{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":10,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":10,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"5b8113af66a9","filters":{"venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition"}},"results":[{"id":"W2094008859","doi":"10.2118/89324-ms","title":"Prediction of Critical Foam Velocity for Effective Cuttings Transport in Horizontal Wells","year":2004,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Drilling; Mechanics; Petroleum engineering; Flow (mathematics); Volumetric flow rate; Critical ionization velocity; Drilling fluid; Materials science; Geotechnical engineering; Geology; Physics","authors":[{"name":"Yibing Li","is_ca":true},{"name":"Ergün Kuru","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01109561865947058,"gpt":0.2111174963836243,"spread":0.2000218777241538,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005795289,0.0003605569,0.0003853115,0.0004910972,0.0002686429,0.000547207,0.0004119109,0.000656441,0.0008172037],"category_scores_gemma":[0.002154369,0.0003206655,0.0002878727,0.0002780209,0.0006129961,0.0004857917,0.000273263,0.0004130774,0.0001295917],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001058489,"about_ca_system_score_gemma":0.001235421,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.006832188,"about_ca_topic_score_gemma":0.002382376,"domain_scores_codex":[0.9998636,0.00002942041,0.000005425957,0.0000208445,0.00004190986,0.00003870052],"domain_scores_gemma":[0.9989709,0.0006175928,0.000169993,0.00003716704,0.0001583191,0.0000461521],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004897472,0.00002170332,0.00340765,0.00001877775,0.000004546436,0.00009306204,0.00001920462,0.9796539,0.009033405,0.004417724,0.0001353066,0.003145763],"study_design_scores_gemma":[0.000002738766,0.00001293827,0.0002416123,0.00000200312,7.098262e-7,0.000005495487,0.000003276767,0.9978655,0.001528866,0.0003050345,0.00002961765,0.000002220515],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7279918,0.0001539144,0.2679746,0.0001177331,0.00001573192,0.00003766864,0.0001408457,0.0004427095,0.003125054],"genre_scores_gemma":[0.9944896,0.00002650519,0.005233584,0.000003713395,0.000001545902,0.00001358724,0.00002659548,0.000009691677,0.0001952562],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.006832188,"threshold_uncertainty_score":0.01358485,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2022907733","doi":"10.2118/74820-ms","title":"Horizontal Well Cleaning and Evaluation Using Concentric Coiled Tubing: A 3 Well Case Study from Australia","year":2002,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Coiled tubing; Concentric; Completion (oil and gas wells); Petroleum engineering; Directional drilling; Drawdown (hydrology); Wellbore; Drilling; Geology; Oil well; Oil field; Drilling fluid; Geotechnical engineering; Environmental geology; Well drilling; Engineering; Mechanical engineering; Aquifer; Metamorphic petrology","authors":[{"name":"Mike Kuchel","is_ca":false},{"name":"Jason K. Clark","is_ca":false},{"name":"Douglas Marques","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.05948866892249436,"gpt":0.2613191045414751,"spread":0.2018304356189807,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001220776,0.0004101791,0.0004555894,0.00101587,0.001264336,0.0006117212,0.0006790755,0.0008336591,0.0007611053],"category_scores_gemma":[0.001984502,0.0003329348,0.0004127314,0.0008393755,0.0006780289,0.0005344055,0.0005904597,0.0003026339,0.0001614078],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002188512,"about_ca_system_score_gemma":0.001062418,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.05098809,"about_ca_topic_score_gemma":0.1104872,"domain_scores_codex":[0.9989549,0.0002343668,0.00005861792,0.0001174228,0.0004874842,0.0001471847],"domain_scores_gemma":[0.9976667,0.0005115948,0.0003324693,0.0001661624,0.001179551,0.0001435896],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"case_report","study_design_scores_codex":[0.002135013,0.004681905,0.3574468,0.001746471,0.0002895886,0.02839144,0.03620028,0.06740512,0.30865,0.001443711,0.001674436,0.1899352],"study_design_scores_gemma":[0.000171891,0.01603383,0.6249376,0.0002876188,0.0004012584,0.006208227,0.05582972,0.08032141,0.1981966,0.0008335615,0.01650939,0.0002689585],"study_design_candidate":"case_report","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9980969,0.00003843296,0.00102468,0.00001765452,0.000001388301,0.0001044913,0.00002591149,0.00001289026,0.0006775697],"genre_scores_gemma":[0.9938164,0.0001000822,0.004422687,0.00001403641,0.000001511753,0.00003802781,0.0000546336,0.00000665682,0.001545937],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.05098809,"threshold_uncertainty_score":0.1013826,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2002006735","doi":"10.2118/94155-ms","title":"Online