{"id":"W1992531913","doi":"10.1080/09537287.2013.767394","title":"Integration of process planning and production planning and control in cellular manufacturing","year":2013,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Production planning; Production (economics); Process (computing); Control (management); Integrated business planning; Domain (mathematical analysis); Computer science; Production control; Process management; Engineering; Manufacturing engineering; Systems engineering; Business; Artificial intelligence","routes":{"ca_aff":true,"ca_fund":false,"ca_venue":false,"about_ca":false,"invisible_to_affiliation_only":false},"retraction":null,"screen":null,"direct_labels":[],"prediction":{"model_version":"metacan-v3-hybrid-931329e0061c","candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001243136,0.0007005683,0.000514962,0.0009829913,0.0007401494,0.003351011,0.00129457,0.001523199,0.001464139],"category_scores_gemma":[0.001551955,0.0005603947,0.0009963068,0.001734523,0.001647639,0.002648531,0.00161897,0.001158459,0.0002866458],"about_ca_system_candidate":false,"about_ca_system_consensus":false,"about_ca_system_score_codex":0.002062329,"about_ca_system_score_gemma":0.003245161,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_topic_score_codex":0.01301252,"about_ca_topic_score_gemma":0.008758067,"domain_scores_codex":[0.9982413,0.0006756022,0.0001272853,0.0002990931,0.0004905349,0.0001661817],"domain_scores_gemma":[0.9992653,0.0003791191,0.0001088995,0.00009648609,0.0001164621,0.00003376486],"domain_codex":null,"domain_gemma":null,"domain_candidate":null,"domain_consensus":null,"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","study_design_scores_codex":[0.00009677088,0.00009666739,0.002422786,0.0003261924,0.00006466323,0.0007168269,0.0008082735,0.5846179,0.002430166,0.3236462,0.0006229994,0.08415052],"study_design_scores_gemma":[0.00003172236,0.0001947999,0.001338342,0.0001955869,0.0001005557,0.000334809,0.0003754596,0.8636828,0.002899847,0.1020201,0.02877406,0.00005192204],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","genre_codex":"methods","genre_gemma":"empirical","genre_scores_codex":[0.01772011,0.001085365,0.9628676,0.0004747804,0.00004280549,0.0001526352,0.00006578106,0.0002740867,0.01731692],"genre_scores_gemma":[0.6674573,0.002073256,0.3245288,0.0001568902,0.00004064316,0.0003301839,0.0002373793,0.00005576755,0.005119766],"genre_candidate":"empirical","genre_consensus":null,"teacher_disagreement_score":0.01301252,"threshold_uncertainty_score":0.0258736,"prediction_status":"machine_predicted_unvalidated"},"machine_scores":{"provisional":true,"baseline":true,"maturity_gate_passed":false,"score_opus":0.01020180118210739,"score_gpt":0.2259666261444739,"score_spread":0.2157648249623665,"validation_status":"score_only:v0-immature-baseline","note":"Baseline scores from an immature model (maturity gate not passed). Scores rank; they never assert a category."}}