Engineering; Programming language","authors":[{"name":"Wail Menesi","is_ca":true},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.07902712514998302,"gpt":0.3579501755480102,"spread":0.2789230503980272,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002260186,0.0007078474,0.0008570746,0.000919427,0.0008100345,0.001384445,0.001125745,0.0009466814,0.004662792],"category_scores_gemma":[0.005341401,0.0004987771,0.0007141505,0.001663771,0.0004970481,0.001589176,0.00119115,0.001172751,0.0004538651],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001477759,"about_ca_system_score_gemma":0.002443238,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006144783,"about_ca_topic_score_gemma":0.009535105,"domain_scores_codex":[0.9984326,0.0008127698,0.00005937717,0.0002262469,0.0002720037,0.000197035],"domain_scores_gemma":[0.9978388,0.001320243,0.000279159,0.0001718393,0.0002127862,0.0001771192],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009291121,0.00007709723,0.0006226251,0.0001743067,0.00002829689,0.00008352488,0.00006488066,0.8969421,0.002971808,0.01670027,0.001264515,0.08097765],"study_design_scores_gemma":[0.00001857428,0.0001031738,0.000274255,0.00002011638,0.000008623872,0.00004182541,0.00005398177,0.9837102,0.001783281,0.01034177,0.003631649,0.00001256215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03167357,0.000301364,0.9618064,0.0002317521,0.00004020202,0.000151283,0.00008905498,0.0002556009,0.005450765],"genre_scores_gemma":[0.4021274,0.0004120792,0.5938654,0.00007699941,0.0000259084,0.0002643679,0.0001895623,0.0001292597,0.00290904],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006144783,"threshold_uncertainty_score":0.01559854,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2146152604","doi":"10.1061/(asce)0742-597x(2008)24:3(173)","title":"Assessing Infrastructure Project Innovation Potential as a Function of Procurement Mode","year":2008,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":43,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia; Shell (Canada)","funders":"Infrastructure Canada","keywords":"Integrated project delivery; Procurement; Business; General partnership; Process management; Process (computing); Function (biology); Variety (cybernetics); Stakeholder; Project management; Marketing; Finance; Economics; Systems engineering; Computer science; Engineering","authors":[{"name":"Paul Tawiah","is_ca":true},{"name":"Alan D. Russell","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05513164758317048,"gpt":0.3444154546522905,"spread":0.28928380706912,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02212472,0.0005533677,0.0004524282,0.00535969,0.0006556445,0.002332427,0.0007759188,0.0008377048,0.002278281],"category_scores_gemma":[0.05216537,0.0003486028,0.000882979,0.003310759,0.0007635808,0.002492395,0.001859065,0.000661305,0.0004650725],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001424725,"about_ca_system_score_gemma":0.001413928,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001752293,"about_ca_topic_score_gemma":0.002809441,"domain_scores_codex":[0.9892079,0.005386743,0.0008471805,0.0008843166,0.003074683,0.0005991197],"domain_scores_gemma":[0.8977168,0.07645023,0.008978452,0.003482683,0.01143721,0.001934534],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.001299124,0.0007916664,0.7381012,0.0004510405,0.0002541755,0.0002817956,0.002808566,0.09926105,0.01303746,0.005596204,0.000555138,0.1375625],"study_design_scores_gemma":[0.00006749326,0.006818532,0.7929137,0.0001835784,0.0002459129,0.0005473729,0.005588714,0.1672074,0.01735586,0.006110081,0.00272912,0.0002322471],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.978583,0.00008280212,0.01312633,0.00005228952,0.000004291793,0.0003653626,0.0002759726,0.0000701997,0.007439737],"genre_scores_gemma":[0.9862135,0.00006197912,0.01227431,0.000008829746,0.000003093033,0.0003064123,0.000189565,0.00001337439,0.0009289606],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02212472,"threshold_uncertainty_score":0.1170081,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2883714063","doi":"10.1061/(asce)me.1943-5479.0000639","title":"How to Improve Interface Management Behaviors in EPC Projects: Roles of Formal Practices and Social Norms","year":2018,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":39,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Interface (matter); Knowledge management; Affect (linguistics); Project management; Psychology; Business; Computer science; Engineering; Marketing","authors":[{"name":"Wenxin Shen","is_ca":false},{"name":"Byungjoo Choi","is_ca":false},{"name":"Sang Hyun Lee","is_ca":false},{"name":"Wenzhe Tang","is_ca":false},{"name":"Carl T. Haas","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03898353472567932,"gpt":0.3395619891551394,"spread":0.3005784544294601,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01863056,0.0004092207,0.0002343873,0.001256932,0.001523442,0.00357827,0.0009660439,0.0007891358,0.0009927233],"category_scores_gemma":[0.06581049,0.0002624144,0.0002157317,0.0006744225,0.002718002,0.002569371,0.002488674,0.001141186,0.0001728446],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00157792,"about_ca_system_score_gemma":0.003750379,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002242507,"about_ca_topic_score_gemma":0.003758049,"domain_scores_codex":[0.9834372,0.01167992,0.0007565393,0.0006301086,0.002825957,0.000670311],"domain_scores_gemma":[0.9400834,0.03182139,0.01242352,0.00451778,0.007688778,0.003465085],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0001862469,0.003266288,0.4287092,0.0006055067,0.0001221324,0.0004222183,0.0904291,0.003212029,0.008450411,0.01172391,0.001995683,0.4508772],"study_design_scores_gemma":[0.000143421,0.001974509,0.7440668,0.0009666648,0.000148578,0.0004933188,0.1602176,0.02778135,0.008926451,0.03069911,0.02430579,0.0002763833],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9740863,0.0001068724,0.0147725,0.001056008,0.00001968886,0.0001565071,0.00001431395,0.0000744893,0.009713236],"genre_scores_gemma":[0.9924772,0.00007817071,0.006874013,0.0000604687,0.00000719776,0.0001091473,0.00001314988,0.00001012729,0.0003704017],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01863056,"threshold_uncertainty_score":0.09852904,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3043380076","doi":"10.1061/(asce)me.1943-5479.0000818","title":"Probabilistic Resilience-Guided Infrastructure Risk