{"id":"W1835481596","doi":"10.1139/l11-006","title":"Delay analysis considering production rate","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"ca_institutions":"","funders":"","keywords":"Nonlinear system; Production (economics); Computer science; Schedule; Production rate; Scheduling (production processes); Productivity; Operations research; Industrial engineering; Mathematical optimization; Risk analysis (engineering); Engineering; Mathematics; Economics","routes":{"ca_aff":false,"ca_fund":false,"ca_venue":true,"about_ca":false,"invisible_to_affiliation_only":true},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001870115,0.001341207,0.0007195803,0.002628197,0.0005083789,0.001771741,0.001290755,0.0007360693,0.005312613],"category_scores_gemma":[0.008435817,0.0004171219,0.001365349,0.001829366,0.0007938058,0.002863008,0.0009626165,0.001227546,0.0006359227],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002113166,"about_ca_system_score_gemma":0.001488772,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00635492,"about_ca_topic_score_gemma":0.002261487,"domain_scores_codex":[0.9983552,0.0002779759,0.0001022692,0.0003166212,0.0007048103,0.0002430893],"domain_scores_gemma":[0.9947712,0.003224366,0.0005814956,0.0002815959,0.001035713,0.0001055902],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001617914,0.00005700161,0.00353725,0.0003700207,0.00006385546,0.0003435462,0.0003251495,0.7952764,0.01077579,0.1159494,0.001105344,0.07203446],"study_design_scores_gemma":[0.000009108721,0.00007779976,0.0009861724,0.00003193697,0.00005420127,0.0001623389,0.0001139463,0.9554006,0.004853479,0.0325657,0.005701919,0.0000426814],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01943055,0.0007663569,0.9704189,0.0001803871,0.00008514622,0.00006791822,0.0001301502,0.000141829,0.008778712],"genre_scores_gemma":[0.8481812,0.002718104,0.133976,0.00006683391,0.0001837569,0.0001633969,0.0002691897,0.0002131723,0.01422838],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.00635492,"threshold_uncertainty_score":0.0177725,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.07036704269185405,"score_gpt":0.2635527125172984,"score_spread":0.1931856698254443,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}