{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":27,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":27,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"53f36e675aec","filters":{"venue":"The Electricity Journal"}},"results":[{"id":"W2030608828","doi":"10.1016/j.tej.2011.09.009","title":"Ontario Feed-in-Tariffs: System Planning Implications and Impacts on Social Welfare","year":2011,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":31,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Welfare; Economics; Social Welfare; Economic surplus; Public economics; Microeconomics; Market economy; Political science","authors":[{"name":"Mehrdad Pirnia","is_ca":false},{"name":"Jatin Nathwani","is_ca":false},{"name":"David Fuller","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0542991203160872,"gpt":0.2913114893992256,"spread":0.2370123690831384,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.000645124,0.00007477755,0.0001095875,0.00008332409,0.001772133,0.00009668717,0.0002325379,0.00006800407,0.0000468207],"category_scores_gemma":[0.00007605073,0.00005855524,0.00004244776,0.0002713558,0.00008053896,0.0001229126,0.00001094048,0.0004966651,0.000006146184],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009332888,"about_ca_system_score_gemma":0.0004831908,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.4217708,"about_ca_topic_score_gemma":0.5730256,"domain_scores_codex":[0.9990706,0.0001053909,0.0001515049,0.00009214519,0.0001849194,0.0003953926],"domain_scores_gemma":[0.9995465,0.00005826202,0.0001468171,0.0000694669,0.00003541264,0.0001435942],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","study_design_scores_codex":[0.0001362519,0.00007064996,0.04987418,0.000007549681,0.00005143476,0.00005315498,0.2096592,0.000005212646,0.00008028443,0.7113907,0.02214103,0.006530359],"study_design_scores_gemma":[0.0002349147,0.00005137688,0.9675778,0.00002916985,0.00001422661,0.0000863501,0.001633233,0.000005691064,0.00002880665,0.002488516,0.02773975,0.0001101627],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9353532,0.000130458,0.00003541395,0.01736909,0.0001024316,0.0001379527,0.000009654643,0.00001786214,0.04684399],"genre_scores_gemma":[0.9984339,0.00001936816,0.000008380448,0.0005851512,0.0003162517,0.000002924654,1.869056e-7,0.000005036086,0.0006288206],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.9177036,"threshold_uncertainty_score":0.9995274,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2612902751","doi":"10.1016/j.tej.2017.03.011","title":"An integrated reconfigurable control and self-organizing communication framework for community resilience microgrids","year":2017,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Ottawa","funders":"","keywords":"Resilience (materials science); Control (management); Electricity; Microgrid; Computer science; Mains electricity; Risk analysis (engineering); Distributed computing; Computer security; Telecommunications; Business; Engineering; Electrical engineering","authors":[{"name":"Lei Wu","is_ca":false},{"name":"Jie Li","is_ca":false},{"name":"Melike Erol‐Kantarci","is_ca":true},{"name":"Burak Kantarcı","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.009136105385163686,"gpt":0.2371547338232681,"spread":0.2280186284381044,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.001372403,0.0001265016,0.0001736691,0.00005083521,0.002887831,0.00066938,0.000809494,0.00009790745,0.000008583113],"category_scores_gemma":[0.0003148991,0.0000957473,0.0000382841,0.00008291567,0.0000651137,0.00039265,0.00001494358,0.00103056,0.000001716013],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00006079676,"about_ca_system_score_gemma":0.00003328468,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007818223,"about_ca_topic_score_gemma":0.00006714519,"domain_scores_codex":[0.9991131,0.0002639989,0.0002216749,0.00007022559,0.00007554815,0.0002554011],"domain_scores_gemma":[0.9986357,0.0003394859,0.000166981,0.0005969586,0.0001835651,0.00007732667],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0008546158,0.0008253222,0.009371226,0.0001856105,0.00113394,0.000006327133,0.01259792,0.07396444,0.2568618,0.005382068,0.005123293,0.6336935],"study_design_scores_gemma":[0.00282759,0.0004694976,0.0180402,0.000170629,0.0002302564,0.0003237953,0.0006278905,0.9318023,0.02024872,0.02001324,0.004708933,0.000536919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4766147,0.005277171,0.5157238,0.001141808,0.0002179743,0.000485539,0.00001348854,0.0002398009,0.0002857526],"genre_scores_gemma":[0.9847326,0.00287614,0.01211068,0.0001246297,0.0001115803,0.000009581737,0.000004544944,0.00002248597,0.000007785387],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8578379,"threshold_uncertainty_score":0.9984103,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2904333925","doi":"10.1016/j.tej.2018.11.005","title":"Including electricity imports in California’s cap-and-trade program: A case study of a border carbon adjustment in practice","year":2018,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Energy, Environment, and Transportation Policies","field":"Energy","cited_by":25,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"University of British Columbia","funders":"University of British Columbia; Pacific Institute for Climate Solutions; Department of Water Resources","keywords":"Opposition (politics); Electricity; Obligation; Emissions trading; Economics; Politics; International economics; International trade; Business; Political science; Engineering; Greenhouse gas; Law","authors":[{"name":"Stefan U. Pauer","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01919325722068561,"gpt":0.3124294453023512,"spread":0.2932361880816656,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001183857,0.0002207943,0.0003337647,0.0003799702,0.0002011506,0.00003266906,0.000162534,0.00008848163,0.0000158903],"category_scores_gemma":[0.0001396171,0.0001665647,0.00005167893,0.0009546494,0.00009638293,0.0001534019,0.00002936012,0.0006646519,6.803661e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002379339,"about_ca_system_score_gemma":0.00009866455,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.04849843,"about_ca_topic_score_gemma":0.05057617,"domain_scores_codex":[0.9975795,0.0004790366,0.0007463029,0.0002403325,0.0004320472,0.000522769],"domain_scores_gemma":[0.9989845,0.0002102191,0.0004470299,0.000212097,0.00004034675,0.0001058337],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.001697074,0.01668771,0.7490799,0.00007881076,0.001104867,0.008652808,0.08697296,0.01367544,0.006348356,0.002904548,0.0001277534,0.1126697],"study_design_scores_gemma":[0.02326577,0.01488195,0.8091961,0.0002520192,0.002041281,0.0410658,0.05086607,0.0225647,0.01686499,0.004307002,0.01227855,0.002415798],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9970689,0.0008380879,0.0000271409,0.0004231057,0.00005918363,0.0004716875,0.00000155381,0.00002369515,0.00108664],"genre_scores_gemma":[0.9988165,0.0005775731,0.0001192196,0.0002326301,0.0001602276,0.00004817238,0.000001351752,0.00002535553,0.00001895813],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1102539,"threshold_uncertainty_score":0.9667484,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4210254026","doi":"10.1016/j.tej.2022.107080","title":"Does dynamic pricing work in a winter-peaking climate? A case study of Hydro Quebec","year":2022,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Hydro-Québec; Desjardins","funders":"","keywords":"Work (physics); Environmental science; Hydro power; Hydroelectricity; Climate change; Economics; Meteorology; Geography; Engineering; Water resource management; Oceanography; Geology; Electrical engineering","authors":[{"name":"Frédéric Pelletier","is_ca":true},{"name":"Ahmad