Management","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"","keywords":"Resilience (materials science); Risk analysis (engineering); Probabilistic logic; Hazard; Risk management; Natural hazard; Computer science; Environmental resource management; Realization (probability); Reliability engineering; Business; Engineering; Environmental science; Finance","authors":[{"name":"Shady Salem","is_ca":true},{"name":"Ahmad Siam","is_ca":true},{"name":"Wael El‐Dakhakhni","is_ca":true},{"name":"Michael J. Tait","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006286498621614063,"gpt":0.2072294685253648,"spread":0.2009429699037507,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002308456,0.001204183,0.0008115593,0.001744358,0.0006427927,0.001804865,0.002044895,0.00113615,0.003261428],"category_scores_gemma":[0.005877677,0.0005594314,0.0008696765,0.0008419721,0.001523303,0.002313067,0.003302976,0.001342245,0.0002175714],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002102371,"about_ca_system_score_gemma":0.00239174,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006840282,"about_ca_topic_score_gemma":0.005942415,"domain_scores_codex":[0.9989641,0.0003541614,0.00004588321,0.0001640595,0.0003078064,0.0001639838],"domain_scores_gemma":[0.9979144,0.001093712,0.000415959,0.0001165034,0.0003488229,0.0001106406],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000007238632,0.000007209669,0.0003337305,0.00002623516,0.00001579937,0.00004164036,0.00003500803,0.9644482,0.0003314226,0.0295017,0.0002955396,0.004956267],"study_design_scores_gemma":[0.00000236268,0.00001450484,0.0001993391,0.00001658319,0.000009161934,0.00003070779,0.00003448996,0.9683141,0.0001871863,0.03052746,0.000651015,0.00001309626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01953604,0.0003376907,0.9695388,0.0007155017,0.00004092709,0.00008262983,0.0001447557,0.0002168432,0.009386897],"genre_scores_gemma":[0.9266945,0.0005450121,0.0688061,0.00009375955,0.00005240863,0.0001836404,0.0001369894,0.00006543642,0.003422126],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006840282,"threshold_uncertainty_score":0.01525384,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3163210510","doi":"10.1061/(asce)me.1943-5479.0000914","title":"Causes of Defects Associated with Tolerances in Construction: A Case Study","year":2021,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":29,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Context (archaeology); Identification (biology); Empirical research; Damage tolerance; Risk analysis (engineering); Management science; Operations management; Knowledge management; Engineering; Computer science; Business; Geography; Mathematics","authors":[{"name":"Saeed Talebi","is_ca":false},{"name":"Lauri Koskela","is_ca":false},{"name":"Patrícia Tzortzopoulos","is_ca":false},{"name":"Chris Rausch","is_ca":true},{"name":"Faris Elghaish","is_ca":false},{"name":"Mani Poshdar","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04605219968653328,"gpt":0.315142906904161,"spread":0.2690907072176277,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004450378,0.0007391224,0.0004831847,0.002879254,0.006427606,0.002344271,0.002303961,0.005059514,0.002230897],"category_scores_gemma":[0.01344364,0.0007455194,0.0007777676,0.002409398,0.003388679,0.001591279,0.003311423,0.002384727,0.0003110331],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003374425,"about_ca_system_score_gemma":0.003493072,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00690474,"about_ca_topic_score_gemma":0.01865896,"domain_scores_codex":[0.9939407,0.002806162,0.000324599,0.0004106191,0.001796389,0.0007214997],"domain_scores_gemma":[0.9840207,0.01023611,0.002449131,0.0007517727,0.001391899,0.001150448],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"case_report","study_design_gemma":"observational","study_design_scores_codex":[0.0002683933,0.002363418,0.130961,0.001621888,0.0001182095,0.4363154,0.2941169,0.01100032,0.006051409,0.01415588,0.005397635,0.09762955],"study_design_scores_gemma":[0.00007113544,0.002003225,0.09274977,0.001646425,0.0002034179,0.2781117,0.5269351,0.01590676,0.008759069,0.008982529,0.06436986,0.0002609463],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9801039,0.0006028966,0.01145316,0.001483321,0.00003657682,0.0002585546,0.00006382815,0.00003028331,0.005967495],"genre_scores_gemma":[0.9877132,0.001165094,0.007074738,0.0002623773,0.00002717639,0.0001037035,0.000037151,0.00002711431,0.003589475],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.00690474,"threshold_uncertainty_score":0.02448332,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3017718767","doi":"10.1061/(asce)me.1943-5479.0000789","title":"Air Transportation Infrastructure Robustness Assessment for Proactive Systemic Risk Management","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"McMaster University","funders":"","keywords":"Robustness (evolution); Computer science; Risk analysis (engineering); Business","authors":[{"name":"Yassien Yassien","is_ca":true},{"name":"Mohamed Ezzeldin","is_ca":true},{"name":"Moataz Mohamed","is_ca":true},{"name":"Wael El‐Dakhakhni","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004711929787514537,"gpt":0.2133475723559003,"spread":0.2086356425683858,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026901,0.001217496,0.0004500179,0.003748612,0.000415508,0.001600233,0.0007099403,0.000745246,0.001698712],"category_scores_gemma":[0.007141436,0.0002534568,0.0008777363,0.001230077,0.0007100289,0.001770279,0.001512469,0.0007016483,0.0001439803],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001677096,"about_ca_system_score_gemma":0.001499694,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005944934,"about_ca_topic_score_gemma":0.005656858,"domain_scores_codex":[0.9988098,0.0004333123,0.00006655594,0.0001625639,0.0004255912,0.0001022751],"domain_scores_gemma":[0.9972606,0.00118678,0.0007431694,0.0002061582,0.000506269,0.00009697088],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006773776,0.00007399679,0.02461363,0.000194518,0.0002332305,0.0001633283,0.0001398946,0.9006866,0.004557789,0.01878407,0.0007765635,0.04970857],"study_design_scores_gemma":[0.000004333309,0.0001187467,0.01522914,0.00006694495,0.00008136807,0.00007685933,0.0002041666,0.967871,0.002555932,0.01241712,0.001335313,0.00003919332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.270397,0.001047913,0.715754,0.0004664213,0.00005513791,0.0003148242,0.0007532797,0.0003518722,0.01085949],"genre_scores_gemma":[0.9734892,0.0002753124,0.02536133,0.00002382116,0.00002281914,0.00009116791,0.0002130664,0.00001614911,0.0005071909],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005944934,"threshold_uncertainty_score":0.01422679,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4200137561","doi":"10.1061/(asce)me.1943-5479.0001009","title":"New