{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":3,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":3,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"e2018ba2c155","filters":{"venue":"Power System Protection and Control"}},"results":[{"id":"W2356101117","doi":"","title":"An overview of setting method of under voltage load shedding","year":2012,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Smart Grid and Power Systems","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Load Shedding; Scheme (mathematics); Transient (computer programming); Electric power system; Voltage; Key (lock); Power (physics); Computer science; Reliability engineering; Engineering; Control (management); Control theory (sociology); Control engineering; Operations research; Electrical engineering; Mathematics; Computer security","authors":[{"name":"Tao Xia","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0205997644724749,"gpt":0.2690841298871874,"spread":0.2484843654147125,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001263374,0.0008050856,0.0005944677,0.001028326,0.0006547266,0.0009570286,0.001114922,0.0006571556,0.005175169],"category_scores_gemma":[0.001550919,0.0004215701,0.0007150004,0.0009564001,0.0007112721,0.001487505,0.001008296,0.0009154667,0.001003943],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005905669,"about_ca_system_score_gemma":0.0006049299,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0006341977,"about_ca_topic_score_gemma":0.0005221349,"domain_scores_codex":[0.9982722,0.0005489166,0.0001706583,0.0003601293,0.0005761771,0.0000718728],"domain_scores_gemma":[0.9994165,0.0001897655,0.0000716088,0.0001235913,0.0001720426,0.00002653974],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001807287,0.00009959555,0.0009014414,0.0009356957,0.00005209262,0.0001696875,0.0005068377,0.04801584,0.02645868,0.1461779,0.006330171,0.7701715],"study_design_scores_gemma":[0.000134893,0.0007849302,0.001505611,0.0002750588,0.00009419373,0.001358303,0.0002561495,0.6837603,0.0358942,0.1221018,0.1536498,0.0001847138],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"review","genre_scores_codex":[0.001212511,0.001037638,0.9926159,0.0000758743,0.00007933576,0.00009231061,0.00002185342,0.0002339535,0.004630525],"genre_scores_gemma":[0.2446055,0.004287126,0.7393205,0.0002182229,0.0003868054,0.000603363,0.0001568488,0.0001949158,0.01022673],"genre_candidate":"review","genre_consensus":null,"teacher_disagreement_score":0.005175169,"threshold_uncertainty_score":0.01731271,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2389845107","doi":"","title":"Analysis of power emergency drills system at home and abroad and its inspiration for China","year":2010,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Safety and Risk Management","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"China; Emergency response; Electric power system; Emergency management; Engineering; Electric power industry; Power (physics); Operations management; Business; Medical emergency; Political science; Economic growth; Economics; Law; Electrical engineering; Medicine","authors":[{"name":"Tong Guang-yi","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005871104126959902,"gpt":0.2066729389197028,"spread":0.2008018347927429,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003039942,0.0001983513,0.0002190449,0.002332913,0.0005596645,0.0008023022,0.0003094734,0.0002378588,0.002444061],"category_scores_gemma":[0.0008243423,0.0001324473,0.0003975848,0.002091101,0.0003680178,0.0006650058,0.0005688448,0.000293705,0.0001424846],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001451561,"about_ca_system_score_gemma":0.0009200523,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0482383,"about_ca_topic_score_gemma":0.04644786,"domain_scores_codex":[0.9996878,0.0000376236,0.00001978367,0.00004084221,0.0001076485,0.0001063704],"domain_scores_gemma":[0.9995333,0.00006256427,0.000123952,0.00002292448,0.0001590867,0.00009825701],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0004647876,0.0001664765,0.8610898,0.000253865,0.000124093,0.003627253,0.005686583,0.02245746,0.005015174,0.01841297,0.006731881,0.07596961],"study_design_scores_gemma":[0.000008561548,0.00008385227,0.9763644,0.00002127206,0.00004007981,0.0002431481,0.004573446,0.01403449,0.0007539971,0.0007966079,0.003054794,0.00002520861],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9911636,0.00008015158,0.0008926547,0.0001531807,0.000006157124,0.00002270026,0.0003780116,0.00002408977,0.007279444],"genre_scores_gemma":[0.9975373,0.000098567,0.0002314255,0.000012614,0.000004896442,0.000007322478,0.0004170747,0.000004756555,0.001686111],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.0482383,"threshold_uncertainty_score":0.09591508,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2392287197","doi":"","title":"Optimization models for Beijing's generation expansion planning under uncertainties","year":2010,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Regina","funders":"","keywords":"Electricity; Beijing; Electricity generation; Reliability (semiconductor); Interval (graph theory); Engineering; Reliability engineering; Electric power system; Electric power; Coal; Electricity market; Environmental economics; Operations research; Power (physics); Computer science; Electrical engineering; Economics; China; Mathematics; Waste management","authors":[{"name":"Niu Yan-tao","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02037323919372279,"gpt":0.2240979302671355,"spread":0.2037246910734127,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008363529,0.0009514068,0.0009315002,0.0004893325,0.0004528873,0.001227623,0.0008320363,0.001114499,0.0027652],"category_scores_gemma":[0.001135333,0.0005716455,0.000810182,0.0007069386,0.0006349522,0.0008960278,0.0007749866,0.0009785215,0.0002301815],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001840874,"about_ca_system_score_gemma":0.00148927,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.02981661,"about_ca_topic_score_gemma":0.01576241,"domain_scores_codex":[0.9996307,0.0001462262,0.00001613043,0.00006959551,0.00007197542,0.00006546146],"domain_scores_gemma":[0.9996359,0.0002168471,0.00005823016,0.00001154105,0.00005813666,0.00001923155],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000004475581,0.000001615761,0.00006107407,0.000004876794,0.000004320995,0.00001232071,0.000005967609,0.9975495,0.00004117403,0.001585013,0.00008401512,0.0006456961],"study_design_scores_gemma":[0.000002250698,0.000003180362,0.00005849037,0.000001396139,0.000002474104,0.000002282338,0.000004123866,0.9986624,0.00002294812,0.001092549,0.0001460397,0.000001940369],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1398771,0.00173732,0.8234742,0.001284953,0.0000976524,0.00009756704,0.0008443865,0.0003598004,0.03222697],"genre_scores_gemma":[0.975658,0.0006648565,0.01493169,0.00005597284,0.00002665693,0.0001716368,0.0002946729,0.00005764979,0.00813883],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.02981661,"threshold_uncertainty_score":0.05928612,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}