{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":242,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":242,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"dd66b661574f","filters":{"venue":"Modular and Offsite Construction (MOC) Summit Proceedings"}},"results":[{"id":"W2939569709","doi":"10.29173/mocs31","title":"Prefabricated Prefinished Volumetric Construction Joining Tech-niques Review","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"National Research Foundation Singapore; National University of Singapore; National Research Foundation; Sembcorp Industries","keywords":"Constructability; Modular design; Computer science; Construction engineering; Engineering; Systems engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.008341770775595862,"gpt":0.1937689649760024,"spread":0.1854271942004066,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002893798,0.0004177792,0.0004981981,0.0005220096,0.0002545247,0.0001616674,0.0001606038,0.0002869791,0.0002554992],"category_scores_gemma":[0.0001358883,0.0003428694,0.0001403282,0.0009858548,0.0003615005,0.001107616,0.00004921413,0.0002923541,0.00004803623],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001576887,"about_ca_system_score_gemma":0.00003579702,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001194464,"about_ca_topic_score_gemma":0.000004192529,"domain_scores_codex":[0.9979156,0.00002463299,0.0007169898,0.0005823136,0.0003439928,0.0004164395],"domain_scores_gemma":[0.9988637,0.00003530129,0.0002247659,0.0002056422,0.0004755929,0.0001949873],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003247302,0.00001809408,0.03453821,0.00100444,0.0001498686,0.000001990602,0.00007131157,0.000004379944,0.03259936,0.01026565,0.006134268,0.91518],"study_design_scores_gemma":[0.0074225,0.0008312269,0.03740822,0.0157075,0.0015503,0.00407765,0.001994102,0.01468559,0.2212594,0.01480482,0.6743295,0.005929277],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8275517,0.0303949,0.1022315,0.001832755,0.003945699,0.002268499,0.0001098779,0.005441179,0.02622386],"genre_scores_gemma":[0.9578426,0.02134226,0.01937624,0.0002166416,0.0003633378,0.0001915912,0.00002730375,0.00009785434,0.000542122],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9092507,"threshold_uncertainty_score":0.9999023,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955960142","doi":"10.29173/mocs141","title":"Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Visualization; Modular design; Vehicle routing problem; Computer science; Building information modeling; Integrated logistics support; Systems engineering; Routing (electronic design automation); Transport engineering; Operations research; Process management; Engineering; Operations management; Data mining; Embedded system","retraction":null,"screen_n_in":null,"score":{"opus":0.009553049174982588,"gpt":0.2105148424160307,"spread":0.2009617932410481,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002414047,0.0003414085,0.0003743909,0.0004918432,0.0001838859,0.0001887413,0.00006142995,0.0002889404,0.00002037207],"category_scores_gemma":[0.00006798759,0.000337332,0.00004927672,0.000493116,0.0002988506,0.0005806264,0.00002670013,0.0002993856,0.000002187267],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008629783,"about_ca_system_score_gemma":0.00003305847,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003892055,"about_ca_topic_score_gemma":0.000004440542,"domain_scores_codex":[0.998461,0.0000275659,0.000513741,0.000472708,0.0002761302,0.0002488385],"domain_scores_gemma":[0.9991417,0.00004206249,0.0002188217,0.0001162772,0.0003774534,0.0001036931],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001985763,0.00005601082,0.271575,0.0007682285,0.0001471721,0.000003056159,0.00119238,0.006786884,0.08401136,0.06017778,0.00006670541,0.5750168],"study_design_scores_gemma":[0.001046131,0.0002163421,0.007679365,0.0004417014,0.00007270458,0.00006882172,0.003237206,0.9568586,0.02910421,0.0006222942,0.0002766373,0.0003760095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7604574,0.0002249138,0.2375492,0.00002752893,0.0004834296,0.0004190517,0.00002505162,0.0002416072,0.0005718312],"genre_scores_gemma":[0.9817379,0.0001059323,0.01787379,0.00003351862,0.00008507612,0.00002082652,0.00007291014,0.00004133421,0.00002876807],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9500717,"threshold_uncertainty_score":0.9999079,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953581745","doi":"10.29173/mocs87","title":"Automatic Selection Tool of Quality Control Specifications for Off-site Construction Manufacturing Products: A BIM-based Ontology Model Approach","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Ontology; Information model; Quality (philosophy); Computer science; Quality assurance; Frame (networking); Product (mathematics); Control (management); Systems engineering; Engineering; Software engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.01565666423060389,"gpt":0.2095694153177762,"spread":0.1939127510871723,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003628245,0.0003643702,0.0005699698,0.0004452794,0.0002089278,0.0001092967,0.0001203092,0.0003098841,0.00004615241],"category_scores_gemma":[0.0000637271,0.0003845861,0.0001546488,0.0003575683,0.000256839,0.0006429515,0.00001399451,0.0002807993,0.000007313332],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001571525,"about_ca_system_score_gemma":0.00007993889,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001700173,"about_ca_topic_score_gemma":0.00001016974,"domain_scores_codex":[0.9978921,0.00002805518,0.0008506138,0.0006007945,0.0002745614,0.0003538808],"domain_scores_gemma":[0.9987139,0.00005955591,0.000353763,0.0002150979,0.0005761946,0.00008147216],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0006512717,0.0002508378,0.07655559,0.006150774,0.0006879895,3.160196e-7,0.0007397105,0.06271743,0.2882026,0.2349749,0.000697415,0.3283711],"study_design_scores_gemma":[0.002220306,0.00009379287,0.004563558,0.00008389851,0.0001563104,0.00005847372,0.0005331238,0.9314238,0.05642942,0.002846683,0.001108083,0.0004825614],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7383643,0.0001714651,0.2586208,0.0001135622,0.0005113897,0.001144671,0.00007553589,0.0003808102,0.00061744],"genre_scores_gemma":[0.90162,0.00004201255,0.09776906,0.00004152199,0.0001335911,0.0002075927,0.00007228868,0.00004442182,0.00006945131],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8687063,"threshold_uncertainty_score":0.9998606,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2937109357","doi":"10.29173/mocs63","title":"Comparing cross laminated timber with concrete and steel: a financial analysis of two buildings in Australia","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Profit margin; Cross laminated timber; Revenue; Timeline; Internal rate of return; Equity (law); Rate of return; Apartment; Building material; Finance; Engineering; Business; Civil engineering; Economics; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.01331232203604725,"gpt":0.2674048499046828,"spread":0.2540925278686356,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003206629,0.0002053646,0.0004132542,0.0001259665,0.000313752,0.0001915029,0.0001562693,0.00009773612,0.0001395501],"category_scores_gemma":[0.00005034616,0.0001874,0.00005778578,0.0002770634,0.001570686,0.0008274639,0.0002284866,0.0001717254,0.000002139902],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001588574,"about_ca_system_score_gemma":0.000007616696,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002105034,"about_ca_topic_score_gemma":0.0005332399,"domain_scores_codex":[0.9987031,0.00001221451,0.0002910223,0.0004577425,0.0002360423,0.0002998411],"domain_scores_gemma":[0.999405,0.00001110765,0.0002550429,0.0001737486,0.00002799228,0.0001271186],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001024534,0.00001088264,0.9910296,0.00003758334,0.00005270788,0.000005394856,0.0004450353,0.0003891498,0.006697765,0.0003014792,0.00000875869,0.0009191748],"study_design_scores_gemma":[0.00115127,0.00007927052,0.9859226,0.00002985111,0.0001815069,0.0000121195,0.0003417139,0.007881202,0.0038296,0.0001745467,0.0001707306,0.0002255986],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9988015,0.00001655063,0.0001094054,0.00002976702,0.00002597364,0.0002224385,0.00000972361,0.00001620203,0.000768443],"genre_scores_gemma":[0.9977292,0.0000145402,0.001875059,0.00001580428,0.00001154282,0.000008417368,0.000005081446,0.000009964621,0.0003304238],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.007492052,"threshold_uncertainty_score":0.764195,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954632388","doi":"10.29173/mocs89","title":"Environmental Benefits of Reusable Modular Mass Timber Construction for Residential use in Japan: an LCA Approach","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Reuse; Benchmark (surveying); Environmental resource management; Sustainability; Engineering; Environmental economics; Environmental science; Civil engineering; Architectural engineering; Computer science; Geography; Ecology; Waste management","retraction":null,"screen_n_in":null,"score":{"opus":0.008603269206812831,"gpt":0.1981218645007147,"spread":0.1895185952939019,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004227205,0.0003289028,0.0004167469,0.0001444127,0.0001730751,0.0001082931,0.0001950672,0.0002573673,0.0004959865],"category_scores_gemma":[0.0000335729,0.0003455657,0.0001179148,0.0002248478,0.0007075636,0.002060145,0.0001696139,0.0002180514,0.00002349377],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003557634,"about_ca_system_score_gemma":0.00001093819,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000229269,"about_ca_topic_score_gemma":0.0000244317,"domain_scores_codex":[0.9976824,0.00003321611,0.000528403,0.0008329642,0.0004378886,0.00048516],"domain_scores_gemma":[0.9992398,0.00002298862,0.000240308,0.0002845435,0.00001911822,0.0001932486],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002226528,0.0001590747,0.9392457,0.0001027761,0.00002220456,5.522543e-7,0.0003567793,0.003107919,0.05061548,0.0007995497,0.00005106612,0.005316268],"study_design_scores_gemma":[0.002978754,0.0005534477,0.9347623,0.00004595859,0.00009820345,0.00008258286,0.006642023,0.02631624,0.02362309,0.00264594,0.001448628,0.0008028262],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9969634,0.00005397416,0.000686175,0.00003416937,0.0001605632,0.001115698,0.00005809822,0.00003583598,0.0008920914],"genre_scores_gemma":[0.9743528,0.00006060473,0.02488467,0.00004258374,0.00004842079,0.00004758766,0.00006145405,0.00003688838,0.0004649643],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02699239,"threshold_uncertainty_score":0.9998996,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955324818","doi":"10.29173/mocs132","title":"Investigating Stakeholders' Perceptions of Feasibility and Implications of Modular Construction-Based Post-Disaster Reconstruction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Process (computing); Modular design; Natural disaster; Flooding (psychology); Emergency management; Construction engineering; Engineering; Civil engineering; Risk analysis (engineering); Forensic engineering; Architectural engineering; Business; Computer science; Geography; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.01834454964080253,"gpt":0.2115309248818566,"spread":0.1931863752410541,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000221977,0.000329818,0.0004857069,0.000432886,0.0001940155,0.00008318718,0.0001114797,0.0002758901,0.0001733231],"category_scores_gemma":[0.00005787443,0.0003551752,0.0001342204,0.0004882059,0.000927537,0.0007532663,0.00003453795,0.0003104566,0.000004599804],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009718553,"about_ca_system_score_gemma":0.00006999446,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004807559,"about_ca_topic_score_gemma":0.00002585891,"domain_scores_codex":[0.9981391,0.00002762387,0.0008005316,0.0005149696,0.0002491055,0.0002686999],"domain_scores_gemma":[0.9984639,0.00004737813,0.000317339,0.0002599498,0.0007457317,0.000165656],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00002758333,0.00002681702,0.7058808,0.000625715,0.00008929584,8.410956e-8,0.0004787765,0.0007744992,0.1999927,0.01142138,0.00003013466,0.08065221],"study_design_scores_gemma":[0.005988375,0.0006861407,0.702225,0.001251309,0.0006413882,0.0009251123,0.04939524,0.1415173,0.08077831,0.0136452,0.0007908883,0.002155778],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.990792,0.0003053923,0.00625369,0.0001306519,0.0005042727,0.000595786,0.0001284241,0.000193184,0.00109664],"genre_scores_gemma":[0.9771186,0.0001039124,0.02254898,0.00003215142,0.00006175756,0.00003282139,0.00004152132,0.00003584376,0.00002440912],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1407428,"threshold_uncertainty_score":0.99989,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954362421","doi":"10.29173/mocs83","title":"Spatial Parameterization of Non-Semantic CAD Elements for Supporting Automated Disassembly Planning","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Key (lock); Reuse; Component (thermodynamics); Building information modeling; Workflow; Process (computing); Automation; CAD; Digitization; Spatial analysis; Software engineering; Data