Modes of Operating for Construction Organizations during the COVID-19 Pandemic: Challenges, Actions, and Future Best Practices","year":2021,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"COVID-19 Pandemic Impacts","field":"Economics, Econometrics and Finance","cited_by":28,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Pandemic; Business; Control (management); Workforce; Productivity; Coronavirus disease 2019 (COVID-19); Best practice; Public relations; Environmental planning; Political science; Economic growth; Geography; Economics; Management","authors":[{"name":"Mohammad Raoufi","is_ca":true},{"name":"Aminah Robinson Fayek","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.08557894207837036,"gpt":0.2981451088667335,"spread":0.2125661667883632,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01827359,0.001233066,0.0005892821,0.003305044,0.009130623,0.00850284,0.003522272,0.003323796,0.002834667],"category_scores_gemma":[0.02030377,0.000686628,0.001109553,0.002592115,0.005209151,0.007555968,0.00719747,0.00362126,0.0006732473],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.009647005,"about_ca_system_score_gemma":0.03417827,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02766602,"about_ca_topic_score_gemma":0.0847182,"domain_scores_codex":[0.9800402,0.0100572,0.001129839,0.0008374844,0.003164898,0.00477032],"domain_scores_gemma":[0.9768877,0.00548391,0.003934674,0.001926819,0.005545595,0.006221336],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"qualitative","study_design_scores_codex":[0.0002311359,0.001296851,0.2987804,0.003605214,0.0002260971,0.0015144,0.1001884,0.004544208,0.008375992,0.01721104,0.02601469,0.5380116],"study_design_scores_gemma":[0.00006697981,0.001156779,0.2098521,0.004884638,0.0001080334,0.0008161625,0.6369275,0.004081789,0.002304066,0.01442681,0.1249018,0.0004733125],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6444333,0.0126474,0.04337777,0.2227509,0.001093711,0.002094107,0.0006149849,0.0008283564,0.07215942],"genre_scores_gemma":[0.9301677,0.007482643,0.05324983,0.004395028,0.0001092217,0.0007194804,0.0003062893,0.00005993826,0.003509862],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02766602,"threshold_uncertainty_score":0.09664112,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2407038954","doi":"10.1061/(asce)me.1943-5479.0000452","title":"Establishing Success Measurements of Joint Ventures in Mega Projects","year":2016,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Private Equity and Venture Capital","field":"Business, Management and Accounting","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Profitability index; Sustainability; Business; Measure (data warehouse); Industrial organization; Variety (cybernetics); Reputation; Reliability (semiconductor); Joint (building); Mega-; Market share; Marketing; Econometrics; Economics; Finance; Computer science","authors":[{"name":"Abdulmohsen S. Almohsen","is_ca":true},{"name":"Janaka Y. Ruwanpura","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03537085960156297,"gpt":0.2225855163733027,"spread":0.1872146567717398,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009442223,0.0003627007,0.0003673074,0.004878347,0.0009924675,0.002173046,0.0006115308,0.0005408701,0.001624619],"category_scores_gemma":[0.0542035,0.0002326001,0.0004166839,0.003483737,0.001142289,0.002159092,0.002800441,0.0007096092,0.0003993099],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001011281,"about_ca_system_score_gemma":0.001035351,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001053267,"about_ca_topic_score_gemma":0.0024608,"domain_scores_codex":[0.9908389,0.003417463,0.001344543,0.0004616302,0.003376869,0.0005606277],"domain_scores_gemma":[0.9276612,0.033232,0.01865166,0.002844237,0.01319529,0.004415516],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001560447,0.0002923985,0.9297652,0.0001398204,0.00009293838,0.0001310431,0.005143104,0.001210934,0.000969133,0.002698709,0.0006633293,0.05873733],"study_design_scores_gemma":[0.00001239146,0.0007184916,0.9788633,0.00008610964,0.00005484445,0.0001420609,0.01039033,0.003653899,0.00179442,0.001225524,0.003013413,0.00004531116],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9913157,0.00008061106,0.001995723,0.0000541195,0.00001418109,0.0001267529,0.0001493871,0.00001890698,0.006244563],"genre_scores_gemma":[0.9966924,0.00005674504,0.002305473,0.000006178103,0.00000824671,0.0001376334,0.0001769496,0.000005066957,0.0006113535],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.009442223,"threshold_uncertainty_score":0.04993588,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3035558579","doi":"10.1061/(asce)me.1943-5479.0000815","title":"Fuzzy Agent-Based Multicriteria Decision-Making Model for Analyzing Construction Crew Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources","funders":"","keywords":"Crew; Multiple-criteria decision analysis; Scope (computer science); Process (computing); Computer science; Operations research; Fuzzy logic; Decision support system; Decision-making models; Management science; Risk analysis (engineering); Engineering; Artificial intelligence; Business","authors":[{"name":"Nebiyu Siraj Kedir","is_ca":true},{"name":"Mohammad Raoufi","is_ca":true},{"name":"Aminah Robinson Fayek","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0143219429588576,"gpt":0.2296791114085091,"spread":0.2153571684496514,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001968598,0.00105946,0.001213015,0.001029062,0.0008717588,0.002132469,0.00197656,0.002198924,0.003796581],"category_scores_gemma":[0.002852397,0.000550449,0.001014788,0.001103201,0.0008346642,0.001349139,0.001048459,0.001515802,0.0004161579],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002519317,"about_ca_system_score_gemma":0.00229322,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01546065,"about_ca_topic_score_gemma":0.01301814,"domain_scores_codex":[0.9990692,0.0004115424,0.00004531962,0.0001819845,0.0001712669,0.0001207638],"domain_scores_gemma":[0.9988503,0.0006597547,0.0001668652,0.00003548146,0.0002041558,0.00008334872],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003428211,0.00003589173,0.0004843704,0.00002458749,0.00003476043,0.00007674623,0.00007265175,0.9798747,0.0002737905,0.01517562,0.0002859706,0.003626686],"study_design_scores_gemma":[0.00000651658,0.00001079218,0.00005717996,0.000003587311,0.00000627594,0.000004671985,0.00001322379,0.9969408,0.00004595482,0.002677769,0.000228973,0.000004237484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0446519,0.0003413857,0.9423035,0.0008580514,0.00008430833,0.0001807535,0.0002446042,0.0001934927,0.011142],"genre_scores_gemma":[0.8459791,0.0004423411,0.1446065,0.0001419974,0.00005148994,0.0005389493,0.0002132748,0.00002564547,0.008000521],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01546065,"threshold_uncertainty_score":0.03074127,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2137564958","doi":"10.1061/(asce)me.1943-5479.0000297","title":"Construction