{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":210,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":210,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"query_hash":"4e0a28a15bab","filters":{"venue":"Reliability Engineering & System Safety"}},"results":[{"id":"W2086668606","doi":"10.1016/j.ress.2011.03.012","title":"Safety analysis in process facilities: Comparison of fault tree and Bayesian network approaches","year":2011,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":740,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University; Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada; National Research Foundation","keywords":"Fault tree analysis; Bayesian network; Process (computing); Computer science; Accident analysis; Event tree; System safety; Reliability engineering; Risk analysis (engineering); Process safety; Data mining; Engineering; Work in process; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.0638897260058269,"gpt":0.2911683807145924,"spread":0.2272786547087655,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.007229282,0.00037841,0.001979158,0.0006692206,0.0001363807,0.00005352201,0.0007818853,0.0002519781,0.000082625],"category_scores_gemma":[0.001191476,0.0003015992,0.0004994314,0.004482563,0.0001546471,0.0003196899,0.0001130732,0.0003235695,0.00001013469],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000200762,"about_ca_system_score_gemma":0.00006890316,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0006762057,"about_ca_topic_score_gemma":0.0006419157,"domain_scores_codex":[0.9940229,0.0004496749,0.002795617,0.0009866663,0.001206454,0.0005386808],"domain_scores_gemma":[0.9963062,0.001355293,0.0004929974,0.00134247,0.0002780462,0.0002250036],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000146305,0.00008204016,0.3598497,0.0002708588,0.000216923,0.000001789147,0.005553966,0.6268293,0.000003156099,0.001103762,0.000009275462,0.00593293],"study_design_scores_gemma":[0.0003089204,0.00004788558,0.2754176,0.00008906153,0.0002437718,0.000002112209,0.008544385,0.7140123,0.00004514334,0.0005919846,0.0003985789,0.0002983286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4390151,0.001243547,0.5506328,0.0001587664,0.0002705584,0.0008352006,0.0001788802,0.0002214579,0.007443733],"genre_scores_gemma":[0.9948051,0.00004853677,0.004945675,0.000002230608,0.00003907841,0.00002612131,0.0000155619,0.00001747203,0.0001002052],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.55579,"threshold_uncertainty_score":0.9999436,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2085731719","doi":"10.1016/j.ress.2012.04.003","title":"Dynamic risk analysis using bow-tie approach","year":2012,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":361,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University; Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bayes' theorem; Bow tie; Reliability (semiconductor); Event (particle physics); Probability distribution; Computer science; Dimension (graph theory); Empirical probability; Applied probability; Reliability engineering; Risk analysis (engineering); Engineering; Posterior probability; Bayesian probability; Statistics; Mathematics; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.0257754498945793,"gpt":0.2956359750277479,"spread":0.2698605251331685,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.01374651,0.0004350211,0.001354997,0.0009376675,0.0003909135,0.0001728216,0.0009627137,0.0002680758,0.00009015203],"category_scores_gemma":[0.002400103,0.0003384149,0.001292213,0.005738094,0.00007550671,0.0006584366,0.0001674025,0.0004386338,0.0002056244],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008745393,"about_ca_system_score_gemma":0.00006318646,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004403391,"about_ca_topic_score_gemma":0.00001348077,"domain_scores_codex":[0.993659,0.0007109598,0.001915998,0.0009595211,0.001866291,0.0008882956],"domain_scores_gemma":[0.9948031,0.00138702,0.0005475451,0.00242067,0.0003577666,0.0004838695],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002476967,0.00008396797,0.1061569,0.00006703159,0.0005186715,0.000001106625,0.0004801481,0.8893895,0.00008105652,0.0004711969,0.00001987871,0.002705825],"study_design_scores_gemma":[0.0001608836,0.000009360059,0.1169401,0.00001794322,0.001126615,0.00001110907,0.0008445012,0.8784022,0.00001501616,0.00006871045,0.002042078,0.000361542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2977491,0.0006984876,0.6991437,0.00004038608,0.0005300397,0.0002576387,0.00008803044,0.0002541984,0.00123843],"genre_scores_gemma":[0.9608754,0.00006293166,0.03867391,0.000005500224,0.0001358554,0.00001516792,0.00002348193,0.00003500107,0.0001727768],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6631263,"threshold_uncertainty_score":0.9999068,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4322102361","doi":"10.1016/j.ress.2023.109186","title":"Digital twin-driven partial domain adaptation network for intelligent fault diagnosis of rolling bearing","year":2023,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Machine Fault Diagnosis Techniques","field":"Engineering","cited_by":336,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Fault (geology); Computer science; Bearing (navigation); Reliability (semiconductor); Data mining; Domain knowledge; Reliability engineering; Engineering; Control engineering; Artificial intelligence; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.01115847692856056,"gpt":0.238745907803576,"spread":0.2275874308750154,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009988473,0.0003795998,0.0006412469,0.0001942289,0.00008395889,0.0000642005,0.0003139799,0.0002113251,0.000004727603],"category_scores_gemma":[0.0003834024,0.0004114867,0.0003152047,0.0006866094,0.00002597083,0.0002477232,0.00007479788,0.0002393135,0.00002064357],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004681305,"about_ca_system_score_gemma":0.00002314246,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000355154,"about_ca_topic_score_gemma":0.000007268247,"domain_scores_codex":[0.9974601,0.0000361836,0.001096138,0.0004281407,0.0003506676,0.0006288277],"domain_scores_gemma":[0.9980531,0.0009935379,0.0001142303,0.0005662118,0.0001262978,0.000146586],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002324645,0.00002377954,0.01187355,0.001785405,0.00008109531,0.000002513315,0.0003405757,0.9814188,0.0002390125,0.0008677395,0.0002945469,0.003049661],"study_design_scores_gemma":[0.0002855964,0.00007124025,0.003864749,0.000813063,0.00003992278,0.000002756072,0.0001503159,0.9809015,0.003765044,0.00008008981,0.00962112,0.0004045517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2985557,0.0002074676,0.6935928,0.0000496038,0.001051673,0.001701331,0.0002606042,0.004317459,0.0002633783],"genre_scores_gemma":[0.981917,0.00010865,0.01639071,0.000002579198,0.0003605829,0.0009308211,0.0001513983,0.0001290594,0.00000922664],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6833613,"threshold_uncertainty_score":0.9998337,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2757101479","doi":"10.1016/j.ress.2017.09.008","title":"A new adaptive sequential sampling method to construct surrogate models for efficient reliability analysis","year":2017,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Probabilistic and Robust Engineering Design","field":"Decision Sciences","cited_by":312,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Fundamental Research Funds for the Central Universities; State Key Laboratory of Advanced Design and Manufacturing for Vehicle Body; China Postdoctoral Science Foundation; National Natural Science Foundation of China","keywords":"Surrogate model; Reliability (semiconductor); Adaptive sampling; Kriging; Importance sampling; Computer science; Monte Carlo method; Sampling (signal processing); Sample (material); Algorithm; Mathematical optimization; Limit (mathematics); Sample size determination; Data mining; Machine learning; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.09563866078808429,"gpt":0.3561772878898688,"spread":0.2605386271017845,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaresearch","metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.01613127,0.0006026184,0.001684699,0.0005553409,0.0007593669,0.0005910386,0.002090769,0.0003151438,0.00002910091],"category_scores_gemma":[0.009526588,0.00049841,0.001046709,0.001157506,0.0001013936,0.000362088,0.0003980939,0.0003500598,0.00004691882],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001025523,"about_ca_system_score_gemma":0.0003981647,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0006490974,"about_ca_topic_score_gemma":0.00001538836,"domain_scores_codex":[0.9932587,0.0003303521,0.002055021,0.001929218,0.001497208,0.0009294589],"domain_scores_gemma":[0.988774,0.004632719,0.0005828899,0.004063857,0.001131493,0.0008150482],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002141408,0.00002817906,0.000218218,0.0001177153,0.0002195336,0.00000260499,0.0002454549,0.9780514,0.0002254512,0.01718691,0.00008225632,0.003408172],"study_design_scores_gemma":[0.0006353701,0.0000847854,0.003774215,0.0001381317,0.0004286757,0.000009963453,0.0001365351,0.9905199,0.0002430718,0.0023169,0.00115018,0.0005622503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.007292896,0.00005723764,0.987887,0.0002516058,0.001511464,0.001861732,0.0003339904,0.0004439445,0.0003601054],"genre_scores_gemma":[0.5651791,7.743928e-7,0.4344063,0.000006298475,0.0001572982,0.00007495487,0.000006307783,0.00003433896,0.0001345914],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5578862,"threshold_uncertainty_score":0.9997467,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2047566635","doi":"10.1016/j.ress.2015.02.007","title":"Application of dynamic Bayesian network to risk analysis of domino effects in chemical infrastructures","year":2015,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":301,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Domino effect; Domino; Computer science; Bayesian probability; Dynamic Bayesian network; Identification (biology); Bayesian network; Risk analysis (engineering); Artificial intelligence; Biology; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.006565670631233726,"gpt":0.2709116564658173,"spread":0.2643459858345836,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006037892,0.0002125795,0.001282812,0.0007099135,0.00002674631,0.00001896422,0.0006528778,0.0001708994,0.00000583996],"category_scores_gemma":[0.003757312,0.0001716535,0.000428787,0.006099018,0.00004480026,0.00009490694,0.0001070904,0.0001836002,0.000009142253],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003813967,"about_ca_system_score_gemma":0.00005853842,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007634403,"about_ca_topic_score_gemma":0.0001506246,"domain_scores_codex":[0.9959871,0.000342107,0.001731252,0.0005931382,0.001055522,0.0002908802],"domain_scores_gemma":[0.9956782,0.001907042,0.0004736135,0.001338479,0.0003708823,0.0002318008],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009862403,0.00002277681,0.1093411,0.00008063813,0.0001529115,5.80038e-7,0.0003492408,0.8803617,0.0005724653,0.0004007162,0.00002074178,0.008598581],"study_design_scores_gemma":[0.0002046471,0.0000229362,0.3444839,0.00004017668,0.0002562033,5.267067e-7,0.00009876072,0.653774,0.0001763677,0.0007575979,0.00007325905,0.0001115608],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4740388,0.0001001059,0.5252421,0.00004317579,0.0001080889,0.0003159923,0.00003521181,0.00003276184,0.00008378219],"genre_scores_gemma":[0.9841612,0.000008039133,0.01573765,0.000003774596,0.00003133772,0.00002712139,0.00001461275,0.00001181963,0.000004466493],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.5101224,"threshold_uncertainty_score":0.6999827,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2040405051","doi":"10.1016/j.ress.2010.12.023","title":"Condition based maintenance optimization for multi-component systems using proportional hazards model","year":2011,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":267,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Condition-based maintenance; Component (thermodynamics); Preventive maintenance; Reliability engineering; Condition monitoring; Dependency (UML); Engineering; Work (physics); Maintenance actions; Unit (ring theory); Computer science; Operations research; Mathematical optimization; Systems engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.0249531931011578,"gpt":0.2221492380271124,"spread":0.1971960449259546,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001012812,0.0004015281,0.0005064447,0.0001590287,0.0001498636,0.0000472817,0.0002060102,0.0002676345,0.00001278269],"category_scores_gemma":[0.0001704584,0.0004070789,0.0002106842,0.0002526642,0.00005221801,0.0003835684,0.00001861629,0.0001940581,0.000004913546],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001389965,"about_ca_system_score_gemma":0.0001215372,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005580029,"about_ca_topic_score_gemma":0.000001431136,"domain_scores_codex":[0.9975773,0.00004839058,0.001017669,0.0005112861,0.0003079758,0.0005374552],"domain_scores_gemma":[0.9985704,0.00006738979,0.0001583666,0.0005623369,0.0004790349,0.0001624861],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000681032,0.00007589582,0.0000834038,0.002637959,0.00003360766,0.000001287111,0.000094075,0.993571,0.0007742516,0.002581603,0.0000361396,0.00004261834],"study_design_scores_gemma":[0.0009318036,0.00003632672,0.000260721,0.0005522193,0.00005709658,0.00001302859,0.00006259795,0.9969367,0.0005686006,0.00001215758,0.0001227309,0.0004459545],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01112529,0.00008491162,0.983924,0.00001091458,0.001229712,0.002018695,0.0002267025,0.001218186,0.0001616199],"genre_scores_gemma":[0.6888313,0.0000126823,0.3105021,0.000005044836,0.00006587715,0.0003159083,0.0001626799,0.00008545419,0.00001899009],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.677706,"threshold_uncertainty_score":0.9998381,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2106315576","doi":"10.1016/j.ress.2006.11.003","title":"Gamma processes and peaks-over-threshold distributions for time-dependent reliability","year":2006,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Probabilistic