mining; Engineering drawing; Database; Engineering; Programming language; Computer vision","retraction":null,"screen_n_in":null,"score":{"opus":0.01144007934626619,"gpt":0.2399338018462283,"spread":0.2284937224999622,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003220082,0.0001689936,0.0002710689,0.00009093901,0.0001818018,0.0001047387,0.00009072509,0.00009973475,0.00009215007],"category_scores_gemma":[0.00004755816,0.0001483506,0.00006421594,0.0001768395,0.00006696404,0.0004141314,0.00001263779,0.0000789984,0.00001157167],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000005533553,"about_ca_system_score_gemma":0.00001827747,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003138741,"about_ca_topic_score_gemma":0.00005549627,"domain_scores_codex":[0.9987439,0.00001283503,0.0004140158,0.0003305012,0.0002044172,0.0002943308],"domain_scores_gemma":[0.9993759,0.00003535735,0.0002975518,0.00006339169,0.0001442033,0.00008359111],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00006638336,0.000007209451,0.9517335,0.0002479215,0.00002949991,7.160727e-7,0.0003197563,0.0001842565,0.01266102,0.00002286364,0.00005241122,0.03467451],"study_design_scores_gemma":[0.000914539,0.0003040693,0.6058836,0.0001855629,0.00005211693,0.00001927022,0.001726445,0.383257,0.006848012,0.00009660995,0.0003975484,0.000315255],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9969478,0.00006232019,0.001592158,0.00002291233,0.0003700574,0.0004263431,0.00006453098,0.0001137815,0.0004000659],"genre_scores_gemma":[0.9957185,0.00001121474,0.003813766,0.00002507512,0.00006052665,0.000003680969,0.0002458892,0.000007470353,0.0001138482],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3830727,"threshold_uncertainty_score":0.6049561,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2939777093","doi":"10.29173/mocs35","title":"A BIM-based Supply Chain Integration for Prefabrication and Modularization","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Prefabrication; Supply chain; Schedule; Modular programming; Integrated project delivery; Precast concrete; Process (computing); Building information modeling; Manufacturing engineering; Systems engineering; Transport engineering; Computer science; Engineering; Operations management; Business; Civil engineering; Project management; Scheduling (production processes)","retraction":null,"screen_n_in":null,"score":{"opus":0.006861548457437031,"gpt":0.1943483338728542,"spread":0.1874867854154172,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001759937,0.0002454373,0.0002029171,0.0003174898,0.0003041167,0.0002187423,0.00006555393,0.0002111066,0.0000225578],"category_scores_gemma":[0.00004929785,0.0002515494,0.00005308133,0.0003367922,0.0002577454,0.0006307675,0.00001352975,0.0001305482,0.000004605389],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007317475,"about_ca_system_score_gemma":0.00002262397,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001117065,"about_ca_topic_score_gemma":0.00002165672,"domain_scores_codex":[0.998879,0.000009805368,0.0003383262,0.00038561,0.000162179,0.0002250494],"domain_scores_gemma":[0.999192,0.00001895896,0.0001039398,0.000102023,0.0004812481,0.0001018468],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001520096,0.00003216448,0.02419945,0.0003138971,0.00007070156,2.455952e-7,0.0006487626,0.0001989708,0.1130959,0.1330109,0.0007463802,0.7275307],"study_design_scores_gemma":[0.001542999,0.0002782203,0.01013262,0.0001596546,0.0001146169,0.00005084498,0.0008036042,0.8558877,0.106461,0.009074657,0.01490869,0.0005853231],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5049661,0.000232049,0.4926022,0.0002353168,0.0004930759,0.0005488307,0.00002563438,0.000341096,0.0005556955],"genre_scores_gemma":[0.973308,0.00009126655,0.02581252,0.00007553127,0.0003564807,0.0001493513,0.00009916227,0.00003775935,0.00006988204],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8556888,"threshold_uncertainty_score":0.9999937,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955588086","doi":"10.29173/mocs91","title":"A Research Roadmap for Off-Site Construction: Automation and Robotics","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Robotics; Automation; Engineering management; Manufacturing engineering; Government (linguistics); Manufacturing; Engineering; Emerging technologies; Technology roadmap; Computer science; Artificial intelligence; Systems engineering; Robot; Process management; Business; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.0129393961551945,"gpt":0.236567965683315,"spread":0.2236285695281205,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004140089,0.0002765347,0.0003184715,0.0004736682,0.0003590977,0.0003449265,0.0000904615,0.0003015599,0.00007638885],"category_scores_gemma":[0.00003541704,0.0002921799,0.00007642972,0.0004634511,0.0003549308,0.0008343839,0.00004470243,0.0003772099,0.00003409946],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001041496,"about_ca_system_score_gemma":0.00003557517,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001063979,"about_ca_topic_score_gemma":0.00001228375,"domain_scores_codex":[0.9983279,0.00001876983,0.0004267696,0.0004912581,0.0003358282,0.0003994798],"domain_scores_gemma":[0.9989354,0.00005434755,0.00009238993,0.0001472276,0.0006116108,0.000159014],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001741006,0.00003363119,0.09951712,0.001351317,0.0002390452,0.000001825053,0.00101819,0.002041885,0.03156662,0.2354371,0.003184452,0.6254347],"study_design_scores_gemma":[0.005373192,0.0006088756,0.02440376,0.00061956,0.0002573906,0.00147807,0.01082983,0.7804288,0.0167334,0.01824424,0.1391298,0.001893077],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9776852,0.001240584,0.01399894,0.0002951707,0.001444534,0.0009408399,0.00003187501,0.000505553,0.003857265],"genre_scores_gemma":[0.96425,0.0006140106,0.03397729,0.00003683968,0.0003703922,0.0001027331,0.00004358092,0.00005745267,0.0005476663],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.778387,"threshold_uncertainty_score":0.999953,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296079691","doi":"10.29173/mocs277","title":"Hindering factors to the utilisation of UAVs for construction projects in South Africa","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Aviation Industry Analysis and Trends","field":"Economics, Econometrics and Finance","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Drone; Software deployment; Construction industry; Integrated project delivery; Investment (military); Business; Construction engineering; Engineering management; Construction management; Engineering; Process management; Civil engineering; Political science; Politics","retraction":null,"screen_n_in":null,"score":{"opus":0.04714594478015876,"gpt":0.2111585434556014,"spread":0.1640125986754426,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000475073,0.0001441423,0.0003057988,0.0005019527,0.0003792313,0.00007111197,0.0001254819,0.00007682826,0.00009610089],"category_scores_gemma":[0.00008172366,0.0001452755,0.00009083965,0.0007277576,0.00007881795,0.0002615972,0.00007567019,0.0001857052,0.000002052255],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001069889,"about_ca_system_score_gemma":0.00001784616,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004387807,"about_ca_topic_score_gemma":0.00001091184,"domain_scores_codex":[0.9987429,0.000009831775,0.0005549782,0.0004005278,0.00008674923,0.0002050536],"domain_scores_gemma":[0.999387,0.00002344194,0.0003474737,0.0001067495,0.00008238284,0.00005292557],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00006594647,0.00004793139,0.8884559,0.00006656619,0.00007893014,2.621533e-7,0.009908763,0.001326333,0.0002907676,0.09004346,0.0001507166,0.009564454],"study_design_scores_gemma":[0.005356679,0.001234451,0.4418362,0.0001259948,0.0002778099,0.00005563826,0.1985666,0.07459787,0.01144438,0.0333889,0.2307672,0.002348323],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9913623,0.0001835922,0.006232236,0.0003405145,0.0003143286,0.0004213822,0.0001588503,0.0000252182,0.0009616307],"genre_scores_gemma":[0.9983155,0.000008007632,0.001251509,0.00002752326,0.00006375164,0.0001239882,0.00002749761,0.00001426141,0.000167952],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4466197,"threshold_uncertainty_score":0.5924163,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2939173706","doi":"10.29173/mocs34","title":"Modular Industry Characteristics and Barriers to its Increased Market Share","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Modular design; Work (physics); Engineering; Construction management; Business; Engineering management; Architectural engineering; Operations management; Construction engineering; Civil engineering; Marketing; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.006202993586963973,"gpt":0.1910571583962765,"spread":0.1848541648093125,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001630403,0.0003144306,0.0002897348,0.0002843755,0.0003321341,0.0002619306,0.0001081179,0.0004135767,0.0006638626],"category_scores_gemma":[0.0001277715,0.0003365649,0.00004618623,0.00036003,0.0002223936,0.000549296,0.00006000081,0.0004018775,0.00002342891],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006779691,"about_ca_system_score_gemma":0.00003261823,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001385067,"about_ca_topic_score_gemma":0.000008672377,"domain_scores_codex":[0.9986541,0.00001156639,0.0003488022,0.0004408339,0.0002146402,0.0003300388],"domain_scores_gemma":[0.9988997,0.00001074532,0.00007401476,0.0001238444,0.0003731913,0.0005184801],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0004367823,0.00003935689,0.4526972,0.001047124,0.0005039104,0.0000186631,0.002535922,0.00003100867,0.1674554,0.01562686,0.01817374,0.3414341],"study_design_scores_gemma":[0.004157356,0.0007267176,0.3949274,0.001186085,0.0005215377,0.001270448,0.009925015,0.1907657,0.1032676,0.001926515,0.2873598,0.00396591],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9938006,0.0001868007,0.001112022,0.0001400036,0.0007085925,0.0002942837,0.0001012378,0.0003277831,0.003328682],"genre_scores_gemma":[0.9969596,0.00008889857,0.00183936,0.0002189682,0.0005150577,0.00004022778,0.00002029577,0.00004440668,0.0002732145],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3374682,"threshold_uncertainty_score":0.9999086,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953706728","doi":"10.29173/mocs116","title":"Evaluation of Risk Management Practice in the Nigeria Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"University of Johannesburg","keywords":"Risk management plan; Risk management; Business; Control (management); Risk analysis (engineering); Project risk management; Identification (biology); IT risk management; Quality (philosophy); Exploratory factor analysis; Plan (archaeology); Operations management; Construction industry; Risk assessment; Enterprise risk management; Project management; Descriptive statistics; Construction management; Marketing; Project management triangle; Engineering; Management; Finance; Economics; Construction engineering; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.03691536977139125,"gpt":0.3275571073050643,"spread":0.290641737533673,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01130597,0.000248185,0.0003493057,0.0008694226,0.0002511502,0.0004043946,0.0004579253,0.0002349552,0.0005352647],"category_scores_gemma":[0.001104512,0.0001904868,0.000103028,0.001859565,0.0003493761,0.001796306,0.0001591984,0.0005610964,0.00006890053],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008163475,"about_ca_system_score_gemma":0.00006515679,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005313208,"about_ca_topic_score_gemma":0.00003062119,"domain_scores_codex":[0.9950792,0.0003129908,0.0009431716,0.0007072313,0.002667755,0.0002896739],"domain_scores_gemma":[0.9969155,0.0003179176,0.000925237,0.000400473,0.00137957,0.00006136329],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0001016554,0.00004104772,0.433036,0.00003604352,0.00007059595,0.000001031748,0.001351977,0.0001800263,0.00008457294,0.0167182,0.0004037478,0.5479751],"study_design_scores_gemma":[0.008223981,0.0003385101,0.4618657,0.0003201586,0.001157297,0.0004885339,0.2552704,0.03688262,0.001279915,0.08528198,0.1476252,0.001265657],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9542866,0.000267841,0.0003592619,0.0003829313,0.000997658,0.001025973,0.0000103785,0.00003507013,0.04263427],"genre_scores_gemma":[0.9942601,0.0003730912,0.004861701,0.0001143024,0.0001029771,0.00004772304,0.000005512514,0.00001205524,0.0002225116],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5467095,"threshold_uncertainty_score":0.7767825,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2898328996","doi":"10.29173/mocs172","title":"Permanent Modular Construction: Construction Performance","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Schedule; Modular construction; Sample (material); Construction industry; Computer science; Construction management; Test (biology); Engineering; Construction