Management Challenges and Best Practices for Rural Transit Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Traffic and Road Safety","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Business; Scope (computer science); Staffing; Best practice; Agency (philosophy); Construction management; Environmental planning; Quality (philosophy); Benchmarking; Documentation; Desk; Project management; Environmental resource management; Engineering; Marketing; Civil engineering","authors":[{"name":"Dai Q. Tran","is_ca":false},{"name":"Matthew R. Hallowell","is_ca":false},{"name":"Keith R. Molenaar","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02060300639720682,"gpt":0.2276093955805832,"spread":0.2070063891833764,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008398721,0.0004073315,0.0003536671,0.00186472,0.01031855,0.00652177,0.002369384,0.001857501,0.001611885],"category_scores_gemma":[0.0191476,0.0006793018,0.0002610243,0.003037406,0.003898619,0.002806289,0.00460693,0.001755413,0.0003123733],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.008811259,"about_ca_system_score_gemma":0.03439182,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.04153758,"about_ca_topic_score_gemma":0.1368424,"domain_scores_codex":[0.9869441,0.006505837,0.0007714994,0.0007100042,0.003078117,0.001990477],"domain_scores_gemma":[0.9867738,0.003277421,0.002920809,0.0009712153,0.003407955,0.002648758],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"qualitative","study_design_scores_codex":[0.00009364478,0.0006841799,0.1121775,0.001724716,0.0000675099,0.005928816,0.5057542,0.004897596,0.006445122,0.01307002,0.0160524,0.3331042],"study_design_scores_gemma":[0.00001864786,0.0002590028,0.06210023,0.0008663844,0.00001699462,0.001542879,0.8290853,0.001725334,0.001117417,0.005436133,0.09773209,0.00009952039],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9405572,0.002107807,0.006730415,0.02276885,0.00008602308,0.0003456117,0.00006676529,0.0001114789,0.02722582],"genre_scores_gemma":[0.9872,0.001335009,0.008516134,0.0003098251,0.0000109052,0.00008749242,0.00003848251,0.00001898537,0.002482978],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04153758,"threshold_uncertainty_score":0.08259159,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3136866223","doi":"10.1061/(asce)me.1943-5479.0000923","title":"Multidomain Drivers of Occupant Comfort, Productivity, and Well-Being in Buildings: Insights from an Exploratory and Explanatory Analysis","year":2021,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Productivity; Computer science; Context (archaeology); Random forest; Quality (philosophy); Thermal comfort; Machine learning; Artificial intelligence; Geography","authors":[{"name":"Min Lin","is_ca":false},{"name":"Abdulrahim Ali","is_ca":false},{"name":"Maedot S. Andargie","is_ca":true},{"name":"Elie Azar","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004454773682254938,"gpt":0.1912924350836937,"spread":0.1868376614014388,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003877632,0.0005747969,0.0003560243,0.001865353,0.0004563026,0.001679613,0.0004731581,0.0004385629,0.001516456],"category_scores_gemma":[0.006544422,0.0002861583,0.001284275,0.001736467,0.0009015382,0.001120999,0.001773246,0.0008807229,0.0001588608],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006522207,"about_ca_system_score_gemma":0.0005506366,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005163658,"about_ca_topic_score_gemma":0.006965082,"domain_scores_codex":[0.9984204,0.001044118,0.0000664622,0.0001651598,0.0001919225,0.0001119437],"domain_scores_gemma":[0.9916122,0.006478903,0.0007329055,0.0004620982,0.0005479602,0.0001658754],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001606221,0.0002887241,0.9480889,0.0002100043,0.0004160232,0.0003604024,0.009590633,0.00976075,0.001145363,0.005208511,0.0005128399,0.02425723],"study_design_scores_gemma":[0.000006479197,0.0002682823,0.9152523,0.0001247283,0.0001235478,0.00018195,0.0166293,0.06109437,0.0007091624,0.004259664,0.00129327,0.00005701583],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9929985,0.00009611766,0.005580294,0.000160983,0.000003355738,0.00004476101,0.000321457,0.00001300014,0.0007815204],"genre_scores_gemma":[0.9975682,0.0000452827,0.001991358,0.0000118755,0.000003480194,0.00003687536,0.000238911,0.000004017362,0.0001000664],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.005163658,"threshold_uncertainty_score":0.0205071,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2156128289","doi":"10.1061/(asce)0742-597x(2004)20:1(25)","title":"In-House Delivery of Multiple-Small Reconstruction Projects","year":2003,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Public Health","funders":"","keywords":"Scope (computer science); Dilemma; Integrated project delivery; Outsourcing; Prioritization; Business; Operations management; Process management; Procurement; Engineering management; Risk analysis (engineering); Project management; Engineering; Marketing; Computer science; Systems engineering","authors":[{"name":"Mohamed Attalla","is_ca":true},{"name":"Tarek Hegazy","is_ca":false},{"name":"Emad