Faruqui","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.005218323653306488,"gpt":0.2152296105036873,"spread":0.2100112868503808,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00139229,0.0001626974,0.0002831848,0.0004853412,0.0003653228,0.00006205864,0.0003428405,0.00003001266,0.0000323223],"category_scores_gemma":[0.00004250208,0.0001075449,0.00006376926,0.001903095,0.000009897553,0.0001391587,0.00008447008,0.0009749011,0.000001054008],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0009652987,"about_ca_system_score_gemma":0.00005413246,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00133912,"about_ca_topic_score_gemma":0.005814121,"domain_scores_codex":[0.9979951,0.0004353012,0.0006114849,0.0001389387,0.0003719051,0.0004472725],"domain_scores_gemma":[0.9993062,0.0001705596,0.0002200126,0.0002209873,0.00003966188,0.00004256987],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001093785,0.0003512198,0.01454538,0.000040285,0.0001512015,0.001967271,0.02059563,0.9532728,0.001344742,0.000007851229,0.00007665245,0.007537595],"study_design_scores_gemma":[0.002857954,0.0009684218,0.006651565,0.0001687275,0.0001689895,0.02032422,0.02009005,0.9473903,0.0005594752,0.00009503324,0.00008545647,0.0006397968],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9906868,0.0004205104,0.007832327,0.00004032085,0.0004027478,0.0004196141,0.00000106649,0.00007933863,0.0001172971],"genre_scores_gemma":[0.9997334,0.00002921,0.00007129943,0.00001227556,0.0000436797,0.00002914616,5.110988e-7,0.00003779746,0.00004271743],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.01835695,"threshold_uncertainty_score":0.4385553,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3087617280","doi":"10.1016/j.tej.2020.106848","title":"Rising market concentration in Texas’s retail electricity market","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Expansive; Competition (biology); Electricity retailing; Retail market; Electricity market; Market concentration; Market power; Electricity; Business; Market economy; Commerce; Market structure; Wholesale market; Industrial organization; Economics; Marketing; Monopoly; Engineering","authors":[{"name":"David P. Brown","is_ca":true},{"name":"Jay Zarnikau","is_ca":false},{"name":"Parviz Adib","is_ca":false},{"name":"Chen-Hao Tsai","is_ca":false},{"name":"C.K. Woo","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01065402921383122,"gpt":0.1967203963961414,"spread":0.1860663671823102,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001345904,0.0002637116,0.0003371785,0.0001587178,0.0002028093,0.0002158977,0.0004592542,0.0001405152,0.0004084658],"category_scores_gemma":[0.0004259854,0.0002210937,0.0000997473,0.002042954,0.00002391525,0.0003969092,0.00002192618,0.00123101,0.00002930197],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005511958,"about_ca_system_score_gemma":0.00013249,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001482706,"about_ca_topic_score_gemma":0.00001372015,"domain_scores_codex":[0.9974601,0.0004674719,0.0006690776,0.0002185298,0.0004788299,0.0007059604],"domain_scores_gemma":[0.9990945,0.0002378991,0.0001864583,0.0001861931,0.0001089488,0.000185997],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.001456742,0.0002871813,0.05372428,0.0003491401,0.0007536598,0.000416742,0.004418326,0.2227388,0.04687472,0.0006283489,0.5800429,0.08830921],"study_design_scores_gemma":[0.0009672788,0.0001550964,0.008408359,0.00004496564,0.00004591975,0.0003293144,0.00002267807,0.9785608,0.007732931,0.0002529322,0.003111816,0.0003678994],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.3919959,0.009842015,0.4856802,0.005681108,0.001125078,0.0015588,0.000008676084,0.0009581683,0.10315],"genre_scores_gemma":[0.9975608,0.0009699686,0.0003489786,0.0004099384,0.0004204483,0.000005466992,0.000002448673,0.00005022676,0.0002317481],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7558221,"threshold_uncertainty_score":0.9015939,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1966350762","doi":"10.1016/j.tej.2014.04.010","title":"Notes from a Small Market: The Energy-only Market in Alberta","year":2014,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Market power; Variety (cybernetics); Investment (military); Factor market; Market microstructure; Industrial organization; Nonmarket forces; Market analysis; Economics; Business; Market share analysis; Market rate; Market economy; Order (exchange); Marketing; Finance; Computer science; Politics; Monopoly; Political science","authors":[{"name":"Derek Olmstead","is_ca":false},{"name":"Matt J. Ayres","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.00459220662865685,"gpt":0.168137729561559,"spread":0.1635455229329021,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001322824,0.0002096572,0.0002325489,0.000159225,0.0001983451,0.0001611591,0.0006456369,0.0001033499,0.0001998536],"category_scores_gemma":[0.0004384559,0.0001287416,0.00008952004,0.0007222137,0.00002262223,0.0001107553,0.0000300685,0.0006556583,0.00001579275],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001859261,"about_ca_system_score_gemma":0.00006061188,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001362092,"about_ca_topic_score_gemma":0.002883704,"domain_scores_codex":[0.9981515,0.0005450841,0.0004069115,0.0001446271,0.000261216,0.0004906497],"domain_scores_gemma":[0.9976458,0.001766998,0.0001193083,0.0003411812,0.00005077391,0.00007591623],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0009587902,0.0004464785,0.04913099,0.000101127,0.001655168,0.00009047901,0.006017924,0.2056599,0.01293458,0.008286385,0.2480216,0.4666965],"study_design_scores_gemma":[0.0007398456,0.00007698641,0.01732537,0.00006613755,0.00005782959,0.0003931755,0.00001381911,0.9614257,0.001984503,0.003849541,0.01372289,0.0003441805],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2298522,0.004659791,0.6705217,0.004709256,0.001433127,0.0004542602,0.000005509509,0.0002478819,0.0881163],"genre_scores_gemma":[0.9974849,0.000426126,0.0002788501,0.0002898102,0.0004710848,0.000009612245,0.000001801222,0.00004572577,0.0009921195],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.7676327,"threshold_uncertainty_score":0.5249931,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3110236022","doi":"10.1016/j.tej.2020.106878","title":"High electrification futures: Impacts to the U.S. bulk power system","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"","funders":"National Renewable Energy Laboratory; Pacific Northwest National Laboratory; Office of Energy Efficiency; U.S. Department of Energy; Office of Energy Efficiency and Renewable Energy; Environmental Defense Fund; Natural Resources Canada","keywords":"Electrification; Futures contract; Environmental economics; Natural resource economics; Electricity; Rural electrification; Business; Economics; Engineering; Electrical engineering; Finance","authors":[{"name":"Caitlin Murphy","is_ca":false},{"name":"Trieu Mai","is_ca":false},{"name":"Yinong Sun","is_ca":false},{"name":"Paige Jadun","is_ca":false},{"name":"Paul Donohoo-Vallett","is_ca":false},{"name":"Matteo Muratori","is_ca":false},{"name":"Ryan Jones","is_ca":false},{"name":"Brent Nelson","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.006635990697534596,"gpt":0.1794587249971947,"spread":0.1728227342996601,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005665313,0.0001742655,0.0001584558,0.00008829718,0.0003832571,0.0001914357,0.0006650009,0.00004661527,0.00003859725],"category_scores_gemma":[0.00008841282,0.00009963124,0.00008268407,0.000918719,0.00000932289,0.00009416448,0.00002405342,0.0005933474,0.0002197771],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002958294,"about_ca_system_score_gemma":0.00003996923,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0000196482,"about_ca_topic_score_gemma":0.000008885145,"domain_scores_codex":[0.9986531,0.0001033676,0.0002812367,0.0001266955,0.0003941282,0.0004415374],"domain_scores_gemma":[0.9993276,0.00006355481,0.00006928066,0.0002824851,0.00006508722,0.0001919841],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00007785448,0.00001702813,0.00004198117,0.00003269179,0.0002950686,0.00002188496,0.001596914,0.7120569,0.01921777,0.008070293,0.2538852,0.004686379],"study_design_scores_gemma":[0.002146205,0.001362756,0.03036903,0.0001571871,0.0004932142,0.001178097,0.00174039,0.2489314,0.1525287,0.0005461929,0.5588276,0.001719189],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.6970564,0.003889285,0.2292118,0.05707343,0.003596617,0.001048354,0.000006645905,0.001212637,0.006904867],"genre_scores_gemma":[0.9963473,0.0001553858,0.00009746099,0.001515174,0.00179241,0.0000133077,0.000001312154,0.00003722977,0.00004038497],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4631256,"threshold_uncertainty_score":0.4062844,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2606814356","doi":"10.1016/j.tej.2017.01.011","title":"Modeling