engineering; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01112635326598991,"gpt":0.1857710283249126,"spread":0.1746446750589227,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002828155,0.000548599,0.000489944,0.0004632019,0.0004070222,0.0003290986,0.000189253,0.0003969789,0.0001041266],"category_scores_gemma":[0.00003276249,0.0005799241,0.0001373919,0.0006128048,0.0007666658,0.001522734,0.00006407413,0.0005483362,0.00008319724],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002658847,"about_ca_system_score_gemma":0.00007888074,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002021834,"about_ca_topic_score_gemma":0.000007278524,"domain_scores_codex":[0.9975075,0.00002271924,0.0007098161,0.0006576743,0.0005604717,0.0005418539],"domain_scores_gemma":[0.9984541,0.00001329097,0.0001889503,0.0002469899,0.0006623567,0.000434304],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003049198,0.00008331179,0.1887632,0.0008720858,0.0005163228,0.00001671616,0.001751182,0.005806215,0.01578779,0.1064957,0.005439798,0.6741627],"study_design_scores_gemma":[0.01157465,0.001062855,0.02634598,0.0009610613,0.0009735515,0.01575495,0.03131822,0.3949995,0.114445,0.01894985,0.3773745,0.00623999],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9741014,0.0009292498,0.007190106,0.0001872275,0.003572221,0.000425889,0.00002558149,0.0009852985,0.012583],"genre_scores_gemma":[0.9795056,0.000676365,0.01859302,0.00006809035,0.0007059491,0.00007586366,0.00005063744,0.00007383266,0.0002506704],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6679227,"threshold_uncertainty_score":0.9996652,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296272583","doi":"10.29173/mocs287","title":"Carbon emissions comparison in modular and site-built residential construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Modular design; Life-cycle assessment; Prefabrication; Construction waste; Environmental impact assessment; Productivity; Environmental economics; Engineering; Environmental resource management; Business; Production (economics); Environmental planning; Environmental science; Civil engineering; Waste management; Computer science; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.007888409632422756,"gpt":0.2051085963982159,"spread":0.1972201867657931,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002452378,0.0003381906,0.0004115778,0.0005916072,0.0004992257,0.000182614,0.0001191373,0.0001969545,0.0001323651],"category_scores_gemma":[0.00002485164,0.0003957563,0.0000747753,0.000622436,0.0002855902,0.0004688976,0.0001245886,0.0006898962,0.000002623854],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001935645,"about_ca_system_score_gemma":0.0000362182,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001932482,"about_ca_topic_score_gemma":0.0001013207,"domain_scores_codex":[0.9980407,0.00003789406,0.0006051693,0.0005547303,0.0003899027,0.0003716536],"domain_scores_gemma":[0.9993876,0.00002050332,0.0001426239,0.0001485739,0.0001266569,0.0001740817],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002193937,0.00007992363,0.7413085,0.0003510526,0.0001382898,0.00001791142,0.002197879,0.00771985,0.1045481,0.016883,0.001125734,0.1254104],"study_design_scores_gemma":[0.006151953,0.0004523401,0.07520394,0.0003258679,0.0003866388,0.002327496,0.02815981,0.7908375,0.0345549,0.009907642,0.04901883,0.002673047],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9937103,0.001232519,0.001217242,0.0001300769,0.001189173,0.0003497496,0.00003062089,0.0003294612,0.001810848],"genre_scores_gemma":[0.9967228,0.0002411871,0.00254521,0.00002934007,0.0001741883,0.00009221112,0.00004023361,0.00004436541,0.000110513],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7831177,"threshold_uncertainty_score":0.9998494,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296079369","doi":"10.29173/mocs278","title":"A principal component analysis of Organisational BIM Implementation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Nonprobability sampling; Building information modeling; Status quo; Process management; Yardstick; Process (computing); Knowledge management; Principal (computer security); Construction industry; Business; Competitive advantage; Computer science; Operations management; Engineering; Construction engineering; Marketing","retraction":null,"screen_n_in":null,"score":{"opus":0.007207543096686039,"gpt":0.2097370530253108,"spread":0.2025295099286247,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0001642809,0.0001562425,0.0002480119,0.0006060564,0.000268551,0.0000525152,0.00008393551,0.00005131826,0.0009960571],"category_scores_gemma":[0.000004815484,0.0001775924,0.0001070382,0.0009699449,0.00009520047,0.0002563089,0.00005189972,0.000165589,0.000001992015],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001352824,"about_ca_system_score_gemma":0.0000251772,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004295718,"about_ca_topic_score_gemma":0.00002355164,"domain_scores_codex":[0.9988239,0.00001351891,0.0004104918,0.0002428659,0.0003481476,0.0001610297],"domain_scores_gemma":[0.9995495,0.00001146839,0.0001339632,0.00007641147,0.0001639537,0.0000647179],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001132244,0.00009432744,0.5359998,0.0002251077,0.002654613,0.000002463547,0.002541149,0.01977558,0.1069428,0.2033903,0.0008017542,0.1274589],"study_design_scores_gemma":[0.003387658,0.0003491387,0.4695845,0.00003179633,0.002898701,0.0002373995,0.03275637,0.3869608,0.04819148,0.004000755,0.05015849,0.001442872],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9912206,0.0001309909,0.007253015,0.00006552873,0.0003661988,0.0001861871,0.0001022274,0.0001428462,0.0005324315],"genre_scores_gemma":[0.9971766,0.00003664031,0.002426676,0.00002771885,0.00005388268,0.00005650568,0.0001765629,0.00001674412,0.00002862108],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3671853,"threshold_uncertainty_score":0.9999171,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3113011181","doi":"10.29173/mocs188","title":"A Framework for Comparative Evaluation of the Life Cycle Sustainability of Modular and Conventional Buildings","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Sustainability; Analytic hierarchy process; Modular design; Process (computing); Multiple-criteria decision analysis; Engineering; Factory (object-oriented programming); Modular construction; Life-cycle assessment; Architectural engineering; Construction engineering; Key (lock); Systems engineering; Computer science; Operations research; Production (economics)","retraction":null,"screen_n_in":null,"score":{"opus":0.03029052058977919,"gpt":0.2730149197842187,"spread":0.2427243991944395,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006040206,0.0001666161,0.000284802,0.0001152871,0.0001150297,0.00004367591,0.0000838867,0.0001589091,0.00001486876],"category_scores_gemma":[0.0002739765,0.0001456895,0.00008859236,0.0002600204,0.0004310626,0.0003339286,0.00003411103,0.000153569,2.591857e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009547939,"about_ca_system_score_gemma":0.0001057475,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001892948,"about_ca_topic_score_gemma":0.000005328647,"domain_scores_codex":[0.9987993,0.00002648855,0.0004007185,0.0002408663,0.0003843762,0.0001482118],"domain_scores_gemma":[0.9977639,0.00003852972,0.0001924028,0.0001042241,0.001800574,0.0001004238],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000402436,0.0001209887,0.1383945,0.001557004,0.0005598094,1.284314e-7,0.004782956,0.02181141,0.008700802,0.7429549,0.0008296905,0.07988535],"study_design_scores_gemma":[0.002887471,0.0001769475,0.02412944,0.0002395802,0.0004882336,0.00003568915,0.01435564,0.6499324,0.02442548,0.2807207,0.002173039,0.0004354238],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9417102,0.000756737,0.05601166,0.0001352913,0.0003826877,0.0006807545,0.0000279229,0.00004771076,0.0002470041],"genre_scores_gemma":[0.9909632,0.00001943374,0.008824565,0.00001293927,0.00007534868,0.00007336467,0.000007001706,0.00001260851,0.00001159211],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.628121,"threshold_uncertainty_score":0.5941046,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296079866","doi":"10.29173/mocs255","title":"Design-for-Manufacturing-and-Assembly (DfMA) for the construction industry: A review","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal; Polytechnique Montréal","funders":"Fonds de recherche du Québec – Nature et technologies; National Research Council Canada; Polytechnique Montréal","keywords":"Engineering; Systematic review; Construction industry; Computer science; Engineering management; Manufacturing engineering; Construction engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.04268418942031275,"gpt":0.2647113452291091,"spread":0.2220271558087964,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006687524,0.0007648825,0.001370659,0.0003445917,0.0008444187,0.0003126512,0.0002784726,0.0007413131,0.0001220829],"category_scores_gemma":[0.00009950781,0.0006227266,0.0004449367,0.0004032427,0.0003248445,0.0004218935,0.00008265825,0.001136283,0.000003474426],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002204192,"about_ca_system_score_gemma":0.0001186105,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000706738,"about_ca_topic_score_gemma":0.000002202973,"domain_scores_codex":[0.9974689,0.000044601,0.0009521951,0.0007559957,0.0003103969,0.0004678823],"domain_scores_gemma":[0.9986416,0.0002939245,0.0004665357,0.0002483988,0.0001888132,0.0001607817],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00001409558,0.000005230649,0.00000708011,0.02017334,0.0003161736,4.29324e-7,0.00003123505,0.00001689975,0.000006001016,0.003426143,0.002740667,0.9732627],"study_design_scores_gemma":[0.0004020755,0.00008357214,0.000002761187,0.004749528,0.001904622,0.0006978539,0.0003277019,0.001833,0.0001154798,0.0005302334,0.9886768,0.0006763122],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.00008400972,0.9672183,0.02616743,0.0001424683,0.001863727,0.003808312,0.0001392836,0.0003688204,0.0002076928],"genre_scores_gemma":[0.00006588489,0.9896071,0.00675827,0.00009095747,0.0004942513,0.00257132,0.0001242594,0.0001286248,0.0001593137],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.9859362,"threshold_uncertainty_score":0.9996224,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953406379","doi":"10.29173/mocs128","title":"Numerical and Experimental Study on Modular-Based Timber Structures","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Tree Root and Stability Studies","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Prefabrication; Stiffness; Modular design; Structural engineering; Cross laminated timber; Finite element method; Engineering; Shear (geology); Shear wall; Frame (networking); Computer science; Mechanical engineering; Geology","retraction":null,"screen_n_in":null,"score":{"opus":0.007846410184613977,"gpt":0.2105612005679601,"spread":0.2027147903833461,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008509702,0.0003169591,0.000361405,0.0001372619,0.0001658153,0.0001193354,0.00007649007,0.0001059386,0.00005740337],"category_scores_gemma":[0.00001209082,0.0002924632,0.00006218903,0.0001568702,0.0001245561,0.0002173616,0.00004398623,0.0002147611,0.00001331594],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005836017,"about_ca_system_score_gemma":0.000006652404,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001507573,"about_ca_topic_score_gemma":0.00001294953,"domain_scores_codex":[0.9987326,0.00001066163,0.0002468791,0.0004695352,0.0002609205,0.0002793536],"domain_scores_gemma":[0.9996212,0.00002294451,0.00004095901,0.0001335493,0.00006482888,0.0001165643],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001443152,0.0001642134,0.9809677,0.0001775814,0.0001743512,0.000004635167,0.001438812,0.00245757,0.008842563,0.0007798818,0.0002347949,0.00461358],"study_design_scores_gemma":[0.005612812,0.001681122,0.868427,0.000101182,0.0001421113,0.00004862928,0.01329707,0.06506285,0.03931218,0.0005409062,0.004322775,0.001451349],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9971688,0.0005021104,0.0002075278,0.00004897776,0.0003704274,0.0004916608,0.000007992539,0.000251144,0.000951327],"genre_scores_gemma":[0.9991204,0.000006051884,0.0006418393,0.00002707228,0.0000830976,0.00003125128,0.000004329002,0.00003591619,0.00005007616],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1125407,"threshold_uncertainty_score":0.9999527,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954795660","doi":"10.29173/mocs110","title":"Lean Construction Supply Chain: A Bibliometric Analysis of the Knowledge Base","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"University of Johannesburg","keywords":"Supply chain; Lean manufacturing; Knowledge management; Citation; Supply chain management; Lean project management; Lean construction; Scopus; Business; Process management; Computer science; Engineering; Construction