{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":3,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":3,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"e2018ba2c155","filters":{"venue":"Power System Protection and Control"}},"results":[{"id":"W2356101117","doi":"","title":"An overview of setting method of under voltage load shedding","year":2012,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Smart Grid and Power Systems","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Load Shedding; Scheme (mathematics); Transient (computer programming); Electric power system; Voltage; Key (lock); Power (physics); Computer science; Reliability engineering; Engineering; Control (management); Control theory (sociology); Control engineering; Operations research; Electrical engineering; Mathematics; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.0205997644724749,"gpt":0.2690841298871874,"spread":0.2484843654147125,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001116661,0.0001392188,0.0003563265,0.00008070596,0.00004302778,0.00001643173,0.00006395981,0.00009582296,0.00002180571],"category_scores_gemma":[0.00001437378,0.000123935,0.00007058221,0.0001226055,0.00001185599,0.0002108534,0.000008034587,0.00009639221,0.000005590795],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000591386,"about_ca_system_score_gemma":0.00001137859,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001091649,"about_ca_topic_score_gemma":0.000004865291,"domain_scores_codex":[0.9989463,0.0001488752,0.0003999958,0.0001162038,0.0001814335,0.0002071922],"domain_scores_gemma":[0.9994575,0.00004640733,0.0001269522,0.0002009548,0.00007616095,0.00009201963],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001728107,0.0001614799,0.01636801,0.01137936,0.0008949139,0.000002421325,0.009365571,0.005691214,0.9137598,0.02056168,0.0004678839,0.02117481],"study_design_scores_gemma":[0.01620254,0.001547028,0.06549627,0.007747194,0.000943285,0.001158874,0.02576489,0.4911407,0.2739297,0.0001085191,0.1125012,0.003459775],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02778581,0.008081725,0.9571356,0.00001379602,0.003707452,0.0007076709,0.00001761772,0.0002346482,0.002315724],"genre_scores_gemma":[0.9992521,0.000009101124,0.0002621575,0.00001254553,0.0003530692,0.00006248651,5.867564e-7,0.00002411846,0.00002388297],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9714662,"threshold_uncertainty_score":0.5053924,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2389845107","doi":"","title":"Analysis of power emergency drills system at home and abroad and its inspiration for China","year":2010,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Safety and Risk Management","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"China; Emergency response; Electric power system; Emergency management; Engineering; Electric power industry; Power (physics); Operations management; Business; Medical emergency; Political science; Economic growth; Economics; Law; Electrical engineering; Medicine","retraction":null,"screen_n_in":null,"score":{"opus":0.005871104126959902,"gpt":0.2066729389197028,"spread":0.2008018347927429,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005520122,0.0001679686,0.0003731302,0.0004072746,0.000319278,0.00009140252,0.00005850436,0.0001021418,0.00005232973],"category_scores_gemma":[0.0000299825,0.0001373822,0.0000941386,0.0003632564,0.00002169952,0.0003960688,0.00005530622,0.00007553334,0.000006982781],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002087374,"about_ca_system_score_gemma":0.000003586018,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000232558,"about_ca_topic_score_gemma":0.0002284934,"domain_scores_codex":[0.998943,0.00002041505,0.0004002819,0.0003151005,0.0001591359,0.0001620914],"domain_scores_gemma":[0.999275,0.00001316467,0.0003744418,0.0001557209,0.0001592573,0.00002242545],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","study_design_scores_codex":[0.004622186,0.0005756239,0.2392932,0.02674821,0.01027354,0.00001696629,0.003112043,0.0006905588,0.1185578,0.5615078,0.0009050248,0.03369711],"study_design_scores_gemma":[0.006025098,0.0001953177,0.6933808,0.0002300298,0.003166055,0.00001453058,0.00164824,0.2641412,0.0002186668,0.0001123652,0.03007887,0.0007888385],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9751889,0.000632447,0.01779062,0.0003619344,0.001170513,0.002165465,0.00001953266,0.0001363612,0.002534293],"genre_scores_gemma":[0.9992679,0.0000146804,0.000008107369,0.00004475928,0.0001490403,0.0002291416,0.000006170472,0.00001454771,0.0002656892],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5613954,"threshold_uncertainty_score":0.5602282,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2392287197","doi":"","title":"Optimization models for Beijing's generation expansion planning under uncertainties","year":2010,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Regina","funders":"","keywords":"Electricity; Beijing; Electricity generation; Reliability (semiconductor); Interval (graph theory); Engineering; Reliability engineering; Electric power system; Electric power; Coal; Electricity market; Environmental economics; Operations research; Power (physics); Computer science; Electrical engineering; Economics; China; Mathematics; Waste management","retraction":null,"screen_n_in":null,"score":{"opus":0.02037323919372279,"gpt":0.2240979302671355,"spread":0.2037246910734127,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003781647,0.000200177,0.0002689033,0.0001402034,0.0004182965,0.000156279,0.00007108852,0.0002445022,0.00001923903],"category_scores_gemma":[0.00002429691,0.0001667795,0.00007976145,0.00009614682,0.00002660794,0.0002943102,0.0000131262,0.0001275966,0.000002491594],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00005439701,"about_ca_system_score_gemma":0.00003860511,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001066893,"about_ca_topic_score_gemma":0.0002970918,"domain_scores_codex":[0.9987703,0.00009221839,0.0003617808,0.000349541,0.0001771583,0.0002489827],"domain_scores_gemma":[0.9992911,0.00003034714,0.000184008,0.0002140183,0.000188518,0.00009199001],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000862908,0.00001668554,0.000008374291,0.00006283226,0.00005116293,6.84113e-7,0.0002176628,0.9054973,0.05103797,0.04146278,0.00007383999,0.001484479],"study_design_scores_gemma":[0.001631897,0.0001183114,0.00001165302,0.00007248799,0.00002992023,0.00003477581,0.0006731877,0.9882836,0.001937995,0.0002050106,0.00677078,0.0002303848],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0211614,0.0003026752,0.9719218,0.0001866521,0.003030373,0.0008243023,0.000006464849,0.0002567296,0.002309615],"genre_scores_gemma":[0.9966266,0.000003246047,0.0009337758,0.00009146882,0.000584874,0.0007404612,0.0000166505,0.00003912202,0.0009637988],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9754652,"threshold_uncertainty_score":0.6801069,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}