the value of integrated U.S. and Canadian power sector expansion","year":2017,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Renewable energy; Electricity; Environmental economics; Electric power system; Flexibility (engineering); Variable renewable energy; Electric power transmission; Grid; Transmission system; Business; Software deployment; Transmission (telecommunications); Industrial organization; Economics; Natural resource economics; Telecommunications; Power (physics); Engineering; Electrical engineering","authors":[{"name":"Philipp Beiter","is_ca":false},{"name":"Wesley Cole","is_ca":false},{"name":"Daniel Steinberg","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008719455630106055,"gpt":0.1977402026130146,"spread":0.1890207469829085,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005229388,0.0001031691,0.0001179658,0.000103212,0.0006583671,0.000161015,0.0003443222,0.00007135446,0.00002099165],"category_scores_gemma":[0.0001199987,0.00005532977,0.00003552877,0.0001066675,0.00003489594,0.0001715391,0.00001156073,0.0004491793,0.00000179244],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001542265,"about_ca_system_score_gemma":0.0001340192,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.03466326,"about_ca_topic_score_gemma":0.0111004,"domain_scores_codex":[0.999323,0.00006645254,0.0001983504,0.00005811159,0.0001323999,0.0002217286],"domain_scores_gemma":[0.9994301,0.00002384762,0.00007135683,0.0002476115,0.0001512411,0.00007590288],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008765874,0.000002838053,0.0001643256,0.000004002412,0.00005966979,0.000003417347,0.0005356511,0.9911495,0.005161331,0.001022415,0.0004062211,0.001481882],"study_design_scores_gemma":[0.0001156307,0.0000210449,0.0005286367,0.00004054722,0.00001579598,0.0001340318,0.0001073871,0.9949849,0.003502636,0.0002764894,0.0001998129,0.00007306941],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.960236,0.0006588969,0.03584852,0.0003848349,0.000410722,0.00008976986,0.000003734534,0.00002788246,0.002339625],"genre_scores_gemma":[0.9994923,0.0001909833,0.0001195742,0.0000395772,0.00008072024,0.000001648321,0.000001000287,0.00001986441,0.00005432016],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.0392563,"threshold_uncertainty_score":0.971765,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W1977381041","doi":"10.1016/j.tej.2012.03.003","title":"Assessing the Economic Value of Transmission in Alberta's Restructured Electricity Market","year":2012,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Electricity market; Economic shortage; Electricity; Clearing; Transmission (telecommunications); Electricity retailing; Business; Economics; Natural resource economics; Environmental economics; Industrial organization; Engineering; Finance; Telecommunications","authors":[{"name":"C.K. Woo","is_ca":false},{"name":"Hao Liu","is_ca":false},{"name":"Fredrich Kahrl","is_ca":false},{"name":"Nick Schlag","is_ca":false},{"name":"Jack Moore","is_ca":false},{"name":"A. Olson","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.00649132535944546,"gpt":0.2313022458841206,"spread":0.2248109205246752,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002054135,0.0002060133,0.0002909843,0.0002468402,0.0002144034,0.0001059111,0.000473245,0.000124658,0.00006989377],"category_scores_gemma":[0.0001119349,0.0001272129,0.0001113942,0.0007529789,0.00003029269,0.0005459951,0.00001420298,0.0008478471,0.000004793741],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000630298,"about_ca_system_score_gemma":0.0001488738,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0002267895,"about_ca_topic_score_gemma":0.00003157169,"domain_scores_codex":[0.9978704,0.0005128972,0.0006102048,0.0001065384,0.0002625503,0.0006373656],"domain_scores_gemma":[0.9988247,0.0005753069,0.0002171706,0.0002489785,0.00003574936,0.00009814442],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002867117,0.0002165273,0.03568154,0.0001997563,0.0006575292,0.00001147271,0.006309611,0.7773494,0.06235185,0.003811886,0.0199956,0.0931281],"study_design_scores_gemma":[0.0009717517,0.00009026643,0.07878652,0.000103781,0.0001285303,0.000998626,0.00005932038,0.8703258,0.04422583,0.001816669,0.002055537,0.0004373764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9024276,0.004705117,0.08267665,0.0004952655,0.0007071867,0.0004140956,9.734488e-7,0.00006290898,0.008510205],"genre_scores_gemma":[0.9986565,0.0004709057,0.0004249605,0.00003471491,0.0002795091,0.000005295972,9.481765e-7,0.00003747327,0.00008966132],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.09622893,"threshold_uncertainty_score":0.5187591,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2039417394","doi":"10.1016/j.tej.2007.02.005","title":"How Effective Are M&amp;As in Distribution? Evaluating the Government's Policy of Using Mergers and Amalgamations to Drive Efficiencies into Ontario's LDCs","year":2007,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":10,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Restructuring; Incentive; Scope (computer science); Government (linguistics); Distribution (mathematics); Industrial organization; Welfare; Economics; Business; Public economics; Microeconomics; Finance; Market economy; Computer science","authors":[{"name":"Frank J. Cronin","is_ca":false},{"name":"Stephen A. Motluk","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02588968658275412,"gpt":0.3485487290078418,"spread":0.3226590424250877,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.003056764,0.00008892949,0.0001360556,0.00007024562,0.001313462,0.0001467948,0.0002556993,0.00004562466,0.000008360504],"category_scores_gemma":[0.00364329,0.00006151599,0.00005438708,0.001096544,0.0002473941,0.0001617348,0.00003630512,0.0003531518,8.417352e-7],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002704696,"about_ca_system_score_gemma":0.0007549793,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.4665592,"about_ca_topic_score_gemma":0.7575458,"domain_scores_codex":[0.9982903,0.0003130051,0.0001976135,0.0001043157,0.0006904518,0.0004043302],"domain_scores_gemma":[0.9986565,0.0006775927,0.0003124865,0.0001000138,0.0001200013,0.000133434],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"qualitative","study_design_gemma":"observational","study_design_scores_codex":[0.0005991578,0.0002207962,0.1217599,0.00002913563,0.0002290774,0.00002355995,0.6330253,0.009355683,0.03131705,0.1213264,0.004376302,0.07773756],"study_design_scores_gemma":[0.0008088606,0.0003594551,0.9402021,0.000185337,0.0001012393,0.00007134533,0.022915,0.0008417377,0.00383323,0.01458583,0.01569923,0.0003967097],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9824628,0.0001288453,0.002888489,0.0137013,0.00005253317,0.0003118457,0.00001579134,0.000003545044,0.0004348374],"genre_scores_gemma":[0.9987112,0.00002683048,0.00008172596,0.0004923242,0.0002162505,0.000003513539,2.534111e-7,0.000004134813,0.0004637882],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8184421,"threshold_uncertainty_score":0.9999867,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4221006047","doi":"10.1016/j.tej.2022.107109","title":"Do gentailers charge higher residential electricity prices in the Texas retail