{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":242,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":242,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"dd66b661574f","filters":{"venue":"Modular and Offsite Construction (MOC) Summit Proceedings"}},"results":[{"id":"W2939569709","doi":"10.29173/mocs31","title":"Prefabricated Prefinished Volumetric Construction Joining Tech-niques Review","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"National Research Foundation Singapore; National University of Singapore; National Research Foundation; Sembcorp Industries","keywords":"Constructability; Modular design; Computer science; Construction engineering; Engineering; Systems engineering","authors":[{"name":"Sze Dai Pang","is_ca":false},{"name":"J.Y. Richard Liew","is_ca":false},{"name":"Ziquan Dai","is_ca":false},{"name":"Yanbo Wang","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008341770775595862,"gpt":0.1937689649760024,"spread":0.1854271942004066,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001307529,0.0007649744,0.000818001,0.002528734,0.0003512363,0.001352638,0.00127144,0.001136135,0.005001202],"category_scores_gemma":[0.00149408,0.0004981234,0.0006073259,0.003173218,0.0005818548,0.001705419,0.0006908028,0.0009478792,0.002783932],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006650428,"about_ca_system_score_gemma":0.001121424,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001366999,"about_ca_topic_score_gemma":0.001717849,"domain_scores_codex":[0.9988788,0.0001079389,0.0001020323,0.0001563593,0.000676083,0.00007875705],"domain_scores_gemma":[0.9986573,0.0005199426,0.0002545201,0.00008500563,0.0004470637,0.0000361451],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00004952103,0.0001185017,0.0003295522,0.01152627,0.00003948665,0.0001752767,0.000135699,0.003320547,0.009608751,0.01103866,0.008052517,0.9556051],"study_design_scores_gemma":[0.000007099311,0.0002514328,0.001442373,0.002094631,0.00006454236,0.001402804,0.0001336984,0.0008761666,0.01511367,0.002073052,0.9765053,0.00003522479],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.006226297,0.9567565,0.01201913,0.0002835611,0.0005473415,0.00007405673,0.00006851833,0.00006525296,0.02395931],"genre_scores_gemma":[0.032015,0.9463419,0.01136274,0.0001681713,0.0003550804,0.0000737245,0.0002645075,0.00004150283,0.009377289],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.005001202,"threshold_uncertainty_score":0.01673073,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955960142","doi":"10.29173/mocs141","title":"Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Visualization; Modular design; Vehicle routing problem; Computer science; Building information modeling; Integrated logistics support; Systems engineering; Routing (electronic design automation); Transport engineering; Operations research; Process management; Engineering; Operations management; Data mining; Embedded system","authors":[{"name":"Sanyuan Niu","is_ca":false},{"name":"Yi Yang","is_ca":false},{"name":"Wei Pan","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009553049174982588,"gpt":0.2105148424160307,"spread":0.2009617932410481,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004022915,0.0007061962,0.0004247917,0.001169875,0.0003138004,0.001110404,0.0005840075,0.0004194829,0.002517549],"category_scores_gemma":[0.0006889878,0.0004126083,0.0006495165,0.001051937,0.0002024826,0.0007154529,0.0009651262,0.0003689115,0.0003574774],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005686317,"about_ca_system_score_gemma":0.001224683,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009389556,"about_ca_topic_score_gemma":0.009118806,"domain_scores_codex":[0.9998123,0.00005679269,0.0000102277,0.00003262524,0.00006021096,0.00002787696],"domain_scores_gemma":[0.9998529,0.00004642595,0.00001778339,0.00001879725,0.00004619453,0.0000178711],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008625555,0.00006993653,0.002388615,0.00005163154,0.00002349606,0.0001335975,0.0001332919,0.9037265,0.004519379,0.004962978,0.001596344,0.08230805],"study_design_scores_gemma":[0.000004668139,0.00001262738,0.0003912024,0.000003885789,0.000004143069,0.00001816244,0.0000392544,0.9969738,0.0008991106,0.0007551652,0.0008924608,0.000005675296],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0864976,0.0001420353,0.9034799,0.0002195553,0.00002664275,0.0001151964,0.0003638786,0.002381527,0.006773662],"genre_scores_gemma":[0.5618766,0.0002735713,0.4343674,0.00002505129,0.000007879987,0.0001636172,0.0006321126,0.0001235402,0.002530189],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.009389556,"threshold_uncertainty_score":0.01866978,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953581745","doi":"10.29173/mocs87","title":"Automatic Selection Tool of Quality Control Specifications for Off-site Construction Manufacturing Products: A BIM-based Ontology Model Approach","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Ontology; Information model; Quality (philosophy); Computer science; Quality assurance; Frame (networking); Product (mathematics); Control (management); Systems engineering; Engineering; Software engineering; Artificial intelligence","authors":[{"name":"Pablo Martı́nez","is_ca":true},{"name":"Rafiq Ahmad","is_ca":true},{"name":"Mohamed Al‐Hussein","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01565666423060389,"gpt":0.2095694153177762,"spread":0.1939127510871723,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001758276,0.000790674,0.000661478,0.00333031,0.0008546766,0.00282098,0.001364749,0.0009646046,0.002776242],"category_scores_gemma":[0.003649975,0.0006556145,0.001903376,0.00183595,0.0006210962,0.00281061,0.001795855,0.0009218709,0.001204248],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00168898,"about_ca_system_score_gemma":0.00306788,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01049998,"about_ca_topic_score_gemma":0.01820566,"domain_scores_codex":[0.998669,0.0002434302,0.0001288161,0.0002067286,0.0006628914,0.00008913742],"domain_scores_gemma":[0.9987079,0.0004109544,0.000164682,0.000224061,0.0004263053,0.0000661336],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003149712,0.001002464,0.0124353,0.001001938,0.0002372782,0.001519364,0.003618575,0.1855409,0.04450007,0.1779937,0.02308423,0.5487511],"study_design_scores_gemma":[0.00004560073,0.0000547757,0.002167383,0.0001649535,0.0001218886,0.0003324988,0.0007788881,0.8989682,0.01223764,0.02475018,0.06031251,0.00006540924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01480783,0.000101439,0.9722101,0.0002014249,0.00003092157,0.0003228826,0.001030678,0.002931016,0.008363707],"genre_scores_gemma":[0.1371084,0.0003001934,0.8550305,0.00009618628,0.000009785349,0.0004681082,0.003679209,0.0004179202,0.002889722],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01049998,"threshold_uncertainty_score":0.02087772,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2937109357","doi":"10.29173/mocs63","title":"Comparing cross laminated timber with concrete and steel: a financial analysis of two buildings in Australia","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Profit margin; Cross laminated timber; Revenue; Timeline; Internal rate of return; Equity (law); Rate of return; Apartment; Building material; Finance; Engineering; Business; Civil engineering; Economics; Mathematics; Statistics","authors":[{"name":"Dylan S. Cazemier","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01331232203604725,"gpt":0.2674048499046828,"spread":0.2540925278686356,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006011248,0.0002460045,0.0002303742,0.001986155,0.0005234523,0.0008599845,0.0002991414,0.0003635715,0.001041279],"category_scores_gemma":[0.001735956,0.0001417998,0.0003382257,0.001524615,0.0005399123,0.000710448,0.0007644595,0.0002973571,0.000167195],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002681709,"about_ca_system_score_gemma":0.0006541995,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.04836689,"about_ca_topic_score_gemma":0.0720764,"domain_scores_codex":[0.9993871,0.0001056689,0.00003443035,0.00005044089,0.0002963371,0.000125959],"domain_scores_gemma":[0.9989089,0.0001963191,0.0003733039,0.00002434006,0.0003044189,0.0001927931],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0007134215,0.000476801,0.9379624,0.0001589502,0.0001181839,0.00203866,0.002977271,0.01244252,0.01099224,0.001767025,0.000450334,0.02990211],"study_design_scores_gemma":[0.000003988713,0.0004662891,0.9899818,0.0000131207,0.00002419677,0.0002374458,0.00246709,0.0050513,0.001051571,0.00007296869,0.0006157441,0.00001441087],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9993263,0.00002609049,0.00003573119,0.00001321299,3.567743e-7,0.000005100474,0.0000524874,5.610509e-7,0.0005400743],"genre_scores_gemma":[0.999473,0.00003858474,0.00007084695,0.000003419248,8.392992e-7,0.000002831498,0.0001075762,5.530894e-7,0.0003022481],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04836689,"threshold_uncertainty_score":0.09617072,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954632388","doi":"10.29173/mocs89","title":"Environmental Benefits of Reusable Modular Mass Timber Construction for Residential use in Japan: an LCA Approach","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":17,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Reuse; Benchmark (surveying); Environmental resource management; Sustainability; Engineering; Environmental economics; Environmental science; Civil engineering; Architectural engineering; Computer science; Geography; Ecology; Waste management","authors":[{"name":"Rafael Novais Passarelli","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008603269206812831,"gpt":0.1981218645007147,"spread":0.1895185952939019,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008308316,0.0008611382,0.0004618321,0.002651145,0.0005207349,0.001557759,0.0004157014,0.0004256654,0.001388246],"category_scores_gemma":[0.0006571271,0.0003400549,0.001614875,0.002120755,0.0005180815,0.0007852303,0.000636274,0.0002641469,0.0001024377],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.004130528,"about_ca_system_score_gemma":0.001368843,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.04840546,"about_ca_topic_score_gemma":0.09118178,"domain_scores_codex":[0.9996597,0.00009127698,0.00001606485,0.00005637781,0.000123793,0.00005275844],"domain_scores_gemma":[0.9996156,0.0001203062,0.00006150217,0.00002417856,0.0001619192,0.0000165622],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.000473687,0.0005341897,0.1300325,0.0007040637,0.000515718,0.001269092,0.0003524844,0.7311139,0.03280995,0.006005794,0.001631334,0.09455734],"study_design_scores_gemma":[0.00003610209,0.0006183331,0.1428244,0.0000704238,0.0008254419,0.0001437748,0.001521632,0.8366466,0.009686328,0.003771626,0.003753867,0.0001015386],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.973685,0.001090333,0.01286252,0.0001497282,0.00001577876,0.0002001106,0.000779177,0.00006944027,0.01114785],"genre_scores_gemma":[0.9892988,0.0005956433,0.008271636,0.00002129418,0.000006800987,0.0001011794,0.0004398524,0.00002259086,0.001242135],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.04840546,"threshold_uncertainty_score":0.09624743,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955324818","doi":"10.29173/mocs132","title":"Investigating Stakeholders' Perceptions of Feasibility and Implications of Modular Construction-Based Post-Disaster Reconstruction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Process (computing); Modular design; Natural disaster; Flooding (psychology); Emergency management; Construction engineering; Engineering; Civil engineering; Risk analysis (engineering); Forensic engineering; Architectural engineering; Business; Computer science; Geography; Political science","authors":[{"name":"Pedram Ghannad","is_ca":false},{"name":"Yong-Cheol Lee","is_ca":false},{"name":"Jin Ouk Choi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01834454964080253,"gpt":0.2115309248818566,"spread":0.1931863752410541,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01031459,0.0003335928,0.0001958679,0.0007116724,0.002038338,0.002025699,0.0008111336,0.001307996,0.003444172],"category_scores_gemma":[0.01818951,0.0002670247,0.0004023742,0.0004615482,0.002228732,0.002118547,0.002655944,0.001171497,0.0003167765],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001630917,"about_ca_system_score_gemma":0.002414971,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002447286,"about_ca_topic_score_gemma":0.004453091,"domain_scores_codex":[0.9925269,0.004835662,0.0002611772,0.0002259505,0.001059766,0.001090593],"domain_scores_gemma":[0.9902879,0.00496873,0.001301924,0.0003365981,0.001736613,0.001368276],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"qualitative","study_design_scores_codex":[0.0005489468,0.001381657,0.2006239,0.002046687,0.00009186714,0.006947841,0.5954843,0.004140676,0.02342212,0.01641931,0.005270151,0.1436226],"study_design_scores_gemma":[0.0000318885,0.001070641,0.07625625,0.0006708306,0.00004886822,0.0008191495,0.8814024,0.003592186,0.002406255,0.002146569,0.03146852,0.00008651872],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9872512,0.0001438309,0.002309942,0.001369277,0.00002142041,0.000110686,0.00002183628,0.00001076007,0.008761005],"genre_scores_gemma":[0.9980145,0.0001719392,0.00111572,0.0001064839,0.000002834885,0.00003725798,0.0000123298,0.000003490395,0.0005353473],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01031459,"threshold_uncertainty_score":0.0545494,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954362421","doi":"10.29173/mocs83","title":"Spatial Parameterization of Non-Semantic CAD Elements for Supporting Automated Disassembly Planning","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Key (lock); Reuse; Component (thermodynamics); Building information modeling; Workflow; Process (computing); Automation; CAD; Digitization; Spatial analysis; Software engineering; Data mining; Engineering drawing; Database; Engineering; Programming language; Computer vision","authors":[{"name":"Chris Rausch","is_ca":true},{"name":"Ben