and Robust Engineering Design","field":"Decision Sciences","cited_by":217,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Gamma process; Reliability (semiconductor); Stochastic process; Gamma distribution; Poisson distribution; Generalized Pareto distribution; Pareto principle; Stochastic modelling; Process (computing); Event (particle physics); Mathematics; Poisson process; Statistical physics; Reliability engineering; Computer science; Mathematical optimization; Statistics; Engineering; Physics; Extreme value theory","retraction":null,"screen_n_in":null,"score":{"opus":0.01558084392964842,"gpt":0.2527144040477506,"spread":0.2371335601181022,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.005818237,0.0004747038,0.0008305443,0.0001766841,0.0003381435,0.0002590072,0.0006923088,0.000279805,0.00003684756],"category_scores_gemma":[0.008216971,0.0003812271,0.0002328398,0.0008393665,0.0001437048,0.0003598893,0.0001496339,0.0002730549,0.00006287426],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006168161,"about_ca_system_score_gemma":0.0002105786,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008899852,"about_ca_topic_score_gemma":0.000008706003,"domain_scores_codex":[0.9952226,0.0001063755,0.001635496,0.00125526,0.001081742,0.0006985166],"domain_scores_gemma":[0.9936108,0.003610456,0.0002454734,0.001416888,0.000848527,0.0002678291],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002108142,0.0003044417,0.006426543,0.003020215,0.00004827397,0.000009609781,0.0001156827,0.9544469,0.001642994,0.02825944,0.004647873,0.0008672527],"study_design_scores_gemma":[0.002149453,0.0002874735,0.04387677,0.0006173362,0.0001952825,0.00010697,0.0001440764,0.8968261,0.001246734,0.0109559,0.04191516,0.001678698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05853783,0.0005759228,0.9358193,0.000360714,0.0007138422,0.001698615,0.000734377,0.0008426241,0.0007168347],"genre_scores_gemma":[0.9896814,0.000008720973,0.008816097,0.000006143161,0.0002971711,0.0002254569,0.00006192753,0.00005140402,0.0008516408],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9311436,"threshold_uncertainty_score":0.999864,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4304689967","doi":"10.1016/j.ress.2022.108890","title":"Deep imbalanced domain adaptation for transfer learning fault diagnosis of bearings under multiple working conditions","year":2022,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Machine Fault Diagnosis Techniques","field":"Engineering","cited_by":214,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Artificial intelligence; Computer science; Categorical variable; Machine learning; Margin (machine learning); Transfer of learning; Fault (geology); Pattern recognition (psychology); Regularization (linguistics); Feature (linguistics); Generalization; Discriminative model; Deep learning; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.008195885281874678,"gpt":0.2224526488936661,"spread":0.2142567636117915,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009502437,0.0003245186,0.000546169,0.0002132934,0.0002594039,0.00002472241,0.0002821457,0.0001250423,0.00003263468],"category_scores_gemma":[0.0001956218,0.0003902662,0.0002739043,0.0004440556,0.00002718008,0.0001302905,0.00005010977,0.0004897212,0.000001891491],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008945753,"about_ca_system_score_gemma":0.00002344425,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00010156,"about_ca_topic_score_gemma":0.00002346391,"domain_scores_codex":[0.9978602,0.0001075874,0.0008315033,0.0003995413,0.0003646719,0.0004365327],"domain_scores_gemma":[0.9982041,0.001123724,0.00007430518,0.000408178,0.00009179624,0.00009794621],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002499943,0.00005404937,0.01161432,0.001030837,0.00006994126,0.000001121637,0.0007658598,0.9800068,0.003908535,0.002107825,0.00002729137,0.0003883884],"study_design_scores_gemma":[0.0008510842,0.0001101136,0.01554998,0.000265889,0.00005688721,0.000008009485,0.00093859,0.9731678,0.003672925,0.0000821141,0.004853596,0.0004430603],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3818729,0.0002087047,0.6142962,0.00004615745,0.0003815192,0.001252546,0.0001226648,0.001674748,0.00014462],"genre_scores_gemma":[0.9853476,0.00003553042,0.01118184,0.000007663982,0.00006431431,0.003054033,0.0001817582,0.0001201248,0.000007142986],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6034747,"threshold_uncertainty_score":0.9998549,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2580336769","doi":"10.1016/j.ress.2007.07.006","title":"Reliable design space and complete single-loop reliability-based design optimization","year":2007,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Probabilistic and Robust Engineering Design","field":"Decision Sciences","cited_by":197,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Manitoba","funders":"","keywords":"Simple (philosophy); Reliability (semiconductor); Limit (mathematics); Mathematical optimization; Point (geometry); Space (punctuation); Optimization problem; Loop (graph theory); State space; Mathematics; Conceptual design; Work (physics); Computer science; State (computer science); Algorithm; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.06123648658483181,"gpt":0.2632736667795107,"spread":0.2020371801946789,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaresearch","metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.02494973,0.0006840455,0.001102693,0.000537946,0.0003667389,0.0003087503,0.0008961077,0.0004485736,0.00004910219],"category_scores_gemma":[0.008982791,0.0005817161,0.0002341436,0.001777907,0.0002111691,0.0004502355,0.0001345032,0.0005034218,0.00008258619],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00107897,"about_ca_system_score_gemma":0.0002289231,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00005235205,"about_ca_topic_score_gemma":0.000001019826,"domain_scores_codex":[0.9928541,0.0005621376,0.002231655,0.00158904,0.001686823,0.001076293],"domain_scores_gemma":[0.986386,0.009620359,0.0004171775,0.002089381,0.0008911067,0.0005960027],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002656004,0.00009794253,0.0003119179,0.0003045995,0.00001834732,0.00001724744,0.00009701025,0.9942085,0.001863279,0.002084434,0.0003306869,0.000400442],"study_design_scores_gemma":[0.000816615,0.0002649204,0.0009933637,0.0003062195,0.00005456086,0.00004022993,0.0001219922,0.9925411,0.001294871,0.0003180145,0.002579225,0.0006688384],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.001865754,0.0002905723,0.9933453,0.0002870813,0.001060892,0.001649439,0.00002574156,0.00100796,0.000467261],"genre_scores_gemma":[0.502606,0.000007440239,0.496954,0.00002733794,0.0001133892,0.00003588627,0.000008270761,0.00007440503,0.0001732543],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.5007402,"threshold_uncertainty_score":0.9996634,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2551968241","doi":"10.1016/j.ress.2016.11.014","title":"Corrosion induced failure analysis of subsea pipelines","year":2016,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":188,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"China Scholarship Council","keywords":"Subsea; Pipeline transport; Pipeline (software); Bayesian network; Corrosion; Reliability engineering; Interval (graph theory); Engineering; Computer science; Bayesian probability; Marine engineering; Materials science; Machine learning; Artificial intelligence; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.02702392373578903,"gpt":0.2884227084786842,"spread":0.2613987847428952,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006069412,0.0003039319,0.00135863,0.001026256,0.0001109834,0.00005256282,0.0009232788,0.0002354091,0.0001857853],"category_scores_gemma":[0.004660313,0.0001753057,0.0009950054,0.005166064,0.00006468928,0.0003182832,0.0001233504,0.0001431397,0.0001342311],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002764342,"about_ca_system_score_gemma":0.00007468613,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001581418,"about_ca_topic_score_gemma":0.0001088467,"domain_scores_codex":[0.9946115,0.0003338828,0.002116288,0.0008517122,0.00169236,0.0003942334],"domain_scores_gemma":[0.9934573,0.002864212,0.0005102953,0.002019257,0.0009240395,0.0002249243],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.0003838637,0.0002478089,0.364568,0.0003232779,0.00122617,0.00001565683,0.0009138312,0.4061599,0.1749274,0.007244111,0.0008192776,0.04317068],"study_design_scores_gemma":[0.001455449,0.0001724302,0.5919375,0.0005735199,0.002579,0.00001137671,0.001323124,0.3751995,0.01329019,0.0005599244,0.01167826,0.001219698],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6626368,0.00009535519,0.3347605,0.001156129,0.0004790098,0.0002524823,0.0001475433,0.0002055836,0.000266625],"genre_scores_gemma":[0.9980564,0.00004328513,0.001523704,0.000006211279,0.00007595259,0.00001142501,0.00000886372,0.00001944918,0.0002547749],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3354195,"threshold_uncertainty_score":0.7148759,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2138648521","doi":"10.1016/j.ress.2003.11.002","title":"Posbist fault tree analysis of coherent systems","year":2004,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":166,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"National Science Foundation","keywords":"Fault tree analysis; Event tree; Reliability engineering; Event tree analysis; Reliability (semiconductor); Computer science; Context (archaeology); Tree (set theory); Operator (biology); Event (particle physics); Fault (geology); Data mining; Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.02221373659911824,"gpt":0.2869630977417368,"spread":0.2647493611426185,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.005859113,0.000361019,0.001789338,0.001027838,0.0001421849,0.00013291,0.001056719,0.000216479,0.00004910284],"category_scores_gemma":[0.001714368,0.0002736849,0.001208384,0.005769397,0.00008764181,0.0002322982,0.000102035,0.0002319757,0.0001196152],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007510819,"about_ca_system_score_gemma":0.0001199367,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001787208,"about_ca_topic_score_gemma":0.0001972137,"domain_scores_codex":[0.9937918,0.000284097,0.00268072,0.0009094973,0.001875078,0.0004588764],"domain_scores_gemma":[0.9949231,0.001198976,0.0006038728,0.002221355,0.0007757209,0.0002769413],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004106446,0.00007605779,0.007901497,0.0001350526,0.000717497,0.000006417072,0.0002761627,0.9813585,0.0003811631,0.007970127,0.00003037771,0.001106089],"study_design_scores_gemma":[0.001070542,0.0001264883,0.1888311,0.0003058492,0.002330887,0.00001670589,0.002200576,0.7981099,0.0003831637,0.0003599981,0.005530209,0.0007345727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5549604,0.0009694952,0.4372317,0.0005218041,0.001298735,0.0007565162,0.0003226016,0.0003944039,0.003544328],"genre_scores_gemma":[0.9983751,0.00004686178,0.001205464,0.000004690518,0.00007227804,0.00002534433,0.00002708338,0.00002259827,0.0002205341],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4434147,"threshold_uncertainty_score":0.9999715,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2012346040","doi":"10.1016/j.ress.2012.12.011","title":"A Bayesian framework for on-line degradation assessment and residual life prediction of secondary batteries inspacecraft","year":2012,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Advanced Battery Technologies Research","field":"Engineering","cited_by":157,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China","keywords":"Residual; Particle filter; Degradation (telecommunications); Population; Battery (electricity); Bayesian probability; Engineering; Computer science; Reliability engineering; Algorithm; Kalman filter; Artificial intelligence; Electronic engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.01854496582864961,"gpt":0.2748202455477143,"spread":0.2562752797190647,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007243916,0.0002474077,0.0003879398,0.0001771031,0.00006930016,0.00001870154,0.0001458826,0.0002508411,0.000007814923],"category_scores_gemma":[0.0004875502,0.0002460684,0.00005973152,0.0002206044,0.00005573891,0.0002976065,0.00005509858,0.0004350563,0.000002059905],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000500457,"about_ca_system_score_gemma":0.00003766675,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00000387081,"about_ca_topic_score_gemma":6.507654e-7,"domain_scores_codex":[0.9984512,0.00003776926,0.0005481064,0.0002567478,0.0002719932,0.0004342395],"domain_scores_gemma":[0.9985285,0.0006476943,0.00006691187,0.0005373719,0.00007826511,0.0001412696],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002331235,0.000176108,0.03252295,0.01528293,0.0003013766,0.000001730394,0.0005319573,0.9014239,0.01232238,0.02337221,0.0004709303,0.01336041],"study_design_scores_gemma":[0.001305141,0.0006894074,0.1723209,0.00154598,0.00007626745,0.0000220107,0.001025222,0.8022593,0.01457783,0.0003975497,0.005014689,0.0007657503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1641748,0.0002552083,0.8330172,0.0001775331,0.0004385838,0.0007275784,0.0002290306,0.0008903888,0.00008968771],"genre_scores_gemma":[0.9386865,0.00005819722,0.0607729,0.00000596657,0.0001594401,0.0001944064,0.00005571195,0.0000589327,0.000007892363],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7745118,"threshold_uncertainty_score":0.9999992,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4317214206","doi":"10.1016/j.ress.2023.109104","title":"Regional seismic risk and resilience assessment: Methodological development, applicability, and future research needs – An earthquake engineering perspective","year":2023,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":146,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada; Inter-American Development Bank; World Bank Group","keywords":"Seismic risk; Fragility; Risk analysis (engineering); Resilience (materials science); Seismic hazard; Earthquake scenario; Risk assessment; Hazard; Context (archaeology); Probabilistic logic; Engineering; Computer science; Civil