electricity market?","year":2022,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Housing Market and Economics","field":"Economics, Econometrics and Finance","cited_by":8,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Alberta","funders":"","keywords":"Electricity; Electricity retailing; Competition (biology); Business; Electricity market; Electricity pricing; Market power; Retail market; Industrial organization; Commerce; Marketing; Microeconomics; Economics; Engineering; Electrical engineering","authors":[{"name":"David P. Brown","is_ca":true},{"name":"Chen-Hao Tsai","is_ca":false},{"name":"Jay Zarnikau","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02870049609125515,"gpt":0.2186858013558014,"spread":0.1899853052645462,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow","sts","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.009862284,0.0003868233,0.0006642148,0.0008231656,0.001924624,0.0006844795,0.002162417,0.0001386476,0.006445696],"category_scores_gemma":[0.0002757185,0.0003180583,0.0003925163,0.002401515,0.00009330537,0.0004691283,0.0002355199,0.002672378,0.0002442562],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001224303,"about_ca_system_score_gemma":0.00019472,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005079312,"about_ca_topic_score_gemma":0.00008858934,"domain_scores_codex":[0.9958565,0.0005335081,0.001357487,0.0006166966,0.0003171476,0.001318712],"domain_scores_gemma":[0.9974905,0.0004673256,0.001190024,0.0006607772,0.00005558612,0.0001358411],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"not_applicable","study_design_scores_codex":[0.003186772,0.002485805,0.4284819,0.00007849035,0.001009998,0.0004126527,0.005459451,0.001702171,0.0005825217,0.1328489,0.3991316,0.02461986],"study_design_scores_gemma":[0.004656568,0.001283905,0.3482023,0.00002156144,0.0001578935,0.001499063,0.000438308,0.01384344,0.0004440774,0.1295946,0.4976889,0.002169236],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.870385,0.004455564,0.0005421844,0.005755771,0.00132989,0.0006737656,0.00003517065,0.00006406977,0.1167586],"genre_scores_gemma":[0.9921379,0.002374447,0.00005583614,0.001722927,0.0008385792,0.00004760706,0.000007228541,0.00006094751,0.002754542],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1217529,"threshold_uncertainty_score":0.9999272,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3113787841","doi":"10.1016/j.tej.2020.106903","title":"Going viral: The impacts of covid19 on retail electricity","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Remuneration; Electricity; Business; Business model; Key (lock); Coronavirus disease 2019 (COVID-19); Mains electricity; Grid; Industrial organization; Environmental economics; Commerce; Economics; Marketing; Finance; Engineering; Computer science; Computer security; Medicine","authors":[{"name":"Russell William Houldin","is_ca":true},{"name":"Bunli Yang","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01493091647588092,"gpt":0.2050543992581141,"spread":0.1901234827822331,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007590021,0.0002017675,0.0002380098,0.0000996599,0.0002533175,0.00008431358,0.0006900472,0.00005276393,0.00006022416],"category_scores_gemma":[0.0002845543,0.0001176013,0.0001502211,0.0008641244,0.00003864856,0.000114859,0.00005185435,0.0009809644,0.00004968684],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001744058,"about_ca_system_score_gemma":0.00004637011,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001483807,"about_ca_topic_score_gemma":0.000005086553,"domain_scores_codex":[0.998371,0.0001629543,0.0003723634,0.0001239523,0.0004916718,0.0004780488],"domain_scores_gemma":[0.9991359,0.0002658406,0.0001418519,0.0002711481,0.00005498913,0.0001303298],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0003767967,0.00009812702,0.001886004,0.00009858864,0.0008830011,0.00006176629,0.001450971,0.7724646,0.06821132,0.005898836,0.12954,0.01903005],"study_design_scores_gemma":[0.001993512,0.001698783,0.01741249,0.0001038861,0.0003621296,0.000270064,0.0001087839,0.6324952,0.2631586,0.002089471,0.07944274,0.0008644103],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9641712,0.001508709,0.01872858,0.00655323,0.0004458248,0.0002801829,0.000003177933,0.0002565677,0.008052547],"genre_scores_gemma":[0.9970179,0.0007027225,0.00004949586,0.001505852,0.0006382406,0.000003425864,7.670639e-7,0.0000378614,0.00004379622],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1949472,"threshold_uncertainty_score":0.4795641,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4412651215","doi":"10.1016/j.tej.2025.107484","title":"Electricity market design with increasing renewable generation: Lessons from Alberta","year":2025,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":true},"ca_institutions":"SGS (Canada); University of Calgary; University of Alberta","funders":"Social Sciences and Humanities Research Council; Social Sciences and Humanities Research Council of Canada; Canada First Research Excellence Fund; University of Alberta","keywords":"Renewable energy; Electricity market; Electricity generation; Electricity; Electricity retailing; Natural resource economics; Business; Environmental economics; Industrial organization; Economics; Engineering; Power (physics); Electrical engineering","authors":[{"name":"David P. Brown","is_ca":true},{"name":"Derek Olmstead","is_ca":true},{"name":"Blake Shaffer","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01283685839725097,"gpt":0.2163718713744744,"spread":0.2035350129772235,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012923,0.0002857638,0.0003242653,0.0003167623,0.0006537886,0.0003463425,0.0004797228,0.0001357789,0.0001015679],"category_scores_gemma":[0.0002715743,0.0002081636,0.00007160307,0.001913703,0.00002663149,0.0002991429,0.0000229394,0.0006888261,0.000009656016],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0005517367,"about_ca_system_score_gemma":0.0003294814,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001201124,"about_ca_topic_score_gemma":0.0005318341,"domain_scores_codex":[0.9977371,0.0006349362,0.0004456826,0.0002363884,0.0003608024,0.0005851021],"domain_scores_gemma":[0.998392,0.0008228285,0.0001449589,0.0003609299,0.0001768355,0.0001024687],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0004497197,0.0001031362,0.001393991,0.00002511614,0.000974498,0.00003323807,0.0003716427,0.772737,0.04269202,0.0004558778,0.1695028,0.01126098],"study_design_scores_gemma":[0.0009044864,0.0001285367,0.0009320567,0.00009814005,0.0002235526,0.0004293163,0.00001454166,0.9370506,0.05619309,0.0011743,0.002459462,0.0003918551],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.02978459,0.002821145,0.9507341,0.0009700449,0.000349172,0.0003494562,0.000002134886,0.0001742112,0.01481517],"genre_scores_gemma":[0.9895933,0.0006595617,0.00683629,0.0002305881,0.0004560053,0.00002303109,0.000007918493,0.00005139145,0.002141904],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.9598087,"threshold_uncertainty_score":0.8488667,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2086789394","doi":"10.1016/j.tej.2013.03.003","title":"British Columbia Electricity Supply Gap Strategy: A Redefinition of Self-Sufficiency","year":2013,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":5,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Mandate; Electricity; Economic shortage; Revenue; Mains electricity; Business; Liquefied natural gas; Natural resource economics; Electricity retailing; Self-sufficiency; Economics; Natural gas; Electricity market; Finance; Power (physics); Waste management; Engineering; Government (linguistics)","authors":[{"name":"Amy Sopinka","is_ca":false},{"name":"Lawrence