Sanchez","is_ca":true},{"name":"Carl T. Haas","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01144007934626619,"gpt":0.2399338018462283,"spread":0.2284937224999622,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001111212,0.00106543,0.0007265717,0.002137162,0.0004343752,0.002308265,0.001389226,0.0005909027,0.00193294],"category_scores_gemma":[0.004326187,0.000599725,0.0008887397,0.00125124,0.001135405,0.001971123,0.001756633,0.0007799178,0.0007569755],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008573732,"about_ca_system_score_gemma":0.00134927,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004391705,"about_ca_topic_score_gemma":0.007512511,"domain_scores_codex":[0.998844,0.0001861789,0.0001204502,0.0002464432,0.0005397778,0.00006303108],"domain_scores_gemma":[0.9983861,0.0005093621,0.0001814749,0.0005048375,0.0003819944,0.00003612398],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001554042,0.0001364549,0.007106652,0.0003404915,0.00005763664,0.000303484,0.001281655,0.3640905,0.06462201,0.04209819,0.002622541,0.517185],"study_design_scores_gemma":[0.00001257506,0.00007776652,0.001877537,0.00007235273,0.00003640269,0.000194906,0.0004460576,0.9007072,0.06003932,0.01619868,0.02028588,0.00005121386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.01335675,0.00007356921,0.9827915,0.00003965654,0.0000085416,0.00006979882,0.0001050283,0.001738138,0.001817114],"genre_scores_gemma":[0.2264945,0.0001548663,0.7714553,0.00002559852,0.000004476383,0.0000763878,0.0007053944,0.0003793485,0.0007041856],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.004391705,"threshold_uncertainty_score":0.008732259,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2939777093","doi":"10.29173/mocs35","title":"A BIM-based Supply Chain Integration for Prefabrication and Modularization","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"Concordia University","funders":"","keywords":"Prefabrication; Supply chain; Schedule; Modular programming; Integrated project delivery; Precast concrete; Process (computing); Building information modeling; Manufacturing engineering; Systems engineering; Transport engineering; Computer science; Engineering; Operations management; Business; Civil engineering; Project management; Scheduling (production processes)","authors":[{"name":"Iloabuchi Alex Ocheoha","is_ca":true},{"name":"Osama Moselhi","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006861548457437031,"gpt":0.1943483338728542,"spread":0.1874867854154172,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002352303,0.0009745056,0.0005633947,0.002457943,0.001205057,0.002716774,0.001337502,0.000918324,0.00542076],"category_scores_gemma":[0.002266613,0.0007658355,0.001041845,0.003099396,0.0005593152,0.002187899,0.002423934,0.001136798,0.001661325],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001551335,"about_ca_system_score_gemma":0.00374472,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005819055,"about_ca_topic_score_gemma":0.006118778,"domain_scores_codex":[0.9975764,0.0005712218,0.000138235,0.0002914829,0.001283397,0.0001393538],"domain_scores_gemma":[0.9991512,0.0001230668,0.00008319211,0.0001754781,0.0004124768,0.00005463874],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009829485,0.0004669571,0.002995624,0.0003208798,0.0001023594,0.0004817432,0.0008807402,0.2510374,0.02507423,0.08705034,0.01005061,0.6214409],"study_design_scores_gemma":[0.00003738373,0.0002568296,0.00282053,0.0001581097,0.00007500975,0.0004847894,0.0003986748,0.8381473,0.02506152,0.01924914,0.1132088,0.0001017388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.006652603,0.0001534918,0.9788286,0.0001924574,0.0000747682,0.0003206417,0.0001857015,0.001287192,0.01230458],"genre_scores_gemma":[0.079689,0.0003641714,0.9116128,0.00006106932,0.00001945947,0.0003616407,0.0006992857,0.000159403,0.007033083],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.005819055,"threshold_uncertainty_score":0.0181343,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955588086","doi":"10.29173/mocs91","title":"A Research Roadmap for Off-Site Construction: Automation and Robotics","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"University of New Brunswick","funders":"","keywords":"Robotics; Automation; Engineering management; Manufacturing engineering; Government (linguistics); Manufacturing; Engineering; Emerging technologies; Technology roadmap; Computer science; Artificial intelligence; Systems engineering; Robot; Process management; Business; Marketing","authors":[{"name":"Jeremy Bowmaster","is_ca":true},{"name":"Jeff H. Rankin","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0129393961551945,"gpt":0.236567965683315,"spread":0.2236285695281205,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03108468,0.003101289,0.002182767,0.0128065,0.007470826,0.02063891,0.005055027,0.01138411,0.03193496],"category_scores_gemma":[0.01752998,0.001368677,0.002111728,0.01467419,0.006707477,0.01820832,0.01297607,0.009794914,0.01708734],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.02635758,"about_ca_system_score_gemma":0.1971159,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.1313553,"about_ca_topic_score_gemma":0.133781,"domain_scores_codex":[0.9782478,0.004839242,0.001546196,0.001451303,0.009607265,0.00430814],"domain_scores_gemma":[0.9370517,0.008277017,0.001763984,0.002471793,0.03953822,0.01089742],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001216567,0.0004798728,0.00156314,0.005283759,0.00003604016,0.0004043157,0.001381094,0.003087224,0.002004531,0.2109533,0.2347968,0.5398884],"study_design_scores_gemma":[0.00001961641,0.0001971185,0.00213066,0.003359721,0.00002078605,0.0001683944,0.002712396,0.001003067,0.0004944716,0.02815288,0.961672,0.00006879676],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"other","genre_gemma":"empirical","genre_scores_codex":[0.006559593,0.2043688,0.115505,0.3179802,0.0179647,0.004637142,0.003179484,0.003550573,0.3262546],"genre_scores_gemma":[0.08483787,0.3222344,0.4257616,0.02473929,0.003239063,0.005194448,0.01211415,0.001114658,0.1207646],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.1313553,"threshold_uncertainty_score":0.2611815,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296079691","doi":"10.29173/mocs277","title":"Hindering factors to the utilisation of UAVs for construction projects in South Africa","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Aviation Industry Analysis and Trends","field":"Economics, Econometrics and Finance","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Drone; Software deployment; Construction industry; Integrated project delivery; Investment (military); Business; Construction engineering; Engineering management; Construction management; Engineering; Process management; Civil engineering; Political science; Politics","authors":[{"name":"Matthew Ikuabe","is_ca":false},{"name":"Clinton Aigbavboa","is_ca":false},{"name":"Opeoluwa Akinradewo","is_ca":false},{"name":"Samuel Adeniyi Adekunle","is_ca":false},{"name":"Adetola Adeniyi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04714594478015876,"gpt":0.2111585434556014,"spread":0.1640125986754426,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001720574,0.0002124449,0.0001576729,0.0009080467,0.001231351,0.001559541,0.0003449821,0.0003243242,0.003207364],"category_scores_gemma":[0.008320171,0.0002445954,0.0001200765,0.001399659,0.0007755728,0.0007919937,0.001076947,0.0004375738,0.0001918909],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001668697,"about_ca_system_score_gemma":0.004327759,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02041454,"about_ca_topic_score_gemma":0.03967442,"domain_scores_codex":[0.9981607,0.0007636244,0.0001357116,0.00008942198,0.0003115525,0.0005390123],"domain_scores_gemma":[0.9918133,0.003251918,0.003252472,0.0001468116,0.0006355669,0.0008999104],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002120639,0.000359003,0.7857327,0.00116264,0.00005620403,0.006657661,0.09174202,0.00163449,0.01007769,0.007411605,0.001784949,0.09316894],"study_design_scores_gemma":[0.000008284906,0.0002350347,0.8042013,0.0006847029,0.00002812212,0.001194853,0.1715551,0.001065003,0.001015933,0.0005864014,0.01939267,0.00003258952],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9967983,0.0001937741,0.000249988,0.0005123261,0.000003383493,0.00002260929,0.00002428956,0.000002111959,0.002193302],"genre_scores_gemma":[0.9987189,0.0004262091,0.0002532158,0.00002525002,0.000001881623,0.00001360056,0.000009750081,0.000001724764,0.0005494629],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.02041454,"threshold_uncertainty_score":0.04059142,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2939173706","doi":"10.29173/mocs34","title":"Modular Industry Characteristics and Barriers to its Increased Market Share","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Modular design; Work (physics); Engineering; Construction management; Business; Engineering management; Architectural engineering; Operations management; Construction engineering; Civil engineering; Marketing; Computer science","authors":[{"name":"Tarek Salama","is_ca":false},{"name":"Osama Moselhi","is_ca":false},{"name":"Mohamed Al‐Hussein","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006202993586963973,"gpt":0.1910571583962765,"spread":0.1848541648093125,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001931654,0.0001089661,0.0001470335,0.001935469,0.0008277912,0.002315841,0.0006525142,0.0004798476,0.01722482],"category_scores_gemma":[0.007151438,0.0001600814,0.0002399786,0.001814066,0.0009505982,0.001476832,0.001519314,0.0006101034,0.001016473],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002525971,"about_ca_system_score_gemma":0.002612231,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02629482,"about_ca_topic_score_gemma":0.05286325,"domain_scores_codex":[0.9979038,0.0002125441,0.00007459946,0.0001976769,0.0009665946,0.0006448658],"domain_scores_gemma":[0.9901073,0.002578076,0.0030094,0.0003411743,0.001786245,0.002177719],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0002817747,0.0004923239,0.9167467,0.0001129055,0.00002279722,0.001127191,0.008668021,0.0007320667,0.004951017,0.01656023,0.004029793,0.04627525],"study_design_scores_gemma":[0.00001351001,0.0001243174,0.9686992,0.00004437955,0.00000660236,0.000260421,0.01187349,0.001086102,0.0007097085,0.0007480402,0.01641471,0.00001947267],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"other","genre_scores_codex":[0.976583,0.00008086271,0.0002770952,0.0004573811,0.00000431859,0.00003629523,0.0001312381,0.000009572844,0.02242035],"genre_scores_gemma":[0.996787,0.00006436746,0.0001280202,0.00003648816,0.000007530311,0.000009519368,0.00008907097,0.000005458355,0.002872586],"genre_candidate":"other","genre_consensus":null,"teacher_disagreement_score":0.02629482,"threshold_uncertainty_score":0.05762273,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953706728","doi":"10.29173/mocs116","title":"Evaluation of Risk Management Practice in the Nigeria Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"University of Johannesburg","keywords":"Risk management plan; Risk management; Business; Control (management); Risk analysis (engineering); Project risk management; Identification (biology); IT risk management; Quality (philosophy); Exploratory factor analysis; Plan (archaeology); Operations management; Construction industry; Risk assessment; Enterprise risk management; Project management; Descriptive statistics; Construction management; Marketing; Project management triangle; Engineering; Management; Finance; Economics; Construction engineering; Geography","authors":[{"name":"Moses C. Ugwu","is_ca":false},{"name":"Temidayo Oluwasola Osunsanmi","is_ca":false},{"name":"Clinton Aigbavboa","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03691536977139125,"gpt":0.3275571073050643,"spread":0.290641737533673,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01008139,0.0003513657,0.0003916294,0.002686131,0.001931413,0.003069232,0.0005990504,0.0006345076,0.001001062],"category_scores_gemma":[0.0244559,0.0003305451,0.000261036,0.001635028,0.001469375,0.001607676,0.00204787,0.0006972589,0.0001657936],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002374351,"about_ca_system_score_gemma":0.004595275,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002533025,"about_ca_topic_score_gemma":0.003837126,"domain_scores_codex":[0.9860314,0.007643137,0.0009675726,0.000411198,0.004342791,0.0006038037],"domain_scores_gemma":[0.9796377,0.00929163,0.005453731,0.0005942881,0.003887933,0.00113478],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"observational","study_design_scores_codex":[0.0002816715,0.001273005,0.3280887,0.001348303,0.00006018512,0.003008846,0.3715839,0.00206241,0.00668702,0.003250443,0.001216578,0.2811389],"study_design_scores_gemma":[0.00002258856,0.001771976,0.2586409,0.002188111,0.00007184,0.002293256,0.7037287,0.005041933,0.004102599,0.00187565,0.02010394,0.0001583078],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9925172,0.0004320653,0.001374916,0.00048186,0.0000114871,0.0001640656,0.00001028136,0.00000878791,0.004999342],"genre_scores_gemma":[0.9960986,0.0008536889,0.002055648,0.00003795105,0.000004702681,0.00005192287,0.000009645364,0.000003397226,0.00088425],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01008139,"threshold_uncertainty_score":0.05331618,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2898328996","doi":"10.29173/mocs172","title":"Permanent Modular Construction: Construction Performance","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Schedule; Modular construction; Sample (material); Construction industry; Computer science; Construction management; Test (biology); Engineering; Construction engineering; Civil engineering","authors":[{"name":"Ryan E. Smith","is_ca":false},{"name":"Talbot