{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":4,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":4,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"5dd7fed24106","filters":{"venue":"Journal of Ship Production"}},"results":[{"id":"W62400544","doi":"10.5957/jsp.2005.21.3.186","title":"Factors Affecting Ship Design and Construction Lead Time and Cost","year":2005,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Context (archaeology); Lead time; Engineering; Quality (philosophy); Naval architecture; Shipbuilding; Process (computing); Probabilistic design; Engineering design process; Design process; Systems engineering; Operations research; Manufacturing engineering; Risk analysis (engineering); Transport engineering; Operations management; Computer science; Work in process; Marine engineering; Business","authors":[{"name":"Howard Moyst","is_ca":true},{"name":"Biman Das","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02451437945360817,"gpt":0.2218322950925136,"spread":0.1973179156389054,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004348827,0.0006617924,0.0004112963,0.002460941,0.001611339,0.002852179,0.0009068223,0.0007084271,0.007172337],"category_scores_gemma":[0.02345202,0.0006488396,0.0005846179,0.00220026,0.001036394,0.001419147,0.001068366,0.0007718487,0.001006128],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003373116,"about_ca_system_score_gemma":0.003563672,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00723021,"about_ca_topic_score_gemma":0.01685465,"domain_scores_codex":[0.9927775,0.002114258,0.0005170567,0.0003343344,0.003520898,0.0007360325],"domain_scores_gemma":[0.9706168,0.02093251,0.003405411,0.0008150305,0.00339241,0.0008378904],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.001657178,0.001269002,0.5120017,0.001547768,0.0002331316,0.007271242,0.008660814,0.1587022,0.02670192,0.009812627,0.003110408,0.2690319],"study_design_scores_gemma":[0.0001456013,0.00258811,0.8285201,0.0004191909,0.0003377253,0.00623337,0.02620334,0.05632919,0.02486819,0.008298208,0.04563792,0.0004191581],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9578338,0.0006302409,0.01954022,0.0002798302,0.00003240388,0.0002575606,0.0001659955,0.0001298683,0.02113005],"genre_scores_gemma":[0.9848136,0.0003789836,0.01068368,0.00002161073,0.00001017147,0.00009574679,0.0001802519,0.00008131179,0.003734606],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.00723021,"threshold_uncertainty_score":0.02447379,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W303161768","doi":"10.5957/jsp.2008.24.4.221","title":"A Computer Simulation Approach to Improving Tugboat Shipbuilding Design and Development Productivity","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Shipbuilding; Shipyard; Vendor; Naval architecture; Piping; Manufacturing engineering; Productivity; Engineering; Process (computing); Operations research; Computer science; Engineering drawing; Marine engineering; Mechanical engineering","authors":[{"name":"Biman Das","is_ca":true},{"name":"Navin Tejpal","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03919690532133227,"gpt":0.2207402117235713,"spread":0.181543306402239,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006719127,0.0005933931,0.0005149007,0.0008262974,0.0005879864,0.00118344,0.0009617016,0.0006933096,0.003962743],"category_scores_gemma":[0.002623708,0.0004925858,0.0004641257,0.001123538,0.0004784833,0.0007119635,0.00066439,0.0007158673,0.0003003665],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001854168,"about_ca_system_score_gemma":0.003263485,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.03031875,"about_ca_topic_score_gemma":0.02381988,"domain_scores_codex":[0.9995136,0.0002408489,0.00001729898,0.00004937024,0.0001317008,0.0000472411],"domain_scores_gemma":[0.9990256,0.0005573721,0.00005237227,0.00009412134,0.0002246189,0.00004594081],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007509335,0.00006436153,0.0008799121,0.00002850377,0.00001530687,0.00003073363,0.00008500066,0.9711623,0.001399572,0.007581682,0.0003684768,0.01830905],"study_design_scores_gemma":[0.00001299573,0.00002540704,0.0001452221,0.000006125987,0.000008464825,0.000008115769,0.00002220418,0.9967657,0.0006138309,0.0009485871,0.001439137,0.000004229683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2009499,0.0003087625,0.7521431,0.0005570457,0.00007418348,0.0002853348,0.0002413983,0.002198082,0.04324219],"genre_scores_gemma":[0.710044,0.0005326471,0.2816357,0.00005490887,0.00001360087,0.0005226572,0.0002677316,0.0001441208,0.006784606],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.03031875,"threshold_uncertainty_score":0.0602845,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W45633412","doi":"10.5957/jsp.2008.24.4.214","title":"Major