Elbeltagi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01053409505689822,"gpt":0.1843697805794448,"spread":0.1738356855225466,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001529711,0.0004158054,0.0003407474,0.0007467424,0.001266188,0.0007719918,0.0008804796,0.000496083,0.006034068],"category_scores_gemma":[0.004970813,0.0003309686,0.0002459691,0.0006171151,0.0003831322,0.0006482805,0.001040224,0.0004165952,0.0007179015],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001330764,"about_ca_system_score_gemma":0.001361243,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004058661,"about_ca_topic_score_gemma":0.009944838,"domain_scores_codex":[0.9986265,0.0006732167,0.0000592353,0.0001162218,0.0002906724,0.0002340883],"domain_scores_gemma":[0.9960168,0.001745486,0.0006547076,0.0004725072,0.0006303059,0.000480124],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.002389518,0.01041671,0.1766981,0.001283721,0.0001729908,0.01532289,0.01865542,0.05753663,0.05813782,0.004372817,0.006165256,0.6488482],"study_design_scores_gemma":[0.0005730445,0.02899995,0.5411981,0.0003850101,0.0003002933,0.01418355,0.07033746,0.1476713,0.1069209,0.003020605,0.08615562,0.000254209],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9903842,0.00003230305,0.005951429,0.0000566116,0.000007057851,0.0002905093,0.00007819064,0.00006482807,0.003134834],"genre_scores_gemma":[0.9874821,0.00008353639,0.008546791,0.00001541854,0.000005991925,0.00008920917,0.00009867147,0.00002714402,0.003651082],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.006034068,"threshold_uncertainty_score":0.02018601,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4399568055","doi":"10.1061/jmenea.meeng-6106","title":"Forecasting Construction Material Prices Using Macroeconomic Indicators of Trading Partners","year":2024,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Forecasting Techniques and Applications","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Business; Construction industry; Economics; Economic indicator; Industrial organization; Finance; Macroeconomics; Engineering; Construction engineering","authors":[{"name":"Ahmed Shiha","is_ca":false},{"name":"Islam H. El-adaway","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.08104265183551933,"gpt":0.355973203240287,"spread":0.2749305514047677,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001044084,0.0003923668,0.000287315,0.001143733,0.0001415428,0.001202982,0.0003482085,0.0005285242,0.0006973064],"category_scores_gemma":[0.005175113,0.0002572298,0.0004053772,0.001546067,0.0001594298,0.001139714,0.0004999661,0.0007179391,0.0002208543],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006964812,"about_ca_system_score_gemma":0.0006788141,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01727985,"about_ca_topic_score_gemma":0.01709526,"domain_scores_codex":[0.9997144,0.00007030998,0.00002374384,0.00006997678,0.00007699765,0.00004455403],"domain_scores_gemma":[0.9984919,0.0006103474,0.0004448667,0.0001015712,0.0002751096,0.00007627309],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003000769,0.000164217,0.5050266,0.00006143579,0.0001767075,0.0002826453,0.0002156172,0.4329521,0.002364221,0.005297758,0.002037052,0.05112158],"study_design_scores_gemma":[0.000008600866,0.00003281515,0.06708568,0.000008154754,0.00002893922,0.00001241238,0.00008616551,0.9306822,0.0006261761,0.0009848526,0.0004281304,0.00001577995],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9804551,0.0001196472,0.01578042,0.0001897653,0.00002232516,0.00003142305,0.0008401906,0.00009137973,0.002469805],"genre_scores_gemma":[0.996603,0.00008154027,0.002498606,0.000005430279,0.000007762294,0.000007797097,0.0006225585,0.000003641936,0.0001697147],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01727985,"threshold_uncertainty_score":0.03435856,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4283801114","doi":"10.1061/(asce)me.1943-5479.0001071","title":"Managing Interdependence-Induced Systemic Risks in Infrastructure Projects","year":2022,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"McMaster University","funders":"","keywords":"Operationalization; Risk analysis (engineering); Risk management; Systemic risk; Project management; Process management; Performance indicator; Critical infrastructure; Resilience (materials science); Interdependence; Business; Schedule; Identification (biology); General partnership; Computer science; Systems engineering; Engineering; Economics","authors":[{"name":"Ahmed Moussa","is_ca":true},{"name":"Wael El‐Dakhakhni","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.06390578444886319,"gpt":0.3331374832692712,"spread":0.269231698820408,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006751135,0.000865484,0.000525664,0.001832754,0.0007406538,0.002361287,0.000878001,0.0009493039,0.0006809589],"category_scores_gemma":[0.01584692,0.0005660162,0.0005268942,0.001440041,0.001223798,0.002071359,0.002722141,0.0009032789,0.00005261854],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001661856,"about_ca_system_score_gemma":0.002095427,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002474671,"about_ca_topic_score_gemma":0.003198121,"domain_scores_codex":[0.9954432,0.002892544,0.0001694777,0.0004109101,0.0007403324,0.0003435267],"domain_scores_gemma":[0.98873,0.007363133,0.002418515,0.0004456601,0.0007133684,0.0003293969],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00007521587,0.0001239741,0.01642886,0.0001122342,0.0001332907,0.0003833936,0.0004963218,0.9294683,0.002941187,0.01868758,0.0001673108,0.03098221],"study_design_scores_gemma":[0.0000118141,0.0002304621,0.00954389,0.00005330848,0.00006412678,0.0001547917,0.0006957888,0.9601011,0.001714668,0.0265799,0.0008136134,0.00003657844],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5495758,0.0003207299,0.4452282,0.0003221801,0.00001534876,0.0002082378,0.00004937013,0.0000590214,0.004221118],"genre_scores_gemma":[0.9790201,0.0001406182,0.02046112,0.000009800992,0.00000455077,0.00006984818,0.00001841233,0.000008156814,0.0002675143],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.006751135,"threshold_uncertainty_score":0.03570384,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1965464526","doi":"10.1061/(asce)me.1943-5479.0000107","title":"Construction Business Cycle Analysis Using the Regime Switching Model","year":2011,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Insurance and Financial Risk Management","field":"Economics, Econometrics and Finance","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Business cycle; Recession; Business; Quarter (Canadian coin); Financial crisis; Gross domestic product; Construction industry; Economics; Economic indicator; Macroeconomics; Engineering","authors":[{"name":"Jaehyun Park","is_ca":false},{"name":"SeungChul Ham","is_ca":false},{"name":"Taehoon