engineering; Geography; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.03505004701717256,"gpt":0.3110336982406344,"spread":0.2759836512234618,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.005696931,0.0003987622,0.0006065299,0.0006083492,0.0003445242,0.0001012825,0.0002979374,0.0002845435,0.000006849205],"category_scores_gemma":[0.0002023969,0.0003774248,0.00009295686,0.001862716,0.0001153947,0.0003467257,0.0001503935,0.0009719959,0.00001855711],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006377301,"about_ca_system_score_gemma":0.00007176752,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00008897059,"about_ca_topic_score_gemma":0.000005705241,"domain_scores_codex":[0.9970534,0.0002525731,0.0006133055,0.00073156,0.0005737483,0.0007753582],"domain_scores_gemma":[0.9979315,0.0008469132,0.00004886608,0.0006532847,0.0001852216,0.0003342101],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003697417,0.00003735151,0.01220183,0.001652074,0.0001662469,0.00001502209,0.003131598,0.9587231,0.002084973,0.003344124,0.00007657385,0.0185301],"study_design_scores_gemma":[0.0002416487,0.00004401492,0.2141886,0.0001034839,0.00002788073,0.00003339756,0.003611421,0.768725,0.00009345562,0.00005663059,0.01249322,0.0003812119],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.950579,0.0006022054,0.04622705,0.0001859621,0.0002130263,0.0004528359,0.00002558478,0.001504698,0.0002096262],"genre_scores_gemma":[0.9890622,0.001066759,0.009259603,0.00000746995,0.0003641576,0.0001284049,0.00002565457,0.00006064414,0.00002509261],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2019868,"threshold_uncertainty_score":0.9998678,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2172471105","doi":"10.1016/j.ress.2015.11.015","title":"Integrated preventive maintenance and production decisions for imperfect processes","year":2015,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Preventive maintenance; Reliability engineering; Imperfect; Quality (philosophy); Production (economics); Sizing; Context (archaeology); Selection (genetic algorithm); Control (management); Operations research; Point (geometry); Engineering; Computer science; Operations management; Risk analysis (engineering); Mathematics; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.009712888612852624,"gpt":0.202891605786752,"spread":0.1931787171738994,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00119326,0.0002852496,0.0003857004,0.00009467908,0.00007831602,0.00004817202,0.0001351623,0.000149852,0.000001601723],"category_scores_gemma":[0.004250681,0.0002500064,0.00007416884,0.0004667426,0.00004694671,0.0003464106,0.00002577306,0.000176944,0.000005848691],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006522732,"about_ca_system_score_gemma":0.0001083422,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000194093,"about_ca_topic_score_gemma":0.0000105465,"domain_scores_codex":[0.9984194,0.00003953065,0.0005313177,0.0004537408,0.0001838838,0.0003721014],"domain_scores_gemma":[0.9984104,0.0002869937,0.00005652469,0.0004132503,0.0006501761,0.0001826378],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001132778,0.00003328624,0.0002071368,0.002338325,0.00004119076,8.428824e-7,0.0004946325,0.9917228,0.000652736,0.0005518192,0.00133027,0.002513682],"study_design_scores_gemma":[0.0009137961,0.000161297,0.0009163953,0.001440462,0.00006759792,0.00005495226,0.0007734825,0.9753469,0.002532039,0.0003309643,0.01690429,0.0005577966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1074265,0.0007438071,0.8855082,0.0001837355,0.001760259,0.00228601,0.00008677626,0.001529042,0.0004756965],"genre_scores_gemma":[0.9775432,0.0002611255,0.0214864,0.000003384759,0.0001240544,0.0003489438,0.00004570343,0.00006238148,0.0001248294],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8701167,"threshold_uncertainty_score":0.9999952,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2026960979","doi":"10.1016/j.ress.2012.07.009","title":"Risk-based design of process systems using discrete-time Bayesian networks","year":2012,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":143,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University; Memorial University of Newfoundland","funders":"","keywords":"Fault tree analysis; Bayesian network; Computer science; Conditional probability; Markov chain; Bayesian probability; Dynamic Bayesian network; Markov process; State space; Probability distribution; Dependency (UML); Algorithm; Mathematical optimization; Reliability engineering; Mathematics; Machine learning; Engineering; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.02532518237650968,"gpt":0.2897537196405188,"spread":0.2644285372640091,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.01387927,0.0004162493,0.00127899,0.0003542383,0.0002481004,0.0001153159,0.0008819009,0.0002907685,0.00004286995],"category_scores_gemma":[0.002705244,0.0003162585,0.0004568768,0.001941402,0.00009003006,0.0005280518,0.00006466683,0.0003348469,0.00005281565],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004124483,"about_ca_system_score_gemma":0.0001370012,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002473863,"about_ca_topic_score_gemma":9.847163e-7,"domain_scores_codex":[0.9935366,0.00115493,0.002211335,0.0006764667,0.001642855,0.0007778482],"domain_scores_gemma":[0.9933468,0.00314553,0.0009089282,0.001627218,0.0005701578,0.0004014256],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008174006,0.0000520395,0.02723274,0.0002369299,0.00006064357,0.000001166322,0.0001680571,0.9714952,0.0001224025,0.0001332061,0.00002409934,0.0003917543],"study_design_scores_gemma":[0.0002640471,0.00003654459,0.007065858,0.0002800649,0.0001649093,0.000009106824,0.000312275,0.9911981,0.0001215403,0.00002623954,0.000180753,0.0003405653],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03713083,0.0008765378,0.9601038,0.00003051472,0.0007476285,0.0007134577,0.00005594184,0.0002081748,0.0001331051],"genre_scores_gemma":[0.9906494,0.00001659859,0.008945067,0.000002762606,0.0002629753,0.00002802519,0.000007686358,0.0000474829,0.00003999827],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9535186,"threshold_uncertainty_score":0.999929,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2060250681","doi":"10.1016/j.ress.2013.09.003","title":"Selective maintenance for multi-state series–parallel systems under economic dependence","year":2013,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":138,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Component (thermodynamics); Series and parallel circuits; Reliability engineering; Series (stratigraphy); State (computer science); Maintenance actions; Resource (disambiguation); Computer science; Genetic algorithm; Mathematical optimization; Operations research; Engineering; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.007771529503925715,"gpt":0.1949150969736654,"spread":0.1871435674697397,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007406874,0.0004884809,0.0006620579,0.000107097,0.0001350867,0.0001405908,0.0003448134,0.0002461205,0.00001361066],"category_scores_gemma":[0.0001479451,0.0004825489,0.0002065775,0.0001980043,0.00005726132,0.000782705,0.00003853159,0.0002996296,0.0001773325],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002185208,"about_ca_system_score_gemma":0.00008209629,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003632115,"about_ca_topic_score_gemma":0.00003253652,"domain_scores_codex":[0.9973232,0.00005658809,0.0009789119,0.0006432449,0.0001790086,0.0008190967],"domain_scores_gemma":[0.9983997,0.000213954,0.0001168467,0.0007400704,0.0003091508,0.0002203111],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003328842,0.00001810796,0.0001436226,0.001800223,0.00006701957,6.853465e-7,0.0001204215,0.9926586,0.000615728,0.003922698,0.0005035792,0.0001160386],"study_design_scores_gemma":[0.0007420866,0.00005288457,0.002980442,0.0003076289,0.00002078483,0.0000298571,0.0002291349,0.9927999,0.0002952902,0.00008244839,0.001910784,0.0005487453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01755951,0.0002559375,0.9745073,0.00008697274,0.002211937,0.003166289,0.0001246444,0.001578704,0.000508746],"genre_scores_gemma":[0.9657511,0.0001514873,0.03169194,0.000009559824,0.0001330708,0.001399431,0.00003698865,0.00013564,0.000690744],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9481916,"threshold_uncertainty_score":0.9997626,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2052461311","doi":"10.1016/j.ress.2009.08.004","title":"Performance evaluation of multi-state degraded systems with minimal repairs and imperfect preventive maintenance","year":2009,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":137,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"","keywords":"Preventive maintenance; Reliability engineering; Reliability (semiconductor); Imperfect; Maintenance actions; Limit (mathematics); Markov process; Failure rate; State (computer science); Degradation (telecommunications); Process (computing); Function (biology); Renewal theory; Markov chain; Mathematical optimization; Inspection time; Production (economics); Computer science; Engineering; Mathematics; Statistics; Algorithm; Economics","retraction":null,"screen_n_in":null,"score":{"opus":0.006999054080612516,"gpt":0.1978709968814139,"spread":0.1908719428008014,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002225802,0.0003308421,0.0005316033,0.000109692,0.00006275436,0.00002811046,0.0001366999,0.0001275551,0.000001624293],"category_scores_gemma":[0.0001744518,0.0002811463,0.00008311661,0.000344635,0.00005816329,0.0003212966,0.00001424348,0.0002027202,0.000002089575],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00062773,"about_ca_system_score_gemma":0.00005964895,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002318388,"about_ca_topic_score_gemma":0.000002854591,"domain_scores_codex":[0.9978551,0.0001202261,0.0007451602,0.0004248316,0.0004601938,0.0003945265],"domain_scores_gemma":[0.998671,0.0001002258,0.00013699,0.0005358093,0.000445078,0.0001108766],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00008887405,0.00003508297,0.00146521,0.001560667,0.00004446643,0.000001129361,0.0003506962,0.9930948,0.001235264,0.000116546,0.00001010967,0.001997169],"study_design_scores_gemma":[0.001008211,0.0002094435,0.06535096,0.0011473,0.00008416071,0.00003373603,0.0001572287,0.9307202,0.000946919,0.000003032316,0.00004851524,0.000290342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.93803,0.0006934137,0.0580428,0.00002250749,0.0003372948,0.001700044,0.00002844619,0.0005988229,0.0005466799],"genre_scores_gemma":[0.9947467,0.0001578959,0.004899835,0.000001702117,0.00002738523,0.00008873567,0.0000130928,0.00003847148,0.00002614625],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.06388575,"threshold_uncertainty_score":0.9999641,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2805879477","doi":"10.1016/j.ress.2018.05.017","title":"Dynamic availability assessment of safety critical systems using a dynamic Bayesian network","year":2018,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":133,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Canada Excellence Research Chairs, Government of Canada; Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs","keywords":"Dynamic Bayesian network; Flexibility (engineering); Reliability engineering; Bayesian network; Process (computing); System safety; Risk analysis (engineering); Computer science; Hazard analysis; Hazard; Cascading failure; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02043473840783427,"gpt":0.3430135391875951,"spread":0.3225788007797608,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.01796313,0.0005948077,0.00196972,0.0003731246,0.0005453303,0.0002097819,0.001354806,0.0004169125,0.0001774902],"category_scores_gemma":[0.004542659,0.0004951734,0.0007679714,0.002645884,0.0005331662,0.0004685399,0.0003073396,0.0005311676,0.00008345836],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002067156,"about_ca_system_score_gemma":0.0004259256,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004513994,"about_ca_topic_score_gemma":0.0001018314,"domain_scores_codex":[0.9893534,0.001339717,0.004140946,0.001585854,0.002528079,0.001051965],"domain_scores_gemma":[0.9893928,0.004499151,0.0006764643,0.003279519,0.001686931,0.0004651934],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001516313,0.0001452438,0.01961736,0.0008233588,0.0001522222,0.00001031941,0.0002074561,0.9690618,0.0006924758,0.007612813,0.00005613209,0.001469181],"study_design_scores_gemma":[0.0003127483,0.0001228363,0.05238394,0.0004693917,0.0001516299,0.00003943301,0.000445038,0.9437608,0.000009955205,0.0004988665,0.001356916,0.0004484442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08933656,0.0004312539,0.9043376,0.000318733,0.002821601,0.0008186247,0.0001904143,0.0003092687,0.001435963],"genre_scores_gemma":[0.9664376,0.00003219275,0.03309869,0.000008524014,0.0002215966,0.00002180547,0.00001426111,0.00005673711,0.0001086061],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.877101,"threshold_uncertainty_score":0.99975,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2961832654","doi":"10.1016/j.ress.2019.106584","title":"A systemic hazard analysis and management process for the concept design phase of an autonomous vessel","year":2019,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Maritime Navigation and Safety","field":"Engineering","cited_by":122,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"European Regional Development Fund; Ocean Frontier Institute; Liikenteen Turvallisuusvirasto Trafi; Tekes","keywords":"Process (computing); Context (archaeology); Hazard; Hazard analysis; Phase (matter); Risk analysis (engineering); Engineering; Systems engineering; Computer science; Business; Reliability engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.008457909048834023,"gpt":0.2389110127950938,"spread":0.2304531037462597,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001096153,0.0002405314,0.0005514768,0.0001324407,0.00006036771,0.00003139848,0.000244785,0.0001067395,0.00001455823],"category_scores_gemma":[0.00002790427,0.0001989014,0.0001524012,0.0004988822,0.00002756897,0.0001337005,0.00002015315,0.0001188539,0.000003769498],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001999972,"about_ca_system_score_gemma":0.0000213998,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001164033,"about_ca_topic_score_gemma":9.540486e-7,"domain_scores_codex":[0.998464,0.00005753672,0.0006642459,0.0003316643,0.0002185007,0.0002640489],"domain_scores_gemma":[0.9986987,0.0003577627,0.00008695495,0.0006408563,0.0001144264,0.0001013282],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005499649,0.00002926623,0.0002266051,0.004784467,0.0004809853,9.417957e-7,0.0003868219,0.9904967,0.0005349477,0.001327497,0.000007641862,0.001669164],"study_design_scores_gemma":[0.001097649,0.00007191259,0.001965129,0.0002124428,0.0004538435,0.000009852838,0.0003747504,0.9937865,0.001312305,0.000005533453,0.0004853458,0.0002247534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1721547,0.0004981463,0.8235435,0.00002337753,0.0003296209,0.00261854,0.0001150656,0.0005141824,0.0002028654],"genre_scores_gemma":[0.9967943,0.00003884087,0.002800138,0.00000373342,0.00003309051,0.0002184145,0.0000332291,0.00003865449,0.00003955694],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8246396,"threshold_uncertainty_score":0.8110964,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2053510719","doi":"10.1016/j.ress.2010.04.003","title":"Periodic inspection optimization model for a complex repairable system","year":2010,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":116,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Interval (graph theory); Reliability engineering; Computer science; Mathematical optimization; Mathematics; Engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.006478532688058146,"gpt":0.185568211057742,"spread":0.1790896783696838,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001069329,0.0003765962,0.0005130093,0.0001519417,0.0002577662,0.00009101095,0.0002322031,0.000338047,0.000009409678],"category_scores_gemma":[0.0002513364,0.0003949243,0.0002278801,0.0003621283,0.00004747534,0.00036534,0.00002529281,0.0003698721,0.00001314361],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009451733,"about_ca_system_score_gemma":0.00005951256,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00003621909,"about_ca_topic_score_gemma":0.0000145843,"domain_scores_codex":[0.9978172,0.00002930705,0.0008605484,0.0005261374,0.0002555364,0.0005112958],"domain_scores_gemma":[0.9984475,0.0001188044,0.00009555947,0.0008483167,0.000319906,0.0001699545],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003833804,0.00002321397,0.00005463403,0.003107968,0.00002491577,5.405977e-7,0.0001936172,0.9877533,0.003412406,0.005101155,0.0002060259,0.00008387608],"study_design_scores_gemma":[0.0005380947,0.00003130467,0.0001691138,0.0001961315,0.00004220003,0.00002853703,0.00014202,0.9971064,0.0001689561,0.000008767813,0.001174104,0.000394413],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01105947,0.00003267151,0.9787263,0.00004621557,0.001788875,0.001470261,0.00009275739,0.005438616,0.001344808],"genre_scores_gemma":[0.8357427,0.00001621396,0.1634588,0.000004583589,0.0001887088,0.000320665,0.0001121272,0.0001017987,0.00005446132],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8246832,"threshold_uncertainty_score":0.9998503,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2042519140","doi":"10.1016/s0951-8320(03)00052-8","title":"Sociotechnical systems, risk management, and public health: comparing the North Battleford and Walkerton outbreaks","year":2003,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":114,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sociotechnical system; Public health; Outbreak; Risk management; Risk analysis (engineering); Human factors and ergonomics; Environmental health; Environmental planning; Business; Poison control; Engineering; Computer science; Geography; Medicine; Knowledge management; Virology","retraction":null,"screen_n_in":null,"score":{"opus":0.04627662267433123,"gpt":0.34010733509157,"spread":0.2938307124172388,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.007338799,0.0002811174,0.0006182899,0.0001233103,0.00175348,0.00004109341,0.0002261804,0.0002274682,0.000009383945],"category_scores_gemma":[0.0007580914,0.0002052256,0.00006683174,0.0003715108,0.0001050265,0.0001318941,0.0001681935,0.001293047,0.00004147518],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000974236,"about_ca_system_score_gemma":0.0003007461,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001238813,"about_ca_topic_score_gemma":0.0001361068,"domain_scores_codex":[0.9949028,0.001658082,0.001248487,0.0005593075,0.0005169511,0.001114393],"domain_scores_gemma":[0.9959782,0.002231925,0.000278427,0.0007319538,0.0001724734,0.0006070711],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.00006845331,0.00005017531,0.9178332,0.01218112,0.00006764399,0.000002667646,0.0005932773,0.002006876,5.91187e-7,0.06404931,0.0005622763,0.002584416],"study_design_scores_gemma":[0.0009376074,0.00007064175,0.8443854,0.0005408278,0.00002053248,0.00001803202,0.001724963,0.03750439,1.360291e-7,0.00002638245,0.1145286,0.0002424973],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8670134,0.01107784,0.07838073,0.00688259,0.004053667,0.01571043,0.0003826676,0.001612136,0.01488655],"genre_scores_gemma":[0.9971699,0.001277231,0.0007601751,0.00006738209,0.0001278376,0.0003800533,0.00002796604,0.00004062322,0.0001487996],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1301565,"threshold_uncertainty_score":0.9995461,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3084679871","doi":"10.1016/j.ress.2020.107232","title":"Quantitative resilience assessment of chemical process systems using functional resonance analysis method and Dynamic Bayesian network","year":2020,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":112,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"Nazarbayev University; Young Researchers and Elite Club","keywords":"Resilience (materials science); Process (computing); Risk analysis (engineering); Bayesian network; Computer science; Human error; Reliability engineering; Process management; Systems engineering; Engineering; Artificial intelligence; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.03558619414875983,"gpt":0.3602605472330854,"spread":0.3246743530843255,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00620471,0.000293586,0.001334939,0.0002325503,0.000148938,0.00009843607,0.0005006393,0.000155207,0.00001542573],"category_scores_gemma":[0.001945718,0.0002406609,0.0003769593,0.004781655,0.0001048922,0.0002856195,0.0001116636,0.0002897797,0.000002326457],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002901114,"about_ca_system_score_gemma":0.0001712481,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001094596,"about_ca_topic_score_gemma":0.000005339982,"domain_scores_codex":[0.9945301,0.0006009258,0.001799698,0.001079817,0.001616501,0.0003729502],"domain_scores_gemma":[0.9952693,0.002521925,0.0005695925,0.0007123325,0.000657281,0.0002695836],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000931668,0.00001732857,0.02249279,0.0002948255,0.0002066872,0.000002799031,0.0002263783,0.9720618,0.001084169,0.003037861,0.000007192376,0.0004749704],"study_design_scores_gemma":[0.0001680086,0.00004393409,0.04257457,0.000122692,0.0003627689,0.000006541966,0.0007393521,0.9555036,0.00004182633,0.0001478599,0.00006847408,0.000220303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1006153,0.0008141815,0.8976396,0.0002397858,0.0001550982,0.000299226,0.00005869719,0.00007834333,0.00009976343],"genre_scores_gemma":[0.9270607,0.0000247227,0.07279804,0.000008415427,0.00005850418,0.00001550714,0.000008876036,0.00001619466,0.000009057186],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8264454,"threshold_uncertainty_score":0.9813866,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1978289729","doi":"10.1016/j.ress.2013.07.010","title":"An effective approximation for variance-based global sensitivity analysis","year":2013,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Probabilistic and Robust Engineering Design","field":"Decision Sciences","cited_by":109,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"","keywords":"Multiplicative function; Variance-based sensitivity analysis; Sensitivity (control systems); Computation; Applied mathematics; Mathematics; Quadrature (astronomy); Variance (accounting); Gaussian; Variance reduction; Function (biology); Product (mathematics); Algorithm; Algebraic number; Mathematical optimization; Computer science; Monte Carlo method; Statistics; Mathematical analysis; One-way analysis of variance; Analysis of variance","retraction":null,"screen_n_in":null,"score":{"opus":0.01539928512278174,"gpt":0.2755507661292996,"spread":0.2601514810065179,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.007807939,0.0003561433,0.0008661256,0.0002455291,0.0001758882,0.0002604289,0.0004418177,0.0002316228,0.0000266505],"category_scores_gemma":[0.004608059,0.0002836053,0.000463866,0.002086337,0.00005294858,0.0004971368,0.00003250839,0.0001505458,0.0000847901],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000926598,"about_ca_system_score_gemma":0.00008594969,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002165107,"about_ca_topic_score_gemma":0.000009195967,"domain_scores_codex":[0.9961267,0.00047258,0.001024572,0.0010052,0.0008720697,0.0004988888],"domain_scores_gemma":[0.9934312,0.003632995,0.0002269071,0.001508196,0.0009073699,0.0002933513],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004153095,0.00007039006,0.003067918,0.0002051339,0.0001078967,0.000001260938,0.00004239408,0.9873576,0.0005089333,0.005460924,0.00005815567,0.003077921],"study_design_scores_gemma":[0.0003540355,0.00007844096,0.1271376,0.0000414475,0.0001660288,0.000003606237,0.00004769463,0.8710367,0.0001297861,0.0005614022,0.0001597811,0.0002834926],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04576379,0.00002421618,0.9505975,0.0001075708,0.0005396128,0.002118462,0.0001611913,0.000553974,0.0001336466],"genre_scores_gemma":[0.93349,2.545763e-7,0.06586377,0.00001360805,0.0001300595,0.0004225873,0.00004121203,0.00002165282,0.00001681828],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8877262,"threshold_uncertainty_score":0.9999616,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3160246689","doi":"10.1016/j.ress.2021.107752","title":"An empirical ship domain based on evasive maneuver and perceived collision risk","year":2021,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Maritime Navigation and Safety","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University","funders":"Canada First Research Excellence Fund; Ocean Frontier Institute; China Scholarship Council; Aalto-Yliopisto; National Natural Science Foundation of China; National Science Foundation","keywords":"Collision; Automatic Identification System; Domain (mathematical analysis); Proxy (statistics); Computer science; Identification (biology); Process (computing); Sample (material); Ship motions; Margin (machine learning); Marine engineering; Point (geometry); Collision avoidance; Operations research; Engineering; Data mining; Hull; Computer security; Machine learning; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.005378508815715582,"gpt":0.2199113513115351,"spread":0.2145328424958195,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009118651,0.0003395238,0.0004512418,0.00009273443,0.0001398957,0.00006929672,0.0001451245,0.000270267,0.00007059852],"category_scores_gemma":[0.0002312663,0.0003438337,0.0001323188,0.0003328934,0.00003134445,0.000131581,0.00002435399,0.0004723596,0.0000371253],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005582927,"about_ca_system_score_gemma":0.00005894174,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001937049,"about_ca_topic_score_gemma":0.000007260136,"domain_scores_codex":[0.9978694,0.000265681,0.0005515395,0.0005434675,0.0004051505,0.000364762],"domain_scores_gemma":[0.9981801,0.0005074163,0.00004328274,0.0008141789,0.0001379179,0.0003171166],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00007646007,0.00007624958,0.006303212,0.0009236772,0.00002669629,0.00004783966,0.0003134226,0.9887668,0.002378474,0.0002997106,0.0001184386,0.0006690343],"study_design_scores_gemma":[0.0009228087,0.00007376345,0.1418069,0.000279855,0.00003022158,0.00002441763,0.0001785919,0.851769,0.000699367,0.00001523931,0.003824763,0.0003750388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9343213,0.00009290792,0.0594711,0.0001973091,0.0006849338,0.000570438,0.000188817,0.001325427,0.0031477],"genre_scores_gemma":[0.9944569,0.0000496003,0.005124676,0.00004351357,0.0001122555,0.00003357568,0.00008799534,0.00006570613,0.00002573397],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1369978,"threshold_uncertainty_score":0.9999014,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4284882312","doi":"10.1016/j.ress.2022.108714","title":"Attention-based multiscale denoising residual convolutional neural networks for fault diagnosis of rotating machinery","year":2022,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Machine Fault Diagnosis Techniques","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Convolutional neural network; Residual; Noise reduction; Artificial intelligence; Computer science; Fault (geology); Pattern recognition (psychology); Artificial neural network; Algorithm; Geology","retraction":null,"screen_n_in":null,"score":{"opus":0.006186896598973588,"gpt":0.2273227308317765,"spread":0.2211358342328029,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001420891,0.000391086,0.0006172442,0.0002131538,0.0002833964,0.00002986669,0.0003867437,0.0001310163,0.00003258397],"category_scores_gemma":[0.0003647285,0.0004545251,0.0003343629,0.0004103919,0.00004005277,0.0001316082,0.0001022068,0.0005073866,8.793888e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007737191,"about_ca_system_score_gemma":0.00003542793,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001585897,"about_ca_topic_score_gemma":0.00001020854,"domain_scores_codex":[0.9972011,0.0001546509,0.001130899,0.0004802412,0.0004938168,0.0005392436],"domain_scores_gemma":[0.9974123,0.001578795,0.0001745925,0.0005665816,0.0001447959,0.0001229315],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000392973,0.00007129532,0.04194342,0.001470786,0.00004998629,0.000002845844,0.00004115885,0.9540741,0.0006622985,0.0002549636,0.0004164727,0.000973347],"study_design_scores_gemma":[0.0006816872,0.00009419362,0.02026681,0.0002195622,0.00005629441,0.00001076117,0.00004432349,0.9768225,0.0007911337,0.000005594224,0.0006047986,0.0004023665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5498932,0.0006601299,0.4440031,0.0001018851,0.001035959,0.001636677,0.0007016149,0.001919533,0.00004791033],"genre_scores_gemma":[0.9792055,0.000006967409,0.01822312,0.00001383665,0.0001902187,0.001966937,0.0002624403,0.0001244626,0.000006470655],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4293123,"threshold_uncertainty_score":0.9997907,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2043475556","doi":"10.1016/j.ress.2005.12.002","title":"Coupling