industry; Marketing; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.01367487874295266,"gpt":0.2163825053200154,"spread":0.2027076265770628,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["bibliometrics"],"consensus_categories":["bibliometrics"],"category_scores_codex":[0.0007920994,0.0002910474,0.0005245706,0.02120987,0.0003118785,0.0003733861,0.0003153577,0.000139888,0.0005526957],"category_scores_gemma":[0.0001041856,0.0002415027,0.0003133928,0.05418807,0.0003446953,0.001276329,0.0003310745,0.0002188296,0.00006717333],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005127111,"about_ca_system_score_gemma":0.00002344043,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002531604,"about_ca_topic_score_gemma":0.00007677306,"domain_scores_codex":[0.9979924,0.0000128571,0.0005609575,0.000575674,0.0004792386,0.0003788938],"domain_scores_gemma":[0.9986247,0.00003643525,0.0004772861,0.0002870398,0.000537044,0.00003743166],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00005733315,0.00008153733,0.8858761,0.0006609666,0.0005348703,7.372643e-7,0.0001308368,0.00009134927,0.001239683,0.06841253,0.0008057255,0.04210834],"study_design_scores_gemma":[0.002668935,0.00006717041,0.8332796,0.0002524496,0.003386039,0.00001615454,0.006732338,0.05366069,0.001507966,0.003832076,0.09352767,0.001068972],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9887786,0.0002588973,0.0006844869,0.0004986873,0.0007283236,0.000551669,0.00001479634,0.0001019171,0.008382621],"genre_scores_gemma":[0.9980777,0.00007647021,0.0004573657,0.000334255,0.0002707845,0.00001826428,0.00003326282,0.00002360848,0.0007083249],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.09272195,"threshold_uncertainty_score":0.9898839,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954062416","doi":"10.29173/mocs93","title":"Risks Identification and Allocation in the Supply Chain of Modular Integrated Construction (MiC)","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Hong Kong Polytechnic University","keywords":"Supply chain; Risk management; Business; Risk analysis (engineering); Identification (biology); Supply chain risk management; Failure mode, effects, and criticality analysis; Bespoke; Modular design; Risk assessment; Stakeholder; Interdependence; Supply chain management; Operations management; Computer science; Service management; Engineering; Reliability engineering; Marketing; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.03765976775095102,"gpt":0.2944018005511277,"spread":0.2567420328001767,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002662266,0.0002555981,0.0003857464,0.0009334447,0.0002321394,0.0004655651,0.0003760486,0.0001696328,0.0001460729],"category_scores_gemma":[0.0002658798,0.0001974412,0.0000824685,0.001576845,0.0005279678,0.001383725,0.0001049447,0.0002989525,0.00002988294],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000472533,"about_ca_system_score_gemma":0.00004405524,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001909135,"about_ca_topic_score_gemma":0.00006027467,"domain_scores_codex":[0.9970921,0.00007994597,0.001002459,0.0007244432,0.0008404942,0.0002605059],"domain_scores_gemma":[0.9982223,0.0001260144,0.0006440204,0.000329288,0.0006143564,0.00006401129],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0001085252,0.00003062148,0.7118229,0.0000830476,0.00003081449,6.154098e-7,0.001399117,0.00007396815,0.01366498,0.0302428,0.0001903777,0.2423523],"study_design_scores_gemma":[0.003061458,0.0002684319,0.7860236,0.0002383828,0.0001362854,0.0002896936,0.05036657,0.09489605,0.01372464,0.02798641,0.0221644,0.000844062],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9941675,0.0002119471,0.00237495,0.0007375104,0.0005917171,0.0008097635,0.00001593155,0.00004487014,0.001045826],"genre_scores_gemma":[0.9975557,0.0003408118,0.00153185,0.00007334311,0.00006283541,0.00003452837,0.00002431338,0.00001306407,0.0003635206],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2415082,"threshold_uncertainty_score":0.8051418,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955193216","doi":"10.29173/mocs120","title":"Cross-Laminated Timber Shear Walls in Balloon Construction: Seismic Performance of Steel Connections","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Resources Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Cross laminated timber; Structural engineering; Shear wall; Shear (geology); Engineering; Seismic analysis; Low-rise; Seismic loading; Compatibility (geochemistry); Civil engineering; Geology","retraction":null,"screen_n_in":null,"score":{"opus":0.0057224313996502,"gpt":0.1843186189176228,"spread":0.1785961875179726,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001255148,0.0002681798,0.0003582153,0.0002872662,0.0001096655,0.00009354761,0.00009049608,0.0001892079,0.0002752372],"category_scores_gemma":[0.000008631067,0.0002640156,0.00006985317,0.0003891414,0.0002412422,0.0007252812,0.00003598764,0.0002364003,0.00005556736],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008594485,"about_ca_system_score_gemma":0.0000199707,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003263896,"about_ca_topic_score_gemma":0.00000707806,"domain_scores_codex":[0.998772,0.000008580507,0.0004147276,0.0003248055,0.0001833949,0.0002964468],"domain_scores_gemma":[0.9995265,0.00001685229,0.00008514455,0.0001220834,0.0001763589,0.00007308843],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001322999,0.00004264056,0.9599511,0.0007185987,0.0001556553,0.000002466376,0.0005416879,0.00901921,0.01490819,0.001160386,0.00009452968,0.01327325],"study_design_scores_gemma":[0.007604274,0.0008307362,0.3393777,0.0009556375,0.0002321871,0.0005289926,0.003342179,0.4711138,0.1571795,0.0003661336,0.01676666,0.001702206],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9927076,0.0004557683,0.00006127509,0.00003893203,0.0005888813,0.0003610423,0.0000145211,0.0001926504,0.005579326],"genre_scores_gemma":[0.9969267,0.0003316825,0.001581126,0.00001343245,0.00005555094,0.00002420679,0.0000161944,0.00003481087,0.001016326],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6205734,"threshold_uncertainty_score":0.9999812,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2937012657","doi":"10.29173/mocs43","title":"Towards net zero energy modular housing: a case study","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Modular design; Roof; Zero-energy building; Architectural engineering; Efficient energy use; Photovoltaics; Container (type theory); Shading; Computer science; Solar gain; Window (computing); Code (set theory); Civil engineering; Solar energy; Engineering; Photovoltaic system; Mechanical engineering; Electrical engineering; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.008059766340086906,"gpt":0.1975599125271606,"spread":0.1895001461870737,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001528532,0.0003179075,0.0002900984,0.0002592866,0.000380308,0.0002074265,0.000122861,0.0001899195,0.00003970122],"category_scores_gemma":[0.00001234624,0.0003343493,0.00006523992,0.0004559578,0.0001770959,0.0005110695,0.0000749438,0.0001717601,0.000002349004],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006521437,"about_ca_system_score_gemma":0.00002039609,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002684208,"about_ca_topic_score_gemma":0.00009265303,"domain_scores_codex":[0.9986338,0.00001175309,0.0003296024,0.00044366,0.0002321748,0.0003490346],"domain_scores_gemma":[0.9993606,0.00000649249,0.00007419319,0.0001749311,0.000228607,0.0001551651],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003375285,0.0006950935,0.08819818,0.0005711253,0.001631409,0.001158423,0.00739629,0.1638848,0.01686714,0.03926932,0.007111512,0.6728792],"study_design_scores_gemma":[0.002740401,0.0007279907,0.001085971,0.0001254057,0.0003456452,0.003490634,0.004762621,0.9344863,0.0170624,0.002538912,0.03102372,0.001610032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9315068,0.0002387028,0.06547874,0.00002408548,0.0006708445,0.0001651635,0.000004798325,0.0005743919,0.001336479],"genre_scores_gemma":[0.9927942,0.00008897842,0.006448326,0.00006517088,0.0003658994,0.00003399375,0.000009553582,0.00006436559,0.0001294907],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7706015,"threshold_uncertainty_score":0.9999108,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2902687294","doi":"10.29173/mocs52","title":"Manufacturing of modular buildings: a literature review","year":2017,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Factory (object-oriented programming); Process (computing); Field (mathematics); Manufacturing engineering; Productivity; Engineering; Systems engineering; Advanced manufacturing; Computer science; Process management; Engineering management","retraction":null,"screen_n_in":null,"score":{"opus":0.02061567046596614,"gpt":0.2617338821326967,"spread":0.2411182116667306,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003079762,0.000842175,0.002162283,0.0005774761,0.0002797474,0.0003559516,0.000429669,0.0007531127,0.00006307902],"category_scores_gemma":[0.00005833691,0.0007572891,0.0006434822,0.0003385017,0.000290908,0.0008157766,0.0001014322,0.0009229724,0.00001482064],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000121902,"about_ca_system_score_gemma":0.00005582644,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005269334,"about_ca_topic_score_gemma":0.000001933566,"domain_scores_codex":[0.9973246,0.00002431482,0.001153062,0.0007120718,0.0003774952,0.0004084984],"domain_scores_gemma":[0.998292,0.0000216395,0.0007331072,0.0004425492,0.0003240271,0.0001867218],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000002948465,0.000006624497,0.00001703786,0.09046991,0.0002330166,0.000005439992,0.00003657411,0.000002480454,0.00002223604,0.001483182,0.0007577804,0.9069628],"study_design_scores_gemma":[0.0001887783,0.00002584582,0.000006999358,0.09919701,0.0008862953,0.0006781396,0.00003322375,0.0001513923,0.0002446242,0.0002287326,0.8977134,0.0006455157],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.0002477664,0.9947481,0.0005534064,0.0000215265,0.001085084,0.0008959601,0.0001029014,0.0002982687,0.002046942],"genre_scores_gemma":[0.0002433876,0.996129,0.002578018,0.00002287969,0.0003962317,0.000128651,0.0001132745,0.0001112829,0.0002773073],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.9063172,"threshold_uncertainty_score":0.9994878,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955214881","doi":"10.29173/mocs113","title":"Research Trends in Off-Site Construction Management: Review of Literature at the Process Level","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Productivity; Quality (philosophy); Process (computing); Excellence; Standardization; Process management; Project management; Engineering management; Business; Engineering; Operations management; Computer science; Systems engineering; Political science","retraction":null,"screen_n_in":null,"score":{"opus":0.01446567416396785,"gpt":0.2580864275503983,"spread":0.2436207533864305,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006157894,0.0002653674,0.0003593494,0.0007721119,0.0001742349,0.0001129136,0.0001763763,0.0002043508,0.0003344938],"category_scores_gemma":[0.00001553472,0.0002184824,0.000101314,0.002037621,0.0003494588,0.0006023025,0.00007057118,0.0005463132,0.00002858045],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001316253,"about_ca_system_score_gemma":0.00001518487,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001072539,"about_ca_topic_score_gemma":0.00002714853,"domain_scores_codex":[0.9981157,0.00003646355,0.0005500009,0.0004455125,0.0005074436,0.0003448681],"domain_scores_gemma":[0.9990559,0.00002306341,0.0001316293,0.00022038,0.0004941163,0.00007489725],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001289186,0.00003518089,0.0715666,0.01278189,0.0001676675,0.000005267297,0.00113491,0.0001581138,0.004581695,0.03359658,0.004113085,0.8717301],"study_design_scores_gemma":[0.01429305,0.0008897297,0.2069238,0.08048802,0.0009893427,0.004074579,0.03233856,0.04964763,0.07066812,0.01628488,0.5177634,0.005638961],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9512599,0.02232857,0.0001370243,0.0003691789,0.0007433635,0.0007058016,0.00006451143,0.0001400337,0.0242516],"genre_scores_gemma":[0.9751593,0.02088523,0.001142736,0.00008545182,0.0001297446,0.0001068549,0.00009561869,0.00004599666,0.00234903],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8660911,"threshold_uncertainty_score":0.8909453,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953598351","doi":"10.29173/mocs105","title":"Smart Manufacturing Support to Product Platforms in Industrialized House Building","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Linnéuniversitetet; Stiftelsen för Kunskaps- och Kompetensutveckling","keywords":"Context (archaeology); Product (mathematics); Asset (computer security); Process (computing); Manufacturing engineering; Business; Computer science; Risk analysis (engineering); Engineering; Marketing; Process management; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.01015971024340754,"gpt":0.2001800418355044,"spread":0.1900203315920969,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002818158,0.0003177742,0.0003643186,0.0005302633,0.00007453193,0.0002751136,0.0001705147,0.0002300779,0.0001362928],"category_scores_gemma":[0.00002656955,0.0003347891,0.00006352366,0.0004112059,0.00005580379,0.001608335,0.00005511713,0.0004692181,0.0001003395],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001602661,"about_ca_system_score_gemma":0.00002407137,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001688437,"about_ca_topic_score_gemma":0.000005552671,"domain_scores_codex":[0.9982604,0.000003046111,0.0005435113,0.0004226279,0.0002999233,0.0004705066],"domain_scores_gemma":[0.9995025,0.00001443031,0.00006695136,0.0001531995,0.00006920339,0.0001936647],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0005836955,0.0001475437,0.5436315,0.002738734,0.0004631677,0.00003660448,0.004921961,0.02242659,0.06550135,0.01248682,0.006857387,0.3402046],"study_design_scores_gemma":[0.0098352,0.0003921966,0.03519184,0.001294993,0.000124093,0.0004981838,0.007113179,0.007847729,0.7043148,0.002732032,0.2271712,0.003484554],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9909453,0.00002936621,0.0005183361,0.00008158208,0.00101031,0.0007461662,0.00001634944,0.0005440427,0.006108483],"genre_scores_gemma":[0.9974091,0.00002652796,0.001984289,0.00005016079,0.0001480024,0.00004719518,0.00001235287,0.00007332018,0.0002490172],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6388135,"threshold_uncertainty_score":0.9999104,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2937193245","doi":"10.29173/mocs23","title":"Offsite