Detection of Coiled Tubing Anomalies on a Small Scale for Safe CT Operations","year":2005,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Non-Destructive Testing Techniques","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Corrosion; Guard (computer science); Magnetic flux leakage; Pipeline (software); Geology; Circumference; Scale (ratio); Computer science; Materials science; Engineering; Physics; Magnet; Composite material; Electrical engineering; Mechanical engineering; Geometry; Mathematics","authors":[{"name":"Paul Harbers","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02575287969720888,"gpt":0.2455538389636459,"spread":0.219800959266437,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007445294,0.0006343013,0.0004466082,0.001559772,0.0002720796,0.0005658473,0.0009177956,0.0005905131,0.01285531],"category_scores_gemma":[0.004662239,0.0003846065,0.0002711099,0.0004718157,0.0002730081,0.000824925,0.0006717393,0.0004321847,0.002596164],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003243375,"about_ca_system_score_gemma":0.0003518642,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001376093,"about_ca_topic_score_gemma":0.002749524,"domain_scores_codex":[0.999575,0.00010918,0.00003643558,0.0000656565,0.0001852735,0.00002846002],"domain_scores_gemma":[0.9938067,0.003103736,0.0004625821,0.001025827,0.001186177,0.0004149945],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.001496344,0.0001411536,0.02415963,0.0002613964,0.00005968445,0.0007464927,0.0003113117,0.009903735,0.43521,0.0009081498,0.01560987,0.5111923],"study_design_scores_gemma":[0.000229174,0.0006866214,0.06728773,0.00008283756,0.0001217631,0.001901496,0.0002856178,0.3927122,0.5092832,0.002285282,0.02499421,0.000129858],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1601969,0.0002005463,0.777167,0.0005208325,0.000107106,0.0002532714,0.0008525994,0.0560762,0.004625564],"genre_scores_gemma":[0.5696783,0.00007933516,0.4249118,0.0001063973,0.00006662575,0.0001419268,0.0006087524,0.001293343,0.003113365],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01285531,"threshold_uncertainty_score":0.04300535,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2075350984","doi":"10.2118/81730-ms","title":"New Life for Old Wells – A Case Study of the Effects of Re-Stimulating Gas Wells Using Fracturing Through Coiled Tubing and Snubbing Techniques","year":2003,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Hydraulic Fracturing and Reservoir Analysis","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Schlumberger (Canada)","funders":"","keywords":"Coiled tubing; Petroleum engineering; Geology","authors":[{"name":"Chad Gutor","is_ca":false},{"name":"Ali Al-Saleem","is_ca":true},{"name":"Bruce Rieger","is_ca":true},{"name":"Stephen Lemp","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01847237456901666,"gpt":0.2535104488507613,"spread":0.2350380742817446,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001844571,0.0004426042,0.0002764374,0.0006698811,0.00257605,0.001215063,0.001370154,0.001521508,0.002224077],"category_scores_gemma":[0.003177787,0.0002740368,0.0005059019,0.0005697259,0.001265923,0.0008356387,0.000791776,0.000996906,0.0002767758],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002772738,"about_ca_system_score_gemma":0.001358097,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01879444,"about_ca_topic_score_gemma":0.09828673,"domain_scores_codex":[0.9988804,0.0003861303,0.0000377397,0.00008396684,0.0004091189,0.0002025073],"domain_scores_gemma":[0.9967036,0.001736695,0.0003313507,0.0002666449,0.0005915277,0.0003701494],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"case_report","study_design_scores_codex":[0.003589549,0.01001165,0.1155995,0.002091182,0.0003122605,0.1364229,0.09373812,0.06661574,0.2032458,0.009926758,0.007308832,0.3511377],"study_design_scores_gemma":[0.000522312,0.04045047,0.2141023,0.0005964077,0.0004554889,0.02597989,0.270828,0.0628335,0.2161785,0.004885755,0.1625948,0.0005726559],"study_design_candidate":"case_report","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9938214,0.0001884747,0.001545574,0.0002311755,0.00001541658,0.000153932,0.00003581576,0.00003485634,0.003973317],"genre_scores_gemma":[0.9890486,0.0003565302,0.005283852,0.00007600369,0.00001125882,0.00005673694,0.00003720502,0.00001673293,0.00511315],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01879444,"threshold_uncertainty_score":0.03737009,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2022334076","doi":"10.2118/94179-ms","title":"Case