{"id":"W1965172406","doi":"10.1109/smartgridcomm.2013.6688015","title":"Intelligent meter placement for power quality estimation in smart grid","year":2013,"lang":"en","type":"article","venue":"","topic":"Bayesian Modeling and Causal Inference","field":"Computer Science","cited_by":7,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Victoria","funders":"","keywords":"Computer science; Reliability engineering; Reliability (semiconductor); Smart grid; Smart meter; Power (physics); Electricity meter; Metre; Power budget; Power quality; Real-time computing; Entropy (arrow of time); Grid; Electric power system; Electrical engineering; Engineering; Mathematics","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001316465,0.0008368794,0.001221828,0.0009222575,0.0006245393,0.0007742451,0.00118781,0.001000526,0.001533469],"category_scores_gemma":[0.006454295,0.0006218422,0.0004109616,0.001151475,0.0007668224,0.002149569,0.001309136,0.000968333,0.000431505],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.000817923,"about_ca_system_score_gemma":0.0008641981,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.001758115,"about_ca_topic_score_gemma":0.003328269,"domain_scores_codex":[0.99897,0.0004480271,0.00005287083,0.0002360046,0.0002243741,0.00006866664],"domain_scores_gemma":[0.9982084,0.0009778966,0.0002894273,0.0002527745,0.0001898639,0.00008165557],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0002612749,0.0001004803,0.001890394,0.00009049832,0.00004558816,0.00008073905,0.0001127592,0.8366265,0.007060779,0.0211734,0.0016945,0.1308631],"study_design_scores_gemma":[0.00001387,0.00001714136,0.0001725434,0.000004112506,0.000005204474,0.00001396145,0.000008788637,0.984013,0.001765257,0.01360625,0.0003722939,0.000007610184],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.009719754,0.00007418339,0.9893701,0.00009597261,0.0000176315,0.00001894913,0.00003046769,0.0002950836,0.000377946],"genre_scores_gemma":[0.6625702,0.0001709478,0.3357482,0.00008981302,0.000059233,0.00007616802,0.0001854342,0.0000907798,0.001009105],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.001758115,"threshold_uncertainty_score":0.00696218,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.05723623120608762,"score_gpt":0.325991335560976,"score_spread":0.2687551043548884,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}