{"id":"W1975246199","doi":"10.1061/(asce)0733-9364(2003)129:6(664)","title":"Optimized Scheduling of Linear Projects","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":58,"is_retracted":false,"has_abstract":true,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bidding; Computer science; Scheduling (production processes); Crew; Linear programming; Operations research; Software; Crew scheduling; Process (computing); Industrial engineering; Engineering; Operations management; Algorithm; Programming language","routes":{"ca_aff":true,"ca_fund":true,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"codex-gemma-dda1882f352a","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002487235,0.0001183324,0.000332237,0.0007393776,0.00005146863,0.00006700362,0.0001791858,0.00004762364,0.00003590887],"category_scores_gemma":[0.001098836,0.00009296198,0.0001174961,0.0004935043,0.00006662005,0.0002162277,0.00003628145,0.0001714839,0.000001875362],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.00002117265,"about_ca_system_score_gemma":0.00004105227,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":6.887681e-7,"about_ca_topic_score_gemma":4.731006e-8,"domain_scores_codex":[0.9980925,0.00007130326,0.0008759837,0.000154923,0.0006533352,0.0001519209],"domain_scores_gemma":[0.9986925,0.0002237047,0.0005427504,0.0001748892,0.0002760242,0.00009014193],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.0001067955,0.00005676323,0.001592677,0.0001693188,0.0003557129,0.0000641306,0.0007180191,0.8813429,0.002642311,0.04836489,0.00009922672,0.06448723],"study_design_scores_gemma":[0.02546219,0.001686937,0.006018401,0.002892378,0.001178965,0.01293459,0.05550046,0.6424152,0.06175191,0.01355618,0.1740112,0.002591593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.4498217,0.0003761553,0.5457373,0.0001198935,0.0008194331,0.0001734991,8.772115e-7,0.00001959209,0.002931594],"genre_scores_gemma":[0.512991,0.0001419554,0.4867409,0.000009502225,0.00004575656,0.000001381289,7.477023e-8,0.00000720653,0.0000622711],"genre_candidate":"methods","genre_consensus":null,"teacher_disagreement_score":0.2389278,"threshold_uncertainty_score":0.379088,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.03945352496548811,"score_gpt":0.3002256918817797,"score_spread":0.2607721669162916,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}