Hong","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02786008300837129,"gpt":0.1991745818365332,"spread":0.171314498828162,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001660805,0.0004573024,0.0009050063,0.001164142,0.0003801398,0.001025069,0.0007513565,0.0008543318,0.004598541],"category_scores_gemma":[0.004758701,0.0003059985,0.001262492,0.000986924,0.0004113239,0.0006923088,0.0006159848,0.001199262,0.0003842282],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008419545,"about_ca_system_score_gemma":0.0007905421,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01617961,"about_ca_topic_score_gemma":0.00727699,"domain_scores_codex":[0.999491,0.0002203369,0.00002349462,0.00008617562,0.00007331857,0.0001057671],"domain_scores_gemma":[0.9981453,0.001404547,0.000187841,0.00006862173,0.000127237,0.00006642742],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009972871,0.00007228462,0.01032197,0.00005669066,0.0001505139,0.0001798904,0.0001137141,0.9431723,0.0005985355,0.02985795,0.001302222,0.01407423],"study_design_scores_gemma":[0.000004526471,0.00000879548,0.0008516863,0.000003197348,0.000008545293,0.000008402171,0.00001121562,0.9952372,0.00003630449,0.003605165,0.0002195365,0.000005358626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3917195,0.0008899929,0.5942971,0.001022016,0.0001088895,0.0001664674,0.0009761437,0.0005431633,0.01027681],"genre_scores_gemma":[0.9866317,0.0004184457,0.009033959,0.00004436828,0.0000384583,0.00009459394,0.000565235,0.00002635006,0.003146881],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01617961,"threshold_uncertainty_score":0.03217089,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2059822862","doi":"10.1061/(asce)me.1943-5479.0000332","title":"Behavioral Economic Concepts for Funding Infrastructure Rehabilitation","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Loss aversion; Behavioral economics; Bidding; Economics; Asset (computer security); Public economics; Asset management; Actuarial science; Business; Microeconomics; Marketing; Risk analysis (engineering); Computer science; Finance","authors":[{"name":"Dina A. Saad","is_ca":true},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005159754096955541,"gpt":0.2457159915964227,"spread":0.2405562374994671,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003836068,0.001414918,0.0006305949,0.002101622,0.0007509012,0.002605272,0.001425772,0.001884844,0.007032453],"category_scores_gemma":[0.008320364,0.0003700566,0.001015186,0.002062922,0.002584809,0.003917977,0.001258144,0.002875131,0.0004883882],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003789956,"about_ca_system_score_gemma":0.002210896,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004354192,"about_ca_topic_score_gemma":0.00284888,"domain_scores_codex":[0.9982467,0.001008325,0.00007180136,0.0001362779,0.0004041919,0.0001327833],"domain_scores_gemma":[0.9958647,0.002849267,0.0005391191,0.0001825418,0.0004287977,0.0001355042],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00001296571,0.00007089846,0.0008947017,0.00009210633,0.00002142898,0.00003835504,0.00009437685,0.05001722,0.0001592186,0.9380259,0.0009215312,0.009651281],"study_design_scores_gemma":[0.00002173365,0.00006941814,0.002301794,0.0001522753,0.00003289232,0.00007157992,0.0002967307,0.1229851,0.0001562585,0.8568419,0.01703133,0.00003894799],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04613351,0.007458889,0.8252712,0.009697353,0.0005323533,0.000416526,0.0006473104,0.00009484835,0.109748],"genre_scores_gemma":[0.829546,0.009368922,0.1384578,0.001249132,0.0007464068,0.001597556,0.0003903814,0.00008628084,0.01855749],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007032453,"threshold_uncertainty_score":0.02749825,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3037838347","doi":"10.1061/(asce)me.1943-5479.0000822","title":"Prioritizing Preproject Planning Activities Using Value of Information Analysis","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Scope (computer science); Prioritization; Resource allocation; Computer science; Process (computing); Reuse; Risk analysis (engineering); Operations research; Process management; Business; Engineering","authors":[{"name":"Mansour Esnaashary Esfahani","is_ca":true},{"name":"Chris Rausch","is_ca":true},{"name":"Carl T. Haas","is_ca":true},{"name":"Bryan T. Adey","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01462366445022767,"gpt":0.246530617159504,"spread":0.2319069527092763,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006622535,0.002073037,0.001795128,0.006227938,0.001078063,0.004819618,0.001644201,0.0008847172,0.003197098],"category_scores_gemma":[0.01246757,0.0008966834,0.001596608,0.004230906,0.0008948867,0.003711024,0.0022692,0.001413269,0.0003305183],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003400513,"about_ca_system_score_gemma":0.00719156,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007700667,"about_ca_topic_score_gemma":0.01244346,"domain_scores_codex":[0.9940081,0.002926462,0.0003197727,0.0005010599,0.001757847,0.0004867472],"domain_scores_gemma":[0.9898323,0.00625433,0.001399349,0.0006671259,0.001564254,0.0002826616],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001996297,0.0003936965,0.0102328,0.0006753401,0.0002768582,0.0002401215,0.0006850573,0.5211237,0.006737602,0.04330766,0.00247913,0.4136484],"study_design_scores_gemma":[0.00003413593,0.0003773014,0.005527565,0.0001970399,0.0001573685,0.0001260994,0.0007384417,0.940995,0.007830224,0.0385464,0.005353692,0.0001166951],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04484425,0.0005273381,0.9439588,0.0005184895,0.00002202724,0.0005508777,0.0001916946,0.0004007363,0.008985722],"genre_scores_gemma":[0.4753416,0.000479383,0.5216095,0.00004606177,0.00002347681,0.0004120949,0.000382786,0.0001675475,0.001537566],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007700667,"threshold_uncertainty_score":0.03502375,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2958346082","doi":"10.1061/(asce)me.1943-5479.0000707","title":"Differentiation of Evaluation Criteria in Design-Build and Construction Manager at Risk Procurements","year":2019,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Procurement; Sample (material); Selection (genetic algorithm); Business; Operations management; Value (mathematics); Marketing; Computer science; Economics; Statistics; Mathematics","authors":[{"name":"Amirali Shalwani","is_ca":false},{"name":"Brian Lines","is_ca":false},{"name":"Jake