History: Efficient Coiled-Tubing Sand Cleanout in a High-Angle Well Using a Complete Integrated Cleaning System","year":2005,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"ConocoPhillips (Canada)","funders":"","keywords":"Wellbore; Coiled tubing; Petroleum engineering; Directional drilling; Drilling; Oil well; Oil production; Engineering; Geology; Geotechnical engineering; Mechanical engineering","authors":[{"name":"M. J. Loveland","is_ca":true},{"name":"Jessica Pedota","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02265397796586299,"gpt":0.1956983248929881,"spread":0.1730443469271251,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004250055,0.001210077,0.0007346201,0.001458703,0.002494857,0.0009961749,0.001186586,0.005863779,0.002826631],"category_scores_gemma":[0.00328712,0.0005857054,0.001023694,0.001125748,0.001571245,0.001364949,0.001041422,0.004033888,0.0009001906],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001795547,"about_ca_system_score_gemma":0.001123409,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.009215224,"about_ca_topic_score_gemma":0.01568156,"domain_scores_codex":[0.9990488,0.0001198593,0.0001076077,0.0001516732,0.0002843442,0.0002875799],"domain_scores_gemma":[0.9984871,0.0004523854,0.0002818967,0.0001455455,0.0001531537,0.000479833],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"case_report","study_design_gemma":"case_report","study_design_scores_codex":[0.00008106105,0.0001073126,0.006312262,0.00007086938,0.00001800035,0.9836071,0.0005574479,0.0006895028,0.0009568586,0.001070702,0.001501811,0.005027079],"study_design_scores_gemma":[0.000009812909,0.0001850859,0.002848037,0.00005470519,0.00002828653,0.9868059,0.0006227805,0.001571913,0.003593317,0.0005224149,0.003730614,0.00002713568],"study_design_candidate":"case_report","study_design_consensus":"case_report","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9143062,0.004066329,0.02783147,0.01379775,0.0008829175,0.0004394803,0.0005590158,0.000480535,0.03763617],"genre_scores_gemma":[0.985247,0.0009266069,0.006380215,0.001412876,0.0002390984,0.00005188886,0.0001422187,0.00007187475,0.005528158],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.009215224,"threshold_uncertainty_score":0.01832318,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1971164986","doi":"10.2118/94163-ms","title":"Large Diameter Coiled Tubing Becomes Available Safely Offshore Through a Newly Developed Spoolable Connector: Case Histories and Field Implementation","year":2005,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Offshore Engineering and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Submarine pipeline; North sea; Coiled tubing; Welding; Butt welding; Cable gland; Marine engineering; Computer science; Engineering; Mechanical engineering; Geology; Geotechnical engineering","authors":[{"name":"Lewis E. Link","is_ca":false},{"name":"Lyle Laun","is_ca":false},{"name":"Kjell Tore Nesvik","is_ca":false},{"name":"Henning Boge","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02103036736883522,"gpt":0.2437158883540021,"spread":0.2226855209851669,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001244013,0.001305479,0.0005092334,0.001670131,0.002690926,0.001514069,0.001579407,0.004826459,0.003765933],"category_scores_gemma":[0.006332164,0.0007666766,0.0009232981,0.001388934,0.002677869,0.001646731,0.002161616,0.003246456,0.0009567286],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002457874,"about_ca_system_score_gemma":0.001252355,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.005473963,"about_ca_topic_score_gemma":0.01300708,"domain_scores_codex":[0.9982194,0.0005783896,0.0001656584,0.0001843345,0.00035561,0.0004966396],"domain_scores_gemma":[0.9970396,0.001028854,0.0005895644,0.0001655512,0.0002863391,0.0008901312],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"case_report","study_design_gemma":"case_report","study_design_scores_codex":[0.0000897333,0.0008615823,0.01888689,0.0001423778,0.00001428802,0.9675264,0.003435593,0.0003168768,0.0008215299,0.0006927224,0.0009148063,0.006297141],"study_design_scores_gemma":[0.00002069645,0.002035064,0.01860675,0.000297156,0.00003559704,0.9589467,0.008594609,0.001022961,0.00250748,0.0007090381,0.007157907,0.00006596635],"study_design_candidate":"case_report","study_design_consensus":"case_report","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9751776,0.001440479,0.004182606,0.00223796,0.0001434083,0.0005418363,0.0001281289,0.00005255172,0.01609533],"genre_scores_gemma":[0.9882659,0.001522169,0.002063371,0.0007716528,0.0001094945,0.0001025498,0.0000699542,0.00002990202,0.007064973],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.005473963,"threshold_uncertainty_score":0.01783317,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1984003475","doi":"10.2118/81708-ms","title":"Re-Completion