Construction in the UK Housing Sector: Barriers and Challenges","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"University of Salford Manchester","keywords":"Affordable housing; Business; Quality (philosophy); Production (economics); Manufacturing sector; Risk analysis (engineering); Engineering; Civil engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.01180564136446773,"gpt":0.1807290933178694,"spread":0.1689234519534017,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003006175,0.0003118854,0.0002792931,0.0003229029,0.000260926,0.0001826667,0.0001153372,0.0002366887,0.00007573151],"category_scores_gemma":[0.00004193993,0.0002255482,0.0000635176,0.0002850228,0.0004834135,0.0006721306,0.00003076996,0.0002586674,0.000006199671],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008998858,"about_ca_system_score_gemma":0.00002224531,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002222076,"about_ca_topic_score_gemma":0.0001002928,"domain_scores_codex":[0.9985646,0.00002785516,0.0003820378,0.0004371724,0.000250805,0.0003375447],"domain_scores_gemma":[0.9994547,0.00004369138,0.00009631721,0.0001409326,0.0001286117,0.0001357846],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00007273314,0.0000107849,0.1585214,0.0002978861,0.0001041013,0.000005835484,0.001947394,0.0000259211,0.0187713,0.0609531,0.0003605839,0.7589289],"study_design_scores_gemma":[0.01882918,0.001017601,0.334462,0.003727635,0.0009760421,0.008095931,0.1409506,0.0239595,0.07033926,0.05544224,0.3343992,0.007800931],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9902481,0.003025219,0.002173163,0.0008101513,0.0007887491,0.0002956554,0.00001655858,0.000254378,0.002388061],"genre_scores_gemma":[0.9928856,0.004830113,0.001873117,0.00006215278,0.0002479155,0.00003899572,0.000003250473,0.00003232604,0.00002649881],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.751128,"threshold_uncertainty_score":0.9197587,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954899194","doi":"10.29173/mocs79","title":"Applying Virtual Reality to Improve the Construction Logistics of High-rise Modular Integrated Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Plan (archaeology); Virtual reality; Construction management; Modular construction; Construction engineering; Unit (ring theory); Engineering; Computer science; Architectural engineering; Transport engineering; Engineering management; Operations research; Operations management; Civil engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.007034569385863198,"gpt":0.1939025671253843,"spread":0.1868679977395211,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003960487,0.0005001133,0.0006033227,0.0004117017,0.0003007824,0.0002158891,0.0002470254,0.0004008887,0.000120378],"category_scores_gemma":[0.00009213438,0.0004364946,0.0001541843,0.0008469821,0.000724052,0.0006578338,0.00008525751,0.0006039666,0.00003441463],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001965062,"about_ca_system_score_gemma":0.00006487349,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001944057,"about_ca_topic_score_gemma":0.0000281365,"domain_scores_codex":[0.9974617,0.00004169262,0.0008990024,0.0006742949,0.0004764542,0.0004468757],"domain_scores_gemma":[0.998333,0.00005382938,0.000316795,0.0003578818,0.0007364953,0.0002020222],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003177818,0.0000454878,0.0254717,0.0004757336,0.0003732074,0.000002101692,0.0005550838,0.01118245,0.154213,0.2199501,0.0006777253,0.5867355],"study_design_scores_gemma":[0.00911715,0.001824604,0.02138535,0.001308824,0.001368175,0.001911471,0.05108123,0.4209106,0.346893,0.036579,0.1024981,0.005122488],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.886276,0.0001754326,0.1068721,0.000180457,0.0032865,0.001364554,0.0001300362,0.000432309,0.001282598],"genre_scores_gemma":[0.9879707,0.0001703481,0.01112247,0.00005813036,0.0002765661,0.0001707729,0.00004963069,0.00005883133,0.0001225821],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5816131,"threshold_uncertainty_score":0.9998087,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3119199326","doi":"10.29173/mocs178","title":"Modularization Business Case: Process Flowchart and Major Considerations","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular programming; Flowchart; Computer science; Schedule; Process (computing); Process management; Risk analysis (engineering); Software engineering; Engineering; Business; Programming language","retraction":null,"screen_n_in":null,"score":{"opus":0.06703827011217275,"gpt":0.3142190966494526,"spread":0.2471808265372798,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.001288655,0.0003052089,0.0003829088,0.0007070348,0.0007523709,0.001220016,0.0001546048,0.0001666111,0.0001827934],"category_scores_gemma":[0.0009260239,0.0002722173,0.00005100907,0.001389595,0.0004742922,0.002333811,0.0001638699,0.0002051822,0.00003843663],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000415112,"about_ca_system_score_gemma":0.0001160796,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005589191,"about_ca_topic_score_gemma":0.00006949033,"domain_scores_codex":[0.9972433,0.000040429,0.0007159603,0.0008344316,0.0008447903,0.0003210848],"domain_scores_gemma":[0.996932,0.0000799941,0.0003349819,0.0002287455,0.002144253,0.0002800158],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0002751589,0.0001244893,0.6168013,0.0003519627,0.0001989553,0.0001972216,0.005840266,0.000479392,0.001680418,0.0973611,0.01162241,0.2650673],"study_design_scores_gemma":[0.01400646,0.0006235236,0.06840291,0.0004166936,0.0008535195,0.03830899,0.0726001,0.3071174,0.00724945,0.3177043,0.1680982,0.004618512],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9824497,0.000298384,0.01061645,0.001420158,0.0008336593,0.0005460599,0.00002104584,0.0001666872,0.003647819],"genre_scores_gemma":[0.9921081,0.00006531327,0.006234279,0.0002028398,0.0002357404,0.00004262459,0.00001378788,0.00002223319,0.001075049],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5483984,"threshold_uncertainty_score":0.999973,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955994317","doi":"10.29173/mocs133","title":"Strategies for Building Information Modelling Adoption in the South African Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Cronbach's alpha; Procurement; Building information modeling; Business; Work (physics); Construction industry; Questionnaire; Process management; Test (biology); Process (computing); Knowledge management; Marketing; Operations management; Engineering; Construction engineering; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.009374625203429156,"gpt":0.1903746049770553,"spread":0.1809999797736261,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003073227,0.0002558914,0.0002292639,0.0003874188,0.0001961423,0.0004758796,0.0001249568,0.0003699668,0.00002282584],"category_scores_gemma":[0.0000112208,0.0002315794,0.00007672632,0.0004521038,0.000130948,0.002336151,0.00001601921,0.0005204757,0.000007783916],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009644361,"about_ca_system_score_gemma":0.00003881893,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002245319,"about_ca_topic_score_gemma":0.000006071666,"domain_scores_codex":[0.998723,0.00001305035,0.0004731365,0.0002551676,0.0002418664,0.0002938013],"domain_scores_gemma":[0.999433,0.00002562274,0.000150835,0.0001139695,0.0002194993,0.00005709476],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002113575,0.00002638041,0.04987104,0.0009600059,0.0001227772,6.800191e-7,0.008761109,0.1447919,0.005693039,0.6203083,0.000316247,0.1689372],"study_design_scores_gemma":[0.001891072,0.0001337837,0.002615996,0.0002384203,0.00009558963,0.0001876137,0.1269157,0.8319423,0.001982513,0.01596379,0.01724924,0.0007839887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8442407,0.00009216608,0.1511265,0.00009131247,0.0006847997,0.0006300854,0.0000194102,0.0001978969,0.002917093],"genre_scores_gemma":[0.9863554,0.0000473956,0.01321975,0.00004897749,0.0001607868,0.0001015174,0.00003053658,0.00002031669,0.0000153673],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6871504,"threshold_uncertainty_score":0.9443533,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2936647771","doi":"10.29173/mocs64","title":"Construction industrialization and it integration: how tall wood buildings can show the right path towards construction 4.0","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Supply chain; Architectural engineering; Construction industry; Industrialisation; Path (computing); Order (exchange); Construction engineering; Computer science; Engineering; Business; Operations management; Marketing; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.01212382203177793,"gpt":0.2026194617216751,"spread":0.1904956396898972,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","sts","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.000387027,0.0005579077,0.0004785667,0.0003240482,0.001793666,0.002022706,0.0003007951,0.0005511001,0.00009149445],"category_scores_gemma":[0.0001739493,0.0004741915,0.0001276791,0.0003201881,0.001436412,0.001901557,0.0001034941,0.0006869088,0.000003974306],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001775755,"about_ca_system_score_gemma":0.00007580163,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000110134,"about_ca_topic_score_gemma":0.0001391692,"domain_scores_codex":[0.9977946,0.00003734123,0.0005747372,0.0006922667,0.0004597031,0.0004413966],"domain_scores_gemma":[0.998333,0.00002724394,0.0004721997,0.0003689951,0.000574615,0.0002239127],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001057049,0.00002449364,0.02860924,0.0002165887,0.0002962966,0.000005475167,0.001234781,0.00007357066,0.01443908,0.1618529,0.005003064,0.7881388],"study_design_scores_gemma":[0.015998,0.00103649,0.06404586,0.002592824,0.002522211,0.01046783,0.0602153,0.1612828,0.2070291,0.05211508,0.4148411,0.007853361],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9489198,0.0005007698,0.03175448,0.00677379,0.0042574,0.001016017,0.00009712458,0.0006402644,0.006040331],"genre_scores_gemma":[0.9903735,0.0008856617,0.007302006,0.0001073852,0.0008507493,0.00009051372,0.00006017525,0.00006086036,0.0002691507],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7802855,"threshold_uncertainty_score":0.999771,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954896328","doi":"10.29173/mocs82","title":"A Knowledge-Based Approach Towards Automated Manufacturing-Centric BIM: Wood Frame Design and Modelling for Light-Frame Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Framing (construction); Modular design; Frame (networking); Field (mathematics); Engineering; Modular construction; Construction engineering; Systems engineering; Construction industry; Computer science; Context (archaeology); Architectural engineering; Best practice; Software engineering; Civil engineering; Compatibility (geochemistry); Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01160253140959458,"gpt":0.2007306233714876,"spread":0.189128091961893,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002829263,0.0004553129,0.0004595704,0.0004049544,0.0002677049,0.0003670228,0.0001458356,0.0004241422,0.00002183035],"category_scores_gemma":[0.00001615117,0.0004518314,0.0001226719,0.0003628515,0.0001169925,0.0005853964,0.00003973399,0.0003529665,0.00001090273],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001212182,"about_ca_system_score_gemma":0.00004226273,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001210439,"about_ca_topic_score_gemma":7.164478e-7,"domain_scores_codex":[0.9981301,0.00001518725,0.0004609431,0.0006609359,0.0002228866,0.0005099275],"domain_scores_gemma":[0.9992164,0.00003849733,0.0001305893,0.000155032,0.0002633769,0.0001961307],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001012761,0.0003860688,0.01058195,0.008269361,0.001201635,0.000004520432,0.004699254,0.4195333,0.05562694,0.05221533,0.003003547,0.4434653],"study_design_scores_gemma":[0.001496563,0.0001025889,0.0001166721,0.000130518,0.00009106127,0.00006568935,0.0007034147,0.9499502,0.03757037,0.001009044,0.008224588,0.000539295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5302435,0.0006748051,0.4663961,0.00005336096,0.0004578924,0.0007697468,0.00001281077,0.0009158415,0.0004759748],"genre_scores_gemma":[0.8873451,0.0001183638,0.1120444,0.00003444029,0.0001468168,0.0001305454,0.00002290565,0.0000736346,0.00008381125],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5304168,"threshold_uncertainty_score":0.9997934,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953985905","doi":"10.29173/mocs75","title":"Smart