ant colony and the degraded ceiling algorithm for the redundancy allocation problem of series–parallel systems","year":2006,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Redundancy (engineering); Computer science; Ant colony optimization algorithms; Heuristics; Mathematical optimization; Metaheuristic; Distributed computing; Algorithm; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.003239535675779656,"gpt":0.1668358979205964,"spread":0.1635963622448168,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002101508,0.0002787921,0.0005077825,0.0000510918,0.0002244196,0.0000716759,0.0002255701,0.0001584168,6.369533e-7],"category_scores_gemma":[0.0001157129,0.0001848235,0.0001385557,0.00027671,0.0001464628,0.0001883437,0.0000287358,0.0002021372,8.467799e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003223649,"about_ca_system_score_gemma":0.00004202194,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003348586,"about_ca_topic_score_gemma":0.00001088832,"domain_scores_codex":[0.9980871,0.00004774654,0.0009662564,0.0003081277,0.0002351197,0.0003556623],"domain_scores_gemma":[0.9982173,0.0007879836,0.0001572256,0.0005295284,0.0002609629,0.00004695667],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005919638,0.00001347934,0.00004505173,0.002136709,0.00004736104,2.429467e-7,0.0001619854,0.9815131,0.0003111644,0.01524294,0.00004791249,0.0004208128],"study_design_scores_gemma":[0.0009985927,0.00003084212,0.0004591591,0.0004001938,0.0000805054,0.00002084614,0.0003146594,0.99504,0.0001960168,0.00008000839,0.002178516,0.0002006342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.007202154,0.003086752,0.9849371,0.0002349859,0.000771357,0.003077948,0.00004729845,0.0004488,0.0001936421],"genre_scores_gemma":[0.9633194,0.0004999568,0.03513802,0.000002046918,0.0002130122,0.00063342,0.00003520316,0.00006405836,0.00009492662],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9561172,"threshold_uncertainty_score":0.7536884,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2759313934","doi":"10.1016/j.ress.2017.09.010","title":"General model for the risk priority number in failure mode and effects analysis","year":2017,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Konkuk University","keywords":"Failure mode and effects analysis; Reliability engineering; Mode (computer interface); Computer science; Risk analysis (engineering); Econometrics; Mathematics; Engineering; Business","retraction":null,"screen_n_in":null,"score":{"opus":0.003492155636325762,"gpt":0.2105865770698364,"spread":0.2070944214335107,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001104549,0.0002663041,0.0004967555,0.0000674846,0.0002844741,0.0001201831,0.0003067789,0.0001903801,0.000001315805],"category_scores_gemma":[0.0005128408,0.0002106645,0.0002125032,0.0001761626,0.00005258125,0.0002660546,0.00005464768,0.0002833427,0.000002120144],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003458412,"about_ca_system_score_gemma":0.00002013494,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003988175,"about_ca_topic_score_gemma":0.0003000701,"domain_scores_codex":[0.9985977,0.00004190446,0.0004470809,0.0003825619,0.0001581333,0.0003726549],"domain_scores_gemma":[0.9982408,0.0003812087,0.00008971921,0.001117641,0.00008173051,0.00008886214],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00001863078,0.000010294,0.01675718,0.0009188404,0.0001398931,5.501618e-7,0.0002170771,0.9802366,0.00006884892,0.001185505,0.00002477128,0.000421818],"study_design_scores_gemma":[0.000428099,0.000006484169,0.06422803,0.0000756159,0.0002495412,0.000001619685,0.00001805901,0.9344598,0.000056801,0.00009845194,0.0001599083,0.0002175954],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2609453,0.0001019311,0.7373192,0.00009329972,0.0002684817,0.000875866,0.00006460473,0.0002321489,0.00009914384],"genre_scores_gemma":[0.9805275,0.0001949347,0.01891403,0.000003453301,0.00007348146,0.0002006736,0.00001083933,0.00003741379,0.00003769159],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7195821,"threshold_uncertainty_score":0.859065,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2963803043","doi":"10.1016/j.ress.2019.106587","title":"Bayesian Stochastic Petri Nets (BSPN) - A new modelling tool for dynamic safety and reliability analysis","year":2019,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":103,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Dalhousie University; Memorial University of Newfoundland","funders":"Research and Development; Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs; Suncor Energy Incorporated; Genome Canada","keywords":"Reliability (semiconductor); Bayesian probability; Computer science; Stochastic Petri net; Reliability engineering; Petri net; Dynamic Bayesian network; Engineering; Artificial intelligence; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.01265941820658842,"gpt":0.2654075755609238,"spread":0.2527481573543354,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.01016437,0.0006566343,0.00217784,0.0008918562,0.0003458913,0.0003097221,0.001006986,0.0003850188,0.000133491],"category_scores_gemma":[0.003090229,0.0005507791,0.001315479,0.003664288,0.00008102849,0.0006075685,0.0002007889,0.000448147,0.0001139842],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008694783,"about_ca_system_score_gemma":0.0002431991,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004882301,"about_ca_topic_score_gemma":0.00004702359,"domain_scores_codex":[0.9919599,0.0003569322,0.002926494,0.00215849,0.001692681,0.0009055566],"domain_scores_gemma":[0.9897814,0.005509066,0.0005564882,0.002969586,0.0006444032,0.0005390899],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000367804,0.00003791145,0.004456756,0.0002238393,0.000274112,0.000001395959,0.0002840633,0.9901018,0.00002738765,0.0008367301,0.00003440918,0.003353852],"study_design_scores_gemma":[0.0008503786,0.0000905617,0.01427527,0.0001022372,0.0007027494,0.000008345657,0.0002587927,0.9790591,0.000004527205,0.001220812,0.002819232,0.0006080033],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07875612,0.0003382598,0.917324,0.000777106,0.0006936531,0.001458287,0.000194822,0.0002971996,0.0001605338],"genre_scores_gemma":[0.9706569,0.00007587976,0.02780721,0.00002074566,0.00009911515,0.00003614006,0.00005653709,0.00005760461,0.001189867],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8919008,"threshold_uncertainty_score":0.9996943,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3137962681","doi":"10.1016/j.ress.2021.107607","title":"Importance of human reliability in process operation: A critical analysis","year":2021,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":101,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Excellence Research Chairs, Government of Canada","keywords":"Human reliability; Risk analysis (engineering); Reliability (semiconductor); Process (computing); Scopus; Human error; Engineering; Variety (cybernetics); Computer science; Power (physics); Business","retraction":null,"screen_n_in":null,"score":{"opus":0.02540754887720934,"gpt":0.3495039954794388,"spread":0.3240964466022295,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.008604571,0.0002774289,0.001432629,0.0004697799,0.0001464372,0.000105506,0.000683787,0.0001845801,0.0002690903],"category_scores_gemma":[0.01123774,0.0002373348,0.0006844388,0.006052652,0.0001240157,0.0004119422,0.0001074632,0.0003314813,0.00002507436],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003843493,"about_ca_system_score_gemma":0.0002314947,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001597303,"about_ca_topic_score_gemma":0.0003730464,"domain_scores_codex":[0.9932885,0.0005633829,0.002905256,0.001207165,0.00162463,0.0004110188],"domain_scores_gemma":[0.9938348,0.002045139,0.0002614234,0.002202403,0.001455547,0.0002007169],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.0000293228,0.000168831,0.373679,0.0003547633,0.0000927145,0.00002924074,0.0004779392,0.6203728,0.0004874829,0.004018651,0.00001397892,0.0002752193],"study_design_scores_gemma":[0.0004095479,0.0000495421,0.6132419,0.0001455096,0.0003535978,0.00001214928,0.001646845,0.3800042,0.001416727,0.00205036,0.0002316955,0.0004380062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.944613,0.0002937735,0.05178394,0.001279473,0.000221761,0.000271905,0.00006729696,0.0001131092,0.001355788],"genre_scores_gemma":[0.9972647,0.00001629394,0.002497069,0.00001298389,0.00005331192,0.00003144646,0.00002385418,0.00001504616,0.00008532177],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2403687,"threshold_uncertainty_score":0.9970911,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2022902485","doi":"10.1016/j.ress.2013.04.011","title":"Optimal inspection planning for onshore pipelines subject to external corrosion","year":2013,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Structural Integrity and Reliability Analysis","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"","keywords":"Pipeline transport; Robustness (evolution); Reliability engineering; Pipeline (software); Monte Carlo method; Context (archaeology); Engineering; Computer science; Failure mode and effects analysis; Mathematical optimization; Mathematics; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.00812049474395125,"gpt":0.2192776167318682,"spread":0.211157121987917,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000557642,0.0004124893,0.0005809871,0.0002252237,0.0001930557,0.0001163656,0.0002974923,0.0002852707,0.00003726654],"category_scores_gemma":[0.0003166064,0.0003697287,0.0003340558,0.0004736964,0.00003148291,0.000293504,0.00004371262,0.0004014521,0.0000817883],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0007682403,"about_ca_system_score_gemma":0.00002078028,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002891966,"about_ca_topic_score_gemma":0.00000919674,"domain_scores_codex":[0.9977794,0.00003909701,0.0008201973,0.0005085685,0.000299288,0.0005534593],"domain_scores_gemma":[0.9985397,0.0003272756,0.00005495864,0.0005630417,0.0002480804,0.0002669047],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004012442,0.00001279214,0.001082745,0.0009355339,0.00002973387,0.000001250991,0.0002858655,0.9698996,0.02643004,0.000145769,0.0004888024,0.0006477715],"study_design_scores_gemma":[0.0003049519,0.00009320228,0.01802259,0.0005708887,0.00006504559,0.00003242456,0.0004224891,0.9693534,0.009115838,0.00002528836,0.001474644,0.0005191783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.5832108,0.0001842289,0.4127201,0.00008217029,0.001325362,0.0008997314,0.00003655854,0.001432278,0.0001087532],"genre_scores_gemma":[0.9792405,0.00001219097,0.01984129,0.00001387586,0.0004597925,0.0002721464,0.0000290373,0.00006978293,0.00006134044],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.3960298,"threshold_uncertainty_score":0.9998755,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3197397722","doi":"10.1016/j.ress.2021.108011","title":"A Review of Risk Analysis Research for the Operations of Autonomous Underwater Vehicles","year":2021,"lang":"en","type":"review","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":95,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Fisheries and Oceans Canada; Canada Research Chairs","keywords":"Risk analysis (engineering); Scope (computer science); SAFER; Bridge (graph theory); Quantitative analysis (chemistry); Relevance (law); Risk assessment; Qualitative analysis; Computer science; Key (lock); Work (physics); Engineering; Underwater; Computer security; Qualitative research; Business; Geography","retraction":null,"screen_n_in":null,"score":{"opus":0.1446987948845586,"gpt":0.4380284132591498,"spread":0.2933296183745912,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaresearch"],"consensus_categories":["metaresearch"],"category_scores_codex":[0.04114569,0.0004276568,0.005392728,0.0009382931,0.0003334158,0.0001050867,0.001893599,0.0003263728,0.00008887918],"category_scores_gemma":[0.01699192,0.0002360329,0.004711935,0.008544578,0.0001780396,0.0001104217,0.0002807502,0.0006473057,0.00002427097],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004603768,"about_ca_system_score_gemma":0.0007689951,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005279598,"about_ca_topic_score_gemma":0.00009742167,"domain_scores_codex":[0.9889771,0.002914241,0.00476942,0.001028734,0.001872637,0.0004378301],"domain_scores_gemma":[0.9656855,0.02638127,0.0009404187,0.003843107,0.003017223,0.0001324207],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00001032978,0.0001025346,0.00004315559,0.1643571,0.004565832,0.000001783494,0.0002545981,0.2561334,6.687332e-7,0.002553225,0.0006641542,0.5713133],"study_design_scores_gemma":[0.00008569766,0.00002840999,0.00006316656,0.04585155,0.01055125,0.000005118026,0.0002586678,0.05262119,0.000002509639,0.00004769496,0.890202,0.0002827424],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.00000376878,0.900464,0.09663814,0.0001945179,0.0001793047,0.001535141,0.0009064566,0.00003124033,0.00004746249],"genre_scores_gemma":[0.0009328474,0.9957647,0.002641312,0.000004018036,0.00008859123,0.0002909573,0.0001147745,0.00003632441,0.0001265141],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.8895379,"threshold_uncertainty_score":0.9912884,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4387339066","doi":"10.1016/j.ress.2023.109707","title":"A hybrid CNN-LSTM model for joint optimization of production and imperfect predictive maintenance planning","year":2023,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Machine Fault Diagnosis Techniques","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Imperfect; Joint (building); Computer