{"id":"W1897996733","doi":"10.1109/pess.2001.970078","title":"A reliability based approach to transmission maintenance planning and its application in BC Hydro system","year":2001,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"ca_institutions":"BC Hydro (Canada)","funders":"BC Hydro","keywords":"Reliability (semiconductor); Reliability engineering; Schedule; Computer science; Monte Carlo method; Transmission system; Transmission (telecommunications); Maintenance engineering; Electric power transmission; Linear programming; Engineering; Power (physics); Telecommunications; Electrical engineering","routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000534245,0.0001630913,0.000240063,0.00009217663,0.00003623017,0.00001735824,0.000132678,0.0001049686,0.000002478236],"category_scores_gemma":[0.00002338293,0.0001401472,0.00003260502,0.0003386872,0.00001247479,0.0001195995,0.00001407751,0.000134896,0.00001826087],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.0002000309,"about_ca_system_score_gemma":0.00001265816,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.00009235217,"about_ca_topic_score_gemma":0.00000941764,"domain_scores_codex":[0.9988191,0.00004003244,0.0003290307,0.0003668519,0.0001313251,0.0003137225],"domain_scores_gemma":[0.999472,0.00004683986,0.00002030024,0.0002807808,0.00003524158,0.000144882],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002250068,0.0002215332,0.007202518,0.00468818,0.0000145256,0.00002007513,0.00173076,0.9495841,0.01968336,0.005925291,0.0008008605,0.009903799],"study_design_scores_gemma":[0.0004098964,0.0000202329,0.003446074,0.0003351354,0.000003578109,0.0000158751,0.0002214298,0.982465,0.001159518,0.00003080342,0.01168791,0.0002045306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.1942811,0.0002608005,0.7744174,0.00008678661,0.00006785621,0.0008491618,0.000002702047,0.0004210619,0.02961307],"genre_scores_gemma":[0.9961911,0.000009065257,0.003323765,0.00005019972,0.00001722338,0.0002374774,0.000003929735,0.00001963571,0.0001475899],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.80191,"threshold_uncertainty_score":0.5715037,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.0094812282500339,"score_gpt":0.2086124084932358,"score_spread":0.1991311802432019,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}