{"id":"W1945904191","doi":"10.13033/isahp.y2013.019","title":"An Integrated Approach for Prioritizing Projects for Implementation Using AHP","year":2013,"lang":"en","type":"article","venue":"ISAHP proceedings","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"ca_institutions":"University Canada West","funders":"","keywords":"Analytic hierarchy process; Computer science; Operations research; Engineering","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02384607,0.001567483,0.001563417,0.01016131,0.002266322,0.005450115,0.002454231,0.001142949,0.004088687],"category_scores_gemma":[0.02183023,0.0009242019,0.00196136,0.007987304,0.00163491,0.003743478,0.004081577,0.001905774,0.0005764026],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.003289643,"about_ca_system_score_gemma":0.009211411,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.004462544,"about_ca_topic_score_gemma":0.007065333,"domain_scores_codex":[0.9678293,0.01876913,0.002117986,0.001191765,0.00937884,0.0007129203],"domain_scores_gemma":[0.9904431,0.005072122,0.0007256083,0.0007387695,0.00267487,0.0003454945],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","study_design_scores_codex":[0.0001930446,0.000463003,0.003146286,0.002526111,0.0006845534,0.0002777501,0.004560513,0.1296395,0.005594243,0.1252147,0.005039519,0.7226607],"study_design_scores_gemma":[0.0003899213,0.001435793,0.004495429,0.002544472,0.000660054,0.0004227973,0.008004493,0.5630082,0.009915831,0.3048297,0.1039069,0.0003863324],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"genre_codex":"methods","genre_gemma":"methods","genre_scores_codex":[0.004469997,0.0003069457,0.9887456,0.0004355729,0.00005174668,0.001064385,0.0001066879,0.0002729277,0.00454618],"genre_scores_gemma":[0.03697487,0.0002704132,0.9611474,0.00005008671,0.00001730213,0.0008022484,0.0001373861,0.00002707676,0.0005732289],"genre_candidate":"methods","genre_consensus":"methods","teacher_disagreement_score":0.02384607,"threshold_uncertainty_score":0.1261116,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.3300772453012211,"score_gpt":0.5013509574773047,"score_spread":0.1712737121760837,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}