Rice","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01112635326598991,"gpt":0.1857710283249126,"spread":0.1746446750589227,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004477601,0.0006078065,0.0003301043,0.001773264,0.0006145668,0.001554884,0.0008601021,0.0004489451,0.007630033],"category_scores_gemma":[0.01480275,0.0002164958,0.0003499408,0.001875691,0.001097224,0.001332156,0.001492524,0.0004015122,0.001623209],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001539104,"about_ca_system_score_gemma":0.001113012,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003364677,"about_ca_topic_score_gemma":0.005305796,"domain_scores_codex":[0.9946753,0.000932532,0.0002363008,0.0003835396,0.003335408,0.0004369833],"domain_scores_gemma":[0.9895512,0.003062979,0.00259818,0.001051779,0.003044957,0.0006908862],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.001911626,0.00134866,0.5574518,0.0007398616,0.0001557569,0.0004716582,0.004010737,0.03116266,0.02525477,0.004158843,0.004421465,0.3689121],"study_design_scores_gemma":[0.00003278428,0.006520517,0.9338955,0.0001061083,0.0001012161,0.001126292,0.005138734,0.01410878,0.02262797,0.001597227,0.01464647,0.00009838159],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9763035,0.00009824958,0.00309624,0.00006023659,0.00001273273,0.00006715098,0.0003389566,0.00009720705,0.01992575],"genre_scores_gemma":[0.9958552,0.0000621865,0.00165044,0.00000578135,0.000005797792,0.00001456588,0.0002931059,0.00003363795,0.002079176],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.007630033,"threshold_uncertainty_score":0.02552497,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296272583","doi":"10.29173/mocs287","title":"Carbon emissions comparison in modular and site-built residential construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Modular design; Life-cycle assessment; Prefabrication; Construction waste; Environmental impact assessment; Productivity; Environmental economics; Engineering; Environmental resource management; Business; Production (economics); Environmental planning; Environmental science; Civil engineering; Waste management; Computer science; Economics","authors":[{"name":"Maryam Kouhirostami","is_ca":false},{"name":"Abdol R. Chini","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007888409632422756,"gpt":0.2051085963982159,"spread":0.1972201867657931,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009565677,0.00038522,0.0002889594,0.004241567,0.0002569143,0.001253979,0.0004020155,0.0004158895,0.001581511],"category_scores_gemma":[0.001374312,0.000120602,0.0006934798,0.004887611,0.0003164707,0.001205798,0.0005319029,0.0002169955,0.0001621045],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001367772,"about_ca_system_score_gemma":0.0006935929,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004293876,"about_ca_topic_score_gemma":0.01849857,"domain_scores_codex":[0.9990525,0.0002418171,0.0000628757,0.0001119013,0.0004604594,0.00007055914],"domain_scores_gemma":[0.9989573,0.0004244403,0.00015437,0.00004274807,0.0003955921,0.00002555634],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.001369217,0.0004231024,0.2131087,0.01177891,0.001037995,0.003168756,0.00291784,0.0365111,0.03174072,0.03953196,0.004953435,0.6534583],"study_design_scores_gemma":[0.00004016476,0.001503691,0.7658495,0.003348058,0.001774099,0.002784692,0.01058927,0.03619272,0.0529575,0.01779098,0.1069823,0.0001869439],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9128108,0.03650556,0.009509415,0.000312067,0.00009970686,0.0001573118,0.001370532,0.0000502299,0.03918448],"genre_scores_gemma":[0.9800603,0.01192891,0.004988007,0.0000701198,0.00002422458,0.00007269158,0.0008141983,0.00002077087,0.00202074],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.004293876,"threshold_uncertainty_score":0.009923995,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296079369","doi":"10.29173/mocs278","title":"A principal component analysis of Organisational BIM Implementation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Nonprobability sampling; Building information modeling; Status quo; Process management; Yardstick; Process (computing); Knowledge management; Principal (computer security); Construction industry; Business; Competitive advantage; Computer science; Operations management; Engineering; Construction engineering; Marketing","authors":[{"name":"Samuel Adeniyi Adekunle","is_ca":false},{"name":"Clinton Aigbavboa","is_ca":false},{"name":"Opeoluwa Akinradewo","is_ca":false},{"name":"Matthew Ikuabe","is_ca":false},{"name":"Adetola Adeniyi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007207543096686039,"gpt":0.2097370530253108,"spread":0.2025295099286247,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00611563,0.0009982451,0.0006830865,0.003775322,0.001138862,0.003023875,0.000716272,0.0005580516,0.00830223],"category_scores_gemma":[0.02834149,0.0004605536,0.0009867779,0.006181704,0.0008094204,0.001074046,0.001942175,0.001129458,0.001831804],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001563163,"about_ca_system_score_gemma":0.004221904,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009277361,"about_ca_topic_score_gemma":0.005122633,"domain_scores_codex":[0.9919351,0.003261622,0.0005056854,0.0007763872,0.003062494,0.0004587159],"domain_scores_gemma":[0.9845946,0.006307049,0.0009445839,0.001328996,0.006499154,0.0003255938],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.001104462,0.001384568,0.2317164,0.0008861226,0.0006675677,0.0003263132,0.02167872,0.01388642,0.009224275,0.02243369,0.0130147,0.6836767],"study_design_scores_gemma":[0.0001151982,0.001489083,0.8394625,0.0002440142,0.000375267,0.0002027296,0.01811882,0.09283961,0.006540084,0.006591661,0.033795,0.000226119],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8354567,0.0001252648,0.1179101,0.0007306609,0.0001999311,0.003966971,0.002681823,0.001406489,0.03752218],"genre_scores_gemma":[0.9076343,0.0001223225,0.08017442,0.00004318852,0.00002780319,0.002915626,0.001906336,0.0002000536,0.006975977],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.009277361,"threshold_uncertainty_score":0.03234291,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3113011181","doi":"10.29173/mocs188","title":"A Framework for Comparative Evaluation of the Life Cycle Sustainability of Modular and Conventional Buildings","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Sustainability; Analytic hierarchy process; Modular design; Process (computing); Multiple-criteria decision analysis; Engineering; Factory (object-oriented programming); Modular construction; Life-cycle assessment; Architectural engineering; Construction engineering; Key (lock); Systems engineering; Computer science; Operations research; Production (economics)","authors":[{"name":"Mohammad Hāshim Kamali","is_ca":true},{"name":"Kasun Hewage","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03029052058977919,"gpt":0.2730149197842187,"spread":0.2427243991944395,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01586203,0.001575753,0.001106743,0.01436213,0.001350087,0.005970491,0.002458356,0.00132459,0.003904326],"category_scores_gemma":[0.01398394,0.0003500885,0.001615883,0.009085028,0.003694515,0.005325106,0.003627711,0.001390729,0.0003316325],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.01048736,"about_ca_system_score_gemma":0.007474777,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01035734,"about_ca_topic_score_gemma":0.009027686,"domain_scores_codex":[0.9883083,0.007572983,0.0005581436,0.0005898945,0.002414105,0.0005565729],"domain_scores_gemma":[0.9925247,0.004408587,0.0007216745,0.0003049558,0.001788442,0.000251683],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0000760047,0.0002381015,0.002782345,0.00122921,0.0001070374,0.0002572567,0.001526878,0.06797484,0.001535897,0.8294611,0.00228685,0.09252448],"study_design_scores_gemma":[0.00007664096,0.001009197,0.007503441,0.003252499,0.0002280117,0.0005041296,0.01128685,0.2498336,0.003081346,0.6225955,0.1004142,0.0002146593],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.03411794,0.007833363,0.86405,0.001841079,0.0001717729,0.001768891,0.0007775503,0.0002883054,0.0891511],"genre_scores_gemma":[0.414159,0.003145164,0.5781097,0.000150207,0.00005802163,0.002067459,0.0004752356,0.00004674518,0.001788463],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01586203,"threshold_uncertainty_score":0.08388746,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296079866","doi":"10.29173/mocs255","title":"Design-for-Manufacturing-and-Assembly (DfMA) for the construction industry: A review","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal; Polytechnique Montréal","funders":"Fonds de recherche du Québec – Nature et technologies; National Research Council Canada; Polytechnique Montréal","keywords":"Engineering; Systematic review; Construction industry; Computer science; Engineering management; Manufacturing engineering; Construction engineering","authors":[{"name":"Sara Rankohi","is_ca":true},{"name":"Carlo Carbone","is_ca":true},{"name":"Ivanka Iordanova","is_ca":true},{"name":"Mario Bourgault","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04268418942031275,"gpt":0.2647113452291091,"spread":0.2220271558087964,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002795699,0.001173312,0.001456175,0.008387399,0.0007295276,0.002241484,0.00130243,0.001934977,0.003470818],"category_scores_gemma":[0.006275892,0.0006228707,0.001214298,0.01161127,0.0009145758,0.002664003,0.001169772,0.001488801,0.0009458106],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001887257,"about_ca_system_score_gemma":0.00815523,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005448817,"about_ca_topic_score_gemma":0.01223342,"domain_scores_codex":[0.9982473,0.0004268457,0.0004029279,0.0001760241,0.0006753998,0.0000714533],"domain_scores_gemma":[0.9931953,0.004834989,0.0006697782,0.0001217416,0.00104001,0.0001381584],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00002887329,0.00007551444,0.0004838317,0.20185,0.0002526908,0.0001974717,0.0005064894,0.0004370624,0.0006990464,0.006515534,0.0170785,0.771875],"study_design_scores_gemma":[0.00001236166,0.0001275697,0.002498133,0.1219023,0.0007699494,0.001156628,0.0006718414,0.00016016,0.0004866014,0.002426808,0.8697476,0.00003997815],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.0001162118,0.9986035,0.0001734468,0.0002069843,0.0001043623,0.00001095724,0.00001301696,0.000004128833,0.0007674805],"genre_scores_gemma":[0.00107891,0.9981845,0.0003934669,0.0001191365,0.00005012622,0.00001504046,0.00001647498,0.000001907028,0.0001404691],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.008387399,"threshold_uncertainty_score":0.01478523,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953406379","doi":"10.29173/mocs128","title":"Numerical and Experimental Study on Modular-Based Timber Structures","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Tree Root and Stability Studies","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Prefabrication; Stiffness; Modular design; Structural engineering; Cross laminated timber; Finite element method; Engineering; Shear (geology); Shear wall; Frame (networking); Computer science; Mechanical engineering; Geology","authors":[{"name":"Sigurdur Ormarsson","is_ca":false},{"name":"Johan Vessby","is_ca":false},{"name":"Marie Johansson","is_ca":false},{"name":"Le Kua","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007846410184613977,"gpt":0.2105612005679601,"spread":0.2027147903833461,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005292252,0.0004322151,0.0004749639,0.0006163618,0.0003064881,0.0002906401,0.0005698006,0.0007854896,0.002582957],"category_scores_gemma":[0.0008929562,0.000168061,0.0003330466,0.0005275345,0.0007383424,0.0003310093,0.0004081271,0.0003239679,0.0002679124],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002045481,"about_ca_system_score_gemma":0.0002078637,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001016746,"about_ca_topic_score_gemma":0.001724214,"domain_scores_codex":[0.999728,0.00003369774,0.00001825187,0.00004475897,0.0001273873,0.00004791772],"domain_scores_gemma":[0.9990784,0.0004039092,0.000123124,0.000153995,0.0001639582,0.00007658065],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0005041349,0.0009189227,0.0136802,0.0004558216,0.00004587074,0.0007353393,0.0006894325,0.609277,0.3444601,0.002208773,0.0006023115,0.02642214],"study_design_scores_gemma":[0.00006401413,0.002342311,0.02165798,0.00003962778,0.00005186208,0.0003193797,0.0005434179,0.86975,0.1030006,0.0007420091,0.001440073,0.00004884809],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9876727,0.00008234405,0.009254389,0.000023041,0.00001760813,0.00003020159,0.0001837843,0.0001090124,0.002626929],"genre_scores_gemma":[0.9926983,0.00004488288,0.006387194,0.000003772443,0.000002534216,0.0000193462,0.0001046942,0.000009393546,0.0007300626],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.002582957,"threshold_uncertainty_score":0.008640885,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954795660","doi":"10.29173/mocs110","title":"Lean Construction Supply Chain: A Bibliometric Analysis of the Knowledge Base","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"University of Johannesburg","keywords":"Supply chain; Lean manufacturing; Knowledge management; Citation; Supply chain management; Lean project management; Lean construction; Scopus; Business; Process management; Computer science; Engineering; Construction industry; Marketing; Political science","authors":[{"name":"Temidayo Oluwasola Osunsanmi","is_ca":false},{"name":"Ayodeji Emmanuel Oke","is_ca":false},{"name":"Clinton