{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":3,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":3,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"9da4d0e117fd","filters":{"venue":"Nanfang dianwang jishu"}},"results":[{"id":"W2394164044","doi":"","title":"Advanced Metering Infrastructure","year":2009,"lang":"en","type":"article","venue":"Nanfang dianwang jishu","topic":"Smart Grid Security and Resilience","field":"Engineering","cited_by":160,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Smart grid; Smart meter; Automatic meter reading; Metering mode; Telecommunications; Automation; Visibility; Telecommunications network; Asset management; Engineering; Process (computing); Grid; Electric power system; Energy management system; Systems engineering; Computer science; Energy management; Electrical engineering; Power (physics); Energy (signal processing); Wireless; Business","authors":[{"name":"Wenpeng Luan","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.002309198549505185,"gpt":0.1880696133992317,"spread":0.1857604148497265,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005433062,0.0001421309,0.0001417575,0.00007795705,0.00007022782,0.00003892036,0.0001841176,0.0001032051,0.00006316232],"category_scores_gemma":[0.00003514953,0.0001358114,0.00005882205,0.0002251988,0.00002267343,0.0002087462,0.00001452271,0.0002168851,0.00006309854],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00004324408,"about_ca_system_score_gemma":0.000009343981,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000001899649,"about_ca_topic_score_gemma":0.000005208628,"domain_scores_codex":[0.9992496,0.00000857671,0.0001314143,0.0001526027,0.0001427523,0.0003150122],"domain_scores_gemma":[0.9996396,0.00002488447,0.00001514875,0.0002098795,0.00001721886,0.00009329006],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.000038866,0.00007321739,0.002619464,0.000199162,0.00009055944,0.0002036137,0.004887541,0.1694259,0.2057357,0.00271146,0.04191857,0.5720959],"study_design_scores_gemma":[0.002558619,0.0004741768,0.3215006,0.0004799386,0.00008217134,0.0001699073,0.0007991419,0.02703856,0.1392453,0.01060831,0.4942892,0.002754079],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9776368,0.001890893,0.001353187,0.0001501882,0.001148125,0.0001344959,0.000009809835,0.000761114,0.01691544],"genre_scores_gemma":[0.9972616,0.0001080906,0.002056145,0.000236809,0.0002231039,0.000004735539,0.000006926002,0.00001738399,0.00008520851],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5693418,"threshold_uncertainty_score":0.5538228,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2356238241","doi":"","title":"Overview of Foreign Nuclear Power Plants in Load-Following","year":2011,"lang":"en","type":"article","venue":"Nanfang dianwang jishu","topic":"High-Voltage Power Transmission Systems","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Nuclear power; Base load power plant; Nuclear power plant; Electric power system; Power (physics); Engineering; Nuclear engineering; Electrical engineering; Reliability engineering; Nuclear physics; Physics","authors":[{"name":"Yun Liu","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03218817731367476,"gpt":0.2348004654628456,"spread":0.2026122881491708,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003047583,0.0002062983,0.0003891607,0.0001802944,0.00002633116,0.00001483677,0.0002899956,0.0001766159,0.0005087928],"category_scores_gemma":[0.00003234619,0.0002033396,0.0001602929,0.0002875624,0.00002225847,0.000213149,0.00002742326,0.0002024505,0.0002533443],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009361712,"about_ca_system_score_gemma":0.00003035721,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001865484,"about_ca_topic_score_gemma":0.00003549557,"domain_scores_codex":[0.9985751,0.00003725368,0.0004390887,0.0002125182,0.0003440123,0.0003920243],"domain_scores_gemma":[0.999394,0.00004644193,0.00004697909,0.0003614102,0.00002496827,0.0001262242],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0005212994,0.00141839,0.2426035,0.006821846,0.00196418,0.004791669,0.2600549,0.001013864,0.3453014,0.02576565,0.08176351,0.02797976],"study_design_scores_gemma":[0.01344381,0.000701829,0.2428946,0.0131019,0.0002657802,0.0001561454,0.01270653,0.00613477,0.09911434,0.001989322,0.6036731,0.005817907],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8353218,0.00664475,0.0002963437,0.000008301378,0.0009110781,0.00036031,0.00004138236,0.0004036091,0.1560124],"genre_scores_gemma":[0.9989079,0.00008204683,0.000727989,0.0000347308,0.00002608722,0.00001111344,0.000003987167,0.00008201135,0.0001241322],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5219095,"threshold_uncertainty_score":0.8291947,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2348924996","doi":"","title":"SSN-Based RT-LAB Simulation of MMC-HVDC System","year":2015,"lang":"en","type":"article","venue":"Nanfang dianwang jishu","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Opal-Rt Technologies (Canada)","funders":"","keywords":"Solver; Engineering; Field-programmable gate array; State space; Microsecond; State (computer science); Electronic engineering; Simulation; Computer science; Embedded system; Physics","authors":[{"name":"Weihu Wang","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02041402717650849,"gpt":0.2325848879540537,"spread":0.2121708607775452,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003781144,0.0001423471,0.0002299514,0.0001399867,0.00003641567,0.00002749587,0.0001017535,0.0001670274,0.00001065807],"category_scores_gemma":[0.00008066873,0.0001411689,0.00007255811,0.0002929345,0.00001706326,0.0001356197,0.00001035647,0.000116846,0.000117751],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002063276,"about_ca_system_score_gemma":0.00004045796,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002015267,"about_ca_topic_score_gemma":0.00002675184,"domain_scores_codex":[0.9990075,0.00004562064,0.000312057,0.0001486104,0.000271323,0.0002149397],"domain_scores_gemma":[0.9993545,0.00005735907,0.00007191909,0.0002673475,0.0001346578,0.0001141622],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002703225,0.00002627658,0.00179873,0.0007209133,0.00004540109,0.00001024863,0.0007342037,0.9817007,0.004289189,0.0002153649,0.002337293,0.008094704],"study_design_scores_gemma":[0.00114524,0.00009927021,0.00111585,0.0003518237,0.00003139156,0.000004900276,0.0005304161,0.9642423,0.009671628,0.00002153462,0.02247332,0.0003122583],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8164592,0.002157771,0.144583,0.00006367136,0.003785472,0.001251487,0.00008798944,0.002113528,0.02949784],"genre_scores_gemma":[0.9991125,9.727958e-7,0.0004129184,0.00001136207,0.0002477252,0.00003520835,0.00001790779,0.00004243914,0.0001189884],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1826532,"threshold_uncertainty_score":0.5756702,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}