Construction Site: Ontology of Information System Architecture","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Computer science; Architecture; Ontology; Process (computing); Task (project management); Information system; Systems engineering; Software engineering; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.002756303758788829,"gpt":0.1564465831172918,"spread":0.1536902793585029,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001420081,0.0002723208,0.0003804663,0.0004512984,0.0001113306,0.00009938294,0.00009658273,0.0003053501,0.00008701988],"category_scores_gemma":[0.0000154519,0.0002740544,0.00009938936,0.0003707269,0.0002180824,0.0009165328,0.0000284667,0.0003025295,0.0000546456],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000101377,"about_ca_system_score_gemma":0.00002698263,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003356537,"about_ca_topic_score_gemma":0.00001183886,"domain_scores_codex":[0.9986479,0.00001376262,0.000579492,0.0002541553,0.0002477476,0.0002569085],"domain_scores_gemma":[0.999197,0.00001570979,0.0002136593,0.0001448754,0.0003299748,0.00009878705],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002554199,0.00002034482,0.3256803,0.003266677,0.0003147206,0.000001582731,0.002044278,0.001995987,0.04153146,0.2113228,0.000627171,0.4129393],"study_design_scores_gemma":[0.01555843,0.001488934,0.1310674,0.002895348,0.001158474,0.009417319,0.05919371,0.3311481,0.193439,0.009057165,0.2397467,0.005829443],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9670457,0.0001865329,0.01961693,0.000053414,0.001726508,0.0004070062,0.00003638077,0.0004298798,0.01049764],"genre_scores_gemma":[0.9917822,0.00004884166,0.007896114,0.00002538416,0.0001028041,0.00002368008,0.00004359989,0.0000212036,0.00005615732],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4071098,"threshold_uncertainty_score":0.9999712,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2940370212","doi":"10.29173/mocs1","title":"Advancing Formwork Systems for the Production of Precast Concrete Building Elements: from Manual to Robotic","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Technische Universität München; Deutscher Akademischer Austauschdienst","keywords":"Precast concrete; Formwork; Prefabrication; Production (economics); Flexibility (engineering); Engineering; Process (computing); Construction engineering; Productivity; Computer science; Civil engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006812242377239999,"gpt":0.2075581749937642,"spread":0.2007459326165242,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002584185,0.0002242599,0.0002708693,0.0001496273,0.0002201518,0.00009614728,0.0001179794,0.0001118001,0.00001764837],"category_scores_gemma":[0.0001175688,0.0001579139,0.000075635,0.0002292383,0.000115026,0.000584844,0.00003026763,0.0001012243,0.000003363617],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001097469,"about_ca_system_score_gemma":0.00001472346,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003385544,"about_ca_topic_score_gemma":0.00001071189,"domain_scores_codex":[0.9986496,0.000008510728,0.0004987964,0.0003489241,0.0002088745,0.0002853267],"domain_scores_gemma":[0.9992007,0.00007613513,0.0001580966,0.0001371051,0.0003365195,0.00009146045],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0002747541,0.000009943669,0.02396796,0.0006257324,0.000518922,4.618628e-7,0.0007246534,0.005247853,0.5313282,0.0330415,0.005028186,0.3992319],"study_design_scores_gemma":[0.005198778,0.0008944838,0.009871913,0.005776844,0.001324074,0.0003311909,0.01961643,0.2052026,0.5299132,0.005983672,0.2129937,0.002893105],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7237072,0.0009814735,0.2709256,0.0002828119,0.002743341,0.0009837542,0.00004704668,0.0001923807,0.0001363912],"genre_scores_gemma":[0.9844878,0.0002625411,0.0142674,0.00001762117,0.000560727,0.0001880998,0.000006641697,0.00003576467,0.0001733524],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3963388,"threshold_uncertainty_score":0.643954,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296079032","doi":"10.29173/mocs276","title":"Unmanned aerial vehicles usage on south african construction projects: perceived benefits","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Asset (computer security); Construction industry; Project management; Data collection; Construction management; Quality (philosophy); Construction engineering; Transport engineering; Engineering; Computer science; Systems engineering; Civil engineering; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.01170830942737495,"gpt":0.1870430771672962,"spread":0.1753347677399213,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001412718,0.000309197,0.0002822966,0.0003098549,0.0006559701,0.0001359333,0.000128534,0.0001104091,0.00006719042],"category_scores_gemma":[0.00004273207,0.0003450417,0.00006911463,0.0003091442,0.0001886382,0.0002920628,0.00007912512,0.0003885672,0.000005465275],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001780586,"about_ca_system_score_gemma":0.00001945508,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001230315,"about_ca_topic_score_gemma":0.000002570521,"domain_scores_codex":[0.9985049,0.00001843281,0.0003179813,0.0004851502,0.0003162086,0.0003572633],"domain_scores_gemma":[0.9995009,0.00002140938,0.000125089,0.0001305321,0.0001032429,0.0001188459],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0005728683,0.0000904651,0.007395434,0.0003422888,0.0001929974,0.00001175054,0.004381305,0.8754395,0.008091437,0.01763465,0.0004972899,0.08535007],"study_design_scores_gemma":[0.01614046,0.003162768,0.04134013,0.0005787954,0.0009391832,0.001113631,0.08386992,0.7005658,0.06780389,0.01242517,0.06451139,0.007548924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.989229,0.0001228918,0.006335732,0.00006666863,0.001024657,0.0004314565,0.00009632763,0.0006700424,0.002023263],"genre_scores_gemma":[0.9894334,0.0001041255,0.00987889,0.00004172561,0.0002472554,0.00008429299,0.00005994595,0.00005660877,0.00009374652],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1748737,"threshold_uncertainty_score":0.9999002,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2936045964","doi":"10.29173/mocs38","title":"The merits of varying forms of mass timber products for offsite and modular construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"European Regional Development Fund","keywords":"Modular design; Work (physics); Resource (disambiguation); Engineering; Quality assurance; Quality (philosophy); Construction engineering; Architectural engineering; Civil engineering; Computer science; Operations management; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.007958136784358116,"gpt":0.1857457947776659,"spread":0.1777876579933078,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002015378,0.0002403629,0.0003227735,0.0001105941,0.0002924429,0.00007599852,0.00008812041,0.0001197148,0.000005993405],"category_scores_gemma":[0.00004006935,0.0001810944,0.00006379974,0.0002265225,0.0006497886,0.0004547394,0.00003546813,0.00009631213,0.000001311704],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002456417,"about_ca_system_score_gemma":0.00001533238,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008637034,"about_ca_topic_score_gemma":0.000004117237,"domain_scores_codex":[0.9988662,0.000006898415,0.0003926144,0.0002898818,0.0001760588,0.0002683218],"domain_scores_gemma":[0.9991862,0.00002815681,0.0001519791,0.0001303628,0.0004432475,0.00006008101],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0008011891,0.00006021828,0.09048442,0.003120031,0.001219705,0.000001402689,0.002740848,0.0001399013,0.667707,0.03450105,0.0008794379,0.1983448],"study_design_scores_gemma":[0.002245315,0.0005638876,0.004150976,0.00027975,0.0003616716,0.0001155107,0.001162956,0.02791838,0.9402043,0.01164098,0.01074703,0.0006092573],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.993624,0.001883977,0.002000184,0.0001227484,0.0004091504,0.0005488305,0.00002542288,0.00009910911,0.001286614],"genre_scores_gemma":[0.9824247,0.0005659977,0.01662032,0.000007457519,0.0001675696,0.0000395656,0.00001012724,0.00003497411,0.00012931],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2724972,"threshold_uncertainty_score":0.7384814,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954092237","doi":"10.29173/mocs135","title":"Bridging the Gap between Academic and Practice Quantity Surveying in Nigerian Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Openness to experience; Bridging (networking); Bridge (graph theory); Curriculum; Body of knowledge; Knowledge management; Public relations; Medical education; Psychology; Sociology; Political science; Pedagogy; Computer science; Medicine; Social psychology","retraction":null,"screen_n_in":null,"score":{"opus":0.01882426593830691,"gpt":0.2410966352264226,"spread":0.2222723692881157,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007372948,0.0002883359,0.0003263007,0.0002941941,0.0002464386,0.0002491114,0.0001208244,0.0005350098,0.00003195496],"category_scores_gemma":[0.0001519275,0.000269787,0.00004860978,0.0005210401,0.0003179149,0.001457784,0.00005676371,0.001359557,0.00001076389],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008362487,"about_ca_system_score_gemma":0.00003256535,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000125127,"about_ca_topic_score_gemma":0.00002822035,"domain_scores_codex":[0.9983954,0.00006062527,0.0005027715,0.0004377134,0.0002617336,0.0003417015],"domain_scores_gemma":[0.9993178,0.0001194819,0.0001749419,0.0001318516,0.0001411641,0.0001148109],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00003589374,0.000004438438,0.8803778,0.0001303559,0.00005850555,0.000001136061,0.0004337641,0.0001171919,0.01138842,0.007478408,0.00008567967,0.09988841],"study_design_scores_gemma":[0.00420894,0.0001866268,0.855621,0.001026178,0.0003814975,0.002597373,0.03404492,0.05580814,0.02067832,0.003899984,0.01915662,0.002390369],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9931918,0.0005975734,0.002290864,0.000538002,0.0008544152,0.0003906606,0.00001502336,0.0002127038,0.001908917],"genre_scores_gemma":[0.9975271,0.0004043079,0.001571323,0.0000828514,0.0003085848,0.00001967748,0.00001256437,0.00003307871,0.00004053119],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.09749804,"threshold_uncertainty_score":0.9999754,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953527716","doi":"10.29173/mocs103","title":"Transfer Learning Enabled Process Recognition for Module Installation of High-rise Modular Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Automation; Computer science; Engineering; Convolutional neural network; Building automation; Embedded system; Software engineering; Systems engineering; Artificial intelligence; Operating system; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006434172699105438,"gpt":0.1866436558455424,"spread":0.180209483146437,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002201866,0.0003095351,0.0004049869,0.0003695444,0.0001722808,0.0001084388,0.0000963006,0.00028888,0.0001006214],"category_scores_gemma":[0.0000320156,0.0003342364,0.0001243025,0.0004021815,0.0001130793,0.001292463,0.00001331698,0.0002834995,0.000009552455],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006005271,"about_ca_system_score_gemma":0.00002524084,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002258449,"about_ca_topic_score_gemma":0.000004983414,"domain_scores_codex":[0.9984278,0.00001168619,0.000532589,0.0004535577,0.0002687415,0.000305593],"domain_scores_gemma":[0.9990546,0.00002332835,0.0001199486,0.0000985339,0.000605241,0.00009834021],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0005362314,0.00007938908,0.04423903,0.003490096,0.0003788942,8.781831e-7,0.001581337,0.03967902,0.4391418,0.02784365,0.00012695,0.4429028],"study_design_scores_gemma":[0.006387259,0.0006233396,0.00530124,0.0007590343,0.0004022085,0.000126728,0.005091168,0.4021792,0.5461816,0.01874875,0.01254243,0.001657018],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9586818,0.000209988,0.03862064,0.0000418737,0.0005447122,0.0007539038,0.00003134426,0.000324657,0.0007910711],"genre_scores_gemma":[0.9939396,0.0001548695,0.005338071,0.00001648696,0.0001424959,0.0001011062,0.00008613057,0.0000606981,0.0001605738],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4412458,"threshold_uncertainty_score":0.999911,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296077905","doi":"10.29173/mocs270","title":"Automated BIM-based CNC file generator for wood panel framing machines in construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Framing (construction); Software; Automation; Numerical control; Computer science; Building information modeling; Information model; Software engineering; Manufacturing engineering; Engineering drawing; Engineering; Mechanical engineering; Operating