Factors Affecting Tugboat Ship Design and Construction","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"Marine and Offshore Engineering Studies","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Shipyard; Shipbuilding; Vendor; Rework; Engineering; Naval architecture; Manufacturing engineering; Operations research; Operations management; Marine engineering; Business","authors":[{"name":"Biman Das","is_ca":true},{"name":"Navin Tejpal","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02322398740630273,"gpt":0.2083710768661037,"spread":0.185147089459801,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001237821,0.0006759514,0.0004512519,0.002648334,0.001739676,0.002476597,0.0006149647,0.0004337665,0.004231065],"category_scores_gemma":[0.006831741,0.0006433419,0.0004301944,0.005127364,0.001185312,0.0005941576,0.000933176,0.0005477875,0.0006222961],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.006572081,"about_ca_system_score_gemma":0.004192104,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.08577942,"about_ca_topic_score_gemma":0.218147,"domain_scores_codex":[0.9978551,0.0004404267,0.0001312529,0.0002080613,0.00084945,0.0005156751],"domain_scores_gemma":[0.9966911,0.001075363,0.0007883598,0.0001609583,0.0009836499,0.0003005512],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0006168889,0.0003068603,0.7286052,0.0004984808,0.00009722412,0.002437537,0.004533576,0.03022639,0.0200556,0.003275138,0.002320579,0.2070266],"study_design_scores_gemma":[0.000009710751,0.0002325312,0.9740123,0.00006347067,0.00004369611,0.0004935854,0.005666366,0.004689532,0.002494385,0.0004008429,0.0118483,0.00004524962],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9842794,0.0006614439,0.003127277,0.0001028598,0.00001497126,0.0001251352,0.0001782289,0.00003954488,0.0114712],"genre_scores_gemma":[0.9871502,0.0006876528,0.003783236,0.00001866789,0.000006971983,0.000068867,0.0003553598,0.000034124,0.007894997],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.08577942,"threshold_uncertainty_score":0.1705603,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W133259137","doi":"10.5957/jsp.2008.24.1.1","title":"A Linear Programming Approach to Optimization of Ship Design and Construction Phases","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Shipbuilding; Schedule; Engineering; Duration (music); Linear programming; Operations research; Construction management; Design–build; Naval architecture; Computer science; Mathematical optimization; Civil engineering; Mathematics; Marine engineering","authors":[{"name":"Howard Moyst","is_ca":true},{"name":"Biman Das","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03528924747972239,"gpt":0.2303881014103877,"spread":0.1950988539306653,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002037043,0.002132644,0.001606243,0.001347994,0.0006680851,0.001985322,0.001632533,0.001536033,0.008402983],"category_scores_gemma":[0.00263899,0.001615818,0.0019819,0.002122545,0.0008074517,0.001072693,0.0008765557,0.002480209,0.0009149174],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002240972,"about_ca_system_score_gemma":0.003473172,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01746807,"about_ca_topic_score_gemma":0.01718479,"domain_scores_codex":[0.9989241,0.0005460109,0.00003774862,0.0001375599,0.0002223901,0.0001320859],"domain_scores_gemma":[0.9988948,0.00087173,0.00007581135,0.00002267711,0.0001102283,0.00002480075],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008907947,0.00002126503,0.00005340193,0.00003264915,0.00001081123,0.00001328127,0.000009939959,0.9931903,0.0001392682,0.002655624,0.0001811545,0.003683286],"study_design_scores_gemma":[0.000009249888,0.00003604907,0.00005073905,0.000008827516,0.000008148507,0.000006472716,0.00001287754,0.9957446,0.0001859886,0.003219639,0.000711632,0.000005772274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.007487955,0.0002483011,0.9831076,0.0002104392,0.0000360412,0.0001645682,0.0002099079,0.0001733881,0.008361893],"genre_scores_gemma":[0.2889834,0.001394179,0.6872541,0.0002532061,0.0001185036,0.00227029,0.0006312518,0.0002933633,0.01880167],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01746807,"threshold_uncertainty_score":0.03473276,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}