Aigbavboa","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01367487874295266,"gpt":0.2163825053200154,"spread":0.2027076265770628,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.006959579,0.0004846127,0.001232835,0.1856646,0.001707018,0.005357962,0.0007503369,0.0005941059,0.003965034],"category_scores_gemma":[0.0308302,0.0002409567,0.001109617,0.175008,0.0008058863,0.004336004,0.002785977,0.0004805392,0.0009086529],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001949352,"about_ca_system_score_gemma":0.004399336,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004834943,"about_ca_topic_score_gemma":0.005230261,"domain_scores_codex":[0.9903207,0.001214423,0.001866173,0.0006308503,0.005625842,0.0003419287],"domain_scores_gemma":[0.9665444,0.0199885,0.003970258,0.001147071,0.007771366,0.0005784176],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0003082647,0.0002549051,0.2566805,0.02077442,0.001470006,0.001274716,0.01263739,0.002560063,0.007207165,0.01272511,0.02464768,0.6594597],"study_design_scores_gemma":[0.00008591268,0.0004412891,0.6973259,0.007097135,0.003278421,0.003196996,0.03048425,0.01456829,0.0101136,0.01547128,0.2176162,0.0003207249],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7699648,0.04612052,0.01421945,0.003160851,0.0003663482,0.001235703,0.0688582,0.00108558,0.09498855],"genre_scores_gemma":[0.9154192,0.02822613,0.01975939,0.0001458399,0.0003063719,0.001021319,0.03047353,0.0001255518,0.004522729],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8143353,"threshold_uncertainty_score":0.03680617,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954062416","doi":"10.29173/mocs93","title":"Risks Identification and Allocation in the Supply Chain of Modular Integrated Construction (MiC)","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Hong Kong Polytechnic University","keywords":"Supply chain; Risk management; Business; Risk analysis (engineering); Identification (biology); Supply chain risk management; Failure mode, effects, and criticality analysis; Bespoke; Modular design; Risk assessment; Stakeholder; Interdependence; Supply chain management; Operations management; Computer science; Service management; Engineering; Reliability engineering; Marketing; Finance","authors":[{"name":"Ibrahim Yahaya Wuni","is_ca":false},{"name":"Qiping Shen","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03765976775095102,"gpt":0.2944018005511277,"spread":0.2567420328001767,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003548118,0.0009954462,0.0004024137,0.003092544,0.001298432,0.002346955,0.0006593921,0.000941843,0.002516812],"category_scores_gemma":[0.007439582,0.0005404485,0.001076049,0.001934185,0.000876795,0.002326923,0.002036043,0.0008558452,0.00021004],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002467846,"about_ca_system_score_gemma":0.002528492,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006730144,"about_ca_topic_score_gemma":0.006034775,"domain_scores_codex":[0.9970872,0.0009160227,0.0001812637,0.0003304168,0.001130902,0.0003542962],"domain_scores_gemma":[0.995733,0.001557742,0.001179197,0.00016031,0.00115986,0.0002100239],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.0006757584,0.0002941475,0.1139071,0.0006433454,0.0003582265,0.002043309,0.004019249,0.6110998,0.01468018,0.0511977,0.002172366,0.1989087],"study_design_scores_gemma":[0.00004576908,0.0007273543,0.07054998,0.0003173416,0.0003069941,0.0007833842,0.004684721,0.8332211,0.01023373,0.07063366,0.008291814,0.0002042746],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6797339,0.000575193,0.3045311,0.0006815488,0.00005008794,0.0004515763,0.0002497747,0.0001578663,0.01356894],"genre_scores_gemma":[0.9572447,0.0002426231,0.04032493,0.00003861315,0.000009996123,0.0001004011,0.0001659872,0.00001829144,0.001854317],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.006730144,"threshold_uncertainty_score":0.01876444,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955193216","doi":"10.29173/mocs120","title":"Cross-Laminated Timber Shear Walls in Balloon Construction: Seismic Performance of Steel Connections","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Resources Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Cross laminated timber; Structural engineering; Shear wall; Shear (geology); Engineering; Seismic analysis; Low-rise; Seismic loading; Compatibility (geochemistry); Civil engineering; Geology","authors":[{"name":"Hossein Daneshvar","is_ca":true},{"name":"Jan Niederwestberg","is_ca":true},{"name":"Carla Dickof","is_ca":false},{"name":"Jean-Philippe Letarte","is_ca":false},{"name":"Ying Hei Chui","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0057224313996502,"gpt":0.1843186189176228,"spread":0.1785961875179726,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004313905,0.0005331697,0.0003078663,0.0004768448,0.0002631844,0.0002831676,0.000388517,0.0005344368,0.001278079],"category_scores_gemma":[0.0006711534,0.0001928043,0.0003568056,0.0004192644,0.0005410528,0.0002358908,0.0003195906,0.0002442682,0.000303697],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002722465,"about_ca_system_score_gemma":0.0002127755,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002349615,"about_ca_topic_score_gemma":0.0057625,"domain_scores_codex":[0.9997466,0.00004888427,0.0000142426,0.00004410135,0.00009394337,0.00005221038],"domain_scores_gemma":[0.9995266,0.0001449294,0.00009250863,0.00005027344,0.0001026358,0.00008311779],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.00266951,0.0005325055,0.05144113,0.0002746051,0.00005233304,0.001158756,0.0009816325,0.198295,0.7145117,0.0006819241,0.0002853724,0.02911556],"study_design_scores_gemma":[0.0001207368,0.01548375,0.3039382,0.00009221398,0.0001687458,0.0005429471,0.002010658,0.2076827,0.4665826,0.0002786282,0.002994013,0.0001048023],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9990849,0.00001867044,0.0004077883,0.000002533939,0.000002233749,0.000004366245,0.00002676295,0.000009831259,0.0004428005],"genre_scores_gemma":[0.9992561,0.00002348724,0.0004275283,0.000001437215,8.083805e-7,0.000003689025,0.00003732892,0.000003357851,0.0002463171],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.002349615,"threshold_uncertainty_score":0.004671872,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2937012657","doi":"10.29173/mocs43","title":"Towards net zero energy modular housing: a case study","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Calgary","funders":"","keywords":"Modular design; Roof; Zero-energy building; Architectural engineering; Efficient energy use; Photovoltaics; Container (type theory); Shading; Computer science; Solar gain; Window (computing); Code (set theory); Civil engineering; Solar energy; Engineering; Photovoltaic system; Mechanical engineering; Electrical engineering; Operating system","authors":[{"name":"Caroline Hachem-Vermette","is_ca":true},{"name":"Chinyere Dara","is_ca":true},{"name":"Rhys Kane","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008059766340086906,"gpt":0.1975599125271606,"spread":0.1895001461870737,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000622167,0.0005139396,0.0002451291,0.0004357122,0.0006128664,0.0006932337,0.0007419887,0.0007392837,0.001512081],"category_scores_gemma":[0.001097169,0.0001504324,0.0004092316,0.0004892544,0.0005684583,0.0005499882,0.0006567461,0.0003131343,0.0002536301],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006799576,"about_ca_system_score_gemma":0.0003389748,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002637709,"about_ca_topic_score_gemma":0.007103364,"domain_scores_codex":[0.9994266,0.0002306301,0.00001598737,0.00005447329,0.0001822864,0.00009001698],"domain_scores_gemma":[0.9996432,0.0001218983,0.00003798333,0.00005712865,0.00007861035,0.00006108714],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"case_report","study_design_scores_codex":[0.002656627,0.004272082,0.08211597,0.001304122,0.0001911365,0.02716134,0.004709976,0.5241534,0.1308449,0.03194913,0.007099911,0.1835414],"study_design_scores_gemma":[0.0006996125,0.01618912,0.08430723,0.0001602455,0.0002503594,0.0116155,0.01139833,0.5732538,0.2433657,0.009775774,0.04881642,0.0001679877],"study_design_candidate":"case_report","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9878331,0.00004221624,0.007332321,0.00005618838,0.000008640977,0.00007985293,0.00007135793,0.00004100868,0.004535254],"genre_scores_gemma":[0.9855168,0.00007480681,0.01191123,0.00001170287,0.000004332701,0.00003346445,0.00008222835,0.00001501441,0.002350416],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.002637709,"threshold_uncertainty_score":0.005244672,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2902687294","doi":"10.29173/mocs52","title":"Manufacturing of modular buildings: a literature review","year":2017,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Factory (object-oriented programming); Process (computing); Field (mathematics); Manufacturing engineering; Productivity; Engineering; Systems engineering; Advanced manufacturing; Computer science; Process management; Engineering management","authors":[{"name":"Yi Yang","is_ca":false},{"name":"Wei Pan","is_ca":false},{"name":"Mi Pan","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02061567046596614,"gpt":0.2617338821326967,"spread":0.2411182116667306,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001663398,0.001187313,0.001607738,0.009405292,0.0005896956,0.002146277,0.001549367,0.001381425,0.006289282],"category_scores_gemma":[0.004750071,0.0006087283,0.001517397,0.01150665,0.000700642,0.002558543,0.001054591,0.0009807934,0.0009820202],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001365146,"about_ca_system_score_gemma":0.005797201,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00540224,"about_ca_topic_score_gemma":0.009665254,"domain_scores_codex":[0.9989642,0.0002212985,0.000253025,0.0001366094,0.0003647558,0.00006008123],"domain_scores_gemma":[0.9958859,0.002817464,0.0005030505,0.00007561321,0.000636538,0.00008145208],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00005873181,0.00007488451,0.000554201,0.2932191,0.000311736,0.0003908243,0.0005803502,0.0006836573,0.0005358928,0.00594133,0.02069741,0.6769519],"study_design_scores_gemma":[0.00001386648,0.0001003029,0.003170385,0.215014,0.00117857,0.001425402,0.0007757235,0.0001848648,0.0004019959,0.002477316,0.775216,0.00004170107],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.0002400007,0.9981905,0.0001683045,0.0002164123,0.00008338306,0.00001599104,0.00004859551,0.000005689483,0.001031196],"genre_scores_gemma":[0.001235588,0.9981617,0.0002995829,0.00009340828,0.00003938421,0.00001205016,0.00004212201,0.000001532498,0.0001146613],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.009405292,"threshold_uncertainty_score":0.02103972,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955214881","doi":"10.29173/mocs113","title":"Research Trends in Off-Site Construction Management: Review of Literature at the Process Level","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Productivity; Quality (philosophy); Process (computing); Excellence; Standardization; Process management; Project management; Engineering management; Business; Engineering; Operations management; Computer science; Systems engineering; Political science","authors":[{"name":"Jun Young Jang","is_ca":false},{"name":"Lee Chan-Sik","is_ca":false},{"name":"Jung In Kim","is_ca":false},{"name":"Tae Wan Kim","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01446567416396785,"gpt":0.2580864275503983,"spread":0.2436207533864305,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.00643648,0.0008872827,0.001412328,0.02024575,0.0007988887,0.004640414,0.001475149,0.002272877,0.003955321],"category_scores_gemma":[0.01917472,0.000801577,0.001404077,0.02612457,0.00165547,0.00669352,0.001372262,0.001783518,0.0008938378],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002761002,"about_ca_system_score_gemma":0.00932585,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005875632,"about_ca_topic_score_gemma":0.009373032,"domain_scores_codex":[0.9959058,0.001103297,0.0009794286,0.0006463952,0.001140406,0.0002246586],"domain_scores_gemma":[0.9544157,0.03424493,0.004321712,0.0004575645,0.00584698,0.0007130057],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001272231,0.0001409145,0.004775657,0.2000971,0.0003477426,0.0005516435,0.003801825,0.000511673,0.0008439019,0.01111288,0.02334894,0.7543405],"study_design_scores_gemma":[0.00002537771,0.0002081149,0.02250118,0.2866867,0.001212234,0.001933754,0.007571787,0.0003543336,0.0006169798,0.005990559,0.6727995,0.00009944449],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.0008161017,0.9966136,0.0001598936,0.00114708,0.0001532138,0.000007602633,0.0000405223,0.000005372443,0.001056692],"genre_scores_gemma":[0.004451179,0.9941591,0.0003632936,0.0005469035,0.0002395399,0.00001347703,0.00006480008,0.000004828553,0.0001568632],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.9797543,"threshold_uncertainty_score":0.0340398,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953598351","doi":"10.29173/mocs105","title":"Smart Manufacturing Support to Product Platforms in Industrialized House Building","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Linnéuniversitetet; Stiftelsen för Kunskaps- och Kompetensutveckling","keywords":"Context (archaeology); Product (mathematics); Asset (computer security); Process (computing); Manufacturing engineering; Business; Computer science; Risk analysis (engineering); Engineering; Marketing; Process management; Computer security","authors":[{"name":"Djordje Popovic","is_ca":false},{"name":"Shamnath Thajudeen","is_ca":false},{"name":"Alexander Vestin","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01015971024340754,"gpt":0.2001800418355044,"spread":0.1900203315920969,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00185479,0.0002014746,0.0001335323,0.001319371,0.001957498,0.003294022,0.0006720934,0.001034225,0.002801386],"category_scores_gemma":[0.002631819,0.0002093423,0.0001432519,0.001502248,0.002611722,0.003011063,0.003341698,0.0005557694,0.0002762143],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002234438,"about_ca_system_score_gemma":0.002821964,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002183157,"about_ca_topic_score_gemma":0.007458705,"domain_scores_codex":[0.9983332,0.0009777503,0.00006601725,0.0001096958,0.0002901348,0.0002232538],"domain_scores_gemma":[0.9975771,0.001606202,0.0003313768,0.0001898978,0.0001542466,0.0001410961],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001532864,0.0005759432,0.02284553,0.001452335,0.00004421849,0.0201098,0.3034565,0.006525305,0.01793853,0.227525,0.003929924,0.3954436],"study_design_scores_gemma":[0.00005209204,0.0006707534,0.04647507,0.002203724,0.00008653451,0.004149078,0.4373182,0.0111427,0.01471253,0.05540852,0.4276704,0.0001104211],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"other","genre_scores_codex":[0.9363095,0.001142493,0.008335706,0.001413496,0.00001689774,0.00007006663,0.00001687273,0.00004795618,0.05264706],"genre_scores_gemma":[0.9942404,0.0004345117,0.003214875,0.00006505064,0.000003555004,0.00001370078,0.000012943,0.000003462999,0.002011421],"genre_candidate":"other","genre_consensus":null,"teacher_disagreement_score":0.003294022,"threshold_uncertainty_score":0.01621211,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2937193245","doi":"10.29173/mocs23","title":"Offsite