system","retraction":null,"screen_n_in":null,"score":{"opus":0.009069530823881115,"gpt":0.19347044105629,"spread":0.1844009102324089,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001938991,0.0003470333,0.0003430883,0.000587991,0.0005600862,0.0001847022,0.00013342,0.000177216,0.0005193357],"category_scores_gemma":[0.00002831322,0.0003955175,0.0001141797,0.0004190953,0.0001391155,0.0004481119,0.00004748169,0.0004123195,0.000003704398],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000224886,"about_ca_system_score_gemma":0.00004775961,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005040011,"about_ca_topic_score_gemma":0.00002994509,"domain_scores_codex":[0.9983023,0.00002151469,0.0005206787,0.0004922069,0.0002696475,0.0003936473],"domain_scores_gemma":[0.9994584,0.00004209548,0.0001451548,0.0001228266,0.0001216797,0.000109794],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000548422,0.000192017,0.06072697,0.001983827,0.0004444314,0.00002279717,0.00126557,0.08271085,0.1052162,0.02659702,0.01106191,0.70923],"study_design_scores_gemma":[0.002176119,0.0001221215,0.005079927,0.00009362763,0.00007392614,0.0002527468,0.002419187,0.9171153,0.04708862,0.00130696,0.02347731,0.0007941692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9862988,0.0003155124,0.009389511,0.00009084467,0.001439975,0.0005859254,0.0003887352,0.0011753,0.0003153723],"genre_scores_gemma":[0.9758966,0.00002988474,0.02286847,0.00007960881,0.0002242474,0.0005014566,0.0002803716,0.00006718522,0.00005220364],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8344045,"threshold_uncertainty_score":0.9998497,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2940100037","doi":"10.29173/mocs37","title":"IoT-based Inventory Control System Framework for Panelized Construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Schedule; Modular design; Computer science; Control (management); Inventory control; Frame (networking); Internet of Things; Production (economics); Systems engineering; Operations research; Engineering; Civil engineering; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.008280878571245565,"gpt":0.2013519070017366,"spread":0.1930710284304911,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000242431,0.000386361,0.0004403587,0.0003414169,0.0004561045,0.0002269075,0.0001325106,0.0004427936,0.0000722053],"category_scores_gemma":[0.00006411381,0.0004018105,0.0001672871,0.0003608526,0.0005913768,0.0003353486,0.00001460031,0.0003003177,0.00002469529],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001881814,"about_ca_system_score_gemma":0.00004879492,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001227713,"about_ca_topic_score_gemma":0.000007389995,"domain_scores_codex":[0.9982249,0.00001902388,0.0005623379,0.0005041102,0.0002680385,0.0004215538],"domain_scores_gemma":[0.998764,0.00004806294,0.0001897761,0.0001740258,0.0006256702,0.000198501],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0009655865,0.00005940841,0.05041178,0.002341079,0.0006537364,0.000003737114,0.0007012144,0.0004554642,0.03523407,0.6533647,0.002859425,0.2529498],"study_design_scores_gemma":[0.01118395,0.0007838453,0.003014124,0.001516203,0.0008692674,0.00064263,0.01026657,0.7786779,0.08772998,0.02056632,0.08218814,0.002561034],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5317903,0.0004264702,0.4602095,0.0001247343,0.00376438,0.0008647509,0.0000683282,0.001190215,0.001561437],"genre_scores_gemma":[0.9461689,0.00002455433,0.05233939,0.0001064931,0.001047997,0.0001859361,0.00002183347,0.00006323044,0.00004167409],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7782225,"threshold_uncertainty_score":0.9998434,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953849572","doi":"10.29173/mocs101","title":"Critical Review of the Principles of Design for Disassembly","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Documentation; Standardization; Checklist; Design elements and principles; Engineering; Construction engineering; Engineering ethics; Sustainable design; Systems engineering; Computer science; Management science; Engineering management; Architectural engineering; Sustainability; Psychology","retraction":null,"screen_n_in":null,"score":{"opus":0.01714431354716709,"gpt":0.2198994742566715,"spread":0.2027551607095044,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001876037,0.00011937,0.0002402283,0.00004803616,0.000048275,0.0000215829,0.000103167,0.00006845928,0.00002531382],"category_scores_gemma":[0.0001125825,0.00009264737,0.00007446117,0.0001222978,0.0000869666,0.0001948016,0.00002907298,0.00006654989,7.748825e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00001416454,"about_ca_system_score_gemma":0.00001314393,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001530802,"about_ca_topic_score_gemma":2.915477e-7,"domain_scores_codex":[0.9992767,0.000004633641,0.0002944002,0.0001561677,0.000139502,0.0001286025],"domain_scores_gemma":[0.9995128,0.00004118632,0.00008634145,0.00009306806,0.0002318925,0.00003473551],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"systematic_review","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0003298435,0.000217181,0.07572778,0.363829,0.000575348,7.333388e-7,0.001549404,0.05690601,0.08383446,0.2906801,0.003019894,0.1233302],"study_design_scores_gemma":[0.001845861,0.0003191598,0.01122973,0.01580188,0.0005153618,0.0000469151,0.0005624209,0.2186109,0.7132971,0.00322449,0.0335292,0.001016941],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7658067,0.01298444,0.2136586,0.0004131237,0.001035574,0.002194593,0.00004337244,0.000197419,0.003666094],"genre_scores_gemma":[0.9762092,0.002394618,0.0211659,0.000039555,0.00003904814,0.00003101053,0.000003637731,0.00002310976,0.00009395734],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6294627,"threshold_uncertainty_score":0.377805,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954735062","doi":"10.29173/mocs98","title":"Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence.","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"","funders":"University of Technology Sydney","keywords":"Productivity; Construction industry; Process (computing); Building industry; Engineering; Operations management; Business; Environmental resource management; Architectural engineering; Computer science; Environmental science; Construction engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.005849767701162874,"gpt":0.1888075885468773,"spread":0.1829578208457144,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002154378,0.000248471,0.0002704163,0.0003105014,0.0001320784,0.0000870087,0.00009018525,0.0001580914,0.00004832062],"category_scores_gemma":[0.00001494574,0.000223013,0.00006713027,0.0004889503,0.0002213544,0.0009038297,0.00001962005,0.0003652015,0.00001121546],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001530648,"about_ca_system_score_gemma":0.00002625417,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004276297,"about_ca_topic_score_gemma":0.00001798356,"domain_scores_codex":[0.9986925,0.0000203381,0.000373981,0.0003959531,0.0002789932,0.0002382053],"domain_scores_gemma":[0.9994829,0.00001897336,0.0001545282,0.0001675543,0.0001302165,0.00004583612],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001842211,0.00003023883,0.07484989,0.0005330432,0.0000769511,0.000001007095,0.001545035,0.02119546,0.8620916,0.01073057,0.00008645331,0.02867552],"study_design_scores_gemma":[0.002604752,0.0002864561,0.1217491,0.0007697468,0.0001093471,0.0002804029,0.009595711,0.1045184,0.7517387,0.004635755,0.002374193,0.001337407],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9929975,0.00007304912,0.0005116242,0.0000934506,0.0008149711,0.0006280038,0.00001402516,0.0001217317,0.004745642],"genre_scores_gemma":[0.9984579,0.000075896,0.0008485216,0.000008759462,0.000180121,0.0000639768,0.00001096072,0.00003041903,0.0003234357],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1103529,"threshold_uncertainty_score":0.9094204,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955930255","doi":"10.29173/mocs117","title":"Decision-making for Cross-Laminated Timber Modular Construction Logistics Using Discrete Event Simulation","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Supply chain; Modular construction; Discrete event simulation; Process (computing); Modularity (biology); Event (particle physics); Work (physics); Engineering; Cross laminated timber; Construction engineering; Computer science; Civil engineering; Business; Simulation; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.009764285313812465,"gpt":0.2647800476268293,"spread":0.2550157623130168,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002495826,0.0004215048,0.0004192123,0.0003629375,0.0003742198,0.0003868922,0.0001282037,0.0003888874,0.0001310184],"category_scores_gemma":[0.0001066382,0.0004419512,0.000171962,0.0004121177,0.0002744502,0.001017595,0.00004818921,0.0002941986,0.00001815204],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002365941,"about_ca_system_score_gemma":0.00003388526,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000007261854,"about_ca_topic_score_gemma":0.000004541499,"domain_scores_codex":[0.9978912,0.00001304635,0.0007068068,0.0006050905,0.0003538254,0.0004299917],"domain_scores_gemma":[0.9986963,0.0000958712,0.0002376264,0.0001953558,0.0006522828,0.000122611],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002262496,0.00002101016,0.05271305,0.0004488201,0.000169703,0.000001748151,0.0002068837,0.8056137,0.01408795,0.01537996,0.00006360875,0.1110673],"study_design_scores_gemma":[0.001039615,0.00006914596,0.002655962,0.0002755223,0.000113675,0.0001181594,0.0005511172,0.9829907,0.002271973,0.006174461,0.003196116,0.000543583],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.557839,0.0001404426,0.4394344,0.000009023985,0.001465649,0.0004999134,0.00003525741,0.0002353483,0.0003409648],"genre_scores_gemma":[0.9415786,0.00004533867,0.05783797,0.0000231315,0.0002696177,0.00003354071,0.00004429288,0.00007123884,0.00009628791],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3837396,"threshold_uncertainty_score":0.9998032,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955292498","doi":"10.29173/mocs77","title":"An Optimized Prefabricated Raft Footing System for Houses on Shrink-Swell Soils: Preliminary Results","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Australian Research Council","keywords":"Prefabrication; Economic shortage; Swell; Engineering; Civil engineering; Sustainability; Geotechnical engineering; Geology","retraction":null,"screen_n_in":null,"score":{"opus":0.007102474888381672,"gpt":0.1988262750153676,"spread":0.1917238001269859,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002052128,0.0003436013,0.000427941,0.0003253878,0.0001730602,0.0001978329,0.0001562816,0.0001972575,0.00001238933],"category_scores_gemma":[0.00004120775,0.000334822,0.000134331,0.0003339174,0.00005509163,0.0004753501,0.00002407027,0.0002011075,0.00001413248],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000104705,"about_ca_system_score_gemma":0.00001161665,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001483381,"about_ca_topic_score_gemma":0.000001033597,"domain_scores_codex":[0.9984082,0.00001122036,0.0004835359,0.0005330487,0.0002157564,0.0003482621],"domain_scores_gemma":[0.9992549,0.00005809754,0.0001290535,0.0002080329,0.0001845081,0.0001653873],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001775829,0.00004843449,0.002732645,0.00237019,0.0005986521,0.000004402203,0.001008584,0.8892,0.04775465,0.00359361,0.0009218981,0.04999114],"study_design_scores_gemma":[0.002260081,0.0003760888,0.001287326,0.000242926,0.0001337881,0.00003522143,0.001563333,0.9586768,0.03373006,0.00002621204,0.001163339,0.0005048279],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9649514,0.0001683364,0.03106728,0.00004419571,0.0006307233,0.0006211913,0.00004459911,0.001370366,0.001101915],"genre_scores_gemma":[0.9885436,0.00004101794,0.010887,0.0000198232,0.0001635535,0.00004739976,0.00007221139,0.00007117449,0.0001542062],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.06947683,"threshold_uncertainty_score":0.9999104,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296168341","doi":"10.29173/mocs264","title":"AWP for residential buildings to modular construction: A proposed framework","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Transport and Logistics Innovations","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Constructability; Modular design; Productivity; Modularity (biology); Work (physics); Engineering; Architectural engineering; Risk analysis (engineering); Systems engineering; Computer science; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.01004394002269353,"gpt":0.2124223688333156,"spread":0.2023784288106221,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002698653,0.0003175732,0.0003493701,0.0004519441,0.000865827,0.0001899228,0.0002228481,0.0001666757,0.0001718469],"category_scores_gemma":[0.00006368828,0.0003824084,0.0001201661,0.0008930439,0.0002030888,0.0003070421,0.00008012443,0.0004816506,0.000004295108],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001454506,"about_ca_system_score_gemma":0.00004166958,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001714395,"about_ca_topic_score_gemma":0.000006487411,"domain_scores_codex":[0.998098,0.000007372157,0.0005144246,0.0005478346,0.0003813488,0.0004510238],"domain_scores_gemma":[0.9992108,0.00002869526,0.0001005048,0.0001748603,0.0003120788,0.0001731101],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0005736799,0.000137674,0.04648602,0.001179316,0.0006137192,0.00002578488,0.002601396,0.02393094,0.09142987,0.7624775,0.01157038,0.05897371],"study_design_scores_gemma":[0.004452702,0.0008976741,0.0108869,0.0003090294,0.0006310988,0.0006910174,0.008211927,0.04192121,0.03007579,0.09695202,0.8017579,0.003212736],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7049305,0.0001966687,0.2899556,0.0005735586,0.0019455,0.0009918432,0.0001744642,0.0006301951,0.0006016381],"genre_scores_gemma":[0.8693562,0.0000296703,0.1295148,0.0001324855,0.0004409246,0.0002519703,0.00006364931,0.00006865982,0.0001416444],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7901875,"threshold_uncertainty_score":0.9998628,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953915164","doi":"10.29173/mocs134","title":"Mass