science; Production (economics); Production planning; Artificial intelligence; Machine learning; Engineering; Economics; Structural engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.009003241732097465,"gpt":0.2287982416947846,"spread":0.2197949999626871,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009965828,0.0002469798,0.0004232796,0.000195419,0.00005408741,0.00001544932,0.0001019008,0.00009386136,7.975918e-7],"category_scores_gemma":[0.0006740625,0.0002521074,0.00009548318,0.0002527801,0.00002454437,0.0001794049,0.00003843962,0.0001565959,9.337609e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003353701,"about_ca_system_score_gemma":0.00001985905,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000113461,"about_ca_topic_score_gemma":4.095425e-7,"domain_scores_codex":[0.9985377,0.00002418424,0.0005743332,0.0003731593,0.0001758155,0.000314877],"domain_scores_gemma":[0.999178,0.0001518934,0.00007747106,0.000383741,0.0001370373,0.00007187947],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002700908,0.00001047611,0.0003296391,0.00324838,0.00003290559,8.543567e-7,0.0002604478,0.9925748,0.002650695,0.0001437815,0.0005457105,0.0001752709],"study_design_scores_gemma":[0.0001822487,0.0000554315,0.001320469,0.0009479449,0.00003010288,0.00001103448,0.00003508265,0.9896771,0.007451653,0.00003062641,0.00004435759,0.0002139925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1317812,0.0001161584,0.8636741,0.00004081231,0.0003201259,0.00128001,0.0001259823,0.002587212,0.00007445713],"genre_scores_gemma":[0.9744785,0.00009951954,0.02473618,0.000001491895,0.00007746058,0.0004693138,0.00004451682,0.00007636764,0.00001661471],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8426974,"threshold_uncertainty_score":0.9999931,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3164217947","doi":"10.1016/j.ress.2021.107792","title":"An Integrated Quantitative Risk Assessment Method for Urban Underground Utility Tunnels","year":2021,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"National Key Research and Development Program of China; Beijing Municipal Science and Technology Commission; State Key Laboratory of Explosion Science and Technology; China University of Mining and Technology; Beijing Nova Program; Ministry of Science and Technology of the People's Republic of China","keywords":"Risk assessment; Engineering; Risk analysis (engineering); Environmental science; Civil engineering; Forensic engineering; Computer science; Business; Computer security","retraction":null,"screen_n_in":null,"score":{"opus":0.006945927118611811,"gpt":0.2635349847544629,"spread":0.2565890576358511,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002764199,0.0006187338,0.0009581528,0.0001201238,0.000265447,0.0001902602,0.0003056151,0.000372228,0.00007441321],"category_scores_gemma":[0.0007710523,0.0006098283,0.0003877337,0.0006700597,0.00005980456,0.0006081295,0.00004742712,0.0007215642,0.000006280097],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002312709,"about_ca_system_score_gemma":0.0003585621,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001996441,"about_ca_topic_score_gemma":0.00004611493,"domain_scores_codex":[0.9961669,0.0005491688,0.001159995,0.0009499073,0.0003875657,0.0007864992],"domain_scores_gemma":[0.9958727,0.00136642,0.0001233264,0.001460458,0.0008421398,0.0003349463],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001093743,0.0001896662,0.005539583,0.004059676,0.0004404068,0.00001938285,0.0008109437,0.9556205,0.003634239,0.02564481,0.0005322981,0.003399085],"study_design_scores_gemma":[0.0007257893,0.0001523269,0.0276067,0.0001097731,0.0001395195,0.00002451878,0.002647525,0.9498955,0.001079199,0.001485025,0.01547625,0.0006578569],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.05080717,0.0002567263,0.9436744,0.00006378653,0.001259196,0.001011214,0.0004978139,0.001497372,0.000932312],"genre_scores_gemma":[0.773115,0.00002103886,0.2262151,0.00001135455,0.0001263362,0.0001418834,0.0002414621,0.00009321611,0.00003459004],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.7223079,"threshold_uncertainty_score":0.9996353,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2057320483","doi":"10.1016/j.ress.2005.12.001","title":"Reliability optimization using multiobjective ant colony system approaches","year":2006,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Mathematical optimization; Redundancy (engineering); Ant colony optimization algorithms; Computer science; Reliability (semiconductor); Probabilistic logic; Multi-objective optimization; Heuristic; Optimization problem; Mathematics; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.007849150253308916,"gpt":0.1696887581511154,"spread":0.1618396078978064,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001602849,0.0006451083,0.0008598294,0.0001732041,0.0002550869,0.0001103629,0.000324062,0.00047406,0.00001244541],"category_scores_gemma":[0.000252844,0.0006535559,0.0002914194,0.0008269562,0.0001015517,0.0005769698,0.00006203118,0.0004421213,0.00002020342],"about_ca_system_candidate":true,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.004528366,"about_ca_system_score_gemma":0.00008970921,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004670779,"about_ca_topic_score_gemma":0.000007576737,"domain_scores_codex":[0.9962029,0.0001828372,0.001437243,0.0008815102,0.000494781,0.0008007462],"domain_scores_gemma":[0.9978796,0.0002706196,0.0001845121,0.001132392,0.0003511423,0.0001817913],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004940727,0.0000714711,0.0006684703,0.00321596,0.00003603648,0.00000494304,0.0001087601,0.9928977,0.0006461957,0.002177757,0.00004121779,0.00008207187],"study_design_scores_gemma":[0.000609258,0.00003549,0.002888091,0.000504487,0.00008139606,0.00004658388,0.0003534964,0.9937281,0.0006894886,0.0000108417,0.0004062595,0.0006465102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.07706507,0.0002770754,0.9123108,0.00002104401,0.001632471,0.001827374,0.0001026204,0.003574699,0.003188869],"genre_scores_gemma":[0.9351511,0.000022331,0.06412493,0.000002303512,0.0003118091,0.00009835977,0.0001072878,0.0001416923,0.00004017607],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.858086,"threshold_uncertainty_score":0.9995916,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4328103202","doi":"10.1016/j.ress.2023.109256","title":"A digital twin-enhanced semi-supervised framework for motor fault diagnosis based on phase-contrastive current dot pattern","year":2023,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Machine Fault Diagnosis Techniques","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Carleton University","funders":"Science and Technology Commission of Shanghai Municipality; National Natural Science Foundation of China","keywords":"Computer science; Stator; Artificial intelligence; Cluster analysis; Feature vector; Induction motor; Fault (geology); Machine learning; Nonlinear dimensionality reduction; Pattern recognition (psychology); Engineering; Dimensionality reduction; Voltage","retraction":null,"screen_n_in":null,"score":{"opus":0.009781662195940162,"gpt":0.270629904702989,"spread":0.2608482425070489,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006992651,0.0007800013,0.0009323041,0.0003694677,0.0001194308,0.0001580166,0.0005196487,0.0003569933,0.00002616701],"category_scores_gemma":[0.001441985,0.000790418,0.0005157827,0.000771245,0.00003389946,0.0002671151,0.00005971508,0.000667878,0.000102445],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001016151,"about_ca_system_score_gemma":0.00004195335,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001152903,"about_ca_topic_score_gemma":0.000001412436,"domain_scores_codex":[0.9964939,0.00005757264,0.001050076,0.0008715003,0.0005679775,0.0009590017],"domain_scores_gemma":[0.9952229,0.003090622,0.0001022852,0.001083764,0.0001765163,0.0003238582],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002055796,0.000546615,0.003860836,0.008178069,0.0001782948,0.00001498414,0.0003451232,0.8766388,0.002138632,0.0003386102,0.001997828,0.1055567],"study_design_scores_gemma":[0.001567068,0.0003061655,0.002909745,0.0028029,0.00005860726,0.000001449764,0.00004246875,0.9758748,0.009140588,0.0000445651,0.006383164,0.0008684845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1304687,0.0001590096,0.8524796,0.0001352446,0.001753346,0.003301353,0.002505068,0.008987922,0.0002097439],"genre_scores_gemma":[0.991196,0.00007565529,0.002724246,0.00002598577,0.0004290899,0.004957635,0.000334276,0.0002490216,0.000008129534],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8607273,"threshold_uncertainty_score":0.9994547,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3212263828","doi":"10.1016/j.ress.2021.108191","title":"A deep learning predictive model for selective maintenance optimization","year":2021,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Predictive maintenance; Component (thermodynamics); Benchmarking; Modular design; Reliability engineering; Turbofan; Computer science; Set (abstract data type); Maintenance actions; Engineering; Machine learning","retraction":null,"screen_n_in":null,"score":{"opus":0.00378129399622761,"gpt":0.177417110569024,"spread":0.1736358165727964,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006426934,0.0003467395,0.0004844703,0.0000829082,0.0001600342,0.00005609681,0.0001544423,0.0002526554,0.00000611189],"category_scores_gemma":[0.0009452743,0.0003777262,0.0002100615,0.0004881919,0.00003098527,0.000328802,0.0000333523,0.0003667958,0.000005575666],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001264584,"about_ca_system_score_gemma":0.00009030209,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000004859391,"about_ca_topic_score_gemma":0.000004049228,"domain_scores_codex":[0.9979246,0.00006205118,0.0006498881,0.0005691872,0.0002324531,0.0005618064],"domain_scores_gemma":[0.9983589,0.0002620745,0.00007690748,0.0004523595,0.0007088503,0.0001408932],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005872944,0.00002560579,0.00006260273,0.001178736,0.00006032558,0.000002076634,0.0004543432,0.9961627,0.0003340824,0.001214268,0.00009098959,0.0003555834],"study_design_scores_gemma":[0.0005864502,0.00004444555,0.0001328178,0.0002739159,0.00005152769,0.00001936364,0.000228324,0.9970028,0.0006845528,0.00005488511,0.0005475151,0.0003733859],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0008781425,0.0002585032,0.9942827,0.00005347943,0.0005655253,0.0008625485,0.00004185813,0.001553717,0.001503562],"genre_scores_gemma":[0.866058,0.0002211497,0.1327683,0.000009553055,0.0001121352,0.0003537119,0.0001355005,0.0001121405,0.0002295098],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8651798,"threshold_uncertainty_score":0.9998674,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W317510280","doi":"10.1016/j.ress.2015.04.013","title":"Search for all d-MPs for all d levels in multistate two-terminal networks","year":2015,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Path (computing); Binary number; Heuristic; Reliability (semiconductor); Algorithm; Binary search algorithm; Value (mathematics); Mathematics; Integer (computer science); Computer science; Mathematical optimization; Search algorithm; Statistics; Arithmetic; Power (physics); Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.02387257834581962,"gpt":0.2593243840548468,"spread":0.2354518057090272,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002690276,0.0003831543,0.0006003389,0.0001375529,0.00004476282,0.000059997,0.0002924546,0.0002445647,0.000002490197],"category_scores_gemma":[0.0003147514,0.0003981253,0.0001926962,0.0002499363,0.00003450279,0.0002720446,0.00004055188,0.0003012627,0.000007228233],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001379612,"about_ca_system_score_gemma":0.00006655222,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001037303,"about_ca_topic_score_gemma":0.00003099449,"domain_scores_codex":[0.9973771,0.00006409565,0.0009132911,0.0005298244,0.0002438795,0.000871826],"domain_scores_gemma":[0.9982851,0.000490391,0.00005711941,0.0005983681,0.0002882483,0.0002807592],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001309174,0.0000334824,0.0003064413,0.001754957,0.00003665371,0.000003959966,0.0003975206,0.9950519,0.0002020044,0.0009419349,0.0002080468,0.0009321572],"study_design_scores_gemma":[0.002096642,0.00009300604,0.0008061667,0.0002833355,0.00002984212,0.00001603905,0.0001212864,0.9886588,0.0003302496,0.00003775974,0.007105926,0.0004209752],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.04412477,0.0002156377,0.9505675,0.0001072729,0.00134232,0.00258279,0.0001626825,0.0007004855,0.0001964862],"genre_scores_gemma":[0.9625528,0.00003144016,0.03627667,0.00001576008,0.0002567501,0.0005634499,0.0001350931,0.0001149572,0.00005305234],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9184281,"threshold_uncertainty_score":0.9998471,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4320486885","doi":"10.1016/j.ress.2023.109170","title":"Modeling and analysis of internal corrosion induced failure of oil and gas pipelines","year":2023,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Structural Integrity and Reliability Analysis","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Genome Canada","keywords":"Corrosion; Integrity management; Pipeline transport; Probabilistic logic; Pipeline (software); Petroleum engineering; Bayesian network; Conditional probability; Fossil fuel; Pitting corrosion; Environmental science; Risk analysis (engineering); Reliability engineering; Forensic engineering; Engineering; Materials science; Computer science; Metallurgy; Statistics; Environmental engineering; Waste management; Mathematics; Business; Artificial intelligence; Mechanical engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.008286273670771302,"gpt":0.2093196634506439,"spread":0.2010333897798726,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007498976,0.0002567047,0.0008853732,0.0005706118,0.00004420888,0.00001851017,0.000154742,0.0002267157,0.000007358562],"category_scores_gemma":[0.0002366064,0.0002252111,0.0002550605,0.001528216,0.0000536883,0.0001197878,0.0000763616,0.0002792696,0.000001328746],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000102589,"about_ca_system_score_gemma":0.00001170282,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0004555073,"about_ca_topic_score_gemma":0.000060206,"domain_scores_codex":[0.9981931,0.00004647082,0.0009144166,0.0003329314,0.0002684051,0.0002447139],"domain_scores_gemma":[0.9989604,0.0002576063,0.00007490083,0.0004180242,0.0001784089,0.0001106258],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002100601,0.000006330878,0.003255475,0.002493256,0.0003321321,0.000001205816,0.0004085878,0.9565213,0.03521714,0.0001672044,0.000003518962,0.001572888],"study_design_scores_gemma":[0.0001752916,0.00002149527,0.005249813,0.0003692573,0.0005819649,0.000005489941,0.0004561754,0.9901845,0.002724302,0.00001734437,0.00002087048,0.000193448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9833986,0.0002660006,0.01551748,0.00005509471,0.000222516,0.00006701696,0.0000745874,0.0003483803,0.00005033383],"genre_scores_gemma":[0.9987538,0.0003353668,0.0008069152,0.000001364082,0.0000321686,0.000007268946,0.0000260679,0.00002483791,0.0000122392],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.0336633,"threshold_uncertainty_score":0.9183842,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4406998460","doi":"10.1016/j.ress.2025.110866","title":"A systematic resilience assessment framework for multi-state systems based on physics-informed neural network","year":2025,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Petro-Canada","funders":"China University of Petroleum, Beijing; National Natural Science Foundation of China","keywords":"Resilience (materials science); Artificial neural network; State (computer science); Computer science; Systems engineering; Management science; Artificial intelligence; Engineering; Physics; Algorithm","retraction":null,"screen_n_in":null,"score":{"opus":0.007810988837815542,"gpt":0.2628894575778986,"spread":0.2550784687400831,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001782226,0.0006398178,0.001349003,0.0002036254,0.0003049509,0.0001859489,0.0005767656,0.0002973886,0.000003197612],"category_scores_gemma":[0.0007886291,0.0005700038,0.0005073744,0.001179148,0.00006029656,0.0002148907,0.00003964539,0.0006278512,0.00001003748],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001933996,"about_ca_system_score_gemma":0.0001910529,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000286019,"about_ca_topic_score_gemma":0.000005985919,"domain_scores_codex":[0.9960701,0.0001884685,0.001584393,0.0006779173,0.0005382606,0.0009408922],"domain_scores_gemma":[0.9955267,0.002360112,0.0001849757,0.001503626,0.0002389605,0.0001856478],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000037737,0.00003208683,0.0008355817,0.0666191,0.000143096,0.000001998882,0.00005300617,0.9216263,0.00003352133,0.01043897,0.00005725203,0.0001213615],"study_design_scores_gemma":[0.0004902479,0.0000586633,0.002281938,0.01184041,0.0001635835,0.000002149968,0.0001372456,0.9842517,0.00008657426,0.0001168117,0.00009766145,0.0004730237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.005019641,0.0002849197,0.9878989,0.00004312089,0.002311624,0.002926074,0.00007330652,0.001135002,0.0003073646],"genre_scores_gemma":[0.9610568,0.00001211753,0.03760451,0.00003421318,0.0002020016,0.0009481903,0.00002728477,0.00006759104,0.00004731132],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9560371,"threshold_uncertainty_score":0.9996752,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3011125477","doi":"10.1016/j.ress.2020.106934","title":"Dynamic vulnerability assessment of process plants with respect to vapor cloud explosions","year":2020,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":79,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"China Scholarship Council","keywords":"Overpressure; Vulnerability (computing); Identification (biology); Event tree; Process (computing); Event (particle physics); Cloud computing; Environmental science; Process safety; Fault tree analysis; Computer science; Ignition system; Event tree analysis; Reliability engineering; Forensic engineering; Risk analysis (engineering); Engineering; Computer security; Chemical plant; Aerospace engineering; Environmental engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.03306402204352425,"gpt":0.3337088873736251,"spread":0.3006448653301008,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004155386,0.0003588716,0.001178763,0.0002185268,0.0001740591,0.00007483803,0.001054038,0.0001288515,0.00007012713],"category_scores_gemma":[0.002577224,0.0002505294,0.0002943539,0.001950146,0.00006567533,0.0002445286,0.0001420708,0.0003722677,0.00005697823],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004040492,"about_ca_system_score_gemma":0.0002655494,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006625256,"about_ca_topic_score_gemma":0.0000335702,"domain_scores_codex":[0.9940522,0.0003890233,0.00181564,0.001169491,0.002126049,0.000447631],"domain_scores_gemma":[0.9954215,0.00154681,0.0003605705,0.001548307,0.0005720393,0.0005507151],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003622576,0.00009554905,0.02230893,0.0004821619,0.00008495418,0.00001484631,0.001440533,0.9721441,0.00107384,0.0005300512,0.000143777,0.00131895],"study_design_scores_gemma":[0.0008941076,0.0006433812,0.1660503,0.0004727528,0.0001208262,0.00001961986,0.003933689,0.8228837,0.0009904058,0.0002879692,0.00296597,0.0007373097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7261814,0.0000496545,0.267483,0.003837001,0.0002938282,0.0009054298,0.0002294785,0.0002832677,0.0007368596],"genre_scores_gemma":[0.9917811,0.00001256534,0.007966083,0.00004136579,0.00006538379,0.00006043445,0.00001099646,0.00003084551,0.00003125482],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2655996,"threshold_uncertainty_score":0.9999947,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2040526657","doi":"10.1016/s0951-8320(02)00204-1","title":"A method for evaluation of reliability indices for repairable circular consecutive-k-out-of-n:F systems","year":2003,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Component (thermodynamics); Reliability (semiconductor); Reliability engineering; Key (lock); Exponential distribution; Mathematics; State (computer science); Statistics; Computer science; Applied mathematics; Engineering; Algorithm; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.0151211530964409,"gpt":0.2571845445431579,"spread":0.242063391446717,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.01345692,0.0003796378,0.001031789,0.0001695949,0.00008529542,0.00002271979,0.0002334188,0.0003530437,0.00000673148],"category_scores_gemma":[0.00386329,0.0003842401,0.0004225645,0.0003971485,0.00006901773,0.0002323035,0.00001530371,0.0001674881,0.000001358634],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009644362,"about_ca_system_score_gemma":0.0002265981,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00006367546,"about_ca_topic_score_gemma":0.000003085311,"domain_scores_codex":[0.996235,0.0004053005,0.001692181,0.0006026782,0.0005753011,0.0004895],"domain_scores_gemma":[0.9953017,0.00156037,0.0003470525,0.001014992,0.001655821,0.0001200824],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0000790547,0.00006443839,0.0002937485,0.01460706,0.0001245154,1.078442e-7,0.0003926244,0.971849,0.003211614,0.009080638,0.00006689448,0.0002303641],"study_design_scores_gemma":[0.00167468,0.0001278894,0.0003065879,0.0006681873,0.0003127082,0.000005054107,0.0004877144,0.9827883,0.007915082,0.0003392178,0.005012991,0.0003615736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.03573689,0.000942675,0.9547142,0.00001434245,0.001768463,0.005343799,0.0002934165,0.0004367525,0.0007494704],"genre_scores_gemma":[0.9008854,0.00003738761,0.09779507,0.000001649058,0.00005156097,0.001077381,0.00005714757,0.00007795287,0.00001646097],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8651485,"threshold_uncertainty_score":0.9998609,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2075221061","doi":"10.1016/j.ress.2009.10.004","title":"Discounted cost model for condition-based maintenance optimization","year":2009,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":76,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Preventive maintenance; Reliability (semiconductor); Reliability engineering; Condition-based maintenance; Optimal maintenance; Mathematical optimization; Computer science; Process (computing); Point (geometry); Engineering; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.005114522545990426,"gpt":0.2022696965118738,"spread":0.1971551739658834,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006197226,0.0003665837,0.0004509257,0.000117028,0.0001239538,0.00006196938,0.0002197387,0.0002200262,0.000009811847],"category_scores_gemma":[0.0002834804,0.0003697189,0.000197223,0.0003265878,0.00003529104,0.0003243647,0.000007312593,0.0001941834,0.000007618974],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001028034,"about_ca_system_score_gemma":0.00006739204,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000005015189,"about_ca_topic_score_gemma":0.000001832556,"domain_scores_codex":[0.998016,0.00002467377,0.0007388197,0.0004446522,0.0002381127,0.0005377444],"domain_scores_gemma":[0.9986677,0.0001751625,0.0000815477,0.0006191672,0.0003052254,0.0001511858],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005928069,0.00003623865,0.00001263082,0.0007105946,0.00001314012,6.4443e-7,0.00005172473,0.9947641,0.0003099675,0.003385461,0.0003382978,0.0003178961],"study_design_scores_gemma":[0.0008734246,0.00004778451,0.0001500102,0.000345044,0.00003240227,0.000003410508,0.00002663684,0.9969799,0.0003013458,0.00009092902,0.0007433679,0.00040576],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.001165702,0.00004921658,0.9938159,0.0003226431,0.0005197892,0.001729616,0.000230387,0.001609319,0.0005574542],"genre_scores_gemma":[0.9205949,0.00003188068,0.07849605,0.00005282289,0.00008462557,0.0002694804,0.0003374983,0.00006612138,0.00006666386],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9194291,"threshold_uncertainty_score":0.9998755,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1983569116","doi":"10.1016/j.ress.2008.03.002","title":"Modelling and optimizing sequential imperfect preventive maintenance","year":2008,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":76,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Imperfect; Preventive maintenance; Reliability engineering; Scheduling (production processes); Sensitivity (control systems); Computer science; Operations research; Engineering; Mathematical optimization; Operations management; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.006935327378912975,"gpt":0.1771236742496857,"spread":0.1701883468707727,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006548201,0.000377285,0.000501507,0.0001047925,0.0001843108,0.00003549283,0.0001709535,0.0002001845,0.000007518321],"category_scores_gemma":[0.00007479583,0.0003792172,0.0001552659,0.0002804077,0.00008464071,0.0003812351,0.00005042678,0.0003488063,0.00001312347],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006014048,"about_ca_system_score_gemma":0.00003721791,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004712181,"about_ca_topic_score_gemma":8.683313e-7,"domain_scores_codex":[0.9979838,0.00005792473,0.0006542311,0.0005014522,0.000243483,0.0005590978],"domain_scores_gemma":[0.9989876,0.0001324944,0.00006050756,0.0005115857,0.0001301614,0.0001776092],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00002494825,0.00001327562,0.00009890189,0.0008723837,0.00003831225,0.00001158021,0.0004359935,0.9965827,0.0007683874,0.0009943577,0.00005266405,0.0001064858],"study_design_scores_gemma":[0.0004192042,0.00003206296,0.0002341755,0.0003709357,0.00002736621,0.000149318,0.00009345194,0.9964058,0.0009515454,0.00002899214,0.0008891226,0.0003980711],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1445894,0.0004549493,0.850683,0.00003280372,0.0007017485,0.0006030129,0.00002370921,0.001242484,0.00166893],"genre_scores_gemma":[0.9629976,0.0006415577,0.03601521,0.000005345239,0.0001175599,0.00006311751,0.00001544639,0.00007959129,0.00006462092],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8184081,"threshold_uncertainty_score":0.9998659,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2599968793","doi":"10.1016/j.ress.2017.03.033","title":"Joint optimization of design, warranty and price for products sold with maintenance service contracts","year":2017,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Innovation Diffusion and Forecasting","field":"Decision Sciences","cited_by":74,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Université Laval","funders":"","keywords":"Warranty; Original equipment manufacturer; Profit (economics); Product (mathematics); Product lifecycle; Business; Preventive maintenance; Service provider; Service (business); Computer science; New product development; Operations research; Operations management; Reliability engineering; Marketing; Engineering; Microeconomics; Economics; Mathematics","retraction":null,"screen_n_in":null,"score":{"opus":0.05889481089202939,"gpt":0.2743097292136147,"spread":0.2154149183215854,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.005979191,0.0001758958,0.0004523971,0.0001038882,0.000308509,0.0001596033,0.0003697021,0.00008575685,0.000005154252],"category_scores_gemma":[0.009103451,0.0001210497,0.00004123307,0.0003278024,0.00005863636,0.0003877624,0.00006914757,0.0001013222,0.000002421732],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00008771351,"about_ca_system_score_gemma":0.00009655653,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002981507,"about_ca_topic_score_gemma":0.000002703946,"domain_scores_codex":[0.9977484,0.00005888182,0.0008996796,0.0004948157,0.0005361365,0.0002620261],"domain_scores_gemma":[0.9953728,0.0006363923,0.0007582721,0.0009772796,0.002175318,0.0000799866],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003580859,0.00005006513,0.001105385,0.001057089,0.00002248686,0.000001782358,0.0005177255,0.9836577,0.005922084,0.00530551,0.0001074035,0.001894668],"study_design_scores_gemma":[0.0009259321,0.00007825642,0.0188689,0.0004700506,0.00001330072,0.00002220604,0.0001674144,0.9756876,0.002557079,0.00004609768,0.0009769254,0.0001862057],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.06351925,0.00002212844,0.9334725,0.001070463,0.0003437479,0.00114009,0.00002035769,0.00007688157,0.000334543],"genre_scores_gemma":[0.916717,0.000003123989,0.0830538,0.00002412538,0.00005192704,0.00003274298,0.000002948106,0.00001778795,0.00009654148],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8531978,"threshold_uncertainty_score":0.9992433,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2074236332","doi":"10.1016/j.ress.2015.03.029","title":"Optimal