Construction in the UK Housing Sector: Barriers and Challenges","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"University of Salford Manchester","keywords":"Affordable housing; Business; Quality (philosophy); Production (economics); Manufacturing sector; Risk analysis (engineering); Engineering; Civil engineering; Economics","authors":[{"name":"Peter Killian","is_ca":false},{"name":"Mohammed Arif","is_ca":false},{"name":"G. N. I. Wood","is_ca":false},{"name":"Amit Kaushik","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01180564136446773,"gpt":0.1807290933178694,"spread":0.1689234519534017,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004891499,0.0003347116,0.0003687234,0.001264344,0.004192281,0.006413722,0.001265194,0.001943135,0.006046049],"category_scores_gemma":[0.009741429,0.000485193,0.0002374328,0.002985381,0.003560881,0.003375977,0.005769766,0.001359054,0.0007203186],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.01006595,"about_ca_system_score_gemma":0.008514486,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.101931,"about_ca_topic_score_gemma":0.1418085,"domain_scores_codex":[0.9914837,0.002993222,0.0005227659,0.0004725829,0.002236098,0.002291542],"domain_scores_gemma":[0.9920679,0.003421932,0.001333007,0.000349027,0.001549855,0.001278285],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"qualitative","study_design_scores_codex":[0.0003616473,0.0006565226,0.2513926,0.002811349,0.00004642268,0.008790127,0.2061345,0.001964204,0.003854342,0.09534664,0.03341094,0.3952307],"study_design_scores_gemma":[0.00002475966,0.0003447653,0.2383214,0.003560762,0.00003351918,0.00370887,0.5386543,0.002162607,0.0007147543,0.00843403,0.2039332,0.0001069597],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9226589,0.005596817,0.002354361,0.02294454,0.0002131836,0.0001426942,0.0001231429,0.00004028242,0.04592608],"genre_scores_gemma":[0.9915891,0.00297392,0.0009786646,0.0007327144,0.00001775274,0.00004602697,0.00005128928,0.00001031819,0.003600235],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.101931,"threshold_uncertainty_score":0.2026753,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954899194","doi":"10.29173/mocs79","title":"Applying Virtual Reality to Improve the Construction Logistics of High-rise Modular Integrated Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Plan (archaeology); Virtual reality; Construction management; Modular construction; Construction engineering; Unit (ring theory); Engineering; Computer science; Architectural engineering; Transport engineering; Engineering management; Operations research; Operations management; Civil engineering; Artificial intelligence","authors":[{"name":"Enoch H.L. Cheung","is_ca":false},{"name":"S. Thomas Ng","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007034569385863198,"gpt":0.1939025671253843,"spread":0.1868679977395211,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006665848,0.0008563261,0.0005397,0.0008881349,0.0004071584,0.001907473,0.0008154087,0.0008916797,0.002015992],"category_scores_gemma":[0.001952158,0.0004600477,0.001046648,0.0006843109,0.0004494191,0.001555865,0.00139111,0.0005435047,0.0003660701],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006216846,"about_ca_system_score_gemma":0.001131418,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007583343,"about_ca_topic_score_gemma":0.006482438,"domain_scores_codex":[0.9994999,0.0001990937,0.00002534149,0.0000554052,0.0001409418,0.00007920466],"domain_scores_gemma":[0.9994804,0.0002102579,0.00008556984,0.00006826545,0.0001151823,0.00004032115],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001073263,0.000171428,0.001988017,0.0001065198,0.00003035743,0.0002617,0.0003190507,0.9350874,0.008559923,0.003124356,0.0004498828,0.04979404],"study_design_scores_gemma":[0.00001510706,0.0001706639,0.001209813,0.0000186773,0.0000338816,0.00006377026,0.0001843502,0.9930675,0.002865452,0.0008717541,0.001468625,0.00003047005],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.188474,0.0004070026,0.7977884,0.0003130281,0.00008850583,0.0001205544,0.00006665631,0.001111531,0.01163036],"genre_scores_gemma":[0.8769901,0.0004927927,0.1202989,0.00006229307,0.00001257234,0.00005825817,0.0000858504,0.00005827367,0.00194104],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.007583343,"threshold_uncertainty_score":0.01507843,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3119199326","doi":"10.29173/mocs178","title":"Modularization Business Case: Process Flowchart and Major Considerations","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular programming; Flowchart; Computer science; Schedule; Process (computing); Process management; Risk analysis (engineering); Software engineering; Engineering; Business; Programming language","authors":[{"name":"William J. O’Brien","is_ca":false},{"name":"James T. O’Connor","is_ca":false},{"name":"Jin Ouk Choi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.06703827011217275,"gpt":0.3142190966494526,"spread":0.2471808265372798,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006008851,0.0009239827,0.0003612142,0.002493654,0.001850444,0.0062854,0.001710151,0.002266753,0.01403185],"category_scores_gemma":[0.009734715,0.0006770084,0.0005779138,0.001980898,0.001777337,0.004175012,0.00156525,0.001877946,0.002964515],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.004567642,"about_ca_system_score_gemma":0.007362043,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.008466137,"about_ca_topic_score_gemma":0.007344255,"domain_scores_codex":[0.9962803,0.00138029,0.0001983741,0.0003011402,0.001497457,0.000342578],"domain_scores_gemma":[0.992844,0.004581213,0.0004892661,0.0004975561,0.001250041,0.0003378617],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0005207376,0.001887626,0.00575694,0.0007722707,0.00002114538,0.004577173,0.009549256,0.05654818,0.01938026,0.6648137,0.02530291,0.2108698],"study_design_scores_gemma":[0.0003107038,0.00103129,0.00758355,0.001815217,0.00004903583,0.002483011,0.007208165,0.2273816,0.03448943,0.1908837,0.5264221,0.0003422926],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"other","genre_scores_codex":[0.07162753,0.000660185,0.7520657,0.009584867,0.0002560727,0.0108703,0.001807517,0.003211759,0.1499161],"genre_scores_gemma":[0.2666376,0.001060892,0.6899168,0.0007225098,0.00006430485,0.00428464,0.001510516,0.0002658612,0.03553687],"genre_candidate":"other","genre_consensus":null,"teacher_disagreement_score":0.01403185,"threshold_uncertainty_score":0.04694122,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955994317","doi":"10.29173/mocs133","title":"Strategies for Building Information Modelling Adoption in the South African Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Cronbach's alpha; Procurement; Building information modeling; Business; Work (physics); Construction industry; Questionnaire; Process management; Test (biology); Process (computing); Knowledge management; Marketing; Operations management; Engineering; Construction engineering; Computer science","authors":[{"name":"Tawakalitu Bisola Odubiyi","is_ca":false},{"name":"Clinton Aigbavboa","is_ca":false},{"name":"Wellington Didibhuku Thwala","is_ca":false},{"name":"Nendy Netshidane","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009374625203429156,"gpt":0.1903746049770553,"spread":0.1809999797736261,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004936964,0.000491712,0.0001961636,0.002976439,0.002550429,0.005305568,0.0007337655,0.0009593287,0.003002514],"category_scores_gemma":[0.008977614,0.000526725,0.0003592955,0.003515467,0.001705518,0.002951598,0.004755536,0.001047603,0.0004073369],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003365353,"about_ca_system_score_gemma":0.00673157,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007858357,"about_ca_topic_score_gemma":0.009167318,"domain_scores_codex":[0.9952751,0.002690332,0.0002699711,0.0002458809,0.0008222365,0.0006964691],"domain_scores_gemma":[0.9949772,0.002962025,0.0008829542,0.0003467453,0.0004967735,0.0003343943],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"observational","study_design_scores_codex":[0.0001445744,0.0005253779,0.1064237,0.001183348,0.00005725459,0.004489169,0.4366593,0.002273675,0.01222634,0.0558365,0.002516879,0.3776639],"study_design_scores_gemma":[0.00004934663,0.0004507616,0.1142694,0.002846401,0.0001427669,0.003640929,0.6444159,0.009325111,0.01163347,0.01699223,0.1960819,0.0001517658],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9425598,0.001050689,0.009447713,0.007005975,0.00001258803,0.0002226933,0.00004575646,0.00005871533,0.03959609],"genre_scores_gemma":[0.9910787,0.0009372968,0.005874397,0.0001356891,0.000001803529,0.00004715722,0.00002495855,0.00001058353,0.001889394],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.007858357,"threshold_uncertainty_score":0.02610946,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2936647771","doi":"10.29173/mocs64","title":"Construction industrialization and it integration: how tall wood buildings can show the right path towards construction 4.0","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Supply chain; Architectural engineering; Construction industry; Industrialisation; Path (computing); Order (exchange); Construction engineering; Computer science; Engineering; Business; Operations management; Marketing; Economics","authors":[{"name":"Conrad Boton","is_ca":true},{"name":"Daniel Forgues","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01212382203177793,"gpt":0.2026194617216751,"spread":0.1904956396898972,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003905923,0.000596154,0.0002646188,0.001731547,0.003698341,0.01409714,0.0007931277,0.002085707,0.01092784],"category_scores_gemma":[0.003514032,0.0004076411,0.0004252854,0.002500388,0.01091014,0.01429891,0.008723544,0.002504154,0.001594483],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0035262,"about_ca_system_score_gemma":0.004244254,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005051979,"about_ca_topic_score_gemma":0.007134181,"domain_scores_codex":[0.9960834,0.00215244,0.00008701558,0.0002083588,0.0008757064,0.0005930018],"domain_scores_gemma":[0.9983358,0.0006734002,0.0001513386,0.0002249284,0.0002599469,0.0003545833],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0000532295,0.00009181554,0.004154573,0.0001822028,0.00002125132,0.0005873656,0.03297783,0.001095859,0.001530758,0.7885206,0.01576333,0.1550211],"study_design_scores_gemma":[0.00001389278,0.0001374688,0.007161518,0.0007743757,0.0000387253,0.0007406243,0.05366409,0.00253008,0.001695077,0.3041275,0.629062,0.00005452541],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"other","genre_gemma":"other","genre_scores_codex":[0.09371895,0.007931463,0.06505383,0.05240316,0.0007056233,0.00007462607,0.00005369535,0.0005566635,0.779502],"genre_scores_gemma":[0.9225699,0.005214416,0.02771137,0.003098406,0.0002391456,0.00006895969,0.00009260436,0.000228312,0.04077684],"genre_candidate":"other","genre_consensus":"other","teacher_disagreement_score":0.01409714,"threshold_uncertainty_score":0.0365572,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954896328","doi":"10.29173/mocs82","title":"A Knowledge-Based Approach Towards Automated Manufacturing-Centric BIM: Wood Frame Design and Modelling for Light-Frame Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Framing (construction); Modular design; Frame (networking); Field (mathematics); Engineering; Modular construction; Construction engineering; Systems engineering; Construction industry; Computer science; Context (archaeology); Architectural engineering; Best practice; Software engineering; Civil engineering; Compatibility (geochemistry); Mechanical engineering","authors":[{"name":"Mahmud Abushwereb","is_ca":true},{"name":"Hexu Liu","is_ca":false},{"name":"Mohamed Al‐Hussein","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01160253140959458,"gpt":0.2007306233714876,"spread":0.189128091961893,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002098001,0.001097581,0.0008836906,0.002698553,0.001222847,0.005269096,0.003583214,0.002064177,0.004069925],"category_scores_gemma":[0.004526564,0.001129203,0.001846417,0.00205475,0.001693768,0.002942306,0.003464936,0.001694923,0.001510578],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002114816,"about_ca_system_score_gemma":0.002949571,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01299775,"about_ca_topic_score_gemma":0.0195225,"domain_scores_codex":[0.9978932,0.0005719042,0.0002038761,0.000448457,0.0007703802,0.000112245],"domain_scores_gemma":[0.9984982,0.0005985734,0.0001335613,0.0004209992,0.0002833967,0.00006531731],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001050796,0.0004446081,0.001723955,0.0006203669,0.000112792,0.001047661,0.003648544,0.48572,0.01815489,0.1206982,0.005418385,0.3623055],"study_design_scores_gemma":[0.00002686543,0.00004926158,0.0006885842,0.0001783717,0.00005273069,0.0003323235,0.0006414672,0.9028514,0.01041003,0.04829983,0.03640202,0.00006714362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.002335711,0.00004216196,0.9936389,0.00009407097,0.000007702546,0.0001004031,0.00009978873,0.0008385638,0.002842761],"genre_scores_gemma":[0.04839833,0.0001621788,0.9489424,0.00005666771,0.000007876461,0.0002073133,0.0004959242,0.0001371591,0.001592139],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01299775,"threshold_uncertainty_score":0.02584416,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953985905","doi":"10.29173/mocs75","title":"Smart Construction Site: Ontology of Information System Architecture","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Computer