Techniques on Shallow Gas Wells Using Coiled Tubing Conveyed Fracturing","year":2003,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Casing; Wellbore; Petroleum engineering; Completion (oil and gas wells); Geology; Coiled tubing; Hydraulic fracturing; Drilling; Natural gas field; Well stimulation; Petroleum; Reservoir engineering; Engineering; Natural gas; Paleontology; Mechanical engineering","authors":[{"name":"Darren Thatcher","is_ca":false},{"name":"Stephen Glanville","is_ca":false},{"name":"Dennis Zander","is_ca":false},{"name":"Harlan Jirges","is_ca":false},{"name":"Jon Weishoff","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02132947176391381,"gpt":0.2230742146356952,"spread":0.2017447428717814,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003750594,0.0003249318,0.0002839156,0.0006593371,0.0004822077,0.0003052689,0.0003750519,0.0002007492,0.001285572],"category_scores_gemma":[0.000632371,0.0001585372,0.0002361036,0.0003207111,0.0004571294,0.00034801,0.000350871,0.0003031289,0.0003274694],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003552303,"about_ca_system_score_gemma":0.000460631,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004345277,"about_ca_topic_score_gemma":0.01157207,"domain_scores_codex":[0.9996814,0.00003779482,0.00002194287,0.00004936054,0.0001502555,0.00005934092],"domain_scores_gemma":[0.9995302,0.0001065174,0.00009450931,0.00009477304,0.0001349241,0.00003911678],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0004394206,0.0001319062,0.005188147,0.0002253652,0.00001260828,0.0006081411,0.0008273933,0.007148061,0.9271065,0.0003251125,0.000239008,0.0577483],"study_design_scores_gemma":[0.00002247563,0.001787179,0.01104709,0.0000189788,0.00002448641,0.0005435038,0.0004628571,0.007225084,0.9746673,0.0001105881,0.004059158,0.00003131229],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"methods","genre_scores_codex":[0.9716336,0.0002566628,0.02619764,0.00002611766,0.00001660849,0.0001277719,0.00005568224,0.0002832946,0.001402769],"genre_scores_gemma":[0.9754765,0.0001265241,0.02233602,0.000005095196,0.000002431182,0.00002348462,0.00005781948,0.00002708802,0.001945052],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.004345277,"threshold_uncertainty_score":0.008639932,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2085073224","doi":"10.2118/81718-ms","title":"Inflatable CT Conveyed Selective Well Testing System for Logging Openhole and Horizontal Wellbores: Development and Use","year":2003,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"ConocoPhillips (Canada)","funders":"","keywords":"Inflatable; Logging; Petroleum engineering; Completion (oil and gas wells); Geology; Engineering; Mechanical engineering","authors":[{"name":"C. G. Blount","is_ca":true},{"name":"C. L. Crabtree","is_ca":true},{"name":"C. R. Pierson","is_ca":true},{"name":"S. B. Rennie","is_ca":true},{"name":"G. R. Mackenzie","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01956724802352725,"gpt":0.1993742902580684,"spread":0.1798070422345412,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001009106,0.0003827525,0.0002700733,0.0007619983,0.0002398869,0.0004298044,0.001180108,0.0004045681,0.002602384],"category_scores_gemma":[0.00129918,0.0001699555,0.0001554143,0.0003655912,0.0004231704,0.0007707609,0.0003360919,0.0002190426,0.0005522975],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002657913,"about_ca_system_score_gemma":0.0006224079,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001441315,"about_ca_topic_score_gemma":0.001705458,"domain_scores_codex":[0.9993788,0.00008557763,0.00005619002,0.0001085016,0.0003334723,0.00003743919],"domain_scores_gemma":[0.9985836,0.0002632086,0.0001500731,0.0002261558,0.0006837883,0.00009320958],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0007698531,0.0002681671,0.02488047,0.0002443553,0.00002612633,0.0006964587,0.0006618005,0.003695318,0.7777304,0.001347923,0.001656078,0.188023],"study_design_scores_gemma":[0.0002105471,0.00566099,0.04839759,0.00008454431,0.0001256417,0.00243977,0.0004079998,0.07683248,0.8433931,0.000438257,0.02189513,0.0001139078],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"methods","genre_scores_codex":[0.6439355,0.0002670916,0.341584,0.0001482043,0.00005299617,0.000894789,0.0007468649,0.008465861,0.00390479],"genre_scores_gemma":[0.8455583,0.0001174789,0.1500784,0.00006323975,0.00001299897,0.0002855734,0.0006644078,0.0001044215,0.003115105],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.002602384,"threshold_uncertainty_score":0.008705914,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2065129484","doi":"10.2118/74840-ms","title":"Shallow