preventive maintenance and repair policies for multi-state systems","year":2015,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Simon Fraser University","funders":"","keywords":"Imperfect; Schedule; Preventive maintenance; Reliability engineering; State (computer science); Optimal maintenance; State space; Mathematical optimization; Markov process; Computer science; Homogeneous; Operations research; Engineering; Mathematics; Algorithm; Statistics","retraction":null,"screen_n_in":null,"score":{"opus":0.01375373015587376,"gpt":0.2218422613420256,"spread":0.2080885311861518,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001442637,0.0003649956,0.0005556195,0.00009964384,0.00007790703,0.00006883677,0.0001667125,0.0001679979,6.275727e-7],"category_scores_gemma":[0.000528929,0.0003474453,0.000163091,0.0002285106,0.00006543924,0.0002993523,0.00004682981,0.0001892015,0.000007794715],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008036852,"about_ca_system_score_gemma":0.00005154867,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0001117367,"about_ca_topic_score_gemma":0.000005470421,"domain_scores_codex":[0.9979479,0.00005967448,0.0007402906,0.0004650114,0.0002142766,0.0005728828],"domain_scores_gemma":[0.9985932,0.0001661397,0.00008050659,0.0005420407,0.0003445933,0.0002735057],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00005477503,0.00002253928,0.0003215966,0.002732815,0.00005697432,0.000001877274,0.0006461539,0.9939291,0.0001108751,0.00159002,0.0004487568,0.00008455679],"study_design_scores_gemma":[0.0009274358,0.00007979794,0.001316966,0.0004560823,0.00003421657,0.00002956174,0.0006029347,0.987239,0.0001290308,0.00001018196,0.008793256,0.0003815602],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.08249179,0.001074306,0.9099453,0.00004577907,0.001593485,0.002041443,0.0001714641,0.002345276,0.00029117],"genre_scores_gemma":[0.940212,0.0001436717,0.05852995,0.000005409868,0.0001319134,0.0003985776,0.00002907418,0.000103771,0.0004456839],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8577202,"threshold_uncertainty_score":0.9998978,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4220994088","doi":"10.1016/j.ress.2022.108474","title":"A review of risk-based decision-making models for microbiologically influenced corrosion (MIC) in offshore pipelines","year":2022,"lang":"en","type":"review","venue":"Reliability Engineering & System Safety","topic":"Corrosion Behavior and Inhibition","field":"Materials Science","cited_by":73,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs; Genome Canada","keywords":"Integrity management; Risk analysis (engineering); Subsea; Submarine pipeline; Risk management; Asset (computer security); Computer science; Engineering; Pipeline transport; Forensic engineering; Business; Computer security; Marine engineering; Environmental engineering","retraction":null,"screen_n_in":null,"score":{"opus":0.02510621662988352,"gpt":0.2948437137763777,"spread":0.2697374971464941,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004719283,0.0006387406,0.003006882,0.0002949229,0.0001317914,0.00002898389,0.0007085388,0.0004012147,0.0001628577],"category_scores_gemma":[0.002682613,0.0005080235,0.001026605,0.0007424583,0.00004944065,0.0001398397,0.0002062578,0.0004958548,0.000009977797],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001186668,"about_ca_system_score_gemma":0.0003560713,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002551914,"about_ca_topic_score_gemma":0.000004307202,"domain_scores_codex":[0.9945391,0.0004047388,0.003155534,0.001024501,0.0004133306,0.0004628302],"domain_scores_gemma":[0.9940422,0.003278848,0.001214833,0.001110554,0.0002623175,0.00009124295],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","study_design_scores_codex":[0.0002254011,0.0002805737,0.00001921151,0.6742861,0.000003726524,0.000007221796,0.00005534602,0.1354538,0.004145039,0.000109628,0.0001996037,0.1852144],"study_design_scores_gemma":[0.0005687128,0.0001932226,0.00001136921,0.7529049,0.0006119543,0.00003828948,0.00002340208,0.02216276,0.0001804442,0.00002885463,0.222213,0.001063164],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","genre_codex":"review","genre_gemma":"review","genre_scores_codex":[0.0005033656,0.9002067,0.09253208,0.000003646355,0.0009345482,0.003700936,0.001900977,0.0002110232,0.000006721975],"genre_scores_gemma":[0.00826016,0.9830784,0.007136118,0.00002090142,0.00005494128,0.001024046,0.0003455089,0.00007851411,0.000001449498],"genre_candidate":"review","genre_consensus":"review","teacher_disagreement_score":0.2220134,"threshold_uncertainty_score":0.9997371,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2088778725","doi":"10.1016/j.ress.2012.06.009","title":"The discrete additive Weibull distribution: A bathtub-shaped hazard for discontinuous failure data","year":2012,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Statistical Distribution Estimation and Applications","field":"Mathematics","cited_by":73,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Western University","funders":"","keywords":"Bathtub; Weibull distribution; Hazard; Failure rate; Reliability (semiconductor); Mathematics; Statistics; Weibull modulus; Function (biology); Hazard ratio; Applied mathematics; Computer science; Power (physics); Materials science; Physics; Confidence interval","retraction":null,"screen_n_in":null,"score":{"opus":0.03243546460428316,"gpt":0.306747582580015,"spread":0.2743121179757319,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001538647,0.0002672317,0.0003608871,0.00001547826,0.0004987861,0.00009307535,0.0005435616,0.000118639,0.0000377041],"category_scores_gemma":[0.004727584,0.0001946085,0.0001340606,0.0002244475,0.00009688994,0.0002544459,0.0001454362,0.0002039762,0.00005888731],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003699849,"about_ca_system_score_gemma":0.00005304723,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000006902827,"about_ca_topic_score_gemma":0.000006375691,"domain_scores_codex":[0.9978843,0.00008988869,0.0007484381,0.0004007404,0.0003098342,0.0005667777],"domain_scores_gemma":[0.994606,0.003336353,0.0001845091,0.001402994,0.000227184,0.0002429918],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00003635072,0.00008022795,0.00008162922,0.0004091535,0.00005754306,2.843227e-7,0.00006728015,0.0001050888,0.00004124261,0.9830608,0.01540641,0.0006539622],"study_design_scores_gemma":[0.001041944,0.00005117541,0.01346034,0.0003325403,0.0003221574,0.00003725276,0.0008026308,0.4281236,0.0001087897,0.004057673,0.550912,0.0007499413],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.0008096854,0.00007893016,0.9715387,0.001530735,0.0003423008,0.001373095,0.02373401,0.0004091451,0.0001833779],"genre_scores_gemma":[0.976923,0.000007725451,0.01738261,0.000008962846,0.0003479069,0.0006165396,0.004530428,0.00003803139,0.0001447566],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.9790031,"threshold_uncertainty_score":0.7935903,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3119241231","doi":"10.1016/j.ress.2021.107438","title":"Quantitative assessment of leakage orifices within gas pipelines using a Bayesian network","year":2021,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":72,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Memorial University of Newfoundland","funders":"Fundamental Research Funds for the Central Universities; Key Technologies Research and Development Program; PetroChina Innovation Foundation; Key Technology Research and Development Program of Shandong; National Natural Science Foundation of China","keywords":"Leakage (economics); Body orifice; Pipeline transport; Orifice plate; Engineering; Computer science; Reliability engineering; Mechanics; Mechanical engineering; Physics","retraction":null,"screen_n_in":null,"score":{"opus":0.04871725392657326,"gpt":0.3558100870375846,"spread":0.3070928331110113,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.008986663,0.0003259759,0.001203564,0.0002006931,0.0002250052,0.000140098,0.0005934032,0.000170029,0.00007755634],"category_scores_gemma":[0.002977109,0.0002629092,0.0005089578,0.002611621,0.00008522215,0.0003342872,0.0001426248,0.0003053971,0.00001748973],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003220557,"about_ca_system_score_gemma":0.0003887092,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002381784,"about_ca_topic_score_gemma":0.0001024332,"domain_scores_codex":[0.9939182,0.0007664175,0.002393046,0.0008924007,0.001587347,0.0004425227],"domain_scores_gemma":[0.9938462,0.002653566,0.0006871402,0.001450358,0.001176163,0.0001865121],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00003433177,0.00005163392,0.01509187,0.0002153322,0.00009365616,0.00002138362,0.0003666864,0.9702545,0.001733503,0.01159955,0.00004285887,0.0004947191],"study_design_scores_gemma":[0.0002273727,0.00004859459,0.01305345,0.0003726121,0.0001090669,0.00002193602,0.002730062,0.9810409,0.0004642114,0.0007858228,0.0008590693,0.0002868944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2213724,0.0006651428,0.7751312,0.0002948016,0.001145959,0.0002523251,0.00005130613,0.000128153,0.0009587673],"genre_scores_gemma":[0.8739893,0.00005442908,0.1256361,0.000007786251,0.0001560323,0.000007359656,0.00001033363,0.00002579077,0.0001127827],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.652617,"threshold_uncertainty_score":0.9999823,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4318562013","doi":"10.1016/j.ress.2023.109130","title":"A comparison study of centralized and decentralized federated learning approaches utilizing the transformer architecture for estimating remaining useful life","year":2023,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Air Quality Monitoring and Forecasting","field":"Environmental Science","cited_by":70,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Prognostics; Transformer; Raw data; Architecture; Computer science; Asset management; Federated learning; Data mining; Reliability engineering; Distributed computing; Engineering; Finance","retraction":null,"screen_n_in":null,"score":{"opus":0.05113267390719354,"gpt":0.2729952128577262,"spread":0.2218625389505327,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002901947,0.0002720893,0.0005693097,0.00004858916,0.0005654684,0.00006254835,0.0001876089,0.00009812205,0.000005159738],"category_scores_gemma":[0.0009682096,0.0002098443,0.0001098466,0.0005039594,0.00007560111,0.00009302006,0.00006777753,0.0003546524,0.000003125542],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001795678,"about_ca_system_score_gemma":0.00001506572,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002352758,"about_ca_topic_score_gemma":0.00001688584,"domain_scores_codex":[0.997454,0.0002745879,0.0008733802,0.0004759018,0.0003806928,0.0005413909],"domain_scores_gemma":[0.9982944,0.001073368,0.0002104529,0.0002606547,0.00001951515,0.0001416665],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001121804,0.00005660344,0.07603657,0.0006800362,0.00005040736,6.859937e-7,0.01279457,0.9060678,0.0005926701,0.00003493154,0.000007375328,0.003566113],"study_design_scores_gemma":[0.001043286,0.0001429656,0.04047639,0.0002759578,0.00006419948,0.000004953411,0.01798373,0.9392619,0.0001908595,0.000004899154,0.0003247515,0.0002260764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9062707,0.0000389425,0.09152085,0.00012234,0.0002244951,0.001309232,0.000006313548,0.0004238292,0.00008325507],"genre_scores_gemma":[0.9914712,0.000002967477,0.008309336,0.000002199651,0.0000546708,0.0000962657,0.00001084871,0.00004189194,0.00001058459],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.08520049,"threshold_uncertainty_score":0.8557203,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2074982381","doi":"10.1016/j.ress.2008.01.009","title":"Optimal design of multi-state weighted k-out-of-n systems based on component design","year":2008,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Component (thermodynamics); Mathematical optimization; Genetic algorithm; Reliability engineering; Selection (genetic algorithm); Optimization problem; State (computer science); Computer science; Mathematics; Engineering; Algorithm; Artificial intelligence","retraction":null,"screen_n_in":null,"score":{"opus":0.0196878663532699,"gpt":0.1992687426813941,"spread":0.1795808763281241,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001471443,0.0004501167,0.0009187488,0.0002260133,0.00007524523,0.00001305411,0.0003126337,0.0002224413,0.000006099348],"category_scores_gemma":[0.0001911052,0.0004299796,0.0002070203,0.0004025965,0.00009812321,0.0001401407,0.00002262989,0.0002793651,0.00001570133],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006174184,"about_ca_system_score_gemma":0.00009140633,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00004496493,"about_ca_topic_score_gemma":2.627803e-7,"domain_scores_codex":[0.9969693,0.0002599165,0.001364239,0.0004392342,0.0004869816,0.0004803077],"domain_scores_gemma":[0.9976972,0.000715824,0.0001990864,0.0009166027,0.0003070655,0.0001642092],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001995448,0.0001343037,0.0001072372,0.0024724,0.00005587515,0.000008618361,0.0003043471,0.9910156,0.005513983,0.00008710296,0.00005063786,0.00005036628],"study_design_scores_gemma":[0.0009696161,0.0001825933,0.0008230016,0.0008865427,0.00003109358,0.000009641342,0.00003650109,0.9884248,0.008135424,8.83404e-7,0.0001311482,0.0003687914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02137269,0.0002085545,0.9748217,0.00000910424,0.001164012,0.001560114,0.00006295037,0.0007171766,0.00008369787],"genre_scores_gemma":[0.8833448,0.00009508847,0.1163051,0.000001824489,0.00003360317,0.00009473934,0.00002013095,0.00008445769,0.0000202782],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.8619721,"threshold_uncertainty_score":0.9998152,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}