Smithwick","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04262594416337055,"gpt":0.3230117498459528,"spread":0.2803858056825822,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.1237493,0.0005993242,0.0008601623,0.008886516,0.002273188,0.005606962,0.001324128,0.0006962423,0.002229877],"category_scores_gemma":[0.2167802,0.0004437215,0.0006498026,0.006103087,0.003319358,0.003253482,0.004383346,0.001240486,0.0003836605],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.005370385,"about_ca_system_score_gemma":0.0046031,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003444874,"about_ca_topic_score_gemma":0.005704928,"domain_scores_codex":[0.8592682,0.09753261,0.01091327,0.001819715,0.02664546,0.003820794],"domain_scores_gemma":[0.7214224,0.2051585,0.02187678,0.005383494,0.04051644,0.005642407],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.003042936,0.00102852,0.4884154,0.0008848234,0.0002122743,0.0005154816,0.04967822,0.007262557,0.005499372,0.02599167,0.001924496,0.4155443],"study_design_scores_gemma":[0.0002677543,0.003270691,0.7783712,0.001238405,0.0001802008,0.0007719127,0.1052536,0.05100198,0.01301762,0.03434308,0.01171987,0.0005636259],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9663121,0.0003765009,0.02071311,0.0004514047,0.00003213487,0.0005021878,0.00005302643,0.0000333557,0.0115263],"genre_scores_gemma":[0.9832961,0.00005918177,0.01588912,0.00004498886,0.000006722357,0.0002069334,0.00003853015,0.00001443674,0.0004439846],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1237493,"threshold_uncertainty_score":0.6544565,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4407984856","doi":"10.1061/jmenea.meeng-6312","title":"Coming Clean: The Impact of Firm Internationalization on Environmental Information Disclosure in the Construction Industry","year":2025,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Corporate Social Responsibility Reporting","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Internationalization; Business; Industrial organization; Construction industry; International trade; Construction engineering; Engineering","authors":[{"name":"Muyang Liu","is_ca":false},{"name":"Xiaowei Luo","is_ca":false},{"name":"Rengong Zhang","is_ca":true},{"name":"Yuexiong Ding","is_ca":false},{"name":"Jane W. Z. Lu","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008382131036297001,"gpt":0.2377838423116883,"spread":0.2294017112753912,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005327046,0.0002093858,0.0003245333,0.001509156,0.0009466107,0.004122423,0.0005258695,0.0006867059,0.003613387],"category_scores_gemma":[0.03238139,0.0001374827,0.0004552488,0.002962856,0.001701904,0.002483962,0.002896388,0.001749578,0.0002777811],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001511308,"about_ca_system_score_gemma":0.00133363,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0116757,"about_ca_topic_score_gemma":0.01229929,"domain_scores_codex":[0.9946764,0.002021675,0.0005246119,0.0006573452,0.001007867,0.001112209],"domain_scores_gemma":[0.8696158,0.04727845,0.07145774,0.003604217,0.004042573,0.004001207],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00007776183,0.0001233647,0.9910877,0.00002224292,0.00006518613,0.0001132598,0.001269545,0.0005402098,0.00009536041,0.0006916544,0.0003551655,0.00555867],"study_design_scores_gemma":[0.000006359436,0.00007821758,0.9917938,0.00002652597,0.00004552105,0.00005055798,0.005621694,0.0006439144,0.0003128125,0.0004610562,0.0009468031,0.00001270644],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9954867,0.0002669996,0.0001989856,0.0005993343,0.000008665651,0.00001464567,0.0001681755,0.000004485385,0.00325211],"genre_scores_gemma":[0.9994414,0.00009268054,0.00004037653,0.00004057533,0.00001212305,0.000004346135,0.0001200901,0.000001626321,0.000246684],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.0116757,"threshold_uncertainty_score":0.02817243,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4323816430","doi":"10.1061/jmenea.meeng-5225","title":"Sustainable Infrastructure Is a Two-Way Street: Balancing Environmental and Condition Performance Goals","year":2023,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Global warming; Pavement management; Transport engineering; Computer science; Network performance; Performance indicator; Environmental economics; Operations research; Business; Environmental resource management; Climate change; Environmental science; Engineering; Economics","authors":[{"name":"Juan Manuel del Campo Yañez","is_ca":true},{"name":"Michelle Min Ji Lee","is_ca":true},{"name":"Omar Swei","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.001976423077989957,"gpt":0.1805956148850411,"spread":0.1786191918070511,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001614335,0.0005277231,0.0004371377,0.0008134495,0.0005039078,0.002406639,0.000696091,0.001261734,0.00182627],"category_scores_gemma":[0.003276011,0.0003511039,0.0004410088,0.00112304,0.0008931771,0.002928626,0.001225444,0.0005888846,0.0002567987],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002580735,"about_ca_system_score_gemma":0.00359658,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01228756,"about_ca_topic_score_gemma":0.023292,"domain_scores_codex":[0.9986612,0.0006017667,0.00003491337,0.0002118181,0.0002787386,0.0002117083],"domain_scores_gemma":[0.999064,0.000356879,0.0002033194,0.00009852289,0.0001740586,0.0001033053],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.00004796448,0.00008879339,0.005524726,0.00004230482,0.00003885694,0.00007015157,0.00006474386,0.9613262,0.002194743,0.01502568,0.0003374435,0.0152384],"study_design_scores_gemma":[0.00001977437,0.0002916133,0.009830155,0.00003672868,0.00004607999,0.00006968018,0.0005745187,0.9600537,0.002957335,0.0223338,0.003744011,0.00004253586],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6531897,0.0002992967,0.3157115,0.001731238,0.00003603446,0.0001749113,0.0003694622,0.0004363239,0.02805141],"genre_scores_gemma":[0.9743342,0.000136751,0.02391386,0.00002458958,0.000007609269,0.00004549914,0.00009512054,0.00003004234,0.001412383],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01228756,"threshold_uncertainty_score":0.02443206,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4416108550","doi":"10.1061/jmenea.meeng-7068","title":"Forecasting Construction Equipment Productivity Based on Weather Conditions: A Data-Driven Time-Series Machine Learning Approach","year":2025,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Leverage (statistics); Construction management; Field (mathematics); Autoregressive model; Project management; Automation; Construction industry","authors":[{"name":"Sena Assaf","is_ca":true},{"name":"Johnny Sawma Awad","is_ca":false},{"name":"Issam Srour","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01419928418921664,"gpt":0.2140958393359872,"spread":0.1998965551467705,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009817648,0.0006756809,0.0005489256,0.001450517,0.0001763934,0.0007997596,0.0007912517,0.0007516103,0.0005982972],"category_scores_gemma":[0.002476148,0.0003354833,0.000582214,0.001321281,0.0001919185,0.0008554599,0.0003588045,0.0007058151,0.0001777052],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006247796,"about_ca_system_score_gemma":0.0004868776,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01191854,"about_ca_topic_score_gemma":0.01015985,"domain_scores_codex":[0.999684,0.00008709142,0.00003101149,0.00009259665,0.00007141584,0.00003393956],"domain_scores_gemma":[0.9991269,0.000483819,0.0001368143,0.00005718819,0.0001593086,0.00003598465],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005896993,0.00015219,0.01389828,0.00005921231,0.00008252589,0.0001027253,0.00005799454,0.9284931,0.00150795,0.001300251,0.0006163666,0.05367051],"study_design_scores_gemma":[0.000001512611,0.000007948306,0.001814632,0.00000294838,0.000005487353,0.000005228639,0.00001128521,0.9974667,0.000190074,0.0003875987,0.0001029511,0.00000371729],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4765777,0.000582649,0.517019,0.0006500561,0.000106853,0.0001037603,0.00122996,0.00109078,0.002639211],"genre_scores_gemma":[0.9628773,0.0002227622,0.03546931,0.00003220071,0.00003920596,0.0000591621,0.000715786,0.00002006149,0.0005643147],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01191854,"threshold_uncertainty_score":0.02369833,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2013987637","doi":"10.1061/(asce)me.1943-5479.0000190","title":"Discussion of “Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling” by Hong Zhang","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Zhàng; Ant colony optimization algorithms; Scheduling (production processes); ANT; Operations research; Computer science; Mathematical optimization; Engineering; Artificial intelligence; Operations management; Geography; Mathematics; Computer network; China","authors":[{"name":"Wail Menesi","is_ca":true},{"name":"Tarek Hegazy","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03503604594685777,"gpt":0.3236500471661229,"spread":0.2886140012192651,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004227513,0.0004142197,0.0003405146,0.0006923493,0.0009483629,0.002020085,0.001354685,0.00236615,0.002902439],"category_scores_gemma":[0.006290147,0.0002267602,0.0007448447,0.001596915,0.001195009,0.002700526,0.001044733,0.002592152,0.0006397826],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001864103,"about_ca_system_score_gemma":0.001428008,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005793038,"about_ca_topic_score_gemma":0.003185235,"domain_scores_codex":[0.9979854,0.001005093,0.0001034592,0.000240688,0.0005750511,0.00009022229],"domain_scores_gemma":[0.997812,0.001174023,0.000100169,0.0000781091,0.0007473205,0.00008828218],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001557731,0.0001097541,0.001754948,0.0008287757,0.0001144636,0.001427454,0.002461614,0.02517008,0.001376018,0.4724213,0.3640469,0.1301328],"study_design_scores_gemma":[0.00005116681,0.0001017419,0.001270782,0.0004603463,0.00003583125,0.000382367,0.00152776,0.02101698,0.001958093,0.08434719,0.8887845,0.00006329265],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"commentary","genre_gemma":"commentary","genre_scores_codex":[0.01565041,0.06582284,0.1155251,0.6746976,0.0302845,0.0002146433,0.0001826356,0.0001752551,0.097447],"genre_scores_gemma":[0.4165326,0.09755915,0.06581192,0.2033522,0.02642101,0.0005217002,0.0002428191,0.0002805155,0.189278],"genre_candidate":"commentary","genre_consensus":"commentary","teacher_disagreement_score":0.005793038,"threshold_uncertainty_score":0.02235752,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4412588980","doi":"10.1061/jmenea.meeng-6699","title":"Assessing Individual Route-Level Distress from Collective Distress by Applying Multitask Learning to Promote Older Adults’ Daily Walking","year":2025,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Mental Health Research Topics","field":"Psychology","cited_by":0,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Distress; Psychology; Applied psychology; Cognitive psychology; Operations management; Business; Engineering; Clinical psychology","authors":[{"name":"Jong-Ryeul Sohn","is_ca":false},{"name":"Gaang Lee","is_ca":true},{"name":"Jinwoo Kim","is_ca":false},{"name":"Changbum R. Ahn","is_ca":false},{"name":"Sang Hyun Lee","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03285313881632391,"gpt":0.3590938803970773,"spread":0.3262407415807534,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009469557,0.0008417945,0.0003967457,0.0008456253,0.0002283917,0.0005944116,0.000436614,0.000539438,0.001013669],"category_scores_gemma":[0.004632624,0.0002075371,0.0005747558,0.0003804526,0.0001345235,0.0008299996,0.0008167981,0.0008354947,0.0002402023],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004390271,"about_ca_system_score_gemma":0.0003826618,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007287384,"about_ca_topic_score_gemma":0.01328537,"domain_scores_codex":[0.9997014,0.0001029258,0.00002357809,0.00009344234,0.00004087901,0.00003769479],"domain_scores_gemma":[0.9985042,0.0008258838,0.0002382733,0.00008678894,0.0001922535,0.0001526523],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0008005415,0.002472431,0.5854727,0.0004978128,0.0005364062,0.0001994347,0.001611288,0.07137536,0.004056907,0.0006052456,0.002807856,0.329564],"study_design_scores_gemma":[0.00006215821,0.001327496,0.2487704,0.0001526602,0.0003126687,0.00008633089,0.0009639917,0.7409387,0.001999793,0.003465413,0.001838328,0.00008207905],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9600368,0.0003340733,0.03731095,0.0003059084,0.00003938468,0.000117956,0.000460217,0.0002085563,0.001186229],"genre_scores_gemma":[0.9871946,0.0001288667,0.01171762,0.00005838144,0.00001711842,0.00008368691,0.0003362216,0.000006654598,0.0004568743],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.007287384,"threshold_uncertainty_score":0.01448995,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}