Pitt","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01635729497783912,"gpt":0.2451533510476377,"spread":0.2287960560697986,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001194395,0.00008904083,0.0002026383,0.00006230392,0.001183455,0.0007808275,0.0005491452,0.0001101767,0.002449561],"category_scores_gemma":[0.0004892753,0.0001053039,0.0001322812,0.00112057,0.0002095068,0.0003222972,0.00001680326,0.0005751726,0.00003361661],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003375025,"about_ca_system_score_gemma":0.00119992,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.6754573,"about_ca_topic_score_gemma":0.372266,"domain_scores_codex":[0.9977653,0.0004050328,0.0003724882,0.0001531385,0.0006057416,0.0006983106],"domain_scores_gemma":[0.9987308,0.0002090687,0.0003952043,0.000144013,0.0002906582,0.0002301972],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"observational","study_design_scores_codex":[0.0000200926,0.0004507785,0.006404075,0.00001780352,0.00009234759,0.00003759693,0.005253826,0.00001712998,0.001878993,0.03120538,0.9122311,0.04239091],"study_design_scores_gemma":[0.002116473,0.001551136,0.5507569,0.000193395,0.0002181021,0.001492848,0.001691157,0.001046108,0.0007225703,0.3036331,0.1353255,0.001252635],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9453812,0.0005527305,0.00008998431,0.003447582,0.0001166547,0.0003709466,0.00002655828,0.0000456362,0.04996869],"genre_scores_gemma":[0.993924,0.00134561,0.00006732173,0.0006761796,0.0004468362,0.000009521267,9.296442e-7,0.00001069696,0.003518872],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7769055,"threshold_uncertainty_score":0.9984623,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2079541384","doi":"10.1016/j.tej.2013.12.009","title":"Are Residential Customers Price-Responsive to an Inclining Block Rate? Evidence from British Columbia","year":2014,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Energy Efficiency and Management","field":"Energy","cited_by":5,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Block (permutation group theory); Agricultural economics; Price elasticity of demand; Business; Economics; Microeconomics; Mathematics","authors":[{"name":"Michael Li","is_ca":false},{"name":"Ren Orans","is_ca":false},{"name":"Jenya Kahn-Lang","is_ca":false},{"name":"C.K. Woo","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01745747018116184,"gpt":0.2581131267570665,"spread":0.2406556565759047,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.002647087,0.0001581065,0.0002839048,0.0001251304,0.001175804,0.001051705,0.0009264583,0.00009299776,0.0003330085],"category_scores_gemma":[0.002436168,0.0001761352,0.0001140478,0.0007299352,0.00006208054,0.00036139,0.000176662,0.0006381979,0.00008782472],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001795527,"about_ca_system_score_gemma":0.00009678912,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.03851433,"about_ca_topic_score_gemma":0.1029129,"domain_scores_codex":[0.9967193,0.001265775,0.0004691975,0.0003701404,0.0005646295,0.0006109715],"domain_scores_gemma":[0.9978688,0.0007464014,0.0004513618,0.0004064058,0.0002503547,0.0002766693],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.001977027,0.0008669669,0.01078895,0.00003773102,0.0008191059,0.001142217,0.005594976,0.4565871,0.05092822,0.001522472,0.2839049,0.1858304],"study_design_scores_gemma":[0.003619777,0.00257512,0.7452521,0.001321617,0.0006849171,0.0008733787,0.001788921,0.01965867,0.009236627,0.01506302,0.1975925,0.002333421],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9929432,0.000279459,0.003191445,0.001116021,0.0005723743,0.0001486304,0.000002341548,0.00008499315,0.001661577],"genre_scores_gemma":[0.992753,0.000153647,0.0003008808,0.002858925,0.001096149,0.00001186121,0.000001537994,0.00003156702,0.00279238],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7344631,"threshold_uncertainty_score":0.9999853,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2790046275","doi":"10.1016/j.tej.2018.01.007","title":"A framework for assessing economic and environmental benefits from transmission line rehabilitation investments","year":2018,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Queen's University","funders":"","keywords":"Rehabilitation; Business; Line (geometry); Electric power transmission; Transmission (telecommunications); Environmental economics; Natural resource economics; Industrial organization; Economics; Environmental planning; Risk analysis (engineering); Engineering; Environmental science; Telecommunications; Electrical engineering; Medicine","authors":[{"name":"Şener Salcı","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0077723794714399,"gpt":0.2342570622431668,"spread":0.2264846827717269,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002634833,0.0001076425,0.0001161953,0.00004414476,0.0003314637,0.0001158063,0.00009385831,0.00008173609,0.00006207291],"category_scores_gemma":[0.00004723385,0.00007906916,0.00004814181,0.00004321298,0.00007108331,0.0002615654,0.000008885811,0.0002632838,0.000001604836],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002772716,"about_ca_system_score_gemma":0.00002722461,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000008434419,"about_ca_topic_score_gemma":0.00000273312,"domain_scores_codex":[0.9993657,0.00004698093,0.0002039468,0.0001080654,0.00007728073,0.0001980678],"domain_scores_gemma":[0.9994196,0.0003490747,0.00004689174,0.00009924663,0.00001307192,0.00007213878],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0003483795,0.0001305374,0.01452895,0.00007834459,0.0003589097,0.000001857582,0.009081385,0.01205563,0.02478466,0.00581128,0.00221459,0.9306055],"study_design_scores_gemma":[0.0007901788,0.000489449,0.07260658,0.00004713775,0.00007750548,0.0000408541,0.0005239253,0.1512244,0.006777786,0.7640994,0.003063251,0.0002595352],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7827402,0.0006188338,0.215991,0.000302252,0.000136093,0.0001331106,0.000006758777,0.00002258982,0.00004915574],"genre_scores_gemma":[0.980894,0.0001262708,0.01832594,0.0001051849,0.0005172988,0.00000465746,0.000005736054,0.00001594327,0.000004920631],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.930346,"threshold_uncertainty_score":0.3224347,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4404515272","doi":"10.1016/j.tej.2024.107447","title":"Is it worthwhile to participate in transactive energy? A decision-making model for empowering residential customers","year":2024,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false},"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Hydro-Québec","keywords":"Transactive memory; Business; Group decision-making; Decision-making models; Environmental economics; Knowledge management; Marketing; Computer science; Psychology; Economics; Social psychology","authors":[{"name":"Alejandro Parrado-Duque","is_ca":true},{"name":"Nilson Henao","is_ca":true},{"name":"Kodjo Agbossou","is_ca":true},{"name":"Sousso Kélouwani","is_ca":true},{"name":"Juan C. Oviedo-Cepeda","is_ca":true},{"name":"J.A. Domínguez-Jiménez","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02161008208650388,"gpt":0.296763006032032,"spread":0.2751529239455281,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006575909,0.0001881642,0.0001933635,0.0005047421,0.0001535633,0.0002223745,0.0003167677,0.0000543899,0.00005235808],"category_scores_gemma":[0.00004279728,0.000155258,0.0001501635,0.0008329017,0.00001131988,0.0002299183,0.0000289458,0.0003845178,0.00001397804],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003796213,"about_ca_system_score_gemma":0.00005471393,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00002012902,"about_ca_topic_score_gemma":0.0002884992,"domain_scores_codex":[0.9984843,0.00003165515,0.0003790874,0.0002088236,0.0003226702,0.0005735098],"domain_scores_gemma":[0.999411,0.0002547521,0.00002581016,0.0001741439,0.00003652108,0.00009781483],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009567063,0.00001102122,0.000008269853,0.00001467492,0.0001186257,0.00003385554,0.002960492,0.9611528,0.000612893,0.0002307769,0.009739266,0.02502166],"study_design_scores_gemma":[0.0002021787,0.00003822049,0.00008828167,0.0002018162,0.00005370667,0.00002682261,0.00009250327,0.990545,0.002033777,0.002881627,0.003641478,0.0001946054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1542783,0.0005489478,0.843015,0.0006510603,0.000654112,0.0001452826,0.000004389419,0.00009930089,0.0006036646],"genre_scores_gemma":[0.9976322,0.0002019338,0.001233499,0.000333174,0.0002796265,0.00007018007,3.895707e-7,0.00005787681,0.0001911101],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.8433539,"threshold_uncertainty_score":0.6331237,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4223474842","doi":"10.1016/j.tej.2022.107111","title":"Impact