science; Architecture; Ontology; Process (computing); Task (project management); Information system; Systems engineering; Software engineering; Engineering","authors":[{"name":"Zakaria Dakhli","is_ca":false},{"name":"Thomas Danel","is_ca":false},{"name":"Zoubeir Lafhaj","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.002756303758788829,"gpt":0.1564465831172918,"spread":0.1536902793585029,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002610978,0.0005301122,0.0006259895,0.00324218,0.001717866,0.007788057,0.001400571,0.001968788,0.003577245],"category_scores_gemma":[0.002193089,0.0005622427,0.001035835,0.004123301,0.00451861,0.01006843,0.002836512,0.002495941,0.00135315],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002538031,"about_ca_system_score_gemma":0.004420602,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.007814173,"about_ca_topic_score_gemma":0.005719721,"domain_scores_codex":[0.997784,0.0009329576,0.0002349911,0.0002644808,0.000578227,0.0002053769],"domain_scores_gemma":[0.9987758,0.0004001771,0.0001024607,0.0003291699,0.0002726349,0.0001197069],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000005825417,0.00001716906,0.000276655,0.00006132045,0.00001131133,0.00008246495,0.0009370173,0.002307729,0.00057389,0.982242,0.001869567,0.01161508],"study_design_scores_gemma":[0.00001775093,0.00003413743,0.0008505983,0.0002771465,0.00003319009,0.0005446381,0.001568963,0.03096807,0.001212364,0.5869101,0.3775345,0.00004851333],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.008185664,0.001085604,0.8960459,0.002305285,0.0002302029,0.0002256322,0.0004942391,0.0009653416,0.09046204],"genre_scores_gemma":[0.2865354,0.003552694,0.6812277,0.0007800721,0.0002064816,0.0006813039,0.001830823,0.0003918211,0.02479369],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.007814173,"threshold_uncertainty_score":0.01841474,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2940370212","doi":"10.29173/mocs1","title":"Advancing Formwork Systems for the Production of Precast Concrete Building Elements: from Manual to Robotic","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Technische Universität München; Deutscher Akademischer Austauschdienst","keywords":"Precast concrete; Formwork; Prefabrication; Production (economics); Flexibility (engineering); Engineering; Process (computing); Construction engineering; Productivity; Computer science; Civil engineering","authors":[{"name":"Mi Pan","is_ca":false},{"name":"Wei Pan","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006812242377239999,"gpt":0.2075581749937642,"spread":0.2007459326165242,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006871508,0.0003826087,0.0001753188,0.0005806526,0.0004949041,0.001244304,0.0005566807,0.0003836171,0.002613094],"category_scores_gemma":[0.0006009841,0.0002122346,0.0004427115,0.0004366415,0.001025756,0.001325887,0.000984452,0.000418397,0.0008048456],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001148381,"about_ca_system_score_gemma":0.001338337,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01176638,"about_ca_topic_score_gemma":0.0168106,"domain_scores_codex":[0.9993838,0.00009396625,0.00003451282,0.00009457626,0.0002925169,0.0001006316],"domain_scores_gemma":[0.9995962,0.00007099569,0.00007948282,0.0001037985,0.0001174782,0.00003205509],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0003309101,0.0003655033,0.03084584,0.001366784,0.000056439,0.001501897,0.004731431,0.02200901,0.2242014,0.02850693,0.001657824,0.6844261],"study_design_scores_gemma":[0.0001458416,0.005473046,0.2061015,0.000771254,0.0003002726,0.003785331,0.01290202,0.06439143,0.3699877,0.01404214,0.3217635,0.0003360182],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8620982,0.002521209,0.08416115,0.0005000361,0.00008141951,0.0004042551,0.000082016,0.0003539621,0.04979786],"genre_scores_gemma":[0.9193175,0.001733307,0.06854478,0.00006132764,0.00001729195,0.00006420857,0.00007420178,0.00002172702,0.01016552],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01176638,"threshold_uncertainty_score":0.02339578,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296079032","doi":"10.29173/mocs276","title":"Unmanned aerial vehicles usage on south african construction projects: perceived benefits","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Asset (computer security); Construction industry; Project management; Data collection; Construction management; Quality (philosophy); Construction engineering; Transport engineering; Engineering; Computer science; Systems engineering; Civil engineering; Computer security","authors":[{"name":"Opeoluwa Akinradewo","is_ca":false},{"name":"Clinton Aigbavboa","is_ca":false},{"name":"Matthew Ikuabe","is_ca":false},{"name":"Samuel Adeniyi Adekunle","is_ca":false},{"name":"Adetola Adeniyi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01170830942737495,"gpt":0.1870430771672962,"spread":0.1753347677399213,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002601832,0.0002525667,0.0002171952,0.001297302,0.001080366,0.001645462,0.0002630843,0.0005159737,0.002409267],"category_scores_gemma":[0.006673683,0.0002513485,0.0002395569,0.001312941,0.0009510017,0.001340474,0.001405957,0.0005858905,0.0001905152],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008147419,"about_ca_system_score_gemma":0.001414394,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002375657,"about_ca_topic_score_gemma":0.007106868,"domain_scores_codex":[0.9979736,0.000941328,0.0001175519,0.00008409503,0.0006088699,0.0002745389],"domain_scores_gemma":[0.9947647,0.002261163,0.001831231,0.00008580494,0.0006314888,0.0004256182],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002164345,0.000584555,0.51604,0.003352472,0.000120688,0.005427342,0.2678736,0.001271902,0.009571019,0.004931334,0.002138503,0.1884722],"study_design_scores_gemma":[0.000007242671,0.0006728969,0.457122,0.001376615,0.00006438513,0.001455628,0.5186969,0.0008200099,0.0009752589,0.0005286778,0.01823412,0.00004617928],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.995027,0.0006141608,0.0003050574,0.0004124303,0.000007425132,0.00001963241,0.00002102098,0.000001812012,0.003591484],"genre_scores_gemma":[0.9979054,0.001201762,0.0003131097,0.00003639387,0.00000409024,0.00001133447,0.0000104638,0.000001214456,0.0005162621],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.002601832,"threshold_uncertainty_score":0.01375997,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2936045964","doi":"10.29173/mocs38","title":"The merits of varying forms of mass timber products for offsite and modular construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"European Regional Development Fund","keywords":"Modular design; Work (physics); Resource (disambiguation); Engineering; Quality assurance; Quality (philosophy); Construction engineering; Architectural engineering; Civil engineering; Computer science; Operations management; Mechanical engineering","authors":[{"name":"Robert Hairstans","is_ca":false},{"name":"Ryan E. Smith","is_ca":false},{"name":"Peter D. Wilson","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007958136784358116,"gpt":0.1857457947776659,"spread":0.1777876579933078,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002918922,0.0004347797,0.0001655907,0.00125899,0.0007857078,0.00243749,0.0006886494,0.0008535888,0.006918058],"category_scores_gemma":[0.004328357,0.0002423601,0.0003628198,0.0007734111,0.0008867249,0.001692785,0.001388728,0.0007240408,0.001150709],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006280497,"about_ca_system_score_gemma":0.0004557671,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004516452,"about_ca_topic_score_gemma":0.003105409,"domain_scores_codex":[0.9977636,0.0005188504,0.00009772917,0.0001651072,0.001298387,0.0001562818],"domain_scores_gemma":[0.9971467,0.00120122,0.0004763539,0.0003883774,0.0005942913,0.0001930602],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0006328302,0.0002750983,0.02371002,0.001728618,0.00004339346,0.001589297,0.005274612,0.006576206,0.1753461,0.04853909,0.002383779,0.7339011],"study_design_scores_gemma":[0.00007723454,0.007645681,0.2586698,0.003257037,0.0002823312,0.01740822,0.01979964,0.01071588,0.1643189,0.0399443,0.4776524,0.0002286035],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6962402,0.005295402,0.07270601,0.00128852,0.0001936948,0.000273951,0.0001156042,0.0001869122,0.2236997],"genre_scores_gemma":[0.9315683,0.001716415,0.05187839,0.0001414127,0.00009577757,0.00007289772,0.00007931642,0.000140415,0.01430706],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.006918058,"threshold_uncertainty_score":0.02314317,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954092237","doi":"10.29173/mocs135","title":"Bridging the Gap between Academic and Practice Quantity Surveying in Nigerian Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Openness to experience; Bridging (networking); Bridge (graph theory); Curriculum; Body of knowledge; Knowledge management; Public relations; Medical education; Psychology; Sociology; Political science; Pedagogy; Computer science; Medicine; Social psychology","authors":[{"name":"Tawakalitu Bisola Odubiyi","is_ca":false},{"name":"Douglas Aghimien","is_ca":false},{"name":"Clinton Aigbavboa","is_ca":false},{"name":"Wellington Didibhuku Thwala","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01882426593830691,"gpt":0.2410966352264226,"spread":0.2222723692881157,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0185299,0.0001767721,0.0003489907,0.003396162,0.001823105,0.002750289,0.0006625736,0.0006242546,0.002801641],"category_scores_gemma":[0.04084529,0.0003876551,0.0001354993,0.0035862,0.002142963,0.002200738,0.002744333,0.0005239283,0.0002916652],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002192532,"about_ca_system_score_gemma":0.004873805,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004826015,"about_ca_topic_score_gemma":0.007720473,"domain_scores_codex":[0.978777,0.01070652,0.002386901,0.001274217,0.005679271,0.001176104],"domain_scores_gemma":[0.9471021,0.03151656,0.007802098,0.002136857,0.009128652,0.002313722],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"qualitative","study_design_scores_codex":[0.0001890299,0.0004275356,0.6430628,0.001167894,0.00002261549,0.0005904117,0.2179646,0.000342709,0.00189931,0.007348942,0.001730541,0.1252536],"study_design_scores_gemma":[0.00001807973,0.0006845691,0.5497272,0.001400151,0.00002167539,0.0009200917,0.4003754,0.001542238,0.001032771,0.0045086,0.03972427,0.00004491836],"study_design_candidate":"qualitative","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.985145,0.001050947,0.003483598,0.002584585,0.0000482556,0.0001238855,0.00007615906,0.00001044423,0.007477021],"genre_scores_gemma":[0.9973587,0.0003822486,0.001109842,0.0002907927,0.00001616971,0.00008575249,0.00003104334,0.000003881078,0.0007214579],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.0185299,"threshold_uncertainty_score":0.09799671,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953527716","doi":"10.29173/mocs103","title":"Transfer Learning Enabled Process Recognition for Module Installation of High-rise Modular Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Automation; Computer science; Engineering; Convolutional neural network; Building automation; Embedded system; Software engineering; Systems engineering; Artificial intelligence; Operating system; Mechanical engineering","authors":[{"name":"Zhiqian Zhang","is_ca":false},{"name":"Wei Pan","is_ca":false},{"name":"Zhenjie Zheng","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006434172699105438,"gpt":0.1866436558455424,"spread":0.180209483146437,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003941054,0.0006229702,0.000311157,0.0007432357,0.0001533763,0.000552777,0.0006557347,0.0005383844,0.0009345119],"category_scores_gemma":[0.0007489017,0.00027549,0.0007203089,0.0005739098,0.0002474067,0.000924463,0.0004490074,0.0004575703,0.0003872169],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007561417,"about_ca_system_score_gemma":0.0005513481,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006310919,"about_ca_topic_score_gemma":0.006252552,"domain_scores_codex":[0.999755,0.00002430864,0.00001176775,0.00006939233,0.0001053252,0.00003417352],"domain_scores_gemma":[0.9998152,0.00004324513,0.00003627131,0.00002168968,0.00007584121,0.000007902375],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001664682,0.0001831299,0.006400959,0.000449783,0.00009890201,0.0004164397,0.0001607652,0.3583369,0.04937719,0.002816764,0.002184158,0.5794085],"study_design_scores_gemma":[0.000002922613,0.00006009352,0.003318963,0.00001733442,0.00003795216,0.00009142298,0.00002508006,0.9740424,0.01957227,0.0008627919,0.001955183,0.00001363543],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1461283,0.001949111,0.8428632,0.0001906448,0.0001016454,0.00007614851,0.0002070881,0.002573862,0.005910053],"genre_scores_gemma":[0.9202591,0.001492002,0.07361082,0.00006595134,0.00002509637,0.00005707569,0.0004466295,0.00005302504,0.003990317],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.006310919,"threshold_uncertainty_score":0.01254833,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296077905","doi":"10.29173/mocs270","title":"Automated BIM-based CNC file generator for wood panel framing machines in construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Framing (construction); Software; Automation; Numerical control; Computer science; Building information modeling; Information model; Software engineering; Manufacturing engineering; Engineering drawing; Engineering; Mechanical engineering; Operating system","authors":[{"name":"M.A. Darwish","is_ca":true},{"name":"Fatima Alsakka","is_ca":true},{"name":"Sena Assaf","is_ca":false},{"name":"Mohamed