{"meta":{"page":1,"per_page":50,"max_per_page":100,"total":2,"total_is_capped":false,"direct_labels_cover":0,"predictions_cover":2,"direct_label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline (scores rank; they never assert a category)","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12","author_layer_release":"2026-06-26"},"query_hash":"8667ba46226f","filters":{"venue":"Tunnel Construction"}},"results":[{"id":"W2363794717","doi":"","title":"Study on Double-O-Tube Tunnel Construction","year":2011,"lang":"en","type":"article","venue":"Tunnel Construction","topic":"Civil and Geotechnical Engineering Research","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Canadian Precast Prestressed Concrete Institute","funders":"","keywords":"Immersed tube; Excavation; Tube (container); Engineering; Tunnel construction; Process (computing); Civil engineering; Mechanical engineering; Computer science; Geotechnical engineering; Operating system","authors":[{"name":"I Precast","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.04835414062937834,"gpt":0.2459272138452933,"spread":0.1975730732159149,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002036207,0.0002549593,0.0002413952,0.000282359,0.0001103114,0.00003940031,0.0001849152,0.0001556881,0.0003666719],"category_scores_gemma":[0.00002516952,0.0002547148,0.00008457459,0.0004209847,0.0001448191,0.0001945259,0.00004391507,0.0005002761,0.0002771258],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0001103629,"about_ca_system_score_gemma":0.00001916597,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00007400267,"about_ca_topic_score_gemma":0.00002264892,"domain_scores_codex":[0.9986129,0.00002472526,0.0003256932,0.0003201314,0.0003206626,0.0003959096],"domain_scores_gemma":[0.9992869,0.00003712211,0.00003166397,0.0004126744,0.000075097,0.0001565342],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"observational","study_design_scores_codex":[0.002153282,0.002401044,0.06009743,0.0007905884,0.001702065,0.0004997051,0.009296658,0.1113584,0.0349828,0.09533764,0.003895406,0.677485],"study_design_scores_gemma":[0.02906295,0.00539929,0.7659167,0.0007082886,0.0006211338,0.003564782,0.02547974,0.05317168,0.07770137,0.02101175,0.0102788,0.007083527],"study_design_candidate":"observational","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9626698,0.00004822711,0.003889109,0.00002152994,0.00164272,0.0005041431,0.000008223946,0.001412427,0.02980382],"genre_scores_gemma":[0.9985412,0.0000297572,0.001028197,0.000007678221,0.0001843787,0.00007056584,0.000006179696,0.00004784484,0.00008418538],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.7058192,"threshold_uncertainty_score":0.9999905,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null},{"id":"W3141295382","doi":"","title":"Challenges in Construction of Underwater Tunnels and Countermeasures","year":2014,"lang":"en","type":"article","venue":"Tunnel Construction","topic":"Civil and Geotechnical Engineering Research","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false},"ca_institutions":"Impact","funders":"","keywords":"Underwater; Shield; Engineering; Drill; Immersed tube; Mining engineering; Geotechnical engineering; Civil engineering; Marine engineering; Geology; Mechanical engineering","authors":[{"name":"Qian Qi-h","is_ca":true}],"retraction":null,"screen_n_in":null,"score":{"opus":0.02550749282448099,"gpt":0.2227322137604116,"spread":0.1972247209359306,"validation_status":"score_only:v0-immature-baseline"},"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002257795,0.0001013561,0.0001700781,0.0001728027,0.00001661067,0.00001119265,0.00005211279,0.00009624119,0.00001922043],"category_scores_gemma":[0.00003907282,0.000100371,0.00002306157,0.0001042879,0.000154409,0.00009761313,0.00001857223,0.0001594655,0.000003803782],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0000294421,"about_ca_system_score_gemma":0.000005573228,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00001716481,"about_ca_topic_score_gemma":0.00004509481,"domain_scores_codex":[0.999352,0.00002181497,0.0001947046,0.0001392992,0.0001272253,0.0001649563],"domain_scores_gemma":[0.9997172,0.00005598547,0.00001811367,0.0001299266,0.00003334317,0.00004541424],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00004525846,0.0000307359,0.006563577,0.001062154,0.00005723115,0.000002974601,0.0003672187,0.05043219,0.03271281,0.03377615,0.00004509552,0.8749046],"study_design_scores_gemma":[0.004754905,0.0004723148,0.3294545,0.001117187,0.00006483372,0.001037219,0.001884243,0.5271321,0.04750445,0.07521155,0.00977927,0.001587457],"study_design_candidate":"design_other","study_design_consensus":null,"genre_codex":"empirical","genre_gemma":"empirical","genre_scores_codex":[0.9790788,0.001029468,0.01240955,0.0001745692,0.0005293464,0.000145639,0.000004112771,0.0002616269,0.00636688],"genre_scores_gemma":[0.9981095,0.0009155184,0.0008864753,0.000002149725,0.00005816555,0.000008028064,0.00000157086,0.00001341917,0.000005146494],"genre_candidate":"empirical","genre_consensus":"empirical","teacher_disagreement_score":0.8733172,"threshold_uncertainty_score":0.4093009,"prediction_status":"machine_predicted_unvalidated"},"labels":[],"label_agreement":null}]}