of COVID-19 on Ontario’s electricity market: Load, generation, emissions","year":2022,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"COVID-19 impact on air quality","field":"Environmental Science","cited_by":3,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"University of Waterloo","funders":"","keywords":"Coronavirus disease 2019 (COVID-19); Electricity; Electricity generation; Electricity market; 2019-20 coronavirus outbreak; Severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2); Business; Economics; Environmental science; Natural resource economics; Engineering; Power (physics); Electrical engineering; Virology; Medicine; Physics","authors":[{"name":"Mehrdad Pirnia","is_ca":true},{"name":"Menna Elsarague","is_ca":true},{"name":"Fuat Can Beylunioğlu","is_ca":true},{"name":"Mohamed Hassan Ahmed","is_ca":true},{"name":"Jatin Nathwani","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.03926787702152481,"gpt":0.3255572967687366,"spread":0.2862894197472118,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00459383,0.000261128,0.0003076497,0.0001468822,0.002016769,0.00007219065,0.0009591052,0.00006107897,0.05421864],"category_scores_gemma":[0.001653354,0.000182072,0.0003735488,0.001358259,0.0001268439,0.0001770794,0.0002799377,0.001520077,0.00005095016],"about_ca_system_candidate":true,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.01788703,"about_ca_system_score_gemma":0.002836834,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.04716056,"about_ca_topic_score_gemma":0.006811102,"domain_scores_codex":[0.9953417,0.001394943,0.0005870587,0.0003309683,0.001685276,0.0006600604],"domain_scores_gemma":[0.9977102,0.0005687109,0.0005730927,0.0005412829,0.00004207538,0.0005646487],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"observational","study_design_scores_codex":[0.001249588,0.001328965,0.2262439,0.000006233248,0.0001880456,0.00004877324,0.005182437,0.1043472,0.05439064,0.00009698047,0.6003534,0.006563852],"study_design_scores_gemma":[0.003503948,0.005411771,0.842612,0.000008231097,0.000184275,0.001858414,0.0001659985,0.02193473,0.005653383,0.007473751,0.1100845,0.001108971],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9878312,0.00006774955,0.00346325,0.003992398,0.0001479864,0.0003628665,0.00002732236,0.00003895227,0.004068297],"genre_scores_gemma":[0.9932555,0.00003115506,0.0000717862,0.00326961,0.0001244244,0.00001487698,0.000003903809,0.00002099727,0.003207752],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6163681,"threshold_uncertainty_score":0.9992825,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4390296028","doi":"10.1016/j.tej.2023.107352","title":"Congestion unpriced: Inefficiency and gaming in Ontario’s two-schedule electricity market design","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"Canada Energy Regulator","funders":"","keywords":"Inefficiency; Schedule; Electricity market; Electricity; Payment; Congestion management; Economics; Shadow price; Microeconomics; Business; Industrial organization; Electric power system; Finance; Power (physics); Engineering","authors":[{"name":"David M. Brown","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.0145601781668439,"gpt":0.2108239442300857,"spread":0.1962637660632418,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002736568,0.0002375184,0.0002777041,0.0006880559,0.0002709017,0.0001570869,0.00029397,0.0001079718,0.00004601735],"category_scores_gemma":[0.0002682915,0.0001986136,0.00004821496,0.002614579,0.00002561441,0.0002832443,0.00003136357,0.001120649,0.00002096725],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0008646016,"about_ca_system_score_gemma":0.0002014856,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0008799386,"about_ca_topic_score_gemma":0.002526016,"domain_scores_codex":[0.9978715,0.0003366927,0.0004849206,0.0002083917,0.0003749552,0.000723586],"domain_scores_gemma":[0.999041,0.0004563111,0.0001247538,0.0001792603,0.00008709465,0.0001116027],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000160393,0.0001011576,0.01646671,0.0000491927,0.0001394915,0.0001362236,0.002463929,0.9298981,0.01731643,0.0003878186,0.007533997,0.02534649],"study_design_scores_gemma":[0.0009688032,0.0001560536,0.05252593,0.00005437049,0.00003760033,0.000610666,0.000035191,0.94168,0.002752271,0.0006591819,0.0001930672,0.0003269255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.7875956,0.001149227,0.2070371,0.0002017508,0.0003971745,0.0005137194,6.493776e-7,0.0003793697,0.002725469],"genre_scores_gemma":[0.9982008,0.0004676766,0.0007183197,0.00003765335,0.00009367365,0.00001872214,0.000002043907,0.00004018755,0.0004209506],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2106052,"threshold_uncertainty_score":0.8099228,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2553061511","doi":"10.1016/j.tej.2016.10.012","title":"KWh effects of residential optional dynamic pricing: Winter evidence from British Columbia, Canada","year":2016,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Housing Market and Economics","field":"Economics, Econometrics and Finance","cited_by":2,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"Education University of Hong Kong","keywords":"Environmental science; Economics","authors":[{"name":"C.K. Woo","is_ca":false},{"name":"Jay Zarnikau","is_ca":false},{"name":"Raymond Li","is_ca":false},{"name":"Alice Shiu","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.008945166370225435,"gpt":0.1826578952517356,"spread":0.1737127288815102,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007496375,0.00009815815,0.0003432084,0.00006350292,0.0002509724,0.0002655247,0.0004665543,0.00006552109,0.0006485076],"category_scores_gemma":[0.0006358599,0.0001059406,0.0001255629,0.0001547525,0.00006654278,0.0002984741,0.00006070827,0.0002511206,0.00003292063],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0006484478,"about_ca_system_score_gemma":0.000313901,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.5466466,"about_ca_topic_score_gemma":0.8388489,"domain_scores_codex":[0.9986346,0.00005932544,0.0006437491,0.0002293894,0.00008514156,0.0003478092],"domain_scores_gemma":[0.9983959,0.0006477949,0.0005847208,0.0002152998,0.00006174808,0.00009448705],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"observational","study_design_gemma":"observational","study_design_scores_codex":[0.0002493904,0.000200677,0.8138676,0.00009038617,0.0007147363,0.0001694558,0.0003830886,0.000129905,0.005150646,0.0004640862,0.1049303,0.07364969],"study_design_scores_gemma":[0.001579283,0.0002016064,0.9443283,0.0005772226,0.0000553664,0.0002937384,0.00001347621,0.001019829,0.0008991039,0.04565765,0.00484953,0.0005248802],"study_design_candidate":"observational","study_design_consensus":"observational","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9884396,0.001760436,0.00679146,0.001020794,0.0009588566,0.0001139896,0.00003336552,0.000009684256,0.0008718714],"genre_scores_gemma":[0.9963325,0.001772684,0.0001331719,0.000151574,0.0002966232,0.000003005798,0.000001175317,0.00001967944,0.001289547],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2922024,"threshold_uncertainty_score":0.7100704,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2603591328","doi":"10.1016/j.tej.2017.03.002","title":"Ontario electricity: When prophecy failed but rent collection