Al‐Hussein","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009069530823881115,"gpt":0.19347044105629,"spread":0.1844009102324089,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001238223,0.0009457235,0.000697923,0.002065808,0.0005827922,0.001280919,0.002267503,0.0008492853,0.01308267],"category_scores_gemma":[0.003034232,0.0006190375,0.0007231244,0.001112692,0.0005375809,0.001125953,0.001305245,0.000720961,0.0041496],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006904454,"about_ca_system_score_gemma":0.001254039,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002223111,"about_ca_topic_score_gemma":0.002399951,"domain_scores_codex":[0.9985719,0.0001857011,0.00008007497,0.0002262508,0.0008455155,0.00009052869],"domain_scores_gemma":[0.9987796,0.0003493283,0.00009748001,0.0002773469,0.0004502618,0.00004587544],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0005019681,0.0002181354,0.003204089,0.0006615612,0.00004385689,0.0007826664,0.0006658745,0.1322603,0.05014845,0.02351676,0.02872765,0.7592686],"study_design_scores_gemma":[0.00008189998,0.0001555146,0.002392978,0.0001073519,0.00002870095,0.0006729445,0.0001673988,0.8575715,0.07456003,0.0053975,0.05875904,0.000105048],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.008006817,0.00009407131,0.9720439,0.00008623097,0.00007124399,0.000364725,0.0005502441,0.01304847,0.005734208],"genre_scores_gemma":[0.1345284,0.0001558601,0.8571525,0.00005965626,0.00002579742,0.0005694278,0.001680232,0.001196075,0.004632076],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01308267,"threshold_uncertainty_score":0.04376596,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2940100037","doi":"10.29173/mocs37","title":"IoT-based Inventory Control System Framework for Panelized Construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Schedule; Modular design; Computer science; Control (management); Inventory control; Frame (networking); Internet of Things; Production (economics); Systems engineering; Operations research; Engineering; Civil engineering; Computer security","authors":[{"name":"Meng Wang","is_ca":true},{"name":"Yongsheng Ma","is_ca":true},{"name":"Mohammed Sadiq Altaf","is_ca":true},{"name":"Mohamed Al-Huseein","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008280878571245565,"gpt":0.2013519070017366,"spread":0.1930710284304911,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009264002,0.000626281,0.0005350171,0.0008512264,0.0007648192,0.002367586,0.002031877,0.001020405,0.004540147],"category_scores_gemma":[0.000616175,0.000320254,0.0008627204,0.0005217825,0.0007788697,0.001530024,0.001128595,0.001055416,0.001029313],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001195716,"about_ca_system_score_gemma":0.00167604,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0119493,"about_ca_topic_score_gemma":0.008909219,"domain_scores_codex":[0.999422,0.00009607441,0.00006682086,0.0001138209,0.0002448657,0.00005649259],"domain_scores_gemma":[0.9997782,0.00004062145,0.00002891951,0.00002671887,0.00009667906,0.0000288455],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0002778351,0.0003250868,0.002704415,0.0006663123,0.0001454013,0.002382812,0.001029519,0.4609106,0.03322108,0.3358858,0.01676066,0.1456905],"study_design_scores_gemma":[0.00003826458,0.0000939115,0.0005512132,0.00008720993,0.00003880405,0.0001946808,0.0001119373,0.9375679,0.004454823,0.01261364,0.04420245,0.0000451689],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.003552667,0.0002405259,0.9815424,0.0002053372,0.0001060434,0.000364305,0.0001674694,0.002794407,0.01102686],"genre_scores_gemma":[0.5223542,0.0009786312,0.4550914,0.0002961249,0.0001328125,0.001670113,0.001347777,0.0002429813,0.01788599],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.0119493,"threshold_uncertainty_score":0.02375948,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953849572","doi":"10.29173/mocs101","title":"Critical Review of the Principles of Design for Disassembly","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Documentation; Standardization; Checklist; Design elements and principles; Engineering; Construction engineering; Engineering ethics; Sustainable design; Systems engineering; Computer science; Management science; Engineering management; Architectural engineering; Sustainability; Psychology","authors":[{"name":"Ernest Kissi","is_ca":false},{"name":"Mark Kyeredey Ansah","is_ca":false},{"name":"Johnson Oteng Ampofo","is_ca":false},{"name":"Emmanuel Amoah Boakye","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01714431354716709,"gpt":0.2198994742566715,"spread":0.2027551607095044,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02068173,0.00114085,0.0008197052,0.005200092,0.00166493,0.003855834,0.002441502,0.002871457,0.004375352],"category_scores_gemma":[0.04182829,0.0006433109,0.0008210955,0.002758117,0.004451705,0.003131279,0.001632919,0.00447458,0.002499124],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.007811859,"about_ca_system_score_gemma":0.01746518,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004927355,"about_ca_topic_score_gemma":0.005530017,"domain_scores_codex":[0.9740816,0.007952955,0.003281383,0.001288255,0.01288296,0.0005127645],"domain_scores_gemma":[0.9312975,0.02279438,0.002987507,0.003118578,0.0390885,0.0007135644],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00009756826,0.00007404792,0.0004553465,0.01350511,0.00007162406,0.0003756709,0.002668834,0.002411313,0.003364205,0.1391613,0.3003205,0.5374945],"study_design_scores_gemma":[0.000004888919,0.00003896502,0.0002465885,0.004278944,0.00001954253,0.0001261137,0.0002698824,0.0001676876,0.001026135,0.006313409,0.9874859,0.00002185494],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.003965161,0.7534766,0.06169297,0.08997401,0.03117256,0.0006585581,0.0003981225,0.0002851998,0.05837693],"genre_scores_gemma":[0.07732484,0.7341557,0.1054399,0.02732068,0.009959714,0.001030011,0.0007910406,0.0004799771,0.0434981],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.02068173,"threshold_uncertainty_score":0.1093768,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954735062","doi":"10.29173/mocs98","title":"Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence.","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"","funders":"University of Technology Sydney","keywords":"Productivity; Construction industry; Process (computing); Building industry; Engineering; Operations management; Business; Environmental resource management; Architectural engineering; Computer science; Environmental science; Construction engineering; Economics","authors":[{"name":"Richard E. Brisland","is_ca":false},{"name":"Perry Forsythe","is_ca":false},{"name":"A Ahmadian Fard Fini","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005849767701162874,"gpt":0.1888075885468773,"spread":0.1829578208457144,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00172574,0.0003048475,0.0002519142,0.001417147,0.0003347605,0.001698764,0.0006204401,0.0003218195,0.003171217],"category_scores_gemma":[0.004156206,0.0001676251,0.0003568062,0.001762506,0.000617246,0.0008508085,0.0008455543,0.0003486761,0.0005712561],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001064813,"about_ca_system_score_gemma":0.001243607,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003453433,"about_ca_topic_score_gemma":0.01126194,"domain_scores_codex":[0.9983926,0.0003002031,0.00008811026,0.0001648484,0.0009421832,0.000112107],"domain_scores_gemma":[0.99691,0.001004127,0.001139725,0.0001220529,0.0007041674,0.000119973],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0002457978,0.0002386014,0.1092574,0.01123063,0.0002226644,0.001508514,0.005643356,0.001855467,0.0418715,0.004874737,0.002980671,0.8200706],"study_design_scores_gemma":[0.00001043918,0.00138593,0.8964198,0.002167326,0.0002890942,0.002073258,0.01158328,0.0006875517,0.02216131,0.002561908,0.06060668,0.00005352684],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8762328,0.05126796,0.008623854,0.001022659,0.0001603152,0.0002776783,0.001275582,0.00008664769,0.0610524],"genre_scores_gemma":[0.9752021,0.0151621,0.003264198,0.00009694159,0.00003424489,0.00006220328,0.0003647577,0.0000272808,0.005786091],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.003453433,"threshold_uncertainty_score":0.01060873,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955930255","doi":"10.29173/mocs117","title":"Decision-making for Cross-Laminated Timber Modular Construction Logistics Using Discrete Event Simulation","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Supply chain; Modular construction; Discrete event simulation; Process (computing); Modularity (biology); Event (particle physics); Work (physics); Engineering; Cross laminated timber; Construction engineering; Computer science; Civil engineering; Business; Simulation; Mechanical engineering","authors":[{"name":"Bahar Abiri","is_ca":false},{"name":"Joseph Louis","is_ca":false},{"name":"Mariapaola Riggio","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009764285313812465,"gpt":0.2647800476268293,"spread":0.2550157623130168,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004042205,0.001280322,0.001758037,0.001114937,0.0007339802,0.002777511,0.001714017,0.002167416,0.005719658],"category_scores_gemma":[0.007444217,0.00118712,0.001676986,0.0009456813,0.001071453,0.001266317,0.001536783,0.002243831,0.0002564606],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002225115,"about_ca_system_score_gemma":0.003046798,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02563298,"about_ca_topic_score_gemma":0.01305303,"domain_scores_codex":[0.998415,0.0009269335,0.00006619604,0.0001941738,0.0001543652,0.0002433049],"domain_scores_gemma":[0.9873022,0.01085639,0.0006527258,0.0001462275,0.0005600086,0.0004825054],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000405408,0.00001941011,0.0003160751,0.000009654425,0.000011296,0.00002238122,0.000007952442,0.9980845,0.00005541123,0.0008783842,0.00003889876,0.0005154172],"study_design_scores_gemma":[0.000007879809,0.00001164424,0.00004327482,0.00000165842,0.000003244225,0.000001148829,0.000008960325,0.9994467,0.00004029127,0.0003927241,0.0000401265,0.000002238787],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3067875,0.0003984528,0.6771573,0.001264014,0.0001274001,0.0006020797,0.000885186,0.0003960802,0.01238192],"genre_scores_gemma":[0.9653404,0.0002189715,0.03056711,0.00007648043,0.00001724903,0.0003354303,0.000308587,0.00002325735,0.003112641],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.02563298,"threshold_uncertainty_score":0.05096757,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955292498","doi":"10.29173/mocs77","title":"An Optimized Prefabricated Raft Footing System for Houses on Shrink-Swell Soils: Preliminary Results","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Australian Research Council","keywords":"Prefabrication; Economic shortage; Swell; Engineering; Civil engineering; Sustainability; Geotechnical engineering; Geology","authors":[{"name":"Bertrand Teodosio","is_ca":false},{"name":"Kasun Shanaka","is_ca":false},{"name":"Kristombu Baduge","is_ca":false},{"name":"Priyan Mendis","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007102474888381672,"gpt":0.1988262750153676,"spread":0.1917238001269859,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002734827,0.0005261329,0.000378711,0.0003494118,0.0002782572,0.0002823782,0.0004368465,0.0003689117,0.002606131],"category_scores_gemma":[0.0004117863,0.0001563549,0.0004012744,0.0002716957,0.0001741773,0.0002764593,0.0002423065,0.0002467459,0.000423517],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002400715,"about_ca_system_score_gemma":0.0002065971,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.002134538,"about_ca_topic_score_gemma":0.004453504,"domain_scores_codex":[0.9997911,0.00001668116,0.00001103151,0.0000407269,0.00007959815,0.00006083907],"domain_scores_gemma":[0.9997535,0.00003243384,0.00003788247,0.00004018106,0.00009053233,0.00004534046],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0008013732,0.0007096845,0.005768888,0.000615351,0.00005847448,0.0005717188,0.0003313399,0.02638799,0.8667333,0.0002315887,0.001057633,0.09673262],"study_design_scores_gemma":[0.0002183067,0.01591493,0.07333652,0.00004612234,0.0001751552,0.0005272535,0.000601294,0.08507261,0.8108724,0.0001567335,0.01295506,0.0001236678],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9820781,0.0001224178,0.01602193,0.00002009799,0.00004197802,0.0001376644,0.0002203314,0.0002201111,0.001137365],"genre_scores_gemma":[0.9795124,0.0001042934,0.017768,0.000008267153,0.000007661582,0.00004215345,0.000191994,0.00002559075,0.002339561],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.002606131,"threshold_uncertainty_score":0.008718371,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4296168341","doi":"10.29173/mocs264","title":"AWP for residential buildings to modular construction: A proposed framework","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Transport and Logistics Innovations","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Constructability; Modular design; Productivity; Modularity (biology); Work (physics); Engineering; Architectural engineering; Risk analysis (engineering); Systems engineering; Computer science; Business","authors":[{"name":"Slim Rebai","is_ca":false},{"name":"Olfa Hamdi","is_ca":false},{"name":"Samer BuHamdan","is_ca":false},{"name":"Zoubeir Lafhaj","is_ca":false},{"name":"Pascal Yim","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01004394002269353,"gpt":0.2124223688333156,"spread":0.2023784288106221,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001912465,0.001032597,0.0004077013,0.002698171,0.001725348,0.004688175,0.002438511,0.002525381,0.00854005],"category_scores_gemma":[0.002046227,0.0005662606,0.001825784,0.002732011,0.003306528,0.005298471,0.004334561,0.00190362,0.001966465],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002029335,"about_ca_system_score_gemma":0.003604315,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009506021,"about_ca_topic_score_gemma":0.008613557,"domain_scores_codex":[0.9984804,0.000533175,0.0001219329,0.0003165737,0.0003541718,0.0001937634],"domain_scores_gemma":[0.999172,0.0002311361,0.0001108165,0.0001102804,0.0002330865,0.0001427761],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.000009854208,0.00008004102,0.0009139347,0.0001743031,0.00001462318,0.0004653867,0.000725862,0.01089568,0.0006116388,0.9450677,0.003244379,0.03779665],"study_design_scores_gemma":[0.00003093269,0.0001209107,0.001485974,0.0006975594,0.00007048978,0.00118072,0.002080423,0.2003173,0.0009182714,0.6111401,0.1818795,0.00007765532],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.004855534,0.000819044,0.9368084,0.00257071,0.0001483989,0.0004319448,0.0002069422,0.0004747325,0.05368429],"genre_scores_gemma":[0.1296655,0.001807933,0.8555934,0.0003803788,0.0001833226,0.000868972,0.0005237628,0.0001011228,0.01087566],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.009506021,"threshold_uncertainty_score":0.02856934,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2953915164","doi":"10.29173/mocs134","title":"Mass