Timber in High-Rise Buildings: Modular Design and Construction; Permitting and Contracting Issues","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Documentation; Adaptability; Process (computing); Architectural engineering; Construction engineering; Engineering; Risk analysis (engineering); Order (exchange); Flexibility (engineering); Business; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.005312865482763209,"gpt":0.1898411320023325,"spread":0.1845282665195693,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003918653,0.0003975926,0.0004773285,0.0003980687,0.0002289468,0.0003607584,0.0000812514,0.000310078,0.0000695937],"category_scores_gemma":[0.00005127896,0.0004244367,0.00005090882,0.0003305793,0.0003084467,0.001191277,0.00004392942,0.000464879,0.000009462054],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008348477,"about_ca_system_score_gemma":0.00001902471,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006453579,"about_ca_topic_score_gemma":0.000006301622,"domain_scores_codex":[0.9981669,0.00002960279,0.0005401563,0.0006160122,0.0002392402,0.0004080457],"domain_scores_gemma":[0.9993078,0.00006249383,0.0001535303,0.0001215239,0.0001949402,0.0001597497],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001670744,0.00002915524,0.5629356,0.000762846,0.0002367115,0.000014033,0.001537416,0.003654055,0.1274105,0.05904859,0.0002013767,0.2440026],"study_design_scores_gemma":[0.009708794,0.0004203165,0.04979133,0.001410352,0.000424927,0.002836404,0.02464484,0.7987469,0.06096125,0.02956285,0.01784496,0.003647078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9827974,0.001937604,0.01265557,0.0001658612,0.0006965594,0.0005318251,0.000007469931,0.0002964388,0.0009112916],"genre_scores_gemma":[0.9340371,0.0008072635,0.06471878,0.00003795655,0.0001698074,0.00003555769,0.000006121546,0.00005242842,0.0001350169],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7950929,"threshold_uncertainty_score":0.9998208,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2938668898","doi":"10.29173/mocs10","title":"Production Monitoring and Process Improvement for Floor Panel Manufacturing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Installation; Process (computing); Factory (object-oriented programming); Modular design; Bridge (graph theory); Production (economics); Engineering; Production line; Computer science; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01111884183171663,"gpt":0.2035844969300306,"spread":0.192465655098314,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001352079,0.0002637783,0.0002126779,0.0001848925,0.0002564216,0.0001360822,0.00006494932,0.0001450669,0.0000136618],"category_scores_gemma":[0.00002589603,0.0002152377,0.00005079541,0.0001022068,0.0001347134,0.0008136057,0.00002174703,0.0001184366,0.000003306687],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008161006,"about_ca_system_score_gemma":0.00001236955,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005008743,"about_ca_topic_score_gemma":0.000002270851,"domain_scores_codex":[0.9987652,0.000003245304,0.0003161891,0.000448945,0.0001696585,0.0002967028],"domain_scores_gemma":[0.9994999,0.00001082237,0.00008533579,0.00008873986,0.0002003273,0.000114891],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00005951877,0.00001098323,0.01446356,0.0005534522,0.00007920715,3.767911e-7,0.0002709292,0.00003519798,0.1986022,0.001172466,0.0000981812,0.784654],"study_design_scores_gemma":[0.001265216,0.0001269757,0.009500699,0.0003255176,0.00009747065,0.0001215466,0.002359043,0.001479069,0.9756535,0.003276394,0.005215857,0.0005786961],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9880517,0.0002897115,0.008982272,0.0002127553,0.001347179,0.0005196335,0.00001288818,0.0003615324,0.0002223269],"genre_scores_gemma":[0.9955451,0.0003579162,0.002988599,0.000008322093,0.0006113264,0.0001957632,0.000003641822,0.00004008098,0.0002492383],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7840753,"threshold_uncertainty_score":0.877714,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2936876376","doi":"10.29173/mocs8","title":"Integration of BIM and Computer Simulations in Modular Construction, A Case Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Chongqing Graduate Student Research Innovation Project","keywords":"Building information modeling; Modular design; Bridge (graph theory); Modular construction; Computer science; Discrete event simulation; Modularity (biology); Systems engineering; Productivity; Construction industry; Event (particle physics); Construction engineering; Software engineering; Engineering; Simulation; Operations management","retraction":null,"screen_n_in":null,"score":{"opus":0.009325367435732571,"gpt":0.2080347975870605,"spread":0.1987094301513279,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001663803,0.0002703899,0.000337103,0.0005430763,0.0001455793,0.0000893949,0.00006034277,0.0001705333,0.00003821558],"category_scores_gemma":[0.00002699398,0.0002280441,0.00005013035,0.0004469698,0.0003266035,0.0007872655,0.00003545991,0.0001762253,0.000001952315],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00007394979,"about_ca_system_score_gemma":0.00001820929,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001023393,"about_ca_topic_score_gemma":0.0002228235,"domain_scores_codex":[0.9985843,0.00002406609,0.0005939507,0.0003978959,0.0001881907,0.0002115602],"domain_scores_gemma":[0.9992917,0.00004130044,0.0001275165,0.0001291442,0.0003094435,0.0001009334],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00006141989,0.000102109,0.4060444,0.0001627443,0.0001541607,0.00004022143,0.00189621,0.0007792911,0.04782915,0.02552933,0.00005669873,0.5173443],"study_design_scores_gemma":[0.0154994,0.001352878,0.1608421,0.001359667,0.0006050829,0.01400094,0.04854934,0.691649,0.04278639,0.01736325,0.002952301,0.003039686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9500347,0.0001432116,0.0485904,0.00005341652,0.0004373108,0.0004461743,0.00002508178,0.0001555182,0.0001141659],"genre_scores_gemma":[0.9916216,0.00008899918,0.008087179,0.00001021345,0.0001136312,0.00002855673,0.00000506977,0.00002619746,0.0000185384],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6908697,"threshold_uncertainty_score":0.9299366,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954344888","doi":"10.29173/mocs140","title":"Parklet: A New Urban Platform for Emergent Forms of Communication and Social Interaction in the Cities","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Smart Parking Systems Research","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Engineering; Architectural engineering; Design studio; Public relations; Sociology; Knowledge management; Studio; Political science; Computer science","retraction":null,"screen_n_in":null,"score":{"opus":0.01955991325097023,"gpt":0.242833705000266,"spread":0.2232737917492958,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003249692,0.0001159951,0.0001863918,0.0001720567,0.0001009838,0.00008202918,0.0001093642,0.00009007871,0.00001145157],"category_scores_gemma":[0.00001571787,0.00009843589,0.00004332213,0.0001433469,0.00007151003,0.0004107716,0.00003316705,0.0001624281,0.000001643137],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005209911,"about_ca_system_score_gemma":0.00001127283,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000696702,"about_ca_topic_score_gemma":0.00005530119,"domain_scores_codex":[0.9992485,0.000007524976,0.0002707074,0.0001405855,0.0001649193,0.0001677714],"domain_scores_gemma":[0.9996871,0.00004305253,0.00007523612,0.00008464219,0.00008219126,0.00002777023],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0004813086,0.00006599589,0.721256,0.003549261,0.0003512494,6.571165e-7,0.04528716,0.0003029592,0.03682107,0.05590945,0.01194785,0.124027],"study_design_scores_gemma":[0.01119022,0.0008708626,0.2357076,0.001542378,0.0002294369,0.0002524703,0.15102,0.2257135,0.02614301,0.01260681,0.3327164,0.002007311],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9972495,0.0003639932,0.0004908267,0.0001387456,0.0001610725,0.0005571774,0.00000629911,0.00003831017,0.0009941115],"genre_scores_gemma":[0.9992216,0.0001233163,0.0003823749,0.0000124102,0.0000830048,0.00004915784,0.00001460968,0.00001639899,0.00009715146],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4855484,"threshold_uncertainty_score":0.4014099,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955382699","doi":"10.29173/mocs95","title":"Serviceability Performance of Timber Concrete Composite Floors","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Northern British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; FPInnovations","keywords":"Serviceability (structure); Structural engineering; Stiffness; Cross laminated timber; Slab; Structural system; Vibration; Engineering; Deflection (physics); Load bearing","retraction":null,"screen_n_in":null,"score":{"opus":0.004045594960303004,"gpt":0.15727912462704,"spread":0.153233529666737,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009904669,0.0002123414,0.0002981393,0.00009318411,0.00007486381,0.00004933847,0.00008802318,0.0001089838,0.0001173405],"category_scores_gemma":[0.000002766832,0.0001930726,0.00006338939,0.0001714358,0.0001145731,0.0004599088,0.00003944732,0.0001352107,0.00004912896],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000346899,"about_ca_system_score_gemma":0.000007919709,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001948776,"about_ca_topic_score_gemma":0.000001759089,"domain_scores_codex":[0.9991124,0.000005643749,0.0002692301,0.000241249,0.0001589494,0.000212571],"domain_scores_gemma":[0.9995989,0.00001081652,0.00005969576,0.000118871,0.0001397584,0.00007199065],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001038054,0.000007693669,0.9487451,0.001044576,0.0001575722,6.020123e-7,0.0005580133,0.000542892,0.04158597,0.0003452589,0.00009001603,0.006818442],"study_design_scores_gemma":[0.004646176,0.0007906626,0.2320193,0.0006866336,0.0004074024,0.0001366113,0.0017435,0.299622,0.4415957,0.0003357522,0.01634417,0.001672011],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9928955,0.0005939984,0.00001685709,0.0000290742,0.0002964489,0.0002663725,0.00001114743,0.0001766131,0.005713924],"genre_scores_gemma":[0.9978161,0.0001850417,0.001630164,0.00001881858,0.00004664476,0.00001018424,0.00001270103,0.00002497625,0.0002553966],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7167258,"threshold_uncertainty_score":0.7873272,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4230082142","doi":"10.29173/mocs191","title":"The Impact of Building Information Modelling (BIM) for Contractor Costing in Offsite Construction Projects in the UK","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Building information modeling; Productivity; Status quo; Activity-based costing; Construction industry; Integrated project delivery; Construction management; Value (mathematics); Risk analysis (engineering); Building construction; Business; Construction engineering; Engineering management; Engineering; Operations management; Computer science; Marketing; Civil engineering; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.0192063035328299,"gpt":0.2318636703462559,"spread":0.212657366813426,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008183509,0.0002564955,0.000292183,0.0003710655,0.0002022291,0.0002741968,0.0001525826,0.0001889346,0.000002680609],"category_scores_gemma":[0.0001478891,0.0001855397,0.0001072395,0.0005745362,0.0002039212,0.001235476,0.00001979857,0.0003442223,8.793952e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002171128,"about_ca_system_score_gemma":0.00008067609,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002329248,"about_ca_topic_score_gemma":0.00006544282,"domain_scores_codex":[0.9984398,0.00002414577,0.0007179916,0.0002068403,0.0002704844,0.0003407212],"domain_scores_gemma":[0.9989967,0.000102182,0.0002572735,0.0001164059,0.0004537226,0.00007371102],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0009367048,0.00006181948,0.3277063,0.0005986017,0.0002480586,0.000001979752,0.0101422,0.1457188,0.008491381,0.1013496,0.0007364352,0.4040082],"study_design_scores_gemma":[0.002988396,0.0001877994,0.007511058,0.0002915353,0.00005762749,0.0002020069,0.01759773,0.9583917,0.00373963,0.006311173,0.002228895,0.0004924631],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9476593,0.0003469676,0.04992153,0.00006312777,0.0004621114,0.0008769633,0.00002371995,0.00008024146,0.0005660184],"genre_scores_gemma":[0.9923002,0.0001259663,0.007285628,0.00001353149,0.0001196765,0.0001127073,0.00002026539,0.00001779557,0.000004258474],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8126729,"threshold_uncertainty_score":0.7566088,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}