succeeded","year":2017,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Economic rent; Electricity; Restructuring; Electricity market; Economics; Electricity retailing; Market economy; Business; Natural resource economics; Engineering; Finance","authors":[{"name":"Russell William Houldin","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02824680165880255,"gpt":0.279530114149326,"spread":0.2512833124905235,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["sts","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.001616119,0.0001588515,0.0002288015,0.000121095,0.008875934,0.001152716,0.001123053,0.0001288536,0.0005501529],"category_scores_gemma":[0.001178129,0.0001226615,0.0001588571,0.0002749974,0.0002548002,0.0004988778,0.00004404125,0.0009822935,0.00005925527],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002224578,"about_ca_system_score_gemma":0.002936791,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.8002728,"about_ca_topic_score_gemma":0.8971743,"domain_scores_codex":[0.9976742,0.0003044537,0.0002887532,0.000203964,0.0007213785,0.00080731],"domain_scores_gemma":[0.9983814,0.0001129888,0.0006247773,0.0003704763,0.000216248,0.0002941391],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0007276128,0.0002956977,0.03461391,0.00001082768,0.0003281611,0.0001502864,0.05650308,0.00002348219,0.002112331,0.03292412,0.8197308,0.0525797],"study_design_scores_gemma":[0.001487149,0.0003937568,0.1483791,0.00004931164,0.0001237763,0.0002028817,0.000312867,0.0001889095,0.002814914,0.0535205,0.7919536,0.00057323],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.8778836,0.0002658895,0.0005022001,0.05342511,0.0007904784,0.0005550623,0.000007674555,0.00004410451,0.0665259],"genre_scores_gemma":[0.895844,0.0002384753,0.00004705315,0.001025349,0.00138855,0.000009876113,3.847118e-7,0.00001204392,0.1014343],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.1137652,"threshold_uncertainty_score":0.9998842,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4382929299","doi":"10.1016/j.tej.2023.107288","title":"Impact of multiyear rate plans on power distributor productivity: Evidence from Alberta","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Productivity; Revenue; Economics; Incentive; Attrition; Empirical evidence; Industrial organization; Operations management; Natural resource economics; Microeconomics; Macroeconomics; Finance","authors":[{"name":"Mark Newton Lowry","is_ca":false},{"name":"David A. Hovde","is_ca":false},{"name":"Rebecca Kavan","is_ca":false},{"name":"Matthew Makos","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01461743408252965,"gpt":0.249633774204101,"spread":0.2350163401215714,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008080049,0.0001826748,0.0002535493,0.0001899423,0.0001254879,0.00006554174,0.0003495668,0.00006950191,0.0000577215],"category_scores_gemma":[0.000880228,0.0001226422,0.0001386262,0.001225171,0.00002022456,0.0002252118,0.0000206521,0.0005105171,0.0001070174],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003034886,"about_ca_system_score_gemma":0.00008880151,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003833588,"about_ca_topic_score_gemma":0.00004538713,"domain_scores_codex":[0.9985759,0.0002168647,0.0003245282,0.0001565893,0.0003152471,0.0004108176],"domain_scores_gemma":[0.9984779,0.0008715743,0.0001452786,0.0003235714,0.00009655783,0.00008509783],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","study_design_scores_codex":[0.000504849,0.0001690869,0.04072668,0.00003824808,0.001061518,0.00005097798,0.003161882,0.7343106,0.1738298,0.00004537126,0.04176389,0.004337156],"study_design_scores_gemma":[0.001308106,0.001442879,0.4807764,0.0005170459,0.0001677694,0.0002209541,0.00003646886,0.436193,0.07759084,0.0005344434,0.0004145177,0.0007975501],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9873856,0.0002690554,0.01118078,0.0002266482,0.0003722454,0.0002173272,0.00003374988,0.0001305545,0.0001840052],"genre_scores_gemma":[0.9993369,0.0002137461,0.0000292174,0.000006238061,0.0001701216,0.000005387282,0.000008932464,0.00003465475,0.0001948192],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.4400497,"threshold_uncertainty_score":0.5001205,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W2079593790","doi":"10.1016/j.tej.2007.10.005","title":"Export Demand Response in the Ontario Electricity Market","year":2007,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Mains electricity; Economics; Supply and demand; Mean reversion; Industrial organization; Business; Electricity retailing; Demand shock; Electricity price; Electricity demand; Monetary economics; Market economy; International economics; Commerce; Microeconomics; Electricity generation; Financial economics; Power (physics); Engineering","authors":[{"name":"Nash Peerbocus","is_ca":false},{"name":"Angelo Melino","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.007685336472541902,"gpt":0.2102668677291225,"spread":0.2025815312565805,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01255286,0.0002419791,0.0002510619,0.0004364646,0.0003362406,0.000156303,0.0007235694,0.0001344663,0.0001032727],"category_scores_gemma":[0.0003037986,0.0001526587,0.000108609,0.001781343,0.00002701648,0.0002185794,0.00001736056,0.001563987,0.00001641581],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.001174706,"about_ca_system_score_gemma":0.0002128833,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0003339324,"about_ca_topic_score_gemma":0.003518077,"domain_scores_codex":[0.9970857,0.0006171977,0.0006584924,0.0001602056,0.0006213652,0.0008570752],"domain_scores_gemma":[0.9983632,0.0009516447,0.0001494708,0.0003488708,0.0000893864,0.00009745355],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"observational","study_design_scores_codex":[0.0232592,0.001690934,0.18936,0.0001679971,0.001604395,0.00472439,0.07968129,0.1962563,0.0608488,0.001423022,0.3825811,0.05840255],"study_design_scores_gemma":[0.003125948,0.001173446,0.8591169,0.0001046454,0.0001773216,0.01326424,0.000365271,0.07522385,0.01753398,0.002248094,0.0263926,0.001273756],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.834699,0.001177086,0.1519388,0.0002947445,0.0003125519,0.0003789568,4.683402e-7,0.00009791971,0.01110046],"genre_scores_gemma":[0.9984223,0.0001458894,0.0002326764,0.0002380534,0.0002236094,0.00000850749,8.809782e-7,0.00003316459,0.0006949622],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.6697568,"threshold_uncertainty_score":0.6794832,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4376105984","doi":"10.1016/j.tej.2023.107267","title":"Walk the line: The paradoxical complexities of US/Canada energy trade","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Global Energy Security and Policy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Context (archaeology); Electricity; Legislation; Renewable energy; International trade; Business; Politics; Energy policy; Emissions trading; Economy; Natural resource economics; Economics; Political science; Greenhouse gas; Engineering; Geography; Law","authors":[{"name":"Laura T.W. Olive","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01881910848802898,"gpt":0.2338932260981594,"spread":0.2150741176101304,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006731278,0.0001816672,0.0002406939,0.0000596982,0.0009004182,0.00007657143,0.001090672,0.00007482628,0.0001239629],"category_scores_gemma":[0.0001517425,0.00008154377,0.0001873928,0.0009955068,0.0002462453,0.00005484155,0.00007826047,0.0007000589,0.000009824615],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00009036376,"about_ca_system_score_gemma":0.000407788,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.4003188,"about_ca_topic_score_gemma":0.4024237,"domain_scores_codex":[0.9977243,0.0005482798,0.000407537,0.0001116976,0.0006291786,0.0005790336],"domain_scores_gemma":[0.9984899,0.0007992463,0.000204743,0.0003544769,0.0000524953,0.00009918768],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00005998476,0.00002850685,0.0000167842,0.000003574955,0.0001323093,0.00001909543,0.0004417709,0.01482854,0.0003062385,0.8976886,0.07931026,0.007164348],"study_design_scores_gemma":[0.0003204651,0.0001072175,0.003593398,0.00001244361,0.00005664694,0.0004772516,0.0002807033,0.005185219,0.004796562,0.07731167,0.9077012,0.0001572248],"study_design_candidate":"not_applicable","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.72227,0.004478794,0.0001939224,0.1873873,0.001621854,0.0001935344,0.00006479453,0.0001780633,0.08361168],"genre_scores_gemma":[0.9924814,0.0007391028,0.0000045843,0.004671107,0.001133256,0.000004970908,0.000005339828,0.00001716315,0.00094315],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.828391,"threshold_uncertainty_score":0.692538,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4413293409","doi":"10.1016/j.tej.2025.107496","title":"Does