Timber in High-Rise Buildings: Modular Design and Construction; Permitting and Contracting Issues","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":true,"about_ca":true},"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Documentation; Adaptability; Process (computing); Architectural engineering; Construction engineering; Engineering; Risk analysis (engineering); Order (exchange); Flexibility (engineering); Business; Computer science","authors":[{"name":"Dalia H. Dorrah","is_ca":true},{"name":"Tamer E. El-Diraby","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005312865482763209,"gpt":0.1898411320023325,"spread":0.1845282665195693,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004665488,0.0003170974,0.0001695211,0.001199634,0.001957049,0.002573178,0.001137816,0.000907028,0.003759255],"category_scores_gemma":[0.00521154,0.0002711776,0.0002472072,0.002809281,0.003583659,0.001952564,0.001252492,0.0009029791,0.0004925756],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003690277,"about_ca_system_score_gemma":0.005256111,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009213326,"about_ca_topic_score_gemma":0.03918813,"domain_scores_codex":[0.9946523,0.002372307,0.0002401167,0.0003145235,0.002097428,0.0003233716],"domain_scores_gemma":[0.9952123,0.002794744,0.0008376192,0.0002896195,0.0006797655,0.0001858634],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00007608514,0.0001313769,0.01861955,0.005126776,0.00003334566,0.005534149,0.05579449,0.007590664,0.01100134,0.3098692,0.007861637,0.5783613],"study_design_scores_gemma":[0.000009193282,0.0002396037,0.05775122,0.003651744,0.00005167882,0.006014158,0.0569372,0.002698387,0.009019998,0.0365307,0.8270099,0.00008615252],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"other","genre_scores_codex":[0.4624301,0.08527172,0.1583238,0.009194843,0.0003856398,0.0005904867,0.0002558412,0.0002039913,0.2833436],"genre_scores_gemma":[0.916109,0.02047976,0.04095988,0.0005549297,0.0001064953,0.0001277191,0.000103573,0.00006839784,0.02149035],"genre_candidate":"other","genre_consensus":null,"teacher_disagreement_score":0.009213326,"threshold_uncertainty_score":0.02677494,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2938668898","doi":"10.29173/mocs10","title":"Production Monitoring and Process Improvement for Floor Panel Manufacturing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Installation; Process (computing); Factory (object-oriented programming); Modular design; Bridge (graph theory); Production (economics); Engineering; Production line; Computer science; Mechanical engineering","authors":[{"name":"Chelsea Ritter","is_ca":true},{"name":"Xinming Li","is_ca":true},{"name":"Mohamed Al‐Hussein","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01111884183171663,"gpt":0.2035844969300306,"spread":0.192465655098314,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003726919,0.0007186558,0.0005430277,0.001311695,0.0009389673,0.001747555,0.0009701382,0.0007268071,0.002391772],"category_scores_gemma":[0.00689843,0.0004500761,0.0005400942,0.001235893,0.0005026852,0.001786877,0.0007420311,0.0006267026,0.0004484002],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001461505,"about_ca_system_score_gemma":0.002097935,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004305987,"about_ca_topic_score_gemma":0.00490559,"domain_scores_codex":[0.9968523,0.0009344001,0.0001348791,0.0004259038,0.001470991,0.000181413],"domain_scores_gemma":[0.9952305,0.001575249,0.0007668821,0.0008281529,0.001497765,0.0001014914],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.0007175708,0.001232136,0.02310766,0.000656129,0.00005679287,0.0003704007,0.001177569,0.1268781,0.06465326,0.004541303,0.002608147,0.7740009],"study_design_scores_gemma":[0.0001489056,0.002496826,0.05024431,0.0003023437,0.0001800044,0.0004945669,0.001342527,0.7293242,0.1783167,0.006369658,0.03062347,0.0001564882],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2653596,0.001412131,0.7076324,0.0006890453,0.0001113179,0.001008165,0.0003654059,0.004433716,0.01898818],"genre_scores_gemma":[0.7973966,0.0006323148,0.1986443,0.00005247518,0.00002078765,0.0001731964,0.00031269,0.00008086947,0.002686654],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.004305987,"threshold_uncertainty_score":0.01971006,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2936876376","doi":"10.29173/mocs8","title":"Integration of BIM and Computer Simulations in Modular Construction, A Case Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"Chongqing Graduate Student Research Innovation Project","keywords":"Building information modeling; Modular design; Bridge (graph theory); Modular construction; Computer science; Discrete event simulation; Modularity (biology); Systems engineering; Productivity; Construction industry; Event (particle physics); Construction engineering; Software engineering; Engineering; Simulation; Operations management","authors":[{"name":"Chengke Wu","is_ca":false},{"name":"Rui Jiang","is_ca":false},{"name":"Xiao Li","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009325367435732571,"gpt":0.2080347975870605,"spread":0.1987094301513279,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002301473,0.00056904,0.0003244625,0.001399628,0.001193904,0.001648049,0.001008194,0.00144157,0.003599226],"category_scores_gemma":[0.002885639,0.0003411301,0.0004962438,0.001874857,0.001260735,0.001261145,0.001993085,0.0005722737,0.0003706581],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001642513,"about_ca_system_score_gemma":0.001525406,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01107398,"about_ca_topic_score_gemma":0.01879137,"domain_scores_codex":[0.9980464,0.001218841,0.00007061943,0.00009790559,0.0003971765,0.0001690007],"domain_scores_gemma":[0.9985051,0.000876172,0.0001092935,0.0001816687,0.0001809808,0.0001468764],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"case_report","study_design_scores_codex":[0.001055418,0.0028104,0.05814767,0.0008655332,0.0001201454,0.02202052,0.01068158,0.5255729,0.01606806,0.1093834,0.007241584,0.2460328],"study_design_scores_gemma":[0.0002477072,0.001737999,0.02942942,0.0003932794,0.0001418039,0.004328039,0.01484941,0.8290724,0.01985108,0.01963578,0.08015876,0.0001542906],"study_design_candidate":"case_report","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8787137,0.0005031316,0.07601818,0.0008346955,0.00003500762,0.0004835968,0.000244527,0.0002632627,0.04290398],"genre_scores_gemma":[0.9424171,0.0003335545,0.0531376,0.00003160653,0.000008570764,0.0001699192,0.0001177968,0.00002976099,0.003754123],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01107398,"threshold_uncertainty_score":0.02201903,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2954344888","doi":"10.29173/mocs140","title":"Parklet: A New Urban Platform for Emergent Forms of Communication and Social Interaction in the Cities","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Smart Parking Systems Research","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Engineering; Architectural engineering; Design studio; Public relations; Sociology; Knowledge management; Studio; Political science; Computer science","authors":[{"name":"Mona Ghandi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01955991325097023,"gpt":0.242833705000266,"spread":0.2232737917492958,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00115713,0.0006247206,0.0003290617,0.0008103201,0.001711198,0.004380205,0.001845567,0.001142204,0.02679819],"category_scores_gemma":[0.001471714,0.0005590277,0.0007323066,0.000596739,0.001958861,0.0045089,0.0118961,0.00159636,0.004734153],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005673157,"about_ca_system_score_gemma":0.000897847,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007335806,"about_ca_topic_score_gemma":0.003740684,"domain_scores_codex":[0.999306,0.0003012334,0.00002608225,0.00009828583,0.0001557584,0.0001126318],"domain_scores_gemma":[0.9987051,0.0003727367,0.00005891399,0.0003544134,0.00006121425,0.0004475159],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001449025,0.0007965392,0.006527399,0.0017254,0.0001230277,0.004836969,0.05357632,0.01300082,0.0562009,0.2623309,0.2398373,0.3595954],"study_design_scores_gemma":[0.0001541943,0.0003842901,0.003198134,0.0002078758,0.0000352842,0.001216433,0.003878898,0.006790454,0.004318607,0.0272665,0.9524266,0.0001227672],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2106693,0.002446278,0.4923801,0.006255002,0.001642921,0.001825227,0.005232059,0.03387421,0.2456749],"genre_scores_gemma":[0.4904194,0.001790078,0.3176869,0.001270605,0.0005005269,0.002439384,0.004256787,0.004746997,0.1768894],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.02679819,"threshold_uncertainty_score":0.08964884,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2955382699","doi":"10.29173/mocs95","title":"Serviceability Performance of Timber Concrete Composite Floors","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":true,"about_ca":false},"ca_institutions":"University of Northern British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; FPInnovations","keywords":"Serviceability (structure); Structural engineering; Stiffness; Cross laminated timber; Slab; Structural system; Vibration; Engineering; Deflection (physics); Load bearing","authors":[{"name":"Thomas Tannert","is_ca":true},{"name":"Md Mehdi Ebadi","is_ca":true},{"name":"Adam Gerber","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.004045594960303004,"gpt":0.15727912462704,"spread":0.153233529666737,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003900026,0.0003486599,0.0002222071,0.0006604437,0.0003008787,0.0002772263,0.0002814646,0.0002624622,0.00363533],"category_scores_gemma":[0.0006030426,0.000143467,0.0002614036,0.0003317521,0.0002702644,0.000290932,0.0004007937,0.0002904936,0.0007553736],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003121411,"about_ca_system_score_gemma":0.0001890235,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.003900278,"about_ca_topic_score_gemma":0.009430582,"domain_scores_codex":[0.9996865,0.00002279217,0.00001656275,0.00005205823,0.0001550746,0.00006711922],"domain_scores_gemma":[0.9995182,0.00006566492,0.00005382506,0.00004226409,0.0002103758,0.0001096771],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","study_design_scores_codex":[0.0009294488,0.0001745147,0.02419148,0.0001148287,0.00002503111,0.0002830461,0.0004166059,0.01246505,0.9285963,0.0001704129,0.0002131257,0.03242028],"study_design_scores_gemma":[0.00002290644,0.004386202,0.2031903,0.00002898419,0.00005489721,0.0002952663,0.0007712021,0.01355241,0.7753986,0.0001426173,0.002106424,0.00005020185],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9983549,0.0000624169,0.0004574767,0.000003321748,0.000004324908,0.000004530628,0.0001047379,0.00002219454,0.000986088],"genre_scores_gemma":[0.9985246,0.00003179937,0.0002306407,0.000003840639,9.456714e-7,0.000002864559,0.0001332043,0.00000931715,0.001062745],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.003900278,"threshold_uncertainty_score":0.01216137,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4230082142","doi":"10.29173/mocs191","title":"The Impact of Building Information Modelling (BIM) for Contractor Costing in Offsite Construction Projects in the UK","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false},"ca_institutions":"","funders":"","keywords":"Building information modeling; Productivity; Status quo; Activity-based costing; Construction industry; Integrated project delivery; Construction management; Value (mathematics); Risk analysis (engineering); Building construction; Business; Construction engineering; Engineering management; Engineering; Operations management; Computer science; Marketing; Civil engineering; Economics","authors":[{"name":"Tochukwu Moses","is_ca":false},{"name":"David Heesom","is_ca":false},{"name":"David Oloke","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0192063035328299,"gpt":0.2318636703462559,"spread":0.212657366813426,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009719393,0.000377596,0.000330272,0.001508014,0.002058307,0.006084597,0.0008776828,0.001182471,0.009826617],"category_scores_gemma":[0.02120122,0.000512204,0.0004254699,0.002291343,0.001634856,0.002587581,0.005564197,0.001610469,0.0007683779],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.01286469,"about_ca_system_score_gemma":0.008951841,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.2302345,"about_ca_topic_score_gemma":0.254814,"domain_scores_codex":[0.9891889,0.004844091,0.0004523896,0.0004003147,0.003867285,0.001247014],"domain_scores_gemma":[0.9898746,0.004231723,0.0009007835,0.0008183792,0.002936591,0.001237881],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.00165193,0.001384426,0.1554962,0.001233746,0.00007915452,0.003008395,0.05015397,0.02471331,0.004833177,0.03424124,0.0312903,0.6919141],"study_design_scores_gemma":[0.0001615695,0.002057364,0.558533,0.002120618,0.0001348398,0.001791998,0.1181602,0.04808207,0.004603901,0.005545297,0.2584619,0.0003472595],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9123141,0.001315138,0.002735092,0.007422523,0.0001099059,0.0001703397,0.0003350758,0.0001178168,0.07547994],"genre_scores_gemma":[0.9907705,0.001002605,0.002285996,0.0001689567,0.000009029324,0.00003008245,0.0001515031,0.0000380198,0.005543386],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2302345,"threshold_uncertainty_score":0.4577888,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}