Gas Pilot for Coiled Tubing Drilling: A Case History","year":2002,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Coiled tubing; Drilling; CTD; Drill; Petroleum engineering; Plan (archaeology); Geology; Engineering; Mechanical engineering; Oceanography; Paleontology","authors":[{"name":"Arvell Bass","is_ca":false},{"name":"B. J. Staal","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04425353607101064,"gpt":0.1998396024825234,"spread":0.1555860664115127,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004182162,0.001708698,0.0006505167,0.001933923,0.003030525,0.00117303,0.0009768802,0.005428372,0.003460487],"category_scores_gemma":[0.005415909,0.0008723098,0.0007892253,0.001707528,0.001842801,0.001730056,0.001223985,0.002887025,0.0006360248],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001986807,"about_ca_system_score_gemma":0.001063031,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004479902,"about_ca_topic_score_gemma":0.01148478,"domain_scores_codex":[0.99896,0.0001900428,0.00007006915,0.0001341493,0.000216688,0.0004290132],"domain_scores_gemma":[0.9984107,0.0005606066,0.0003064062,0.0001054457,0.00007611677,0.0005406361],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"case_report","study_design_gemma":"case_report","study_design_scores_codex":[0.00002240374,0.00006832603,0.003301514,0.0000281812,0.000004998999,0.9936565,0.0004062771,0.0001181204,0.0002079192,0.0003590179,0.0003364664,0.001490206],"study_design_scores_gemma":[0.000008325947,0.00009620773,0.002161591,0.00001889056,0.000005556531,0.9952334,0.0006291903,0.0003056779,0.0002458644,0.0002234038,0.001062382,0.000009554005],"study_design_candidate":"case_report","study_design_consensus":"case_report","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9678753,0.002747323,0.004465248,0.003539852,0.0004122099,0.0001919749,0.0001558147,0.0001190038,0.02049327],"genre_scores_gemma":[0.994427,0.0006828539,0.0009872231,0.0005315653,0.0001654735,0.0000315371,0.00004554632,0.00002088351,0.003107849],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.005428372,"threshold_uncertainty_score":0.01441532,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1980188112","doi":"10.2118/89660-ms","title":"High Rate Stimulation Using 2 7/8\" Coiled Tubing Zonal Isolation Straddle Packer","year":2004,"lang":"en","type":"article","venue":"SPE/ICoTA Coiled Tubing Conference and Exhibition","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"ConocoPhillips (Canada)","funders":"","keywords":"Straddle; Coiled tubing; Petroleum engineering; Well stimulation; Geology; Stimulation; Isolation (microbiology); Operator (biology); Engineering; Marine engineering; Neuroscience; Reservoir engineering; Chemistry; Petroleum; Paleontology; Business; Biology; Bioinformatics","authors":[{"name":"Helge Halvorsen","is_ca":false},{"name":"Kjetil Ormark","is_ca":true},{"name":"Alistair MacCleod","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0175842980313853,"gpt":0.2116756465926912,"spread":0.1940913485613059,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002065648,0.0001889976,0.0002261287,0.0003453158,0.000280059,0.0002389467,0.000266328,0.0001767546,0.003130059],"category_scores_gemma":[0.0002102462,0.0001072503,0.0001458406,0.000193719,0.0003390622,0.0002346371,0.0003624888,0.0001608438,0.0006983062],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002153139,"about_ca_system_score_gemma":0.0003484843,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0007329873,"about_ca_topic_score_gemma":0.00202305,"domain_scores_codex":[0.9998314,0.00002392251,0.00001218672,0.00003154942,0.00005524078,0.00004569888],"domain_scores_gemma":[0.9998205,0.00005698706,0.00003048012,0.00002250504,0.00003913979,0.00003040354],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","study_design_scores_codex":[0.0001568915,0.00002817694,0.001532751,0.00009000803,0.000003399385,0.0001495133,0.0001755078,0.0006769637,0.9780937,0.0001906293,0.0002158478,0.0186866],"study_design_scores_gemma":[0.00003559503,0.0008597648,0.01452158,0.00001736051,0.00001907544,0.0004254258,0.0002068479,0.005281541,0.9647777,0.0001103348,0.01371775,0.00002713397],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9350238,0.0003664517,0.05727515,0.0001005639,0.00005441833,0.0001624376,0.00007492933,0.0007375095,0.006204702],"genre_scores_gemma":[0.9700355,0.0001357645,0.02473644,0.00005566514,0.0000175338,0.00005667163,0.00006310082,0.00004677356,0.004852518],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.003130059,"threshold_uncertainty_score":0.01047105,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}