energy policy scholarship consider energy resilience? A bibliometric analysis and agenda for reform","year":2025,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Global Energy Security and Policy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Scholarship; Resilience (materials science); Energy (signal processing); Political science; Energy policy; Environmental economics; Public economics; Economic system; Economics; Regional science; Public administration; Sociology; Economic growth; Renewable energy; Engineering; Physics; Electrical engineering","authors":[{"name":"Shardul Tiwari","is_ca":true},{"name":"A. M. Chakrabarty","is_ca":false},{"name":"Chelsea Schelly","is_ca":false},{"name":"Mostafa Sahraei‐Ardakani","is_ca":false},{"name":"Jianli Chen","is_ca":false},{"name":"Ge Ou","is_ca":false}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01637272366726606,"gpt":0.3042743000794386,"spread":0.2879015764121726,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["bibliometrics"],"consensus_categories":["bibliometrics"],"category_scores_codex":[0.001091236,0.0003019475,0.0004943365,0.0418011,0.001119875,0.000474296,0.0006669524,0.000227529,0.0000619714],"category_scores_gemma":[0.001186909,0.0001649854,0.0003933385,0.119976,0.0001831983,0.0003381355,0.0001306233,0.0004630434,0.000001788011],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004330443,"about_ca_system_score_gemma":0.0005091852,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.03564977,"about_ca_topic_score_gemma":0.01644599,"domain_scores_codex":[0.9974152,0.0003756123,0.0005675249,0.0003525877,0.0004259686,0.0008630696],"domain_scores_gemma":[0.998027,0.0006419219,0.000288443,0.0004379049,0.000371248,0.0002334789],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.0001598128,0.00006343709,0.0004111215,0.00000995357,0.001077523,0.000009828604,0.00008253467,0.0005747894,0.0006979964,0.9041898,0.002011898,0.09071135],"study_design_scores_gemma":[0.001255128,0.0001938447,0.01176314,0.00003092217,0.0009445323,0.0001697158,0.00009198962,0.001367879,0.0203495,0.3854223,0.5779854,0.0004256013],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.525042,0.03493982,0.0804242,0.08401871,0.002551163,0.0005747438,0.0001882702,0.0006229915,0.2716381],"genre_scores_gemma":[0.9817653,0.004430129,0.0002499478,0.00677653,0.0006330556,0.00002079378,0.000008854586,0.00001908667,0.006096334],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.5759735,"threshold_uncertainty_score":0.9707719,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3195749126","doi":"10.1016/j.tej.2021.107012","title":"Electricity as a service and local control: Responding to a post-Covid world","year":2021,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Housing, Finance, and Neoliberalism","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"University of Toronto","funders":"","keywords":"Coronavirus disease 2019 (COVID-19); Electricity; Service (business); Business; Focus (optics); Control (management); Mains electricity; Economics; Electricity market; Industrial organization; Public economics; Environmental economics; Market economy; Marketing; Engineering; Electrical engineering; Management","authors":[{"name":"Russell William Houldin","is_ca":true},{"name":"Bunli Yang","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.01733016952879615,"gpt":0.2322558846031608,"spread":0.2149257150743646,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001569343,0.0002418155,0.0005460317,0.0009390421,0.0007272441,0.0003594783,0.0003916747,0.0001024031,0.000260709],"category_scores_gemma":[0.0002444999,0.0002223627,0.0001476136,0.003455049,0.00004613327,0.0002524446,0.00008254973,0.0008500459,0.0003083371],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003093295,"about_ca_system_score_gemma":0.0002585921,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.0005358312,"about_ca_topic_score_gemma":0.0006348089,"domain_scores_codex":[0.9978898,0.0001411525,0.0006677072,0.0004307986,0.0001225399,0.0007480608],"domain_scores_gemma":[0.9984931,0.0002692851,0.0003736685,0.0003205641,0.0002237728,0.0003196003],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","study_design_scores_codex":[0.004099431,0.0008564216,0.02471079,0.000129153,0.0009952276,0.001717224,0.01217474,0.002075129,0.01926262,0.8625094,0.01825597,0.05321394],"study_design_scores_gemma":[0.006400753,0.001064487,0.03779106,0.0001325525,0.0001286043,0.006693496,0.0003061928,0.01001384,0.008411594,0.05873032,0.8686545,0.001672528],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.922389,0.00582538,0.03308843,0.02247833,0.0003429978,0.000245521,0.00003135619,0.00005374333,0.01554524],"genre_scores_gemma":[0.9685084,0.0004807213,0.0002591017,0.02616739,0.0003963287,0.000008503177,0.000002058042,0.00003706035,0.00414045],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8503986,"threshold_uncertainty_score":0.9067689,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W4248428443","doi":"10.1016/j.tej.2013.06.011","title":"Now Coal-Free, Is Ontario Ahead of Schedule, or Behind?","year":2013,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"routes":{"ca_aff":false,"ca_fund":false,"ca_venue":false,"about_ca":true},"ca_institutions":"","funders":"","keywords":"Coal; Schedule; Economics; Operations management; Engineering; Waste management; Management","authors":[],"retraction":null,"screen_n_in":null,"score":{"opus":0.02223710843427774,"gpt":0.2734723726245197,"spread":0.2512352641902419,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006838409,0.00008775343,0.0001599259,0.00006691394,0.0007080036,0.0001268075,0.0007628333,0.00007885954,0.003081738],"category_scores_gemma":[0.0003587714,0.00005799842,0.00009879602,0.0002856849,0.0002021138,0.0002699321,0.00003105806,0.0005347216,0.0001109625],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0004030518,"about_ca_system_score_gemma":0.001775104,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_topic_score_codex":0.6879509,"about_ca_topic_score_gemma":0.9011075,"domain_scores_codex":[0.9985755,0.0001390154,0.0002355518,0.00009123352,0.0004938815,0.0004647886],"domain_scores_gemma":[0.9990013,0.0001651504,0.0002550017,0.0002127084,0.0001544806,0.0002113747],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","study_design_scores_codex":[0.00005075442,0.00006501235,0.006754179,0.000003631029,0.00005706227,0.000009312829,0.02009259,0.000005609291,0.0001814002,0.006121897,0.9616346,0.00502395],"study_design_scores_gemma":[0.0009661454,0.0002854017,0.1145098,0.0000541311,0.00005726779,0.0001398512,0.0004938329,0.00006173977,0.002857732,0.03864577,0.8416142,0.0003140676],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9123772,0.0003493191,0.0001519032,0.05969142,0.0002415857,0.00025856,0.00002210972,0.00001365149,0.02689425],"genre_scores_gemma":[0.911062,0.0002655362,0.0001616088,0.004721384,0.0006803037,0.000004244324,1.949617e-7,0.000009131424,0.08309557],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.2131566,"threshold_uncertainty_score":0.9978296,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}