{"id":"W1873158791","doi":"","title":"Probabilistic Reliability Planning at British Columbia Transmission Corporation: Method and Project Case","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"ca_institutions":"TransCanada (Canada)","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Plan (archaeology); Transmission (telecommunications); Computer science; Reliability engineering; Business system planning; Operations research; Service (business); Engineering; Geography; Business; Artificial intelligence; Telecommunications; Process management","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":true,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002194675,0.0002925164,0.0006010882,0.0001080503,0.0003112856,0.000352112,0.0005676408,0.0001860379,0.00006124312],"category_scores_gemma":[0.0008959517,0.0002961291,0.00009383866,0.0003877034,0.0001919066,0.0001852223,0.0001890809,0.0003269739,0.000004395375],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0003207949,"about_ca_system_score_gemma":0.00009027155,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.000897388,"about_ca_topic_score_gemma":0.00005926591,"domain_scores_codex":[0.9973552,0.0000915253,0.0009374197,0.0006869739,0.0005753873,0.0003535158],"domain_scores_gemma":[0.9980041,0.0002731921,0.0003294757,0.0002787867,0.0009341431,0.0001803168],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00255387,0.001634683,0.01202289,0.02389378,0.001610913,0.0005579027,0.03488846,0.07827153,0.1363723,0.4920108,0.1843753,0.0318076],"study_design_scores_gemma":[0.007200891,0.002135515,0.00963085,0.01352465,0.0005751983,0.0375473,0.005612582,0.64803,0.0136516,0.07243174,0.1834731,0.00618657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.2844785,0.0002963633,0.5338702,0.000334873,0.00519442,0.008333273,0.0002731996,0.0006712755,0.1665479],"genre_scores_gemma":[0.9363235,0.00001589734,0.06101299,0.00004162814,0.00005689677,0.0005718047,0.000004567386,0.00004317308,0.001929588],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.6518449,"threshold_uncertainty_score":0.9999491,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.04560159232388095,"score_gpt":0.3019429093764173,"score_spread":0.2563413170525363,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}