{"id":"W133259137","doi":"10.5957/jsp.2008.24.1.1","title":"A Linear Programming Approach to Optimization of Ship Design and Construction Phases","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Shipbuilding; Schedule; Engineering; Duration (music); Linear programming; Operations research; Construction management; Design–build; Naval architecture; Computer science; Mathematical optimization; Civil engineering; Mathematics; Marine engineering","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002037043,0.002132644,0.001606243,0.001347994,0.0006680851,0.001985322,0.001632533,0.001536033,0.008402983],"category_scores_gemma":[0.00263899,0.001615818,0.0019819,0.002122545,0.0008074517,0.001072693,0.0008765557,0.002480209,0.0009149174],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002240972,"about_ca_system_score_gemma":0.003473172,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01746807,"about_ca_topic_score_gemma":0.01718479,"domain_scores_codex":[0.9989241,0.0005460109,0.00003774862,0.0001375599,0.0002223901,0.0001320859],"domain_scores_gemma":[0.9988948,0.00087173,0.00007581135,0.00002267711,0.0001102283,0.00002480075],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.000008907947,0.00002126503,0.00005340193,0.00003264915,0.00001081123,0.00001328127,0.000009939959,0.9931903,0.0001392682,0.002655624,0.0001811545,0.003683286],"study_design_scores_gemma":[0.000009249888,0.00003604907,0.00005073905,0.000008827516,0.000008148507,0.000006472716,0.00001287754,0.9957446,0.0001859886,0.003219639,0.000711632,0.000005772274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.007487955,0.0002483011,0.9831076,0.0002104392,0.0000360412,0.0001645682,0.0002099079,0.0001733881,0.008361893],"genre_scores_gemma":[0.2889834,0.001394179,0.6872541,0.0002532061,0.0001185036,0.00227029,0.0006312518,0.0002933633,0.01880167],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.01746807,"threshold_uncertainty_score":0.03473276,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.03528924747972239,"score_gpt":0.2303881014103877,"score_spread":0.1950988539306653,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}